Loading...
HomeMy WebLinkAboutResolution 1999-026 RESOLUTION 1999-026 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ATASCADERO AMENDING THE GENERAL PLAN URBAN SERVICES LINE WHEREAS, the City of Atascadero has received an application to extend the Urban Services Line of the General Plan for the purpose of providing sewer service to property generally located at 905 El Camino Real as depicted in Exhibit "A", attached hereto and made a part of this Resolution as though fully set forth herein; and WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the local guidelines implementing the California Environmental Quality Act, have been adhered to; and WHEREAS, on April 20, 1999, the Planning Commission held a public hearing and after hearing testimony, took action to recommend approval of the amendment; and WHEREAS, a timely and properly noticed public hearing upon General Plan Amendment No. 99002 was held by the City Council of the City of Atascadero on May 11, 1999 at which hearing evidence, oral and documentary, was admitted on behalf of said amendment. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Atascadero, in a regular session assembled on May 11, 1999, approved General Plan Amendment No. 99002 based on the findings and conditions as outlined in Exhibit "B", attached hereto and made a part of this Resolution. On motion by Council Member Arrambide and seconded by Council Member Clay, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: Council Members Arrambide, Clay, and Mayor Johnson NOES: Council Member Luna ABSENT: Council Member Lerno abstained ADOPTED: May 11, 1999 4Ray T ADERO n ATTEST: Marcia McClure Torgerson City Clerk AMD AS FORM: Ro Y. Hanley, City orney ATTACHMENT A LAND USE MAP General Plan Amendment#99002 905 91 Camino Real Exhibit 0 001 - • ••• • • . • ' • 1 H r - r^ I/ - I 1\ Nor lq 1 IMPS s S S 1 IVA ,� Findings and Conditions of Aaaroval Genera,Plan Amendment 99002 Extension of Urban Services Line Exhibit'W Resolution 1999-026 905 El Camino Real Findings of Approval: 1. Extension of sewer service to the area will not overburden the City's sewer plan or collection system. 2.._ Extansian of sewer-service to.thearea.mid not.affect..service top iority areas as identified in the General Plan Land Use Element. Conditions of Anaroval: . T 1._ The applicant._shall submit..sewer improvement.plans..prepared by a registered civil engineer for review and approval by the City Engineer and the Chief of Wastewater Operations,prior.to recordation.of the final mag_ Sewer improvement plans shall conform to the requirements of the City Standard Specifications. 2... Prior to.issuance. of the first.building,permit,the.applicant.,shall demonstrate that the portions of the existing wastewater collection system required to convey sewage from the project_siaeto.Pump Station#5 have adequate capacity._ The sewage flow used in the capacity calculations shall be the flow from all areas within the existing Urban Services Line at_builcl,-out:plus,the.flow generated by the project. M the existing wastewater collection system does not have adequate capacity to adequately convey the sewage flow at build-out plus the.flow from.the project site,the applicant shall design and construct improvements to the existing wastewater collection system as required by the City End.and.the_Chief of Wastewater Operations.. Plans.for improving the existing wastewater collection system shall be prepared by a registered civil engineer and submitted.for review and..approval by the. City Engineer and the Chief of Wastewater Operations. Improvements to the existing wastewater collection system shall be completed prior to the final inspection of the first building constructed on the site. 3. The applicant shall enter into an agreement with the City to pay a pro-rata share for the design:_and construction.of upgrades to.Pump Station#5 prior to the issuance of the first building permit. The form and content of the agreement shall be reviewed and approved by the _City Attorney_,and_the:.Clay. Engineer._ 'The..upgrades shall be designed to accommodate existing wet weather flows plus the increased flow generated by the prajeeL.The..applicant'&pro-rata.share shall.bebased.osn.theanticipated average daily dry weather flow generated by the project divided by the existing average daily dry weather flow to Pump Station#5. 4.. The..applicant.shall acquire title or interest..in any offsite land that may be'required to allow construction of the sewer improvements required by these conditions of approval. The applicant_shall bear all costs associated with the acquisitions. The applicant shall Page-1 of 2 gain concurrence from all ad3aca t property owners whose ingress or egress is affected by constsuetion of the improvements required by these conditions of approval. 5. The applicant shall enter into a Plan Check/Inspection Agreement with the City and shall pay all.outstmding fees.prior to.issuance of a.Certificate of Completion 6. The applicant shall obtain an encroadmient permit prior to commencing any work within existing ngbts of way. 7. All improvements shall in the public right of way shall be secured with a 100% performance guarantee and a 50%labor and materials guarantee until the improvements are acceptect as.substantially complete by.the City_.Engineer_ Prior to the final inspection of the improvements, and before the other guarantees are released, a 10% maintenance guarantee shall be posted to cover the improvements for a period of acne(1)year from the date of final inspection The guarantee amounts shall be based on an engineer's,estimate submitted by.the project a 4necr.and approved by the City.En* eer. The estimate shall be based on City standard unit prices. The City Attorney shall approve the form of guarantee S. The.applicant.shall submit.a written statemel.from.a registered civil engineer certifying that all work shown on the plans has been completed and is in full compliance with the plans.. approved-by.the City and the Uniform._Building..Code(s) prior to the final inspection. 9. A Mylar copy and a blue line print of wbuilt improvement plans, signed by the registered engineer who prepared the plans shall be provided to the City Engineer prior to the final inspection. 10. The applicant shall be responsible for the relocation and/or alteration of existing utilities. 11. The applicant shall pay all sewer annexation fees prior to the issuance of a construction pem&.for the public improvements. 12. The applicant shall pay for all costs associated with the establishment of a reimbursement agreement or assessment district, if applicable,includin&but not limited to preparation of studies,maps,and recordation of documents. - 13. No-other properties.shall be served.by sewer.service cnnsmuled by applicant without having been added to the Urban Services Line by a General Plan.Amendment. Page Z-of Z..