HomeMy WebLinkAboutResolution 1998-050 RESOLUTION NO. 1998-050
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF ATASCADERO, CALIFORNIA ADOPTING A
REVISED FEE SCHEDULE FOR BUILDING PERMITS
AND PLAN REVIEW SERVICES
WHEREAS, California Health & Safety Code Sections 17951 and 19852 provide the
authority to local governments to prescribe fees that are reasonably required to administer and
process building permits, including but not limited to plan examination, inspection, enforcement
and other services; and
WHEREAS, Atascadero Municipal Code Section 8-1.102 requires that the City Council
adopt fees for building and safety services by resolution; and
WHEREAS, the City Building Official is required to perform plan reviews, inspections and
other services to safeguard the public health, safety and welfare; and
WHEREAS, the International Conference of Building Officials has prepared standardized
fee schedules which are based on average costs for permit, plan review and inspection activities;
WHEREAS, the fee schedules for these services must be revised from time to time to assure
the City completely recovers the costs associated with rendering such services; and
WHEREAS, the Building Official has conducted a study to determine the appropriate
increase in fees so the City may completely recover its costs in providing these services.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ATASCADERO,
CALIFORNIA DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The City Council hereby adopts the fees for Building and Safety permits, plan
review and other services set forth in Exhibit "A" attached hereto and incorporated here in by this
reference.
SECTION 2. The Building Official shall determine valuation of construction projects using
square foot value for the type of construction as found in the latest publication of Building
Standards as published by the International Conference of Building Officials
SECTION 3. Upon the effective date of this Resolution, the fees adopted herein shall
supersede fees previously adopted by this City Council for those purposes. This Resolution does
not supersede or repeal any other portion of any other Resolution other than the fees, unless
amended or repealed herein.
SECTION 4. The fees established in this Resolution do not exceed the estimated
reasonable cost of providing the service for which the fee is imposed.
On motion by Council Member Lerno and seconded by Mayor Pro Tem Johnson, the
foregoing resolution is hereby adopted in its entirety by the following roll-call vote.:
AYES: Council Members Johnson, Lerno and Mayor Carden
NOES: Council Members Clay and Luna
ABSENT: None
ADOPTED: November 10, 1998
CITY OF ATASCAD RO CA ry
1 �
Harold L. III, M or
ATTEST:
l
Marcia McClure Torgerson, City Jerk
APPROVED AS TO FORM:
�- 1
Roy . Hanley, City At rney
Resolution 1998-050
EXHIBIT A
1. Building Permit Fees
Total Valuation Fee
$1.00 to$500.00 $22.00
$501.00 to$2,000.00 $22.00 for the first$500.00 plus$2.75 for each additional
$100.00 or fraction thereof,to and including$2,000.00
$2,001 to$25,000.00 $63.00 for the first$2,000.00 plus$12.50 for each additional
$1,000.00 or fraction thereof,to and including$25,000.00
$25,001.00 to$50,000.00 $352.00 for the first$25,000.00 plus$9.00 for each
additional$1,000.00 or fraction thereof,to and including
$50,000.00
$50,001.00 to$100,000.00 $580.00 for the first$50,000.00 plus$6.25 for each
additional$1,000.00 or fraction thereof,to and including
$100,000.00
$100,001.00 to$500,000.00 $895.00 for the first$100,000.00 plus$5.00 for each
additional$1,000.00 or fraction thereof,to and including
$500,000.00
$500,001.00 to$1,000,000.00 $2,855.00 for the first$500,000.00 plus$4.25 for each
additional$1,000.00 or fraction thereof,to and including
$1,000,000.00
$1,000,000.00 and up $4,955.00 for the first$1,000,000.00 plus$2.75 for each
additional$1,000.00 or fraction
2. Plan Review Fees:
The plan review fee shall be 65% of the permit fee
3. Energy Conservation:
Plan review and permit fees shall be increased by 10%where compliance with California
energy conservation laws is required.
4. Disabled Access:
Plan review and permit fees shall be increased by 10%where compliance with California
access law is required.
5. Strong Motion (SMIP):
Permit fees shall be increased in amounts as required by state law to support the State of
California Strong Motion Instrumentation and Seismic Hazard Mapping Program.
6. Mechanical, Plumbing and Electrical Permit Fees:
Plan review and permit fees shall be based on Tables 3-13, 3-C and 3-1) of the 1994 Uniform
Administrative Code.
7. Miscellaneous Fees
Fees for the following miscellaneous services shall be charged at actual cost plus 15%
administrative processing:
A. Inspections outside of normal business hours(minimum charge 2 hours
B. Reinspection fees assessed under provisions of UBC Section 305.8
C. Inspections for which no fee is specifically indicated
D. Additional plan review required by changes, additions or revisions
E. For use of outside consultants for plan checking and inspections or both(including
administrative and overhead costs)