Loading...
HomeMy WebLinkAboutPC Resolution 2015-0028 EXHIBIT A: CEQA Exemption PLN 2015-1553 / CUP 2015-0291 – 8055 El Camino Real EXHIBIT B: Conditions of Approval PLN 2015-1553 / CUP 2015-0291 – 8055 El Camino Real Conditions of Approval PLN-2015-1553 / CUP-2015-0291 8055 El Camino Real Wireless Cellular Facility Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Agency Requirement FED: Federal Government CAL: California Government LOC: Local Government Standard Conditions 1. The approval of this use permit shall become final and effective for the purposes of issuing building permits, provided the required conditions of approval have been satisfied, fourteen (14) days following the Planning Commission approval unless prior to the time, an appeal to the decision is filed as set fort h in Section 9-1.111(b) of the Zoning Ordinance. BP PS LOC 2. Approval of this Conditional Use Permit shall be valid for twenty –four (24) months after its effective date. At the end of the period, the approval shall expire and become null and void unless the applicant has received a building permit or applied for an extension of entitlement. BP PS LOC 3. The Community Development Department shall have the authority to approve minor changes to the project that (1) increase the square footage of the project by less than 10%, (2) result in a superior site design or appearance, and/or (3) address a construction design issue that is not substantive to the Conditional Use Permit. BP PS LOC Project Conditions 4. All site design, landscaping, antenna / shelter placement, site fencing, exterior elevations, finish materials and colors shall be consistent with Exhibit C and Exhibit D. BP/FO PS LOC 5. Cellular tower shall not exceed a height of 29-feet, measured from the highest point of the structure to ground level, consistent with Exhibit D BP PS LOC 6. Cellular provider shall be limited to that are a which is shown on Exhibit C. Co-location for additional wireless carriers will be required to obtain approval of a separate Administrative Use Permit (AUP) or as required by the Federal Communications Commission (FCC). On-Going PS LOC / FED Conditions of Approval PLN-2015-1553 / CUP-2015-0291 8055 El Camino Real Wireless Cellular Facility Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Agency Requirement FED: Federal Government CAL: California Government LOC: Local Government 7. Proposed colors for cell phone tower must be consistent with existing colors and materials of the commercial-retail building. BP PS LOC 8. Proposed cabinets that are exposed beyond the roofline of the existing building must color match the existing building / roof color and materials. BP PS LOC 9. Lighting installations shall be consistent with the approved site plan. No new light glare sources shall be permitted. BP PS LOC 10. Prior to the final inspection, the applicant shall submit a written statement from a registered civil engineer that all work has been completed and is in full compliance with the approved plans and the California Building Code (CBC) prior to the final inspection, if required. FO CE LOC t:\- 15 plns\pln 2015-1553 microcelltower 8055 ecr\pc resolution 2015-0028.docx EXHIBIT C: Overall Site Plan PLN 2015-1553 / CUP 2015-0291 – 8055 El Camino Real EXHIBIT D: Proposed Elevations PLN 2015-1553 / CUP 2015-0291 – 8055 El Camino Real