HomeMy WebLinkAboutPC Resolution 2019-0030PC RESOLUTION 2019-0030 CITY OF ATASCADERO
PLANNING
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA,
RECOMMENDING THE CITY COUNCIL APPROVE A
CONDITIONAL USE PERMIT (MASTER PLAN OF DEVELOPMENT)
AND VESTING TENTATIVE PARCEL MAP (AT18-0111) DEV18-0124
7900 Curbaril Ave.
APN 031-231-003
WHEREAS, an application has been received from Robert Mannon (PO Box 2359,
Atascadero, Ca 93423), Applicant, and Owner, to consider a Planned Development zone map and
text amendment, a Master Plan of Development (Conditional Use Permit), and a Vesting Tentative
Parcel Map; and
WHEREAS, the site's current General Plan Land Use Designation is Medium Density
Residential (MDR); and
WHEREAS, the site's current Zoning Designation is Residential Multi -Family (RMF -10);
and
WHEREAS, the Planning Commission has recommended that the City Council approve a
Planned Development 36 overlay zoning district on the subject property; and,
WHEREAS, the PD36 requires the adoption of a Master Plan of Development, approved
in the form of a Conditional Use Permit; and
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and
WHEREAS, a timely and properly noticed Public Hearing upon the subject Master Plan
of Development and Vesting Tentative Tract Map was held by the Planning Commission of the
City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of
said Master Plan of Development; and
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public
Hearing, studied and considered the proposed Conditional Use Permit (Master Plan of
Development) and the proposed the Vesting Tentative Parcel Map (AT 18-0111).
NOW, THEREFORE, BE IT RESOLVED, the Planning Commission of the City of
Atascadero takes the following actions:
SECTION 1. Recitals: The above recitals are true and correct.
SECTION 2. Public Hearing. The Planning Commission of the City of Atascadero, at a Public
Hearing held on October 15, 2019, considered the proposed project.
SECTION 3. Facts and Findings. The Planning Commission makes the following findings,
determinations and approvals with respect to the Conditional Use Permit and Vesting Tentative
Parcel Map:
A. Findings for Approval of a Conditional Use Permit
FINDING: The proposed project or use is consistent with the General Plan
FACT: The proposed project is consistent with General Plan Land Use Circulation and
Housing Element Policies. Application of the PD36 overlay zone allows for development
standards to be established through a Master Plan of Development. The proposed project
is consistent with the Zoning Ordinance and the PD36 overlay zone as proposed.
FINDING: The proposed project or use satisfies all applicable provisions of the Title
(Zoning Ordinance) including provisions of the PD36 Overlay Zone
FACT: The Planned Development 36 overlay allows for development standards to be
established through a Master Plan of Development. The proposed project is consistent
with the Zoning Ordinance and the PD36 as proposed.
FINDING: The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be detrimental
to the health, safety, or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in the
vicinity of the use.
FACT: The proposed residential use will not be detrimental to the health, safety, or welfare
of the general public or persons residing in the neighborhood. A residential use is consistent
with the surrounding neighborhood The Planned Development overlay language and City
development standards will ensure that pedestrian and vehicular access conditions are
designed in a manner which does not create ongoing safety concerns.
FINDING: The proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development.
FACT: The proposed residential use is consistent with surrounding residential and
commercial uses.
FINDING: The proposed use or project will not generate a volume of traffic beyond the
safe capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the Land Use
Element.
FACT: The proposed single-family residences will not generate significant and
unavoidable impacts to traffic. The project will contribute City TIF fees toward the US 101
interchanges. All abutting public roads will be improved to City standard.
FINDING: The proposed project is in compliance with any pertinent City policy or criteria
adopted by ordinance or resolution of the City Council, including the City's Appearance
Review Manual and the Inclusionary Housing Policy.
FACT: The proposed project was reviewed by the Design Review Committee and was
found to comply with all standards of the City's Appearance Review Manual. The project
is proposing to comply with the City's interim Inclusionary Housing Policy.
FINDING: The Master Plan of Development standards or processing requirements will
enhance the opportunity to best utilize special characteristics of an area and will have a
beneficial effect on the area.
FACT: The PD36 allows for small lot single-family developments within the multi -family
zoning district providing flexibility in ownership and product type throughout the City.
FINDING: Benefits derived from the Master Plan of Development and PD36 Overlay Zone
cannot be reasonably achieved through existing development standards or processing
requirements.
FACT: The Planned Development 36 overlay text modifies standard development
requirements to allow for a small lot single-family development with individual lot
ownership. City Council Planned Development Policy requires project benefits such as
affordable inclusionary housing, pocket parks, and high-quality landscape and architecture
in exchange for modified development standards. As conditioned, the project satisfies
these requirements.
B. Findings for Approval of Vesting Tentative Tract Map (AT18-0111)
FINDING: The proposed subdivision, design and improvements as conditioned, are
consistent with the General Plan and applicable zoning requirements, including provisions
of the PD36 overlay district.
FACT: The proposed amendments are consistent with General Plan Land Use Circulation
and Housing Element Policies. The Planned Development 36 overlay allows for
development standards to be established through a Master Plan of Development. The
proposed project is consistent with the Zoning Ordinance and the PD36 as proposed for
amendment.
FINDING: The proposed subdivision, as conditioned, is consistent with the proposed
Planned Development Overlay District 436 Master Plan of Development.
FACT: The subdivision is consistent with the currently proposed Master Plan of
Development.
FINDING: The site is physically suitable for the type of development proposed.
FACT: The site has minimal slope. The site has been designed to accommodate the
proposed residential units and associated site improvements including drainage.
FINDING: The site is physically suitable for the density of development proposed.
FACT: The site is located along Curbaril near to the intersection with Morro Rd / Highway
41. The surrounding uses include multi -family and commercial. The maximum density of
the site is 10 du/ac which could accommodate a total of 6 residential units. A total of 4
units are proposed.
FINDING: The design and improvement of the proposed subdivision will not cause
substantial environmental damage or substantially and unavoidably injure fish and wildlife
or their habitat.
FACT: The proj ect biologist confirmed that no sensitive species or environmental features
exist on the property.
FINDING: The design of the subdivision or the type of improvements will not cause
serious health problems.
FACT: The design of the subdivision or the type of improvements will not cause serious
health problems.
FINDING: The design of the subdivision will not conflict with easements acquired by the
public at large for access through, or the use of property within, the proposed subdivision;
or substantially equivalent alternative easements are provided.
FACT: The site is private property and no easements for public use exist at this time.
FINDING: Covenants, Conditions and Restrictions (CC&R's) or equivalent shall be
required that incorporate the Master Plan of Development conditions of approval to ensure
that the site retains the proposed qualities (architecture, colors, materials, plan amenities,
fencing, and landscaping) over time.
FACT: A condition of approval has been included in the attached resolution, requiring
CC&R's be recorded concurrently with the final map.
FINDING: The proposed subdivision design and type of improvements proposed will not
be detrimental to the health, safety or welfare of the general public.
FACT: The proposed residential use will not be detrimental to the health, safety, or welfare
of the general public or persons residing in the neighborhood. A residential use is consistent
with the surrounding neighborhood. The Planned Development overlay language and City
development standards will ensure that pedestrian and vehicular access conditions are
designed in a manner which does not create ongoing safety concerns.
SECTION 4. Approval. The Planning Commission of the City of Atascadero, in a regular session
assembled on October 15, 2019, resolved to recommend the City Council approve a master plan
of development and vesting tentative parcel map consistent with the following:
EXHIBIT A: Vesting Tentative Parcel Map (AT18-0111)
EXHIBIT B: Conditions of Approval
EXHIBIT C: Master Plan of Development
SECTION 5. CEQA. The proposed project is Categorically Exempt (Class 15) from the
provisions of the California Environmental Quality Act (California Public Resources Code §§
21000, et seq., "CEQA") and CEQA Guidelines (Title 14 California Code of Regulations §§
15000, et seq.) CEQA pursuant to CEQA Guidelines Section 15315, which exempts minor
subdivisions of land.
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner Anderson, and seconded by Commissioner Wolff, the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Commissioners Anderson, Keen, Shaw, Wolff, van den Eikhof, Dariz, Zirk (7)
NOES: None
ABSENT: None
ABSTAINED:None
ADOPTED: October 15, 2019
ATTEST:
Phil Dunsmore
Planning Commission Secretary
CITY OF ATASCADERO, CA
Tom Zirk
Planning Commission Chairperson
EXHIBIT A: Tentative Parcel Map
DEV18-0124
EXHIBIT B: Conditions of Approval
DEV18-0124
Conditions of Approval /
Timing
Responsibility
/Monitoring
Mitigation Monitoring Program
FM: Final Map
Curbaril Residential Planned Development
BP: Building Permit
F0: Final Occupancy
IP: Improvement Plans
PS: Planning Services
BS: Building Services
FD: Fire Department
DEV18-0124
FI: Final Improvement Inspection
PD: Police Department
CE: City Engineer
CA: City Attorney
7900 Curbaril Ave.
Planning Services
1. The approval of this use permit shall become final and effective
Ongiong
PS
for the purposes of issuing building permits thirty (30) days
following the City Council approval of the Establishment of PD36
upon second reading, unless prior to that time, an appeal to the
decision is filed as set forth in Section 9-1.111(b) of the Zoning
Ordinance.
2. The Community Development Director shall have the authority
BP/FM
PS, CE
to approve minor changes to the project that remain in
substantial conformance to the approved Master Plan of
Development. Such changes may include, but are not limited to,
building alterations and/or architectural changes, site placement
of structures, landscape modifications, and construction design
issues that do not substantively affect the Master Plan of
Development.
The DRC shall make a recommendation to the Community
Development Director related to any proposed architectural
design changes not in keeping with the architectural style
approved by this resolution.
The Planning Commission shall have the final authority to
approve any changes to the Master Plan of Development and
any associated Tentative Maps deemed to be substantive by
the Community Development Director.
3. Approval of this Conditional Use Permit shall be valid for the life
Ongoing
PS
of the Tentative Map.
4. The applicant shall defend, indemnify, and hold harmless the
Ongoing
PS
City of Atascadero or its agents, officers, and employees against
any claim or action brought to challenge an approval by the city,
or any of its entities, concerning the subdivision
■ All project development shall be in conformance with the
BP
PS
attached exhibits with the following modifications:
Conditions of Approval /
Timing
Responsibility
/Monitoring
Mitigation Monitoring Program
FM: Final Map
Curbaril Residential Planned Development
BP: Building Permit
F0: Final Occupancy
IP: Improvement Plans
PS: Planning Services
BS: Building Services
FD: Fire Department
DEV18-0124
FI: Final Improvement Inspection
PD: Police Department
CE: City Engineer
CA: City Attorney
7900 Curbaril Ave.
■ The parking court shall be colored or stamped concrete in
areas not designated as pavers in compliance with PD -25
standards.
■ Stucco be hand troweled smooth finish
■ Windows be high quality materials, not vinyl.
■ Roofing be architectural grade dimensional composition
shingles.
■ A darker integral stucco color for color scheme A and tying
the units together by using the same window and garage
color for all 4 units
■ Use of historic color palettes for complimentary and accent
colors
■ Concrete pads & access gates shall be installed for trash
storage
■ Retaining walls shall be dark color split face block
5. Affordable Housing Requirement: The applicant shall submit a
GP/BP
PS, CA
payment of 5% of the building valuation for each residential unit
to be placed into the City's inclusionary housing fund. Payment
shall be required prior to building permit issuance.
6. The emergency services and facility maintenance costs listed
BP
PS
below shall be 100% funded by the project in perpetuity. The
service and maintenance costs shall be funded through a
community facilities district established by the City at the
developer's cost. The funding mechanism must be in place
prior to or concurrently with acceptance of the final maps. The
funding mechanism shall be approved by the City Attorney,
City Engineer and Administrative Services Director prior to
acceptance of any final map. The administration of the above
mentioned funds shall be by the City. Developer agrees to
participate in the community facilities district and to take all
steps reasonably required by the City with regard to the
establishment of the district and assessment of the property.
■ All Atascadero Police Department service costs to the
project.
■ All Atascadero Fire Department service costs to the
project.
Conditions of Approval /
Mitigation Monitoring Program
Curbaril Residential Planned Development
DEV18-0124
7900 Curbaril Ave.
Timing
FM: Final Map
BP: Building Permit
F0: Final Occupancy
IP: Improvement Plans
FI: Final Improvement Inspection
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
CA City Attorney
• Off-site common City of Atascadero park facilities
maintenance service costs related to the project.
7. All tract maintenance costs listed below shall be 100% funded by
BP
PS
the project in perpetuity. The service and maintenance cost shall
be funded through a Home Owners Association established by
the developer subject to City approval. The Home Owners
Association must be in place prior to, or concurrently with
acceptance of any final maps. The Home Owners Association
shall be approved by the City Attorney, City Engineer and
Administrative Services Director prior to acceptance of any Final
Map. The administration of the above mentioned funds, and the
coordination and performance of maintenance activities, shall be
the responsibility of the Home Owners Association.
a) All streets, bridges, sidewalks, streetlights, street signs,
roads, emergency access roads, emergency access gates,
and sewer mains within the project.
b) All parks, trails, recreational facilities and like facilities.
c) All open space and native tree preservation areas.
d) All drainage facilities and detention basins.
e) All creeks, flood plains, floodways, wetlands, and riparian
habitat areas.
fl All common landscaping areas, street trees, medians,
parkway planters, manufactured slopes outside private
yards, and other similar facilities.
g) All frontage landscaping and sidewalks along public streets
Timing
Responsibility
Conditions of Approval /
/Monitoring
Mitigation Monitoring Program
FM: Final Map
Curbaril Residential Planned Development
BP: Building Permit
F0: Final Occupancy
IP: Improvement Plans
PS: Planning Services
BS: Building Services
FD: Fire Department
DEV18-0124
FI: Final Improvement Inspection
PD: Police Department
CE: City Engineer
CA City Attorney
7900 Curbaril Ave.
8. Prior to final map, the applicant shall submit CC&Rs for review by
BP
PS, BS
the Community Development Department. The CC&R's shall
record with the Final Map and shall include the following:
a) Provisions for maintenance of all common areas including
access, parking, street trees, fencing and landscaping.
b) A detailed list of each individual homeowner's
responsibilities for maintenance of the individual units.
c) Individual unit's responsibility for keeping all trash
receptacles within the unit's garage.
d) Concurrent with recordation of CC&Rs and/or integrated
into CC&Rs shall be a paragraph addressing the City's
roles and responsibilities related to the administration and
enforcement of any CC&R provisions.
ENGINEERING CONDITIONS
PROJECT SPECIFIC CONDITIONS
9. Public improvement plans (PIPs) shall be prepared by a licensed
IP
CE
civil engineer. PIPs shall be prepared on 24"x36" plan sheets,
shall use the City Standard border and signature block, and shall
comply with Section 2 of City Standard Specifications.
10. The Public Improvement Plan shall provide a City Standard
PI
CE
plan and profile for the right-of-way centerline and new top of
curb. A typical road section shall be diagramed and
dimensioned on the plan and profile sheet and shall show right-
of-way limits, centerline, lane widths, frontage improvements,
PUE easement (beyond the right-of-way), and road surface
cross -gradients. The plan and profile of the existing CL and
edge of road flowline shall extend a minimum of 25 -feet beyond
the limits of the new improvements to adequately show
continuity between existing road conditions and the new
frontage improvements, to the satisfaction of the City Engineer.
11. The Public Improvement Plan shall include design sections at 25-
PI
CE
feet stations from centerline to right-of-way.
Conditions of Approval /
Timing
Responsibility
/Monitoring
Mitigation Monitoring Program
FM: Final Map
Curbaril Residential Planned Development
BP: Building Permit
F0: Final Occupancy
PS: Planning Services
BS: Building Services
FD: Fire Department
IP: Improvement Plans
FI: Final Improvement Inspect on
PD: Police Department
DEV18-0124
CE: City Engineer
CA City Attorney
7900 Curbaril Ave.
12. An engineer's cost estimate shall be prepared by a registered civil
PI
CE
engineer (using the City's standard spreadsheet) and submitted
for review and approval by the City Engineer.
13. Prior to final inspection of the subdivision improvements, the
FI
CE
Applicant's engineer shall submit the following documents for
review and approval by the City Engineer:
a. Record drawings prepared by a registered civil engineer
b. Material certifications
c. Material and site conditions testing reports
Cl. Applicant's portion of the City Engineer's Final Inspection
Checklist
e. Engineer of Work Certification (City form)
f. Utility provider clearance letters
g. Stormwater Forms:
i. ATAS - SWP-1001 Engineer Certification Form
ii. ATAS - SWP-1003 Owner Agent Information
iii. ATAS - SWP-3001 Stormwater System O&M Agreement
iv. ATAS - SWP-3002 Private Stormwater System Recorded
Notice
PARCEL MAP CONDITIONS
14. Prior to recording the Parcel Map, the Applicant shall have the
FM
CE
map reviewed by the public utility providers for power,
telephone, gas, cable TV, and the Atascadero Mutual Water
Company. The Applicant shall obtain a letter from each utility
company stating that the easements and rights-of-way shown
on the map for public utility purposes are acceptable.
15. Documents required to be recorded concurrently with the
FM
CE
Parcel Map shall be listed on the certificate sheet of the map.
16. The City of Atascadero may require an additional map sheet
FM
CE
for information purposes in accordance with the Subdivision
Map Act.
EASEMENTS
Conditions of Approval /
Timing
Responsibility
/Monitoring
Mitigation Monitoring Program
FM: Final Map
Curbaril Residential Planned Development
BP: Building Permit
F0: Final Occupancy
IP: Improvement Plans
PS: Planning Sennces
BS: Building Services
FD: Fire Department
DEV 18-0124
FI: Final Improvement Inspection
PD: Police Department
CE: City Engineer
CA: City Attorney
7900 Curbaril Ave.
17. A 6 -feet wide Public Utility Easement (PUE) shall be
FM
CE
dedicated contiguous to the Curbaril right-of-way.
18. Wherever an easement is created for commonly owned or
FM
CE
operated improvements for the benefit of more than one lot a
maintenance and operations agreement shall be required, to
the satisfaction of the Community Development Director and
City Engineer.
19. Development improvements that modify a natural drainage
FM
CE
course may be required to provide an easement for the
benefit of upstream tributary properties to an adequate point
of discharge, to the satisfaction of the City Engineer.
20. Easements that are not intended to continue in perpetuity or may
FM
CE
be subject to future modifications shall be recorded by separate
instrument concurrently with the Parcel Map and not shown or
referenced on the Parcel Map.
OFF-SITE ROAD IMPROVEMENTS
21. The Applicant shall construct new frontage improvements
IP
CE
consisting of a 5 -ft wide integral sidewalk, curb and gutter, new
driveway approaches with a wrap-around ADA compliant
sidewalk, and widen the roadway pavement to join said frontage
improvements, in accordance with City Standard Specifications
and Drawings and to the satisfaction of the City Engineer.
22. Where the new frontage improvements do not join existing
IP
CE
frontage improvement, the Applicant shall construct an asphalt
ramp in accordance with San Luis Obispo County Standard No.
C-7.
STORM WATER
23. Post -construction stormwater shall comply with the Section 5 of
BP
CE
the City Standard Specifications and the Regional Water Quality
Control Board Res. No. R3-2013-0032.
24. The Applicant's engineer shall prepare a hydrology study for
BP
CE
review and approval by the City Engineer. Storm water detention
or retention facilities may be required. The study shall analyze the
change in stormwater run-off between existing site conditions and
Timing
Responsibility
Conditions of Approval /
/Monitoring
Mitigation Monitoring Program
FM: Final Map
BP: Building Permit
PS: Planning Services
Curbaril Residential Planned Development
F0: Final Occupancy
IP: Improvement Plans
BS: Building Services
FD: Fire Department
DEV18-0124
A Final Improvement Inspection
PD: Police Department
CE: City Engineer
CA City Attorney
7900 Curbaril Ave.
post -development conditions and shall include design and sizing
recommendations of storm water improvements to be included
on the improvement plans.
25. Where storm water is concentrated as a result of new
BP
CE
improvements, the drainage shall be conveyed in a non-erosive,
controlled condition to an adequate point of discharge, to the
satisfaction of the City Engineer. Where concentrated drainage
from new improvements cannot be avoided and crosses more
than one property, drainage easements may be required, to the
satisfaction of the City Engineer.
WASTEWATER
26. Each lot shall be served by a separate sewer lateral to the public
BP, IP
CE
sewer main in Curbaril Ave in accordance with City Standard
Specifications and Drawings. Easements may be required
wherever lateral(s) cross adjacent lots.
UTILITIES
27. Each lot shall be served with separate services for water, sewer,
BP, IP
CE
gas, power, telephone and cable TV. Utility laterals shall be
located and constructed to each lot in accordance with City
Standard Specifications and Drawings and to the satisfaction of
the City Engineer.
EXHIBIT C: Master Plan of Development
DEV18-0124
IDWAIDMICV-1, WMI, cl
--.I i 1,
tAL
dl,4t
M ou
Proposed Front Elevation I Jim i i
Prnflsed Back Elevatiorl
Option B
Proposed Side Elevation
Elevation
2 PTTT�d--�'
Ptaptci Front Elevation
4 Proposed Back Elavabon
,o_,�---
Proposed FirSt Floor Plan
Proposed Second Flom Plan ,,
li In
0 4 1000001DOO4 0 9oo 0
a•an.anaAa•u,w �i 3 s
ne+N+aA•,wwsNr �+ + �� ry ij � i
«.s+•�ww+.s>� 37� v �ruanr-��wiur�s�u � a
N.�7 sws iuvE no : !
FF[IT
I i
8
! 1
! i
4
i
1 i
i
I
Y S
■
..Jn.anaasJ.�a,a i�=3 1 f 5
nrsvmtlaasswwrYrq Ja»s.Jri>raw y3*� h � i4i t
..ecsra4.:o.n,.�s ��R �� "� zzsfE.r9'ON36Y:75YSv � d � W
«+s 4.a.annn i� � �enraavm��aosr
7 B��nf� Miora ��� t� � "� � s2ijS'�2lti82lf1� ► � 3 a
�II
L�
,y� h
sv
d�
�. dill t r
A R
Ile
Hp
Ez
p
tl9�EE S. Qkk �S
yyr i�}•� _asa «aK d $ � 4p 5�8 's
€€ J
d
It
rMnt>nayssvu�> Y! t '
rro�avaan000rx � o�
8�B,� l+ 1 - sails �naysan� ; : 4 a U
A INSV _IX,
w
in
I
Xs
4