Loading...
HomeMy WebLinkAboutDRC_2020-12-02_AgendaPacket http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view DRC Website CITY OF ATASCADERO DESIGN REVIEW COMMITTEE AGENDA Committee Meeting Wednesday, December 2, 2020 2:00 P.M. City Hall 6500 Palma Avenue Atascadero, California CALL TO ORDER Roll Call: Chairperson Roberta Fonzi Committee Member Heather Newsom Committee Member Duane Anderson Committee Member Mark Dariz Committee Member Emily Baranek APPROVAL OF AGENDA PUBLIC COMMENT CONSENT CALENDAR 1. APPROVAL OF DRAFT MINUTES OF NOVEMBER 18, 2020 City of Atascadero Design Review Committee Agenda Regular Meeting December 2, 2020 Page 2 of 2 http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view DRC Website DEVELOPMENT PROJECT REVIEW 2. DESIGN REVIEW OF A MIXED-USE DEVELOPMENT AT 11700/11600 EL CAMINO REAL (Dove Creek Commercial Amendment) The applicants are proposing a mixed-use development on the vacant commercial portion of Dove Creek that includes retail, residential and lodging uses on the approximately 5-acre vacant site within the Dove Creek development. The conceptual project includes 80 residential units, 100 hotel rooms and approximately 37,000 square feet of commercial uses along with underground parking, and a large community park/common area for review and consideration. The applicants are requesting an exception to the height standards to allow an approximately 68-foot tall building where 35-feet is allowed and the applicants are requesting to increase the allowed residential density to 80 additional units above the 279 that were previously allowed in Dove Creek.  Recommendation: Staff requests the DRC review the proposed design and direct the applicant to make any modifications to the site or building design as necessary. (AMND19-0086) COMMITTEE MEMBER COMMENTS AND REPORTS DIRECTOR’S REPORT ADJOURNMENT The next DRC meeting is tentatively scheduled for Wednesday, December 9, 2020, at 2:00 p.m. Agendas, Minutes and Staff Reports are available online at www.atascadero.org under City Officials & Commissions, Design Review Committee. DRC Draft Minutes of 11/18/2020 Page 1 of 4 ITEM NUMBER: 1 DATE: 12-2-20 x CITY OF ATASCADERO DESIGN REVIEW COMMITTEE DRAFT MINUTES Regular Meeting – Wednesday, November 18, 2020 – 2:00 P.M. City Hall, 6500 Palma Avenue, Atascadero, CA (Meeting held by teleconference) CALL TO ORDER – 2:00 p.m. Acting Chairperson Dariz called the meeting to order at 2:01 p.m. ROLL CALL Present: Committee Member Duane Anderson Committee Member Mark Dariz Committee Member Emily Baranek Committee Member Heather Newsom Absent: Chairperson Roberta Fonzi (excused) Staff Present: Community Development Director, Phil Dunsmore Senior Planner, Kelly Gleason Assistant Planner, Mariah Gasch Others Present: Frances Romero Loch Soderquist Various members of the public APPROVAL OF AGENDA MOTION: By Committee Member Anderson and seconded by Committee Member Newsom to approve the Agenda. Motion passed 4:0 by a roll call vote. PUBLIC COMMENT None. Acting Chairperson Dariz closed the Public Comment period. CONSENT CALENDAR 1. APPROVAL OF DRAFT MINUTES OF NOVEMBER 4, 2020 1 DRC Draft Minutes of 11/18/2020 Page 2 of 4 ITEM NUMBER: 1 DATE: 12-2-20 MOTION: By Committee Member Anderson and seconded by Committee Member Baranek to approve the Consent Calendar. Motion passed 4:0 by a roll call vote. DEVELOPMENT PROJECT REVIEW 2. DESIGN REVIEW OF A MINI-STORAGE AND CO-WORKING OFFICE USE EVELOPMENT AT 11450 VIEJO CAMINO AND 11505 EL CAMINO REAL The request consists of preliminary design and neighborhood compatibility of a mini-storage and co-working office use w/approx. 56,330 sf of storage space, a 2,000 sf workshop, and 3,320 sf of co-working office space in the Public zoning district. The project includes a Master Plan of Development, Zone Text Change, Lot Line Adjustment, realignment of a natural drainage feature, and a remainder parcel for future development.  Recommendation: Staff requests the DRC review the proposed design and direct the applicant to make any modifications to the site or building design as necessary. (DEV20-0076) Director Dunsmore introduced and gave a history on the project. EX-PARTE COMMUNICATIONS All Committee members stated they received the same emails and letters. Committee member Newsom spoke with the applicant and heard the project previously at the DRC and Council. Committee member Baranek spoke with the design team. Committee members Anderson, Baranek and Dariz reviewed this previously at the DRC meeting on June 24, 2020. Director Dunsmore stated that this is a new application. Dunsmore noted that the primary focus of the DRC is to determine if the land use compatibility findings can be made with the improved design or whether the land use compatibility issue remains regardless of design. Planner Gleason presented the project. PUBLIC COMMENT Emails received (Exhibits A-H) were distributed to the Committee prior to the meeting. The following members of the public spoke during public comment: Frances Romero who made a presentation (Exhibit I), Loch Soderquist, Sharyn Malizia, Max Zappas, Ted Lawton, Vy Pierce, and John Malizia. Acting Chairperson Dariz closed the Public Comment period. Staff and the applicant answered questions raised during public comment. 2 DRC Draft Minutes of 11/18/2020 Page 3 of 4 ITEM NUMBER: 1 DATE: 12-2-20 Acting Chairperson Dariz re-opened the Public Comment period. PUBLIC COMMENT The following members of the public spoke during public comment: Frances Romero, Max Zappas and Vy Pierce. Acting Chairperson Dariz closed the Public Comment period. The applicant (Frances Romero on behalf of Scott Newton) informed Director Dunsmore during the meeting that they would like to modify the proposed co-working space into an assembly/community room. Director Dunsmore stated that this amendment would remove the need for a Zoning Text Amendment MOTION: By Committee member Anderson and seconded by Committee member Baranek to approve the project concept redesign to include public assembly (community room) and mini-storage, and that the committee is in agreement that the design and land use is compatible with General Plan Policy. Motion passed 3:1 by a roll call vote. (Newsom voted no) Planner Gleason stated that this project will not go to City Council for final action, unless it’s appealed. It will move on to Planning Commission for a use permit, once staff receives a complete application. COMMITTEE MEMBER COMMENTS AND REPORTS None DIRECTOR’S REPORT Director Dunsmore stated that the next meeting is scheduled for December 2, 2020, to hear the Dove Creek Commercial Amendment project. ADJOURNMENT– 3:40 p.m. The next regular meeting of the DRC is scheduled for December 2, 2020. MINUTES PREPARED BY: _________________________________________________ Annette Manier, Recording Secretary Administrative Assistant The following exhibits are available in the Community Development Department: Exhibit A – Email from Nancy Ayres 3 DRC Draft Minutes of 11/18/2020 Page 4 of 4 ITEM NUMBER: 1 DATE: 12-2-20 Exhibit B – Email from Justin Crawford Exhibit C – Email from Justin Crawford Exhibit D – Email from Brianna Doran Exhibit E – Email from Cathy LeMoine Exhibit F – Email from Janet Murrieta Exhibit G – Email from Susan Sparling Exhibit H – Email from Susan Sparling Exhibit I – Applicant’s presentation 4 ITEM NUMBER: 2 DATE: 12/2/2020 Atascadero Design Review Committee Staff Report – Community Development Department Dove Creek Commercial Development Concepts MEETING DATE PROJECT PLANNER APPLICANT CONTACT PLN NO. 12/2/2020 2nd meeting Kelly Gleason Cal Coastal LLC AMND19- 0086 PROJECT ADDRESS GENERAL PLAN DESIGNATION ZONING DISTRICT ASSESOR PARCEL NUMBER(S) SITE AREA 11600/11700 El Camino Real Mixed-Use / Planned Development(MU/PD) Commercial Retail / Planned Development 24 (CR/PD24) 045-331-014 Approximately 5.2 acres RECOMMENDATION Staff Requests the Design Review Committee: 1. Review preliminary design concepts for a mixed-use development on a vacant commercial lot within the Dove Creek Development. PROJECT DESCRIPTION The applicants are proposing a mixed-use development concept that includes retail, residential and lodging uses on an approximately 5 -acre site within the Dove Creek development. An updated design concept is provided in response to DRC and public comment. Concepts one and two are detailed in the attached staff report from November 4th. ENVIRONMENTAL DETERMINATION The City of Atascadero’s environmental review process incorporates the requirements in implementing the California Environmental Quality Act. Persons, agencies, or organizations interested in obtaining more information regarding the environmental should contact the Community Development Department. ☐ EIR / MND / ND / Statutory Exemption to be circulated ☐ Prior CEQA Review: ☐ Categorical Exemption ☒ Undetermined – Analysis required 5 ITEM NUMBER: 2 DATE: 12/2/2020 DISCUSSION: Conceptual Design concepts for the dove creek Promenade were presented at the November 4, 2020 Design Review Committee meeting. Based on neighborhood interest and the complexity of the project, the proposed project is being presented a 2nd time for review and comment. The applicant has also conducted additional public outreach and has developed a 3rd concept plan in response to input. An overview of concept 1 and 2 is provided in the November 4th staff report (Attachment 2). Concept 3 and additional information as requested by DRC and the public is provided below. Design Concept Overview: Design Concepts 1 and 2, as detailed in the attached November 4 th staff report include:  80 residential units (24 apartments and 56 air space condominiums)  100-room hotel  37,053 square-feet of commercial tenant space  392 parking spaces Design concept 3 includes a reduced scale project with:  66 residential units (estimated)  112-room hotel (estimated)  14,880 square-feet of commercial tenant space (estimated)  300+/- parking spaces (estimated) All concepts are designed with multiple levels that maximize the use of site topography and include:  A semi-subterranean ground level parking area to conceal the parking lot and preserve additional space for community use  A main level which includes the central courtyard with retail and residential uses  Upper floors that include residential and hotel uses including a usable roof deck The design concept allows the parking count to be maximized while creating a walkable, experience based mixed-use development that is aesthetically pleasing as viewed from surrounding properties and the street. Preliminary Design Concept 3: The applicant team has held additional virtual outreach meetings with the neighborhood and solicited feedback on the proposed design concepts . Using this feedback, the team has developed a 3rd design concept to address some of the neighborhood and DRC input and expand on the features desired by the community. Concept revisions include:  Replacement of Buildings B and C with additional residential units along Cashin and Bliss Streets. (eliminating apartments, retail, and hotel uses in these locations) o Additional residential buildings allows for height reductions for the E and D buildings adjacent to Cashin and Bliss Streets. 6 ITEM NUMBER: 2 DATE: 12/2/2020 o All residential units are now for-sale condominium units.  Enlarging the central courtyard by eliminating podium level parking and shifting the main retail and hotel building (Building A) toward El Camino Real and Santa Barbara Rd. o Allows for both park-like area and pool on the podium level o Expanded footprint of building A to accommodate additional retail fronting the central courtyard. o Building mass shifted farther away from existing residences. Height/Massing: With the replacement of the apartment building (Building C) and the retail and hotel building (Building B) with residential condominiums, the height of the buildings adjacent to Cashin and Bliss streets are able to be reduced by eliminating the top floor from the E and D buildings. The E buildings, located directly adjacent to the internal street frontages have been reduced from 3 stories to 2 stories. The D buildings, located between the E buildings and the central podium courtyard have been reduced from 4 stories to 3 stories (2 stories as measured from the podium level). 7 ITEM NUMBER: 2 DATE: 12/2/2020 Retail and Hotel Building (A): In the 3rd design concept, Building A has been pushed closer to El Camino Real and Santa Barbara Rd. This eliminates the podium level parking area and allows for a larger building footprint to accommodate the relocation of retail and hotel uses farther from the existing neighborhood. The building retains 4 main stories from the podium level with a rooftop bar and penthouse units to reduce the mass of the top floor. As the design scheme remains highly conceptual, detailing of the streetscape from El Camino Real and Santa Barbara Rd have not been fully designed. Attention will need to be given to this elevation as the main entry to retail spaces will remain from the central courtyard. The difference between the street level and main podium level is also not known at this time and will be further analyzed as preliminary grading plans are developed. Height: Per the Atascadero Municipal Code, the maximum height, as measured from average finished grade, is currently 35-feet in the Commercial Retail zoning district. This project is unique in that there are two finished grades, the ground level and the podium level. The following table provides a summary of assumed building heights for the preliminary View from Wickson Way: Concepts 1 & 2 View from Wickson Way: Concept 3 8 ITEM NUMBER: 2 DATE: 12/2/2020 concept 3 as measured from either the podium level, ground level, or both, a s appropriate, based on building siting and visual impact: Building and use Location Height from ground level (GL) or podium level (PL) Average finished grade (AFG) Zoning Height Limit from Average Finished Grade (AFG) A – Retail / Hotel Internal facing ECR and Santa Barbara 68’ (PL) 77.25’ (AFG incl PL) 35’ B – Retail / Residential Apartments Corner of ECR and Cashin St. -- -- C – Residential Apartments Corner of Santa Barbara Rd and Bliss St. -- -- D – Residential / Retail Internal, behind E buildings 43.67’ (GL) 32.67’ (PL) 37.47’ to 38.74’(AFG) 35’ E – Residential condos Adjacent to Cashin and Bliss Streets. 23.66’-28.66’ (GL) 23 to 27.3 (AFG) 35’ It is important to note that height can be a State density bonus concession. In addition, the State required the newly adopted Housing Element to include a program to increase the height in the multi-family and commercial zones to allow for additional housing density. Affordable Housing / State Density Bonus: The project will be subject to the City’s a ffordable housing policies. Incorporation of affordable housing will also entitle the project to a density bonus and concessions that may include exceptions to development standards. The State of California requires that all jurisdictions offer bonus residential units and/or development standard waivers to projects that require a percentage of units at an affordable rate. The state requires that the city provide waivers/concessions if a project provides:  One incentive or concession for projects that includ e at least 10 percent of the for-sale units for persons and families of moderate income.  Two incentives or concessions for projects that include at least 20 percent of the for-sale units for persons and families of moderate income.  Three incentives or concessions for projects that include at least 30 percent of the for-sale units for persons and families of moderate income. Concessions can include, but are not limited to landscape reductions, height increases, and setback reductions. Parking reductions are also required by the State for projects that include affordable housing units. As the project is in the conceptual design phase, specific concession requests have not been identified at this time nor has an affordable housing proposal been formalized. 9 ITEM NUMBER: 2 DATE: 12/2/2020 Neighborhood Character: During the October 2019 City Council meeting and November 4, 2020 DRC meeting, neighbors expressed concerns about scale and mass, in addition to general compatibility with the surrounding neighborhood. One of the key findings for approval of the Master Plan of Development amendment is consistency with the character of the surrounding area as it relates to present and future development patterns. This project is in the early stages of concept development and the applicant team has mad e efforts to modify and hone the development concept to ensure that this finding can be made. Conclusion: As concept 3 has been developed as part of an iterative process since the November 4th DRC meeting, staff has not had an opportunity to review the pr eliminary proposal for code compliance. This review may result in modifications to the site plan and/or design concept. Following submittal of a refined concept plan and staff review for code compliance, the DRC will have another opportunity to review the finalized design prior to Planning Commission and City Council hearings. DRC DISCUSSION ITEMS: Three concepts have been developed for DRC and neighborhood review. The applicant is seeking direction on which concept best fits within the Dove Creek devel opment and provides the best commercial opportunity for the City. The DRC is asked to provide direction on the following: 1. Building height, scale, and massing 2. Architectural theme and detailing 3. Overall site design concept ATTACHMENTS: 1. Concept 3 preliminary concept site plan 2. Public Comment Letters received as of 11/23/2020 3. November 4, 2020 DRC staff report (with previous comment letters attached) 10 EXISTING CENTRAL PARKEXISTING CENTRAL PARK approx. 33,000 sf Existing Plan 39,000 Added SF ADDED CENTRAL PARK TOTAL 64,000 sf 11 REVISED SITE PLAN CONCEPT EXISTING CENTRAL PARK 1.5 Acres of Open Space Corner Buildings B&C will Change to E & D 12 EXISTING CENTRAL PARK 1.5 Acres of Open Space REVISED SITE PLAN CONCEPT 13 BLDG. E -DESIGN REVISIONS 3 STORY DESIGN REMOVE 3rd STORY BLDG. E REVISIONS vv 14 BLDG. D -DESIGN REVISIONS 4 STORY DESIGN REMOVE 4th STORY BDLG. D REVISIONS 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 ITEM NUMBER: 2 DATE: 11/4/2020 Atascadero Design Review Committee Staff Report – Community Development Department Dove Creek Commercial Development Concepts MEETING DATE PROJECT PLANNER APPLICANT CONTACT PLN NO. 11/04/2020 Kelly Gleason Cal Coastal LLC AMND19- 0086 PROJECT ADDRESS GENERAL PLAN DESIGNATION ZONING DISTRICT ASSESOR PARCEL NUMBER(S) SITE AREA 11600 El Camino Real Mixed-Use / Planned Development(MU/PD) Commercial Retail / Planned Development 24 (CR/PD24) 045-331-014 Approximately 5.2 acres RECOMMENDATION Staff Requests the Design Review Committee: 1. Review preliminary design concepts for a mixed- use development on a vacant commercial lot within the Dove Creek Development. PROJECT DESCRIPTION The applicants are proposing a mixed-use development concept that includ es retail, residential and lodging uses on an approximately 5 -acre site within the Dove Creek development. Two concepts are proposed, each with 80 residential units, 100 hotel rooms and approximately 37,000 square feet of commercial uses:  Concept 1 is designed with a resort focus bringing the hotel pool down to the plaza level with possible pool membership to residents of Dove Creek.  Concept 2 is designed with a more public plaza setting surrounded by retail and restaurant uses with residential and a hotel use on the upper floors; ENVIRONMENTAL DETERMINATION The City of Atascadero’s environmental review process incorporates the requirements in implementing the California Environmental Quality Act. Persons, agencies, or organizations interested in obtai ning more information regarding the environmental should contact the Community Development Department. ☐ EIR / MND / ND / Statutory Exemption to be circulated ☐ Prior CEQA Review: ☐ Categorical Exemption ☒ Undetermined – Analysis required 74 ITEM NUMBER: 2 DATE: 11/4/2020 DISCUSSION: Project History: The Dove Creek project was originally approved as a General Plan Amendment in 2004 as a mixed-use project and included 279 residential units and a 5-acre commercial parcel to replace a 63-acre commercial center previously envisioned for the site. The resulting 5-acre commercial parcel was approved to be developed with a 60,000 square foot neighborhood commercial center and was later amended to allow for the construction of a hardware/nursery store with an outdoor sales yard and large parking lot (Tractor Supply). The commercial parcel has remained vacant even though the City required that the commercial parcel develop in conjunction with the residential project . The commercial corner site is located within the Commercial Retail zoning district and within the PD12 overlay zone. The 5-acre parcel is all that remains of the former 63- acre commercial area that was rezoned as part of the Dove Creek Mixed -Use project. The Commercial retail zone allows mixed-use development with a maximum base density of 24 units per acre, resulting in a maximum potential of 125 market rate units on the existing vacant 5.2-acre commercial site in addition to a large variety of commercial uses. However, the PD12 overlay zone sets a maximum residential density of the entire Dove Creek project to 200 base density units and 79 bonus units for a total of 279 residential units, consistent with the previous environmental analysis for the project site. This base residential density of 279 units was also assumed within the comprehensive environmental analysis performed for the 2002 General Plan Update and therefore, any amendments will need to be considered through additional environmental review to determine if the amended project proposal will create additional environmental impacts. The current owners of the 5-acre commercial parcel submitted a request for an amendment to the Planned Development to increase the residential density of the Dove Creek Project and proceed with a mixed -use development on the vacant comm ercial site. The Council authorized the application to proceed and the applicant has refined two design concepts for DRC review to begin their application process. Since the applicants wish to retain the Commercial Zoning, no amendment to the General Plan Land Use map or an amendment to the zoning map is being requested. The concept plans propose a variety of uses to achieve economic viability and synergy with a goal of long-term success. The current project proposals rely on experience based land uses, which include visitor-serving uses combined with neighborhood serving uses. Unlike traditional retail centers, this new concept is consistent with the current trend for commercial properties and significantly helps increase neighborhood compatibility. The mix of uses include residential, small-scale boutique retail, a boutique hotel and restaurant spaces. Each of the concepts incorporate a large central courtyard that accommodates outdoor spaces for the surrounding uses and a pedestrian oriented environment that would be open to the Dove Creek neighborhood. Both concepts include:  80 residential units (24 apartments and 56 air space condominiums)  100-room hotel 75 ITEM NUMBER: 2 DATE: 11/4/2020  37,053 square-feet of commercial tenant space divided into 23 potential individual tenant spaces Design Concepts: The proposed design concept includes multiple levels that maximize the use of site topography:  A semi subterranean ground level parking area to conceal the parking lot and preserve additional space for community use;  A main level which includes the central courtyard with retail and residential uses,  Upper floors that include residential and hotel uses including a usable roof deck The design concept allows the parking count to be maximized while creating a walkable, experienced based mixed-use development that is aesthetically pleasing as viewed from surrounding properties and the street. The two presented design concepts share the same mix of uses and building massing.  Design A provides for a large pool within the ground floor courtyard area;  Design B provides for a park-like central courtyard with the pool on the roof deck of the hotel. Each of the concepts are described further below. Ground /Subterranean Level: The ground level plans are the same for both concepts A and B. The existing site provides a flat graded pad that is several feet higher than the adjacent internal project streets: Cashin St. and Bliss St. However, the rear of the pad, towards the intersection of El Camino Real and Santa Barbara Road, is approximately 15-feet below the grade of the streets. The current design concept includes lowering the grade of the site down to the level of Cashin and Bliss Streets, reducing the height of the site approximately 7- 10 feet from the high point along Cashin Street and allowing for a semi-subterranean parking area lined with residential uses facing the internal streets. This ground level includes a retail building at the intersection of Cashin Street and El Camino Real. Residential units would line Cashin and Bliss streets to enhance neighborhood compatibility between existing residential and proposed commercial uses. The new residential uses would provide a transition in use, massing, and scale from the existing neighborhood to the larger commercial building located toward t he “rear” of the site, closer to the Santa Barbara and El Camino Real frontages. The remaining portion of the ground level would be underground parking (both private residential garage parking and general use parking for the development). Designing the site with this semi- subterranean level allows for a majority of the parking to be hidden from sight , while also reducing the overall height of the development as viewed from the existing neighborhood. 76 ITEM NUMBER: 2 DATE: 11/4/2020 Main (Podium) Level: The next level is a raised “podium” that is designed as the main level for the commercial uses and takes advantage of the approximately 21 -foot grade difference between the internal streets and the intersection of El Camino Real and Santa Barbara Roa d. This level is proposed with commercial storefronts surrounding an outdoor use area and access to additional residential uses adjacent to Cashin and Bliss streets. While the podium level is raised above the parking level, the central shared courtyard area is proposed to have ample landscape with mature trees and greenspace throughout to define and accentuate outdoor use areas. Additional parking is provided on this level adjacent to Santa Barbara Rd and El Camino Real. The podium level is raised approximately 19-feet, allowing for the level to be at grade at a portion of El Camino Real and Santa Barbara Rd to allow for emergency vehicle access. Elevators to the podium level and mechanical rooms Ground level retail 24-unit Apartment building Residential condo units Garage parking 77 ITEM NUMBER: 2 DATE: 11/4/2020 The site is enhanced by the addition of a central community area that includes numerous commercial and neighborhood serving amenities. Two concepts are proposed for this area, each designed with flexible use areas that can change and respond to adjacent commercial activities as needed. The focus for both concepts is on commercial synergy and creating an experienced based destination. Hotel units above ground floor retail Hotel Lobby and Banquet space Larger commercial tenant space Apartments Residential condominiums Boutique retail Central Plaza 78 ITEM NUMBER: 2 DATE: 11/4/2020 Design Concept A: Resort Spaces The first design concept offers a “resort” like appearance for the podium level. The hotel pool is located within the central courtyard surrounded by poolsid e amenities. It is envisioned that in this concept, the pool will also be available for access to Dove Creek residents for a membership fee. Amenities include a covered bar and game area, dedicated restrooms and showers, and cabanas surrounded by landscaping for privacy from adjacent commercial uses. Outdoor spaces are also provided adjacent to restaurant and retail uses to allow for outdoor dining opportunities. A detached covered beer garden or similar stand-alone use is integrated into the design in addition to areas for outdoor fire pits possibly associated with a restaurant or tasting room. Additionally, the concept includes two small vendor spaces that could be utilized for pop-up commercial or restaurant uses, such as those that would fit within a cla ssic airstream type trailer. Design Concept B: General Public Spaces The second design concept offers an outdoor park-like setting with areas for outdoor restaurant opportunities and community uses. A tiered turf area that can be used as a small amphitheater venue is the main feature of the space with adjacent water features that may include a splash pad and other family oriented features . Large paved spaces are located adjacent to restaurant and retail spaces to allow for expansion into the outdoor environment. Covered outdoor spaces offer opportunities for a beer garden or similar outdoor oriented use. The concept proposal also includes space for up to seven pop-up market stands for non-permanent vendors. 79 ITEM NUMBER: 2 DATE: 11/4/2020 Third and Fourth Floors: The third floor is mostly occupied by residential uses and the hotel. Residential uses lining Cashin and Bliss Streets will be a total of 3-stories. The third floor of these buildings include a large entry deck, diminishing the mass of the third floor as a transition from the surrounding 2-story neighborhood. The main hotel and retail building (A), located more internal to the site, will be a total of 3 main stories with the 4th story and roof deck tiered back from the lower floors and accompanied by an indoor/outdoor roof deck bar, as discussed below. Roof Deck / 5th floor: The concept for the 4th floor of the hotel building varies depending on the podium level design. Both concepts include penthouse rooms in a design that steps the building back to create a diminishing building mass. Under podium Concept A, a gym room and other accessory hotel amenities would be located on this level along with the rooftop bar. With podium Concept B, the hotel pool would occupy a portion of the roof deck in place of the gym. Under this scenario, the pool would remain for hotel guests only. It is envisioned that the roof deck bar would be open to the public in both scenarios. 80 ITEM NUMBER: 2 DATE: 11/4/2020 Neighborhood Character: During the October 2019 City Council meeting, neighbors expressed concerns about scale and mass, in addition to general compatibility with the surrounding neighborhood. Existing residential units along both Bliss and Cashin Streets are two stories with side and/or rear yards adjacent to the street. Within the proposed project, all ground floor residential units are designed to take primary access from the internal vehicular alley allowing for landscaping within the setback areas between the buildings and the existing sidewalk. Small balconies are currently included on the second floor for visual interest. There are two layers of residential buildings that act as a transition to the commercial portion of the development. The “E” buildings are located adjacent to Cashin and Bliss Streets with the “D” buildings located behind them, more internal to the site. The “E” buildings are designed to be 3-stories with the upper unit footprint approximately 50% of the lower floors to reduce the building mass and provide greater compatibility with the adjacent existing residences. The “D” buildings are four stories tall and are designed with a similar upper floor deck feature. (See Residential Component section below for more discussion) Boutique Hotel Concept: The proposed hotel is designed with 100 total rooms on the upper floors of buildings A and B. A small concierge lobby and banquet room is accessed from the podium level in Building A. The hotel is envisioned as a self -check-in model and each room is currently designed with a kitchenette. Current City code limits the number of hotel rooms with kitchenettes to 10% of the total number of rooms. This is to ensure that hotel rooms do not turn into long-term residences. The current hotel proposal includes single studio rooms. No multi-room spaces are proposed. In Building A, access to the rooms is via an external walkway on the 2nd floor and an internal hallway on the 3rd floor with roof deck access on the top floor. Juliette balconies are included to provide visual interest. Residential Component: The concept proposal includes two different residential types: apartment units and “for- sale” condominiums. The apartments are located in Building C, at the corner of Bliss Street and Santa Barbara Rd. All three stories are residential with a total of 24 one- bedroom units. All units are currently designed with an internal hallway including the ground floor units in building C. Balconies are included on the upper floors. The stairwell and elevator shaft are located adjacent to Bliss Street to minimize privacy issues with existing residential townhomes. 81 ITEM NUMBER: 2 DATE: 11/4/2020 The condominium units are located along Cashin and Bliss Streets. The “E” buildings are three stories with a combination of one and two story units. The 3rd floor footprint is approximately 50% of the levels below to allow for an enhanced deck feature that acts as the entry to the upper units. The roofline is varied along the elevations facing Cashin and Bliss streets to provide texture and visual interest. The “D” buildings are designed similarly to the “E” buildings but contain an extra residential level to accommodate retail spaces on the podium level with high ceilings. The ground floor, 2nd and 3rd level includes one-bedroom units backed by either the private garages accessed from the subterranean parking level or the podium level retail spaces. The fourth floor penthouse units have 2 -bedrooms each and a large deck area that acts as the entry to the unit. 3rd floor deck with trellis 82 ITEM NUMBER: 2 DATE: 11/4/2020 Affordable Housing: The project is proposing to follow the State density bonus law in compliance with the City’s current Inclusionary Housing Policy. The State law requires that the City grant concessions to projects providing a minimum percentage of affordable housing units. As the design concept is further refined, these concessions will be identified and analyzed prior to final action by the City Council. Qualifying concessions include parking reductions, height waivers, and other property development standard deviations. Architectural Theme: The applicant is proposing a mission style architectural theme. Building details include stucco exterior finish, mission tile roofing, arched recessed windows, and tower elements. This architectural style generally allows for clean lines and rhythmic design features that layer and allow light and shadow to provide visual interest. The theme also has numerous design features that can be used to enhance the visual appearance of the buildings and break up the building mass such as wrought iron accents, balconies, trellis features, and textured tile roofs. The applicant is proposing a consistent color scheme throughout the project to create a sense of place and provide an authentic architectural style. The buildings are proposed as white or off-white with dark windows and doors and red clay tile roof. Arched covered patio areas are included on the apartment buildings and circular tower features are included in the hotel building, consistent with the mission theme. Parking and Access: The project includes 392 total parking spaces, 32 of which are private residential garage spaces accessed from the subterranean parking level. Of the remaining 360 spaces, 83 ITEM NUMBER: 2 DATE: 11/4/2020 266 are hidden from view underground and 94 are behind the hotel building adjacent to El Camino Real and Santa Barbara Rd. Based on preliminary calculations, the project is providing more parking than is required by code. There are two vehicular access points to the project: one from Bliss Street and one from Cashin Street. The approved Master Plan of Development for Dove Creek permits up to three driveways into the site. An emergency acce ss point is also proposed from Santa Barbara Road near the intersection with El Camino Real at the point where the podium level is at grade with the adjacent street. This will allow emergency vehicles to enter the podium level without navigating the subterranean parking level if needed. Main pedestrian access to the site utilizes the stairway and elevator system for the residential units fronting Cashin and Bliss streets. The stairways and elevators are located at the sides of each building, providing up to six (6) main pedestrian access points to the podium level from the surrounding sidewalks on Cashin and Bliss streets. There are also opportunities for access in buildings B and C and the central parking elevator and stairway located in Building A. There may also be opportunities for pedestrian access off El Camino Real and Santa Barbara Road where the podium level is at grade with these streets, however, more analysis is needed on accessibility compliance for connections in these locations to determine f easibility. Setbacks: The buidings along Cashin and Bliss streets are set back 10-feet from the back of sidewalk. A corner of the stairwell of Building B, located at the corner of Cashin and El Camino Real encroaches approximately 3 feet into the setbac k area. This building is designed with the stairwell fronting Cashin Street to limit the number of hotel room windows overlooking the street and existing residences beyond. The Building C hotel rooms are setback approximately 20 feet from the street. Building A, the larger retail and hotel building is designed with the podium parking between the adjacent El Camino Real and Santa Barbara Road frontage and the building. The hotel building setback from these streets varies between 75 - and 100-feet. From the street level, the hotel building will appear as a three-story building. The podium parking is setback a minimum of 7- feet at the closet points and provides for up to 25-feet of landscaped setback area at the intersection of El Camino Real and Santa Barbara Road. 84 ITEM NUMBER: 2 DATE: 11/4/2020 As the podium level utilizes the site topography, portions of the semi -subterranean level will daylight along the El Camino Real and Santa Barbara Road frontages. True to the mission style, white walls have been incorporated where this occurs an d landscaping has been included in the setback areas to layer with this feature. Height: Per the Atascadero Municipal Code, the maximum height, as measured from average finished grade, is 35-feet in the Commercial Retail zoning district. This project is unique in that there are two finished grades, the ground level and the podium level. The following table provides a summary of proposed building heights as measured from either the podium level, ground level, or both, as appropriate, based on buildin g siting and visual impact: Architectural walls to conceal semi- subterranean parking level 85 ITEM NUMBER: 2 DATE: 11/4/2020 Building and use Location Height from ground level (GL) or podium level (PL) Average finished grade (AFG) Zoning Height Limit from Average Finished Grade (AFG) A – Retail / Hotel Internal facing ECR and Santa Barbara 68’ (PL) 77.25’ (AFG incl PL) 35’ B – Retail / Residential Apartments Corner of ECR and Cashin St. 56’ (GL) 46.75’ (AFG) 35’ C – Residential Apartments Corner of Santa Barbara Rd and Bliss St. 51’ (GL) 47.95’ (AFG) 35’ D – Residential / Retail Internal, behind E buildings 52.67’ (GL) 41.67’ (PL) 46.47’ to 47.74’(AFG) 35’ E – Residential condos Adjacent to Cashin and Bliss Streets. 33’-38’ (GL) 32.27 to 36.67 (AFG) 35’ As this project includes an amendment to the PD24 overlay zone, the City Council can approve a height exception to allow for the additional building height. Height can also be a requested concession through the State’s Density Bonus Law. Should an exception to the maximum height be requested under the provisions of the Municipal Code, the following finding will need to be made: 86 ITEM NUMBER: 2 DATE: 11/4/2020  The project will not result in substantial detrimental effects on the enjoyment and use of adjoining properties and that the modified height will not exceed the lifesaving equipment capabilities of the Fire Department The key to making the findings for increased height is neighborhood compatibility. Design elements have been included for the residential condominiums fronting Cashin and Bliss streets to increase neighborhood compatibility while maintaining the viability of the project. The condominium units are three stories in total height but have a reduced upper floor to diminish the overall mass of the buildings. The taller more commercial buildings are set back toward the interior of the site to increase setbacks from the existing residential units. Buildings B and C are designed with the most height fronting Cashin and Bliss Streets and may impact neighborhood compatibility. Each of these buildings are located at the intersections with the internal Dove Creek streets and the adjacent City arterials. Building B includes retail on the ground floor and two floors of hotel units above. The stairwell is integrated at each end of the building and abutting Cashin Street. The building is setback 7-10-feet from the back of sidewalk. As previously mentioned, the stairwell was intentionally located at this elevation to minimize intrusions to the privacy of existing residential units. However, design and use of the building will result in an approximately 3-story building adjacent to Cashin Street with a tower feature that extends to accommodate the elevator and stairwell. Building C is similarly designed at the corner of Bliss Street and Santa Barbara Rd. View from Santa Barbara Rd 87 ITEM NUMBER: 2 DATE: 11/4/2020 The Fire Department has reviewed the preliminary concepts and believes that current emergency response vehicles would be able to adequately serve the site; however, more detailed analysis will be required as the project moves forward through the review process. DRC DISCUSSION ITEMS: Two concepts are presented for DRC and neighborhood review. The applicant is seeking direction on which concept best fits within the Dove Creek development and provides the best commercial opportunity for the City. The DRC is also asked to provide direction on neighborhood compatibility, including building height, scale, and massing. This also includes direction on architectural theme and overall site design concept. ATTACHMENTS: 1. Applicant Design Concept Package 2. Public Comment Letters received as of 10/30/2020 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142