RESOLUTION NO. 2016-012
RESOLUTION OF THE CITY COUNICL
OF THE CITY OF ATASCADERO, APPROVING A VESTING
TENTATIVE SUBDIVISION MAP 2014-0108, CONSISTENT WITH THE
PD-33 OVERLAY ZONING DISTRICT
(Halcon Residential Planned Development
ConsciousBuild Atascadero Dev. LLC)
WHEREAS, an application has been received from
ConsciousBuild Atascadero Dev. LLC. (2921 Garabaldi Ave, San Luis Obispo, CA
93401) Owner and Applicant, and;
to consider Planning Application PLN 2014-1529, for a project consisting of a General Plan
Land Use Diagram Amendment, Zone Text and Map Amendments, Establishment of a Planned
Development Overlay Zone, Vesting Tentative Tract Map, Tree Removal Permit and
certification of a Mitigated Negative Declaration ("MND") on a 10± acre site located on Viejo
Camino and Halcon Road, Atascadero, CA 93422 (APN’s 045-401-003, & 004); and,
WHEREAS, the site’s current General Plan Land Use Designation is Suburban Estates
(SE); and,
WHEREAS, the site’s current Zoning Designation is Residential Suburban (RS); and,
WHEREAS, the Planning Commission has recommended that the City Council approve
a General Plan Land Use Diagram Amendment to change the Land Use Designation of lots
within the project site to Single-Family Residential - X (SFR-X) and Single-Family residential –
Y (SFR-Y); and,
WHEREAS, the Planning Commission has recommended that the City Council approve
a Zoning Ordinance Text Change and Zoning Map Amendment to establish zoning code text for
PD-33 zoning district and to change the zoning of lots with the project area to Residential Single-
Family – X (RSF-X) and Residential Single-Family - Y (RSF-Y), with a PD-33 overlay on the
entire project site based on findings; and,
WHEREAS, the PD-33 requires the adoption of a Master Plan of Development,
approved in the form of a Conditional Use Permit for cluster development portions of the project
area; and,
WHEREAS, The Planning Commission has recommended that the City Council approve
of a Master Plan of Development (CUP 2014-0284) prepared for the project site which, as
conditioned, meet all requirements of the PD-33 Overlay Zoning District; and,
City of Atascadero
Resolution No. 2016-012
Page 2 of 5
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2015-0007 was
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Tract Map was held by the Planning Commission of the City of Atascadero at which hearing
evidence, oral and documentary, was admitted on behalf of said Subdivision; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on February 2, 2016 studied and considered Vesting Tentative Tract Map
2014-0108 (TR 3078), after studying and considering the proposed Mitigated Negative
Declaration prepared for the project, and
WHEREAS, the Planning Commission of the City of Atascadero has recommended
approval of Vesting Tentative Map 2014-0108 (TR 3078), and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Tract Map was held by the City Council of the City of Atascadero at which hearing evidence,
oral and documentary, was admitted on behalf of said Subdivision; and,
WHEREAS, the City Council of the City of Atascadero, at a duly noticed Public Hearing
held on February 23, 2016 studied and considered Vesting Tentative Tract Map 2014-0108 (TR
3078), after studying and considering the proposed Mitigated Negative Declaration prepared for
the project, and
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of
Atascadero:
SECTION 1. Findings of Approval for Tentative Tract Map, the City Council of the
City of Atascadero makes the following findings, determinations and recommendations with
respect to the proposed Vesting Tentative Tract Map:
1. The proposed subdivision, design and improvements as conditioned, is consistent
with the General Plan and applicable zoning requirements, including provisions of the
PD-33 overlay district.
2. The proposed subdivision, as conditioned, is consistent with the proposed Master
Plan of Development (CUP 2014-0284).
3. The site is physically suitable for the type of development proposed.
4. The site is physically suitable for the density of development proposed.
City of Atascadero
Resolution No. 2016-012
Page 3 of 5
5. The design of the subdivision or the type of improvements will not cause serious
health problems.
6. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or
their habitat.
7. The design of the subdivision will not conflict with easements acquired by the public
at large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
SECTION 2. Approval. The City Council of the City of Atascadero, in a regular
session assembled on February 23, 2016, resolved to approve Vesting Tentative Subdivision
Map TR 3084 (TTM 2014-0108) subject to the following:
1. EXHIBIT A: Tentative Parcel Map 2014-0108
2. EXHIBIT B: Conditions of Approval / Mitigation Monitoring Program.
3. EXHIBIT C: Grading Plan
4. EXHIBIT D: Utility Plan
City of Atascadero
Resolution No. 2016-012
Page 4 of 5
On motion by Council Member Kelley, and seconded by Mayor O’Malley, the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Council Members Fonzi, Kelley, Sturtevant and Mayor O’Malley
NOES: Mayor Pro Tem Moreno
ABSTAIN: None
ABSENT: None
ADOPTED: February 23, 2016
CITY OF ATASCADERO, CA
__________________________________
Tom O’Malley, Mayor
ATTEST:
______________________________________
Marcia McClure Torgerson, C.M.C., City Clerk
APPROVED AS TO FORM:
______________________________________
Brian A. Pierik, City Attorney
City of Atascadero
Resolution No. 2016-012
Page 5 of 5
1. EXHIBIT A: Tentative Parcel Map 2014-0108
2. EXHIBIT B: Conditions of Approval / Mitigation Monitoring Program.
3. EXHIBIT C: Grading Plan
4. EXHIBIT D: Utility Plan
Due to the length of the exhibits they have not been reproduced as an attachment;
however, they may be reviewed in the office of the City Clerk.
City of Atascadero
Resolution No. 2016-012
Exhibits
Exhibit A: Vesting Tentative Subdivision Map TR 3078 (TTM 2014-0108)
City of Atascadero
Resolution No. 2016-012
Exhibits
Exhibit B: Conditions of Approval / Mitigation Monitoring Program
Vesting Tentative Subdivision Map TR 3078 (TTM 2014-0108)
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
Planning Department
1. This Vesting Tentative Subdivision Map (TTM) is for the
creation of 17 legal lots of record described on the attached
exhibits and shall apply APNs 045-401-003, 004 regardless of
owner.
Ongoing PS
2. The approval of this Vesting Tentative Subdivision Map shall
become final and effective for the purposes of issuing building
permits upon the effective date of the associated Zone Text
Amendment establishing Planned Development Overlay Zone
#33, unless an appeal is made with the appropriate judicial
circuit.
Ongoing PS
3. The Community Development Director and/or City Engineer
shall have the authority to make modifications to the final map
that remain in substantial conformance with the approved
Tentative Map.
BP / FM PS, CE
4. Approval of this Vesting Tentative Subdivision Map shall be
valid for twenty-four (24) months after its effective date and
shall expire Monday, Date, 2018. At the end of the period, the
approval shall expire and become null and void unless the
project has received a final map or a time extension has been
granted, consistent with the Atascadero Municipal Code.
BP / FM PS
5. Vesting Tentative Subdivision Map was deemed complete on
November 20, 2015, for the purposes of vested development
rights and fees consistent with the Subdivision Map Act of the
State of California.
On-going PS, CE
6. A final parcel map drawn in substantial conformance with the
approved vesting tentative map, and in compliance with all
conditions set forth herein, shall be submitted for review and
approval in accordance with the Subdivision Map Act and the
City’s Subdivision Ordinance
FM PS/CE
7. The subdivider shall defend, indemnify, and hold harmless the
City of Atascadero or its agents, officers, and employees
against any claim or action brought to challenge an approval
by the City, or any of its entities, concerning the subdivision.
Ongoing
8. All subsequent Tentative Map and construction permits shall
be consistent with the Master Plan of Development (CUP
BP / FM PS, CE
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
2014-0284) approved for the project.
9. The parcel map shall be subject to additional fees for park or
recreation purposes (QUIMBY Act) as required by City
Ordinance
BP PS
10. All maintenance costs listed below shall be 100% funded by
the project in perpetuity, except for public facilities that are
planned for and currently maintained by the City of
Atascadero. The service and maintenance cost shall be
funded through an entity or mechanism established by the
developer, subject to City Staff approval. This entity or
mechanism must be in place prior to, or concurrently with
acceptance of any final map(s). The entity or mechanism
shall be approved by the City Attorney, City Engineer and
Administrative Services Director prior to acceptance of any
Final Map(s). The administration of the above mentioned
funds, and the coordination and performance of
maintenance activities, shall be the responsibility of the
entity or mechanism.
a) All streets, bridges, sidewalks, streetlights, street signs, roads,
emergency access roads, emergency access gates, traffic
control signals, pavement markings and sewer mains within
the proposed project including residential streets within any
residential subdivision.
b) All landscaping and lighting within the proposed project area.
c) Common area fencing and/or features.
d) Open areas on private property within the proposed project
area including detention facilities, bio-swales, and other low-
impact-development features.
e) Newly constructed drainage facilities on private property within
the proposed project area.
f) Landscaped frontages within the right-of-way of all public
streets within the defined specific plan boundary.
g) On-site sewer and storm drains located outside of the right-of-
way.
11. Prior to final map, the applicant shall submit CC&Rs for
review by the Community Development Department. The
CC&R’s shall record with the Final Map and shall include the
following:
a) Provisions for maintenance of all common areas including
parking lot, landscape areas, free standing signs, lighting and
solid waste storage.
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
b) Maintenance of on-site sewer and storm drainage systems.
c) Ensuring compliance with the Master Plan of Development.
d) Standards for the design, maintenance and appearance of
individual lot development and maintenance.
e) A provision for review by the City Community Development
Department for any changes to the CC&R’s that relate to the
above requirements prior to the changes being recorded or
taking effect.
f) Concurrent with recordation of CC&Rs and/or integrated into
CC&Rs shall be a paragraph addressing the City’s roles and
responsibilities related to the administration and enforcement of
any CC&R provisions.
12. All Conditions and mitigation monitoring program for CUP
2014-0284, as amended, are hereby incorporated by
reference.
On-Going PS
Public Works Project Conditions
City Engineer Project Conditions
13. The internal streets shall be offered as public rights-of-way as
shown on the tentative map and shall be extended to include the
cul-de-sac adjacent to lots 9, 16 & 17.
BP, GP CE
14. Internal streets shall not be improved with sidewalks but shall
comply with City standards for Rural Local roads. The road
shoulder adjacent to Lots 1-5 and Lots 13-15 shall include a 5-
foot wide walkable shoulder of compacted Class II Agg Base or
DG, with a cross-slope matching that of the street, but not
exceeding 4%. Where curb & gutter, or, an AC dike are required
to convey stormwater, the area behind the curb or dike shall be
compacted base or DG as described above. Curb ramps are not
required at the intersections of the internal streets.
BP, GP CE
15. Viejo Camino shall be improved to City standards as shown on the
Tentative Map along the project frontage. New improvements shall
be consistent with City standards and the Circulation Element and
shall include new curb, gutter, street intersection with cross-gutter,
traffic signage and delineation, a bike lane (Class II), and transit
stop. The street pavement shall be completed to integrate the
existing roadway with the new frontage improvements as shown on
the Tentative Map.
BP, GP CE
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
16. Along the Viejo Camino frontage, the property owner shall dedicate
an easement and construct a public pedestrian and bike trail to
accommodate a 10-foot wide detached pedestrian & bike trail. The
pedestrian/bike trail shall be constructed of asphalt to the
satisfaction of the Director of Public Works and Director of
Community Development. Final alignment shall meander as
necessary to conform to the existing terrain, trees and drainage
requirements to the satisfaction of the Director of Public Works and
Director of Community Development. The path shall wrap along the
Halcon Rd frontage (off-site frontage) within the existing City ROW
for a distance required by the City Engineer.
BP, GP CE
17. The transit stop shown on Viejo Camino shall be not less than 90
feet long (end-to-end, including transition lanes). The transit stop
shall be designed using smooth curves to allow for ease of
entry/exiting of the bus as well as street sweeping equipment. The
bus staging area shall be of sufficient width to allow the bus to be
safely located out of the travel lane(s) while loading or unloading
passengers to the satisfaction of the City Engineer. The structural
pavement-section shall be sufficient to support the typical transit
vehicles but shall be not less than 6” Class A concrete over 6” Class
II Aggregate Base, to the satisfaction of the City Engineer. Sidewalk
at the transit stop shall be in addition to the concrete pad necessary
to place the transit street furniture (bus shelter, bench, sign and
other street furniture as deemed necessary by the Director of Public
Works). Additional right-of-way shall be dedicated to accommodate
the turn-out to the satisfaction of the City Engineer.
BP, GP CE
18. The Subdivider shall plant street trees along the Viejo Camino
street frontage behind the public sidewalk and within 15-feet.
Trees planted closer than 10-feet shall include deep-root planter
barriers as approved by the City Engineer. One street tree shall
be planted for each 35 linear feet (or portion thereof) of road
frontage.
BP, GP CE
19. Street trees on the internal streets shall be planted at the time of
lot development along the road frontages of the internal streets
offered to the public. One street tree shall be planted for each 35
linear feet (or portion thereof) of road frontage.
BP, GP CE
20. A new gravity sewer shall be designed and extended in Viejo
Camino to serve the lots of Tract 3078, to the satisfaction of the
City Engineer. An optional route along Halcon Rd can be explored
for feasibility, subject to the review and approval of the city
Engineer. The developer may request a reimbursement
agreement for future private sewer connections for any off-site
sewer extension subject to City Ordinance and City Council
BP CE
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
authorization. Notice of developer intent to request a
reimbursement agreement must be made in writing prior to the
start of construction.
21. Each new lot shall be served by separate laterals for water,
power, communications, gas & cable TV (if available adjacent to
the subject property).
BP CE
22. The Final Map shall include the offer of Public Utility Easements
along all street frontages (6-feet wide), to the satisfaction of the
City Engineer.
FM CE
23. The Subdivider shall dedicated sufficient public right-of-way for
street purposes along the northerly side of Santa Barbara Street
to accommodate the existing improved road alignment.
FM CE
STANDARD CONDITIONS
24. All public improvements shall be constructed in conformance with
the City of Atascadero Engineering Department Standard
Specifications and Drawings.
BP, GP CE
25. In the event that the applicant is allowed to bond for the public
improvements required as a condition of this map, the applicant
shall enter into a Subdivision Improvement Agreement with the City.
FM CE
26. An engineer’s estimate of probable cost shall be submitted for
review and approval by the City Engineer to determine the amount
of the bond.
FM CE
27. The Subdivision Improvement Agreement (SIA) shall record
concurrently with the Final Map. If it is the intent of the developer to
pursue a reimbursement agreement with the City for the installation
of off-site sewer facilities, reference to said agreement and terms
shall be included in the SIA.
FM CE
28. The applicant shall be responsible for the relocation and/or
alteration of existing utilities.
BP, GP CE
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
29. The applicant shall install all new utilities (water, gas, electric, cable
TV and telephone) underground. Utilities shall be extended to the
property line frontage of each lot or its public utility easement.
BP, GP CE
30. The applicant shall monument all property corners for construction
control and shall promptly replace them if disturbed.
FM CE
31. The applicant shall acquire title interest in any off-site land that may
be required to allow for the construction of the improvements. The
applicant shall bear all costs associated with the necessary
acquisitions. The applicant shall also gain concurrence from all
adjacent property owners whose ingress and egress is affected by
these improvements.
FM CE
32. Slope easements shall be provided as needed to accommodate cut
of fill slopes.
FM CE
33. Drainage easements shall be provided as needed to accommodate
both public and private drainage facilities.
FM CE
34. The final map shall be signed by the City Engineer prior to the map
being placed on the agenda for City Council acceptance.
FM CE
35. Prior to recording the tract map, the applicant shall submit a map
drawn in substantial conformance with the approved tentative map
and in compliance with all conditions set forth herein. The map shall
be submitted for review and approval by the City in accordance with
the Subdivision Map Act and the City's Subdivision Ordinance.
FM CE
36. Prior to recording the tract map, the applicant shall set monuments
at all new property corners. A registered civil engineer or licensed
land surveyor shall indicate by certificate on the parcel map, that
corners have been set or shall be set by a date specific and that
they will be sufficient to enable the survey to be retraced.
37. Prior to recording the tract map, the applicant shall pay all
outstanding plan check/inspection fees.
38. Prior to recording the map, the applicant shall complete all
improvements required by these conditions of approval
FM CE
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
39. Prior to recording the tract map, the applicant shall have the map
reviewed by all applicable public and private utility companies
(cable, telephone, gas, electric, Atascadero Mutual Water
Company). The applicant shall obtain a letter from each utility
company indicating their review of the map. The letter shall identify
any new easements that may be required by the utility company. A
copy of the letter shall be submitted to the City. New easements
shall be shown on the map.
FM CE
40. Upon recording the final map, the applicant shall provide the City
with a black line clear Mylar (0.4 mil) copy and a blue line print of the
recorded map.
FM CE
41. Prior to the final inspection of any public improvements, the
applicant shall submit a written statement from a registered civil
engineer that all work has been completed and is in full compliance
with the approved plans.
FM CE
42. Prior to the final inspection, the applicant shall submit a written
certification from a registered civil engineer or land surveyor that all
survey monuments have been set as shown on the final map.
BP, GP CE
43. An encroachment permit shall be obtained prior to any work within
City rights of way.
BP, GP CE
44. Prior to the issuance of building permits the applicant shall submit a
grading and drainage plan prepared by a registered civil engineer for
review and approval by the City Engineer.
BP, GP CE
45. The applicant shall submit a hydraulic analysis with the first plan
check submittal of the water system improvements for the project.
The analysis should take into account the fire flows required by the
California Building Code. The applicant is responsible for designing
and constructing water system improvements that will provide water
at pressures and flows adequate for the domestic and fire protection
needs of the project.
BP, GP CE
MITIGATION MONITORING PROGRAM
Mitigation Measure 1.c.1: A landscape buffer shall be provided along
Santa Barbara Rd. Landscape material shall consist of native and/or
drought tolerant species. As mixture of low and medium plants shall be
utilized to provide visual screening of the project from the adjacent
BP PS/BS
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
neighborhood.
Mitigation Measure 1.c.2: Street trees shall be provided along Viejo
Camino and Halcon Rd. Street trees shall be spaced at no greater than
30-feet on center, however, rural tree groupings may be approved by
the City Engineer due to topographic or sight distance concerns and/or
to maintain the rural nature of the street.
BP CE/BS
Mitigation Measure 1.c.3: Rear or side yard privacy fencing where
adjacent to a private road shall be set back from the edge of shoulder a
minimum of 10-feet. Where rear or side yard fencing is adjacent to a
public road, a minimum setback from the edge of
pavement/sidewalk/pedestrian path of 10-feet shall be observed.
Fencing adjacent to a public roadway shall be a maximum of 6-feet high
and shall include landscaping on the street side of the fence. Fencing
shall be decorative in nature. Any walls proposed for rear or side yards
adjacent to a public road shall be constructed of high quality materials
and shall adhere to the same setback as privacy fencing.
BP PS/BS
Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any
off site glare. All exterior site lights shall utilize full cut-off, “hooded”
lighting fixtures to prevent offsite light spillage and glare.
BP PS/BS
Mitigation Measure 3.b.1: The project shall be conditioned to comply
with all applicable District regulations pertaining to the control of fugitive
dust (PM-10) as contained in Section 2 “Assessing and Mitigating
Construction Impacts.”
2.4 Fugitive Dust Mitigation Measures: Standard List
a. Reduce the amount of the disturbed area where possible;
b. Use water trucks or sprinkler systems in sufficient quantities to
prevent airborne dust from leaving the site. Increased watering
frequency would be required whenever wind speeds exceed 15
mph. Reclaimed (non-potable) water should be used whenever
possible;
c. All dirt stock-pile areas should be sprayed daily as needed;
d. All roadways, driveways, sidewalks, etc. to be paved should be
completed as soon as possible, and building pads should be laid as
soon as possible after grading unless seeding or soil binders are
used;
e. All of these fugitive dust mitigation measures shall be shown on
grading and building plans; and
f. The contractor or builder shall designate a person or persons to
BP PS/BS
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
monitor the fugitive dust emissions and enhance the
implementation of the measures as necessary to minimize dust
complaints, reduce visible emissions below 20% opacity, and to
prevent transport of dust offsite. Their duties shall include holidays
and weekend periods when work may not be in progress.
Mitigation Measure 3.b.2: The project shall be conditioned to comply
with all applicable APCD regulations pertaining to Naturally Occurring
Asbestos (NOA). Prior to any grading activities a geologic evaluation
should be conducted to determine if NOA is present within the area that
will be disturbed. If NOA is not present, and exemptions request must be
filed with the District. If NOA is found at the site, the applicant must
comply with all requirements outlined in the Asbestos ATCM. This may
include development of an Asbestos Dust Mitigation Plan and an
Asbestos Health and Safety program for approval by the APCD.
Technical Appendix 4.4 of the SLO County APCD CEQA Air Quality
Handbook includes a map of zones throughout San Luis Obispo County
where NOA has been found and geological evaluation is required prior
to any grading.
BP PS/BS
Mitigation Measure 4.a.1: A qualified biologist shall conduct a pre-
construction survey within 30 days of initial site disturbance to identify
whether silvery legless lizards are present. If silvery legless lizards are
detected, a biological monitor shall be present during initial ground
disturbing and vegetation removal activities to allow for a salvage and
relocation effort for the lizard and other ground dwelling common wildlife
that may be present.
BP PS
Mitigation Measure 4.a.2: A qualified biologist shall conduct a pre-
construction survey within 30 days of initial site disturbance to identify
whether American badger are present. If American badger or their dens
are detected during the survey, the location of the den shall be mapped,
the biologist shall monitor the den for three days if it is within 50ft of
proposed blueprints. If the den is deemed inactive it shall be destroyed if
the den is active the biologist will continue monitoring its status till the
den becomes inactive so it can be destroyed, during that time all
development activities shall respect a 50ft buffer or exclusion zone
around the den.
BP PS
Mitigation Measure 4.a.3: Conduct a springtime rare plant survey to
determine the presence/absence of any special-status plants. Should
any be discovered, implement a seed and/or plant salvage program and
incorporate the salvaged material into the drainage setback and
detention basin landscaped areas.
BP PS
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
Mitigation Measure 4. d.1: Vegetation removal and initial site
disturbance shall be conducted between September 1 and January 31
outside of the nesting season for birds. If vegetation and/or tree removal
is planned for the bird nesting season, then preconstruction nesting bird
survey, prepared by a qualified biologist, shall be required to determine
if any active nests would be impacted by project construction. If no
active nests are found, then no further mitigation shall be required. If
any active nests are found that would be impacted by construction, then
the nest sites shall be avoided with the establishment of a non-
disturbance buffer zone around active nests as determined by a
qualified biologist. Nest sites shall be avoided and protected with the
non-disturbance buffer zone until the adults and young of the year are
no longer reliant on the nest site for survival as determined by a
qualified biologist. As such, avoiding disturbance or taking of an active
nest would reduce potential impacts on nesting birds to a less-than-
significant level.
BP PS
Mitigation Measure 4.e.1: Grading and excavation activities shall be
consistent with the City of Atascadero Tree Ordinance. Special
precautions when working around native trees include:
1. During grading activities an arborist must be present.
2. All existing trees outside of the limits of work shall remain.
3. Earthwork shall not exceed the limits of the project area.
4. Low branches in danger of being torn from trees shall be
pruned prior to any heavy equipment work being done.
5. Vehicles and stockpiled material shall be stored outside the drip
line of all trees.
6. All trees within twenty feet of construction work shall be fenced
for protection with 4-foot chain link, snow or safety fencing
placed per the approved tree protection plan. Tree protection
fencing shall be in place prior to any site excavation or grading.
Fencing shall remain in place until completion of all
construction activities.
7. Any roots that are encountered during excavation shall be
clean cut by hand and sealed with an approved tree seal.
8. Utilities such as water, gas, power, cable, storm drainage, and
sewer should be redirected from under the canopy of any trees
that are to remain.
9. Where a building is placed within the canopy of a tree the
foundation should be redesigned so that it bridges across any
root systems.
10. Any foundation or other structure that encroaches within the
drip line of trees to be saved shall be dug by hand.
11. At no time shall tree roots be ripped with construction
equipment.
BP PS/ BS
Mitigation Measure 4.e.2: Tree protection fencing shall be installed at
the locations called out in the Tree Protection Plan. An inspection of the
tree fencing shall be done by City staff prior to issuance of building
permits.
BP PS/ BS
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
Mitigation Measure 4.e.3: The following measure shall be incorporated
on-site during the construction process of the proposed project:
1. A minimum height construction protective barrier shall
be erected around the drip line of the tree plus 4’. The
fence shall be supported with “T” posts at no more
than 6’ o.c. and tied at least 3 places per post. This
fence shall be installed by the General Contractor
before any rough grading is allowed on the site.
Approval for this stage must be obtained in writing
from either the Arborist or the Counties/Cities
representative.
2. Earthwork shall not exceed the limits of the project
area.
3. Low branches in danger of being torn during
construction process shall be pruned prior to any
heavy equipment work being undertaken.
4. Once the rough grading is accomplished the fence
may be moved closer to the trunk of the tree for finish
grading. At no time shall the fence be placed within
the Critical Root Zone (CRZ). This location is
determined by the diameter of the trunk at Diameter
Breast Height (DBH). (4.5’ above grade) and is 1’ per
1” diameter in the direction of the drip line. At no time
shall the fence be moved closer to the trunk than the
drip line, unless additional preservation measures are
implemented as recommended by the project arborist.
5. Any roots that are encountered over 2” diameter,
during the excavation process shall be clean cut
perpendicular to the direction of root growth with a
handsaw. At no time shall tree seal be applied to any
cut. Any roots over 2” diameter the county/city
representative shall be notified to determine the
preferred course of action.
6. All trenching with CRZ area shall require hand
trenching to preserve and protect roots over 2” in
diameter.
7. No grading of trenching is allowed within the CRZ
fenced area without written permission from the
County/City representative or a certified arborist.
8. Any roots over 4” in diameter are not to be cut or
ripped until inspected and approved in writing by the
arborist.
9. If, for whatever reason, work must be accomplished
inside the drip line 4”-6” of mulch must be applied first
to decrease the possibilities of compaction upon
written approval from the arborist.
10. There shall be a pre-construction meeting between
BP PS/ BS
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
the Engineering/Planning staff of the County/City,
Grading equipment operators, Project Superintendent
and the Arborist to review the project conditions and
requirements prior to any grubbing or earth work for
any portions of the project site. All tree protection
fencing shall be installed for inspection prior to this
meeting.
11. All trees shall be pruned before any construction takes
place that are in the development areas to be saved if
they might be damaged by the construction
equipment. This must be accomplished by a bonded,
licensed, and certified Tree Service Contractor.
12. All debris shall be cleared from the area or chipped
and spread on the site or stacked in orderly piles for
future use by the Owner, at the Owners request.
13. In locations where paving is to occur within the drip
line grub only and do not compact unless authorized
in writing. Permeable pavers or other preamble
surface must be approved by the Arborist.
Mitigation Measure 4.e.4: Upon project completion and prior to final
occupancy a final status report shall be prepared by the project arborist
certifying that the tree protection plan was implemented, the trees
designated for protection were protected during construction, and the
construction-related tree protection measures are no longer required for
tree protection.
FO PS/
Mitigation Measure 4.e.5: All utilities shall remain outside the drip lines
of native trees, unless preservation measures, as specified by the
project arborist, are implemented.
BP PS/ BS
Mitigation 5.a.b.c.1: An archaeological monitor shall be present during
initial vegetation clearing, site “grubbing, and grading for all portions of
the project.
GP PS
Mitigation 5.d.1: In the event that human remains are discovered on the
property, all work on the project shall stop and the Atascadero Police
Department and the County Coroner shall be contacted. The
Atascadero Community Development Department shall be notified. If
the human remains are identified as being Native American, the
California Native American Heritage Commission (NAHC) shall be
contacted at (916) 653-4082 within 24 hours. A representative from
both the Chumash Tribe and the Salinan Tribe shall be notified and
present during the excavation of any remains.
BP / GP PS
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
Mitigation Measure 6.b.1: The on-site subdivision / grading permit plans
shall include erosion control measures to prevent soil, dirt, and debris
from entering the storm drain system during and after construction,
consistent with mitigation or construction methods outlined in the
geotechnical report. Plans shall be approved by the City Engineer prior
to issuance.
GP PS/CE
Mitigation Measure 6.b.2: All cut and fill slopes mitigated with an
appropriate erosion control method (erosion control blanket, hydro-
mulch, or straw mulch appropriately anchored) immediately after
completion of earthwork, as approved by the City Engineer. All
disturbed slopes shall have appropriate erosion control methods in
place.
GP PS/CE
Mitigation Measure 6.b.3: The contractor will be responsible for the
clean-up of any mud or debris that is tracked onto public streets by
construction vehicles. An approved device must be in place prior to
commencement of grading activities. This device shall be approved by
the City Engineer.
GP PS/CE
Mitigation Measure 6.b.4: A re-vegetation plan shall be submitted with
building permits. All disturbed cut and fill slopes shall be vegetated as
specified in a landscaping plan. The landscaping plan must be approved
by both the Community Development Department and the Public Works
Department.
GP PS/CE
Mitigation Measure 8.h.1: All new construction will comply with section
the California Building and Fire Codes. New residences in the City are
required to install fire sprinklers. Fire protection measures shall include
the use of non-combustible exterior construction and roofs and fire-
resistant building materials.
BP FD
Mitigation Measure 9.d.e.f.1: The project shall integrate Low Impact
Development Best Management Practice’s into the project design which
may include on-site detention and/or retention basins, pervious paving,
and vegetated swales. The detention basins must meet the City’s
drainage design standards with surface runoff being treated for water
quality through structural control measures including: disconnected
downspouts flowing to vegetated bio-swales, and pervious pavement
and/or landscape areas to control storm volume. All drainage control
features shall be subject to the approval of the City Engineer.
GP PS/CE
Mitigation Measure 9.d.e.f.2: The developer shall ensure that all
contractors are aware of all storm water quality measures and that such
measures are implemented. Failure to comply with the approved
GP PS/CE
City of Atascadero
Resolution No. 2016-012
Exhibits
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney
construction Best Management Practices will result in the issuance of
correction notices, citations, or stop orders.
Mitigation Measure12.a.1: Private yard outdoor activity spaces for each
residential parcel adjacent to Viejo Camino and Halcon Rd where
outdoor noise levels exceed City standards shall be located where the
building provides acoustical screening opportunities. If no such areas
exist within the design of the structure on the site, private outdoor use
areas shall be enclosed by a 6-foot high solid wall.
BP PS/BP
Mitigation Measure 12.a.2: Windows on facades adjacent to Halcon and
Viejo Camino Road shall include additional sound attenuation features
such as dissimilar glass or other methods aimed at reducing sound
transmission beyond the standard dual pane requirements.
BP PS/BP
Mitigation Measure: 14: Prior to final map recordation, the applicant shall
annex into the City’s Community Facilities District (CFD) to off-set
additional costs associated with the provision of additional police, fire,
and park services.
FM PS/BP
Mitigation Measure 16.a.b.1: In addition to the City’s Development
Impact Fees, each new residential unit shall pay towards its fair share of
the US 101 / Santa Barbara interchange improvements. The project may
be eligible for TIF fee credits for Citywide development impact fees
associated with the interchange improvements. Any TIF credit shall be
approved by the City Engineer.
BP PS/CE
Mitigation Measure 16.d.1: Access for parcels abutting Halcon Rd shall
be consolidated and shall be designed as private roads meeting City
road standards. Driveways to individual parcels with existing residences
may be approved by the City Engineer in locations where consolidated
access cannot be utilized due to parcel locations. All access roads and
driveways shall be evaluated at the time of tentative map submittal
and/or improvement permits for sight distance.
FM PS/CE/FD
Mitigation Measure 6.f.1: In addition to an on-street bike lane, a multi-
use path shall be provided along Viejo Camino and Halcon Roads
consistent with the adopted City bike and trail Master Plan and the
SLOCOG Salinas River Trail Plan.
FM PS
Mitigation Measure 17.d.1: Landscaping plans shall be submitted to the
Community Development Department for review and approval.
Landscaping must consist of drought tolerant species and utilize drip
irrigation. Turf shall not be permitted as a part of the approved
landscaping plan.
BP PS
City of Atascadero
Resolution No. 2016-012
Exhibits
EXHIBIT C: Grading and Drainage Plan
City of Atascadero
Resolution No. 2016-012
Exhibits
EXHIBIT D: Utility Plan