Loading...
HomeMy WebLinkAboutPC_2016-02-02_AgendaPacket WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website CITY OF ATASCADERO PLANNING COMMISSION AGENDA Regular Meeting Tuesday, February 2, 2016 – 7:00 P.M. Historic City Hall Council Chambers 6500 Palma Avenue, 4th Floor (Enter on Lewis Ave./Jr. High School Side) Atascadero, California 93422 CALL TO ORDER Pledge of Allegiance Roll Call: Chairperson Mark Dariz Vice Chairperson Jan Wolff Commissioner David Bentz Commissioner Duane Anderson Commissioner Jerel Seay Commissioner Charles Bourbeau Commissioner Dennis Schmidt APPROVAL OF AGENDA PUBLIC COMMENT (This portion of the meeting is reserved for persons wishing to address the Commission on any matter not on this agenda and over which the Commission has jurisdiction. Speakers are limited to three minutes. Please state your name for the record before making your presentation. The Commission may take action to direct the staff to place a matter of business on a future agenda.) PLANNING COMMISSION BUSINESS A. ELECTION OF CHAIRPERSON AND VICE CHAIRPERSON The Commission will select a Chairperson and Vice Chairperson. City of Atascadero Planning Commission Agenda Regular Meeting, February 2, 2016 Page 2 of 7 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website CONSENT CALENDAR (All items on the consent calendar are considered to be routine and non -controversial by City Staff and will be approved by one motion if no member of the Commission or public wishes to comment or ask qu estions.) 1. APPROVAL OF DRAFT ACTION MINUTES OF DECEMBER 15, 2015 COMMUNITY DEVELOPMENT STAFF REPORTS 2. PLN 2016-1580, TREE REMOVAL FOR 10025 EL CAMINO REAL Property Owner: Mark Egan, Rancho Del Bordo Estates, LLC, PO Box 6788, Santa Rosa, CA 95406 Certified Arborist: Henry Curtis, Whits Turn Tree Care, PO Box 1784, Templeton, CA 93465 Project Title: PLN 2016-1580 / TRP 2016-0196 Project Location: 10025 El Camino Real, Atascadero, CA 93422 APN 030-461-029 (San Luis Obispo County) Project Description: The proposed project includes a request to remove two blue oak trees in the Rancho Del Bordo Estates. One tree is dead and the other is diseased. General Plan Designation: High Density Residential (HDR) Zoning District: High Density Multiple-Family Residential (RMF-20) Staff Recommendation: Staff recommends the Planning Commission approve Resolution 2016-A approving Tree Removal Permit 2016-0196, based on findings and subject to mitigation. City of Atascadero Planning Commission Agenda Regular Meeting, February 2, 2016 Page 3 of 7 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website PUBLIC HEARINGS DISCLOSURE OF EX PARTE COMMUNICATIONS: Prior to a project hearing Planning Commission Members must disclose any communications they have had on any quasi-judicial agenda items. This includes, but is not limited to, Tentative Subdivision Maps , Parcel Maps, Variances, Conditional Use Permits, and Planned Development Permits. This does not disqualify the Planning Commission Member from participating and voting on the matter, but gives the public and applicant an opportunity to comment on the ex parte communication. (For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public hearing and invite the applicant or applicant’s representative to make any comments. Members of the public will be invited to provide testimony to the Commission following the applicant. Speakers should state their name for the record and can address the Commission for three minutes. After all public comments have been received, the public hearing will be closed, and the Commission will discuss the item and take appropriate action(s).) 3. PLN 2099-0795 – 8570 EL CORTE ROAD Property Owner/Applicant: 8570 Corte, LLC, 125 South Bowling Green Way, Los Angeles, CA 90049 Project Title: 8570 El Corte Master Plan of Development Amendments Project Location: 8570 El Corte Road, Atascadero, CA 93422 (San Luis Obispo County) APN: 030-421-005 Project Description: The proposed project consists of Amendments to the Master Plan of Development and conditions of approval of Vesting Tentative Subdivision Map 2006-0082, adjusting lot lines, elimination of proposed pedestrian paths, and revision of architectural elevations. Existing General Plan Designation: Single-Family Residential (SFR-X) Existing Zoning: Residential Single-Family (RSF-X) / Planned Development (PD-17) Proposed Environmental Determination: The proposed project has been reviewed and found to be consistent with certified Mitigated Negative Declaration 2006-0031 per California Environmental Quality Act (CEQA) guidelines Sec. 15164(a) through (e). There are no new environmental impacts or information of substantial importance associated with the proposed project revisions. No new mitigation measures are proposed. Staff Planner: Alfredo R. Castillo, AICP, Associate Planner, acastillo@atascadero.org, Phone: 470-3436 Staff Recommendation: Staff recommends the Planning Commission: 1. Adopt Draft PC Resolution 2016-A amending CUP 2006-0178, based on findings and conditions of approval; 2. Adopt Draft PC Resolution 2016-B amending TTM 2006-0082 conditions of approval for consistency with approved Master Plan of Development. City of Atascadero Planning Commission Agenda Regular Meeting, February 2, 2016 Page 4 of 7 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website PUBLIC HEARINGS (CONTINUED) DISCLOSURE OF EX PARTE COMMUNICATIONS: Prior to a project hearing Planning Commission Members must disclose any communications they have had on any quasi-judicial agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, Variances, Conditional Use Permits, and Planned Development Permits. This does not disqualify the Planning Commission Member from participating and voting on the matter, but gives the public and applicant an opportunity to comment on the ex parte communication. (For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public hearing and invite the applicant or applicant’s representative to make any comments. Members of the public will be invited t o provide testimony to the Commission following the applicant. Speakers should st ate their name for the record and can address the Commission for three minutes. After all public comments have been received, the public hearing will be closed, and the Commission will discuss the item and take appropriate action(s).) 4. PLN 2014-1529, HALCON GENERAL PLAN AMENDMENT Applicant/Owner: Conscious Build Atascadero Dev. LLC, 2921 Garibaldi Ave., San Luis Obispo, CA 93401 Project Title: PLN 2014-1529 – Halcon General Plan Amendment General Plan Amendment 2014-0029 / Zone Change 2014-0175 / Tentative Tract Map 2014-0108 / Tree Removal Permit 2014-0178 Project Location: 11955 & 11975 Viejo Camino, Atascadero, CA 93422 (San Luis Obispo County) APN: 045-401-003, & 004 11675, 11745, 11885, 11845, 11855, 11875 Halcon Rd., Atascadero, CA 93422 (San Luis Obispo County) APN: 045-401-014, 013, 010, 009, 018, & 017 Project Description: The applicant is requesting a General Plan Amendment and Rezone of 37.7 acres of residential property to allow for an increase in residential density. The subject parcels are located along Halcon Road at the southerly boundary of the City limits. Current zoning allows for a minimum lot size of 2.5 to 10 acres depending on certain site characteristics. The proposed General Plan Amendment and Rezoning would create a 17 unit sm all lot single-family development (“The Groves”) encompassing 10 acres of the project site at the Viejo Camino and Halcon intersection and increase the density of the remaining 27.7 acres of the project site (“Neighbor Parcels”) to allow for 1 primary dwelling unit per acre. There are currently 6 existing units within the project area. The proposal would increase the number of primary units to a maximum of 45 residential units. Nineteen (19) native trees are proposed for removal as part of The Groves development. Additional trees may be removed as the Neighbor parcels develop. Existing General Plan Designation: Suburban Estates (SE) Existing Zoning: Residential Suburban (RS) Proposed General Plan Designation: Single-Family Residential –Y (SFR-Y: 1 du/ac) Single-Family Residential – X (SFR-X: 2 du/ac) Proposed Zoning: Residential Single-Family-Y (RSF-Y: 1 du/ac) Residential Single-Family – X (RSF-X: 2 du/ac) Staff Recommendation: Staff recommends the Planning Commission: 1. Adopt Resolution PC 2016-A, recommending to the City Council that they adopt and certify Mitigated Negative Declaration 2015-0007 based on findings; and City of Atascadero Planning Commission Agenda Regular Meeting, February 2, 2016 Page 5 of 7 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website 2. Adopt Resolution PC 2016-B, recommending to the City Council approval of General Plan Amendment 2014-0030 based on findings; and 3. Adopt Resolution PC 2016-C, recommending to the City Council approval of Zoning Map Amendment ZCH 2014-0175 based on findings; and 4. Adopt Resolution PC 2016-D, recommending to the City Council approval of Title 9 Zone Text Amendment ZCH 2015-0178 establishing PD overlay zone 33 based on findings; and 5. Adopt Resolution PC 2016-E recommending to the City Council approval of Conditional Use Permit 2014-0284 (Master Plan of Development) based on findings and subject to Conditions of Approval and Mitigation Monitoring; and 6. Adopt Resolution PC 2016-F recommending the City Council approve of Tentative Subdivision Map TTM 2014-0108, based on findings and subject to Conditions of Approval and Mitigation Monitoring; and 7. Adopt Resolution PC 2016-G recommending to the City Council approval of Tree Removal Permit TRP 2014-0178, based on findings and subject to Conditions of Approval and Mitigation Monitoring. City of Atascadero Planning Commission Agenda Regular Meeting, February 2, 2016 Page 6 of 7 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website PUBLIC HEARINGS (CONTINUED) DISCLOSURE OF EX PARTE COMMUNICATIONS: Prior to a project hearing Planning Commission Members must disclose any communications they have had on any quasi-judicial agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, Variances, Conditional Use Permits, and Planned Development Permits. This does not disqualify the Planning Commission Member from participating and voting on the matter, but gives the public and applicant an opportunity to comment on the ex parte communication. (For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public hearing and invite the applicant or applicant’s representative to make any comments. Members of the public will be invited to provide testimony to the Commission following the applicant. Speakers should state their name for the record and can address the Commission for three minutes. After all public comments have been received, the public hearing will be closed, and the Commission will discuss the item and take appropriate action(s).) 5. PLN 2015-1571 – DOWNTOWN FIRST FLOOR OFFICE RESTRICTIONS COMMISSIONER COMMENTS AND REPORTS DIRECTOR’S REPORT ADJOURNMENT The next regular meeting will be on February 16, 2016 at City Hall Council Chambers, 6500 Palma Avenue, Atascadero. Please note: Should anyone challenge in court any proposed development entitlement listed on this Agenda, that person may be limited to raising those issues addressed at the public hearing described in this notice or in written correspondence delivered to the Planning Commission at, or prior to, this public hearing. Applicant/Owner: City of Atascadero, 6500 Palma Ave., Atascadero, CA 93422 Project Title: PLN 2015-1571 – Downtown Code Text amendment limiting ground floor office uses. Project Location: Downtown Commercial (DC) Zoning District - West Mall, East Mall, and portions of El Camino Real across from the Sunken Gardens Project Description: The City will consider amendments to the Downtown zoning regulations limiting ground floor office uses within specific locations in the Downtown Commercial Zoning District. Staff Planner: Kelly Gleason, Senior Planner, kgleason@atascadero.org, Phone: 470-3446 Staff Recommendation: Planning Commission recommend approval of the pro posed text changes to the City Council. City of Atascadero Planning Commission Agenda Regular Meeting, February 2, 2016 Page 7 of 7 WEBSITE: www.atascadero.org http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view Planning Commission Website City of Atascadero WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING The Planning Commission meets in regular session on the first and third Tuesday of each month at 7:00 p.m. at City Hall, Council Chambers, 6500 Palma Avenue, Atascadero. Matters are considered by the Commission in the order of the printed Agenda. Copies of the staff reports or other documentation relating to each item of business referred to on the Agenda are on file in the office of the Community Development Department and are available for public i nspection during City Hall business hours at the Front Counter of City Hall, 6500 Palma Avenue, Atascadero, and on our website, www.atascadero.org. All documents submitted by the public during Commission meetings that are either read into the record or referred to in their statement will be noted in the minutes and available for review in the Community Development Department. Commission meetings are audio recorded, and may be reviewed by the public. Copies of meeting recordings are available for a fee. Contact the City Clerk for more information (470-3400). In compliance with the Americans with Disabilities Act, if you need special assistance to participate in a City meeting or other services offered by this City, please contact the City Manager’s Office or the City Clerk’s Office, both at (805) 470-3400. Notification at least 48 hours prior to the meeting or time when services are needed will assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service. TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA Under Agenda item, “PUBLIC COMMENT”, the Chairperson will call for anyone from the audience having business with the Commission to approach the lectern and be recognized. 1. Give your name for the record (not required) 2. State the nature of your business. 3. All comments are limited to 3 minutes. 4. All comments should be made to the Chairperson and Commission. 5. No person shall be permitted to make slandero us, profane or negative personal remarks concerning any other individual, absent or present. This is when items not on the Agenda may be brought to the Commission’s attention. A maximum of 30 minutes will be allowed for Public Comment Portion (unless changed by the Commission). TO SPEAK ON AGENDA ITEMS (from Title 2, Chapter 1 of the Atascadero Municipal Code) Members of the audience may speak on any item on the agenda. The Chairperson will identify the subject, staff will give their report, and the Commission will ask questions of staff. The Chairperson will announce when the public comment period is open and will request anyone interested to address the Co mmission regarding the matter being considered to step up to the lectern. If you wish to speak for, against or comment in any way: 1. You must approach the lectern and be recognized by the Chairperson. 2. Give your name (not required). 3. Make your statement. 4. All comments should be made to the Chairperson and Commission. 5. No person shall be permitted to make slanderous, profane or negative personal remarks concerning any other individual, absent or present. 6. All comments limited to 3 minutes. If you wish to use a computer presentation to support your comments, you must notify the C ommunity Development Department at 470-3402 at least 24 hours prior to the meeting. Digital presentations brought to the meeting should be on a USB drive or CD. You are required to submit to the Recording Secretary a printed copy of your presentation for the record. Please check in with the Recording Secretary before the meeting begins to announce your presence and turn in the printed copy. The Chairperson will announce when the public comment period is closed, and thereafter, no further public comments will be heard by the Commission. PC Draft Action Minutes of 12/15/15 Page 1 of 7 CITY OF ATASCADERO PLANNING COMMISSION DRAFT ACTION MINUTES Regular Meeting – Tuesday, December 15, 2015 – 7:00 P.M. City Hall Council Chambers 6500 Palma Avenue, Atascadero, California CALL TO ORDER - 7:00 p.m. Chairperson Dariz called the meeting to order at 7:00 p.m. and Commissioner Bentz led the Pledge of Allegiance. ROLL CALL Present: Commissioners Anderson, Bentz, Bourbeau, Seay, Schmidt, Vice Chairperson Wolff, and Chairperson Dariz Absent: None Others Present: Recording Secretary, Annette Manier Staff Present: Community Development Director, Phil Dunsmore Associate Planner, Alfredo Castillo Contract Planner, Katie Banister Rachelle Rickard, City Manager Joe Allen, Police Department Commander Brian Pierik, City Attorney APPROVAL OF AGENDA MOTION: By Commissioner Bentz and seconded by Commissioner Anderson to approve the Agenda. Motion passed 7:0 by a roll-call vote. PUBLIC COMMENT None Chairperson Dariz closed the Public Comment period. ITEM NUMBER: 1 DATE: 2-2-16 1 PC Draft Action Minutes of 12/15/15 Page 2 of 7 PLANNING COMMISSION BUSINESS None CONSENT CALENDAR Chairperson Dariz stated that the Agenda states we are approving minutes for Dec. 3 rd, however, the Commission is approving minutes for December 1, 2015. 1. APPROVAL OF DRAFT ACTION MINUTES OF DECEMBER 1, 2015 `MOTION: By Commissioner Bentz and seconded by Commissioner Bourbeau to approve the consent calendar. Motion passed 7:0 by a roll-call vote. COMMUNITY DEVELOPMENT STAFF REPORTS None PUBLIC HEARINGS 2. PLN 2014-1535, CONDITIONAL USE PERMIT FOR 10080 OLD MORRO ROAD EAST Property Owner/Applicant: Benjamin DeGarmo, PO Box 404, Atascadero, CA 93423 Project Title: PLN 2014-1535 / CUP 2015-0286 Project Location: 10080 Old Morro Road East, Atascadero, CA 93422 (San Luis Obispo County) APN 056-451-001 Project Description: The project consists of an application for a Conditional Use Permit to allow an oversized accessory building with a bathroom and conditioned office space. The proposed garage/workshop is two stories with approximately 3,440 square feet of floor area, which is 116% of the size of the existing residence. General Plan Designation: RE Zoning District: RS Staff Planner: Katie Banister, Contract Planner, kbanister@atascadero.org, 470-3480 Proposed Environmental Determination: The proposed project is categorically exempted from CEQA under Section 15303: New construction or conversion of small structures. Staff Recommendation: The Planning Commission adopt PC Resolution 2015 -A approving Conditional Use Permit 2015-0286. 2 PC Draft Action Minutes of 12/15/15 Page 3 of 7 EX PARTE COMMUNICATIONS: Commissioner Anderson went by and looked at the site. Commissioner Bourbeau also visited the site, and then spoke with Contract Planner Banister. Contract Planner Banister gave the staff report and stated for the record, that the published agenda is incorrect and that the structure is 107% of the size of the existing residence (not 116% as published). She also stated that staff is recommending that Condition 10. F. be amended to say that outdoor storage is allowed and fully screened from the adjacent street or adjacent properties. Also, Condition 11 should be changed to read on-site signage shall be limited to two (2) square feet, instead of four (4). She stated that an email was received from a resident and distributed to the Commission tonight (Exhibit A). Associate Planner Castillo answered questions from the Commission in relation to the Lot Line Adjustment. Community Development Director Dunsmore answered questions from the Commission. PUBLIC COMMENT The following members of the public spoke on this item: Ben DeGarmo and Greg Vaughan. Mr. DeGarmo answered questions from the Commission. Chairperson Dariz closed the Public Comment period. MOTION: By Commissioner Bentz and seconded by Commissioner Schmidt to adopt PC Resolution 2015-A approving PLN 2015-1535/CUP 2015-0286 allowing a 3,191 square-foot detached accessory structure which exceeds 50% of the size of the primary residence at 10080 Old Morro Road East, based on findings and subject to conditions of approval. Motion passed 5:2 by a roll-call vote. (Bourbeau and Wolff voted no) 3. PLN 2099-0829, ZONE CHANGE, TENTATIVE TRACT MAP, AND CONDITIONAL USE PERMIT FOR 5310 CARRIZO ROAD Property Owner/Applicant: 5310 Carrizo Rd, LLC, 125 South Bowling Green Way, Los Angeles, CA 90049 Project Title: PLN 2099-0829 /ZCH 2015-0179/ZCH 2004-0078/CUP 2001-0126/TRP 2015- 0193/LLA 2015-0120 Project Location: 5318-5310 Carrizo Road, Pinon Way / Copado Way, Atascadero, CA 93422 (APN 049-105-001 through 012) 3 PC Draft Action Minutes of 12/15/15 Page 4 of 7 EX PARTE COMMUNICATIONS: Chairperson Dariz and Commissioner Anderson heard this project at the Design Review Committee (DRC). Commissioner Bourbeau visited the site, called Mr. Ephraim with questions, and he met with Associate Planner Castillo about the project. Commissioner Bentz received a phone call from Royce Eddings, and spoke about the project on the phone. Associate Planner Castillo gave the staff report, and he and Community Development Director Dunsmore answered questions from the Commission. Associate Planner Castillo explained that this project went before the DRC, and that the HOA would be responsible for future tie-in to sewer services. PUBLIC COMMENT The following members of the public spoke on this item: Royce Eddings, Brian McCallister, Kasey Sullivan, Corey Sullivan, a resident who spoke about lighting who did not give his name, and John McDonald. Chairperson Dariz closed the Public Comment period. Project Description: The project consists of an application for various amendments to a previously approved project that created a subdivision consisting of 11 new single -family residences and preserved one (1) colony home. The proposed project consists of an application for a Zone Change (elimination of the PD-17 overlay zone) and replacement with a project specific, Planned Development overlay zone, amendment to the Conditional Use Permit (CUP) / Master Plan of Development (MPD), Lot Line Adjustment (LLA) of 4 legal lots of record, and removal of one (1) native tree to accommodate proposed circulation improvements. General Plan Designation: Single-Family Residential (SFR) Zoning District: Residential Single-Family (RSF-X) / Planned Development (PD-17) Staff Planner: Alfredo Castillo, AICP, Associate Planner, acastillo@atascadero.org, 470-3436 Proposed Environmental Determination: Consistent with Adopted Mitigated Negative Declaration 2004-0030. Staff Recommendation: 1. Adopt Draft PC Resolution 2015-A, recommending to City Council approval of an amendment to Zone Change 2004-0078 replacing an existing Planned Development Overlay (PD-17) with a new Planned Development Overlay zone (PD-31) over 12 lots of legal record; and, 2. Adopt Draft PC Resolution 2015-B recommending to City Council approval of amendments to Conditional Use Permit 2004-0126 based on findings and subject to Conditions of Approval; and, 3. Adopt Draft PC Resolution 2015-C recommending to the City Council approval of Lot Line Adjustment 2015-0193 based on findings and subject to Conditions of Approval; and, 4. Adopt Draft PC Resolution 2015-D recommending to City Council approval of Tree Removal Permit 2015-0193 for the removal of one (1) 36-inch Coast Live Oak totaling 36-inches in DBH. 4 PC Draft Action Minutes of 12/15/15 Page 5 of 7 The Commission and staff addressed concerns about traffic and lighting from the neighbors. PUBLIC COMMENT Chairperson Dariz re-opened the Public Comment period. The following member of the public spoke on this item: John McDonald. Chairperson Dariz closed the Public Comment period. MOTION: By Commissioner Bourbeau and seconded by Commissioner Bentz to adopt PC Resolution 2015-A to recommend approval to the City Council an amendment to Zone Change 2004-0078 replacing an existing Planned Development Overlay (PD-17) with a new Planned Development Overlay zone (PD-31) over 12 lots of legal record; and, By Commissioner Bourbeau and seconded by Commissioner Bentz to adopt PC Resolution 2015-B to recommend to the City Council amendments to Conditional Use Permit 2004-0126 based on findings and subject to Conditions of Approval; and, By Commissioner Bourbeau and seconded by Commissioner Bentz to adopt PC Resolution 2015-C to recommend to the City Council approval of Lot Line Adjustment 2015-0120 based on findings and subject to Conditions of Approval, and, By Commissioner Bourbeau and seconded by Commissioner Bentz to adopt PC Resolution 2015-D to recommend to the City Council approval of Tree Removal Permit 2015-0193 for the removal of one (1) Coast Live Oak totaling 36-inches in DBH. Motion passed 7:0 by a roll-call vote. 5 PC Draft Action Minutes of 12/15/15 Page 6 of 7 4. PLN 2015-1574, ZCH 2015-0180 Repealing Municipal Code Chapter 5-13 regarding medical marijuana facilities and adding Section 9-6.186 to Title 9 of the Atascadero Municipal Code prohibiting marijuana cultivation, marijuana dispensaries, commercial cannabis activities, and medical marijuana deliveries. EX PARTE COMMUNICATIONS: Commissioner Bourbeau spoke to Police Commander Joe Allen, Community Development Director Dunsmore, and the owners of Dubs Green Garden, who are in the audience tonight. Community Development Director Dunsmore gave the staff report and answered questions from the Commission. Mr. Dunsmore stated that the item is scheduled to go to City Council on January 12, 2016, and that these provisions will take effect March 1, 2016. City Attorney Pierik and Police Commander Allen talked about the issue and answered questions from the Commission. PUBLIC COMMENT The following members of the public spoke on this item: Ernest Hall and Andrew Labarbara. Chairperson Dariz closed the Public Comment period. Property Owner/Applicant: City of Atascadero, 6500 Palma Ave., Atascadero, CA 93422 Project Title: PLN 2015-1574 / ZCH 2015-0180 Project Location: Citywide Project Description: Municipal Code text amendment to clarify the City’s prohibition on medical marijuana cultivation, dispensing, delivery and all other associated activities consistent with the limitations allowed by California Assembly Bills 243, 266 and 643. Proposed Environmental Determination: The proposed Ordinance is not a project within the meaning of Section 15378 of the California Environmental Quality Act (“CEQA”) Guidelines because it has no potential for resulting in physical change in the environm ent, either directly or ultimately. In the event that this Ordinance is found to be a project under CEQA, it is subject to the CEQA exemption contained in CEQA Guidelines Section 15061(b)(3) because it can be seen with certainty to have no possibility of a significant effect on the environment. City Staff: Phil Dunsmore, Community Development Director, pdunsmore@atascadero.org, 470 - 3488 Staff Recommendation: Adopt PC Resolution-A recommending the City Council approve Ordinance No. 2015-A repealing Chapter 5-13 regarding Medical Marijuana facilities and adding Section 9- 6.186 to Title 9 of the Atascadero Municipal Code prohibiting medical marijuana dispensaries, marijuana cultivation facilities, commercial cannabis activities, and medical marijuana deliveries. 6 PC Draft Action Minutes of 12/15/15 Page 7 of 7 City Manager Rickard and City Attorney Pierik answered questions raised by the Commission. MOTION: By Commissioner Bentz and seconded by Vice Chairperson Wolff to recommend that the City Council adopt an ordinance repealing Municipal Code 5-13 regarding Medical Marijuana Facilities and adding Section 9-6.186 to Title 9 of the Municipal Code prohibiting marijuana cultivation facilities, marijuana dispensaries, commercial cannabis activities and medical marijuana deliveries. Motion passed 7:0 by a roll-call vote. COMMISSIONER COMMENTS AND REPORTS None DIRECTORS REPORT Community Development Director Dunsmore announced that the January 5, 2016 Planning Commission meeting may be cancelled, and that there is a tentative date for an Eagle Ranch Joint Planning Commission/City Council meeting on January 19, 2016. Community Development Director Dunsmore gave the Commission on update on Walmart. ADJOURNMENT – 9:54 p.m. The next regular meeting of the Planning Commission is scheduled for January 5, 2016, at 7:00 p.m. at City Hall, Council Chambers, 6500 Palma Avenue, Atascadero. MINUTES PREPARD BY: ____________________________ Annette Manier, Recording Secretary The following exhibits are available in the Community Development Department: Exhibit A – Email from Clement Salvadori t:\~ planning commission\pc minutes\pc minutes 2015\draft actn minutes 12 15 15 final version.am.docx 7 8 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 Atascadero Planning Commission Staff Report – Community Development Department Katie Banister, Assistant Planner, 470-3480, kbanister@atascadero.org PLN 2016-1580 Tree Removal Permit 2016-0196 10025 El Camino Real – Rancho Del Bordo Estates SUBJECT: The applicant is requesting the removal of two (2) native trees in a mobile home development. The trees proposed for removal are a 16-inch diameter dead blue oak and a 24-inch diameter diseased blue oak. RECOMMENDATION: Staff Recommends: The Planning Commission adopt Resolution PC 2016-A to allow the removal of two (2) native trees, based on findings and subject to mitigation. Situation and Facts: 1. Property Owner / Applicant: Mark Egan Rancho Del Bordo Estates, LLC PO Box 6788 Santa Rosa, CA 95406 2. Project Address: 10025 El Camino Real (APN 030-461-029) Atascadero, CA 93422 3. Certified Arborist: Henry Curtis Whit’s-Turn Tree Care PO Box 1784 Templeton, CA 93465 4. General Plan Designation: High Density Residential (HDR) 5. Zoning District: High Density Multiple-Family Residential (RMF-20) 9 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 6. Site Area: Approximately 18.34 acres 7. Existing Use: Rancho Del Bordo Estates mobile home Development Surrounding Zoning / General Plan Designation North: Residential Single-Family (RSF-Z) / Single-Family Residential (SFR-Z) East: Recreation (L) / Public Recreation (REC) South: High Density Residential Multiple-Family (RMF-20) / High-Density Residential (HDR) Public (P) / Public Facilities (PUB) West: El Camino Real Low Density Residential Multiple-Family (RMF-10) / Moderate Density Residential (MDR) Project Location Map Rancho Del Bordo Estates 10025 El Camino Real Atascadero State Hospital RSF Heilmann Regional Park RMF-10 10 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 ANALYSIS: The proposed tree removals are located in the Rancho Del Bordo Mobilehome Estates located at 10025 El Camino Real. Rancho Del Bordo Estates Tree 1 Tree 2 11 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 Tree 1: 24-inch diseased blue oak Tree number 1 is a 24-inch blue oak. This tree is located about 6 feet from the mobile home located on space number 62 surrounded by an irrigated lawn. The canopy of this tree is entirely over the roof of the nearby home . Henry Curtis, certified arborist, reports the tree has an “immenent chance of failure in the lower trunk and anchor root area”. The tree shows “all the signs of root rot.” At one time, the tree had two co-dominant stems; the stem on the side opposite f rom the house failed at some time in the past. Typically, this type of failure results in damage or death of the roots growing from the same side of the tree. There is evidence this pattern occurred in this instance, which leaves the tree vulnerable to failure in the direction of the home. Tree number 2 is a 16-inch blue oak tree on space number 62. This tree is dead. 12 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 Tree 2: 16-inch dead blue oak Evaluative Criteria for Tree Removal Atascadero Municipal Code Section 9-11.105 (d) (3) provides the criteria the Planning Commission should use when evaluating tree removals. (i) The potential effect that tree removal could have on topography, knowing that hilltops, ravines, streambeds and other natural watercourses are more environmentally sensitive than flat or gentle sloping lands; (ii) The potential effect that tree removal could have on soil retention and erosion from increased flow of surface waters; Staff comment: Both trees are located on flat, landscaped ground. Their removal is not anticipated to destabilize the soil or any topographic feature. 13 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 (iii) The potential effect that tree removal could have on the ambient and future noise level; Staff comment: Both trees are located in a fully developed mobile home park. Ambient and future noise are those expected in a residential neighborhood, and relatively quiet. The trees may have a small, localized effect on ambient noise, but their removal will not have a significant impact. (iv) The potential effect that tree removal could have on the ability of existing vegetation to reduce air movement and wind velocity; Staff comment: Both trees are located away from other trees and near residences. Air movement in the neighborhood is likely controlled by the layout of the mobile homes and not by isolated trees in the development. (v) The potential effect that tree removal could have on significantly reducing available wildlife habitat or result in the displacement of desirable species; Staff comment: Both trees are located in a fully developed neighborhood. Wildlife habitat is limited to small landscaped areas with minimal habitat value. These tree removals will eliminate a small part of the available habitat. (vi) Aesthetics; Staff comment: The removal of both trees will have a negative impact on the aesthetics of the immediate surrounding area. (vii) The number, size, species, condition and location of trees to be removed; Staff comment: Two blue oak trees in poor condition are proposed for removal. The trees are located close to existing structures in an existing mobile home development. (viii) The special need to protect existing blue and valley oaks because of regeneration problems; Staff comment: The trees are both blue oaks. (ix) The cumulative environmental effects of tree removal. Staff comment: While removing these two trees in poor condition will have a very limited environmental impact, placing irrigated turf or structures over the critical root zone of native trees has a detrimental impact on their health and makes their removal more likely. 14 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 Tree Mitigation The Atascadero Municipal Code requires mitigation for all trees approved for removal. The Tree Ordinance allows for either replanting of new native trees, or payment of mitigation fees to the tree fund. Based on the 40-inch cumulative diameter of the two trees, twenty-seven (27) 5-gallon oak trees are required for replanting. Alternatively, the applicant may choose to pay $1333.33 to the City’s tree mitigation fund. A combination of the two mitigation methods is permitted. FINDINGS: In considering any tree removal request, at least one of the required findings must be made. Staff has identified the following finding as appropriate for the application request. (i) The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an arborist; ALTERNATIVES: 1. The Commission may approve the project with additional or revised project conditions. 2. The Commission may deny the project if it is found that the required findings cannot be made. The Commission’s motion to deny must include a finding basis for denial. 3. The Commission may continue the hearing and refer the item back to staff for additional information or analysis. Direction should be given to staff and the applicant on required information. ATTACHMENTS: Attachment 1 – Arborist Report Attachment 2 – Draft Resolution PC 2016-A Bond payment for tree #31, impacted 45% : 15 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 ATTACHMENT 1: Arborist Report PLN 2016-1580 / TRP 2016-0196 16 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 17 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 18 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 ATTACHMENT 2: Draft Resolution PC 2016-A PLN 2016-1580 / TRP 2016-0196 DRAFT RESOLUTION NO. PC 2016-A A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO APPROVING PLN 2016-1580 / TRP 2016-0196, TO ALLOW THE REMOVAL OF TWO (2) BLUE OAK TREES TOTALING 40-INCHES DIAMETER AT BREAST HEIGHT (DBH) LOCATED AT 10025 EL CAMINO REAL (APN 030-461-029) WHEREAS, an application was received from Mark Egan of Rancho Del Bordo Estates, LLC, PO Box 6788, Santa Rosa, California, 95406 (Property Owner), and by Henry Curtis, Whit’s-Turn Tree Care, PO Box 1784, Templeton, California, 93465 (Arborist), for a Tree Removal Permit to remove two (2) blue oak trees totaling forty (40) inches DBH. WHEREAS, the Planning Commission reviewed the proposed Tree Removal Permit application on February 2, 2016, at 7:00 p.m. and considered testimony and reports from staff, the applicants, and the public; and, NOW THEREFORE, the Planning Commission of the City of Atascadero, California takes the following actions: SECTION 1. Findings for tree removal. The Planning Commission finds as follows: The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an arborist. Tree number 1 suffers from a damaged trunk and root rot in the anchor roots. Tree number 2 is dead. SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on February 2, 2016, and resolved to approve Tree Removal Permit 2016-0196, subject to the following: EXHIBIT A: Conditions of Approval EXHIBIT B: Required Tree Removal Mitigation EXHIBIT C: Site Plan 19 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 On motion by Commissioner ____________________, and seconded by Commissioner _________________________, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSENT: ( ) ABSTAINED: ( ) ADOPTED: CITY OF ATASCADERO, CA _________________________________________ Mark Dariz Planning Commission Chairperson ATTEST: ___________________________________ Phil Dunsmore Planning Commission Secretary 20 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 EXHIBIT A: Conditions of Approval / Mitigation Monitoring PLN 2016-1580 / TRP 2016-0196 Conditions of Approval PLN 2016-1580 / TRP 2016-0196 10025 El Camino Real Timing FM; Final Map BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 1. The approval of this application shall become final, subject to the completion of the conditions of approval, fourteen (14) days following the Planning Commission approval unless prior to that time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. Tree removal PS 2. The applicant and/or subsequent owners shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the proposed tree removal. Ongoing PS 3. The owner or applicant shall mitigate the tree removal by replanting native trees, making appropriate payment to the tree mitigation fund, or a combination thereof as shown in Exhibit B. Larger box trees may be substituted for five-gallon replacement trees per the Atascadero Native Tree Guidelines. Tree removal PS 4. Payment to the tree mitigation fund or approval of a tree replanting and irrigation plan shall occur before trees are removed. Tree removal PS 5. If tree replanting is selected, the owner or applicant shall provide drip irrigation to new trees until they are established. Tree planting PS 21 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 Exhibit B Required Tree Removal Mitigation PLN 2016-1580 / TRP 2016-0196 Evergreen Native Trees (inches)Deciduous Native Trees (inches)Totals dbh notes dbh notes 1 1 24-inches diseased 2 2 16-inches dead 3 3 4 4 5 5 6 6 Total 0-inches Total 40-inches 40-inches Mitigation Requirement req'd tree replacements:0 five gal trees req'd tree replacements:27 five gal trees 27 five gal trees Proposed Replanting 0 five gal trees Proposed Replanting 0 five gal trees 0 five gal trees 0 box trees (24'')0 box trees (24'')0 box trees (24'') Remaining Mitigation 0 five gal trees Remaining Mitigation 27 five gal trees 27 five gal trees Tree Fund Payment:-$ Tree Fund Payment:1,333.33$ 1,333.33$ 22 ITEM NUMBER: ITEM NUMBER: 2 DATE: 2-2-16 Exhibit C Site Plan PLN 2016-1580 / TRP 2016-0196 Bond payment for tree #31, impacted 45% : Tree Number 1 Tree Number 2 El Camino Real 23 Atascadero Planning Commission Staff Report - Community Development Department Alfredo R. Castillo, AICP, Associate Planner, acastillo@atascadero.org (805) 470-3436 El Corte Subdivision Amendments PLN 2099-0795 (8570 El Corte, LLC) STAFF RECOMMENDATIONS: 1. Adopt Draft PC Resolution 2016-A, approving amendments to Conditional Use Permit 2006-0178 (Master Plan of Development) based on findings and subject to Conditions of Approval and Mitigation Monitoring; and, 2. Adopt Draft PC Resolution 2016-B, amending and reconsidering Vesting Tentative Tract Map 2006-0082 for consistency with an adopted Master Plan of Development, based on findings and subject to Conditions of Approval. DISCUSSION: Situation and Facts: 1. Owner / Applicant: 8570 El Corte, LLC, 125 South Bowling Green Way, Los Angeles, CA 90049 2. Project Address: 8570 El Corte (APN 030-421-005) (San Luis Obispo County) 3. General Plan Designation: SFR (Single-Family Residential) 4. Zoning District: RSF-X (Residential Single-Family - X) / Planned Development (PD-17) 5. Site Area: 2.0 acres 6. Existing Use: Single-Family Residence / Vacant 7. Environmental Status: Consistent with certified Mitigated Negative Declaration 2006-0031 ITEM NUMBER: ITEM NUMBER: 3 DATE: 2-2-16 24 Background On June 12, 2007, a seven (7) lot subdivision with a planned development overlay was approved by the City Council. The proposed development has not moved forward since that time and a new owner has obtained the property and is seeking an amendment to conditions of approval pertaining to proposed subdivision improvements, architectural elevations, and minor adjustments or proposed lot lines. Surrounding Land Use and Setting: North: Residential Single-Family (RSF-X) East: Residential Multi-Family (RMF-10) South: Recreation (Chalk Mountain) West: Residential Single-Family (RSF-X) RMF-16 RSF-Y RMF-10 CR 8570 El Corte Rd 25 The project site is within the Residential Single-Family General Plan Land Use Designation and is zoned Residential Single-Family-X (0.5 acre minimum lot size), which allows for a maximum density of 4.0 units per acre with the establishment of a PD Overlay Zone. The proposed project site has a Planned Development overlay (PD -17). The surrounding neighborhood is developed with single -family developments. The adjacent development, Chalk Mountain Village, contains higher density small lot single - family homes and open space areas. ANALYSIS: The proposed site plan has been designed to meet the minimum requirements of the Atascadero Municipal Code and the appearance review requirements of the General Plan. The following are the proposed amendments that the applicant is requesting:  Revising residential units size ranges from 1,422 square feet (sf) to 2,134 sf;  Elimination of a pedestrian path and easements that originally were proposed to impede upon existing willow trees and identified wetlands ;  Elimination of common area sidewalks to be placed between lots 5 and 6;  Architectural elevation revisions. Site Plan and Circulation The proposed project still includes seven detached single-family residences arranged around a common cul-de-sac that gains access from El Corte Road. Each unit has an attached two-car garage and additional guest parking is provided within the driveway of each lot. This will remain as a part of the proposed amendment. Proposed lot sizes have increased in lots 5 and 6 as a part of the proposed amendments due to proposed elimination of a sidewalk in between these lots. This sidewalk was proposed to connect to a pedestrian path adjacent to an existing riparian vegetation area. This riparian vegetation and an identified wetland area is located along the La Linia frontage. The certified environmental document included a review from the previous project biologist that determined there will be no significant impacts to the riparian and/or wetland vegetation with the mitigation measures as identified. The environmental analysis determined that the only potential impacts to the existing vegetation would occur from installation of the pedestrian connection to La Linia Avenue. This connection is proposed to be eliminated and therefore, reduce any potential impacts. If any removals are required, they will be required to be mitigated at a ratio of 3:1, consistent with the Mitigated Negative Declaration (Mitigation Measure 4.b.1). Public/Subdivision Improvements Frontage improvements continue to be proposed along the El Corte and right-of-way. Due to the sensitivity of the existing wetland, the applicant is proposing elimination of some frontage improvements to eliminate conflicts with the existing riparian area. The originally approved project already had included modified frontage improvements along the La Linia frontage. 26 The City Engineer is requesting that the applicant construct curb, gutter, and sidewalk along around the proposed cul-de-sac. A sidewalk will be provided linking the cul-de- sac to provide areas of pedestrian and passive recreation opportunities. Public Works has reviewed the proposed amendments , and has provided revised conditions of approval for both the Master Plan of Development and vesting Tentative Map. Architecture, Materials, and Color The applicant has revised the approved architecture and reduced the overall size of the proposed homes. The applicant is proposing elimination of homes with 2nd stories. The proposed architecture has also been revised for more consistency with the surrounding neighborhood. Attachment 6 shows the proposed architectural revision, as well as Draft PC Resolution 2016-A. Site Drainage Historically, the site drains toward the La Linia Road frontage where the riparian and wetland vegetation currently exists. The project is designed to direct site-generated flows to the cul-de-sac and out to the El Corte right-of-way and to the existing drainage along La Linia. Historic flows from the neighboring parcels located up-hill from the proposed development will be captured and conveyed by an open dry creek swale to the existing drainage swale. Wastewater Sanitary sewer will be connected to existing sewer facilities in El Corte Road. This condition remains per the previous approval. Vesting Tentative Subdivision Map A seven-lot Tentative Tract Map (TTM 2006-0082) was originally approved consistent with the proposed Master Plan of Development and proposed PD–17 Overlay Zone. The vesting map is still valid and has been conditioned by staff and the City Engineer to for consistency with the proposed amendments. Findings Conditional Use Permit (Master Plan of Development) A Master Plan of Development is required for the Planned Development in the form of a Conditional Use Permit. The proposed amendments to the approved Master Plan of Development sets development standards related to architectural design, site design, landscape, signage, and specific development standards required by the zoning ordinance. The Planning Commission must make the following five findings to recommend approval of the proposed Master Plan of Development: 1. The proposed project or use is consistent with the General Plan and the City’s Appearance Review Manual. 27 Staff Comment: The use is consistent with the General Commercial designation of the General Plan and General Plan Land Use Element Policy 1.1 and 1.1.7. 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including the Planned Development Ordinance. Staff Comment: As conditioned, the project satisfies all Conditional Use Permit and Planned Development zoning code provisions. 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use. Staff Comment: The proposed residential development will not be detrimental to the general public or working person’s health, safety, or welfare. 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development. Staff Comment: The proposed project is compatible with the surrounding neighborhood. 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full deve lopment in accordance with the Land Use Element. Staff Comment: The proposed project and use is consistent with the traffic projections and road improvements anticipated within the General Plan and as proposed by the applicant. Proposed Environmental Determination The proposed project has been reviewed and found to be consistent with certified Mitigated Negative Declaration 2006-0031 per California Environmental Quality Act (CEQA) guidelines Sec. 15164(a) through (e). There are no new environmental i mpacts or information of substantial importance associated with the proposed project revisions. No new mitigation measures are proposed. 28 ALTERNATIVES: 1. The Commission may make modifications to the project and/or conditions of approval. 2. The Commission may determine more information is needed on some aspect of the project and may refer the item back to the applicant and staff to develop the additional information. The Council should clearly state the type of information required and move to continue the item to a future date. 3. The Commission may deny the proposed amendments. The proposed project would not be modified and the site may be developed as previously approved. ATTACHMENTS: Attachment 1: Location, General Plan, and Zoning Map Attachment 2: Applicant Letter Attachment 3: Site Plan Attachment 4: Revised Vesting Tentative Map Attachment 5: Revised Landscaping Plan Attachment 6: Proposed Architecture Elevations Attachment 7: Draft PC Resolution 2016-A Master Plan of Development Attachment 8: Draft PC Resolution 2016-B – Vesting Tentative Map 29 Attachment 1: Location Map, General Plan and Zoning Morro Rd. CP CR RMF-16 RS RS RS Existing: General Plan Designation – Single-Family Residential – X Zoning District – Residential Single-Family – X Proposed: General Plan Designation – Single-Family Residential – X Zoning District – Residential Single-Family – X / PD-17 8570 El Corte Rd 30 Attachment 1: Applicant Letter 31 32 ATTACHMENT 3: Site Plan 33 ATTACHMENT 5: Revised Landscaping Plan 34 ATTACHMENT 6: Proposed Architectural Elevations 35 ATTACHMENT 6: Proposed Architectural Elevations 36 ATTACHMENT 7: Draft PC Resolution 2016-A Approval of Proposed Master Plan of Development (CUP) Amendments DRAFT RESOLUTION PC 2016-A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ATASCADERO, CALIFORNIA, AMENDING CONDITIONAL USE PERMIT 2006-0178 (MASTER PLAN OF DEVELOPEMNT) ON APN 030-421-005 (8570 El Corte, LLC) WHEREAS, an application has been received from 8570 El Corte, LLC (125 South Bowling Green Way, Los Angeles, CA 90049) Applicant and Property Owner, to consider a and amendment to an approved Master Plan of Development and Vesting Tentative Tract Map located at 8570 El Corte Road, (APN 030-421-005); and, WHEREAS, the City Council approved the site’s Zoning District be changed from RSF- X (Residential Single-Family-X) to RSF-X with PD17 (Residential Single-Family-X with a Planned Development Overlay 17); and, WHEREAS, the Planned Development #17 Overlay Zone requires the adoption of a Master Plan of Development, approved in the form of a Conditional Use Permit; and, WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2006-0031 were prepared for the project and certified at the June 12, 2007 City Council hearin g, in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional Use Permit amendment application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of Development; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on February 2, 2016, studied and considered Conditional Use Permit 2005- 0173 (Master Plan of Development), after first studying and considering the Proposed Mitigated Negative Declaration prepared for the project, and, Existing General Plan Designation: MDR Existing Zoning District: RMF-10 Proposed General Plan Designation: MDR Proposed Zoning Designation: RMF-10 / PD -25 37 NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the following actions: SECTION 1. Findings for Approval of Conditional Use Permit Amendment. The Planning Commission finds as follows: 1. The proposed amendment is consistent with the General Plan and the City’s Appearance Review Manual; and, 2. The proposed amendment satisfies all applicable provisions of the Title (Zoning Ordinance) including provisions of the PD-17 Overlay Zone with the exception of specific concessions made in accordance with the State Density bonus program; and, 3. The amendment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. The proposed amendment will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 5. The proposed amendment will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. 6. The Master Plan of Development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area; and 7. Benefits derived from the Master Plan of Development and PD overlay zone cannot be reasonably achieved through existing development standards or processing requirements; and, SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on February 2, 2016 resolved to approve amendments Conditional Use Permit 2006-0178 (Master Plan of Development) subject to the following: EXHIBIT A: Certified Mitigated Negative Declaration EXHIBIT B: Conditions of approval / Mitigation Monitoring Program EXHIBIT C: Master Plan of Development / Site Plan EXHIBIT D: Grading Plan EXHIBIT E: Architectural Elevations and Floor Plans EXHIBIT F: Color Boards EXHIBIT G: Utility Plan EXHIBIT H: Landscape Plan 38 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by Commissioner _____, and seconded by Commissioner ______, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: () NOES: () ABSTAIN: () ABSENT: () ADOPTED: CITY OF ATASCADERO, CA ______________________________ Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 39 EXHIBIT B: Certified Mitigated Negative Declaration El Corte 8570 LLC /PLN 2099-0795 40 EXHIBIT B: Conditions of Approval / Mitigation Monitoring Program Planned Development_17 /PLN 2099-0795 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure Planning Services 1. This resolution shall supersede City Council Resolution No. 2007-047. All conditions of approval / mitigation contained PC Resolution 2016-00XX shall be considered the master plan of development and be utilized for administering and future project approvals. FM PS 2. The approval of this use permit shall become final and effective for the purposes of issuing building permits thirty (30) days following the City Council approval of ZCH 2006-0112 upon second reading, unless prior to that time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. FM PS 3. The Community Development Department shall have the authority to approve the following minor changes to the project that (1) modify the site plan project by less than 10%, (2) result in a superior site design or appearance, and/or (3) address a construction design issue that is not substantive to the Master Plan of Development. BP / FM PS, CE 4. Approval of this Conditional Use Permit shall be valid twenty-four (24) months after its effective date. At the end of the period, the approval shall expire and become null and void unless the project has received a building permit. BP / FM PS 5. The applicant shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the city, or any of its entities, concerning the subdivision. Ongoin g PS 6. All subsequent Tentative Map and construction permits shall be consistent with the Master Plan of Development contained herein. BP / FM PS, CE 7. All exterior elevations, finish materials and colors shall be consistent with the Master Plan of Development as shown in EXHIBIT E with the following modifications:  All exterior material finishes (siding, trim, doors, windows, light fixtures, garage doors) shall be durable, high quality, and consistent with the architectural appearance.  Roofs shall be architectural grade dimensional shingles.  Exterior stucco shall be smooth finish or similar. No knock-down finishes will BP PS 41 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure be permitted. 8. All site development shall comply with the standards of the Planned Development 17 Overlay District. BP PS, BS 9. All site work, grading, and site improvements shall be consistent with the Master Plan of Development as shown in EXHIBIT C, D and H. BP/FM PS, BS, CE 10. All project fencing shall be installed consistent with EXHIBIT C and H subject to the following modifications:  Fencing material and treatment shall comply with the PD17 standards.  Final fence location shall be subject to staff approval.  No fencing shall cross the creek channel nor shall be placed in any way which restricts flow. GP/BP PS 11. Final selection of colors and materials shall be subject to staff approval and generally consistent with the provided color board in exhibit F. GP/BP PS 12. A final landscape and irrigation plan shall be approved prior to the issuance of building permits and included as part of site improvement plan consistent with EXHIBIT H, and as follows:  All exterior meters, air conditioning units and mechanical equipment shall be screened with landscape material.  Final tree list shall be submitted with building permits, subject to staff approval.  Street and open space trees shall be minimum 15-gallon size and double staked.  Front yard areas shall be landscaped with drought tolerant species, subject to staff approval. 13. The developer and/or subsequent owner shall assume responsibility for the continued maintenance of all landscape and common areas. 14. Affordable Housing Requirement: The applicant shall deed restrict one (1) unit at the moderate income rate or shall pay in-lieu fees for each unit based on 5% of the construction valuation of each unit. GP/BP PS, CA 15. A Tree Protection Plan shall be submitted with subsequent building permits for encroachment within the drip line of native trees located on the subject parcel and any adjacent properties. The applicant will contract with a certified arborist to monitor all activity within the drip lines of existing native oak trees and the existing riparian GP/BP PS 42 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure vegetation. 16. The emergency services and facility maintenance costs listed below shall be 100% funded by the project in perpetuity. The service and maintenance costs shall be funded through a community facilities district established by the City at the developer's cost. The funding mechanism must be in place prior to or concurrently with acceptance of the final maps. The funding mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above mentioned funds shall be by the City. Developer agrees to participate in the community facilities district and to take all steps reasonably required by the City with regard to the establishment of the district and assessment of the property.  All Atascadero Police Department service costs to the project.  All Atascadero Fire Department service costs to the project.  Off-site common City of Atascadero park facilities maintenance service costs related to the project. BP PS 17. All tract maintenance costs listed below shall be 100% funded by the project in perpetuity. The service and maintenance cost shall be funded through a Home Owners Association established by the developer subject to City approval. The Home Owners Association must be in place prior to, or concurrently with acceptance of any final maps. The Home Owners Association shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any Final Map. The administration of the above mentioned funds, and the coordination and performance of maintenance activities, shall be the responsibility of the Home Owners Association. a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access roads, emergency access gates, and sewer mains within the project. b) All parks, trails, recreational facilities and like facilities. c) All open space and native tree preservation areas. d) All drainage facilities and detention basins. e) All creeks, flood plains, floodways, wetlands, and riparian habitat areas. f) All common landscaping areas, street trees, medians, parkway planters, manufactured slopes outside private yards, and other similar facilities. g) All frontage landscaping and sidewalks along arterial streets BP PS 18. Prior to final map, the applicant shall submit CC&Rs for review by the Community Development Department. The CC&R’s shall record with the Final Map and shall include the following: BP PS, BS 43 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure a) Provisions for maintenance of all common areas including access, parking, street trees, fencing and landscaping in perpetuity. b) A detailed list of each individual homeowner’s responsibilities for maintenance of the individual units. c) Residents shall keep all trash receptacles within the unit’s designated trash storage area. d) Garages shall be maintained and used for vehicle parking. e) No boats, RV’s or other type of recreation vehicle may occupy a guest or resident parking space, including within an individual garage. 19. Approval of this permit shall include the removal of 1 Native Tree, if required. The applicant shall be required to pay mitigation fees or provide replantings on-site per the requirements of the Atascadero Native Tree Ordinance. Any additional on-site native removals shall be subject to Planning Commission approval. BP PS, BS 20. The applicant must provide for the repair and maintenance of on-site shared improvements. This includes roads, sidewalks, street trees, streetlights, private sewer system, drainage facilities, recreation areas and common landscaping. The two methods that may be used are: a) Homeowners Association. This private organization would be responsible for the maintenance, repair and replacement of the facilities. b) Assessment District and Landscape and Lighting District. Funds for the maintenance, repair and replacement of the facilities would be collected on the property tax bill and distributed to the City. The City Engineer and City Attorney shall approve the final form prior to recordation. FM CE 21. The perimeter retaining walls shall be maintained by the Homeowners Association, if required. FM CE/PS City Engineer Standard Conditions 24. A six (6) foot Public Utility Easement (PUE) shall be provided contiguous to the property frontage. GP, BP CE 25. The applicant shall acquire title interest in any off-site land that may be required to allow for the construction of the improvements. The applicant shall bear all costs associated with the necessary acquisitions. The applicant shall also gain concurrence from all adjacent property owners whose ingress and egress is affected by these improvements. GP, BP CE 44 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure 26. The on-site streets shall be improved consistent with the Vesting Tentative Tract Map. GP, BP CE 27. Off-site streets shall be improved consistent with the Vesting Tentative Tract Map, if required. GP, BP CE 28. Alignment of frontage improvements shall be approved by the City Engineer. GP, BP CE 29. A mechanism to provide for the funding of maintenance for lighting, street improvements, special paving surfaces, sewer, storm drain, common area landscape, open space, and hardscape shall be provided. GP, BP CE 30. All utilities shall be undergrounded on project frontage GP, BP CE 31. A mechanism must be provided to fund the maintenance of all sewer mains throughout the project area. The developer shall establish a benefit maintenance assessment district, or similar funding mechanism, approved by the City, to provide sufficient funds, on an annual basis, to pay for the maintenance activities on the sewer mainline and related facilities within the project area. GP, BP CE 32. All onsite sewer mains shall be privately owned and maintained. FM CE 33. Applicant shall pay sewer extension (Annexation), Connection and Reimbursement fees (if applicable) upon issuance of building permit. BP CE 34. Gravity mains within the subdivision shall be eight (8) inches in diameter. BP CE 35. Drainage piping serving fixtures which have flood level rims located below the elevation of the next upstream manhole cover of the public or private sewer serving such drainage piping shall be protected from backflow of sewage by installing an approved type backwater valve. Fixtures above such elevation shall not discharge through the backwater valve. BP CE 36. All sanitary sewer (SS) mains shall terminate in manholes unless extension of the main, at some later date, is anticipated. If extension of a SS main is anticipated, said SS main may terminate in a cleanout providing the next downstream manhole is less than 300 linear feet from the cleanout and that the point of termination is not a reasonable location for a SS main angle point or intersection. BP CE Atascadero Mutual Water Company 61. Before the issuance of building permits, the applicant shall submit plans to AMWC for the water distribution facilities needed to serve the project. AMWC shall review and approve the plans before construction begins on the water system improvements. All water distribution facilities shall be constructed in conformance with AMWC Standards and Details and the California Waterworks Standards (Code of Regulations Title 22, Division 4, Chapter 16). All cross-connection 45 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure devices shall conform to AWWA and California Department of Health Services standards. 62. Before issuance of building permits, the applicant shall obtain a “Will Serve” letter from AMWC for the newly created lots within the subdivision. 2016 Additional Conditions 63. The internal street shall be improved consistent with City Standards shall be offered as a public right-of-way. Typical street section shall provide 36 feet curb- curb within a 50-feet wide right-of-way. The cul-de-sac shall be designed in accordance with City Standard No. 415 with 34-feet curb radius. 64. The internal street shall be improved with a 5-feet wide integral sidewalk-curb- gutter per City Standard No. 419. Driveway ramps shall be installed at each lot per City Standard No. 423 and shall include a 4-feet wide sidewalk that wraps behind the ramp. The new sidewalk shall terminate at the curb returns on El Corte and shall have a center ADA compliant pedestrian ramp. The end of the sidewalk may require a transition of asphalt-concrete to connect the sidewalk to the shoulder on El Corte. 65. The El Corte Road shoulder, including AC dike of curb & gutter, shall be improved to transition to the new street and to convey street drainage to the existing over- side drain at the corner of El Corte and La Linia. El Corte Road improvements shall also include a defined shoulder of compacted Class II aggregate base. 66. The developer shall provide hydraulic calculations for post -development storm water run-off tributary to El Corte and the existing over-side drain at the corner of El Corte and La Linia. Should said calculations determine that the existing over- side drain is undersized for the added storm water run-off, the developer shall be responsible for modification to the over-side drain. 67. The developer shall plant street trees along all street frontages, to the satisfaction of the Public Works Director and Community Development Director. Street trees shall be planted between 10 feet and 15 feet of the sidewalk or AC dike. One street tree shall be planted for each 35 linear feet (or portion thereof) of road frontage. Street trees may be grouped if approved by the Community Development Director. 68. Public sewer, water, gas, power, telecommunications and cable TV mains shall be extended from El Corte Road into the new street, to the satisfaction of the City Engineer. 69. Each new lot shall be served by separate laterals for sewer, water, power, communications, gas & cable TV, to the satisfaction of the City Engineer. 46 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure 70. A public utility easement shall be dedicated along all street frontages, to the satisfaction of the City Engineer. 71. Storm water run-off entering the site from the northwesterly corner of the subject property may be collected and conveyed in a pipe to the existing drainage swale along La Linia Road. A safe overland escape route shall be provided should the storm sewer become plugged or fail. The developer shall dedicate an easement for the pipe and overland route. Mitigation Measure 1.c.1: All retaining walls shall be constructed of dark color split face block or of similar color and texture to blend into the surrounding natural environment. BP PS 1.c.1 Mitigation Measure 1.c.2: each unit shall be painted with darker earth toned colors. All materials shall be high quality and designed to blend with the surrounding environment. BP PS 1.c.2 Mitigation Measure 3.b.1: The project shall be conditioned to comply with all applicable District regulations pertaining to the control of fugitive dust (PM-10) as contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality Handbook.  Asbestos has been identified by the state Air Resources Board as a toxic air contaminant. Serpentine and ultramafic rocks are very common in the state and may contain naturally occurring asbestos. Under the State Air Resources Board Air Toxics Control Measure (ATCM) for Construction, Grading, Quarrying, and Surface Mining Operations, prior to any grading activities at the site, the project proponent shall ensure that a geologic evaluation is conducted to determine if naturally occurring asbestos is present within the area that will be disturbed. If Naturally Occurring Asbestos (NOA) is found at the site the applicant must comply with all requirements outlined in the Asbestos ATCM for Construction, Grading, Quarrying, and Surface Mining Operations. If NOA is not present, an exemption request must be filed with the District. If NOA is found at the site the applicant must comply with all requirements outlined in the Asbestos ATCM. This may include development of an Asbestos Dust Mitigation Plan and an Asbestos Health and Safety Program for approval by the APCD. Should Naturally Occurring Asbestos be identified within the area of construction, and the worked area will be less than or equal to one acre, then the dust control measures identified below are required. If the disturbed area is greater than one acre, additional requirements may include but are not limited to 1) an Asbestos Dust Mitigation Plan which must be approved by the District before construction begins, and 2) an Asbestos Health and Safety Program will also be required for some projects.  Dust Control Measures for Construction and Grading Operation Projects One Acre or Less: No person shall engage in any construction or grading operation on property where the area to be disturbed is one (1.0) acre or less unless all of the following dust mitigation measures are initiated at the start and maintained throughout the duration of the construction or grading activity: (A) Construction vehicle speed at the work site must be limited to fifteen(15) BP BS 3.b.1 47 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure miles per hour or less; (B) Prior to any ground disturbance, sufficient water must be applied to the area to be disturbed to prevent visible emissions from crossing the property line; (C) Areas to be graded or excavated must be kept adequately wetted to prevent visible emissions from crossing the property line; (D) Storage piles must be kept adequately wetted, treated with a chemical dust suppressant, or covered when material is not being added to or removed from the pile; (E) Equipment must be washed down before moving from the property onto a paved public road; and (F) Visible track-out on the paved public road must be cleaned using wet sweeping or a HEPA filter equipped vacuum device within twenty-four (24) hours. Mitigation Measure 3.b.2: Naturally Occurring Asbestos (NOA) has been identified by the state Air Resources Board as a toxic air contaminant. Serpentine and ultramafic rocks are very common in the state and may contain naturally occurring asbestos. Under the State Air Resources Board Air Toxics Control Measure (ATCM) for Construction, Grading, Quarrying, and Surface Mining Operations, prior to any grading activities at the site, the project proponent shall ensure that a geologic evaluation is conducted to determine if naturally occurring asbestos is present within the area that will be disturbed. If naturally occurring asbestos is found at the site the applicant must comply with all requirements outlined in the Asbestos ATCM for Construction, Grading, Quarrying, and Surface Mining Operations. These requirements may include but are not limited to 1) an Asbestos Dust Mitigation Plan which must be approved by t he District before construction begins, and 2) an Asbestos Health and Safety Program will also be required for some projects. BP PS 3.b.2 Mitigation Measure 4.b.1: Replace willow tree removals at a ratio of 3:1 for any willow removals necessary to construct the pedestrian connection to La Linia Ave. Willow stakes shall be spaced approximately 4-feet apart according to ACOE recommendations. Stakes shall be placed deep enough to reach water during summer months with 50% - 80% of the stakes below ground. W illow stakes should be collected from existing native willow trees in the vicinity of the project area (preferably the ones being removed). BP PS 4.b.1 Mitigation Measure 4.b.2: prior to issuance of building permits, the Cottonwood tree shall be treated to eliminate existing mistletoe plants. GP PS 4.e.4 Mitigation Measure 4.e.1: The Grading Plan shall identify tree protection fencing around the dripline, or as recommended by the project arborist, of each existing on - site or off-site native tree. GP/BP PS 4.e.1 48 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure Mitigation Measure 4.e.2: Grading and excavation and grading work shall be consistent with the City of Atascadero Tree Ordinance. Special precautions when working around native trees include: 1. All existing trees outside of the limits of work shall remain. 2. Earthwork shall not exceed the limits of the project area. 3. Low branches in danger of being torn from trees shall be pruned prior to any heavy equipment work being done. 4. Vehicles and stockpiled material shall be stored outside the dripline of all trees. 5. All trees within the area of work shall be fenced for protection with 4 -foot chain link, snow or safety fencing placed per the approved tree protection plan. Tree protection fencing shall be in place prior to any site excavation or grading. Fencing shall remain in place until completion of all construction activities. 6. Any roots that are encountered during excavation shall be clean cut by hand and sealed with an approved tree seal. GP PS 4.e.2 49 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure Mitigation Measure 4.e.3: The developer shall contract with a certified arborist during all phases of project implementation. The certified arborists shall be responsible for monitoring the project during all phases of construction through project completion, as follows: (a) A written agreement between the arborist and the developer outlining an arborist monitoring schedule for each construction phase through final inspection shall be submitted to and approved by planning staff prior to the issuance of building/grading permits. (b) Arborist shall schedule a pre-construction meeting with engineering /planning staff, grading equipment operators, project superintendent to review the project conditions and requirements prior to any grubbing or earth work for any portion of the project site. All tree protection fencing and trunk protection shall be installed for inspection during the meeting. Tree protection fencing shall be installed at the line of encroachment into the tree’s root zone area. (c) As specified by the arborist report and City staff:  Prune all trees in active development areas to be saved for structural strength and crown cleaning by a licensed and certified arborist;  Remove all debris and spoils from the lot cleaning and tree pruning.  In locations where paving is to occur within the tree canopy, grub only and do not grade nor compact. Install porous pavers over a three -inch bed of ¾ inch granite covered with one-inch pea gravel for screeding. If curbs are required, use pegged curbs to secure the porous pavers. Pegged curbs are reinforced six to eight curbs poured at grade with a one-foot by one-foot pothole every four to six linear feet.  All trenching or grading within the protected root zone area, outside of the tree protection fence shall require hand trenching or preserve and protect roots that are larger than 2 inches in diameter.  No grading or trenching is allowed within the fenced protected area.  Any roots that are 4 inches in diameter or larger are not to be cut until inspected and approved by the on-site arborist. (d) Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented, the trees designated for protection were protected during construction, and the construction-related tree protection measures are no longer required for tree protection. GP PS 4.e.3 Mitigation Measure 6.b: The grading permit application plans shall include erosion control measures to prevent soil, dirt, and debris from entering the storm drain system during and after construction. GP CE 6.b Mitigation Measure 6.c.d: A soils report shall be required to be submitted with a future building permit by the building department. The building plans will be required to follow the recommendations of the soils report to assure safety for residents and buildings. GP BS 6.c.d 50 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure Mitigation Measure 8e.f.1: A Stormwater Pollution Prevention Plan (SWPPP)/Erosion Control Plan shall be submitted and approved by the City Engineer prior to the issuance of the building permit. The plan shall include storm water measures for the operation and maintenance of the project for the review and approval of the City Engineer. The Building Permit application plans shall identify Best Management Practices (BMPs) appropriate to the uses conducted on site that effectively prohibit the entry of pollutants into storm water runoff. BP CE 8.e.f Mitigation Measure 8.e.f.2: The developer is responsible for ensuring that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices, citations, or stop work orders. BP BS,PS,CE 8.ef.2 Mitigation Measure 11.d: All construction activities shall comply with the City of Atascadero Noise Ordinance for hours of operation. Ongoing BS/PS 11.d Mitigation Measure 15.a.b.1: Frontage improvements shall be required along El Corte Rd and La Linia Ave. Additional improvements may be required, subject to the approval of the City Engineer. BP CE 15.a.b.1 51 EXHIBIT C: Master Plan of Development/Site Plan – See project file for full size exhibit 52 EXHIBIT D: Grading Plan – See project file for full size rendering 53 EXHIBIT E: Architectural Elevations and Floor Plans 54 EXHIBIT E: Architectural Elevations and Floor Plans 55 EXHIBIT E: Architectural Elevations and Floor Plans 56 EXHIBIT E: Architectural Elevations and Floor Plans 57 EXHIBIT E: Architectural Elevations and Floor Plans 58 EXHIBIT F: Color Boards - refer to project file Lot 1 Lot 2 Lot 3 Lot 4 59 EXHIBIT F: Color Boards - refer to project file Lot 5 Lot 6 Lot 7 60 EXHIBIT G: Utility Plan 61 EXHIBIT G: Landscape Plan 62 ATTACHMENT 8: Draft PC Resolution 2016-B Reconsideration / Amendment Vesting Tentative Tract Map DRAFT PC RESOLUTION 2016-B RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, AMENDING AN APPROVED TENTATIVE SUBDIVISION MAP (TTM) 2006-0082, A SEVEN LOT SUBDIVISION CONSISTENT WITH A MASTER PLAN OF DEVELOPMENT ON APN 030-421-005 (8570 El Corte LLC) WHEREAS, an application has been received from 8570 El Corte, LLC (125 South Bowling Green Way, Los Angeles, CA 90049) Applicant and Property Owner, to consider a and amendment to an approved Master Plan of Development and Vesting Tentative Tract Map located at 8570 El Corte Road, (APN 030-421-005); and, WHEREAS, the site’s Zoning District is RSF-X (Residential Single-Family-X) to with a Planned Development Overlay (PD-17) and, WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2006-0031 was prepared and certified for the project on June 12, 2007 and was made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the City Council of the City of Atascadero, approved a Vesting Tentative Subdivision Map to subdivide the property at a duly noticed public hearing on June 12, 2007; WHEREAS, an application was received by the City of Atascadero to amended Vesting Tentative Subdivision Map 2006-0031) and the application was reviewed and deemed to be consistent with certified Mitigated Negative Declaration 2006-0031; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on February 2, 2016 studied and considered amendments to approved Vesting Tentative Tract Map 2006-0082, after first studying and considering the Proposed amendments to the Master Plan of Development prepared for the project, and NOW THEREFORE, the Planning Commission of the City of Atascadero takes the following actions: SECTION 1. Findings of Amendments and Reconsideration of Tentative Vesting Subdivision Map 2006-0082, the Planning Commission of the City of Atascadero finds as follows: 63 1. The proposed subdivision amendments, design and improvements as conditioned, is consistent with the General Plan and applicable zoning requirements, including provisions of the PD-17 overlay district. 2. The proposed amendments, as conditioned, are consistent with the Master Plan of Development (CUP 2006-0178). 3. The site is physically suitable for the type of development proposed. 4. The site is physically suitable for the density of development proposed. 5. The design and improvement of the proposed subdivision will not cause substantial environmental damage or substantially and unavoidably injure fish and wildlife or their habitat. 6. The design of the subdivision will not conflict with easements acquired by the public at large for access through, or the use of property within, the proposed subdivision; or substantially equivalent alternative easements are provided. 7. The proposed subdivision design and type of improvements proposed will not be detrimental to the health, safety or welfare of the general public. SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on February 2, 2016, resolved to approve amendments and reconsideration of Vesting Tentative Subdivision Map (TTM 2006-0082) subject to the following: 1. Exhibit A: Vesting Tentative Subdivision Map 2. Exhibit B: Conditions of Approval / Mitigation Monitoring Program. 64 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith b y the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by Commissioner _____, and seconded by Commissioner ______, the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: () NOES: () ABSTAIN: () ABSENT: () ADOPTED: CITY OF ATASCADERO, CA ______________________________ Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 65 Exhibit A: Tentative Tract Map 66 Exhibit B: Conditions of Approval / Mitigation Monitoring Program Tentative Subdivision Map 2006-0088 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 – Vesting Tentative Subdivision Map Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure Planning Services 1. This resolution shall supersede City Council Resolution No. 2007-048. All conditions of approval / mitigation contained PC Resolution 2016-00XX shall be utilized for final map approval. FM PS 2. The Community Development Department shall have the authority to approve the following minor changes to the project that (1) modify the site plan project by less than 10%, (2) result in a superior site design or appearance, and/or (3) address a construction design issue that is not substantive to the Master Plan of Development. BP / FM PS, CE 3. Vesting Tentative Subdivision Map was deemed complete on January, 11, 2016, for the purposes of vesting rights consistent with the Subdivision Map Act of the State of California. BP / FM PS, CE 4. Vesting Tentative Subdivision Map 2006-0031 shall expire on February 2, 2018, unless the map is accepted by the City Council, or the subdivision map is extended consistent with the Atascadero Municipal Code. BP / FM PS, CE 5. The applicant shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the city, or any of its entities, concerning the subdivision. Ongoin g PS 6. All Conditions of Approval and Mitigation Measures listed in PC Resolution 2016-A shall be in full force and shall be applicable to the Vesting Tentative Subdivision Map. FM PS 7. Affordable Housing Requirement: The applicant shall deed restrict one unit at the moderate income rate or shall pay in-lieu fees for each unit based on 5% of the construction valuation of each unit. GP/BP PS, CA 8. The emergency services and facility maintenance costs listed below shall be 100% funded by the project in perpetuity. The service and maintenance costs shall be funded through a community facilities district established by the City at the developer's cost. The funding mechanism must be in place prior to or concurrently with acceptance of the final maps. The funding mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above mentioned funds shall be by the City. Developer agrees to participate in the community facilities district and to take all steps reasonably required by the City with regard to the establishment of the district and assessment of the property.  All Atascadero Police Department service costs to the project. BP PS 67 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 – Vesting Tentative Subdivision Map Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure  All Atascadero Fire Department service costs to the project.  Off-site common City of Atascadero park facilities maintenance service costs related to the project. 9. All tract maintenance costs listed below shall be 100% funded by the project in perpetuity. The service and maintenance cost shall be funded through a Home Owners Association established by the developer subject to City approval. The Home Owners Association must be in place prior to, or concurrently with acceptance of any final maps. The Home Owners Association shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any Final Map. The administration of the above mentioned funds, and the coordination and performance of maintenance activities, shall be the responsibility of the Home Owners Association. a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access roads, emergency access gates, and sewer mains within the project. b) All parks, trails, recreational facilities and like facilities. c) All open space and native tree preservation areas. d) All drainage facilities and detention basins. e) All creeks, flood plains, floodways, wetlands, and riparian habitat areas. f) All common landscaping areas, street trees, medians, parkway planters, manufactured slopes outside private yards, and other similar facilities. g) All frontage landscaping and sidewalks along arterial streets BP PS 10. Prior to final map, the applicant shall submit CC&Rs for review by the Community Development Department. The CC&R’s shall record with the Final Map and shall include the following: a) Provisions for maintenance of all common areas including access, parking, street trees, fencing and landscaping in perpetuity. b) A detailed list of each individual homeowner’s responsibilities for maintenance of the individual units. c) Residents shall keep all trash receptacles within the unit’s designated trash storage area. d) Garages shall be maintained and used for vehicle parking. e) No boats, RV’s or other type of recreation vehicle may occupy a guest or resident parking space, including within an individual garage. BP PS, BS 68 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 – Vesting Tentative Subdivision Map Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure 11. The applicant must provide for the repair and maintenance of on-site shared improvements. This includes roads, sidewalks, street trees, streetlights, private sewer system, drainage facilities, recreation areas and common landscaping. The two methods that may be used are: a) Homeowners Association. This private organization would be responsible for the maintenance, repair and replacement of the facilities. b) Assessment District and Landscape and Lighting District. Funds for the maintenance, repair and replacement of the facilities would be collected on the property tax bill and distributed to the City. The City Engineer and City Attorney shall approve the final form prior to recordation. FM CE City Engineer Project Conditions 12. The public walkway between Erika Court shall be contained within a public access easement. FM CE 13. Erika Court shall be located within a public access easement. FM CE 14. The internal street shall be improved consistent with City Standards shall be offered as a public right-of-way. Typical street section shall provide 36 feet curb-curb within a 50-feet wide right-of-way. The cul-de-sac shall be designed in accordance with City Standard No. 415 with 34-feet curb radius. 15. The internal street shall be improved with a 5-feet wide integral sidewalk-curb-gutter per City Standard No. 419. Driveway ramps shall be installed at each lot per City Standard No. 423 and shall include a 4-feet wide sidewalk that wraps behind the ramp. The new sidewalk shall terminate at the curb returns on El Corte and shall have a center ADA compliant pedestrian ramp. The end of the sidewalk may require a transition of asphalt-concrete to connect the sidewalk to the shoulder on El Corte. 16. The El Corte Road shoulder, including AC dike of curb & gutter, shall be improved to transition to the new street and to convey street drainage to the existing over-side drain at the corner of El Corte and La Linia. El Corte Road improvements shall also include a defined shoulder of compacted Class II aggregate base. 17. The developer shall provide hydraulic calculations for post-development storm water run-off tributary to El Corte and the existing over-side drain at the corner of El Corte and La Linia. Should said calculations determine that the existing over-side drain is undersized for the added storm water run-off, the developer shall be responsible for modification to the over-side drain. 18. The developer shall plant street trees along all street frontages, to the satisfaction of the Public Works Director and Community Development Director. Street trees shall be planted between 10 feet and 15 feet of the sidewalk or AC dike. One street tree shall be planted for each 35 linear feet (or portion thereof) of road frontage. Street 69 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 – Vesting Tentative Subdivision Map Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure trees may be grouped if approved by the Community Development Director. 19. Public sewer, water, gas, power, telecommunications and cable TV mains shall be extended from El Corte Road into the new street, to the satisfaction of the City Engineer. City Engineer Standard Conditions 20. In the event that the applicant bonds for the public improvements required as a condition of this map, the applicant shall enter into a Subdivision Improvement Agreement with the City Council. GP, BP CE 21. An engineer’s estimate of probable cost shall be submitted for review and approval by the City Engineer to determine the amount of the bond. GP, BP CE 22. The Subdivision Improvement Agreement shall record concurrently with the Final Map. FM CE 23. A six (6) foot Public Utility Easement (PUE) shall be provided contiguous to the property frontage. GP, BP CE 24. The applicant shall acquire title interest in any off-site land that may be required to allow for the construction of the improvements. The applicant shall bear all costs associated with the necessary acquisitions. The applicant shall also gain concurrence from all adjacent property owners whose ingress and egress is affected by these improvements. GP, BP CE 25. Slope easements shall be obtained by the applicant as needed to accommodate cut or fill slopes. GP, BP CE 26. Drainage easements shall be obtained by the applicant as needed to accommodate both public and private drainage facilities. GP, BP CE 27. A preliminary subdivision guarantee shall be submitted for review in conjunction with the processing of the tract map. FM CE 28. The final map shall be signed by the City Engineer prior to the map being placed on the agenda for City Council acceptance. FM CE 29. Prior to recording the tract map, the applicant shall pay all outstanding plan check/inspection fees. FM CE 30. Prior to recording the map, the applicant shall bond for or complete all improvements required by these conditions of approval. FM CE 31. Prior to recording the tract map, the applicant shall bond for or set monuments at all new property corners. A registered civil engineer or licensed land surveyor shall FM CE 70 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 – Vesting Tentative Subdivision Map Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure indicate by certificate on the parcel map, that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. 32. Prior to recording the tract map, the applicant shall submit a map drawn in substantial conformance with the approved tentative map and in compliance with all conditions set forth herein. The map shall be submitted for review and approval by the City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. FM CE 33. All existing and proposed utility, pipeline, open space, or other easements are to be shown on the final/parcel map. If there are building or other restrictions related to the easements, they shall be noted on the final/parcel map. The applicant shall show all access restrictions on the final/parcel map. FM CE 34. Prior to recording the tract map, the applicant shall have the map reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company indicating their review of the map. The letter shall identify any new easements that may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the parcel map. FM CE 35. Prior to the issuance of building permits the applicant shall submit plans and supporting calculations/reports including street improvements, underground utilities, composite utilities, and grading/drainage plans prepared by a registered civil engineer for review and approval by the City Engineer. GP, BP CE 36. Submit calculations to support the design of any structures or pipes. Closed conduits shall be designed to convey the 10-year flow with gravity flow, the 25-year flow with head, and provide safe conveyance for the 100-year overflow. GP, BP CE 37. Provide for the detention and metering out of developed storm runoff so that it is equal to or less than undeveloped storm runoff. GP, BP CE 38. Drainage basins shall be designed to desilt, detain and meter storm flows as well as release them to natural runoff locations. GP, BP CE 39. Show the method of dispersal at all pipe outlets. Include specifications for size & type of rip rap. GP, BP CE 40. Concentrated drainage from off-site areas shall be conveyed across the project site in drainage easements. Acquire drainage easements where needed. Drainage shall cross lot lines only where a drainage easement has been provided. If drainage easement cannot be obtained the storm water release must follow the exact historic path, rate and velocity as prior to the subdivision. GP, BP CE 41. Applicant shall submit erosion control plans and a Storm Water Pollution Prevention Plan (SWPPP). The Regional Water Quality Control Board shall approve the GP, BP CE 71 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 – Vesting Tentative Subdivision Map Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure SWPPP. 42. All public improvements shall be constructed in conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer GP, BP CE 43. The on-site streets shall be improved consistent with the Tentative Tract Map. GP, BP CE 44. Off-site streets shall be improved consistent with the Tentative Tract Map. GP, BP CE 45. Alignment of frontage improvements shall be approved by the City Engineer. GP, BP CE 46. A mechanism to provide for the funding of maintenance for lighting, street improvements, special paving surfaces, sewer, storm drain, common area landscape, open space, and hardscape shall be provided. GP, BP CE 47. All utilities shall be undergrounded on project frontage GP, BP CE 48. A mechanism must be provided to fund the maintenance of all sewer mains throughout the project area. The developer shall establish a benefit maintenance assessment district, or similar funding mechanism, approved by the City, to provide sufficient funds, on an annual basis, to pay for the maintenance activities on the sewer mainline and related facilities within the project area. GP, BP CE 49. All onsite sewer mains shall be privately owned and maintained. FM CE 50. Prior to recording the final map, provisions for the repair and maintenance of the private SS shall be included in the CC&R’s for this tract. Included shall be a mechanism to maintain the private sewer and structures, such as a homeowners association. The City Engineer and City Attorney shall approve the final form prior to recordation. FM CE 51. Applicant shall pay sewer extension (Annexation), Connection and Reimbursement fees (if applicable) upon issuance of building permit. BP CE 52. Gravity mains within the subdivision shall be eight (8) inches in diameter. BP CE 53. Drainage piping serving fixtures which have flood level rims located below the elevation of the next upstream manhole cover of the public or private sewer serving such drainage piping shall be protected from backflow of sewage by installing an approved type backwater valve. Fixtures above such elevation shall not discharge through the backwater valve. BP CE 54. All sanitary sewer (SS) mains shall terminate in manholes unless extension of the main, at some later date, is anticipated. If extension of a SS main is anticipated, said SS main may terminate in a cleanout providing the next downstream manhole is less than 300 linear feet from the cleanout and that the point of termination is not a BP CE 72 Conditions of Approval / Mitigation Monitoring Program 8570 El Corte Road PLN 2099-0795 – Vesting Tentative Subdivision Map Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibil ity /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure reasonable location for a SS main angle point or intersection. 73 ITEM NUMBER: 4 DATE: 2-2-16 Atascadero Planning Commission Staff Report – Community Development Department Kelly Gleason, Senior Planner, 470-3446, kgleason@atascadero.org PLN 2014-1529 Halcon Residential Density Change / ConsciousBuild Residential Planned Development (CousciousBuild Atascadero Dev. LLC.) RECOMMENDATIONS: The Planning Commission recommends to the City Council the following: 1. Adopt Resolution PC 2016-A, recommending to the City Council certification of mitigated negative declaration 2015-0007 based on findings; and 2. Adopt Resolution PC 2016-B, recommending to the City Council approval of General Plan Amendment 2014-0030 based on findings; and 3. Adopt Resolution PC 2016-C, recommending to the City Council approval of Title 9 Zone Text Amendment ZCH 2015-0178 establishing PD overlay zone 33 based on findings; and 4. Adopt Resolution PC 2016-D, recommending to the City Council approval of Zone Map Amendment ZCH 2014-0175 based on findings; and 5. Adopt Resolution PC 2016-E recommending to the City Council approval of Conditional Use Permit 2014-0284 (Master Plan of Development) and Tree Removal Permit TRP 2014-0178 based on findings and subject to Conditions of Approval and Mitigation Monitoring; and 6. Adopt Resolution PC 2016-F recommending to the City Council approval of Tentative Subdivision Map TTM 2014-0108, based on findings and subject to Conditions of Approval and Mitigation Monitoring. 74 DRC REVIEW: The DRC reviewed the proposed amendments and made recommendations which have been incorporated into the project. DISCUSSION: Situation and Facts: 1. Applicant: ConsciousBuild Atascadero Dev. LLC. 2921 Garibaldi Ave San Luis Obispo, CA 93401 2. Owners: ConsciousBuild Atascadero Dev. LLC. 2921 Garibaldi Ave San Luis Obispo, CA 93401 Ben and Amanda Poore 11675 Halcon Rd Atascadero, CA 93422 Carol Ratzlaff 11745 Halcon Rd Atascadero, CA 93422 Mike and Laura Joy 11885 Halcon Rd Atascadero, CA 93422 Shawn Sarnecki 11845 Halcon Rd Atascadero, Ca 93422 Pat and Terri Rodda 11855 Halcon Rd Atascadero, Ca 93422 Jeannie Dagnall 11875 Halcon Rd Atascadero, CA 93422 3. Address: 11955 & 11975 Viejo Camino; 11675, 111745, 11885, 11845, 11855, 11875 Halcon Rd (APN’s 045-401-003, & 004 and 045-401-014, 013, 010, 009, 018, & 017) 4. Current General Plan: Suburban Estates (SE) 75 5. Proposed General Plan: Single-Family Residential – Y (1 du/ac) Single-Family Residential – X (2 du/ac) 6. Current Zoning District: Residential Suburban (RS) 7. Proposed Zoning District: Residential Single-Family – Y (1 du/ac) Residential Single-Family – X (2 du/ac) 8. Project Area: Approximately 37.7 acres 9. Existing Use: Single-family residential / Vacant 10. Environmental Status: Proposed Mitigated Negative Declaration 2015-0007 Surrounding Land Use and Setting: North: Paloma Park East: Small Lot Single-Family/Multi-Family (Las Lomas Development) South: Large Lot Single-family – County Parcels West: Public zoned land (Existing Single-family / schools / church) PROJECT DESCRIPTION: 76 The requested General Plan Amendment and Zone Change encompasses 37.7 acres on the south end of the City along Halcon Rd. The project area consists of eight (8) existing parcels and is divided into two adjoining project packages as follows: The Groves project:  Comprised of two (2) existing lots at the corner of Viejo Camino and Halcon Rd.  17 units proposed  General Plan Amendment: SFR-X (2 du/ac)  Zone Map Amendment: RSF-X (2 du/ac)  Planned development (PD) Overlay Zone Text Amendment  Conditional Use Permit (Master Plan of Development): architecture, road layout, and landscaping.  Tentative Tract Map: subdivision into 17 single family parcels ranging in size from 0.25-acre to over 1-acre.  Tree Removal Permit The Neighbors project:  Comprised of six (6) existing parcels fronting Halcon Rd  Maximum development potential of 28 lots that could be available for future development (no subdivision or development proposed at this time).  General Plan Amendment: SFR-Y (1 du/ac)  Zone Map Amendment: RSF-Y (1 du/ac)  Planned development (PD) Overlay Zone Text Amendment The project site is bordered by rural residential county properties, Paloma Park, the Las Lomas development, and public zoned land between Viejo Camino and El Camino Real. The project is in close proximity to a nu mber of small-lot single-family and multi- family developments including Las Lomas, Dove Creek, and Southside Villas. 77 ANALYSIS: Project Design The Neighbor portion of the project, excluding the two existing parcels, are designed to take access off of Halcon Rd. Based on the submitted traffic analysis, the future roads serving the neighbor parcels must be consolidated and analyzed for adequate sight- distance when submitted. This will allow for two cul-de-sac access roads off of Halcon to serve a majority of the remaining neighbor parcels, creating a more cohesive neighborhood design and minimizing traffic conflicts on Halcon Rd The Groves portion of the project is designed to take access off of Viejo Camino. The subdivision is designed to provide access to two of the existing Neighbor parcels once they develop. The Viejo Camino entrance narrows at the intersection to slow traffic in order to eliminate potential conflicts with the proposed on-street parking. Access to parcels within the subdivision is provided by private roads and shared driveways. On- street parking has been provided throughout the subdivision to allow for guest parking in addition to parking in garages and private driveways. Viejo Camino Entrance to The Groves Halcon Entrances To The Neighbor Parcels Paloma Park 78 Planned Development Overlay Zone Policy: The Planned Development Benefit Policy was established by the City Council in 2004. It requires that planned development projects offer community benefits in exchange for modified development standards. The benefit chart is shown below. All Tier 1 benefits are considered mandatory. PD Location Tier 1 Benefits Tier 2 Benefits Inside of Urban Core PD-7 PD-17 Custom PD’s a) Affordable / Workforce Housing b) High Quality Architectural Design c) High Quality Landscape Design d) Buffering between Urban and Suburban zones (large lot sizes, increased setbacks, landscape buffers, etc.) e) Higher density to meet Housing Element goals a) Pocket Parks in larger projects b) Trails / Walkways for Pedestrian Connectivity c) Historic Preservation Outside of Urban Core Rural / Suburban Areas PD-16 Custom PD’s a) Natural Open Space Preservation a) Multi-Purpose Trails – Equestrian / Bicycle / Pedestrian b) Recreational Areas / Facilities c) Historic Preservation The projects include the following benefits: The Groves Tier1 (required elements, also includes Tier 1 Urban Core Benefits):  Affordable Housing (Payment of in-lieu fee as discussed below)  High Quality Architectural Design  High Quality Landscape Design  Buffering between urban and suburban land uses  Higher Density Housing  Natural Open Space Preservation Tier 2 (optional benefits):  Pedestrian connectivity The Neighbors Tier1 (required elements):  Affordable Housing (Payment of in-lieu fee as discussed below)  High Quality Architectural Design (DRC review required for future clustered development projects) 79  High Quality Landscape Design at the project edges incorporating street trees and pathway landscaping as discussed below.  Buffering between urban and suburban land uses  Higher Density Housing  Natural open space preservation Tier 2 (optional benefits):  Pedestrian connectivity Parking: Parking for residential units within The Groves development will be provided in garages. Road standards for residential developments require that on -street parking be maximized for guest parking opportunities. The Groves portion of the project has been designed to provide approximately 32 on-street parking spaces. In addition, all proposed parcels can accommodate at least two (2) cars within the residential driveways. The Neighbor parcels will be rezoned to RSF-Y, requiring a 1-acre minimum lot size. Based on the size of these parcels, on-street parking will not be required. Language has been included in the PD-33 text to require on-street parking should a cluster development be proposed with lot sizes below a half -acre in size. Architecture, Materials, and Color: A Master Plan of Development in the form of a Conditional Use Permit (CUP 2014- 0284) has been submitted for The Groves portion of the project site. This application will govern individual site and architectural design themes for the Groves project. Architectural guidance for the Neighbor parcels will be codified in the PD overlay language. The City Councils Planned Development Benefit Policy requires that a finding be made that the project provides high quality arch itectural design. A finding has been included in the attached resolutions to this effect. Based on the analysis below, staff believes that this finding can be affirmed. The project went before the DRC in November 2015. The DRC reviewed the project for subdivision layout, architectural design, landscape design, and sound wall design and integration. DRC discussion points and recommendations are discussed below as applicable. The Neighbor Parcels: The neighbor parcels may develop individually or may be combined for future mapping and development. No specific development or subdivision has been proposed at this time, only the rezoning that would allow a subdivision in the future. These parcels will allow for a density of 1 du/ac. Under this scenario, two optio ns for development exist: 1) If sewer is present, development may be clustered and smaller lots may be approved 80 providing that the overall site density remain at 1 du/ac; 2) The lots may follow the standard minimum lot size of 1-acre, providing a more larger-lot development with more rural home sites. If the project develops with larger 1-acre or greater lots, review of residential design will be completed by staff at time of building permit. If a cluster development is proposed over any portion of the site, the project will be brought to DRC for review and direction. Language will be included in the PD overlay zone text to this effect. The DRC discussed this approach and recommended that this approach be included in the project approvals. Language has been included in the PD33 overlay text to this effect. A finding is required that the project provides high quality architectural design in order to be approved under the Planned Development Overlay Policy. ThePD33 text ensures that cluster developments will have all architecture and site design elements reviewed by the DRC, allowing for oversight of the aesthetic components of any such future project. If the Neighbor parcels subdivide into larger parcels of 1-acre or greater, residences will likely be built as custom homes at a higher price point than standard small lot planned development sites. Based on this, staff has included a finding in the attached resolutions to affirm the required PD Benefit Policy finding. The Groves Project: The submitted CUP application includes detailed architectural concept plans for the Groves portion of the project (see attachment 9 for concept plans). The proposed architecture theme is contemporary agrarian in nature with many details consistent with ranch style homes. The proposed homes include dark colored standing seem metal roofing, board and batten siding, horizontal wood siding, and stone accents. Homes are designed with a mix of 1- and 2-story elements. Elevations include articulated horizontal and vertical elements to break up the mass of the building and accentuate the building form. The DRC reviewed the proposed architectural design. There was discussion related to the compatibility of the proposed design theme with the surrounding neighborhood. There was some concern that the more modern architectural style may provide compatibility issues with the surrounding neighborhood. However, it was also discussed that the larger lot sizes and landscaping provides greater residential separation that normally seen on Planned Development projects, minimizing the aggregate effect of the building aesthetics. Discussion also touched on allowing differing architectural styles throughout the City to provide aesthetic variety. The massing and architectural detailing of the buildings provide visual interest. The project provides 360 -degree architecture minimizing blank and unarticulated walls. Based on these considerations, n o changes to the project architecture were recommended by the DRC. 81 Landscape Plan: The Master Plan of Development for the Groves portion of the project includes landscape design details. Landscaping for the Neighbor parcels, including requirements for street tree planting and drought-tolerant plant palettes will be included in the PD overlay language. Consistent with the PD Benefit Policy, a finding must be made that the project includes high quality landscaping. The Groves: The landscape proposed for The Groves development has been designed to retain the natural vegetation to a great extent and be minimalistic in nature. Areas adjacent to the residences will be landscaped with a native plant palette. The remaining portion of the parcels will retain the existing landscape. All areas of disturbed earth not landscaped with drought-tolerant plants will be hydroseeded with a native grass mixture. Proposed fencing includes rural split rail fences along the project boundary and for front yards internal to the project. Solid wood fencing is proposed for private yard areas 82 where not adjacent to Viejo Camino. Language is included in the Planned Development Overlay Zone to ensure that solid fencing of private yard areas adjacent to Viejo Camino be minimized and maintain an adequate setback from the public improvements and rural style fencing. The DRC recommended that a minimum 10-foot setback from the split rail fencing be established for structures and solid fencing along the Viejo Camino frontage to provide consistency throughout the development and adequate setback from the required pedestrian path. This would allow the future residents to erect privacy fencing for portions of the rear yard while maintaining an aesthetic project edge. Street trees will be provided along Viejo Camino and Halcon Roads. The lots face internal roads in the proposed Groves development, which places rear yards adjacent to Viejo Camino. Open style fencing is conditioned to be setback a minimum of 5 -feet from the back of pedestrian path and landscape be provided between the path and the fencing to minimize the visual impact along the public street frontage. Language for the provision of street trees along Halcon will be included in the Planned Development Overlay Zone. Deviations from the standard 30-foot spacing may be allowed to provide for rural street tree clustering, topographical feature avoidance, and to avoid drainage feature conflicts as applicable and where approved by the Community Development Director and City Engineer. Visual Buffering The proposed project is bounded in the City by higher density developments and public uses. However, residential uses within the County jurisdiction to the south remain rural in nature and occupy larger estate lots. In addition, Paloma Park is located off of Viejo Camino and Halcon Rd across from the project site. As such, the visual character of the project edges is an important feature. The Groves portion of the project has been designed to cluster development away from Santa Barbara Rd and the existing rural county parcels. A majority of the oak woodland along the eastern port ion of the project site has been retained by clustering lots to the north western portion of the site. The landscape plan also shows proposed tree planting in the rear yard areas of Lot 7 along the Santa Barbara Rd. frontage. The project has been conditioned to enhance landscaping in this area and provide lower shrubs as well as trees to visually screen the development. 83 The Neighbors: Landscaping is required to be provided along the Halcon Rd frontage upon future development of abutting parcels. Street trees and pathway landscaping are required and will ensure that a consistent visual element is provided along the entirety of the Halcon Rd frontage. Should future developers request a cluster subdivision over all or part of the Neighbor parcels, a landscape plan will be required as part of the development proposal, ensuring that a high quality design is achieved. Should the parcels develop in a large-lot pattern, landscaping will remain rural in nature. Native Tree Mitigation / Preservation: The Groves: There are 108 mature oak trees within The Groves project boundary. The project as proposed will require the removal of 19 native trees. The majority of trees to be removed are located near lots 15 and 16 in the residential portion of the development. An additional tree is proposed for removal along Street -A. A finding is included, consistent with the City’s Native Tree Ordinance, to allow for the removal of the identified trees. In addition, a tree protection plan is required to be submitted with the building permits for the project to ensure that the remaining trees are protected throughout construction. All tree removals will be mitigated in accordance with the provisions of the Native Tree Ordinance. The applicant is proposing a tree preservation easement as mitigation for the proposed tree removals. The easement would be placed on Lots 7 and 10 where oak trees are most dense. Evergreen Native Trees (inches)Deciduous Native Trees (inches)Totals dbh notes dbh notes 1 8-inches 1 52-inches 2 4-inches 2 16-inches 3 9-inches 3 8-inches 4 6-inches 4 30-inches 5 6-inches 5 4-inches 6 6-inches 6 10-inches 7 7-inches 7 13-inches 8 4-inches 8 10-inches 9 13-inches 10 10-inches 11 14-inches 12 12-inches Total 99-inches Total 143-inches 242-inches Mitigation Requirement req'd tree replacements:17 five gal trees req'd tree replacements:48 five gal trees Remaining Mitigation 17 five gal trees Remaining Mitigation 48 five gal trees 65 five gal trees Tree Fund Payment:825.00$ Tree Fund Payment:2,383.33$ 3,208.33$ 84 The Neighbor Parcels Tree removals would be analyzed and mitigated once development or improvement plans are submitted. All tree removals will be mitigated per the requirements of the Atascadero Native Tree Ordinance and tree protection measures will follow the standards set forth in City guidelines. Site Drainage: The Groves portion of the project site has been designed to meet all City standards for stormwater management. Drainage swales and three (3) on-site basins will integrate with existing drainage patterns and mitigate additional flows caused by the increase in impervious surfaces. The applicant has also incorporated permeable pavement into the design for the residential driveways, minimizing to the extent possible the amount of impermeable surfaces. Neighbor parcels will be required to meet current City stormwater management standards at the time of construction and development. Wastewater and Utilities: City wastewater facilities will be extended to The Groves portion of the project. The developer will be required to cover the cost of extending these facilities, however, reimbursement may be requested if properties outside of The Groves development connect to any developer installed extensions in accordance with City ordinance. Neighbor parcels 1-acre or greater will be allowed to be served by private on -site septic systems. Should a cluster development be proposed over any portion or portions of the Neighbor parcels resulting in lot sizes of less than 1-acre, sewer hook-up will be required. Inclusionary Housing The City Council initiated an inclusionary housing program in 2003. The policy requires that all residential discretionary projects that require a legislative act to provide for affordable housing in the form of either fees paid into the City inclusionary housing fund or the provision of affordable units within the project. The fee s payment was originally set at 2.5% of the building valuation of each residence within the development but was later raised to 5%. Per Council policy, projects of 10 units or less could opt to pay the fees; projects of more than 10 units are required to construct affordable units. The proposed development includes a General Plan Amendment, Zone Map Amendment and Zone Text Change (legislative acts), the project shall comply with the existing policy. In addition, the Planned Development Benefit policy requires that all residential PD’s provide affordable housing as one of the required benefits. 85 Under the current policy, up to nine (9) deed restricted affordable units at the moderate rate would be required throughout the project site, including throughout the neighbor parcels. The proposed project is unique in a number of ways and the applicant is requesting an alternative to the adopted policy. 1. Neighbor Parcel development plan unknown The affordable housing policy is applicable to the entirety of the pro ject area, requiring the deed restriction of up to 9 units at the moderate income rate based on total potential build-out of the project area. This presents a number of challenges as the neighbor parcels will potentially develop individually and the number of residences to be constructed is unknown. a. Deed restricted lots would be required to be identified with the approval of this project, any requirement to provide for the construction of affordable units could place an undue burden on one or two of the property owners within the development. b. The project may end up providing more than the 20% requirement should development occur below maximum build-out potential. c. Based on the requirement for lots of less than 1 -acre to connect to City sewer, affordable units designated within the Neighbor portion of the project would not be able to be constructed as density bonus units unless a cluster development plan was submitted and sewer was extended. This scenario does not allow for the offset of costs associated with the provision of affordable units as assumed by the current City Inclusionary Housing policy. 2. Economic challenges Due to the location of the project on the edge of the City limits, costs to extend infrastructure to serve the project and surrounding area exceed those normally incurred by other projects and impacts to the Santa Barbara interchange trigger fair share mitigation payment of approximately $15,879 per unit as discussed below. 86 3. Limited Density Bonus Potential The proposed project has been designed to support compatibility with the surrounding area and avoid impacts to sloped forested areas. As such, The Groves portion of the project has been designed below the maximum density of 20 units. In addition, the neighbor portion of th e project would only be able to implement a density bonus if sewer is available and a clustered development plan is presented. Current Council policy recognizes the need to offset some of the costs associated with providing affordable units by allowing any constructed affordable units to be density bonus units. Because of the limitations of the Groves project site and the need to provide for larger lots adjacent to existing rural areas, additional units cannot be included in the project design. And because the development pattern of the Neighbor parcels is unknown, the inclusion of density bonus sites cannot be identified at this time. Therefore , the applicant has limited means to offset costs associated with the construction of affordable units. Based on these factors, the applicant is requesting an alternative to the established City Council policy which modifies two of the current provisions: 1. Instead of constructing affordable units, the applicant is requesting payment of fees into the City’s inclusionary housing fund. 2. The applicant is requesting that the fee be reduced to 2.5% of the valuation of each new residence instead of the current 5% requirement. Staff has reviewed the applicants proposal and agrees that certain modifications to the policy are warranted based on the specific characteristics and circumstances of the project. The current policy allows for a request to be made to provide payment of the in - lieu fee as an alternative to providing residential units. Staff recommends that this alternative be considered. The current policy sets the in-lieu fee at 5% of the building valuation of the constructed market rate units (approximately $15,000 for a 2 ,400 sf residence). Staff recommends based on this adopted Council Policy that the in -lieu fee remain at 5% for all residential units within the project area. The Council has the ultimate authority to approve alternatives to the current policy. It should be noted that this fee applies to all residential units within the project boundary including the existi ng residences on the neighbor parcels. Payment of this fee would be triggered prior to recordation of a future subdivision map proposed for the development of the Neighbor Parcels. The fee is based on the square-footage of each residence. 87 Tentative Tract Map A 17-lot Vesting Tentative Tract Map (TTM 2014-0108) is proposed for The Groves portion of the project. Subdivision and development of the Neighbor parcels is not proposed at this time and will require future application. The Groves: The Vesting Tentative Subdivision Map (VTTM) includes project conditions to meet all City standards. The applicant will be required to record CC&R’s with the Map that will include maintenance provisions for drainage areas, open spaces, etc. throughout the proposed development as needed. Pedestrian and Bike Facilities: Pedestrian and bike facilities are required for both Halcon Rd and Viejo Camino consistent with the City’s Bike Master Plan and Trail Master Plan, and the comprehensive SLOCOG Salinas River Trail Plan which focuses on linking Santa Margarita to Paso Robles. The project is responsible for the construction of a 10-foot wide detached multi-use trail along Viejo Camino and Halcon Rd. This path will be decomposed granite or similar as approved by the City Engineer. Landscaping is required to be provided between the curb and the path. The Groves project is required to provide adequate easements to accommodate the pathway improvements as specified in the project conditions. The Neighbor parcels will provide easements and construct improvements upon each parcel development. Language is included in the Planned Development Overlay Zone text to this effect. Within The Groves portion of the project, walkable shoulders are provided along roadways throughout the development to accommodate pedestrians while maintaining the rural character of the area and maximizing natural drainage control. Consolidated access associated with the Development of the neighbor parcels will include walkable shoulders along all new roads. The traffic analysis recommended that a crosswalks be installed at the Viejo Camino/Halcon intersection and the Viejo Camino/Santa Barbara intersection. Because there are no existing pedestrian facilities along Santa Barbara between Viejo Camino and El Camino Real, this crosswalk is not conditioned to be included as part of site development. The crosswalk at Viejo Camino crossing Halcon Rd provides a key connection from this neighborhood to Paloma Park. The intersection at this location is wide to accommodate quarry truck traffic. The Groves project, as conditioned, will be required to install a crosswalk at this location and work with the City Engineer to implements any improvements required to provide safe pedestrian access at this location. 88 Traffic A traffic analysis was prepared for the project site. The traffic analysis assumed 51 units to provide a conservative analysis of the project related traffic impacts. Based on the analysis, the project would result in 57 total PM peak hour trips. This numb er includes the existing residences and therefore, additional PM peak hour trips from new units would be slightly less. Slightly more than half of the project would take access off of Viejo Camino with approximately 19 primary residential units taking access off of Halcon Rd. LOS at the study intersections (SB Rd/US 101, SB Rd/ECR, and SB Rd/Viejo Camino) remains at LOS A or B under the Existing plus project scenario. LOS drops to unacceptable levels at the SB/US101 interchange under the cumulative and cumulative plus project scenarios. This is due to the inclusion of Eagle Ranch in the analysis. Refer to the below Santa Barbara Mitigation Fee discussion for mitigation measures associated with this cumulative impact. Both Halcon and Viejo Camino are classified as Minor Arterials by the City. City standards and specifications call for two vehicular travel lanes, on-street parking or class II bike facilities, curb, gutter, and sidewalk. Bike facilities and pedestrian facilities are required for these street sections. Based on traffic projections and area development patterns, the City Engineer has called for build out of these roadways to include two vehicular travel lanes, class II bike lanes, drainage control (i.e. curb and gutter), and pedestrian pathway. Due to the fact that these roads provide linkages to Paloma Park and the comprehensive trail network proposed and approved by SLOCOG to link Santa Margarita to Paso Robles, the project is required to provide an enhanced detached pedestrian pathway along both project frontages in addition to Class II bike lanes as discussed above. The traffic analysis analyzed sight distance along Halcon Rd and Viejo Camino. The report determined that sight-distance at the proposed Viejo Camino entrance met sight distance standards and provided clear sight lines in excess of 400-feet. The report identified concerns with sight-distance at the existing access points from Halcon Rd and recommended that access points be consolidated and located an adequate distance 89 away from the horizontal and vertical curves. Planned Development Overlay 33 language includes requirements for the consolidation of access from Halcon Rd and requires a sight-distance analysis at the time plans are proposed to ensure that access from Halcon Rd meets minimum sight-distance standards. Santa Barbara Mitigation Fee: As part of the Eagle Ranch project analysis, a traffic study was completed that shows the need for re-construction of the Santa Barbara interchange to accommodate future traffic growth in the area. The need for the improvements, which consist of roundabouts at each on-ramp, are triggered by the Eagle Ranch development but are contributed to by area developments that increase trip generation above what was anticipated by the General Plan. The proposed project will increase residential density above that which was anticipated by the General Plan. The fair share for the improvements is $15,879 per unit based on estimated construction costs for the improvements. A detailed cost estimate has not yet been completed. Once the detailed cost analysis has been finalized, the fee will be adjusted to reflect this analysis. A condition has been included to require fair share payment toward the Santa Barbara interchange cost for all new residential units. The payment will be required by both The Groves portion of the project and the Neighbor portion of the project upon site development. Noise The noise analysis prepared for the project identified exterior noise levels for proposed parcels adjacent to Viejo Camino and Halcon Roads in excess of maximum standards. This is mostly due to the existing truck route from the nearby Quarry. As such, the report recommends that the identified parcels provide exterior activity areas that are either located outside of the high noise areas or are shielded from the noise source. Many of the proposed unit plans for the Groves portion of the project are designed to include shielded patio areas within the building footprints or are properly sited to achieve adequate sound attenuation without additional shielding. For units that cannot be sited in such a manner, a solid wall will need to be constructed to provide shielding from the noise source. The DRC recommends that any required sound walls along the street frontages be setback a minimum of 10-feet from the edge of the public easement which accommodates the pedestrian pathway and that landscaping be included to visually screen the wall from the street. In addition, the DRC recommends that the wall taper down at the project site boundaries to transition effectively to areas where sound attenuation is not required. Conditions of approval have been included to this effect. As the Neighbor parcels are not yet subdivided and no design plan have been submitted, language governing the design of sound attenuation walls for outdoor activity areas is included as part of the PD33 overlay language. 90 Community Facilities District Formation Based on findings from the 2003 Taussig Study, revenue from new residential development including property tax revenues, vehicle licensing fees, sales taxes, and other revenues are insufficient to cover the maintenance and emergency services costs of new development. Based on the revenue projections from the Taussig Study, the City has developed standard conditions of approval for new development projects that require the cost of maintenance and emergency services to be funded by the project through a combination of road assessment districts, landscape and lighting districts , and community facilities districts (CFD). The Groves portion of the project will be required to annex into the City’s CFD and establish a Homeowners Association or other similar mechanism to maintain the development’s roadways, common area landscaping, drainage, etc. Language has been included in PD-33 to require annexation into the CFD prior to recordation of any final map for the Neighbor parcels and that maintenance mechanisms be established at the time of development of the Neighbor parcels. Proposed Planned Development Overlay 33 Zone Text The proposed project requires establishment of a custom Planned Development. This will allow for the clustered development proposed for The Groves portion of the project and will provide opportunities for clustering of the Neighbor pa rcels when, and if, they develop. In addition, adoption of the PD-33 text will ensure that City goals for frontage improvements, consolidation of driveways, and fiscal neutrality will be achieved. Key requirements include:  Standards for frontage improvements  Affordable housing requirements  Processes for the review and approval of subsequent development plans  Pedestrian pathway standards  Frontage landscaping  Consolidated access and neighborhood connectivity The full proposed text can be found in Attachment 7. FINDINGS The following findings are required to be made to recommend project approval and are included as a part of the attached Resolutions. General Plan Amendment 1. The proposed General Plan Amendment has been prepared consistent with the applicable laws and guidelines of the State of California; and, 91 Staff Comment: All applicable State Laws have been adhered to in the preparation of this General Plan Amendment application. 2. A duly noticed public hearing has been held to receive and consider public testimony regarding the proposed amendments to the General Plan Land Use Diagram; and, Staff Comment: Hearing notices were prepared in accordance with State Law and applicable Atascadero Municipal Code requirements. A public hearing was held by the Planning Commission at which public testimony was received and considered prior to taking action on the proposed application. 3. The proposed amendment is in the public interest and protects the health, safety and welfare of public by ensuring the orderly development of the City. The proposed amendment is consistent with General Plan Land Use Policies 1.1, 1.3, 2.1, 2.3, 5.3, 6.1, 7.1, 7.2, 8.5, 15.1, and 15.6; Circulation Policies 1.1, 1.4, 1.5, 2.1, and 3.2; and Housing Element Policies 1.1, 4.3 and 10.1 . The proposed amendment provides for new housing opportunities within the City’s urban services line and increases residential density in areas appropriate for residential growth. The proposed Planned Development Overlay District and requirements for a Master Planned neighborhood ensure that the overall neighborhood design and layout supports existing and future traffic patterns and provides pedestrian connectivity both internal and external to the development area. Establishment of Planned Development Overlay 33 and Zone Map Change As specified in the City’s General Plan and Zoning Ordinance, the following specific findings for the proposed Zone Change must be made to approve the proposed amendment to the Planned Development Overlay: 1. The proposed amendment is in conformance with the adopted General Plan Goals, Policies, and Programs and the overall intent of the General Plan, and; Staff Comment: The proposed amendments are consistent with General Plan Land Use Policies 1.1, 1.3, 2.1, 2.3, 5.3, 6.1, 7.1, 7.2, 8.5, 15.1, and 15.6; Circulation Policies 1.1, 1.4, 1.5, 2.1, and 3.2; and Housing Element Policies 1.1, 4.3 and 10.1. 2. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particu lar case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 92 Staff Comment: The proposed residential use will not be detrimental to the health, safety, or welfare of the general public or persons residing in the neighborhood. A residential use is consistent with the surrounding neighborhood. The Planned Development Overlay language and City development standards will ensure that pedestrian and vehicular access conditions are designed in a manner which does not create ongoing safety concerns. 3. The proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, Staff Comment: The proposed residential use is consistent with other residential and residential serving uses in the area. 4. The proposed zone change will not create any new significant and unavoidable impacts to traffic, infrastructure, or public services; and Staff Comment: The proposed residential use will not generate significant and unavoidable impacts to traffic, infrastructure, or public services. The project will contribute City TIF fees and mitigation fees toward the Santa Barbara/US 101 interchange. All internal and abutting roads have been designed to City standard. All residences within the project area will be required to annex into the Citywide Community Facilities District to cover costs associated with the increased City costs of providing police, fire, and park services to new residents. 5. Modification of development standards or processing requirements is warranted to promote orderly and harmonious development, and; Staff Comment: The establishment of PD-33 will establish development standards that promote a cohesive neighborhood development and ensure that City goals related to traffic mitigation, aesthetic character, inclusionary housing, and pedestrian connectivity, among others, are achieved. 6. Modification of development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area, and; Staff Comment: The proposed Planned Development text will modify standard development requirements to allow for a clustered development pattern, preserving heavily sloped and treed areas of the project site. In addition, the ability to provide larger lots adjacent to existing rural residential areas will provide a transition from proposed higher density single-family areas to larger lot developments bordering the City. Modified standards for the neighboring parcels will provide for consolidated access and clustering opportunities allowing for the siting of new units in a way which compliments the neighborhood character and preserves topographic and other natural features. 7. Benefits derived from the overlay zone cannot be reasonably achieved through existing development standards or processing requirements. 93 Staff Comment: The Planned Development Overlay Zone 33 ensures that development within the area provide certain benefit as identified by Council Policy. Development under the PD33 standards will maintain and enhance neighborhood character, buffer between adjacent larger-lot residential zones, and provide pedestrian connectivity. In addition, the clustering of lots allows for the retention and preservation of native oak habitat. Conditional Use Permit (Master Plan of Development): A Master Plan of Development is required for the Planned Development in the form of a Conditional Use Permit. The approved Master Plan of Development sets development standards related to architectural design, site design, landscape, signage, and specific development standards required by the Zoning Ordinance. The Planning Commission must make the following five findings to recommend to the City Council approval of the proposed Master Plan of Development amendments: 1. The proposed project or use is consistent with the General Plan and t he City’s Appearance Review Manual. Staff Comment: The proposed amendments are consistent with the General Plan Land Use Policies 1.1, 1.3, 2.1, 2.3, 5.3, 6.1, 7.1, 7.2, 8.5, 15.1, and 15.6; Circulation Policies 1.1, 1.4, 1.5, 2.1, and 3.2; and Housing Element Policies 1.1, 4.3 and 10.1. 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including the Planned Development Ordinance. Staff Comment: The proposed amendments satisfy all Conditional Use Permit and Planned Development zoning code provisions. 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of t he general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use. Staff Comment: The proposed amendments will not be detrimental to the general public or working person’s health, safety, or welfare. 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development. Staff Comment: The proposed amendments are compatible with the surrounding neighborhood. The project includes detached small lot single-family residences with 94 high quality landscape and architecture. The project has been designed to enhance the appearance of this currently vacant site. 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. Staff Comment: The proposed amendments and use is consistent with the traffic projections and road improvements anticipated within the General Plan and as conditioned. Tree Removal: 1. The tree is obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal, as certified by a report from the Site Planner and determined by the Community Development Department based on the following factors:  Early consultation with the City;  Consideration of practical design alternatives;  Provision of cost comparisons (from applicant) for practical design alternatives;  If saving tree eliminates all reasonable uses of the property; or  If saving the tree requires the removal of more desirable trees Staff Comment: The proposed removals occur within the areas of proposed infrastructure or residential units that cannot be reasonable redesigned to avoid the need for removal. Tentative Subdivision Map (TTM) Findings The following findings must be made for the TTM 2014-0108 to be approved: 1. The proposed subdivision, design and improvements as conditioned, is consistent with the General Plan and applicable zoning requirements, including provisions of the PD-33 Overlay District. Staff Comment: See applicable comments under findings for General Plan Amendment and Zone Text Amendment. 2. The site is physically suitable for the type of development proposed. 95 Staff Comment: The Fire Department and Public Works Department have reviewed the proposed development plans and all City standards can be met. The clustering of lots will allow development to avoid heavily sloped areas. All roads and private driveways will be required to meet applicable Fire Department and Engineering standards. 3. The site is physically suitable for the density of development proposed. Staff Comment: The approval of the proposed General Plan Amendment will increase the residential density of the sites allowing for additional residential units to be constructed. City staff has reviewed the proposed density changes and determined that site characteristics, neighboring land uses, and abutting roads can support the proposed development potential. City sewer will be required to be extended for all lots less than 1-acre. Lots of 1-acre or greater will be required to show septic feasibility at the time of building permit. 4. The design and improvement of the proposed subdivision will not cause substantial environmental damage or substantially and unavoid ably injure fish and wildlife or their habitat. Staff Comment: The proposed project will not result in substantial environmental damage. No creeks or waterways are located on the project site. All native tree removals will be mitigated per the City’s Native Tree Ordinance. Mitigation Measures have been incorporated into the project to ensure a less than significant impact to any sensitive species found on the project site. 5. The design of the subdivision will not conflict with easements acquired by the public at large for access through, or the use of property within, the proposed subdivision; or substantially equivalent alternative easements are provided. Staff Comment: No easements for public access currently exist on the project site. Consolidated access will be required to be designed off Halcon Rd. Access location and design is required to serve all future and existing lots at the time of development. 6. The proposed subdivision design and type of improvements proposed will not be detrimental to the health, safety or welfare of the general public. Staff Comment: The subdivision design has been reviewed and approved, as conditioned, by the City Engineer. All proposed roads and frontage improvements meet City standards. 96 ENVIRONMENTAL DETERMINATION A Draft Mitigated Negative Declaration was circulated to public agencies and interested members of the public starting November 30, 2015. The environmental analysis identified concerns regarding potential impacts to aesthetics, noise, biological resources, air quality, and traffic. Mitigation measures pertaining to these resources are included. A finding is proposed that this project would not have a significant effect on the environment based upon the implementation of the identified mitigation measures. Staff recommends that the Planning recommend certification of the Proposed Mitigated Negative Declaration 2015-0007 to City Council. CONCLUSION The proposed project consist of a General Plan Amendment and Rezone of 8 existing parcels along Halcon and Viejo Camino to increase residential density in the area from a 2.5 acre minimum lot size to a combination of 1 du/acre density and 2 du/acre density. The project has been reviewed and analyzed by staff and recommendations from the Design Review Committee have been incorporated. The project, as designed and conditioned, meets all the required findings for approval. ALTERNATIVES 1. The Planning Commission may recommend modifications to the proposed amendments and/or conditions of approval for the project. 2. The Planning Commission may determine more information is needed on some aspect of the amendments and may refer the item back to the applicant and staff to provide the additional information. The Commission should clearly state the type of information required and move to continue the item to a future date. 3. The Planning Commission may recommend denial to the City Council. The Commission should specify the reasons for recommendation of the denial of the project amendments. ATTACHMENTS: Attachment 1: Zoning Map Attachment 2: Conceptual neighborhood development plan Attachment 3: Proposed Vesting Tentative Map – The Groves Attachment 4: Proposed Mitigated Negative Declaration 2015-0007 Attachment 5: Draft Resolution PC 2016-A Attachment 6: Draft Resolution PC 2016-B Attachment 7: Draft Resolution PC 2016-C 97 Attachment 8: Draft Resolution PC 2016-D Attachment 9: Draft Resolution PC 2016-E Attachment 10: Draft Resolution PC 2016-F 98 Attachment 1: Zoning Map Current General Plan: Suburban Estates (SE) Proposed General Plan: Single-Family Residential – Y (1 du/ac) Single-Family Residential – X (2 du/ac) Current Zoning District: Residential Suburban (RS) Proposed Zoning District: Residential Single-Family – Y (1 du/ac) Residential Single-Family – X (2 du/ac) Project Site Area 1 99 Attachment 2: Conceptual Neighborhood Development Plan The Groves Development – 2du/ac maximum The Neighbor Parcels – 1du/ac maximum 100 Attachment 3: Proposed Vesting Tentative Map – The Groves 101 Attachment 4: Proposed Mitigated Negative Declaration 2015-0007 Please see the following page 102 103 CITY OF ATASCADERO PROPOSED NEGATIVE DECLARATION #2015-0007 6500 Palma Avenue Atascadero, CA 93422 805/461-5035 Findings: 1. The project does not have the potential to degrade the environment. 2. The project will not achieve short-term goals to the disadvantage of long-term environmental goals and policies. 3. The project does not have impacts which are individually limited, but cumulatively considerable. 4. The project will not cause substantial adverse effects on human beings either directly or indirectly. Determination: Based on the above findings, and the information contained in the Initial Study 2015-0007made a part hereof by reference and on file in the Community Development Department), it has been determined that the above project will not have an adverse impact on the environment. Prepared By: Kelly Gleason, Senior Planner Date Posted: November 30, 2015 Public Review Ends: December 21, 2015 Attachments: - Location Map - General Plan and Zoning Designation Map - Aerial Map - Neighborhood concept development plan - Vesting Tentative Tract Map (The Groves) - Landscape Plan - Grading and Drainage Plan - Tree Inventory Map - Wetlands Map - Hazardous Materials Map - FEMA Flood Insurance Rate Map - Initial Study 2015-0007 Applicant/Owner: ConsciousBuild Atascadero Dev. LLC, 2921 Garibaldi Ave. San Luis Obispo, CA 93401 Project Title: PLN 2014-1529 – Halcon General Plan Amendment GPA 2014-0029 / ZCH 2014-0175 / TTM 2014-0108 / TRP 2014-0178 Project Location: 11955 & 11975 Viejo Camino, Atascadero, CA 93422 (San Luis Obispo County) APN 045-401-003, & 004 11676, 11745, 11885, 11855, 11875 Halcon Rd., Atascadero, CA 93422 (San Luis Obispo County) APN 045-401-014, 013, 010, 009, 018, & 017 Project Description: The applicant is requesting a General Plan Amendment and Rezone of 37.7 acres of residential property to allow for an increase in residential density. The subject parcels are located along Halcon Road at the southerly boundary of the City limits. Current zoning allows for a minimum lot size of 2.5 to 10 acres depending on certain site characteristics. The proposed General Plan Amendment and Rezoning would create a 17 unit small lot single-family development (“The Groves”) encompassing 10 acres of the project site at the Viejo Camino and Halcon intersection and increase the density of the remaining 27.7 acres of the project site (“Neighbor Parcels”) to allow for 1 primary dwelling unit per acre. There are currently 6 existing units within the project area. The proposal would increase the number of primary units to a maximum of 45 residential units. The highest density (17 units) will be located on the property at the corner of Viejo Camino and Halcon Road (“The Groves”). The Groves development will preserve a portion of the existing oak woodland grove on the southeast corner of the property in permanent open space easements. Nineteen (19) native trees are proposed for removal as part of The Groves development. Additional trees may be removed as the Neighbor parcels develop. Existing General Plan Designation: Suburban Estates (SE) Existing Zoning: Rural Suburban (RS) Proposed General Plan Designation: Single-Family Residential –Y (SFR-Y: 1 du/ac) Single-Family Residential – X (SFR-X: 2 du/ac) Proposed Zoning: Residential Single-Family-Y (RSF-Y: 1 du/ac) Residential Single-Family – X (RSF-X: 2 du/ac) 104 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em ENVIRONMENTAL CHECKLIST FORM Environmental Review 2015-0007 Lead Agency Name and Address: City of Atascadero 6500 Palma Avenue, Atascadero, CA 93422 Contact Person and Phone Number: Kelly Gleason, Senior Planner City of Atascadero, Phone: 805.470.3446 General Plan Designation: Existing: Suburban Estates Proposed: Single Family Residential –Y (SFR-Y: 1 du/ac) Single Family Residential – X (SFR-X: 2 du/ac) Zoning: Existing: Rural Suburban Proposed: Residential Single Family-Y (RSF-Y: 1 du/ac) Residential Single Family – X (RSF-X: 2 du/ac) Surrounding Land Uses and Setting East: Open Space & Single Family Residential (2 du/ac) North: City Parkland Applicant/Owner: ConsciousBuild Atascadero Dev. LLC, 2921 Garibaldi Ave. San Luis Obispo, CA 93401 Project Title: PLN 2014-1529 – Halcon General Plan Amendment GPA 2014-0029 / ZCH 2014-0175 / TTM 2014-0108 / TRP 2014-0178 Project Location: 11955 & 11975 Viejo Camino, Atascadero, CA 93422 (San Luis Obispo County) APN 045-401-003, & 004 11676, 11745, 11885, 11855, 11875 Halcon Rd., Atascadero, CA 93422 (San Luis Obispo County) APN 045-401-014, 013, 010, 009, 018, & 017 Project Description: The applicant is requesting a General P lan Amendment and Rezone of 37.7 acres of residential property to allow for an increase in residential density. The subject parcels are located along Halcon Road at the southerly boundary of the City limits. Current zoning allows for a minimum lot size of 2.5 to 10 acres depending on certain site characteristics. The proposed General Plan Amendment and Rezoning would create a 17 unit small lot single-family development (“The Groves”) encompassing 10 acres of the project site at the Viejo Camino and Halcon intersection and increase the density of the remaining 27.7 acres of the project site (“Neighbor Parcels”) to allow for 1 primary dwelling unit per acre. There are currently 6 existing units within the project area. The proposal would increase the number of primary units to a maximum of 45 residential units. The highest density (17 units) will be located on the property at the corner of Viejo Camino and Halcon Road (“The Groves”). The Groves development will preserve a portion of the existing oak woodland grove on the southeast corner of the property in permanent open space easements. Nineteen (19) native trees are proposed for removal as part of The Groves development. Additional trees may be removed as the Neighbor parcels develop. Existing General Plan Designation: Suburban Estates (SE) Existing Zoning: Rural Suburban (RS) Proposed General Plan Designation: Single Family Residential –Y (SFR-Y: 1 du/ac) Single Family Residential – X (SFR-X: 2 du/ac) Proposed Zoning: Residential Single Family-Y (RSF-Y: 1 du/ac) Residential Single Family – X (RSF-X: 2 du/ac) 105 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em South: Residential – County Jurisdiction West: Public Recreation & Public Facilities Other public agencies whose approval is required None 106 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 1 Location Map Project Location 107 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 2 General Plan Designation Map Existing Zoning Designation: Residential Suburban (RS) Proposed Zoning Designation: Residential Single Family – Y (RSF-Y: 1 du/ac) Residential Single Family – X (RSF-X: 2 du/ac) Existing General Plan Designation: Suburban Estates (SE) Proposed General Plan Designation: Single Family Residential –Y ( S F R - Y : 1 d u / a c ) Single Family Residential – X (SFR-X: 2 du/ac) 108 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 3 Aerial View Neighbor Parcels: Lots with existing residences proposed for future development City / County Boundary Lots proposed for The Groves development: 17 small-lot single family units 109 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 4 Neighborhood Concept Development Plan 110 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 5 Vesting Tentative Tract Map 111 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 6 Proposed Landscape Plan 112 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 7 Preliminary Grading & Drainage Plan 113 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 8 Tree Inventory Map 114 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 9 National Wetlands Inventory Map 115 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 10 Hazardous Materials Map 116 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Attachment 11 FEMA Flood Insurance Rate Map Project Location 117 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Exhibit A Mitigation Monitoring Program PLN 2014-1529 / GPA 2014-0030 / ZCH 2014-0175 / TTM 2014-0108 / CUP 2014-0284 Halcon General Plan Amendment / The Groves Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Agency Requirement FED: Federal Government CAL: California Government LOC: Local Government Mitigation Measure 1.c.1: A landscape buffer shall be provided along Santa Barbara Rd. Landscape material shall consist of native and/or drought tolerant species. As mixture of low and medium plants shall be utilized to provide visual screening of the project from the adjacent neighborhood. BP PS/BS LOC Mitigation Measure 1.c.2: Street trees shall be provided along Viejo Camino and Halcon Rd. Street trees shall be spaced at no greater than 30-feet on center, however, rural tree groupings may be approved by the City Engineer due to topographic or sight dis tance concerns and/or to maintain the rural nature of the street. BP CE/BS LOC Mitigation Measure 1.c.3: Rear or side yard privacy fencing where adjacent to a private road shall be set back from the edge of shoulder a minimum of 10-feet. Where rear or side yard fencing is adjacent to a public road, a minimum setback from the edge of pavement/sidewalk/pedestrian path of 10-feet shall be observed. Fencing adjacent to a public roadway shall be a maximum of 6-feet high and shall include landscaping on the str eet side of the fence. Fencing shall be decorative in nature. Any walls proposed for rear or side yards adjacent to a public road shall be constructed of high quality materials and shall adhere to the same setback as privacy fencing. BP PS/BS LOC Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any off site glare. All exterior site lights shall utilize full cut-off, “hooded” lighting fixtures to prevent offsite light spillage and glare. BP PS/BS LOC Mitigation Measure 3.b.1: The project shall be conditioned to comply with all applicable District regulations pertaining to the control of fugitive dust (PM-10) as contained in Section 2 “Assessing and Mitigating Construction Impacts.” 2.4 Fugitive Dust Mitigation Measures: Standard List a. Reduce the amount of the disturbed area where possible; b. Use water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency would be required whenever wind speeds exce ed 15 mph. Reclaimed (non-potable) water should be used whenever possible; c. All dirt stock-pile areas should be sprayed daily as needed; d. All roadways, driveways, sidewalks, etc. to be paved should be completed as soon as possible, and building pads should be laid as soon as possible after grading unless seeding or soil binders are BP PS/BS CAL / FED 118 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Exhibit A Mitigation Monitoring Program PLN 2014-1529 / GPA 2014-0030 / ZCH 2014-0175 / TTM 2014-0108 / CUP 2014-0284 Halcon General Plan Amendment / The Groves Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Agency Requirement FED: Federal Government CAL: California Government LOC: Local Government used; e. All of these fugitive dust mitigation measures shall be shown on grading and building plans; and f. The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. Mitigation Measure 3.b.2: The project shall be conditioned to comply with all applicable APCD regulations pertaining to Naturally Occurring Asbestos (NOA). Prior to any grading activities a geologic evaluation should be conducted to determine if NOA is present within the area that will be disturbed. If NOA is not present, and exemptions request must be filed with the District. If NOA is found at the site, the applicant must comply with all requirements outlined in the Asbestos ATCM. This may include development of an Asbestos Dust Mitigation Plan and an Asbestos Health and Safety program for approval by the APCD. Technical Appendix 4.4 of the SLO County APCD CEQA Air Quality Handbook includes a map of zones throughout San Luis Obispo County where NOA has been found and geological evaluation is required prior to any grading. BP PS/BS CAL Mitigation Measure 4.a.1: A qualified biologist shall conduct a pre - construction survey within 30 days of initial site disturbance to identify whether silvery legless lizards are present. If silvery legless lizards are detected, a biological monitor shall be present during initial ground disturbing and vegetation removal activities to allow for a salvage and relocation effort for the lizard and other ground dwelling common wildlife that may be present. BP PS CAL Mitigation Measure 4.a.2: A qualified biologist shall conduct a pre - construction survey within 30 days of initial site disturbance to identify whether American badger are present. If American badger or their dens are detected during the survey, the location of the den shall be mapped, the biologist shall monitor the den for three days if it is within 50ft of proposed blueprints. If the den is deemed inactive it shall be destroyed if the den is active the biologist will continue monitoring its status till the den becomes inactive so it can be destroyed, during that time all development activities shall respect a 50ft buffer or exclusion zone around the den. BP PS CAL Mitigation Measure 4.a.3: Conduct a springtime rare plant survey to determine the presence/absence of any special -status plants. Should any be discovered, implement a seed and/or plant salvage program and incorporate the salvaged material into the drainage setback and detention basin landscaped areas. BP PS CAL 119 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Exhibit A Mitigation Monitoring Program PLN 2014-1529 / GPA 2014-0030 / ZCH 2014-0175 / TTM 2014-0108 / CUP 2014-0284 Halcon General Plan Amendment / The Groves Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Agency Requirement FED: Federal Government CAL: California Government LOC: Local Government Mitigation Measure 4. d.1: Vegetation removal and initial site disturbance shall be conducted between September 1 and January 31 outside of the nesting season for birds. If vegetation and/or tree removal is planned for the bird nesting season, then preconstruction nesting bird survey, prepared by a qualified biologist, shall be required to determine if any active nests would be impacted by project constructi on. If no active nests are found, then no further mitigation shall be required. If any active nests are found that would be impacted by construction, then the nest sites shall be avoided with the establishment of a non-disturbance buffer zone around active nests as determined by a qualified biologist. Nest sites shall be avoided and protected with the non-disturbance buffer zone until the adults and young of the year are no longer reliant on the nest site for survival as determined by a qualified biologis t. As such, avoiding disturbance or taking of an active nest would reduce potential impacts on nesting birds to a less - than-significant level. BP PS FED/CAL Mitigation Measure 4.e.1: Grading and excavation activities shall be consistent with the City of Atascadero Tree Ordinance. Special precautions when working around native trees include: 1. During grading activities an arborist must be present. 2. All existing trees outside of the limits of work shall remain. 3. Earthwork shall not exceed the limits of the project area. 4. Low branches in danger of being torn from trees shall be pruned prior to any heavy equipment work being done. 5. Vehicles and stockpiled material shall be stored outside the drip line of all trees. 6. All trees within twenty feet of construction work shall be fenced for protection with 4-foot chain link, snow or safety fencing placed per the approved tree protection plan. Tree protection fencing shall be in place prior to any site excavation or grading. Fencing shall remain in place until completion of all construction activities. 7. Any roots that are encountered during excavation shall be clean cut by hand and sealed with an approved tree seal. 8. Utilities such as water, gas, power, cable, storm drainage, and sewer should be redirected from under the canopy of any trees that are to remain. 9. Where a building is placed within the canopy of a tree the foundation should be redesigned so that it bridges across any root systems. 10. Any foundation or other structure that encroaches within the drip line of trees to be saved shall be dug by hand. 11. At no time shall tree roots be ripped with construction equipment. BP PS/ BS FED/CAL Mitigation Measure 4.e.2: Tree protection fencing shall be installed at the locations called out in the Tree Protection Plan. An inspection of the tree fencing shall be done by City staff prior to issuance of building permits. BP PS/ BS CAL/LOC 120 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Exhibit A Mitigation Monitoring Program PLN 2014-1529 / GPA 2014-0030 / ZCH 2014-0175 / TTM 2014-0108 / CUP 2014-0284 Halcon General Plan Amendment / The Groves Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Agency Requirement FED: Federal Government CAL: California Government LOC: Local Government Mitigation Measure 4.e.3: The following measure shall be incorporated on- site during the construction process of the proposed project: 1. A minimum height construction protective barrier shall be erected around the drip line of the tree plus 4’. The fence shall be supported with “T” posts at no more than 6’ o.c. and tied at least 3 places per post. This fence shall be installed by the General Contractor before any rough grading is allowed on the site. Approval for this stage must be obtained in writing from either the Arborist or the Counties/Cities representative. 2. Earthwork shall not exceed the limits of the project area. 3. Low branches in danger of being torn during construction process shall be pruned prior to any heavy equipment work being undertaken. 4. Once the rough grading is accomplished the fence may be moved closer to the trunk of the tree for finish grading. At no time shall the fence be pla ced within the Critical Root Zone (CRZ). This location is determined by the diameter of the trunk at Diameter Breast Height (DBH). (4.5’ above grade) and is 1’ per 1” diameter in the direction of the drip line. At no time shall the fence be moved closer to the trunk than the drip line, unless additional preservation measures are implemented as recommended by the project arborist. 5. Any roots that are encountered over 2” diameter, during the excavation process shall be clean cut perpendicular to the direction of root growth with a handsaw. At no time shall tree seal be applied to any cut. Any roots over 2” diameter the county/city representative shall be notified to determine the preferred course of action. 6. All trenching with CRZ area shall require hand trenching to preserve and protect roots over 2” in diameter. 7. No grading of trenching is allowed within the CRZ fenced area without written permission from the County/City representative or a certified arborist. 8. Any roots over 4” in diameter are not to be cut or ripped until inspected and approved in writing by the arborist. 9. If, for whatever reason, work must be accomplished inside the drip line 4”-6” of mulch must be applied first to decrease the possibilities of compaction upon written approval from the arborist. 10. There shall be a pre-construction meeting between the Engineering/Planning staff of the County/City, Grading equipment operators, Project Superintendent and the Arborist to review the project conditions and requirements prior to any grubbing or earth work for any portions of the project site. All tree protection fencing shall be installed for inspection prior to this meeting. 11. All trees shall be pruned before any construction takes place that are in the development areas to be saved if BP PS/ BS LOC 121 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Exhibit A Mitigation Monitoring Program PLN 2014-1529 / GPA 2014-0030 / ZCH 2014-0175 / TTM 2014-0108 / CUP 2014-0284 Halcon General Plan Amendment / The Groves Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Agency Requirement FED: Federal Government CAL: California Government LOC: Local Government they might be damaged by the construction equipment. This must be accomplished by a bonded, licensed, and certified Tree Service Contractor. 12. All debris shall be cleared from the area or chipped and spread on the site or stacked in orderly piles for future use by the Owner, at the Owners request. 13. In locations where paving is to occur within the drip line grub only and do not compact unless authorized in writing. Permeable pavers or other preamble surface must be approved by the Arborist. Mitigation Measure 4.e.4: Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented, the trees designated for protection were protected during construction, and the construction-related tree protection measures are no longer required for tree protection. FO PS/ LOC Mitigation Measure 4.e.5: All utilities shall remain outside the driplines of native trees, unless preservation measures, as specified by the project arborist, are implemented. BP PS/ BS LOC Mitigation 5.a.b.c.1: An archaeological monitor shall be present during initial vegetation clearing, site “grubbing, and grading for all portions of the project. GP PS LOC Mitigation 5.d.1: In the event that human remains are discovered on the property, all work on the project shall stop and the Atascadero Police Department and the County Coroner shall be contacted. The Atascadero Community Development Department shall be notified. If the human remains are identified as being Native American, the California Native American Heritage Commission (NAHC) shall be contacted at (916) 653 - 4082 within 24 hours. A representative from both the Chumash Tribe and the Salinan Tribe shall be notified and present during the excavation of any remains. BP / GP PS CAL Mitigation Measure 6.b.1: The on-site subdivision / grading permit plans shall include erosion control measures to prevent soil, dirt, and debris from entering the storm drain system during and after construction, consistent with mitigation or construction methods outlined in the geotechnical report. Plans shall be approved by the City Engineer prior to issuance. GP PS/CE CAL Mitigation Measure 6.b.2: All cut and fill slopes mitigated with an appropriate erosion control method (erosion control blanket, hydro-mulch, or straw mulch appropriately anchored) immediately after completion of earthwork, as approved by the City Engineer. All disturbed slopes shall have appropriate erosion control methods in place. GP PS/CE CAL Mitigation Measure 6.b.3: The contractor will be responsible for the clean up of any mud or debris that is tracked onto public streets by construction GP PS/CE CAL 122 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Exhibit A Mitigation Monitoring Program PLN 2014-1529 / GPA 2014-0030 / ZCH 2014-0175 / TTM 2014-0108 / CUP 2014-0284 Halcon General Plan Amendment / The Groves Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Agency Requirement FED: Federal Government CAL: California Government LOC: Local Government vehicles. An approved device must be in place prior to commencement of grading activities. This device shall be approved by the City Engineer. Mitigation Measure 6.b.4: A re-vegetation plan shall be submitted with building permits. All disturbed cut and fill slopes shall be vegetated as specified in a landscaping plan. The land scaping plan must be approved by both the Community Development Department and the Public Works Department. GP PS/CE CAL Mitigation Measure 8.h.1: All new construction will comply with section the California Building and Fire Codes. New residences in th e City are required to install fire sprinklers. Fire protection measures shall include the use of non-combustible exterior construction and roofs and fire-resistant building materials. BP FD CAL/LOC Mitigation Measure 9.d.e.f.1: The project shall integrate Low Impact Development Best Management Practice’s into the project design which may include on-site detention and/or retention basins, pervious paving, and vegetated swales. The detention basins must meet the City’s drainage design standards with surface runoff being treated for water quality through structural control measures including: disconnected downspouts flowing to vegetated bio-swales, and pervious pavement and/or landscape areas to control storm volume. All drainage control features shall be subject to the approval of the City Engineer. GP PS/CE CAL Mitigation Measure 9.d.e.f.2: The developer shall ensure that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices, citations, or stop orders. GP PS/CE CAL Mitigation Measure12.a.1: Private yard outdoor activity spaces for each residential parcel adjacent to Viejo Camino and Halcon Rd where outdoor noise levels exceed City standards shall be located where the building provides acoustical screening opportunities. If no such areas exist within the design of the structure on the site, private outdoor use areas shall be enclosed by a 6-foot high solid wall. BP PS/BP LOC Mitigation Measure 12.a.2: Windows on facades adjacent to Halcon and Viejo Camino Road shall include additional sound attenuation features such as dissimilar glass or other methods aimed at reducing sound transmission beyond the standard dual pane requirements. BP PS/BP LOC Mitigation Measure: 14: Prior to final map recordation, the applicant shall annex into the City’s Community Facilities District (CFD) to off -set additional costs associated with the provision of additional police, fire, and park services. FM PS/BP LOC 123 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em Exhibit A Mitigation Monitoring Program PLN 2014-1529 / GPA 2014-0030 / ZCH 2014-0175 / TTM 2014-0108 / CUP 2014-0284 Halcon General Plan Amendment / The Groves Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Agency Requirement FED: Federal Government CAL: California Government LOC: Local Government Mitigation Measure 16.a.b.1: In addition to the City’s Development Impact Fees, each new residential unit shall pay towards its fair share of the US 101 / Santa Barbara interchange improvements. The project may be eligible for TIF fee credits for Citywide development impact fees associated with the interchange improvements. Any TIF credit shall be approved by the City Engineer. BP PS/CE LOC Mitigation Measure 16.d.1: Access for parcels abutting Halcon Rd shall be consolidated and shall be designed as private roads meeting City road standards. Driveways to individual parcels with existing residences may be approved by the City Engineer in locations where consolidated access cannot be utilized due to parcel locations. All access roads and driveways shall be evaluated at the time of tentative map submittal and/or improvement permits for sight distance. FM PS/CE/FD LOC Mitigation Measure 6.f.1: In addition to an on-street bike lane, a multi-use path shall be provided along Viejo Camino and Halcon Roads consistent with the adopted City bike and trail Master Plan and the SLOCOG Salinas River Trail Plan. FM PS LOC Mitigation Measure 17.d.1: Landscaping plans shall be submitted to the Community Development Department for review and approval. Landscaping must consist of drought tolerant species and utilize drip irrigation. Turf shall not be permitted as a part of the approved landscaping plan. BP PS LOC 124 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. Aesthetics Agriculture and Forest Resources Air Quality Biological Resources Cultural Resources Geology /Soils Greenhouse Gas Emissions Hazards & Hazardous Materials Hydrology / Water Quality Land Use / Planning Mineral Resources Noise Population / Housing Public Services Recreation Transportation/Traffic Utilities / Service Systems Mandatory Findings of Significance On the basis of this initial evaluation: I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have a “potentially significant effect” or “potentially significant unless mitigated” impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project. Kelly Gleason 11-30-2015 Kelly Gleason, Senior Planner Date 125 CITY OF ATASCADERO INITIAL STUDY 11/30/15 ISND PLN 2014-1529.em EVALUATION OF ENVIRONMENTAL IMPACTS: 1) A brief explanation is required for all answers except "No Imp act" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not ap ply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project-specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis). 2) All answers must take account of the whole action involved, including off -site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts. 3) Once the lead agency has determined that a particular physical impact may occur, and then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect may be significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from "Earlier Analyses," as described in (5) below, may be cross-referenced). 5) Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following: a) Earlier Analysis Used. Identify and state where they are available for review. b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. c) Mitigation Measures. For effects that are "Less than Significant with Mitigation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. 6) Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 7) Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 8) This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 9) The explanation of each issue should identify: a) the significance criteria or threshold, if any, used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significance . 126 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 23 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact 1. AESTHETICS -- Would the project: a) Have a substantial adverse effect on a scenic vista? b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? c) Substantially degrade the existing visual character or quality of the site and its surroundings? d) Create a new source of substantial light or glare that would adversely affect day or nighttime views in the area? SOURCES: Project Description; Conceptual Site Plan; and California Department of Transportation. DISCUSSION: 1.a. The proposed residential development and associated General Plan Amendment and rezone will not obscure a designated scenic vista. A scenic vista is described as a “viewpoint that provides expansive views of a highly valued landscape for the benefit of the general public” (CEQA Guidelines). The property is to be reclassified and rezoned consistent with surrounding properties. 1.b. The proposed rezoning will not substantially damage scenic resources. The project site is near Highway 101 which is an eligible state scenic highway but is not officially designated as one (Caltrans Scenic Highway Program). The site is not visible from Highway 101. The site does not contain any historic structures and will not disturb any rock outcroppings. 1.c. The proposed project proposes increased residential density in an existing residential area. Higher density housing opportunities currently exist to the East of the project site. Paloma park is located to the North of the project site and commercial and public uses are located to the West of the project site. The existing neighborhood to the South of the project site consists of larger lot parcels located outside of the City limits. These parcels retain a more rural character. The portion of the project proposed to allow for 1 dwelling unit per acre remains in keeping with this rural character. Any reduction in lot size to allow for a cluster development pattern would be required to cluster along the Halcon Rd frontage and provide larger lots and/or opens pace easements adjacent to existing large lots outside the project boundary. The proposed 2 dwelling unit/acre portion of the project has been designed to cluster residential development away from Santa Barbara Rd to the extent feasible. A large portion of this project site will remain in open space. This open space area is heavily wooded, providing a visual buffer between existing residences to the South and the project site. Additionally, in order to retain a transition from the proposed residential density of the existing large lot pattern to the South, mitigation measures have been included to provide visual buffers b etween these areas. 1.d. New residences at this location are not expected to generate substantial light or glare. Any future lighting at this site is to be designed to eliminate off site glare, consistent with existing City ordinances. Mitigation Measure 1.c.1: A landscape buffer shall be provided along Santa Barbara Rd. Landscape material shall consist of native and/or drought tolerant species. As mixture of low and medium plants shall be utilized to provide visual screening of the project from the adja cent neighborhood. Mitigation Measure 1.c.2: Street trees shall be provided along Viejo Camino and Halcon Rd. Street trees shall be spaced at no greater than 30-feet on center, however, rural tree groupings may be approved by the City Engineer due to topographic or sight distance concerns and/or to maintain the rural nature of the street. Mitigation Measure 1.c.3: Rear or side yard privacy fencing where adjacent to a private road shall be set back from the edge of shoulder a minimum of 10-feet. Where rear or side yard fencing is adjacent to a public road, a minimum setback from the edge of pavement/sidewalk/pedestrian path of 10 -feet shall be observed. Fencing adjacent to a public roadway shall be a maximum of 6-feet high and shall include landscaping on the street side of the fence. Fencing shall be decorative in nature. Any walls proposed for rear or side yards adjacent to a public road shall be constructed of high quality materials and shall adhere to the same setback as privacy fencing . 127 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 24 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any off site glare. All exterior site lights shall utilize full cut-off, “hooded” lighting fixtures to prevent offsite light spillage and glare. 2. AGRICULTURAL AND FOREST RESOURCES -- In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optio nal model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and the forest carbon measurement methodology provided in the Forest Protocols adopted by the California Air Resources Board. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non- agricultural use? b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined in Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))?? d) Result in the loss of forest land or conversion of forest land to non-forest use? e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of farmland to non-agricultural use or conversion of forest land to non-forest use? SOURCES: Site Plan; Department of Conservation; and Atascadero General Plan. DISCUSSION 2.a. The property is not shown on the maps prepared pursuant to the Farmland Mapping and Monitor ing Program of the California Resources Agency as prime farmland. 2.b. The property is not in an agricultural zone and is not under a Williamson Act contract. 2.c. The project does not involve rezoning of forest land or timberland. 2.d.e. The project will not result in a loss of forest land and will not result in a conversion of forest land to non -forest use or farmland to non-agricultural uses. Mitigation Measure: No applicable mitigation measures 3. AIR QUALITY -- Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan?  b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? 128 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 25 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non - attainment under an applicable federal or state ambient air quality standard (including releasing emissions that exceed quantitative thresholds for ozone precursors)? d) Expose sensitive receptors to substantial pollutant concentrations? e) Create objectionable odors affecting a substantial number of people? SOURCES: Air Pollution Control District (APCD) CEQA Air Quality Handbook, 2012; Project Description; and Conceptual Site Plan. DISCUSSION: 3. a.c.) The proposed project will result in the future construction of up to 39 new primary dwelling units. The proposed project is within the South Central Coast Air Basin and is in a non-attainment zone for Particle Mater (PM-10). According to the Operational Screening Criteria for Project Air Quality Analysis (Table 1 -1, SLOAPCD, 2012), Single Family Housing would have to be at or over 68 -70 dwelling units in order to be expected to exceed the APCD Annual GHG Bright Line Threshold, as well as the APCD Daily Ozone Precursor Significance Threshold. Based on the overseeing agency’s screening criteria for the residential portion of the proposed project, the impact is determined to be less than significant. 3.b.) Construction activities, including demolition and site grading, have the potential to produce small quantities of air pollution that include dust and equipment exhaust. Air quality impacts from construction would be temporary and short term. No construction is proposed on the project s ite at this time. At the time of future development, any proposed demolition or new residential units shall be conditioned to comply with all applicable APCD regulations in place at the time of future project proposal, including any conditions pertaining to the control of fugitive dust (PM-10) as showed in Section 2 “Assessing and Mitigating Construction Impacts” of the April 2012 CEQA Air Quality Handbook. 3.d.e) The construction of the project will not concentrate pollutants or create objectionable odo rs based on the proposed uses and screening criteria established by the San Luis Obispo Air Pollution Control District. Therefore, the impact is considered less than significant. Mitigation Measure 3.b.1: The project shall be conditioned to comply with all applicable District regulations pertaining to the control of fugitive dust (PM-10) as contained in Section 2 “Assessing and Mitigating Construction Impacts .” 2.4 Fugitive Dust Mitigation Measures: Standard List a. Reduce the amount of the disturbed area where possible; b. Use water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency would be required whenever wind speeds exceed 15 mph. Reclaimed (non -potable) water should be used whenever possible; c. All dirt stock-pile areas should be sprayed daily as needed; d. All roadways, driveways, sidewalks, etc. to be paved should be completed as soon as possible, and building pads should be laid as soon as possible after grading un less seeding or soil binders are used; e. All of these fugitive dust mitigation measures shall be shown on grading and building plans; and f. The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. 129 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 26 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact Mitigation Measure 3.b.2: The project shall be conditioned to comply with all applicable APCD regulations pertaining to Naturally Occurring Asbestos (NOA). Prior to any grading activities a geologic evaluation should be conducted to determine if NOA is present within the area that will be disturbed. If NOA is not present, and exemptions request must be filed with the District. If NOA is found at the site, the applicant must comply with all requirements outlined in the Asbestos ATCM. This may include development of an Asbestos Dust Mitigation Plan and an Asbestos Health and Safety program for approval by the APCD. Technical Appendix 4.4 of the SLO County APCD CEQA Air Quality Handbook includes a map of zones throughout San Luis Obispo County where NOA has been found and geological evaluation is required prior to any grading. 4. BIOLOGICAL RESOURCES -- Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, or regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Pl an, or other approved local, regional, or state habitat conservation plan? SOURCES: Atascadero Native Tree Regulations; General Plan 2025; Conceptual Site Plan; Site Visit; Oak Tree Protection Plan; Biological Resources Survey Report; and The U.S. Fish and Wildlife Service National Wetland Inventory. DISCUSSION: 4.a. According to the applicants Biological Resources Survey Report “no special-status plant species were identified during the survey conducted on August 21, 2014;” however this botanical survey was not conducted within the appropriate blooming season for special-status plant species with the potential to occur on the project site. Therefore, a seasonal special-status plant survey should be conducted prior to any development activities to ensure the protection of special-status species. The report further identified the possibility of silverly legless lizards and American badgers being present on-site and identifies bird and bat nests in trees and recommends mitigation measures to reduce the risk of impact to those species. 130 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 27 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact 4.b.c. There is no riparian habitat and no wetland habitat within the project site . According to the U.S. Fish and Wildlife Service National Wetlands Inventory the nearest wetland and riparian habitats to this site are approximately 0.24 miles away. 4.d. The site is located within the City’s urban core and is surrounded by residential and public uses. The Land Use Element EIR concludes that development within the City limits will not have a significant impact on wildlife or wildlife corridors. However the site is a habitat for nesting and migratory native birds, the Biological Resources Survey Report concludes that vegetation and tree removal during the nesting season for birds could result in the destruction of active bird’s nests. Destruction of active nests is prohibited by the Fish and Game Code of California Sections 3503 and 3503.1. To reduce this potential impact to nesting birds, impleme ntation of mitigation measure 4.d.1 and 4.d.2 will reduce this impact to a less than significant threshold. 4.e. The proposed General Plan Amendment and Rezone consists of two project portions. The Groves portion of the project contains a tentative map application as well as a conditional use permit which acts as the master plan of development for the site. Tree impacts in this portion of the project are known and are discussed below. The Neighbor parcels are submitted with a concept plan to show anticip ated future lotting layouts, however, no map or development plan is proposed at this time. Any future development of this portion of the project will be required to adhere to the City’s Tree Ordinance. Mitigation Measures are included below to achieve comp liance. The Groves: There are 108 mature oak trees within the project boundary. The Oak Tree Protection Plan reports that the trees on average display declining health. The applicant is proposing the removal of 19 native trees and notes that two trees on the project site are currently dead (Oak Tree Protection Plan). The majority of trees to be removed are located near lots 15 and 16 in the residential portion of the development. An additional tree is proposed for removal along Street-A. The City’s Native Tree ordinance contains standards that dedicate when a tree may be removed. In this instance, proposed development cannot be modified to accommodate the preservation of the identified native trees. The applicant has demonstrated, to the extent feasible, t he preservation of native trees through site design and location of project amenities. With the proposed mitigation measures incorporated, conflict with the City’s Native Tree Ordinance is determined to be less than significant. 4.f. The site is not located in an area that will conflict with an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan. Mitigation Measure 4.a.1: A qualified biologist shall conduct a pre -construction survey within 30 days of initial site disturbance to identify whether silvery legless lizards are present. If silvery legless lizards are detected, a biological monitor shall be present during initial ground disturbing and vegetation removal a ctivities to allow for a salvage and relocation effort for the lizard and other ground dwelling common wildlife that may be present. Mitigation Measure 4.a.2: A qualified biologist shall conduct a pre -construction survey within 30 days of initial site disturbance to identify whether American badger are present. If American badger or their dens are detected during the survey, the location of the den shall be mapped, the biologist shall monitor the den for three days if it is within 50ft of proposed blueprints. If the den is deemed inactive it shall be destroyed if the den is active the biologist will continue monitoring its status till the den becomes inactive so it can be destroyed, during that time all development activities shall respect a 50ft buffer or exclusion zone around the den. Mitigation Measure 4.a.3: Conduct a springtime rare plant survey to determine the presence/absence of any special - status plants. Should any be discovered, implement a seed and/or plant salvage program and incorporate the s alvaged material into the drainage setback and detention basin landscaped areas. Mitigation Measure 4. d.1: Vegetation removal and initial site disturbance shall be conducted between September 1 and January 31 outside of the nesting season for birds. If vegetation and/or tree removal is planned for the bird nesting season, then preconstruction nesting bird survey, prepared by a qualified biologist, shall be required to determine if any active nests would be impacted by project construction. If no active nests are found, then no further mitigation shall be required. If any active nests are found that would be impacted by construction, then the nest sites shall be avoided with the establishment of a non -disturbance buffer zone around active nests as determi ned by a qualified biologist. Nest sites shall be avoided and protected with the non-disturbance buffer zone until the adults and young of the year are no longer reliant on the nest site for survival as determined by a qualified biologist. As such, avoidin g disturbance or taking of an active nest would reduce potential impacts on nesting birds to a less -than-significant level. 131 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 28 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact Mitigation Measure 4.e.1: Grading and excavation activities shall be consistent with the City of Atascadero Tree Ordinance. Special precautions when working around native trees include: 1. During grading activities an arborist must be present 2. All existing trees outside of the limits of work shall remain. 3. Earthwork shall not exceed the limits of the project area. 4. Low branches in danger of being torn from trees shall be pruned prior to any heavy equipment work being done. 5. Vehicles and stockpiled material shall be stored outside the drip line of all trees. 6. All trees within twenty feet of construction work shall be fenced for protection w ith 4-foot chain link, snow or safety fencing placed per the approved tree protection plan. Tree protection fencing shall be in place prior to any site excavation or grading. Fencing shall remain in place until completion of all construction activities. 7. Any roots that are encountered during excavation shall be clean cut by hand and sealed with an approved tree seal. 8. Utilities such as water, gas, power, cable, storm drainage, and sewer should be redirected from under the canopy of any trees that are to remain. 9. Where a building is placed within the canopy of a tree the foundation should be redesigned so that it bridges across any root systems. 10. Any foundation or other structure that encroaches within the drip line of trees to be saved shall be dug by hand. 11. At no time shall tree roots be ripped with construction equipment. Mitigation Measure 4.e.2: Tree protection fencing shall be installed at the locations called out in the Tree Protection Plan. An inspection of the tree fencing shall be done by City staf f prior to issuance of building permits. Mitigation Measure 4.e.3: The following measure shall be incorporated on-site during the construction process of the proposed project: 1. A minimum height construction protective barrier shall be erected around th e drip line of the tree plus 4’. The fence shall be supported with “T” posts at no more than 6’ o.c. and tied at least 3 places per post. This fence shall be installed by the General Contractor before any rough grading is allowed on the site. Approval for this stage must be obtained in writing from either the Arborist or the Counties/Cities representative. 2. Earthwork shall not exceed the limits of the project area. 3. Low branches in danger of being torn during construction process shall be pruned prior to any heavy equipment work being undertaken. 4. Once the rough grading is accomplished the fence may be moved closer to the trunk of the tree for finish grading. At no time shall the fence be placed within the Critical Root Zone (CRZ). This location is determined by the diameter of the trunk at Diameter Breast Height (DBH). (4.5’ above grade) and is 1’ per 1” diameter in the direction of the drip line. At no time shall the fence be moved closer to the trunk than the drip line, unless additional preservation measures are implemented as recommended by the project arborist. 5. Any roots that are encountered over 2” diameter, during the excavation process shall be clean cut perpendicular to the direction of root growth with a handsaw. At no time shall tree seal be applied t o any cut. Any roots over 2” diameter the county/city representative shall be notified to determine the preferred course of action. 6. All trenching with CRZ area shall require hand trenching to preserve and protect roots over 2” in diameter. 7. No grading of trenching is allowed within the CRZ fenced area without written permission from the County/City representative or a certified arborist. 8. Any roots over 4” in diameter are not to be cut or ripped until inspected and approved in writing by the arborist. 9. If, for whatever reason, work must be accomplished inside the drip line 4”-6” of mulch must be applied first to decrease the possibilities of compaction upon written approval from the arborist. 10. There shall be a pre-construction meeting between the Engineering/Planning staff of the County/City, Grading equipment operators, Project Superintendent and the Arborist to review the project conditions and requirements prior to any grubbing or earth work for any portions of the project site. 132 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 29 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact All tree protection fencing shall be installed for inspection prior to this meeting. 11. All trees shall be pruned before any construction takes place that are in the development areas to be saved if they might be damaged by the construction equipment. This must be accomplished by a bonded, licensed, and certified Tree Service Contractor. 12. All debris shall be cleared from the area or chipped and spread on the site or stacked in orderly piles for future use by the Owner, at the Owners request. 13. In locations where paving is to occur within the drip line, grub only and do not compact unless authorized in writing by the arborist or required by the City Engineer for the construction of infrastructure improvements. Permeable pavers or other permeable surfaces should be used as paving under the drip line as approved by the Arborist. Mitigation Measure 4.e.4: Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented, the trees designated for protection were protected during construction, and the construction -related tree protection measures are no longer required for tree protection. Mitigation Measure 4.e.5: All utilities shall remain outside the driplines of native trees , unless preservation measures, as specified by the project arborist, are implemented . Mitigation Measure 4.e.6: Establish an open space preservation easement on portions of lots 15 and 16 to protect a portion of the existing oak grove. 5. CULTURAL RESOURCES -- Would the project: a) Cause a substantial adverse change in the significance of a historical resource as defined in '15064.5? b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to '15064.5? c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? d) Disturb any human remains, including those interred outside of formal cemeteries? _____________________________________________________________________________________________ SOURCES: Project description; Site Plan; CEQA Guidelines Sections 15060 to 15065; Atascadero City GIS Data; Site Visit; Archaeological Survey Report. DISCUSSION: 5.a.b.c. Geographical Information systems (GIS) of the City of Atascadero show that there are no known historic or archaeological resources located on or adjacent to the site. The Archaeological Survey conducted by SWCA Environmental Consultants has a concurring statement that “no historical resources or unique archeological resources…were identified in the project area…however…it is possible that isolated and potentially significant artifacts are present, but obscured at the time of the survey” as such SWCA “recommends that an archaeological monitor be present during initial vegetation clearing, site “grubbing, and grading”. Having a monitor on -site during initial clearing activities would reduce the risk of disturbing an archaeological site to no impact. 5.d. No known human remains have been found or documented in the vicinity of the project . The site may have human remains on-site due to no known archeological study completed directly on -site. In addition, known Native American burial sites have been located around the project area. Implementation of mitigation measure 5.d.1, will reduce the potential for a significant impact to less than significant thresholds. Mitigation 5.a.b.c.1: An archaeological monitor shall be present during initial vegetation clearing, site “grubbin g, and grading for all portions of the project. Mitigation 5.d.1: In the event that human remains are discovered on the property, all work on the project shall stop and 133 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 30 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact the Atascadero Police Department and the County Coroner shall be contacted. The Atascadero Community Development Department shall be notified. If the human remains are identified as being Native American, the California Native American Heritage Commission (NAHC) shall be contacted at (916) 653 -4082 within 24 hours. A representative from both the Chumash Tribe and the Salinan Tribe shall be notified and present during the excavation of any remains. 6. GEOLOGY AND SOILS -- Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. ii) Strong seismic ground shaking? iii) Seismic-related ground failure, including liquefaction? iv) Landslides? b) Result in substantial soil erosion or the loss of topsoil? c) Be located on a geologic unit or soil that is unstabl e, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property? e) Have soils incapable of adequately su pporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? SOURCES: Project description; Land Use Element EIR; Geotechnical Engineering Report; Earth Systems Pacific; Preliminary Grading and Drainage Plan, North Coast Engineering; City of Atascadero GIS. DISCUSSION: 6.a.i The project is not located on any known earthquake faults. The property contain s no unusual geological formations. Therefore no impact. 6.a.ii. Although there are no known faults within the project area, there are faults located near the City that have been known to create seismic events. The 2003 San Simeon earthquake was the last known large seismic event that affected the proposed project area. The City adopts the California Building Code as its building code and updates this code during each required adoption cycle. This code is continually updated with requirements to make build ing safer during a seismic event. Incorporation of the latest California Building Code requirements at the time of building permit submittal will reduce the exposure of people and structures to strong ground shaking to a less than significant level. 134 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 31 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact 6.a.iii. City of Atascadero Geographical information systems (GIS) show the project site to be in an area of low to moderate risk for liquefaction, therefore no impact. . 6.a.iv. GIS mapping shows the project site to be in an area of moderate to high risk for landslides therefore mitigation is necessary to reduce impact of potential landslides. Incorporation of the latest California Building Code requirements and a soils report by a qualified soil scientist at the time of building permit submittal will reduce the exposure of people and structures to landslide events to a less than significant level. 6.b. GIS depicts the project site to consist of low to moderate erodible soils. The incorporation of mitigation measures will reduce soil erosion on site to a les s than significant level. Construction activities on the site will be required to comply with sedimentation and erosion control measures prescribed by the City Engineer as well as mitigation proposed by the geotechnical report. Mitigation measure 6.b.1 th rough 6.b.4 shall be implemented and potential significant impacts to a less than significant threshold. 6.c.d. Geographical Information System’s expansion determination indicates that the bearing soils lie in the “Low to Moderate” and “Moderate” expansion potential ranges. Due to the site area’s non -expansive soils and crushed rock, the Preliminary Stormwater Control Plan and Basin Analysis Report concluded that no special measures with respect to expansive soils are considered necessary. Therefore, impac ts are considered less than significant. 6.e. The higher density portion of the site (The Groves: 2 du/ac) will be served by City sewer. The portion of the site proposed for a 1 du/ac density (The Neighbor Parcels) may be served by City sewer or on -site septic systems. Any existing or new lot served by an onsite septic system will be required to meet all applicable City and State regulations governing such. Therefore, there is no impact. Mitigation Measure 6.b.1: The on-site subdivision / grading permit plans shall include erosion control measures to prevent soil, dirt, and debris from entering the storm drain system during and after construction, consistent with mitigation or construction methods outlined in the geotechnical report. Plans shall be approv ed by the City Engineer prior to issuance. Mitigation Measure 6.b.2: All cut and fill slopes mitigated with an appropriate erosion control method (erosion control blanket, hydro-mulch, or straw mulch appropriately anchored) immediately after completion of earthwork, as approved by the City Engineer. All disturbed slopes shall have appropriate erosion control methods in place. Mitigation Measure 6.b.3: The contractor will be responsible for the cleanup of any mud or debris that is tracked onto public streets by construction vehicles. An approved device must be placed prior to commencement of grading activities. This device shall be approved by the City Engineer. Mitigation Measure 6.b.4: A re-vegetation plan shall be submitted with building permits. All disturbed cut and fill slopes shall be vegetated as specified in a landscaping plan. The landscaping plan must be approved by both the Community Development Department and the Public Works Department. 7. GREENHOUSE GAS EMISSIONS -- Would the project: a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? b) Conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of greenhouse gases? SOURCES: Project description; Site Plan; San Luis Obispo County Air Pollution Control District (APCD) CEQA Air Quality Handbook, 2012; Atascadero 2014 Climate Action Plan; General Plan 2025, 2004. 135 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 32 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact DISCUSSION: 7.a. According to the Operational Screening Criteria for Project Air Quality Analysis (Table 1 -1, SLOAPCD, 2012), Single Family Housing would have to be at or over 68-70 dwelling units in order to be expected to exceed the APCD Annual GHG Bright Line Threshold as well as the APCD Daily Ozone Precursor Significance Threshold. The proposed project may include up to 39 additional units to be constructed on the project site. The proposed residential units do not exceed air quality and emissions thresholds set by the Operational Screening Criteria for Project Air Quality Analysis (Table 1-1, SLOAPCD, 2012). Therefore the proposed project’s impacts are determined to be less than significant. 7.b. The proposed project will allow for an increase in residential density on existing residential parcels. The proposed project is in the vicinity of existing higher density residential ne ighborhoods and public uses including a City park. The proposed project is not in conflict with the City’s adopted Climate Action Plan, and therefore the impact is determined to be less than significant. Mitigation Measure: No applicable mitigation measu res 8. HAZARDS AND HAZARDOUS MATERIALS -- Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one- quarter mile of an existing or proposed school? d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? e) For a project located within an airport land use plan area or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people living or working in the project area? f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people living or working in the project area? g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? SOURCES: Project description; General Plan Land Use Element; Department of Toxic Substances Control: EnviroStor; City of Atascadero GIS. 136 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 33 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact DISCUSSION 8.a.b.c. The proposed project does not generate or involve the use of significant amounts of hazardous materials. There are no known hazardous materials on the site or nearby. Therefore no impact. 8.d. The property is not a listed hazardous material site on the EnviroStor database. Therefore no impact. 8.e.f. The property is not near an airport. Therefore no impact. 8.g. Proposed project does not impair implementation with an adopted emergency response plan or evacuation plan, therefore no impact. 8.h. The proposed project is within the urban services line and not located adjacent to rural residential parcels under County jurisdiction. The project site is bounded by a City maintained park to the North and commercial and public uses to the west. The fire response time is listed as 5 minutes or less. Geographical information systems show the project site to be in a high fire hazard zone. Implementation of the Mitigation Measure 8.h.1 will render this impact to a less than significant threshold. Mitigation Measure 8.h.1: All new construction will comply with section the California Building and Fire Codes. New residences in the City are required to install fire sprinklers. Fire protection measures shall include the use of non - combustible exterior construction and roofs and fire-resistant building materials. 9. HYDROLOGY AND WATER QUALITY -- Would the project: a) Violate any water quality standards or waste discharge requirements? b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of previously-existing nearby wells would drop to a level that would not support existing land uses or planned uses for which permits have been granted)? c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site? d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner that would result in floodi ng on- or off-site? e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? f) Otherwise substantially degrade water quality? g) Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood 137 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 34 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact Insurance Rate Map or other flood hazard delineation map? h) Place within a 100-year flood hazard area structures that would impede or redirect flood flows? i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding a s a result of the failure of a levee or dam? j) Inundation by seiche, tsunami, or mudflow? ____________________________________________________________________________________________ SOURCES: Project description; Atascadero GIS; FEMA Flood Map; Site Plan; Resolution No. R3-2013-0032 Central Coast Water Control Board; California Department of Conservation. DISCUSSION: 9.a. The proposed project will add additional wastewater discharge and reduce storm water infiltration on a primarily vacant site. The proposed lot sizes range from 0.25 acres to over 1 -acre. Storm water regulations require that additional runoff due to increased impervious surfaces be retained on site and metered out to natural drainage patterns. Overall, the proposed project will have a less than significant impact on water quality standards. Erosion, sediment and environmental control measures specified in the project description shall be implemented as necessary to ensure reduced pollutant releases and minimize potential environmental impacts of the project. Therefore, the proposed project will have a less than significant impact. 9b. The proposed rezoning and future development will not deplete ground water supplies. Water will be provided by Atascadero Mutual Water Company. All building permits require a will serve letter from Atascadero Mutual Water Company prior to permit issuance. 9c.d.f. Future construction activities are subject to review for compliance with City drainage and grading regulations. Drainage will not be permitted to create or intensify any hazards for persons or property in the vicinity. 9e. The Central Coast Water Quality Control Board requires reducing pollutant discharges to the Maximum Extent Practicable and preventing storm water discharges from causing or contributing to a violation of receiving water quality standards in all applicable development projects that require approvals and/or permits issued under the Permittee’s planning, building, or other comparable authority. 9.g.h.i. The proposed development will be outside of the 100 -year flood hazard area. 9.j. The project area is not subject to inundation by a tsunami, according to the California Department of Conservation. Mitigation Measure 9.d.e.f.1: The project shall integrate Low Impact Development Best Management Practice’s into the project design which may include on-site detention and/or retention basins, pervious paving, and vegetated swales. The detention basins must meet the City’s drainage design standards with surface runoff being treated for water quality through structural control measures including: disconnected downspouts flowing to vegetated bio-swales, and pervious pavement and/or landscape areas to control storm volume. All drainage control features shall be subject to the approval of the City Engineer. Mitigation Measure 9.d.e.f.2: The developer shall ensure that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices, citations, or stop orders. 10. LAND USE AND PLANNING - Would the project: a) Physically divide an established community? 138 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 35 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? c) Conflict with any applicable habitat conservation plan or natural community conservation plan? SOURCES: Land Use Element; Project description; Lot Line Adjustment Map; and Atascadero Municipal Code. DISCUSSION: 10.a. The project will not physically divide an established community. The proposed General Plan Amendment and Zone Change will result in an increase in residential density within an existing residential neighborhood. 10.b. The proposed General Plan Amendment and zoning map change are being proposed in order to enable future higher density residential uses adjacent to existing small -lot single-family development, City recreational facilities, and public uses. While the proposed application is seeking modification to the current zoning and General Plan designations, the proposed use is consistent with the surrounding neighborhood and supports housing goals. 10.c. The project is consistent with the open space and conservation policies identified in the General Plan. Mitigation Measure: No applicable mitigation measures 11. MINERAL RESOURCES -- Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? SOURCES: Project description and Planning staff site visit. DISCUSSION: 11.a.b. No mining is proposed as a part of this project. No known mineral resources have been identified in the area. Mitigation Measure: No applicable mitigation measures 12. NOISE -- Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? b) Exposure of persons to or generation of excessive ground-borne vibration or ground-borne noise levels? c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existin g without the project? d) A substantial temporary or periodic increase in ambient 139 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 36 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact noise levels in the project vicinity above levels existing without the project? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? f) For a project within the vicinity of a private airstrip, would the project expose people living or working in the project area to excessive noise levels? SOURCES: Project description; Noise Element; Noise Ordinance; Acoustical Design Manual ; Acoustic Study; David Dubbink Associates; and the Quarry EIR. DISCUSSION: 12a. The proposed project is located on an identified truck route utilized by the Rocky Mountain Quarry to the north - east of the project site. The Quarry EIR identifies a maximum of 212 daily truck trips with 46 occurring at peak hours. Based on the acoustical analysis prepared by David Dubbink Associates, the average Leq for parcels along Halcon and Viejo Camino is calculated at 62.2 dB, 2 dB in excess of the City’s standard for outdoor activity areas. Normal residential construction would reduce the exterior dB by 20%, therefore, interior levels remain below the 45 dB level. The Acoustic Study determined that with the implementation of recommended mitigations, the project will not result in significant exposure of persons to the generation of noise levels in excess of standards established in the local general plan or noise ordinance. Mitigation measures have been identified below consistent with the recommendations contained in the Acoustical Analysis to ensure compliance wi th the City’s maximum dB standards for residential indoor and outdoor activity spaces. 12.b.c.d. Future development of the residential multi-family lot is expected to involve some construction equipment and use of impact tools that make noise. Noise leve ls on the site are thus expected to be raised temporarily. The future residential units and the commercial use of the existing building on site are not expected to generate unacceptable levels of noise. Any electrical or mechanical equipment used for const ruction of the proposed project is required to comply with the Atascadero Noise Ordinance, Chapter 14 in the Atascadero Municipal Code. Any permanent change in ambient noise levels that might be created by equipment or equipment shelter mechanical features will be required to be designed to be consistent with the Noise Ordinance. 12.e.f. The project is not located within an airport land use plan or private airstrip. Mitigation Measure12.a.1: Private yard outdoor activity spaces for each residential parc el adjacent to Viejo Camino and Halcon Rd where outdoor noise levels exceed City standards shall be located where the building provides acoustical screening opportunities. If no such areas exist within the design of the structure on the site, private outdo or use areas shall be enclosed by a 6-foot high solid wall. Mitigation Measure 12.a.2: Windows on facades adjacent to Halcon and Viejo Camino Road shall include additional sound attenuation features such as dissimilar glass or other methods aimed at redu cing sound transmission beyond the standard dual pane requirements. 13. POPULATION AND HOUSING -- Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? 140 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 37 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? _____________________________________________________________________________________________ SOURCES: Project description and General Plan Land Use Element. DISCUSSION: 13.a. The project proposes up to a maximum of 45 primary dwelling units. The project is bounded by public uses, commercial uses, City recreation facilities, and residential uses. There are currently six existing residential units on the project site, which may remain with future development of the parcels or may be replaced by new housing units. City wastewater infrastructure is located in proximity to the project site and the project site is located within the identified Urban Services Line where the General Plan anticipates more intensive u ses to occur. These units and associated infrastructure improvements will not induce direct or indirect substantial population growth in the City of Atascadero. 13.b.c. No housing or persons will be displaced. All buildings on site are currently vacant. Mitigation Measure: No applicable mitigation measures 14. PUBLIC SERVICES -- Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? Police protection? Schools? Parks? Other public facilities? SOURCES: Project description; Land Use Element EIR; City Fire Department; City Police Department; and City Public Works Department. DISCUSSION: Development Impact Fees: Development Impact Fees will be required of any new project for which a building permit is issued. The concept of the impact fee program is to fund a nd sustain improvements which are needed as a result of new development as stated in the General Plan and other policy documents within the fee program. Development Impact Fees fall into the following categories: Drainage Fees; Streets, Road, Bridge Fees; Sewer Fees; Public Safety Fees; Park Fees, and Miscellaneous Fees. In addition, school fees are collected by the Atascadero Unified School District. The amount of impact fees to be paid will be determined at the time of issuance of building permit. Fire and Police: Impact fees are charged for new development, to help pay the cost of providing new facilities to serve the expanding city. The Fire Department of the City of Atascadero has indicated that it will be able to adequately service the proposed project. The applicant shall comply with all requirements of the Fire Department. The City of Atascadero Police Department has also indicated that the proposed project poses no problems to the police to adequately service it. In addition to typical fire and police development impact fee payments, the proposed project will need to annex into the City’s Community Facilities District (CFD). Since 2005, the City requires new development to annex into the City’s CFD to off-set on-going costs to provide police, fire, and parks services. The proposed project will not result in substantial adverse impacts to these public services; therefore the impact is less than significant. Schools: At build out of the General Plan, the city’s population will overburden the existing school system unless 141 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 38 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact additional classroom space is added. The Atascadero Unified School District charges impact fees to fund additional schools as needed. State law restricts mitigation of school impacts to the levying of these fees and other measur es adopted by the school district. Provision of adequate facilities for the population is the responsibility of the school district. Development impact will be assessed by the school district, and collected at the time of building permit issuance for each residential unit. Parks: The proposed project will not increase demand on existing City parks and recreation facilities . The proposed project applicant will be required to pay development impact fees as a part of building permit issuance for additional park facilities within the City. In addition, the project will be required to annex into the City’s CFD for on -going maintenance costs of existing parks. With the payment of these fees and annexation into the City’s CFD, the impact is less than significant. Other public facilities: The construction of the project will have no impact on construction of other public facilities. Mitigation Measure: 14: Prior to final map recordation, the applicant shall annex into the City’s Community Facilities District (CFD) to off-set additional costs associated with the provision of additional police, fire, and park services. 15. RECREATION -- a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?     b) Does the project include recreational facilities or require the construction or expansion of recreational facilities that might have an adverse physical effect on the environment? SOURCES: Project description; Parks and Recreation Element. DISCUSSION: 15.a. Future residents are expected to use existing parks and recreational facilities, but not in numbers that are expected to result in substantial physical deterioration of any facilities. The proposed project is required to pay Development Impact Fees for each new residential unit as well as pay into the City’s Community Facilities District (CFD) to off-set additional maintenance costs created by new residences. With implementation of mitigation measure 15.a.1, the impact is less than significant. 15.b. The project does not involve construction of recreational facilities. See Mitigation Measure 14 16. TRANSPORTATION/TRAFFIC -- Would the project: a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit? b) Conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other standards 142 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 39 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact established by the county congestion management agency for designated roads or highways? c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? e) Result in inadequate emergency access? f) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities? SOURCES: Land Use Element; Circulation Element; Project Description; ITE Trip Generation Rates (8th edition); Atascadero Fire Department;, City of Atascadero Engineering Standards ; and Transportation Impact Study. DISCUSSION: 16a.b. The Transportation Impact Study concludes the proposed project is estimated to generate 565 new daily trips, 45 new AM peak hour trips, and 57 new PM peak hour trips. Under existing plus the project scenario all study intersections would operate acceptably at Level of Service (LOS) B or better with the addition of project trips. Under the cumulative plus project scenario the LOS delays increase at all identified intersections that were studied. The LOS at the Santa Barbara Rd / El Camino Real intersection and the Santa Barbara Rd / Viejo Camino intersections remain at acceptable levels with delays running at LOS B or better. Any LOS below of a LOS D is considered deficient under the City’s General Plan. Proposed project traffic impact is c onsidered less than significant. US 101 Mainline Operations and Interchange – Santa Rosa Road The Traffic Report shows additional queuing delays at the US 101 / Santa Barbara Road northbound and southbound on-ramps. The Traffic Report cumulative impact analysis takes into consideration the Eagle Ranch project and the build-out impacts of that project on the US 101/Santa Barbara interchange. The cumulative impacts identified in the traffic analysis list the Santa Barbara / US 101 interchange at a LOS C during the AM peak hours and a LOS F for the PM peak hour. In both scenarios, the queues exceed the storage capacity of the overpass. While the Eagle Ranch project is a major contributor to the LOS decline at the interchange, the proposed project d oes contribute to the decline. The Santa Barbara Road / US 101 interchange is an identified project (ST-37) under the City’s Master Facilities Plan for improvements. The 2006 Study identified that the interchange required an estimated $8.1 million to construct interchange improvements that includes, but not limited to right -of-way acquisition, round-about construction, lane configuration, and interchange approach improvements. We anticipate that this cost has increased since the study was completed. A current cost analysis is expected to be completed in early 2016. With the anticipated build-out of the general plan, the Santa Barbara / US 101 interchange does not operate at unacceptable levels. Projects which increase density or intensity of commercial and residentia l development above that anticipated in the General Plan impact the LOS of the interchange. To mitigate deficiencies above those anticipated by the General Plan, the City funded a study to determine fair share fee payments for new residential units and com mercial developments within the area of impact. A mitigation measure has been included to pay for its “fair-share” of improvements to the Santa Barbara Road interchange. Implementation of this mitigation measure creates an impact that is less than signific ant with mitigation incorporated. 16.c. No changes will occur to the air traffic patterns . 16.d. The Neighbor parcels proposed for future mapping and development could allow for an additional 22 primary units. The traffic report includes a sight distance analysis of the Neighbor parcels and the anticipated lotting pattern. It was determined that access roads need to be consolidated once future development occurs to provide adequate sight 143 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 40 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact distance onto Halcon Rd. A mitigation measures has been listed belo w to ensure that access way consolidation occurs with any future development of the Neighbor parcels. 16.e. The proposed project provides adequate emergency vehicle access. The Fire department will review plans to determine suitable fire protection measures; therefore impact is less than significant. 16.f. The project is located along a bike and pedestrian trail route identified in the City’s General Plan, the City’s Bike Master Plan, and by the approved North San Luis Obispo County Salinas River Trail Map. Mitigations Measures have been included below to include bicycle and pedestrian facilities consistent with these adopted plans, which will bring the project impact to less than significant. In addition, the project will increase the density of residen tial units located directly across from Paloma Park. The intersection at Halcon Rd and Viejo Camino is currently unimproved on both the project side and the park side. The traffic report includes recommendations to provide safe pedestrian facilities at the intersection of Halcon and Viejo Camino, as listed below. Mitigation Measure 6.a.b.1: In addition to the City’s Development Impact Fees, each new residential unit shall pay towards its fair share of the US 101 / Santa Barbara interchange improvements. The project may be eligible for TIF fee credits for Citywide development impact fees associated with the interchange improvements. Any TIF credit shall be approved by the City Engineer. Mitigation Measure 16.d.1: Access for parcels abutting Halcon Rd shall be consolidated and shall be designed as private roads meeting City road standards. Driveways to individual parcels with existing residences may be approved by the City Engineer in locations where consolidated access cannot be utilized due to parcel lo cations. All access roads and driveways shall be evaluated at the time of tentative map submittal and/or improvement permits for sight distance. Mitigation Measure 6.f.1: In addition to an on-street bike lane, a multi-use path shall be provided along Viejo Camino and Halcon Roads consistent with the adopted City bike and trail Master Plan and the SLOCOG Salinas River Trail Plan. 17. UTILITIES AND SERVICE SYSTEMS --Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or a re new or expanded entitlements needed? e) Result in a determination by the wastewater treatment provider that serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments? f) Be served by a landfill with sufficient permitted capacity to accommodate the project’s solid waste disposal needs? 144 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 41 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact g) Comply with federal, state, and local statutes and regulations related to solid waste? SOURCES: Project description; Land Use Element; and Hydrology and Water Quality Element. DISCUSSION: 17.a.b.e Six existing residential units are currently served by the City’s sewer system. The applicant will be required to connect all residential units to the City’s sanitary sewer system. The City’s sewer system has capacity to treat all wastewater generated by the proposed project and will not result in the construction or expansion of new or existing wastewater facilities, therefore the impact is less than significant. 17.c. On-site storm water drainage has been designed to flow into a multiple detention basins throughout the project site. Low Impact Development strategies are proposed as part of the projects development plan . Consistent with the Regional Water Quality Control Board’s Post Stormwater Construction standards, all new discharges are contained on - site and mimics pre-construction stormwater flow. Therefore, impact is less than significant. 17.d The Atascadero Mutual Water Company (AMWC) has indicated that it can provide water to the proposed project. All property within the City limits is entitled to water from the AMWC . The project is not expected to require a significant quantity of water for the proposed use. Water is p umped from several portions of the largest underground basin in the county, the Paso Robles Formation, using a series of shallow and deep wells. The water company anticipates that it will be able to meet the city’s needs through build out and beyond: Water demand at build out is estimated to be at 16,000 -20,000 acre-feet per year (AFY). The City is projected to have enough water to meet the demand with the Nacimiento Water Project which has allocated the City an additional 3,000 AFY with a flow rate of 3.48 million gallons per day (mgd). All proposed landscaping is drought -tolerant, consistent with the City’s water efficient landscaping ordinance and the AMWCs water conservation programs. Turf will not be permitted to be installed by the developer in any po rtion of the proposed project for consistency with the City’s ordinance. This is included as a mitigation measure. 17.f.g. Solid waste will be collected by the City of Atascadero, through contract personnel, and processed to the Chicago Grade landfill. There is sufficient capacity to serve the proposed project. Therefore the impact is less than significant. Mitigation Measure 17.d.1: Landscaping plans shall be submitted to the Community Development Department for review and approval. Landscaping must cons ist of drought tolerant species and utilize drip irrigation. Turf shall not be permitted as a part of the approved landscaping plan. 18. MANDATORY FINDINGS OF SIGNIFICANCE -- a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? c) Does the project have environmental effects that will cause substantial adverse effects on human beings, either  145 CITY OF ATASCADERO INITIAL STUDY 11/30/15 Page 42 ISND PLN 2014-1529.em Initial Study 2015-0007 PLN 2014-1529 – Halcon GPA Potentially Significant Impact Less Than Significant with Mitigation Incorporation Less Than Significant Impact No Impact directly or indirectly? d) Does the project have the potential to achieve short-term environmental goals to the disadvantage of long term environmental goals? DISCUSSION: This project site is currently comprised of 8 individual parcels, 6 of which contain existing single - family residences. The proposed project will increase the residential density of the project site allowing for up to 45 residential units total. Project applications include a General Plan Amendment, Zone Map Change, Planned Development Overlay Zone Change, Tentative Tract Map, and Master Plan of Development. The project site is currently zoned for a residential density of 1 du/2.5 acres. The proposed zoning would include a 10 acre portion of the site zoned for a density of 2 du/ac and the remaining 27.7 acre portion of the site at a density of 1 du/ac. Project- related impacts have been identified and mitigation measures have bee n included within the proposal to reduce the effect of the proposed project as described herein. SOURCES: California Department of Transportation The U.S. Fish and Wildlife Service National Wetlands Inventory General Plan 2025, City of Atascadero, 2004 California Department of Conservation Zoning Ordinance, part of Municipal Code, City of Atascadero, as amended CEQA Air Quality Handbook, Air Pollution Control District San Luis Obispo County, April 2012 Acoustical Design Manual, Brown-Buntin Associates, 1991 Flood Insurance Map FEMA Flood Map 08-09-1704V-060700, Site Plan Resolution No. R3-2013-0032 Central Coast Water Control Board CEQA Guidelines, Sections 15060 to 15065 City of Atascadero, GIS Data Atascadero Tree Ordinance Atascadero Fire Department City of Atascadero Engineering Standards California Department of Toxic Substances Control: Envirostor PROJECT SOURCES: Project Description Site Improvement Plans, Grading Plan Preliminary Stormwater Drainage Plan Biological Report Tree Impact Report Traffic Impact Study Architectural Elevations Acoustical Analysis Archeological Survey Report Biological Resources Survey Report 146 ATTACHMENT 5: Resolution PC 2015-A Recommendation to Certify Proposed Mitigated Negative Declaration 2015-0007 DRAFT RESOLUTION PC 2016-A MND CERTIFICATION RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING CITY COUNCIL CERTIFY MITIGATED NEGATIVE DECLARATION 2015-0007 HALCON RESIDENTIAL PLANNED DEVELOPMENT CONSCIOUSBUILD ATASCADERO DEV. LLC. WHEREAS, an application has been received from ConsciousBuild Atascadero Dev. LLC. (2921 Garabaldi Ave, San Luis Obispo, CA 93401) Owner and Applicant, and; Ben and Amanda Poore (11675 Halcon Rd, Atascadero, CA 93422) Owner, and; Carol Ratzlaff (11745 Halcon Rd, Atascadero, CA 93422) Owner, and; Mike and Laura Joy (11885 Halcon Rd, Atascadero, CA 93422) Owner, and; Shawn Sarnecki (11845 Halcon Rd, Atascadero, CA 93422) Owner, and; Pat and Terri Rodda (11855 Halcon Rd, Atascadero, CA 93422) Owner, and; Jeannie Dagnall (11875 Halcon Rd, Atascadero, CA 93422) Owner. to consider Planning Application PLN 2014-1529, for a project consisting of a General Plan Land Use Diagram Amendment, Zone Text and Map Amendments, Establishment of a Planned Development Overlay Zone, Vesting Tentative Tract Map, Tree Removal Permit and certification of a Mitigated Negative Declaration ("MND") on a 37.7± acre site located on Viejo Camino and Halcon Road, Atascadero, CA 93422 (APN’s 045-401-003, & 004 and 045-401- 014, 013, 010, 009, 018, & 017); and, WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2015-0007 were prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, 147 WHEREAS, Section 21000, et. seq., of the Public Resources Code and Section 15000, et. seq., of Title 14 of the California Code of Regulations (the “CEQA Guidelines”), which govern the preparation, content, and processing of Negative Declarations, have been fully implemented in the preparation of the MND. WHEREAS, pursuant to California State Law and the Atascadero Municipal Code, public hearing notices were mailed to all property owners within an area exceeding a three hundred foot radius of the subject property and a public hearing was published for a minimum of 10 days prior to the first public hearing; and WHEREAS, a duly noticed public hearing was held by the Atascadero Planning Commission on February 2, 2016, to consider the MND at which all interested persons were given the opportunity to be heard and has recommended certification of the MND; and WHEREAS, the Planning Commission of the City of Atascadero has reviewed and considered the information contained in the MND for the Halcon Residential Planned Development and associated applications; and, NOW THEREFORE, the Planning Commission of the City of Atascadero, hereby resolves to recommend that the City Council certify Proposed Mitigated Negative Declaration 2015-0007 based on the following Findings, and as shown in Exhibit A: 1. The Proposed Mitigated Negative Declaration has been completed in compliance with CEQA; and, 2. The Proposed Mitigated Negative Declaration was presented to the Planning Commission, and the information contained therein was considered by the Planning Commission, prior to recommending action on the project for which it was prepared; and, 3. The project does not have the potential to degrade the environment when mitigation measures are incorporated into the project; and, 4. The project will not achieve short-term to the disadvantage of long-term environmental goals; and, 5. The project does not have impacts which are individually limited, but cumulatively considerable; and, 6. The project will not cause substantial adverse effects on human beings either directly or indirectly; and, BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. 148 On motion by, __________and seconded by ____________ the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSTAIN: ( ) ABSENT: () ADOPTED: CITY OF ATASCADERO, CA ______________________________ Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 149 Exhibit A: Proposed Mitigated Negative Declaration 2015-0007 150 ATTACHMENT 6: Draft Resolution PC 2015-B Recommendation to Approve General Plan Amendment 2014-0030 DRAFT PC RESOLUTION 2016-B GENERAL PLAN LAND USE DIAGRAM AMENDMENT RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING GENERAL PLAN LAND USE DIAGRAM AMENDMENT 2014-0030 HALCON RESIDENTIAL PLANNED DEVELOPMENT CONSCIOUSBUILD ATASCADERO DEV. LLC. WHEREAS, an application has been received from ConsciousBuild Atascadero Dev. LLC. (2921 Garabaldi Ave, San Luis Obispo, CA 93401) Owner and Applicant, and; Ben and Amanda Poore (11675 Halcon Rd, Atascadero, CA 93422) Owner, and; Carol Ratzlaff (11745 Halcon Rd, Atascadero, CA 93422) Owner, and; Mike and Laura Joy (11885 Halcon Rd, Atascadero, CA 93422) Owner, and; Shawn Sarnecki (11845 Halcon Rd, Atascadero, CA 93422) Owner, and; Pat and Terri Rodda (11855 Halcon Rd, Atascadero, CA 93422) Owner, and; Jeannie Dagnall (11875 Halcon Rd, Atascadero, CA 93422) Owner. to consider Planning Application PLN 2014-1529, for a project consisting of a General Plan Land Use Diagram Amendment, Zone Text and Map Amendments, Establishment of a Planned Development Overlay Zone, Vesting Tentative Tract Map, Tree Removal Permit and certification of a Mitigated Negative Declaration ("MND") on a 37.7± acre site located on Viejo Camino and Halcon Road, Atascadero, CA 93422 (APN’s 045-401-003, & 004 and 045-401- 014, 013, 010, 009, 018, & 017); and, WHEREAS, the site’s current General Plan Land Use Designation is Suburban Estates (SE); and, WHEREAS, the site’s current Zoning Designation is Residential Suburban (RS); and, 151 WHEREAS, a General Plan Land Use Diagram Amendment is proposed by the applicants to change the Land Use Designation of lots within the project site to Single-Family Residential – X (SFR-X) and Single Family Residential – Y (SFR-Y) as identified in the amended General Plan Land Use Diagram attached to this Resolution as Exhibit B; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2015-0007 was prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the Planning Commission has determined that it is in the best interest of the City to enact this amendment to the General Plan to protect the health, safety and welfare of its citizens by applying orderly development and expanding housing opportunities within the City; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject general Plan Land Use Diagram Amendment application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said General Plan amendments; and, WHEREAS, the Planning Commission of the City of Atascadero, at a Public Hearing held on February 2, 2016, studied and considered General Plan Amendment 2014-0030 for the Halcon Residential Planned Development, after first studying and considering the Draft Mitigated Negative Declaration prepared for the project adopted Planned Development Overlay Zone #33 in conjunction with CUP 2014-0284, and, NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Atascadero makes the following findings, determinations and recommendations with respect to the proposed General Plan Land Use Diagram Amendment: SECTION 1. Findings for Approval the Halcon Residential Planned Development General Plan Land Use Diagram Amendment: The Atascadero Planning Commission finds as follows:  The proposed General Plan Amendment is consistent with the findings attached as Exhibit A. SECTION 2. Recommendation of Approval. The Atascadero Planning Commission, in a regular session assembled on February 2, 2016 resolved to recommend that City Council approve the General Plan Land Use Diagram Amendment consistent with the following exhibits: 1. EXHIBIT A: General Plan Amendment Findings 2. EXHIBIT B: General Plan Land Use Amendment Diagram 152 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by, and seconded by the foregoing resolution is hereby adopted in it s entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSTAIN: ( ) ABSENT: () ADOPTED: CITY OF ATASCADERO, CA ______________________________ Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 153 Exhibit A: General Plan Land Use Amendment Findings Halcon Residential Planned Development (PLN 2015-1529) GENERAL PLAN AMENDMENT FINDINGS 1. The proposed General Plan Amendment has been prepared consistent with the applicable laws and guidelines of the State of California; and, Staff Comment: All applicable State Laws have been adhered to in the preparation of this General Plan Amendment application. 2. A duly noticed public hearing has been held to receive and consider public testimony regarding the proposed amendments to the General Plan Land Use Diagram; and, Staff Comment: Hearing notices were prepared in accordance with State Law and applicable Atascadero Municipal Code requirements. A public hearing was held by the Planning Commission at which public testimony was received and considered prior to taking action on the proposed application. 3. The proposed amendment is in the public interest and protects the health, safety and welfare of public by ensuring the orderly development of the City. The proposed amendment is consistent with General Plan Land Use Policies 1.1, 1.3, 2.1, 2.3, 5.3, 6.1, 7.1, 7.2, 8.5, 15.1, and 15.6; Circulation Policies 1.1, 1.4, 1.5, 2.1, and 3.2; and Housing Element Policies 1.1, 4.3 and 10.1. The proposed amendment provides for new housing opportunities within the City’s urban services line and increases residential density in areas appropriate for residential growth. The proposed Planned Development O verlay District and requirements for a Master Planned neighborhood ensure that the overall neighborhood design and layout supports existing and future traffic patterns and provides pedestrian connectivity both internal and external to the development area. 154 Exhibit B: General Plan Land Use Diagram Amendment Halcon Residential Planned Development (PLN 2015-1529) APN’s 045-401-003, & 004 Current GP designation: Suburban Estates (SE) Proposed GP designation: Single- Family Residential – X (SFR-X) APN’s 045-401-014, 013, 010, 009, 018, & 017 Current GP designation: Suburban Estates (SE) Proposed GP designation: Single- Family Residential – Y (SFR-Y) 155 ATTACHMENT 7: Draft Resolution PC 2015-C Recommendation to Approve Zone Text Amendment 2015-0178 DRAFT PC RESOLUTION 2016-C PD-33 OVERLAY DISTRICT ZONING CODE TEXT AMENDMENT RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL ADOPT AN ORDINANCE ESTABLISHING A PLANNED DEVELOPMENT OVERLAY DISTRICT #33 CODE TEXT (ZCH 2015-0178) FOR THE HALCON RESIDENTIAL PLANNED DEVELOPMENT HALCON RESIDENTIAL PLANNED DEVELOPMENT CONSCIOUSBUILD ATASCADERO DEV. LLC. WHEREAS, an application has been received from ConsciousBuild Atascadero Dev. LLC. (2921 Garabaldi Ave, San Luis Obispo, CA 93401) Owner and Applicant, and; Ben and Amanda Poore (11675 Halcon Rd, Atascadero, CA 93422) Owner, and; Carol Ratzlaff (11745 Halcon Rd, Atascadero, CA 93422) Owner, and; Mike and Laura Joy (11885 Halcon Rd, Atascadero, CA 93422) Owner, and; Shawn Sarnecki (11845 Halcon Rd, Atascadero, CA 93422) Owner, and; Pat and Terri Rodda (11855 Halcon Rd, Atascadero, CA 93422) Owner, and; Jeannie Dagnall (11875 Halcon Rd, Atascadero, CA 93422) Owner. to consider Planning Application PLN 2014-1529, for a project consisting of a General Plan Land Use Diagram Amendment, Zone Text and Map Amendments, Establishment of a Planned Development Overlay Zone, Vesting Tentative Tract Map, Tree Removal Permit and certification of a Mitigated Negative Declaration ("MND") on a 37.7± acre site located on Viejo Camino and Halcon Road, Atascadero, CA 93422 (APN’s 045-401-003, & 004 and 045-401- 014, 013, 010, 009, 018, & 017); and, 156 WHEREAS, the site’s current General Plan Land Use Designation is Suburban Estates (SE); and, WHEREAS, the site’s current Zoning Designation is Residential Suburban (RS); and, WHEREAS, the Planning Commission has recommended that the City Council approve a General Plan Land Use Diagram Amendment to change the Land Use Designation of lots within the project site to Single-Family Residential (SFR-X) and Single-Family Residential – Y (SFR-Y); and, WHEREAS, a Zoning Ordinance Text Change is proposed by the applicants to establish zoning code text for Planned Development Overlay Zone #33 (PD-33); and, WHEREAS, Article 28 of the Atascadero Municipal Code allows for the creation of Planned Development Overlay Zones to promote orderly and harmonious development and to enhance the opportunity to best utilize special site characteristics; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2015-0007 was prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the Planning Commission has determined that it is in the best interest of the City to amendment to the Zoning Code Text to protect the health, safety and welfare of its citizens by applying orderly development and expanding housing opportunities within the City; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Text Change application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said zoning text amendments; and, WHEREAS, the Planning Commission of the City of Atascadero, at a Public Hearing held on February 2, 2016, studied and considered Zone text Change 2015-0178to establish Planned Development Overlay Zone #33, after first studying and considering the Draft Mitigated Negative Declaration prepared for the project, and, NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Atascadero makes the following findings, determinations and recommendations with respect to the proposed Zoning Code Text Amendment: SECTION 1. Findings for Approval of a Zone Text Change Amendment creating a Planned Development District Zone #33. The Planning Commission finds as follows: 157 1. The proposed amendment is in conformance with the adopted General Plan Goals, Policies, and Programs and the overall intent of the General Plan, and; 2. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 3. The proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 4. The proposed zone change will not create any new significant and unavoidable impacts to traffic, infrastructure, or public service impacts; and 5. The proposed zone change is consistent with the project-specific Mitigated Negative Declaration and incorporates all feasible mitigation measures consistent with the Mitigation Monitoring and Reporting Program; and, 6. Modification of development standards or processing requirements is warranted to promote orderly and harmonious development, and; 7. Modification of development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area, and; 8. Benefits derived from the overlay zone cannot be reasonably achieved through existing development standards or processing requirements. SECTION 2. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on February 2, 2016 resolved to recommend that the City Council introduce for first reading, an ordinance that would amend the City Zoning Ordinance with the following: 9-3.678 Establishment of Planned Development Overlay Zone No. 33 (PD33) Planned Development Overlay Zone No. 33 is established as shown on the official zoning maps (Section 9-1.102 of this title). A Planned Development Overlay Zone No. 33 is established on parcels APN’s 045- 401-003, & 004 and 045-401-014, 013, 010, 009, 018, & 017 with a combined acreage of 37.7 acres. Development shall be permitted as follows: (a) Project Area Development Standards The following development standards shall be applicable to the entire project area as identified in Figure 1. (1) Lots of less than 1-acre net shall be required to hook up to City sewer. 158 (2) All utilities, including electric, telephone and cable, along the frontage of, and within the PD and along the project frontages shall be installed and/or relocated underground. (3) All residential uses shall be consistent with the requirements of the underlying zoning district except as allowed by a master plan of development. (4) Any future tree removal shall require approval of the Planning Commission. Exceptions for single-family uses will not be considered exempt within the Planned Development Overlay Zone. (5) Street trees shall be provided along all internal and abutting public street frontages at a maximum spacing of 30-feet on-center. Clustering and alternative spacing may be approved by the City Engineer to accommodate topographic, sight-distance, or drainage conflicts or to maintain the rural setting within larger lot development areas. (6) The construction of any new residential unit (not applicable to replacement of existing units) shall require payment of a mitigation fee toward the Santa Barbara / US 101 interchange. Payment shall be made prior to issuance of any residential building permit. Final fee amount shall be based on a City approved engineers cost estimate for the final improvements. (7) All newly constructed residential units shall be subject to inclusionary housing fee payment totaling 2.5% of the building valuation for any primary residential unit. (8) All shared facilities and public street frontages shall be maintained by the development as a whole or in portions. An HOA or other maintenance mechanism shall be established for each subdivision requiring such prior to recordation of any final map. (9) All parcels shall annex into the City’s Community Facilities District prior to or concurrent with recordation of any final map. Annexation will not be required for existing parcels if no map is pursued. (10) Solid privacy fencing adjacent to public frontages shall be setback a minimum of 10-feet from the edge of the pedestrian path/public way easements. All low property line fencing will include landscaping between the fencing and the pedestrian pathway. (11) All lighting shall be designed to eliminate any off site glare. All exterior site lights shall utilize full cut-off, “hooded” lighting fixtures to prevent offsite light spillage and glare (12) APCD construction level mitigation measures for fugitive dust and construction emissions shall be required for any site development. (b) The Groves Development – RSF-X parcels (APN’s 045-401-003, & 004) The following development standards shall be applicable to The Groves development parcels, identified in Figure 1. (1) A clustered subdivision may be permitted with an overall maximum density of 2 du/ac. (2) All clustered site development shall require the approval of a master plan of development. All construction and development shall conform to the approved master plan of development, as conditioned. (3) No subsequent tentative parcel or tract map shall be approved unless found to be consistent with the approved master plan of development. 159 (4) A meandering 10-foot wide pedestrian pathway shall be required along the Viejo Camino frontage, subject to the approval of the City Engineer. Easements shall be dedicated to the City where applicable to accommodate all pedestrian facilities. (5) All internal streets shall be designed with a 4-foot minimum width walkable shoulder. Exceptions may be granted where topography or drainage facilities conflict, subject to the approval of the City Engineer. (6) Larger parcels shall abut Santa Barbara Rd to provide a buffer to the existing rural residential area, maximize tree retention, and minimize grading on heavily sloped areas. (7) A cul-de-sac connection to the neighboring parcels (APN’s 045-401-014, 013), as shown on figure 1, shall be provided through The Groves Development site. (8) On street parking shall be provided for all streets serving lots of ½ acre or less. (9) All shared facilities shall be maintained by the development through an HOA or other City approved maintenance mechanism. (c) The Neighboring Parcels – RSF-Y parcels (APN’s 045-401-014, 013, 010, 009, 018, & 017) The following Development Standards shall apply to future development within the Planned Development boundary. (1) A cluster subdivision may be permitted on any portions or portions of the site area providing overall density does not exceed 1 du/ac. (2) All clustered site development shall require the approval of a master plan of development. All construction and development shall conform to the approved master plan of development, as conditioned. (3) Architectural site design and individual lot development for non -clustered developments shall be completed by staff and/or a designee of the Community Development Director. (4) Access to the Neighbor Parcel portion the project site from Halcon Rd shall be consolidated into 2 access roads. Shared access roads shall be evaluated for sight-distance upon submittal of any tentative map and/or development plan. Proposed access roads shall be designed to serve the entire area. Private driveways shall be eliminated once development commences. Private driveways serving existing residences where access off of the shared roads is not feasible, may request an exception to this requirements, subject to the approval of the City Engineer. Should any parcel resulting from the subdivision of APN’s 045-401-014, 013 take access via Halcon Rd, the consolidated access roads shall be utilized. No private driveway connections to Halcon Rd from APN’s 045-401-014, 013, or subdivided portions thereof, shall be permitted. (5) All shared facilities shall be maintained by the development through an HOA or other City approved maintenance mechanism. (6) On-street parking shall be required for roads serving lots of ½ acre or less. (7) Walkable shoulders designed to meet City standards shall be required for all roads serving lots of ½ acre or less. Roads serving lots of greater than ½ acre shall be designed to City standards. 160 (8) A meandering 10-foot wide pedestrian pathway shall be required along the Halcon Rd. frontage, subject to the approval of the City Engineer. Easements shall be dedicated to the City where applicable to accommodate all pedestrian facilities. (9) A noise analysis shall be required for all residential units and private outdoor areas located within 75-feet of Halcon Rd. A noise analysis will only be required for private outdoor areas where the usable space is located entirely within this zone. (10) A biological survey to determine the presence of sensitive plant species and wildlife species such as nesting birds, American badger, or Silvery legless lizards shall be conducted prior to the issuance of any building permit or approval of any subdivision map or development plan. Recommendations from the report shall be adhered to prior to and/or during construction. Figure 1 Development Diagram The Neighboring Parcels - APN’s 045- 401-014, 013, 010, 009, 018, & 017 The Groves Development - APN’s 045-401-003, & 004 Site Access Potential consolidated access point Potential consolidated access point Cul-de-sac connection to adjoining lots (APN’s 045- 401-014, 013) 161 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by, and seconded by the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSTAIN: ( ) ABSENT: () ADOPTED: CITY OF ATASCADERO, CA ______________________________ Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 162 ATTACHMENT 8: Draft Resolution PC 2015-D Recommendation to Approve Zone Map Amendment 2014-0175 DRAFT PC RESOLUTION 2016-D ZONING MAP AMENDMENT RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL ADOPT AN ORDINANCE APPROVING ZONE CHANGE ZCH 2014-0175 AMENDING THE OFFICIAL ZONING MAP DESIGNATION FOR THE HALCON RESIDENTAIL PLANNED DEVELOPMENT HALCON RESIDENTIAL PLANNED DEVELOPMENT CONSCIOUSBUILD ATASCADERO DEV. LLC. WHEREAS, an application has been received from ConsciousBuild Atascadero Dev. LLC. (2921 Garabaldi Ave, San Luis Obispo, CA 93401) Owner and Applicant, and; Ben and Amanda Poore (11675 Halcon Rd, Atascadero, CA 93422) Owner, and; Carol Ratzlaff (11745 Halcon Rd, Atascadero, CA 93422) Owner, and; Mike and Laura Joy (11885 Halcon Rd, Atascadero, CA 93422) Owner, and; Shawn Sarnecki (11845 Halcon Rd, Atascadero, CA 93422) Owner, and; Pat and Terri Rodda (11855 Halcon Rd, Atascadero, CA 93422) Owner, and; Jeannie Dagnall (11875 Halcon Rd, Atascadero, CA 93422) Owner. to consider Planning Application PLN 2014-1529, for a project consisting of a General Plan Land Use Diagram Amendment, Zone Text and Map Amendments, Establishment of a Planned Development Overlay Zone, Vesting Tentative Tract Map, Tree Removal Permit and certification of a Mitigated Negative Declaration ("MND") on a 37.7± acre site located on Viejo Camino and Halcon Road, Atascadero, CA 93422 (APN’s 045-401-003, & 004 and 045-401- 014, 013, 010, 009, 018, & 017); and, WHEREAS, the site’s current General Plan Land Use Designation is Suburban Estates (SE); and, 163 WHEREAS, the site’s current Zoning Designation is Residential Suburban (RS); and, WHEREAS, the Planning Commission has recommended that the City Council approve a General Plan Land Use Diagram Amendment to change the Land Use Designation of lots within the project site to Single-Family Residential - X (SFR-X) and Single-Family residential – Y (SFR-Y); and, WHEREAS, the Planning Commission has recommended that the Cit y Council approve a Zoning Ordinance Text Change to establish zoning code text for Planned Development Overlay Zone #33 (PD-33); and, WHEREAS, a Zoning Map Amendment is proposed by the applicant to change the zoning of lots with the project area to Residential Single-Family (RSF-X) and Residential-Single Family – Y (RSF-Y), with a PD-33 overlay on the entire project site in order to correspond with the recommended General Plan Land Use Diagram Amendment and PD-33 Zoning Ordinance code text; and, WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2015-0007 was prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, the Planning Commission has determined that it is in the best interest of the City to enact this amendment to the Zoning Map to protect the health, safety and welfare of its citizens by applying orderly development and expanding housing opportunities within the City; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Zoning Map Amendment application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Zoning Map Amendments; and, WHEREAS, the Planning Commission of the City of Atascadero, at a Public Hearing held on February 2, 2016, studied and considered Zoning Map Amendment ZCH 2014-0175 after first studying and considering the Draft Mitigated Negative Declaration prepared for the project; and, NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Atascadero makes the following findings, determinations and recommendations with respect to the proposed Zoning Map Amendment: 164 SECTION 1. Findings for Approval of an Amendment to the Official Zoning Map of Atascadero changing the zoning of lots within the project area. The Planning Commission finds as follows: 1. The proposed zone change will be compatible with existing or desired conditions in surrounding neighborhoods and surrounding General Plan land uses and General Plan policies. 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including the PD-33 Ordinance; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; 4. The proposed project or use will not be inconsistent with the character of the immediate neighborhood or contrary to its orderly development. SECTION 2. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on February 2, 2016, resolved to recommend that the City Council introduce for first reading an ordinance (ZCH 2014-0175) that would rezone the subject site consistent with the following: 1. EXHIBIT A: Zone Change Map 165 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by, and seconded by the foregoing resol ution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSTAIN: ( ) ABSENT: () ADOPTED: CITY OF ATASCADERO, CA ______________________________ Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 166 Exhibit A: Zoning Map Amendment Halcon Residential Planned Development (PLN 2014-1529) APN’s 045-401-003, & 004 Current Zoning: Residential Suburban (RS) Proposed Zoning: Residential Single- Family – X (RSF-X) / PD33 APN’s 045-401-014, 013, 010, 009, 018, & 017 Current Zoning: Residential Suburban (RS) Proposed Zoning: Residential Single- Family – Y (RSF-Y) / PD33 167 ATTACHMENT 9: Draft Resolution PC 2015-E Master Plan of Development (CUP) 2014-0284 DRAFT PC RESOLUTION 2016-E MASTER PLAN OF DEVELOPMENT / TREE REMOVAL PERMIT THE GROVES RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO RECOMMENDING THAT THE CITY COUNCIL APPROVE THE MASTER PLAN OF DEVELOPMENT FOR THE GROVES DEVELOPMENT AS A PORTION OF THE HALCON RESIDENTIAL PLANNED DEVELOPMENT HALCON RESIDENTIAL PLANNED DEVELOPMENT CONSCIOUSBUILD ATASCADERO DEV. LLC. WHEREAS, an application has been received from ConsciousBuild Atascadero Dev. LLC. (2921 Garabaldi Ave, San Luis Obispo, CA 93401) Owner and Applicant, and; to consider Planning Application PLN 2014-1529, for a project consisting of a General Plan Land Use Diagram Amendment, Zone Text and Map Amendments, Establishment of a Planned Development Overlay Zone, Vesting Tentative Tract Map, Tree Removal Permit and certification of a Mitigated Negative Declaration ("MND") on a 10± acre site located on Viejo Camino and Halcon Road, Atascadero, CA 93422 (APN’s 045-401-003, & 004); and, WHEREAS, the site’s current General Plan Land Use Designation is Suburban Estates (SE); and, WHEREAS, the site’s current Zoning Designation is Residential Suburban (RS); and, WHEREAS, the Planning Commission has recommended that the City Council approve a General Plan Land Use Diagram Amendment to change the Land Use Designation of lots within the project site to Single-Family Residential - X (SFR-X) and Single-Family residential – Y (SFR-Y); and, WHEREAS, the Planning Commission has recommended that the City Council approve a Zoning Ordinance Text Change and Zoning Map Amendment to establish zoning code text for PD-33 zoning district and to change the zoning of lots with the project area to Residential Single- Family – X (RSF-X) and Residential Single-Family - Y (RSF-Y), with a PD-33 overlay on the entire project site based on findings; and, 168 WHEREAS, the PD-33 requires the adoption of a Master Plan of Development, approved in the form of a Conditional Use Permit for cluster development portions of the project area; and WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2015-0007 was prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Master Plan of Development was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of Development; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on February 2, 2016 studied and considered Conditional Use Permit 2014- 0284 (Master Plan of Development)and Tree Removal Permit 2014-0178, after studying and considering the proposed Mitigated Negative Declaration prepared for the project, and NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Atascadero makes the following findings, determinations and recommendations with respect to the proposed Master Plan of Development and Tree Removal Permit: SECTION 1. Findings for Approval of Master Plan of Development. The Planning Commission recommends that the City Council finds as follows: 1. The proposed project or use is consistent with the General Plan and the City’s Appearance Review Manual; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including provisions of the PD-33 Overlay Zone; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. The proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 5. The Master Plan of Development standards or processing requirements is warranted to promote orderly and harmonious development; and 169 6. The proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. 7. The Master Plan of Development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area; and 8. Benefits derived from the Master Plan of Development and PD-33 Overlay Zone cannot be reasonably achieved through existing development standards or processing requirements; and, 9. The proposed project will not result in substantial detrimental effects on the enjoyment and use of adjoining properties; and, SECTION 2. Findings for Approval of Tree Removal. The Planning Commission recommends the City Council finds as follows: 1. The trees are obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal, as certified by a report from the Site Planner and determined by the Community Development Department based on the following factors:  Early consultation with the City;  Consideration of practical design alternatives;  Provision of cost comparisons (from applicant) for practical design alternatives;  If saving tree eliminates all reasonable uses of the property; or  If saving the tree requires the removal of more desirable trees. SECTION 3. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on February 2, 2016 resolved to recommend that the City Council approve the Master Plan of Development and associated Tree removal Permit subject to the following: 1. EXHIBIT A: Conditions of approval / Mitigation Monitoring Program 2. EXHIBIT B: Master Plan of Development / Site Plan 3. EXHIBIT C: Landscape Plan 4. EXHIBIT D: Elevations / Floor Plan 5. EXHIBIT E: Grading and Drainage Plan 6. EXHIBIT F: Utility Plan 7. EXHINIT G: Noise Analysis Diagram 170 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by, ______and seconded by _____the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSTAIN: ( ) ABSENT: () ADOPTED: CITY OF ATASCADERO, CA ______________________________ Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 171 EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves (PLN 2014-1529) Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Planning Services 1. The approval of this use permit shall become final and effective for the purposes of issuing building permits thirty (30) days following the City Council approval of ZCH 2014-0175 and ZCH 2015-0178 upon second reading, unless prior to that time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. FM PS 2. The Community Development Director shall have the authority to approve minor changes to the project that remain in substantial conformance to the approved Master Plan of Development. Such changes may include, but are not limited to, building alterations and/or architectural changes, site placement of structures, landscape modifications, and construction design issues that do not substantively affect the Master Plan of Development. The DRC shall make a recommendation to the Community Development Director related to any proposed architectural design changes not in keeping with the architectural style approved by this resolution. The Planning Commission shall have the final authority to approve any changes to the Master Plan of Development and any associated Tentative Maps deemed to be substantive by the Community Development Director. BP / FM PS, CE 3. Approval of this Conditional Use Permit shall be valid for twenty-four (24) months after its effective date. At the end of the period, the approval shall expire and become null and void unless the project has received a building permit. BP / FM PS 4. The applicant shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the city, or any of its entities, concerning the subdivision Ongoing PS 172 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. 5. All subsequent Tentative Map and construction permits shall be in substantial conformance with the Master Plan of Development contained herein. BP / FM PS, CE 6. All exterior elevations, finish materials and colors shall be in substantial conformance with the Master Plan of Development as shown in EXHIBIT D with the following modifications:  Garage doors shall be of a color compatible with the building color scheme and shall be designed to blend in with the façade rather that contrast.  Any proposed exterior street, pedestrian, or building mounted light fixtures shall be of architectural grade and design and shall be compliment the architectural style, subject to staff approval. All lighting shall comply with dark sky standards and shall be located and directed to avoid off-site glare per City ordinance.  Stucco siding shall be smooth troweled or similar. No machine finishes will be permitted.  Stone accent banding shall wrap each façade to an adjoining projected feature or at a distance approved by staff. BP PS 7. All site work, grading, and site improvements shall be in substantial conformance with the Master Plan of Development as shown in EXHIBIT B, C, E and F. BP/FM PS, BS, CE 8. A final landscape and irrigation plan shall be approved prior to the issuance of building permits and included as part of site improvement plan consistent with EXHIBIT C, and as follows:  All exterior meters, trash storage areas, air conditioning units and mechanical equipment shall be screened with landscape material and/or architecturally compatible enclosures.  All areas shown on the landscape plan and/or areas disturbed during construction for individual lots shall be landscaped and/or hydroseeded with a native mix by the developer completed prior to final of each lot.  Landscape areas between the Viejo Camino pathway and the split rail fence (limits of public easement) shall be landscaped prior to final and acceptance of the off-site BP PS, BS 173 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. improvements.  Street trees shall be provided along Viejo Camino at a maximum spacing of 30 feet on center. Groupings of trees may be allowed to accommodate sight-distance, topographical features, and/or rural character, subject to the approval of the Community Development Director and City Engineer.  Landscape screening comprised of a combination of trees and native shrubs/grasses shall be provided between all pedestrian pathways and any solid fencing or sound wall features. Walkable shoulders shall be considered as pedestrian pathways for the purposes of this condition.  The corner of Viejo Camino and Santa Barbara Rd shall include enhanced landscaping to buffer between the project and the existing rural residences. Landscaping shall include a combination of trees and native shrubs/grasses, subject to staff approval.  Street and screening trees shall be minimum 15-gallon size and double staked.  A neighborhood identification monument sign shall be permitted at the Viejo Camino project entrance. Monument sign design shall be consistent with building and/or sound wall materials and shall be subject to the review and approval of staff.  Adequate sight-distance shall be maintained at all intersections and private driveways. Shrubs/grasses shall be setback or eliminated where clear sight-distance is required. 9. All project fencing shall be installed consistent with EXHIBIT C subject to the following modifications:  All solid fencing shall be setback a minimum of 10-feet from the edge of right-of-way/public access easements and shall include landscaping within the setback area.  Split rail fencing shall be installed along the Viejo Camino frontage at the edge of the easement dedication. This fencing shall be maintained by the HOA.  Rear yard privacy fencing for lost abutting Viejo Camino or any interior street shall be setback a minimum of 10-feet from the edge of the easement dedications. This includes GP/BP PS 174 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. all pathways and walkable shoulders.  All project fencing shall be of consistent style and material.  Sound walls may be required for outdoor activity areas located in areas along Viejo Camino where decibel readings exceed residential standards, as identified in EXHIBIT G. Where required, sound walls shall be of architectural quality and include features such as decorative top caps. Sound walls shall have the same setback and landscaping requirements as solid fencing. Any sound wall proposed at the boundaries of the project shall taper in a decorative matter and not abruptly terminate at the property line. Neighborhood signage may be incorporated into the sound wall design. Alternatively, sound attenuation areas may be integrated into the building design and/or setback outside of the identified area. 10. Final selection of colors and materials identified in EXHIBIT D shall be subject to staff approval. GP/BP PS 11. Affordable Housing Requirement: The applicant shall submit a payment of 2.5% of the building valuation for each residential unit to be placed into the City’s inclusionary housing fund. Payment shall be required prior to building permit issuance. GP/BP PS, CA 12. A Tree Protection Plan shall be prepared as part of the on- and off-site improvement plan package and/or any residential building permit where construction activities will occur within 20- feet of a native tree dripline. The applicant will contract with a certified arborist to monitor all activity within the drip lines of existing native trees. GP/BP PS 13. The emergency services and facility maintenance costs listed below shall be 100% funded by the project in perpetuity. The service and maintenance costs shall be funded through a community facilities district established by the City at the developer's cost. The funding mechanism must be in place prior to or concurrently with acceptance of the final maps. The funding mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above mentioned funds shall be by the City. Developer agrees to participate in the community facilities district and to take all steps reasonably required by the City with regard to the establishment of the district and assessment of the BP PS 175 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. property.  All Atascadero Police Department service costs to the project.  All Atascadero Fire Department service costs to the project.  Off-site common City of Atascadero park facilities maintenance service costs related to the project. 14. All tract maintenance costs listed below shall be 100% funded by the project in perpetuity. The service and maintenance cost shall be funded through a Home Owners Association established by the developer subject to City approval. The Home Owners Association must be in place prior to, or concurrently with acceptance of any final maps. The Home Owners Association shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any Final Map. The administration of the above mentioned funds, and the coordination and performance of maintenance activities, shall be the responsibility of the Home Owners Association. a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access roads, emergency access gates, and sewer mains within the project. b) All parks, trails, recreational facilities and like facilities. c) All open space and native tree preservation areas. d) All drainage facilities and detention basins. e) All creeks, flood plains, floodways, wetlands, and riparian habitat areas. f) All common landscaping areas, street trees, medians, parkway planters, manufactured slopes outside private yards, and other similar facilities. g) All frontage landscaping and sidewalks along public streets BP PS 15. Prior to issuance of building permits for any residential unit, the applicant shall pay their fair share toward improvements at the US 101/Santa Barbara interchange based on a City approved cost estimate for the build-out improvements. BP PS, BS 176 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. 16. Prior to final map, the applicant shall submit CC&Rs for review by the Community Development Department. The CC&R’s shall record with the Final Map and shall include the following: a) Provisions for maintenance of all common areas including access, parking, street trees, fencing and landscaping. b) A detailed list of each individual homeowner’s responsibilities for maintenance of the individual units. c) Individual unit’s responsibility for keeping all trash receptacles within the unit’s garage. BP PS, BS 17. Approval of this permit shall include the removal of 19 Native Oak Trees, totaling 242-inches dbh. The applicant shall provide a tree preservation easement over a portion of lots 10 and 7 as mitigation of the approved removals. Any additional removals shall be subject to Planning Commission approval. BP PS, BS ENGINEERING CONDITIONS PROJECT SPECIFIC CONDITIONS 18. The internal streets shall be offered as public rights-of-way as shown on the tentative map and shall be extended to include the cul-de-sac adjacent to lots 9, 16 & 17. BP, GP CE 19. Internal streets shall not be improved with sidewalks but shall comply with City standards for Rural Local roads. The road shoulder adjacent to Lots 1-5 and Lots 13-15 shall include a 5-foot wide walkable shoulder of compacted Class II Agg Base or DG, with a cross-slope matching that of the street, but not exceeding 4%. Where curb & gutter, or, an AC dike are required to convey stormwater, the area behind the curb or dike shall be compacted base or DG as described above. Curb ramps are not required at the intersections of the BP, GP CE 177 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. internal streets. 20. Viejo Camino shall be improved to City standards as shown on the Tentative Map along the project frontage. New improvements shall be consistent with City standards and the Circulation Element and shall include new curb, gutter, street intersection with cross-gutter, traffic signage and delineation, a bike lane (Class II), and transit stop. The street pavement shall be completed to integrate the existing roadway with the new frontage improvements as shown on the Tentative Map. BP, GP CE 21. Along the Viejo Camino frontage, the property owner shall dedicate an easement and construct a public pedestrian and bike trail to accommodate a 10-foot wide detached pedestrian & bike trail. The pedestrian/bike trail shall be constructed of compacted class 2 aggregate base or decomposed granite to the satisfaction of the Director of Public Works and Director of Community Development. Final alignment shall meander as necessary to conform to the existing terrain, trees and drainage requirements to the satisfaction of the Director of Public Works and Director of Community Development. BP, GP CE 22. The transit stop shown on Viejo Camino shall be not less than 90 feet long (end-to-end, including transition lanes). The transit stop shall be designed using smooth curves to allow for ease of entry/exiting of the bus as well as street sweeping equipment. The bus staging area shall be of sufficient width to allow the bus to be safely located out of the travel lane(s) while loading or unloading passengers to the satisfaction of the City Engineer. The structural pavement-section shall be sufficient to support the typical transit vehicles but shall be not less than 6” Class A concrete over 6” Class II Aggregate Base, to the satisfaction of the City Engineer. Sidewalk at the transit stop shall be in addition to the concrete pad necessary to place the transit street furniture (bus shelter, bench, sign and other street furniture as deemed necessary by the Director of Public Works). Additional right-of-way shall be dedicated to accommodate the turn-out to the satisfaction of the City Engineer. BP, GP CE 178 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. 23. The Subdivider shall plant street trees along the Viejo Camino street frontage behind the public sidewalk and within 15-feet. Trees planted closer than 10-feet shall include deep-root planter barriers as approved by the City Engineer. One street tree shall be planted for each 35 linear feet (or portion thereof) of road frontage. BP, GP CE 24. Street trees on the internal streets shall be planted at the time of lot development along the road frontages of the internal streets offered to the public. One street tree shall be planted for each 35 linear feet (or portion thereof) of road frontage. BP, GP CE 25. A new gravity sewer shall be designed and extended in Viejo Camino to serve the lots of Tract 3078, to the satisfaction of the City Engineer. An optional route along Halcon Rd can be explored for feasibility, subject to the review and approval of the city Engineer. The developer may request a reimbursement agreement for future private sewer connections for any off-site sewer extension subject to City Ordinance and City Council authorization. Notice of developer intent to request a reimbursement agreement must be made in writing prior to the start of construction. BP CE 26. Each new lot shall be served by separate laterals for water, power, communications, gas & cable TV (if available adjacent to the subject property). BP CE 27. The Final Map shall include the offer of Public Utility Easements along all street frontages (6-feet wide), to the satisfaction of the City Engineer. FM CE 28. The Subdivider shall dedicated sufficient public right-of-way for street purposes along the northerly side of Santa Barbara Street to accommodate the existing improved road alignment. FM CE 29. A crosswalk shall be installed across Halcon Rd at Viejo Camino. The developer shall work with the City Engineer to install any improvements necessary to provide safe pedestrian access. The developer may request reimbursement based on a fair share analysis for other properties within the project area once they develop. Any request for a reimbursement agreement must be provided in writing prior to issuance of the subdivision improvement plans for the required crosswalk and must be included by reference in the subdivision improvement agreement. FM/GP CE 179 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. STANDARD CONDITIONS 30. All public improvements shall be constructed in conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings. BP, GP CE 31. In the event that the applicant is allowed to bond for the public improvements required as a condition of this map, the applicant shall enter into a Subdivision Improvement Agreement with the City. FM CE 32. An engineer’s estimate of probable cost shall be submitted for review and approval by the City Engineer to determine the amount of the bond. FM CE 33. The Subdivision Improvement Agreement (SIA) shall record concurrently with the Final Map. If it is the intent of the developer to pursue a reimbursement agreement with the City for the installation of off-site sewer facilities, reference to said agreement and terms shall be included in the SIA. FM CE 34. The applicant shall be responsible for the relocation and/or alteration of existing utilities. BP, GP CE 35. The applicant shall install all new utilities (water, gas, electric, cable TV and telephone) underground. Utilities shall be extended to the property line frontage of each lot or its public utility easement. BP, GP CE 36. The applicant shall monument all property corners for construction control and shall promptly replace them if disturbed. FM CE 37. The applicant shall acquire title interest in any off-site land that may be required to allow for the construction of the improvements. The applicant shall bear all costs associated with the necessary acquisitions. The applicant shall also gain concurrence from all adjacent property owners whose ingress and egress is affected by these improvements. FM CE 180 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. 38. Slope easements shall be provided as needed to accommodate cut of fill slopes. FM CE 39. Drainage easements shall be provided as needed to accommodate both public and private drainage facilities. FM CE 40. The final map shall be signed by the City Engineer prior to the map being placed on the agenda for City Council acceptance. FM CE 41. Prior to recording the tract map, the applicant shall submit a map drawn in substantial conformance with the approved tentative map and in compliance with all conditions set forth herein. The map shall be submitted for review and approval by the City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. FM CE 42. Prior to recording the tract map, the applicant shall set monuments at all new property corners. A registered civil engineer or licensed land surveyor shall indicate by certificate on the parcel map, that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. 43. Prior to recording the tract map, the applicant shall pay all outstanding plan check/inspection fees. 44. Prior to recording the map, the applicant shall complete all improvements required by these conditions of approval FM CE 45. Prior to recording the tract map, the applicant shall have the map reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company indicating their review of the map. The letter shall identify any new easements that may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the map. FM CE 46. Upon recording the final map, the applicant shall provide the City with a black line clear Mylar (0.4 mil) copy and a blue line print of the recorded map. FM CE 181 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. 47. Prior to the final inspection of any public improvements, the applicant shall submit a written statement from a registered civil engineer that all work has been completed and is in full compliance with the approved plans. FM CE 48. Prior to the final inspection, the applicant shall submit a written certification from a registered civil engineer or land surveyor that all survey monuments have been set as shown on the final map. BP, GP CE 49. An encroachment permit shall be obtained prior to any work within City rights of way. BP, GP CE 50. Prior to the issuance of building permits the applicant shall submit a grading and drainage plan prepared by a registered civil engineer for review and approval by the City Engineer. BP, GP CE 51. The applicant shall submit a hydraulic analysis with the first plan check submittal of the water system improvements for the project. The analysis should take into account the fire flows required by the California Building Code. The applicant is responsible for designing and constructing water system improvements that will provide water at pressures and flows adequate for the domestic and fire protection needs of the project. BP, GP CE MITIGATION MONITORING PROGRAM Mitigation Measure 1.c.1: A landscape buffer shall be provided along Santa Barbara Rd. Landscape material shall consist of native and/or drought tolerant species. As mixture of low and medium plants shall be utilized to provide visual screening of the project from the adjacent neighborhood. BP PS/BS Mitigation Measure 1.c.2: Street trees shall be provided along Viejo Camino and Halcon Rd. Street trees shall be spaced at no greater than 30-feet on center, however, rural tree groupings may be approved by the City Engineer due to topographic or sight distance concerns and/or to maintain the rural nature of the street. BP CE/BS Mitigation Measure 1.c.3: Rear or side yard privacy fencing where adjacent to a private road shall be set back from the edge of shoulder a minimum of 10-feet. Where rear or side yard fencing is adjacent to a public road, a minimum setback from the edge of BP PS/BS 182 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. pavement/sidewalk/pedestrian path of 10-feet shall be observed. Fencing adjacent to a public roadway shall be a ma ximum of 6-feet high and shall include landscaping on the street side of the fence. Fencing shall be decorative in nature. Any walls proposed for rear or side yards adjacent to a public road shall be constructed of high quality materials and shall adhere to the same setback as privacy fencing. Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any off site glare. All exterior site lights shall utilize full cut -off, “hooded” lighting fixtures to prevent offsite light spillage and glare. BP PS/BS Mitigation Measure 3.b.1: The project shall be conditioned to comply with all applicable District regulations pertaining to the control of fugitive dust (PM-10) as contained in Section 2 “Assessing and Mitigating Construction Impacts.” 2.4 Fugitive Dust Mitigation Measures: Standard List a. Reduce the amount of the disturbed area where possible; b. Use water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency would be required whenever wind speeds exceed 15 mph. Reclaimed (non-potable) water should be used whenever possible; c. All dirt stock-pile areas should be sprayed daily as needed; d. All roadways, driveways, sidewalks, etc. to be paved should be completed as soon as possible, and building pads should be laid as soon as possible after grading unless seeding or soil binders are used; e. All of these fugitive dust mitigation measures shall be shown on grading and building plans; and f. The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. BP PS/BS Mitigation Measure 3.b.2: The project shall be conditioned to comply with all applicable APCD regulations pertaining to Naturally Occurring Asbestos (NOA). Prior to any grading activities a geologic evaluation should be conducted to determine if NOA is present BP PS/BS 183 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. within the area that will be disturbed. If NOA is not present, and exemptions request must be filed with the District. If NOA is found at the site, the applicant must comply with all requirements outlined in the Asbestos ATCM. This may include development of an Asbestos Dust Mitigation Plan and an Asbestos Health and Safety program for approval by the APCD. Technical Appendix 4.4 of the SLO County APCD CEQA Air Quality Handbook includes a map of zones throughout San Luis Obispo County where NOA has been found and geological evaluation is required prior to any grading. Mitigation Measure 4.a.1: A qualified biologist shall conduct a pre- construction survey within 30 days of initial site disturbance to identify whether silvery legless lizards are present. If silvery legless lizards are detected, a biological monitor shall be present during initial ground disturbing and vegetation removal activities to allow for a salvage and relocation effort for the lizard and other ground dwelling common wildlife that may be present. BP PS Mitigation Measure 4.a.2: A qualified biologist shall conduct a pre - construction survey within 30 days of initial site disturbance to identify whether American badger are present. If American badger or their dens are detected during the survey, the location of the den shall be mapped, the biologist shall monitor the den for three days if it is within 50ft of proposed blueprints. If the den is deemed inactive it shall be destroyed if the den is active the biologist will continue monitoring its status till the den becomes inactive so it can be destroyed, during that time all development activities shall respect a 50ft buffer or exclusion zone around the den. BP PS Mitigation Measure 4.a.3: Conduct a springtime rare plant survey to determine the presence/absence of any special-status plants. Should any be discovered, implement a seed and/or plant salvage program and incorporate the salvaged material into the drainage setback and detention basin landscaped areas. BP PS Mitigation Measure 4. d.1: Vegetation removal and initial site disturbance shall be conducted between September 1 and January 31 outside of the nesting season for birds. If vegetation and/or tree removal is planned for the bird nesting season, then preconstruction nesting bird survey, prepared by a qualified biologist, shall be required to determine if any active nests would be impacted by project construction. If no active nests are found, then no further mitigation shall be required. If any active nests are found that would be impacted by construction, then the nest sites shall be avoided with the establishment of a non-disturbance buffer zone around active nests as determined by a qualified biologist. Nest sites shall be avoided and protected with the non-disturbance buffer zone until BP PS 184 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. the adults and young of the year are no longer reliant on the nest site for survival as determined by a qualified biologist. As such, avoiding disturbance or taking of an active nest would reduce potential impacts on nesting birds to a less-than-significant level. Mitigation Measure 4.e.1: Grading and excavation activities shall be consistent with the City of Atascadero Tree Ordinance. Special precautions when working around native trees include: 1. During grading activities an arborist must be present. 2. All existing trees outside of the limits of work shall remain. 3. Earthwork shall not exceed the limits of the project area. 4. Low branches in danger of being torn from trees shall be pruned prior to any heavy equipment work being done. 5. Vehicles and stockpiled material shall be stored outside the drip line of all trees. 6. All trees within twenty feet of construction work shall be fenced for protection with 4-foot chain link, snow or safety fencing placed per the approved tree protection plan. Tree protection fencing shall be in place prior to any site excavation or grading. Fencing shall remain in place until completion of all construction activities. 7. Any roots that are encountered during excavation shall be clean cut by hand and sealed with an approved tree seal. 8. Utilities such as water, gas, power, cable, storm drainage, and sewer should be redirected from under the canopy of any trees that are to remain. 9. Where a building is placed within the canopy of a tree the foundation should be redesigned so that it bridges across any root systems. 10. Any foundation or other structure that encroaches within the drip line of trees to be saved shall be dug by hand. 11. At no time shall tree roots be ripped with construction equipment. BP PS/ BS Mitigation Measure 4.e.2: Tree protection fencing shall be installed at the locations called out in the Tree Protection Plan. An inspection of the tree fencing shall be done by City staff prior to issuance of building permits. BP PS/ BS Mitigation Measure 4.e.3: The following measure shall be incorporated on-site during the construction process of the proposed project: 1. A minimum height construction protective barrier shall be erected around the drip line of the tree plus 4’. The fence shall be supported with “T” posts at no more than 6’ o.c. and tied at least 3 places per post. This fence shall be installed by the General Contractor before any rough grading is allowed on the site. Approval for this stage must BP PS/ BS 185 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. be obtained in writing from either the Arborist or the Counties/Cities representative. 2. Earthwork shall not exceed the limits of the project area. 3. Low branches in danger of being torn during construction process shall be pruned prior to any heavy equipment work being undertaken. 4. Once the rough grading is accomplished the fence may be moved closer to the trunk of the tree for finish grading. At no time shall the fence be placed within the Critical Root Zone (CRZ). This location is determined by the diameter of the trunk at Diameter Breast Height (DBH). (4.5’ above grade) and is 1’ per 1” diameter in the direction of the drip line. At no time shall the fence be moved closer to the trunk than the drip line, unless additional preservation measures are implemented as recommended by the project arborist. 5. Any roots that are encountered over 2” diameter, during the excavation process shall be clean cut perpendicular to the direction of root growth with a handsaw. At no time shall tree seal be applied to any cut. Any roots over 2” diameter the county/city representative shall be notified to determine the preferred course of action. 6. All trenching with CRZ area shall require hand trenching to preserve and protect roots over 2” in diameter. 7. No grading of trenching is allowed within the CRZ fenced area without written permission from the County/City representative or a certified arborist. 8. Any roots over 4” in diameter are not to be cut or ripped until inspected and approved in writing by the arborist. 9. If, for whatever reason, work must be accomplished inside the drip line 4”-6” of mulch must be applied first to decrease the possibilities of compaction upon written approval from the arborist. 10. There shall be a pre-construction meeting between the Engineering/Planning staff of the County/City, Grading equipment operators, Project Superintendent and the Arborist to review the project conditions and requirements prior to any grubbing or earth work for any portions of the project site. All tree protection fencing shall be installed for inspection prior to this meeting. 11. All trees shall be pruned before any construction takes place that are in the development areas to be saved if they might be damaged by the 186 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. construction equipment. This must be accomplished by a bonded, licensed, and certified Tree Service Contractor. 12. All debris shall be cleared from the area or chipped and spread on the site or stacked in orderly piles for future use by the Owner, at the Owners request. 13. In locations where paving is to occur within the drip line grub only and do not compact unless authorized in writing. Permeable pavers or other preamble surface must be approved by the Arborist. Mitigation Measure 4.e.4: Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented, the trees designated for protection were protected during construction, and the construction-related tree protection measures are no longer required for tree protection. FO PS/ Mitigation Measure 4.e.5: All utilities shall remain outside the drip lines of native trees, unless preservation measures, as specified by the project arborist, are implemented. BP PS/ BS Mitigation 5.a.b.c.1: An archaeological monitor shall be present during initial vegetation clearing, site “grubbing, and grading for all portions of the project. GP PS Mitigation 5.d.1: In the event that human remains are discovered on the property, all work on the project shall stop and the Atascadero Police Department and the County Coroner shall be contacted. The Atascadero Community Development Department shall be notified. If the human remains are identified as being Native American, the California Native American Heritage Commission (NAHC) shall be contacted at (916) 653-4082 within 24 hours. A representative from both the Chumash Tribe and the Salinan Tribe shall be notified and present during the excavati on of any remains. BP / GP PS Mitigation Measure 6.b.1: The on-site subdivision / grading permit plans shall include erosion control measures to prevent soil, dirt, and debris from entering the storm drain system during and after construction, consistent with mitigation or construction methods outlined in the geotechnical report. Plans shall be approved by the City Engineer prior to issuance. GP PS/CE 187 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Mitigation Measure 6.b.2: All cut and fill slopes mitigated with an appropriate erosion control method (erosion control blanket, hydro- mulch, or straw mulch appropriately anchored) immediately after completion of earthwork, as approved by the City Engineer. All disturbed slopes shall have appropriate erosion control methods in place. GP PS/CE Mitigation Measure 6.b.3: The contractor will be responsible for the clean-up of any mud or debris that is tracked onto public streets by construction vehicles. An approved device must be in place prior to commencement of grading activities. This device shall be ap proved by the City Engineer. GP PS/CE Mitigation Measure 6.b.4: A re-vegetation plan shall be submitted with building permits. All disturbed cut and fill slopes shall be vegetated as specified in a landscaping plan. The landscaping plan must be approved by both the Community Development Department and the Public Works Department. GP PS/CE Mitigation Measure 8.h.1: All new construction will comply with section the California Building and Fire Codes. New residences in the City are required to install fire sprinklers. Fire protection measures shall include the use of non-combustible exterior construction and roofs and fire-resistant building materials. BP FD Mitigation Measure 9.d.e.f.1: The project shall integrate Low Impact Development Best Management Practice’s into the project design which may include on-site detention and/or retention basins, pervious paving, and vegetated swales. The detention basins must meet the City’s drainage design standards with surface runoff being treated for water quality through structural control measures including: disconnected downspouts flowing to vegetated bio- swales, and pervious pavement and/or landscape areas to control storm volume. All drainage control features shall be subject to the approval of the City Engineer. GP PS/CE Mitigation Measure 9.d.e.f.2: The developer shall ensure that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices, citations, or stop orders. GP PS/CE Mitigation Measure12.a.1: Private yard outdoor activity spaces for each residential parcel adjacent to Viejo Camino and Halcon Rd BP PS/BP 188 Conditions of Approval / Mitigation Monitoring Program Halcon Residential Planned Development – The Groves Planned Development (PD-33) Master Plan of Development Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. where outdoor noise levels exceed City standards shall be located where the building provides acoustical screening opportunities. If no such areas exist within the design of the structure on the site, private outdoor use areas shall be enclosed by a 6-foot high solid wall. Mitigation Measure 12.a.2: Windows on facades adjacent to Halcon and Viejo Camino Road shall include additional sound attenuation features such as dissimilar glass or other methods aimed at reducing sound transmission beyond the standard dual pane requirements. BP PS/BP Mitigation Measure: 14: Prior to final map recordation, the applicant shall annex into the City’s Community Facilities District (CFD) to off- set additional costs associated with the provision of additional police, fire, and park services. FM PS/BP Mitigation Measure 16.a.b.1: In addition to the City’s Development Impact Fees, each new residential unit shall pay towards its fair share of the US 101 / Santa Barbara interchange improvements. The project may be eligible for TIF fee credits for Citywide development impact fees associated with the interchange improvements. Any TIF credit shall be approved by the City Engineer. BP PS/CE Mitigation Measure 16.d.1: Access for parcels abutting Halcon Rd shall be consolidated and shall be designed as private roads meeting City road standards. Driveways to individual parcels with existing residences may be approved by the City Engineer in locations where consolidated access cannot be utilized due to parcel locations. All access roads and driveways shall be evaluated at the time of tentative map submittal and/or improvement permits for sight distance. FM PS/CE/FD Mitigation Measure 6.f.1: In addition to an on-street bike lane, a multi-use path shall be provided along Viejo Camino and Halcon Roads consistent with the adopted City bike and trail Master Plan and the SLOCOG Salinas River Trail Plan. FM PS Mitigation Measure 17.d.1: Landscaping plans shall be submitted to the Community Development Department for review and approval. Landscaping must consist of drought tolerant species and utilize drip irrigation. Turf shall not be permitted as a part of the approved landscaping plan. BP PS 189 EXHIBIT B: Master Plan of Development / Site Plan 190 EXHIBIT C: Landscape Plan 191 EXHIBIT C: Landscape Plan 192 EXHIBIT D: Elevations / Floor Plan 193 EXHIBIT D: Elevations / Floor Plan 194 EXHIBIT D: Elevations / Floor Plan 195 EXHIBIT D: Elevations / Floor Plan 196 EXHIBIT D: Elevations / Floor Plan 197 EXHIBIT D: Elevations / Floor Plan 198 EXHIBIT D: Elevations / Floor Plan 199 EXHIBIT E: Grading and Drainage Plan 200 EXHIBIT F: Utility Plan 201 EXHIBIT G: Noise Analysis Diagram Area of db exceedance 202 ATTACHMENT 10: Draft Resolution PC 2015-D VESTING TENATIVE SUBDISION MAP (TTM) 2014-0108 DRAFT PC RESOLUTION 2016-F TRACT MAP – THE GROVES RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, RECOMMENDING THAT THE CITY COUNCIL APPROVE A VESTING TENTATIVE SUBDIVISION MAP 2014-0108, CONSISTENT WITH THE PD-33 OVERLAY ZONING DISTRICT HALCON RESIDENTIAL PLANNED DEVELOPMENT CONSCIOUSBUILD ATASCADERO DEV. LLC. WHEREAS, an application has been received from ConsciousBuild Atascadero Dev. LLC. (2921 Garabaldi Ave, San Luis Obispo, CA 93401) Owner and Applicant, and; to consider Planning Application PLN 2014-1529, for a project consisting of a General Plan Land Use Diagram Amendment, Zone Text and Map Amendments, Establishment of a Planned Development Overlay Zone, Vesting Tentative Tract Map, Tree Removal Permit and certification of a Mitigated Negative Declaration ("MND") on a 10± acre site located on Viejo Camino and Halcon Road, Atascadero, CA 93422 (APN’s 045-401-003, & 004); and, WHEREAS, the site’s current General Plan Land Use Designation is Suburban Estates (SE); and, WHEREAS, the site’s current Zoning Designation is Residential Suburban (RS); and, WHEREAS, the Planning Commission has recommended that the City Council approve a General Plan Land Use Diagram Amendment to change the Land Use Designation of lots within the project site to Single-Family Residential - X (SFR-X) and Single-Family residential – Y (SFR-Y); and, WHEREAS, the Planning Commission has recommended that the City Council approve a Zoning Ordinance Text Change and Zoning Map Amendment to establish zoning co de text for PD-33 zoning district and to change the zoning of lots with the project area to Residential Single- Family – X (RSF-X) and Residential Single-Family - Y (RSF-Y), with a PD-33 overlay on the entire project site based on findings; and, 203 WHEREAS, the PD-33 requires the adoption of a Master Plan of Development, approved in the form of a Conditional Use Permit for cluster development portions of the project area; and, WHEREAS, The Planning Commission has recommended that the City Council approve of a Master Plan of Development (CUP 2014-0284) prepared for the project site which, as conditioned, meet all requirements of the PD-33 Overlay Zoning District; and, WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2015-0007 was prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Master Plan of Development was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of Development; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on February 2, 2016 studied and considered Vesting Tentative Tract Map 2014-0284 (TR 3078), after studying and considering the proposed Mitigated Negative Declaration prepared for the project, and NOW THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Atascadero makes the following findings, determinations and recommendations with respect to the proposed Vesting Tentative Tract Map: SECTION 1. Findings of Approval for Tentative Tract Map, the Planning Commission of the City of Atascadero recommends that the City Council find as follows: 1. The proposed subdivision, design and improvements as conditioned, is consistent with the General Plan and applicable zoning requirements, including provisions of the PD-33 overlay district. 2. The proposed subdivision, as conditioned, is consistent with the proposed Master Plan of Development (CUP 2014-0284). 3. The site is physically suitable for the type of development proposed. 4. The site is physically suitable for the density of development proposed. 5. The design of the subdivision or the type of improvements will not cause serious health problems. 204 6. The design and improvement of the proposed subdivision will not cause substantial environmental damage or substantially and unavoidably injure fish and wildlife or their habitat. 7. The design of the subdivision will not conflict with easements acquired by the public at large for access through, or the use of property within, the proposed subdivision; or substantially equivalent alternative easements are provided. 8. The proposed subdivision design and type of improvements proposed will not be detrimental to the health, safety or welfare of the general public. SECTION 2. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on February 2, 2016, resolved to recommend to the City Council approval of a Vesting Tentative Subdivision Map TR 3084 (TTM 2014-0108) subject to the following: 1. EXHIBIT A: Tentative Parcel Map 2014-0108 2. EXHIBIT B: Conditions of Approval / Mitigation Monitoring Program. 3. EXHIBIT C: Grading Plan 4. EXHIBIT D: Utility Plan 205 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by Commissioner _______________________ and seconded by Commissioner ________________________, the foregoing Resolution is hereby adopted in its entirety on the following roll call vote: AYES: NOES: ABSENT: ADOPTED: CITY OF ATASCADERO By: _______________________________ Planning Commission Chairperson ATTEST: ______________________________ Phil Dunsmore Planning Commission Secretary 206 Exhibit A: Vesting Tentative Subdivision Map TR 3078 (TTM 2014-0108) 207 Exhibit B: Conditions of Approval / Mitigation Monitoring Program Vesting Tentative Subdivision Map TR 3078 (TTM 2014-0108) Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Planning Department 1. This Vesting Tentative Subdivision Map (TTM) is for the creation of 17 legal lots of record described on the attached exhibits and shall apply APNs 045-401-003, 004 regardless of owner. Ongoing PS 2. The approval of this Vesting Tentative Subdivision Map shall become final and effective for the purposes of issuing building permits upon the effective date of the associated Zone Text Amendment establishing Planned Development Overlay Zone #33, unless an appeal is made with the appropriate judicial circuit. Ongoing PS 3. The Community Development Director and/or City Engineer shall have the authority to make modifications to the final map that remain in substantial conformance with the approved Tentative Map. BP / FM PS, CE 4. Approval of this Vesting Tentative Subdivision Map shall be valid for twenty-four (24) months after its effective date and shall expire Monday, Date, 2018. At the end of the period, the approval shall expire and become null and void unless the project has received a final map or a time extension has been granted, consistent with the Atascadero Municipal Code. BP / FM PS 5. Vesting Tentative Subdivision Map was deemed complete on November 20, 2015, for the purposes of vested development rights and fees consistent with the Subdivision Map Act of the State of California. On-going PS, CE 6. A final parcel map drawn in substantial conformance with the approved vesting tentative map, and in compliance with all conditions set forth herein, shall be submitted for review and approval in accordance with the Subdivision Map Act and the City’s Subdivision Ordinance FM PS/CE 7. The subdivider shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the subdivision. Ongoing 8. All subsequent Tentative Map and construction permits shall be consistent with the Master Plan of Development (CUP 2014-0284) approved for the project. BP / FM PS, CE 208 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 9. The parcel map shall be subject to additional fees for park or recreation purposes (QUIMBY Act) as required by City Ordinance BP PS 10. All maintenance costs listed below shall be 100% funded by the project in perpetuity, except for public facilities that are planned for and currently maintained by the City of Atascadero. The service and maintenance cost shall be funded through an entity or mechanism established by the developer, subject to City Staff approval. This entity or mechanism must be in place prior to, or concurrently with acceptance of any final map(s). The entity or mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any Final Map(s). The administration of the above mentioned funds, and the coordination and performance of maintenance activities, shall be the responsibility of the entity or mechanism. a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access roads, emergency access gates, traffic control signals, pavement markings and sewer mains within the proposed project including residential streets within any residential subdivision. b) All landscaping and lighting within the proposed project area. c) Common area fencing and/or features. d) Open areas on private property within the proposed project area including detention facilities, bio-swales, and other low- impact-development features. e) Newly constructed drainage facilities on private property within the proposed project area. f) Landscaped frontages within the right-of-way of all public streets within the defined specific plan boundary. g) On-site sewer and storm drains located outside of the right-of- way. 11. Prior to final map, the applicant shall submit CC&Rs for review by the Community Development Department. The CC&R’s shall record with the Final Map and shall include the following: a) Provisions for maintenance of all common areas including parking lot, landscape areas, free standing signs, lighting and solid waste storage. b) Maintenance of on-site sewer and storm drainage systems. c) Ensuring compliance with the Master Plan of Development. d) Standards for the design, maintenance and appearance of 209 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney individual lot development and maintenance. e) A provision for review by the City Community Development Department for any changes to the CC&R’s that relate to the above requirements prior to the changes being recorded or taking effect. 12. All Conditions and mitigation monitoring program for CUP 2014-0284, as amended, are hereby incorporated by reference. On-Going PS Public Works Project Conditions City Engineer Project Conditions 52. The internal streets shall be offered as public rights-of-way as shown on the tentative map and shall be extended to include the cul-de-sac adjacent to lots 9, 16 & 17. BP, GP CE 53. Internal streets shall not be improved with sidewalks but shall comply with City standards for Rural Local roads. The road shoulder adjacent to Lots 1-5 and Lots 13-15 shall include a 5- foot wide walkable shoulder of compacted Class II Agg Base or DG, with a cross-slope matching that of the street, but not exceeding 4%. Where curb & gutter, or, an AC dike are required to convey stormwater, the area behind the curb or dike shall be compacted base or DG as described above. Curb ramps are not required at the intersections of the internal streets. BP, GP CE 54. Viejo Camino shall be improved to City standards as shown on the Tentative Map along the project frontage. New improvements shall be consistent with City standards and the Circulation Element and shall include new curb, gutter, street intersection with cross-gutter, traffic signage and delineation, a bike lane (Class II), and transit stop. The street pavement shall be completed to integrate the existing roadway with the new frontage improvements as shown on the Tentative Map. BP, GP CE 55. Along the Viejo Camino frontage, the property owner shall dedicate an easement and construct a public pedestrian and bike trail to accommodate a 10-foot wide detached pedestrian & bike trail. The pedestrian/bike trail shall be constructed of compacted class 2 aggregate base or decomposed granite to the satisfaction of the Director of Public Works and Director of Community Development. Final alignment shall meander as necessary to conform to the existing terrain, trees and drainage requirements to the satisfaction of the Director of Public Works and Director of Community Development. BP, GP CE 210 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 56. The transit stop shown on Viejo Camino shall be not less than 90 feet long (end-to-end, including transition lanes). The transit stop shall be designed using smooth curves to allow for ease of entry/exiting of the bus as well as street sweeping equipment. The bus staging area shall be of sufficient width to allow the bus to be safely located out of the travel lane(s) while loading or unloading passengers to the satisfaction of the City Engineer. The structural pavement-section shall be sufficient to support the typical transit vehicles but shall be not less than 6” Class A concrete over 6” Class II Aggregate Base, to the satisfaction of the City Engineer. Sidewalk at the transit stop shall be in addition to the concrete pad necessary to place the transit street furniture (bus shelter, bench, sign and other street furniture as deemed necessary by the Director of Public Works). Additional right-of-way shall be dedicated to accommodate the turn-out to the satisfaction of the City Engineer. BP, GP CE 57. The Subdivider shall plant street trees along the Viejo Camino street frontage behind the public sidewalk and within 15-feet. Trees planted closer than 10-feet shall include deep-root planter barriers as approved by the City Engineer. One street tree shall be planted for each 35 linear feet (or portion thereof) of road frontage. BP, GP CE 58. Street trees on the internal streets shall be planted at the time of lot development along the road frontages of the internal streets offered to the public. One street tree shall be planted for each 35 linear feet (or portion thereof) of road frontage. BP, GP CE 59. A new gravity sewer shall be designed and extended in Viejo Camino to serve the lots of Tract 3078, to the satisfaction of the City Engineer. An optional route along Halcon Rd can be explored for feasibility, subject to the review and approval of the city Engineer. The developer may request a reimbursement agreement for future private sewer connections for any off -site sewer extension subject to City Ordinance and City Council authorization. Notice of developer intent to request a reimbursement agreement must be made in writing prior to the start of construction. BP CE 60. Each new lot shall be served by separate laterals for water, power, communications, gas & cable TV (if available adjacent to the subject property). BP CE 61. The Final Map shall include the offer of Public Utility Easements along all street frontages (6-feet wide), to the satisfaction of the City Engineer. FM CE 211 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 62. The Subdivider shall dedicated sufficient public right-of-way for street purposes along the northerly side of Santa Barbara Street to accommodate the existing improved road alignment. FM CE STANDARD CONDITIONS 63. All public improvements shall be constructed in conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings. BP, GP CE 64. In the event that the applicant is allowed to bond for the public improvements required as a condition of this map, the applicant shall enter into a Subdivision Improvement Agreement with the City. FM CE 65. An engineer’s estimate of probable cost shall be submitted for review and approval by the City Engineer to determine the amount of the bond. FM CE 66. The Subdivision Improvement Agreement (SIA) shall record concurrently with the Final Map. If it is the intent of the developer to pursue a reimbursement agreement with the City for the installation of off-site sewer facilities, reference to said agreement and terms shall be included in the SIA. FM CE 67. The applicant shall be responsible for the relocation and/or alteration of existing utilities. BP, GP CE 68. The applicant shall install all new utilities (water, gas, electric, cable TV and telephone) underground. Utilities shall be extended to the property line frontage of each lot or its public utility easement. BP, GP CE 69. The applicant shall monument all property corners for construction control and shall promptly replace them if disturbed. FM CE 70. The applicant shall acquire title interest in any off-site land that may be required to allow for the construction of the improvements. The applicant shall bear all costs associated with the necessary acquisitions. The applicant shall also gain concurrence from all adjacent property owners whose ingress and egress is affected by these improvements. FM CE 212 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 71. Slope easements shall be provided as needed to accommodate cut of fill slopes. FM CE 72. Drainage easements shall be provided as needed to accommodate both public and private drainage facilities. FM CE 73. The final map shall be signed by the City Engineer prior to the map being placed on the agenda for City Council acceptance. FM CE 74. Prior to recording the tract map, the applicant shall submit a map drawn in substantial conformance with the approved tentative map and in compliance with all conditions set forth herein. The map shall be submitted for review and approval by the City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. FM CE 75. Prior to recording the tract map, the applicant shall set monuments at all new property corners. A registered civil engineer or licensed land surveyor shall indicate by certificate on the parcel map, that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. 76. Prior to recording the tract map, the applicant shall pay all outstanding plan check/inspection fees. 77. Prior to recording the map, the applicant shall complete all improvements required by these conditions of approval FM CE 78. Prior to recording the tract map, the applicant shall have the map reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company indicating their review of the map. The letter shall identify any new easements that may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the map. FM CE 79. Upon recording the final map, the applicant shall provide the City with a black line clear Mylar (0.4 mil) copy and a blue line print of the recorded map. FM CE 213 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 80. Prior to the final inspection of any public improvements, the applicant shall submit a written statement from a registered civil engineer that all work has been completed and is in full compliance with the approved plans. FM CE 81. Prior to the final inspection, the applicant shall submit a written certification from a registered civil engineer or land surveyor that all survey monuments have been set as shown on the final map. BP, GP CE 82. An encroachment permit shall be obtained prior to any work within City rights of way. BP, GP CE 83. Prior to the issuance of building permits the applicant shall submit a grading and drainage plan prepared by a registered civil engineer for review and approval by the City Engineer. BP, GP CE 84. The applicant shall submit a hydraulic analysis with the first plan check submittal of the water system improvements for the project. The analysis should take into account the fire flows required by the California Building Code. The applicant is responsible for designing and constructing water system improvements that will provide water at pressures and flows adequate for the domestic and fire protection needs of the project. BP, GP CE MITIGATION MONITORING PROGRAM Mitigation Measure 1.c.1: A landscape buffer shall be provided along Santa Barbara Rd. Landscape material shall consist of native and/or drought tolerant species. As mixture of low and medium plants shall be utilized to provide visual screening of the project from the adjacent neighborhood. BP PS/BS Mitigation Measure 1.c.2: Street trees shall be provided along Viejo Camino and Halcon Rd. Street trees shall be spaced at no greater than 30-feet on center, however, rural tree groupings may be approved by the City Engineer due to topographic or sight distance concerns and/or to maintain the rural nature of the street. BP CE/BS Mitigation Measure 1.c.3: Rear or side yard privacy fencing where adjacent to a private road shall be set back from the edge of shoulder a minimum of 10-feet. Where rear or side yard fencing is adjacent to a public road, a minimum setback from the edge of pavement/sidewalk/pedestrian path of 10-feet shall be observed. Fencing adjacent to a public roadway shall be a maximum of 6 -feet high and shall include landscaping on the street side of the fence. Fencing BP PS/BS 214 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney shall be decorative in nature. Any walls proposed for rear or side yards adjacent to a public road shall be constructed of high quality materials and shall adhere to the same setback as privacy fencing. Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any off site glare. All exterior site lights shall utilize full cut-off, “hooded” lighting fixtures to prevent offsite light spillage and glare. BP PS/BS Mitigation Measure 3.b.1: The project shall be conditioned to comply with all applicable District regulations pertaining to the control of fugitive dust (PM-10) as contained in Section 2 “Assessing and Mitigating Construction Impacts.” 2.4 Fugitive Dust Mitigation Measures: Standard List a. Reduce the amount of the disturbed area where possible; b. Use water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency would be required whenever wind speeds exceed 15 mph. Reclaimed (non-potable) water should be used whenever possible; c. All dirt stock-pile areas should be sprayed daily as needed; d. All roadways, driveways, sidewalks, etc. to be paved should be completed as soon as possible, and building pads should be laid as soon as possible after grading unless seeding or soil binders are used; e. All of these fugitive dust mitigation measures shall be shown on grading and building plans; and f. The contractor or builder shall designate a person or persons to monitor the fugitive dust emissions and enhance the implementation of the measures as necessary to minimize dust complaints, reduce visible emissions below 20% opacity, and to prevent transport of dust offsite. Their duties shall include holidays and weekend periods when work may not be in progress. BP PS/BS Mitigation Measure 3.b.2: The project shall be conditioned to comply with all applicable APCD regulations pertaining to Naturally Occurring Asbestos (NOA). Prior to any grading activities a geologic evaluation should be conducted to determine if NOA is present within the area that will be disturbed. If NOA is not present, and exemptions request must be filed with the District. If NOA is found at the site, the applicant must comply with all requirements outlined in the Asbestos ATCM. This may include development of an Asbestos Dust Mitigation Plan and an Asbestos Health and Safety program for approval by the APCD. Technical Appendix 4.4 of the SLO County APCD CEQA Air Quality Handbook includes a map of zones throughout San Luis Obispo County BP PS/BS 215 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney where NOA has been found and geological evaluation is required prior to any grading. Mitigation Measure 4.a.1: A qualified biologist shall conduct a pre - construction survey within 30 days of initial site d isturbance to identify whether silvery legless lizards are present. If silvery legless lizards are detected, a biological monitor shall be present during initial ground disturbing and vegetation removal activities to allow for a salvage and relocation effort for the lizard and other ground dwelling common wildlife that may be present. BP PS Mitigation Measure 4.a.2: A qualified biologist shall conduct a pre - construction survey within 30 days of initial site disturbance to identify whether American badger are present. If American badger or their dens are detected during the survey, the location of the den shall be mapped, the biologist shall monitor the den for three days if it is within 50ft of proposed blueprints. If the den is deemed inactive it shall be destroyed if the den is active the biologist will continue monitoring its status till the den becomes inactive so it can be destroyed, during that time all development activities shall respect a 50ft buffer or exclusion zone around the den. BP PS Mitigation Measure 4.a.3: Conduct a springtime rare plant survey to determine the presence/absence of any special -status plants. Should any be discovered, implement a seed and/or plant salvage program and incorporate the salvaged material into the drainage setback and detention basin landscaped areas. BP PS Mitigation Measure 4. d.1: Vegetation removal and initial site disturbance shall be conducted between September 1 and January 31 outside of the nesting season for birds. If vegetation and/or tree removal is planned for the bird nesting season, then preconstruction nesting bird survey, prepared by a qualified biologist, shall be required to determine if any active nests would be impacted by project construction. If no active nests are found, then no further mitigation shall be required. If any active nests are found that would be impacted by construction, then the nest sites shall be avoided with the establishment of a non- disturbance buffer zone around active nests as determined by a qualified biologist. Nest sites shall be avoided and protected with the non-disturbance buffer zone until the adults and young of the year are no longer reliant on the nest site for survival as determined by a qualified biologist. As such, avoiding disturb ance or taking of an active nest would reduce potential impacts on nesting birds to a less-than- significant level. BP PS Mitigation Measure 4.e.1: Grading and excavation activities shall be consistent with the City of Atascadero Tree Ordinance. Special precautions when working around native trees include: 12. During grading activities an arborist must be present. BP PS/ BS 216 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney 13. All existing trees outside of the limits of work shall remain. 14. Earthwork shall not exceed the limits of the project area. 15. Low branches in danger of being torn from trees shall be pruned prior to any heavy equipment work being done. 16. Vehicles and stockpiled material shall be stored outside the drip line of all trees. 17. All trees within twenty feet of construction work shall be fenced for protection with 4-foot chain link, snow or safety fencing placed per the approved tree protection plan. Tree protection fencing shall be in place prior to any site excavation or grading. Fencing shall remain in place until completion of all construction activities. 18. Any roots that are encountered during excavation shall be clean cut by hand and sealed with an approved tree seal. 19. Utilities such as water, gas, power, cable, storm drainage, and sewer should be redirected from under the canopy of any trees that are to remain. 20. Where a building is placed within the canopy of a tree the foundation should be redesigned so that it bridges across any root systems. 21. Any foundation or other structure that encroaches within the drip line of trees to be saved shall be dug by hand. 22. At no time shall tree roots be ripped with construction equipment. Mitigation Measure 4.e.2: Tree protection fencing shall be installed at the locations called out in the Tree Protection Plan. An inspection of the tree fencing shall be done by City staff prior to issuance of building permits. BP PS/ BS Mitigation Measure 4.e.3: The following measure shall be incorporated on-site during the construction process of the proposed project: 14. A minimum height construction protective barrier shall be erected around the drip line of the tree plus 4’. The fence shall be supported with “T” posts at no more than 6’ o.c. and tied at least 3 places per post. This fence shall be installed by the General Contractor before any rough grading is allowed on the s ite. Approval for this stage must be obtained in writing from either the Arborist or the Counties/Cities representative. 15. Earthwork shall not exceed the limits of the project area. 16. Low branches in danger of being torn during construction process shall be pruned prior to any heavy equipment work being undertaken. 17. Once the rough grading is accomplished the fence may be moved closer to the trunk of the tree for finish grading. At no time shall the fence be placed within the Critical Root Zone (CRZ). This location is determined by the diameter of the trunk at Diameter BP PS/ BS 217 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Breast Height (DBH). (4.5’ above grade) and is 1’ per 1” diameter in the direction of the drip line. At no time shall the fence be moved closer to the trunk than the drip line, unless additional preservation measures are implemented as recommended by the project arborist. 18. Any roots that are encountered over 2” diameter, during the excavation process shall be clean cut perpendicular to the direction of root growth with a handsaw. At no time shall tree seal be applied to any cut. Any roots over 2” diameter the county/city representative shall be notified to determine the preferred course of action. 19. All trenching with CRZ area shall require hand trenching to preserve and protect roots over 2” in diameter. 20. No grading of trenching is allowed within the CRZ fenced area without written permission from the County/City representative or a certified arborist. 21. Any roots over 4” in diameter are not to be cut or ripped until inspected and approved in writing by the arborist. 22. If, for whatever reason, work must be accomplished inside the drip line 4”-6” of mulch must be applied first to decrease the possibilities of compaction upon written approval from the arborist. 23. There shall be a pre-construction meeting between the Engineering/Planning staff of the County/City, Grading equipment operators, Project Superintendent and the Arborist to review the project conditions and requirements prior to any grubbing or earth work for any portions of the project site. All tree protection fencing shall be installed for inspection prior to this meeting. 24. All trees shall be pruned before any construction takes place that are in the development areas to be saved if they might be damaged by the construction equipment. This must be accomplished by a bonded, licensed, and certified Tree Service Contractor. 25. All debris shall be cleared from the area or chipped and spread on the site or stacked in orderly piles for future use by the Owner, at the Owners request. 26. In locations where paving is to occur within the drip line grub only and do not compact unless authorized in writing. Permeable pavers or other preamble surface must be approved by the Arborist. Mitigation Measure 4.e.4: Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented, the trees designated for protection were protected during construction, and the construction-related tree protection measures are no lo nger required for FO PS/ 218 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney tree protection. Mitigation Measure 4.e.5: All utilities shall remain outside the drip lines of native trees, unless preservation measures, as specified by the project arborist, are implemented. BP PS/ BS Mitigation 5.a.b.c.1: An archaeological monitor shall be present during initial vegetation clearing, site “grubbing, and grading for all portions of the project. GP PS Mitigation 5.d.1: In the event that human remains are discovered on the property, all work on the project shall stop and the Atascadero Police Department and the County Coroner shall be contacted. The Atascadero Community Development Department shall be notified. If the human remains are identified as being Native American, the California Native American Heritage Commission (NAHC) shall be contacted at (916) 653-4082 within 24 hours. A representative from both the Chumash Tribe and the Salinan Tribe shall be notified and present during the excavation of any remains. BP / GP PS Mitigation Measure 6.b.1: The on-site subdivision / grading permit plans shall include erosion control measures to prevent soil, dirt, and debris from entering the storm drain system during and after construction, consistent with mitigation or construction methods outlined in the geotechnical report. Plans shall be approved by the City Engineer prior to issuance. GP PS/CE Mitigation Measure 6.b.2: All cut and fill slopes mitigated with an appropriate erosion control method (erosion control blanket, hydro - mulch, or straw mulch appropriately anchored) immediately after completion of earthwork, as approved by the City Engineer. All disturbed slopes shall have appropriate erosion control methods in place. GP PS/CE Mitigation Measure 6.b.3: The contractor will be responsible for the clean-up of any mud or debris that is tracked onto public streets by construction vehicles. An approved device must be in place prior to commencement of grading activities. This device shall be approved by the City Engineer. GP PS/CE Mitigation Measure 6.b.4: A re-vegetation plan shall be submitted with building permits. All disturbed cut and fill slopes shall be vegetated as specified in a landscaping plan. The landscaping plan must be approved by both the Community Development Department and the Public Works Department. GP PS/CE 219 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure 8.h.1: All new construction will comply with section the California Building and Fire Codes. New residences in the City are required to install fire sprinklers. Fire protection measures shall include the use of non-combustible exterior construction and roofs and fire- resistant building materials. BP FD Mitigation Measure 9.d.e.f.1: The project shall integrate Low Impact Development Best Management Practice’s into the project design which may include on-site detention and/or retention basins, pervious paving, and vegetated swales. The detention basins must meet the City’s drainage design standards with surface runoff being treated for water quality through structural control measures including: disconnected downspouts flowing to vegetated bio-swales, and pervious pavement and/or landscape areas to control storm volume. All drainage control features shall be subject to the approval of the City Engineer. GP PS/CE Mitigation Measure 9.d.e.f.2: The developer shall ensure that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices, citations, or stop orders. GP PS/CE Mitigation Measure12.a.1: Private yard outdoor activity spaces for each residential parcel adjacent to Viejo Camino and Halcon Rd where outdoor noise levels exceed City standards shall be located where the building provides acoustical screening opportunities. If no such areas exist within the design of the structure on the site, private outdoor use areas shall be enclosed by a 6-foot high solid wall. BP PS/BP Mitigation Measure 12.a.2: Windows on facades adjacent to Halcon and Viejo Camino Road shall include additional sound attenuation features such as dissimilar glass or other methods aimed at reducing sound transmission beyond the standard dual pane requirements. BP PS/BP Mitigation Measure: 14: Prior to final map recordation, the applicant shall annex into the City’s Community Facilities District (CFD) to off -set additional costs associated with the provision of additional police, fire, and park services. FM PS/BP Mitigation Measure 16.a.b.1: In addition to the City’s Development Impact Fees, each new residential unit shall pay towards its fair share of the US 101 / Santa Barbara interchange improvements. The project may be eligible for TIF fee credits for Citywide development impact fees associated with the interchange improvements. Any TIF credit shall be approved by the City Engineer. BP PS/CE 220 Conditions of Approval / Mitigation Monitoring Program TTM 2014-0108 Vesting Tentative Tract Map (The Groves – Halcon Residential Development) APN 045-401-003 & 004 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure 16.d.1: Access for parcels abutting Halcon Rd shall be consolidated and shall be designed as private roads meeting City road standards. Driveways to individual parcels with existing residences may be approved by the City Engineer in locations where consolidated access cannot be utilized due to parcel locations. All access roads and driveways shall be evaluated at the time of tentative map submittal and/or improvement permits for sight distance. FM PS/CE/FD Mitigation Measure 6.f.1: In addition to an on-street bike lane, a multi- use path shall be provided along Viejo Camino and Halcon Roads consistent with the adopted City bike and trail Master Plan and the SLOCOG Salinas River Trail Plan. FM PS Mitigation Measure 17.d.1: Landscaping plans shall be submitted to the Community Development Department for review and approval. Landscaping must consist of drought tolerant species and utilize drip irrigation. Turf shall not be permitted as a part of the approved landscaping plan. BP PS 221 EXHIBIT C: Grading and Drainage Plan 222 EXHIBIT D: Utility Plan 223 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 Atascadero Planning Commission Staff Report - Community Development Department Kelly Gleason, Senior Planner, 470-3446, kgleason@atascadero.org Zoning Text Amendment to prohibit ground floor office uses Downtown Commercial Zone PLN 2015-1571 RECOMMENDATION: Adopt a resolution recommending the City Council amend the Zoning Regulations to prohibit office and health care services uses on the ground floor within specific locations within the Downtown Commercial Zoning District. DISCUSSION: Background: The City adopted the Downtown Revitalization Plan (DRP) in 2000 in order to outline goals, objectives and programs aimed at supporting the economic vitality and redevelopment of the downtown area. The plan is designed to implement the City’s General Plan with a goal of coordinating public and private investment to help realize the vision of an enhanced and economically viable downtown. The Plan envisioned a downtown with a land use pattern predominated by “multi-story mixed uses with retail uses on the ground floor and residential and office above .” Furthermore, the plan suggests utilizing incentives to relocate medical office uses outside of the downtown. When the DRP was originally adopted in July of 2000, changes were implemented to the Zoning Code to prohibit offices on the ground floor in the downtown commercial zone. Less than two years later, on April 23, 2002, the Atascadero Main Street organization requested an amendment of the Downtown Commercial Zoning District to accommodate non-retail uses interested in occupying ground floor storefront locations as a way to address vacancies in the downtown. At that time, the Carlton Hotel was under construction, and many surrounding storefronts were vacant. The City Council ultimately approved this amendment in June of 2003. The amendment also included provisions to address the appearance of downtown offices to maintain storefronts and retail feel. 224 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 Thirteen years later, the area around Sunken Gardens is predominantly surrounded by office uses. Now that City Hall is again occupied, there are plans in place to construct a pedestrian bridge linking Colony Square to the downtown core, and there are new restaurants beginning to occupy spaces throughout the downtown area. Additionally, new owners wish to develop both the Colony Square and Hoff properties, adding synergy to the downtown. These efforts are helping to stimulate the visions that were adopted in the DRP. However, there are currently no incentives in place or restrictions to discourage the expansion of office uses in the downtown. Plans to re-construct a medical office building for the existing medical office at 5920 West Mall are currently moving forward. The development of this new medical office building with new ground floor medical office space fronting the park contrasts with the vision put in place by the DRP. The proposed change of zoning will prohibit this in the future, requiring such uses to be above the ground floor or in other locations. Now is the time to look to the desired future of our downtown, especially the area surrounding the park, to take steps towards a gradual transition to more pedestrian oriented uses such as retail and restaurant uses. A minor Code revision prohibiting new office and other non-pedestrian oriented uses on the ground floor in key focus areas is again suggested to begin this transition. Previous Review and Outreach On November 10, 2015, staff brought this proposal to the City Council to determine if there was interest in pursuing the text amendment. On a unanimous vote, the City Council directed staff to explore the text amendment, and thereby authorized staff to begin the process. On January 14th, staff presented the proposed amendment to the Chamber of Commerce Board. At this time, the Chamber has not taken a position on the amendment, however, their discussion appeared supportive of the proposed action. Staff has since visited offices and businesses around the downtown to discuss the proposal with property owners and tenants. At this time, no objection to the proposal has been heard. Analysis: What the code revision will do: The revision will prohibit new office uses on the ground floor in identified key locations in the downtown commercial zone, such as the properties surrounding Sunken Gardens Park. The proposed Zoning Amendment to limit non-pedestrian uses to the second floor and above in these identified locations is a first step in encouraging a more pedestrian oriented environment. Later phases could explore incentive programs or a look at more aggressively implementing the zoning change to require land use compliance on change of ownership. 225 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 Effect on existing office uses: Existing office uses on the ground floor would become non-conforming and would be allowed to remain. Projects currently in process, such as the office at 5920 West Mall would be allowed to continue at this time. City’s policy on non-conforming uses: In accordance with the Municipal Code (MC 9-7.103), non-conforming uses are allowed to remain indefinitely but may not be expanded or reconstructed. New office uses can be established where a prior office use existed unless the prior office use has been discontinued for 6-months or more. With the proposed text amendment, the Planning Commission may wish to consider alternative provisions that trigger land use compliance upon a change of tenants or change of ownership, thereby facilitating a more rapid transition to retail or restaurant uses in these key focus areas. Adding more aggressive policies may trigger a more rapid transition, but this option could also lead to vacancies as there is no guarantee or control in securing restaurant and retail tenants. Proposed Text Change The proposed text change alters the Zoning Regulations, MC Section 9-3.2: “Downtown district allowable land uses and permit requirements.” A note* would be added to specific land uses within the section to clarify that: *Non-retail, medical and health services, dental or other office uses shall only be permitted on the second and/or third floor on East and West Mall between El Camino Real and Palma Ave and along both sides of El Camino Real between East Mall and Traffic Way. The note would be added to the following land uses that are currently allowed within the Downtown Commercial Zoning District:  Research and Development  Business Services  Health Care Services  Office uses Conclusion: Current trends provide us with an opportunity to create a text amendment that will gradually result in the transition of office to retail/restaurant uses in the Downtown Commercial Zone. This minor text amendment would simply prohibit new ground floor office uses. Planning Commission’s recommendation will be reviewed by the City Council on February 23, 2016. If the Council chooses to amend the zoning text, it would take effect 30 days following a second read of the ordinance to amend the 226 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 zoning. The second reading of this item would likely be scheduled for the March 8th hearing, thereby allowing this change to be effective on April 8, 2016. FISCAL IMPACT: If the text amendment is approved, it will ultimately result in encouraging office uses to relocate to preferred office locations outside of the downtown core or above the ground level, supporting redevelopment of the downtown core to tax generating uses in areas closest to the core. ALTERNATIVES: 1. The Planning Commission may choose to look to other methods of discouraging new office uses in the downtown, or may look to what incentive options are available. Currently, the downtown already has incentives such as flexible development standards (i.e. no parking requirement). This step to amend the zoning should be considered a first phase of directing the transition towards a vibrant, healthy downtown. 2. The Planning Commission may wish to modify the area subject to the proposed text amendment such as expanding to portions of Entrada or Traffic Way. ATTACHMENTS: 1. Location Map 2. Draft Resolution 227 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 ATTACHMENT 1: Location Map Areas subject to proposed text Amendment SE SE Woodridge Specific Plan 228 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 DRAFT PC RESOLUTION 2015-A DOWNTOWN OFFICE USES ZONING CODE TEXT AMENDMENT RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL ADOPT AN ORDINANCE AMENDING AMC 9-3.2 TO PROHIBIT OFFICE AND SIMILAR USES ON THE GROUND FLOOR ON WEST MALL AND EAST MALL STREETS BETWEEN EL CAMINO REAL AND PALMA AVENUE AND ALONG EL CAMINO REAL BETWEEN WEST MALL AND TRAFFIC WAY WHEREAS, The City adopted a Downtown Revitalization Plan in 2000 with the intent of facilitating a vision of an enhanced, and economically viable downtown with places to shop, dine and provide for events in the City’s downtown core. The Plan envisioned a downtown with a land use pattern predominated by “multi-story mixed uses with retail uses on the ground floor and residential and office above”; and WHEREAS, the Downtown Revitalization plan implemented the City’s General Plan with a goal of coordinating public and private investment to help realize the vision of an enhanced and economically viable downtown. Furthermore, the plan suggests utilizing incentives to relocate medical office uses outside of the downtown; and WHEREAS, the City has analyzed this proposed zoning amendment and determined that it is not a project within the meaning of section 15378 of the California Environmental Quality Act (“CEQA”) Guidelines because it has no potential for resulting in physical change in the environment, either directly or ultimately; and WHEREAS, in the event that this proposed amendment is found to be a project under CEQA, it is subject to the CEQA exemption contained in CEQA Guidelines section 15061(b)(3) because it can be seen with certainty to have no possibility of a significant effect on the environment; and WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Text Change application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said zoning text amendments; and, 229 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Atascadero makes the following findings, determinations and recommendations with respect to the proposed Zoning Code Text Amendment: SECTION 1. Findings for Approval of a Zone Text Change Amendment. The Planning Commission finds as follows: 1. The proposed amendment is in conformance with the adopted General Plan Goals, Policies, and Programs and the overall intent of the General Plan because it implements the General Plan through the adopted Downtown Revitalization Plan, and; 2. The amendments will not be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use because the amendments only apply to limiting the future location of offices; and, 3. The proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development because the downtown commercial zone is designed for restaurants, retail and other pedestrian related, active land uses; and, 4. The proposed zone change will not create any new significant and unavoidable impacts to traffic, infrastructure, or public service impacts; and 5. The zoning amendment is not a project within the meaning of section 15378 of the California Environmental Quality Act (“CEQA”) Guidelines because it has no potential for resulting in physical change in the environment, either directly or ultimately; and in the event that this proposed amendment is found to be a project under CEQA, it is subject to the CEQA exemption contained in CEQA Guidelines section 15061(b)(3) because it can be seen with certainty to have no possibility of a significant effect on the environment. SECTION 2. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on February 2, 2016 resolved to recommend that the City Council introduce for first reading, an ordinance that would amend the City Zoning Ordinance as identified in attached Exhibit A. BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. 230 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 On motion by, and seconded by the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSTAIN: ( ) ABSENT: () ADOPTED: CITY OF ATASCADERO, CA ______________________________ Planning Commission Chairperson Attest: ______________________________ Phil Dunsmore Planning Commission Secretary 231 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 EXHIBIT A Downtown Code Text Amendment 9-3.262 Downtown district allowable land uses and permit requirements. The following table identifies the land uses allowed by this article in the downtown zoning districts, and the land use permit required to establish each use. In addition to the land use permit required by this section, special provisions related to certain land uses may apply, precise plan approval may also be required for certain uses in compliance with Section 9-1.108. A building permit is required prior to any construction. Design review approval shall be req uired for all permits, consistent with Appendix A of the Downtown Revitalization Plan. Allowed Uses and Permit Requirements for Downtown Zoning Districts P Permitted Use CUP Conditional Use Permit required — Use not allowed Permit Required Specific Use Regulations Land Use1 DC DO Manufacturing & Processing Uses Light repair services P — Printing and publishing P P R&D2,7 (Research and development including technology) P7 P R&D — Biotechnology, chemical, pharmaceutical CUP7 CUP Recreation, Education & Assembly Uses Membership organizations CUP — Amusement services P — Indoor recreation services P — Libraries, museums, galleries P P Public amusement and entertainment CUP — Public parks and playgrounds P P Schools — Public CUP — Schools — Business and vocational CUP CUP Studios — Art, dance, martial arts, music, etc. P CUP 232 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 Allowed Uses and Permit Requirements for Downtown Zoning Districts P Permitted Use CUP Conditional Use Permit required — Use not allowed Permit Required Specific Use Regulations Land Use1 DC DO Residential Uses Age restricted housing CUP4 — Home occupations P P 9-6.105 Live/work projects P5/CUP6 — Multifamily and single-family dwellings P3 P3 Retail Trade Artisan shops P — Auto and vehicle dealerships — Indoor display/sales only CUP — Bar/tavern P — Building materials and hardware — All activities indoors P — Eating and drinking places — Without drive-through P — Food and beverage retail sales P — Furniture, home furnishings and equipment P — General merchandise P — Temporary or seasonal sales P — 9-6.174 Services Automated teller machines (ATMs) P P Banks and financial services — Without drive-through CUP P Bed and breakfast CUP — Business services P7 P Child/adult day care centers — CUP Government offices and facilities P P Health care services P7 P Hotels and motels CUP — Offices P7 P Personal services P — Transportation, Communications & Infrastructure Uses 233 ITEM NUMBER: ITEM NUMBER: 5 DATE: 2-2-16 Allowed Uses and Permit Requirements for Downtown Zoning Districts P Permitted Use CUP Conditional Use Permit required — Use not allowed Permit Required Specific Use Regulations Land Use1 DC DO Broadcasting studios CUP P Transit stations and terminals CUP CUP Utility facilities CUP CUP Key to Zoning District Symbols DC Downtown Commercial DO Downtown Office Notes: (Only the notes that apply to this table are shown below.) 1 See Section 9-3.701 for land use descriptions. See Section 9-1.106(d) regarding uses not listed. 2 Plot Plan approval required (9-2.108). Precise Plan approval (9-2.109) may also be required. Conditional Use Permit approval required for all projects over 10,000 sf in floor area and multiple -family residential developments consisting of twelve or more units. 3 Residential uses allowed only on second and third floor, except sites north of Olmeda Avenue. If a project is required to provide a unit in compliance with the Americans with Disabilities Act, the handicapped accessible unit may be located on a first floor. A first floor unit shall be located in a non - storefront location within a tenant space. 4 Use allowed only on sites north of Olmeda Avenue. 5 Permitted use if the residential quarters are located on the second or third floors. 6 Conditional Use Permit required if the residential quarters are located on the first floor . 7 Non-Retail and other office related uses shall only be permitted on the second and/or third floor on West Mall and East Mall between El Camino Real and Palma Avenue and El Camino Real between West Mall and Traffic Way. Note: Where the last column in the tables (“Specific Use Regulations”) includes a section number, the regulations in the referenced section apply to the use. Provisions in other sections of this article may also apply. (Ord. 570 § 1, 2013; Ord. 552 § 2, 2010; Ord. 473 § 2, 2005; Ord. 421 § 3, 2003; Ord. 375 § 3, 2001) 234