HomeMy WebLinkAboutPC_2017-08-01_AgendaPacket
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
CITY OF ATASCADERO
PLANNING COMMISSION AGENDA
SPECIAL MEETING
Tuesday, August 1, 2017
6:00 P.M. (note time change)
Historic City Hall Council Chambers
6500 Palma Avenue, 4th Floor
Atascadero, California 93422
CALL TO ORDER
Pledge of Allegiance
Roll Call: Chairperson Duane Anderson
Vice Chairperson Jerel Seay
Commissioner Ryan Betz
Commissioner Mark Dariz
Commissioner Josh Donovan
Commissioner Jan Wolff
Commissioner Tom Zirk
APPROVAL OF AGENDA
PUBLIC COMMENT
(This portion of the meeting is reserved for persons wishing to address the Commission on any matter not
on this agenda and over which the Commission has jurisdiction. Speakers are limited to three minutes.
Please state your name for the record before making your presentation. The Commission may take action
to direct the staff to place a matter of business on a future agenda.)
CONSENT CALENDAR
(All items on the consent calendar are considered to be routine and non-controversial by City staff and will
be approved by one motion if no member of the Commission or public wishes to comment or ask questions.)
1. APPROVAL OF DRAFT MINUTES OF PLANNING COMMISSION MEETING ON
JUNE 28, 2017
2. APPROVAL OF TIME EXTENSION FOR PLN 2007-1246, 1905 EL CAMINO
REAL (THE ANNEX)
City of Atascadero Planning Commission Agenda Special Meeting, August 1, 2017
Page 2 of 5
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
PLANNING COMMISSION BUSINESS
COMMUNITY DEVELOPMENT STAFF REPORTS
3. PLN 2017-1652 / TRP 2017-0215, TREE REMOVAL FOR 9710 LAUREL ROAD
Property
Owner/Applicant:
Ben and Tom Graves, PO Box 1501, Templeton, CA 93465
Certified Arborist: A&T Arborists, PO Box 1311, Templeton, CA 93465
Project Title: PLN 2017-1652 / TRP 2017-0215
Project Location: 9710 Laurel Rd., Atascadero, CA 93422
APN 055-041-018 (San Luis Obispo County)
Project Description:
The project consists of a request to remove 4 native oak trees totaling 54 inches in
diameter. The largest tree is a 32-inch diameter coast live oak. The applicant has
applied for a building permit to construct a residence and detached garage.
General Plan Designation: Rural Estates (RE)
Zoning District: Residential Suburban (RS)
Proposed
Environmental
Determination:
The project is Categorically Exempt (Class 3) from the provisions of the California
Environmental Quality Act (California Public Resources Code §§ 21000, et seq., “CEQA”)
and CEQA Guidelines (Title 14 California Code of Regulations §§ 15000, et seq.) CEQA
pursuant to CEQA Guidelines Section 15303, for the construction of one single-family
residence and an accessory structure in a residential zone.
City Staff: Katie Banister, Assistant Planner, kbanister@atascadero.org, Phone: 470-3480
Staff
Recommendation:
The Planning Commission adopt PC Resolution 2017 -A approving Tree Removal
Permit 2017-0215.
City of Atascadero Planning Commission Agenda Special Meeting, August 1, 2017
Page 3 of 5
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
PUBLIC HEARINGS
DISCLOSURE OF EX PARTE COMMUNICATIONS:
Prior to a project hearing Planning Commission Members must disclose any communications they have had on any quasi-judicial
agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, Variances, Conditional Use
Permits, and Planned Development Permits. This does not disqualify the Planning Commission Member from participating and
voting on the matter, but gives the public and applicant an opportunity to comment on the ex parte communication.
(For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public
hearing and invite the applicant or applicant’s representative to make any comments. Members of the public will be invited t o provide
testimony to the Commission following the applicant. Speakers should state their name for the record and can address the
Commission for three minutes. After all public comments have been received, the public hearing will be closed, and the Commission
will discuss the item and take appropriate action(s).)
4. PLN 2017-1642, MASTER PLAN OF DEVELOPMENT FOR 6410 SANTA LUCIA
ROAD, ST. WILLIAMS CHURCH
COMMISSIONER COMMENTS AND REPORTS
DIRECTOR’S REPORT
Property Owner: Roman Catholic Bishop of Monterey
Applicant: St. Williams Parish, 6410 Santa Lucia Road, Atascadero, CA 93422
Project Title: PLN 2017-1642 / DRC 2017-0100
Project Location: 6410 Santa Lucia Road, Atascadero, CA 93422
(San Luis Obispo County) APN 030-271-023
Project Description: The project is a Master Plan of Development for St. William’s Parish. The new facilities will be
constructed in two phases. Phase 1 is a new 6,400 square-foot youth center with additional
parking and exterior landscaping. Phase 2 is the removal of the existing hall and rectory
buildings, and construction of a new 14,000 square -foot assembly hall with second-story staff
offices, and a 1,000 square-foot storage building. 159 on-site parking spaces will be available
upon completion. Curb, gutter, and sidewalk improvements will be required in accordance with
AMC 9-4.159. The removal of three native trees is proposed, including two valley oaks with
diameters totaling 52 inches and one blue oak with a 44 -inch diameter. Existing street trees
on Santa Lucia Road may need to be removed and replaced to accommodate curb gutter and
sidewalk improvements.
General Plan Designation: High Density Residential (HDR)
Zoning District: High Density Multi-Family Residential (RMF-20)
Environmental
Determination:
The project qualifies for a class 32 categorical exemption (CEQA Guidelines § 15332) from
the California Environmental Quality Act (CEQA)
City Staff: Katie Banister, Assistant Planner, Email: kbanister@atascadero.org, Phone: 470 -3480
Staff
Recommendation:
Staff recommends the Planning Commission adopt Resolution PC 2017-A approving
Conditional Use Permit and Master Plan of Development 2017-0311 allowing a church and
related activities use, new youth center, parish hall and expanded parking area; and Tree
Removal Permit 2017-0216 allowing the removal of 3 native oak trees with diameters totaling
66 inches.
City of Atascadero Planning Commission Agenda Special Meeting, August 1, 2017
Page 4 of 5
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
ADJOURNMENT
The next regular meeting will be on August 15, 2017, at 6:00 p.m. at City Hall Council
Chambers, 6500 Palma Avenue, Atascadero.
Please note: Should anyone challenge in court any proposed development entitlement listed
on this Agenda, that person may be limited to raising those issues addressed at the public
hearing described in this notice or in written correspondence delivered to the Planning
Commission at, or prior to, this public hearing.
City of Atascadero Planning Commission Agenda Special Meeting, August 1, 2017
Page 5 of 5
WEBSITE: www.atascadero.org
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR Code
with your smartphone
to view Planning
Commission Website
City of Atascadero
WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING
The Planning Commission meets in regular session on the first and third Tuesday of each month at 7:00 p.m. at City
Hall, Council Chambers, 6500 Palma Avenue, Atascadero. Matters are considered by the Commission in the order of
the printed Agenda.
Copies of the staff reports or other documentation relating to each item of business referred to on the Agenda are on
file in the office of the Community Development Department and are available for public inspection during City Hall
business hours at the Front Counter of City Hall, 6500 Palma Avenue, Atascadero, and on our website,
www.atascadero.org. All documents submitted by the public during Commission meetings that are either read into
the record or referred to in their statement will be noted in the minutes and available for review in the Community
Development Department. Commission meetings are audio recorded, and may be reviewed by the public. Cop ies of
meeting recordings are available for a fee. Contact the City Clerk for more information (470-3400).
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in a City
meeting or other services offered b y this City, please contact the City Manager’s Office or the City Clerk’s Office,
both at (805) 470-3400. Notification at least 48 hours prior to the meeting or time when services are needed will
assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or
service.
TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA
Under Agenda item, “PUBLIC COMMENT”, the Chairperson will call for anyone from the audience having business
with the Commission to approach the lectern and be recognized.
1. Give your name for the record (not required)
2. State the nature of your business.
3. All comments are limited to 3 minutes.
4. All comments should be made to the Chairperson and Commission.
5. No person shall be permitted to make slanderous, profane or negative personal remarks concerning any
other individual, absent or present.
This is when items not on the Agenda may be brought to the Commission’s attention. A maximum of 30 minutes will
be allowed for Public Comment Portion (unless changed by the Commission).
TO SPEAK ON AGENDA ITEMS (from Title 2, Chapter 1 of the Atascadero Municipal Code)
Members of the audience may speak on any item on the agenda. The Chairperson will identify the subject, staff will
give their report, and the Commission will ask questions of staff. The Chairperson will announce when the public
comment period is open and will request anyone interested to address the Co mmission regarding the matter being
considered to step up to the lectern. If you wish to speak for, against or comment in any way:
1. You must approach the lectern and be recognized by the Chairperson.
2. Give your name (not required).
3. Make your statement.
4. All comments should be made to the Chairperson and Commission.
5. No person shall be permitted to make slanderous, profane or negative personal remarks concerning any
other individual, absent or present.
6. All comments limited to 3 minutes.
If you wish to use a computer presentation to support your comments, you must notify the C ommunity Development
Department at 470-3402 at least 24 hours prior to the meeting. Digital presentations brought to the meeting should
be on a USB drive or CD. You are required to submit to the Recording Secretary a printed copy of your presentation
for the record. Please check in with the Recording Secretary before the meeting begins to announce your presence
and turn in the printed copy.
The Chairperson will announce when the public comment period is closed, and thereafter, no further public
comments will be heard by the Commission.
PC Draft Minutes of 6/28/17
Page 1 of 9
CITY OF ATASCADERO
PLANNING COMMISSION
DRAFT MINUTES
Special Meeting – Wednesday, June 28, 2017 – 6:00 P.M.
City Hall Council Chambers
6500 Palma Avenue, Atascadero, California
CALL TO ORDER - 6:00 p.m.
Chairperson Anderson called the meeting to order at 6:00 p.m. and Commissioner
Donovan led the Pledge of Allegiance.
ROLL CALL
Present: Commissioners Dariz, Donovan, Vice Chairperson Seay, and
Chairperson Anderson
Absent: Commissioner Betz (excused absence)
Commissioner Wolff (excused absence)
Commissioner Zirk (excused absence)
Others Present: Recording Secretary, Annette Manier
Staff Present: City Manager, Rachelle Rickard
Community Development Director, Phil Dunsmore
Associate Planner, Alfredo Castillo
Senior Planner, Kelly Gleason
Mike Bertaccini, City Engineer
Nick DeBar, Public Works Director
APPROVAL OF AGENDA
MOTION: By Vice Chairperson Seay and seconded by
Commissioner Dariz to approve the Agenda.
Motion passed 4:0 by a roll-call vote.
PUBLIC COMMENT
None
Chairperson Anderson closed the Public Comment period.
ITEM NUMBER: 1
DATE: 8-1-17
1
PC Draft Minutes of 6/28/17
Page 2 of 9
CONSENT CALENDAR
1. APPROVAL OF DRAFT MINUTES OF PLANNING COMMISSION MEETING ON
JUNE 6, 2017
2. APPROVAL OF TIME EXTENSION FOR TENTATIVE PARCEL MAP 2009-0095,
(WALMART)
MOTION: By Commissioner Dariz and seconded by
Commissioner Donovan to approve the
consent calendar.
Motion passed 4:0 by a roll-call vote.
PLANNING COMMISSION BUSINESS
None
COMMUNITY DEVELOPMENT STAFF REPORTS
None
PUBLIC HEARINGS
DISCLOSURE OF EX PARTE COMMUNICATIONS:
Prior to a project hearing, Planning Commission Members must disclose any communications they have had on any quasi-
judicial agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, Variances, Conditional Use
Permits, and Planned Development Permits. This does not disqualify the Planning Commission Member from participating and
voting on the matter, but gives the public and applicant an opportunity to comment on the ex parte communication.
(For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public
hearing and invite the applicant or applicant’s representative to make any comments. Members of the public will be invited t o provide
testimony to the Commission following the applicant. Speakers should state their name for the record and can address the
Commission for three minutes. After all public comments have been received, the public hearing will be closed, and the Commission
will discuss the item and take appropriate action(s).)
PUBLIC HEARINGS
DISCLOSURE OF EX PARTE COMMUNICATIONS:
Prior to a project hearing Planning Commission Members must disclose any communications they have had on any quasi-judicial
agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, Variances, Conditional Use
Permits, and Planned Development Permits. This does not disqualify the Planning Commission Member from participating and
voting on the matter, but gives the public and applicant an opportunity to comment on the ex parte communication.
(For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public
hearing and invite the applicant or applicant’s representative to make any comments. Members of the public will be inv ited to provide
testimony to the Commission following the applicant. Speakers should state their name for the record and can address the
Commission for three minutes. After all public comments have been received, the public hearing will be closed, and th e Commission
will discuss the item and take appropriate action(s).)
3. PLN 2015-1556, MULTI-FAMILY DEVELOPMENT AT 10850 EL CAMINO REAL
Property
Owner/Applicant:
Chris Seaberg, Hartberg Properties, LLC, 2165 Wilton Dr., Cambria, CA 93428
Project Title: PLN 2015-1556 – Hartberg Planned Development
2
PC Draft Minutes of 6/28/17
Page 3 of 9
Associate Planner Alfredo Castillo gave a presentation on the project.
EX PARTE COMMUNICATIONS
Commissioner Dariz and Chairperson Anderson heard this project at the Design Review
Committee (DRC).
Associate Planner Castillo and Public Works Director DeBar answered questions from
the Commission.
PUBLIC COMMENT
The following members of the public spoke during public comment: Bill Isaman and
Nancy Marsh. Applicant Isaman stated he is satisfied with the conditions requested by
the City.
Chairperson Anderson closed the Public Comment period.
Public Works Director DeBar and City Engine er Bertaccini addressed concerns
regarding traffic and driveway conflicts. Applicant Isaman addressed questions
regarding fencing between the development and the adjacent residential neighborhood.
Project Location: 10850 El Camino Real, Atascadero, CA 93422
(San Luis Obispo County) APN 045-351-008
Project
Description:
The project consists of an application for a 75 unit Multi- Family Development.
The project area is approximately 3.79 acres with a slope of 6% in a western
direction away from El Camino Real. Currently, the grassland site is partially
developed with older, clustered structures to be demolished. All existing
structures were deemed not historically significant. All utilities are currently
available to the existing residence. The applicant is proposing the following
as a part of the proposed project:
75 total units including a mix of the following:
3 stories is designated to the senior apartments at the rear of the site;
20 townhomes at 2 stories;
7 single-family residential cottages 2 stories each;
A total of 126 parking spaces;
On-site recreational amenities including BBQ areas and landscaped greens;
Landscaping plan including use of drought tolerant native plants
Removal of 28 on-site trees, 2 native Coast Live Oak and 26 non-native species
to allow for proposed improvements including buildings, parking lots, and road
improvements.
General Plan Designation: High Density Residential (HDR)
Zoning District: Residential Multi-Family (RMF-20)
Proposed
Environmental
Determination:
The City of Atascadero prepared an Initial Study to determine if the pr oposed
project would have a significant adverse effect on the environment. The
Mitigated Negative Declaration (MND) is available for review from 5/25/17 to
6/13/17 and is available at www.atascadero.org and at City Hall.
City Staff: Alfredo Castillo, Assoc. Planner, acastillo@atascadero.org, Phone: 470-3436
Staff
Recommendation:
Staff recommends that the Planning Commission approve the project with
conditions.
3
PC Draft Minutes of 6/28/17
Page 4 of 9
MOTION: By Commissioner Dariz and seconded by
Commissioner Donovan to adopt PC
Resolution 2017-A to certify Mitigated
Negative Declaration MND Number 2017-
0009 for PLN 2015-1556 at 10850 El Camino
Real, based on findings and subject to
conditions.
Motion passed 4:0 by a roll-call vote.
MOTION: By Commissioner Dariz and seconded by
Commissioner Donovan to adopt PC
Resolution 2017-B to approve the
establishment of a Planned Development
Overlay No. 34 Zoning Code Text
Amendment and Zone Map Amendment,
and recommending that the City Council
adopt an Ordinance establishing a Planned
Development Overlay for PLN 2015-1556 at
10850 El Camino Real, based on findings
and subject to conditions.
Motion passed 4:0 by a roll-call vote.
MOTION: By Commissioner Dariz and seconded by
Commissioner Donovan to adopt PC
Resolution 2017-C recommending that the
City Council approve a Master Plan of
Development and Tree Removal Permit for
PLN 2015-1556 at 10850 El Camino Real,
based on findings and subject to
conditions.
Motion passed 4:0 by a roll-call vote.
MOTION: By Commissioner Dariz and seconded by
Commissioner Donovan to adopt PC
Resolution 2017-E recommending that the
City Council approve a Vesting Tentative
Subdivision Map for PLN 2015-1556 at
10850 El Camino Real, based on findings
and subject to conditions.
Motion passed 4:0 by a roll-call vote.
4
PC Draft Minutes of 6/28/17
Page 5 of 9
4. PLN 2017-1632, CONDITIONAL USE PERMIT OF MULTIPLE ACCESSORY
STRUCTURES (GREENHOUSES)
Senior Planner Gleason gave a presentation on the project.
EX PARTE COMMUNICATIONS
Commissioner Dariz and Chairperson Anderson heard this project at the DRC.
Senior Planner Gleason and Community Development Director Dunsmore answered
questions from the Commission. Community Development Director Dunsmore stated
that 2 letters were received in regards to the deer fencing (Exhibit A) and (Exhibit B).
Commissioner Dariz suggested that the Commission define deer fencing as large wire
mesh, and specifically not chain link fencing.
PUBLIC COMMENT
The following members of the public spoke during public comment: Greg Baker, who
gave a presentation on his project.
Chairperson Anderson closed the Public Comment period.
MOTION: By Commissioner Donovan and seconded
by Commissioner Dariz to adopt PC
Resolution 2017-A for PLN 2017-1632 to
approve five (5) accessory structures and a
fencing height exception at 9082 Palomar,
with added conditions that the fencing be
deer wire mesh fencing, and any lighting
Property Owner: Gregory Baker, 9082 Palomar Ave., Atascadero, CA 93422
Project Title: PLN 2017-1632 / DRC 2017-0101 / CUP 2017-0308
Project Location: 9082 Palomar Ave., Atascadero, CA 93422 (San Luis Obispo County)
APN 030-111-029
Project Description: The applicant proposes to permit 5 existing greenhouse structures for small
scale agricultural production of vegetables. Four of the greenhouses are 700
sf and one is 360 sf. The applicant also proposed the installation of a new
deer fence along the property frontage to allow for expanded gardening within
this area.
General Plan Designation: SFR-Y
Zoning District: RSF-Y
Proposed
Environmental
Determination:
The project qualifies for a Class 3 categorical exemption (construction of small
structures).
City Staff: Kelly Gleason, Senior Planner, kgleason@atascadero.org, Phone: 470-3446
Staff Recommendation: Planning Commission adopt the proposed resolution for approval of the project.
5
PC Draft Minutes of 6/28/17
Page 6 of 9
must be low-wattage safety lighting (so the
applicant can go out to his greenhouses at
night), but lighting is not for the purpose of
keeping the greenhouses lit at night, and
lighting is not for growing purposes.
Motion passed 4:0 by a roll-call vote.
5. PLN 2017-1626 / PLN 2007-1246, DEL RIO ROAD COMMERCIAL AREA SPECIFIC
PLAN – ANNEX HOTEL
Associate Planner Castillo gave a presentation on the project.
EX PARTE COMMUNICATIONS
Commissioner Dariz and Chairperson Anderson heard this project at the DRC.
Associate Planner Castillo, Community Development Director Dunsmore, and City
Manager Rickard answered questions from the Commission.
PUBLIC COMMENT
The following members of the public spoke during public comment: Patti Whelen, Thom
Jess, Loren Douglas, and Richard McVicker.
Loren Douglas asked the Commission to add a condition taking into consideration the
Clean Water and Ground W ater Act and propose a “grasscrete” which will allow water to
charge the groundwater system.
Chairperson Anderson closed the Public Comment period.
Property Owner: MP Annex, LLC, 284 Higuera St., San Luis Obispo, CA 93401
Project Title: PLN 2017-1626 / PLN 2007-1246
Project Location: 1800 and 1860 El Camino Real., Atascadero, CA 93422 (San Luis Obispo
County) APN 049-131-070 / 048
Project Description: The project consists of a Conditional Use Permit and Master Plan of
Development Amendment to accommodate a new 120-room hotel. The
proposed project would amend the MPD to allow a new hotel within the Del
Rio Road Commercial Area Specific Plan (DRCASP) and a CUP for a parking
lot as a primary use on a legal parcel.
General Plan Designation: General Commercial (GC)
Zoning District: Commercial Retail (CR) / Commercial Park (CPK) / SP-2
Proposed
Environmental
Determination:
The City of Atascadero certified a Final EIR SCH #20100051034 and has
prepared an addendum to this Final EIR consistent with CEQA guidelines per
Section 15164 and Section 21083 of the California Public Resources Code.
City Staff: Alfredo Castillo, Assoc. Planner, acastillo@atascadero.org, Phone: 470-3436
Staff
Recommendation:
Staff recommendation is to approve the project with conditions.
6
PC Draft Minutes of 6/28/17
Page 7 of 9
Public Works Director DeBar addressed questions raised during public comment about
stormwater requirements. Associate Planner Castillo addressed questions raised
during public comment which address lighting.
MOTION: By Vice Chairperson Seay and seconded by
Commissioner Dariz to approve PC
Resolution 2017-A recommending the City
Council approve PLN 2017-1626, an
Addendum to the previously certified EIR
for the Del Rio Road Commercial Area
Specific Plan and determine that said
addendum, together with the previously-
certified addendum, together with the
previously certified EIR serves as the
appropriate environmental document for
the proposed Master Plan of Development
Amendments, based on findings and
subject to conditions.
Motion passed 4:0 by a roll-call vote.
MOTION: By Vice Chairperson Seay and seconded by
Commissioner Dariz to approve PC
Resolution 2017-B recommending the City
Council approve PLN 2017-1626, a Master
Plan of Development Amendment, based on
findings and subject to conditions.
Motion passed 4:0 by a roll-call vote.
MOTION: By Vice Chairperson Seay and seconded by
Commissioner Dariz to approve PC
Resolution 2017-C recommending the City
Council approve PLN 2017-1626, a
Conditional Use Permit, based on findings
and subject to conditions.
Motion passed 4:0 by a roll-call vote.
Chairperson Anderson adjourned for a break at 8:05 p.m.
Chairperson Anderson readjourned the meeting at 8:13 p.m.
7
PC Draft Minutes of 6/28/17
Page 8 of 9
6. PLN 2017-1638, SITE DEVELOPMENT FOR 6990 EL CAMINO REAL
(BOGMAR)
Senior Planner Gleason gave a presentation on the project.
EX PARTE COMMUNICATIONS
Commissioner Dariz and Chairperson Anderson heard this project at the DRC.
Senior Planner Gleason, Community Development Director Dunsmore, and Public
Works Director DeBar answered questions from the Commission.
Senior Planner Gleason stated that 2 letters were received in regards to this project;
one from Caltrans (Exhibit C) and one from Air Pollution Control District (APCD) (Exhibit
D). Staff is recommending that we take tree removal findings (remove 4 trees) and
revised APCD’s recommendations and incorporate them into the Resolution, however,
staff is not in agreement with the Caltrans letter recommending that the driveway be
closed. Public Works Director DeBar also recommends keeping the driveway open, as
it is critical to make the site work.
PUBLIC COMMENT
The following members of the public spoke during public comment: Sam Bogdanovich,
who gave a presentation on the project.
Chairperson Anderson closed the Public Comment period.
Property Owner: Donna Halliday, 5740 Olmeda Ave., Atascadero, CA 93422
Applicant: BogMar Properties LLC, 680 W. Shaw Ave. Ste. 202, Fresno, CA 93704
Project Title: PLN 2017-1638 / VAR 2017-0097 / DRC 2017-0097
Project Location: 6990 El Camino Real, Atascadero, CA 93422
(San Luis Obispo County) APN 030-211-036
Project
Description:
Site development of an approx. 3,500 sf retail/restaurant building and
associated site improvements on a vacant lot downtown at the corner of El
Camino Real and Morro Road. The site was formerly developed with a fuel
station. The request includes a Variance to the required zero-foot setback
from the street frontage in the downtown zone.
General Plan Designation: Downtown (D)
Zoning District: Downtown Commercial (DC)
Proposed
Environmental
Determination:
The City prepared an Initial Study. The Notice of Intent to adopt Mitigated
Negative Declaration is available for review from 5/25/17 to 6/20/17 and is
available at www.atascadero.org/Environmental Docs and at City Hall.
City Staff: Kelly Gleason, Senior Planner, kgleason@atascadero.org, Phone: 470-3446
Staff
Recommendation:
Staff recommendation is to approve the project with conditions.
8
PC Draft Minutes of 6/28/17
Page 9 of 9
MOTION: By Vice Chairperson Seay and seconded by
Commissioner Dariz to adopt PC
Resolution 2017-A to approve PLN 2017-
1638, a setback variance at Morro Road and
El Camino Real, with the included
mitigations as specified in Exhibit C from
APCD, and added conditions that the
applicant and City work together to create
an easement, applicant to add a planter,
and electricity to accommodate a future
sign, and include the findings for tree
removal.
Motion passed 4:0 by a roll-call vote.
7. AMENDMENT TO CONDITIONAL USE PERMIT 2005-0159 FOR 8005
GABARDA ROAD (This item has been withdrawn).
COMMISSIONER COMMENTS AND REPORTS
None
DIRECTOR’S REPORT
Community Development Director stated that the next meeting scheduled for July 18th
may be cancelled. Community Development Director gave an update on the La Plaza
project, Eagle Ranch, and Proposition 64.
ADJOURNMENT – 8:52 p.m.
The next Special Regular meeting of the Planning Commission is scheduled for July
18, 2017, at 6:00 p.m. at City Hall, Council Chambers, 6500 Palma Avenue,
Atascadero.
MINUTES PREPARED BY:
____________________________
Annette Manier, Recording Secretary
Administrative Assistant
The followings Exhibits are available in the Community Development Department:
Exhibit A – Letter from Rod Black
Exhibit B – Letter from Atascadero Resident
Exhibit C – Letter from APCD
Exhibit D – Letter from Caltrans (Dept. of Transportation)
9
10
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
ADDITIONAL INFORMATION MAY BE OBTAINED BY CONTACTING THE ATASCADERO
COMMUNITY DEVELOPMENT DEPARTMENT AT
http://www.atascadero.org
6500 PALMA AVENUE | ATASCADERO, CA 93422 | (805) 461-5000 | (805) 461-7612
Atascadero Planning Commission
Staff Report – Community Development Department
PLN 2007-1246
Vesting Tentative Parcel Map Time Extension
RECOMMENDATION(S):
Staff recommends Planning Commission adopt Resolution PC 2017-A, approving a
one-year time extension of Vesting Tentative Parcel Map 2011-0098 (AT 07-0059) and
CUP 2009-0237 in compliance with Sections 11-4.23(a) and 11-4.33(b) of the
Subdivision Ordinance (Title 11).
Project Info In-Brief:
PROJECT
ADDRESS: 1905 El Camino Real Atascadero, CA APN
049-102-
020,031,032,045,
048,056,049-131-
070
PROJECT
PLANNER
Alfredo R. Castillo, AICP
Associate Planner 470-3436 acastillo@atascadero.org
APPLICANT MP Annex, LLC, 284 Higuera Street, San Luis Obispo, CA 93401
PROPERTY
OWNER MP Annex, LLC, 284 Higuera Street, San Luis Obispo, CA 93401
GENERAL PLAN
DESIGNATION:
ZONING
DISTRICT:
SITE
AREA EXISTING USE PROPOSED USE
General
Commercial (GC)
Commercial
Retail (CR) /
SP-2
11.3
acres
Vacant / Colony
House General Retail
ENVIRONMENTAL DETERMINATION
☒ Environmental Impact Report SCH: 2010051034
☐ Negative / Mitigated Negative Declaration No. ___________
☐ Categorical Exemption CEQA – Guidelines Section 153____
☐ Statutory Exemption §§ 21000, et seq & ________________________
☐ No Project – Ministerial Project
11
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
DISCUSSION:
Existing Surrounding Uses / Parcel Configurations:
Existing Zoning Existing Aerial / Surrounding
North: South: East: West:
Commercial Retail
(CR) / SP-2
Residential Multi-
Family (RMF-20) /
Residential
Suburban (RS)
Residential Suburban
(RS)
Commercial Park
(CPK) / Planned
Development Overlay
Background:
The Del Rio Road Commercial Area Specific Plan was adopted on July 12, 2012. It
included two components; a Walmart component and an “Annex” component. On the
Annex portion of the site, the approval included a Vesting Tentative Parcel map that
resulted in a 8-lot subdivision for the northwest/northeast corner of Del Rio Road and El
Camino Real. The 8-lot map accommodates seven proposed retail pads, a hotel (Annex
Hotel) and one remainder parcel (6-lot subdivision).
MP Annex LLC, has been actively working with City Staff to begin partial construction of
portions of the Annex. Recently, the City Council approved an amendment to the Master
Plan of Development allowing for a hotel use on Parcel 8. Additionally, the applicant has
submitted plans for the remainder 6-lot subdivision.
Analysis:
The tentative map expires on July 12, 2017; however, with an application submitted for
a time extension, the Subdivision Map Act automatically extends the map for an
additional 60 days while the City considers the extension request . This request would
extend the map until July 12, 2018. The Subdivision Map Act mandates an initial two -
12
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
year life and, by local ordinance, the City can extend initial life up to an additional 12
months. Additionally, the City may extend the time at which the map expires for a period
or periods not to exceed a total of five years (these are discretionary extensions). The
application for the extension must be filed prior to the expiration date. The Planning
Commission has discretion on whether they want to extend the map, or they can defer
the decision to the City Council. The Commission or City Council may also decide
whether project conditions should be added, modified, or deleted.
On July 11, 2013, the California State Senate approved Senate Bill 116. The bill states
that if a map has not expired as of the dat e of SB 116 (July 11, 2013) the map is
automatically extended another 24 months. This extension is automatic because it is
phrased in mandatory terms without reference to an application; whereas, the other
extensions require an application and City review and approval. This automatic
extension granted by SB 116 did not require any action by the City and extended
Vesting Tentative Parcel Map AT 07-0059 until July 12, 2016. Prior to July 12, 2016, MP
Annex, LLC had filed an extension that was approved by the Community Development
Director, thereby extending the map until July 12, 2017. Only an initial extension may be
approved by the Director, while subsequent extensions require Planning Commission
review.
Based on the limitations of the Subdivision Map Act, the map may be eligible for future
extensions as this is the second discretionary extension and up to five may be allowed.
Conclusion:
Staff is continuing to work with the applicant team on phase 1 of the Annex, which is the
Annex Hotel to be operated by Hilton Home 2 Suites brand. The applicant wishes to
further develop the northeast corner of the Specific Plan with retail or restaurant pads
however additional development may be contingent upon completion of road
improvements at the Del Rio interchange. No factors have changed to warrant
reconsideration of project conditions or entitlements. Staff recommends the Planning
Commission approve the Time Extension as requested.
ENVIRONMENTAL DETERMINATION:
This project is a necessarily included element of the projects considered in Final EIR
SCH #2010051034, certified by the City Council on June 26, 2012, which adequately
addressed the effects of the proposed project. No substantial changes have been made
in the project, no substantial changes in the circu mstances under which the project is
being undertaken and no new information of substantial importance to the project which
was not known or could not have been known when the Final EIR No. 2010051034 was
certified has become known. Therefore, no further environmental review is required.
13
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
FINDINGS:
A Vesting Tentative Tract Map was approved as part of the project consistent with the
Del Rio Road Commercial Area Specific Plan. The Vesting Tentative Parcel Map was
conditioned to meet all City standards including on-site and off-site street
improvements.
Time Extension Findings
The following are required findings that must be made by the Planning Commission to
extend VTPM 2011-0098 (AT 07-0059), consistent with section 9-2.117 of the
Atascadero Municipal Code.
1. There have been no changes to the provisions of the General Plan or zoning
regulations applicable to the project since the approval of the entitlement (AMC
9-2.117(a)(1));
2. There have been no changes in the character of the site or its surroundings
which affect how the standards of the General Plan or zoning regulations apply to
the project (AMC 9-2.117(a)(2)).
Map History:
Approval Expiration
Original Approval 7/12/2012 7/12/2014
Automatic Extension (SB 116) 7/14/2014 7/12/2016
Director Extension 6/24/2016 7/12/2017
Proposed Extension 7/12/2018
ALTERNATIVES:
1. The Commission may approve the Time Extension subject to additional or
revised project conditions.
2. The Commission may deny the Time Extension if it is found to be inconsistent
with the General Plan or any of the other required findings. The Commission’s
motion to deny must include a finding basis for denial.
3. The Commission may continue the hearing and refer the item back to staff for
additional information or analysis. Direction should be given to staff and the
applicant on required information.
14
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENTS:
1. AT 2007-0059
2. Conditions of Approval TPM 2011-0098
3. Draft Resolution 2017-A
15
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 1: AT 2007-0059
PLN 2007-1246
16
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 2: Conditions of Approval – VTPM 2007-0059
PLN 2007-1246
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Planning Services
1. This Vesting Tentative Map (TPM 2009-0098) is for the
reconfiguration of legal lots of record into eight (8) legal lots of
record described on the attached exhibits and shall apply to the
APNs 049-102-020, 031, 032, 045, 048, 056 and 049-131-070
regardless of owner.
FM PS
The approval of this vesting tentative parcel map shall become final and
effective for the purposes of issuing building permits fourteen (14)
days following City Council approval of TPM 2009-0098 unless
prior to that time, an appeal to the decision is filed as set forth in
Section 9-1.111(b) of the Zoning Ordinance.
On-Going PS
2. Approval of this Vesting Tentative Map shall be valid for twenty-four
(24) months after its effective date. At the end of the period, the
approval shall expire and become null and void unless t he project
has received a building permit or a time extension has been
granted.
FM
PS
3. A final parcel map drawn in substantial conformance with the
approved vesting tentative map, and in compliance with all
conditions set forth herein, shall be submitted for review and
approval in accordance with the Subdivision Map Act and the City’s
Subdivision Ordinance.
FM PS
4. The subdivider shall defend, indemnify, and hold harmless the City
of Atascadero or its agents, officers, and employees against any
claim or action brought to challenge an approval by the city, or any
of its entities, concerning the subdivision.
FM PS
5. The parcel map shall be subject to additional fees for park or
recreation purposes (QUIMBY Act) as required by City Ordinance.
FM
PS
6. All maintenance costs listed below shall be 100% funded by the
project in perpetuity, except for public facilities that are planned for
an currently maintained by the City of Atascadero. The service and
maintenance cost shall be funded through an entity or mechanism
established by the developer, subject to City Staff approval. This
entity or mechanism must be in place prior to, or concurrently with
acceptance of any final map(s). The entity or mechanism shall be
approved by the City Attorney, City Engineer and Administrative
Services Director prior to acceptance of any Final Map(s). The
administration of the above mentioned funds, and the coordination
and performance of maintenance activities, shall be the
responsibility of the entity or mechanism.
a) All streets, bridges, sidewalks, streetlights, street signs, roads,
emergency access roads, emergency access gates, traffic
control signals, pavement markings and sewer mains within
the proposed project including residential streets within any
residential subdivision, as shown in Exhibit B. Exception: new
BP PS
17
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
collector street located south of Walmart store within the
Specific Plan area will be maintained by the City of
Atascadero.
b) All landscaping and lighting within the proposed project area
as shown in Exhibit B.
c) All creeks, flood plains, floodways, wetlands, and riparian
habitat areas that may be within the boundaries shown in
Exhibit B.
d) Property line walls, fences, retaining walls, solid waste storage
areas, signs, slopes, and parking lots within the boundaries
shown in Exhibit b.
e) Open areas on private property within the proposed project
area including detention facilities, bio-swales, and other low-
impact-development features as shown in Exhibit B.
f) Newly constructed drainage facilities on private property within
the proposed project area as shown in Exhibit B.
g) Landscaped frontages and medians within the right-of-way of
all public streets within the defined specific plan boundary.
h) On-site sewer and storm drains located outside of the right-of-
way.
7. Prior to final map, the applicant shall submit CC&Rs for review and
approval by the Community Development Department. The
CC&R’s shall record with the Final Map and shall include the
following:
a) Provisions for maintenance of all common areas including
parking lot, landscape areas, free standing signs, lighting and
solid waste storage.
b) Provisions for the shared use of parking areas, drive aisles,
walkways and solid waste storage.
c) Maintenance of on-site sewer and storm drainage systems.
d) Ensuring compliance with the Specific Plan Master Plan of
Development.
e) Standards for the design, maintenance and appearance of
buildings, signs, common areas and parking lots.
f) A provision for review and approval by the City Community
Development Department for any changes to the CC&R’s that
relate to the above requirements prior to the changes being
recorded or taking effect.
BP PS
8. All subsequent Tentative Maps and improvements shall be
consistent with the Del Rio Road Commercial Area Specific Plan
Master Plan of Development.
FM PS, CE
18
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
9. Concurrently with recordation of Final Map, the applicant shall
report all necessary reciprocal easements for parking, vehicular
access, solid waste storage, pedestrian access among all lots
within the project boundary.
Reciprocal access easements shall be provided to all contiguous
off-site commercial parcels consistent with the Del Rio Road
Commercial Area Specific Plan.
FM PS, CE
Fire Department
10. Prior to occupancy of the first building, the applicant shall paint
curbs red with white lettering every 50 feet stating “No Parking–
Fire Lane” along all driveways with a curb -to-curb width of less
than 34-feet. This shall be shown on all applicable plans prior to
issuance of first building permit
FM FD
11. Prior to issuance of the first building permit, the applicant shall
obtain approval from the City Fire Department for any private
driveway sections
FM FD
City Engineer / Public Works
Specific Project Conditions
PUBLIC IMPROVEMENTS
12. All public improvements shall be installed prior to recordation of a
Final Map to insure orderly development of the surrounding area
consistent with section 66411.1(b)(2) of the Subdivision Map Act.
In the event that the applicant bonds for the public improvements
required as a condition of the Final Parcel Map, the applicant shall
enter into a Subdivision Improvement Agreement with the City
Council prior to recordation of the Final Map. (Map Act
66462.5(a)(1))
GP, BP, FM CE
13. An engineer’s estimate of probable cost shall be submitted for
review and approval by the City Engineer to determine the amount
of the bond. The engineer’s estimate of probable cost shall use the
County of San Luis Obispo Standard Costs for Public Works
Engineering or other estimate acceptable to the City Engineer.
GP, BP, FM CE
14. Prior to recordation of the Final Parcel Map, the applicant shall
enter into an agreement to complete the off-site improvements
required as a condition of the Final Map and the Subdivision
Improvement Agreement, at such time the City acquires a title
interest in the land that will permit the improvements to be made.
(Map Act 66462.5(c))
FM CE
15. The Subdivision Improvement Agreement shall record concurrently
with the Final Map
FM CE
PARCEL MAPS
16. Prior to recording the Final Parcel Map, the applicant shall file a
Final map drawn in substantial conformance with the approved
Vesting Tentative Parcel Map, all applicable Mitigation Measures
FM CE
19
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
requirements and in compliance with all conditions set forth
herein. The map shall be submitted for review and approval by the
City in accordance with the Subdivision Map Act and the City's
Subdivision Ordinance.
17. The applicant shall secure, at the applicant's expense,
sufficient title, or interest in land to permit construction of any off-
site improvements that the applicant is required to construct.
a. If the applicant is unable to acquire sufficient title or interest to
permit construction of the required off-site improvements, the
applicant shall notify the City of this inability not less than six
months prior to approval of the Parcel Map. In such case, the
City may thereafter acquire sufficient interest in the land,
which will permit construction of the off-site improvements by
the applicant.
b. The applicant shall pay all of the City's costs of acquiring said
off-site property interests pursuant to Government Code
Section 66462.5 et. seq. Applicant shall pay such costs
irrespective of whether the Parcel Map is recorded or whether
a reversion occurs. The cost of acquisition may include, but is
not limited to, acquisition prices, damages, engineering
services, expert fees, title examination, appraisal costs,
acquisition services, relocation assistance services and
payments, legal services and fees, mapping services,
document preparation, expenses, and/or damages as
provided under Code of Civil Procedures Sections 1268.510-
.620 and overhead.
c. The applicant agrees that the City will have satisfied the 120-
day limitation of Government Code Section 66462.5 and the
foregoing conditions relating thereto when it files its eminent
domain action in superior court within said time.
d. At the time the applicant notifies the City as provided in “B”
hereinabove, the applicant shall simultaneously submit to the
City in a form acceptable to the City all appropriate
appraisals, engineering specifications, legal land descriptions,
plans, pleadings, and other documents deemed necessary by
the City to commence its acquisition proceedings. Said
documents must be submitted to the City for preliminary
review and comment at least 30 days prior to the applicant's
notice described hereinabove at “B”.
e. The applicant agrees to deposit with the City, within five days
of request by the City, such sums of money as the City
estimates to be required for the costs of acquisition. The City
may require additional deposits as needed.
f. The applicant shall execute any agreements mutually
agreeable prior to approval of the Parcel Map as may be
FM CE
20
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
necessary to assure compliance with the foregoing
conditions.
Failure by the applicant to notify the City as required by “b” hereinabove, or
simultaneously submit the required and approved documents specified in
“e” hereinabove, or make the deposits specified in “f” hereinabove, shall
constitute applicant's waiver of the requirements otherwise imposed upon
the City to acquire necessary interests in land pursuant to Section
66462.5. In such event, subdivider shall meet all conditions for installing or
constructing off-site improvements notwithstanding Section 66462.5.
18. Concurrent with Final Parcel Map approval, the applicant shall
record a reciprocal access easement and maintenance agreement
for all shared driveways and drive isles within the project site as well
as adjacent commercial lots, as required by the City Engineer and/or
the Del Rio Road Commercial Area Specific Plan.
FM CE
19. A preliminary subdivision guarantee shall be submitted for review
in conjunction with the processing of the Vesting Tentative Parcel
Map. A final subdivision guarantee is required prior to Final
Parcel Map approval.
FM CE
20. The Final Parcel Map shall be acceptable to the City Engineer or
Surveyor prior to the map being placed on the agenda for City
Council acceptance.
FM CE
21. Prior to recording the Final Parcel map, the applicant shal l pay all
outstanding plan check or inspection fees.
FM CE
22. Prior to recording the parcel map, the applicant shall submit a
copy of a valid San Luis Obispo County tax bond
FM CE
23. Prior to City Surveyor or Engineer approval of the Final Parcel
Map, the applicant shall dedicate all necessary right-of-ways,
storm drain easements, sewer easements, or other public utility
easements by the map or separate documents.
FM CE
24. Prior to recording the Final Parcel map, the applicant shall bond
for or set monuments at all new property corners. A registered
civil engineer or licensed land surveyor shall indicate by certificate
on the parcel map, that corners have been set or shall be set by a
date specific and that they will be sufficient to enable the survey to
be retraced. If the property corners are not set prior to map
recordation, the applicant shall bond the property corner
installation.
FM CE
25. All existing and proposed utility, pipeline, open space, or other
easements are to be shown on the Final Parcel map. If there are
building or other restrictions related to the easements, they shall
be noted on the Final Parcel map. The applicant shall show all
access restrictions on the Final Parcel map.
FM CE
26. Prior to approval of the Final Parcel map by the City Council, the
applicant shall have the map reviewed by all applicable public and
private utility companies (cable, telephone, gas, electric,
Atascadero Mutual Water Company). The applicant shall obtain a
letter from each utility company indicating their review of the map.
The letter shall identify any new easements that may be required
FM CE
21
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
by the utility company. A copy of the letter(s) shall be submitted
to the City. New easements shall be shown on the Final Parcel
map.
27. Prior to Final Parcel Map approval by the City Council, the
applicant shall remove existing structures from each lot.
FM CE
28. Prior to Final Parcel Map approval applicant shall quitclaim or
relocate any easement in conflict with proposed structures or
other obstruction(s), as required by the City Engineer.
FM CE
29. A Lighting and Landscape District funding mechanism to provide
for the maintenance for lighting, medians, special paving surfaces,
storm drain, and hardscape shall be provided and accepted by the
City Engineer prior to Final Parcel Map recordation..
FM CE
OFFSITE IMPROVEMENT PLANS
30. Prior to the issuance of an encroachment permit(s) for
construction of any offsite improvements, the applicant(s) shall
submit plans and supporting calculations/reports including street
improvements, underground utilities, composite utilities, traffic
control and grading/drainage plans prepared by a registered civil
engineer for review and approval by the City Engineer. The
Submitted plans shall be in conformance with the requirements of
the Vesting Tentative Map, City Standard Specifications and
Drawings and Specific Plan.
GP, BP CE
31. Prior to the issuance of any onsite improvement Building Permit,
the on-site public improvements shall be designed in accordance
with the Vesting Tentative Parcel Map, Specific Plan, City
Engineering Specifications and Drawings or as required by the
City Engineer.
GP, BP CE
32. All offsite and onsite public improvements shall be constructed in
conformance with the City of Atascadero Engineering Department
Standard Specifications and Drawings or as required by the City
Engineer
GP, BP CE
33. The project shall include construction of all vehicular lanes, curbs,
gutters and sidewalks along entire frontage as shown on the
Master Plan of Development, Specific Plan, or Vesting Tentative
Parcel map.
GP, BP CE
34. Prior to issuance of encroachment permits for public
improvements (Street, Sewer, Storm Drain, Water), the applicant,
by written agreement with the City Engineer, shall guarantee
installation of the improvements through faithful performance
bonds, letters of credit or any other acceptable means. Building
final shall be withheld if the improvements are not completed. The
faithful performance bonds/letters of credit/or other financial
means shall include an inflation factor that is satisfactory to the
City Engineer.
EP CE
35. El Camino Real shall be shown on the Final Parcel Map as an
arterial street with a minimum right of way half width of 50 -feet,
per City Standard Drawing No. 407. The applicants shall acquire
and dedicate to the City the right-of-way required for all street
improvements as identified in the Final Environmental Impact
FM CE
22
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Report Traffic Study, the Vesting Tentative Map, and Specific
Plan. The Applicant shall provide sufficient right of way to convert
the intersection at Del Rio Road/El Camino Real to a modern
roundabout. The roundabout will require an inscribed diameter of
approximately 160 feet and will include a combination of single
and dual circulating lanes. Single-lane approaches are required
for the southbound and westbound entrances. The northbound
approach shall include a dual-lane entry with a left-only lane and a
shared through/right-turn lane. The eastbound approach shall
include a shared through/left-turn lane and a 125-foot long right-
turn lane. Travel lanes shall be a minimum of twelve foot wide.
The roundabout shall include facilities for pedestrians and
bicyclists.
The applicants shall design the roundabout in conformance with
the conceptual plan is shown in Figure 3 of the Del Rio Road Area
Specific Plan Transportation Impact Analysis for the City of
Atascadero February 6, 2012. The Applicant is responsible for all
frontage improvement costs..
36. Del Rio Road shall be shown on the Final Parcel Map as a
collector street with a minimum width of 60-feet, per City Standard
Drawing No. 406. Del Rio Road shall be designed to include a
center turn lane into the Walmart and Annex sites as well as
Obispo Road.
FM CE
37. The Annex frontage improvement plans shall include a left turn
pocket for the driveway across from the Walmart Project
38. The applicant(s) shall improve the intersection of Del Rio Road
and Rio Rita Road to meet site distance, horizontal and vertical
alignment standards of the City Engineering Standards. The
proposed improvements shall be acceptable to the City Engineer.
BP, GP CE
39. Prior to Final Parcel Map approval, the applicant(s) shall dedicate
sidewalk easements sufficient to encompass accessibility
requirements for sidewalks installed with drive approaches in
accordance with the current City standard.
FM CE
40. Applicant(s) shall submit a composite utility plan, signed by
PG&E, AT&T, Charter Cable TV and Southern California Gas
Company indicating location of all underground utilities that will
serve the project. New or relocated undergrounded facilities will
be installed in an up to 10 foot wide PUE. Plan shall be reviewed
and approved by the City Engineer prior to approval of public
improvement plans.
GP, BP CE
41. Prior to building final, all new and existing power lines and
overhead cables less than 34 KV within or fronting the project site
shall be installed underground.
GP, BP CE
42. Prior to street improvement plan approval by the City Engineer,
the applicant shall submit a street tree location plan to the
Community Development Department for review and approval.
The location of the street trees shall not conflict with sewer or
storm drain infrastructure. The plan shall include proposed sewer
lateral locations and storm drain infrastructure for reference.
GP, BP PS, CE
23
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
43. Prior to the Final Parcel Map being filed with the County Recorder,
the applicant shall not grant or record easements within areas
proposed to be granted, dedicated, or offered for dedication for
public streets or highways, access rights, building restriction
rights, or other easements; unless subordinated to the proposed
grant or dedication. If easements are granted after the date of
tentative map approval, subordination must be executed by the
easement holder, to the satisfaction of the City Engineer, prior to
the filing of the Parcel Map.
FM CE
44. Prior to building final, the applicant(s) shall construct onsite and
offsite street pavement in accordance with one of the following
two options
a. The applicant shall construct the full pavement section
including the final lift of asphalt to finish grade in conformance
with the design Traffic Index. Prior to building final, the
applicant shall refurbish the pavement to the satisfaction of the
City Engineer.
b. The applicant shall construct a pavement section that is a
minimum of 1½” lower than finish grade, in conformance with
the design Traffic Index. Prior to building final, the applicant
shall refurbish the pavement, and complete the final lift of
asphalt to meet finish grade to the satisfaction of the City
Engineer
GP, BP CE
45. Prior to building final, the applicant shall construct and final full
street improvements as shown in the Specific Plan and required
by the mitigation monitoring program within the affected portion of
the project site, as well as the required offsite street improvements
to the satisfaction of the City Engineer.
BP CE
46. Prior to building final, the applicant(s) shall install a community
mailbox and post in accordance with the City’s standards, and
secure approval of the U.S. Postal Service prior to installation.
The community mailboxes shall not cause a sight distance
obstruction and shall have a minimum four foot clear zone behind
the mailbox.
FO CE
47. Prior to building final, the applicant shall construct accessible
ramps at intersections, as required by the City Engineer.
FO CE
48. Prior to building final, the applicant shall repair any broken or
damaged curb, gutter and sidewalk, and repair or reconstruct the
half section plus 10 feet of pavement on onsite or offsite streets
within or near the project. All damaged facilities shall be repa ired
to the City Engineer’s satisfaction.
FO CE
49. Prior to the construction of offsite improvements the project
applicant(s) shall prepare and submit a Construction Traffic
Control Plan for review and approval by the City Engineer. The
plan shall identify routing for all delivery and haul trucks and, if
necessary, limit deliveries to non-peak times. To the extent
feasible, truck routing should avoid travel through residential
areas and emphasize the use of US 101. The plan shall be
developed in conformance with the California MUTCD, latest
EP CE
24
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
edition. The plan shall include the following provisions:
a. Maintain access for land uses in proximity of the project site
during project construction.
b. Schedule deliveries and pick-ups of construction materials to
non-peak travel periods, to the maximum extent feasible.
c. Coordinate haul trucks, deliveries and pick -ups to reduce the
potential of trucks waiting to load or unload for protracted
periods of time.
d. Minimize obstruction of through traffic lanes on surrounding
public streets.
e. Construction equipment traffic entering and exiting the project
site shall be controlled by flagman.
f. Identify designated transport routes for heavy trucks (in
addition to haul trucks) to be used over the duration of the
proposed project.
g. Schedule vehicle movements to ensure to the maximum extent
feasible that there are no vehicles waiting offsite and impeding
public traffic flow on the surrounding streets.
h. Establish requirements to ensure the safety of the pedestrians
and access to local businesses.
i. Coordinate with adjacent businesses and emergency service
providers to ensure adequate access exists to the project site
and neighboring businesses.
j. Prohibit parking for construction workers except on the project
site and any designated off-site parking locations. These off-
site locations shall not include adjacent commercial center
parking lots or residential streets and will require the approval
of the City Engineer.
GRADING
50. The applicant shall, to the City Engineer’s satisfaction, comply
with all Geology, Soils and Seismicity mitigation measures and
time frames contained in the City Council adopted Mitigation
Monitoring and Reporting Program.
51. Prior to issuance of grading permit, the applicant shall submit a
grading plan consistent with the approved tentative map, Master
Plan of Development, Specific Plan, arborist report and conditions
of approval. The grading plan shall be based on a detailed
engineering geotechnical report specifically approved by the
geologist and/or soils engineer that addresses all submitted
recommendations.
GP, BP CE
52. Prior to issuance of a grading permit for this project, the applicant
shall submit a copy of the grading permit for the export site and an
exhibit of the proposed haul route. The applicant is responsible to
GP, BP CE
25
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
obtain approval from all applicable agencies for the soil hauling
operation and the placement of fill off-site.
53. The applicant shall comply with the following requirements for the
soil hauling operation:
a. Obtain an encroachment permit from the City Engineer for the
work.
b. The hours of operation shall be between 8:30 am to 3:30 pm,
Monday through Friday.
c. Provide street sweeping service on all City streets along the
haul route during all hours of work on a schedule approved by
the City Engineer.
d. Provide traffic control and flagging personnel along the haul
route to the satisfaction of the City Engineer.
GP, BP CE
54. Prior to issuance of a grading permit, the applicant(s) shall sign a
Haul Route Repair Agreement and pay a Haul Route Pavement
Repair Security Cash Deposit (Deposit) of $100,000, which may
be increased or decreased based upon an estimated cost to
complete the repairs of streets damaged during the dirt hauling
operation. The limits and scope of the repairs shall be determined
by the City Engineer. In order to receive a refund of the Deposit,
the applicant or subsequent property owners shall complete any
required pavement repairs to the satisfaction of the City Engineer
within six months from the completion of the dirt hauling operation
or prior to issuance of Building Permits. If the pavement repairs
are not completed within six months, the City may use the Deposit
to complete the repairs and for any incurred staff and
administrative costs. Any funds remaining at the completion of
the repairs will be refunded to the applicant. If the Deposit is
insufficient to complete the repairs, the City shall seek additional
funds from the applicant.
GP, BP CE
1. DRAINAGE
55. Prior to grading permit issuance, the applicant shall obtain City
Engineer approval of a drainage study for the proposed private
onsite and public offsite storm drain system from the City
Engineer. The study shall demonstrate that runoff generated
onsite will not negatively affect downstream waterways or
properties. Onsite and offsite storm drain facilities shall comply
with City Engineering Drainage Standards.
GP CE
56. The applicant shall, to the City Engineer’s satisfaction, comply
with all stormwater mitigation measures and time frames
contained in the Mitigation Monitoring and Reporting Program.
57. Prior to issuance of permits affecting Caltrans right-of-way, the
applicant shall submit evidence of written approval for the
proposed construction within the Caltrans right-of- way to the City
Engineer.
GP CE
58. Maintenance responsibilities for all slopes, retai ning walls,
drainage devices, and erosion and sedimentation control
GP, BP CE
26
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
devices/systems not accepted by the City shall be the
responsibility of the property owner in perpetuity.
59. Prior to grading permit issuance, the applicant shall obtain and
submit to the City a notarized Letter of Permission for grading
over all easements.
GP CE
60. Prior to grading permit issuance, the applicant shall obtain a
notarized Letter of Permission for grading outside of the property
lines/tract boundary from the affected property owner(s).
GP CE
61. Prior to grading permit, the applicant shall obtain a notarized
Acceptance of Drainage from all affected property owners if
drainage is being diverted to areas that currently do not accept the
drainage.
GP CE
62. Prior to issuance of grading permit, the applicant shall record in
the Office of the County Recorder any needed slope easements
from adjacent property owners, as directed by the City Engineer.
GP CE
63. Prior to issuance of grading permits in Jurisdictional Waters of the
United States, the applicant shall acquire permits from the Army
Corps of Engineers, California Department of Fish and Game, and
the Regional Water Control Board for any work within any natural
drainage course. A copy of the permits, or a response letter from
each agency indicating a permit is not required, shall be submitted
to the City prior to issuance of grading permits.
GP CE
64. The applicant or subsequent property owners shall be responsible
for providing regularly scheduled maintenance of the storm drain
infrastructure, as required by the City Engineer.
CE
65. The applicant shall form an organized drainage maintenance
entity to finance the future ongoing maintenance and capital
replacement of water quality, low impact development,
hydromodification, erosion and sedimentation devices/systems
identified on the project’s approved storm drain plan. The
applicant shall pay for all costs associated with the formation of
the maintenance entity. Water quality, erosion and sedimentation
devices/systems shall include but are not limited to catch basin
inserts, debris excluders, bio-treatment basins, vortex separation
type systems, and other devices/systems for storm water quality.
The applicant shall be responsible for the maintenance of all
project water quality, erosion and sedimentation devices/systems
until the district has been established.
FM CE
66. Prior to Final Parcel Map approval, the applicant shall place a
note on the map, prohibiting the lot owners within this
development from interfering with the establis hed drainage master
plan and from erecting walls, curbs or similar solid constructions,
except as approved by the City Engineer.
FM CE
67. Prior to issuance of grading permit, the applicant shall have
approved by the City Engineer, an Urban Stormwater Mitigation
Plan that incorporates appropriate post construction best
management practices (BMPs), maximizes pervious surfaces, and
includes infiltration into the design of the project to the extent
technically feasible..
GP CE
27
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
68. The applicant must obtain coverage under a statewide General
Construction Activities Stormwater Permit (General Permit). In
accordance with the General Permit, the applicant shall file with
the State a Notice of Intent (NOI) for the proposed project. Prior to
issuance of grading permit by the City, the applicant shall have
approved by the City Engineer a Stormwater Pollution Prevention
Plan (SWPPP). The SWPPP shall include a copy of the NOI and
shall reference the corresponding Waste Discharge Identification
(WDID) number issued by the State upon receipt of the NOI.
BP CE
69. Prior to issuance of a grading permit applicant shall consult with
the Central Coast RWQCB regarding further actions with the
groundwater plume on the Walmart site. Consultation shall result
in written confirmation to the City from the RWQCB Staff of any
clean-up, corrective action or monitoring that may be needed prior
to, or post construction.
GP, BP CE
70. Applicant shall abandon any existing septic system facilities in
accordance with City standards prior to approval of site grading.
GP, BP CE
71. Prior to the issuance of building permits the applicant shall provide
for the detention and metering out of developed storm runoff so
that the peak runoff and its associated duration is equal to or less
than undeveloped storm runoff quantities to the satisfaction of the
the City Engineer.
GP, BP CE
72. Drainage basins shall be designed to desilt, detain and meter
storm flows as well as release them to natural runoff locations.
GP, BP CE
73. Prior to the issuance of building permits the applicant shall show
the method of dispersal at all pipe outlets. Include specifications
for size and type.
GP, BP CE
74. Prior to storm drain plan approval, the applicant shall obtain all
easements needed for future storm drainage system maintenance
by the City.
GP, BP CE
75. Prior to the issuance of building permits the applicant shall show
method of stormwater conveyance to approved off-site drainage
facilities.
GP, BP CE
76. Concentrated drainage from off-site areas shall be conveyed
across the project site in drainage easements. Applicant shall
acquire drainage easements where needed. Drainage shall cross
lot lines only where a drainage easement has been provided. If
drainage easement cannot be obtained the storm water release
must follow the historic path, rate and velocity as prior to the
subdivision.
GP, BP CE
SEWER AND UTILITIES
77. Prior to issuance of building permits for each component of the
Specific Plan, the project applicant shall submit plans to the City
for approval that demonstrate compliance with the City Sanitary
Sewer Management Plan, including City standards for the Fats,
Oils and Grease (FOG) Program; and the installation of
adequately sized grease interceptors for all food service
establishments, gas stations, auto shops, etc.
BP CE
28
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
78. Existing sewer manhole frame and covers relocated or adjusted
due to street or other construction shall be replaced with current
City Standard Manhole Cover per Standard Drawing No. 608 or
as required by the City Engineer.
GP, BP CE
79. All existing above ground utilities shall be undergrounded on
project frontage in the 10 foot wide PUE.
GP, BP CE
80. All sewer system plans shall be reviewed and approved by the
City Engineer.
GP, BP CE
81. Prior to sewer plan approval, the applicant shall provide a sewer
area study in accordance with City policies for review and
approval by the City Engineer.
GP, BP CE
82. All onsite private sewer mains and laterals shall be privately
owned and maintained. Sewer mains in Public Roads shall be
owned and maintained by the City.
FM CE
83. Prior to recording the final map, provisions for the repair and
maintenance of the private sanitary sewer system shall be
included in the CC&R’s for the development. Included shall be a
mechanism to maintain the private sewer and structures, such as
a maintenance association. The City Engineer and City Attorney
shall approve the final form prior to recordation.
FM CE
84. Applicant shall pay all sewer fees including extension
(Annexation), Connection and Reimbursement fees (if applicable)
prior to issuance of each building permit.
BP CE
85. Private gravity mains within the specific plan area shall be sized
and installed in accordance with the Uniform Plumbing Code.
Public gravity mains within the specific plan area shall be a
minimum of eight (8) inches in diameter.
BP CE
86. Drainage piping serving fixtures which have flood level rims
located below the elevation of the next upstream manhole cover
of the public or private sewer serving such drainage piping shall
be protected from backflow of sewage by installing an approved
type backwater valve. Fixtures above such elevation shall not
discharge through the backwater valve.
BP CE
87. All sanitary sewer (SS) mains shall terminate in manholes unless
extension of the main, at some later date, is an ticipated. If
extension of a SS main is anticipated, said SS main may
terminate in a cleanout providing the next downstream manhole is
less than 300 linear feet from the cleanout and that the point of
termination is not a reasonable location for a SS main angle point
or intersection.
BP CE
EASEMENTS
88. A ten (10) foot Public Utility Easement (PUE) shall be provided
contiguous to the property frontage. Modifications may be made
to the width on case by case basis as allowed by the City
Engineer.
FM CE
TRAFFIC
29
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Conditions of Approval
TPM 2009-0098 (Annex Map)
Vesting Tentative Parcel Map
(Del Rio Road Commercial Area Specific Plan)
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision Improvement
Plans
FM: Final Map
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility /Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
89. Intersection improvements shall have a minimum vehicle stacking
distance in accordance with the EIR Traffic Study.
GP, BP CE
90. The applicant shall, to the City Engineer’s satisfaction, comply
with all transportation mitigation measures and time frames
contained in the City Council adopted Mitigation Monitoring and
Reporting Program
91. The applicant shall include low glare, LED cobra style street lights
in the offsite improvement plans. Light spacing shall be based on
the AASHTO Roadway Lighting Design Guide (2005). Light color
shall be approved by the City Engineer.
92. The location, width and depth of all project driveways shall
substantially conform to the approved Parcel Map. This shall be
shown on all applicable plans prior to issuance of first building
permit. No additional driveways shall be permitted along the
project frontage.
GP, BP CE
93. Any dead-end drive aisles shall have a hammerhead or turn-
around area to facilitate vehicular movements. This shall be
shown on all applicable plans prior to issuance of first building
permit.
GP, BP CE
94. The site shall be designed to adequately accommodate all
vehicles (e.g. automobiles, vans, trucks) that can be expected to
access the site. This includes, but is not limited to, adequate
maneuvering areas around loading zones and parking spaces,
and appropriate turning radii.
GP, BP CE
TRANSIT/ BUS STOP
95. The Walmart and Annex sites shall provide a bus stop at the El
Camino Real frontage fronting both the Walmart and Annex
frontage as shown on Master Plan of Development. The bus stop
shall be designed and constructed to the City Engineer’s
satisfaction and include the following elements:
a. A 8’X14’ permanent, City approved transit shelter structure,
that compliments the architecture of the development it fronts,
and includes a bench, trash receptacle, solar lighting (all
electrical conduits shall be located within the shelter structure),
bicycle racks and rain gutters.
b. Color elevations and materials board for the proposed bus
shelter structure shall be supplied to the Community
Development Director, for review and approval, prior to
construction.
BP CE
96. The bus stop shall comply with all ADA and State accessibility
regulations as specified in the most recent version of the
California Disabled Accessibility Guidebook (CalDag). Proposed
disabled access shall be delineated on construction plans.
EP CE
97. The bus stop location shall be a minimum of 100’ from the
intersection of Del Rio Road and El Camino Real or as approved
by the City Engineer.
End of Conditions
EP
30
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 3: Draft Resolution 2017-A
PLN 2007-1246
DRAFT RESOLUTION NO. PC 2017-A
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO APPROVING A ONE-YEAR
TIME EXTENSION OF AN APPROVED VESTING TENTATIVE PARCEL
MAP AND CONDITIONAL USE PERMIT
TPM 2011-0098
1950 EL CAMINO REAL
(MP Annex, LLC)
WHEREAS, the applicant, MP Annex, LLC, has applied for an extension of a Vesting
Tentative Parcel Map that proposes a subdivision of 11.3 gross acres into four parcels consisting
8 parcels for commercial / retail development and one (1) remainder parcel for the development
of six (6) residential lots; and
WHEREAS, the City Council approved a Vesting Tentative Parcel Map and A
Conditional Use Permit on July 12, 2012; and
WHEREAS, the automatic one-year Time Extension via SB 116 went into effect July
11, 2013, setting the expiration date to July 12, 2012; and,
WHEREAS, the applicant had submitted for a one-year time extension for Vesting
Tentative Parcel Map entitlements; approved on June 24, 2016 by the Community Development
Director, consistent with Atascadero Municipal Code section 9-2.117(a) ; and,
WHEREAS, the applicant has submitted for an additional one-year time extension for
Vesting Tentative Parcel Map entitlements; and,
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1: Findings for approval of the Time Extension: The Planning Commission
makes the following findings consistent with Atascadero Municipal Code Section 9-2.117(a)
A. FINDING: There have been no changes to the provisions of the General Plan or
zoning regulations applicable to the project since the approval of the entitlement;
FACT: There have been no applicable changes to the General Plan or zoning
regulations since the project was entitled on July 12, 2012. All conditions of
approval and required mitigation measures are to be completed by all projects
31
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
within the adopted Specific Plan overlay zone (SP-2) in addition to all applicable
zoning requirements and General Plan requirements.
B. FINDING: There have been no changes in the character of the site or its
surroundings which affect how the standards of the General Plan or zoning
regulations apply to the project.
FACT: The site remains vacant. The surrounding properties have yet to develop;
therefore, there have been no changes in the character or its surroundings which
affect how the standards of the General Plan or zoning regulations apply to the
project.
SECTION 2: Approval: The Planning Commission does hereby approve a one-year
Time Extension of TPM 2011-0098, to expire on July 12, 2018.
32
ITEM 2 | 8/1/2017
Del Rio Road Specific Plan
PLN 2007-1246 / MP Annex, LLC
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
On motion by Commissioner _______________________, and seconded by Commissioner
______________________ , the foregoing resolution is hereby adopted in its entirety by the following
roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
______________________________
Duane Anderson
Planning Commission Chairperson
ATTEST:
___________________________________
Phil Dunsmore
Planning Commission Secretary
33
34
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
ADDITIONAL INFORMATION MAY BE OBTAINED BY CONTACTING THE ATASCADERO
COMMUNITY DEVELOPMENT DEPARTMENT AT
http://www.atascadero.org
6500 PALMA AVENUE | ATASCADERO, CA 93422 | (805) 461-5000 | (805) 461-7612
Atascadero Planning Commission
Staff Report – Community Development Department
PLN 2017-1652
Tree Removal Permit for Single Family Residence
RECOMMENDATION(S):
Staff recommends the Planning Commission adopt PC Resolution 2017-A approving
Tree Removal Permit 2017-0215 to allow the removal of four (4) native trees, based on
findings and subject to mitigation.
Project Info In-Brief:
PROJECT
ADDRESS: 9710 Laurel Road Atascadero, CA APN 055-041-018
PROJECT
PLANNER
Torina Wilson, Planning Intern
Katie Banister, Assistant Planner 470-3480 twilson@atascadero.org
kbanister@atascadero.org
PROPERTY
OWNER Tom Graves, PO Box 1501, Templeton, CA 93465
ARBORIST Chip Tamagni, A&T Arborists, PO Box 1311, Templeton, CA 93465
GENERAL PLAN
DESIGNATION:
ZONING
DISTRICT:
SITE
AREA EXISTING USE PROPOSED USE
Residential Estate
(RE)
Residential
Suburban
(RS)
3.6
acres Undeveloped
Single-Family
Residence and
Detached Garage
ENVIRONMENTAL DETERMINATION
☐ Environmental Impact Report SCH: ___________________________
☐ Negative / Mitigated Negative Declaration No. ___________
☒ Categorical Exemption CEQA – Guidelines Section 15303
☐ Statutory Exemption §§ 21000, et seq & ________________________
☐ No Project – Ministerial Project
35
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
DISCUSSION:
Existing Surrounding Uses / Parcel Configurations:
Existing Zoning Existing Aerial / Surrounding
North: South: East: West:
Residential Suburban
(RS)
Residential Suburban
(RS)
Residential Suburban
(RS)
Residential Suburban
(RS)
Summary:
The applicant has applied for building permits for a 2,495 square -foot single-family
residence and 840 square-foot detached garage, which will require the removal of four
(4) native oak trees. The trees proposed for removal have a cumulative diameter of 54
inches and include a 4-inch valley oak, 32-inch live oak, 16-inch blue oak, and a 4-inch
blue oak.
Analysis:
The proposed tree removal is located on a steeply sloping vacant lot in the Residential
Suburban zone (RS). The applicant has applied to construct a single family residence
and detached garage on the property.
The subject trees are each located within the proposed footprint of the driveway and
house. The garage will be placed approximately 150 -feet from Laurel Rd, and will
require the removal of two native trees, a valley oak with 4 -inch diameter and a blue oak
with 2-inch diameter (the smallest sized deciduous oak subject to the Native Tree
Ordinance). The 30-inch coast live oak and the 16-inch blue oak are located at the
perimeter of the proposed building footprint. This site design results in a significant
reduction in the quantity of grading needed to construct a home on this steep lot. The
majority of trees on the site will be retained.
RS
36
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
9710 Laurel Rd
One of the trees to be removed (#490) is in decline with a condition rating of 2 on a
scale of 10. Tree numbers 481 and 491 were given a condition rating of 5 and 3
respectively. Tree number 496 was previously planted, and stands at 2 inches in
diameter with a condition rating of 4.
Table 1. Trees to be Removed
Tree ID Diameter
(inches)
Condition
(1-10)
Location
481 4 5 Underneath proposed driveway
490 32 2 Underneath proposed porch
491 16 3 Underneath proposed building footprint
496 2 4 Underneath proposed dirveway
Tree #490: 32-inch DBH c
Tree #481: 4-inch DBH c
Tree #496: 2-inch DBH
Tree #491: 16-inch DBH
37
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Native Trees Proposed for Removal
View of Trees #496 and 481; Facing Laurel Rd. and Proposed Driveway Entrance
Tree #496
Tree #481
Trees #496 and 481 are located
near the front of the property
and stand at 2” and 4” in
diameter, respectively. The trees
are located on the flat portion of
the property, and removal will
not increase erosion on site. The
young nature and small stature
of the trees will not cause a
significant change in air patterns
upon their removal.
Tree #481
Tree #496
Laurel Rd. & Proposed
Driveway Entrance
38
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
View of Trees # 490 and 491; View from Residence Footprint
Tree # 490
Tree # 491
Trees # 490 and 491 are located in the center of the lot just below a steep hill. Tree
#490 is in decline and has a condition rating of 2. Due to their location, the trees’
removal could have an impact on erosion; however, many trees will remain standing at
the base of the hill and will stabilize the soil. Removal of these two trees will have a
minimal impact on air flow on site.
Tree #491
Tree #490
39
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Trees at the base of the hill; Trees # 490 & 491 are not visible from lower on the
property due to other tree foliage.
View of property from the opposite side of Laurel Rd.; Trees to be removed are not
visible from the street.
Evaluative
Criteria for
Tree Removal
40
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Atascadero Municipal Code Section 9-11.105(d)(3) provides the criteria the Planning
Commission should use when evaluating tree removals.
(i) The potential effect that tree removal could have on topography, knowing that
hilltops, ravines, streambeds and other natural watercourses are more
environmentally sensitive than flat or gentle sloping lands;
(ii) The potential effect that tree removal could have on soil retention and erosion
from increased flow of surface waters;
Staff comment: The trees are located on a less steep area of the lot and will
not have a significant effect on erosion. The land exposed by these removals
will be held in place by retaining walls constructed for the foundation of the
residence.
(iii) The potential effect that tree removal could have on the ambient and future
noise level;
Staff comment: The trees are located on a steep lot above Laurel Road, a
residential street serving single family homes in the Residential Suburban
zone. Ambient noise traveling into the lot will be minimal with minor input from
the residences in the vicinity. Local tree removals will have little impact on the
noise from traffic below.
(iv) The potential effect that tree removal could have on the ability of existing
vegetation to reduce air movement and wind velocity;
Staff comment: Air movement in the neighborhood is controlled by the steep
hills lining the east side of Laurel Road. The property is adjacent to a steep hill
and the remaining trees on site and the future house and garage will slow
localized air movement.
(v) The potential effect that tree removal could have on significantly reducing
available wildlife habitat or result in the displacement of desirable species;
Staff comment: The property offers wildlife habitat that will be reduced by the
development of the lot; however, the site plan limits that reduction by keeping
the development on one portion of the lot leaving the majority untouched. The
subject trees are of low quality, or are young and small.
(vi) Aesthetics;
Staff comment: The trees proposed for removal are not visible on the street
and will therefore have no visual impact on the neighborhood. Construction of
a home and garage will have an impact; however, significant foliage existing
on the property will decrease its visibility from neighboring properties and the
street.
41
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
(vii) The number, size, species, condition and location of trees to be removed;
Staff comment: All 4 trees proposed for removal are on the lower portion of the
lot. There are two blue oaks (#496 and #491 ), one valley oak (#481), and one
coast live oak (#490). The largest tree, the coast live oak has been determined
by an arborist to be in decline. The remaining trees have relatively low
condition ratings of 3, 4 and 5.
(viii) The special need to protect existing blue and valley oaks because of
regeneration problems;
Staff comment: Three of the trees to be removed (totaling 22-inches in
diameter) are blue and valley oak trees.
(ix) The cumulative environmental effects of tree removal.
Staff comment: While removing the trees will have a limited environmental
impact, the proposed site plan for this property generally limits construction
activity to a small part of the property.
Tree Mitigation
The Atascadero Municipal Code requires mitigation for all trees approved for removal.
The Tree Ordinance allows for either replanting of new native trees, or payment of
mitigation fees to the tree fund.
Based on the species and cumulative diameter of the trees, thirteen (13) 5 -gallon oak
trees are required for replanting. Alternatively, the applicant may choose to pay $633.33
to the City’s tree mitigation fund. Substitution for larger trees or a combination of the
two mitigation methods is also permitted.
ENVIRONMENTAL DETERMINATION:
The proposed project is Categorically Exempt (Class 3) from the provisions of the
California Environmental Quality Act (California Public Resources Code §§ 21000, et
seq., “CEQA”) and CEQA Guidelines (Title 14 California Code of Regulations §§ 15000,
et seq.) CEQA pursuant to CEQA Guidelines Section 15303, because it is one single
family residence and an accessory structure in a residential zone.
FINDINGS:
In considering any tree removal request, the Planning Commission must make at least
one of the required findings. Staff has identified the following finding as appropriate for
the application request. The findings and the facts to support these findings are
included in the attached resolution (Attachment number 2).
i. The tree is obstructing proposed improvements that cannot be reasonably
designed to avoid the need for tree removal, as certified by a report from the
42
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
site planner and determined by the Community Development Department
based on the following factors:
(a) Early consultation with the City,
(b) Consideration of practical design alternatives,
(c) Provision of cost comparisons (from applicant) fo r practical design
alternatives
ALTERNATIVES:
1. The Planning Commission may include modifications to the project and/or
conditions of approval for the project. Any proposed modifications including
conditions of approval, should be clearly re-stated in any vote on any of the
attached resolutions.
2. The Planning Commission may determine that more information is needed on
some aspect of the project and may refer the item back to the applicant and staff
to develop the additional information. The Commission should clearly state the
type of information that is required. A motion, and approval of that motion, is
required to continue the item to a future date.
3. The Planning Commission may deny the project. The Commission must specify
what findings cannot be made, and provide a brief oral statement, based on the
Staff Report, oral testimony, site visit, correspondence, or any other rationale
introduced and deliberated by the Planning Commission.
ATTACHMENTS:
1. Tree Protection Spreadsheet from Arborist Report
2. Draft Resolution PC 2017-A
43
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 1: Tree Protection Spreadsheet from Arborist’s Report
PLN 2017-1652 / TRP 2017-0215
44
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 2: Draft Resolution PC 2017-A
PLN 2017-1652 / TRP 2017-0215
DRAFT RESOLUTION NO. PC 2017-A
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ATASCADERO APPROVING PLN 2017-1652 / TRP 2017-0215,
TO ALLOW THE REMOVAL OF FOUR (4) NATIVE OAK TREES
TOTALING 54-INCHES DIAMETER AT BREAST HEIGHT (DBH)
LOCATED AT 9710 LAUREL ROAD (APN 055-041-018)
WHEREAS, an application was received from Tom Graves, PO Box 1501, Templeton, CA
93465 (Owner), and by Chip Tamagni of A&T Arborists, PO BOX 1311, Templeton, CA 93465
(Arborist), for a Tree Removal Permit to remove four (4) native oak trees totaling fifty- four (54) inches
DBH; and
WHEREAS, the Planning Commission reviewed the proposed Tree Removal Permit application
on August 1, 2017, at 6:00 p.m. and considered testimony and reports from staff, the applicants, and the
public.
NOW THEREFORE, the Planning Commission of the City of Atascadero, California takes the
following actions:
SECTION 1. Findings for tree removal. The Planning Commission finds as follows:
The tree is obstructing proposed improvements that cannot be reasonably designed to avoid the
need for tree removal, as certified by a report from the site planner and determined by the
Community Development Department based on the following factors:
a. Early consultation with the City,
b. Consideration of practical design alternatives,
c. Provision of cost comparisons (from applicant) for practical design alternatives,
d. If saving tree eliminates all reasonable use of the property, or
e. If saving the tree requires the removal of more desirable trees.
Fact: The applicant has provided a site plan which avoids the majority of the native trees on the
site. The house and septic leach field have been placed relatively close to the street in an area
without significant tree cover. The number and placement of trees located near the property’s
Laurel Road frontage have the result of any driveway placement resulting in impacts to native
trees. Moving the house and the septic leach field closer to Laurel Road would hav e an impact
on a greater number of larger trees. The largest tree proposed for removal is in decline.
SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a special
regular session assembled on August 1, 2017 resolved to approve Tree Removal Permit 2017-0215,
subject to the following:
EXHIBIT A: Conditions of Approval
EXHIBIT B: Required Tree Removal Mitigation
EXHIBIT C: Site Plan
Bond payment for tree #31, impacted 45% :
45
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
On motion by Commissioner ____________________, and seconded by Commissioner
_________________________, the foregoing resolution is hereby adopted in its entirety by the following
roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ABSTAINED: ( )
ADOPTED:
CITY OF ATASCADERO, CA
_________________________________________
Duane Anderson
Planning Commission Chairperson
ATTEST:
___________________________________
Phil Dunsmore
Planning Commission Secretary
46
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT A: Conditions of Approval
PLN 2017-1652 / TRP 2017-0215
Conditions of Approval
PLN 2017-1652 / TRP 2017-0215
9710 Laurel Road
Timing
FM; Final Map
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
1. This Tree Removal Permit shall allow the removal of 4 native oak trees
identified in Exhibit C at 9710 Laurel Road, APN 055-041-018, regardless of
owner.
BP PS
2. The approval of this application shall become final, subject to the completion
of the conditions of approval, fourteen (14) days following the Planning
Commission approval unless prior to that time, an appeal to the decision is
filed as set forth in Section 9-1.111(b) of the Zoning Ordinance.
Tree removal
PS
3. The applicant and/or subsequent owners shall defend, indemnify, and hold
harmless the City of Atascadero or its agents, officers, and employees against
any claim or action brought to challenge an approval by the City, or any of its
entities, concerning the proposed tree removal.
Ongoing
4. The applicant shall not remove the trees until the building permit for the
residence is issued.
BP PS
5. The owner or applicant shall mitigate the tree removal by replanting
thirteen 5-gallon native oak trees, making a payment of $633.33 to the
Atascadero tree mitigation fund, or a combination thereof as shown in
Exhibit B. Larger box trees may be substituted for five-gallon replacement
trees per the Atascadero Native Tree Guidelines.
Tree removal PS
6. Payment to the tree mitigation fund or tree replanting shall occur before the
building permit for the residence can be finaled.
BP PS
7. If tree replanting is selected, the owner or applicant shall provide drip
irrigation to new trees until they are established.
BP PS
47
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Exhibit B Required Tree Removal Mitigation
PLN 2017-1652 / TRP 2017-0215
Evergreen Native Trees (inches)Deciduous Native Trees (inches)Totals
dbh notes dbh notes
1 32-inches tree #490 1 4-inches tree #481
2 2 16-inches tree #491
3 3 2-inches tree #496
4 4
5 5
6 6
7 7
Total 32-inches Total 22-inches 54-inches
Mitigation Requirement
req'd tree replacements:5 five gal trees req'd tree replacements:7 five gal trees
Proposed Replanting 0 five gal trees Proposed Replanting 0 five gal trees 0 five gal trees
0 fifteen gal trees 0 fifteen gal trees 0 fifteen gal trees
0 box trees (24'')0 box trees (24'')0 box trees (24'')
Remaining Mitigation 5 five gal trees Remaining Mitigation 7 five gal trees 13 five gal trees
Tree Fund Payment:266.67$ Tree Fund Payment:366.67$ 633.33$
48
ITEM 3 | 08/01/2017
Tree Removal Permit
PLN 2017-1652 / Graves
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Tree # 481
Tree # 496
Tree # 490
Tree # 491
Septic Leach
Field
Exhibit C Site Plan
PLN 2017-1652 / TRP 2017-0215
Site Plan with trees to be removed
49
50
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
ADDITIONAL INFORMATION MAY BE OBTAINED BY CONTACTING THE ATASCADERO
COMMUNITY DEVELOPMENT DEPARTMENT AT
http://www.atascadero.org
6500 PALMA AVENUE | ATASCADERO, CA 93422 | (805) 461-5000 | (805) 461-7612
Atascadero Planning Commission
Staff Report – Community Development Department
PLN 2017-1642
Master Plan of Development
St. William’s Parish
RECOMMENDATION(S):
Planning Commission approve PC Resolution 2017-A approving Conditional Use Permit
(CUP) 2017-0311 allowing a Church and Related Activities use in the High Density
Residential Multi-Family zoning district and a master plan of develo pment for the
church’s property, and Tree Removal Permit 2017-0216 allowing the removal of three
native trees totaling 66 inches in diameter.
Project Info In-Brief: St. William’s Parish proposes new facilities for their growing
church. Phase 1 is a youth center, expanded parking area, and landscaping. Phase 2
is a larger Parish Hall to replace the existing hall and rectory, and a storage building.
PROJECT
ADDRESS: 6410 Santa Lucia Road Atascadero, CA APN 030-271-023, 006,
012, 015, 025
PROJECT
PLANNER
Katie Banister
Assistant Planner 470-3480 kbanister@atascadero.org
APPLICANT Mark Lowerison
PROPERTY
OWNER Roman Catholic Bishop of Monterey County
GENERAL PLAN
DESIGNATION:
ZONING
DISTRICT:
SITE
AREA EXISTING USE PROPOSED USE
HDR RMF-20 3.6
acres
Church, Parish
Hall and Rectory
Church, Parish Hall,
Youth Center
ENVIRONMENTAL DETERMINATION
☐ Environmental Impact Report SCH: ___________________________
☐ Negative / Mitigated Negative Declaration No. ___________
☒ Categorical Exemption CEQA – Guidelines Section 15332
☐ Statutory Exemption §§ 21000, et seq & ________________________
☐ No Project – Ministerial Project
51
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
SPECIAL DEVELOPMENT PLAN STANDARDS
☒ N/A
☐ Specific Plan ______________________________________________________
☐ Planned Development Overlay____________________________________________
USE
CLASSIFICATION
ALLOWED OR
CONDITIONALLY
ALLOWED USE
STRUCTURE 50-YEARS OLD
OR GREATER
JURISDICTIONAL
CREEK
Churches and Related
Activities
☐ Allowed
☒ Conditional
☐ No
☐ Colony Home / Commercial
☐ Registered Building
☒ Yes, but not deemed
historically significant
☐ Atascadero
☐ Graves
☐ Paloma
☐ Boulder
☐ Other
☒ N/A
EXISTING USES
St. William’s parish has three existing buildings: the church, hall and rectory residence. The
parking lot is used as a Caltrans Park & Ride location. Several sea-train storage containers are
located near Venado Avenue.
SURROUNDING ZONING DISTRICTS AND USES
North: Highway 101
South: Immediately to the South is a multi-family development (RMF-20), across Venado
Avenue are single-family residences (LSF-Y).
East: Mix of multi-family and single-family residences (RMF-20).
West: Mix of multi-family and single-family residences (RMF-20 and RSF-Z)
AVERAGE SLOPE VEGETATION
Approximately 10% Landscaping, oak woodland and non-native grass meadow.
DENSITY / FLOOR AREA RATIO
☐ RSF-X / LSF-X: 4 units per acre
☐ RMF-10: 2-10 units per acre
☐ RMF-20: 20-24 units per acre
☐ CP/CR/CS/CN/DO/DC: Max 20
units per acre
☐ Other: __________________
☐ State Density Bonus
Requested
☐ Density Bonus for High
Quality Architecture
☐ City Inclusionary Housing
Density Bonus
☐ Inclusionary Housing
Required
☒ Floor Area Ratio (FAR)
0.18 at completion of Phase 2
(Total square foot of building
compared to the size of the
property)
52
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ZONING ORDINANCE / MUNICIPAL CODE STANDARDS / CITY POLICIES
City Standards Meets
Requirements
Exception Requested
Setback standards (AMC 9-4.103-.110)
☒Yes ☐No
Height Standards (AMC 9-4.112-113)
☒Yes ☐No
Parking Standards (AMC 9-4.114-121)
☐Yes ☒No Planning Commission
Modification
Landscaping (AMC 9-4.124-127)
☐Yes ☒No Planning Commission Reduction
of Landscaping
Fencing Standards (AMC 9-4.128)
☐Yes ☒No Planning Commission
Modification
Grading Standards (AMC 9-4.138-145)
☒Yes ☐No
Lighting Standards (AMC 9-4.137)
☒Yes ☐No
Water Efficient Landscaping (AMC Title 8,
Chapter 10 ) ☒Yes ☐No
Use Classification Standards:
Church and Related Activities (AMC 9-6.121)
Accessory Storage (AMC 9-6.103) .
☒Yes ☐No
☐Yes ☒No
CUP to allow development of
conforming uses on a lot with
non-conforming uses
ADVISORY BODIES / OUTSIDE AGENCIES THAT REQUIRE REVIEW OF PROPOSED PROJECT:
☐ Native American Tribes
☐ Atascadero Mutual Water Company (AMWC)
☐ Caltrans District 5
☐ Regional Water Quality Control Board (RWQCB)
☐ Dept. of Fish & Wildlife (DFW)
☐ SLO Air Pollution Control (APCD)
☐ SLO County
☐ _____________________________
☐ _____________________________
☐ _____________________________
APPROVAL PROCESS
☒ DRC ☐ AUP ☒ PC ☐ CC
DATE APPLICATION DEEMED COMPLETE
July 11, 2017
53
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
REPORT-IN-BRIEF:
St. William’s Parish proposes an expansion of church facilities in two phases. Three
native trees are proposed for removal. Exceptions for number of parking spaces,
landscaping, fencing, and accessory storage are requested.
DISCUSSION:
Existing Zoning Existing Aerial / Surrounding
Surrounding Zoning Districts And Uses
North: Highway 101
South: Immediately to the South is a multi-family development (RMF-20). Across Venado
Avenue are single-family residences (LSF-Y).
East: Mix of multi-family and single-family residences (RMF-20).
West: Mix of multi-family and single-family residences (RMF-20 and RSF-Z)
Background:
St. William’s Parish was founded at their location at the intersection of Ardilla and Santa
Lucia Roads in 1950. The first church building was bought at auction from Camp San
Luis in 1949. This structure now serves as the Parish Hall. The current 6,500 square-
foot church building was constructed in 1968 and 1969.
RMF-20
RSF-Z
LSF-Y
DC
54
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Summary:
St. Williams Parish proposes a master plan of development for future development of
the church property. Phase 1 is likely to begin in the next year. Phase 2 will be
constructed a few years in the future.
Phase 1:
New 6,385 square-foot youth center,
Expansion of the parking lot,
Driveway from Venado Avenue,
Curb, gutter and sidewalk on the Ardilla frontage wrapping around the corner with
Santa Lucia Road, and
Landscaping.
Phase 2:
Demolition of the existing 2,113 square-foot rectory (residence) and 3,500
square-foot parish hall,
New 14,000 square-foot parish hall with 2nd floor offices,
New 1,000 square-foot storage building, and
Curb, gutter and sidewalk on Santa Lucia Road and Venado Avenue.
Analysis:
Churches and related uses. Under current zoning ordinance standards, churches
require a CUP when located in the residential districts. St. William’s was originally
established prior to City incorporation; therefore, there is no CUP on file for this
property.
When a use does not conform to the requirements of the zoning ordinance due to lack
of entitlement (in this case, the church does not have a CUP), it cannot be altered or
expanded unless the approval of the entitlement is secured (Atascadero Municipal Code
(AMC) 9-7.105). If approved, CUP 2017-0311 will bring the church into conformance
with the City zoning ordinance by establishing a CUP. The CUP would also allow for the
phased expansion.
AMC 9-6.121 requires religious meeting facilities to be located on a collector or arterial
road. The St. William’s Parish property is located on a busy intersection adjacent to the
Traffic Way/Highway 101 interchange. Both Santa Lucia and Ardilla a re classified as
minor arterial roads.
AMC 9-6.121 limits churches in the single-family zoning districts to a sanctuary, Sunday
school, accessory residence and small meeting rooms. In contrast, St. Williams’s is
located in the multi-family residential zoning district. The municipal code does not give
specific standards for churches in this zone. In all districts, churches must be located
on a collector or arterial street. The 3.6-acre property is adequately sized to
accommodate the church’s proposal. With conditions included in Draft Resolution
2017-A, the project will not have a significant negative impact on the neighborhood.
55
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Phase 1
The first phase includes a new youth center with 5 classrooms and a 200-person
capacity hall. The building would be located in the open field on a terrace above the
church and hall. The architecture of the 19-foot tall building is fairly modest with
contemporary materials including stucco and Hardie-board siding in muted earth-toned
colors with rock-face accents and a metal roof. The structure is on a partially raised
foundation to limit the amount of grading required. Between the youth center and
church is a deck and an amphitheater, which utilize the slope cleverly. The Design
Review Committee generally endorsed the design with some reservation about the
contrast in styles between the church and youth center. A condition is provided in the
draft resolution to incorporate the same rock-face material used in the youth center into
the retaining walls in front of the church.
Also included in Phase 1 is a new parking area on the Ardilla Road side of the building
with approximately 35 new spaces. A circular driveway will provide an area for parents
to drop off their children. On the Venado Avenue side of the building, several
accessible spaces are proposed. The driveway from this reside ntial road will remain
gated with a gravel roadbase surface. It is provided primarily for emergency access. A
condition is provided in the draft resolution to keep this driveway gated except in
emergency situations.
Phase 2
Phase 2 includes the demolition of the rectory residence and the existing parish hall,
both to be replaced with a larger parish hall. The applicant has provided conceptual
drawings of the future hall. They depict a 2-story building with approximately 14,000
square feet of floor area, 4,500 square feet of which is assembly space. Located
upstairs are several offices and conference rooms. A 1,000 square -foot storage
building is also proposed to the south of the youth center.
Staff recommends the Planning Commission approve a maximum size for these
structures in conceptual form. The completed design could be considered by the DRC
when the church is ready to apply for building permits for these structures. Conditions
are included in the draft resolution to limit the structures to 14,000 and 1,000 square
feet, respectively. The Planning Commission should consider whether they would like
to set a different maximum size to give more or less flexib ility to the future design. A
condition is provided in the draft resolution with floor area limitations.
Accessory storage
The church uses four cargo containers to store miscellaneous items near the Venado
Avenue frontage. The municipal code allows the use of cargo containers under limited
circumstances. Containers must be placed in the rear half of the property outside the
required setbacks. A building permit is required to ensure cargo containers are placed
on an adequate foundation. Placing two or more cargo containers on a property
requires a Conditional Use Permit.
56
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
The City adopted regulations regarding the use of cargo containers in 2013. The
church’s cargo containers were placed on the property before that time. Therefore the
church’s containers are legal, but nonconforming with today’s regulations. Through the
conditional use permit process, the Planning Commission can allow new, conforming
uses on a site with non-conforming uses.
Staff recommends the church be allowed to retain the cargo containers in their current
state temporarily. The containers are currently well screened by a 6-foot fence that
blocks the view from Venado Avenue. The containers are intended to be replaced by a
new 1,000 square-foot storage building in Phase 2 of the master plan of development.
Moving the cargo containers onto an approved foundation would be cost prohibitive for
temporary storage purposes.
At their July 12, 2017 meeting, the Design Review Committee endorsed allowing the
cargo containers to remain temporarily. A condition is included in the draft resolution to
require the cargo containers to be removed during Phase 2, at the time the hall is
constructed.
Parking
The church has approximately 124 existing parking spaces, some of which are used as
a park-and-ride lot. Neighbors present at the DRC meeting July 12, 2017 report the
church has adequate parking except during mid -week funerals when park-and-ride
users and church visitors both create a high demand for parking. The applicant
proposes a parking lot with a total of 159 parking spaces in Phase 1.
The assembly uses on the property generally require the largest share of parking.
There are two existing assembly spaces: the church and the hall. Phase 1 will add
youth classrooms with a smaller assembly space. Phase 2 will add approximately
1,000 square feet of additional assembly space to the hall.
The applicant reports the different assembly spaces will not all typically be used
concurrently. Generally the church is used for mass on Sunday mornings. The hall is
used for special events such as wed dings, and the youth center will be used on
weekday evenings. Staff has provided the parking requirement for two scenarios: the
first assumes the entire facility (church, youth center, and hall) is used at the same time,
the second is more realistic and assumes the youth center and either the church or the
hall are used together (see Table 1, below).
Provided parking is inadequate to serve all buildings at one time ; however, when
calculated for a realistic use of the buildings, Phase 1 will be only 3 parking spaces
short of the required 162. Phase 2 will be 9 spaces short of the 168 parking -space
requirement.
57
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Table 1. St. Williams Parish Parking Requirement
Project
Phase
Required spaces
(all assembly spaces)
Required spaces
(one assembly space)
Proposed
Existing 214 126 124 (existing)
Phase 1 250 162 159
Phase 2 281 168 159
AMC 9-4.115 allows several exceptions to parking requirements. The applicant
requests a Planning Commission Modification, which the commission can approve if the
“characteristics of a use or its immediate vicinity do not necessitate the number of
parking spaces” and “reduced parking will be adequate to accommodate on the site all
parking needs generated by the use” (AMC 9-4.115). Based on current use of the
parking lot, the way the Catholic Church uses its buildings, and how few parking spaces
the use lacks, staff recommends the Planning Commission can make the appropriate
finding. A condition is included in the draft resolution to require a total of 159 parking
spaces, which may include compact, bicycle and motorcycle spaces as permitted by the
municipal code. Another condition is provided to require an assessment of how well the
expanded parking lot is serving the church before construction of Phase 2 can begin.
Native Trees
Multiple large native oak trees are located on the site. The applicant has gone to great
lengths to provide a site plan that preserves as many oak trees as possible. Three
trees will be removed:
24-inch valley oak in the footprint of the youth center (tree #102). On a scale
between 1 and 5, with 5 being the worst condition, the arborist rated this tree as
a 3 for both health and structural integrity.
12-inch blue oak (tree #104) will be replaced by the circular driveway. The
arborist rated this tree a 4 for health and a 4 for structural integrity. This tree has
little foliage and a significant lean due to crowding. The arborist reports its
removal will make space for nearby trees, which will remain.
30-inch valley oak by (tree #179) will be impacted by the driveway and
stormwater infiltration area. The arborist rated this tree a 2 for health and 2 for
structural integrity.
AMC 9-11.105 gives evaluative criteria for approving tree removal s. The trees
proposed to be removed are on flat to moderately sloping land. Their loss will not have
a significant impact on any watercourse or destabilize any hillside as they will be
replaced with asphalt and a new building. Some impact on future noise level might be
expected from removing these trees, but a noise study conducted on the site did not
anticipate excessive noise from Highway 101 beyond the level permitted by the General
Plan for sensitive receptors. Remaining oak trees and proposed shade trees will
compensate for the loss of the oak trees on air movement and wildlife habitat. The oaks
to be removed are blue and valley oaks, which are particularly challenging to
regenerate. Two of the trees are rated at or above average for health and structural
integrity; however, the applicant has worked to preserve as many trees as possible.
58
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Staff recommends the Planning Commission approve the tree removal permit with
standard mitigation requirements to re-plant trees or pay into the tree mitigation fund as
conditioned in the draft resolution. Members of the DRC instructed the applicant to
carefully select pavers, which are proposed under an 18 -inch valley oak tree in the new
parking area, to ensure the tree has a better chance of survival. A condition is included
in the draft resolution for the applicant to work with staff to choose high qua lity pavers
for this purpose.
Landscaping
AMC 9-4.125 requires 25% of the site to be landscaped in the multi-family residential
zones. In contrast, commercial zones are required to landscape only 10% of the site.
Landscaped areas must include all area s not covered by pavement or buildings. The
City’s Water Efficient Landscape Ordinance AMC 8-10 requires new plantings to be
drought tolerant and meet a prescribed irrigation budget. AMC 9-4.119 requires a 3-foot
tall solid fence, decorative wall or land scape equivalent to separate parking spaces
arranged to head toward the street.
The applicant has provided a landscape plan that includes a variety of drought tolerant
plant materials. Calculations for an irrigation budget will be required at the time of
applying for building permits. Older planters will be revitalized and new planting areas
will be provided with both shade trees and lower stature shrubs. The property visible
from Venado Avenue is proposed to remain in a relatively natural state. No new
plantings are proposed in this area. Feedback from neighbors at the DRC meeting
indicated they prefer this hillside be left with a natural appearance.
The proposed landscaping is closer to the landscaping requirement for commercial uses
(10%) than the multi-family residential requirement (25%), but the use is not residential.
The areas most visible from public streets will be landscaped and the majority of native
trees retained.
The Planning Commission may approve a modification to the landscaping standards if
they find that “existing vegetation, topography or structural arrangement preclude the
need for landscaping.” Staff recommends the Planning Commission make this finding
and approve the landscaping as proposed.
Fencing
Atascadero Municipal Code 9-4.128(a)(4) requires non-residential uses to provide
screening for residential uses with a six-foot tall solid wall or fence. The church property
is surrounded by residential uses, which are currently only partially screened. The DRC
reviewed the fencing and made the following recommendations:
The white two-rail fence on the southwest property line should be left in place.
This fence is attractive and maintains a residential feel on Venado Road.
Six-foot tall solid fencing should be placed at the property lines on the northern
and western property lines, except where the rail fence is located.
Six-foot tall solid fencing should be placed at the property line between the
rectory building and the adjacent apartments on Santa Lucia.
59
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
The eastern property line adjacent to the a partment complex is adequately
screened by vegetation and elevation difference. No fence is needed at this
location.
A diagram of these recommendations is included as Exhibit E of the draft resolution.
Conditions are included to require these fences be constructed during Phase 1.
Frontage Improvements
Atascadero Municipal Code 9-4.159 requires the installation of frontage improvements
including curb, gutter, sidewalk and road improvements when a proposed project in the
commercial and multi-family zoning districts exceeds 25% of the assessed value of the
property. When this threshold is surpassed, all adjoining properties under common
ownership must receive frontage improvements. St. William’s Parish owns property
with Ardilla Road, Santa Lucia Road and Venado Avenue frontages. Completion of
Phase 1 improvements trigger the need for frontage improvements.
Per the municipal code, the owner is required to install frontage improvements on all
sides of the property. Curb, gutter and sidewalk will be constructed on all three
frontages and a new alignment for the intersection of Ardilla and Santa Lucia Roads will
be established to increase safety at this turn. The City Engineer has provided a
condition to require the church to install improvements on Ardilla Road including the
intersection with Santa Lucia Road with Phase 1. With the recording of a covenant and
agreement, improvements on Santa Lucia and Venado could be deferred until
construction of the parish hall. The covenant would allow the City to require the se
improvements in the future even if the new parish hall is never constructed.
ENVIRONMENTAL DETERMINATION:
The proposed project is Categorically Exempt (Class 32) from the provisions of the
California Environmental Quality Act (California Public Resources Code §§ 21000, et
seq., “CEQA”) and CEQA Guidelines (Title 14 California Code of Regulations §§ 15000,
et seq.) CEQA pursuant to CEQA Guidelines Section 15332, because it is an in-fill
development on less than 5 acres surrounded by urban uses and without valuable
habitat for threatened species. The project will not result in significant impacts to traffic,
noise, air quality or water quality. The project will be served by existing roads and
utilities, and is consistent with the applicable policies of the Atascadero General Plan.
The notice of exemption is included in the draft resolution.
FINDINGS:
To approve Conditional Use Permit 2017-0311, the Planning Commission must make
the following findings. These findings, and facts to support these findings, are included
in the attached resolution in Attachment 4.
Conditional Use Permit (AMC Section 9-2.110(b).(3).(iv)):
1. The proposed project or use is consistent with the General Plan.
2. The proposed project or use satisfies all applicable provisions of this title.
60
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety or welfare of the general public or persons
residing or working in the neighborhood of the use, or be detrimental or injurious
to property or improvements in the vicinity of the use.
4. That the proposed project or use will not be inconsistent with the character of the
immediate neighborhood or contrary to its orderly development.
5. That the proposed use or project will not generate a volume of traffic beyond the
safe capacity of all roads providing access to the project, either existing or to be
improved in conjunction with the project, or beyond the normal traffic volume of
the surrounding neighborhood that would result from full development in
accordance with the land use element.
6. That the proposed project is in compliance with any pertinent city policy or criteria
adopted by ordinance or resolution of the city council.
Parking Modification (AMC Section 9-4.115(h))
7. That the characteristics of a use or its immediate vicinity do not necessitate the
number of parking spaces, type of design, or improvements required by this title.
8. That reduced parking will be adequate to accommodate on the site all parking
needs generated by the use,
Landscaping Modification (AMC Section 9-4.125(c).(2))
9. That existing vegetation, topography or structural arrangement preclude the need
for landscaping:
Fencing Modification (AMC Section 9-4.128(b).(3))
10. That specifically identified characteristics of the site or site vicinity would make
required fencing or screening unnecessary or ineffective.
Tree Removal Permit (AMC Section 9-11.105(d).(2).(v)
11. The tree is obstructing proposed improvements that cannot be reasonably
designed to avoid the need for tree removal, as certified by a report from the site
planner and determined by the Community Development Department based on
the following factors:
a. Early consultation with the City,
b. Consideration of practical design alternatives,
c. Provision of cost comparisons (from applicant) for practical design
alternatives,
d. If saving tree eliminates all reasonable use of the property, or
e. If saving the tree requires the removal of more desirable trees.
61
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
RECOMMENDATION:
Staff recommends the Planning Commission adopt Resolution PC 2017-A approving
Conditional Use Permit and Master Plan of Development 2017-0311 allowing a church
and related activities use, new youth center, parish hall and expanded parking area; and
Tree Removal Permit 2017-0216 allowing the removal of 3 native oak trees with
diameters totaling 66 inches.
ALTERNATIVES:
1. The Planning Commission may include modifications to the project and/or
conditions of approval for the project. Any proposed modifications including
conditions of approval, should be clearly re-stated in any vote on any of the
attached resolutions.
2. The Planning Commission may determine that more information is needed on
some aspect of the project and may refer the item back to the applicant and staff
to develop the additional information. The Commission should clearly state the
type of information that is required. A motion, and approval of that motion, is
required to continue the item to a future date is required.
3. The Planning Commission may deny the project. The Commission must specify
what findings cannot be made, and provide a brief oral statement, based on the
Staff Report, oral testimony, site visit, correspondence, or any other rationale
introduced and deliberated by the Planning Commission.
ATTACHMENTS:
1. Arborist Report
2. Acoustical Analysis Report
3. Site Photos
4. Draft Resolution PC 2017-A
62
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 1: Arborist Report
PLN 2017-1642
63
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
64
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 2: Acoustical Analysis Report
PLN 2017-1642
65
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
66
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
67
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
68
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
69
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
70
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 3: Site Photos
PLN 2017-1642
Existing Rectory, Hall and Church (left to right)
Santa Lucia Parking Area and Frontage
71
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Ardilla Road Parking Area
Future Site for the Youth Center
72
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Fencing – Southern Property Line Adjacent to Apartments
Fencing – Northwest Property Corner
73
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Fencing Southwest Property Line (Venado Ave)
Fencing - Cargo Containers off Venado Road
74
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Cargo Containers Viewed from the site of the new Youth Center
75
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
ATTACHMENT 4: Draft Resolution PC 2017-A
PLN 2017-1642
DRAFT PC RESOLUTION 2017-A
MASTER PLAN OF DEVELOPMENT
TREE REMOVAL PERMIT
RESOLUTION OF THE PLANNING COMMISSION
APPROVING A MASTER PLAN OF DEVELOPMENT
AND TREE REMOVAL PERMIT
PLN 2017-1642
ST. WILLIAM’S PARISH
LOWERISON / ROMAN CATHOLIC BISHOP OF MONTEREY COUNTY
WHEREAS, an application has been received from Mark Lowerison, 1391 Berwick
Drive, Cambria, CA 93428, and owner Catholic Bishop of Monterey County, 6410 Santa Lucia
Road, Atascadero, CA 93422 to consider Planning Application PLN 2017-1642, for Conditional
Use Permit 2017-0311, master plan of development, and Tree Removal Permit 2017-0216 on a
3.6 acre site located on 6410 Santa Lucia Road, Atascadero, CA 93422 (APN’s 030-271-023,
030-271-006, 030-271-012, 030-271-015, and 030-271-025); and
WHEREAS, the site’s current General Plan Land Use Designation is High-Density
Residential (HDR); and
WHEREAS, the site’s current Zoning District is High-Density Multiple-Family
Residential (RMF-20); and
WHEREAS, establishing a Church and Related Activities use requires the adoption of a
Conditional Use Permit in the RMF-20 zoning district; and
WHEREAS, St. William’s Parish currently operates as legal non-conforming use for
lack of entitlement; and
WHEREAS, the Design Review Committee reviewed the project at their July 12, 2017
meeting and provided recommendations to the Planning Commission regarding the site plan and
architectural appearance of the project; and
WHEREAS, the proposed project qualifies for an Categorical Exemption consistent with
CEQA Guidelines Section 15332: In-fill Development Projects; and
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and
76
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
WHEREAS, a timely and properly noticed Public Hearing was held by the Planning
Commission of the City of Atascadero at which hearing evidence, oral and documentary, was
admitted on behalf of said Master Plan of Development and Tree Removal Permit; and
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on August 1, 2017, studied and considered PLN 2017-1642.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City
of Atascadero makes the following findings, determinations and recommendations with respect
to the proposed Conditional Use Permit, Master Plan of Development, and Tree Removal Permit:
SECTION 1. Findings of Environmental Exemption. The Planning Commission finds as
follows:
1. The proposed project is Categorically Exempt (Class 32) from the provisions of the
California Environmental Quality Act (California Public Resources Code §§ 21000, et
seq., “CEQA”) and CEQA Guidelines (Title 14 California Code of Regulations §§
15000, et seq.) CEQA pursuant to CEQA Guidelines Section 15332, for in-fill
development projects. A notice of determination is included as Exhibit A.
SECTION 2. Findings for approval of Conditional Use Permit and Master Plan of
Development. The Planning Commission finds as follows:
1. The proposed project or use is consistent with the General Plan; and
Fact. The project is consistent with the Land Use, Open Space and Circulation (LOC) Policies
and Programs 1.1 for guiding new development into the urban core; 1.1.7 for infill development;
1.1.10 for master planning the development; 1.3 for enhancing the appearance of the Highway
101 and Traffic Way gateway; 1.3.2 for screening residential uses from non-residential uses;
1.4.1 for screening exterior lights; 2.1 and 2.1.1 for nei ghborhood compatibility; 2.1.3 and 7.2.3
for providing street trees; 2.1.6 for a use permit for a social establishment in a residential area; 2.3
and 2.3.3 for providing pedestrian facilities; 4.2 for enhancing pedestrian circulation in the
downtown; 5.2, 5.3, and 5.3.2 for limited grading on a slope; 6.2 for working with the local
Native American Community to ensure archeological and cultural resources are protected; 6.4 for
maintaining the church structure, which has local architectural significance; 7.1 and 7.2.1 for
maintaining the majority of native trees on site; 7.2.4 for providing shade trees; 8.5.3 for
providing on-site stormwater management; 10.3 and 10.3.4 and 10.3.5 for reducing vehicular
trips by providing a park-and-ride lot; 13.1 for convenient location of services; and 15.1 for
directing growth to an area with existing City services.
The project is consistent with Circulation Element (CIR) Policies and Programs 1.1.6 for
requiring the developer to provide for construction of the street; 1.3.1 for avoiding diverting
traffic through the existing neighborhood; 1.3.3 for locating the church on an arterial with
minimal driveways; 1.4 for requiring a tree lined street; 1.5.1 for requiring adequate off -street
parking; 1.5.3 for landscaping, lighting, screening and shade trees in the parking lot; 2.2.2 for
providing bicycle parking; 2.3.1 for providing adequate sidewalks; and 3.1 and 3.2.3 for
providing a park-and-ride lot to promote alternatives to single-occupancy vehicle travel. CIR
Policy 1.3 is to maintain level of service (LOS) C or better at all intersections. While the adjacent
intersections do not meet this standard under existing conditions, the project will result in an
increase of off-peak trips, which will not further degrade the LOS.
77
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
The project is also in conformance with the Noise and Safety Element of the General Plan. The
applicant has provided a noise study for the impact of traffic noise from Highway 101, and
Ardilla and Santa Lucia Roads on the church which is a noise-sensitive land use. The study
showed the expected noise is within allowed limits set by the General Plan (Safety and Noise
Element Goals 6, 7, and 10).
2. The proposed project or use satisfies all applicable provisions of this title; and
Fact. The church use is located on two minor arterials streets. In the multi-family zoning
districts, church facilities are not restricted to limited functions as in the single-family zoning
districts.
3. The establishment, and subsequent operation or conduct of the use will not, because of
the circumstances and conditions applied in the particular case, be detrimental to the
health, safety or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in
the vicinity of the use; and
Fact. St. William’s Parish has been located at this site since the 1950’s without significant
negative impact on the surrounding neighborhood. The church leaders report their commitment
to being a good neighbor. The growing parish will accommodate their expansion with the new
structures but also with additional Sunday masses as needed. The frontage improvements
required on Ardilla and Santa Lucia Roads will significantly increase safety for pedes trians and
vehicular traffic.
4. That the proposed project or use will not be inconsistent with the character of the
immediate neighborhood or contrary to its orderly development; and
Fact. While the church is located in a residential area, it is adjacent to Highway 101, and near
downtown, Atascadero High School and Atascadero Bible Church.
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the land use
element; and
Fact. At peak hours, traffic at the Highway 101 interchange at Traffic Way experiences an F
rating in the southbound direction. Northbound traffic experiences a C in the morning and D
during the evening commute. The intersection of Ardilla and Traffic Way experiences a level of
service of B during peak times. At other times of the day, the circulation of this area functions at
an A level of service. Weekday traffic to the church is limited enough to allow a park-and-ride
lot to be located on site. While the new buildings will increase trips to the area, they are off -peak
trips that will not contribute significantly to morning and evening rush hour delays. Required
frontage improvements will provide a safer turn radius at the Ardilla and Santa Lucia intersection
and better pedestrian facilities that provide part of needed connections to downtown.
6. That the proposed project is in compliance with any pertinent City policy or criteria
adopted by ordinance or resolution of the City Council.
Fact. The City Council has not adopted policies pertinent to this project.
78
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
SECTION 3. Findings for Planning Commission Parking Modification. The Planning
Commission finds as follows:
1. The characteristics of a use or its immediate vicinity do not necessitate the number of
parking spaces, type of design, or improvements required by this title; and
Fact. The typical operation of the church will not use all the structures at the same time. The
modification of the parking requirement reflects the maximum number of spaces required if the
largest assembly space (the church) is completely occupied and the youth center is likewise
occupied.
2. Reduced parking will be adequate to accommodate on the site all parking needs
generated by the use.
Fact. The parking needs for typical operation of the church will be satisfied by the reduced
parking requirement.
SECTION 4. Findings for Planning Commission Landscaping Modification . The Planning
Commission finds as follows:
1. That existing vegetation, topography or structural arrangement preclude the need for
landscaping.
Fact. The developed parts of the property will be well landscaped. The Venado Avenue frontage
will be left in a natural state. Proposed landscaping coverage is consistent with other non-
residential uses in the City. The areas most visible from adjacent arterial streets will be
landscaped.
SECTION 5. Findings for Planning Commission Fencing Modification. The Planning
Commission finds as follows:
1. That specifically identified characteristics of the site or site vicinity would make required
fencing or screening unnecessary or ineffective.
Fact. The full fencing requirement will be provided on most sections of the church’s exterior
property lines. Near the Venado Avenue frontage a lower profile fence will be left in place in
keeping with the existing appearance of the neighborhood. The multi-family development at the
corner of Santa Lucia Road and Venado Avenue does not need screening on its western property
line due to the topography and existing vegetation, which provides adequate screening.
SECTION 6. Findings for Approval of Tree Removal. The Planning Commission
recommends the City Council finds as follows:
1. The trees are obstructing proposed improvements that cannot be reasonably designed to
avoid the need for tree removal, as certified by a report from the Site Planner and
determined by the Community Development Department based on the following factors:
Early consultation with the City;
Consideration of practical design alternatives;
Provision of cost comparisons (from applicant) for practical design alternatives;
If saving tree eliminates all reasonable uses of the property; or
If saving the tree requires the removal of more desirable trees.
79
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Fact. The applicant has consulted with City staff for many months in designing the site layout for
the project. He has considered multiple design alternatives to reduce the impact of the project on
the many oak trees on the property. The removal of one of the three trees to be removed will
benefit other trees nearby. The other two removals are unavoidable and allowing these trees to be
removed allows a site plan that retains many other native oak trees.
SECTION 7. Approval. The Planning Commission of the City of Atascadero, in a special
regular session assembled on August 1, 2017 resolved to approve the Conditional Use Permit,
Master Plan of Development, and associated Tree removal Permit subject to the following:
1. EXHIBIT A: Notice Of Determination
2. EXHIBIT B: Conditions of Approval
3. EXHIBIT C: Master Plan of Development / Site Plan
4. EXHIBIT D: Landscape Plan
5. EXHIBIT E: Fencing Plan
6. EXHIBIT F: Elevations – Youth Center
7. EXHIBIT G: Floor Plan – Youth Center
8. EXHIBIT H: Elevations – Conceptual Parish Hall
9. EXHIBIT I: Floor Plan – Conceptual Parish Hall
10. EXHIBIT J: Topographic Survey and Native Tree Inventory
11. EXHIBIT K: Native Tree Mitigation
On motion by Commissioner _____________ and seconded by Commissioner ______________
the foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
______________________________
Duane Anderson
Planning Commission Chairperson
Attest:
______________________________
Phil Dunsmore, AICP
Planning Commission Secretary
80
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Proposed Project Site
EXHIBIT A: Notice of Determination
PLN 2017-1642
CITY OF ATASCADERO
NOTICE OF EXEMPTION
6500 Palma Avenue Atascadero, CA 93422 805.461.5000
TO: File Date Adopted: July 24, 2017
FROM: Katie Banister, Assistant Planner
City of Atascadero
Community Development Department
6500 Palma Avenue
Atascadero, CA 93422
SUBJECT: Filing of Notice of Determination in Compliance with Section 21152.1 of the Public
Resources Code.
Project Title: PLN 2017-1642 – Master Plan of Development for St. William’s Parish
Project Applicant: St. William’s Parish, 6410 Santa Lucia Road, Atascadero, CA 93428
Project Owner: Roman Catholic Diocese of Monterey, P.O. Box 2048, Monterey, CA 93942
Project Location: St. William’s Parish, 6410 Santa Lucia Road, Atascadero, CA 93422 (San Luis
Obispo County, 030-271-023)
Project Area
81
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Project Description:
The proposed project consists of expansion of existing St. William’s Parish on 6410 Santa Lucia Road
located in the Residential Multi-Family (RMF-20) zoning district / High Density Residential (HDR) land
use designation. The Atascadero Municipal Code (AMC) defines St. William’s Parish as a “Churches and
Related Activities” use, which is subject to the standards in AMC section 9-6.121. Churches and related
activities located in the residential zoning districts require approval of a Conditional Use Permit (CUP),
consistent with AMC section 9-3.230.
St. Williams Parish proposes a master plan of development for future development of the church property.
Existing
• 6,500 square-foot church
• 3,500 square-foot parish hall
• 2,113 square-foot rectory
• Park-and-Ride lot
Phase 1:
• New 6,385 square-foot youth center,
• Expansion of the parking lot,
• Curb, gutter and sidewalk on the Ardilla Road frontage wrapping around the corner with Santa
Lucia Road, and
• Landscaping.
Phase 2:
• Demolition of the rectory (residence) and parish hall,
• New 14,000 square-foot parish hall with 2nd floor offices,
• New 1,000 square-foot storage building, and
• Curb, gutter and sidewalk on Santa Lucia Road and Venado Avenue.
The removal of three native oaks trees is proposed, including a 24-inch valley oak, 12-inch blue oak and
30-inch valley oak. Street trees on Santa Lucia Road may need to be removed and replaced to
accommodate curb gutter and sidewalk improvements.
Name of Public Agency Approving Project: City of Atascadero
Name of Person or Agency Carrying Out Project: Mark Lowerison / St. William’s Parish
Exempt Status:
Ministerial (Sec. 15073) Emergency Project (Sec. 1507 (b) and (c))
Declared Emergency (Sec. 15061 (a)) General Rule Exemption (Sec. 15061.c)
Categorically Exempt (Sec. 15301-15333): 15332
Reasons why project is exempt: The Class 32 Exemption of the California Environmental Quality Act
(CEQA) (Section 15332, In-Fill Development projects) consists of projects characterized as in -fill
development meeting the following conditions:
a) The project is consistent with the applicable general plan designation and all applicable general
plan policies as well as with applicable zoning designation and regulations.
Churches require a conditional use permit when located in the residential districts. This project is consistent
with its General Plan designation (High Density Residential), all applicable general plan policies, its zoning
82
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
designation (Residential Multi Family) and regulations with the approval of a Conditional Use Permit. The
General Plan Consistency Matrix at the end of this Notice of Exemption provides all pertinent General Plan
Policies and how the proposed project is consistent with the General Plan.
b) The proposed development occurs within city limits on a project site of no more than five acres
substantially surrounded by urban uses.
The proposed project is within the City limits of the City of Atascadero on a site 3.6 acres in size. The
property is surrounded by single & multi-family residential uses. The proposed project is located within an
existing church site, and the proposed project plans to develop new church facilities by building a 6,500
square-foot youth center, and removing the existing parish hall and rectory buildings, and constructing a new
two-story 14,000 square-foot parish hall and 1,000 square-foot storage building. Directly adjacent to the site
are existing residential uses.
c) The project site has no value as habitat for endangered, rare or threatened species.
The project site was developed with a church use in 1941. Areas without structures are used for outdoor
church activities and parking. The oak trees provide limited, fragmented habitat without critical value. No
endangered species are known to inhabit the site.
d) Approval of the project would not result in any significant effects relating to traffic, noise, air
quality, or water quality.
Traffic. City Staff analyzed expected daily trips and total peak “hour” trips for the project using the Institute
of Traffic Engineers (ITE) Vehicle Trip Generation Manual, 9th edition. When fully built, the project is
expected to generate 221 daily trips including 14 “AM peak” trips and 2 “PM peak” trips (existing conditions
generate 103 daily expected trips including 7 “AM Peak” trips and 1 “PM Peak” trip) . This calculation
assumes that assembly spaces will be used concurrently; however, the applicant reports the assembly spaces
are used for different purposes and rarely at the same time. Further, the majority of trips are expected on
weekends. No significant impact is expected to peak hour trips.
Noise. Churches are considered a sensitive noise receptor. Due to its proximity to Highway 101, the church
is exposed to transportation noise. An acoustical analysis was prepared to quantify the level of exposure.
Recorded noise levels are currently within the allowed limit for exterior noise. New structures are
conditioned to attenuate interior noise levels and the structures will also block noise in outdoor use areas. No
significant noise impact is expected.
Air Quality. The proposed project has been analyzed for air quality impacts utilizing the San Luis Obispo
County Air Pollution Control District (SLOAPCD) threshold of significance for both construction and
operational impacts, as outlined in the agency’s CEQA Air Quality Handbook, April 2012. Projects expected
to exceed 1150 CO2e (MT/year) of greenhouse gases (GHG) and 25 lb/day of ozone precursors (ROG +Nox)
are considered significant. Emissions are calculated using the size and use of a structure.
The 2012 APCD CEQA Handbook contains operational screening criteria to determine if a proposed
project has a potential to have a significant impact to air quality. SLOAPCD recognizes that a proposed
church would need to exceed 73,000 sf of gross floor area to exceed operational and construction
thresholds for GHG. Similarly, a church exceeding 48,000 sf of gross floor area may cause a project to
exceed the Ozone precursor threshold. Table 2 below shows thresholds of significance for each proposed
use. The proposed size is expressed as a ratio of maximum-size-without-exceeding-thresholds to
demonstrate the cumulative impact of all proposed uses. Per Table 2, the project is expected to produce
83
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
332 CO2e (MT/year) (28.9% of the threshold of significance), and 9.6 lb/day of ROG and Nox (38.4% of
the threshold of significance). The proposed project falls below the established threshold for operational and
construction standards for GHG and ozone precursor emissions. The applicant will need to abide by all
applicable construction related rules and regulations for building permits, remodels and demolition.
Table 2. APCD Air Quality Threshold Analysis
Use Proposed
(sq. ft.)
GHG Threshold
(sq. ft.)
GHG
(%)
Ozone Threshold
(sq. ft.)
Ozone
(%)
Church (youth center and
assembly area of parish hall)
16,400 73,000 22.5 48,000 34.2
Offices 4,000 69,000 5.8 104,000 3.8
Storage Building 1,000 173,000 0.6 269,000 0.4
Percentage of maximum allowed pollutant for the entire project 28.9 38.4
Water Quality. During construction, the project will be required to prevent erosion and pollutant-carrying
runoff by stabilizing graded areas and slowing water leaving the site. Once complete, the project must
comply with Regional Water Quality Control Board Post-Construction Stormwater Management
Requirements. The applicant has provided a site plan that does not disturb creeks or natural drainage
patterns, leaves a large portion of the permeable soils on site undisturbed, and will direct runoff to vegetated
areas. At the time of applying for building permits, the applicant will submit a stormwater control plan to the
City staff, who will ensure compliance.
e) The site can be adequately served by all required utilities and public services.
The proposed project is currently served by all utilities including electric (Pacific Gas and Electric Company),
natural gas (Southern California Gas Company) and telecommunication (Charter Cable / AT&T). Existing
public services at the site include sewer service as provided by the City of Atascadero and water service by
the Atascadero Mutual Water Company (AMWC). These service providers have adequate capacity to
continue to serve the site at completion of the project.
Contact Person: Katie Banister, Assistant Planner, kbanister@atascadero.org, (805) 470-3480
Date: July 24, 2017 ________________________________
Katie Banister, Assistant Planner
Attachment A: General Plan Policies and Programs Consistency Matrix
84
City of Atascadero
2025 General Plan Policies & Programs Consistency Matrix – PLN 2017-1642
Policy Program Consistency
Land Use Element / Open Space and Conservation
Policy 1.1. Preserve the rural
atmosphere of the community and assure
“elbow room” in areas designated for
lower density development by guiding
new development into the Urban Core to
conform to the historic Colony land use
patterns of the City and to respect the
natural environment, hillside areas, and
existing neighborhoods
7. Within the Urban Core encourage infill
development or the revitalization or reuse of land
already committed to urban development where
utilities and public services exist.
The proposed project is an infill development on
existing church property. The project would utilize
vacant land behind the existing facilities and
replace existing facilities with a larger parish hall.
The property is surrounded my residential uses.
All utilities are available including roads and the
City sewer.
8. Appropriate land use and corresponding lot size
and density shall be determined by site
conditions, slope, neighborhood characteristics,
and proximity to the Urban Core rather than by
the availability of sewer.
The proposed land use, a Church and Related
Activities, is appropriate for this location. The site
has been used as a church since the 1940’s, and
will continue to be used as a church. The
property is located on two minor arterial streets
adjacent to Highway 101. The project makes use
of the natural grade and the proposed density of
buildings is consistent with the high-density multi-
family residential zoning district.
10. Require the comprehensive master planning of
large development projects to minimize
environmental impacts and maximize community
compatibility. Projects identified in and shall be
required to have an approved Master Plan of
Development prior to any site development. The
Master Plan of Development may be approved in
the form of Conditional Use Permit, Planned
Development, or Specific Plan
The project is master planned taking into
consideration all proposed phases of
development.
Policy 1.3: Enhance the rural
character and appearance of the City,
including commercial corridors,
gateways and public facilities.
11. Update and maintain the Appearance Review
Manual to include provisions for rural character
design features, street trees, landscaping,
parking, fencing, screening, and architectural
design (except for single family development),
with standards tailored to specific areas of the
City, including commercial corridors, and
gateways such as Highway 101 and Morro Road.
The project will provide street trees, landscaping,
parking, and screening for residential uses. The
construction materials for the youth center, which
is closer in proximity to residential uses, are
similar to residential construction materials. The
proposed elevation is similar to a residential use.
The proposed hall is a larger, more commercial-
type structure. It is placed closer to Santa Lucia
and screened from nearby apartments. Churches
are a common part of the rural landscape and St.
William’s acts as a buffer between Highway 101 85
City of Atascadero
2025 General Plan Policies & Programs Consistency Matrix – PLN 2017-1642
Policy Program Consistency
and nearby residences.
12. Require landscaping and/or screening to buffer
non-residential uses from residential areas.
As conditioned, the proposed project will include
fencing along its perimeter, where appropriate, to
screen residences from the church use.
Policy 1.4: Ensure that “darkness” remain
a rural characteristic by requiring that all
exterior lighting does not result in
significant off-site spillage or glare.
13. Amend and maintain the Sign and Zoning
Ordinances to require that all nondecorative
exterior lighting shall be shielded to direct light
toward buildings or the ground.
As conditioned, the proposed project will provide
lighting fixtures with appropriate screening and a
timer to extinguish outdoor lighting after hours of
operation
Policy 2.1: Ensure that new development
is compatible with existing and
surrounding neighborhoods.
1. Require that the appearance, mass and scale of
multi-family development is compatible with
adjacent single-family neighborhoods.
The proposed project is in a multi-family zoning
district. The elevation of the proposed youth
center is similar to a residential use. The
proposed hall is a larger, more commercial-type
structure. It is placed closer to Santa Lucia and
screened from nearby apartments and single-
family residences. The view from Venado, where
nearby single-family residences are located, will
not be significantly altered in Phase 1. The
appearance of the Phase 2 storage building will
be reviewed by the Design Review Committee for
neighborhood compatibility. St. William’s Parish
acts as a buffer between Highway 101 and nearby
residences.
3. Update Public Works standards for roadways to
provide for street trees and landscaping
consistent with the community's rural character.
The project is required to provide street trees and
a low wall screening parking from the public
street. The parking area will include shade trees
and drought-tolerant landscaping.
6. Require Conditional Use Permit approval for
social establishments, including senior citizen
facilities, in residential areas.
Per Atascadero Municipal Code section 9-6.121,
this project requires CUP approval. Current
existing use on this property is Churches and
Related Activities, and will be compatible with
existing and surrounding neighborhoods.
Policy 2.3: Incorporate Pedestrian and
Transit Oriented design concepts into
new residential and commercial
development within the Urban Core
3. Pedestrian walkways shall be prioritized in new
residential developments and between
residential developments and commercial areas.
The project will include sidewalk improvements on
Ardilla and Santa Lucia Roads, two heavily used
pedestrian corridors connecting downtown, the
high school and nearby residences. This corner
currently lacks pedestrian facilities. Street trees 86
City of Atascadero
2025 General Plan Policies & Programs Consistency Matrix – PLN 2017-1642
Policy Program Consistency
will also be provided.
Policy 4.2: Enhance the appearance of the
downtown area and improve pedestrian
circulation.
3. Develop a comprehensive streetscape and
pedestrian access plan for the Downtown area.
The project will provide better access for
pedestrians between the downtown and nearby
residences.
Policy 5.2: Require hillside development
and subdivisions to blend in with
surrounding topography.
2. Update and maintain the Zoning Ordinance to
require structures to be located below prominent
ridgelines visible from City streets, when
alternative building sites are available.
While the youth center will be located on a higher
elevation than the existing facilities, it is not on a
ridgeline. The youth center has a relatively low
profile (19 feet in height), and the uphill side is cut
approximately 8 vertical feet into the slope. The
structure is partially screened from nearby streets
by trees and other buildings on the site.
3. Update the Zoning Ordinance to include
standards for minimizing hillside grading, cuts,
fills, and ridgeline disturbance.
The youth center will be located on a relatively flat
terrace above the church. It will utilize retaining
walls and stem wall construction to minimize the
amount of grading required. The driveway and
parking areas are designed to utilize the existing
slope wherever possible.
4. Prohibit development on slopes 30% or greater,
unless no other feasible building site exists
The average slope of the site is about 10%.
Policy 5.3: Prevent unnecessarily
intensive grading of development sites.
2. Limit grading to the minimum area necessary to
accomplish site development.
The site plan embraces the topography of the
property wherever possible to minimize grading.
Policy 6.2: Protect prehistoric cultural
resources from disturbance associated
with development.
2. For discretionary projects within the generalized
areas of archaeological resources, require Phase
I surveys to determine the extent and
significance of archaeological sites prior to
approval
The applicant has worked with the local Native
American community to ensure archeological and
cultural resources are preserved if found on-site.
A representative from the Salinan Tribe visited
and walked the site on July 12, 2017. Her general
assessment concluded a Phase I survey is not
necessary on the site due to the shallow shale
formation where the youth center will be located.
The Atascadero Municipal Code requires work to
stop and appropriate agencies and tribes to be
contacted if archeological resources are
discovered during construction.
Policy 6.4: Encourage conservation and
preservation of structures and houses
that have historical and architectural
1. Protect historic buildings and sites. Atascadero's
historic buildings and features shall be
preserved and protected in recognition of the
Two of the three existing structures on site are
more than 50 years old, which is considered
historical by the California Environmental Quality 87
City of Atascadero
2025 General Plan Policies & Programs Consistency Matrix – PLN 2017-1642
Policy Program Consistency
significance. role the community's past plays in its present
and future. Historic overlay zoning shall be
utilized to protect appropriate historic districts.
Act. The rectory was constructed in 1949, but is
not historically significant. The parish hall was
brought to the site from Camp Roberts in 1941.
The building was a warehouse-type structure at
the military base and is also not historically
significant. In contrast, the church building, which
was constructed in 1969 (48 years old), has
significant mid-century modern architectural
features inspired by Frank Lloyd Wright. The
church intends to retain this minor Atascadero
landmark.
Policy 7.1: Ensure that the native trees of
Atascadero are protected from new
development in order to retain the natural
character of the community.
1. Enforce all provisions of the Atascadero Native
Tree Ordinance as a high priority.
The project requires the removal of three native
trees. The architect has supplied a site plan that
integrates the majority of native trees into the
landscaping. The trees removed will be mitigated
to the standard of the Native Tree Ordinance.
Policy 7.2: Protect and replenish native
tree populations, including saplings.
1. Continue to implement and enforce the Native
Tree Ordinance to protect and replenish native
tree species within the City. Construction
permits for both residential and non-residential
development shall be required to preserve as
many native trees as possible. Buildings shall
be designed to utilize existing trees in the
landscaping pattern. Any trees removed shall
either (1) be replaced with like species, (2) in-
lieu contributions made to the City's tree
replacement fund or (3) have Planning
Commission approved conservation easements
created depending on the characteristics of the
affected site.
The project requires the removal of three native
trees. The architect has supplied a site plan that
integrates the majority of native trees into the
landscaping. The trees removed will be mitigated
to the standard of the Native Tree Ordinance
either by replanting on-site or paying into the tree
replacement fund so trees can be planted
elsewhere in the City.
3. The City shall implement a comprehensive
program for street tree planting and
maintenance within the Urban Core and all
major routes and approaches to the community.
The project includes planting street trees adjacent
to the sidewalk on both Ardilla and Santa Lucia
Roads.
4. Require planting of large canopy shade trees in
new projects, in part to provide shading adjacent
to buildings to conserve energy use.
The proposed landscape plan adds approximately
20 street trees and 20 shade trees to the site.
Approximately 15 native oak trees are retained. 88
City of Atascadero
2025 General Plan Policies & Programs Consistency Matrix – PLN 2017-1642
Policy Program Consistency
Many of these trees will shade parked cars and
the parking lot area, which can lower the “heat-
island” effect of asphalt.
Policy 8.5: The City shall implement a
storm water control program consistent
with the requirements of the National
Pollution Discharge Elimination System
(NPDES) Permit Program (Phase II).
3. New development shall be required to maintain
historic off-site storm flows unless improvements
are made that maintain historic downstream and
upstream flows
The project must comply with Regional Water
Quality Control Board post-construction
stormwater requirements, which will maintain
historic flows of stormwater.
Policy 10.3: Support regional efforts to
maintain clean air.
3. Concentrate new intensive development at
identified nodes to help reduce vehicle trips.
The site is at the intersection of two well-traveled
minor arterial roads.
5. Support the development of park and ride
locations in appropriate locations
The church has an existing park-and-ride lot.
Policy 13.1: Facilitate convenient location
of goods and services needed by local
residents.
The church is located closed to residences and
has nearby access to Highway 101.
Policy 15.1: Growth should be directed
to areas where services can be provided
in a cost-effective manner.
The project is proposed for a location where City
services are in place. The City will not incur
significant costs to provide service to this use.
Circulation
Policy 1.1: Plan, fund and implement
circulation improvements necessary to
comply with adopted City safety and level
of service standards, and the General
Plan Circulation Diagram
6. Maintain an equitable funding and capital
expenditure system for roadway improvement
that includes requiring developers to provide for
construction of their fair-share portion of arterial,
collector, and local streets at the time of
development.
The project will install curb, gutter and sidewalk
frontage improvements on Ardilla Road, Santa
Lucia Road, and Venado Avenue. The
intersection of Ardilla and Santa Lucia Roads will
be given new geometry to provide a more square
turn which will result in safer vehicle movements
through the intersection.
Policy 1.3: Maintain LOS C or better as the
standard at all intersections and on all
arterial and collector roads. Upon City
Council approval, accept LOS D where
residences are not directly impacted and
improvements to meet the City’s standard
would be prohibitively costly or disruptive
The Highway 101 interchange at Traffic Way
experiences level of service F during peak hours.
Traffic Way from Ardilla to Highway 101 is
expected to have a level of service D by 2025
without mitigation measures. The majority of this
traffic is due to the high school and proximity to
downtown. The majority of trips generated by the
church are during off-peak hours, and will not
contribute significantly to localized traffic
congestion. The roadway improvements to the
intersection of Ardilla and Santa Lucia Roads will
improve the safety of traffic movements there. 89
City of Atascadero
2025 General Plan Policies & Programs Consistency Matrix – PLN 2017-1642
Policy Program Consistency
1. Require new commercial development design to
avoid diverting traffic through existing residential
neighborhoods.
While a driveway is provided to Venado Road, a
condition of approval requires this access way to
be blocked by locked gate or chain.
3. Locate high traffic generating uses along arterial
streets with a minimum number of driveways.
Driveways and access points should be shared
whenever possible.
Both Ardilla and Santa Lucia Roads are minor
arterial roads. The church will continue to use the
three existing driveways on these roads. No new
points of access will be added.
Policy 1.4: Preserve the winding, tree-
lined nature of the city street system in
hillside areas
Trees currently located on Santa Lucia are not
well maintained. They will need to be removed
due to the alignment of the future sidewalk.
London Plane Sycamore Trees will be provided
on both Ardilla and Santa Lucia Road at 30-foot
intervals.
Policy 1.5: Maintain an adequate and
well-designed supply of off-street parking,
particularly in commercial, industrial, and
higher- density residential areas.
1. Require all development to provide sufficient and
convenient parking areas with minimal conflict
with street traffic.
The applicant proposes total 159 on-site parking
spaces. The Atascadero Municipal Code requires
a total of 401 parking spaces for the proposed
project assuming all assembly spaces are used
simultaneously. Typical operations use only one
assembly space at a time, which would
necessitate 168 parking spaces at the
construction of Phase 2.
The Atascadero Municipal Code section 9-4.115
allows reducing the required number of parking
spaces through Conditional Use Permit approval,
provided that the parking lot uses will be adequate
and sufficient.
3. Require off-street parking areas to include
landscaping, screening, lighting and shade trees
to mitigate adverse visual impacts and provide
comfort for users.
As conditioned, the proposed project will include a
landscaped off-street parking area utilizing
drought tolerant plant species and including many
shade trees. New lighting fixtures will provide an
up to date appearance.
Policy 2.2: Accommodate bicycles at
major destinations including downtown,
bus stops, schools, and other public
facilities.
2. Require adequate and safe bicycle access and
bicycle parking in conjunction with new
development.
The project is conditioned to include at least one
bicycle parking rack to hold a minimum of 5
bicycles.
Policy 2.3: Promote walking as an 1. Develop pedestrian-friendly design standards The project will include sidewalk improvements on 90
City of Atascadero
2025 General Plan Policies & Programs Consistency Matrix – PLN 2017-1642
Policy Program Consistency
alternative to vehicle travel in retail
district and multi-family areas.
that apply to all residential and commercial
projects and require construction of adequate
sidewalks and/or pedestrian trails in new
development.
Ardilla and Santa Lucia Roads, two heavily used
pedestrian corridors connecting downtown, the
high school and nearby residences. This corner
currently lacks pedestrian facilities.
Policy 3.1: Promote alternatives to single-
occupancy vehicle travel, particularly for
commute trips.
1. Seek funding for programs that promote transit,
ridesharing, bicycling and walking.
The St. William’s Parish has an agreement with
Caltrans Park & Ride program to share the
church’s parking space with Caltrans to promote
ridesharing in Atascadero.
Policy 3.2: Encourage expansion of public
transit as needed to meet the changing
needs of the area for local and regional
access, including fixed route and demand
response where appropriate.
3. Support and encourage the use and expansion
of Park & Ride facilities.
The St. William’s Parish has an agreement with
the Caltrans Park & Ride program to share the
church’s parking space with Caltrans to promote
ridesharing in Atascadero.
Noise and Safety 91
City of Atascadero
2025 General Plan Policies & Programs Consistency Matrix – PLN 2017-1642
Policy Program Consistency
2: New development of noise-sensitive
land uses shall not be permitted in areas
exposed to existing or projected future
levels of noise from transportation noise
sources which exceed 60 dBn or CNEL
(70 Ld,/CNEL for playgrounds and
neighborhood parks) unless the project
design includes effective mitigation
measures to reduce noise in outdoor
activity areas and interior spaces to or
below the levels specified for the given
land use in Table IV-3.
1. The City shall review new public and private
development proposals to determine
conformance with the policies of this Noise
Element.
2. Allow noise barriers and modifications to
buildings containing noise-sensitive uses only
when site planning alone cannot adequately
accomplish noise reduction.
3. Require all noise barriers and sound attenuation
walls to be constructed of architecturally
attractive materials and buffered with
landscaping.
4. Amend the zoning ordinance to require masonry
sound attenuation barriers between commercial
and residential districts.
5. When mitigation must be applied to satisfy the
policies in Chapter 3.3, the following priorities for
mitigation shall be observed, where feasible:
a) First: Setbacks/open space separation
b) Second: Site layout/orientation/shielding of
noise-sensitive uses with nonnoise-sensitive
uses
c) Third: Construction of earthen berms
d) Fourth: Structural measures: acoustical
treatment of buildings and noise barriers
constructed of concrete, wood, or materials other
than earth.
6. Where the development of a project subject to
discretionary approval may result in land uses
being exposed to existing or projected future
noise levels exceeding the levels specified by the
policies, the City shall require an acoustical
analysis at the time the application is accepted
for processing. For development not subject to
discretionary approval and/or environmental
review, the requirements for an acoustical
analysis shall be implemented prior to the
issuance of a building permit. The requirements
for the content of an acoustical analysis are given
in the following section
The General Plan identifies churches as a
sensitive noise receptor. Due to its proximity to
Highway 101, the church is exposed to
transportation noise. An acoustical analysis was
prepared to quantify the level of exposure. Table
IV-3 permits a maximum of 60dB for outdoor uses
and 45 dB for indoor uses for churches. At the
time of peak-hour traffic, noise level
measurements were taken at two locations.
Location 1 (site of the future outdoor playground)
experiences 58.1 dBA Leq(h) and will be
screened from freeway noise by the youth center.
Location 2 (in the footprint of the future youth
center) experiences 60.2 dB Leq(g). This noise
level will be mitigated by a condition requiring
building materials to reduce the noise level to
below 45 dB inside the building.
92
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT B: Conditions of Approval
PLN 2017-1642
Conditions of Approval
Master Plan of Development
St. William’s Parish
6410 Santa Lucia Road
CUP 2017-0311
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary
Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
1. Conditional Use Permit 2017-0311 shall be for a master plan of development for a
church and related activities use as described in attached Exhibits C, D, E F, G,
H, and I, located at 6410 Santa Lucia Road (assessor’s parcel numbers 030-271-
023, 030-271-006, 030-271-012, 030-271-015, and 030-271-025), regardless of
owner.
Ongoing PS
2. Tree Removal Permit 2017-0216 allows the removal of 3 oak trees (identified by
the project arborist as trees #102, 104 and 179) totaling 66 inches in diameter on
parcels 030-271-025 and 030-271-006 as shown in Exhibit J, regardless of
owner.
BP PS
3. The approval of this use permit shall become final and effective for the purposes
of issuing building permits fourteen (14) days following the Planning Commission
approval unless prior to the time, an appeal to the decision is filed as set forth in
Section 9-1.111(b) of the Zoning Ordinance.
Ongoing PS
4. The Community Development Department shall have the authority to approve the
following minor changes to the project that (1) modify the site plan project by less
than 10%, (2) result in a superior site design or appearance, and/or (3) address a
construction design issue that is not substantive to the Conditional Use Permit.
Ongoing PS, CE
5. Approval of this Conditional Use Permit shall be valid for twenty-four (24) months
after its effective date. At the end of this time period, the approval shall expire
and become null and void unless the project has received a building permit or a
time extension. If Phase 2 does not receive a construction permit and commence
construction within 5 years of the effective date of this resolution, the project
approvals shall become null and void unless a time extension is approved.
BP PS
6. The owner and applicant shall defend, indemnify, and hold harmless the City of
Atascadero or its agents, officers, and employees against any claim or action
brought to challenge an approval by the City, or any of its entities, concerning this
conditional use permit.
Ongoing CA
Planning Services
7. The design of the hall and storage building shall be approved by the Design
Review Committee before building permits are issued for these structures. The
hall shall be limited to a maximum of 15,000 square feet in floor area, and the
storage building shall be limited to a maximum of 1,500 square feet of floor area.
BP PS
8. The three (3) existing cargo containers with space enclosed between the 2nd and
3rd containers may remain on parcel 030-271-025 until the building permit for the
new hall is finalized. At that time, the containers shall either be removed or the
owner shall apply for a building permit to legalize them. The cargo containers
cannot be altered or expanded, and no additional cargo containers may be placed
on the site unless an amendment to this conditional use permit is approved.
Existing fencing or functionally equivalent screening shall be kept in place
BP PS / BS
93
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
between the containers and Venado Avenue.
9. The owner shall provide 159 parking spaces before the building permit for the first
building is finalized. The spaces may be a combination of full size, compact,
motorcycle, and bicycle spaces as permitted by Atascadero Municipal Code 9-
4.115.
BP PS
10. The owner shall provide at least one bicycle rack for five (5) or more bicycles at a
location to be approved by Planning Services staff. Location of bicycle parking
shall be close to a building entry.
BP PS
11. Before building permits for the new hall (Phase 2) can be approved, the owner or
applicant shall provide an assessment of the function of the parking lot for uses
present at that time, and whether the 159 parking spaces provided will be
sufficient for the larger hall. If found by Planning Staff to be insufficient, additional
parking spaces shall be provided, as needed.
BP PS
12. Native trees shall not be removed until the building permit for the youth center
is issued.
BP PS
13. The owner shall mitigate the tree removals by replanting native trees, making
appropriate payment to the tree mitigation fund, or a combination thereof as
shown in Exhibit K. Fifteen-gallon trees may be substituted for five-gallon
replacement trees per the Atascadero Native Tree Guidelines.
BP PS
14. Payment to the tree mitigation fund or approval of a tree replanting and
irrigation plan shall occur before the building permit for the youth center
(Phase 1) is finalized.
BP PS
15. If tree replanting is selected, the owner shall provide drip irrigation to new trees
until they are established.
BP PS
16. The owner shall provide high-quality pavers to be placed under the 18-inch
valley oak in the new parking area to be approved by Planning Services staff.
BP PS
17. The owner shall provide landscaping as generally shown in Exhibit D,
including shade trees in the parking area and street trees on both Ardilla and
Santa Lucia Roads, revegetation of the landscape planters between the
existing parking areas, and new landscaping planters bordering parking areas.
At the time of application for building permits, the owner or applicant shall
provide a landscaping and irrigation plan in conformance with the City Water
Efficient Landscape Ordinance to be approved by Planning Services staff.
BP PS
18. The owner shall provide a three (3) foot tall solid fence, decorative wall or
landscape equivalent between the sidewalk and parking lot where parked cars
are arranged to head toward the street. Sections of this wall may be
constructed in time with frontage improvements.
BP PS
19. The driveway on Venado Avenue shall be blocked by a locked gate, cable or
chain during normal operations. The driveway may be used in emergencies
and occasionally for staff purposes, but shall not be used for ingress or egress
for general parishioner use.
BP PS / FD
20. New lighting shall conform to the standards of Atascadero Municipal Code 9-
4.137 for exterior lighting. All pole lighting shall be shielded from neighboring
properties and buildings. Before the building permit for Phase 1 improvements
is finalized, a nighttime inspection of light intensity and shielding shall be
required to ensure conformance with City standards.
BP PS
21. Exterior lighting shall be placed on a timer device to extinguish lights every
night at 10 o’clock PM, except on those nights when a church function
continues past this time. In that event, lights shall be turned off at the
conclusion of the church function.
Ongoing PS
22. Stucco on the Youth Center shall have a smooth hand-troweled finish. BP PS
23. Colors for the Youth Center shall be a muted earth tone to be approved by
Planning Services Staff.
BP PS
94
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
24. Interior noise from exterior sources received in the youth center and new hall
shall be attenuated to a maximum of 45 Leq dB.
BP BS / PS
25. All new utilities and utilities to new structures shall be installed underground. BP PS
Building Services
26. New buildings shall conform to all Building Code requirements including
permitting, room sizes, restrooms, exiting, path of travel, etc. Inclusion of the floor
plan with this conditional use permit does not provide relief from standard Building
Codes in place at the time of submittal of building permits.
The owner or applicant shall obtain a building permit prior to beginning any
demolition or construction work on site.
BP BS
Public Works
27. A Storm Water Control Plan (SWCP) shall be prepared in accordance with City
Standard Specifications and the Regional Water Quality Control Board Res.
No. R3-2013-0032. The SWCP shall be completed on the City standard form
available from the City Engineer.
BP PW
28. A lot merger or lot line adjustment shall be completed as necessary to align
with the proposed building locations in order to conform to property line set
back requirements as defined in the City’s zoning regulations, to the
satisfaction of the City Engineer and Community Development Director.
Easements for access and utilities shall be created or adjusted as necessary,
to the satisfaction of the City Engineer.
BP PW / PS
29. The property owner shall design and construct new street frontage
improvements along all three public street frontages. Frontage improvements
shall be designed and constructed in accordance with City Standards and
Specifications and to the satisfaction of the City Engineer as follows:
a. Ardilla: An integral curb-gutter-sidewalk, driveway approaches, and one
pedestrian curb ramp in alignment with the northerly side of Traffic Way.
b. Ardilla and Santa Lucia intersection: Integral curb-gutter-sidewalk, one
pedestrian curb ramp, and storm drain inlet.
c. Santa Lucia: Curb-gutter-sidewalk and driveway approach. Sidewalk on
Santa Lucia may be detached in accordance with City standards subject
to approval by the City Engineer.
d. Venado: An integral curb-gutter-sidewalk and driveway approach.
The street improvements on Santa Lucia and Venado (identified in c & d
above) may be deferred upon execution of a Covenant & Agreement with the
City to guarantee the future installation of said improvements. The frontage
improvements can be required at any time in the future upon demand of the
City Engineer. The Santa Lucia frontage will not be deferred beyond the time
of construction of Phase 2 (Hall building).
BP PW
30. Prior to final inspection of the public street improvements, the property owner
shall submit record drawings for review and approval by the City Engineer.
BP PW
31. Fire Department
32. New facilities shall conform to all Fire Code and City Fire Department Policy
requirements including, but not limited to, driveway slope and length, fire truck
turn around, location of fire hydrants, and fire sprinklers.
BP FD
95
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT C: Master Plan of Development / Site Plan
PLN 2017-1642
Existing
Church
Future
Hall
New
Youth
Center
Future
Storage
Expanded
Parking
Area
96
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT D: Landscape Plan
PLN 2017-1642
97
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
Plant Pallette
98
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT E: Fencing Plan
PLN 2017-1642
3-foot tall solid fence,
decorative wall or
landscape equivalent
6-foot tall solid
fence or wall
Rail fence to
remain
No fencing
required
Screening around cargo
containers to remain until
containers are removed
6-foot tall solid
fence or wall
Driveway entrance to be
blocked with a locked gate
or similar obstruction
99
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT F: Elevations – Youth Center
PLN 2017-1642
100
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
101
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT G: Floor Plan – Youth Center
PLN 2017-1642
102
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT H: Elevation – Conceptual Parish Hall
PLN 2017-1642
103
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT I: Floor Plan – Conceptual Parish Hall
PLN 2017-1642
104
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
105
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT J: Topographic Survey and Native Tree Inventory
PLN 2017-1642
X – Tree 102
X – Tree 179
X – Tree 104
106
ITEM 4 | 08/01/2017
Master Plan of Development
PLN 2017-1642 / St. William’s Parish
Planning Commission | City of Atascadero | www.atascadero.org | fb.me/planningatascadero
EXHIBIT K: Native Tree Mitigation
PLN 2017-1642
Evergreen Native Trees (inches)Deciduous Native Trees (inches)Totals
dbh notes dbh notes
1 1 24-inches #102
2 2 12-inches #104
3 3 30-inches #179
4 4
5 5
6 6
Total 0-inches Total 66-inches 66-inches
Mitigation Requirement
req'd tree replacements:0 five gal trees req'd tree replacements:44 five gal trees 44 five gal trees
Proposed Replanting 0 five gal trees Proposed Replanting 0 five gal trees 0 five gal trees
0 box trees (24'')0 box trees (24'')0 box trees (24'')
Remaining Mitigation 0 five gal trees Remaining Mitigation 44 five gal trees 44 five gal trees
Tree Fund Payment:-$ Tree Fund Payment:2,200.00$ 2,200.00$
107
108