Loading...
HomeMy WebLinkAboutPC_2016-11-15_AgendaPacket WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website CITY OF ATASCADERO PLANNING COMMISSION AGENDA Regular Meeting Tuesday, November 15, 2016 – 7:00 P.M. City Hall Council Chambers, 4th floor 6500 Palma Avenue Atascadero, California 93422 CALL TO ORDER Pledge of Allegiance Roll Call: Chairperson Jan Wolff Vice Chairperson Duane Anderson Commissioner David Bentz Commissioner Mark Dariz Commissioner Jerel Seay Commissioner Charles Bourbeau Commissioner Dennis Schmidt APPROVAL OF AGENDA PUBLIC COMMENT (This portion of the meeting is reserved for persons wishing to address the Commission on any matter not on this agenda and over which the Commission has jurisdiction. Speakers are limited to three minutes. Please state your name for the record before making your presentation. The Comm ission may take action to direct the staff to place a matter of business on a future agenda.) PLANNING COMMISSION BUSINESS CONSENT CALENDAR (All items on the consent calendar are considered to be routine and non -controversial by City staff and will be approved by one motion if no member of the Commission or public wishes to comment or ask questions.) 1. APPROVAL OF DRAFT MINUTES OF NOVEMBER 1, 2016 2. APPROVAL OF 2017 PLANNING COMMISSION MEETING SCHEDULE City of Atascadero Planning Commission Agenda Regular Meeting, Nov. 15, 2016 Page 2 of 5 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website COMMUNITY DEVELOPMENT STAFF REPORTS 3. PLN 2014-1529, TREE REMOVAL PERMIT ADDENDUM FOR 11955 & 11975 VIEJO CAMINO 4. PLN 2016-1618, TREE REMOVAL PERMIT FOR 2605 TRAFFIC WAY Property Owner/Applicant: Midland Cerro Roble, 7305 Morro Rd., Ste. 200, Atascadero CA 93422 Certified Arborist: Chip Tamagni, A&T Arborists, PO Box 1311, Templeton, CA 93465 Project Title: PLN 2014-1529 / TRP 2014-0178 Project Location: 11955 & 11975 Viejo Camino., Atascadero, CA 93422 APN 045-401-003, 004 (San Luis Obispo County) Project Description: The project consists of a request to remove 6 dead oak trees. These removals are in addit ion to the removals previously approved as part of the residential subdivision. General Plan Designation: SFR-X Zoning District: RSF-X/PD 33 City Staff: Kelly Gleason, Sr. Planner, kgleason@atascadero.org, Phone: 470 -3446 Staff Recommendation: The Planning Commission adopt PC Resolution 2016-A approving Tree Removal Permit Addendum 2014-0178. Property Owner/Applicant: Congregation Ohr Tzafon, 2605 Traffic Way, Atascadero, CA 93422 Certified Arborist: Chip Tamagni, A&T Arborists, PO Box 1311, Templeton, CA 93465 Project Title: PLN 2016-1618 / TRP 2016-0207 Project Location: 2605 Traffic Way, Atascadero, CA 93422 APN 049-063-003 (San Luis Obispo County) Project Description: The project consists of a request to remove one hazardous coast live oak tree in an area where a playground is proposed. The tree has 3 weak branch attachments, and is hazardous for the existing parking area. The proposed playground would be below the canopy of the tree. General Plan Designation: REC Zoning District: L City Staff: Katie Banister, Assistant Planner, kbanister@atascadero.org, Phone: 470 -3480 Staff Recommendation: The Planning Commission adopt PC Resolution 2016 -A approving Tree Removal Permit 2016- 0207. City of Atascadero Planning Commission Agenda Regular Meeting, Nov. 15, 2016 Page 3 of 5 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website 5. PLN 2016-1620, TREE REMOVAL PERMIT FOR 6340 ALCANTARA AVE. PUBLIC HEARINGS DISCLOSURE OF EX PARTE COMMUNICATIONS: Prior to a project hearing, Planning Commission Members must disclose any communications they have had on any quasi-judicial agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, Variances, Conditional Use Permits, and Pl anned Development Permits. This does not disqualify the Planning Commission Member from participating and voting on the matter, but gives the public and applicant an opportunity to comment on the ex parte communication. (For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public hearing and invite the applicant or applicant’s representative to make any comments. Members of the public will be invited t o provide testimony to the Commission following the applicant. Speakers should state their name for the record and can address the Commission for three minutes. After all public comments have been received, the public hearing will be closed, and the Commission will discuss th e item and take appropriate action(s).) 6. PLN 2016-1597, CONDITIONAL USE PERMIT FOR 2535, 2605, 2705 EL CAMINO REAL (EMERALD RIDGE APARTMENTS) Property Owner: Scott Cursey, 6340 Alcantara, Atascadero CA 93422 Certified Arborist: Chip Tamagni, A&T Arborists, PO Box 1311, Templeton, CA 93465 Project Title: PLN 2016-1620 / TRP 2016-0208 Project Location: 6340 Alcantara Ave./6503 Poquito Creek Lane, Atascadero, CA 93422 APN 030-292-065 (San Luis Obispo County) Project Description: The project consists of a request to remove a 28-inch valley oak located approx. 13 feet from the proposed improvements that includes construction of a bridge (BLD 2015-12775) for the construction of 5 new residential homes. General Plan Designation: Medium Density Residential (MDR) / Zoning District: RMF-10 / PD-7 City Staff: Alfredo R. Castillo, Associate Planner, acastillo@atascadero.org, Phone: 470-3480 Staff Recommendation: The Planning Commission adopt PC Resolution 2016-A approving Tree Removal Permit 2016-0208. Property Owner: Peter Laughlin, LDC Commercial, PO Box 2003, Monterey, CA 93942 Representative: RRM Design Group, 3765 S. Higuera, Suite 102, San Luis Obispo, CA 93401 Project Title: PLN 2016-1597 / DRC 2016-0088 - Emerald Ridge Project Location: 2535, 2605, 2705 El Camino Real, Atascadero, CA 93422 APN 049-151-009, 049-151-063, 049-151-011 (San Luis Obispo County) Project Description: The applicant is proposing a 208 unit apartment complex. The proposal includes 72 one (1) bedroom units and 136 two (2) bedroom units. The applicant is requesting a density bonus for high quality architectural design, which is a discretionary approval of the Planning Commission (27 units of the 208 total units). General Plan Designation: High Density Residential (HDR) / Zoning District: Residential Multi-Family (RMF-20) Proposed Environmental Determination: Based on the Initial Study prepared for the project, a Mitigated Negative Declaration is proposed. The Mitigated Negative Declaration is available for public review from 10/27/16 through 11/15/16 at 6500 Palma Ave., Community Development Department from 8:30 a.m. to 5:00 p.m. Monday through Friday. This document can be found electronically in PDF format on the City’s website at http://www.atascadero.org/environmentaldocs. City Staff: Alfredo R. Castillo, AICP, Associate Planner, acastillo@atascadero.org, Phone: 470-3436 Staff Recommendation: Staff recommends the Planning Commission adopt PC Resolution 2016-A approving CUP 2016-0298 for a high density residential apartment complex based on findings; the Design Review Committee recommends the Planning Commission adopt PC Resolution 2016-B approving a density bonus for high quality residential design, consistent with the City’s General Plan for an additional 27 market rate units. City of Atascadero Planning Commission Agenda Regular Meeting, Nov. 15, 2016 Page 4 of 5 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website COMMISSIONER COMMENTS AND REPORTS DIRECTOR’S REPORT ADJOURNMENT The next regular meeting will be on December 6, 2016 at City Hall Council Chambers, 6500 Palma Avenue, Atascadero. Please note: Should anyone challenge in court any proposed development entitlement listed on this Agenda, that person may be limited to raising those issues addressed at the public hearing described in this notice or in written correspondence delivered to the Planning Commission at, or prior to, this public hearing. City of Atascadero Planning Commission Agenda Regular Meeting, Nov. 15, 2016 Page 5 of 5 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website City of Atascadero WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING The Planning Commission meets in regular session on the first and third Tuesday of each month at 7:00 p.m. at City Hall, Council Chambers, 6500 Palma Avenue, Atascadero. Matters are considered by the Commission in the order of the printed Agenda. Copies of the staff reports or other documentation relating to each item of business referred to on the Agenda are on file in the office of the Community Development Department and are available for public inspection during City Hall business hours at the Front Counter of City Hall, 6500 Palma Avenue, Atascadero, and on our website, www.atascadero.org. All documents submitted by the public during Commission meetings that are either read into the record or referred to in their statement will be noted in the minutes and available for review in the Community Development Department. Commission meetings are audio recorded, and may be reviewed by the public. Copies of meeting recordings are available for a fee. Contact the City Clerk for more information (470-3400). In compliance with the Americans with Disabilities Act, if you need special assistance to participate in a City meeting or other services offered by this City, please contact the City Manager’s Office or the City Clerk’s Office, both at (805) 470-3400. Notification at least 48 hours prior to the meeting or time when services are needed will assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service. TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA Under Agenda item, “PUBLIC COMMENT”, the Chairperson will call for anyone from the audience having business with the Commission to approach the lectern and be recognized. 1. Give your name for the record (not required) 2. State the nature of your business. 3. All comments are limited to 3 minutes. 4. All comments should be made to the Chairperson and Commission. 5. No person shall be permitted to make slanderous, profane or negative personal remarks concerning any other individual, absent or present. This is when items not on the Agenda may be brought to the Commission’s attention. A maximum of 30 minutes will be allowed for Public Comment Portion (unless changed by the Commission). TO SPEAK ON AGENDA ITEMS (from Title 2, Chapter 1 of the Atascadero Municipal Code) Members of the audience may speak on any item on the agenda. The Chairperson will identify the subject, staff will give their report, and the Commission will ask questions of staff. The Chairperson will announce when the public comment period is open and will request anyone interested to address the Co mmission regarding the matter being considered to step up to the lectern. If you wish to speak for, against or comment in any way: 1. You must approach the lectern and be recognized by the Chairperson. 2. Give your name (not required). 3. Make your statement. 4. All comments should be made to the Chairperson and Commission. 5. No person shall be permitted to make slanderous, profane or negative personal remarks concerning any other individual, absent or present. 6. All comments limited to 3 minutes. If you wish to use a computer presentation to support your comments, you must notify the C ommunity Development Department at 470-3402 at least 24 hours prior to the meeting. Digital presentations brought to the meeting should be on a USB drive or CD. You are required to submit to the Recording Secretary a printed copy of your presentation for the record. Please check in with the Recording Secretary before the meeting begins to announce your presence and turn in the printed copy. The Chairperson will announce when the public comment period is closed, and thereafter, no further public comments will be heard by the Commission. PC Draft Minutes of 11/1/16 Page 1 of 4 CITY OF ATASCADERO PLANNING COMMISSION DRAFT MINUTES Regular Meeting – Tuesday, November 1, 2016 – 7:00 P.M. City Hall Council Chambers 6500 Palma Avenue, Atascadero, California CALL TO ORDER - 7:00 p.m. Chairperson Wolff called the meeting to order at 7:00 p.m. and Commissioner Bourbeau led the Pledge of Allegiance. ROLL CALL Present: Commissioners Bentz, Dariz, Bourbeau, Seay, and Vice Chairperson Anderson and Chairperson Wolff Absent: Commissioner Schmidt (unexcused) Others Present: Recording Secretary, Annette Manier Staff Present: Community Development Director, Phil Dunsmore Associate Planner, Alfredo Castillo APPROVAL OF AGENDA MOTION: By Commissioner Dariz and seconded by Commissioner Bourbeau to approve the Agenda. Motion passed 6:0 by a roll-call vote. PUBLIC COMMENT None Chairperson Wolff closed the Public Comment period. PLANNING COMMISSION BUSINESS Commissioner Bentz stated that a memo was distributed to all Commissioners prior to the hearing from Jim Baldovin concerning the Messer project on tonight’s agenda. Chairperson Wolff stated all Commissioners have received the memo and it will be entered into the record as an Exhibit to the minutes. ITEM NUMBER: 1 DATE: 11-15-16 1 PC Draft Minutes of 11/1/16 Page 2 of 4 CONSENT CALENDAR 1. APPROVAL OF DRAFT ACTION MINUTES OF OCTOBER 18, 2016 MOTION: By Commissioner Bentz and seconded by Commissioner Bourbeau to approve the consent calendar. Motion passed 6:0 by a roll-call vote. COMMUNITY DEVELOPMENT STAFF REPORTS None PUBLIC HEARINGS DISCLOSURE OF EX PARTE COMMUNICATIONS: Prior to a project hearing, Planning Commission Members must disclose any communications they have had on any quasi- judicial agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, V ariances, Conditional Use Permits, and Planned Development Permits. This does not disqualify the Planning Commission Member from participating and voting on the matter, but gives the public and applicant an opportunity to comment on the ex parte communica tion. (For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public hearing and invite the applicant or applicant’s representative to make any comments. Members of the public will be invited to provide testimony to the Commission following the applicant. Speakers should state their name for the record and can address the Commission for three minutes. After all public comments have been received, the public hearing will be closed, and the Commission will discuss the item and take appropriate action(s).) 2. PLN 2016-1590, TENTATIVE PARCEL MAP FOR 8575-8585 ATASCADERO AVE. Property Owner: Michael D. Messer, 7555 Atascadero Ave., Atascadero, CA 93422 Project Title: PLN 2016-1590 / TPM 2016-0103 Project Location: 8575-8585 Atascadero Ave. , Atascadero, CA 93422 (APN 056-181-039, 040) San Luis Obispo County Project Description: The project consists of a proposed Tentative Parcel Map to subdivide two (2) existing lots totaling 2.45 acres into four (4) lots ranging from ½ acre to 0.84 acres. The minimum lot size in this zoning district is ½ acre. Zoning District: RSF-X General Plan Designation: SFR-X City Staff: Alfredo Castillo, AICP, Associate Planner, acastillo@atascadero.org, Phone: 470-3436 Proposed Environmental Determination: Class 15 exemption, Minor Land Division, consistent with Section 15315 of the California Environmental Quality Act (CEQA) Staff Recommendation: Staff recommends to the Planning Commission approval of TPM AT 16- 0178. 2 PC Draft Minutes of 11/1/16 Page 3 of 4 EX PARTE COMMUNICATIONS: Commissioner Dariz stated that Mr. Baldovin called him and they spoke on the phone, and he heard this item at the Design Review Committee (DRC). Commissioner Bourbeau stated that he drove by and walked the property. Vice Chairperson Anderson stated that he also heard this item at the DRC meeting. Associate Planner Castillo presented the staff report and he and Community Development Director Dunsmore answered questions from the Commission. Mr. Castillo noted that the DRC heard this project on May 11, 2016, and declined to move the project forward as proposed. From that meeting, staff met with the applicant to revise the project. Mr. Castillo stated that staff has added additional conditions in addition to the standard conditions as follows:  Arborist report and mitigation is required for tree removal at proposed driveway  Abandoning previous easements  Requiring a 5-foot “no build” easement consistent with City ordinances  Additional plantings along existing easement Mr. Castillo confirmed that the RSF-Y on page 9 of the staff report should say RSF-X. The agenda should say 2.36 acres instead of 2.45 acres. PUBLIC COMMENT The following persons spoke during public comment: Mike Messer (who gave a presentation on his project) Jim Baldovin, Mike Lucas, Kathy Villalba, Kevin Campion, Jerry Olvo, Alex Zanini, and Vincent McDonald. Mr. Messer answered questions from the Commission. Chairperson Wolff closed the Public Comment period. Staff addressed the public’s comments regarding parcel size/net acreage, access road and two-way traffic, Fire Department access, and paving requirements for the driveway. Staff answered the Commission’s questions in regards to the fence, 2nd units, Fire Department access, parking, easement, and parcel size. Commissioner Dariz stated his concerns with issues that have not been completely cleared up for him which include with turnout and pullouts for fire access, calculation for net area for each lot (math doesn’t add up; lots are not a half-acre), and parking on the street, He also stated his desire to have someone from the Fire Department available to answer his questions. There was a concern from Commissioner Bentz regarding refuse/trash cans being delivered to the street (Atascadero Ave.) with this long driveway. Is there space to accommodate all of these trash receptacles on the street (up to 12) without blocking access to this property or without putting it in front of other people’s properties? 3 PC Draft Minutes of 11/1/16 Page 4 of 4 Staff explained parking requirements for SFR’s, net acreage, and that the Fire Department has reviewed and approved this project. Staff said the applicant should answer the question in regards to the trash receptacles on the street. MOTION: By Commissioner Bourbeau and seconded by Commissioner Bentz that the Planning Commission adopt PC Resolution 2016-A approving PLN 2016-1590 for a four (4) parcel subdivision at 8585 & 8575 Atascadero Avenue (AT 16-0178), subject to conditions of approval, and based on findings. Motion passed 5:1 by a roll-call vote. (Dariz voted no) COMMISSIONER COMMENTS AND REPORTS None DIRECTORS REPORT Community Development Director Dunsmore stated he does not have the Sign Handbook for distribution yet, but will have them in the near future. Community Development Director Dunsmore stated that the next Planning Commission meeting is scheduled for November 1 5, 2016, and the Commission will hear three Tree Removal Permits and a Conditional Use Permit for the Emerald Ridge Apartments. Community Development Director Dunsmore gave an update on Walmart, the property across from Miners (carwash), the Hoff property, the trees in Sunken Gardens, the property next door to Rancho Tee, and Santa Maria Brewery. ADJOURNMENT – 8:10 p.m. The next regular meeting of the Planning Commission is scheduled for November 15, 2016, at 7:00 p.m. at City Hall, Council Chambers, 6500 Palma Avenue, Atascadero. MINUTES PREPARED BY: ____________________________ Annette Manier, Recording Secretary The following Exhibit is available in the Community Development Department: Exhibit A – Letter from Jim Baldovin 4 ITEM NUMBER: 2 DATE: 11-15-16 C I T Y O F A T A S C A D E R O COMMUNITY DEVELOPMENT DEPARTMENT 6500 PALMA AVE., ATASCADERO, CA 93422  (805) 461-5000  FAX (805) 461-7612 DRAFT Planning Commission Meeting Schedule 2017 MEETING DATE MEETING TYPE TIME LOCATION: Historic City Hall 6500 Palma Ave., Atascadero CA 93422 January 3 Regular 7:00 p.m. “ January 17 Regular 7:00 p.m. “ February 7 Regular 7:00 p.m. “ February 21 Regular 7:00 p.m. “ March 7 Regular 7:00 p.m. “ March 21 Regular 7:00 p.m. “ April 4 Regular 7:00 p.m. “ April 18 Regular 7:00 p.m. “ May 2 Regular 7:00 p.m. “ May 16 Regular 7:00 p.m. “ June 6 Regular 7:00 p.m. “ June 20 Regular 7:00 p.m. “ July 4 NO MEETING, HOLIDAY “ July 18 Regular 7:00 p.m. “ August 1 Regular 7:00 p.m. “ August 15 Regular 7:00 p.m. “ September 5 Regular 7:00 p.m. “ September 19 Regular 7:00 p.m. “ October 3 Regular 7:00 p.m. “ October 17 Regular 7:00 p.m. “ November 7 Regular 7:00 p.m. “ November 21 Regular 7:00 p.m. “ December 5 Regular 7:00 p.m. “ December 19 Regular 7:00 p.m. “ t:\~ planning commission\pc meeting schedule\pc meeting schedule 2017.docx 5 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 Atascadero Planning Commission Staff Report – Community Development Department Kelly Gleason, Senior Planner, 470-3446, kgleason@atascadero.org PLN 2014-1529 Tree Removal Permit 2014-0178 Addendum Cerro Roble (The Groves) Residential Subdivision SUBJECT: The applicant is requesting the removal of six (6) additional native trees that have died since approval of the project. None of the proposed trees are located within the development footprint but are in close proximity to proposed residential structures. The trees proposed for removal were previously identified as trees to be saved. RECOMMENDATION: Staff Recommends: The Planning Commission adopt Resolution PC 2016-A to allow the removal of six (6) native trees, based on findings and subject to mitigation. Situation and Facts: 1. Property Owner: Midland Cerro Roble, LLC / Dennis Moresco 7305 Morro Road, Atascadero, CA 93422 2. Project Address: 11955 & 11975 Viejo Camino (APN 045-401- 003, 004) Atascadero, CA 93422 3. Certified Arborist: Chip Tamagni A&T Arborists, PO Box 1311, Templeton, CA 93465 4. General Plan Designation: Single-Family Residential – X (SFR-X) 5. Zoning District: Residential Single-Family - X / PD-33 (SFR-X / PD33 6. Site Area: Approximately 10 acres 7. Existing Use: Vacant – Approved residential development 6 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 ANALYSIS: The proposed tree removals are located within the Cerro Roble project area. The residential planned development project was approved In March of 2016 which included the removal of 19 native oak trees totaling 242 inches. The project has been modified slightly and tree removals within the development footprint have been reduced to 13 trees totaling 192 inches. However, a number of trees that were proposed to be saved have died over the summer months. These trees will be adjacent to residential structures once the project is completed creating an unsafe condition and thus the applicant has requested removal of these trees. The proposed tree removals total 218 inches. The largest of the trees (63-inches dbh) has already fallen. A summary of the tree removals is provided below: Consistent with AMC 9-11.105, the tree removal permit fee has been waived due to the nature of the trees. Evaluative Criteria for Tree Removal Atascadero Municipal Code Section 9-11.105 (d) (3) provides the criteria the Planning Commission should use when evaluating tree removals. (i) The potential effect that tree removal could have on topography, knowing that hilltops, ravines, streambeds and other natural watercourses are more environmentally sensitive than flat or gentle sloping lands; Tree# dbh condition 231 34 dead but standing 3429 63 dead on ground 299 18 dead standing 298 35 dead standing 296 24 90% dead 295 44 dead standing 7 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 No impact will occur to site topography or topographic features. (ii) The potential effect that tree removal could have on soil retention and ero sion from increased flow of surface waters; All areas within the residentail area will be landscaped prior to final of the structures. Trees outside this area exist in wooded areas where other healthy trees will contine to provide benefit. (iii) The potential effect that tree removal could have on the ambient and future noise level; Staff comment: The trees are located in a planned residential neighborhood. The removal of the trees will not have a significant impact on ambient noise. (iv) The potential effect that tree removal could have on the ability of existing vegetation to reduce air movement and wind velocity; Staff comment: The project was designed to preserve the heavily wooded areas of the site. Removal of the trees will not destabilize surrounding vegetation. (v) The potential effect that tree removal could have on significantly reducing available wildlife habitat or result in the displacement of desirable species; Staff comment: The trees are located within an area planned for residential development. The heavily wooded portion of the site will be preserved as part of the original project approvals. (vi) Aesthetics; Staff comment: Removal of the trees will not have a negative impact on the aesthetics of the immediate surrounding area. The proposed residential planned development includes the installation of new landscaping. (vii) The number, size, species, condition and location of trees to be removed; Staff comment: The trees are dead or dying. The largest has already fallen. The trees will be adjacent to residential structures upon project completion and will pose a safety risk. (viii) The special need to protect existing blue and valley oaks because of regeneration problems; Staff comment: The trees proposed for removal are coast live oaks. 8 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 (ix) The cumulative environmental effects of tree removal. Staff comment: There will be no cumulative environmental impacts resulting from this tree removal. The project, as designed, will preserve approximately 1 acre of oak woodland. Tree Mitigation The Atascadero Municipal Code requires mitigation for all trees approved for removal. The Tree Ordinance allows for either replanting of new native trees, payment of mitigation fees to the tree fund, or the provision of a tree preservation easement. The original project approvals included the provision of a 1 -acre open space easement as mitigation for the tree removals totaling 242 inches dbh. Since project approval, the tree removals required to accommodate the development footprint and associated site work have been reduced to 192-inches dbh. In addition, the final landscape plans include a number of native trees (15 15-gallon live oaks) to be replanted throughout the project site. Specifically, native trees will be grouped at the Santa Barbara / Viejo Camino intersection and surrounding drainage basins and features , as well as integrated into the landscape for each residential lot. Based on this, staff recommends that the Planning Commission find that the current project provision of the tree preservation easement and native landscaping is adequate to mitigate the total proposed on-site removals. Should the Planning Commission find that this is not adequate mitigation, fees or additional replanting can be required. Based on the Atascadero Native Tree Ordinance, payment of $1,816.67 or the replanting of 36 five- gallon trees would provide a mitigation alternative. FINDINGS: In considering any tree removal request, at least one of the required findings must be made. Staff has identified the following finding as appropriate for the application request. (i)The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an arborist; Bond payment for tree #31, impacted 45% : 9 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 ALTERNATIVES: 1. The Commission may approve the project with additional or revised project conditions. 2. The Commission may deny the project if it is found that the required findings cannot be made. The Commission’s motion to deny must include a finding basis for denial. 3. The Commission may continue the hearing and refer the item back to staff for additional information or analysis. Direction should be given to staff and the applicant on required information. ATTACHMENTS: Attachment 1 – Arborist Letter Attachment 2 – Draft Resolution PC 2016-A 10 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 ATTACHMENT 1: Arborist Report PLN 2014-1529 / TRP 2014-0178 11 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 12 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 ATTACHMENT 2: Draft Resolution PC 2016-A PLN 2014-1529 / TRP 2014-0178 DRAFT RESOLUTION NO. PC 2016-A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING AN ADDENDUM TO TRP 2014-0178, TO ALLOW THE REMOVAL OF SIX (6) ADDITIONAL COAST LIVE OAK TREES TOTALING 218-INCHES DIAMETER AT BREAST HEIGHT (DBH) HALCON RESIDENTIAL PLANNED DEVELOPMENT MIDLAND CERRO ROBLE, LLC. WHEREAS, an application was received from Midland Cerro Roble, LLC (7305 Morro Rd # 200, Atascadero, CA 93422) (Applicant and Owner), to consider a Tree Removal Permit for the Cerro Roble development to remove six (6) additional coast live oak trees totaling 218 inches dbh. WHEREAS, the Planning Commission reviewed the proposed Tree Removal Permit application on November 15, 2016, at 7:00 p.m. and considered testimony and reports from staff, the applicants, and the public; and, NOW THEREFORE, the Planning Commission of the City of Atascadero, California takes the following actions: SECTION 1. Findings for tree removal. The Planning Commission finds as follows: 1. The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an arborist SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on November 15, 2016, and resolved to approve an addendum to Tree Removal Permit 2014-0178, subject to the following: EXHIBIT A: Conditions of Approval 13 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 On motion by Commissioner ____________________, and seconded by Commissioner _________________________, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSENT: ( ) ABSTAINED: ( ) ADOPTED: CITY OF ATASCADERO, CA _________________________________________ Jan Wolff Planning Commission Chairperson ATTEST: ___________________________________ Phil Dunsmore Planning Commission Secretary 14 ITEM NUMBER: ITEM NUMBER: 3 DATE: 11-15-16 EXHIBIT A: Conditions of Approval / Mitigation Monitoring PLN 2014-1529 / TRP 2014-0178 Conditions of Approval PLN 2014-1529 / TRP 2014-0178 Cerro Roble Residential Development Timing FM; Final Map BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 1. The approval of this application shall become final, subject to the completion of the conditions of approval, fourteen (14) days following the Planning Commission approval unless prior to that time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. Tree removal PS 2. The applicant and/or subsequent owners shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the proposed tree removal. Ongoing PS 3. This approval is an addendum to the previous approval for the removal of 242 inches dbh for the development of the Cerro Roble project. All conditions associated with the previous project approval remain in effect unless amended by this resolution. Tree removal PS 4. The Cerro Roble project entitlement includes a requirement for the provision of a 1-acre minimum tree preservation easement and landscaping with native tree species. This shall be considered adequate to mitigate the additional proposed removals. Tree removal PS 5. Approval shall be for the following trees totaling 218 inches dbh: Additional trees that are dead/dying Tree# dbh condition 231 34 dead but standing 3429 63 dead on ground 299 18 dead standing 298 35 dead standing 296 24 90% dead 295 44 dead standing Tree removal PS 15 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 Atascadero Planning Commission Staff Report – Community Development Department Stefanie Farmer, Planning Intern, 470-3466, sfarmer@atascadero.org Katie Banister, Assistant Planner, 470-3480, kbanister@atascadero.org PLN 2016-1618 Tree Removal Permit 2016-0207 2605 Traffic Way (Hamilton / Congregation Ohr Tzafon) SUBJECT: The applicant is requesting the removal of one (1) native tree. The tree is a 33” diameter coast live oak. RECOMMENDATION: Staff Recommends: The Planning Commission adopt Resolution PC 2016-A to allow the removal of one (1) native tree, based on findings and subject to mitigation. Situation and Facts: 1. Property Applicant: Jessica Hamilton 8924 Palomar Avenue Atascadero, CA 93422 2. Property Owner: Congregation Ohr Tzafon 3. Project Address: 2605 Traffic Way (APN 049-063-003) Atascadero, CA 93422 4. Certified Arborist: Chip Tamagni, A&T Arborists PO Box 1311, Templeton CA 93465 4. General Plan Designation: Recreation (REC) 5. Zoning District: Recreation (L) 6. Site Area: Approximately 1.3 acres 7. Existing Use: Membership Organization 16 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 Project Location BACKGROUND: Congregation Ohr Tzafon is a synagogue located on Traffic Way across from San Benito Elementary School. The congregation would like to construct a playground in the northwest corner of their property under a native oak tree located there. In preparation for this project, an arborist was consulted regarding measures to protect the tree from damage during construction. The consulting arborist has determined the tree is hazardous and should be removed whether or not a playground is constructed due to its location immediately adjacent to the parking lot. ANALYSIS: The property is located at the corner of Potrero Road and Traffic Way. The railroad tracks border the northeastern side of the property and San Benito Elementary school borders the southwestern side of the property. The synagogue is positioned between two parking lots and a biblical garden. Most of the landscaping runs along the perimeter of the property with several mature non-native trees including London Plane sycamores, redwoods, and other evergreens. There are two mature coast live oak trees. One is located in the front of the building along Traffic Way and will remain. The tree proposed for removal is located near the northwestern corner of the property. 2605 Traffic Way L 17 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 Aerial of Tree Location The arborist’s report identifies the subject tree as a multi-trunk coast live oak with a 33 inch diameter. The tree grew from multiple trunk sprouts that developed after a larger tree failed in the past. All three branches that grow from the main trunk are significantly weak due to a large cavity that extends through the entire trunk area. The arborist has concluded that the large cavity is a sign of significant decay and disease. The tree is considered to be structurally vulnerable and therefore hazardous to any pedestrians and vehicles in the vicinity of the canopy. MITIGATION: Due to the diseased condition of the tree, fees for the tree removal permit are not required. The applicant has expressed an interest in seeking a waiver for mitigation due to their non-profit status. Staff has examined the Native Tree Ordinance for possible fee exemptions; however the ordinance requires mitigation for all tree removal permits. Waiving fees is considered a gift of public funds, which is a violation of state law. The applicant must mitigate the removal of this tree by replanting eleven 5 -gallon trees (six 15-gallon trees) on site or paying $550 into the native tree replacement fund. S taff has included a condition to require at least 2 trees be replanted on site and the remainder of the mitigation be paid in fees. Project Location: 2605 Traffic Way Coast Live Oak Tree San Benito Elementary School 18 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 Coast live oak at 2605 Traffic Way FINDINGS: In considering any tree removal request, at least one of the required findings must be made. Staff has identified the following finding as appropriate for the application request. (i) The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an arborist Staff comment: The coast live oak has a large cavity that extends throughout the entire trunk area as a result from significant decay and disease. The arborist has determined this tree to be hazardous to any pedestrians and vehicles in the area. ALTERNATIVES: 1. The Commission may approve the project with additional or revised project conditions. 2. The Commission may deny the project if it is found that the required findings cannot be made. The Commission’s motion to deny must include a finding basis for denial. 3. The Commission may continue the hearing and refer the item back to staff for additional information or analysis. Direction should be given to staff and the applicant on required information. 33-inch coast live oak tree Large cavity in trunk 19 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 ATTACHMENTS: Attachment 1 – Arborist Report Attachment 2 – Draft Resolution PC 2016-A 20 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 ATTACHMENT 1: Arborist Report PLN 2016-1618 / TRP 2016-0207 21 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 22 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 ATTACHMENT 2: Draft Resolution PC 2016-A PLN 2016-1618 / TRP 2016-0207 DRAFT RESOLUTION NO. PC 2016-A A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO APPROVING PLN 2016-1618 / TRP 2016-0207, TO ALLOW THE REMOVAL OF ONE (1) COAST LIVE OAK TREE TOTALING 33 INCHES DIAMETER LOCATED AT 2605 TRAFFIC WAY (APN 049-063-003) WHEREAS, an application was received from Jessica Hamilton (8924 Palomar Avenue, Atascadero, California 93422), Applicant; Congregation Ohr Tzafon (2605 Traffic Way, Atascadero, California 93422), Property Owner; and Chip Tamagni, A&T Arborists, PO Box 1311, Templeton California 93465, Arborist, for a Tree Removal Permit to remove one (1) coast live oak totaling thirty three (33) inches diameter. WHEREAS, the Planning Commission reviewed the proposed Tree Removal Permit application on November 15, 2016, at 7:00 p.m. and considered testimony and reports from staff, the applicants, and the public; and, NOW THEREFORE, the Planning Commission of the City of Atascadero, California takes the following actions: SECTION 1. Findings for tree removal. The Planning Commission finds as follows: The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an arborist. SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on November 15, 2016, and resolved to approve Tree Removal Permit 2016-0207, subject to the following: EXHIBIT A: Conditions of Approval EXHIBIT B: Required Tree Removal Mitigation 23 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 On motion by Commissioner ____________________, and seconded by Commissioner _________________________, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSENT: ( ) ABSTAINED: ( ) ADOPTED: CITY OF ATASCADERO, CA _________________________________________ Jan Wolff Planning Commission Chairperson ATTEST: ___________________________________ Phil Dunsmore Planning Commission Secretary 24 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 EXHIBIT A: Conditions of Approval / Mitigation Monitoring PLN 2016-1618 / TRP 2016-0207 Conditions of Approval PLN 2016-1618 / TRP 2016-0207 2605 Traffic Way Timing FM; Final Map BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 1. The approval of this application shall become final, subject to the completion of the conditions of approval, fourteen (14) days following the Planning Commission approval unless prior to that time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. Tree removal PS 2. The applicant and/or subsequent owners shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the proposed tree removal. Ongoing PS 3. The owner or applicant shall mitigate the tree removal as shown in Exhibit B. At least two native trees shall be planted on-site. The remaining mitigation may be completed through additional tree planting or by making appropriate payment to the tree mitigation fund, or a combination thereof as shown in Exhibit B. Larger box trees may be substituted for five-gallon replacement trees consistent with the Atascadero Native Tree Guidelines. 4. Tree removal PS 5. Payment to the tree mitigation fund or approval of a tree replanting and irrigation plan shall occur before trees are removed. Tree removal PS 6. The owner or applicant shall provide irrigation to all new trees planted onsite until they are established. Tree planting PS 25 ITEM NUMBER: ITEM NUMBER: 4 DATE: 11-15-16 Exhibit B Required Tree Removal Mitigation PLN 2016-1618 / TRP 2016-0207 Evergreen Native Trees (inches)Deciduous Native Trees (inches)Totals dbh notes dbh notes 1 33-inches coast live oak 1 2 2 3 3 4 4 5 5 6 6 Total 33-inches Total 0-inches 33-inches Mitigation Requirement req'd tree replacements:11 five gal trees req'd tree replacements:0 five gal trees 11 five gal trees Proposed Replanting 0 five gal trees Proposed Replanting 0 five gal trees 0 five gal trees 0 box trees (24'')0 box trees (24'')0 box trees (24'') Remaining Mitigation 11 five gal trees Remaining Mitigation 0 five gal trees 11 five gal trees Tree Fund Payment:550.00$ Tree Fund Payment:-$ 550.00$ Either plant fifteen (15) 5-gallon oak trees, or pay $550 to the City’s native tree mitigation fund, or a combination thereof. 26 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 Atascadero Planning Commission Staff Report – Community Development Department Stefanie Farmer, Planning Intern, 470-3466, sfarmer@atascadero.org Alfredo Castillo, AICP Associate Planner, 470-3436, acastillo@atascadero.org PLN 2016-1620 Tree Removal Permit 2016-0208 6340 Alcantara / Poqutio Creek Lane (Cursey) SUBJECT: The applicant is requesting the removal of one (1) native tree approximately 13-feet from the construction of a public improvement project. The tree is a 28-inch diameter valley oak. RECOMMENDATION: Staff Recommends: The Planning Commission adopt Resolution PC 2016-A to allow the removal of one (1) native tree, based on findings and subject to mitigation. Situation and Facts: 1. Property Applicant/Owner: Scott Cursey 6340 Alcantara Atascadero, CA 93422 2. Project Address: 6340 Alcantara (APN 030-292-065) / Poquito Creek Lane, Atascadero, CA 93422 3. Certified Arborist: Chip Tamagni, A&T Arborists PO Box 1311, Templeton CA 93465 4. General Plan Designation: Medium Density Residential (MDR) 5. Zoning District: Residential Multi-Family (RMF-10) 6. Site Area: Approximately 3 acres 27 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 7. Existing Use: Vacant; Single Family Home ANALYSIS: Project Location The property is located along Tecorida Avenue in a Residential Multi-family (RMF-10) neighborhood adjacent to Commercial Retail (CR) properties. Currently, five of the lots are vacant and the north eastern lot along Alcantara Avenue has an existing single family home. The site includes a previously approved project that involves a six-lot subdivision that was approved in 2003 (Resolution 2003-010). The approved project includes a seasonal creek that will be preserved with a new project access road bridging the creek from Tecorida Avenue. The project recently commenced construction of the bridge over the creek area. Project Site 6340 Alcantara RSF-Y CR RMF-10 CT 28 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 Aerial Project Plan The bridge will need a concrete retaining wall on both sides of the approach to retain the soil. According to the arborist report, the concrete wall will need to be constructed in the location of one large valley oak on the southern side of the bridge because the tree is approximately 13 feet from the bridge abutment . Valley Oak Location Existing Home Poquito Creek Lane Bridge & 28 inch valley oak CR Proximity of valley oak to bridge Southern side of the bridge 29 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 The original intention was to preserve the 28-inch valley oak based on the location of the tree to the bridge on the approved building plans. However, after the development of the bridge, the arborist concluded that the tree should to be removed . The concrete curtain needs to be constructed directly through the side of th e tree in order to maintain the two vehicle width required by the fire department. In addition, the arborist rated the condition of the valley oak a three out of ten (3/10) due to the suppression of two nearby canopies. Even though the removal of the valley oak was unanticipated, the other valley oak in close proximity will be preserved. The tree protection plan from the project maintains the preservation of the remaining 30 trees on site. FINDINGS: In considering any tree removal request, at least one of the required findings must be made. Staff has identified the following finding as appropriate for the application request. (iii) The tree is interfering with existing utilities and/or structures, as certified by a report from the site planner; Staff comment: The valley oak resides within the space required in order to create the necessary stability for the bridge and the surrounding soil. ALTERNATIVES: 1. The Commission may approve the project with additional or revised project conditions. 2. The Commission may deny the project if it is found that the required findings cannot be made. The Commission’s motion to deny must include a finding basis for denial. 3. The Commission may continue the hearing and refer the item back to staff for additional information or analysis. Direction should be given to staff and the applicant on required information. ATTACHMENTS: Attachment 1 – Arborist Report Attachment 2 – Draft Resolution PC 2016-A 30 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 ATTACHMENT 1: Arborist Report PLN 2016-1620 / TRP 2016-0208 10-12-16 Alfredo Castillo, Atascadero Planning Department Re: Scott Cursey, Tecorida Project I visited the site today to inspect a potential issue with the approach to the bridge. On both sides of the bridge, a concrete curtain will need to be constructed to retain soil for the bridge approach. On the east side of the bridge are two large valley oaks adjacent to the bridge abutments. Scott Cursey, Casey O’Conner and I discussed methodology to avoid insuring the large buttressing roots from these trees by potholing footings while leaving the roots intact. Tree #495 is a 28” valley oak located on the east side of the bridge about 13 feet from the bridge abutment. Our issue with this tree is the concrete curtain will need to be constructed directly through the side of the tree to maintain the two vehicle width required by the fire department for this project. From the drawings, it appeared it could stay but in the field it is now going to be in the way. This may be due to the trunk being plotted just a foot or two off from the survey depending on which side of the tree it was surveyed from. I originally rated this tree a 4/10 but that probably should have been closer to a three due to the fact this tree is suppressed by two large trees that have full canopies above #495. We will need to get City permission to remove this tree with mitigation i n order to construct the bridge to fire department standards. Please let me know what will be needed from our end to make this happen. Sincerely, Chip Tamagni 31 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 Certified Arborist #WE 6436-A California State Pest Control Advisor #75850 Certified Hazard Risk Assessor #1209 Cal Poly B.S. Forestry and Natural Resources Management 32 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 ATTACHMENT 2: Draft Resolution PC 2016-A PLN 2016-1620 / TRP 2016-0208 DRAFT RESOLUTION NO. PC 2016-A A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO APPROVING PLN 2016-1620 / TRP 2016-0208, TO ALLOW THE REMOVAL OF ONE (1) VALLEY OAK TREE TOTALING 28 INCHES DIAMETER LOCATED AT 6340 ALCANTARA AVENUE. (APN 030-292-065) WHEREAS, an application was received from Scott Cursey (6340 Alcantara Avenue), Applicant/Owner; and Chip Tamagni, A&T Arborists, PO Box 1311, Templeton California 93465, Arborist, for a Tree Removal Permit to remove one (1) valley oak totaling twenty eight (28) inches diameter. WHEREAS, the Planning Commission reviewed the proposed Tree Removal Permit application on November 15, 2016, at 7:00 p.m. and considered testimony and reports from staff, the applicants, and the public; and, NOW THEREFORE, the Planning Commission of the City of Atascadero, California takes the following actions: SECTION 1. Findings for tree removal. The Planning Commission finds as follows: The tree is interfering with existing utilities and/or structures, as certified by a report from the site planner. SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on November 15, 2016, and resolved to approve Tree Removal Permit 2016-0208, subject to the following: EXHIBIT A: Conditions of Approval EXHIBIT B: Required Tree Removal Mitigation 33 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 On motion by Commissioner ____________________, and seconded by Commissioner _________________________, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSENT: ( ) ABSTAINED: ( ) ADOPTED: CITY OF ATASCADERO, CA _________________________________________ Jan Wolff Planning Commission Chairperson ATTEST: ___________________________________ Phil Dunsmore Planning Commission Secretary 34 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 EXHIBIT A: Conditions of Approval / Mitigation Monitoring PLN 2016-1620 / TRP 2016-0208 Conditions of Approval PLN 2016-1620 / TRP 2016-1620 6340 Alcantara Avenue / Poquito Creek Lane Timing FM; Final Map BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 1. The approval of this application shall become final, subject to the completion of the conditions of approval, fourteen (14) days following the Planning Commission approval, unless prior to that time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. Tree removal PS 2. The applicant and/or subsequent owners shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the proposed tree removal. Ongoing PS 3. The owner or applicant shall mitigate the tree removal by replanting native trees, making appropriate payment to the tree mitigation fund, or a combination thereof as shown in Exhibit B. Larger box trees may be substituted for five-gallon replacement trees consistent with the Atascadero Native Tree Guidelines. Tree removal PS 4. Payment to the tree mitigation fund or approval of a tree replanting and irrigation plan shall occur before trees are removed. Tree removal PS 5. If tree replanting is selected, the owner or applicant shall provide irrigation to new trees until they are established. Tree planting PS 35 ITEM NUMBER: ITEM NUMBER: 5 DATE: 11-15-16 Exhibit B Required Tree Removal Mitigation PLN 2016-1620 / TRP 2016-1620 Evergreen Native Trees (inches)Deciduous Native Trees (inches)Totals dbh notes dbh notes 1 1 28-inches valley oak 2 2 3 3 4 4 5 5 6 6 Total 0-inches Total 28-inches 28-inches Mitigation Requirement req'd tree replacements:0 five gal trees req'd tree replacements:9 five gal trees 9 five gal trees Proposed Replanting 0 five gal trees Proposed Replanting 0 five gal trees 0 five gal trees 0 box trees (24'')0 box trees (24'')0 box trees (24'') Remaining Mitigation 0 five gal trees Remaining Mitigation 9 five gal trees 9 five gal trees Tree Fund Payment:-$ Tree Fund Payment:466.67$ 466.67$ Either plant nine (9) 5-gallon oak trees, or pay $466.67 to the City’s native tree mitigation fund, or a combination thereof. 36 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Atascadero Planning Commission Staff Report - Community Development Department Alfredo R. Castillo, AICP, Planner, (805) 470-3436, acastillo@atascadero.org PLN 2016-1597 2535, 2605, 2705 El Camino Real Emerald Ridge Apartments (RRM Design Group / LDC Commercial, Inc.) SUBJECT: The proposed project consists of an application for a Conditional Use Permit (CUP) and Tree Removal Permit (TRP) to construct a 208-Unit apartment complex on 7.5 acres. The applicant is requesting up to a 15% density bonus consistent with the City’s General Plan Policy 2.1.2, which allows for allows for additional residential units beyond the maximum density for “exceptionally high design quality.” RECOMMENDATION: Staff Recommends the Planning Commission adopt: 1. Draft Resolution PC 2016-A certifying Mitigated Negative Declaration 2016-0003; 2. Draft Resolution PC 2016-B, approving TRP 2016-0200, permitting the removal of up to 80 coast live oak native trees for the construction of a proposed 208-unit multi-family development; Staff and the Design Review Committee Recommends Planning Commission: 3. Adoption of Draft Resolution PC 2015-C, approving Conditional Use Permit (CUP) 2016-0298 for the construction of a multi-family apartment complex and approving a 15% density bonus, based on findings, allowing an additional 27 units above the maximum allowed density in the RMF -20 zone, for a total of 208 residential units. Situation and Facts: 1. Applicant: RRM Design Group 3765 S. Higuera St. #102, San Luis Obispo, CA 93401 2. Owners: LDC Commercial, Inc. PO Box 2003, Monterey, CA 93942-2003 37 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 3. Project Address: 2535, 2605, 2705 El Camino Real, Atascadero, CA 93422 (San Luis Obispo County) APN 049-151-009, 011, 063 4. General Plan Designation: High Density Residential (HDR) 5. Zoning District: Residential Multi-family (RMF-20) 6. Site Area: 7.5 acres 7. Existing Use: Existing Colony Home / Vacant 8. Environmental Status: Proposed Mitigated Negative Declaration 2016-0003 DISCUSSION: Background: The proposed project is located along El Camino Real between San Benito Road and Madera Place and is less than ½ mile from the Del Rio Road / El Camino Real regional marketplace (Walmart / Annex). Emerald Ridge was originally approved in 2004 as a 45-unit attached multi-family condominium project and was granted a density bonus for “high quality architectural design”, consistent with the adopted 2002 General Plan . In 2005, additional phases were approved and proposed architecture was revised. A total of 132 units were approved. This approval expired in May of 2016. Due to changing market conditions, the applicant and their design team have revised the original project to incorporate the City’s increased density within the High Density Residential (HDR) / Residential Multi-Family zone. This zone formerly allowed up to 16 units per acre with no minimum lot size and now allows for up to 24 units per acre. Additionally, as with the previously approved project, the applicant is seeking a density bonus for “exceptionally high quality design”, consistent with the City’s General Plan Policy 2.1.2. This density bonus does not require a dedication for “affordable housing”, instead it is a policy incentive for developers to bring forth high quality residential design that can be used a model for similar development throughout th e City. The density bonus that they are seeking would allow 208 units where 181 units would be allowed. It is important to note that this site would allow up to only 165 units without the density bonus if the applicant where to include the local road conne ction since the road portion (approximately 0.7 acres) would be excluded from density calculations. However the applicant has worked with Staff and included this road connection as a part of the project scope knowing the significance of this future roadway connection to support both residential and commercial properties. This site has been identified by the City’s General Plan and Housing element as one of the suitable locations for high density housing. The applicant is not proposing to 38 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 subdivide for ownership and instead intends to develop the project as rental housing over three (3) phases. Surrounding Land Use and Setting: Aerial Photo North: Residential Suburban (RS) East: Residential Suburban (RS) South: El Camino Real / Commercial Park (CPK) West: Residential Multi-Family (RMF-20) Proposed Site 39 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 DRC Review The Design Review Committee reviewed the proposed project on August 24, 2016 and on September 28, 2016 for architectural design, landscape, and site planning. Concerned residents attended the meetings and provided input for the DRC’s consideration. The DRC provided comments to the applicant team and ultimately recommended approval of the proposed project to the Planning Commission with the following recommendations:  The applicant should show parking consistent with the Americans with Disabilities Act and California Building Code (COA #22);  The applicant must provide City Staff with a parking management plan for each phase of the project (COA #19);  Direct City Staff to utilize parking along proposed “Street B” as guest parking to count towards meeting the project’s parking requirement. The DRC is recommending to the Planning Commission conditional approval of the proposed site plan, as well as, recommending that the Commission adopt findings that the proposed project is of “high quality architectural design” based on the submitted architectural elevations, floor plans, and proposed color scheme and finishes. Analysis Site Plan The proposed project’s originally approved site plan, as amended, included two (2) vehicle access points off of El Camino Real, extensive grading with the use of retaining walls, and minimal open space. The applicant did not move forward with the originally approved project due to costs, as well as the economic downturn. The ap plicant has chosen to re-design the project into a multi-family apartment complex versus for sale air-space condos. During this time period, Staff was processing the Del Rio Road Commercial Area Specific Plan. As a part of this work effort, the Public Wo rks Department developed a conceptual access plan for a proposed new collector road that would need to be constructed with the Specific Plan and a preliminary circulation plan for the neighborhood between the eastern boundary of the Specific Plan and San B enito Road. This preliminary circulation plan (shown as “A” street in the exhibit below) depicted how the future collector road could provide connectivity to future potential development areas. This circulation plan has not been adopted by the City, but has been used as a guide for future development. The portion of the “A” street identified within the Wal-Mart site is identified on their tentative map and has been named “Gran Mercado. 40 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Preliminary 2012 Conceptual Access Exhibit With the preliminary circulation route and the ability to obtain higher densities, the applicant is proposing a new site plan that incorporates a key future connection to this neighborhood (Street B). It is likely to reduce the cost of the original project by minimizing grading and the use of retaining walls, and maximizing density as allowed in the RMF-20 zone. The applicant is proposing to shift “Street B” over to the edge of their property and stub the street for future connection. Because of this design change, the applicant lost the ability to accommodate additional parking. To rectify t his, the applicant is providing parallel parking areas (31 spaces total) to assist with the parking demand of the proposed project. The DRC has directed Staff to include this parking as a part of its on-site parking calculation. Street B will be a critical future link to not only this project, but potential future circulation of the neighborhood. The proposed project consists of two (2) legal lots and one (1) remainder parcel on 7.5 5 acres. The site contains one existing Colony House which is located at 2605 El Camino Real. Currently the site contains site plan includes the following: Proposed Walmart Proposed Project Proposed Gran Mercado Street 41 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16  Construction of 6 separate apartment buildings completed in three (3) separate phases;  Three (3) buildings, three-stories each, with a mix of one bedroom apartment units and two (2) bedroom attached townhome units;  Three (3) buildings, four-stories each, with a mix of one bedroom apartment units and two (2) bedroom attached townhome units;  Reuse of historic colony home into a clubhouse for private use of residents;  Recreational amenities including community pool, BBQ area and tot lot;  Dedication and Construction of a new street “B” for future connection into Gran Mercado (Del Rio Road Specific Plan);  Revision to recreation amenities including a new proposed dog run;  Proposed pedestrian amenities and walkways;  On-Site parking demand met consistent with City Code;  Use of solar panels on carports;  Proposed improvements along El Camino Real. Proposed Site Plan Future Street B 42 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Two (2) side walk access paths from the proposed sidewalk along El Camino Real are proposed. While these are key components, Staff is recommending two (2) additional connections to the El Camino Real proposed sidewalk to facilitate better transit uses, active transportation, and reduction of Vehicle Miles Traveled (VMT) and Greenhouse Gas (GHG) emissions. Also, staff is concerned that people will shortcut through the landscape if these paths are not provided. There are grade changes that may make this infeasible such as American with Disability Act (ADA) switchbacks and other improvements may be necessary that add additional costs, so staff has included qualifiers that this may be waived. Based on the AMC Section 9-3.252(b), the Minimum number of units allowed on-site is 150 units with a Maximum of 181 units on-site. The applicant is proposing a total of 208 units, or 28 units per acre, which is 4 more units per acre that the maximum density allowed. The applicant is requesting that the Planning Commission grant a 15% density bonus consistent with General Plan Policy 2.1.2 which allows for such a bonus for exceptionally high quality architectural design. The applicant is proposing improvements to be completed in phases. The following is a program for improvements for the proposed project:  Phase 1: 70 units, project entry monument signage, proposed Street B improvements; carports;  Phase 2: 70 units, additional on-site parking; El Camino Real improvements, colony house refurbishment, tot-lot area, carports;  Phase 3: 68 units, common pool area and recreational area, parking and carport area, final El Camino real improvements. Proposed Phase Plan 43 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Parking The Atascadero Municipal Code requires projects to provide off-street parking. For multi- family residential projects, the code has minimum parking standards for the number of parking spaces per bedroom, for guests, and the number of covered versus uncovered spaces. The code also has the ability to reduce parking requirements by adding bicycle racks and motorcycle parking (AMC 9-4.115 (a)-(c)). The following are the parking requirements for consistency with the Atascadero Municipal Code: Proposed Parking Calculations – Emerald Ridge Unit Types Number of Units Typical Parking Requirement - AMC Parking Spaces Needed- AMC Provided Spaces On- Site 1 bedroom unit 72 1.5 spaces per unit 108 spaces 98 uncovered spaces 247 Covered Spaces 11 uncovered guest spaces 31 uncovered guest spaces (Street B) 14 Motorcycle Stalls 2 bedroom unit 136 2 spaces per unit 272 spaces Guest Spaces 1 per 5 units 42 spaces Motorcycle Parking Substitution 1 motorcycle space per 20 spaces -21 spaces Bicycle Parking Substitution 1 bicycle rack per 20 spaces -21 spaces Total Number of Parking Spaces Required under AMC 380 spaces *208 spaces covered 401 spaces provided +21 spaces The applicant has met the required number of parking spaces through the inclusion of 31 guest parking spaces on Street B, which has been conditioned to be dedicated as a public street (COA #11/32). The applicant has worked with City Staff to include this vital neighborhood circulation route that has been preliminarily outlined. If Street B were not included, this project would likely meet both maximum density and minimum parking standards. Because the proposed project deviates from how parking is calculated through the municipal code, AMC section for 9-4.115 allows for the Planning Commission to modify parking standards through the conditional use permit process through specific findings. 9-4.115 Atascadero Municipal Code Off-Street Parking Required. (h) Planning Commission Modification. The parking standards of this title may be modified through conditional use permit approval based upon specific findings of fact that the characteristics of a use or its immediate vicinity do not necessitate the number of parking spaces, type of design, or improvements required by this title and that reduced parking will be adequate to accommodate on the site all parking needs generated by the use. 44 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Staff supports the parking exception to allow off-site guest parking and tandem parking since the proposed project is along a major transit line for regional transit and is located less than ½ mile away from the Del Rio Road Commercial Area Specific Plan, which has been identified as a major commercial node. Additionally, the project provides significant neighborhood benefits with the proposed street connection. Proposed Architectural Elevations / Colors / Materials The applicant has substantially revised the elevations to accommodate the additional density, as well as meet the superior architecture for potential density bonus. The proposed architecture has been inspired by the existing colony home on -site, as well as the dominate craftsmen style architecture predominately found in colony homes. The proposed architecture includes:  Use of hardy plank cement board (faux-wood)siding on some elevations;  Craftsman style gables and pop-outs that complement the existing colony house;  Varying roof elevations and heights;  Use of topography to reduce grading and step elevation architecture to mask elevation heights and density;  Use of varied colors and stone veneer to provide a variation in elevations;  Enhanced architecture elevations along El Camino Real to provide a sense of place.  On-site preservation and adaptive re-use of the existing Colony House. The applicant is proposing six (6) buildings total with three or four stories. The use of existing grades help mask building heights through the use of sub floors, and step construction to provide the project an appearance of reduced massing and scale. Through this methodology of design, coupled with the use of varying roof elevations, gables, and pop- outs, the architecture of the proposed project to reduces the mass and gives the appearance of lower density. The applicant is also preserving the existing colony house for use as a common area and updating the exterior porch for consistency with the craftsman theme. The maximum building height in the RMF-20 zone is limited to two (2) stories in height, as well as 30-feet maximum, as measured from finished grade. The average building height of all the buildings within the proposed development is approximately 36.5-feet, with building 3- A containing the maximum building height of 46-feet from finished grade. The City’s fire department and building department has reviewed the proposed building elevations and has determined that the elevation will not exceed the lifesaving equipment capabilities. The Planning Commission may waive the height requirement consistent with the following: 45 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Atascadero Municipal Code – Height Waiver section 9-4.113(b) (b)Exceptions to Height Limitations. (1) Planning Commission Waiver. The height limitations of this section may be modified through conditional use permit approval, provided the Planning Commission first finds the project will not result in substantial detrimental effects on the enjoyment and use of adjoining properties and that the modified height will not exceed the lifesaving equipment capabilities of the Fire Department. Staff has included the required findings for this Planning Commission modification in the findings, as well as a part of draft PC Resolution 2016-C. Building Elevation – Prototype A Building Elevation – Prototype B 46 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 High Quality Architectural Design Density Bonus The applicant is requesting an additional 27 units through the General Plan Density Bonus for high quality architecture above the maximum allowed units for the RMF -20 zone (181 units) for a total of 208 units in the proposed project. General Plan Policy 2.1.2 states the following: General Plan Policy 2.1.2 Develop standards and procedures to allow the Planning Commission to grant up to a 15% density bonus for attached multi-family projects of exceptionally high design quality through the Conditional Use Permit process. The City has approved three (3) density bonuses for high quality architecture:  Las Lomas / Woodridge Specific Plan, including multi-family housing component;  Dove Creek;  The Originally approved Emerald Ridge Townhomes / Condos. Las Lomas Apartment 47 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Dove Creek 2004 Approved Elevations – Emerald Ridge Condos This density bonus is for exceptionally high quality design, and is not connected to affordable housing. This is a discretionary action that the Planning Commission may grant to the applicant and has been included as a General Plan policy as a tool to encourage high quality, innovative design in the City’s multi -family projects. The dedication of the road should be considered part of the q uality design contribution to the neighborhood and a significant reason to support the density bonus as proposed . Additionally, the preservation and re-use of the colony house on this site should be viewed as a contribution to the quality of this project. Projects that are granted this type of density should be viewed as “standard bearers” for future projects that are similar in density. When Staff reviews such requests, it takes the following into consideration: 1. Utilizes high quality materials and finishes through all four sides of the building(s) located on-site; 2. The project uses reduction of massing and other techniques to reduce appearance of bulk, and density; 48 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 3. Use of varied rooflines, pop-outs, architectural appendages and other elements that create visually appealing projects; 4. Use of architectural materials appropriate with the vernacular of the architectural theme. 5. Significant contributions to the community such as a park, historic preservation, or road dedications. Proposed Architectural Elevations – Renderings 49 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 The proposed project includes the following “high quality” design features:  Use of high quality materials such as brick veneer, stone veneer, siding, and other finishes consistent with the California Craftsman architectural style that is on-site on all four sides of the building;  The proposed project utilizing massing, coupled with grading techniques to reduce bulk and the apparent density of the project with the appearance of large lot homes instead of typical apartment style homes;  The proposed project utilizes varies roof line types, pop-outs, eve brackets, exposed rafter tails, and other architectural features that enhance the California Craftsman style of architecture and create a visually appealing project from the City’s major arterial, El Camino Real;  The proposed project incorporates materials consistent with the California Craftsman style of architecture;  The proposed project include rehabilitation and re-use of a historic colony house and integrates this as a “clubhouse”, as well as, takes design cues from the existing colony house that compliments the overall development. Additionally, the proposed project includes a critical roadway connection to the future Gran Mercado collector road. Staff has included specific findings for the high quality architectural bonus as a part of Draft Resolution PC 2016-C. Landscape Design The applicant has submitted a proposed landscaping plan. The applicant is preserving existing large and matures oaks that are located near the proposed clubhouse and recreation area, and along El Camino Real. The applicant is proposing significant landscaping along El Camino Real, the proposed pedestrian entry, and along future Street B. The applicant is proposing landscaping that includes drought tolerant planting plan for the buildings and areas open space areas. A condition has been added requiring the applicant to enter into a water wise program or similar program offered by the Atascadero Mutual Water Company. The proposed landscaping plan is consistent with the City’s water efficient landscaping. Wastewater and Utilities Sanitary sewer will be connected to existing sewer facilities. Sanitary sewer will be connected to existing sewer facilities within the El Camino Real right-of-way. The Wastewater Treat Plant and the City collection system have sufficient capacity to handle the proposed additional effluent. The Atascadero Municipal Water Company (AMWC) has reviewed the proposed project and provided comments in regards to this project. 50 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Stormwater Drainage The proposed project conforms with Post-Stormwater Construction requirements established by the Central Coast Regional Water Quality Control Board (RWQCB). The applicant is proposing to meet stormwater and drainage requirements through the use of on-site storm water detention and filtration chambers located under portions of the parking lot and water quality treatment areas located along El Camino Real and the recreation area near the clubhouse. The project has been condition ed to meet both the City and RWQCB rules and requirements. Native Tree Removal The project site includes over 119 native coast live oaks on-site. The applicant is proposing to preserve at least 19 native trees. The applicant is proposing removal of 689-inches DBH of Coast Live Oak. The majority of the trees that are proposed to be removed include small native trees that are within building foot prints, driveways, and within the designated bio-swales needed to comply with State mandated stormwater drainage regulations. The average size of the trees proposed for removal is 8.6 inches in diameter, with many of the mature trees being preserved on -site. The City’s tree removal ordinance requires tree removal permits and mitigation for all native evergreen trees greater than 4-inches in diameter. The Applicant is required to pay $11,483.33 into the tree fund or replant 230 five-gallon native trees. A combination of mitigation fees and replanting is also available. Final mitigation fees based on re-plantings will be calculated as a part of a building permit submittal for on-site improvements. Circulation Circulation system upgrades are a key component of this project. This includes construction of the proposed new “Street B” which will allow for a future connection to “Street A” in the preliminary circulation concept. With the improvement plans submitted by the future Walmart store as a part of the Del Rio Road Commercial Area Specific Plan, the applicant has re-designed their project to incorporate Street “B” with a future connection to the new collector Road, Gran Mercado (Street “A”). A traffic impact report was completed in conjunction with the Mitigated Negative Declaration. This traffic impact report indicated that with the completion of the project, the intersection of Del Rio Road and El Camino Real will operate at acceptable Levels of Service (LOS) consistent with the City’s General Plan. The analysis assumed the completion of the roundabout at EL Camino and Del Rio which is curre ntly being developed by the Wal-Mart project. The traffic study also evaluated the intersection of San B enito Road and EL Camino Road and found that this will remain at LOS “A” following project completion. However, the LOS for El Camino Real and Del Rio Road is expected to drop to a level “C” operation in the cumulative scenario (the proposed project plus all additional growth anticipated by the City’s General Plan such as Wal Mart, the Annex project and assuming all area properties are completely developed). Even with this drop in service 51 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 operation, the anticipated LOS still meets the City’s current General Plan standard for acceptable traffic volumes. Del Rio Road / El Camino Circulation 52 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 The traffic study indicated that the following would need to be implemented to reduce traffic impacts created by the proposed development: • A new Southbound left turn lane on El Camino Real at future Street B will be warranted under future plus project traffic volumes; • Contribution of City Wide Traffic Impact Fee program for 181 units. Additional traffic impacts will be created at the Del Rio Road / US 101 interchange, specifically for vehicle queue lengths that already exceed available storage. With no adopted additional mitigation fee for the Del Rio Road / US 101 interchange, the TIF program will contribute to this fair share improvement, however this traffic impact fee only anticipates the maximum general plan build out of 181 units, and not the additional 27 units. Therefore, the applicant will need to provide mitigation for the additional 27 units through an additional traffic impact fee based on its fair share of impact to the US 101 / Del Rio Road interchange , in addition to the standard development impact fee required at the time of permit issuance. The traffic mitigation shall be as follows: • Contribution of City Wide Traffic Impact Fee program plus Del Rio Road / US 101 fair share contribution for 27 bonus units. With payment of standard traffic impact fees for the 181 units, and standard traffic impact fee plus fair share of interchange fee on the 27 bonus units, this potential impact is considered less than significant with mitigation as indicated in the attached environmental analysis. General Plan Consistency The General Plan High Density Residential (HDR) land use designation permits a maximum density of 24 dwelling units per acre. Implementing General Plan programs requires appearance review of architectural design, materials, landscaping, and incorporate architectural themes into the site and building design. The General Plan also allows for the Planning Commission to permit an additional 15% density bonus, consistent with Policy 2.1.2 for high quality architectural design. As analyzed above, the proposed project, as conditioned, is consistent with the City’s adopted General Plan. In staff’s opinion, the project is consistent with the goals and poli cies of the Land Use Element and the Housing Element. The project will provide an additional 208 new dwellings units of high quality multi-family rental units that assist the City in meeting its 2014-2019 Regional Housing Needs Allocation (RHNA) goals. As conditioned, the project incorporates architectural and landscape elements that are consistent with the character of the surrounding neighborhood, and the General Plan’s appearance review requirement. 53 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Findings: Conditional Use Permit (Master Plan of Development): A Master Plan of Development is required for all multi-family projects over 12 units, which is approved through the Conditional Use Permit process (AMC section 9 - 2.110(2)). The Conditional Use Permit process provides the opportunity for the publ ic and the Planning Commission to review the specifics of land use proposals, such as architectural design, site design, landscape, and specific standards of the Zoning Ordinance. The following five findings must be made to approve a Conditional Use Permit: 1. The proposed project or use is consistent with the General Plan and the City’s Appearance Review Manual. Staff Comment: The use and appearance is consistent with the high density residential designation of the Plan and General Plan Land Use Element Policies and Housing Element Policies. 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance). Staff Comment: As conditioned, the project satisfies the City’s Zoning Code provisions, incorporating high-quality architectural design. Staff has included findings for density bonus, parking, and height waivers. Upon adoption of these findings, the project as condition will satisfy this and all other requirements. 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use. Staff Comment: The proposed residential project will not be detrimental to the general public or working persons’ health, safety, or welfare. 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development. Staff Comment: The project has been designed to be consistent with the existing neighborhood character as the site has taken into account enviro nmental consideration and site design challenges to provide the necessary high density targets. 54 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either exist ing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. Staff Comment: The proposed project and use is consistent with the traffic projections and road improvements anticipated within the General Plan. A traffic impact report was produced as a part of the proposed project and projects traffic volumes associated with the proposed project to meet LOS level C or above. Based on staff’s analysis in the preceding sections, it appears that all of the required findings for approval of a Master Plan of Development (Conditional Use Permit) can be made. The project is consistent with the City’s General Plan Land Use and Housing Elements. Density Bonus Findings: The Planning Commission must make the following findings to grant a 15 percent (15%) density bonus, consistent with General Plan Policy 2.12 for exceptionally high quality architectural design: 1. The proposed project utilizes high quality materials and finishes through all four sides of the building(s) located on-site. Staff Comment: The proposed project utilizes high quality materials such as brick veneer, stone veneer,, siding, and other finishes consistent with the California Craftsman architectural style that is on-site on all four sides of the building 2. The proposed project utilizes reduction of massing and other techniques to reduce appearance of bulk, and density. Staff Comment: The proposed project utilizing massing reduction techniques, coupled with grading to reduce bulk and the apparent density of the project with the appearance of large lots homes instead of typical apartment style homes. 3. The proposed project implements the use of varied rooflines, pop-outs, architectural appendages and other elements that create visually appealing projects. Staff Comment: The proposed project utilizes varies roof line types, pop-outs, eve brackets, exposed rafter tails, and other architectural features that enhance the California Craftsman style of architecture and create a visually appealing project from the City’s major arterial, El Camino Real. 55 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 4. The proposed project utilizes architectural materials appropriate with the vernacular of the architectural theme. Staff Comment: The proposed project incorporates materials consistent with the California Craftsman style of architecture. 5. The proposed project incorporates significant contributions to the community such as a park, historic preservation, or road dedications. Staff Comment: As proposed, the project includes rehabilitation and re-use of a historic colony house and integrates this as a “clubhouse”, as well as, takes design cues from the existing colony house that compliments the overall development. Add itionally, the proposed project includes a critical roadway connection to the future Gran Mercado collector road. Native Tree Removal Findings: The Planning Commission must make the following findings related to removal of a native tree(s) that is 24-inches or above: The tree is obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal, as certified by a report from the site planner and determined by the Community Development Department based on the following factors: a. Early consultation with the City, b. Consideration of practical design alternatives, c. Provision of cost comparisons (from applicant) for practical design alternatives, d. If saving tree eliminates all reasonable use of the property, or e. If saving the tree requires the removal of more desirable trees. Staff Comment: The applicant has consulted with the City and has considered design alternatives. In order to meet density targets in the land use designation, the applicant has sited buildings to preserve as many native trees as feasibly possible. Based on Staff’s analysis and the arborist report, staff recommends that the Planning Commission can make the required findings for native tree removals. Parking Modification Findings: The Planning Commission must make the following findings to modify parking requirements for off-street parking, consistent with AMC section 9-4.115 through 9- 4.123: 1. The characteristics of a use or its immediate vicinity do not necessitate the number of parking spaces, type of design, or improvements required by this title. 56 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Staff Comment: The proposed project meets the parking requirements through off -site visitor parking that is to be located on “Street B” which is directly adjacent to the proposed project. The remainder of the project provides covered, uncovered parking consistent with the City’s Municipal Code. 2. Reduced parking will be adequate to accommodate on the site all parking needs generated by the use. Staff Comment: At minimum, the proposed project is able to accommodate parking of residents. Additional guest parking is available on -site and with an additional parking located along both “Street B” and El Camino Real, parking will be sufficient for the proposed use. Building Height Waiver Findings: The Planning Commission must make the following findings to modify building height requirements in the RMF-20 zone for buildings in excess of two (2) stories and greater than 30-feet in height, consistent with AMC section 9-113(b)(1): 1. The project will not result in substantial detrimental effects on the enjoyment and use of adjoining properties. Staff Comment: The proposed project and its stories and heights utilize existing grades that minimizes the bulk and appearance of height of the structur es. The site is gently sloping and utilizes the grade change to reduce the visual appearance of the buildings, therefore the proposed project will not result in substantial detrimental effects on the enjoyment of the adjoining properties. 2. The modified height will not exceed the lifesaving equipment capabilities of the Fire Department. Staff Comment: The proposed project, as reviewed by the City’s Fire Department, has been determined to not exceed the lifesaving equipment capabilities of the department. Proposed Environmental Determination Staff has prepared a Draft Mitigated Negative Declaration that was circulated to public agencies and interested members of the public on October 27, 2016. The Environmental Analysis identified concerns regarding potential impacts to aesthetics, air quality, biology, cultural resources, geology and soils, water quality, noise, and traffic. Mitigation measures pertaining to these areas are included. A finding is proposed that this project would not have a significant effect on the environment based upon the implementation of the identified mitigation measures. 57 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Staff is recommending the Commission recommend that the City Council certification of Proposed Mitigated Negative Declaration 2016-0003. CONCLUSION: The proposed project is consistent with the General Plan and Atascadero Municipal Code, as analyzed within this staff report. The project has been reviewed by the City’s Design Review Committee and recommendations have been included in the plans or conditioned in the attached resolutions. It is staff’s opinion that the proposed project, as conditioned, allows the Planning Commission to make all of the required findings for project approval. ALTERNATIVES: 1. The Commission may recommend modifications to the project an d/or conditions of approval for the project. 2. The Commission may determine that more information is needed on some aspect of the project and may refer the item back to the applicant and staff to develop the additional information. The Commission should cle arly state the type of information that is required and move to continue the item to a future date. 3. The Commission may r deny the project. The Commission should specify the reasons for denial of the project and make an associated finding with such action. ATTACHMENTS: Attachment 1: Location Map, General Plan, and Zoning Attachment 2: Applicant Project Narrative Attachment 3: Applicant Design Package Attachment 4: Proposed Mitigated Negative Declaration 2016-0003 Attachment 5: Draft Resolution PC 2016-A – Certification of Mitigated Neg Dec Attachment 6: Draft Resolution PC 2016-B – Tree Removal Permit Attachment 7: Draft Resolution PC 2016-C – CUP / Density Bonus Approval 58 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Attachment 1: Location Map, General Plan, and Zoning Existing Designations: -General Plan: High Density Residential (HDR) -Zoning District: Residential Multi-Family (RMF-20) Project location: 10785 El Camino Real / 9355 Avenida Maria 59 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Attachment 2: Applicant Project Narrative 60 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 61 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 62 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 63 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 64 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 65 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Attachment 3: Applicant Design Package Please see the following Attachment at end of this packet 66 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Attachment 5: Proposed Mitigated Negative Declaration 2016-0003 Please see the following Attachment 67 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 ATTACHMENT 6: Draft Resolution PC 2016-A CUP 2016-0298 Recommendation to Certify Mitigated Negative Declaration 2016-0003 DRAFT RESOLUTION PC 2016-A A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, CERTIFYING PROPOSED MITIGATED NEGATIVE DECLARATION 2016-0003 PREPARED FOR, CONDITIONAL USE PERMIT 2016-0298, AND TREE REMOVAL PERMIT 2016-0200, ON APN 045-151-009, 011, 063 (2605, 2535, 2705 El Camino Real El Camino Real) RRM Design Group / LDC Commercial, Inc. WHEREAS, an application has been received from RRM Design Group (3765 South Higuera Street, #102, San Luis Obispo, CA 93401), Applicant and LDC Commercial Inc. (PO Box 2003, Monterey, CA 93942-2003), Property Owner, for approval of a Conditional Use Permit consistent with Atascadero Municipal Code section 9-2.110(a), a tree removal permit to remove 608-inches DBH of coast live oaks, and a fifteen (15%) percent density bonus request consistent with the City’s adopt General Plan Policy 2.1.2 on APN 049-151-009, 011, 063 for the construction of 208 multi-family residential units; and, WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2016-0003 were prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the Planning Commission of the City of Atascadero held a public hearing on November 15, 2016 following the close of the review period to consider the Initial Study and Proposed Mitigated Negative Declaration; and, NOW, THEREFORE, the Planning Commission of the City of Atascadero hereby certify Proposed Mitigated Negative Declaration 2016-0003 based on the following Findings as shown in Exhibit A: 1. The Proposed Negative Declaration has been completed in compliance with CEQA guidelines section 15070 through 15075; and, 68 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 2. Proposed Negative Declaration 2015-0002 was circulated for a 20-day public review from October 27, 2016 to November 15, 2016, consistent with CEQA Guidelines Section 15105 (b); and 3. CEQA Section 21091(f) and 15704 require a lead agency to consider a Negative Declaration together with any comments received before approving the projects, one (1) written comments received by the lead agency; and 4. The City of Atascadero Community Development Department is the custodian of Negative Declaration 2016-0003 along with other material that constitutes the record of proceedings upon which this determination is made, which this record is available to the public for viewing at 6500 Palma Avenue, Atascadero, CA 93422; and 5. Based on the Planning Commission recommendation there is no substantial evidence that the project may have a significant effect on the environment; and 6. Based on the entire record, including any comments received, and the Planning Commission determines that there is no substantial evidence that the project may have a significant effect on the environment; and 7. The Negative Declaration prepared for the project reflects the Planning Commission’s independent judgment and analysis. 69 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by Commissioner ______________________, and seconded by Commissioner ___________________, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSTAIN: ( ) ABSENT: ( ) ADOPTED: CITY OF ATASCADERO, CA ______________________________ Jan Wolff Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 70 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Exhibit A: Proposed Mitigated Negative Declaration 2016-0003 71 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Exhibit A: Proposed Mitigated Negative Declaration 2016-0003 72 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 ATTACHMENT 5: Draft Resolution PC 2016-B PLN 2016-1597 / TRP 2016-0200 DRAFT RESOLUTION PC 2016-B RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING PLN 2015-1597 / CONDITIONAL USE PERMIT 2016-0298 (MASTER PLAN OF DEVELOPMENT) / TREE REMOVAL PERMIT 2016-0200 ON APN 049- 151-009-011, 063 (2605, 2535, 2705 El Camino Real El Camino Real) RRM Design Group / LDC Commercial, Inc. WHEREAS, an application has been received from RRM Design Group (3765 South Higera Street, #102, San Luis Obispo, CA 93401), Applicant and LDC Commercial, Inc.(PO Box 2003, Monterey, CA 93942-2003), Property Owner, for approval of a Conditional Use Permit consistent with Atascadero Municipal Code Section 9-2.110(a), a tree removal permit to remove 608-inches DBH of coast live oaks, and a fifteen (15%) percent density bonus request consistent with the City’s adopt General Plan Policy 2.1.2 on APN 049-151-009, 011, 063 for the construction of 208 multi-family residential units; and, WHEREAS, the site’s current General Plan Land Use Designation is General High- Density Residential (HDR); and, WHEREAS, the site’s current Zoning Designation is Residential Multi Family (RMF- 20); and, WHEREAS, Atascadero Municipal Code Section 9-11.105(d) requires a Planning Commission decision regarding all tree removal application requests involving native trees 24- inches dbh or larger; and, WHEREAS, the Planning Commission has certified Mitigated Negative Declaration 2016-0003 that was prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, 73 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 WHEREAS, timely and properly noticed Public Hearings upon the subject Tree Removal Permit was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Tree Removal Permit; and, WHEREAS; the Planning Commission reviewed the proposed Tree Removal Permit on November 15, 2016, and considered testimony and reports from staff, the applicants, and the public after first studying and considering the Mitigated Negative Declaration 2016-0003 prepared for the project, and; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Atascadero makes the following findings and determinations with respect to the proposed Native Tree Removal Permit: SECTION 1. Findings for Approval of Tree Removal Permit. The Planning Commission finds as follows: 1. The trees obstruct proposed improvements that could not be reasonably designed to avoid the need for tree removal, as certified by a report from the Site Planner and determined by the Community Development Department based on the following factors: a. Early consultation with the City; b. Consideration of practical design alternatives; c. Provision of cost comparisons (from applicant) for practical design alternatives; d. If saving tree eliminates all reasonable uses of the property; or if saving the tree requires the removal of more desirable trees. SECTION 2. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on November 15, 2016, approved Tree Removal Permit TRP 2016-0200 subject to the following Conditions and Exhibits: 1. EXHIBIT A: Conditions of Approval 2. EXHIBIT B: Mitigation Chart 74 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 On motion by Commissioner ____________________, and seconded by Commissioner _________________________, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSENT: ( ) ABSTAINED: ( ) ADOPTED: CITY OF ATASCADERO, CA _________________________________________ Jan Wolff Planning Commission Chairperson ATTEST: ___________________________________ Phil Dunsmore Planning Commission Secretary 75 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT A: Conditions of Approval / Mitigation Monitoring PLN 2016-1597 / TRP 2016-0200 Conditions of Approval PLN 2016-1597 / TRP 2016-0200 Emerald Ridge Apts. Timing FM; Final Map BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 1. The approval of this application shall become final, subject to the completion of the conditions of approval, fourteen (14) days following the Planning Commission approval unless prior to that time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. Tree removal PS 2. The applicant and/or subsequent owners shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the proposed tree removal. Ongoing PS 3. The owner or applicant shall mitigate the tree removals by replanting native trees, making appropriate payment to the tree mitigation fund, or a combination thereof as shown in Exhibit B. Larger box trees may be substituted for five-gallon replacement trees per the Atascadero Native Tree Guidelines. Building Permit PS 4. Payment to the tree mitigation fund or approval of a tree replanting and irrigation plan shall occur before trees are removed. Building Permit PS 5. If tree replanting is selected, the owner or applicant shall provide drip irrigation to new trees until they are established. Building Permit / Ongoing PS 76 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Exhibit B Required Tree Removal Mitigation PLN 2016-1616 / TRP 2016-0204 77 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 ATTACHMENT 5: Draft Resolution PC 2016-C PLN 2016-1597 / CUP 2016-0298 DRAFT RESOLUTION PC 2016-C RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING PLN 2015-1597 / CONDITIONAL USE PERMIT 2016-0298 (MASTER PLAN OF DEVELOPMENT) / TREE REMOVAL PERMIT 2016-0200 ON APN 049- 151-009-011, 063 (2605, 2535, 2705 El Camino Real El Camino Real)RRM Design Group / LDC Commercial, Inc. WHEREAS, an application has been received from RRM Design Group (3765 South Higuera Street, #102, San Luis Obispo, CA 93401), Applicant and Central Coast Assets, LLC (PO Box 2003, Monterey, CA 93942-2003), Property Owner, for approval of a Conditional Use Permit consistent with Atascadero Municipal Code section 9-2.110(a), a tree removal permit to remove 608-inches DBH of coast live oaks, and a fifteen (15%) percent density bonus request consistent with the City’s adopt General Plan Policy 2.1.2 on APN 049-151-009, 011, 063 for the construction of 208 multi-family residential units; and, WHEREAS, the site’s General Plan Designation is HDR (High Density Residential); and, WHEREAS, the site’s current Zoning District is RMF-20 (Residential Multi-Family-20); and, WHEREAS, Atascadero Municipal Code Section 9-2.110(a) requires a Master Plan of Development to be approved in the form of a Conditional Use Permit to approve multi -family development over 12 units; and, WHEREAS, Atascadero Municipal Code Section 9-4.113(b)(1) allows the Planning Commission modification of height limitations, provided the Commission first finds the project will not result in substantial detrimental effects on the enjoyment and use of adjoining properties and that the modified height will not exceed the lifesaving equipment capabilities of the Fire Department; and, WHEREAS, Atascadero Municipal Code Section 9-4.115(h) allows the Planning Commission the ability to modify parking standards of the Atascadero Municipal Code through conditional use permit approval based upon specific findings of fact that the characteristics of a use or its immediate vicinity do not necessitate the number of parking spaces, type of design, or 78 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 improvements required by this title and that reduced parking will be adequate to accommodate on the site all parking needs generated by the use.; and, WHEREAS, the Atascadero General Plan Policy 2.1.2 allows the Planning Commission to grant up to a fifteen percent (15%) density bonus for “exceptionally high quality architecture”) through required findings; and, WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2016-0003 was prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional Use Permit application was held by the Planning Commission of the City of Atascadero at w hich hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of Development; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on November 15, 2016, studied and considered Conditional Use Permit 2016-0298 (Master Plan of Development) after first studying and considering the Proposed Mitigated Negative Declaration prepared for the project, and NOW, THEREFORE, the Planning Commission takes the following actions: SECTION 1. Findings for Building Height Waiver. The Planning Commission of the City of Atascadero finds as follows: 1. The project will not result in substantial detrimental effects on the enjoyment and use of adjoining properties. 2. The modified height will not exceed the lifesaving equipment capabilities of the Fire Department. SECTION 2. Findings for Parking Modifications. The Planning Commission of the City of Atascadero finds as follows: 1. The characteristics of a use or its immediate vicinity do not necessitate the nu mber of parking spaces, type of design, or improvements required by this title. 2. Reduced parking will be adequate to accommodate on the site all parking needs generated by the use. SECTION 3. Findings for General Plan Policy 2.1.2 Density Bonus. The Planning Commission of the City of Atascadero finds as follows: 79 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 1. The proposed project utilizes high quality materials and finishes through all four sides of the building(s) located on-site. 2. The proposed project utilizes reduction of massing and other techniques to reduce appearance of bulk, and density. 3. The proposed project implements the use of varied rooflines, pop-outs, architectural appendages and other elements that create visually appealing projects. 4. The proposed project utilizes architectural materials appropriate with the vernacular of the architectural theme. 5. The proposed project incorporates significant contributions to the community such as a park, historic preservation, or road dedications. SECTION 4. Findings for Approval of Conditional Use Permit. The Planning Commission of the City of Atascadero finds as follows: 1. The proposed project or use is consistent with the General Plan, as well as the City’s Appearance Review Manual and any pertinent City policy or criteria adopted by ordinance or resolution of the City Council; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance), with exceptions of building height and parking modifications with findings contained here within; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. SECTION 5. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on November 15, 2016, resolved to approve Conditional Use Permit 2015-0298 (Master Plan of Development) subject to the following: 1. EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program 2. EXHIBIT B: Master Plan of Development (Site Plan) 3. EXHIBIT C: Proposed Parking Matrix 80 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 4. EXHIBIT D: Landscape Plan 5. EXHIBIT E: Grading and Drainage Plan / Utility Plan 6. EXHIBIT F: Floor Plans, Elevations 7. EXHIBIT G: Color and Materials Board 8. EXHIBIT H: Alternative Street B Concept. 81 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 On motion by Commissioner ____________________, and seconded by Commissioner __________________, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSTAIN: ( ) ABSENT: ( ) ADOPTED: CITY OF ATASCADERO, CA ______________________________ Jan Wolff Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 82 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program Master Plan of Development (CUP 2016-0298) Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Planning Department Standard Conditions 1. This Conditional Use Permit shall be for 2605, 2535, 2705 El Camino Real, described in attached exhibits (APN 049-151-009, 011,063) regardless of owner. This conditional use permit shall supersede all previously approved master plans of development for this site. Ongoing PS 2. The approval of this use permit shall become final and effective for the purposes of issuing building permits consistent with section 9-1.111 of the Atascadero Municipal Code. Ongoing PS 3. The Community Development Department shall have the authority to approve the following minor changes to the project that (1) modify the site plan building foot print of the project by less than 10%, and/or (2) address a construction design issue that is not substantive to the Master Plan of Development. The Planning Commission shall have the final authority to approve any other changes to the Master Plan of Development or any proposed architectural changes due to the approval of density bonus with high quality architectural design. BP PS, CE 4. Approval of this Conditional Use Permit shall be valid consistent with section 9-2.112 (a) of the Atascadero Municipal Code. BP PS 5. The applicant shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the subdivision. Ongoing 6. All site plan improvements shall be consistent with Exhibit B of the master plan of development. BP PS, CE 7. All landscaping must consist of drought tolerant landscaping consistent with the Atascadero Mutual Water Company’s drought tolerant plant list or comparable drought tolerant species. Landscaping shall be installed prior to issuance of final permits for each phase of development. BP PS 8. Landscaping shall be included along the north eastern property line. Pedestrian paths shall be setback a minimum of 1-foot from the property line where feasible to allow for landscaping of grasses and vines. BP PS 9. Landscaping plan shall be reviewed by the Atascadero Police Department to BP PS 83 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney ensure neighborhood safety. 10. Fencing and screening shall be reviewed and approved by the City Staff. External low scale/pedestrian scale fencing such as split rail fencing or similar is required adjacent to El Camino Real and shall be approved with landscaping plan and be located outside the right-of-way. BP PS 11. “Street B” and the pathway that runs along “Street B” shall be offered for dedication to the City. PS / PW FM/COC 12. The pedestrian path that runs along “Street B” shall be extended to the north- east property line to provide for future connectivity. BP CE 13. All elevations must be consistent with Exhibit F. Minor changes that are found to be in substantial conformance with Exhibit F that result in a superior quality appearance may be approved by the Community Development Director. Maximum building heights shall not exceed 46-feet in height measured from finished grade. BP PS 14. Color and materials board shall be consistent with Exhibit G. Any color deviations or additional colors must be approved by the Community Development Director or their designee prior to the issuance of building permits. BP PS 15. Solar panels shall be utilized consistent with the adopted environmental analysis on carports unless infeasible due to solar access. If solar panels are found to be infeasible, the appropriate CEQA process shall be followed to update the project impacts and identify new mitigation measures as needed. BP PS 16. Community Identity monument signage shall require a building permit, be consistent with color and materials of the proposed architecture elements, and meet the standards established by Section 15, Signs. Community identification signage shall be located outside the city right-of-way or any easement dedicated for public access. BP PS 17. The applicant is required to participate in the City of Atascadero Police Department Crime Free Multi-Family Housing Program. On-Going PD 18. A Lot Line Adjustment shall be required to be completed prior to final occupancy of the 1st building in Phase 1 to ensure all required elements and turn arounds are located on properties. Recordation of COC with a quitclaim for easement or Final Map recordation shall be completed BP PS 19. The 30-foot wide private access and public utility easement as shown on Recorded Maps book 27, page 55 shall be abandoned as a part of a recorded parcel map or certificate of compliance with a quitclaim. BP CE 84 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 20. The project shall be developed and maintained as one development, regardless of owner(s) and phases. On-Going PS 21. Final carport locations and heights shall be determined by the City Fire Marshall. BP FS 22. A parking management plan shall be submitted with each phase of the proposed development to ensure adequate parking spaces are provided. BP PS 23. Street trees along El Camino Real shall be provided at a maximum spacing of 30-feet on center. Trees shall be Live Oak or Native Sycamore and shall be located within 10-feet of the back of sidewalk. Existing vegetation proposed to remain can be incorporated into the street tree requirement. Tre spacing at the entrance may exceed the maximum spacing to preserve safe sight distance. Accent tree varieties may also be located at this location. Street trees along “Street B” shall be a medium sized tree such as Chinese pistache, Chitalpa, or other species approved by the Community Development Director. Tree spacing shall be a maximum, of 30-feet on center. BP PS 24. Street trees, which are defined as any tree within the sidewalk, within any planter area that separates the sidewalk from the travel way/parking lanes, or within 10 feet of the back of sidewalk, shall be maintained by the property owner in a manner which allows the tree to grow to its natural canopy height and width. Low lying branches shall be removed consistent with fire department standards for clear access. Irrigation shall be monitored and maintained and deep root watering methods shall be utilized. Should a tree require replacement, approval of the replacement tree species and location shall be obtained from the City’s Planning Division prior to removal. Any removed street tree shall be replaced in accordance with City standards and any approved entitlement conditions. This shall apply to trees along the project frontage of El Camino Real and Future Street. BP PS 25. Parking lot shade trees, both those in planter fingers/islands and along the perimeter of parking areas, shall be maintained in a manner which allows the tree to achieve a canopy to provide a minimum of 10% coverage of the parking lot. Low lying branches shall be removed consistent with fire department standards for clear access. Irrigation shall be monitored and maintained and deep root watering methods shall be utilized. Should a tree require replacement, approval of the replacement tree species and location shall be obtained from the City’s Planning Division prior to removal. Any removed street tree shall be replaced in accordance with City standards and any approved entitlement conditions. BP PS 26. Two additional pedestrian pathways shall be provided along the El Camino Real frontage linking the City sidewalk to the developments pedestrian trail, if BP PS 85 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney feasible and meets ADA accessibility requirements 27. Retaining and/or decorative walls associated with the pedestrian trail along the El Camino real frontage shall be finished consistent with the architectural detailing of the project. Material options include stucco, brick/stone veneer, or a decorative dark color split face block consistent with the approved color scheme. BP PS 28. The applicant shall be required to submit construction plans to San Luis Obispo Air Pollution Control District (SLOAPCD) to define appropriate mitigation measures to ensure air emissions do not exceed thresholds for each phase of development for both construction and operation emissions. A letter outlining these mitigation measures shall be provided to the City prior to issuance of any building permit or grading permit for each phase of the project. BP/GP PS Building Division Conditions 29. All building permit submittals shall be consistent with the adopted California Building Code (CBC) at the time of building permit submittal. BP BS 30. All required fire-turnarounds shall be approved by the Fire Marshall prior to the issuance of permits. BP FS 31. Location of fire hydrants shall be reviewed and approved by the Fire Marshall prior to the issuance of permits. BP FS 32. Painted Red Curbs or installation of no-parking signs shall be determined by the Fire Marshall within the boundary of the proposed project and shall be installed prior to final occupancy of each phase. BP FS/CE Public Works Project Conditions 33. The developer shall offer to the public a 50-feet wide right-of-way along the northerly project boundary, connecting the El Camino Real right-of-way to the easterly project boundary, to the satisfaction of the City Engineer. GP, BP CE 34. The developer shall design and improve said right-of-way in accordance with City Standards and Standard Specifications and to the satisfaction of the City Engineer. The structural pavement section shall be designed based on a Traffic Index = 5.0 with a 20-year life, to the satisfaction of the City Engineer. GP, BP CE 35. The new right-of-way (Street B) shall be improved with public utilities, including an 8” public water main, 8” public sewer main, 18” storm sewer, gas, power, telephone, and cable TV systems from El Camino Real to the easterly project boundary. GP, BP CE 86 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 36. Public improvement plans (PIPs) shall be prepared by a licensed civil engineer. PIPs shall be prepared on 24”x36” plan sheets and in accordance with Section 2 of City Standard Specifications effective date March 6, 2014. GP, BP CE 37. El Camino Real signing and striping shall be in accordance with the California Manual on Uniform Traffic Control Devices (CA-MUTCD) and shall include a bicycle lane, to the satisfaction of the City Engineer GP, BP CE 38. Street lights may be required at specific locations as determined by the City Engineer for both El Camino Real and Street B. GP, BP CE 39. The design of structural pavement section shall be based on a Traffic Index = 10.00 (based on a 20-year design life for reconstruction) for frontage improvements along El Camino Real. Pavement and base sections shall be designed and constructed in accordance with the City of Atascadero Engineering Standards and Standard Specifications. When said standards and specifications are not clear, lack necessary details, or are silent, the minimum standard shall be based upon the current edition of the San Luis Obispo County Public Improvement Standards or Caltrans Standard Drawings and Standard Specifications, as determined by the City Engineer. GP, BP CE 40. Street trees shall be planted along El Camino Real to the satisfaction of the Community Development Director and City Engineer. Trees planted within 10-feet of the public sidewalk shall use deep-root barriers”. GP, BP CE 41. The subject property shall be designed to accept and convey off-site storm water run-off consistent with the existing on-site and off-site drainage patterns and restrictions. Stormwater detention/retention as well as water quality shall conform to the City and State requirements GP, BP CE 42. This project shall comply with the Post-Construction Storm Water Management regulations and requirements of the City’s Standard Specifications and the RWQCB (Central Coast Region) Resolution No. R3- 2013-0032. All development submittals shall include a Storm Water Control Plan (SWCP) using the City’s form and associated supporting documentation. An Operations and Maintenance Plan (OMP) is required and shall be prepared and submitted to the City Engineer for review and approval. At the discretion of the City Engineer based on the complexity of the OMP, an estimated operating and maintenance budget may be required to be prepared by a licensed engineer GP, BP CE 43. The City Engineer can require the OMP be recorded as an agreement against the property. When recordation of an OMP agreement is required, the agreement shall contain provisions allowing the City to enter the property, following reasonable notice to the property owner or tenant, to conduct an inspection of the storm water system and post-construction storm water management controls. GP, BP CE 87 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 44. The OMP shall include a section addressing inspection and reporting by a third party, to the satisfaction of the City Engineer. GP, BP CE 45. When an OMP is required after the City has created a City Standard OMP template, the OMP shall be based on the City template, to the satisfaction of the City Engineer. GP, BP CE 46. A Storm Water Pollution Prevention Plan (SWPPP) is required prior to any ground disturbing activities. The WDID number provided upon acceptance of the SWPPP into the State’s SMARTS system registration shall be noted on the Title Sheet of the Public Improvement Plans. BP CE 47. Prior to approval of construction plans, percolation testing shall be completed for all drainage basins requiring infiltration. The project engineer shall provide calculations and a report demonstrating that the basin will drain within seven (7) days following a storm. The system shall be in compliance with the Post Construction Stormwater Management requirements in accordance with all City and State regulations. BP CE 48. Flood control basins are utilized in the City of Atascadero, as determined appropriate depending upon site conditions: Retention basins, Detention basins, and Subsurface Infiltration Basins. In all cases, the Project Engineer shall provide evidence that the basin will completely drain within seven (7) days to the satisfaction of the City Engineer. Flood control basins may be incorporated into other on-site storm water management facilities. Retention Basin. Any drainage basin which is used as a terminal disposal facility shall be classified as a retention basin. a. Basin Capacity. The basin capacity is to be based on the theoretical runoff from a 50-year storm, 10-hour intensity for 10-hour duration. No reduction in required capacity shall be given for soil percolation rates. In addition, an antecedent moisture factor of 1.3 shall be required in locations where there are limited areas for overflow (i.e., a natural sump). b. Percolation Test Required. A minimum of 3 percolation tests per basin shall be submitted to the City Engineer for approval prior to approval of the plans, to determine that the basin will be able to drain within the seven -day standard noted above. Deep soil borings may be required in areas where there is concern of shallow depth to groundwater. Detention Basin. Any drainage basin which has a downstream outlet designed to meter the outflow shall be classified as a detention basin. Basin capacity shall be based on receiving the runoff from a 50-year storm with the watershed in its fully- developed condition, and releasing the flow equivalent to the runoff from a 2 -year storm with the project site in its pre- development condition. The outlet shall release water in a non-erosive manner. Subsurface Infiltration Basins. Subsurface basins may be used for either retention or detention of site runoff, where their application is suitable for project conditions. GP, BP CE 88 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Subsurface basins shall be limited to locations where the depth to seasonally high groundwater is greater than 10-feet below the deepest portion of the basin. The Project Engineer must address the following areas of concern: a. Design Criteria. i. Distance to structures on site ii. Maintenance practicality including landscape maintenance and maintenance access iii. Horizontal distance to wells or septic facilities iv. Long-term percolation rate v. Surface (vehicle) loading characteristics (where applicable) c. Drain Rock. Drain rock shall be clean, crushed granite (angular rock of similar approved hardness per a manufacturer’s recommendations) with rock size ranging from 1-1/2-inch to 3/4-inch. Rock gradation shall conform to the Specification of ASTM C-33 #4. d. Operational Requirements. i. Water quality of inflow (both sediment and chemical loading) may require pretreatment or separation ii. Maintenance plan shall include provisions for vehicular access and/or confined-space entry safety requirements, where applicable iii. A safe overflow path shall be identified on the plan, to the satisfaction of the City Engineer. Overflow Path Required. The design of all drainage basins shall identify the designated route for overflow. The Project Engineer shall design the overflow path so that the flow in a 100- year storm is non-erosive and will not damage downstream improvements (including other basins). 49. The on-site wastewater collection system shall be privately owned and operated. That portion offered to the public will remain as a private wastewater system until accepted by the City of Atascadero. GP, BP CE 50. New on-site public utility distribution systems for gas, power, telephone, cable TV shall be constructed underground, to the satisfaction of the City Engineer. GP, BP CE Mitigation Monitoring / MND 2016-0003 Mitigation Measure 1.d.1: A photo metric plan will be required for each phase of construction at the time of building permit submittal. BP PS/BS Mitigation Measure 3.b.1: At the time of building permit submittal, the Applicant may submit a detailed construction plan with timelines for construction to ensure appropriate quality mitigation measures are in place for each phase of construction. The applicant may submit this construction schedule to APCD and provide City Staff a list of mitigation measures as approved by SLOAPCD. These mitigation measures will be placed on the approved building plans for each phase. BP PS/BS 89 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure 3.b.2: The project shall be conditioned to comply with all applicable APCD regulations pertaining to Naturally Occurring Asbestos (NOA). Prior to any grading activities a geologic evaluation should be conducted to determine if NOA is present within the area that will be disturbed. If NOA is not present, and exemptions request must be filed with the District. If NOA is found at the site, the applicant must comply with all requirements outlined in the Asbestos ATCM. This may include development of an Asbestos Dust Mitigation Plan and an Asbestos Health and Safety program for approval by the APCD. Technical Appendix 4.4 of the SLO County APCD CEQA Air Quality Handbook includes a map of zones throughout San Luis Obispo County where NOA has been found and geological evaluation is required prior to any grading. GP PS/BS Mitigation Measure 3.b.3: The project shall reduce nitrogen oxides (NOx), reactive organic gases (ROG), and diesel particulate matter (DPM) emissions from construction equipment listed below: 1. Maintain all construction equipment in proper tune according to manufacturer’s specifications; 2. Fuel all off-road and portable diesel powered equipment with ARB certified motor vehicle diesel fuel (non-taxed version suitable for use off-road); 3. Use diesel construction equipment meeting ARB's Tier 2 certified engines or cleaner off-road heavy-duty diesel engines, and comply with the State off- Road Regulation; 4. Use on-road heavy-duty trucks that meet the ARB’s 2007 or cleaner certification standard for on-road heavy-duty diesel engines, and comply with the State On-Road Regulation; 5. Construction or trucking companies with fleets that that do not have engines in their fleet that meet the engine standards identified in the above two measures (e.g. captive or NOx exempt area fleets) may be eligible by proving alternative compliance; 6. All on and off-road diesel equipment shall not idle for more than 5 minutes. Signs shall be posted in the designated queuing areas and or job sites to remind drivers and operators of the 5 minute idling limit; 7. Diesel idling within 1,000 feet of sensitive receptors is not permitted; 8. Staging and queuing areas shall not be located within 1,000 feet of sensitive receptors; 9. Electrify equipment when feasible; 10. Substitute gasoline-powered in place of diesel-powered equipment, where feasible; and, 11. Use alternatively fueled construction equipment on-site where feasible, such as compressed natural gas (CNG), liquefied natural gas (LNG), propane or biodiesel BP PS/BS Mitigation Measure 3.b.4: The project shall utilize Best Available Technology (BACT) in order to reduce ozone precursor emissions from the list below. 1. Further reducing emissions by expanding use of Tier 3 and Tier 4 off-road and 2010 on-road compliant engines; 2. Repowering equipment with the cleanest engines available; and 3. Installing California Verified Diesel Emission Control Strategies. These strategies are listed at: http://www.arb.ca.gov/diesel/verdev/vt/cvt.htm BP PS/BS 90 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure 3.d.1: The project shall be conditioned to comply with all applicable District regulations pertaining to the control of fugitive dust (PM-10): 2.4 Fugitive Dust Mitigation Measures: Expanded List If the estimated ozone precursor emissions from the actual fleet for a given construction phase are expected to exceed the APCD threshold of significance after the standard mitigation measures are factored into the estimation, then BACT needs to be implemented to further reduce these impacts. The BACT measures can include: 1. Reduce the amount of the disturbed area where possible; 2. Use of water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency would be required whenever wind speeds exceed 15 mph. Reclaimed (non -potable) water should be used whenever possible; 3. All dirt stock pile areas should be sprayed daily as needed; 4. Permanent dust control measures identified in the approved project revegetation and landscape plans should be implemented as soon as possible following completion of any soil disturbing activities; 5. Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading should be sown with a fast germinating, non-invasive grass seed and watered until vegetation is established; 6. All disturbed soil areas not subject to revegetation should be stabilized using approved chemical soil binders, jute netting, or other methods approved in advance by the APCD; 7. All roadways, driveways, sidewalks, etc. to be paved should be completed as soon as possible. In addition, building pads should be laid as soon as possible after grading unless seeding or soil binders are us ed; 8. Vehicle speed for all construction vehicles shall not exceed 15 mph on any unpaved surface at the construction site; 9. All trucks hauling dirt, sand, soil, or other loose materials are to be covered or should maintain at least two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance with CVC Section 23114; 10. Install wheel washers where vehicles enter and exit unpaved roads onto streets, or wash off trucks and equipment leaving the site; 11. Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water should be used where feasible; 12. All of these fugitive dust mitigation measures shall be shown on grading and building plans; and The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. The name and telephone number of such persons shall be provided to the APCD Compliance Division prior to the start of any grading, earthwork or demolition. BP PS/BS 91 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure 4.d.1: If any active nests are found that would be impacted by construction, then the nest sites shall be avoided with the establishment of a non - disturbance buffer zone around active nests as determined by a qualified biologist. Nest sites shall be avoided and protected with the non-disturbance buffer zone until the adults and young of the year are no longer reliant on the nest site for survival as determined by a qualified biologist. As such, avoiding disturbance or take of an active nest would reduce potential impacts on nesting birds to a less-than-significant level. GP PS Mitigation Measure 4.e.1: Grading and excavation and grading work shall be consistent with the City of Atascadero Tree Ordinance. Special precautions when working around native trees include: 1. All existing trees outside of the limits of work shall remain. 2. Earthwork shall not exceed the limits of the project area. 3. Low branches in danger of being torn from trees shall be pruned prior to any heavy equipment work being done. 4. Vehicles and stockpiled material shall be stored outside the drip line of all trees. 5. All trees within twenty feet of construction work shall be fenced for protection with 4-foot chain link, snow or safety fencing placed per the approved tree protection plan. Tree protection fencing shall be in place prior to any site excavation or grading. Fencing shall remain in place until completion of all construction activities. 6. Any roots that are encountered during excavation shall be clean cut by hand and sealed with an approved tree seal. 7. Utilities such as water, gas, power, cable, storm drainage, and sewer should be redirected from under the canopy of any trees that are to remain. 8. Where a building is placed within the canopy of a tree the foundation should be redesigned so that it bridges across any root systems. 9. Any foundation or other structure that encroaches within the drip line of trees to be saved shall be dug by hand. 10. At no time shall tree roots be ripped with construction equipment. GP PS Mitigation Measure 4.e.2: Tree protection fencing shall be installed at the locations called out in the Tree Protection Plan. An inspection of the tree fencing shall be done by City staff prior to issuance of building permits. GP PS Mitigation Measure 4.e.3: The following measure shall be incorporated on-site during the construction process of the proposed project: 1. A minimum height construction protective barrier shall be erected around the drip line of the tree plus 4’. The fence shall be supported with “T” posts at no more than 6’ o.c. and tied at least 3 places per post. This fence shall be installed by the General Contractor before any rough grading is allowed on the site. Approval for this stage must be obtained in writing from either the Arborist or the Counties/Cities representative. 2. Earthwork shall not exceed the limits of the project area. 3. Low branches in danger of being torn during construction process GP PS 92 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney shall be pruned prior to any heavy equipment work being undertaken. 4. Once the rough grading is accomplished the fence may be moved closer to the trunk of the tree for finish grading. At no time shall the fence be placed within the Critical Root Zone (CRZ). This location is determined by the diameter of the trunk at Diameter Breast Height (DBH). (4.5’ above grade) and is 1’ per 1” diameter in the direction of the drip line. At no time shall the fence be moved closer to the trunk than the drip line. 5. Any roots that are encountered over 2” diameter, during the excavation process shall be clean cut perpendicular to the direction of root growth with a handsaw. At no time shall tree seal be applied to any cut. Any roots over 2” diameter the county/city representative shall be notified to determine the preferred course of action. 6. All trenching with CRZ area shall require hand trenching to preserve and protect roots over 2” in diameter. 7. No grading of trenching is allowed within the CRZ fenced area without written permission from the County/City representative or a certified arborist. 8. Any roots over 4” in diameter are not to be cut or ripped until inspected and approved in writing by the arborist. 9. If, for whatever reason, work must be accomplished inside the drip line 4”-6” of mulch must be applied first to decrease the possibilities of compaction upon written approval from the arborist. 10. There shall be a pre-construction meeting between the Engineering/Planning staff of the County/City, Grading equipment operators, Project Superintendent and the Arborist to review the project conditions and requirements prior to any grubbing or earth work for any portions of the project site. All tree protection fencing shall be installed for inspection prior to this meeting. 11. All trees shall be pruned before any construction takes place that are in the development areas to be saved if they might be damaged by the construction equipment. This must be accomplished by a bonded, licensed, and certified Tree Service Contractor. 12. All debris shall be cleared from the area or chipped and spread on the site or stacked in orderly piles for future use by the Owner, at the Owners request. 13. In locations where paving is to occur within the drip line grub only and do not compact unless authorized in writing. Permeable pavers or other preamble surface must be approved by the Arborist. Mitigation Measure 4.e.4: Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented, the trees designated for protection were protected during construction, and the construction-related tree protection measures are no longer required for tree protection for each phase. FI PS 93 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure 4.e.5: All utilities shall remain outside the driplines of native trees BP PS/ BS Mitigation 5.a.1: Modifications to the building shall reflect the original design and follow the Secretary of the Interior’s Standards for the treatment of historic properties. The proposed project includes a modified floor plan of the colony home and a new deck. The modified floor plan shall preserve all defining characteristics and features of the building. The new deck shall be designed to emphasize unique and original features of the home, such as the bay windows. The design shall incorporate the original characteristics of the deck with the encircling veranda and utilize minimal solid wood posts and rails. BP PS/ BS Mitigation 5.b.c.1: Conduct a phase one archaeological survey before the issuance of building permits. If resources are present on the project site, a cultural resource monitor from the Salinan Tribe will be present during all ground disturbing activities. GP PS/ BS Mitigation 5.d.1: In the event that human remains are discovered on the property, all work on the project shall stop and the Atascadero Police Department and the County Coroner shall be contacted. The Atascadero Community Development Department shall be notified. If the human remains are identified as being Native American, the California Native American Heritage Commission (NAHC) shall be contacted at (916) 653-4082 within 24 hours. A representative from both the Chumash Tribe and the Salinan Tribe shall be notified and present during the excavation of any remains. GP PS Mitigation Measure 6.b.1: The on-site subdivision / grading permit plans shall include erosion control measures to prevent soil, dirt, and debris from entering the storm drain system during and after construction, consistent with mitigation or construction methods outlined in the geotechnical report. Plans shall be approved by the City Engineer prior to issuance. GP PS/ BS Mitigation Measure 6.b.2: All cut and fill slopes mitigated with an appropriate erosion control method (erosion control blanket, hydro-mulch, or straw mulch appropriately anchored) immediately after completion of earthwork, as approved by the City Engineer. All disturbed slopes shall have appropriate erosion control methods in place. GP PS / BS Mitigation Measure 6.b.3: The contractor will be responsible for the clean-up of any mud or debris that is tracked onto public streets by construction vehicles. An approved device must be placed prior to commencement of grading activities. This device shall be approved by the City Engineer. GP / FI PS/CE Mitigation Measure 8.h.1: Construction will comply with section the California Building and Fire Codes. New residences in the City are required to install fire sprinklers. Fire protection measures shall include the use of non-combustible exterior construction and roofs and fire-resistant building materials. BP / FI BS / FD Mitigation Measure 9.d.e.f.2: The developer is responsible for ensuring that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices, citations, or GP PS/CE 94 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 Conditions of Approval / Mitigation Monitoring Program PLN 2016-1597 / CUP 2016-0298 Emerald Ridge Apartments 2605, 2535, 2705 El Camino Real APN 049-151-009,011,063 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney stop orders. Mitigation Measure 16.a.b.1: Striping El Camino Real must be provide a designated left turn lane that provides access to the project access roadway. FI PS/CE Mitigation Measure 16.a.b.2: Restricting parking to improve sight lines for vehicles exiting the commercial driveway on the south side of Principal Ave must be approved by the Public Works department. This may include red curb striping / signage or any other additional devices required to enforce no parking along this segment. FM or FI FD Mitigation Measure 16.a.b.3: Payment of Circulation System Fee (TIF) shall be made prior to the issuance of building permits for 181 residential units th at contribute to the deficiencies to the US 101 / Del Rio Road interchange. Those traffic impact fees shall be collected based on the adopted traffic impact fee at the time of building permit issuance. At this time, the adopted traffic impact fee is $3,684 per units, which is collected as a part of the overall development impact fee. BP PS/CE Mitigation Measure 16.a.b.4: Payment of Circulation System Fee (TIF) shall be made prior to the issuance of building permits for 27 bonus residential units not anticipated by the City’s General Plan that contribute to the deficiencies to the US 101 / Del Rio Road interchange. Those traffic impact fees shall be collected based on the adopted traffic impact fee at the time of building permit issuance. At this time, the adopted traffic impact fee is $3,684 per units, which is collected as a part of the overall development impact fee. An additional, fair share contribution, traffic fee shall be applicable for the 27 bonus units. The applicant shall pay its fair share based on its percentage impact by the provided traffic study. The fair share contribution shall be based on the September 23, 2014 Management Report estimating the Del Rio Road / US 101, which is estimated at 12 million dollars. This additional feel shall be collected as a part of Phase II and Phase III units, or distributed evenly over all 3 phases. The applicant may further refine the percentage of impact with an additional study to be approved by both the City Engineer and the Community Development Directo r. BP PS/CE Mitigation Measure 17.d.1: Landscaping plans shall be submitted to the Community Development Department for review and approval. Landscaping must consist of drought tolerant species and utilize drip irrigation. BP PS/BP 95 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT B: Master Plan of Development (Site Plan) Master Plan of Development (CUP 2016-0298 ) *Full Sized Site Plan in Project File 96 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT C: Proposed Parking Matrix / Parking Plan Master Plan of Development (CUP 2016-0298 ) Proposed Parking Calculations – Emerald Ridge Unit Types Number of Units Typical Parking Requirement - AMC Parking Spaces Needed- AMC Provided Spaces On-Site 1 bedroom unit 72 1.5 spaces per unit 108 spaces 98 uncovered spaces 247 Covered Spaces 11 uncovered guest spaces 31 uncovered guest spaces (Street B) 14 Motorcycle Stalls 2 bedroom unit 136 2 spaces per unit 272 spaces Guest Spaces 1 per 5 units 42 spaces Motorcycle Parking Substitution 1 motorcycle space per 20 spaces -21 spaces Bicycle Parking Substitution 1 bicycle rack per 20 spaces -21 spaces Total Number of Parking Spaces Required under AMC 380 spaces 401 spaces provided +21 spaces 97 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT C: Proposed Parking Matrix / Parking Plan Master Plan of Development (CUP 2016-0298 ) 98 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT D: Landscaping Plan Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 99 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT E: Grading and Drainage Plan / Utility Plan Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 100 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT E: Grading and Drainage Plan / Utility Plan Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 101 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT E: Grading and Drainage Plan / Utility Plan Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 102 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT F: Floor Plans / Elevations Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 103 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT F: Floor Plans / Elevations Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 104 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT F: Floor Plans / Elevations Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 105 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT F: Floor Plans / Elevations Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 106 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT F: Floor Plans / Elevations Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 107 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT F: Floor Plans / Elevations Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 108 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT F: Floor Plans / Elevations Master Plan of Development (CUP 2016-0298 ) *Full Sized Plan in Project File 109 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT G: Color and Materials Board Master Plan of Development (CUP 2016-0298 ) *Additional Colors may be approved by Community Development Director 110 ITEM NUMBER: ITEM NUMBER: 6 DATE: 11-15-16 EXHIBIT H: Street B Angled Parking Alternative Master Plan of Development (CUP 2016-0298 ) T:\- 16 PLNs\PLN 2016-1597 Emerald Ridge Redesign\Planning Commission\PLN2016-1597 Emerald Ridge.doc 111 DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADEROPROJECT# 0238-01-RS15 SHEET INDEXT.1 COVER SHEETT.2 INSPIRATION BOARDT.3 TOPOGRAPHIC SURVEY A.1 ARCHITECTURAL SITE PLANA.2 SITE SECTIONSA.3 VEHICULAR ACCESS AND PARKINGA.4 ACCESSIBLE PATHWAYSA.5 PEDESTRIAN PATHWAYSA.6 PROJECT PHASING PLANA.7 MIN. OPEN SPACE EXHIBITA.8 MIN. LANDSCAPE COVERAGE EXHIBITC.1 PRELIMINARY GRADING PLANC.2 PLELIMINARY UTILITY PLANL.1 INSPIRATION IMAGESL.2 OVERALL LANDSCAPE PLANL.3 COMMON LANDSCAPE AREAL.4 TYP. COURTYARD LANDSCAPEL.5 PLANT SCHEDULEA.9 BLDG. A TYP. UNIT PLANSA.10 BLDG. A TYP. UNIT PLANS A.11 BLDG. 1A, 3A & 5A SUBFLOORA.12 BLDG. 1A, 3A & 5A FIRST FLOORA.13 BLDG. 1A, 3A & 5A SECOND FLOORA.14 BLDG. 1A, 3A & 5A THIRD FLOORA.15 BLDG. 1A, 3A & 5A ELEVATIONSA.16 BLDG. 1A, 3A & 5A ELEVATIONSA.17 BLDG. B TYP. UNIT PLANSA.18 BLDG. B TYP. UNIT PLANSA.19 BLDG. B TYP. UNIT PLANSA.20 BLDG. 2B, 4B & 6B SUBFLOORA.21 BLDG. 2B, 4B & 6B FIRST FLOORA.22 BLDG. 2B, 4B & 6B SECOND FLOORA.23 BLDG. 2B, 4B & 6B THIRD FLOORA.24 BLDG. 2B, 4B & 6B ELEVATIONSA.25 BLDG. 2B, 4B & 6B ELEVATIONSA.26 CLUBHOUSE FLOOR PLANA.27 CLUBHOUSE ELEVATIONSA.28 CLUBHOUSE ELEVATIONSA.29 TYPICAL CARPORTSA.30 PERSPECTIVE - PROJECT ENTRYA.31 PERSPECTIVE - EL CAMINOA.32 PERSPECTIVE - TYP. COURTYARDA.33 PERSPECTIVE - CLUBHOUSEA.34 COLORS AND MATERIALSTOTAL SHEET COUNT = 44BUILDING AREASBUILDING A (35 UNITS) *(12) - PLAN A13,464 SF(8) - PLAN B 5,544 SF(9) - PLAN C1 8,856 SF(5) - PLAN C2 4,840 SF(1) - STUDIO 450 SFCARPORTS/TANDEM/STORAGE/STAIRSCOURTYARDS/WALKWAYS 14,286 SF BUILDING A SUBTOTAL 47,440 SF(3) - BUILDING A TOTAL 142,320 SF*BUILDINGS 1A AND 3A WILL HAVE 1 LESS 1 BED UNIT FOR A TOTAL OF 34 UNITS PER BLDG.BUILDING B (35 UNITS) (10) - PLAN A11,220 SF(12) - PLAN B 2,079 SF(3) - PLAN C1 2,952 SF(2) - PLAN C2 1,936 SF(2) - PLAN D 2,108 SF(6) - PLAN E 6,768 SFSTAIRS/COURTYARDS/WALKWAYS 7,626 SF BUILDING B SUBTOTAL 34,689 SF(3) - BUILDING A TOTAL 104,067 SFCARPORTS (172 STALLS) (31) - STANDARD (4-PACK) 18,414 SF(12) - COMPACT (4-PACK) 5,568 SFCARPORT TOTAL 23,982 SFPROJECT DIRECTORYCLIENT: LDC COMMERCIALPO BOX 2003MONTEREY, CA 93940ARCHITECT: RRM DESIGN GROUP 3765 SOUTH HIGUERA ST, SUITE 102SAN LUIS OBISPO, CA 93401 CONTACT: EDDIE HERRERAEMAIL: EMHERRERA@RRMDESIGN.COMPH: 805-543-1794LANDSCAPE: RRM DESIGN GROUP3765 SOUTH HIGUERA ST, SUITE 102SAN LUIS OBISPO, CA 93401CONTACT: WES AROLACIVIL: RRM DESIGN GROUP3765 SOUTH HIGUERA ST, SUITE 102SAN LUIS OBISPO, CA 93401CONTACT: TIM WALTERSARBORIST: DAVE’S TREE SERVICE 625 JAMESON COURTARROYO GRANDE, CA. 93420CONTACT: DAVE RAGAN PH: 805-481-1038 TRAFFIC: W-TRANS 475 14TH STREET, SUITE 290OAKLAND, CA. 94612CONTACT: SMADAR BOARDMANPH: 510-444-2600HISTORICAL: BERTRANDO AND BERTANDO RESEARCH CONSULTANTS267 FOOTHILL BLVD.SAN LUIS OBISPO, CA 93405 CONTACT: BETSY BERTRANDOPH: 805-544-1308DWELLING UNIT AREASUNIT A - TOWNHOME LOWER FLOOR 598 SFUPPER FLOOR 524 SFTOTAL LIVING 1,122 SFDECK/PATIO 64 SFUNIT B - FLAT LOWER FLOOR 693 SFTOTAL 693 SFDECK/PATIO 45 SFUNIT C1 - FLAT LOWER FLOOR 984 SFTOTAL 984 SFUNIT C2 - FLAT LOWER FLOOR 968 SFTOTAL 968 SFDECK/PATIO 50 SFUNIT D - FLAT LOWER FLOOR 1,054 SFTOTAL LIVING 1,054 SFPATIO 59 SFUNIT E - TOWNHOME LOWER FLOOR 590 SFUPPER FLOOR 538 SFTOTAL LIVING 1,128 SFDECK 76 SFPATIO 60 SFCLUBHOUSE LOWER FLOOR 1,580 SFATTIC 400 SFTOTAL LIVING 1,128 SFDECK 910 SFDENSITY STATISTICSLOT AREA (NET)7.55 AC (328,878 SF)RMF ZONE DENSITY24 DWELLING UNITS PER NET ACRE 24DU x 7.55 AC = 181 UNITS15% DENSITY BONUS FOR ATTACHED MULTI-FAMILY PROJECT OF EXCEPTIONALLY HIGH DESIGN QUALITY THROUGH THE CONDITIONAL USE PERMIT PROCESS.181 UNITS x 0.15 = 27 UNITSTOTAL DWELLING UNITS ALLOWED = 208 UNITST.1COVER SHEETDWELLING UNITSNUMBER OF DWELLING UNITS PROPOSED 1 BED UNITS 722 BED UNITS 136 TOTAL DWELLING UNITS 208 PARKING CALCS.Table 1. Required Parking per City Zoning Code Unit Type Parking Requirement Spaces Required One-bedroom (72) 1.5 spaces/unit1 72 x 1.5 = 108.0 Two-bedroom (136) 2.0 spaces/unit1 136 x 2.0 = 272.0 Guest 1.0 space/5 units 208/5 = 42.0 SUBTOTAL 422.0 Parking Substition2 Car Space Substitution for Motorcycle Parking - 21.0Parking Substition3 Car Space Substitution for Bicycle Rack Parking - 21.0TOTAL – 208 UNITS 380 1One covered space/unit required 2City ordinance 9-4.115(b). Parking spaces may be replaced at a ratio of (1) motorcycle space for each (20) spaces. 3City ordinance 9-4.115(c). Parking spaces may be replaced at a ratio of (1) bike rack for each (20) spaces. Table 2. Proposed Parking Unit Type Parking Requirement Spaces Required One-bedroom (72) 1.5 spaces/unit1 72 x 1.5 = 108.0 Two-bedroom (136) 2.0 spaces/unit1 136 x 2.0 = 272.0 Guest 1.0 space/5 units 208/5 = 42.0 SUBTOTAL 422.0 Parking Substition2 Car Space Substitution for Motorcycle Parking - 14.0(1:30 ratio)Parking Substition3 Car Space Substitution for Bicycle Rack Parking - 21.0TOTAL – 208 units 387.0 Supplemental off-site parking (El Camino Real) +/-25.0With Supplemental Guest Parking at El Camino Real 412.0 1One covered space/unit required 2City ordinance 9-4.115(b). Parking spaces may be replaced at a ratio of (1) motorcycle space for each (20) spaces. 3City ordinance 9-4.115(c). Parking spaces may be replaced at a ratio of (1) bike rack for each (20) spaces. Table 3. Proposed Parking Breakdown Summary Parking Space Type Spaces Provided Uncovered Standard 57 Uncovered Compact 351 Electric Car 6Carports Standard 1242 Carports Compact 48 1,2 Carports/Tandem (Bldg A) 752 Guest 42(31 stalls on Street B) TOTAL Vehicle Stalls 387 Off-Site Supplemental Guest Parking 25 TOTAL Vehicle Stalls Plus Off-Site Supplemental Guest Parking 412 Motorcycle Stalls 14 Bicycle Racks (5 bikes per rack) 21 TOTAL Motorcycle and Bicycle 35 1 Code allows 20% compact spaces. Total of 20% compact spaces proposed, consisting of uncovered and as carports.. 2 Covered Parking. One (1) covered parking space (carport or tandem) per dwelling unit required. Total of 247 proposed; 208 required. PROJECT DATAAPN: 049-151-063, 049-151-009, 049-151-011ZONING: RMF 20 ALLOWABLE HEIGHT: 30 FT/2 STORIESPROPOSED HEIGHT: REFER TO SITE BLDG. SECTIONS (HEIGHT AND STORY INCREASE THROUGH C.U.P.)ALLOWABLE LOT COVERAGE: 50%SETBACKS: FRONT: 25 FEET SIDE: 5 FEET REAR: 10 FEETOPEN SPACE: (SEE SHEET A.7)REQUIRED: 300 SF PER UNIT208 UNITS X 300 SF = 62,400 SF MIN. REQUIRED*SPACE MAY BE PROVIDED IN MORE THAN ONE LOCATION PROVIDED THAT NO INDIVIDUAL OPEN SPACE IS LESS THAN 1,000 SFMIN LANDSCAPE: 25% (SEE SHEET A.8)Attachment 5: Applicant Design Package112 DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 T.2PROJECT NARRATIVE3765 S. Higuera St., Ste. 102 • San Luis Obispo, CA 93401 p: (805) 543-1794 • f: (805) 543-4609 www.rrmdesign.coma California corporation y Lenny Grant, Architect C26973 y Jerry Michael, PE 36895, LS 6276 y Jeff Ferber, LA 2844 EMERALD RIDGE PROJECT NARRATIVE Applicant: LDC Commercial Representative: RRM Design Group Addresses: 2605, 2555, &2705 El Camino Real APNs: 049-151-063, 049-151-049, 049-151-011) Land Use/Zoning: Residential Multiple-Family High Density (RMF -20) Project Description: 208 residential units on 7.55 acres The units include: 1)One-bedroom units (72); and 2)Two-bedroom units (136). Density Calculations Per Municipal Code Section 9-3.173 (f), a density bonus may be granted, subject to approval by the City Council through a master plan of development (CUP), consistent with Sections 9-3.801 through 9-3.806. In addition, General Plan Policy 2.1 supports approval of a 15% density bonus through the CUP upon a finding of superior design. Allowed Density: 24 units/acre Calculation: 24 x 7.55 = 181.2 15% Density Bonus: 181 x 0.15 = 27 Proposed Density: 181 + 27 = 208 units Proposed Density – Rationale for Support: Consistent with the following Housing Element goals and policies: 1)Goal HOS 1: Promote diverse and high-quality housing opportunities to meet the needs of all segments of the community. 2)Policy 1.2: Encourage a variety of high-quality housing types in multi-family areas. 3)Goal HOS 3: Ensure that an adequate amount of rental housing exists. 4)Policy 4.3: Encourage attractive architecture and site landscaping that respect terrain and native trees. 5)Policy 6.3: Encourage multi-family projects that provide affordable housing (affordable by design). 6)Policy 10.1: Encourage infill and intensification in areas suitable for housing within the Urban Services Line (USL). Parking Calculations Table 1. Required Parking per City Zoning Code Unit Type Parking Requirement Spaces Required One-bedroom (72) 1.5 spaces/unit1 72 x 1.5 = 108.0 Two-bedroom (136) 2.0 spaces/unit1 136 x 2.0 = 272.0 Guest 1.0 space/5 units 208/5 = 42.0 SUBTOTAL 422.0 Parking Substition2 Car Space Substitution for Motorcycle Parking - 21.0 Parking Substition3 Car Space Substitution for Bicycle Rack Parking - 21.0 TOTAL – 208 UNITS 380 1One covered space/unit required 2City ordinance 9-4.115(b). Parking spaces may be replaced at a ratio of (1) motorcycle space for each (20) spaces. 3City ordinance 9-4.115(c). Parking spaces may be replaced at a ratio of (1) bike rack for each (20) spaces. Per Municipal Code Section 9-4.115 (h), the City’s parking standards may be modified through conditional use permit approval based on specific findings of fact that the characteristics of a use or its immediate vicinity do not necessitate the number of parking spaces, type of design, or improvements required by this title and that reduced parking will be adequate to accommodate on the site all parking needs generated by the use. Table 2. Proposed Parking Unit Type Parking Requirement Spaces Required One-bedroom (72) 1.5 spaces/unit1 72 x 1.5 = 108.0 Two-bedroom (136) 2.0 spaces/unit1 136 x 2.0 = 272.0 Guest 1.0 space/5 units 208/5 = 42.0 SUBTOTAL 422.0 Parking Substition2 Car Space Substitution for Motorcycle Parking - 14.0 (1:30 ratio) Parking Substition3 Car Space Substitution for Bicycle Rack Parking - 21.0 TOTAL – 208 units 387.0 Supplemental off-site parking (El Camino Real) +/-25.0 With Supplemental Guest Parking at El Camino Real 412.0 1One covered space/unit required 2City ordinance 9-4.115(b). Parking spaces may be replaced at a ratio of (1) motorcycle space for each (20) spaces. 3City ordinance 9-4.115(c). Parking spaces may be replaced at a ratio of (1) bike rack for each (20) spaces. Table 3. Proposed Parking Breakdown Summary Parking Space Type Spaces Provided Uncovered Standard 57 Uncovered Compact 351 Electric Car 6 Carports Standard 1242 Carports Compact 48 1,2 Carports/Tandem (Bldg A) 752 Guest 42 (31 stalls on Street B) TOTAL Vehicle Stalls 387 Off-Site Supplemental Guest Parking 25 TOTAL Vehicle Stalls Plus Off-Site Supplemental Guest Parking 412 Motorcycle Stalls 14 Bicycle Racks (5 bikes per rack) 21 TOTAL Motorcycle and Bicycle 35 1 Code allows 20% compact spaces. Total of 20% compact spaces proposed, consisting of uncovered and as carports.. 2 Covered Parking. One (1) covered parking space (carport or tandem) per dwelling unit required. Total of 247 proposed; 208 required. Emerald Ridge Narrative Page5 of 5 Building Height Per Municipal Code Section 9-4.113 (b)(1), height may be modified through the CUP process provided that the “Planning Commission first finds the project will not result in substantial detrimental effects on the enjoyment and use of adjoining properties and that the modified height will not exceed the lifesaving equipment capabilities of the Fire Department.” In order to meet full density consistent with City Housing Element goals and to protect on-site resources, the applicant is requesting three-story apartment buildings with subterranean parking garage level at some buildings. Reasons to support the added height include: 1)Development along the main project streetscape is a combination of two and three stories, so there are gaps in the massing and a variety of roof heights. 2)Taller buildings are oriented to the center and back of the site where they do not impact the privacy or solar access of adjacent properties. 3)The apparent mass of the of the building is minimized by stepping the building foundation with the slope of the existing topography. 4)Development is placed along the perimeter of the site leaving a large central open area to accommodate preservation of the existing Colony House and healthy native oak trees per the Arborist’s Report. 5)Development preserves the existing colony home and offers adaptive reuse of existing home by converting the structure into common clubhouse facility. 6)Development provides large centralize common open space to allow community connectivity. Conditional Use Permit - Rationale for support: 1)The project will provide community linkage to pedestrian and vehicular access by working with City staff to incorporate Street “B” to the project. 2)Project respects site topography; the building footprints have been sited to step with elevation changes and help minimize extensive grading. The goal is to have balanced cut and fill on site. 3)Heritage oak trees will be saved as feasible, consistent with the recommendations of the Arborist, and adequate room provided for their health and survival. 4)The historic Colony House will be rehabilitated and saved in place with its adaptive reuse as a project amenity (central clubhouse). 5)Garages are provided which will reduce the visual impact of total vehicles parked on site. 6)Community storage provided to help reduce visual clutter. jmwN:\0201\0238-01-RS15-Emerald-Ridge-Apartments-Entitlement-Con-Docs\Planning\Narrative\eh-Emerald-Ridge-Project-Narrative-8-31-16-Admin.docx Attachment 5: Applicant Design Package113 DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 INSPIRATION IMAGE BOARDT.3Attachment 5: Applicant Design Package114 88089090090090091092088089090091092088089090091087287260"OAK12"OAK17"OAK24"PINE14"TR22"OAK10"OAK22"TR22"TR(DEAD)3-12"TR5-8"TR4-10"TR13"OAK8"OAK6"OAK6"TR10"OAK6"TR2-15"OAK12"OAK3-10"OAK9"TR(DEAD)24"TR36"OAK15"OAK10"OAK14"OAK6"OAK10"OAK3"OAK2-10"OAK10"OAK10"OAK15"OAK15"OAK20"PINE6"OAK27"TR9"OAK16"OAK15"OAK2-10"OAK18"OAK5"TR4"OAK17"TR(DEAD)2-12"TR10"OAK3-10"TR12"TR14"TR2-16"OAK8"TR9"OAK15"TR6"OAK8"OAK3"OAK6"OAK8"OAK8"OAK10"OAK10"OAK3"OAK5"OAK5"OAK5"OAK5"OAK5"OAK5"OAK5"OAK3"OAK5"OAK5"OAK3"OAK6"OAK12"OAK5"OAK12"OAK6"OAK6"OAK6"OAK6"OAK8"OAK8"OAK6"OAK60"OAK60"OAK60"OAK3-4"OAK2-15"OAK30"OAK22"TR18"TR4-10"TR30"OAK6"OAK40"OAK4.14863.23SMHRIM873.50INVERT=863.61LOT14PORTIONOFLOT15ELCAMINOREALCC-2000-0544733MB25LOT16CONCRETEDROPINLETTG=873.25INV=871.25DROPINLETTC872.88INV=870.00EXISTINGPAVEDDRIVEWAYSHEDSHEDSHEDGARAGEHOUSE3MB2524"PIPEEDGE OFPAVEMENTEDGEOFPAVEMENTCURB&GUTTEREDGE OFPAVEMENTCURB&GUTTERACBERMDROPINLETTG871.30DROPINLETTG871.10WALLWALLWALLCONCRETETELEPHONEPULLBOX)/9/9/ 9/ 9 =< 9/DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 T.4EXISTING TOPOGRAPHYSCALE: 1”=30’01530 60Attachment 5: Applicant Design Package115 873.25+/-878.80876.46874.51rampramp60"OAK12"OAK17"OAK24"PINE14"TR22"OAK10"OAK3-12"TR5-8"TR4-10"TR13"OAK6"TR2-15"OAK9"TR(DEAD)24"TR36"OAK15"OAK14"OAK10"OAK3"OAK2-10"OAK10"OAK10"OAK15"OAK15"OAK20"PINE6"OAK27"TR9"OAK16"OAK15"OAK2-10"OAK18"OAK5"TR17"TR(DEAD)2-12"TR10"OAK3-10"TR12"TR14"TR2-16"OAK8" TR9"OAK15"TR8"OAK3"OAK6"OAK8"OAK8"OAK10"OAK10"OAK5"OAK5"OAK3"OAK5"OAK5"OAK6"OAK12"OAK12"OAK6"OAK6"OAK6"OAK6"OAK8"OAK8"OAK6"OAK60"OAK60"OAK60"OAK30"OAK22"TR18"TR4-10"TR30"OAK6"OAK40"OAK880890900900920880890910880890910&$&/8%+286(%8,/',1*7<3($%8,/',1*7<3(%%8,/',1*7<3($%8,/',1*7<3(%%8,/',1*7<3(%%8,/',1*7<3($322/$5($727/27$5($3 )) )) )))) ))67$1'$5'&$53257&203$&7&$5325767$1'$5'&$53257&2 0 3 $&7 &$53 2 57 &203 $&7 &$5 32 5 767$1'$5'&$5325767$1'$5'&$5325767$1'$5'&$5325767$1'$5'&$53257757575757575+&(/(&75,&67$//6(7%$&. 6 (7 %$&. 6(7%$&. 6(7%$&. &2857<$5'&2857<$5'&2857<$5'&2857<$5'&2857<$5'&2857<$5'&29(5('7$1'(0&29(5('7$1'(0&29(5('7$1'(09,(:'(&.+&0$,/.,26.352-(&7(175<6,*1    33 5 $0 3 5 $0 3  %$$$5$03%%4$5($  63$$5($%%4$5($&$532577(0325$5<352-(&77851$5281'$5($67$1'$5'&$53257  )) )) ))   &&5$03    ))   &&0$,1(175<&20021$5($322/(175< &    ))&2857<$5'6(7%$&.   ))&2857<$5'3('(675,$175$,/3('(675,$175$,/3('(675,$175$,/5$03 )) ))&2857<$5'$&&(6672)8785(675((7$ 127$3$57 3529,'( +L*+&217,1828662/,':22')(1&($/21*1257+(513523(57</,1(,11(5('*('2*581+&+&+&(/(&75,&67$//6+&+&&$5325767$//+&81&29(5('67$//+&&$5325767$//+&+&&$5325767$//+&&$5325767$//+&+&7$1'(067$//+&+&7$1'(067$//+&+&7$1'(067$//+&+&+&+&81&29(5('67$//+&81&29(5('67$//+&+&81&29(5('67$//6+&81&29(5('67$//+&+&81&29(5('67$//+&&203$&7&$53257&203$&7&$53257&203$&7&$53257&67$1'$5'&$5325767$1'$5'&$5325767$1'$5'&$5325767$1'$5'&$5325767$1'$5'&$5325767$1'$5'&$5325767$1'$5'&$53257&&A.1DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 ARCHITECTURAL SITE PLANSCALE: 1”=30’01530 60Attachment 5: Applicant Design Package116 %/'*$8)) %/'*%/)) %/'*%8)) %/'*$/)) 3/3/&$53257&$53257&$53257&$53257&$53257&$53257&$53257 352326('%/'*+(,*+7 352326('%/'*+(,*+7%/'*+(,*+7  833(5))%/'*+(,*+7  /2:(5))%8,/',1*%72:1+20()/$7 352326('%/'*+(,*+7 352326('%/'*+(,*+7%8,/',1*$%/'*+(,*+7 %/'*+(,*+7  352326('72:(5+(,*+772:(5+(,*+7 72:1+20()/$7'(&.)/$7*$5$*( 6725$*(/,1(2) ( 6,7(*5$'(/,1(2) ( 6,7(*5$'((/&$0,125($/$3$570(176 *$5$*(  +LJK6ROLG:RRG)HQFH&/8%+286()) %/'*%/)) %/'*%8)) 3/ 833(5)) /2:(5))72:1+20()/$7%/'*+(,*+7 %/'*+(,*+7  352326('%/'*+(,*+7 352326('%/'*+(,*+7%8,/',1*%&$53257/,1(2) ( 6,7(*5$'(&$53257&$53257&/8%+286((/&$0,125($/%/'*$/)) %/'*$8)) 72:1+20(%8,/',1*$72:1+20(72:1+20()/$7 )/$7 )/$7 )/$7)/$7*$5$*( 6725$*( 833(5)) /2:(5))%/'*+(,*+7 *$5$*( $3$570(176 %/'*+(,*+7  352326('%/'*+(,*+7 352326('%/'*+(,*+7/,1(2) ( 6,7(*5$'(%/'*(;32685(  +LJK6ROLG:RRG)HQFH%/'*$8)) %/'*$/)) %/'*%8)) %/'*%/)) &$532573/&$53257&$5325772:1+20()/$7)/$7*$5$*( 6725$*('(&.72:1+20()/$7&2002123(163$&((/&$0,125($/ 833(5)) /2:(5)) /2:(5)) 833(5))       352326('%/'*+(,*+7 352326('72:(5+(,*+7 352326('%/'*+(,*+7%8,/',1*$%8,/',1*%%/'*+(,*+7 %/'*+(,*+7  352326('%/'*+(,*+7 352326('%/'*+(,*+7/,1(2) ( 6,7(*5$'( +LJK6ROLG:RRG)HQFHA.2DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 SITE CROSS-SECTIONSSITE SECTION CSITE SECTION BSITE SECTION ASCALE: 1”=30’01530 60Attachment 5: Applicant Design Package117 COVERED COMPACT PARKINGCOVERED STANDARD PARKINGCOVERED TANDEM PARKINGPARKING LEGENDUNCOVERED STANDARD PARKINGUNCOVERED COMPACT PARKINGOFF-SITE “NON-REQUIRED”SUPPLEMENTAL GUEST PARKINGELECTRIC VEHICLE PARKINGMOTORCYCLE PARKINGBICYCLE PARKINGBUILDING 2TYPE BBUILDING 4TYPE BBUILDING 6TYPE BBUILDING 5TYPE ABUILDING 1TYPE ABUILDING 3TYPE ASTREET ‘B’CLUBHOUSECOMMONAREAEL CAMINO REALHCHCHCHCHCHCHCHCHCHCHCHCHCHCHCSTANDARD STALLS: A MINIMUM OF 2% OF EACH PARKING STALL TYPE TO BE ADA COMPLIANT AND ON AN ACCESSIBLE ROUTE. ACCESSIBLE SITE PARKING SHALL COMPLY THE LATEST BUILDING CODE ADDITION AS ADOPTED BY THE CITY OF ATASCADERO. MIN. 2 ACCESSIBLE STALLS REQUIRED, 3 PROVIDEDMIN. 3 ACCESSIBLE STALLS REQUIRED, 4 PROVIDEDSEE SHEET A.1 FOR HC LOCATIONSMIN. 2 ACCESSIBLE STALLS REQUIRED, 7 PROVIDEDSEE SHEET A.1 FOR HC LOCATIONSMIN. 1 ACCESSIBLE STALLS REQUIRED, 1 PROVIDEDSEE SHEET A.1 FOR HC LOCATIONSA.3DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 VEHICULAR ACCESS AND PARKING SCALE: 1”=30’01530 60Attachment 5: Applicant Design Package118 873.25+/-878.80876.46874.51rampramp%8,/',1*7<3($%8,/',1*7<3(%%8,/',1*7<3($%8,/',1*7<3(%%8,/',1*7<3(%%8,/',1*7<3($&/8%+286(A.4DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 PEDESTRIAN ACCESSIBLE PATH OF TRAVELACCESSIBLE PATH OF TRAVELSCALE: 1”=30’01530 60Attachment 5: Applicant Design Package119 873.25+/-878.80876.46874.51rampramp&/8%+286(%8,/',1*7<3($%8,/',1*7<3(%%8,/',1*7<3($%8,/',1*7<3(%%8,/',1*7<3(%%8,/',1*7<3($A.5DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 PROJECT PEDESTRIAN PATHWAYSPEDESTRIAN PATHWAYSSCALE: 1”=30’01530 60Attachment 5: Applicant Design Package120 873.25+/-878.80876.46874.51rampramp&/8%+286(%8,/',1*7<3($%8,/',1*7<3(%%8,/',1*7<3($%8,/',1*7<3(%%8,/',1*7<3(%%8,/',1*7<3($A.6DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15PROJECT PHASING PLAN%8,/',1*7<3($%8,/',1*7<3(%&/8%+286(%8,/',1*7<3($%8,/',1*7<3(%878.808764646ramp%8,/',1*7<3(%%8,/',1*7<3($87646.46pTENTATIVE PROJECT PHASING SUMMARYPHASE 1 STREET ‘B’ BUILDING 1A BUILDING 2B PROJECT ENTRY MONUMENT PARKING/CARPORTS PHASE 2 BUILDING 3A BUILDING 4B CLUBHOUSE/TOT-LOT AREA PARKING/CARPORTSPHASE 3 BUILDING 5A BUILDING 6B COMMON POOL AREA PARKING/CARPORTS PHASE 1PHASE 2PHASE 3SCALE: 1”=30’01530 60Attachment 5: Applicant Design Package121 VEHICLE PARKING AND DRIVEWAY ACCESSOPEN SPACE AREA (81,000 SF)LEGENDBUILDING FOOTPRINTA.7DATE: MAY 26, 2016EMERALD RIDGE APARTMENTS2535, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 MINIMUM OPEN SPACE EXHIBITSCALE: 1”=30’01530 60CLUBHOUSEBUILDING 1TYPE ABUILDING 2TYPE BBUILDING 3TYPE ABUILDING4TYPEBBUILDING6TYPEBBUILDING5TYPEACOMMONOPEN AREASTREET 'B'EL CAMINOREALOPEN SPACE CALCULATIONREQUIRED: 300 SF PER UNIT 208 UNITS X 300 SF = 62,400 SF MIN. REQUIRED *SPACE MAY BE PROVIDED IN MORE THAN ONE LOCATION PROVIDED THAT NO INDIVIDUAL OPEN SPACE IS LESS THAN 1,000 SF PROVIDED: 81,000 SF Attachment 5: Applicant Design Package122 BUILDING FOOTPRINTVEHICLE ACCESS PAVEMENTLANDSCAPE AREA (128,200 SF)LEGENDA.8DATE: MAY 26, 2016EMERALD RIDGE APARTMENTS2535, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 MINIMUM LANDSCAPE COVERAGE EXHIBITSCALE: 1”=30’01530 60CLUBHOUSEBUILDING 1TYPE ABUILDING 2TYPE BBUILDING 3TYPE ABUILDING4TYPEBBUILDING6TYPEBBUILDING5TYPEACOMMONOPEN AREASTREET 'B'EL CAMINOREALLANDSCAPE COVERAGE CALCULATIONREQUIRED: LOT AREA 328,878 SF (7.55 AC) MIN. 25% REQUIRED 82,219.5 SF PROVIDED: 128,200 SF Attachment 5: Applicant Design Package123 DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 PRELIMINARY GRADING PLANC.1SCALE: 1”=30’01530 60Attachment 5: Applicant Design Package124 DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 PRELIMINARY UTILITY PLANC.2SCALE: 1”=30’01530 60Attachment 5: Applicant Design Package125 DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 STORM WATER CONTROL PLANC.3SCALE: 1”=30’01530 60Attachment 5: Applicant Design Package126 DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 landscape inspiration images|community space & courtyardsL.1Attachment 5: Applicant Design Package127 DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 OVERALL LANDSCAPE SITE PLANL.2SCALE: 1”=30’01530 60BUILDING 1BUILDING 3BUILDING 5CLUBHOUSESHEET L.4SHEET L.3BUILDING 2BUILDING 4EL CAMINO REALBUILDING 6Attachment 5: Applicant Design Package128 SITE KEYDATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 COMMON OPEN SPACE LANDSCAPE PLANL.3Attachment 5: Applicant Design Package129 124536WATER WALL FEATUREELEVATED PLANTER SEAT WALLHEIGHT WITH SPECIMENMAGNOLIA TREEDECORATIVE PAVINGDECORATIVE PAVERS WITHACCENT BANDINGSHADE AND DROUGHT TOLERANTPLANTINGS, TYP.LARGE ACCENT POTTERY TOMATCH ARCHITECTURAL STYLE1LANDSCAPE KEY:23456SITE KEYDATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15TYPICAL BUILDING COURTYARD LANDSCAPE PLANL.4Attachment 5: Applicant Design Package130 TREESBOTANICAL NAMECOMMON NAMECONT ACER RUBRUM `ARMSTRONG` ARMSTRONG RED MAPLE 24"BOX ARBUTUS X `MARINA` ARBUTUS MULTI-TRUNK 24"BOX ARBUTUS X `MARINA` ARBUTUS STANDARD 24"BOX LAURUS NOBILIS SWEET BAY 24"BOX MAGNOLIA X SOULANGIANA SAUCER MAGNOLIA MULTI-TRUNK 60"BOX OLEA EUROPAEA `SWAN HILL` TM SWAN HILL OLIVE FIELD GROWN PLATANUS RACEMOSA CALIFORNIA SYCAMORE MULTI-TRUNK 24"BOX PLATANUS RACEMOSA CALIFORNIA SYCAMORE 24"BOX PYRUS CALLERYANAORNAMENTAL PEAR24"BOX QUERCUS AGRIFOLIACOAST LIVE OAK24"BOX TRISTANIA CONFERTABRISBANE BOX24"BOX X CHITALPA TASHKENTENSISCHITALPA24"BOXSHRUBSBOTANICAL NAMECOMMON NAMECONT ALYOGYNE HUEGELII `SANTA CRUZ` BLUE HIBISCUS 5 GAL ANIGOZANTHOS MIX KANGAROO PAW 1 GAL ANISODONTEA CAPENSIS CAPE MALLOW 5 GAL ARBUTUS UNEDO `COMPACTA` DWARF STRAWBERRY TREE 5 GAL ARCTOSTAPHYLOS DENSIFLORA `HOWARD MCMINN` HOWARD MCMINN MANZANITA 5 GAL ARCTOSTAPHYLOS DENSIFLORA `SENTINEL` MANZANITA 5 GAL BERGENIA CORDIFOLIA HEARTLEAF BERGENIA1 GAL CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER`FEATHER REED GRASS 1 GAL CAREX DIVULSABERKELEY SEDGE 1 GAL CEANOTHUS GRISEUS HORIZONTALIS `YANKEE POINT` CALIFORNIA LILAC 1 GAL CEANOTHUS X `BLUE JEANS` CALIFORNIA LILAC 5 GAL CHONDROPETALUM TECTORUM `EL CAMPO` CAPE RUSH 5 GAL CISTUS LADANIFER CRIMSON SPOT ROCKROSE 1 GAL DIANELLA CAERULEA `CASSA BLUE` CASSA BLUE FLAX LILY 1 GAL PLANT SCHEDULE DIANELLA CAERULEA `VARIEGATA`BLUE FLAX LILY1 GALDIETES VEGETAAFRICAN IRIS1 GALECHIUM CANDICANSPRIDE OF MADEIRA5 GALHEUCHERA MAXIMAISLAND ALUM ROOT1 GALHEUCHERA MIX CORAL BELLS 1 GALHYDRANGEA QUERCIFOLIA `SNOW QUEEN` SNOW QUEEN OAKLEAF HYDRANGEA 5 GALJUNCUS PATENS CALIFORNIA GRAY RUSH 1 GALLEONOTIS LEONURUS LION`S TAIL 5 GALLEUCADENDRON X `SAFARI SUNSET` CONEBUSH 5 GALLEYMUS CONDENSATUS `CANYON PRINCE` NATIVE BLUE RYE 1 GALLIRIOPE MUSCARI `MAJESTIC` MAJESTIC LIRIOPE 1 GALLOMANDRA LONGIFOLIA `BREEZE` DWARF MAT RUSH 1 GALLOROPETALUM CHINENSE GREEN LOROPETALUM 5 GALMUHLENBERGIA RIGENS DEER GRASS 1 GALNEPETA X FAASSENII `WALKERS LOW` WALKERS LOW CATMINT 1 GALPENNISETUM SPATHIOLATUM RYE PUFFS 1 GALPHORMIUM X `SEA JADE` NEW ZEALAND FLAX 5 GALPHORMIUM X `SHIRAZ` NEW ZEALAND FLAX 5 GALPOLYSTICHUM MUNITUM WESTERN SWORD FERN 1 GALROSA ACICULARIS `ICEBERG` PRICKLY ROSE 5 GALROSMARINUS OFFICINALIS ROSEMARY 5 GALROSMARINUS OFFICINALIS `HUNTINGTON CARPET` HUNTINGTON CARPET ROSEMARY 5 GALSALVIA CLEVELANDIICLEVELAND SAGE 5 GALSEDUM RUPESTREANGELINA SEDUM 1 GALSENECIO MANDRALISCAE `BLUE CHALK STICKS` SENECIO1 GALSESLERIA AUTUMNALIS AUTUMN MOOR GRASS1 GALSOLANUM JASMINOIDES POTATO VINE 1 GALIRRIGATION DESIGN:THE IRRIGATION DESIGN WILL COMPLY WITH THE LOCAL AND THESTATE WATER CONSERVATION REQUIREMENTS. THE WATERCONSERVATION METHOD FOR THE NEW LANDSCAPE PLANTMATERIAL HAS A LOW TO MEDIUM WATER USE, AND THE ETWU(ESTIMATED TOTAL WATER USE) PER YEAR IS ESTIMATED TO BE WITHINTHE MAXIMUM ALLOWABLE WATER ALLOCATION (MAWA) WHICHWILL BE CALCULATED FOR THE PROJECT.ADDITIONALLY, A WEATHER SENSING, 'SMART CONTROLLER' WILL BEUSED TO MONITOR THE IRRIGATION WATER AND MANAGE DAILYWATER CONSUMPTION TO THE MINIMUM REQUIREMENTS FOR EACHHYDROZONE.ALL TREES, LAWN, TYPICAL SHRUB AND GROUNDCOVER AREAS WILLBE IRRIGATED ON SEPARATES SYSTEMS SO THAT ONCE ESTABLISHED,WATER CAN BE REGULATED IN A MORE EFFICIENT MANNER.TREES WILL BE IRRIGATED BY BUBBLERS. LAWN WILL BE IRRIGATED BYHIGH EFFICIENCY SPRAY NOZZLES. ALL OTHER PLANTING WILL RECEIVEDRIP IRRIGATION.PLANTING DESIGN:THE PLANT MATERIAL SELECTED IN THE LIST AT THE LEFT IS KNOWN TOTHRIVE IN THE LOCAL SOILS AND CLIMATE CONDITIONS OF THEPROJECT SITE. THE LANDSCAPE WILL BE DESIGNED FOR DROUGHTTOLERANT, LOW MAINTENANCE LANDSCAPING, REQUIRINGMINIMAL WATER USE TO CONSERVE WATER AND PREVENT RUN-OFF.THE BIO-RETENTION AREAS, SHOWN ON THE PLANS, INCORPORATESPECIAL SOILS AND PLANT MATERIAL WHICH INCREASES WATERQUALITY THROUGH BIO-FILTRATION AND ALLOWS THE WATER TOPERCOLATE INTO THE NATIVE SOIL, RECHARGING THEGROUNDWATER. ABOVE GRADE UTILITIES, AND TRASH ENCLOSURESWILL BE SCREENED WITH TALLER PLANT MATERIAL. TREES HAVE BEENLOCATED TO SHADE PATHWAYS AND PARKING AREAS.DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15PLANT SCHEDULEL.5Attachment 5: Applicant Design Package131 UPD W UPGREAT ROOM17'10" X 14'0"KIT.10'3" X 12'6"ENTRY4'10" X 5'0"PATIOPWD.5'2" X 5'6"S.S.LAUNDRYHOOK-UPLOCATIONUPD W UPENTRY4'10" X 5'0"PATIOPWD.5'2" X 5'6"S.LIVING17'10" X 14'0"KITCHEN/DINING15'0" X 10'6"S.LAUNDRYHOOK-UPLOCATIONBED 212'8" x 10'2"BATH 111'4" X 5'1"BED 113'1" X 11'8"BATH 27'6" X 7'0"HALLCL. 1CL.2HALLBATH6'2"x10'1"CL.7'6"x3'10"CL.6'3"x5'6"BED 113'1" X 11'8"BED 211'8" x 13'3"A.9DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 TYPICAL UNIT PLANS - BUILDINGS 1A, 3A & 5AUNIT PLAN A - TOWNHOME2BED/2.5 BATH/1.5 BATHLOWER LEVEL - GALLEY KITCHEN OPTIONUPPER LEVELUPPER LEVEL- ONE BATH OPTIONLOWER LEVEL012 4 8SCALE: 1/4”=1’Attachment 5: Applicant Design Package132 DWDINING11'6" X 10'S.DINING11'6" X 10'KIT.11'6" X 12'8"HALLBED 112'6"x 12'6"BED 212'6" X 10'7"BATH10'0" X 6'4"LIVING14'6" X 11'8"CL.3'9"x6'8"S.LAUNDRYHOOK-UPLOCATIONDWDINING11'6" X 10'S.DINING11'6" X 10'KIT.11'6" X 12'8"BATH10'0" X 6'4"LIVING14'6" X 11'8"S.BED 114'1" X 12'6"OFFICE13'6" x 10'7"PATIO/DECKLAUNDRYHOOK-UPLOCATIONDWBATH10' X 6'3"BED12'3" X 10'6"DINING7' X 8'KIT.11'1" X 7'9"LIVING12'6" X 12'10"PATIO/DECKENTRY8'3" X 4'6"CL.S.S.DINING11'6" X 10'S.DINING11'6" X 10'S.LAUNDRYHOOK-UPLOCATIONA.10DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 TYPICAL UNIT PLANS - BUILDINGS 1A, 3A & 5AUNIT PLAN C1 - FLAT2BED/1BATHUNIT PLAN C2 - FLAT1BED/1BATHUNIT PLAN B - FLAT1BED/1BATH012 4 8SCALE: 1/4”=1’Attachment 5: Applicant Design Package133 UPCORRIDOR1-CAR GARAGE 1-CAR GARAGE1-CAR GARAGE1-CAR GARAGE 1-CAR GARAGE 1-CAR GARAGE 1-CAR GARAGE1-CAR GARAGE1-CAR GARAGE1-CAR GARAGE1-CAR GARAGE1-CAR GARAGE1-CAR GARAGECOMMON STAIRSTANDEMTANDEMTANDEMTANDEMTANDEMTANDEMTANDEMTANDEMTANDEMTANDEMTANDEMTANDEMUTIL.SITE KEYA.11DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 OVERALL FLOOR PLAN - BUILDINGS 1A, 3A & 5A BLD’G. SUBFLOORGARAGE STALLS | STORAGE024 8 16SCALE: 1/8”=1’Attachment 5: Applicant Design Package134 DWDWDWDW DWDWDWDWDWDWDWDWDWDWDWDWDWDNUPBATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.DININGLIVINGKIT.BATHBEDPATIOENTRYCL.BATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.DININGLIVINGKIT.BATHBEDPATIOENTRY CL.DININGLIVINGKIT.BATHBEDENTRYCL.DININGLIVINGKIT.BATHBEDENTRYCL.DININGKIT.BATHLIVINGENTRYBED 1OFFICEPATIO/DECKDININGKIT.BATHLIVINGENTRYBED 1OFFICEPATIO/DECKDININGKIT.BATHLIVINGENTRYBED 1OFFICEPATIO/DECKDININGKIT.BATHLIVINGENTRYBED 1OFFICEPATIO/DECKDININGKIT.BATHLIVINGENTRYBED 1OFFICEPATIO/DECKDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGLIVINGKIT.BATHBEDENTRYCL.DININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYSTUDIO(COMMON AREA ATBUILDINGS 3A AND 5A)A.12DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 OVERALL FLOOR PLAN - BUILDINGS 1A, 3A & 5ABLD’G. FIRST FLOORAPARTMENT UNITS | COMMON COURTYARDUNIT 104PLAN C2UNIT 105PLAN C2UNIT 106PLAN C2UNIT 103PLAN BUNIT 107PLAN BUNIT 102PLAN BUNIT 108PLAN BUNIT 101PLAN C2UNIT 109PLAN C2UNIT 116PLAN BUNIT 115PLAN BUNIT 114PLAN C1UNIT 113PLAN C1UNIT 117STUDIO PLANUNIT 112PLAN C1UNIT 111PLAN C1UNIT 110PLAN C1COURTYARD024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package135 DNDNDWDW DWDWDWDWUPDWUPDWUPDWUPDWUPD W UPD W UPD W UPD W UPDW UPDW UPDW UPDW DNDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGLIVINGKIT.BATHBEDENTRYCL.DININGLIVINGKIT.BATHBEDENTRYCL.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.DECKDECKCOMMON DECK AREAA.13DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 OVERALL FLOOR PLAN - BUILDINGS 1A, 3A & 5A BLD’G. SECOND FLOORAPARTMENT UNITS | COMMON BALCONYUNIT 203PLAN AUNIT 208PLAN AUNIT 202PLAN AUNIT 209PLAN AUNIT 201PLAN C1UNIT 210PLAN C1UNIT 218PLAN BUNIT 217PLAN BUNIT 216PLAN C1UNIT 215PLAN C1UNIT 214PLAN AUNIT 204PLAN AUNIT 213PLAN AUNIT 205PLAN AUNIT 212PLAN AUNIT 206PLAN AUNIT 211PLAN AUNIT 207PLAN A024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package136 HALLBATHCL.CL.BED 1BED 2HALLBATHCL.CL.BED 1BED 2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2HALLBATHCL.CL.BED 1BED 2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2HALLBATHCL.CL.BED 1BED 2BED 2BED 1BED 2 BED 1BED 2BED 1A.14DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 OVERALL FLOOR PLAN - BUILDINGS 1A, 3A & 5ABLD’G. THIRD FLOORAPARTMENT UNITSUNIT 203PLAN AUNIT 208PLAN AUNIT 202PLAN AUNIT 209PLAN AUNIT 214PLAN AUNIT 204PLAN AUNIT 213PLAN AUNIT 205PLAN AUNIT 212PLAN AUNIT 206PLAN AUNIT 211PLAN AUNIT 207PLAN A024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package137 A.15DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 BUILDINGS 1A, 3A & 5ABLD’G. FRONT ELEVATIONSOUTH VIEWBLD’G. LEFT ELEVATIONWEST VIEW024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package138 A.16DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 BUILDINGS 1A, 3A & 5ABLD’G. RIGHT ELEVATIONEAST VIEWBLD’G. REAR ELEVATIONNORTH VIEW024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package139 UPD W UPWGREAT ROOM17'10" X 14'0"KIT.10'3" X 12'6"ENTRY4'10" X 5'0"PATIOPWD.5'2" X 5'6"S.PWD.5'2" X 5'6"S.LAUNDRYHOOK-UPLOCATIONUPD W UPW ENTRY4'10" X 5'0"PATIOPWD.5'2" X 5'6"S.LIVING17'10" X 14'0"KITCHEN/DINING15'0" X 10'6"PWD.5'2" X 5'6"S.LAUNDRYHOOK-UPLOCATIONBED 212'8" x 10'2"BATH 111'4" X 5'1"BED 113'1" X 11'8"BATH 27'6" X 7'0"HALLCL. 1CL.2HALLBATH6'2"x10'1"CL.7'6"x3'10"CL.6'3"x5'6"BED 113'1" X 11'8"BED 211'8" x 13'3"A.17DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 TYPICAL UNIT PLANS - BUILDINGS 2B, 4B & 6BUNIT PLAN A - TOWNHOME2BED/2.5 BATH/1.5 BATHUPPER LEVELUPPER LEVEL- ONE BATH OPTIONLOWER LEVELLOWER LEVEL - GALLEY KITCHEN OPTION012 4 8SCALE: 1/4”=1’Attachment 5: Applicant Design Package140 DWDWDINING11'6" X 10'KIT.11'6" X 12'8"HALLBED 112'6"x 12'6"BED 212'6" X 10'7"BATH10'0" X 6'4"LIVING14'6" X 11'8"CL.3'9"x6'8"S.DINING11'6" X 10'KIT.11'6" X 12'8"BATH10'0" X 6'4"LIVING14'6" X 11'8"S.BED 114'1" X 12'6"OFFICE13'6" x 10'7"PATIO/DECKLAUNDRYHOOK-UPLOCATIONLAUNDRYHOOK-UPLOCATIONDWBATH10' X 6'3"BED12'3" X 10'6"DINING7' X 8'KIT.11'1" X 7'9"LIVING12'6" X 12'10"PATIO/DECKENTRY8'3" X 4'6"CL.S.S.LAUNDRYHOOK-UPLOCATIONA.18DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 TYPICAL UNIT PLANS - BUILDINGS 2B, 4B & 6BUNIT PLAN C1 - FLAT2BED/1BATHUNIT PLAN C2 - FLAT1BED/1BATHUNIT PLAN B - FLAT1BED/1BATH012 4 8SCALE: 1/4”=1’Attachment 5: Applicant Design Package141 DWS.BED 113'0" X 10'6"LAUNDRY5'4" X 6'8"BATH5'8" X 10'5"CL.BED 210'6" X 12'0"KITCHEN12'4" X 14'0"LIVING14'0" X 15'0"DINING9'0" X 9'0"ENTRYCL. S.LAUNDRYHOOK-UPLOCATIONDWS.KIT.11' X 11'GREAT ROOM18' X 14'ENTRYPWD.6'1" X 5'8"DECKS.LAUNDRYHOOK-UPLOCATIONS.PATIOBED 212'8" X 12'9"BED 112'11" X 10'2"W.I.C.6'1"x5'1"HALLBATH6'1" X 12'S.A.19DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 TYPICAL UNIT PLANS - BUILDINGS 2B, 4B & 6BUNIT PLAN E - TOWNHOME2BED/1.5 BATHUPPER LEVELLOWER LEVELUNIT PLAN D - FLAT2BED/1BATH012 4 8SCALE: 1/4”=1’Attachment 5: Applicant Design Package142 DWDWPATIOBED 2BED 1W.I.C.HALLBATHPATIOBED 2BED 1W.I.C.HALLBATHPATIOBED 2BED 1W.I.C.HALLBATHPATIOBED 2BED 1W.I.C.HALLBATHPATIOBED 2BED 1W.I.C.HALLBATHPATIOBED 2BED 1W.I.C.HALLBATHBATH LAUNDRYCL.BED 1BED 2KITCHENLIVINGENTRYDININGBATHLAUNDRYCL.BED 1BED 2KITCHENLIVINGENTRYDININGCOURTYARDA.20DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 OVERALL FLOOR PLAN - BUILDINGS 2B, 4B & 6BBLD’G. SUBFLOORAPARTMENT UNITS | COMMON COURTYARDUNIT 117PLAN EUNIT 001PLAN DUNIT 116PLAN EUNIT 112PLAN EUNIT 115PLAN EUNIT 111PLAN EUNIT 002PLAN DUNIT 110PLAN E024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package143 DWDWDWDW DW DW DNDWDWDWDWDWDWDWDW DW DWD W KIT.GREATROOMENTRYPWD.DECKKIT.GREATROOMENTRYPWD.DECKKIT.GREATROOMENTRYPWD.DECKKIT.GREATROOMENTRYPWD.DECKKIT.GREATROOMENTRYPWD.DECKKIT.GREATROOMENTRYPWD.DECKDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYDININGKIT.HALLBED 1BED 2BATHLIVINGCL.ENTRYBATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.BATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.DININGLIVINGKIT.BATHBEDPATIOENTRYCL.BATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.DININGLIVINGKIT.BATHBEDPATIOENTRYCL.BATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.DININGKIT.BATHLIVINGENTRYBED 1OFFICEPATIO/DECKDININGKIT.BATHLIVINGENTRYBED 1OFFICEPATIO/DECKCOURTYARDA.21DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 OVERALL FLOOR PLAN - BUILDINGS 2B, 4B & 6BBLD’G. FIRST FLOORAPARTMENT UNITS | COMMON COURTYARDUNIT 104PLAN CUNIT 105PLAN CUNIT 106PLAN CUNIT 103PLAN BUNIT 107PLAN BUNIT 102PLAN BUNIT 108PLAN BUNIT 101PLAN BUNIT 109PLAN BUNIT 117PLAN EUNIT 113PLAN DUNIT 116PLAN EUNIT 112PLAN EUNIT 115PLAN EUNIT 111PLAN EUNIT 114PLAN DUNIT 110PLAN E024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package144 DNDNDWDWDWDWDWDWUPDWUPDWUPDWUPDWUPDWUPDWUPD W UPD W UPD W UPD W DNBATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.BATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.DININGLIVINGKIT.BATHBEDENTRYCL.BATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.BATHBEDDININGKIT.LIVINGPATIO/DECKENTRYCL.DININGLIVINGKIT.BATHBEDPATIOENTRYCL.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.GREATROOMKIT.ENTRYPATIOPWD.S.COMMON DECK AREACOMMON DECK AREAA.22DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 OVERALL FLOOR PLAN - BUILDINGS 2B, 4B & 6BBLD’G. SECOND FLOORAPARTMENT UNITS | COMMON BALCONYUNIT 204PLAN AUNIT 205PLAN AUNIT 206PLAN AUNIT 207PLAN AUNIT 203PLAN AUNIT 208PLAN AUNIT 202PLAN AUNIT 209PLAN AUNIT 201PLAN AUNIT 210PLAN AUNIT 216PLAN BUNIT 215PLAN BUNIT 213PLAN BUNIT 214PLAN BUNIT 212PLAN BUNIT 211PLAN B024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package145 BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2HALLBATHCL.CL.BED 1BED 2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2HALLBATHCL.CL.BED 1BED 2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2BED 2BATH 1BED 1BATH 2HALLCL. 1CL.2A.23DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 OVERALL FLOOR PLAN - BUILDINGS 2B, 4B & 6BBLD’G. THIRD FLOORAPARTMENT UNITSUNIT 204PLAN AUNIT 205PLAN AUNIT 206PLAN AUNIT 207PLAN AUNIT 203PLAN AUNIT 208PLAN AUNIT 202PLAN AUNIT 209PLAN AUNIT 201PLAN AUNIT 210PLAN A024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package146 A.24DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 BUILDINGS 2B, 4B & 6BBLD’G. FRONT ELEVATIONSOUTH VIEWBLD’G. LEFT ELEVATIONWEST VIEW024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package147 A.25DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 BUILDINGS 2B, 4B & 6BBLD’G. RIGHT ELEVATIONEAST VIEWBLD’G. REAR ELEVATIONNORTH VIEW024 8 16SCALE: 1/8”=1’SITE KEYAttachment 5: Applicant Design Package148 UPDNOFFICELOBBYLOUNGELOUNGESHAREDFACILITYLAUNDRYRESTROOMNEW DECKNEWPORCHNEWPORCHACCESSIBLE RAMPENTRY(E) STAIRSLOUNGELOUNGENEW FIREPLACEWASHER/DRYEREQUIPMENT BY OWNERDN(E) ATTICSPACE(E) ATTICSPACE(E) STAIRSA.26DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 CLUBHOUSE FLOOR PLANPROPOSED FLOOR PLAN(EXISTING FOOTPRINT TO REAMAIN)EXISTING ATTIC(TO REMAIN)012 4 8SCALE: 1/4”=1’SITE KEYAttachment 5: Applicant Design Package149 A.27DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 CLUBHOUSE ELEVATIONSWEST ELEVATIONFRONT VIEWSOUTH ELEVATIONRIGHT VIEW012 4 8SCALE: 1/4”=1’SITE KEYAttachment 5: Applicant Design Package150 A.28DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 CLUBHOUSE ELEVATIONSEAST ELEVATIONREAR VIEWNORTH ELEVATIONLEFT VIEW012 4 8SCALE: 1/4”=1’SITE KEYAttachment 5: Applicant Design Package151   7<3   7<37<3&203$&767$// ; 0,1/$1'6&$3($5($3(56,7(3/$1&21&&85%)8785(62/$53$1(//2&$7,21 7<3    7<37<367$1'$5'67$// ; 0,1/$1'6&$3($5($3(56,7(3/$1&21&&85%)8785(62/$53$1(//2&$7,21A.29DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 TYPICAL CARPORTS FLOOR PLANCOMPACTTYP. SIDE ELEVATIONCOMPACTFRONT ELEVATIONCOMPACTFLOOR PLANSTANDARDTYP. SIDE ELEVATIONSTANDARDFRONT ELEVATIONSTANDARDSITE KEYAttachment 5: Applicant Design Package152 A.30DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 PROJECT ENTRANCE PERSPECTIVE VIEW FROM EL CAMINO REAL | MONUMENT SIGN AREA SITE KEYAttachment 5: Applicant Design Package153 A.31DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 BUILDINGS 1A, 3A & 5A PERSPECTIVE VIEW FROM EL CAMINO REAL | COMMON COURTYARD AREA SITE KEYAttachment 5: Applicant Design Package154 SITE KEYA.32DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 BUILDINGS 2B, 4B & 6B PERSPECTIVE VIEW FROM SECOND LEVEL WALKWAY | COMMON COURTYARD AREAAttachment 5: Applicant Design Package155 A.33DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 CLUBHOUSE PERSPECTIVE VIEW FROM OPEN SPACE WALKWAY | COMMON TOT-LOT AREASITE KEYAttachment 5: Applicant Design Package156 A.34DATE: SEPT. 28, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 TYPICAL BUILDINGS AND CLUBHOUSE COLORS AND MATERIALSB. ASPHALT SHINGLES:GAF ROOFING TIMBERLINE HD IN BARKWOOD1. MAIN COLOR:SHERWIN WILLIAMS DUTCH COCOA SW60322. ACCENT COLOR:SHERWIN WILLIAMSREALIST BEIGE SW60783. DOOR AND WINDOW TRIM:SHERWIN WILLIAMSIVORY LACE SW70134. ACCENTS AND DETAILS:SHERWIN WILLIAMSSOFTWARE SW7074COLOR SCHEME 1COLOR SCHEME 21. 1.2. 2.3.3.4. 4.A. B.A. B.1. MAIN COLOR:SHERWIN WILLIAMSJERSEY CREAM SW6379 2. ACCENT COLOR:SHERWIN WILLIAMSRUSKIN ROOM GREEN SW00423. DOOR AND WINDOW TRIM:SHERWIN WILLIAMSROCKY RIVER SW62154. ACCENTS AND DETAILS:SHERWIN WILLIAMSREDDENED EARTH SW60531. SIDING:SHERWIN WILLIAMSCLARY SAGE SW6178 2. DOOR AND WINDOW TRIM:SHERWIN WILLIAMSROSEMARY SW61873. ACCENTS AND DETAILS:SHERWIN WILLIAMSMUSLIN SW61334. DOORS AND WINDOWS:SHERWIN WILLIAMSRED TOMATO SW66075. BRICK VENEER:EL DORADO STONE TUNDRABRICK IN HARTFORD6. ASPHALT SHINGLES:GAF ROOFING TIMBERLINE HD IN MISSION BROWNCOLOR SCHEME 4CLUBHOUSE1.1.2.2.3.3.4.4.5.1. MAIN COLOR:SHERWIN WILLIAMSHALCYON GREEN SW6213 2. ACCENT COLOR:SHERWIN WILLIAMSCHELSEA MAUVE SW00023. DOOR AND WINDOW TRIM:SHERWIN WILLIAMSCLOCK GRAY SW 62784. ACCENTS AND DETAILS:SHERWIN WILLIAMSIVORY LACE SW7013COLOR SCHEME 51.2.3.4.6.C. ASPHALT SHINGLES:GAF ROOFING TIMBERLINE HD IN PEWTER GRAYCOLOR SCHEME 31.2.3.4.C.C.1. MAIN COLOR:SHERWIN WILLIAMS ROCKWOOD RED SW28022. ACCENT COLOR:SHERWIN WILLIAMS DOPPER TAN SW61443. DOOR AND WINDOW TRIM:SHERWIN WILLIAMSKILIM BEIGE SW61064. ACCENTS AND DETAILS:SHERWIN WILLIAMSROCKWOOD SHUTTER GREEN SW2809COLOR SCHEME 61.2.3.4.1. MAIN STUCCO:SHERWIN WILLIAMS MANNERED GOLD SW61302. STUCCO ACCENT:SHERWIN WILLIAMSIVORIE SW61273. DOOR AND WINDOW TRIM:SHERWIN WILLIAMSPEWTER GREEN SW62084. ACCENTS AND DETAILS:SHERWIN WILLIAMSCORDOVAN SW6027A. ASPHALT SHINGLES:GAF ROOFING TIMBERLINE HD IN CHARCOAL1. MAIN STUCCO:SHERWIN WILLIAMSCONNECTED GRAY SW61652. STUCCO ACCENT:SHERWIN WILLIAMSFAVORITE TAN SW61573. DOOR AND WINDOW TRIM:SHERWIN WILLIAMSFOXY SW63334. ACCENTS AND DETAILS:SHERWIN WILLIAMSCLOCK GRAY SW6278B. BRICK VENER:EL DORADO STONE TUNDRABRICK IN HARTFORDC. STONE VENEER:EL DORADO STONE RIVER ROCK IN RIO GRANDEA. STONE VENEER:EL DORADO STONE STACKED STONE IN ALDERWOODROOF SHINGLE OPTIONSSTONE VENEER OPTIONSAttachment 5: Applicant Design Package157 ANGLED PARKING ALTERNATIVE STATISTICSWITH STREET ‘B’ PARALLEL PARKING LAYOUTPROPOSED PARKING: 380 VEHICLE STALLS (SEE SHEET T.1 PARKING CALCS.)WITH STREET ‘B’ ANGLED PARKING LAYOUTPROPOSED PARKING: 391 VEHICLE STALLS (11 ADDITIONAL STALLS GAINED WITH ANGLED PARKING ALTERNATIVE) DESIGN CONSIDERATIONS: PARALLEL PARKING LAYOUT PREFERRED BY DESIGN TEAM AND PUBLIC WORKS DEPT. ANGLED PARKING LAYOUT WILL REQUIRE REDUCTION OF OPEN SPACE AREA TO ALLOW FOR APPROPRIATE STREET ‘B’ ROAD WIDTH. MIN. OPEN SPACE AREA WILL STILL BE MET. BUILDINGS 1A AND 2B WILL REQUIRE HORIZONTAL SHIFT WHICH WILL COMPRESS SITE CIRCULATION AND LIMIT LANDSCAPE BUFFER ZONES BETWEEN BUILDINGS AND DRIVEWAY AREAS.EXB.1DATE: OCT. 04, 2016EMERALD RIDGE APARTMENTS2555, 2605 AND 2705 EL CAMINO REAL, ATASCADERO PROJECT# 0238-01-RS15 PARKING EXHIBIT - STREET ‘B’ ANGLED PARKING OPTIONSCALE: 1”=30’01530 60Attachment 5: Applicant Design Package158