HomeMy WebLinkAboutPC Resolution 2016-0029
EXHIBIT A: Categorical Exemption
PLN 2016-1590 / TPM 2016-0103
EXHIBIT B: Conditions of Approval
PLN 2016-1590 / TPM 2016-0103
Conditions of Approval
PLN 2016-1590 / TPM 2016-0103
8585 / 8575 Atascadero Avenue
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Planning Conditions
1. The approval of this application shall become final, subject to the completion of the
conditions of approval, fourteen (14) days following the Planning Commission approval
unless prior to the time, an appeal to the decision is filed as set forth in Section 9-
1.111(b) of the Zoning Ordinance.
Ongoing
PS
2. Approval of this Tentative Parcel Map shall be valid for a period of twenty-four (24)
months and shall expire on November 1, 2018, consistent with Section 66452.6(a)(1)
of the California Subdivision Map Act.
FM PS
3. The approved Tentative Parcel Map may be extended consistent with Section
66452.6(e) of the California Subdivision Map Act. A one (1) year extension may be
granted consistent with Section 9-2.117(a) of the Atascadero Municipal Code. Any
subsequent tentative map extensions shall be consistent with Section 11-4.23 of the
Atascadero Municipal Code.
FM PS
4. The Community Development Department shall have the authority to approve minor
changes to the project that (1) result in a superior site design or appearance, and/or
(2) address a construction design issue that is not substantive to the Tentative Parcel
Map.
FM PS / CE
5. The subdivider shall defend, indemnify, and hold harmless the City of Atascadero or
its agents, officers, and employees against any claim or action brought to challenge an
approval by the City, or any of its entities, concerning the subdivision.
Ongoing CA
6. All residential units are subject to QUIMBY Act impact fees, and development impact
fees at the time of building permit issuance.
FM PS
7. An Arborist Report shall be prepared and submitted to the Community Development
Department in conjunction with improvement plans for the driveway and any
improvements required on Atascadero Avenue as required by the City Engineer in
order to identify any native tree impacts associated with the required improvements.
Any tree removals must be consistent with the City’s Native Tree Ordinance.
BP PS
8. Any native tree removals completed associated with new residential development
must be consistent with the City’s Native Tree Ordinance.
BP PS
9. Private Road Easement described in DOC No. 15534 Vol. 2811, OR 859-861 in the
San Luis Obispo Office of Records shall be abandoned on Final Map.
FM PS/PW
10. Final Map shall provide a 5-foot no-build easement along the northern portion of
proposed parcel 1 and 2 (adjacent to existing private driveway easement).
FM PS/PW
11. Final Map Shall provide a 5-foot no building easement directly adjacent to access
easement owned in fee by proposed parcel 2 on both sides of the access easement.
FM PS/PW
Conditions of Approval
PLN 2016-1590 / TPM 2016-0103
8585 / 8575 Atascadero Avenue
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
12. Proposed Parcel 1 and Parcel 2 shall plant any native tree mitigations within the 5-foot
no build easement to buffer the development from the existing neighborhood.
BP PS
Public Works Project Conditions
13. The flag portion of Parcel 2 shall be blanketed with an easement for private access,
public & private utilities and private drainage for the benefit of parcels 1, 3, and 4. An
extension of this easement shall be extended northwesterly, contiguous to the
northeasterly property line of Parcel 1, for a distance of approximately 20 feet more or
less to adequately serve Parcel 1.
FM CE
14. The common driveway serving all four (4) parcels shall be constructed prior to
recordation of the Parcel Map.
FM CE
15. Public utilities (water, sewer, gas, power, telephone and cable TV) shall be extended
to all four parcels prior to recordation of the Parcel Map.
FM CE
16. A common driveway maintenance agreement shall be prepared and submitted for
review and approval by the Community Development Director and City Engineer.
FM CE
17. A City standard driveway approach shall be constructed on Atascadero Rd (20-feet
wide) in accordance with City Standard No 425.
FM CE
18. The subdivider may be required to modify the existing driveway approach on
Atascadero Ave. serving the adjacent property northerly of the flag lot, to the
satisfaction of the City Engineer.
FM CE
19. The subdivider may be required to relocate the existing fire hydrant located on
Atascadero Ave., southerly of the flag lot, to the satisfaction of the City Engineer and
AMWC.
FM CE
20. The existing trees located in the Atascadero Ave. public right-of-way shall be removed
to accommodate the new common driveway approach, minimum pavement returns
and vehicular sight distance (when existing onto Atascadero Ave.).
FM CE
21. A Storm Water Control Plan (SWCP) shall be prepared in accordance with City
Standard Specifications and the Regional Water Quality Control Board Res. No. R3-
2013-0032. The SWCP shall be completed on the City standard form available from
the City Engineer and shall include the supporting data and calculations prepared by a
registered civil engineer. Post-construction storm water management applied within
this subdivision shall evaluate the complete build-out of each parcel.
Storm water management components serving more than one parcel shall be included
in the subdivision improvement plans as follows:
a. Each Post-Construction Requirement (PCR) identified in the Storm
Water Control Plan (SWCP).
b. A list of each Structural Control Measure (SCM) associated with each
PCR.
FM, BP CE
Conditions of Approval
PLN 2016-1590 / TPM 2016-0103
8585 / 8575 Atascadero Avenue
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
c. The area (in SF) of the impervious surface associated with each PCR.
d. The total area (in SF) of impervious surfaces to be constructed.
e. At complete build-out, this project includes PCRs 3 and 4 and therefore
an Operations/Maintenance Plan & Schedule (OMPS) is required to be
prepared for each PCR.
f. In soil types not conducive to percolation, the plans may be required to
include details for amended permeable layers of material below
drainage features and the basin to enhance and promote percolation of
storm water.
22. A detailed hydrology study shall be prepared and submitted for review and approval by
the City Engineer. The analysis shall evaluate the pre-development run-off and post-
development run-off (at complete build-out) and detain or retain (on-site) the post-
development storm water run-off in a manner so as to not impact adjacent and
downstream properties, to the satisfaction of the City Engineer. Detention or retention
basins and associated drainage improvements shall be privately owned and
maintained by the property owner(s).
FM, BP CE
23. New subdivision improvements shall be constructed in accordance with City
Standards and Standards Specifications.
FM, BP CE
24. Prior to final inspection of the subdivision improvements, the subdivider shall submit
record drawings for review and approval by the City Engineer.
FM, BP CE
25. Applications for building permits for structures on specific parcels within the
subdivision shall not be accepted by the City until the subdivision improvement plans
are approved, subdivision improvements are bonded for (as appropriate), and the
Parcel Map is recorded. Building plans for stock plans (not associated with a specific
parcel) may be accepted for review, as determined by the Chief Building Official.
FM, BP CE
26. Public improvement plans shall be prepared by a registered Civil Engineer and
approved by the City Engineer prior to the start of any work. The plans shall include,
but are not limited to the following:
a. On-site and off-site subdivision grading, drainage, storm water
management, and erosion control.
b. Public and common driveway/road improvements.
c. Public utilities necessary to serve each parcel.
d. Extension or modifications to the AMWC water distribution system.
e. Extension of sewer laterals to each parcel.
f. Post-construction storm water management facilities and storm water
collection systems serving more than one parcel.
FM, BP CE
Conditions of Approval
PLN 2016-1590 / TPM 2016-0103
8585 / 8575 Atascadero Avenue
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
27. Prior to recording the parcel map, the applicant shall pay all outstanding plan
check/inspection fees.
FM CE
28. A Soils Report providing technical specifications for grading of the site shall be
prepared by a Geotechnical Engineer. The Soils Report shall include percolation
testing suitable for the design of post-construction storm water management and
treatment.
FM, BP CE
29. All existing easements that are intended to be retained shall be shown on the parcel
map and noted accordingly.
FM CE
EXHIBIT C: Tentative Parcel Map TPM 2016-0103 (AT 16-0178)