HomeMy WebLinkAboutDec-82 - Sinaloa Avenue - D-0221 t
IN
CONSTRUCTION NOTES
:; J
4 � — o construction shall be started without plans approved by
�q the Engineering Department. The City Engineer shall b
4 Q notified t least twenty-four hours prior to starting
i. of construction. any construction done without approved
----------------------
plans or prior notification to the City Engineer will b
i
_w refected and ill be at the contractor' s and,/or owner' s risk.
_ 2 . All construction work and installations shall conform to the
County o San Luis Obispo Standards anal. Specifications, and '
' €m all work shall be subject - o the approval of the City Engineer,
_ - n 09
3. Soils tests shall be dune in accordance with the County
Standards and Specifications Sections 11-351. 1403 and 11--35.1.
C1 J � C 1404 . .All tests must by made within fifteen days prior to
placing material. The test results shall clearly indicate
a ® m 1' t� G' /� the location and source o the material
( • � � _
tl1 N my u 16,t� /p 4 . Compaction tests shall be made on subgrade material and
material placed a pecifie! by the Engineer. Said. tests
C I shall be made prior to the placing f the next material.
Subgrade material shall b compacted to a relative compac-
tion
omp c-tion of 5% in the zone between finished subgrade elevation
- - --- -------- _ o _-- _-_--- _ �� �/ -� and one foot below. All material in fill sections below the
--- zone mentioned above shall e compacted to 90% relative
ve
g compaction.
--- ------- ---------
---------- --- ---- --- - - -- ---- ---- - - --- - — registered Civil Engineer must certify that the improve-
; ments, when completed, are in accordance with the plans
s
prier to the request for final inspection® As-built plans
_ are to b prepared after construction is completed.. The
Civil Engineer certifying the improvements and preparing the
`— _—
as-built plans shall be present when the final inspection. is
- -- — Made
A base prune coat seal will be applied
ry — .Ara inspection agreement is required prier to the stat of
x construction.
All utility companies must be notified
®I J y p prior to the start of
construction.
v y,
--- 1� .� A City encroachment permit is required for all workdone
with the City right-of-way.
—„ 11. , The City inspector, acting of behalf of the City Engineering
Department, may require revisions in the plans to salve
ti unforseen problems that may arise in the field. All revisions
° shall be subject to the approval of the developer's engineer.
g
I
7 #°
' e 111 � ' �®a s t -
_ - P r_01:; I-- r- L
PAV9v0 J7 �/Gn9 7_ /MP t J7S
x/s r7 /& 4c�, ,tel LIV
y / �
�
CURB.? L-0. C L. 5 AGOCZA agkcae
lei
TYPI CAL Sec.
100
n i
ten- �. b - j ------ ------ --- —
01
1 �, `3/2.2
�`� ml
t �
—
0
< # u� FILL c.oLc> c�ir�r wi -4 wuEo ac�7 — l� f
. .
.- 6 e ,/ I-AVE -- --
v
U 5F
f2t8BtE ti �, __
I
'`, \ ' � • fie P.e®mss
p I P.
ASSU THAr CAW rY ( ��
AlvD lZ CDl4sY Acr if � 'O�E�
t
4 I, P�,oC. 6s)Z:keAp 71 91
Cit t �E
14-A ! / � �CIS
s ` _a::;44_-J40-7
f
goy .C� / �- � 7-
j ! �`2 2-
T-A •t 9 VA7-® .
g AP `!E Y
12-
:-I-SL
I-SL .3 Z
P1
W
CURB GRADES
f
/ C_ NALOA AVE- .
i
t 43.G 8 A� S 4- /cSCALVI
r ,
VPAWW BY: RL.
7 7777777 777777
.,. A
SC.K rte= �4<.
Icy!G, '