HomeMy WebLinkAboutPC Resolution 2018-0011
Exhibit A
Notice of Exemption
Exhibit B
Conditions of Approval
CUP 2005-0159 Amendment
Cargo Containers at Public Works Corp Yard
8005 GABARDA RD.
028-421-001
The following conditions of approval apply to the project referenced above. The conditions of
approval are grouped under specific headings that relate to the timing of required compliance.
Additional language within a condition may further define the timing of the required compliance.
A. The following conditions shall be satisfied prior to the issuance of the any
BUILDING PERMIT, or at the time specified in the condition.
1. Building permit(s) shall be required for all cargo containers 120 square-feet or
greater, and for any roof structure connecting the containers. Building permits
shall include the following information at minimum:
Construction details of the footing, anchoring or foundation beneath the
cargo containers
If electrical and climate control are being provided to the structures, this
shall be included with the building permit information
Site plan showing setbacks to existing structures and proximity to the
boundaries of cultural site SLO-834
2. Footing, foundation, or anchoring system shall be designed to avoid impacts to
the underground cultural site, as outlined in the 2011 Archeological Report by
Bruce Gibson. A minimum one foot buffer shall be maintained to native soil.
3. If new impervious areas exceed 1000 sq. ft., a drainage plan is required per
Municipal Code section 9-4.149.b.
B. The following conditions shall be applied to the project IN PERPETUITY until such
time that the use is extinguished.
4. The entitlement described at the location per this resolution is determined to be
vested with the property upon issuance of a building permit.
5. Approval of this entitlement shall be final and effective consistent with
Atascadero Municipal Code (AMC) section 9-1.111 seq. et. al.
6. Project construction shall be in accordance with provided Exhibit(s) and
conditions, adopted with this Resolution. If the cargo containers are painted or
a roof structure is added, the colors shall match the existing buildings on site,
including beige walls and green roofs. Roof structures shall be constructed of
metal to match existing buildings.
7. Additional cargo containers may be permitted on the subject site in the future,
without additional Planning Commission review, provided that a building permit
is obtained and the containers are painted to match existing buildings.
Exhibit C
Site Plan
2 new 40’ long cargo
containers proposed
2 existing cargo
containers
Exhibit D
Elevations & Colors
If cargo containers are painted
or roof structure is added, they
shall match existing buildings:
tan walls & green roof