HomeMy WebLinkAboutPC_2018-03-06_AgendaPacket
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
CITY OF ATASCADERO
PLANNING COMMISSION AGENDA
REGULAR MEETING
Tuesday, March 6, 2018
6:00 P.M.
Historic City Hall Council Chambers
6500 Palma Avenue, 4th Floor
Atascadero, California 93422
CALL TO ORDER
Pledge of Allegiance
Roll Call: Chairperson Jerel Seay
Vice Chairperson Tom Zirk
Commissioner Duane Anderson
Commissioner Ryan Betz
Commissioner Mark Dariz
Commissioner Josh Donovan
Commissioner Jan Wolff
APPROVAL OF AGENDA
PUBLIC COMMENT
(This portion of the meeting is reserved for persons wishing to address the Commission on any
matter not on this agenda and over which the Commission has jurisdiction. Speakers are limited
to three minutes. Please state your name for the record before making your presentation. The
Commission may take action to direct the staff to place a matter of business on a future agenda.)
CONSENT CALENDAR
(All items on the consent calendar are considered to be routine and non-controversial by City staff
and will be approved by one motion if no member of the Commission or public wishes to
comment or ask questions.)
1. APPROVAL OF DRAFT MINUTES OF PLANNING COMMISSION MEETING ON
FEBRUARY 20, 2018
City of Atascadero Planning Commission Agenda Regular Meeting, March 6, 2018
Page 2 of 5
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
2. APPROVAL OF TIME EXTENSION FOR 11955 VIEJO CAMINO, CERRO
ROBLE DEVELOPMENT (PLN 2014-1529)
PLANNING COMMISSION BUSINESS
COMMUNITY DEVELOPMENT STAFF REPORTS
NONE
PUBLIC HEARINGS
DISCLOSURE OF EX PARTE COMMUNICATIONS:
Prior to a project hearing Planning Commission Members must disclose any communications they have had on any
quasi-judicial agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, Variances,
Conditional Use Permits, and Planned Development Permits. This does not disqualify the Planning Commission
Member from participating and voting on the matter, but gives the public and applicant an opportunity to comment on
the ex parte communication.
(For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open
the public hearing and invite the applicant or applicant’s representative to make any comments. Members of the public
will be invited to provide testimony to the Commission following the applicant. Speakers should state their name for the
record and can address the Commission for three minutes. After all public comments have been received, the public
hearing will be closed, and the Commission will discuss the item and take appropriate action(s).)
3. CONDITIONAL USE PERMIT FOR 8120 MORRO ROAD
Property Owner: Farid and Manirva Roboz
Representative: Jason Akraa
Project Title: PLN 2017-1654 – Conditional Use Permit
Project Location: 8120 Morro Road, Atascadero, CA
APN 030-231-028 (San Luis Obispo County)
Project
Description:
The applicant proposes a mixed-use development to include a ground floor
liquor / convenience store (general retail) and 3 residential units on the 2nd
floor.
Proposed
Environmental
Determination:
The project qualifies for a Class 32 CEQA Exemption.
City Staff: Kelly Gleason, Senior Planner, kgleason@atascadero.org, Phone: (805)
470-3446.
Recommendation: Staff recommends that the Planning Commission adopt PC Resolution 2018 -A
approving a Conditional Use Permit to allow a mixed-use retail and residential
development, based on findings and subject to conditions.
City of Atascadero Planning Commission Agenda Regular Meeting, March 6, 2018
Page 3 of 5
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
4. CONDITIONAL USE PERMIT AMENDMENT FOR 6300-6500 EL CAMINO
REAL, THE LA PLAZA PROJECT
5. CONDITIONAL USE PERMIT FOR 8005 GABARDA AVE.
Property Owner: Z3 LLC
Representative: RRM Design Group
Project Title: PLN 2017-1649 – La Plaza
Project Location: 6300-6500 El Camino Real, Atascadero, CA
APN 030-193-001, 003, 017, 016, 030, 033 (San Luis Obispo County)
Project
Description:
The proposed project includes an Amendment to a previously approved mixed -
use development on previously developed properties within Downtown
Atascadero. Proposed project includes 18,000 sf of commercial type uses on
the 1st floor, 40 residential units on 2nd and 3rd floors, and 11,761 sf pedestrian
plaza located on Atascadero Mall. Portions of excess City right -of-way are
proposed to be abandoned to accommodate the project. A subdivision map
would perfect right-of-way changes.
Proposed
Environmental
Determination:
A Notice of Intent to adopt Mitigated Negative Declaration was circulated from
10/18/17 to 11/7/17 and is available at www.atascadero.org.
City Staff: Phil Dunsmore, Community Development Director,
pdunsmore@atascadero.org, Phone: (805) 470-3488
Recommendation: Staff recommends that the Planning Commission adopt PC Resolution 2018 -A
and PC Resolution 2018-B approving the project amendments.
Property Owner: City of Atascadero, 6500 Palma Ave., Atascadero, CA 93422
Representative: Bob Joslin, Public Works Dept.
Project Title: PLN 2099-0367 – CUP 2005-0159 Amendment
Project Location: 8005 Gabarda Ave., Atascadero, CA
APN 028-421-001 (San Luis Obispo County)
Project
Description:
The proposed project consists of a Conditional Use Permit for cargo containers
for storage at the Public Works Maintenance Yard. The Atascadero Municipal
Code allows for two (2) or more cargo containers to be permitted through the
Conditional Use Permit process.
Proposed
Environmental
Determination:
The proposed project is Categorically Exempt (Class 3) from the provisions of
the California Environmental Quality Act. CEQA Section 15303 exempts new
construction of small structures.
City Staff: Callie Taylor, Sr. Planner, ctaylor@atascadero.org, Phone: (805) 470-3448.
Recommendation: Staff recommends that the Planning Commission adopt PC Resolution 2018 -A
approving installation of cargo containers.
City of Atascadero Planning Commission Agenda Regular Meeting, March 6, 2018
Page 4 of 5
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
COMMISSIONER COMMENTS AND REPORTS
DIRECTOR’S REPORT
ADJOURNMENT
The next regular meeting will be on March 20, 2018, at 6:00 p.m. at City Hall Council
Chambers, 6500 Palma Avenue, Atascadero.
Please note: Should anyone challenge in court any proposed development
entitlement listed on this Agenda, that person may be limited to raising those
issues addressed at the public hearing described in this notice or in written
correspondence delivered to the Planning Commission at, or prior to, this public
hearing.
City of Atascadero Planning Commission Agenda Regular Meeting, March 6, 2018
Page 5 of 5
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
City of Atascadero
WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING
The Planning Commission meets in regular session on the first and third Tuesday of each month at 6:00 p.m. at City
Hall, Council Chambers, 6500 Palma Avenue, Atascadero. Matters are considered by the Commission in the order of
the printed Agenda.
Copies of the staff reports or other documentation relating to each item of business referred to on the Agenda are on
file in the office of the Community Development Department and are avail able for public inspection during City Hall
business hours at the Front Counter of City Hall, 6500 Palma Avenue, Atascadero, and on our website,
www.atascadero.org. All documents submitted by the public during Commission meetings that are either read into
the record or referred to in their statement will be noted in the minutes and available for review in the Community
Development Department. Commission meetings are audio recorded, and may be reviewed by the publ ic. Copies of
meeting recordings are available for a fee. Contact the City Clerk for more information (470-3400).
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in a City
meeting or other services offered by this City, please contact the City Manager’s Office or the City Clerk’s Office,
both at (805) 470-3400. Notification at least 48 hours prior to the meeting or time when services are needed will
assist the City staff in assuring that reasonable a rrangements can be made to provide accessibility to the meeting or
service.
TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA
Under Agenda item, “PUBLIC COMMENT”, the Chairperson will call for anyone from the audience having business
with the Commission to approach the lectern and be recognized.
1. Give your name for the record (not required)
2. State the nature of your business.
3. All comments are limited to 3 minutes.
4. All comments should be made to the Chairperson and Commission.
5. No person shall be permitted to make slanderous, profane or negative personal remarks concerning any
other individual, absent or present.
This is when items not on the Agenda may be brought to the Commission’s attention. A maximum of 30 minutes will
be allowed for Public Comment Portion (unless changed by the Commission).
TO SPEAK ON AGENDA ITEMS (from Title 2, Chapter 1 of the Atascadero Municipal Code)
Members of the audience may speak on any item on the agenda. The Chairperson will identify the subject, staff will
give their report, and the Commission will ask questions of staff. The Chairperson will announce when the public
comment period is open and will request anyone interested to address the Co mmission regarding the matter being
considered to step up to the lectern. If you wish to speak for, against or comment in any way:
1. You must approach the lectern and be recognized by the Chairperson.
2. Give your name (not required).
3. Make your statement.
4. All comments should be made to the Chairperson and Commission.
5. No person shall be permitted to make slanderous, profane or negative personal remarks concerning any
other individual, absent or present.
6. All comments limited to 3 minutes.
If you wish to use a computer presentation to support your comments, you must notify the C ommunity Development
Department at 470-3402 at least 24 hours prior to the meeting. Digital presentations brought to the meeting should
be on a USB drive or CD. You are required to submit to the Recording Secretary a printed copy of your presentation
for the record. Please check in with the Recording Secretary before the meeting begins to announce your presence
and turn in the printed copy.
The Chairperson will announce when the public comment period is closed, and thereafter, no further public
comments will be heard by the Commission.
PC Draft Minutes of 2/20/18
Page 1 of 5
CITY OF ATASCADERO
PLANNING COMMISSION
DRAFT MINUTES
Regular Meeting - Tuesday, February 20, 2018 - 6:00 P.M.
City Hall Council Chambers
6500 Palma Avenue, Atascadero, California 93422
CALL TO ORDER – 6:03 p.m.
Chairperson Seay called the meeting to order at 6:03 p.m. and Commissioner Betz led
the Pledge of Allegiance.
ROLL CALL
Present: Commissioners Anderson, Betz, Dariz, Donovan, Wolff,
Vice Chairperson Zirk and Chairperson Seay
Absent: None
Staff Present: City Manager, Rachelle Rickard
Deputy City Clerk, Amanda Muther
Senior Planner, Callie Taylor
Senior Planner Kelly Gleason
APPROVAL OF AGENDA
MOTION: By Commissioner Betz and seconded by Commissioner
Wolff to approve the Agenda.
Motion passed 7:0 by a roll-call vote.
PUBLIC COMMENT
The following members of the public spoke during public comment: Linda Keltz
Chairperson Seay closed the Public Comment period.
ITEM NUMBER: 1
DATE: 3-6-18
1
PC Draft Minutes of 2/20/18
Page 2 of 5
CONSENT CALENDAR
1. APPROVAL OF DRAFT MINUTES OF PLANNING COMMISSION MEETING ON
FEBRUARY 6, 2018
Commissioner Donovan noted that he had not been at the February 6, 2018 meeting
and would be abstaining.
MOTION: By Commissioner Anderson and seconded by
Commissioner Wolff to approve the Consent Calendar.
Motion passed 6:0 by a roll-call vote.
(Donovan abstained)
PLANNING COMMISSION BUSINESS
None
COMMUNITY DEVELOPMENT STAFF REPORTS
NONE
PUBLIC HEARINGS
DISCLOSURE OF EX PARTE COMMUNICATIONS:
Prior to a project hearing Planning Commission Members must disclose any communications they have had on any
quasi-judicial agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, Variances,
Conditional Use Permits, and Planned Development Permits. This does not disqua lify the Planning Commission
Member from participating and voting on the matter, but gives the public and applicant an opportunity to comment on
the ex parte communication.
(For each of the following items, the public will be given an opportunity to speak . After a staff report, the Chair will open
the public hearing and invite the applicant or applicant’s representative to make any comments. Members of the public
will be invited to provide testimony to the Commission following the applicant. Speakers should state their name for the
record and can address the Commission for three minutes. After all public comments have been received, the public
hearing will be closed, and the Commission will discuss the item and take appropriate action(s).)
2. PLN 2017-1674, TENTATIVE PARCEL MAP FOR 6907 EL CAMINO REAL
Applicant: City of Atascadero, 6500 Palma Ave., Atascadero, CA 93422
Project Title: PLN 2017-1674 – Tentative Parcel Map
Project Location: 6907 El Camino Real, Atascadero, CA
APN 029-361-045 (San Luis Obispo County)
Project
Description:
A Tentative Parcel Map is proposed to subdivide the former Creekside City
Hall parcel to create 3 separate lots. The existing Transit Center on Capistrano
Ave. and the existing public plaza area near the Centennial Bridge will become
separate parcels that will be retained by the City. The remaining parcel
housing the Creekside building and adjacent improvements will be sold for
private uses.
Proposed
Environmental
Determination:
A Notice of Intent to Adopt a Negative Declaration was circulated from 12/4/17
to 12/24/17.
City Staff: Callie Taylor, Senior Planner, ctaylor@atascadero.org, Phone: (805) 470-3448.
Recommendation: Staff recommends that the Planning Commission adopt PC Resolution 2018 -A
approving the subdivision map.
2
PC Draft Minutes of 2/20/18
Page 3 of 5
EX PARTE COMMUNICATIONS
None
Senior Planner Taylor gave the staff report and she and City Manager Rickard
answered questions from the Commission.
PUBLIC COMMENT
The following members of the public spoke during public comment: Linda Keltz
Chairperson Seay closed the Public Comment period.
MOTION: By Commissioner Anderson and seconded by
Commissioner Donovan recommending the Planning
Commission adopt PC Resolution 2018-A, approving the
subdivision map.
Motion passed 7:0 by a roll-call vote.
3. PLN 2017-1679, CITYWIDE TREE ORDINANCE AMENDMENTS
EX PARTE COMMUNICATIONS
None
Senior Planner Gleason gave the staff report and she and Senior Planner Taylor
answered questions from the Commission.
PUBLIC COMMENT
The following members of the public spoke during public c omment: Mike Orvis, Corey
Meyer and Jim Patterson.
Chairperson Seay closed the Public Comment period.
Applicant: City of Atascadero, 6500 Palma Ave., Atascadero, CA 93422
Project Title: PLN 2017-1679 – Citywide Tree Ordinance Amendments
Project Location: Citywide, Atascadero, CA, (San Luis Obispo County)
Project
Description:
The Planning Commission will review Tree Ordinance Text Updates of the
Atascadero Municipal Code including amendments to the Atascadero Native
Tree Ordinance and Tree Guidelines including changing the level of review
required for trees exceeding 24” dbh from Planning Commission approval to
staff approval and establishing a Heritage Tree list for native and non-native
landmark trees that will require Planning Commission review and approval.
Proposed
Environmental
Determination:
Exempt from CEQA (Section 15061(b)(3). No significant environmental
impact.
City Staff: Kelly Gleason, Senior Planner, kgleason@atascadero.org, Phone: (805)
470-3446.
Recommendation: Staff recommends that the Planning Commission adopt PC Resolution 201 8-A
recommending that the City Council adopt proposed amendments to the
Atascadero Native Tree Ordinance and the Native Tree Guidelines and
Standards.
3
PC Draft Minutes of 2/20/18
Page 4 of 5
Following concerns raised by members of the Atascadero Land Preservation Society
(ALPS) during Public Comment, Vice Chairperson Zirk moved to recommend the
Planning Commission:
1. Adopt PC Resolution 2018-A recommending that the City Council adopt an
Ordinance to amend Title 9, Chapter 11 of the Atascadero Municipal Code Tree
Ordinance based on findings, subject to additional staff and ALPS
recommendations to be placed before the City Council.
2. Adopt PC Resolution 2018-B, recommending the City Council make
amendments to the Native Tree Guidelines and Standards based on findings with
Heritage Tree List changes as recommended by staff.
After Vice Chairperson Zirk’s motion there was additional discussion by the
Commission. City Manager Rickard clarified the City’s standard practices for presenting
information to Council and advised that through the staff report process, City Council
would be able to receive ALPS written recommendations.
Based on the additional information, Vice Chairperson Zirk withdrew his amended
motion.
The Planning Commission noted the concerns raised by ALPS during public comment
and strongly encouraged staff to meet with ALPS in order to provide Council with a list
of ALPS concerns/recommendations for review and consideration at the Council level.
MOTION: By Vice Chairperson Zirk and seconded by
Commissioner Dariz recommending the Planning
Commission:
1. Adopt Resolution PC 2018-A, recommending the
City Council adopt an ordinance to amend Title 9,
Chapter 11 of the Atascadero Municipal Code
(Tree Ordinance), based on findings.
2. Adopt Resolution PC 2018-B, recommending that
the City Council make amendments to the Native
Tree Guidelines and Standards, based on
findings, with Heritage Tree List changes as
recommended by staff.
Motion passed 7:0 by a roll-call vote.
COMMISSIONER COMMENTS AND REPORTS
Commissioner Wolff announced that the Old Carl’s Jr. sign had finally been removed
and expressed gratitude to City staff for their constant attention to the matter.
DIRECTOR’S REPORT
Senior Planner Gleason announced the items that were planned for the next meeting
agenda.
4
PC Draft Minutes of 2/20/18
Page 5 of 5
ADJOURNMENT - 7:20 p.m.
The next Regular meeting of the Planning Commission is scheduled for March 6, 2018,
at 6:00 p.m. at City Hall, Council Chambers, 6500 Palma Avenue, Atascadero.
MINUTES PREPARED BY:
____________________________
Amanda Muther
Deputy City Clerk
5
Atascadero Planning Commission
Staff Report – Community Development Department
Kelly Gleason, Senior Planner, 470-3446, kgleason@atascadero.org
PLN 2014-1529
Vesting Tentative Tract Map Time Extension
Cerro Roble Residential Development
(Midland Pacific Homes)
SUBJECT:
The consideration of a one-year time extension for the Cerro Roble Residential
Development: Tract 3078 and associated Master Plan of Development.
RECOMMENDATION:
Staff recommends Planning Commission adopt Resolution PC 2018-A, approving a
one-year time extension of PLN 2014-1529, which includes a vesting Tentative Tract
Map (TR 3078) and Conditional Use Permit in compliance with Sections 11-4.23(a) and
11-4.33(b) of the Subdivision Ordinance (Title 11).
SITUATION AND FACTS:
1. Owner and Applicant: Midland Pacific Homes
7305 Morro Rd, Suite 207, Atascadero CA 93422
2. Project Address: 11955 Viejo Camino
APN 045-401-003, 004
3. General Plan Designation: Single-Family residential - X (SFR-X)
4. Zoning District: Residential Single-Family - X (RSF-X) / Planned
development #33 (PD 33)
5. Site Area: 8.8 acres
6. Existing Use: Improvements under construction
7. Environmental Status: Certified Mitigated Negative Declaration
ITEM NUMBER: 2
DATE: 3/6/2018
6
DISCUSSION:
Background:
The Cerro Roble project (formerly known as The Groves) was approved on April 7,
2016 and included entitlements for a Vesting Tentative Tract map, Conditional Use
Permit, and Tree Removal Permit.
The applicant has pulled permits for, and is in the process of constructing subdivision
and public improvements for the project. Improvements are required to be constructed
prior to final map recordation unless bonded for. The applicant is working toward
completion of the improvements at this tim e.
Analysis:
The Subdivision Map Act mandates an initial two -year life and, by local ordinance, the
City can extend initial life up to an additional 12 months. Additionally, the City may
continue to extend, in one year increments, the time at which the map expires for a
period or periods not to exceed a total of five years. The application for the extension
must be filed prior to the expiration date. The Planning Commission has discretion on
whether they want to extend the map, or they can defer the decision to the City Council.
The proposed Time Extension would extend the Vesting Tentative Map until April 7,
2019. The applicant must have their vesting tentative map accepted by the City Council
on or before April 7, 2019, unless an additional extension has been granted.
Vesting Tentative Parcel Map
A Vesting Tentative Tract Map was approved as part of the project consistent with the
Master Plan of Development and PD33 overlay zoning standards. The Vesting
Tentative Tract Map was conditioned to meet all City standards including on-site and
off-site street improvements. No new standards have been established since the time of
project approval.
Conditional Use Permit
A Master Plan of Development in the form of a Conditional Use Permit was approved
concurrently with the Tentative Tract Map. The Master plan of Development and Tract
Map make up the full project entitlements that guide development and build -out of the
project. The expiration date Conditional Use Permit will be extended 1 -year with this
approval to be consistent with the life of the map.
Time Extension Findings
The following are required findings that must be made by the Planning Commissi on to
extend the Vesting Map, consistent with Section 9-2.117 of the Atascadero Municipal
Code.
Finding #1
There have been no changes to the provisions of the General Plan or zoning
regulations applicable to the project since the approval of the entitlement (AMC 9-
2.117(a)(1));
7
There have been no applicable changes to the General Plan or zoning regulations since
the project was entitled. All conditions of approval and required mitigation measures are
to be completed in addition to all applicable zoning requirements and General Plan
requirements.
Finding #2
There have been no changes in the character of the site o r its surroundings which affect
how the standards of the General Plan or zoning regulations apply to the project (AMC
9-2.117(a)(2)).
The site is currently under construction with subdivision improvements in accordance
with approved entitlements. The surrounding properties have yet to develop, therefore
there have been no changes in the character or its surroundings which affect how the
standards of the General Plan or zoning regulations apply to the project.
In staff’s opinion, the required findings may be made by the Planning Commission to
extend the life of the Vesting Tentative Tract Map and associated entitlements for one
(1) year.
Map History:
Approval Expiration
Original Approval 04/07/16 04/07/18
Proposed Extension (Applied on 01/18/18) 03/06/18 04/07/19
CONCLUSION:
The applicant is under construction with subdivision and public improvements for the
Cerro roble project. No significant factors have changed to warrant reconsideration of
project conditions or entitlements. Staff recommends the Planning Commission approve
the Time Extension as requested.
ALTERNATIVES:
1. The Commission may approve the Time Extension subject to additional or revised
project conditions.
2. The Commission may deny the Time Extension if it is found to be inconsistent with
the General Plan or any of the other required findings. The Commission’s motion to
deny must include a finding basis for denial.
3. The Commission may continue the hearing and refer the item back to staff for
additional information or analysis. Direction should be given to staff and the
applicant on required information.
8
ATTACHMENTS:
Attachment 1 - Location Map (General Plan & Zoning)
Attachment 2 - TR 3078
Attachment 3 – Master Plan of Development
Attachment 4 - Conditions of Approval PLN 2014-1529
Attachment 5 - Draft Resolution 2018-A
9
Zoning District: Residential Single-Family – X / PD 33
Land Use Designation: Single-Family Residential - X
ATTACHMENT 1: Location Map (General Plan / Zoning)
PLN 2014-1529
11955 Viejo Camino
Proposed
Project Site
10
ATTACHMENT 2: TR 3078
11955 Viejo Camino
11
ATTACHMENT 3: Master Plan of Development
11955 Viejo Camino
12
ATTACHMENT 4: Conditions of Approval/Mitigation Monitoring Program
PLN 2014-1529
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Planning Services
1. The approval of this use permit shall become final and effective
for the purposes of issuing building permits thirty (30) days
following the City Council approval of ZCH 2014-0175 and ZCH
2015-0178 upon second reading, unless prior to that time, an
appeal to the decision is filed as set forth in Section 9-1.111(b)
of the Zoning Ordinance.
FM PS
2. The Community Development Director shall have the authority
to approve minor changes to the project that remain in
substantial conformance to the approved Master Plan of
Development. Such changes may include, but are not limited
to, building alterations and/or architectural changes, site
placement of structures, landscape modifications, and
construction design issues that do not substantively affect the
Master Plan of Development.
The DRC shall make a recommendation to the Community
Development Director related to any proposed architectural
design changes not in keeping with the architectural style
approved by this resolution.
The Planning Commission shall have the final authority to
approve any changes to the Master Plan of Development and
any associated Tentative Maps deemed to be substantive by
the Community Development Director.
BP / FM PS, CE
3. Approval of this Conditional Use Permit shall be valid for
twenty-four (24) months after its effective date. At the end of
the period, the approval shall expire and become null and void
unless the project has received a building permit.
BP / FM PS
4. The applicant shall defend, indemnify, and hold harmless the
City of Atascadero or its agents, officers, and employees
against any claim or action brought to challenge an approval by
the city, or any of its entities, concerning the subdivision
Ongoing PS
5. All subsequent Tentative Map and construction permits shall be
in substantial conformance with the Master Plan of
Development contained herein.
BP / FM PS, CE
13
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
6. All exterior elevations, finish materials and colors shall be in
substantial conformance with the Master Plan of Development
as shown in EXHIBIT D with the following modifications:
Garage doors shall be of a color compatible with the building
color scheme and shall be designed to blend in with the
façade rather that contrast.
Any proposed exterior street, pedestrian, or building mounted
light fixtures shall be of architectural grade and design and
shall be compliment the architectural style, subject to staff
approval. All lighting shall comply with dark sky standards
and shall be located and directed to avoid off-site glare per
City ordinance.
Stucco siding shall be smooth troweled or similar. No
machine finishes will be permitted.
Stone accent banding shall wrap each façade to an adjoining
projected feature or at a distance approved by staff.
BP PS
7. All site work, grading, and site improvements shall be in
substantial conformance with the Master Plan of Development
as shown in EXHIBIT B, C, E and F.
BP/FM PS, BS, CE
8. A final landscape and irrigation plan shall be approved prior to
the issuance of building permits and included as part of site
improvement plan consistent with EXHIBIT C, and as follows:
All exterior meters, trash storage areas, air conditioning units
and mechanical equipment shall be screened with
landscape material and/or architecturally compatible
enclosures.
All areas shown on the landscape plan and/or areas
disturbed during construction for individual lots shall be
landscaped and/or hydroseeded with a native mix by the
developer completed prior to final of each lot.
Landscape areas between the Viejo Camino pathway and
the split rail fence (limits of public easement) shall be
landscaped prior to final and acceptance of the off-site
improvements.
Street trees shall be provided along Viejo Camino at a
maximum spacing of 30 feet on center. Groupings of trees
may be allowed to accommodate sight-distance,
topographical features, and/or rural character, subject to the
approval of the Community Development Director and City
BP PS, BS
14
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Engineer.
Landscape screening comprised of a combination of trees
and native shrubs/grasses shall be provided between all
pedestrian pathways and any solid fencing or sound wall
features. Walkable shoulders shall be considered as
pedestrian pathways for the purposes of this condition.
The corner of Viejo Camino and Santa Barbara Rd shall
include enhanced landscaping to buffer between the project
and the existing rural residences. Landscaping shall include
a combination of trees and native shrubs/grasses, subject to
staff approval.
Street and screening trees shall be minimum 15-gallon size
and double staked.
A neighborhood identification monument sign shall be
permitted at the Viejo Camino project entrance. Monument
sign design shall be consistent with building and/or sound
wall materials and shall be subject to the review and
approval of staff.
Adequate sight-distance shall be maintained at all
intersections and private driveways. Shrubs/grasses shall be
setback or eliminated where clear sight-distance is required.
9. All project fencing shall be installed consistent with EXHIBIT C
subject to the following modifications:
All solid fencing shall be setback a minimum of 10-feet from
the edge of right-of-way/public access easements and shall
include landscaping within the setback area.
Split rail fencing shall be installed along the Viejo Camino
frontage at the edge of the easement dedication. This
fencing shall be maintained by the HOA.
Rear yard privacy fencing for lost abutting Viejo Camino or
any interior street shall be setback a minimum of 10-feet
from the edge of the easement dedications. This includes
all pathways and walkable shoulders.
All project fencing shall be of consistent style and material.
Sound walls may be required for outdoor activity areas
located in areas along Viejo Camino where decibel
readings exceed residential standards, as identified in
EXHIBIT G. Where required, sound walls shall be of
architectural quality and include features such as
GP/BP
PS
15
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
decorative top caps. Sound walls shall have the same
setback and landscaping requirements as solid fencing.
Any sound wall proposed at the boundaries of the project
shall taper in a decorative matter and not abruptly terminate
at the property line. Neighborhood signage may be
incorporated into the sound wall design. Alternatively,
sound attenuation areas may be integrated into the building
design and/or setback outside of the identified area.
10. Final selection of colors and materials identified in EXHIBIT D
shall be subject to staff approval.
GP/BP PS
11. Affordable Housing Requirement: The applicant shall submit a
payment of 2.5% of the building valuation for each residential
unit to be placed into the City’s inclusionary housing fund.
Payment shall be required prior to building permit issuance.
GP/BP
PS, CA
12. A Tree Protection Plan shall be prepared as part of the on- and
off-site improvement plan package and/or any residential
building permit where construction activities will occur within 20-
feet of a native tree dripline. The applicant will contract with a
certified arborist to monitor all activity within the drip lines of
existing native trees.
GP/BP PS
13. The emergency services and facility maintenance costs listed
below shall be 100% funded by the project in perpetuity. The
service and maintenance costs shall be funded through a
community facilities district established by the City at the
developer's cost. The funding mechanism must be in place
prior to or concurrently with acceptance of the final
maps. The funding mechanism shall be approved by the City
Attorney, City Engineer and Administrative Services Director
prior to acceptance of any final map. The administration of
the above mentioned funds shall be by the City. Developer
agrees to participate in the community facilities district and to
take all steps reasonably required by the City with regard to
the establishment of the district and assessment of the
property.
All Atascadero Police Department service costs to the
project.
All Atascadero Fire Department service costs to the
project.
Off-site common City of Atascadero park facilities
BP PS
16
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
maintenance service costs related to the project.
14. All tract maintenance costs listed below shall be 100% funded
by the project in perpetuity. The service and maintenance cost
shall be funded through a Home Owners Association
established by the developer subject to City approval. The
Home Owners Association must be in place prior to, or
concurrently with acceptance of any final maps. The Home
Owners Association shall be approved by the City Attorney, City
Engineer and Administrative Services Director prior to
acceptance of any Final Map. The administration of the above
mentioned funds, and the coordination and performance of
maintenance activities, shall be the responsibility of the Home
Owners Association.
a) All streets, bridges, sidewalks, streetlights, street signs,
roads, emergency access roads, emergency access
gates, and sewer mains within the project.
b) All parks, trails, recreational facilities and like facilities.
c) All open space and native tree preservation areas.
d) All drainage facilities and detention basins.
e) All creeks, flood plains, floodways, wetlands, and
riparian habitat areas.
f) All common landscaping areas, street trees, medians,
parkway planters, manufactured slopes outside private
yards, and other similar facilities.
g) All frontage landscaping and sidewalks along public
streets
BP PS
15. Prior to issuance of building permits for any residential unit,
the applicant shall pay their fair share toward improvements
at the US 101/Santa Barbara interchange based on a City
approved cost estimate for the build-out improvements.
BP PS, BS
16. Prior to final map, the applicant shall submit CC&Rs for review
by the Community Development Department. The CC&R’s shall
record with the Final Map and shall include the following:
a) Provisions for maintenance of all common areas
including access, parking, street trees, fencing and
landscaping.
b) A detailed list of each individual homeowner’s
responsibilities for maintenance of the individual units.
c) Individual unit’s responsibility for keeping all trash
receptacles within the unit’s garage.
BP PS, BS
17
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
17. Approval of this permit shall include the removal of 19 Native
Oak Trees, totaling 242-inches dbh. The applicant shall provide
a tree preservation easement over a portion of lots 10 and 7 as
mitigation of the approved removals. Any additional removals
shall be subject to Planning Commission approval.
BP PS, BS
ENGINEERING CONDITIONS
PROJECT SPECIFIC CONDITIONS
18. The internal streets shall be offered as public rights-of-way as
shown on the tentative map and shall be extended to include
the cul-de-sac adjacent to lots 9, 16 & 17.
BP, GP CE
19. Internal streets shall not be improved with sidewalks but shall
comply with City standards for Rural Local roads. The road
shoulder adjacent to Lots 1-5 and Lots 13-15 shall include a
5-foot wide walkable shoulder of compacted Class II Agg
Base or DG, with a cross-slope matching that of the street,
but not exceeding 4%. Where curb & gutter, or, an AC dike
are required to convey stormwater, the area behind the curb
or dike shall be compacted base or DG as described above.
Curb ramps are not required at the intersections of the
internal streets.
BP, GP CE
20. Viejo Camino shall be improved to City standards as shown on
the Tentative Map along the project frontage. New
improvements shall be consistent with City standards and the
Circulation Element and shall include new curb, gutter, street
intersection with cross-gutter, traffic signage and delineation, a
bike lane (Class II), and transit stop. The street pavement shall
be completed to integrate the existing roadway with the new
frontage improvements as shown on the Tentative Map.
BP, GP CE
21. Along the Viejo Camino frontage, the property owner shall
dedicate an easement and construct a public pedestrian and
bike trail to accommodate a 10-foot wide detached pedestrian &
bike trail. The pedestrian/bike trail shall be constructed of
compacted class 2 aggregate base or decomposed granite to
the satisfaction of the Director of Public Works and Director of
Community Development. Final alignment shall meander as
necessary to conform to the existing terrain, trees and drainage
requirements to the satisfaction of the Director of Public Works
and Director of Community Development.
BP, GP CE
18
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
22. The transit stop shown on Viejo Camino shall be not less than
90 feet long (end-to-end, including transition lanes). The transit
stop shall be designed using smooth curves to allow for ease of
entry/exiting of the bus as well as street sweeping equipment.
The bus staging area shall be of sufficient width to allow the bus
to be safely located out of the travel lane(s) while loading or
unloading passengers to the satisfaction of the City Engineer.
The structural pavement-section shall be sufficient to support
the typical transit vehicles but shall be not less than 6” Class A
concrete over 6” Class II Aggregate Base, to the satisfaction of
the City Engineer. Sidewalk at the transit stop shall be in
addition to the concrete pad necessary to place the transit street
furniture (bus shelter, bench, sign and other street furniture as
deemed necessary by the Director of Public Works). Additional
right-of-way shall be dedicated to accommodate the turn-out to
the satisfaction of the City Engineer.
BP, GP CE
23. The Subdivider shall plant street trees along the Viejo Camino
street frontage behind the public sidewalk and within 15-feet.
Trees planted closer than 10-feet shall include deep-root
planter barriers as approved by the City Engineer. One street
tree shall be planted for each 35 linear feet (or portion thereof)
of road frontage.
BP, GP CE
24. Street trees on the internal streets shall be planted at the time
of lot development along the road frontages of the internal
streets offered to the public. One street tree shall be planted
for each 35 linear feet (or portion thereof) of road frontage.
BP, GP CE
25. A new gravity sewer shall be designed and extended in Viejo
Camino to serve the lots of Tract 3078, to the satisfaction of
the City Engineer. An optional route along Halcon Rd can be
explored for feasibility, subject to the review and approval of
the city Engineer. The developer may request a
reimbursement agreement for future private sewer
connections for any off-site sewer extension subject to City
Ordinance and City Council authorization. Notice of developer
intent to request a reimbursement agreement must be made
in writing prior to the start of construction.
BP CE
26. Each new lot shall be served by separate laterals for water,
power, communications, gas & cable TV (if available adjacent
to the subject property).
BP CE
27. The Final Map shall include the offer of Public Utility
Easements along all street frontages (6-feet wide), to the
satisfaction of the City Engineer.
FM CE
19
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
28. The Subdivider shall dedicated sufficient public right-of-way
for street purposes along the northerly side of Santa Barbara
Street to accommodate the existing improved road alignment.
FM CE
29. A crosswalk shall be installed across Halcon Rd at Viejo
Camino. The developer shall work with the City Engineer to
install any improvements necessary to provide safe
pedestrian access. The developer may request
reimbursement based on a fair share analysis for other
properties within the project area once they develop. Any
request for a reimbursement agreement must be provided in
writing prior to issuance of the subdivision improvement plans
for the required crosswalk and must be included by reference
in the subdivision improvement agreement.
FM/GP CE
STANDARD CONDITIONS
30. All public improvements shall be constructed in conformance
with the City of Atascadero Engineering Department Standard
Specifications and Drawings.
BP, GP CE
31. In the event that the applicant is allowed to bond for the public
improvements required as a condition of this map, the applicant
shall enter into a Subdivision Improvement Agreement with the
City.
FM CE
32. An engineer’s estimate of probable cost shall be submitted for
review and approval by the City Engineer to determine the
amount of the bond.
FM CE
33. The Subdivision Improvement Agreement (SIA) shall record
concurrently with the Final Map. If it is the intent of the developer
to pursue a reimbursement agreement with the City for the
installation of off-site sewer facilities, reference to said
agreement and terms shall be included in the SIA.
FM CE
34. The applicant shall be responsible for the relocation and/or
alteration of existing utilities.
BP, GP CE
35. The applicant shall install all new utilities (water, gas, electric,
cable TV and telephone) underground. Utilities shall be
extended to the property line frontage of each lot or its public
utility easement.
BP, GP CE
20
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
36. The applicant shall monument all property corners for
construction control and shall promptly replace them if
disturbed.
FM CE
37. The applicant shall acquire title interest in any off-site land that
may be required to allow for the construction of the
improvements. The applicant shall bear all costs associated with
the necessary acquisitions. The applicant shall also gain
concurrence from all adjacent property owners whose ingress
and egress is affected by these improvements.
FM CE
38. Slope easements shall be provided as needed to accommodate
cut of fill slopes.
FM CE
39. Drainage easements shall be provided as needed to
accommodate both public and private drainage facilities.
FM CE
40. The final map shall be signed by the City Engineer prior to the
map being placed on the agenda for City Council acceptance.
FM CE
41. Prior to recording the tract map, the applicant shall submit a
map drawn in substantial conformance with the approved
tentative map and in compliance with all conditions set forth
herein. The map shall be submitted for review and approval by
the City in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
FM CE
42. Prior to recording the tract map, the applicant shall set
monuments at all new property corners. A registered civil
engineer or licensed land surveyor shall indicate by certificate
on the parcel map, that corners have been set or shall be set by
a date specific and that they will be sufficient to enable the
survey to be retraced.
43. Prior to recording the tract map, the applicant shall pay all
outstanding plan check/inspection fees.
44. Prior to recording the map, the applicant shall complete all
improvements required by these conditions of approval
FM CE
45. Prior to recording the tract map, the applicant shall have the
map reviewed by all applicable public and private utility
companies (cable, telephone, gas, electric, Atascadero Mutual
Water Company). The applicant shall obtain a letter from each
FM CE
21
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
utility company indicating their review of the map. The letter
shall identify any new easements that may be required by the
utility company. A copy of the letter shall be submitted to the
City. New easements shall be shown on the map.
46. Upon recording the final map, the applicant shall provide the City
with a black line clear Mylar (0.4 mil) copy and a blue line print of
the recorded map.
FM CE
47. Prior to the final inspection of any public improvements, the
applicant shall submit a written statement from a registered civil
engineer that all work has been completed and is in full
compliance with the approved plans.
FM CE
48. Prior to the final inspection, the applicant shall submit a written
certification from a registered civil engineer or land surveyor that
all survey monuments have been set as shown on the final map.
BP, GP CE
49. An encroachment permit shall be obtained prior to any work
within City rights of way.
BP, GP CE
50. Prior to the issuance of building permits the applicant shall
submit a grading and drainage plan prepared by a registered
civil engineer for review and approval by the City Engineer.
BP, GP CE
51. The applicant shall submit a hydraulic analysis with the first plan
check submittal of the water system improvements for the
project. The analysis should take into account the fire flows
required by the California Building Code. The applicant is
responsible for designing and constructing water system
improvements that will provide water at pressures and flows
adequate for the domestic and fire protection needs of the
project.
BP, GP CE
MITIGATION MONITORING PROGRAM
Mitigation Measure 1.c.1: A landscape buffer shall be provided along
Santa Barbara Rd. Landscape material shall consist of native and/or
drought tolerant species. As mixture of low and medium plants shall
be utilized to provide visual screening of the project from the
adjacent neighborhood.
BP PS/BS
Mitigation Measure 1.c.2: Street trees shall be provided along Viejo
Camino and Halcon Rd. Street trees shall be spaced at no greater
than 30-feet on center, however, rural tree groupings may be
BP CE/BS
22
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
approved by the City Engineer due to topographic or sight distance
concerns and/or to maintain the rural nature of the street.
Mitigation Measure 1.c.3: Rear or side yard privacy fencing where
adjacent to a private road shall be set back from the edge of
shoulder a minimum of 10-feet. Where rear or side yard fencing is
adjacent to a public road, a minimum setback from the edge of
pavement/sidewalk/pedestrian path of 10-feet shall be observed.
Fencing adjacent to a public roadway shall be a maximum of 6-feet
high and shall include landscaping on the street side of the fence.
Fencing shall be decorative in nature. Any walls proposed for rear or
side yards adjacent to a public road shall be constructed of high
quality materials and shall adhere to the same setback as privacy
fencing.
BP PS/BS
Mitigation Measure 1.d.1: All lighting shall be designed to eliminate
any off site glare. All exterior site lights shall utilize full cut -off,
“hooded” lighting fixtures to prevent offsite light spillage and glare.
BP PS/BS
Mitigation Measure 3.b.1: The project shall be conditioned to comply
with all applicable District regulations pertaining to the control of
fugitive dust (PM-10) as contained in Section 2 “Assessing and
Mitigating Construction Impacts.”
2.4 Fugitive Dust Mitigation Measures: Standard List
a. Reduce the amount of the disturbed area where possible;
b. Use water trucks or sprinkler systems in sufficient quantities
to prevent airborne dust from leaving the site. Increased
watering frequency would be required whenever wind speeds
exceed 15 mph. Reclaimed (non-potable) water should be used
whenever possible;
c. All dirt stock-pile areas should be sprayed daily as needed;
d. All roadways, driveways, sidewalks, etc. to be paved should
be completed as soon as possible, and building pads should be
laid as soon as possible after grading unless seeding or soil
binders are used;
e. All of these fugitive dust mitigation measures shall be shown
on grading and building plans; and
f. The contractor or builder shall designate a person or persons
to monitor the fugitive dust emissions and enhance the
implementation of the measures as necessary to minimize dust
complaints, reduce visible emissions below 20% opacity, and to
prevent transport of dust offsite. Their duties shall include
holidays and weekend periods when work may not be in
progress.
BP PS/BS
23
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Mitigation Measure 3.b.2: The project shall be conditioned to comply
with all applicable APCD regulations pertaining to Naturally
Occurring Asbestos (NOA). Prior to any grading activities a geologic
evaluation should be conducted to determine if NOA is present
within the area that will be disturbed. If NOA is not present, and
exemptions request must be filed with the District. If NOA is found at
the site, the applicant must comply with all requirements outlined in
the Asbestos ATCM. This may include development of an Asbestos
Dust Mitigation Plan and an Asbestos Health and Safety program for
approval by the APCD. Technical Appendix 4.4 of the SLO County
APCD CEQA Air Quality Handbook includes a map of zones
throughout San Luis Obispo County where NOA has been found and
geological evaluation is required prior to any grading.
BP PS/BS
Mitigation Measure 4.a.1: A qualified biologist shall conduct a pre-
construction survey within 30 days of initial site disturbance to
identify whether silvery legless lizards are present. If silvery legless
lizards are detected, a biological monitor shall be present during
initial ground disturbing and vegetation removal activities to allow for
a salvage and relocation effort for the lizard and other ground
dwelling common wildlife that may be present.
BP PS
Mitigation Measure 4.a.2: A qualified biologist shall conduct a pre-
construction survey within 30 days of initial site disturbance to
identify whether American badger are present. If American badger or
their dens are detected during the survey, the location of the den
shall be mapped, the biologist shall monitor the den for three days if
it is within 50ft of proposed blueprints. If the den is deemed inactive
it shall be destroyed if the den is active the biologist will continue
monitoring its status till the den becomes inactive so it can be
destroyed, during that time all development activities shall respect a
50ft buffer or exclusion zone around the den.
BP PS
Mitigation Measure 4.a.3: Conduct a springtime rare plant survey to
determine the presence/absence of any special-status plants.
Should any be discovered, implement a seed and/or plant salvage
program and incorporate the salvaged material into the drainage
setback and detention basin landscaped areas.
BP PS
Mitigation Measure 4. d.1: Vegetation removal and initial site
disturbance shall be conducted between September 1 and January
31 outside of the nesting season for birds. If vegetation and/or tree
removal is planned for the bird nesting season, then preconstruction
nesting bird survey, prepared by a qualified biologist, shall be
required to determine if any active nests would be impacted by
project construction. If no active nests are found, then no further
mitigation shall be required. If any active nests are found that would
be impacted by construction, then the nest sites shall be avoided
with the establishment of a non-disturbance buffer zone around
active nests as determined by a qualified biologist. Nest sites shall
BP PS
24
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
be avoided and protected with the non-disturbance buffer zone until
the adults and young of the year are no longer reliant on the nest
site for survival as determined by a qualified biologist. As such,
avoiding disturbance or taking of an active nest would reduce
potential impacts on nesting birds to a less-than-significant level.
Mitigation Measure 4.e.1: Grading and excavation activities shall be
consistent with the City of Atascadero Tree Ordinance. Special
precautions when working around native trees include:
1. During grading activities an arborist must be present.
2. All existing trees outside of the limits of work shall remain.
3. Earthwork shall not exceed the limits of the project area.
4. Low branches in danger of being torn from trees shall be
pruned prior to any heavy equipment work being done.
5. Vehicles and stockpiled material shall be stored outside the
drip line of all trees.
6. All trees within twenty feet of construction work shall be
fenced for protection with 4-foot chain link, snow or safety
fencing placed per the approved tree protection plan. Tree
protection fencing shall be in place prior to any site
excavation or grading. Fencing shall remain in place until
completion of all construction activities.
7. Any roots that are encountered during excavation shall be
clean cut by hand and sealed with an approved tree seal.
8. Utilities such as water, gas, power, cable, storm drainage,
and sewer should be redirected from under the canopy of
any trees that are to remain.
9. Where a building is placed within the canopy of a tree the
foundation should be redesigned so that it bridges across
any root systems.
10. Any foundation or other structure that encroaches within the
drip line of trees to be saved shall be dug by hand.
11. At no time shall tree roots be ripped with construction
equipment.
BP PS/ BS
Mitigation Measure 4.e.2: Tree protection fencing shall be installed
at the locations called out in the Tree Protection Plan. An inspection
of the tree fencing shall be done by City staff prior to issuance of
building permits.
BP PS/ BS
Mitigation Measure 4.e.3: The following measure shall be
incorporated on-site during the construction process of the proposed
project:
1. A minimum height construction protective barrier
shall be erected around the drip line of the tree
plus 4’. The fence shall be supported with “T”
posts at no more than 6’ o.c. and tied at least 3
places per post. This fence shall be installed by
the General Contractor before any rough grading
is allowed on the site. Approval for this stage must
be obtained in writing from either the Arborist or
BP PS/ BS
25
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
the Counties/Cities representative.
2. Earthwork shall not exceed the limits of the project
area.
3. Low branches in danger of being torn during
construction process shall be pruned prior to any
heavy equipment work being undertaken.
4. Once the rough grading is accomplished the fence
may be moved closer to the trunk of the tree for
finish grading. At no time shall the fence be placed
within the Critical Root Zone (CRZ). This location
is determined by the diameter of the trunk at
Diameter Breast Height (DBH). (4.5’ above grade)
and is 1’ per 1” diameter in the direction of the drip
line. At no time shall the fence be moved closer to
the trunk than the drip line, unless additional
preservation measures are implemented as
recommended by the project arborist.
5. Any roots that are encountered over 2” diameter,
during the excavation process shall be clean cut
perpendicular to the direction of root growth with a
handsaw. At no time shall tree seal be applied to
any cut. Any roots over 2” diameter the county/city
representative shall be notified to determine the
preferred course of action.
6. All trenching with CRZ area shall require hand
trenching to preserve and protect roots over 2” in
diameter.
7. No grading of trenching is allowed within the CRZ
fenced area without written permission from the
County/City representative or a certified arborist.
8. Any roots over 4” in diameter are not to be cut or
ripped until inspected and approved in writing by
the arborist.
9. If, for whatever reason, work must be
accomplished inside the drip line 4”-6” of mulch
must be applied first to decrease the possibilities
of compaction upon written approval from the
arborist.
10. There shall be a pre-construction meeting
between the Engineering/Planning staff of the
County/City, Grading equipment operators, Project
Superintendent and the Arborist to review the
project conditions and requirements prior to any
grubbing or earth work for any portions of the
project site. All tree protection fencing shall be
installed for inspection prior to this meeting.
11. All trees shall be pruned before any construction
takes place that are in the development areas to
be saved if they might be damaged by the
construction equipment. This must be
accomplished by a bonded, licensed, and certified
Tree Service Contractor.
12. All debris shall be cleared from the area or
26
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
chipped and spread on the site or stacked in
orderly piles for future use by the Owner, at the
Owners request.
13. In locations where paving is to occur within the
drip line grub only and do not compact unless
authorized in writing. Permeable pavers or other
preamble surface must be approved by the
Arborist.
Mitigation Measure 4.e.4: Upon project completion and prior to final
occupancy a final status report shall be prepared by the project
arborist certifying that the tree protection plan was implemented, the
trees designated for protection were protected during construction,
and the construction-related tree protection measures are no longer
required for tree protection.
FO PS/
Mitigation Measure 4.e.5: All utilities shall remain outside the drip
lines of native trees, unless preservation measures, as specified by
the project arborist, are implemented.
BP PS/ BS
Mitigation 5.a.b.c.1: An archaeological monitor shall be present
during initial vegetation clearing, site “grubbing, and grading for all
portions of the project.
GP PS
Mitigation 5.d.1: In the event that human remains are discovered on
the property, all work on the project shall stop and the Atascadero
Police Department and the County Coroner shall be contacted. The
Atascadero Community Development Department shall be
notified. If the human remains are identified as being Native
American, the California Native American Heritage Commission
(NAHC) shall be contacted at (916) 653-4082 within 24 hours. A
representative from both the Chumash Tribe and the Salinan Tribe
shall be notified and present during the excavation of any remains.
BP / GP PS
Mitigation Measure 6.b.1: The on-site subdivision / grading permit
plans shall include erosion control measures to prevent soil, dirt, and
debris from entering the storm drain system during and after
construction, consistent with mitigation or construction methods
outlined in the geotechnical report. Plans shall be approved by the
City Engineer prior to issuance.
GP PS/CE
Mitigation Measure 6.b.2: All cut and fill slopes mitigated with an
appropriate erosion control method (erosion control blanket, hydro-
mulch, or straw mulch appropriately anchored) immediately after
completion of earthwork, as approved by the City Engineer. All
disturbed slopes shall have appropriate erosion control methods in
place.
GP PS/CE
27
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Mitigation Measure 6.b.3: The contractor will be responsible for the
clean-up of any mud or debris that is tracked onto public streets by
construction vehicles. An approved device must be in place prior to
commencement of grading activities. This device shall be approved
by the City Engineer.
GP PS/CE
Mitigation Measure 6.b.4: A re-vegetation plan shall be submitted
with building permits. All disturbed cut and fill slopes shall be
vegetated as specified in a landscaping plan. The landscaping plan
must be approved by both the Community Development Department
and the Public Works Department.
GP PS/CE
Mitigation Measure 8.h.1: All new construction will comply with
section the California Building and Fire Codes. New residences in
the City are required to install fire sprinklers. Fire protection
measures shall include the use of non-combustible exterior
construction and roofs and fire-resistant building materials.
BP FD
Mitigation Measure 9.d.e.f.1: The project shall integrate Low Impact
Development Best Management Practice’s into the project design
which may include on-site detention and/or retention basins,
pervious paving, and vegetated swales. The detention basins must
meet the City’s drainage design standards with surface runoff being
treated for water quality through structural control measures
including: disconnected downspouts flowing to vegetated bio-
swales, and pervious pavement and/or landscape areas to control
storm volume. All drainage control features shall be subject to the
approval of the City Engineer.
GP PS/CE
Mitigation Measure 9.d.e.f.2: The developer shall ensure that all
contractors are aware of all storm water quality measures and that
such measures are implemented. Failure to comply with the
approved construction Best Management Practices will result in the
issuance of correction notices, citations, or stop orders.
GP PS/CE
Mitigation Measure12.a.1: Private yard outdoor activity spaces for
each residential parcel adjacent to Viejo Camino and Halcon Rd
where outdoor noise levels exceed City standards shall be located
where the building provides acoustical screening opportunities. If no
such areas exist within the design of the structure on the site, private
outdoor use areas shall be enclosed by a 6-foot high solid wall.
BP PS/BP
Mitigation Measure 12.a.2: Windows on facades adjacent to Halcon
and Viejo Camino Road shall include additional sound attenuation
features such as dissimilar glass or other methods aimed at
reducing sound transmission beyond the standard dual pane
requirements.
BP PS/BP
28
Conditions of Approval /
Mitigation Monitoring Program
Halcon Residential Planned Development – The Groves
Planned Development (PD-33) Master Plan of
Development
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Mitigation Measure: 14: Prior to final map recordation, the applicant
shall annex into the City’s Community Facilities District (CFD) to off -
set additional costs associated with the provision of additional police,
fire, and park services.
FM PS/BP
Mitigation Measure 16.a.b.1: In addition to the City’s Development
Impact Fees, each new residential unit shall pay towards its fair
share of the US 101 / Santa Barbara interchange improvements.
The project may be eligible for TIF fee credits for Citywide
development impact fees associated with the interchange
improvements. Any TIF credit shall be approved by the City
Engineer.
BP PS/CE
Mitigation Measure 16.d.1: Access for parcels abutting Halcon Rd
shall be consolidated and shall be designed as private roads
meeting City road standards. Driveways to individual parcels with
existing residences may be approved by the City Engineer in
locations where consolidated access cannot be utilized due to parcel
locations. All access roads and driveways shall be evaluated at the
time of tentative map submittal and/or improvement permits for sight
distance.
FM PS/CE/FD
Mitigation Measure 6.f.1: In addition to an on-street bike lane, a
multi-use path shall be provided along Viejo Camino and Halcon
Roads consistent with the adopted City bike and trail Master Plan
and the SLOCOG Salinas River Trail Plan.
FM PS
Mitigation Measure 17.d.1: Landscaping plans shall be submitted to
the Community Development Department for review and approval.
Landscaping must consist of drought tolerant species and utilize drip
irrigation. Turf shall not be permitted as a part of the approved
landscaping plan.
BP PS
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
29
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Planning Department
1. This Vesting Tentative Subdivision Map (TTM) is for the
creation of 17 legal lots of record described on the attached
exhibits and shall apply APNs 045-401-003, 004 regardless of
owner.
Ongoing PS
2. The approval of this Vesting Tentative Subdivision Map shall
become final and effective for the purposes of issuing building
permits upon the effective date of the associated Zone Text
Amendment establishing Planned Development Overlay Zone
#33, unless an appeal is made with the appropriate judicial
circuit.
Ongoing PS
3. The Community Development Director and/or City Engineer
shall have the authority to make modifications to the final map
that remain in substantial conformance with the approved
Tentative Map.
BP / FM PS, CE
4. Approval of this Vesting Tentative Subdivision Map shall be
valid for twenty-four (24) months after its effective date and
shall expire Monday, Date, 2018. At the end of the period, the
approval shall expire and become null and void unless the
project has received a final map or a time extension has been
granted, consistent with the Atascadero Municipal Code.
BP / FM PS
5. Vesting Tentative Subdivision Map was deemed complete on
November 20, 2015, for the purposes of vested development
rights and fees consistent with the Subdivision Map Act of the
State of California.
On-going PS, CE
6. A final parcel map drawn in substantial conformance with the
approved vesting tentative map, and in compliance with all
conditions set forth herein, shall be submitted for review and
approval in accordance with the Subdivision Map Act and the
City’s Subdivision Ordinance
FM PS/CE
7. The subdivider shall defend, indemnify, and hold harmless the
City of Atascadero or its agents, officers, and employees
against any claim or action brought to challenge an approval
by the City, or any of its entities, concerning the subdivision.
Ongoing
8. All subsequent Tentative Map and construction permits shall
be consistent with the Master Plan of Development (CUP
2014-0284) approved for the project.
BP / FM PS, CE
9. The parcel map shall be subject to additional fees for park or
recreation purposes (QUIMBY Act) as required by City
Ordinance
BP PS
10. All maintenance costs listed below shall be 100% funded by
the project in perpetuity, except for public facilities that are
planned for and currently maintained by the City of
30
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Atascadero. The service and maintenance cost shall be
funded through an entity or mechanism established by the
developer, subject to City Staff approval. This entity or
mechanism must be in place prior to, or concurrently with
acceptance of any final map(s). The entity or mechanism
shall be approved by the City Attorney, City Engineer and
Administrative Services Director prior to acceptance of any
Final Map(s). The administration of the above mentioned
funds, and the coordination and performance of
maintenance activities, shall be the responsibility of the
entity or mechanism.
a) All streets, bridges, sidewalks, streetlights, street signs, roads,
emergency access roads, emergency access gates, traffic
control signals, pavement markings and sewer mains within
the proposed project including residential streets within any
residential subdivision.
b) All landscaping and lighting within the proposed project area.
c) Common area fencing and/or features.
d) Open areas on private property within the proposed project
area including detention facilities, bio-swales, and other low-
impact-development features.
e) Newly constructed drainage facilities on private property within
the proposed project area.
f) Landscaped frontages within the right-of-way of all public
streets within the defined specific plan boundary.
g) On-site sewer and storm drains located outside of the right-of-
way.
11. Prior to final map, the applicant shall submit CC&Rs for
review by the Community Development Department. The
CC&R’s shall record with the Final Map and shall include the
following:
a) Provisions for maintenance of all common areas including
parking lot, landscape areas, free standing signs, lighting and
solid waste storage.
b) Maintenance of on-site sewer and storm drainage systems.
c) Ensuring compliance with the Master Plan of Development.
d) Standards for the design, maintenance and appearance of
individual lot development and maintenance.
e) A provision for review by the City Community Development
Department for any changes to the CC&R’s that relate to the
above requirements prior to the changes being recorded or
taking effect.
12. All Conditions and mitigation monitoring program for CUP
2014-0284, as amended, are hereby incorporated by
On-Going PS
31
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
reference.
Public Works Project Conditions
City Engineer Project Conditions
52. The internal streets shall be offered as public rights-of-way as
shown on the tentative map and shall be extended to include the
cul-de-sac adjacent to lots 9, 16 & 17.
BP, GP CE
53. Internal streets shall not be improved with sidewalks but shall
comply with City standards for Rural Local roads. The road
shoulder adjacent to Lots 1-5 and Lots 13-15 shall include a 5-
foot wide walkable shoulder of compacted Class II Agg Base or
DG, with a cross-slope matching that of the street, but not
exceeding 4%. Where curb & gutter, or, an AC dike are required
to convey stormwater, the area behind the curb or dike shall be
compacted base or DG as described above. Curb ramps are not
required at the intersections of the internal streets.
BP, GP CE
54. Viejo Camino shall be improved to City standards as shown on the
Tentative Map along the project frontage. New improvements shall
be consistent with City standards and the Circulation Element and
shall include new curb, gutter, street intersection with cross-gutter,
traffic signage and delineation, a bike lane (Class II), and transit
stop. The street pavement shall be completed to integrate the
existing roadway with the new frontage improvements as shown on
the Tentative Map.
BP, GP CE
55. Along the Viejo Camino frontage, the property owner shall dedicate
an easement and construct a public pedestrian and bike trail to
accommodate a 10-foot wide detached pedestrian & bike trail. The
pedestrian/bike trail shall be constructed of compacted class 2
aggregate base or decomposed granite to the satisfaction of the
Director of Public Works and Director of Community Development.
Final alignment shall meander as necessary to conform to the
existing terrain, trees and drainage requirements to the satisfaction
of the Director of Public Works and Director of Community
Development.
BP, GP CE
56. The transit stop shown on Viejo Camino shall be not less than 90
feet long (end-to-end, including transition lanes). The transit stop
shall be designed using smooth curves to allow for ease of
entry/exiting of the bus as well as street sweeping equipment. The
bus staging area shall be of sufficient width to allow the bus to be
safely located out of the travel lane(s) while loading or unloading
passengers to the satisfaction of the City Engineer. The structural
pavement-section shall be sufficient to support the typical transit
vehicles but shall be not less than 6” Class A concrete over 6” Class
II Aggregate Base, to the satisfaction of the City Engineer. Sidewalk
at the transit stop shall be in addition to the concrete pad necessary
BP, GP CE
32
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
to place the transit street furniture (bus shelter, bench, sign and
other street furniture as deemed necessary by the Director of Public
Works). Additional right-of-way shall be dedicated to accommodate
the turn-out to the satisfaction of the City Engineer.
57. The Subdivider shall plant street trees along the Viejo Camino
street frontage behind the public sidewalk and within 15-feet.
Trees planted closer than 10-feet shall include deep-root planter
barriers as approved by the City Engineer. One street tree shall
be planted for each 35 linear feet (or portion thereof) of road
frontage.
BP, GP CE
58. Street trees on the internal streets shall be planted at the time of
lot development along the road frontages of the internal streets
offered to the public. One street tree shall be planted for each 35
linear feet (or portion thereof) of road frontage.
BP, GP CE
59. A new gravity sewer shall be designed and extended in Viejo
Camino to serve the lots of Tract 3078, to the satisfaction of the
City Engineer. An optional route along Halcon Rd can be explored
for feasibility, subject to the review and approval of the city
Engineer. The developer may request a reimbursement
agreement for future private sewer connections for any off -site
sewer extension subject to City Ordinance and City Council
authorization. Notice of developer intent to request a
reimbursement agreement must be made in writing prior to the
start of construction.
BP CE
60. Each new lot shall be served by separate laterals for water,
power, communications, gas & cable TV (if available adjacent to
the subject property).
BP CE
61. The Final Map shall include the offer of Public Utility Easements
along all street frontages (6-feet wide), to the satisfaction of the
City Engineer.
FM CE
62. The Subdivider shall dedicated sufficient public right-of-way for
street purposes along the northerly side of Santa Barbara Street
to accommodate the existing improved road alignment.
FM CE
STANDARD CONDITIONS
63. All public improvements shall be constructed in conformance with
the City of Atascadero Engineering Department Standard
Specifications and Drawings.
BP, GP CE
33
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
64. In the event that the applicant is allowed to bond for the public
improvements required as a condition of this map, the applicant
shall enter into a Subdivision Improvement Agreement with the City.
FM CE
65. An engineer’s estimate of probable cost shall be submitted for
review and approval by the City Engineer to determine the amount
of the bond.
FM CE
66. The Subdivision Improvement Agreement (SIA) shall record
concurrently with the Final Map. If it is the intent of the developer to
pursue a reimbursement agreement with the City for the installation
of off-site sewer facilities, reference to said agreement and terms
shall be included in the SIA.
FM CE
67. The applicant shall be responsible for the relocation and/or alteration
of existing utilities.
BP, GP CE
68. The applicant shall install all new utilities (water, gas, electric, cable
TV and telephone) underground. Utilities shall be extended to the
property line frontage of each lot or its public utility easement.
BP, GP CE
69. The applicant shall monument all property corners for construction
control and shall promptly replace them if disturbed.
FM CE
70. The applicant shall acquire title interest in any off-site land that may
be required to allow for the construction of the improvements. The
applicant shall bear all costs associated with the necessary
acquisitions. The applicant shall also gain concurrence from all
adjacent property owners whose ingress and egress is affected by
these improvements.
FM CE
71. Slope easements shall be provided as needed to accommodate cut
of fill slopes.
FM CE
72. Drainage easements shall be provided as needed to accommodate
both public and private drainage facilities.
FM CE
73. The final map shall be signed by the City Engineer prior to the map
being placed on the agenda for City Council acceptance.
FM CE
34
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
74. Prior to recording the tract map, the applicant shall submit a map
drawn in substantial conformance with the approved tentative map
and in compliance with all conditions set forth herein. The map shall
be submitted for review and approval by the City in accordance with
the Subdivision Map Act and the City's Subdivision Ordinance.
FM CE
75. Prior to recording the tract map, the applicant shall set monuments
at all new property corners. A registered civil engineer or licensed
land surveyor shall indicate by certificate on the parcel map, that
corners have been set or shall be set by a date specific and that
they will be sufficient to enable the survey to be retraced.
76. Prior to recording the tract map, the applicant shall pay all
outstanding plan check/inspection fees.
77. Prior to recording the map, the applicant shall complete all
improvements required by these conditions of approval
FM CE
78. Prior to recording the tract map, the applicant shall have the map
reviewed by all applicable public and private utility companies
(cable, telephone, gas, electric, Atascadero Mutual Water
Company). The applicant shall obtain a letter from each utility
company indicating their review of the map. The letter shall identify
any new easements that may be required by the utility company. A
copy of the letter shall be submitted to the City. New easements
shall be shown on the map.
FM CE
79. Upon recording the final map, the applicant shall provide the City
with a black line clear Mylar (0.4 mil) copy and a blue line print of the
recorded map.
FM CE
80. Prior to the final inspection of any public improvements, the
applicant shall submit a written statement from a registered civil
engineer that all work has been completed and is in full compliance
with the approved plans.
FM CE
81. Prior to the final inspection, the applicant shall submit a written
certification from a registered civil engineer or land surveyor that all
survey monuments have been set as shown on the final map.
BP, GP CE
82. An encroachment permit shall be obtained prior to any work within
City rights of way.
BP, GP CE
35
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
83. Prior to the issuance of building permits the applicant shall submit a
grading and drainage plan prepared by a registered civil engineer for
review and approval by the City Engineer.
BP, GP CE
84. The applicant shall submit a hydraulic analysis with the first plan
check submittal of the water system improvements for the project.
The analysis should take into account the fire flows required by the
California Building Code. The applicant is responsible for designing
and constructing water system improvements that will provide water
at pressures and flows adequate for the domestic and fire protection
needs of the project.
BP, GP CE
MITIGATION MONITORING PROGRAM
Mitigation Measure 1.c.1: A landscape buffer shall be provided along
Santa Barbara Rd. Landscape material shall consist of native and/or
drought tolerant species. As mixture of low and medium plants shall be
utilized to provide visual screening of the project from the adjacent
neighborhood.
BP PS/BS
Mitigation Measure 1.c.2: Street trees shall be provided along Viejo
Camino and Halcon Rd. Street trees shall be spaced at no greater than
30-feet on center, however, rural tree groupings may be approved by
the City Engineer due to topographic or sight distance concerns and/or
to maintain the rural nature of the street.
BP CE/BS
Mitigation Measure 1.c.3: Rear or side yard privacy fencing where
adjacent to a private road shall be set back from the edge of shoulder a
minimum of 10-feet. Where rear or side yard fencing is adjacent to a
public road, a minimum setback from the edge of
pavement/sidewalk/pedestrian path of 10-feet shall be observed.
Fencing adjacent to a public roadway shall be a maximum of 6 -feet high
and shall include landscaping on the street side of the fence. Fencing
shall be decorative in nature. Any walls proposed for rear or side yards
adjacent to a public road shall be constructed of high quality materials
and shall adhere to the same setback as privacy fencing.
BP PS/BS
Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any
off site glare. All exterior site lights shall utilize full cut-off, “hooded”
lighting fixtures to prevent offsite light spillage and glare.
BP PS/BS
Mitigation Measure 3.b.1: The project shall be conditioned to comply
with all applicable District regulations pertaining to the control of fugitive
dust (PM-10) as contained in Section 2 “Assessing and Mitigating
Construction Impacts.”
2.4 Fugitive Dust Mitigation Measures: Standard List
BP PS/BS
36
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
a. Reduce the amount of the disturbed area where possible;
b. Use water trucks or sprinkler systems in sufficient quantities to
prevent airborne dust from leaving the site. Increased watering
frequency would be required whenever wind speeds exceed 15
mph. Reclaimed (non-potable) water should be used whenever
possible;
c. All dirt stock-pile areas should be sprayed daily as needed;
d. All roadways, driveways, sidewalks, etc. to be paved should be
completed as soon as possible, and building pads should be laid as
soon as possible after grading unless seeding or soil binders are
used;
e. All of these fugitive dust mitigation measures shall be shown on
grading and building plans; and
f. The contractor or builder shall designate a person or persons to
monitor the fugitive dust emissions and enhance the
implementation of the measures as necessary to minimize dust
complaints, reduce visible emissions below 20% opacity, and to
prevent transport of dust offsite. Their duties shall include holidays
and weekend periods when work may not be in progress.
Mitigation Measure 3.b.2: The project shall be conditioned to comply
with all applicable APCD regulations pertaining to Naturally Occurring
Asbestos (NOA). Prior to any grading activities a geologic evaluation
should be conducted to determine if NOA is present within the area that
will be disturbed. If NOA is not present, and exemptions request must be
filed with the District. If NOA is found at the site, the applicant must
comply with all requirements outlined in the Asbestos ATCM. This may
include development of an Asbestos Dust Mitigation Plan and an
Asbestos Health and Safety program for approval by the APCD.
Technical Appendix 4.4 of the SLO County APCD CEQA Air Quality
Handbook includes a map of zones throughout San Luis Obispo County
where NOA has been found and geological evaluation is required prior
to any grading.
BP PS/BS
Mitigation Measure 4.a.1: A qualified biologist shall conduct a pre-
construction survey within 30 days of initial site disturbance to identify
whether silvery legless lizards are present. If silvery legless lizards are
detected, a biological monitor shall be present during initial ground
disturbing and vegetation removal activities to allow for a salvage and
relocation effort for the lizard and other ground dwelling common wildlife
that may be present.
BP PS
Mitigation Measure 4.a.2: A qualified biologist shall conduct a pre-
construction survey within 30 days of initial site disturbance to identify
whether American badger are present. If American badger or their dens
are detected during the survey, the location of the den shall be mapped,
the biologist shall monitor the den for three days if it is within 50ft of
proposed blueprints. If the den is deemed inactive it shall be destroyed if
the den is active the biologist will continue monitoring its status till the
BP PS
37
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
den becomes inactive so it can be destroyed, during that time all
development activities shall respect a 50ft buffer or excl usion zone
around the den.
Mitigation Measure 4.a.3: Conduct a springtime rare plant survey to
determine the presence/absence of any special-status plants. Should
any be discovered, implement a seed and/or plant salvage program and
incorporate the salvaged material into the drainage setback and
detention basin landscaped areas.
BP PS
Mitigation Measure 4. d.1: Vegetation removal and initial site
disturbance shall be conducted between September 1 and January 31
outside of the nesting season for birds. If vegetation and/or tree removal
is planned for the bird nesting season, then preconstruction nesting bird
survey, prepared by a qualified biologist, shall be required to determine
if any active nests would be impacted by project construction. If no
active nests are found, then no further mitigation shall be required. If
any active nests are found that would be impacted by construction, then
the nest sites shall be avoided with the establishment of a non-
disturbance buffer zone around active nests as determined by a
qualified biologist. Nest sites shall be avoided and protected with the
non-disturbance buffer zone until the adults and young of the year are
no longer reliant on the nest site for survival as determined by a
qualified biologist. As such, avoiding disturbance or taking of an active
nest would reduce potential impacts on nesting birds to a less -than-
significant level.
BP PS
Mitigation Measure 4.e.1: Grading and excavation activities shall be
consistent with the City of Atascadero Tree Ordinance. Special
precautions when working around native trees include:
12. During grading activities an arborist must be present.
13. All existing trees outside of the limits of work shall remain.
14. Earthwork shall not exceed the limits of the project area.
15. Low branches in danger of being torn from trees shall be
pruned prior to any heavy equipment work being done.
16. Vehicles and stockpiled material shall be stored outside the drip
line of all trees.
17. All trees within twenty feet of construction work shall be fenced
for protection with 4-foot chain link, snow or safety fencing
placed per the approved tree protection plan. Tree protection
fencing shall be in place prior to any site excavation or grading.
Fencing shall remain in place until completion of all
construction activities.
18. Any roots that are encountered during excavation shall be
clean cut by hand and sealed with an approved tree seal.
19. Utilities such as water, gas, power, cable, storm drainage, and
sewer should be redirected from under the canopy of any trees
that are to remain.
20. Where a building is placed within the canopy of a tree the
foundation should be redesigned so that it bridges across any
root systems.
21. Any foundation or other structure that encroaches within the
drip line of trees to be saved shall be dug by hand.
BP PS/ BS
38
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
22. At no time shall tree roots be ripped with construction
equipment.
Mitigation Measure 4.e.2: Tree protection fencing shall be installed at
the locations called out in the Tree Protection Plan. An inspection of the
tree fencing shall be done by City staff prior to issuance of building
permits.
BP PS/ BS
Mitigation Measure 4.e.3: The following measure shall be incorporated
on-site during the construction process of the proposed project:
14. A minimum height construction protective barrier shall
be erected around the drip line of the tree plus 4’. The
fence shall be supported with “T” posts at no more
than 6’ o.c. and tied at least 3 places per post. This
fence shall be installed by the General Contractor
before any rough grading is allowed on the site.
Approval for this stage must be obtained in writing
from either the Arborist or the Counties/Cities
representative.
15. Earthwork shall not exceed the limits of the project
area.
16. Low branches in danger of being torn during
construction process shall be pruned prior to any
heavy equipment work being undertaken.
17. Once the rough grading is accomplished the fence
may be moved closer to the trunk of the tree for finish
grading. At no time shall the fence be placed within
the Critical Root Zone (CRZ). This location is
determined by the diameter of the trunk at Diameter
Breast Height (DBH). (4.5’ above grade) and is 1’ per
1” diameter in the direction of the drip line. At no time
shall the fence be moved closer to the trunk than the
drip line, unless additional preservation measures are
implemented as recommended by the project arborist.
18. Any roots that are encountered over 2” diameter,
during the excavation process shall be clean cut
perpendicular to the direction of root growth with a
handsaw. At no time shall tree seal be applied to any
cut. Any roots over 2” diameter the county/city
representative shall be notified to determine the
preferred course of action.
19. All trenching with CRZ area shall require hand
trenching to preserve and protect roots over 2” in
diameter.
20. No grading of trenching is allowed within the CRZ
fenced area without written permission from the
County/City representative or a certified arborist.
21. Any roots over 4” in diameter are not to be cut or
ripped until inspected and approved in writing by the
arborist.
22. If, for whatever reason, work must be accomplished
inside the drip line 4”-6” of mulch must be applied first
to decrease the possibilities of compaction upon
BP PS/ BS
39
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
written approval from the arborist.
23. There shall be a pre-construction meeting between
the Engineering/Planning staff of the County/City,
Grading equipment operators, Project Superintendent
and the Arborist to review the project conditions and
requirements prior to any grubbing or earth work for
any portions of the project site. All tree protection
fencing shall be installed for inspection prior to this
meeting.
24. All trees shall be pruned before any construction takes
place that are in the development areas to be saved if
they might be damaged by the construction
equipment. This must be accomplished by a bonded,
licensed, and certified Tree Service Contractor.
25. All debris shall be cleared from the area or chipped
and spread on the site or stacked in orderly piles for
future use by the Owner, at the Owners request.
26. In locations where paving is to occur within the drip
line grub only and do not compact unless authorized
in writing. Permeable pavers or other preamble
surface must be approved by the Arborist.
Mitigation Measure 4.e.4: Upon project completion and prior to final
occupancy a final status report shall be prepared by the project arborist
certifying that the tree protection plan was implemented, the trees
designated for protection were protected during construction, and the
construction-related tree protection measures are no longer required for
tree protection.
FO PS/
Mitigation Measure 4.e.5: All utilities shall remain outside the drip lines
of native trees, unless preservation measures, as specified by the
project arborist, are implemented.
BP PS/ BS
Mitigation 5.a.b.c.1: An archaeological monitor shall be present during
initial vegetation clearing, site “grubbing, and grading for all portions of
the project.
GP PS
Mitigation 5.d.1: In the event that human remains are discovered on the
property, all work on the project shall stop and the Atascadero Police
Department and the County Coroner shall be contacted. The
Atascadero Community Development Department shall be notified. If
the human remains are identified as being Native American, the
California Native American Heritage Commission (NAHC) shall be
contacted at (916) 653-4082 within 24 hours. A representative from
both the Chumash Tribe and the Salinan Tribe shall be notified and
present during the excavation of any remains.
BP / GP PS
Mitigation Measure 6.b.1: The on-site subdivision / grading permit plans
shall include erosion control measures to prevent soil, dirt, and debris
from entering the storm drain system during and after construction,
consistent with mitigation or construction methods outlined in the
GP PS/CE
40
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
geotechnical report. Plans shall be approved by the City Engineer prior
to issuance.
Mitigation Measure 6.b.2: All cut and fill slopes mitigated with an
appropriate erosion control method (erosion control blanket, hydro-
mulch, or straw mulch appropriately anchored) immediately after
completion of earthwork, as approved by the City Engineer. All
disturbed slopes shall have appropriate erosion control methods in
place.
GP PS/CE
Mitigation Measure 6.b.3: The contractor will be responsible for the
clean-up of any mud or debris that is tracked onto public streets by
construction vehicles. An approved device must be in place prior to
commencement of grading activities. This device shall be approved by
the City Engineer.
GP PS/CE
Mitigation Measure 6.b.4: A re-vegetation plan shall be submitted with
building permits. All disturbed cut and fill slopes shall be vegetated as
specified in a landscaping plan. The landscaping plan must be approved
by both the Community Development Department and the Public Works
Department.
GP PS/CE
Mitigation Measure 8.h.1: All new construction will comply with section
the California Building and Fire Codes. New residences in the City are
required to install fire sprinklers. Fire protection measures shall include
the use of non-combustible exterior construction and roofs and fire-
resistant building materials.
BP FD
Mitigation Measure 9.d.e.f.1: The project shall integrate Low Impact
Development Best Management Practice’s into the project design which
may include on-site detention and/or retention basins, pervious paving,
and vegetated swales. The detention basins must meet the City’s
drainage design standards with surface runoff being treated for water
quality through structural control measures including: disconnected
downspouts flowing to vegetated bio-swales, and pervious pavement
and/or landscape areas to control storm volume. All drainage control
features shall be subject to the approval of the City Engineer.
GP PS/CE
Mitigation Measure 9.d.e.f.2: The developer shall ensure that all
contractors are aware of all storm water quality measures and that such
measures are implemented. Failure to comply with the approved
construction Best Management Practices will result in the issuance of
correction notices, citations, or stop orders.
GP PS/CE
Mitigation Measure12.a.1: Private yard outdoor activity spaces for each
residential parcel adjacent to Viejo Camino and Halcon Rd where
outdoor noise levels exceed City standards shall be located where the
building provides acoustical screening opportunities. If no such areas
BP PS/BP
41
Conditions of Approval / Mitigation Monitoring Program
TTM 2014-0108
Vesting Tentative Tract Map
(The Groves – Halcon Residential Development)
APN 045-401-003 & 004
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
exist within the design of the structure on the site, private outdoor use
areas shall be enclosed by a 6-foot high solid wall.
Mitigation Measure 12.a.2: Windows on facades adjacent to Halcon and
Viejo Camino Road shall include additional sound attenuation features
such as dissimilar glass or other methods aimed at reducing sound
transmission beyond the standard dual pane requirements.
BP PS/BP
Mitigation Measure: 14: Prior to final map recordation, the applicant shall
annex into the City’s Community Facilities District (CFD) to off-set
additional costs associated with the provision of additional police, fire,
and park services.
FM PS/BP
Mitigation Measure 16.a.b.1: In addition to the City’s Development
Impact Fees, each new residential unit shall pay towards its fair share of
the US 101 / Santa Barbara interchange improvements. The project may
be eligible for TIF fee credits for Citywide development impact fees
associated with the interchange improvements. Any TIF credit shall be
approved by the City Engineer.
BP PS/CE
Mitigation Measure 16.d.1: Access for parcels abutting Halcon Rd shall
be consolidated and shall be designed as private roads meeting City
road standards. Driveways to individual parcels with existing residences
may be approved by the City Engineer in locations where consolidated
access cannot be utilized due to parcel locations. All access roads and
driveways shall be evaluated at the time of tentative map submittal
and/or improvement permits for sight distance.
FM PS/CE/FD
Mitigation Measure 6.f.1: In addition to an on-street bike lane, a multi-
use path shall be provided along Viejo Camino and Halcon Roads
consistent with the adopted City bike and trail Master Plan and the
SLOCOG Salinas River Trail Plan.
FM PS
Mitigation Measure 17.d.1: Landscaping plans shall be submitted to the
Community Development Department for review and approval.
Landscaping must consist of drought tolerant species and utilize drip
irrigation. Turf shall not be permitted as a part of the approved
landscaping plan.
BP PS
42
ATTACHMENT 5: Draft Resolution PC 2018-A
DRAFT RESOLUTION PC 2018-A
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING A ONE-
YEAR TIME EXTENSION OF AN APPROVED VESTING TENTATIVE
TRACT MAP AND CONDITIONAL USE PERMIT
ON APN 045-401-003, 004
(PLN 2014-1529)
CERRO ROBLE
11955 VIEJO CAMINO
(MIDLAND PACIFIC)
WHEREAS, the applicant, Midland Pacific Homes, (Owner/Applicant) 7305 Morro
Road, Ste. 207, Atascadero, CA 93422, proposes a subdivision of 8.8 acres into 17 parcels in
accordance with the PD 33 zoning standards and approved project entitlements; and
WHEREAS, the City Council approved a Vesting Tentative Tract Map (TR 3078) and a
Conditional Use Permit on April 7, 2016; and
WHEREAS, the applicant has submitted for a one-year time extension to for Vesting
Tentative Tract Map and associated entitlements, consistent with Atascadero Municipal Code
section 9-2.117(a); and,
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1: Findings for approval of the time extension: The Planning Commission
makes the following findings:
1. There have been no changes to the provisions of the General Plan or zoning
regulations applicable to the project since the approval of the entitlement;
2. There have been no changes in the character of the site or its surroundings which
affect how the standards of the General Plan or zoning regulations apply to the
project.
SECTION 2: Approval: The Planning Commission does hereby approve a one-year
Time Extension of PLN 2014-1529 and TR 3078, to expire on April 7, 2019.
43
On motion by Commissioner _______________________, and seconded by
Commissioner ______________________ , the foregoing resolution is hereby adopted in its
entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
______________________________
Jerel Seay
Planning Commission Chairperson
ATTEST:
___________________________________
Phil Dunsmore
Planning Commission Secretary
44
ITEM 3 | 3/6/2018
Morro Rd Mixed Use
PLN 2017-1654 / Roboz
ADDITIONAL INFORMATION MAY BE OBTAINED BY CONTACTING THE ATASCADERO
COMMUNITY DEVELOPMENT DEPARTMENT AT
http://www.atascadero.org
6500 PALMA AVENUE | ATASCADERO, CA 93422 | (805) 461-5000
Atascadero Planning Commission
Staff Report – Community Development Department
Morro Rd Mixed-Use, 8120 Morro Rd
(PLN 2017-1654)
RECOMMENDATION:
Design Review Committee recommends:
Planning Commission adopt PC Resolution 2018-A, approving a Conditional Use Permit
to allow a mixed-use retail and residential development at 8120 Morro Rd, based on
findings and subject to Conditions of Approval.
Summary: The proposed project includes construction of a new two-story mixed use
building with a commercial retail space on the ground floor and three (3) apartments
above. The commercial portion of the building totals 3,866 sf and the residential portion
totals 2,993 sf. Associated site improvements include parking, landscaping, a
monument sign, and trash enclosure.
PROJECT
ADDRESS: 8120 Morro Rd Atascadero, CA APN 031-231-028
PROJECT
PLANNER
Kelly Gleason,
Senior Planner 470-3446 kgleason@atascadero.org
APPLICANT’S
REPRESENTATIVE
Jason Akraa
PROPERTY
OWNER
Farid and Manirva Roboz
GENERAL PLAN
DESIGNATION:
ZONING
DISTRICT:
SITE
AREA EXISTING USE PROPOSED
USE
General
Commercial
Commercial
Professional /
PD3
0.429
acres
Vacant
Mixed-Use
Retail and
Residential
ENVIRONMENTAL DETERMINATION
☒ Categorical Exemption CEQA – Class 32: Infill Development Project (Section 15332)
45
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
DISCUSSION:
Existing Surrounding Uses / Parcel Configurations:
Existing Zoning Existing Aerial / Surrounding
North: South: East: West:
Commercial Commercial –
Developed as Multi-
Family (existing non-
conforming)
Commercial Multi-Family – Medium
Density
Background:
In 2006 a Conditional Use Permit was approved for a 5400 sf retail center which
included a 3,000 sf liquor store. The project was not constructed and the application
expired. The application currently includes a 3,866 sf commercial tenant space with 3
residential units above (two 1-bedroom units and one 2-bedroom unit). The applicant is
considering a convenience/liquor store use for the commercial space which is
considered “general retail” in the City’s zoning ordinance and is an allowed use in the
Commercial Professional zone. The project requires the approval of a Conditional Use
Permit based on the mixed-use proposal.
Analysis:
A Conditional Use Permit is required for mixed-use developments (residential above
commercial) in the commercial zones. Planning Commission review is required to
ensure compatibility and appropriateness of the proposed use. Design review of
elevations and site plan elements is required for all commercial projects. The site is
bordered to the North by commercial use, to the South by a multi-family development
within the commercial zone, and to the west by residential multi -family zoned properties
that are currently developed with single-family houses.
46
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Site Design
The project includes a two-story building along the west half of the site with parking
proposed along the east and wrapping to the rear of the site. The lower floor retail use
includes access from Morro Rd and the parking lot. The trash enclosure has been
relocated to the interior of the parking area adjacent to the building per the request of
the DRC and residential neighbors. Access to the residential units is via an open
stairway at the rear of the building.
A pedestrian connection is included from the sidewalk along Morro Rd to the front
entrance of the building facing Morro Rd. The path does not provide a direct path from
the sidewalk as the elevation of the building is raised above the sidewalk in order to
meet drainage requirements and would be too steep to meet ADA standards. The path
is designed as an ADA accessible ramp that stages at the building entrance and runs
parallel to the sidewalk connecting to the sidewalk adjacent to the project driveway.
During the DRC meeting, the neighbors expresse d concerns about locating the trash
enclosure along the property line as they felt this posed a safety and privacy concern to
their homes. It was felt that the area could become attractive to homeless individuals.
The applicant relocated the trash enclosure toward the interior of the site adjacent to the
parking area at the rear corner of the building.
Parking
The project includes 20 parking spaces for both the residential and commercial uses.
Parking spaces are located to the side and rear of the site. Parking is required as
follows:
Use # spaces
Required
Total #
required
spaces
# spaces
provided
General
Merchandise 7.5
14 20 Residential
Units 6
Although excess parking is proposed beyond the minimum code standards, the retail
store use may generate higher parking lot turnover and experience peak hours which
may benefit from the additional on-site parking. In addition, the City adopted a corridor
plan for Morro Rd which eliminates some on-street parking where bio-retention and bio-
filtration swales and basins are required to meet storm water requirements as
development and road improvements occur.
Landscaping
The applicant has proposed new landscaping throughout the project site within parking
lot fingers and at the property boundaries. Some of this landscaping is required to meet
post construction storm water requirements and is designed as bio-retention swales.
47
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
The applicant has included shade trees in the parking lot, street trees along Morro Rd,
and landscape between the parking stalls and building.
Based on neighborhood testimony, the DRC recommended that a solid wall with wood
paneling be constructed along the rear property line to provide an adequate barrier
while retaining the residential nature from the adjacent properties. The applicant has
provided a 6-foot and 8-foot wall design option for consideration. The DRC
recommended that a 6-foot wall be installed for compatibility with adjacent fencing. The
6-foot option is included in the resolution of approval. Additionally, fast growing
landscaping designed for screening was recommended along the rear property line.
Staff has included a condition to this effect. Staff will work with the applicant on
appropriate screening species and spacing once the existing vegetation is trimmed up.
Proposed Landscape & Site Plan
48
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Elevations / Architectural Design
The proposed architecture follows a Mediterranean theme with lower floor colonnade,
wood columns, balcony railing on the second floor, and tile roof. The second floor
balcony wraps the entire building creating enhanced shadow and depth and providing
visual interest from all sides of the building.
The lower floor commercial space includes an entrance facing both the parking lot and
Morro Rd. While the layout of the interior of the store includes use of the perimeter walls
for shelving, the applicant has made efforts to increase glazing along the Morro Rd and
parking lot facades. Proposed glazing is raised off the ground and not designed as full
height storefront windows due to the interior layout.
The second floor includes numerous doors and windows along all 4 facades. This
design enhances the visual character of the building and no recommendations are
included for this portion of the building.
Proposed Design Theme
Proposed Fencing Concept
49
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Signage
A monument sign is proposed along the Morro Rd frontage. The sign is proposed to be
constructed of a wood base and posts surrounding stained wood panels to match the
building. Each sign face is proposed to be 20 sf. The sign is 6 -feet in height meeting the
municipal code requirements.
ENVIRONMENTAL DETERMINATION:
Class 32 of the California Environmental Quality Act (CEQA) (Section 15332, In -fill
Development Projects), exempts projects characterized as in-fill development. The
project is consistent with the City’s General Plan and would not result in any significant
effects relating to noise, traffic, air quality, or water quality. The project site is less than
five acres, surrounded by urban uses, can be adequately served by all required utilities
and public services, and is not habitat for endangered sp ecies.
FINDINGS:
To approve a Conditional Use Permit, the Planning Commission must make the
following findings. These findings and the facts to support these findings are included in
the attached resolution.
Conditional Use Permit (AMC Section 9-2.110(b).(3).(iv)
1. The proposed project or use is consistent with the General Plan ; and,
2. The proposed project or use satisfies all applicable provisions of the Zoning
Ordinance; and,
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case,
be detrimental to the health, safety or welfare of the general public or persons
residing or working in the neighborhood of the use, or be detrimental or
injurious to property or improvements in the vicinity of the use; and,
4. The proposed project or use will not be inconsistent with the character of the
immediate neighborhood or contrary to its orderly development; and,
5. The proposed use or project will not generate a volume of traffic beyond the
safe capacity of all roads providing access to the project, either existing or to
be improved in conjunction with the project, or beyond the normal traffic
volume of the surrounding neighborhood that would result from full
development in accordance with the land use element; and,
6. The proposed project is in compliance with any pertinent City policy or criteria
adopted by ordinance or resolution of the City Council.
50
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
RECOMMENDATION:
DRC and City Staff recommend the Planning Commission adopt Resolution PC 2018-A
approving a Conditional Use Permit to allow a mixed-use development as proposed.
ALTERNATIVES:
1. The Planning Commission may include modifications to the project and/or
Conditions of Approval for the project. Any proposed modifications, including
Conditions of Approval, should be clearly re-stated in any vote on any of the
attached resolutions.
2. The Planning Commission may determine that more information is needed on
some aspect of the project and may refer the item back to the applicant and staff
to develop the additional information. The Commission should clearly state the
type of information that is required. A motion, and approval of that motion, is
required to continue the item to a future date.
3. The Planning Commission may deny the project. The Commission must specify
what findings cannot be made, and provide a brief oral statement, based on the
Staff Report, oral testimony, site visit, correspondence, or any other rationale
introduced and deliberated by the Planning Commission.
ATTACHMENTS:
1. Site Aerial
2. Site Photographs
3. Draft Resolution PC 2018-A
51
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 1: Site Aerial
PLN 2017-1654
Subject site:
8120 Morro Rd
52
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 2: Site Photographs
PLN 2017-1654
53
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 3: Draft Resolution PC 2018-A
PLN 2017-1654
DRAFT RESOLUTION PC 2018-A
CONDITIONAL USE PERMIT
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA,
APPROVING A MIXED USE RETAIL AND RESIDENTIAL
DEVELOPMENT
8120 MORRO RD (APN 031-231-028) ROBOZ
(PLN 2017-1654)
WHEREAS, an application has been received from Farid and Manirva Roboz, 671
Atascadero Rd, Morro Bay, CA 93442 (Owner and Applicant), to consider Planning Application
PLN 2017-1654, for a project consisting of a Conditional Use Permit for a mixed-use
development on a 0.429 acre site located at 8120 Morro Rd, Atascadero, CA 93422; and,
WHEREAS, the site’s current General Plan Land Use Designation is General
Commercial (GC); and,
WHEREAS, the site’s current Zoning District is Commercial Professional / Planned
Development Overlay #3 (CP/PD3); and,
WHEREAS, mixed-use developments require the approval of a Conditional Use Permit
in the CP zoning district; and,
WHEREAS, the Design Review Committee reviewed the proposed project on November
29, 2017 and provided recommendations to the Planning Commission regarding the site plan and
architectural appearance of the project; and,
WHEREAS, the proposed project qualifies for an Categorical Exemption consistent with
CEQA Guidelines Section 15332: Infill Development; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit was held by the Planning Commission of the City of Atascadero at which hearing
evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on March 6, 2018, studied and considered PLN 2017-1654; and,
54
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City
of Atascadero makes the following findings, determinations and recommendations with respect
to the proposed Conditional Use Permit:
SECTION 1. Findings of Environmental Exemption. The Planning Commission finds as
follows:
1. The proposed project is Categorically Exempt (Class 32) from the provisions of the
California Environmental Quality Act (California Public Resources Code §§ 21000, et
seq., “CEQA”) and CEQA Guidelines (Title 14 California Code of Regulations §§
15000, et seq.) and pursuant to CEQA Guidelines Section 15332, for infill development.
A notice of determination is included as Exhibit A.
SECTION 2. Findings for approval of Conditional Use Permit. The Planning Commission
finds as follows:
1. The proposed project or use is consistent with the General Plan; and,
Fact. The project is consistent with the Land Use, Open Space and Circulation (LOC) Policies
and Programs 1.1 for guiding new development into the urban core; 1.1.7 for infill development;
1.4.1 for screening exterior lights; 2.1.3 and 7.2.3 for providing street trees; 7.2.4 for providing
shade trees; 8.5.3 for providing on-site stormwater management; 13.1 for convenient location of
goods and services; and 15.1 for directing growth to an area with existing City services.
The project is consistent with Circulation Element (CIR) Policies and Programs 1.3.3 for locating
on an arterial with minimal driveways; 1.4 for requiring a tree lined street; 1.5.1 for requiring
adequate off-street parking; 1.5.3 for landscaping, lighting, screening and shade trees in the
parking lot; and 2.3.1 for providing adequate sidewalks.
2. The proposed project or use satisfies all applicable provisions of the Zoning Ordinance;
and,
Fact. The proposed mixed-use project can be permitted though the Conditional Use Permit
process as identified in the Municipal Code and General Plan. The proposed structure and site
plan are consistent with the applicable provisions of the Atascadero Municipal Code with
the approval of the subject entitlement.
3. The establishment, and subsequent operation or conduct of the use will not, because of
the circumstances and conditions applied in the particular case, be detrimental to the
health, safety or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in
the vicinity of the use; and,
Fact. The proposed mixed-use development will be constructed on a currently vacant lot
surrounded by commercial and residential uses. The establishment of the use on a commercial
infill site will not be detrimental to the public health, safety, or welfare. Conditions of
Approval have been added to ensure that no sight distance issues occur due to the
location of the monument signs.
55
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
4. The proposed project or use will not be inconsistent with the character of the immediate
neighborhood or contrary to its orderly development; and,
Fact. The proposed development is consistent with surrounding commercial uses along Morro
Rd and adjacent to residential uses to the north of the site.
5. The proposed use or project will not generate a volume of traffic beyond the safe capacity
of all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the land use
element; and,
Fact. The proposed mixed-use development is an anticipated use along Morro Rd. Morro Rd is
a State Highway, designed to accommodate the traffic that will result from the proposed project.
6. The proposed project is in compliance with any pertinent City policy or criteria adopted
by ordinance or resolution of the City Council.
Fact. The Design Review Committee has reviewed the proposed project and found the site plan
and elevations to be consistent with the criteria in the City’s Design Review Manual.
SECTION 3. Approval. The Planning Commission of the City of Atascadero, in a regular
session assembled on March 6, 2018 resolved to approve the Conditional Use Permit subject to
the following:
EXHIBIT A: Notice of Exemption
EXHIBIT B: Conditions of Approval
EXHIBIT C: Site Plan / Landscape Plan
EXHIBIT D: Elevations
EXHIBIT E: Fence Design Concept
56
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
On motion by Commissioner _____________, and seconded by Commissioner
______________, the foregoing resolution is hereby adopted in its entirety by the following roll
call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
______________________________
Jerel Seay
Planning Commission Chairperson
Attest:
______________________________
Phil Dunsmore
Planning Commission Secretary
57
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Proposed Project Site
EXHIBIT A: Notice of Exemption
PLN 2017-1654
CITY OF ATASCADERO
NOTICE OF EXEMPTION
6500 Palma Avenue Atascadero, CA 93422 805.461.5000
TO: File Date Adopted: Feb. 23, 2018
FROM: Kelly Gleason, Senior Planner
City of Atascadero
Community Development Department
6500 Palma Avenue
Atascadero, CA 93422
SUBJECT: Filing of Notice of Determination in Compliance with Section 21152.1 of the Public
Resources Code.
Project Title: PLN 2017-1654 – Mixed Use Development
Project Applicant: Farid and Manirva Roboz, 671 Atascadero Rd, Morro Bay, Ca 93442
Project Owner: Farid and Manirva Roboz, 671 Atascadero Rd, Morro Bay, Ca
93442
Project Location: 8120 Morro Rd, Atascadero, CA 93422 (San Luis Obispo County, 031-231-028)
Project Area
Subject site:
8120 Morro Rd
58
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Project Description:
The proposed project includes construction of a new two-story mixed use building with a commercial
retail space on the ground floor and three (3) apartments above. The commercial portion of the building
totals 3,866 sf and the residential portion totals 2,993 sf. Associated site improvements include parking,
landscaping, a monument sign, and trash enclosure.
The site is currently vacant and is bordered by commercial and mufti-family residential zoning. No native
trees are proposed for removal.
Name of Public Agency Approving Project: City of Atascadero
Name of Person or Agency Carrying Out Project: Farid and Manirva Roboz
Exempt Status:
Ministerial (Sec. 15073) Emergency Project (Sec. 1507 (b) and (c))
Declared Emergency (Sec. 15061 (a)) General Rule Exemption (Sec. 15061.c)
Categorically Exempt (Sec. 15301-15333): 15332
Reasons why project is exempt: The Class 32 Exemption of the California Environmental Quality Act
(CEQA) (Section 15332, In-Fill Development projects) consists of projects characterized as in -fill
development meeting the following conditions:
a) The project is consistent with the applicable general plan designation and all applicable general
plan policies as well as with applicable zoning designation and regulations.
Mixed Use residential and commercial projects require a conditional use permit. This project is consistent
with its General Plan designation (General Commercial), all applicable general plan policies, its zoning
designation (Commercial Professional) and regulations with the approval of a Conditional Use Permit.
The project is consistent with the Land Use, Open Space and Circulation (LOC) Policies and Programs
1.1 for guiding new development into the urban core; 1.1.7 for infill development; 1.4.1 for screening
exterior lights; 2.1.3 and 7.2.3 for providing street trees; 7.2.4 for providing shade trees; 8.5.3 for
providing on-site stormwater management; 13.1 for convenient location of goods and services; and 15.1
for directing growth to an area with existing City services.
The project is consistent with Circulation Element (CIR) Policies and Programs 1.3.3 for locating on an
arterial with minimal driveways; 1.4 for requiring a tree lined street; 1.5.1 for requiring adequate off -
street parking; 1.5.3 for landscaping, lighting, screening and shade trees in the parking lot; and 2.3.1 for
providing adequate sidewalks.
b) The proposed development occurs within city limits on a project site of no more than five acres
substantially surrounded by urban uses.
The proposed project is within the City limits of the City of Atascadero on a site 0.429 acres in size. The
property is surrounded by commercial as well as single & multi-family residential uses. The site is currently
vacant.
c) The project site has no value as habitat for endangered, rare or threatened species.
59
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
The project site is a vacant site bordered by developed areas. The site is located off of Highway 41. No
sensitive species exist on site.
d) Approval of the project would not result in any significant effects relating to traffic, noise, air
quality, or water quality.
The project site is located off of State Highway 41 which is designed to accommodate commercial build -
out of Morro Rd as anticipated in the General Plan. As the project is located adjacent to a heavily traveled
road, residential uses will be required to incorporate fenestration design which mitigated exposure to
excessive noise. The project is located on a less than half acre lot and is proposed for 3 residential units
and 3,500 square feet of commercial space. Air quality impacts are less than significant. No impact to
water quality will occur. Per City and State standards, all projects are required to implement stormwater
detention, retention, and filtration as necessary.
e) The site can be adequately served by all required utilities and public services.
The project site is located in an area with full city and utility services. All service providers have adequate
capacity to serve the site at completion of the project.
All of the above considerations have been evaluated. The project will not impact an environmental
resource no create a cumulative impact. Development in this area was anticipated in the General Plan
build-out scenario and no significant cumulative impact will result as part of this project. The project will
not create an unusual circumstance that would result in an environmental impact nor ids it located along a
designated scenic highway. The site is currently vacant and has not been previously developed. No
historic resources exist on the site or adjacent to the site.
Contact Person: Kelly Gleason, Senior Planner, kgleason@atascadero.org, (805) 470-3446
Date: February 23, 2018 ________________________________
Kelly Gleason, Senior Planner
60
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT B: Conditions of Approval
PLN 2017-1654
Conditions of Approval
Conditional Use Permit
Mixed-Use Development
8120 Morro Rd
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary
Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
1. This entitlement shall be for a mixed-use development as described in attached
Exhibits, located at 8120 Morro Rd (APN 031-231-028), regardless of owner.
Ongoing PS
2. The approval of this use permit shall become final and effective for the purposes
of issuing building permits fourteen (14) days following the Planning Commission
approval unless prior to the time, an appeal to the decision is filed as set forth in
Section 9-1.111(b) of the Zoning Ordinance.
Ongoing PS
3. The Community Development Department shall have the authority to approve the
following minor changes to the project that (1) modify the site plan project by less
than 10%, (2) result in a superior site design or appearance, and/or (3) address a
construction design issue that is not substantive to the Conditional Use Permit.
Ongoing PS, CE
4. Approval of this Conditional Use Permit shall be valid for twenty-four (24) months
after its effective date. At the end of this time period, the approval shall expire
and become null and void unless the project has received a building permit or a
time extension.
BP PS
5. The owner and applicant shall defend, indemnify, and hold harmless the City of
Atascadero or its agents, officers, and employees against any claim or action
brought to challenge an approval by the City, or any of its entities, concerning this
conditional use permit.
Ongoing CA
Planning Services
6. A bicycle rack shall be provided near the entrance to each of the buildings on the
subject site.
BP PS
7. The landscaping shall include fast growing screen trees along the rear
property line adjacent to the Residential Multi-Family zoned parcels. Larger
evergreen shrubs may be approved in areas where conflicts with existing
landscaping exist.
BP PS
8. New lighting shall conform to the standards of Atascadero Municipal Code 9-
4.137 for exterior lighting. All pole lighting shall be shielded from neighboring
properties and buildings.
BP PS
9. The trash enclosure shall be architecturally compatible with the building.
BP PS
10. The residential units shall incorporate construction techniques and material
specs that meet the City’s General Plan limits for interior sound levels.
Public Works
11. All improvements in State Hwy 41 (Morro Rd) must be constructed in
accordance with Caltrans Standards and Specifications.
BP PW
61
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT C: Site Plan / Landscape Plan
PLN 2017-1654
62
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT D: Elevations
PLN 2017-1654
63
ITEM 3 | 3/6/2018
Morro Rd Mixed Use / 8120 Morro Rd.
PLN 2017-1654 / Roboz
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT E: Fence Design Concept
PLN 2017-1654
Proposed Wall/Fence Detail
Location: At North property line between the project and Residential Multi-Family
zoned property
Materials: Concrete wall with wood applied to elevation facing residential uses.
64
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
http://www.atascadero.org
6500 PALMA AVENUE | ATASCADERO, CA 93422 | (805) 461-5000 | FAX (805) 461-7612
Atascadero Planning Commission
Staff Report – Community Development Department
La Plaza
Project Amendments
(PLN 2017-1649)
RECOMMENDATION(S):
Staff Recommends the Planning Commission adopt:
1. Draft PC Resolution 2018-A, recommending the City Council approve the La
Plaza development project, and;
2. Draft PC Resolution 2018-B, recommending the City Council approve the
Tentative Parcel Map, Road Abandonment and road closure.
DISCUSSION:
Background:
On November 21, 2017, the Planning Commission reviewed and approved the La Plaza
Mixed-Use project and recommended approval of the related road abandonment, road
closure and plaza project to the City Council (Attachment 3: PC Staff report). The
project included the following:
Building A: One three-story building with approximately 14,000 square feet of
commercial space on the first floor and 40 air space residential condominium
units on the 2nd and 3rd floors
Building B: One three story building with 3,749 square feet (sf) of commercial
uses on the first floor and 9,070 sf of office space on 2nd and 3rd floors
Tentative Parcel map to allow separate ownership of commercial and residential
spaces and adjustments to the right of way to include abandonment and closure
Public improvements that include a pedestrian plaza and a driveway access on
Atascadero Mall
The applicant wishes to amend the project to allow residential units instead of office on
the upper floors of Building B. Building B is the building proposed directly across from
Sunken Gardens Park, while Building A is to the north. The residential unit count would
increase by two-units, and the entire project would include 42 units. Building B would
contain two 3-bedroom units on the second floor and two 2-bedroom units on the third
floor. Other changes include the addition of a rooftop deck on Building A. The rear deck
facing Highway 101 is proposed to be converted to mechanical area for A/C units, and a
65
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
new balcony is proposed on Building A facing El Camino Real (Attachment 1). These
changes would not result in any noticeable modifications to the exterior of the building.
As originally proposed, the project includes 84 new parking spaces between the building
and Hwy 101, and proposed right-of-way abandonment of portions of El Camino Real,
Atascadero Avenue, and partial vehicular closure of Atascadero Avenue (Atascadero
Mall) to allow for construction of a plaza . The project included a height exception to
allow buildings to be 45 feet in height where 18 feet is allowed, with an additional 20-
feet for unoccupied architectural features such as tower features. These features do not
change with this amendment.
Although the Planning Commission resolutions that were passed at the November
hearing were with the intent of providing a final action on the project (with the exception
of the road abandonment), the curre nt project amendment would be a recommendation
to the City Council for the entire project. The City Council will take final action on all
components of the project. This is because the requested road abandonment is linked
to both the tentative parcel map and development portions of the project.
Land Use Change
The applicant does not feel confident that the proposed upstairs office space use will be
readily occupied. Staff has found that most office spaces that are less than 2,000
square feet have higher vacancy rates. However, larger office spaces within prominent
locations are readily occupied. In essence, many business that formerly relied on small
offices, now work remotely or from home. The proposed office space in the La Plaza
project would have been a total of 9,700 square feet and the office space would be
upstairs overlooking Sunken Gardens Park and City Hall, presumably a very desirable
location.
Residential uses above the ground floor are an allowed use within the Downtown
Zoning District and “mixed-use” in the downtown is encouraged by the General Plan.
However, some concerns do exist when placing residential above what is assumed to
be the City’s prime restaurant and retail environment:
1. Residential uses can be a barrier to nearby restaurants, particularly restaurants
that wish to remain open late and serve alcohol. Alcohol Beverage Control (ABC)
has historically severely restricted the licenses of businesses that are within 100
feet of a residence, potentially reducing the viability of restaurants and bars.
2. Residential tenants above an active business may be a barrier to land uses such
as restaurants, night clubs and other entertainment uses because of the noise
conflicts and potential for complaints.
3. The proposed residential units that will be directly above the restaurant/retail
space will be 3-bedroom units. 3-bedroom units are typically marketed to
families. Such an environment may not be compatible with family living.
4. Larger units may have some tendency to increase parking demand that would
overlap the parking demand of restaurants while offices would likely have an
offset demand.
66
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
In summary, Mixed-use is a desired use in the downtown and can add to a vibrant “24 -
hour presence”. The previous office use would have generated the need for
approximately 30 parking spaces while the 2 additional residential units will not result in
more than 6 parking spaces. Therefore, overall parking demand will be reduced. The 2
additional units will maximize the density allowance on the site in considerati on of the
15% density bonus that was endorsed by the Planning Commission at the previous
hearing. Modifying the project from office to residential is not likely to alter the exterior
appearance of the building and is not inconsistent with the General Plan; however,
specific project conditions need to be incorporated to ensure that the residential land
use will not result in detrimental impacts to the desired economic development of the
downtown. Suggested conditions includes:
1. A disclosure shall be required for all residential tenants to inform them that the
property is within a commercial zoning district and will be exposed to noise levels
that will exceed levels found within a residential neighborhood.
2. Occupancy of commercial spaces are prioritized over the residential uses and
residential occupancy shall not preclude the operation, permitting, hours of
operation or land use allowed within the first floor commercial spaces.
Height Exception, View Corridor
The Planning Commission previously took action on the height exception that would
allow the buildings to exceed the 18 -foot height limit. The height limit was intended to
preserve the viewshed of City Hall from Highway 101 between Atascadero Creek and
Traffic Way. In the previous staff report, a lot of attention was given to the discussion of
the height exception, and the Commission adopted findings to allow the exception.
However, what was not clearly discussed is the location of Building B, within the
Atascadero Mall right of way, and ho w it will narrow the field of vision from Highway
101. The location of Building B will be directly across from Sunken Gardens Park and
will alter the historical symmetry of Atascadero Mall as illustrated in the graphic below:
Existing right of way
Proposed right of way
67
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
In exchange for economic development, and towards the implementation of the
Downtown Revitalization plan, the addition of the new building within Atascadero Mall
may be appropriate since it will complete the pedestrian plaza, be visually attractive,
and help align pedestrian traffic coming through the Highway 101 undercrossing to a
safe crossing at El Camino Real. However, the design of the building within this critical
location should be carefully considered, as it will be within this prominent view corridor.
Previous design iterations for this location proposed a two-story building in the road
abandonment area with an upstairs patio facing the park. The current designs proposes
a larger three story building with two first floor spaces that would be conduc ive to
restaurants with patio dining., .
Photo-simulation of building design “B” within the Atascadero Mall right of way
\
Building Design Changes
The applicant is proposing to make refinements to the exterior elevations and roof area
that include the following:
Addition of proposed roof deck/patio on Building A (larger building to the north)
Expansion of front side balcony towards EL Camino Real on Building A
Conversion of rear balcony facing Highway 101 to a utlities/mechanical pad for Air
conditioning units and other equipment
The proposed building design modifications will not result in substantial modifications to
the building design. The rooftop deck would not be visible from EL Camino Real and
would simply provide an outdoor space for residential occupants. An enlarged balcony
68
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
facing EL Camino Real adds to the design of the building and will allow residential
occupants to enjoy outdoor space. The balcony that had been proposed on the rear of
the building was found to not be desirable because of the high level of noise from
Highway 101.
Proposed Plaza
The applicant is working with the City to refine the design of the plaza area that will be
developed on the existing street right-of-way of Atascadero Mall to ensure adequate
flexibility of the space. The pedestrian plaza would connect the existing pedestrian
undercrossing at the dead-end of Atascadero Avenue and US Highway 101. This would
also ensure a safe pedestrian flow from the undercrossing to the relo cated pedestrian
crossing at El Camino Real and West Mall. Proposed improvements include passive
recreational activities, container gardens, and plaza area that could be used for events
or vendors.
An important part of the plaza is the inclusion of a veh icle access road that will continue
to provide access to the service station (Klems) and to the auto mechanic (La Rosa’s).
The 20-foot wide street would be developed as part of the plaza improvements and
would allow for vehicular access to the automotive b usiness separate from the plaza.
Conditions require a pedestrian barrier to prevent pedestrians from utilizing the road for
access between EL Camino Real and the tunnel. The project includes the elimination of
the current pedestrian crosswalk at East Mall and relocation of a new crosswalk at West
Mall at the south end of the signalized intersection. This condition is included in Draft
PC Resolution 2017-B.
Ultimately, the proposed improvements are consistent with the City’s Downtown
Revitalization Plan. The plan envisioned a future plaza connecting the existing tunnel to
the Downtown. Through this private / public partnership, the plan is being implemented
with the proposed project.
Roadway Abandonment / Road Closure
The Planning Commission previously took action on the road abandonment. No
changes are proposed to that action, which is a recommendation to City Council . The
road abandonment requires final action by the Cit y Council and would be completed
through recordation of the Tentative Parcel Map.
69
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Proposed Atascadero Avenue Vehicular Closure Schematic
10 foot road and
landscape easement on
El Camino Real
Right-of-Way
abandonment over
Atascadero Avenue.
(Atascadero Mall)
Portion of Atascadero Avenue
to be closed to vehicular traffic.
A
B
C
70
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Tentative Parcel Map
The applicant is proposing a Tentative Parcel Map that combines the underlying seven
(7) lots and proposes to combine them into four (4) parcels, with the ability for two (2) of
the four (4) parcels to be further subdivided into air space condominiums through the
final map process. The tentative map has been reviewed for consistency with the AMC,
the California Subdivision Map Act, and the California Street and Highways Code
because of the proposed vacancies of right-of-way. The attached resolution B
recommends the City Council approve the map in conjunction with the project.
Conclusion:
The La Plaza Redevelopment Project represents a significant step forward in
implementing the City’s Downtown Revitalization Plan that was crafted over 10 years
ago. While development proposals for this key piece of property have been previously
proposed and approved, the applicant and property owner have made a significant
commitment to Atascadero and is ready to proceed forward with develop ment of the
site. The proposed project is expected to be a catalyst for future development within the
Downtown and includes a mix of uses that will contribute to a “24 -hour” feel of
downtown with residences and retail/services. Although staff would prefer that the
project retain some upstairs office or commercial use, the project continues to retain
elements that will implement the City’s vision for downtown.
Existing
Crosswalk to
be relocated
20-foot vehicular
access
71
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
The La Plaza project is an identified City Council priority project and its approval is
included in its 2017-2018 Action Plan. The Planning Commission’s action on this project
will be a recommendation to City Council. City Council is scheduled to review the
project on March 27.
ENVIRONMENTAL DETERMINATION:
The City of Atascadero prepared an Initial Study to determine if the proposed project
would have a significant adverse effect on the environment. A Mitigated Negative
Declaration was prepared for the project and was certified by the Planning Commission.
(See Attachment 3).
ALTERNATIVES:
1. The Planning Commission may suggest modifications to the project and/or
Conditions of Approval for the project. Any proposed modifications including
Conditions of Approval, should be clearly re-stated in any vote on the attached
resolution. Such modifications will be a recommendation to the City Council.
2. The Planning Commission may determine that more information is needed on
some aspect of the project and may refer the item back to the applicant and staff
to develop the additional information. The Commission should clearly state the
type of information that is required. A motion, and approval of that motion, is
required to continue the item to a future date.
3. The Planning Commission may suggest that the City Council deny the project
amendments. The Commission must specify what findings cannot be made, and
provide a brief oral statement, based on the Staff Report, oral testimony, site
visit, correspondence, or any other rationale introduced and deliberated by the
Planning Commission.
ATTACHMENTS:
1. Revised Building Plans
2. Applicant’s Project Description
3. Draft PC Resolution A (includes Complete Development Plans)
4. Draft PC Resolution B, Tentative Map and Road Abandonment
72
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 1: PROPOSED BUILDING AMENDMENTS
Building A Proposed West Elevation
Building A Previous Elevation
Building B Proposed residential floorplans (no exterior change)
Roof feature to support roof top deck
Expanded balcony
73
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Attachment 2: APPLICANT’S PROJECT DESCRIPTION
Project Description
The Atascadero La Plaza development project is located in the heart
of the Atascadero downtown across El Camino Real from The City Hall and
The Sunken Garden. The project location has been the victim of a number
of unfortunate circumstances and was originally the site of the Atascadero
Hotel, which was burned down in 1965. A portion of the project site was
rebuilt and most recently housed the North County Christian Thrift Store,
which then burned down in 2009. Jack in the Box occupied the North East
side of the project, but vacated this downtown location for a more freeway
accessible location off of 101 freeway at the Santa Rosa exit. This vacated
Jack in the Box was tied up in 30 years of lease ‘options to extend’ since
(2009/2010). The years following the North County Christian Thrift Store
fire, the property changed ownership 3 times and has had many proposed
projects presented to the Atascadero City Planning Department and City
Counsel. Many other circumstances such as adjacent property acquisition,
cell tower easements, and bankruptcy have kept these dilapidated
buildings and vacant land from being re-developed.
The proposed La Plaza development is an homage to Atascadero
history and its founding years. The original La Plaza, which was also known
as the Mercantile, was built in 1917 and then fell victim to a fire in 1934.
The development team is heavily inspired by the founding days of
Atascadero, which has spurred the desire to reference certain attributes of
these first buildings of Atascadero. The architectural style of the proposed
La Plaza development is in the same Palladian style as the City Hall
building, The Printery building, and the former La Plaza building. E.G.
Lewis, Atascadero’s founder, envisioned all the main and dominant
buildings within the Atascadero Estates to be built in this style and it is the
goal of the La Plaza development team to continue in that vision.
Our project, like the original La Plaza, will consist of commercial/retail
space and residential uses. The new La plaza will have two buildings with a
combined total of 18,000SF of commercial/retail space and 42 residential
units built to condominium specifications. There will be 5 different floor
plans for the residential units and the retail/commercial space will be
divided on an as needed basis. All commercial/retail space will be equipped
74
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
with venting, electrical, and plumbing that any restaurant would need. The
La Plaza development team is focused on “class A” tenants and will be
focused on a healthy tenant mix throughout the available leasing space.
The land is currently configured in 6 separate assessor’s parcels with
a total gross area of 1.83 acres (79,541 SF). The parcels are going to be
reconfigured with this project. There will be 4 ground parcels and 42
airspace condos to allow for condominium sale in the future (Parcel map on
pg.**). The zoning for this project is Downtown Commercial and typically
would only allow for 36 residential units, but The City of Atascadero granted
the project a 15% bonus for architectural excellence. This allows the project
to move forward with 42 units. Because this project is in a “Downtown
Commercial Zone” where there is no requirement for parking for the
commercial space. However, one space is required per residential unit so
our requirement for parking is 42, 27 of which will be private garages. The
proposed project recognizes the city and local businesses need for more
parking and will be providing a total of 89 parking spaces on site, 4 of which
will be designated for electric car charging stations.
The construction of the proposed La Plaza project is anticipated to be
steel framed for the bottom floor of commercial/retail space because of the
20ft ceilings and minimal support beams. The residential levels will be
wood framed.
75
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 3: DRAFT PC RESOLUTION 2018 A – MASTER PLAN OF
DEVELOPMENT
DRAFT PC RESOLUTION 2018-A
RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
ATASCADERO, CALIFORNIA, RECOMENDING APPROVAL OF THE
LA PLAZA DEVELOPMENT, INCLUDING AN EXCEPTION TO
BUILDING HEIGHT STANDARDS AND RESIDENTIAL DENSITY
STANDARDS TO THE CITY COUNCIL
LA PLAZA DOWNTOWN REDEVELOPMENT
Z3 LLC
(PLN 2017-1649)
WHEREAS, an application has been received from Z3 LLC, Owner / Applicant (8189
San Dimas Lane, Atascadero, CA 93422), to consider Planning Application PLN 2017-1649, for
a project consisting of a Master Plan of Development (CUP), Tentative Parcel Map, Roadway
Abandonment, and certification of a Mitigated Negative Declaration ("MND") on a 1.83 acre site
located on 6300 through 6500 El Camino Real (APN’s 030-193-001,003,017,016, 031,030,033);
and,
WHEREAS, the site’s current General Plan Land Use Designation is Downtown (D);
and
WHEREAS, the site’s current Zoning District is Downtown Commercial (DC); and
WHEREAS, Atascadero Municipal Code § 9-2.110(a)(2) requires that multiple-family
developments consisting of twelve (12) or more units, even if such development is listed as an
allowed use in a particular zoning district, receive an approval of Master Plan of Development in
the form of a Conditional Use Permit (CUP); and
WHEREAS, Atascadero Municipal Code Section 9-4.113(b)(1) allows the Planning
Commission modification of height limitations, provided the Commission first finds the project
will not result in substantial detrimental effects on the enjoyment and use of adjoining properties
and that the modified height will not exceed the lifesaving equipment capabilities of the Fire
Department; and,
WHEREAS, Atascadero Municipal Code Section 9-15.1011 allows the Planning
Commission the ability to modify signage standards, provided that the Planning Commission
make the appropriate four (4) required findings; and,
76
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
WHEREAS, the Atascadero General Plan Policy 2.1.2 allows the Planning Commission
to grant up to a fifteen percent (15%) density bonus for “exceptionally high quality architecture”
through required findings; and,
WHEREAS, an Initial Study and proposed Mitigated Negative Declaration,
Environmental Document No. 2017-0018 was prepared for the project and made available for
public review in accordance with the requirements of the California Environmental Quality Act
(CEQA); and
WHEREAS, the Planning Commission of the City of Atascadero, at a Public Hearing
held on March 6, 2018, studied and considered PLN 2017-1649 to approve a Master Plan of
Development, after first studying and considering the proposed Mitigated Negative Declaration
prepared for the project, and
NOW, THEREFORE BE IT RESOLVED by the Planning Commission of the City of
Atascadero:
SECTION 1. The Planning Commission makes the following findings, determinations
and approvals with respect to the proposed Master Plan of Development:
A. Findings for Approval of Height Waiver
1. FINDING: The proposed project will not result in substantial detrimental effects
on the enjoyment and use of adjoining properties.
FACT: The proposed project does not result in substantial detrimental effects to
the enjoyment of the use of adjoining properties, as the building height is
necessary to meet the proposed density, as required by the California Department
of Housing and Community Development, and the proposed height will help to
identify the downtown as the commercial core of the City. Additionally, all
proposed structures are well articulated and consist of high quality architectural
design, similar to the existing surrounding development.
2. FINDING: The modified height will not exceed the lifesaving equipment
capabilities of the Fire Department.
FACT: The Atascadero Emergency Services Department (Atascadero Fire
Department) has reviewed the proposed project and determined that, based on
building placement including setbacks, location of turnouts and fire lanes, the
proposed project will not exceed the lifesaving equipment capabilities of the
Department.
B. Findings for Sign Ordinance Design Exception
1. FINDING: The sign is consistent with the purposes set forth in Section 9-15.002;.
FACT: The proposed signage meets the intent established by the City’s Signage
77
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Ordinance, in particular the proposed signage will minimize the adverse impacts
of signage and maintain a positive City image, and reasonably allow for the
identification of businesses within La Plaza.
2. FINDING: The opportunity to combine signs for more than one (1) use on a
single sign structure has been considered.
FACT: The applicant is proposing the use of both a freeway oriented pylon sign
and a monument sign. While it may be optimal to include just signage over a
business, the applicant wishes to increase visibility and marketability of spaces for
lease with additional signage oriented towards El Camino Real and Highway 101.
Ensuring viability and marketability of these spaces is a priority for City Staff and
the City Council.
3. FINDING: For freeway-oriented signs, the sign area and height are the minimum
needed to achieve adequate visibility along the freeway due to highway ramp
locations and grade differences.
FACT: The height of the freeway oriented sign is a similar height based on a
balloon test completed for the existing 76 Gasoline Station on the other side of the
freeway completed in 2013. The 7-foot clearance is tall enough that it will not be
lost in the existing foliage that is adjacent to Highway 101.
4. FINDING: Conformance with all other applicable codes and ordinances of the
City, including, but not limited to, the Zoning Ordinance, General Plan and its
several elements, and the appearance review guidelines.
FACT: The proposed project is consistent with all applicable codes and
ordinances, and meets the intent of the appearance review guidelines, and City
Way Finding program.
C. Findings for Density Bonus
1. FINDING: The proposed project utilizes high quality materials and finishes
through all four sides of the building(s) located on-site.
FACT: The proposed project is inspired by City landmarks including Historic
City Hall and the Printery. The proposed project is an Italianate design and a
visual appealing project. The proposed project utilizes similar materials found in
both these historic structures and appropriately uses tower elements, pop-outs, and
other architectural features to create a design that will become one of the center-
pieces of Downtown Atascadero, complimenting Historic City Hall and the
Sunken Gardens.
2. FINDING: The proposed project utilizes reduction of massing and other
techniques to reduce appearance of bulk, and density.
78
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
FACT: The proposed project utilizes materials, pop-outs, decking, and other
features to reduce bulk and density.
3. FINDING: The proposed project implements the use of varied rooflines, pop-
outs, architectural appendages and other elements that create visually appealing
projects.
FACT: The proposed project includes tower elements, varied rooflines, columns,
and the use of colonnades to create a visually appealing project within Downtown
Atascadero.
4. FINDING: The proposed project utilizes architectural materials appropriate with
the vernacular of the architectural theme.
FACT: The proposed project utilizes Italianate design similar to Historic City
Hall and the Printery. The applicant has included the use of brick material, and
Spanish tile in similar color schemes to that of City Hall to present a unified
design theme for buildings near the Sunken Gardens.
5. FINDING: The proposed project incorporates significant contributions to the
community such as a park, historic preservation, or road dedications.
FACT: The proposed project includes a significant contribution to the
Community in the form of a new pedestrian plaza that will be constructed within
the right-of-way of Atascadero Avenue (Mall). This key pedestrian linkage was
envisioned by the City’s Vision Plan for Downtown. The applicant may be
afforded credits for parkland facilities fees in exchange for construction of the
proposed project.
D. Findings for Approval of Master Plan of Development
1. FINDING: The proposed project or use is consistent with the General Plan.
FACT: The proposed project is consistent with the intention of vertical mixed-use
in the Downtown. The proposed project meets the underlying zoning ordinance’s
prescribed density requirements for 20 units per acre and includes a mix of
commercial, office, and residential uses.
2. FINDING: The proposed project or use satisfies all applicable provisions of the
Title 9 of the Atascadero Municipal Code this title.
FACT: With adoption of findings made for the height waiver exception, and
Density Bonus, the proposed project satisfied all applicable provisions of the
Atascadero Municipal Code.
3. FINDING: The establishment, and subsequent operation or conduct of the use will
not, because of the circumstances and conditions applied in the particular case, be
79
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
detrimental to the health, safety or welfare of the general public or persons residing
or working in the neighborhood of the use, or be detrimental or injurious to
property or improvements in the vicinity of the use.
FACT: The proposed project will not be detrimental to the health, safety or
welfare of the general public or persons residing or working in the vicinity, as the
proposed project includes a mix of uses including residential, non-residential uses
such as retail, professional services, and tourist commercial uses that are consistent
with the City’s underlying zoning (DC), as well as consistent with the goals and
policies of the City’s General Plan and Housing Element. Residential uses will not
involve hazardous waste handling.
4. FINDING: The proposed project or use will not be inconsistent with the character
of the immediate neighborhood or contrary to its orderly development.
FACT: The proposed project is consistent with the immediate neighborhood as the
proposed project is consistent with the adopted Downtown Revitalization Plan, and
the Downtown Vision Plan.
5. FINDING: The proposed use or project will not generate a volume of traffic
beyond the safe capacity of all roads providing access to the project, either existing
or to be improved in conjunction with the project, or beyond the normal traffic
volume of the surrounding neighborhood, that would result from full development
in accordance with the land use element.
FACT: The proposed project will generate 1,304 average new daily trips on a new
local roadway that intersects with El Camino Real, the City’s primary north / south
arterial. El Camino Real is a roadway facility that currently operates at an
acceptable level of service, consistent with the City’s adopted General Plan and
will continue to operate at an acceptable level of service with the proposed project,
as well as what is considered build-out for the General Plan. The proposed project
has been conditioned to pay development impact fees for proposed increases in
traffic on regional serving highways (US 101) and other transportation related
impacts.
6. FINDING: The proposed project is in compliance with any pertinent City policy
or criteria adopted by Ordinance or Resolution of the City Council.
FACT: The proposed project meets the City Council’s Policy on vertical mixed-
use processing and the project been conditioned to annex into the City’s
Community Facilities District to make the proposed project fiscally neutral. The
proposed project meets the thresholds for high quality architectural design,
landscaping, common open spaces. Therefore, the project, as proposed, is in
compliance with pertinent City policies established by the City Council.
SECTION 2. Approval of Master Plan of Development. The Planning Commission of
80
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
the City of Atascadero, in a regular session assembled on March 6, 2018, resolved to recommend
the City Council approve the Master Plan of Development subject to the following, on file in the
Community Development Office and incorporated herein by reference:
1. EXHIBIT A: Conditions of approval / Mitigation Monitoring Program
2. EXHIBIT B: Master Plan of Development / Site Plan
3. EXHIBIT C: Landscape Plan
4. EXHIBIT D: Elevations / Floor Plan / Sections
5. EXHIBIT E: Colors and Materials Board
6. EXHIBIT F: Signage
7. EXHIBIT G: Grading and Drainage Plan
8. EXHIBIT H: Utility Plan
9. EXHIBIT I: Proposed Plaza Improvements
BE IT FURTHER RESOLVED, that a copy of this Resolution be delivered forthwith by the
Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner _________, and seconded by Commissioner ____, the
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ()
NOES: ()
ABSTAIN: ()
ABSENT: ()
ADOPTED:
CITY OF ATASCADERO, CA
______________________________
Jerel Seay
Planning Commission Chairperson
Attest:
______________________________
Phil Dunsmore
Planning Commission Secretary
81
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Exhibit A
Conditions of Approval
City of Atascadero
PLN 2017-1649
LA PLAZA REDEVELOPMENT
6500 EL CAMINO REAL
PARENT APN 030-193-001,003,017,016, 031,030,033
The following conditions of approval apply to the project referenced above. The conditions of
approval are grouped under specific headings that relate to the timing of required compliance.
Additional language within a condition may further define the timing of the required compliance.
1. Conditions of Approval in PC Resolution for Tentative Parcel Map AT 17-0088
shall be incorporated herein.
☐ PLN
2. For the purposes of development impact fee collection, impact fees shall be
based on the date of building permit submittal, consistent with the California
Subdivision Map Act.
☐ PLN
3. A landscape and irrigation plan shall be approved prior to the issuance of
building permits and included as part of site improvement plan consistent with
EXHIBIT C, with the exception of the proposed public plaza located within the
right-of-way of Atascadero Avenue (Mall), and must include the following:
All exterior meters, trash storage areas, air conditioning units and
mechanical equipment shall be screened with landscape material
and/or architecturally compatible enclosures.
London Plane Sycamore or similar trees with a minimum size of 24 inch
box shall be provided along El Camino Real at a maximum spacing of
30 feet on center (tree variety may be adjusted upon approval of
Community Development Director). Groupings of additional accent
trees may be allowed to accommodate sight-distance, topographical
features, subject to the approval of the Community Development
Director and City Engineer.
☐ PLN
4. The public plaza is expected to be a versatile park-like space that can be used
for events. The applicant shall work with the City on the final design of
proposed public plaza within the Atascadero Avenue (Mall). The draft and final
design shall be approved by the Community Development Director and shall
include the following provisions:
a. Design elements such as low decorative fencing to guide pedestrians
towards the signalized intersection
b. Removable fencing to allow maximum use of the roadway and the plaza if
the road is closed during events and happenings
c. Provisions to accommodate food trucks, electrical needs, lighting,
emergency access and other elements necessary for events and
happenings
☐ PLN
82
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
d. Landscaping as approved by the Public Works Director/Community
Development Director
e. The design shall not incorporate a curb, gutter or sharp grade change
between the roadway and plaza
f. The applicant may revise items a. – e. with the advance written approval of
the City Manager or designee thereof
5. Plaza improvements shall be completed prior to occupancy of Buildings A or B.
6. Exterior finishes, including brick color shall be approved by the City Community
Development Department.
7. The portion of Atascadero Avenue (Mall) extending southwesterly from El
Camino Real that is to remain for vehicular access to the adjacent property
(gas station and auto services) shall be at least 20-feet wide and shall
terminate approximately 40 feet northeasterly of the entrance to the pedestrian
tunnel under State Rte 101, to the satisfaction of the Public Works Director.
The design and improvements of said vehicular access and the Public Plaza
area shall be to the approval of the Public Works Director and Community
Development Director. Public improvement plans prepared by a licensed civil
engineer are required to be approved by the Director of Public Works.
☐ PLN
8. Fire hydrant locations shall be to the satisfaction of the City Fire Marshall and
Public Works Director.
☐ FD
9. Properties and/or areas that are managed or owned by an Association, or other
such private entity shall be metered separately, as required by the Public
Works Director.
☐ PLN
10. Ground monument signage fronting El Camino Real shall be limited to a total of
(2) monument signs and shall be consistent with Sign standards shown in
Table 15-2 for ground monument signage with the following exceptions:
Maximum of six (6) feet in total height
Total of 60 square feet of signage allowed for each side
Ground monument signage may be permitted directly adjacent to the
back of sidewalk
Ground monument signage shall be located no closer than 200-feet
from each other
11. A total of four (4) Building Name signs shall be permitted within the
development with the name “La Plaza”. Size shall be proportional to wall
façade or placement on tower element.
12. A freeway oriented pylon sign shall be permitted on-site with the maximum
height of 75-feet. Additional height may be granted by the Design Review
Committee. Signage shall include the City’s Logo and “Downtown Atascadero”
on the faces of the sign. The City’s Logo and “Downtown Atascadero” shall not
count against the maximum signage area. Maximum signage area shall be
83
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
determined by the Community Development Director or their designee.
13. Maximum project density shall not exceed 42 dwelling units. Any additional
dwelling units shall be approved by the Planning Commission as a minor
conditional use permit or its equivalent.
14. Building heights shall not exceed the following:
45-Feet maximum for occupied spaces;
65-Feet maximum for un-occupied spaces.
Additional height exception may be granted by the Design Review Committee.
15. The El Camino Real pedestrian entry/exit doors serving the proposed
structures shall not swing into the public right-of-way more than one foot.
16. The proposed waterfall structure in front of Building A shall be located entirely
within the subject property and shall not encroach into the public right-of-way.
17. A disclosure shall be required for all residential tenants to inform them that the
property is within a commercial zoning district and will be exposed to noise
levels that will exceed levels found within a residential neighborhood.
18. Occupancy of commercial spaces are prioritized over the residential uses and
residential occupancy shall not preclude the operation, permitting, hours of
operation or land use allowed within the first floor commercial spaces.
19. The following land uses shall be prohibited on the ground floor:
a. Health Care Services
b. Offices
c. Government offices and facilities
20. All site work, grading, and site improvements shall be in substantial
conformance with the Master Plan of Development as shown in any of the
enclosed exhibits.
☐ PLN
21. Native tree protection shall be installed and up at all times during construction
related activities per the tree protection plan.
☐ PLN
22. Pedestrian ramps on El Camino Real shall be constructed on each side of the
street type entrance between Buildings A and B.
23. The applicant shall relocate the (E) sewer main that extends under proposed
Building “B”, to the satisfaction of the City Engineer. An easement over the re -
routed sewer main shall be dedicated to the public, to the satisfaction of the
City Engineer.
24. Construction of the new driveway approach, northwesterly of Building A,
requires removal of the existing driveway approach serving the adjacent
northwesterly property. Vehicular access to this property shall be combined
with the subject property.
84
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
25. The applicant shall coordinate with the Regional Transit Authority regarding the
relocation and modification to the existing bus shelter and bus stop. Final
location shall be approved by the Regional Transit Authority and the City
Engineer.
26. Discharges to the public storm drain system are subject to review under the
City’s MS4 State Permit and the requirements established by the Regional
Water Quality Control Board for discharges to waters of the United States.
Illicit discharges shall not be approved and shall be eliminated where known to
exist or are identified. Certain non-storm water discharges may not be
considered illicit where it can be shown that these waters are not
contaminated. Uncontaminated spring water, pumped ground water, and water
from crawl space pumps are not considered illicit discharges and are therefore
not prohibited from discharging to the storm drain system. The applicant shall
provide verification to the satisfaction of the City Engineer that the proposed
discharge waters are not contaminated.
27. All landscaping is to be installed prior to final inspection of development within
Parcel Map AT 17-0088.
☐ PLN
28. The entitlement described at the location per this resolution is determined to be
vested with the property upon issuance of a building permit.
☐ PLN
29. Approval of this entitlement shall be final and effective consistent with
Atascadero Municipal Code (AMC) section 9-1.111 seq. et. al.
☐ PLN
30. Project construction must be in accordance with provided Exhibit(s), adopted
with this Resolution. Changes to architecture, landscaping design, and non-
substantive subdivision design may be approved by the Community
Development Director or the Design Review Committee (DRC).
☐ PLN
31. In accordance with the Atascadero Municipal Code section 9-8.105, any
violation of any of the Conditions of Approval is unlawful and may be cause for
revocation of this entitlement and subject the applicant and/or future property
owners to the penalties set forth in the Atascadero Municipal Code, as well as
any other available legal remedies.
☐ PLN
32. The applicant shall agree to indemnify and defend at his/her sole expense any
action brought against the City, its present or former agents, officers, or
employees because of the issuance of this approval, or in any way relating to
the implementation thereof, or in the alternative, to relinquish such approval.
The applicant shall reimburse the City, its agents, officers, or employees, for
any court costs and attorney's fees which the City, its agents, officers or
employees may be required by a court to pay as a result of such action. The
City may, at its sole discretion, participate at its own expense in the defense of
any such action, but such participation shall not relieve applicant of his/her
obligations under this condition.
☐ CM
33. Should the described use be abandoned or extinguished, the property may be ☐ PLN
85
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
used and / or developed with any use allowed by the underlying zoning district.
☐ PWD
A. The following are mitigation measures that mitigate adverse
environmental effects identified in the prepared Environmental
Document. Any change in these measures may affect the validity of the
adopted Environmental Document, and a new or amended
Environmental Document may be required.
MITIGATION MEASURE TIMING
Aesthetics
AES-1 At the time of building permit submittal of the proposed project,
applicant must submit a photometric plan showing locations of
proposed on-sight lighting. Prior to final occupancy, City Staff and
the applicant shall meet on-site and review lights at dusk
condition to ensure off-site light spillage and glare are limited.
Prior to Building
Permit Issuance
AES-2 Any luminaire pole height shall not exceed 14-feet in height to
minimize off-site light spillage for consistency with the Atascadero
Municipal Code.
Prior to Building
Permit Issuance
AES-3 Limit intensity to up to 3.0 foot candles at ingress/egress, and
otherwise 0.6 foot candle minimum to 1.0 maximum in parking
areas and/or for street lighting, bollards, etc to be reviewed at the
time of building final.
Prior to Building
Permit Final
Air Quality
AQ-1 Demolition activities can have potential negative air quality
impacts, including issues surrounding proper handling,
abatement, and disposal of asbestos containing material (ACM).
Asbestos containing materials could be encountered during the
demolition or remodeling of existing structures or the disturbance,
demolition, or relocation of above or below ground utility
pipes/pipelines (e.g., transit pipes or insulation on pipes). If this
project will include any of these activities, then it may be subject
to various regulatory jurisdictions, including the requirements
stipulated in the National Emission Standard for Hazardous Air
Pollutants These requirements include, but are not limited to: 1)
written notification, within at least 10 business days of activities
commencing, to the APCD, 2) asbestos survey conducted by a
Certified Asbestos Consultant, and, 3) applicable removal and
disposal requirements of identified ACM. Please contact the
APCD Engineering & Compliance Division at (805) 781-5912 for
further information or go to slocleanair.org/rules-
regulations/asbestos.php for further information. To obtain a
Notification of Demolition and Renovation form go to the “Other
Forms” section of slocleanair.org/library/download-forms.php.
Prior to Building
Permit Issuance
86
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
MITIGATION MEASURE TIMING
AQ-2 Based on the information provided, San Luis Obispo APCD is
unsure of the types of equipment that may be present during the
project’s construction phase. Portable equipment, 50 horsepower
(hp) or greater, used during construction activities may require
California statewide portable equipment registration (issued by
the California Air Resources Board) or an APCD permit.
The following list is provided as a guide to equipment and
operations that may have permitting requirements, but should not
be viewed as exclusive. For a more detailed listing, refer to the
Technical Appendices, page 4-4, in the APCD's 2012 CEQA
Handbook.
Power screens, conveyors, diesel engines, and/or
crushers;
Portable generators and equipment with engines that are
50 hp or greater; and,
Electrical generation plants or the use of standby
generator;
Internal combustion engines;
Rock and pavement crushing;
Unconfined abrasive blasting operations;
Tub grinders;
Trommel screens; and,
Portable plants (e.g. aggregate plant, asphalt batch plant,
concrete batch plant, etc).
To minimize potential delays, prior to the start of the project,
please contact the APCD Engineering & Compliance Division at
(805) 781-5912 for specific information regarding permitting
requirements.
During
Construction
AQ-3 Effective February 25, 2000, the APCD prohibited developmental
burning of vegetative material within San Luis Obispo County. If
you have any questions regarding these requirements, contact
the APCD Engineering & Compliance Division at (805) 781-5912
During
Construction
AQ-4 Construction activities can generate fugitive dust, which could be
a nuisance to local residents and businesses in close proximity to
the proposed construction site. Projects with grading areas that
are greater than 4-acres or are within 1,000 feet of any sensitive
receptor shall implement the following mitigation measures to
manage fugitive dust emissions such that they do not exceed the
APCD’s 20% opacity limit (APCD Rule 401) or prompt nuisance
violations (APCD Rule 402):
a. Reduce the amount of the disturbed area where possible;
and,
During
Construction
87
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
MITIGATION MEASURE TIMING
b. Use of water trucks or sprinkler systems in sufficient
quantities to prevent airborne dust from leaving the site
and from exceeding the APCD’s limit of 20% opacity for
greater than 3 minutes in any 60 minute period. Increased
watering frequency would be required whenever wind
speeds exceed 15 mph. Reclaimed (non-potable) water
should be used whenever possible. Please note that
since water use is a concern due to drought
conditions, the contractor or builder shall consider the
use of an APCD-approved dust suppressant where
feasible to reduce the amount of water used for dust
control. For a list of suppressants, see Section 4.3 of the
CEQA Air Quality Handbook.
c. All dirt stock pile areas should be sprayed daily and
covered with tarps or other dust barriers as needed;
d. Permanent dust control measures identified in the
approved project revegetation and landscape plans should
be implemented as soon as possible following completion
of any soil disturbing activities;
e. Exposed ground areas that are planned to be reworked at
dates greater than one month after initial grading should
be sown with a fast germinating, non-invasive, grass seed
and watered until vegetation is established;
f. All disturbed soil areas not subject to revegetation should
be stabilized using approved chemical soil binders, jute
netting, or other methods approved in advance by the
APCD;
g. All roadways, driveways, sidewalks, etc. to be paved
should be completed as soon as possible. In addition,
building pads should be laid as soon as possible after
grading unless seeding or soil binders are used;
h. Vehicle speed for all construction vehicles shall not
exceed 15 mph on any unpaved surface at the
construction site;
i. All trucks hauling dirt, sand, soil, or other loose materials
are to be covered or should maintain at least two feet of
freeboard (minimum vertical distance between top of load
and top of trailer) in accordance with CVC Section 23114;
j. Track-Out” is defined as sand or soil that adheres to
and/or agglomerates on the exterior surfaces of motor
vehicles and/or equipment (including tires) that may then
fall onto any highway or street as described in California
Vehicle Code Section 23113 and California Water Code
13304. To prevent ‘track out’, designate access points and
require all employees, subcontractors, and others to use
them. Install and operate a ‘track-out prevention device’
where vehicles enter and exit unpaved roads onto paved
streets. The ‘track-out prevention device’ can be any
device or combination of devices that are effective at
88
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
MITIGATION MEASURE TIMING
preventing track out, located at the point of intersection of
an unpaved area and a paved road. Rumble strips or
steel plate devices need periodic cleaning to be effective.
If paved roadways accumulate tracked out soils, the track-
out prevention device may need to be modified;
k. Sweep streets at the end of each day if visible soil material
is carried onto adjacent paved roads. Water sweepers
shall be used with reclaimed water should be used where
feasible. Roads shall be pre-wetted prior to sweeping
when feasible;
l. All PM10 mitigation measures required should be shown on
grading and building plans; and,
m. The contractor or builder shall designate a person or
persons to monitor the fugitive dust emissions and
enhance the implementation of the measures as
necessary to minimize dust complaints, reduce visible
emissions below the APCD’s limit of 20% opacity for
greater than 3 minutes in any 60 minute period. Their
duties shall include holidays and weekend periods when
work may not be in progress. The name and telephone
number of such persons shall be provided to the APCD
Engineering & Compliance Division prior to the start of any
grading, earthwork or demolition.
AQ-5 This project is in close proximity to nearby sensitive receptors.
Projects that will have diesel powered construction activity in
close proximity to any sensitive receptor shall implement the
following mitigation measures to ensure that public health benef its
are realized by reducing toxic risk from diesel emissions:
To help reduce sensitive receptor emissions impact of diesel
vehicles and equipment used to construct the project, the
applicant shall implement the following idling control
techniques:
1. California Diesel Idling Regulations
a. On-road diesel vehicles shall comply with Section
2485 of Title 13 of the California Code of Regulations.
This regulation limits idling from diesel-fueled
commercial motor vehicles with gross vehicular weight
ratings of more than 10,000 pounds and licensed for
operation on highways. It applies to California and
non-California based vehicles. In general, the
regulation specifies that drivers of said vehicles:
1. Shall not idle the vehicle’s primary diesel engine for
greater than 5 minutes at any location, except as
noted in Subsection (d) of the regulation; and,
2. Shall not operate a diesel-fueled auxiliary power
system (APS) to power a heater, air conditioner, or
any ancillary equipment on that vehicle during
sleeping or resting in a sleeper berth for greater
During
Construction
89
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
MITIGATION MEASURE TIMING
than 5.0 minutes at any location when within 1,000
feet of a restricted area, except as noted in
Subsection (d) of the regulation.
b. Off-road diesel equipment shall comply with the 5-
minute idling restriction identified in Section 2449(d)(2)
of the California Air Resources Board’s In-Use Off-
Road Diesel regulation.
c. Signs must be posted in the designated queuing areas
and job sites to remind drivers and operators of the
state’s 5-minute idling limit.
d. The specific requirements and exceptions in the
regulations can be reviewed at the following web sites:
www.arb.ca.gov/msprog/truck-idling/2485.pdf and
www.arb.ca.gov/regact/2007/ordiesl07/frooal.pdf.
AND/OR
2. Diesel Idling Restrictions Near Sensitive Receptors
In addition to the state required diesel idling requirements,
the project applicant shall comply with these more
restrictive requirements to minimize impacts to nearby
sensitive receptors:
a. Staging and queuing areas shall not be located within
1,000 feet of sensitive receptors;
b. Diesel idling within 1,000 feet of sensitive receptors
shall not be permitted;
c. Use of alternative fueled equipment is recommended;
and
d. Signs that specify the no idling areas must be posted
and enforced at the site.
AQ-6 Exterior architectural coasting shall be limited to Volatile Organic
Compound (VOC) of 50 grams per liter maximum to the extent
feasible.
During
Construction
AQ-7 Interior architectural coasting shall be limited to Volatile Organic
Compound (VOC) of 0 grams per liter maximum to the extent
feasible within residential and non-residential spaces.
During
Construction
AQ-8 Should hydrocarbon contaminated soil be encountered during
construction activities, the APCD must be notified as soon as
possible and no later than 48 hours after affected material is
discovered to determine if an APCD Permit will be required. In
addition, the following measures shall be implemented
immediately after contaminated soil is discovered:
Covers on storage piles shall be maintained in place at all
times in areas not actively involved in soil addition or
removal;
Contaminated soil shall be covered with at least six inches
Dirong
Construction
90
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
MITIGATION MEASURE TIMING
of packed uncontaminated soil or other TPH –non-
permeable barrier such as plastic tarp. No headspace
shall be allowed where vapors could accumulate;
Covered piles shall be designed in such a way to eliminate
erosion due to wind or water. No openings in the covers
are permitted;
The air quality impacts from the excavation and haul trips
associated with removing the contaminated soil must be
evaluated and mitigated if total emissions exceed the
APCD’s construction phase thresholds;
During soil excavation, odors shall not be evident to such
a degree as to cause a public nuisance; and,
Clean soil must be segregated from contaminated soil.
The notification and permitting determination requirements shall
be directed to the APCD Engineering & Compliance Division at
(805) 781-5912.
Green House Gas Emissions
GHG-1 The proposed project shall include a minimum of four (4) electric
vehicle (EV) chargers within the proposed parking lot. Vehicle
chargers shall be counted as parking spaces for the purposes of
parking calculations.
Prior to Building
Permit Final
Cultural Resources
CR-1 Recordation and documentation shall be produced according to
the California Register of Historic Resources prior to issuance of
demolition permits for both 6452 and 6490 El Camino Real.
Documentation shall include the following:
Completion of State of California Form DPR 523B;
Large scale color photographs of exterior and interior with
scale and caption;
Large scale site plan and floor plan of existing building(s)
with legend and callouts of location photographs taken;
Copies of selected historic photographs;
Written description of construction and use of the
structures; and,
Digital copies of all materials submitted in PDF format.
Prior to Demo
Permit Issuance
CR-2 In the event that human remains are discovered on the property,
all work on the project shall stop and the Atascadero Police
Department and the County Coroner shall be contacted
immediately. The Atascadero Community Development Director
shall be notified. If the human remains are identified as being
native American, the California Native American Heritage
Commission (NAHC) shall be contacted at (916) 653-4082 within
24 hours. A representative from both the Chumash Tribe and the
Salinan Tribe shall be notified during the excavation of any
During
Construction
91
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
MITIGATION MEASURE TIMING
remains.
Noise
NO-1 Soffit vents, eave vents, dormer vents and other wall and roof
penetrations shall be on the walls and roofs facing away from the
noise source wherever possible.
Prior to Building
Permit Issuance
NO-2 The walls of habitable spaces and office space on second and
third stories nearest the noise source shall have wall construction
with an S.T.C. (Sound Transmission Class) rating of 30 or greater.
For instance, stucco exterior or equivalent on 2” x 4” stud walls
with minimum R-13 batt insulation and two layers of ½” gypsum
board on the interior will provide an S.T.C. rating of 30 or greater
along these walls.
Prior to Building
Permit Issuance
NO-3 Common acoustic leaks, such as electrical outlets, pipes, vents,
ducts, flues, and other breaks in the integrity of the wall, ceiling or
roof construction on the side of the dwellings nearest
transportation noise sources shall receive special attention during
construction. All construction openings and joints on the walls on
the noise facing side of the site shall be insulated, sealed and
caulked with a resilient, non-hardening, acoustical caulking
material. All such openings and joints shall be airtight to maintain
sound isolation.
Prior to Building
Permit Issuance
NO-4 To meet the interior LDN 45 dBA requirements, windows for
habitable spaces on the second and third floors of affected units
facing the noise source shall be of double-glazed construction
with one light of laminated glass, and installed in accordance with
the recommendations of the manufacturer. The windows shall
have full gaskets, with an S.T.C. rating of 30 or better, as
determined in testing by an accredited acoustical laboratory.
Prior to Building
Permit Issuance
Transportation & Traffic
TP-1 The applicant or developer must relocate the existing pedestrian
crossing at the midblock crossing at the intersection of East Mall
and El Camino Real to the signalized intersection of West Mall
and El Camino Real. The applicant shall re-stripe and provide
conduit for a new pedestrian crossing signal adjacent to the
project site. The proposed improvement may be eligible for TIF
credits based on the adopted Capital Improvement Plans at the
time of building permit issuance.
Prior to release
final sign off of
off-site
improvements.
TP-2 The applicant shall work with City Staff and the Regional Transit
Authority to relocate the adjacent southbound RTA stop that
currently exists near the intersection of Entrada and El Camino
Real. This includes relocation or re-construction of a bus shelter,
as deemed appropriate by the City Engineer
Prior to release
final sign off of
off-site
improvements.
92
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
MITIGATION MEASURE TIMING
Utilities Services
UT-1 The proposed project must pay all applicable sewer connection
fees at the time of building permit issuance. A fee credit may be
applicable for all existing fixtures and connections listed in
demolition permits for buildings removed.
Prior to Building
Permit Issuance
UT-2 The applicant shall be responsible for providing fair share impact
fees for wastewater in effect at the time of building permit
issuance.
Prior to Building
Permit Issuance
UT-3 The developer must include trash and recycle receptacles near
public entries and a minimum of (3) trash and recycle receptacles
within the proposed plaza to be dispersed throughout the length
of the plaza. Receptacle design shall be approved by Staff and
included on landscaping plans at the time of building permit
submittal.
Prior to release
final sign off of
on-site
improvements.
**END CONDITIONS**
93
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT B: MASTER PLAN OF DEVELOPMENT / SITE PLAN
94
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT C: LANDSCAPE PLAN
95
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT D: Elevations / Floor Plan / Sections
Building A front elevation Building A Rear Elevation
96
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Building B Elevations
“A” First Floor Plan
“A” Second floor plan
97
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
98
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
“A” Third Floor Plan “A” Roof Plan
99
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Building B
First Floor
Second Floor Third Floor
100
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT E: COLORS AND MATERIALS BOARD
101
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT F: SIGNAGE
102
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT G: GRADING AND DRAINAGE PLAN
103
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT H: UTILITY PLAN
104
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT I: PROPOSED PLAZA IMPROVEMENTS
20-foot vehicular
access
End pavement
approximately 50 northeast
of property marker
Curve may be needed
by Engineer
105
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 4: DRAFT PC RESOLUTION - B, TENTATIVE MAP & ROAD
ABANDONMENT
DRAFT PC RESOLUTION 2018-B
RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
ATASCADERO, CALIFORNIA, RECOMMENDING APPROVAL OF
TENTATIVE PARCEL MAP AT 17-0088, INCLUDING A ROAD
ABANDONMENT TO VACATE PORTIONS OF AN EASEMENT FOR
PUBLIC USE ALONG EL CAMINO REAL, AND A PORTION OF RIGHT
OF WAY FOR ATASCADERO AVENUE PURSUANT TO SECTION 8332
OF THE CALIFORNIA STREETS AND HIGHWAYS CODE
AND RECOMMEND TO THE CITY COUNCIL A PARTIAL VEHICULAR
CLOSURE OF ATASCADERO AVENUE FOR THE CONSTRUCTION OF
A PUBLIC PEDESTRIAN PLAZA PURSUANT TO SECTION 12920 OF
THE CALIFORNIA STREETS AND HIGHWAYS CODE
LA PLAZA DOWNTOWN REDEVELOPMENT
Z3 LLC
(PLN 2017-1649)
WHEREAS, an application has been received from Z3 LLC, Owner / Applicant (8189
San Dimas Lane, Atascadero, CA 93422), to consider Planning Application PLN 2017-1647, for
a project consisting of a Master Plan of Development (CUP), Tentative Parcel Map (including
condominiums), roadway abandonment, and certification of a Mitigated Negative Declaration
("MND") on a 1.83 acre site located on 6300 through 6500 El Camino Real (APN’s 030-193-
001,003,017,016, 031,030,033); and,
WHEREAS, an application has been received from Z3 LLC, Owner / Applicant (8189
San Dimas Lane, Atascadero, CA 93422) to abandon an approximate 0.11 acre portion of a
public access easement directly adjacent to the El Camino Real Right-of-Way; abandon a portion
of right-of-way, which is approximately 0.24 acre of Atascadero Avenue (also referred to as
“Atascadero Mall”), being portions of Lots 18 and 19, Block H-B, Atascadero Colony
Subdivision, City of Atascadero, County of San Luis Obispo, State of California and filed for
record on October 21, 1914 in Book 4 at Page 32 of Maps; and partially close to vehicular traffic
in the remaining portion of right-of-way along Atascadero Avenue (Mall), with the exception of
20-feet for the construction of a pedestrian plaza; and
WHEREAS, the site’s current General Plan Land Use Designation is Downtown (D);
and
WHEREAS, the site’s current Zoning District is Downtown Commercial (DC); and
106
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
WHEREAS, Atascadero Municipal Code § 9-2.110(a)(2) requires that multiple-family
developments consisting of twelve (12) or more units, even if such development is listed as an
allowed use in a particular zoning district, receive an approval of Master Plan of Development in
the form of a Conditional Use Permit (CUP); and
WHEREAS, Atascadero Municipal Code Section 9-4.113(b)(1) allows the Planning
Commission modification of height limitations, provided the Commission first finds the project
will not result in substantial detrimental effects on the enjoyment and use of adjoining properties
and that the modified height will not exceed the lifesaving equipment capabili ties of the Fire
Department; and,
WHEREAS, Atascadero Municipal Code Section 9-15.1011 allows the Planning
Commission the ability to modify signage standards, provided that the Planning Commission
make the appropriate four (4) required findings; and,
WHEREAS, the Atascadero General Plan Policy 2.1.2 allows the Planning Commission
to grant up to a fifteen percent (15%) density bonus for “exceptionally high quality architecture”
through required findings; and,
WHEREAS, Official City of Atascadero Land Use and Zoning Maps reflect a portion of
El Camino Real as right-of-way; however, this portion of right-of-way has been quitclaimed by
the City of Atascadero through City Council Resolution 06-95; and,
WHEREAS, the proposed abandoned portion of the right-of-way for Atascadero Avenue
(Mall) is shown on portion of Lot 18, Block H-B, Atascadero Colony Subdivision, City of
Atascadero, County of San Luis Obispo, State of California and filed for record on
October 21, 1914 in Book 4 at Page 32 of Maps, approximately 0.24 acres, will become a part of
the adjacent property currently zoned Downtown Commercial; and,
WHEREAS, the proposed abandoned the public use easement, approximately 0.11 acres
created by an offer of dedication per Official Record 88-O.R.-114 along for El Camino Real will
become a part of the adjacent property currently zoned Downtown Commercial; and,
WHEREAS, the remaining right of way, approximately 74-feet, as shown in Lot 8 of
Block H-B, and a portion of Lot 6 Block E-B, Atascadero Colony Subdivision, City of
Atascadero, County of San Luis Obispo, State of California and filed for record on October 21,
1914 in Book 4 at Page 32 of Maps shall be closed to vehicular traffic, with the exception of a
20-foot paved section directly southeast of Lot 6, Block E-B; and,
WHEREAS, an Initial Study and proposed Mitigated Negative Declaration,
Environmental Document No. 2017-0018 was prepared for the project and made available for
public review in accordance with the requirements of the California Environmental Quality Act
(CEQA); and
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and
107
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
WHEREAS, a timely and properly noticed Public Hearing on the subject Tentative
Parcel Map was held by the Planning Commission of the City of Atascadero at which hearing
evidence, oral and documentary, was admitted on behalf of said Subdivision; and
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on November 21, 2017, studied and considered Tentative Parcel Map (AT
17-0088) for PLN 2017-1649, after certifying Mitigated Negative Declaration Environmental
Document No. 2017-0018, prepared for the project.
NOW, THEREFORE BE IT RESOLVED by the Planning Commission of the City of
Atascadero:
SECTION 1. The Planning Commission makes the following findings, determinations
and approvals with respect to the Tentative Parcel Map, Road Abandonment and Road Closure:
A. Findings for Approval of Tentative Parcel Map
2. FINDING: The proposed subdivision, together with the provisions for its design
and improvement, is consistent with the General Plan and the proposed Zone Text
Change Amendment (Government Code§§ 66473.5 and 66474(a) and (b)).
FACT: The proposed subdivision has been designed and includes proposed
improvements that are consistent with the City’s adopted General Plan, in
addition to the requirements that have been considered for the adoption of the
Master Plan of Development.
3. FINDING: The site is physically suitable for the type of development
(Government Code§ 66474(c)).
FACT: The proposed site is suitable for this type of development as the grades
are gently sloping. Based on the existing grades and proposed grading plan, the
proposed subdivision contains a number of parcels and ultimately a number of
residential air space condominiums and non-residential air space condominiums
on Parcels 2 and 3 that are consistent with the density of the underlying
Downtown Commercial (DC) zoning district.
4. FINDING: The site is physically suitable for the proposed density of
development (Government Code § 66474(d)).
FACT: The site is a redevelopment of formerly developed commercial properties
within the City’s Downtown Core. The proposed development is consistent with
the proposed density within the Downtown Commercial zoning district with an
appropriate mix of uses. Therefore, the project is consistent with the surrounding
neighborhood and is suitable for the proposed density.
5. FINDING: The design of the subdivision or the proposed improvements will not
108
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
cause substantial environmental damage or substantially and avoidably injure fish
or wildlife or their habitat (Government Code § 66474(e)).
FACT: The proposed project has been analyzed, consistent with the California
Environmental Quality Act (CEQA), through certified Mitigated Negative
Declaration, Environmental Document No. 2017-0018. With the incorporation of
mitigation measures, in addition to project conditions, the proposed project’s
impacts will be mitigated to a threshold of less than significant, therefore the
proposed project will not create substantial environmental damage.
6. FINDING: The design of the subdivision or the type of improvements will not
cause serious health problems (Government Code § 66474(f)).
FACT: The proposed project and the types of improvements includes the
subdivision of seven (7) existing parcels into four (4) parcels with two (2) parcels
for future condominium purposes which includes a total 42 air space residential
condominiums and eight (8) air-space non-residential condominiums. Because the
proposed project is consistent with envisioned downtown redevelopment, and the
improvements have been reviewed for consistency with the threshold established
by the City, through adopted Ordinances, and City policies, the proposed project
will not cause serious health problems.
7. FINDING: The design of the subdivision will not conflict with easements for
access through or use of property within the proposed subdivision (Government
Code § 66474(g)).
FACT: The installation of public improvements are necessary, prior to recordation
of a Final Map, in order to ensure orderly development of the surrounding area
(Government Code § 66411.1(b)(2).
8. FINDING: The proposed project or use satisfies all applicable provisions of the
Title 9 of the Atascadero Municipal Code this title.
FACT: Public improvements that are included, as conditioned by the City
Engineer, are required and consistent with the City’s adopted General Plan, Master
Facilities Plan, and Municipal Code. Therefore the proposed improvements are
necessary to ensure orderly development of the surrounding area.
B. Findings for Roadway Abandonment SHC §8332
1. At the hearing, the legislative body shall hear the evidence offered by persons interested.
Finding. The proposed road abandonment is consistent with the City’s General Plan
Land Use and Circulation Element. The Atascadero Mall right of way was bisected by
Highway 101 in the 1950’s and no longer serves a necessary purpose for street access.
109
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Fact. The Planning Commission received oral testimony by the project applicant, project
representative, and interested persons prior to making a recommendation for vacation of
public easements and roadway abandonment.
2. The street, highway, or public service easement described in the notice of hearing or
petition is unnecessary for present or prospective public use
FACT. The Planning Commission, after hearing public testimony by persons interested
in the vacation of a public easement along El Camino Real, and the aband onment of a
portion of right-of-way in Atascadero Avenue directly adjacent to the proposed project,
recommends to the City Council that these portions of right-of-way and public easements
are unnecessary for the present or prospective use of the public and therefore should be
vacated through recordation of Tentative Parcel Map AT 17-0088.
B. Findings for Partial Vehicular Closure SHC §1920
1. The governing body of a city by resolution or ordinance removes a street from public use,
or closes it to vehicular or pedestrian traffic, such resolution or ordinance may set forth
such minimum maintenance requirements, including the maintenance of drainage, for the
street as the governing body determines are necessary for the public safety.
FACT. The Planning Commission recommends, through approval of a resolution, to the
City Council that a portion of Atascadero Avenue be closed to vehicular traffic; however,
public right-of-way shall be retained for the use of pedestrians, and bicyclists, and shall
continue to be maintained by the City necessary for public safety.
SECTION 3. The Planning Commission recommends the following actions to the City
Council of the City of Atascadero with respect to roadway abandonment pursuant to §8332 and
partial vehicular closure pursuant §1920 to of the California Streets and Highways Code:
A. Abandoning a portion of the right-of-way for Atascadero Avenue (Mall) shown as a
portion of Lot 18, Block H-B, Atascadero Colony Subdivision, City of Atascadero, County of
San Luis Obispo, State of California and filed for record on October 21, 1914 in Book 4 at Page
32 of Maps, approximately 0.24 acres, converting this portion of property to a General Plan Land
Use Designation of Downtown (D), and a Zoning District of Downtown Commercial (DC);
B. Abandoning a public use easement, approximately 0.11 acres created by an offer of
dedication per Official Record 88-O.R.-114 along El Camino Real and reverting this portion of
property to a General Plan Land Use Designation of Downtown (D), and a Zoning District of
Downtown Commercial (DC);
C. Approximately 74-feet of right-of-way, owned and maintained by the City of
Atascadero, as shown in Lot 8 of Block H-B, and a portion of Lot 6 Block E-B, Atascadero
Colony Subdivision, City of Atascadero, County of San Luis Obispo, State of California and
filed for record on October 21, 1914 in Book 4 at Page 32 of Maps shall be closed to vehicular
traffic, with the exception of a 20-foot paved section directly southeast of Lot 6, Block E -B to
110
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
construct a public pedestrian plaza.
SECTION 2. The Planning Commission of the City of Atascadero, in a regular session
assembled on March 6, 2018, resolved to recommend approval of Tentative Parcel Map (AT 17-
0088) for PLN 2017-1649, and accompanying road abandonment, subject to the following, on
file in the Community Development Department and incorporated herein by reference:
1. EXHIBIT A: Tentative Subdivision Map (AT 17-0088)
2. EXHIBIT B: Road Abandonment map
3. EXHIBIT C: Conditions of Approval
4. EXHIBIT D: Grading Plan
5. EXHIBIT E: Utility Plan
BE IT FURTHER RESOLVED, that a copy of this Resolution be delivered forthwith by the
Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner _________, and seconded by Commissioner ________, the
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ()
NOES: ()
ABSTAIN: ()
ABSENT: ()
ADOPTED:
CITY OF ATASCADERO, CA
______________________________
Jerel Seay
Planning Commission Chairperson
Attest:
______________________________
Phil Dunsmore
Planning Commission Secretary
111
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT A –TENTATIVE PARCEL MAP
112
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Exhibit B
Exhibit B: Road Abandonment diagram
10 foot road and
landscape easement on
El Camino Real
Right-of-Way
abandonment over
Atascadero Avenue.
(Atascadero Mall)
Portion of Atascadero Avenue
to be closed to vehicular traffic.
113
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Exhibit C
Conditions of Approval
City of Atascadero
PLN 2017-1649
LA PLAZA DOWNTOWN REDEVELOPMENT
TENTATIVE PARCEL MAP AT 17-0088
Road Abandonment
6500 EL CAMINO REAL
PARENT APN 030-193-001,003,017,016, 031,030,033
The following conditions of approval apply to the project referenced above. The conditions of
approval are grouped under specific headings that relate to the timing of required compliance.
Additional language within a condition may further define the timing of the required compliance.
A. General Conditions.
1. The emergency services and facility maintenance costs listed below shall be
100% funded by the project in perpetuity. The service and maintenance
costs shall be funded through a community facilities district established by
the City at the developer's cost. The funding mechanism must be in place
prior to or concurrently with acceptance of the final m aps. The funding
mechanism shall be approved by the City Attorney, City Engineer and
Administrative Services Director prior to acceptance of any final map. The
administration of the above mentioned funds shall be by the City. Developer
agrees to participate in the community facilities district and to take all steps
reasonably required by the City with regard to the establishment of the
district and assessment of the property.
All Atascadero Police Department service costs to the project.
All Atascadero Fire Department service costs to the project.
Off-site common City of Atascadero park facilities maintenance
service costs related to the project.
☐ PLN
2. Prior to recordation of the Parcel Map, the Applicant shall establish a,
Property Owners’ Association, or similar funding mechanism approved by
the City, to provide sufficient funds on an annual basis to pay for the
operation, maintenance and future replacement of privately owned-in-
common subdivision improvements. The engineer of record shall prepare
and submit an estimated operating budget and capital improvement
replacement analysis for review and approval by the City Engineer, prior to
recordation of the Parcel Map.
☐ PLN
3. Prior to recording the Final Map, the Applicant shall have the map reviewed
by the public utility providers for power, telephone, gas, cable TV, and the
Atascadero Mutual Water Company. The Applicant shall obtain a letter from
each utility company stating that the easements and rights-of-way shown on
the map for public utility purposes are acceptable.
☐ PWD
114
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
4. Documents that the City of Atascadero requires to be recorded concurrently
with the Final Map (e.g.: off-site rights-of-way dedications, easements not
shown on the map, agreements, etc.) shall be listed on the certificate sheet
of the map.
☐ PWD
5. The City of Atascadero may require an additional map sheet for information
purposes in accordance with the Subdivision Map Act.
☐ PWD
6. The El Camino Real pedestrian entry/exit doors serving any building shall
not swing into the public right-of-way more than one foot.
☐ PWD
7. The proposed waterfall structure in front of Building A shall be located
entirely within the subject property and shall not encroach into the public
right-of-way.
☐ PWD
8. The relocation of the existing public sewer main shall be completed prior to
issuance of, or, in conjunction with the issuance of building permits for the
southerly most building (Tentative Parcel 3).
9. Atascadero Mall Plaza improvements shall be completed prior to occupancy
of Buildings A or B.
☐ PWD
10. Rights-of-way acquisitions and/or abandonments shall be completed
in accordance with City regulations, the Streets and Highways Code, the
Subdivision Map Act, and to the satisfaction of the City Engineer. Public
rights-of-way abandonments completed through the Parcel Map process
shall be adequately identified on the certificate sheet of the map as well as
on subsequent map sheets.
☐ PWD
11. All plans shall contain the City of Atascadero "Standard Notes for
Improvement Plans" on file in the City Engineer's office.
12. Rights-of-way abandonments shall be completed through the Parcel Map
process in accordance with City regulations, the Streets and Highways
Code, the Subdivision Map Act, and to the satisfaction of the City
Engineer.
13. Easements that are not intended to continue in perpetuity shall not be
shown on the Parcel Map and shall be recorded by separate instrument.
14. Frontage improvements shall be designed and constructed in
accordance with City adopted standards and specifications including but
not limited to decorative paver bands, street furniture, tree wells, trash
containers, raised planters, etc. Paver bands along the back of curb or
within the pedestrian plaza shall be stamped concrete pavement that
matches the City adopted standard paver pattern and color.
☐ PWD
B. Roadway Improvements
115
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
15. Construction of the new driveway approach, northwesterly of Building A,
requires removal of the existing driveway approach serving the adjacent
northwesterly property. Vehicular access to this property shall be combined
with the subject property.
☐ PWD
16. Pedestrian ramps on El Camino Real shall be constructed on each side of
the street type entrance located between Buildings A and B.
☐ PWD
17. The southeasterly 20-feet of Atascadero Mall shall be extended
southwesterly as a vehicular access drive to a point that provides adequate
vehicular access to the adjacent southerly property, to the satisfaction of
the City Engineer and Community Development Director.
☐ PWD
18. Improvement of Atascadero Mall northwesterly of the access drive and
adjacent to the subject property shall be improved as a public plaza and
shall include pedestrian channelization (including physical barriers such as
raised planters, decorative fencing or short walls, planter islands, etc.)
necessary to direct pedestrians exiting the pedestrian tunnel through the
open plaza area, to the satisfaction of the City Engineer and Community
Development Director.
☐ PWD
19. The applicant shall coordinate with the Regional Transit Authority regarding
the relocation and modification to the existing bus shelter and bus stop.
Final location shall be approved by the Regional Transit Authority and the
City Engineer.
☐ PWD
20. Roadway signing, striping, and traffic signal modifications shall be in
accordance with the California Manual on Uniform Traffic Control Devices
(CA-MUTCD) and shall be designed and constructed to the satisfaction of
the City Engineer.
☐ PWD
C. Wastewater Collection System
21. The public gravity sewer system within the subject property shall be
modified in accordance with City Standards and to the satisfaction of the
City Engineer. The new sewer main system shall be offered to the public
and shall include a 20-feet wide public sewer easement. The wastewater
collection system shall be designed and constructed in accordance with
City standards and specifications, to the satisfaction of the City Engineer.
☐ PWD
22. Gravity sanitary sewer (SS) mains shall terminate in manholes.
☐ PWD
23. The on-site sewer laterals shall be privately owned and maintained by
individual lot owners.
☐ PWD
24. Each lot served by the wastewater collection system shall pay all sewer
fees prior to the issuance of a building permit.
☐ PWD
D. Stormwater
25. The project shall be designed and constructed in accordance with the post-☐ PWD
116
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
construction storm water management regulations in accordance with City
Standards and the State RWQCB Resolution R3-2013-0032.
26. Common drainage basins (serving multiple lots) shall be designed to desilt,
detain and meter storm flows in accordance with City regulations.
☐ PWD
27. Storm Sewer shall be of either cast-in-place or precast reinforced concrete
pipe, polyvinyl chloride pipe, high density polyethylene pipe or an approved
equal.
Minimum pipe diameter allowable on any storm drain within a
roadway or road right-of-way shall be 18" diameter. A lesser size
may be used for down drains on fill slopes if approved by the City
Engineer.
Minimum design velocity in closed conduits shall be 2 f.p.s. when
conduit is flowing to capacity and should not exceed 15 f.p.s.
Closed conduits shall be designed to convey the 10-year storm
flow with gravity flow, the 25-year storm flow with head, and
provide a safe overland route for the conveyance for the 100-year
storm overflow.
Manholes or junction boxes, entry to which does not fall in the
gutter line, must have standard 24" diameter manhole covers.
Those falling in the gutter line may use the standard grated
manhole cover and serve also as an inlet manhole.
☐ PWD
28. Prior to approval of subdivision improvement plans, the project engineer
shall provide calculations and a report confirming compliance with City
regulations and the low-impact development requirements.
☐ PWD
29. When a Storm Water Operation - Maintenance Plan (OMP) is required for
an individual lot or group of lots, the City Engineer can require the OMP to
be recorded as an agreement against each property. When recordation of
an OMP agreement is required, the agreement shall contain provisions
allowing the City to enter the property, following reasonable notice to the
property owner or tenant, to conduct an inspection of the storm water
system and post-construction storm water management controls.
☐ PWD
30. When an OMP is required, the OMP shall include a section addressing
annual inspection and reporting to the City by a third party, to the
satisfaction of the City Engineer.
☐ PWD
E. Easements
31. On-site easements for ingress, egress, pedestrian traffic, drainage, utilities,
etc., shall be shown on the Parcel Map, or, created by separate documents
to be approved by the City Engineer and City Attorney (as necessary) and
recorded concurrently with the Parcel Map.
☐ PWD
32. Driveways serving more than one lot shall require an
easement/maintenance agreement for ingress/egress, public & private
utilities, and drainage, to the satisfaction of the City Engineer and
☐ PWD
117
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Community Development Director.
33. Drainage easements shall be dedicated over areas containing drainage
improvements that benefit or serve more than one property. The
determination as to whether the easement is private or offered to the public
will be determined by the City Engineer prior to approval of the subdivision
improvement plan and Parcel Map.
☐ PWD
34. Wherever an easement is created for commonly owned or operated
improvements for the benefit of more than one lot, there shall also be
created a maintenance and operations agreement, to the satisfaction of the
City Engineer and City Attorney.
☐ PWD
35. Easements that are not intended to continue in perpetuity shall not be
shown on the Parcel Map and shall be recorded by separate instrument.
☐ PWD
F. Utilities
36. New utility distribution systems and services shall be constructed
underground, to the satisfaction of the City Engineer.
☐ PWD
Each parcel shall be served with separate services for water, sewer, gas,
power, telephone and cable TV. Utility laterals shall be located and
constructed to each lot in accordance with City Standards and Standard
Specifications.
37. The right of way abandonment shall exclude that portion of right
of way between El Camino Real and the City’s property at
Atascadero Mall as shown below:
**END CONDITIONS**
☐ PWD
118
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT D – GRADING & DRAINAGE PLAN
EXHIBIT E – UTILITY PLAN
119
ITEM 4 | 3/6/2018
La Plaza Downtown Development
PLN 2017-1649 / Z3 LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
120
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Atascadero Planning Commission
Staff Report – Community Development Department
Public Works Corp. Yard Cargo Containers
(CUP 2005-0159 Amendment)
RECOMMENDATION:
Staff recommends Planning Commission approve PC Resolution 2018-A approving
installation of cargo containers at the Public Works Corp. Yard at 8005 Ga barda,
subject to findings and Conditions of Approval.
Project Info In-Brief: A Conditional Use Permit is proposed in order to install cargo
containers for storage at the Public Works Maintenance Yard. The Atascadero
Municipal Code allows for two (2) or more cargo containers to be permitted through the
Conditional Use Permit process.
PROJECT
ADDRESS: 8005 Gabarda Rd. Atascadero, CA APN 028-421-001
PROJECT
PLANNER
Callie Taylor
Senior Planner 470-3448 ctaylor@atascadero.org
APPLICANT City Public Works Department
PROPERTY
OWNER City of Atascadero
GENERAL PLAN
DESIGNATION:
ZONING
DISTRICT:
SITE
AREA EXISTING USE PROPOSED USE
Public (P) Public (P) 75.4 ac. Public Works Corp
Yard
Two (2) new 40’ Cargo
Containers for Storage
ENVIRONMENTAL DETERMINATION
☐ Environmental Impact Report SCH: ___________________________
☐ Negative / Mitigated Negative Declaration No. ___________
☒ Categorical Exemption CEQA – Guidelines Section 15303
☐ Statutory Exemption §§ 21000, et seq & ________________________
☐ No Project – Ministerial Project
121
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
DISCUSSION:
Existing Surrounding Uses / Parcel Configurations:
Existing Zoning Existing Aerial / Surrounding
North: South: East: West:
Single-family Chalk Mountain Golf
Course
Salinas River Railroad tracks &
Single-family
Background:
The City of Atascadero Public Works Corp. Yard and maintenance facilities are located
at the end of Gabarda Road, adjacent to the W astewater Treatment Plant. In 2005, a
Conditional Use Permit was approved by the Planning Commission to allow a 12,000
square foot office and maintenance building, paved parking areas, and vehicle shelters
for City transit vehicles. In 2011, a 3,000 square foot bus shelter was constructed.
A portion of the 75 acre City property overlays a cultural site of historical significance
which has been mapped by archeologists an d capped in 1982 to protect the
archeological site in place underground. Any new structures or underground utilities on
the property are required to maintain a minimum one-foot buffer above the native soil
within the boundaries of the archeological site.
Analysis:
The City is currently proposing to expand storage facilities at the Public Works Corp.
Yard. Two existing cargo containers are located towards the center of the site and are
used for storage. Two (2) additional 40 foot long by 10 foot wide cargo containers (800
sq. ft. total) are proposed to be placed adjacent to the bus barn.
122
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Site Plan / Aerial
40’ long cargo container
2 new 40’ long cargo
containers proposed
2 existing cargo
containers
123
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Atascadero Municipal Code Section 9-6.103 allows cargo containers to be used for
accessory storage purposes when certain standards can be met. One (1) cargo
container may be permitted on lots over one (1) acre in size, subject to Design Review
Committee (DRC) review for neighborhood compatibility. Two (2) or more cargo
containers require a minor Conditional Use Permit, subject to Planning Commission
review for neighborhood compatibility. A building permit shall be issued and shall
identify a foundation/anchoring system for the containers.
1. Neighborhood Compatibility
The Municipal Code requires Planning Commission review when multiple cargo
containers are proposed for a site in order to ensure that the containers are
visually compatible with the site and surroundings. The subject site at 8005
Gabarda is a City maintenance facility and is developed with several very large
metal buildings. The site includes wastewater treatment facilities and Public
Works outdoor storage yard. The site is approximately 75 acres in size. The
proposed cargo containers are located towards the center of the site, and will not
be visible from adjacent properties.
Staff has included a Condition of Approval which will allow future installation of
additional cargo containers at the Public Works Corp. Yard, provided that a
building permit is obtained to ensure anchoring and setbacks are maintained,
and the containers are painted to match the existing buildings on site.
2. Archeological Site Protection
The two cargo containers are proposed to be located just outside the south west
boundary of cultural site SLO-834, which was discovered in 1977 and placed on
the National Register of Historic Places. In 1982, 30,000 cubic yards of imported
sterile fill soil was brought onsite to cap and protect the archeological site in
place approximately three feet underground. In 2011, an archeological report
and contour map were developed by doing test trenches to confirm the depth of
the imported fill soil along the edges of SLO-834. The 2011 archeological report
shows that approximately 18 to 24-inches of fill soil was placed above native soil
along the south west edge of SLO-834. The archeological report states that
future construction projects in this area will not have an adverse impact on the
cultural site provided that all footings stay one foot above the native soil, as
determined by the 2011 topographic maps and the 1979 cultural site boundaries.
The proposed cargo containers will be placed on existing grade, with minimal site
disturbance for the anchoring system. No site grading or excavation is being
proposed; therefore, the placement of the cargo containers will not have an
impact on cultural site SLO-834.
124
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ENVIRONMENTAL DETERMINATION:
The proposed project is Categorically Exempt (Class 3) from the provisions of the
California Environmental Quality Act (California Public Resources Code §§ 21000, et
seq., “CEQA”) and CEQA Guidelines (Title 14 California Code of Regulations §§ 15000,
et seq.) pursuant to CEQA Guidelines Section 15303 (New Construction or Conversion
of Small Structures). This exemption is included in Attachment 3.
FINDINGS:
To approve the requested Conditional Use Permit, the Planning Commission must
make the following findings. These findings , and the facts to support these findings, are
included in the attached Resolution 2018-A.
Conditional Use Permit (AMC Section 9-2.110(b).(3).(iv)
1. The proposed project or use is consistent with the General Plan; and,
2. The proposed project or use satisfies all applicable provisions of this title; and,
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety or welfare of the general public or persons
residing or working in the neighborhood of the use, or be detrimental or injurious
to property or improvements in the vicinity of the use; and,
4. The proposed project or use will not be inconsistent with the character of the
immediate neighborhood or contrary to its orderly development; and,
5. The proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be
improved in conjunction with the project, or beyond the normal traffic volume of
the surrounding neighborhood that would result from full development in
accordance with the land use element.
ALTERNATIVES:
1. The Planning Commission may include modifications to the project and/o r
Conditions of Approval for the project. Any proposed modifications including
Conditions of Approval, should be clearly re-stated in any vote of the attached
resolution.
2. The Planning Commission may determine that more information is needed on
some aspect of the project and may refer the item back to the applicant and staff
to develop the additional information. The Commission should clearly state the
type of information that is required. A motion, and approval of that motion, is
required to continue the item to a future date.
125
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
3. The Planning Commission may deny the project. The Commission must specify
what findings cannot be made and provide a brief oral statement based on the
staff report, oral testimony, site visit, correspondence, or any other rationale
introduced and deliberated on by the Planning Commission.
ATTACHMENTS:
1. Site Aerial
2. Site Photographs
3. Draft Resolution 2018-A
126
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 1: Site Aerial
CUP 2005-0159 Amendment, Cargo Containers for Storage at Public Works Corp. Yard
2 new 40’ long cargo
containers 2 existing cargo
containers
127
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 2: Site Photographs
CUP 2005-0159 Amendment, Cargo Containers for Storage at Public Works Corp. Yard
Existing office & maintenance buildings
Existing bus barn Location of proposed cargo containers
128
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 3: Draft Resolution 2018-A
CUP 2005-0159 Amendment
DRAFT PC RESOLUTION 2018-A
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA
APPROVING MULTIPLE CARGO CONTAINERS
CITY OF ATASCADERO
8005 GABARDA RD. (APN 028-421-001)
(CONDITIONAL USE PERMIT 2005-0159 AMENDMENT)
WHEREAS, an application has been received from the City of Atascadero, 6500 Palma
Avenue, Applicant and Owner, to consider a Conditional Use Permit for multiple 40 foot long
cargo containers on a 75.4 acre site located at 8005 Gabarda Road, Atascadero, CA 93422
(APN’s 028-421-001); and,
WHEREAS, the site’s current General Plan Land Use Designation is Public (P); and,
WHEREAS, the site’s current Zoning District is Public (P); and,
WHEREAS, the proposed project qualifies for a Categorical Exemption consistent with
CEQA Guidelines Section 15303: Construction or Conversion of Small Structures; and
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit was held by the Planning Commission of the City of Atascadero at which hearing
evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on March 6, 2018, studied and considered amendment to CUP 2005-0159;
and
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City
of Atascadero makes the following findings, determinations and recommendations with respect
to the proposed Conditional Use Permit:
SECTION 1. Findings of Environmental Exemption. The Planning Commission finds as
follows:
View from Palomar Ave
Existing 360 sf structures and creek channel
129
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
1. The proposed project is Categorically Exempt (Class 3) from the provisions of the
California Environmental Quality Act (California Public Resources Code §§ 21000, et
seq., “CEQA”) and CEQA Guidelines (Title 14 California Code of Regulations §§
15000, et seq.) CEQA pursuant to CEQA Guidelines Section 15303, for new construction
of small structures including accessory structures. A Notice of Determination is included
as Exhibit A.
SECTION 2. Findings for approval of Conditional Use Permit. The Planning Commission
finds as follows:
1. The proposed project or use is consistent with the General Plan; and
Fact: The proposed accessory structures (cargo containers) are incidental storage
structures which are secondary to the primary use of the site as a City facility for Public
Works maintenance and operations. The storage use is consistent with the General Plan
Public land use designation and all applicable policies.
2. The proposed project or use satisfies all applicable provisions of this title; and
Fact: The proposed cargo containers are consistent with the applicable provisions of the
Atascadero Municipal Code with the approval of the subject entitlement. The Atascadero
Municipal Code allows for the installation of two (2) or more cargo containers on sites
over one (1) acre with the approval of a minor Conditional Use Permit.
3. The establishment, and subsequent operation or conduct of the use will not, because of
the circumstances and conditions applied in the particular case, be detrimental to the
health, safety or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in
the vicinity of the use; and
Fact: The establishment of cargo containers as incidental structures at the Public Works
corp. yard will not be detrimental to the public health, safety, or welfare. The subject site
is a City maintenance and storage facility which is approximately 75 acres in size and can
accommodate the proposed storage buildings without impacting property or
improvements in the vicinity of the use.
4. The proposed project or use will not be inconsistent with the character of the immediate
neighborhood or contrary to its orderly development; and
Fact: The proposed cargo containers are located towards the center of a 75 acre City
maintenance facility. The containers will not be visible from offsite. The storage
containers are consistent with the Public Works corp. yard uses and architecture,
including the surrounding storage, office and maintenance facilities. The required
finding for neighborhood compatibility can be made to allow multiple cargo containers
on the subject site.
130
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
5. The proposed use or project will not generate a volume of traffic beyond the safe capacity
of all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the land use
element.
Fact: The proposed storage use will not increase traffic at the existing facility.
SECTION 3. Approval. The Planning Commission of the City of Atascadero, in a regular
session assembled on March 6, 2018 resolved to approve the Conditional Use Permit subject to
the following:
EXHIBIT A: Notice of Exemption
EXHIBIT B: Conditions of approval
EXHIBIT C: Site Plan
EXHIBIT D: Elevations, colors
On motion by ___________________, and seconded by ___________________, the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ()
NOES: ()
ABSTAIN: ()
ABSENT: ()
ADOPTED:
CITY OF ATASCADERO, CA
______________________________
Jerel Seay
Planning Commission Chairperson
Attest:
______________________________
Phil Dunsmore
Planning Commission Secretary
131
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Exhibit A
Notice of Exemption
132
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Exhibit B
Conditions of Approval
CUP 2005-0159 Amendment
Cargo Containers at Public Works Corp Yard
8005 GABARDA RD.
028-421-001
The following conditions of approval apply to the project referenced above. The conditions of
approval are grouped under specific headings that relate to the timing of required compliance.
Additional language within a condition may further define the timing of the required compliance.
A. The following conditions shall be satisfied prior to the issuance of the any
BUILDING PERMIT, or at the time specified in the condition.
1. Building permit(s) shall be required for all cargo containers 120 square-feet or
greater, and for any roof structure connecting the containers. Building permits
shall include the following information at minimum:
Construction details of the footing, anchoring or foundation beneath the
cargo containers
If electrical and climate control are being provided to the structures, this
shall be included with the building permit information
Site plan showing setbacks to existing structures and proximity to the
boundaries of cultural site SLO-834
2. Footing, foundation, or anchoring system shall be designed to avoid impacts to
the underground cultural site, as outlined in the 2011 Archeological Report by
Bruce Gibson. A minimum one foot buffer shall be maintained to native soil.
3. If new impervious areas exceed 1000 sq. ft., a drainage plan is required per
Municipal Code section 9-4.149.b.
B. The following conditions shall be applied to the project IN PERPETUITY until such
time that the use is extinguished.
4. The entitlement described at the location per this resolution is determined to be
vested with the property upon issuance of a building permit.
5. Approval of this entitlement shall be final and effective consistent with
Atascadero Municipal Code (AMC) section 9-1.111 seq. et. al.
6. Project construction shall be in accordance with provided Exhibit(s) and
conditions, adopted with this Resolution. If the cargo containers are painted or
a roof structure is added, the colors shall match the existing buildings on site,
133
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
including beige walls and green roofs. Roof structures shall be constructed of
metal to match existing buildings.
7. Additional cargo containers may be permitted on the subject site in the future,
without additional Planning Commission review, provided that a building permit
is obtained and the containers are painted to match existing buildings.
134
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Exhibit C
Site Plan
2 new 40’ long cargo
containers proposed
2 existing cargo
containers
135
ITEM 5 | 3/6/2018
Public Works Corp. Yard
CUP 2005-0159 Amendment / City of Atascadero
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Exhibit D
Elevations & Colors
If cargo containers are painted
or roof structure is added, they
shall match existing buildings:
tan walls & green roof
136