HomeMy WebLinkAboutResolution 1999-026 RESOLUTION 1999-026
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ATASCADERO AMENDING THE GENERAL PLAN URBAN SERVICES LINE
WHEREAS, the City of Atascadero has received an application to extend the Urban
Services Line of the General Plan for the purpose of providing sewer service to property
generally located at 905 El Camino Real as depicted in Exhibit "A", attached hereto and made a
part of this Resolution as though fully set forth herein; and
WHEREAS, the laws and regulations relating to the preparation and public notice
of environmental documents, as set forth in the local guidelines implementing the California
Environmental Quality Act, have been adhered to; and
WHEREAS, on April 20, 1999, the Planning Commission held a public hearing and after
hearing testimony, took action to recommend approval of the amendment; and
WHEREAS, a timely and properly noticed public hearing upon General Plan Amendment
No. 99002 was held by the City Council of the City of Atascadero on May 11, 1999 at which
hearing evidence, oral and documentary, was admitted on behalf of said amendment.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Atascadero, in a regular session assembled on May 11, 1999, approved General Plan Amendment
No. 99002 based on the findings and conditions as outlined in Exhibit "B", attached hereto and
made a part of this Resolution.
On motion by Council Member Arrambide and seconded by Council Member Clay, the
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Council Members Arrambide, Clay, and Mayor Johnson
NOES: Council Member Luna
ABSENT: Council Member Lerno abstained
ADOPTED: May 11, 1999
4Ray
T ADERO
n
ATTEST:
Marcia McClure Torgerson
City Clerk
AMD AS FORM:
Ro Y.
Hanley, City orney
ATTACHMENT A
LAND USE MAP
General Plan Amendment#99002
905 91 Camino Real
Exhibit
0 001 -
• ••• • •
. • ' • 1 H
r -
r^ I/ -
I 1\
Nor lq
1
IMPS s S S
1
IVA
,�
Findings and Conditions of Aaaroval
Genera,Plan Amendment 99002
Extension of Urban Services Line
Exhibit'W Resolution 1999-026
905 El Camino Real
Findings of Approval:
1. Extension of sewer service to the area will not overburden the City's sewer plan or
collection system.
2.._ Extansian of sewer-service to.thearea.mid not.affect..service top iority areas as identified
in the General Plan Land Use Element.
Conditions of Anaroval:
. T
1._ The applicant._shall submit..sewer improvement.plans..prepared by a registered civil
engineer for review and approval by the City Engineer and the Chief of Wastewater
Operations,prior.to recordation.of the final mag_ Sewer improvement plans shall conform
to the requirements of the City Standard Specifications.
2... Prior to.issuance. of the first.building,permit,the.applicant.,shall demonstrate that the
portions of the existing wastewater collection system required to convey sewage from the
project_siaeto.Pump Station#5 have adequate capacity._ The sewage flow used in the
capacity calculations shall be the flow from all areas within the existing Urban Services
Line at_builcl,-out:plus,the.flow generated by the project. M the existing wastewater
collection system does not have adequate capacity to adequately convey the sewage flow
at build-out plus the.flow from.the project site,the applicant shall design and construct
improvements to the existing wastewater collection system as required by the City
End.and.the_Chief of Wastewater Operations.. Plans.for improving the existing
wastewater collection system shall be prepared by a registered civil engineer and
submitted.for review and..approval by the. City Engineer and the Chief of Wastewater
Operations. Improvements to the existing wastewater collection system shall be
completed prior to the final inspection of the first building constructed on the site.
3. The applicant shall enter into an agreement with the City to pay a pro-rata share for the
design:_and construction.of upgrades to.Pump Station#5 prior to the issuance of the first
building permit. The form and content of the agreement shall be reviewed and approved
by the _City Attorney_,and_the:.Clay. Engineer._ 'The..upgrades shall be designed to
accommodate existing wet weather flows plus the increased flow generated by the
prajeeL.The..applicant'&pro-rata.share shall.bebased.osn.theanticipated average daily dry
weather flow generated by the project divided by the existing average daily dry weather
flow to Pump Station#5.
4.. The..applicant.shall acquire title or interest..in any offsite land that may be'required to
allow construction of the sewer improvements required by these conditions of approval.
The applicant_shall bear all costs associated with the acquisitions. The applicant shall
Page-1 of 2
gain concurrence from all ad3aca t property owners whose ingress or egress is affected
by constsuetion of the improvements required by these conditions of approval.
5. The applicant shall enter into a Plan Check/Inspection Agreement with the City and shall
pay all.outstmding fees.prior to.issuance of a.Certificate of Completion
6. The applicant shall obtain an encroadmient permit prior to commencing any work within
existing ngbts of way.
7. All improvements shall in the public right of way shall be secured with a 100%
performance guarantee and a 50%labor and materials guarantee until the improvements
are acceptect as.substantially complete by.the City_.Engineer_ Prior to the final inspection
of the improvements, and before the other guarantees are released, a 10% maintenance
guarantee shall be posted to cover the improvements for a period of acne(1)year from the
date of final inspection The guarantee amounts shall be based on an engineer's,estimate
submitted by.the project a 4necr.and approved by the City.En* eer. The estimate shall
be based on City standard unit prices. The City Attorney shall approve the form of
guarantee
S. The.applicant.shall submit.a written statemel.from.a registered civil engineer certifying
that all work shown on the plans has been completed and is in full compliance with the
plans.. approved-by.the City and the Uniform._Building..Code(s) prior to the final
inspection.
9. A Mylar copy and a blue line print of wbuilt improvement plans, signed by the
registered engineer who prepared the plans shall be provided to the City Engineer prior to
the final inspection.
10. The applicant shall be responsible for the relocation and/or alteration of existing utilities.
11. The applicant shall pay all sewer annexation fees prior to the issuance of a construction
pem&.for the public improvements.
12. The applicant shall pay for all costs associated with the establishment of a reimbursement
agreement or assessment district, if applicable,includin&but not limited to preparation
of studies,maps,and recordation of documents. -
13. No-other properties.shall be served.by sewer.service cnnsmuled by applicant without
having been added to the Urban Services Line by a General Plan.Amendment.
Page Z-of Z..