HomeMy WebLinkAboutFeb-87 - Traffic Way - D-0359 ............CONSTRUCTION NOTES 1. NO CONSTRUCTION SHALL BE STARTED WITHOUT PLANS APPROVED BY THE CITY ENGINEERING DEPARTMENT. THE CITY ENGINEER SHALL BE NOTIFIED AT LEAST TWENTY-FOUR '1
HOURS PRIOR TO STARTING OF CONSTRUCTION. ANY CONSTRUCTION DONE WITHOUT APPROVED
PLANS OR PRIOR NOTIFICATION TO THE lTr ENGINEER WILL BE REJECTED AND WILL BE�LT THE CONTRACTORS AND LOT OWNER'S RISK. t2. ALL CONSTRUCTION WORK AND INSTALLATIONS SHALL CONFORM TO THE COUNTY OF SAN LUIS jc OBISPO STANDARDS AND SPECIFICATIONS, AND ALL WORK SHALL BE SUBJECT TO THE APPROVAL OF THE CIT� ENGINEER.0/' I3. SOILS TESTS SHALL BE DONE IN ACCORDANCE WITH COUNTY STANDARDS AND SPECIFICATIONS-351.1403 and 1 1-351.1404. ALL TESTS MUST BE MADE WITHIN FIFTEEN DAYS if SPECTIONS 11
PRIOR TO PLACING MATERIAL. THE TEST RESULTS SHALL CLEARLY INDICATE THE LOCATION AND 7 a&r41At1A1Cr W446 b Y OVVERS SOURCE OF MATERIAL.ee f OIZ44 3/x 51 TREE W(5FE 0f4,91A* 14AI) I/O,pc.c.SIDEW,41k 2.4 11-21e,�L F(TYP I CA L) _L1 945-.74 4. COMPACTION TESTS SHALL BE MADE ON SUB-GRADE MATERIAL AND MATERIAL PLACED AS SPECIFIED PER CO.SM.DWCr b-5 I 1k'-Zss BY THE ENGINEER. SAID TESTS SHALL BE MADE PRIOR TO THE PLACING OF THE NEXT MATER INSMLL AC. IAL............................................. FleE HYDR4AI ew— *0*16pr ro)(15T PP�4Q 5. SUBGRADE MATERIAL SHALL BE COMPACTED TO A RELATIVE COMPACTION OF 95% IN THE ZONE
n //0 ,v//og BETWEEN FINISHED SUB-GRADE ELEVATION AND ONE FOOT BELOW. ALL MATERIAL IN FILL SECTIONS�
�T BELOW THE ABOVE MENTIONED ZONE SHALL BE COMPACTED TO 90% RELATIVE COMPACTION.6. A REGISTERED CIVI FY THAT THE IMPROVEMENTS, WHEN COMPLETED, ARE
Ir ze
IICERTIFYING THE I ROV ' TS AND PREPARING THE AS-BUILT PLANS SHALL BE PRESENT WHEN
70 N 29 I7. AN INSPECTION AGREEMENT IS REQUIRED PRIOR TO THE START OF CONSTRUCTION A PEc-CoNgTRuc-II-101V 00AIIERUCr W179 67YEA(61AIEERW 16 Rf�UIREO
M ION. ��
ROACHMENT PERMIT IS REQUIRED FOR ALL WORK WITHIN THE RIGHT-OF-WAY.c/Ty
t
0 I y T EX15T P 4 VEMEN T 5114 It bE j4NOT TO RFYFW MYREMAJ T N THE PLANS TO SOLVE UN E Lu IN TH II6ECT10AIAN NEW PWINCY IAll TY1 ISTAVC7M A0 AIT N
5TA CTM 96MON 70 Lqf IMA &YNGNEER 70
12. ANY DISTURBED MAILBOXES SHALL BE REPLACED IN A MANNER APPROVED BY THE POSTMASTER.
/0, 190' 7010MC�CIK-AITOF,64,6E. (OffNOTE17) NOfe 1 i Stle/ A7.5 beew oi1e,--1aye& INDEX OF T 71-he A75WOlelw VA R>I E5 14. EXISTING PAVEMENT SHALL BE CUT TO REVEAL COMPETENT STRUCTURAL SECTION AND NE14 PAVING N D DEVELOPER.51DEWIll RAN YZEW 7WFIC WAY Rc,c cmpb46uT71[1p CZ455H 4�6 49cr(SIT NO T,�13) OA ? 11,4Z L/F T,F5 T,5 5C41E-' 1"' :'20' CIV ENSED LAND SURVEYOR, LI Z"AC. 8 rHAf e
ERED TOA POINT THAT WILL CROSSFALL.WL TYPIC /8. IAITHfEVEN7')WTrHECON7^4CTOR #OTIC[91&0,eiZrdi�dPITIEbIN7#ic�INF,4AIPCTR,4,0�EHi MZ801AIIII A/ T5. To r,qC/W CA,4iff 4,7 FN TION Of T9,F FNCr A 11cb 1,F WE 54/I 6 TO 90 wl Ty,C COA I Tv C TOR ,4 I Z gF YEI,0 IIW t - ------Ito 61 IIt f III4 4 IIItIIIII4—--------- IIII---------- 4 4-4 IIt T.......... t
IIIIII4 4- II4- III---------- 4 IIt t III .............-----------II-- --------- II ---- ----------- IDE,A -----------t--------------- IUT111"Y APPROVAL
t I ---------_------------ ................ ......... IIT----------------- lit IPIPE 4,, if w gu--YE WIFIC AIL
4 II------------------- ---------- ---------It IAU IIIII4 IC, I4 4 ISO, 1 IMA"----------------IILL I5OUT146RAI C461F
N5 CO. WE---------- II4mvADW murium w47ER xrE
IIt4 I5LE r v
I . .........II4 IL f T
4 III4 A05TAW)TEk III ---------- IIt IIk R -MYTIAM 4 4 It t TtII41 I4 IIf t II...... ---------- ------ ................t---- ------- CUR8 GUTTER %5/40f W&K P144N AfEMACED FM J,4v 0AR50
t -------------T'-4 I4 I-4 IIP19t &K. 4-Al 5555 TRAFRC WAY, ATASUDRO
LOT5 Z&
T ----------------4 - t---------- - ----------------------- ET- _ x
IL V------ ............-4 4 IT IAPPRovED:
I6 -7-...I........4---4 .E. 46144
III-------.....----------- 14(o
It4-- I—------- zk 4- t----------4 ------------ - - --------........... ----------- (Reel j1ey_q
------------4 IKEUFFEL ESSER 43 711624 Iti US A-'