HomeMy WebLinkAboutPC Resolution 2019-0002
EXHIBIT A: Notice of Exemption
DEV 18-0113
CITY OF ATASCADERO
NOTICE OF EXEMPTION
6500 Palma Avenue Atascadero, CA 93422 805.461.5000
TO: File
FROM: Mariah Gasch, Assistant Planner
City of Atascadero
6500 Palma Avenue, Atascadero, CA 93422
SUBJECT: Filing of Notice of Determination in Compliance with Section 21152 of the Public
Resources Code.
Project Title: DEV18-0113
Project Applicant: David Raminha
Project Location: 11505 Halcon Road, Atascadero, CA, 93422, San Luis Obispo County (APN 045-311-
010)
Project Description: Conditional Use Permit to allow for contract construction services in the Service
Commercial zoning district created by Specific Planning Zone 1.
Name of Public Agency Approving Project: City of Atascadero
Name of Person or Agency Carrying Out Project: David Raminha
Exempt Status:
Ministerial (Sec. 15073) Emergency Project (Sec. 1507 (b) and (c))
Declared Emergency (Sec. 15061 (a)) General Rule Exemption (Sec. 15061.c)
Categorically Exempt (Sec. 15303)
Reasons why project is exempt: Class 3 of the California Environmental Quality Act (CEQA) (Section
15303, New construction of small structures) exempts up to four commercial buildings in urbanized areas
that are not exceeding 10,000 square feet of floor area.
Contact Person: Mariah Gasch (805) 470-3436
Date: January 15, 2019
Completed by: Mariah Gasch, Assistant Planner
EXHIBIT B: Conditions of Approval
DEV 18-0113
Conditions of Approval
DEV 18-0113
11505 Halcon Road
Contract construction services
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Project Specific Conditions
1. This Conditional Use Permit shall be for the operation of a 2.7 acre contract construction
use and accessory outdoor storage area at 11505 Halcon Road, Atascadero, California,
APN 045-311-010, as shown in Exhibit C, regardless of owner.
Ongoing
2. The approval of this use permit shall become final and effective for the purposes of
issuing building permits fourteen (14) days following the Planning Commission approval
unless prior to the time an appeal to the decision is filed as set forth in Section 9-1.111(b)
of the Zoning Ordinance.
Ongoing
3. The Community Development Department shall have the authority to approve minor
changes to the project that (1) modify the site plan by less than 10%, (2) result in a
superior site design or appearance, and/or (3) address a construction design issue that is
not substantive to the Conditional Use Permit. The Planning Commission shall have the
final authority to approve any other changes to the Conditional Use Permit unless
appealed to the City Council.
BP
4. Approval of this Conditional Use Permit shall be valid for twenty-four (24) months after its
effective date. At the end of the period, the approval shall expire and become null and
void unless the project has received a building permit or business license.
BP / BL
5. The applicant shall defend, indemnify, and hold harmless the City of Atascadero or its
agents, officers, and employees against any claim or action brought to challenge an
approval by the City, or any of its entities, concerning the contract construction services
use.
Ongoing
6. Exterior paint colors for the building shall be natural earth toned colors, subject to staff
approval prior to painting the buildings. BL / BP
7. Architectural elevations shall be consistent with Exhibit D. BP
8. This CUP shall be for the storage of construction equipment associated with the contract
construction services business. Storage of equipment or materials that are not associated
with the approved use shall be prohibited.
Ongoing
9. New vinyl coated chain link fencing shall be installed along the front of the property and
along the side (northeastern) property line as shown on the attached site plan (Exhibit C).
New fencing shall be installed in these locations prior to occupancy of the site. Vinyl
coating shall be black or dark brown unless alternative colors are approved by the
Community Development Director.
BL / FO
10. A final landscape and irrigation plan shall be submitted to and approved by the City prior BL / FO
Conditions of Approval
DEV 18-0113
11505 Halcon Road
Contract construction services
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
to the issuance of a business license and shall include:
Plant species selection, size, and spacing for landscape areas identified on site plan
(Exhibit C),
Street trees identified on the site plan (Exhibit C) along Halcon Road shall be
Coast live Oak trees, or similar native trees subject to staff approval,
Landscaping or ground cover material under trees,
Shrubs shall be added to the right of the entrance driveway in the existing dirt
area at the front of the lot,
Drip and other water conserving irrigation methods, and
All plant selections shall come from the Atascadero Mutual Water Company’s list of
Water-Conserving Plants for North County Landscapes.
All landscape and irrigation shall be installed prior to occupancy of the new business on site.
11. The approved landscape and irrigation plan is to be implemented prior to site occupancy
and vegetation and irrigation shall be maintained in good condition while the site is
occupied.
Ongoing
12. Accessible parking and access ways shall be provided consistent with CBC standards. BL / BP
13. Trash storage (dumpsters or cans) shall be provided in an area that is screened from
view and located on a floor or bottom surface of concrete or other impervious materials.. Ongoing
14. The applicant shall apply for a building permit for all signs proposed. Signage shall
comply with Atascadero Municipal Code (Sign Ordinance) requirements for size and
location.
BP
15. Lighting shall comply with AMC standards for shielding in order to prevent glare. Any
proposed exterior lighting will be in compliance with Municipal Code standards, and
ensure no off-site glare. Building mounted light fixtures shall be fully shielded, cut-off light
fixtures in order to eliminate visible light sources and prevent off site glare.
Ongoing
16. Emergency access ways shall be maintained through the construction yard to provide fire
truck access, as required by the Fire Department Ongoing
17. Owner shall install a new fire hydrant that complies with fire code standards. BP
18. The subject property is located in Flood Hazard Zone A and is therefore subject to all
requirements of the flood Damage Prevention Regulations of the City and FEMA. The
Base Flood Elevation (BFE) is 882’ (NAV ’88 Elevation Datum).
The site topographic survey shall be based on the NAV ’88 Elevation Datum.
New structures shall have a Finished Floor (FF) elevation at or above the BFE.
.
Prior to Final Inspection, a licensed land surveyor shall prepare and submit a FEMA
Elevation Certificate for each structure to the City Engineer.
FI
19. As part of the Building Permit application, a Storm Water Control Plan (SWCP) must be
completed and filed with the City in accordance with the State regulations (Regional
Water Quality Control Board Res. No. R3-2013-0032). The SWCP shall be completed on
BP
Conditions of Approval
DEV 18-0113
11505 Halcon Road
Contract construction services
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
the City standard form available from the City Engineer.
20. When a SWCP is required, the plans shall include:
Each Post-Construction Requirement (PCR) identified in the Storm Water Control
Plan (SWCP)
A list of each Structural Control Measures (SCM) associated with each PCR
The area (in SF) of the impervious surface associated with each PCR
The total area (in SF) of impervious surfaces to be constructed per the plan set
BP
21. When a project includes PCRs 3 or 4, an Operations/ Maintenance Plan & Schedule
(OMPS) is required to be prepared for each PCR. In soils types not conducive to
percolation, the plans may be required to include details for amended permeable layers of
material below drainage features and the basin to enhance and promote percolation of
storm water.
BP
22. An Operations & Maintenance Plan and Storm Water Maintenance & Management
Agreement shall be approved by the City Engineer and recorded against the subject
property prior to a Final Inspection.
FI
23. New frontage improvements consisting of curb, gutter, sidewalk, and driveway
approaches may be triggered and installation required depending on the valuation of
improvements to the existing structures and proposed building improvement valuation
(see Municipal Code section 9-4.159(a)(1) and (b)(3).
BP
24. The road shoulder shall be cleared of brush to provide a clear line-of-sight for
approximately 150-ft in both directions on Halcon Road measured from the center of the
driveway.
Ongoing
25. The Applicant shall construct a 4-ft wide Class 2 aggregate base shoulder in accordance
with City Standard Specifications and Standard Drawings. BP
EXHIBIT C: Site Plan
DEV 18-0113
EXHIBIT D: Elevations
DEV 18-0113
Proposed Office Building
Proposed Shop Building
EXHIBIT E: Proposed Renderings
DEV 18-0113