GENERAL NOTES
No construction shall be started without plans approved
by the Engineering Department. The City Engineer shall
&xi_5r L11VOER&WIJAID 101 51 TE be notified at least- twenty-four hours prior to
Z,//Vc-!5 ai�mrtlnq of can:,t: ion. Any ecnstruction done
witnout approved plans or prior notification to the
Ow. City Engineer will be rejected and will be at the
contractor's and/or owner's risk.
2. All construction work and installations shall conform
7 to the County of San Luis Obispo Standards and
A 7A' 5 CA OAEIF49 Specifications, and all work shall be sub ect to the
'6-A 06N- 072F9
eq4peD Ae approval of the City Engineer.
:��S�ZUC7-A:7,V
ZnV6
3. Soils tests shall be done in accordance with the County
Standards and Specifications Sections 11-351.1403 and
6' 11-351.1404. All tests must be made within fifteen
elt days prior to placing material. The test results shall
VICINIT)e IWAF
clearly indicate the location and source of the
------— /Vo SCAIX material.
1-60
-L 4. Compaction tests shall be made on subgrade material and
material placed as specified by the Engineer. Said
tests shall be made prior to the placing of the next
material.
PIP
5. Subgrade material shallbe compacted to a relative
4
compaction of 95% in the zone between finished subgrade
D
elevation and one foot below. All material in fill
------- sections below the zone mentioned above shall be
'Q. _Z11AJ&5 TO 5-5 A40VC-P compacted to 9G% relative compaction.
V&
............ 6. A registered Civil Engineer must certify that the
improvements, when completed, are in accordance with
&rl5T 6115 N&W PRIMAR-r-
C\ the plans prior to the request for final inspection.
As-built plans are to be prepared after construction is
&Q� Completed. The Civil Engineer certifying the
WC -built plans shall be
improvements and preparing the as
'Zz It
0 present when the final inspection is made.
7. An inspection agreement is required prior to the start
> of construction.
S:)
8. A City encroachment permit is required for all work
CONSTRUCTION NOTES
Q done within the City right-of-way.
PRWA46AIT ZiMZ"A0Aff 3' F /1"' Sawcut and join 'existing pavement as required, Contractor 9. The City inspector, acting on behalf of the City
-Z SOLANO , ROAD k-�y Engineering Department, may require revisions in the
0 and City inspector to determine adequacy of existing
ILI structural section with maximum limit of replacement as plans to solve unforseen problems that may arise in the
field. All revisions shall be subject to the approval
�_ 4 .
7, indicated. 2" A.C. over 5.5" Class Hagg. base of the developer's engineer.
(TI = 4.0).
-0 0,
10. All utilities shown are accurate to the extent of
0,
QConstruct 6" Type A P.C.C. curb and gutter -per County available records and knowledge. contractor shall
locate all utilities and contact all ut'3'lity companies
Std. Dwg. C-1. prior to construcLiva.
A= 74"25'C6
9 Zo' /_3"'I Construct 4" thick P.C.C. sidewalk per County Std. Dwg. 11 . Contractor shall call U.S.A. 800-642-24'44 forty eight
CONC CjJ9B (2;�) (�) � I V-) (48) hours prior to excavation in the public right of
B-5. (Refer to typical section for width. ) way for the purpose of locating all underground
AW9Q utilities.
Construct wheelchair ramp per County Std. Dwg. B-7. 12. The City Engineer shall be notified at least 24 hours
5c" /"-,Zo, �5T9 0.;-40-00 TO S7,-,q 04,4700
I+ G prior to start of construction.
(/Vo 6CAI-6)
Adjust existng water valve box to grade.
35-06' 0 5 /0 Zo 40 13. The Contractor shall be responsible for coordinating
disposal of all excess material and construction debris
0
0, Construct commercial P.C.C. driveway per County Std. with the City of Atascadero.
eX1577 DRIVCWIIY� RAMP 70 50, C4Z.645 REVIEWED I WASS )P60�� 15L4_y1Z_WZ_D Dwg. B-3. 14. Stationing is based on street centerlines.
56 REMOVaO �13C-j-LliC&D
AlIT-H NC-W CU1,15 6U77-C-P Install water service connection and rmter box per County 15. All utility trenching shall conform to County Std. W-8
610C-W41_1< VO A41i 710� C-0�777 Std. Dwgs. W-4 and W-5. and Section 11-351.1638.
16. Coordinate sewer hookup with City construction
'gia-x eaa, RevIeNap: 47-45 OERO 7] �4TZW ro Remove existing concrete curb and gutter. inspector.
G
17. Coordinate water and gas hookups with Atascadero Mutual
Sawcut and join existing curb gutter and sidewalk at . Water Company and Southern Califotnia Gas Company
G
Sta. 366 + 46.71 BCR. respectivelv.
001)"�C T N"� t;1§27
P9?FPARFf) �14f_OR '�If C)F ATE
EET IMPROVEME ND PROFILE
REVISIONS REFERENCES
-____ RC E 1Z c-6 SOLANO ROAD
NUMBER jAfi iNiTIA0� 1 DESCRIPTION BENCH MARK 644-5-9
-1,0AIS 4R6' 9,45450 0A1 rW 7VP ao" --------- "ales
ALL 4aZd5097 (769
8&V15101V5 )IMI? CITY FI-IINCH&CK
ELetl,�,9rIOAl Ar 7-116r POINr a"4119Fe eertleN (ReR) aAl FROM INTERSECTION OF EL CAMINO REAL TO 297 FEET EAST OF EL CAMINO REAL
;r
el- -Iwwo Re,41_ 47 1vvRTHz1-9,5r caeNee ol- &=Z C1901AV
-------------
i+
APPROVED
141VD soz_1�9mo Rzvv 146 Rele /45 I&MIL r C1111ee ewe-.19045� SSOCIATES
ENGINEERING DEVELOPMENT A
979 O&OS ST., B�5, sm LUIS OBISPO, CA. 93401 (805)649-8658 S,REET I OF I SH