Loading...
HomeMy WebLinkAboutResolution 1999-053 RESOLUTION NO. 1999-053 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ATASCADERO, CALIFORNIA ADOPTING A REVISED FEE SCHEDULE FOR BUILDING PERMITS AND PLAN REVIEW SERVICES WHEREAS, California Health & Safety Code Section 17951 provide the authority to local governments to prescribe fees that are reasonably required to administer and process building permits, including but not limited to plan examination, inspection,enforcement and other services; and WHEREAS,the City's Building Official is required to perform plan reviews, inspections and other services to safeguard the public health, safety and welfare; and WHEREAS, the International Conference of Building Officials has prepared standardized fee schedules which are based on average costs for permit,plan review and inspection activities; WHEREAS, the fee schedules for these services must be revised from time to time to assure the City recovers the costs associated with rendering such services; and WHEREAS, the Building Official has conducted a review of the current fee schedule and has proposed revisions to the fees; and WHEREAS, the City Council held a public hearing on September 14, 1999 to consider the proposed revisions to the fee schedule. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ATASCADERO, CALIFORNIA DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. The City Council hereby adopts the fees for Building and Safety permits,plan review and other services set forth in Exhibit"A" attached hereto and incorporated here in by this reference. SECTION 2. The Building Official shall determine valuation of construction projects using square foot value for the type of construction as found in the latest publication of Building Standards as published by the International Conference of Building Officials SECTION 3. Upon the effective date of this Resolution, the fees adopted herein shall supersede fees previously adopted by this City Council for those purposes. This Resolution does not supersede or repeal any other portion of any other Resolution other than the fees,unless amended or repealed herein. SECTION 4. The fees established in this Resolution do not exceed the estimated reasonable cost of providing the service for which the fee is imposed. CITY OF ATASCADERO Resolution No. 1999-053 Page 2 SECTION 5. This Resolution shall become effective on November 1, 1999. APPROVED AND ADOPTED this 14th day of September, 1999 on the following roll call vote: AYES: Council Members Arrambide, Clay,Lerno,Luna and Mayor Johnson NOES: None ABSENT: None Ray Joh son Mayor ATTEST: Marcia McClure Torgerson City Clerk APP OVED AS TO FORM: Roy A. Hanley City lorney Resolution 1999-053 EXHIBIT A 1. Building Permit Fees Total Valuation Fee $1.00 to$500.00 $23.50 $501.00 to$2,000.00 $23.50 for the first$500.00 plus$3.05 for each additional $100.00 or fraction thereof,to and including$2,000.00 $2,001 to$25,000.00 $69.25 for the first$2,000.00 plus$14.00 for each additional $1,000.00 or fraction thereof,to and including$25,000.00 $25,001.00 to$50,000.00 $391.25 for the first$25,000.00 plus$10.10 for each additional$1,000.00 or fraction thereof,to and including $50,000.00 $50,001.00 to$100,000.00 $643.75 for the fust$50,000.00 plus$7.00 for each additional$1,000.00 or fraction thereof,to and including $100,000.00 $100,001.00 to$500,000.00 $993.75 for the first$100,000.00 plus$5.60 for each additional$1,000.00 or fraction thereof,to and including $500,000.00 $500,001.00 to$1,000,000.00 $3,233.75 for the first$500,000.00 plus$4.75 for each additional$1,000.00 or fraction thereof,to and including $1 000,000.00 $1,000,000.00 and up $5,608.75 for the first$1,000,000.00 plus$3.65 for each additional$1,000.00 or fraction 2. Plan Review Fees: The plan review fee shall be 65%of the permit fee 3. Energy Conservation: Plan review and permit fees shall be increased by 10%where compliance with California energy conservation laws is required. 4. Disabled Access: Plan review and permit fees shall be increased by 10%where compliance with California access law is required. 5. Strong Motion (SMIP): Permit fees shall be increased in amounts as required by state law to support the State of California Strong Motion Instrumentation and Seismic Hazard Mapping Program. 6. Mechanical,Plumbing and Electrical Permit Fees: Plan review and permit fees shall be based on Tables 3-B, 3-C and 3-D of the 1997 Uniform Administrative Code. Electrical permit fees for commercial projects shall be determined at a rate of 0.074 per square foot. The Building Official may establish other formulas in place of the tables listed above provided the fees are not in excess of the fees established by the tables. 7. Miscellaneous Services Fees Fees for the following miscellaneous services shall be charged at actual cost plus 15% administrative processing: A. Inspections outside of normal business hours(minimum charge 2 hours) B. Reinspection fees assessed under provisions of UBC Section 305.8 C. Inspections for which no fee is specifically indicated D. Additional plan review required by changes,additions or revisions E. For use of outside consultants for plan checking and inspections or both(including administrative and overhead costs). F. For plan review and inspection services for demolition of buildings. G. For the installation of temporary trailer facilities.