Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Agency Requirement
FED: Federal Government
CAL: California Government
LOC: Local Government
Standard Conditions
1. The approval of this use permit shall become final and
effective for the purposes of issuing building permits,
provided the required conditions of approval have
been satisfied, fourteen (14) days following the
Planning Commission approval unless prior to the
time, an appeal to the decision is filed as set fort h in
Section 9-1.111(b) of the Zoning Ordinance.
BP PS LOC
2. Approval of this Conditional Use Permit shall be valid
for twenty –four (24) months after its effective date. At
the end of the period, the approval shall expire and
become null and void unless the applicant has
received a building permit or applied for an extension
of entitlement.
BP PS LOC
3. The Community Development Department shall have
the authority to approve minor changes to the project
that (1) increase the square footage of the project by
less than 10%, (2) result in a superior site design or
appearance, and/or (3) address a construction design
issue that is not substantive to the Conditional Use
Permit.
BP PS LOC
Project Conditions
4. All site design, landscaping, antenna / shelter
placement, site fencing, exterior elevations, finish
materials and colors shall be consistent with Exhibit C
and Exhibit D.
BP/FO PS LOC
5. Cellular tower shall not exceed a height of 29-feet,
measured from the highest point of the structure to
ground level, consistent with Exhibit D
BP PS LOC
6. Cellular provider shall be limited to that are a which is
shown on Exhibit C. Co-location for additional wireless
carriers will be required to obtain approval of a
separate Administrative Use Permit (AUP) or as
required by the Federal Communications Commission
(FCC).
On-Going PS LOC / FED
Conditions of Approval
PLN-2015-1553 / CUP-2015-0291
8055 El Camino Real Wireless
Cellular Facility
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Agency Requirement
FED: Federal Government
CAL: California Government
LOC: Local Government
7. Proposed colors for cell phone tower must be
consistent with existing colors and materials of the
commercial-retail building.
BP PS LOC
8. Proposed cabinets that are exposed beyond the
roofline of the existing building must color match the
existing building / roof color and materials.
BP PS LOC
9. Lighting installations shall be consistent with the
approved site plan. No new light glare sources shall be
permitted.
BP PS LOC
10. Prior to the final inspection, the applicant shall submit
a written statement from a registered civil engineer that
all work has been completed and is in full compliance
with the approved plans and the California Building
Code (CBC) prior to the final inspection, if required.
FO CE LOC
t:\- 15 plns\pln 2015-1553 microcelltower 8055 ecr\pc resolution 2015-0028.docx
EXHIBIT C: Overall Site Plan
PLN 2015-1553 / CUP 2015-0291 – 8055 El Camino Real
EXHIBIT D: Proposed Elevations
PLN 2015-1553 / CUP 2015-0291 – 8055 El Camino Real