HomeMy WebLinkAboutPC Resolution 2018-0010
EXHIBIT A –TENTATIVE PARCEL MAP
Exhibit B
Exhibit B: Road Abandonment diagram
10 foot road and
landscape easement on
El Camino Real
Right-of-Way
abandonment over
Atascadero Avenue.
(Atascadero Mall)
Portion of Atascadero Avenue
to be closed to vehicular traffic.
Exhibit C
Conditions of Approval
City of Atascadero
PLN 2017-1649
LA PLAZA DOWNTOWN REDEVELOPMENT
TENTATIVE PARCEL MAP AT 17-0088
Road Abandonment
6500 EL CAMINO REAL
PARENT APN 030-193-001,003,017,016, 031,030,033
The following conditions of approval apply to the project referenced above. The conditions of
approval are grouped under specific headings that relate to the timing of required compliance.
Additional language within a condition may further define the timing of the required compliance.
A. General Conditions.
1. The emergency services and facility maintenance costs listed below shall
be 100% funded by the project in perpetuity. The service and maintenance
costs shall be funded through a community facilities district established by
the City at the developer's cost. The funding mechanism must be in place
prior to or concurrently with acceptance of the final maps. The funding
mechanism shall be approved by the City Attorney, City Engineer and
Administrative Services Director prior to acceptance of any final map. The
administration of the above mentioned funds shall be by the City. Developer
agrees to participate in the community facilities district and to take all steps
reasonably required by the City with regard to the establishment of the
district and assessment of the property.
All Atascadero Police Department service costs to the project.
All Atascadero Fire Department service costs to the project.
Off-site common City of Atascadero park facilities maintenance
service costs related to the project.
☐ PLN
2. Prior to recordation of the Parcel Map, the Applicant shall establish a,
Property Owners’ Association, or similar funding mechanism approved by
the City, to provide sufficient funds on an annual basis to pay for the
operation, maintenance and future replacement of privately owned-in-
common subdivision improvements. The engineer of record shall prepare
and submit an estimated operating budget and capital improvement
replacement analysis for review and approval by the City Engineer, prior to
recordation of the Parcel Map.
☐ PLN
3. Prior to recording the Final Map, the Applicant shall have the map reviewed
by the public utility providers for power, telephone, gas, cable TV, and the
Atascadero Mutual Water Company. The Applicant shall obtain a letter from
each utility company stating that the easements and rights-of-way shown
on the map for public utility purposes are acceptable.
☐ PWD
4. Documents that the City of Atascadero requires to be recorded concurrently
with the Final Map (e.g.: off-site rights-of-way dedications, easements not
shown on the map, agreements, etc.) shall be listed on the certificate sheet
of the map.
☐ PWD
5. The City of Atascadero may require an additional map sheet for information
purposes in accordance with the Subdivision Map Act.
☐ PWD
6. The El Camino Real pedestrian entry/exit doors serving any building shall
not swing into the public right-of-way more than one foot.
☐ PWD
7. The proposed waterfall structure in front of Building A shall be located
entirely within the subject property and shall not encroach into the public
right-of-way.
☐ PWD
8. The relocation of the existing public sewer main shall be completed prior to
issuance of, or, in conjunction with the issuance of building permits for the
southerly most building (Tentative Parcel 3).
9. Atascadero Mall Plaza improvements shall be completed prior to occupancy
of Buildings A or B.
☐ PWD
10. Rights-of-way acquisitions and/or abandonments shall be completed
in accordance with City regulations, the Streets and Highways Code, the
Subdivision Map Act, and to the satisfaction of the City Engineer. Public
rights-of-way abandonments completed through the Parcel Map process
shall be adequately identified on the certificate sheet of the map as well as
on subsequent map sheets.
☐ PWD
11. All plans shall contain the City of Atascadero "Standard Notes for
Improvement Plans" on file in the City Engineer's office.
12. Rights-of-way abandonments shall be completed through the Parcel
Map process in accordance with City regulations, the Streets and
Highways Code, the Subdivision Map Act, and to the satisfaction of the
City Engineer.
13. Easements that are not intended to continue in perpetuity shall not be
shown on the Parcel Map and shall be recorded by separate instrument.
14. Frontage improvements shall be designed and constructed in
accordance with City adopted standards and specifications including but
not limited to decorative paver bands, street furniture, tree wells, trash
containers, raised planters, etc. Paver bands along the back of curb or
within the pedestrian plaza shall be stamped concrete pavement that
matches the City adopted standard paver pattern and color.
☐ PWD
B. Roadway Improvements
15. Construction of the new driveway approach, northwesterly of Building A,
requires removal of the existing driveway approach serving the adjacent
northwesterly property. Vehicular access to this property shall be combined
with the subject property.
☐
PWD
16. Pedestrian ramps on El Camino Real shall be constructed on each side of
the street type entrance located between Buildings A and B.
☐
PWD
17. The southeasterly 20-feet of Atascadero Mall shall be extended
southwesterly as a vehicular access drive to a point that provides adequate
vehicular access to the adjacent southerly property, to the satisfaction of
the City Engineer and Community Development Director.
☐ PWD
18. Improvement of Atascadero Mall northwesterly of the access drive and
adjacent to the subject property shall be improved as a public plaza and
shall include pedestrian channelization (including physical barriers such as
raised planters, decorative fencing or short walls, planter islands, etc.)
necessary to direct pedestrians exiting the pedestrian tunnel through the
open plaza area, to the satisfaction of the City Engineer and Community
Development Director.
☐ PWD
19. The applicant shall coordinate with the Regional Transit Authority
regarding the relocation and modification to the existing bus shelter and
bus stop. Final location shall be approved by the Regional Transit Authority
and the City Engineer.
☐ PWD
20. Roadway signing, striping, and traffic signal modifications shall be in
accordance with the California Manual on Uniform Traffic Control Devices
(CA-MUTCD) and shall be designed and constructed to the satisfaction of
the City Engineer.
☐ PWD
C. Wastewater Collection System
21. The public gravity sewer system within the subject property shall be
modified in accordance with City Standards and to the satisfaction of the
City Engineer. The new sewer main system shall be offered to the public
and shall include a 20-feet wide public sewer easement. The wastewater
collection system shall be designed and constructed in accordance with
City standards and specifications, to the satisfaction of the City Engineer.
☐ PWD
22. Gravity sanitary sewer (SS) mains shall terminate in manholes.
☐ PWD
23. The on-site sewer laterals shall be privately owned and maintained by
individual lot owners.
☐ PWD
24. Each lot served by the wastewater collection system shall pay all sewer
fees prior to the issuance of a building permit.
☐ PWD
D. Stormwater
25. The project shall be designed and constructed in accordance with the post-
construction storm water management regulations in accordance with City
Standards and the State RWQCB Resolution R3-2013-0032.
☐ PWD
26. Common drainage basins (serving multiple lots) shall be designed to desilt,
detain and meter storm flows in accordance with City regulations.
☐ PWD
27. Storm Sewer shall be of either cast-in-place or precast reinforced concrete
pipe, polyvinyl chloride pipe, high density polyethylene pipe or an approved
equal.
Minimum pipe diameter allowable on any storm drain within a
roadway or road right-of-way shall be 18" diameter. A lesser size
may be used for down drains on fill slopes if approved by the City
Engineer.
Minimum design velocity in closed conduits shall be 2 f.p.s. when
conduit is flowing to capacity and should not exceed 15 f.p.s.
Closed conduits shall be designed to convey the 10-year storm
flow with gravity flow, the 25-year storm flow with head, and
provide a safe overland route for the conveyance for the 100-year
storm overflow.
Manholes or junction boxes, entry to which does not fall in the
gutter line, must have standard 24" diameter manhole covers.
Those falling in the gutter line may use the standard grated
manhole cover and serve also as an inlet manhole.
☐ PWD
28. Prior to approval of subdivision improvement plans, the project engineer
shall provide calculations and a report confirming compliance with City
regulations and the low-impact development requirements.
☐ PWD
29. When a Storm Water Operation - Maintenance Plan (OMP) is required for
an individual lot or group of lots, the City Engineer can require the OMP to
be recorded as an agreement against each property. When recordation of
an OMP agreement is required, the agreement shall contain provisions
allowing the City to enter the property, following reasonable notice to the
property owner or tenant, to conduct an inspection of the storm water
system and post-construction storm water management controls.
☐ PWD
30. When an OMP is required, the OMP shall include a section addressing
annual inspection and reporting to the City by a third party, to the
satisfaction of the City Engineer.
☐ PWD
E. Easements
31. On-site easements for ingress, egress, pedestrian traffic, drainage, utilities,
etc., shall be shown on the Parcel Map, or, created by separate documents
to be approved by the City Engineer and City Attorney (as necessary) and
recorded concurrently with the Parcel Map.
☐ PWD
32. Driveways serving more than one lot shall require an
easement/maintenance agreement for ingress/egress, public & private
☐ PWD
utilities, and drainage, to the satisfaction of the City Engineer and
Community Development Director.
33. Drainage easements shall be dedicated over areas containing drainage
improvements that benefit or serve more than one property. The
determination as to whether the easement is private or offered to the public
will be determined by the City Engineer prior to approval of the subdivision
improvement plan and Parcel Map.
☐ PWD
34. Wherever an easement is created for commonly owned or operated
improvements for the benefit of more than one lot, there shall also be
created a maintenance and operations agreement, to the satisfaction of
the City Engineer and City Attorney.
☐ PWD
35. Easements that are not intended to continue in perpetuity shall not be
shown on the Parcel Map and shall be recorded by separate instrument.
☐ PWD
F. Utilities
36. New utility distribution systems and services shall be constructed
underground, to the satisfaction of the City Engineer.
☐ PWD
Each parcel shall be served with separate services for water, sewer, gas,
power, telephone and cable TV. Utility laterals shall be located and
constructed to each lot in accordance with City Standards and Standard
Specifications.
37. The right of way abandonment shall exclude that portion of right
of way between El Camino Real and the City’s property at
Atascadero Mall as shown below:
**END CONDITIONS**
☐ PWD
EXHIBIT D – GRADING & DRAINAGE PLAN
EXHIBIT E – UTILITY PLAN