Loading...
HomeMy WebLinkAboutPC Resolution 2019-0001 EXHIBIT 1: Mitigation Monitoring Program DEV 18-0073 EXHIBIT B: Conditions of Approval DEV 18-0073 Conditions of Approval Master Plan of Development Hotel 940 El Camino Real DEV 18-0073 1. This Conditional Use Permit shall amend CUP 2000-0014 to allow a hotel use as described in these Conditions of Approval and generally shown in attached Exhibits C D, and E located at 940 El Camino Real, legally described as Parcels 2, 3 and 4 of Lot Line Adjustment ATAL 12-0072 (Certificates of Compliance recorded as Official Records 12-004603, 12-004604, and 12-004605), City of Atascadero, County of San Luis Obispo, State of California, (Assessor’s Parcel Numbers 049-045-033, 049-045-034 and 049-045-035), regardless of owner. 2. The approval of this use permit shall become final and effective for the purposes of issuing building permits fourteen (14) days following the Planning Commission approval unless an appeal of the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. 3. All Conditions of Approval of Planning Commission Resolution 2012-0020 shall remain in effect unless specifically amended or superseded by this resolution. The approval to allow two retail pads on the subject lots shall remain in force as an alternative to the hotel. 4. Ongoing, any increase to the number of hotel rooms, the maximum height of the building, or the addition of exhibit/conference space must be approved by the Planning Commission. 5. Before the project may receive building permits, the site plan, landscape plan, elevations, and signage plan shall be reviewed by the Design Review Committee. The determination of the Design Review Committee shall be binding on the project unless appealed to the Planning Commission. 6. The Community Development Department shall have the authority to approve minor changes to the project that (1) modify the site plan of the project by less than 10%, (2) result in a superior site design or appearance, and/or (3) address a construction design issue that is not substantive to the Conditional Use Permit. 7. Approval of this Conditional Use Permit shall be valid for twenty-four (24) months after its effective date. At that time, the Master Plan of Development shall revert back to the project described in Planning Commission Resolution 2012-0020, unless the project has applied for a building permit for the hotel structure or received a time extension. 8. The owner and applicant shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning this conditional use permit. 9. The hotel shall be limited to a maximum of 131 bedrooms. 10. All buildings shall be limited to a maximum of 4 above-ground stories and 60 feet in height. 11. To the satisfaction of the Design Review Committee, the architectural style, colors and materials of the hotel shall be compatible with the existing hotel. 12. The owner shall install any new utilities placed for the hotel underground. 13. Before building permits may be issued, the owner shall apply for and record a Lot Line Adjustment so that buildings are not constructed over lot lines. Easements shall be provided for drainage and circulation throughout the subject site as needed. 14. Before building permits may be issued, the owner shall prepare an acoustical analysis of noise received by the project from Highway 101 and other sources. The project shall be designed and constructed so that noise in outdoor activity areas does not exceed 60 dBn or CNEL, and noise indoors does not exceed 45 dBn or CNEL. 15. No new free-standing freeway-oriented signage structures may be erected (no additional pylon signs or pole signs). New sign faces for the hotel may be placed on/in existing pylon structures. Sign faces added to the pylon sign shall not have a white or similar pale-color background. 16. No new free-standing or monument signs may be erected unless the existing monument sign near the intersection of El Camino Real and the first entrance to the center is removed. Any new monument sign may be permitted up to 10 feet in height with 60 sq. ft. of sign area per side. Landscaping shall be installed at the base of the sign. No cabinet signs are permitted on the existing or future monument signs. 17. Wall-mounted signage may be installed on walls of the building that face the freeway, a parking lot, or public street. Each sign shall be proportionate to the size of the wall as determined by the Design Review Committee, not to exceed 1 square foot per linear foot of building frontage. Wall signs shall be made of individual channel letters or be exteriorly illuminated (no internally illuminated cabinet signs permitted). 18. The owner shall provide a minimum of 200 parking spaces within the center on the west side of El Camino Real. The parking spaces may be used in common for the entire center. 19. The owner shall provide and maintain a minimum of 323 parking spaces within 400 feet of the subject property. The parking spaces may be used in common for the entire center. 20. If project uses change from those anticipated by the Trip Generation Analysis prepared by Associated Transportation Engineers on October 18, 2018, then the circulation impacts of the project shall be reanalyzed. Depending on anticipated impacts, signalization of the El Camino Real / San Ramon intersection may be required to be installed by the owner. 21. The owner shall provide an accessible paved sidewalk connection between the front door of the hotel and the parking lot immediately in front of the existing hotel as generally shown in Exhibit D. The design and location shall be to the satisfaction of the Director of Community Development. 22. The owner shall provide an accessible paved sidewalk connection between the front door of the hotel and the El Camino Real sidewalk as generally shown in Exhibit D. The design and location shall be to the satisfaction of the Director of Community Development. 23. The owner shall provide crosswalk striping, signage and/or lighting to the satisfaction of the City Engineer across El Camino Real at the intersection with the second driveway into the center as generally shown in Exhibit D. 24. The owner shall provide an internal paved pedestrian/bicycle connection to the public bicycle path located along the southwest side of the property between the two hotels as generally shown in Exhibit D. The design and location of the connection shall be to the satisfaction of the Director of Community Development and the City Engineer. 25. A minimum 10-foot wide landscaped setback shall be maintained between the public bicycle path and the rear of the hotel and/or any fencing or walls in proximity to an outdoor swimming pool/recreation area. 26. No fence or wall shall be placed between the hotel and the public bicycle path except in proximity to an outdoor swimming pool/recreation area to the satisfaction of the Design Review Committee. 27. The landscape plan shall include trees with an expected height of approximately 20 feet on both sides of the bicycle path at a rate of 30 feet on center. 28. All landscape areas shall be maintained in good condition in perpetuity and dead or damaged/diseased landscape shall be replaced with like species. 29. No growth control agents shall be applied to landscape trees. 30. Tree canopy trimming shall preclude trimming of primary leader branches on trees. Trees shall be pruned and trained to reach natural height, while thinning overall canopy for balance and maintenance. 31. A Preliminary Storm Water Control Plan (PSWCP) must be submitted and shall be prepared in accordance with the State regulations (Regional Water Quality Control Board Res. No. R3-2013-0032). The PSWCP shall be completed using the City standard form available from the Building Permit Counter and shall include a preliminary hydrology report. The preliminary hydrology report shall be prepared and submitted for review and approval by the City Engineer. The analysis shall indicate the effects of the proposed development on adjacent and downstream properties. The scope of the study shall include analysis of all existing public and private drainage infrastructure between the subject property and an adequate point of discharge. Storm water detention or retention facilities will be required. Detention or retention facilities and associated drainage improvements shall be privately owned and maintained by the property owner. EXHIBIT C: Conceptual Site Plan DEV 18-0073 EXHIBIT D: Site Plan - West of El Camino Real DEV 18-0073 Install crosswalk Install accessible sidewalk to El Camino Real Install accessible sidewalk to connect existing parking areas Install an internal pedestrian connection to the public walking/bicycling path (location to be determined) EXHIBIT E: Conceptual Elevations DEV 18-0073