Loading...
HomeMy WebLinkAbout1997 - Graves Creek 11 M I 88 E8 DIST COUNTY POST MILES TOTAL 59 —6 Y MeGsured along of Roadway ROUTE TOTAL PROJECT NO. SHEETS 4 5 0`�t 6' 1'—9"'Y SLO I Bro 2J 4 Br-q 4 1 11 8 "*NGINEER CIVIL REGISTEkED RO0dW0 N. INGRAHAM y Uj No. 26242 Ele v 69.O�± 3/98 > PLANS APPROVAL DATE Exp, Elev 69.0± UBW CIVIL Toe Raj/ Ingra IKK ham Dejesse Assocl9tes, Inc. Consulting Structural Engineers CAL 825 Page Street, First Floor Berkeleyo California 94710 H. W. El. 6J.6 1125156 -0*-�Existing J6WF194 Exis tin g Concrete 71 6 Y MON.-00 7" 6 Girder, Typ. Abutment LE T virr—1(43"A L E C TI 0 N Approx OG Scale: 1`�-5�-O" '—'-----Exl*stl'ng PCC Piles, Typ. Datum Elev 50.0-± 0+50 Z 1+00 Roadway Ele v 69.0--� < Abut I Abut 2 A— Ele v 68.8± V A ELE ATI 0N" SCO/e: 1`--5 0" Ele v 61.6± Existing Concrete Abutment 7-0 -t .1 71 T— E Girder & INDEX TO PLANS ea'r"ing, Typ ExistIng 15C40 'T1 ^N AT ABUTMENT End Diaphrogm S E BB Sto 0-�5325_7� 0 Sto 1-f 12.75.± scale: C-51 0" SHEET NO. T1 TLE ���Intermediote Gen eral Plan Elev 69.00± Diaphragm, T)p Ele.v 69,00 2 End Diaphragm To Paso Robles Strengthenl*ng Details 0+50 , 1+00 11 1 LEGEND Roodwo" y 1ndkGteS EXiSting Structure To Creston Rd Indicates New Construct* Ion "Indixtes Direction Of TraffiC Strengthening -T- End Diophragm At Girder Support Bearing -Bearing STANDARD PLANS DA TED JUL Y 1992 A 10A Abbreviations A 10B Synbols PLAN scale.. 1 5, 0" NO TE.- The contractor shall verify G// controlling field dimensions before orderin or fob* t* 9 nco Ing any m a t eriol. By MOWN CHECKED EARTHOUAKE- RETROFIT WIUjIAM W. ADDIZSPURGER DE81ON LIU P. GORYL BROM NO. PREPARED FOR THE DESIGN OVERS1014T Tj ABu—mApimm DETAILS CHECKED By CHECKED M. BENOIT H Q. UU LAYOUT 4 63 Q. UU N. INGRAHAM C1 CN P. GORYL 9C-01 GRAVES CREEK BRIDG it I I --- N la I I�P-- 9- now CHECKED By PLANS AND SPECS PROJECT ENGINEER MILE SIGN OFF DATE QUANT, MES By J.C. deSI SPECIFICATIONS 1F ATASCADERu^ !�j 1 11111 1 � Q. UU LVA P. GORYL COMPAR CITY V4* cc ------ ED R. SENNETT GENERAL PLAN ------------- CU 105-152 010i -- <-> CL REVEM DATIM ORIGINAL SCALE IN INCHES FOR REDUCED PLANS EA 05-1,0281 DISREGARD PRINTS BEARING SrAM ONLY) OF 0 2 CONTRACT NO. 59Y026 EARLIER REVISION DA 2A 2 DIST COUNTY ROUTE POST MILES SHEET TOTAL TOTAL PROJECT NO. SHEET 5 SLO REGISTERED INGINEER CIVIL N. INGRAHAM N 26242 ' S Girder & Girder & DetG,,#1 imilar PLANS APPROVAL DATE Exp. 3Z98 CIVIL Ingraham DeJesse Associates, Inc. Bearing, Typ. Bearing, TYP Consulting Structural Engineers M OF C 825 Page Street, First Floor BB New End Diaphragm New End Diaphragm--, EB rkeley,, California 94710 Strengthening Strengthening Be R'I nflwn I" oodWC7y Roadwcy G1 NERA L NO TES LOAD FACTOR DESIGN Detail "l Bridge Design Specifications (198J AASHTO with Interims and J_ Re vision s by CA L TRA/VS) DESIGN SEISIVIC LOAD BearIng Bearing A TC-32 A RS Curve Peck Bedrock Acceleratl*on=0.6g Soil Pro Re=Typ e D Fault Moment Magnitude=75± .025 A PLAN ABUTMENT 1 PLAN ABUTMENT 2 SpectraAcceleration Increased by 207. 1'�- 51 0" - Scale. scale#. 11�- 5t 00 S TEEL, W fy =J6,000 psi (A,)b) REINFORCED CONCRETE XISTING E Rroge Assumed for Retrofit Evaluation f'c=J,750 psi fy=44,000 psi Girder Girder Top o f 7 6 11-± Existing ROAD PLANS Ex t erio r Top of Existing For utilities, signs and traffic stagi*ng, Girder see '�?OAD PLANS". A In tenor A Girder Note: J Y2 Existing End The Contractor shall verify a// controlling Diaphragm Existing End Diaphragm field dimensions before ordering or fabn'cating any material. Existing End 6", 6AY' A-57- 6 1- I V8 Diaphragm 7 *'0 A J25N 18 W 'W ir or :z I +1 + + Q) (TYP) �z 4% 1 01 + -4 �18110 A J25N _:j V�� C12xJ0 NO I 'Y16 1) (TYP) tAMC18x42. 7 JY8"�t PARTIAL ELEVATIUN AT END DIAPMERAGAWA "E "TIf" ' A- A "' ETAIL 1 t) U UN U SCGle.- J14 — Scale: J14 — NOTE- THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL. EARTHOUAKE RETROFIT ---------- DESIGN BY CHECKED BRIDGE NO. WIL"AM W. ADDIESPURGER Q. LIU P. GORYL PREPARED FOR THE M. BENOIT GRAVES CREEK BRIDGE DESIGN OVERSIGH I By CHECKED 49C-0163 .: TAA'),Z&W DETAILS Ar"a POW MILE 9 8 IMAD A8U- IE By CHECKED CD Q. LIU P. GORYL A"61TY AO' F AmIA4"CAlu"kER0 QUANTITIES END DIAPHRAGM STRENGTHENING DETAILS 77 Q. LIU J.C. deSILVA -SIGN OFF DATE - ------ ---------- 1 1 11 11 1111,11� IN ­ I I I _ I i m'MINARY STAGE 0 SHM OF ORIGINAL SCALE IN INCHES I I I CU 05-152 DWEGARD PRINM BEARING FOR REDUCED PLANS 0 1 2 3 EA 05—LO261 EARUER REVISION DATES NMI 7 71 2�45- 2 2