Loading...
HomeMy WebLinkAboutResolution 2020-001 Conditions of Approval / Mitigation Monitoring Program 7835 El Camino Real Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Planning Services Conditions 1. This Conditional Use Permit shall allow for the establishment of a drive- through restaurant at 7835 El Camino Real described on the attached exhibits and located on APN 030-132-049 &-050, regardless of owner. Ongoing PS 2. The approval of this use permit shall become final and effective for the purpose of issuing building permits fourteen (14) days following the Planning Commission approval, unless an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. Ongoing PS 3. The Community Development Department shall have the authority to approve the following minor changes to the project that (1) modify the site plan project by less than 10%, and/or (2) result in a superior site design or appearance. BL PS, CE 4. Approval of this Conditional Use Permit shall be valid for twenty-four (24) months after its effective date. At the end of the period, the approval shall expire and become null and void unless the project has received a building permit. BL PS 5. The applicant shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning this conditional use permit. Ongoing CA 6. The speaker shall include the Automatic Volume Control (AVC) feature. BP PS 7. The applicant shall merge the two lots before building permits are issued for construction of the new drive-through building. BP PS 8. A minimum of five (5) parking spaces shall be added to the site as off- street parking. Ongoing PS 9. Landscaping shall be consistent with the approved Landscape Plan. Landscaping shall be added prior to requesting a final planning inspection. BP/ Ongoing PS 10. New lighting shall conform to the standards of Atascadero Municipal Code 9-4.137 for exterior lighting. BP PS Conditions of Approval / Mitigation Monitoring Program 7835 El Camino Real Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 11. Elevations shall incorporate high quality materials and shall be consistent with the colors and design shown in Exhibit D. Stucco shall have a smooth finish. BP PS 12. The building wall facing El Camino Real on the northerly building elevation shall be modified to include an awning, tilework, artwork, a window or other features to enhance the appearance of the large blank space. This can include additional signage logo. BP PS 13. All utilities shall be installed underground. BP PS 14. The existing storage building shall be painted to match the new drive- through. BP/Ongoing PS 15. The retaining wall shall be resurfaced with stone to match the new drive- through. BP PS 16. All mechanical equipment onsite shall be screened, including all ground and roof-mounted equipment, air conditioners, transformers, etc. BP PS 17. An exemption to Sign Code 9-15.008 shall be permitted for wall signs as shown in Exhibit D to allow a maximum of 20 square feet of signage on the eastern and western building faces. BP PS 18. The owner shall mitigate any non-permitted onsite grading and repair the slope and fence as necessary. BP PS 19. The Use Permit shall be subject to additional review upon receipt of noise or operational complaints. Additional mitigation may be warranted upon verification of recurring noise or operational disturbances that impact residential properties. Ongoing PS Public Works Conditions 20. Site design shall be in general conformance with modified preliminary grading plan dated January 8, 2020 to the satisfaction of the City Engineer. BP/GP CE