HomeMy WebLinkAboutPC Resolution 2018-0022PC RESOLUTION 2018-0022 It WXV 1120,13
CITY OF ATASCAD'ERO
RESOLUTION OF THE PLANNING COMMISSION PLANNING
OF THE CITY OF ATASCADERO, CALIFORNIA,
AMENDING CONDITIONAL USE PERMIT 2003-0117 (MASTER PLAN OF
DEVELOPMENT) AND TENTATIVE TRACT MAP 2014-0107 FOR THE PRINCIPAL
MIXED-USE PROJECT
APN 030-491-001, 013, 019, 020
9105 Principal Avenue / ECR Principal, LLC
(PLN 14-1519/AMND18-0053)
WHEREAS, an application has been received from ARH Quiky Investments, LLC (835
Aerovista Place, Suite 230, San Luis Obispo, CA 93401), Applicant, and ECR Principal, LLC
(125 South Bowling Green Way, Los Angeles, CA 90049), Owner, to amend a previously
approved Master Plan of Development and Vesting Tentative Tract Map on a 5.25 -acre site
located at 9105, 9107, 9109 Principal Ave and 9300 Pino Solo (APN 030-491-001, 013, 019,
020); and,
WHEREAS, the site's current General Plan Land Use Designation is Medium Density
Residential (MDR) and General Commercial (GC); and,
WHEREAS, the site's current Zoning Designation is Residential Multi -Family (RMF -
10) and Commercial Retail (CR) with a Planned Development #24 (PD -24) Overlay; and,
WHEREAS, the PD -24 requires the adoption of a Master Plan of Development,
approved in the form of a Conditional Use Permit; and
WHEREAS, the City Council approved the original Master Plan of Development (CUP
2003-0117) of the project on October 12, 2004, and approved the most recent amendment to the
Master Plan of Development on May 26, 2015; and,
WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2015-0001
were prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the certified Mitigated Negative Declaration adequately addresses the
effects of the project as proposed for amendment, no substantial changes have been made in the
project, no substantial changes in the circumstances under which the project is being undertaken
and no new information of substantial importance to the project which was not known or could
not have been known when the Mitigated Negative Declaration No. 2015-0001 was certified has
become known, and therefore, no further environmental review is required; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on June 19, 2018, studied and considered the proposed amendments to
Conditional Use Permit 2003-0117 (Master Plan of Development) and Tentative Subdivision
Map (TTM) 2014-0107, after studying and considering the certified Mitigated Negative
Declaration prepared for the project, and,
NOW, THEREFORE, BE IT RESOLVED, the Planning Commission of the City of
Atascadero takes the following actions:
SECTION 1. Findings for Approval of Conditional Use Permit and Tentative Tract
Map. The Planning Commission of the City of Atascadero finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
Fact. The proposed amendments are consistent with General Plan Land Use Policies 1. 1,
1.3, 2.3, 5.3, 6.1, 7.1, 7.2, 8.5, 15.1, and 15.6; Circulation Policies 1.1, 1.3, 1.4, and 1.5;
and Housing Element Policies 1.1, 4.1, and 4.3. The project design was previously
approved by Planning Commission and City Council in 2015 and was found to comply
with the Appearance Review Manual. The Design Review Committee reviewed the
proposed utility amendment and exhibit and recommended conduit be installed for future
undergrounding along El Camino Real.
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including provisions of the PD -24 Overlay Zone; and,
Fact. The Planned Development 24 overlay allows for development standards to be
established through a Master Plan of Development.
3. The establishment, and subsequent operation or conduct of the use will not, because of
the circumstances and conditions applied in the particular case, be detrimental to the
health, safety, or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in
the vicinity of the use; and,
Fact. The proposed residential use will not be detrimental to the health, safety, or welfare
of the general public or persons residing in the neighborhood. A residential use is
consistent with the surrounding neighborhood to the west and south, and the commercial
development is consistent with the adjacent commercial uses on El Camino Real and the
corner of Principal Avenue. The Planned Development overlay language, mitigation
measures, and City development standards will ensure that pedestrian and vehicular
access conditions are designed in a manner which does not create ongoing safety
concerns.
4. The proposed project or use will not be inconsistent with the character or the immediate
neighborhood or contrary to its orderly development; and,
Fact. The proposed residential use is consistent with other attached and detached multi-
family residential and residential serving uses in the area. The carwash is consistent with
other commercial and service uses along El Camino Real.
5. The proposed use or project will not generate a volume of traffic beyond the safe capacity
of all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the Land Use
Element; and
Fact. The proposed residential and commercial uses will not generate significant and
unavoidable impacts to traffic. The project will contribute City TIF fees toward the US
101 interchanges. Frontage roads will be developed to City standards, including a turn
lane on Principal Avenue. All internal and abutting public roads have been designed to
City standard.
6. The site is physically suitable for the type of development proposed; and,
Fact. The site is mostly flat, with slopes near Pino Solo and along the ephemeral
drainage area. Development has been designed to avoid the drainage swale and most of
the large native trees on site. The overall development pattern and site layout has been
maintained consistent with the 2015 project approval.
7. The site is physically suitable for the density of development proposed; and,
Fact. The site is located between a major commercial area on El Camino Real, and a
single-family residential development to the west. The configuration of the project
design takes into account natural topography of the site, and acts as a buffer between
commercial and single-family residential uses.
8. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat; and,
Fact. Setbacks are maintained between the proposed development and the ephemeral
drainage swale on site. Permits, or letters of exemption, are required from permitting
agencies for work around the swale, as identified in the mitigation measures; and,
9. The design of the subdivision or the type of improvements will not cause serious health
problems; and,
Fact. A mitigated negative declaration was prepared for the project, which considered
environmental effects, including impacts to air quality, and determined the project would
not create significant impact with the incorporated mitigation measures. The design of
the subdivision or the type of improvements will not cause serious health problems.
10. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided; and,
Fact. The site is private property, currently fenced and restricted to public access.
Frontage improvements will be installed to provide pedestrian access on sidewalks
around the periphery of the project site; and,
11. Covenants, Conditions and Restrictions (CC&R's) or equivalent shall be required that
incorporate the Master Plan of Development Conditions. of Approval to ensure that the
site retains the proposed qualities (architecture, colors, materials, plan amenities, fencing,
and landscaping) over time; and,
Fact. A Condition of Approval was included in the 2015 resolution, requiring CC&R's
be recorded concurrently with the final map.
12. The Master Plan of Development standards or processing requirements will enhance the
opportunity to best utilize special characteristics of an area and will have a beneficial
effect on the area; and,
Fact. The PD -24 established development standards that promote a cohesive
neighborhood development and ensure that City goals related to traffic mitigation,
aesthetic character, inclusionary housing, and pedestrian connectivity, among others, are
achieved.
13. Benefits derived from the Master Plan of Development and PD -24 Overlay Zone cannot
be reasonably achieved through existing development standards or processing
requirements; and,
Fact. The Planned Development 24 overlay text modifies standard development
requirements to allow for a mixed-use residential and commercial project. Modified
standards for the development enable the unit count and site design as approved by City
Council in 2015. City Council Planned Development Policy requires project benefits such
as affordable inclusionary housing, pocket parks, and high-quality landscape and
architecture in exchange for modified development standards. The project satisfies these
requirements.
14. The proposed project will not result in substantial detrimental effects on the enjoyment
and use of adjoining properties.
Fact. The Planned Development Overlay Zone 24 ensures that development within the
area provide certain benefits as identified by Council Policy. Development under the PD -
24 standards will maintain and enhance neighborhood character and provide transition
between commercial and single-family uses.
SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a
regular session assembled on June 19, 2018, resolved to approve amendments to Conditional
Use Permit 2003-0117 (Master Plan of Development) and Tentative Tract Map 2014-0107
subject to the following:
EXHIBIT A: Conditions of Approval
EXHIBIT B: Utility Exhibit
On motion by Commissioner Anderson, and seconded by Commissioner Dariz, the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
ADOPTED:
Commissioners Anderson, Betz, Dariz, Donovan, Wolff, and Zirk (6)
None (0)
Commissioner Seay (1)
None (0)
June 19, 2018
CITY OF ATASCADERO, CA
Tom Zirk
Planning ission Vice Chairperson
ATTEST:
Phil Dunsmore
Planning Commission Secretary
t:\- pins (pre 2018 projects)\- 14 pins\pin 2014-1519 - auzco principal mixed-use\2018 amendment undergrounding of utilities\pc resolution
2018-0022.docx
EXHIBIT A: Conditions of Approval
CUP 2003-0117 and TTM 2014-0107 (2018 Amendment) / PLN 2014- 1519
Timing
Conditions of Approval — 2018 Amendment
Principal Mixed -Use Planned Development (PD -24)
FM: Final Map
GR Grading Permit
BP, Building Permit
Master Plan of Development / Tract 3070
p
To FI: Final inspeectioncton Temposaancy
CUP 2003-O117/TTM 2014-0107 (2018 Amendment)
FO: Final Occupancy
1. This amendment shall be for utility line location and undergrounding only. No other project
Ongoing
changes are authorized by this amendment.
2. The approval of this amendment shall become final and effective for the purposes of issuing
FM/BP
building permits fourteen (14) days following the Planning Commission approval, unless prior
to that time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning
Ordinance.
3. All previous Conditions of Approval and Exhibits approved with Council Resolution No. 2015-
Ongoing
045 (CUP) and Council Resolution No. 2015-046 (TTM) adopted May 26, 2015 , shall remain
in effect for the approved project, unless specifically noted below. Only the conditions noted
below regarding undergrounding of utilities shall be modified with this resolution.
4. The following Conditions of Approval regarding requirements for undergrounding of utilities
Ongoing
shall be deleted:
Council Resolution No. 2015-045 (CUP):
• Public Works condition #44: "New utility services for power, telecommunications and
cable TV shall be placed underground, beginning from the off-site point of connection
established by the public utility provider."
• Public Works condition #55: "Overhead utilities shall be placed underground where
located along the subject property frontage of EI Camino Real, Principal, and Pino Solo."
• Public Works condition #56: "The applicant shall install all new utilities (water, gas,
electric, cable TV and telephone) underground. Utilities shall be extended to the property
line frontage of each lot or its public utility easement."
Council Resolution No. 2015-046 (TTM):
• Public Works condition #16: "New utility services for power, telecommunications and
cable TV shall be placed underground, beginning from the off-site point of connection
established by the public utility provider."
• Public Works condition #43: "All utilities shall be undergrounded on project frontage."
Timing
Conditions of Approval — 2018 Amendment
Principal Mixed -Use Planned Development (PD -24)
FM: Final Map
GP: Grading Permit
BP: Building Permit
ment / Tract 3070
Plan of Development
To: TemporaryOccupancyMaster
Fl: Final inspection
CUP 2003-0117/TTM 2014-0107 (2018 Amendment)
FO: Final Occupancy
5. The applicant shall install all new utility services (water, gas, electric, cable TV and
FM/BP
telephone) underground, beginning from the off-site point of connection established by
the public utility provider, as depicted on the attached Exhibit B. Utilities shall be
extended to the property line frontage of each lot or its public utility easement.
6. Overhead utilities shall be placed underground where located along the subject property
FM/BP
frontage of EI Camino Real, Principal, and Pino Solo, as depicted in the attached Exhibit
B.
7. In order to facilitate future undergrounding of utilities, the applicant shall install conduit
FM / BP
along the EI Camino Real project frontage where utilities are to remain overhead.
Conduit size, material, and location shall be reviewed and approved by the City Engineer
prior to installation.
EXHIBIT B: Utility Exhibit
Utility finesto remain overhead
OVERHEAD UTILITY NOTES
Erls.Ung vIllIfy pole to ry
reicirc
j JI
DiOpnq viffirty p6e and guy ionchor to rernaln.
C Dernwrarnovo &%Winove
g thecdulbty Uries.
W)
(�5' Derrotcemove a*tIng Wafy pole,
NOW OvethOOd pe,11W IM11,
Now power pole.
Not
usud.
39 -- — — — — — — — — — — —
f4
Z4
r—j L,
ii
A�s
% 6
114