HomeMy WebLinkAboutFC_2019-05-16_MinutesCITY OF ATASCADERO
FINANCE COMMITTEE
MINUTES
Thursday, May 16, 2019
4:00 p.m.
Atascadero City Hall — Conference Room 306
6500 Palma Avenue, Atascadero, California
CALL TO ORDER:
Chairperson Bourbeau called the meeting to order at 4:03 p.m.
PRESENT: COMMITTEE MEMBERS: Charles Bourbeau, Chair
Susan Funk, Vice Chair
Gere Sibbach
Rachelle Rickard
Jeri Rangel
ABSENT: COMMITTEE MEMBERS: None
ALSO PRESENT: Amanda Muther, Deputy City Clerk
Nick DeBar, Public Works Director
Cindy Chavez, Deputy Administrative Services Director
Z Ri 4.19101-1111:1 k' 197-11 :31
1. Finance Committee Draft Action Minutes — April 25, 2019
■ Recommendation: Committee approve the Draft Action Minutes of the
April 25, 2019 Finance Committee Meeting. [City Clerk]
Motion: By Vice Chairperson Funk and seconded by Committee Member Sibbach
to approve the Consent Calendar.
Motion passed 5:0 by a roll -call vote.
PUBLIC COMMENT:
The following citizens spoke during Public Comment: None.
Chairperson Bourbeau closed the PUBLIC COMMENT period.
Atascadero Finance Committee
May 16, 2019
Page 1 of 2
B. BUSINESS:
1. Budget Review — Capital Proiects
Administrative Services Director Rangel provided a packet (Exhibit A), gave an overview
of the Capital Projects section of the City's Budget and answered questions from the
Committee. City Manager Rachelle Rickard and Public Works Director Nick DeBar also
answered questions from the Committee.
PUBLIC COMMENT:
The following citizens spoke on this item: Karen Peterson
Chairperson Bourbeau closed the Public Comment period.
C. INDIVIDUAL DETERMINATIONS: None.
ADJOURN
Chairperson Bourbeau adjourned the meeting at 5:31 p.m.
MINUTES PREPARED BY:
Amanda Muther
Deputy City Clerk
The following exhibits are available for review in the City Clerk's office:
• Exhibit A — Capital Projects handout
APPROVED: May 23, 2019
Atascadero Finance Committee
May 16, 2019
Page 2 of 2
CAPITAL PROJECTS Finance Committee Minutes Exhibit A
Narrative Cate:
The following pages give a brief description of the projects included in this section of the budget. It also includes a description for projects proposed for the Five Year
Capital Improvement Plan. (Projects listed in italics are a part of the Five Year Capital Improvement Program, but do not have funding in fiscal years 2919-2921.)
CATEGORY A: ROAD IMPROVEMENT PROJECTS
Projects identified in this category are related to constructing new roads or improving existing roads to address capacity or operational deficiencies.
Del Rio Road @ US 101 Interchange Improvements: Improvements to increase traffic capacity and level of service at the interchange of US 191 and Del Rio Road in
accordance with the Dei Rio Road Specific Plan involving bridge widening, roundabouts at the ramp interchanges, and pedestrianlbicycle accommodations.
State Route 41 Complete Streets: Improve and connect pedestrian and ADA accessibility facilities from El Camino Real to Portola Road and at San Gabriel Road.
Other improvements include pavement widening to accommodate the addition of buffered bike lanes and delineation of on -street parking, with the City participating in
the cost sharing.
CATEGORY B: ROAD REHABILITATION PROJECTS
Projects identified in this category are related to pavement management of existing roads to maintain good pavements or rehabilitate poor pavement and associated
drainage conditions. These projects generally address entire roadway segments (intersection to intersection) to improve overall pavement conditions beyond the routine
potholing and patching performed by City maintenance personnel.
Crack Sealing Pavement Preservation Program: A program that focuses on preserving good pavements for various City maintained roadways by sealing cracks and
other pavement maintenance and spot repair activities between rehabilitation treatment projects.
Santa Lucia Road Rehabilitation: Pavement rehabilitation, drainage improvements, and culvert repairs for 9.85 miles of Santa Lucia Road between Portola Road and
Ardilla Avenue.
Viejo Camino Road Rehabilitation: Pavement rehabilitation for 9.18 miles of Viejo Camino Road between El Camino Real and La Paloma Court.
2019 Pavement Resurfacing Project: Pavement maintenance, surface treatments, pavement markings, and minor repairs for 4.35 miles of road segments including:
• E[ Camino Real Central (Highway 41 to San Anselmo Road)
• Curbaril Avenue West (Highway 41 to US 101)
• Santa Rosa Road (Highway 41 to EI Camino Real)
• Santa Barbara Road (San Antonio Road to Viejo Camino Road)
• Viejo Camino Road (Santa Barbara Road to Halcon Road)
• San Jacinto Avenue (EI Camino Real to Nogales Avenue)
2020 Pavement Resurfacing Project: Pavement maintenance, surface treatments, pavement markings, and minor repairs for 3.83 miles of road segments including:
• Curbaril Avenue East (US 101 to Acacia Road)
• Porto[a Road (Highway 41 to Ardilla Avenue)
• Ardilla Avenue (Portola Road to San Anselmo Road)`i
• San Anselmo Road —West (Ardilla Avenue to Monterey Road)2
G-2
CAPITAL PROJECTS
Narrative
Rehabilitation work for this section may be performed as part of the San Anselmo Road Rehabilitation — West Project.
Surface treatment on San Anselmo Road may be extended to include section between Monterey Road and US 101 southbound on/off ramps.
San Anselmo Road Rehabilitation - West: Heavy pavement rehabilitation for 0.21 miles of San Anselmo between Monterey Road and EI Camino Real, including
intersections of US 101 onioff-ramps (does not include bridge deck). A portion of San Anselmo Road between Monterey Road and southbound US 101 on/off-ramp
intersection may have surface treatment and other minor work performed with 2020 Pavement Resurfacing Project in lieu of rehabilitation.
EI Camino Real Resurfacing - South: Pavement maintenance and repairs for 1.90 miles of El Camino Real between EI Bordo Avenue and the south City limits. This
section of EI Camino Real was partially reconstructed as part of the Southern California Gas transmission pipeline project in 2016 and begins where microsurfacing
restoration ended (EI Bordo Avenue). Pavement rehabilitation is planned between Musselman Drive and Viejo Camino, and surface treatments and minor repairs for
the other sections. New pavement markings and signage will be installed and will improve lane identification and overall aesthetics.
Traffic WaylArdilla Avenue Rehabilitation: Pavement rehabilitation, drainage improvements, pavement markings, and traffic signage for approximately 0.24 miles of
Traffic Way between EI Camino Real and Ardilla Avenue and Ardil[a Avenue from Traffic Way to Atascadero Mall.
San Gabriel Road Rehabilitation: Heavy pavement rehabilitation, drainage improvements, culvert repairs, shoulder widening, pavement markings, and traffic signage
for 0.79 miles of San Gabriel Road between Highway 41 and San Marcos Road. Significant surface drainage issues for the majority of the project will require shoulder
work and new berms, and possibly new storm drains and piping. Work may be combined with San Marcos Road Rehabilitation (San Gabriel Rd to Portola Rd) into a
single construction project.
San Marcos Road Rehabilitation: Heavy pavement rehabilitation, drainage improvements, culvert repairs, storm drainage facilities, and other minor work for 0,66
miles of San Marcos Road between San Gabriel Road and Portola Road. Significant surface drainage deficiencies exist along a majority of this roadway segment that
may require new storm drains and piping. Work may be combined with San Gabriel Road Rehabilitation (Highway 41 to San Marcos Rd) into a single construction
project.
San Marcos Road Embankment Subsidence Repair: Repair for embankment subsidence on San Marcos Road approximately 0.50 miles north of Los Altos Road.
Proposed work involves excavating and removing overburden material to bedrock surface. Embankment subsidence extends outside right-of-way that requires
coordination with two private properties.
Downtown Streets Rehabilitation: Pavement rehabilitation, surface treatments, drainage improvements, pavement markings, traffic signage, and minor repairs for
1.90 miles of downtown road segments including:
• Entrada Avenue (El Camino Real to Lewis Avenue)
■ West Mall (El Camino Real to Capistrano A venue)
• East Mall (El Camino Real to Lewis Avenue)
• Palma Avenue (Traffic Way to East Mall)
■ Lewis Avenue (Traffic Way to Capistrano Avenue)
■ Traffic Way (El Camino Real to Via Avenue)
■ 01meda Avenue (Traffic Way to West Mall)
Traffic Way Rehabilitation - North: Heavy pavement rehabilitation, drainage improvements, pavement markings, traffic signage, and other miscellaneous and related
work for 9.09 miles of Traffic Way between Chico Road and Santa Cruz Road -
G -3
CAPITAL PROJECTS
Narrative
Street Assessment Districts Improvement Projects: Pavement maintenance and repair for miscellaneous small assessment districts of Lobos, Aguila, Cayucos,
Falda, Maleza, Pinal-Escarpa, San Fernando, and Sonora-Pinal.
Apple Valley Maintenance District No. 1 Pavement Management: Pavement maintenance of roadways within the Apple Valley Street and Storm Drain Maintenance
District No. I involving crack sealing, surface treatments, minor drainage corrections, and other miscellaneous and related work.
De Anza Maintenance District No. 3 Pavement Management: Pavement maintenance of roadways within the De Anza Street and Storm Drain Maintenance District
No. 3 involving crack sealing, surface treatments, minor drainage corrections, and other miscellaneous and related work.
Las Lomas Maintenance District No. 2 Pavement Management: Pavement maintenance of roadways within the Las Lomas Street and Storm drain Maintenance
District No. 2 involving crack sealing, surface treatments, minor drainage corrections, and other miscellaneous and related work.
Citywide Pavement Condition Evaluation Update: Pavement conditions of City -maintained pavements will be visually inspected and evaluation data entered into the
City's pavement management software system (StreetSaver@). This system is used to inventory existing pavements conditions, record work performed, and determine
prioritization of roadway work using Critical Point Management for various budget scenarios. Pavement condition evaluation updates are performed every five years.
CATEGORY C: MEASURE F-14 ROAD PROJECTS
Projects identified in this category are funded by Sales Tax Measure F-14 revenues and focus on preserving and improving pavement conditions of existing local,
neighborhood road segments (collector and residential functional classifications). The CIP schedule includes separate projects for resurfacing (maintenance) and
rehabilitation construction, but these projects may be combined into a single project when costs savings, construction staging, or other benefits are in the best interest of
the overall program. Specific roadway segments included in resurfacing and rehabilitation projects are found in Section F of this budget.
Pavement Resurfacing Projects: Surface treatments (maintenance and resurfacing projects) include crack sealing, slurry seals, chip seals, microsurfacing, and other
techniques geared toward preserving good pavement conditions.
Pavement Rehabilitation Projects: Rehabilitation treatments include overlays, mill and overlays, full -depth reclamation, cold -in-place recycling, and other major
construction geared toward improving fair to bad pavement conditions.
CATEGORY D: BRIDGE PROJECTS
Projects identified in this category are for bridge construction, replacement, and repair projects.
Santa Lucia Road Bridge Replacement: Full bridge replacement and roadway approach improvements for Santa Lucia Road over Graves Creek.
Via Avenue Bridge Replacement: Full bridge replacement and roadway approach improvements for Via Avenue over Atascadero Creek.
Bridge Evaluations and Studies: Planning and preliminary engineering work for various bridges needing rehabilitation, replacement, or improvements.
CATEGORY E: DRAINAGE PROJECTS
Projects identified in this category are drainage improvement projects that are intended to reduce flooding potential or improve the existing drainage system.
G-4
CAPITAL PROJECTS
Narrative
Storm Drain and Culvert Improvement Program: A program that focuses on replacing and repairing roadway culverts, storrn drain inlets, and storm sewers at
various locations to address drainage or flooding issues.
Drainage Improvement Program: A program that focuses on improving roadway drainage conditions at various locations to address surface drainage or flooding
issues.
Culvert Repairs from 2017 and 2018 Winter Storms: Replace and repair culverts and storm drains damaged from 2017 and 2018 winter storms, including headwalls,
riprap, pavement restoration, and other miscellaneous and related work. Work locations include the following:
■ Santa Lucia Road at EI Monte Road
• Llano Road at Corriente Road
Santa Ana Road between Santa Lucia Road and Graves Creek Road
• San Gabriel Road between San Marcos Road and Escondido Road
■ Carmelita Road at Barranco Road
• El Camino Real at Plata Lane
CATEGORY F: FACILITIES PROJECTS
Projects identified in this category are new construction or improvements to public facilities.
Zoo Garden Event Center: Construction of a new zoo facility near the flamingo exhibit for zoo education, various City -sponsored events, and for rent by the public.
CATEGORY G: PARKS PROJECT'S
Parks projects identified in this category are for repair and enhancement projects.
Centennial Bridge and Plaza Project: Construction of public spaces or expansion of City Hall parking lot, site removals and site preparation, and other miscellaneous
and related work.
Atascadero Lake Pipeline Repair: Repair and rehabilitation to the 1950's era pipeline that diverts water from Atascadero Creek to Atascadero Lake.
La Plaza Park Project: Construction of a pedestrian plaza across from Sunken Gardens between EI Camino Real and the US 101 pedestrian tunnel. Plaza Park wilt
be situated in Atascadero Mall public way and Main Street parcel remnant. Planned work includes concrete surfacing, pavers, pergola structure, trees and landscaping,
storm management facilities, electrical, and other miscellaneous and related work.
G-5
CAPITAL PROJECTS
Narrative
CATEGORY l: OTHER PROJECTS
CDBG Accessibility Barrier Removal Projects: Improvements to deficient pedestrian facilities, sidewalks, and walkways to comply with American Disability Act
(ADA) standards. Projects are typically funded on an annual basis through the Community Development Block Grants (CDBG). The Traffic Way Accessibility
Improvement Project is programed for the FY19/20 budget cycle and involves replacing concrete sidewalk, ADA and driveway ramps, Concrete curbing, asphalt repair,
and other miscellaneous and related work on Traffic Way between U5 101 undercrossing to EI Camino Real.
Downtown Parking Wayfinding Signage: Installation of traffic signs in the Downtown Colony District to guide and direct motorists to public parking areas.
Maiden Statute Placement: Repair the base of the Maiden Statue in Sunken Gardens.
Native Tree Re -Planting: Planting of native oak tree seedlings throughout Atascadero on sites determined by the Native Tree Atlas.
G-6
CAPITAL PROJECTS
2019-2021 Capital Projects Summary
CATEGORY A: ROAD IMPROVEMENT PROJECTS
Del Rio Road @ US 101 Interchange $ 1,175,000 $1,175,000
Improvements
State Route 41 Complete Streets 120,000 120,000 E
CATEGORY B: ROAD REHABILITATION PROJECTS
Crack Sealing Pavement Preservation 60,000
Program
60,000
FUND
FUND
FUND
FUND
Viejo Camino Road Rehabilitation 182,000
FUND
2020 Pavement Resurfacing Project 810,000
810,000
101
289
282
265
GRANTS
310
1,045,310 e
Traffic WaylArdilla Avenue Rehabilitation 295,000
295,000 A
San Gabriel Road Rehabilitation 51,000
STATE&
San Marcos Road Rehabilitation 44,000
44,000
PROJECT TITLE
BUDGETED
275,000
Street Assessment District Improvement 50,000
Projects
50,000 c
Apple Valley Maintenance District No. 1 156,000
Pavement Management
LOCAL
FEDERAL
GENERAL
103,000 °
Las Lomas Maintenance District No, 2 394,000
Pavement Management
MEASURE F-14
CIRCULATION
DRAINAGE
LTF
GRANT
GRANT
CAPITAL
OTHER
SALES TAX
FEES
FEES
FUNDS
FUNDS
FUNDS
FUNDS
FUNDS
CATEGORY A: ROAD IMPROVEMENT PROJECTS
Del Rio Road @ US 101 Interchange $ 1,175,000 $1,175,000
Improvements
State Route 41 Complete Streets 120,000 120,000 E
CATEGORY B: ROAD REHABILITATION PROJECTS
Crack Sealing Pavement Preservation 60,000
Program
60,000
Santa Lucia Road Rehabilitation Project 787,000
787,000
Viejo Camino Road Rehabilitation 182,000
182,000
2020 Pavement Resurfacing Project 810,000
810,000
San Anselmo Road Rehabilitation -West 390,000
40,000 350,000 A
EI Camino Real Resurfacing - South 1,250,000
204,690
1,045,310 e
Traffic WaylArdilla Avenue Rehabilitation 295,000
295,000 A
San Gabriel Road Rehabilitation 51,000
51,000
San Marcos Road Rehabilitation 44,000
44,000
San Marcos Road Embankment 275,000
Subsidence Repair
275,000
Street Assessment District Improvement 50,000
Projects
50,000 c
Apple Valley Maintenance District No. 1 156,000
Pavement Management
156,000 °
De Anza Maintenance District No. 3 103,000
Pavement Management
103,000 °
Las Lomas Maintenance District No, 2 394,000
Pavement Management
394,000 P
G-11
BUDGET
PAGE
REFERENCE
G-21
G-18
G-18
G-19
G-19
G-19
G-19
G-19
G-19
G-19
G19
G-19
G-20
H-3
H-11
H-7
I
CAPITAL PROJECTS
2019-2021 Capital Proiects Summary
CATEGORY C: MEASURE F-14 ROAD PROJECTS
2019 Pavement Rehabilitation Projects
$ 2,300,000
FUND
FUND
FUND
FUND
La Plaza Park Project
FUND
475,000 "
(West/Central
101
281
282
265
GRANTS
310
2020 Pavement Rehabilitation Projects
2,600,000
STATE &
PROJECT TITLE
BUDGETED
(East)
LOCAL
FEDERAL
GENERAL
MEASURE F-14
CIRCULATION
DRAINAGE
LTF
GRANT
GRANT
CAPITAL
OTHER
SALES TAX
FEES
FEES
FUNDS
FUNDS
FUNDS
FUNDS
FUNDS
CATEGORY C: MEASURE F-14 ROAD PROJECTS
2019 Pavement Rehabilitation Projects
$ 2,300,000
$ 2,300,000
Atascadero Lake Pipeline Repair
100,004
1
100,000 "
La Plaza Park Project
475,004 1
475,000 "
(West/Central
2020 Pavement Rehabilitation Projects
2,600,000
2,600,000
(East)
2021 Pavement Resurfacing Projects
300,000
300,000
East/South
2021 Pavement Rehabilitation Projects
1,740,000
1,740,000
South
2022 Pavement Rehabilitation Projects
50,000
50,000
West
CATEGORY D: BRIDGE PROJECTS
Santa Lucia Road Bridge Replacement 9,447,170 1,447,170 F
Via Avenue Bridge Replacement 3,411,000 391,240 3,019,760 F
Bridge Evaluations and Studies 25,000 25,000
CATEGORY E: DRAINAGE PROJECTS
Storm Drain and Culvert Improvement 150,000 150,000
Program
Drainage Improvement Program 50,000 50,000
Improvements to Storm Damaged Culverts 348,000 348,000
BUDGET
PAGE
REFERENCE
F-7
F-7
F-7
F-7
F-7
G-18
G-18
G18
G-22
G-22
G-22
CATEGORY F: FACILITIES PROJECTS
Zoo Garden Event Center 1 668,5001 1 1 1 1 1 1 1 668,500 H-29
CATEGORY G: PARKS PROJECTS
Centennial Bridge and Plaza Project
266,980
266,980 '
Atascadero Lake Pipeline Repair
100,004
1
100,000 "
La Plaza Park Project
475,004 1
475,000 "
G-12
G-26
G-23
G-23
CAPITAL PROJECTS
2019-2021 Capital Protects Summary
CATEGORY I: OTHER PROJECTS
CDBG Accessibility Barrier Removal
Projects
$ 304,850 $ 304,850 K
FUND
FUND
FUND
FUND
Native Tree Re -Planting
FUND
109
281
282
265
GRANTS
310
PROJECT TITLE
BUDGETED
STATE &
LOCAL
FEDERAL
GENERAL
MEASURE F-14
CIRCULATION
DRAINAGE
LTF
GRANT
GRANT
CAPITAL
OTHER
SALES TAX
FEES
FEES
FUNDS
FUNDS
FUNDS
FUNDS
FUNDS
CATEGORY I: OTHER PROJECTS
CDBG Accessibility Barrier Removal
Projects
$ 304,850 $ 304,850 K
Downtown Parking Wayfinding Signage
15,000 15,000 I
Maiden Statue Placement
15,000 15,000 I
Native Tree Re -Planting
18,000 18,000 L
TOTAL EXPENDITURES 1 $ 20,426,500 $ 6,990,000 1 $1,175,000 1 $ 548,000 1 $ 2,869,930 1 $ 765,000 1 $ 4,771,780 1 $ - 1 $ 3,306,790
A Urban State Highway Account Grant
B Gas Tax Fund -Road Repair & Accountability Act of 2017
C Street Maintenance Assessment Districts Fund
D De Anza Street & Storm Drain District
E Regional State Highway Account Grant
F Highway Bridge Replacement and Rehabilitation Grant
G Public Facilities Fees Fund
H Parkland Facilities Fees Fund
1 2010 Bond Proceeds Master Agreement Fund
i Open Space Acquisition Fees Fund
K Community Development Block Grant
L Native Tree Planting Fund
M Fire Facilities Fees Fund
N General Funds
0 Apple Valley Street & Storm Drain District
P Las Lamas Street & Storm Drain District
G-13
BUDGET
PAGE
REFERENCE
H-24
G-26
G-26
H-26
CAPITAL PROJECTS
Five Year Capital Improvement Plan
Estimated
Project Title Proposed Proposed Estimated Estimated Estimated Total for Five
FY2019120 FY2020121 FY2021/22 FY2022123 FY2023124 Year Period
CATEGORY A: ROAD IMPROVEMENT PROJECTS
Del Rio Road @ US 101 Interchange Improvements $ 575,000 $ 600,000 $ 6,000,000 $ 5,000,000 $ - $ 12,175,000
State Route 41 Complete Streets 120,000 _ _ _
- 5 120,000
CATEGORY B: ROAD RPHARILITATION PRC].1FC'T.q
Crack Sealing Pavement Preservation Program
Santa Lucia Road Rehabilitation Project
30,000
787,000
30,000
-
30,000 30,000 30,000
- - -
150,000
787,000
Viejo Camino Road Rehabilitation
182,000
-
- - _
1$2,000
2020 Pavement Resurfacing Project
810,000
-
- - -
810,000
San Anselmo Road Rehabilitation - West
390,000
-
- - -
390,000
El Camino Real Resurfacing - South
75,000
1,175,000
- - -
1,250,000
Traffic Way/Ardilla Avenue Rehabilitation
18,000
277,000
- - -
295,000
San Gabriel Road Rehabilitation
-
51,000
784,000 - -
835,000
San Marcos Road Rehabilitation
-
44,000
681,000 - -
725,000
San Marcos Road Embankment Subsidence Repair
275,000
-
- - -
275,000
Downtown Streets Rehabilitation
-
-
101,000 1,574,000 -
1,675,000
Traffic Way Rehabilitation - North
-
-
- 69,000 1,081,000
1150000
Street Assessment Districts Improvement Projects
50,000
-
_ - -
50,000
Apple Valley Maintenance District No. 1 Pavement Management
156,000
-
- - -
156,000
De Anza Maintenance District No. 3 Pavement Management
103,000
-
- - -
103,000
Las Lomas Maintenance District No. 2 Pavement Management
-
394,040
- - -
394,000
Citywide Pavement Condition Evaluation Update
-
- I
- - 50,000
50,000
G-14
CAPITAL PROJECTS
Five Year Capital Improvement Plan
CATEGORY C: MEASURE F-14 ROAD PROJECTS
2019 Pavement Rehabilitation (West/Central)
$ 2,300,000 $ - $ - $ - $ - $
2,300,000
2020 Pavement Rehabilitation (East)
1,690,000 910,000 - - -
2,600,000
Estimated
Project Title
Proposed
Proposed
Estimated
Estimated
Estimated
Total for Five
2,650,400
FY2019120
FY2020121
FY2021122
FY2022123
FY2023/24
Year Period
CATEGORY C: MEASURE F-14 ROAD PROJECTS
2019 Pavement Rehabilitation (West/Central)
$ 2,300,000 $ - $ - $ - $ - $
2,300,000
2020 Pavement Rehabilitation (East)
1,690,000 910,000 - - -
2,600,000
2021 Pavement Resurfacing (East/South)
- 300,000 - _ _
300,000
2021 Pavement Rehabilitation (South)
50,000 1,690,000 810,000 - -
2,550,000
2022 Pavement Rehabilitation (West)
- 50,000 1,630,000 970,000 -
2,650,400
2023 Pavement Rehabilitation
- - 50,000 1,380,000 970,000
2,400,000
2024 Pavement Resurfacing
- - - - 300,000
300,000
2024 Pavement Rehabilitation
- - - 1 50,000_]_1,520,000
1,570,000
CATEGORY D: BRIDGE PROJECTS
Santa Lucia Road Bridge Replacement
447,170 1,000,000 1,705,000 - -
3,152,170
Via Avenue Bridge Replacement
1,426,000 1,985,000 - - -
3,411,000
Bridge Evaluations and Studies
25,000 _ - - -
25,000
CATEGORY E: DRAINAGE PROJECTS
Storrs Drain and Culvert Improvement Program
75,000 75,000 75,000 75,000 75,000
375,000
Drainage Improvement Program
25,000 25,000 25,000 25,000 25,000
125,000
Improvements to Storm Damaged Culverts
348,000 - - - -
348,000
CATEGORY F: FACILITIES PROJECTS
Zoo Garden Event Center 668,500 - - - - 668,500
G-15
CAPITAL PROJECTS
Five Year Capital Improve entPlan
Estimated
Project Title Proposed Proposed Estimated Estimated Estimated Total for Five
FY2019120 FY2020121 FY2021122 FY2022123 FY2023124 Year Period
CATEGORY G: PARK AND RECREATION PROJECTS
Centennial Bridge and Plaza Project
Atascadero Lake Pipeline Repair
La Plaza Park Project
CATEGORY 1: OTHER PROJECTS
CDBG Accessibility Barrier Removal Pr,
Downtown Parking Wayfinding Signage
Maiden Statue Placement
Native Tree Re-Plantin❑
Totals for All Categories;
266,980 - -
- - 266,980
100,000 - -
- - 100,000
475,000 - -
- - 475.000
344,850 - 100,000 100,000 100,000 604,850
15,000 - - - - 15,000
15,000 - - - - 15,000
9,000 9,000 15,000 - - 33,000
$ 11,811,500 $ 8,615,000 $ 12,006,000 $ 9,273,000 $ 4,151,000 $ 45,856,500
G-16
FUND ANALYSIS
Capital Projects Fund
FUND
TYPE
310 Special Revenue
REVENUES
Revenues from Other Agencies
Revenue from Use of Money
Transfers In
Total Revenues
EXPENSES
Special Projects
Capital Outlay
Total Expenses
Net Income
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE
2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
ACTUAL ACTUAL BUDGETED ESTIMATED REQUESTED REQUESTED
$ 475,407 $ 270,486 $ 88,550 $ 88,550 $ - $ -
(3,063) 298 - 6,900 7,030 6,450
23,840 - - - _ -
496,184 270,784 88,550 95,450 7,030 6,450
(15,147)
(499,190) (335,882) (88,550) (88,550) - -
(514,337) (335,882) -- (88,550) (88,550) - -
(18,153) (65,098) - 6,900 7,030 6,450
424,566 406,413 319,320 341,320 348,220 355,250
$ 406,413 $ 341,315 $ 319,320 $ 348,220 $ 355,250 $ 361,700
C-15
SUMMARY OF REVENUES
Capital Pro'ects Fund
FUND
310 SECTION
G
ACCOUNT REVENUE 2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
NUMBER DESCRIPTION ACTUAL ACTUAL BUDGETED PROJECTED ESTIMATED ESTIMATED
CAPITAL PROJECTS FUND (310)
Revenues from Other Agencies
Grant Revenue:
43642.8309
RSHA- Route 41 Multipurpose
Pathway to the Park
43642.7642
RSHA- Route 41 Corridor
Study
43631.4301
FEMA Revenue- 2017 Storms
43625.2301
OES Revenue- 2017 Storms
43625.6578
HCD- Housing Related Parks
Grant- Lake Park Equipment
Revenue from Use of Money
46110,0000
Investment Earnings
Transfers In
Transfer In From:
49525.8880
Transfer from Local Transporta-
tion Fund for Atascadero
Creek Trail
Total Capital Projects
Fund
$ 469,879 $ - $ - $ _ $
5,528
- 2,606
716
267,164 88,550 88,550
(3,063) 298 - 6,900 7,030 6,450
23,840 - - - _
$ 496,184 $ 270,784 $ 88,550 $ 95,450 $ 7,030 $ 6,450
D-27
CAPITAL PROJECTS
Capital Projects Fund
FUND TYPE
310 Capital Projects
DESCRIPTION
This fund is typically used to account for capital improvement projects with special funding such as grants or dedicated reimbursements. It is also used as a
type of clearinghouse for projects with many different sources of funding.
ACTIVITY DETAIL
OBJECT EXPENSE 2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
NUMBER CLASSIFICATION ACTUAL ACTUAL BUDGETED ESTIMATED REQUESTED REQUESTED
SPECIAL PROJECTS
7401542 Route 41 Corridor Study
7165099 Annual Road Crack Fill and
Maintenance Program
Total Special Projects
CAPITAL OUTLAY
8901309 Route 41 Multi -Purpose Pathway
to the Park
8301304 Lake View Drive Pavement Resurfacing
8301881 Lighted Crosswalk Replacement
8701817 Lake Park Playground Equipment and
BBQ Area
Total Capital Outlay
ACTIVITY TOTAL
$ 5,528 $ - $ _ $ _ $ _ $ _
9,619
15,147
483,558
15,632
- 68,718 - - _
- 267,164 88,550 88,550
499,190 335,882 88,550 88,550 -
$ 514,337 $ 335,882 $ 88,550 $ 88,550 $
G-17
FUND ANALYSIS
Local Trans ortation Fund
FUND TYPE
265 Special Revenue
EXPENSES
Special Projects
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
Capital Outlay
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
REVENUES
(23,840)
Revenues from Other Agencies
$ 962,506
$ 898,148
$ 4,928,940
$ 2,196,220
$ 3,074,900
$ 3,945,660
Revenue from Use of Money
5,962
9,904
29,770
75,980
53,830
37,660
Transfers In
-
109,268
599,240
564,460
109,780
970,310
Total Revenues
968,468
1,017,320
5,557,950
2,836,660
3,238,510
4,953,630
EXPENSES
Special Projects
-
(33,055)
(91,950)
(74,950)
(175,000)
(30,000)
Capital Outlay
(398,425)
(728,753)
(8,240,020)
(3,930,280)
(4,410,170)
(4,532,000)
Transfers Out
(23,840)
Total Expenses
(422,265)
(761,808)
(8,331,970)
(4,005,230)
(4,585,170)
(4,562,000)
Net income
546,203
255,542
{2,774,020)
(1,168,570)
(1,346,660)
391,630
BEGINNING AVAILABLE BALANCE
3,318,644
3,864,847
5,071,260
4,120,360
2,951,790
1,605,130
ENDING AVAILABLE BALANCE
$ 3,864,847
$ 4,120,359
$ 2,297,240
$ 2,951,790
$ 1,605,130
$ 1,996,760
C-16
SUMMARY OF REVENUES
Local Transportation Fund
FUND
SECTION
265
G
ACCOUNT
REVENUE
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
NUMBER
DESCRIPTION
ACTUAL
ACTUAL
BUDGETED
PROJECTED
ESTIMATED
ESTIMATED
LOCAL TRANSPORTATION FUND 265
Revenues from Other Agencies
43421.0000
TDA Non -Transit- Bikepath
$ 22,289
$ 23,040
$ 23,560
$ 26,570
$ 28,290
$ 28,860
43428.0000
TDA Non -Transit- Streets
593,893
573,256
573,860
716,040
849,000
882,480
43632.8648
HBRR Grants- Santa Lucia Road
179,857
156,530
1,312,970
436,830
447,170
1,000,000
Bridge Replacement
43632.8515
HERR Grants- Via Avenue Bridge
166,467
134,584
2,899,270
397,500
1,262,440
1,757,320
Replacement
43643.8496
USHA Grants- EI Camino Real
-
-
114,000
566,000
-
-
Pavement Rehabilitation
43643.XXXX
USHA Grants- San Anselmo
-
-
-
-
350,000
-
Road Rehabilitation - West
43643.XXXX
USHA Grants- Traffic Way/Ardilla
-
-
-
-
18,000
277,000
Avenue Rehabilitation
43642.7939
RSHA- ATP Application
-
4,722
5,280
5,280
-
-
436XX.XXXX
STIP Grant- State Route 41
-
-
-
48,000
120,000
-
Complete Streets
43625.2301
OES Revenue -2017 Storms
-
1,298
-
-
-
_
43625.4301
FEMA Revenue- 2017 Storms
-
4,718
Revenue from Use of Money
46110,0000 Investment Earnings
5,962 9,904 29,770 75,980 53,830 37,660
D-28
SUMMARY OF REVENUES
Local Transportation Fund
FUND
-
SECTION
265
G
ACCOUNT
REVENUE 2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
NUMBER
DESCRIPTION ACTUAL
ACTUAL
BUDGETED
PROJECTED
ESTIMATED
ESTIMATED
LOCAL TRANSPORTATION FUND 265 continued
Transfers In
49560.8496
Transfer from Gas Tax Fund for $ -
$ 109,268
$ 599,240
$ 564,460
$ 34,780
$ -
EI Camino Real (North)
Rehabilitation
49560.8496
Transfer from Gas Tax Fund for -
-
-
-
75,000
970,310
El Camino Real (South)
Rehabilitation
Total Local Transportation
Fund $ 968,468
$ 1,017,320
$ 5,557,950
$ 2,836,660
$ 3,238,510
$ 4,953,630
D-29
CAPITAL PROJECTS
Local Transoortation Fund
FUND
265
TYPE
Special Revenue
DESCRIPTION
This fund accounts for Local Transportation Funds that can be used for streets projects. Local Transportation Funds (LTF) must first be spent to meet any
reasonable community transit need. The City uses the majority of LTF monies to run the City's bus system and to contribute to San Luis Obispo Regional Transit
Authority. Any remaining funds are accounted for in this fund and must be used for bikepath projects and street projects.
ACTIVITY DETAIL
OBJECT
EXPENSE
2016-2017
2017-2018
2018-2019
2018-2019
2099-2020
2020-2021
NUMBER
CLASSIFICATION
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
SPECIAL PROJECTS
7161625
Pavement Crack Sealing Preservation
$ -
$ -
$ 30,004
$ -
$ 30,000
$ 30,000
Program
7161076
Citywide Pavement Condition
-
-
50,000
50,000
-
-
Evaluation Update
7161893
State Route 41 Complete Streets
-
28,333
6,670
19,670
120,000
-
7161939
ATP Grant Application-Atascadero
-
4,722
5,280
5,280
-
_
Avenue/Mall Connection
7XXXXXX
Bridge Evaluations and Studies
-
-
-
-
25,000
-
Total Special Projects
-
33,055
91,950
74,950
175,000
30,000
CAPITAL OUTLAY
8301496
EI Camino Real Rehabilitation -North
348
109,268
1,445,320
1,411,000
-
-
8301442
San Anselmo Road Rehabilitation -East
7,684
36,390
496,090
474,000
-
-
8301406
Santa Barbara Road Rehabilitation
13,932
245,286
-
-
8301091
East Front Street Rehabilitation
1,104
9,046
289,850
261,350
-
-
8301756
Santa Lucia Road and Culvert Repairs
6,265
-
_
-
-
_
8401648
Santa Lucia Road Bridge Replacement
179,857
156,530
1,312,970
436,830
447,170
1,000,000
8401515
Via Avenue Bridge Replacement
188,035
153,424
3,273,690
449,000
1,426,000
1,985,000
G-18
CAPITAL PROJECTS
Local Transportation Fund
FUND
265
TYPE
Special Revenue
OBJECT
EXPENSE
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
NUMBER
CLASSIFICATION
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
CAPITAL OUTLAY (continued)
8301660
Santa Lucia Road Rehabilitation
$ 1,200
$ 11,155
$ 567,650
$ 218,000
$ 787,000
$ -
Project
8301654
Viejo Camino Road Rehabilitation
-
7,654
252,450
78,100
182,000
-
8301910
2019 Pavement Resurfacing Project
-
-
592,000
592,000
-
_
830XXXX
2020 Pavement Resurfacing Project
-
-
-
-
810,000
-
8301964
San Anselmo Road Rehabilitation -West
-
-
10,000
10,000
390,000
-
830XXXX
EI Camino Real Resurfacing -South
-
-
-
-
75,000
1,175,000
83OXXXX
Traffic Way/Ardilla Avenue Rehabilitation
-
-
-
-
18,000
277,000
830XXXX
San Gabriel Road Rehabilitation
-
-
-
-
-
51,000
830XXXX
San Marcos Road Rehabilitation
-
-
-
-
-
44,000
830XXYX
San Marcos Road Embankment
_
_
_
-
275,000
-
Subsidence Repair
Total Capital Outlay
398,425
728,753
8,240,020
3,930,280
4,410,170
4,532,000
TRANSFERS OUT
9505031 Transfer to Capital Projects Fund for
Atascadero Creek Trail Project
Total Transfers Out
ACTIVITY TOTAL
23,840
23,840 - - _ _ -
$ 422,265 $ 761,808 $ 8,331,970 $ 4,005,230 $ 4,585,170 $ 4,562,003
G-19
FUND ANALYSIS
Street Maintenance Assessment Districts Fund
FUND
267 TYPE
Special Revenue
REVENUES
Taxes and Assessments
Revenue from Use of Money
Total Revenues
EXPENSES
Special Projects
Total Expenses
Net Income
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE
2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
ACTUAL ACTUAL BUDGETED ESTIMATED REQUESTED REQUESTED
$ 2,160 $ 2,160 $ 2,160 $ 2,160 $ 2,160 $ 2,160
95 258 260 1,520 1,090 590
2,255 2,418 2,420 3,680 3,250 2750
- - (50,000) - (50,000) -
- -(50,000) - {50,000} -
2,255 2,418 (47,580) 3,680 (46,750) 2,750
69,582 71,837 75,160 74,260 77,940 31,190
$ 71,837_ $ 74,255 $ 27, 580 $ 77,940 $ 31,190 $ 33,940
C-17
SUMMARY OF REVENUES
Street Maintenance Assessment Districts Fund
FUND
SECTION
267
G
ACCOUNT
REVENUE
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
NUMBER
DESCRIPTION
ACTUAL
ACTUAL
BUDGETED
PROJECTED
ESTIMATED
ESTIMATED
STREET MAINTENANCE ASSESSMENT DISTRICTS FUND 267
Taxes and Assessments
41100.0000
Assessment Fees
$ 2,160
$ 2,160
$ 2,160
$ 2,160
$ 2,160
$ 2,160
Revenue from Use of Money
46110.0000
Investment Earnings
95
258
260
1,620
1,090
590
Total Street Maintenance
Assessment Districts Fund
$ 2,255
$ 2,418
$ 2,420
$ 3,680
$ 3,250
$ 2,750
D-29
CAPITAL PROJECTS
Street Maintenance Assessment Districts Fund
FUND
TYPE
267 Special Revenue
DESCRIPTION
This program accounts for assessments collected to maintain various streets within the City.
ACTIVITY DETAIL
OBJECT
NUMBER
EXPENSE
CLASSIFICATION
SPECIAL PROJECTS
716516X Street Assessment Districts
Improvement Projects
Total Special Projects
ACTIVITY TOTAL,
2016-2017 2017-2018
ACTUAL ACTUAL
2018-2019 2018-2019 2019-2020 2020-2021
BUDGETED ESTIMATED REQUESTED REQUESTED
- $ 50,000 $ - $ 50,000 $ -
50,000 - 50,000 -
$ - $ - $ 50,000 $ - $ 50,000 $ -
G-20
FUND ANALYSIS
Circulation System Fees Fund
FUND
281 TYPE
Special Revenue
REVENUES
Permits and Fees
Revenue from Use of Money
Total Revenues
EXPENSES
Capital Outlay
Total Expenses
Net Income
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE x
* AVAILABLE DEFERRED REVENUE BALANCE:
EI Camino Real @ Viejo Camino Signal
El Camino Real @ San Diego Way Signal
Hwy 101 @ Santa Barbara Interchange
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
- 800,950
800,950
800,950
$ 296,570
$ 668,057
$ 939,550
$ 186,930
$ 509,560
$ 794,850
4,885
10,859
39,910
46,260
41,930
37,800
301,455
678,916
979,460
233,190
551,490
832,650
(125,895)
(197,468)
(826,640)
(733,950)
_ {575,000}
(600,000)
(125,895)
(197,468)
(826,640)
(733,950)
(575,000)
(600,000)
175,560
481,448
152,820
(500,760)
(23,510)
232,650
1,896,658
2,072,218
4,065,350
2,553,670
2,052,910
2,029,400
$ 2,072,218
$ 2,553,666
$ 4,218,170
$ 2,052,910
$ 2,029,400
$ 2,262,050
$ 55,465
$ 55,465 $
- $ 55,465
$ 55,465
$ 55,465
71,455
71,455
- 71,455
71,455
71,455
800,856
800,950
- 800,950
800,950
800,950
C-18
Revenue from Use of Money
46110.0000 Investment Earnings
Total Circulation System
Fees Fund
4,885
10,859
SUMMARY OF REVENUES
46,260
41,930
37,800
Circulation System Fees Fund
FUND
$ 301,455
281
$ 979,460
$ 233,190
SECTION
$ 832,650
G
ACCOUNT
REVENUE
2016-2017 2017-2018 2018-2019
2018-2019 2019-2020 2020-2021
NUMBER
DESCRIPTION
ACTUAL ACTUAL BUDGETED
PROJECTED ESTIMATED ESTIMATED
CIRCULATION SYSTEM FEES FUND (281)
Permits and Fees
42450.6020
Impact Fees
$ 296,570 $ 668,057 $ 939,550
$ 186,930 $ 509,560 $ 794,850
Revenue from Use of Money
46110.0000 Investment Earnings
Total Circulation System
Fees Fund
4,885
10,859
39,910
46,260
41,930
37,800
$ 301,455
$ 678,916
$ 979,460
$ 233,190
$ 551,490
$ 832,650
D-30
CAPITAL PROJECTS
Circulation System Fees Fund
FUND
TYPE
281 Special Revenue
DESCRIPTION
The City currently has and maintains an extensive system of roadways available for transportation of goods and services as well as for educational, recreational
and social purposes. Undeveloped parcels create few trips on this system other than the occasional visit to the site for weed abatement purposes. A developed
parcel will, however, generate a statistically predictable amount of trips, depending upon the specific land use of the development. Thus, it can be said that all
new development contributes to traffic impacts which have significant and widespread cumulative impact on the City's existing road system. Because of this, the
City charges a Circulation System Fee in order to fund the creation of more lane miles, or more efficient lane miles, to accommodate the additional trips created
by new development. These fees are deposited into this fund and then used for the construction of the new/increased/improved roadway and bridge facilities as
listed in the Atascadero Master Facilities Plan updated in February 2006. ("ST' numbers refer to the Atescadero Master Facilities Plan project number for this
item.)
ACTIVITY DETAIL
OBJECT
EXPENSE
2016.2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
NUMBER
CLASSIFICATION
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
CAPITAL OUTLAY
8201909
Purchase of Del Ria Property (ST -26)
$ _
$ -
$ 603,590
$ 603,590
$ -
$ -
8301876
Downtown Infrastructure
-
44,639
55,360
55,360
-
-
Enhancement Pian (ST --44)
8301286
Del Rio Road @ US 101 Interchange
125,895
152,829
167,690
75,000
575,000
600,000
Improvements (ST -26)
Total Capital Outlay
125,895
197,468
826,640
733,950
575,000
600,000
ACTIVITY TOTAL
$ 125,895
$ 197,468
$ 826,640
$ 733,950
$ 575,000
$ 600,000
G-21
FUND ANALYSIS
Storm Drainage Facilities Fees Fund
FUN❑ TYPE
282 Special Revenue
REVENUES
Permits and Fees
Revenue from Use of Money
Total Revenues
EXPENSES
Capital Outlay
Total Expenses
Net Income
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
ACTUAL
ACTUAL
BUDGETED
ESTIMATE❑
REQUESTED
REQUESTED
$ 50,823
$ 58,112
$ 114,260
$ 34,500
$ 32,550
$ 63,450
960
2,110
3,720
9,980
5,360
810
51,783
60,222
117,980
44,480
37,910
64,260
[21,432} _ (678,570) (80,000) (448,000) (100,000)
(21,432) (678,570) (80,000) (448,000) (100,000)
51,783 38,790 (560,590) (35,520) (410,090) (35,740)
523,322 575,105 782,460 613,900 578,380 168,290
$ 575,105 $ 613,895 $ 221,870 $ 578,380 $ 168,290 $ 132,550
C-19
SUMMARY OF REVENUES
Storm Drainage Facilities Fees Fund
FUND
282
SECTION
G
ACCOUNT
REVENUE
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
NUMBER
DESCRIPTION
ACTUAL
ACTUAL
BUDGETED
PROJECTED
ESTIMATED
ESTIMATED
STORM DRAINAGE FACILITIES FEES FUND 282
Permits and Fees
42450.6020
Impact Fees
$ 50,823
$ 58,112
$ 114,260
$ 34,500
$ 32,550
$ 63,450
Revenue from Use of Money
46110.0000
Investment Earnings
960
2,110
3,720
9,980
5,360
810
Total Storm Drainage
Facilities Fees Fund
$ 51,783
$ 60,222
$ 117,980
$ 44,480
$ 37,910
$ 64,260
D-31
CAPITAL PROJECTS
Storm Drainage Facilities Fees Fund
FUND
TYPE
282 Special Revenue
DESCRIPTION
The construction of flood control and storm drainage facilities is essential to the preservation of private property, public streets, curbs and other facilities. Water
runoff increases as vacant land is developed and bare dirt or turf is replaced with impervious rooftop, parking lots, driveways, pools and sidewalks. The
cumulative effects of the additional runoff is managed by constructing the appropriate capital facilities. Because the need for these capital facilities is directly
related to new construction, a Storm Drainage Facilities Fee is charged on all new development. The fees are deposited into this fund and then used for the
construction of the newlincreasedlimproved capital facilities as listed in the Atascadero Master Facilities Plan, updated in February 2006. ("sD" numbers refer to
the Atasaadero Master Facilities Plan project number for this item.)
ACTIVITY DETAIL
OBJECT
NUMBER
EXPENSE
CLASSIFICATION
CAPITAL OUTLAY
8505192 Storm Drain and Culvert Improvement
Program (SD -09)
8501060 Drainage Improvement
Program (sD-io)
8XXXXXX Improvements to Storm Damaged
Culverts (sr -os)
Total Capital Outlay
ACTIVITY TOTAL
2016-2017 2017-2018 2018-2019
ACTUAL ACTUAL BUDGETED
$ - $ 21,432 $ 478,570
- 200,000
2018-2019 2019-2020 2020-2021
ESTIMATED REQUESTED REQUESTED
$ 80,000
$ 75,000
25,000
348,000
$ 75,000
25,000
21,432 678,570 80,000 448,000 100,000
$ - $ 21,432
G-22
$ 678,570 $ 80,000 $ 448,000 $ 100,000
FUND ANALYSIS
Parkland Facilities Fees Fund
FUND
TYPE
287
Special Revenue
REVENUES
Permits and Fees
Revenue from Use of Money
Other Revenue
Total Revenues
EXPENSES
Capital Outlay
Transfers Out
Total Expenses
Net Income
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
$ 196,777
$ 236,343
$ 770,570
$ 143,090
$ 139,490
$ 398,670
2,940
6,297
42,290
29,020
20,800
18,740
-
-
31,710
31,710
-
-
199,717
242,640
844,570
203,820
160,290
417,410
(4,165) (29,305) (778,250) (611,710) (575,000) -
(460,000) - _ - _
(4,165) (489,305) (778,250) 611,710) X575,000} -
195,552 (246,565) 55,320 (407,890) (414,710) 417,410
1,459,562 1,655,114 3,450,200 1,408,450 1,000,560 585,850
$ 1,655,114 $ 1,408,449 $ 3,516,520 $ 1,000,560 $ 585,850 $ 1,003,260
C-20
Revenue from Use of Money
46110.0000 Investment Earnings
Other Revenge
47900.1820 Donations -.toy Playground
Total Parkland Facilities
Fees Fund
2,940 6,297 42,290 29,020 20,800 18,740
- - 31,710 31,710 - -
$ 199,717 $ 242,640 $ 844,570 $ 203,820 $ 160,290 $ 417,410
D-32
SUMMARY OF REVENUES
Parkland Facilities Fees Fund
FUND
SECTION
287
G
ACCOUNT
REVENUE
2016-2017 2017-2018 2018-2019
2018-2019 2019-2020 2020-2021
NUMBER
DESCRIPTION
ACTUAL ACTUAL BUDGETED
PROJECTED ESTIMATED ESTIMATED
PARKLAND FACILITIES FEES FUND (287)
Permits and Fees
42450.6020
Impact Fees
$ 196,777 $ 236,343 $ 770,570
$ 143,090 $ 139,490 $ 398,670
Revenue from Use of Money
46110.0000 Investment Earnings
Other Revenge
47900.1820 Donations -.toy Playground
Total Parkland Facilities
Fees Fund
2,940 6,297 42,290 29,020 20,800 18,740
- - 31,710 31,710 - -
$ 199,717 $ 242,640 $ 844,570 $ 203,820 $ 160,290 $ 417,410
D-32
CAPITAL PROJECTS
Parkland Facilities Fees Fund
FUND TYPE
287
Special Revenue
DESCRIPTION
The provision of a well-planned park system with a variance in the size and nature of facilities offered is an important amenity to the residents of the City. Future
residential development, by increasing the City's population, will necessarily impact the City's park system. Without future parkland and continued development
of currently owned, but underutilized parkland, the City's parks will become overcrowded and overused with the ultimate result becoming a negative experience for
park users. Because the need for new facilities and land acquisitions is directly related to new construction, a Parkland Facilities Fee is charged on all new
development. These fees are deposited into this fund and then used for expanded/new facilities and land acquisitions as listed in the Atascadero Master Facifities
Plan, updated in February 2006. ("PK" numbers refer to the Atascadero Master Facilities Plan project number for this item.)
ACTIVITY DETAIL
OBJECT EXPENSE
NUMBER CLASSIFICATION
CAPITAL OUTLAY
2016-2017 2097-2018 2018-2019 2018-2019 2019-2820 2020-2021
ACTUAL ACTUAL BUDGETED ESTIMATED REQUESTED REQUESTED
8701624 Atascadero Lake Pipeline Repair(PK-oi) $ 4,165 $ 29,305 $ 241,540 S 50,000 $ 100,000 $
8701820 Jay Playground - - 536,710 536,710 -
8701913 La Plaza Park Project - - - 25,000 475,000 _
Total Capital Outlay 4,165 29,305 778,250 611,710 575,000
TRANSFERS OUT
9505035 Transfer to 2010 Bond Proceeds
Master Agreement Fund for
Centennial Bridge and Plaza
Project (PK -o&)
Total Transfers Out
ACTIVITY TOTAL
- 460,000
- gtDu,uuu - - - -
$ 4,165 $ 489,305 $ 778,250 $ 611,710 S 575,000 -
G-23
FUND ANALYSIS
2010 Bond Proceeds Master Agreement Fund
FUND
TYPE
315
Special Revenue
REVENUES
Revenue from Use of Money
Transfers In
Total Revenues
EXPENSES
Capital Outlay
Total Expenses
Net Income
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE
2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
ACTUAL ACTUAL BUDGETED ESTIMATED REQUESTED REQUESTED
$ 1,731 $ 10,675 $ - $ 5,830 $
- 460,000 - -
1,731 470,675 - 5,830 _
120,828) (2,064,191) (320,650) 500 (296,980) -
(720,828) (2,064,191) 320,650) 500 (296,980) -
(719,097) (1,593,516) (320,650) 6,330 (296,980) -
2,603,259 1,884,162 320,650 290,650 296,980 -
$ 1,884,162 $ 290,646 $ - $ 296,980 $
C-22
SUMMARY OF REVENUES
2010 Bond Proceeds Master Agreement Fund
FUND
SECTION
315
G
ACCOUNT
REVENUE
2016-2017
2017-2018
2018-2019 2018-2019 2019-2020 2020-2021
NUMBER
DESCRIPTION
ACTUAL
ACTUAL
BUDGETED PROJECTED ESTIMATED ESTIMATED
2010 BOND PROCEEDS MASTER AGREEMENT FUN❑
315
Revenue from Use of Money
4611Q.0000
Investment Eamings
$ 1,731
$ 10,675
$ - $ 5,830 $ - $ -
Other Sources
49529.8246
Transfer in from Parkland
-
460,000
- -
Facilities Fees Fund for
Centennial Bridge and Plaza
Project
Total 2010 Bond Proceeds
Master Agreement
Projects Fund
$ 1,731
$ 470,675
$ - $ 5,830 $
D-34
CAPITAL PR-OJECTS
2010 Bond Proceeds Master Agreement Fund
FUND TYPE
315 Special Revenue
DESCRIPTION
On September 1, 2010, the City issued $16,010,000 in Lease Revenue Bonds to be used for various Redevelopment public improvement projects within the
downtown area. These projects include Historic City Hall, the Downtown Pedestrian Bridge and Centennial Plaza, continued Downtown Streetscape
Improvements, and Wayfinding Signage, to name just a few.
As part of .tune 2011 state legislation, all redevelopment agencies throughout the State were dissolved. At that time, the Redevelopment Agency was in the
process of expending the 2010 bond proceeds in accordance with bond covenants which require the funds to be spent on the Historic City Hall Rehabilitation
Project with remaining funds to be spent on other eligible redevelopment projects. The Historic City Hal[ Rehabilitation Project has been completed leaving
remaining 2010 bond proceeds. In accordance with redevelopment dissolution law, in August of 2014, the City and the Successor Agency entered into a Master
Agreement, transferring all remaining bond proceeds to the City to be spent on projects for which the bonds were originally sold. This fund accounts for the
expenditure of those 2010 bond funds transferred to the City under the Master Agreement.
The Centennial Bridge and Plaza Project, the Maiden Statue Placement Project, and the Downtown Parking Wayfinding Signage Project are the remaining priority
projects and these projects will utilize the remainder of the bond funds.
ACTIVITY DETAIL
OBJECT EXPENSE
NUMBER CLASSIFICATION
CAPITAL OUTLAY
8201832 Purchase of East Mall Properties
8400432 Centennial Bridge and Plaza Project
8700287 Maiden Statue Placement
8XXXYXX Downtown Parking Wayfinding Signage
Total Capital Outlay
ACTIVITY TOTAL
2016-2017
❑rTl IAI
720,828
2017-2018 2418-2019
ACTUAL BUDGETED
$ 116,000
1,948,191
270,650
50,000
2018.2019 2019-2020
ESTIMATED REQUESTED
$ (500) $ -
266,980
15,000
15,000
720,828 2,064,191 320,650 (500) 296,980
$ 720,828 $ 2,064,191 $ 320,650 $ (500) $ 296,980
G-26
2020-202'1
REQUESTED
FUND ANALYSIS
Colony Park Community Center Construction Fund
FUND TYPE
397 Special Revenue
REVENUES
Revenue from Use of Money
Total Revenues
EXPENSES
Special Projects
Total Expenses
Net Income
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE
2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
ACTUAL ACTUAL BUDGETED ESTIMATED REQUESTED REQUESTED
$ - $ (94) $ - $ - $ - $
(94) - - - -
- - (2,610) (2,610) - -
- (2,610) (2,610) - -
(94) (2,61Oy (2,610) -
2,699 2,699 7,880 2,610 - -
$ 2,699 $ 2,605 $ 6,270 $ - $ - $
C-24
SUMMARY OF REVENUES
Golonv Bark Community Center Construction Fund
FUND SECTION
397 G
ACCOUNT REVENUE 2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
NUMBER DESCRIPTION ACTUAL ACTUAL BUDGETED PROJECTED ESTIMATED ESTIMATED
COLONY PARK COMMUNITY. CENTER CONSTRUCTION FUND 1397
Revenue from Use of Money
46110.0000 Investment Earnings S _ $ (94) $ - $ _ $ _ $ _
Total Colony Park
Community Center
Construction Fund $ - $ (94) $ - $ _ $ _ $ _
❑-36
CAPITAL PROJECTS
Colony Park Community Center Construction Fund
FUND
TYPE
397
Special Revenue
DESCRIPTION
This fund accounted for the planning, design, and construction of a 19,000 square foot, concrete and steel framed community center. The Colony Park
Community Center includes a full-size gymnasium, teen center, dance room, arts and crafts room, computer lab, caf6, restrooms and kitchen. The Center
opened to the public in December 2007. The remainder of the amount left in this fund will be used to purchase additional equipment, and then the fund will be
closed out.
ACTIVITY DETAIL
OBJECT EXPENSE 2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
NUMBER CLASSIFICATION ACTUAL ACTUAL BUDGETED ESTIMATED REQUESTED REQUESTED
SPECIAL PROJECTS
7109090 Equipment $ - $ - $ 21610 $ 2,610 $ - $ -
Total Capital Outlay - - 2,610 2,610 - -
ACTIVITY TOTAL $ - $ - $ 2,610 $ 2,610 $ - $
G-28
FUND ANALYSIS
In Lieu LowtModerate Income Housing Fund
FUND
Type
222 Special Revenue
REVENUES
Permits and Fees
Revenue from Use of Money and Property
Total Revenues
EXPENSES
Operations
Special Projects
Total Expenses
Net Income
OTHER CASH SOURCESUUSES)
(increase) / Decrease in Notes Receivable
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE
2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
ACTUAL ACTUAL BUDGETED ESTIMATED REQUESTED REQUESTED
$ 109,467 $ - $ - $ - $ - $ -
766 2,738 4,610 11,010 8,950 7,410
110,233 2,738 4,640 11,010 8,950 7,410
(47,010) (46,230) (49,530) (49,530) (49,910) (50,400)
(86,971) - - (132,740) - -
(133,981) (46,230) (49,530) (182,270) (49,910) (50,400)
(23,748) (43,492) (44,920) (171,260) (40,960) (42,990)
175,737 - - - - -
527,590 679,579 435,260 636,090 464,830 423,870
$ 679,579 $ 636,087 $ 390,340 $ 464,830 $ 423,870 $ 380,880
C-33
SUMMARY OF REVENUES
In Lieu Low/Moderate Income Housing Fund
FUND SECTION
222
H
ACCOUNT REVENUE 2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
NUMBER DESCRIPTION ACTUAL ACTUAL BUDGETED PROJECTED ESTIMATED ESTIMATED
IN LIEU LOWIMODERATE INCOME HOUSING FUND 222
Permits and Fees
42462.6010 Low/Moderate Housing In Lieu Fees $ 89,232
42461.6010 Low/Moderate Housing Loans 20,235
Revenue from Use of Money and
Property
46110.0000 Investment Earnings
Total In Lieu Low/Moderate
Income Housing Fund
766 2,738 4,610 11,010 8,950 7,410
$ 110,233 $ 2,738 $ 4,610 $ 11,010 $ 8,950 $ 7,410
D-45
OTHER FUNDS
In Lieu LowfModerate Income Housing Fund
FUND CODE
222 Special Funds
DESCRIPTION
The City Council adopted a policy of inclusionary (affordable) housing requirements for projects requesting a legislative action (Zone Changes and General Plan
Amendments). Inclusionary housing consists of deed restricted units that may not sell for more than the published limits for a 30 -year period. Projects that
propose ten or less residential units may build inclusionary housing on-site or pay "In Lieu" fees. The in Lieu Fees are to be expended on programs that provide
andfor promote affordable housing within the City as determined by the City Council,
ACTIVITY DETAIL
OBJECT EXPENSE
NUMBER CLASSIFICATION
OPERATIONS
2016-2017 2017-2018 2018-2019 2018-2019 2019-2020 2020-2021
ACTUAL ACTUAL BUDGETED ESTIMATED REQUESTED REQUESTED
6500000 Contract Services
$ 500
$ 3,300
$ 5,000
$ 5,000
$ 5,000
$ 5,000
6900000 Service Allocation
46,510
42,930
44,530
44,530
44,910
45,400
Total Operations
47,010
46,230
49,530
49,530
49,910
50,400
SPECIAL PROJECTS
7225001 Loss on Moderate Income Program Loan
84,200
-
-
129,240
-
-
7225025 Closing Cost Program Expense
2,771
-
-
3,500
Total Special Projects
86,974
-
-
132,740
-
-
ACTIVITY TOTAL
$ 133,981
$ 46,230
$ 49,530
$ 182,270
$ 49,910
$ 50,400
H-18
OTHER FUNDS
In Lieu Low/Moderate Income Housing Fund
FUND CODE
222 Special Funds
DETAIL BACKUP
OBJECT EXPENSE
NUMBER CLASSIFICATION
6500000 Contract Services
DESCRIPTION
Services to provide legal opinions and the
creation/updating of legal documents
BASIS
Estimate
6900000 Service Allocation Allocation of services provided by the General Allocation
Fund. All personnel costs associated with running
the City's inclusionary housing program are
provided by the General Fund and charged to the
program here
H-19
2019-2020 2020-2021
AMOUNT AMOUNT
5,000 $ 5,000
44,910 45,400
FUND ANALYSIS
Atascadero Tourism Business Improvement District ATBI❑ Fund
FUND
TYPE
235 Special Revenue
REVENUES
Taxes and Assessments
Revenue From Use of Money
Total Revenues
EXPENSES
Operations
Total Expenses
Net Income
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
$ 267,507
$ 275,295
$ 266,480
$ 264,540
$ 284,000
$ 326,770
724
1,580
2,560
6,240
5,500
4,670
268,231
276,875
269,040
270,780
289,500
331,440
(232,639)
(323,637)
(379,660)
(311,110)
(311,020)
(316,450)
(232,639)
(323,637)
(379,660)
(311,110)
(311,020)
(316,450)
35,592
(46,762)
(110,620)
(40,330)
(21,520)
14,990
329,849
365,441
220,690
318,680
278,350
256,830
$ 365,441
$ 318,679
$ 110,070
$ 278,350
$ 256,830
$ 271,820
C-35
SUMMARY OF REVENUES
Atascadero Tourism Business Improvement District ATBID Fund
FUND SECTION
235 N
ACCOUNT REVENUE 2016-2017 2017-2018
NUMBER DESCRIPTION ACTUAL ACTUAL
ATASCADERO TOURISM BUSINESS IMPROVEMENT DISTRICT ATBID FUND 235
Taxes and Assessments
41530.6300 Transient Occupancy Assessments $ 267,507 $ 275,295
Revenue from Use of Money
2018-2019 2018-2019 2019-2020 2020-2021
BUDGETED PROJECTED ESTIMATED ESTIMATED
$ 266,480 $ 264,540 $ 284,000 $ 326,770
46110.0000 Inves#ment Earnings
724
1,580
2,560
5,240
5,500
4,670
Total ATBID Fund
$ 268,231
$ 276,875
$ 269,040
$ 270,780
$ 289,500
$ 331,440
D-47
OTHER FUNDS
Atascadero Tourism Business Improvement District ATBID Fund
FUND
TYPE
235 Special Revenue
DESCRIPTION
This fund accounts for the revenues and expenses associated with the Atascadero Tourism Business Improvement District (ATBID). On June 1, 2013, the City
established ATBID for the purpose of funding tourism promotion and increasing stays at the lodging businesses in Atascadero. A two percent (2%)
assessment is placed on the nightly rent of all occupied rooms or spaces for all transient occupancies in Atascadero.
ACTIVITY DETAIL
OBJECT EXPENSE
NUMBER CLASSIFICATION
OPERATIONS
6050000
Office Expense
6070000
Advertising
6404000
Operating Supplies
6500000
Contract Services
6600000
Professional Development
6700000
Business Development
6900000
Administration
$ -
Total Operations
ACTIVITY TOTAL
DETAIL BACKUP
OBJECT EXPENSE
NUMBER CLASSIFICATION
6050000 Office Expense
6070000 Advertising
6400000 Operating Supplies
2016-2017
ACTUAL
91,005
120
138,414
425
2,675
232,639
2017-2018
2018-2019
2018-2019
2019-2020
2020-2421
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
$ -
$ 5,000
$ 1,000
$ 1,000
$ 1,000
144,521
95,000
157,530
155,000
160,000
-
2,000
500
500
500
172,938
275,000
149,000
151,250
151,250
425
-
430
430
430
3,000
-
-
-
-
2,753
2,660
2,650
2,840
3,270
323,637
379,660
311,110
311,020
316,450
$ 232,639 $ 323,637 $ 379,650 $ 311,110 $ 311,020 $ 316,450
DESCRIPTION
Copies, postage, general supplies
Brochures, magazines, media and online
advertisements, trade show materials
Miscellaneous materials and equipment
H-22
2019-2020
BASIS AMOUNT
Estimated $ 1,000 $
Estimated 155,000
Estimated
2020-2021
❑Remi IMT
1,000
160,000
500 500
OTHERFUNDS
Atascadero Tourism Business Improvement District ATBID Fund
FUND
TYPE
235 Special Revenue
DETAIL BACKUP (continued)
OBJECT
NUMBER
6500000
EXPENSE
CLASSIFICATION
Contract Services
6600000 Professional Development
6900000 Administration
DESCRIPTION
Professional services including marketing,
promotions, public relations, attendance at trade
shows, event transportation of lodging guests,
contract administration services
Central Coast Tourism Council local chapter dues
Administration of fund by City staff
H-23
BASIS
Estimated
Estimated
Estimated
2019-2020
AMOUNT
$ 151,250
430
2,840
2020-2021
AMOUNT
$ 151,250
430
3,270
C-37
FUND ANALY515
Tree Planting Fund
FUND
TYPE
250
Special Revenue
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
ACTUAL.
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
REVENUES
Permits and Fees
$ 8,992
$ 15,541
$ 10,000
$ 25,100
$ 10,000
$ 10,000
Revenue from Use of Money
-
564
280
1,940
1,580
920
Total Revenues
8,992
16,105
10,280
27,040
11,580
10,920
EXPENSES
Operations
(26,797)
(36,865)
(51,560)
(29,860)
{36,770}
(37,230)
Special Projects
-
(5,760)
24,240)
(6,000)
(9,000)
(9,000)
Total Expenses
(26,797)
42,625)
(75,800)
(34,860)
(45,770)
(46,230)
Net Income
(17,805)
(26,520)
(65,520)
(7,820)
(34,190)
(35,310)
OTHER CASH_SOURCESI(USES)
Repaid from / (Loaned to) Atascadero Land
Preservation Society for Three Bridges Trail
-
-
-
120,000
-
BEGINNING AVAILABLE BALANCE
145,208
127,403
183,020
100,880
93,060
178,870
ENDING AVAILABLE BALANCE
$ 127,403
$ 100,883
$ 117,500
$ 93,060
$ 178,870
$ 143,560
C-37
SUMMARY OF REVENUES
Tree Planting Fund
FUND
SECTION
250
H
ACCOUNT
REVENUE
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
NUMBER
DESCRIPTION
ACTUAL
ACTUAL
BUDGETED
PROJECTED
ESTIMATED
ESTIMATED
TREE PLANTING FUND (250)
r'
Permits and Fees
42450.6020
Tree Mitigation Fees
$ 8,992
$ 15,541
$ 10,000
$ 25,100
$ 10,000
$ 10,000
Revenue from Use of Money
46110.0000
Investment Earnings
-
564
280
1,940
1,580
920
Total Tree Planting Fund
$ 8,992
$ 16,105
$ 10,280
$ 27,040
$ 11,580
$ 10,920
D-49
OTHER FUNDS
Tree Planting Fund
FUND TYPE
250 Special Revenue
DESCRIPTION
This fund accounts for Tree Mitigation Fees and the expenditure thereof. These funds are used for the planting of native trees and the ongoing maintenance of
those planted trees, in coordination with the Atascadero Land Preservation Society (ALPS), The City is working with ALPS to plant and maintain new native trees
and shrubs, including site identification, planting plans, site preparation, tree planting with deer and gopher protection, water truck irrigation in dry months, and
annual weed spraying. In addition, the City conducts periodic native tree seedling giveaway programs, providing free Blue Oak and Valley Oak seedlings to
residents living in habitat zones of the program.
ACTIVITY DETAIL
OBJECT EXPENSE
NUMBER CLASSIFICATION
OPERATIONS
6050000
Office Expense
6300000
Utilities
6400000
Operating Supplies
6500000
Contract Services
6600000
Professional Development
6900000
Oversight and Administration
Total Operations
SPECIAL PROJECTS
7700812 Native Tree Replanting
Total Special Projects
ACTIVITY TOTAL
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
$ -
$ -
100
$ 100
$ 100
$ 100
-
-
300
-
-
-
-
698
100
200
100
200
17,397
21,967
36,000
15,000
19,000
19,000
-
-
500
-
500
500
9,400
14,200
14,560
14,560
17,070
17,430
26,797
36,865
51,560
29,860
36,770
37,230
-
5,760
24,240
5,000
9,000
9,000
-
5,760
24,240
5,000
9,000
9,000
$ 26,797
$ 42,625
$ 75,800
$ 34,860
$ 45,770
$ 46,230
H-26
OTHER FUNDS
Tree Planting Fund
FUND
250 TYPE
Special Revenue
DETAIL BACKUP
OBJECT
EXPENSE
2019-2020
2020-2021
NUMBER
CLASSIFICATION
DESCRIPTION
BASIS
AMOUNT
AMOUNT
6050000
Office Expense
Postage, printing, copies, office supplies
Estimated
$ 100
$ 100
6300000
Utilities
Water to estahlis3 oak seedlings
Estimated
-
-
6400000
Operating Supplies
Plant replacement, maintenance tools and native
Estimated
100
2p0
tree nursery items
6500000
Contract Services
Seedling maintenance services including
Estimated
19,000
19,000
watering, weed spraying, tree maintenance and
arborist services
6600000
Professional Development
Staff training to keep up to date on tree topics and
Estimated
500
500
compliance
6900000
Oversight and Administration
Allocation of City staff to manage maintenance
Allocation
17,070
17,430
contracts and planting contracts for the Native
Tree Replanting Program
7700812
Native Tree Replanting
Plant native oak tree seedlings throughout
Estimated
9,000
9,000
Atascadero on sites determined by the Native
Tree Atlas
H-27
SALES TAX MtASURE F-14
Proiects Fund
FUND
101
TYPE
General Fund
DESCRIPTION
This fund is a sub -account of the General Fund and is used to account for projects with special funding received from Sales Tax Measure F-14 approved by
voters in November 2014. The sales tax measure increases the City sales tax rate by 0.5% effective April 1, 2015, and includes a 9 member Citizen Oversight
committee, an annual road report, and a 12 year sunset clause.
When voters approved Sales Tax Measure F-14, they also approved Measure E-14, recommending the sales tax revenue be used for the purpose of repairing
and maintaining neighborhood roads and other roadways.
Road repair projects are typically larger road projects that repair or rehabilitate the road. Road maintenance projects are also typically large projects that are
designed to preserve those roads that are in good or fair condition. Neighborhood roads and other roadways includes residential roads serving those lots directly
fronting the road and not through -traffic, collector roads funneling local traffic from residential roads to arterial roads, and arterial roads carrying the largest
amount of traffic.
Other costs may also include drainage repairs necessary to preserve/protect/repair the surface of the road, bridge repairs to maintain the asphaltipavement on the
bridge structure excluding maintenance of the structure itself, consultant and City staff time spent working directly on the project, and Federal American with
Disabilities Act requirements for any deficient disabled access improvements within the project area. Not included and not funded with this general sales tax
Increase is routine road maintenance, e.g. minor pothole repairs, vegetation control, shoulder control, street staffing, road widening, bikeways, new roads,
roundabouts, general administration and overhead.
The Public Works department develops a prioritization plan for the work using a tool known as the "Critical Point Management' methodology. All of the City
maintained roads have been inspected and entered into a program that evaluated the condition of each to help determine how resources can be best spent to
Prevent street pavements from dropping into a condition that will trigger more expensive maintenance, rehabilitation, and reconstruction. This process provides
the lowest life -cycle costs for the roadway system to maximize the overall pavement condition.
F-1
SALES TAX MEASURE F-14
Proiects Fund
FUND
101 TYPE
General Fund
2019 Rehabilitation Project: $2,525,300
3.03 miles
This project is scheduled for construction during 2019 and is expected to be heavy or light rehabilitation projects designed to improve fair to bad pavement conditions for
entire roadway segments, such as overlays and cold -in-place recycling. During the engineering phase, it may be determined that a different treatment would be more
appropriate. While the expected treatment method may change, the following road segments will be repaired.
Road Name
Beginning Location
Ending Location
Length
[ft.]
Width
(ft.)
Area
{sq. ft.)
CURRENT
PCI
Expected Treatment
PCI
Expected Treatment
Balboa Rd
San Fernando Rd
Graves Creek Rd
6,900
22
151,800
31
Heavy Rehabilitation
Garcia Rd
Santa Cruz Rd
San Gregorio Rd
2,695
24
64,680
56
Heavy Rehabilitation
Monterey Rd
Del Rio Rd
Campo Rd
3,134
25
78,350
53
Heavy Rehabilitation
Navarette Ave
Santa Lucia Rd
San Marcos Rd
3,290
21
69,090
27
Heavy Rehabilitation
2020 Rehabilitation Project: $2,650,000 4 01 miles
This project is scheduled for construction during 2020 and is expected to be heavy or light rehabilitation projects designed to improve fair to bad pavement conditions for
entire roadway segments, such as overlays and cold -in-place recycling. During the engineering phase, it may be determined that a different treatment would be more
appropriate. While the expected treatment method may change, the following road segments will be repaired.
Road Name
Gabarda Rd
Gabarda Rd
Junipero Ave
Palomar Ave
Robles Ave
Sinaloa Ave
Sombrilla Ave
Sombrilla Ave
Sonora Ave
Valle Ave
Valle Ave
Beginning Location
Curbaril Ave
Tampico Rd
EI Camino Real
EI Camino Real
Santa Ysabel Ave
Pueblo Ave
To End
Robles Ave
Valle Ave
North End
Escarpa Ave
Ending Location
Tampico Rd
City Corp. Yard Entrance
To End
Castano Ave
Sombrilla Ave
Curbaril Ave
Robles Ave
Curbaril Ave
Pinal Ave
Escarpa Ave
Curbaril Ave
Length
Width
Area
CURRENT
(ft.)
(ft.)
(sq, ft.)
PCI
Expected Treatment
1.378
22
30,316
28
Heavy Rehabilitation
925
22
20,350
28
Heavy Rehabilitation
3,590
22
78,980
47
Heavy Rehabilitation
4,013
22
88,286
42
Heavy Rehabilitation
440
22
9,680
39
Heavy Rehabilitation
1,255
22
27,610
36
Heavy Rehabilitation
1,457
21
30,597
35
Heavy Rehabilitation
2,447
21
42,987
35
Heavy Rehabilitation
1,425
16
22,800
14
Heavy Rehabilitation
1,350
22
29,700
42
Heavy Rehabilitation
3,315
22
72,930
40
Heavy Rehabilitation
F-2
SALES TAX MEASURE F-14
Protects Fund
FUND
101 TYPE
General Fund
2021 Resurfacing Project: $340,000 2.96 miles
This project is scheduled for construction during 2021 and is expected to be heavy or light resurfacing projects designed to preserve good pavement conditions for entire
roadway segments. Resurfacing for these projects are strategically -timed treatments to the entire pavement surface, such as seal coats and slurry seals, beyond the routine
potholing and patching that City staff perform. During the engineering phase, it may be determined that a different treatment would be more appropriate. While the expected
treatment method may change, the following road segments will be repaired.
F-3
CURRENT
PGI
Expected Treatment
75
Length
Width
Area
Road Name
Beginning Location
Ending Location
(ft.)
(ft.)
(sq. ft.)
El Dorado Rd
Santa Fe Rd
La Lina Ave
725
20
14,500
Halcon Rd
Viejo Camino
Calle Milano
1,540
31
47,740
Las Lomas Ave
North End
Principal Ave
1,035
22
22,770
Plata Ln
West End
El Camino Real
520
37
19,240
Pueblo Ave
San Luis Ave
El Camino Real
440
37
16,280
San Luis Ave
Pueblo Ave
Curbaril Ave
1,215
27
32,845
Solano Ave
EI Camino Real
La Lina Ave
690
27
18,630
Mountain View Dr
Portola Rd
Santa Rasa Rd
2,443
18
43,974
San Diego Rd
Atascadero Ave
Colorado Rd
1,064
21
22,344
San Gabriel Rd
Atascadero Ave
West Front Rd
1,725
21
36,225
F-3
CURRENT
PGI
Expected Treatment
75
Light Resurfacing
83
Light Resurfacing
86
Light Resurfacing
78
Light Resurfacing
75
Light Resurfacing
90
Light Resurfacing
87
Light Resurfacing
76
Light Resurfacing
84
Light Resurfacing
70
Heavy Resurfacing
SALES TAX MEASURE F-14
Projects Fund
FUND
101 TYPE
General Fund
2021 Rehabilitation Project: $2,550,000
3.44 miles
This project is scheduled for construction during 2021 and is expected to be heavy or light rehabilitation projects designed to improve fair to bad pavement conditions for
entire roadway segments, such as overlays and cold -in-place recycling. During the engineering phase, it may be determined that a different treatment would be more
appropriate. While the expected treatment method may change, the following road segments will be repaired.
Road Name
Alegre Ave
Coromar Ave
Coromar Ave
Coromar Ave
La Paz Ln
Marchant Way
Marchant Ave
Old Morro Rd East
Pismo Ave
San Diego Rd
San Guillermo Ln
San Rafael Rd
Beginning Location
Atascadero Ave
Marchant Ave
Curbaril Ave
Via Tortuga
Atascadero Ave
Pismo Ave
Curbaril Ave
Hwy 41 (West)
Hwy 41
Colorado Rd
San Gabriel Rd
San Gabriel Rd
2022 Rehabilitation Project; $2,650,000
Ending Location
To End
Curbaril Ave
Via Tortuga
Portola Rd
To End
Santa Rosa Rd
Atascadero Ave
Hwy 41 (East)
Marchant Way
Hwy 101 On Ramp
To End
Los Osos Rd
Length
Width
Area
CURRENT
Balboa Rd
(%)
(ft.)
(sq. ft.)
PCI[
Expected Treatment
460
20
9,200
38
Heavy Rehabilitation
447
21
9,387
39
Heavy Rehabilitation
1,677
21
35,217
42
Heavy Rehabilitation
1,497
21
31,437
41
Heavy Rehabilitation
2,175
18
39,150
26
Heavy Rehabilitation
1,700
27
45,900
24
Heavy Rehabilitation
1,450
21
22,050
52
Heavy Rehabilitation
2,850
20
57,000
43
Heavy Rehabilitation
874
22
19,228
43
Heavy Rehabilitation
2,047
21
42,987
22
Heavy Rehabilitation
920
20
18,400
12
Heavy Rehabilitation
2,450
21
51,450
43
Heavy Rehabilitation
3.27 miles
This project is scheduled for construction during 2022 and is expected to be heavy or light rehabilitation projects designed to improve fair to bad pavement conditions for
entire roadway segments, such as overlays and cold -in-place recycling. During the engineering phase, it may be determined that a different treatment would be more
appropriate. While the expected treatment method may change, the following road segments will be repaired.
Road Name
Ardilla Rd
Balboa Rd
Cebada Ln
Cenegal Rd
Corriente Rd
Beginning Location
North End
Santa Ana Rd
Santa Ana Rd
To End
San Fernando Rd
F-4
Width
Length
Ending Location
(ft.)
Balboa Rd
2,478
San Fernando Rd
4,615
To End
2,375
Laurel Rd
5,340
Santa Ana Rd
2,439
F-4
Width
Area
CURRENT
(ft.)
(sq. ft.)
PC]
Expected Treatment
20
49,564
40
Heavy Rehabilitation
21
96,915
23
Heavy Rehabilitation
21
49,875
40
Heavy Rehabilitation
20
106,800
22
Heavy Rehabilitation
21
51,219
19
Heavy Rehabilitation
FUND ANALYSIS
Sales Tax Measure F-14 Projects Fund
FUND TYPE
101 General Fund
REVENUES
Taxes and Assessments
Revenue from Use of Money
Total Revenues
EXPENSES
Capital Outlay
Total Expenses
Net Income
BEGINNING AVAILABLE BALANCE
ENDING AVAILABLE BALANCE
2016-2017
2017-2018
2018-2019
2018-2019
2019-2020
2020-2021
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
$ 2,119,420
$ 2,307,369
$ 2,168,900
$ 2,297,400
$ 2,342,000
$ 2,384,000
6,570
554
12,530
66,240
56,360
32,050
2,125,990
2,307,923
2,181,430
2,363,640
2,398,360
2,416.050
(2,138,147)
(1,684,344)
(3,706,570)
(1,710,000)
(4,040,000)
_ (2,950,000)
(2,138,147)
_(1,684,344)
(3,706,570)
(1,710,000)
(4,040,000)
(2,950,000)
(12,157)
623,579
(1,625,140)
653,640
(1,641,640)
(633,950)
2,373,900
2,361,743
1,093,690
2,985,320
3,638,960
1,997,320
$ 2,361,743
$ 2,985,322
$ (431,450)
$ 3,638,960
$ 1,997,320
$ 1,463,370
2
Revenue from Use of Money
46110.1010 Investment Earnings
Total Sales Tax Measure
F-14 Projects Fund
6,570 554 12,530 66,240 56,360 32,050
$ 2,125,990 $ 2,307,923 $ 2,181,430 $ 2,363,640 $ 2,398,360 $ 2,416,050
3
SUMMARY OF REVENUES
Sales Tax Measure F-14 Proiects Fund
FUND
TYPE
141
General Fund
ACCOUNT
REVENUE
2016-2017 2017-2018 2018-2019
2018-2019 2019-2020 2020-2021
NUMBER
DESCRIPTION
ACTUAL ACTUAL BUDGETED
PROJECTED ESTIMATED ESTIMATED
SALES TAX MEASURE F-14 PROJECTS FUND (101)
Taxes
41210.1010
Sales Tax
$ 2,119,420 $ 2,307,369 $ 2,168,900
$ 2,297,400 $ 2,342,000 $ 2,384,000
Revenue from Use of Money
46110.1010 Investment Earnings
Total Sales Tax Measure
F-14 Projects Fund
6,570 554 12,530 66,240 56,360 32,050
$ 2,125,990 $ 2,307,923 $ 2,181,430 $ 2,363,640 $ 2,398,360 $ 2,416,050
3
SALES TAX MEASURE F-14
Proiects Fund
FUND TYPE
101 General Fund
ACTIVITY DETAIL
OBJECT EXPENSE
NUMBER CLASSIFICATION
CAPITAL OUTLAY
8301650
2016 Pavement Resurfacing
8301670
2016 Pavement Rehabilitation
8301750
2017 Pavement Resurfacing
8301770
2017 Pavement Rehabilitation
8301870
2018 Pavement Rehabilitation
8301970
2019 Pavement Rehabilitation
8302070
2020 Pavement Rehabilitation
8302150
2021 Pavement Resurfacing
8302170
2021 Pavement Rehabilitation
8302270
2022 Pavement Rehabilitation
$ -
Total Capital Outlay
ACTIVITY TOTAL
2016-2017
2017-2018
2018-2019
2018-2019
20119-2020
2020-2021
ACTUAL
ACTUAL
BUDGETED
ESTIMATED
REQUESTED
REQUESTED
$ 216,874
$ -
$ -
$ -
$ _
$ _
1,569,599
37,356
205,740
-
230,337
13,079
43,110
-
121,337
1,408,576
460,080
-
-
200,032
2,000,470
1,460,000
-
-
-
25,301
952,170
200,000
2,300,000
-
-
-
45,000
50,000
1,690,000
910,000
-
-
-
-
-
300,000
-
-
-
-
50,000
1,690,000
-
-
-
-
-
50,000
2,138,147
1,684,344
3,706,570
1,710,000
4,040,000
2,950,000
$ 2,138,147
$ 1,684, 344
$ 3,706,570
$ 1,710,000
$ 4,040,000
$ 2,950,000
F-7