HomeMy WebLinkAboutPC Resolution 2015-0019
EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
Planning Department Standard Conditions
1. This Conditional Use Permit shall be for 10785 El Camino Real
and 9355 Avenida Maria described on the attached exhibits and
located on Lots 1 and 2 recorded in Parcel Map 49-16, San Luis
Obispo County (APN 045-321-020,021) regardless of owner.
Ongoing PS LOC
2. The approval of this use permit shall become final and effective
for the purposes of issuing building permits following the City
Council approval unless prior to the time, an appeal to the
decision is filed consistent with established appeals of
municipalities as required by the California Civil and / or
Government Code.
Ongoing PS LOC / CAL
3. The Community Development Department shall have the
authority to approve the following minor changes to the project
that (1) modify the site plan project by less than 10%, (2) result
in a superior site design or appearance, and/or (3) address a
construction design issue that is not substantive to the Master
Plan of Development. The Planning Commission shall have the
final authority to approve any other changes to the Master Plan
of Development and any associated Tentative Maps unless
appealed to the City Council.
BP / FM PS, CE LOC
4. Approval of this Conditional Use Permit shall be valid for twenty-
four (24) months after its effective date. At the end of the
period, the approval shall expire and become null and void
unless the project has received a building permit or an
extension of the permit is granted.
BP / FM PS LOC
5. The applicant shall defend, indemnify, and hold harmless the
City of Atascadero or its agents, officers, and employees
against any claim or action brought to challenge an approval by
the City, or any of its entities, concerning the subdivision.
Ongoing LOC
6. All site plan improvements shall be consistent with Exhibit B of
the master plan of development.
BP PS, CE LOC
7. All landscaping must consist of drought tolerant landscaping
consistent with the Atascadero Mutual Water Company’s
drought tolerant plant list or comparable drought tolerant
species. Landscaping shall be installed prior to issuance of final
permits for each phase of development.
LOC / CAL
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
8. Landscaping plan shall be reviewed by the Atascadero Police
Department to ensure neighborhood safety.
BP PS LOC
9. Fencing and screen shall be reviewed and approved by the City
Staff. External fencing is required along El Camino Real. No
internal fencing is permitted along interior lot lines.
BP PS LOC
10. All elevations must be consistent with Exhibit F. Maximum
building heights shall not exceed 43-feet in height measured
from finished grade.
BP PS LOC
11. Color and materials board shall be consistent with Exhibit G.
Any color deviations or additional colors must be approved by
the Community Development director or their designee prior to
the issuance of building permits.
BP PS LOC
12. Additional architectural elements must be included as a part of
the building permit submittal:
Decorative end caps for awnings;
Use of hardy plank siding at bases and at gables;
Varying shutter colors to be approved by Staff.
BP PS LOC
13. Solar panels shall be utilized where feasible on carports as
shown in Exhibit F.
BP PS LOC
14. Consistent with California Government Code Sections 65915
through 65918, three (3) developer incentives will be provided
for the construction of a minimum of nine (9) deed restricted,
very-low income units (11% of total project units). Those
developer incentives include:
Reduction of corner yard setback for Lot 1 identified in
recorded Parcel Map 49-16, San Luis Obispo County, to
a minimum of five (5) feet as measures from the edge of
property line.
Reduction of the number of required parking spaces as
identified in Exhibit C.
Waiver of maximum 30-foot height requirements and
maximum two-stories.
BP PS CAL
15. In exchange for waiver and/or modification of three standards in
Title 9 of the Atascadero Municipal Code, the applicant shall be
required to deed restrict a minimum of nine (9) units to
households whom qualify as very-low income, consistent with
the San Luis Obispo County affordable housing standards.
BP PS CAL
16. A deed restriction shall be entered between the City of
Atascadero and the applicant deed restricting 86 units for a term
of no less than 55 years. This deed restriction shall be recorded
prior to the issuance of building permits. The following shall be a
BP PS CAL
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
breakdown of restricted units:
A minimum of 46 units shall be deed restricted for
households of very-low income
All remaining units shall be deed restricted for
households of low income
17. Atascadero Waste Alternatives shall be consulted prior to the
issuance of building permits for final location of trash
enclosures.
BP PS LOC
18. Community Identity monument signage will be provided and
shall be limited to a maximum of 50 square feet (sf). Community
identity signage shall require a building permit and be consistent
with color and materials of the proposed architecture elements.
BP PS LOC
19. The applicant is required to enter into the City of Atascadero
Police Department Crime Free Multi-Family Housing Program
and show proof.
On-Going PD LOC
20. A Lot Line Adjustment shall be required to be completed prior to
final occupancy of the 1st building in Phase 1.
BP PS CAL
21. Project shall be developed and maintained as one development,
regardless of owner(s) and phases.
On-Going PS LOC
22. Approval of this permit shall include the removal of 21 Native
Oak Trees, totaling 499-inches dbh. The applicant shall be
required to pay mitigation fees or provide replantings on-site per
the requirements of the Atascadero Native Tree Ordinance. Any
additional removals shall be subject to Planning Commission
approval.
BP PS LOC
Building Division Conditions
23. All building permit submittals shall be consistent with the
adopted California Building Code (CBC) at the time of building
permit submittal.
BP BS CAL
24. All required fire-turnarounds shall be approved by the Fire
Marshall prior to the issuance of permits.
BP FS CAL
25. Location of fire hydrants shall be reviewed and approved by the
Fire Marshall prior to the issuance of permits.
BP FS CAL
26. Painted Red Curbs or installation of no-parking signs shall be
determined by the Fire Marshall within the boundary of the
BP FS/CE CAL
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
proposed project.
Public Works Project Conditions
City Engineer Project Conditions
27. The project shall be designed and constructed in accordance
with the State Water Board Resolution No. R3-2013-0032 and
City of Atascadero stormwater control regulations. The plan
and supporting documentation shall identify site design
components addressing performance requirements 1 through 4
including, but not limited to stormwater retention/detention,
percolation rates, stormwater run-off treatment measures and a
post-construction Operations & Maintenance plan.
GP, BP CE CAL
28. Where stormwater run-off is directed to underground basins,
percolation testing shall be performed at and below the depth of
the bottom of the proposed system. A Percolation Report shall
be prepared by a licensed civil or geotechnical engineer and
included in the stormwater system calculations
GP, BP CE CAL
29. Stormwater discharge from this site onto the adjacent northerly
property shall be discharged in a non-erosive sheet-flow, to the
satisfaction of the City Engineer.
GP, BP CE CAL
30. A public utility easement (6-feet wide) shall be dedicated along
both public street frontages. Additional area may be required as
determined by the public utility providers to accommodate
transformers, switch gear or other facilities pertinent to the dry
utilities systems
GP, BP CE LOC
31. The existing pedestrian ramp at the northeasterly corner of El
Camino Real and Avenida Maria shall be updated in
accordance with Caltrans Standard Plan A88A and to the
satisfaction of the City Engineer.
GP, BP CE LOC
32. The emergency access drive proposed on El Camino Real shall
be gated. The gate design and operation shall be to the
satisfaction of the Fire Marshall and City Engineer. The gate
shall open into the property and shall not encroach into the
public right-of-way.
GP, BP CE LOC
33. On-site drainage swales exceeding 5% gradient in the direction
of flow shall include erosion control measures such as rock
slope protection or landscaping, to the satisfaction of the City
Engineer.
GP, BP CE LOC
34. If required by the City Engineer, the developer shall remove on-
street parking on the project side of the street and install “No
Parking” signs or paint the curb red with stenciled “No Parking -
GP, BP CE LOC
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
Fire Lane”.
35. If street trees are required, trees shall be planted behind the
sidewalk. Deep-root barriers shall be used on all trees planted
within 10-feet of the public sidewalk or drive approach.
GP, BP CE LOC
36. The sewer lateral shall connect to the existing sewer main in El
Camino Real in accordance with City Standards and
Specifications. It shall be at the sole discretion of the City
Engineer to allow the sewer lateral to connect directly into an
existing manhole. Should a connection to the manhole be
allowed, the manhole shall be cored, the lateral connected using
a Kor-N-Seal type connection or equal, lateral invert at the point
of connection to the manhole shall be 0.10’ above the existing
flow-line in the manhole channel, and a smooth channel cored
and finished from the lateral to the main channel, to the
approval and satisfaction of the City Engineer.
GP, BP CE LOC
37. Typical street sections and improvements shall be consistent
with Exhibit I or as approved by the City Engineer.
GP, BP CE LOC
City Engineer Standard Conditions
38. The applicant shall acquire title interest in any off-site land that
may be required to allow for the construction of the
improvements. The applicant shall bear all costs associated with
the necessary acquisitions. The applicant shall also gain
concurrence from all adjacent property owners whose ingress
and egress is affected by these improvements.
GP, BP CE LOC
39. Slope easements shall be obtained by the applicant as needed
to accommodate cut or fill slopes.
GP, BP CE LOC
40. Drainage easements shall be obtained by the applicant as
needed to accommodate both public and private drainage
facilities.
GP, BP CE LOC
41. Prior to the issuance of building permits the applicant shall
submit plans and supporting calculations/reports including street
improvements, underground utilities, composite utilities, and
grading/drainage plans prepared by a registered civil engineer
for review and approval by the City Engineer.
GP, BP CE LOC
42. A mechanism for funding and maintenance of the storm drain
facilities shall be provided.
GP, BP CE LOC
43. Prior to the issuance of building permits the applicant shall show
the method of dispersal at all pipe outlets. Include specifications
for size & type.
GP, BP CE LOC
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
44. Prior to the issuance of building permits the applicant shall show
method of conduct to approved off-site drainage facilities.
GP, BP CE LOC
45. Concentrated drainage from off-site areas shall be conveyed
across the project site in drainage easements. Acquire drainage
easements where needed. Drainage shall cross lot lines only
where a drainage easement has been provided. If drainage
easement cannot be obtained the storm water release must
follow the exact historic path, rate and velocity as prior to the
subdivision.
GP, BP CE LOC
46. Applicant shall submit erosion control plans and a Storm Water
Pollution Prevention Plan (SWPPP). The Regional Water
Quality Control Board shall approve the SWPPP.
GP, BP CE CAL
47. All public improvements shall be constructed in conformance
with the City of Atascadero Engineering Department Standard
Specifications and Drawings or as directed by the City Engineer
GP, BP CE LOC
48. The on-site residential streets shall be improved consistent with
the Exhibit B and E.
GP, BP CE LOC
49. Off-site streets shall be improved as required by the City
Engineer.
GP, BP CE LOC
50. Alignment of frontage improvements shall be approved by the
City Engineer.
GP, BP CE LOC
51. All utilities shall be undergrounded on project frontage GP, BP CE LOC
52. All onsite sewer mains shall be privately owned and maintained. FM CE LOC
53. Applicant shall pay sewer extension (Annexation), Connection
and Reimbursement fees (if applicable) upon issuance of
building permit.
BP CE LOC
54. Gravity mains within the project shall be eight (8) inches in
diameter, or as specified by the City Engineer.
BP CE LOC
Mitigation Monitoring Program – Mitigated Negative Declaration 2015-0002
Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any
off site glare. All exterior site lights shall utilize full cut-off, “hooded”
lighting fixtures to prevent offsite light spillage and glare. Any luminaire
pole height shall not exceed 20-feet in height, limit intensity to 2.0 foot
candles at ingress /egress, and otherwise 0.6 foot candle minimum to 1.0
maximum in parking areas. No light shall be permitted to spill off -site.
Fixtures shall be shield cut-off type.
BP BS/PS LOC
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
Mitigation Measure 1.d.2: At the time of building permit submittal of the
proposed project, applicant must submit a photometric plan showing
locations of proposed on-site lighting. Prior to final occupancy, City staff
and the applicant shall meet on-site and review lights at dusk condition to
ensure off-site light spillage and glare
BP BS/PS LOC
Mitigation Measure 3.b.1: The project shall be conditioned to comply with
all applicable District regulations pertaining to the control of fugitive dust
(PM-10) as contained in Section 2 “Assessing and Mitigating
Construction Impacts.”
2.4 Fugitive Dust Mitigation Measures: Standard List
a. Reduce the amount of the disturbed area where possible;
b. Use water trucks or sprinkler systems in sufficient quantities to
prevent airborne dust from leaving the site. Increased watering
frequency would be required whenever wind speeds exceed 15
mph. Reclaimed (non-potable) water should be used whenever
possible;
c. All dirt stock-pile areas should be sprayed daily as needed;
d. All roadways, driveways, sidewalks, etc. to be paved should be
completed as soon as possible, and building pads should be laid as
soon as possible after grading unless seeding or soil binders are
used;
e. All of these fugitive dust mitigation measures shall be shown on
grading and building plans; and
f. The contractor or builder shall designate a person or persons to
monitor the fugitive dust emissions and enhance the implementation
of the measures as necessary to minimize dust complaints, reduce
visible emissions below 20% opacity, and to prevent transport of
dust offsite. Their duties shall include holidays and weekend periods
when work may not be in progress.
BP BS/PS CAL
Mitigation Measure 3.b.2: The project shall be conditioned to comply with
all applicable APCD regulations pertaining to Naturally Occurring
Asbestos (NOA). Prior to any grading activities a geologic evaluation
should be conducted to determine if NOA is present within the area that
will be disturbed. If NOA is not present, and exemptions request must be
filed with the District. If NOA is found at the site, the applicant must
comply with all requirements outlined in the Asbestos ATCM. This may
include development of an Asbestos Dust Mitigation Plan and an
Asbestos Health and Safety program for approval by the APCD.
Technical Appendix 4.4 of the SLO County APCD CEQA Air Quality
Handbook includes a map of zones throughout San Luis Obispo County
where NOA has been found and geological evaluation is required prior to
any grading.
BP BS/PS CAL
Mitigation Measure 4.d.1: The Atascadero Biological Report
recommends a follow-up nesting raptor survey be conducted during the
BP BS/PS FED/CAL
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
raptor nesting season (March – August) by a qualified wildlife biologist
prior to construction activities. Nesting birds, including nesting raptors
(hawks, eagles, owls) and bats, are known to occur within ten miles of
the proposed project. If active raptor nests are found onsite or within 500
feet of the property, an appropriate avoidance plan should be designed
to include no onsite disturbances until the chicks have fledged.
Mitigation Measure 4.e.1: Grading and excavation and grading work
shall be consistent with the City of Atascadero Tree Ordinance. Special
precautions when working around native trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be
pruned prior to any heavy equipment work being done.
4. Vehicles and stockpiled material shall be stored outside the drip
line of all trees.
5. All trees within twenty feet of construction work shall be fenced
for protection with 4-foot chain link, snow or safety fencing
placed per the approved tree protection plan. Tree protection
fencing shall be in place prior to any site excavation or grading.
Fencing shall remain in place until completion of all construction
activities.
6. Any roots that are encountered during excavation shall be clean
cut by hand and sealed with an approved tree seal.
7. Utilities such as water, gas, power, cable, storm drainage, and
sewer should be redirected from under the canopy of any trees
that are to remain.
8. Where a building is placed within the canopy of a tree the
foundation should be redesigned so that it bridges across any
root systems.
9. Any foundation or other structure that encroaches within the
drip line of trees to be saved shall be dug by hand.
10. At no time shall tree roots be ripped with construction
equipment.
BP BS/PS LOC
Mitigation Measure 4.e.2: Tree protection fencing shall be installed at
the locations called out in the Tree Protection Plan. An inspection of the
tree fencing shall be done by City staff prior to issuance of building
permits.
BP BS/PS LOC
Mitigation Measure 4.e.3: Upon project completion and prior to final
occupancy a final status report shall be prepared by the project arborist
certifying that the tree protection plan was implemented, the trees
designated for protection were protected during construction, and the
construction-related tree protection measures are no longer required for
tree protection.
BP PS LOC
Mitigation Measure 4.e.4: All utilities shall remain outside the drip lines
of native trees, to the extent feasible.
BP PS LOC
Mitigation 5.d.1: In the event that human remains are discovered on the
property, all work on the project shall stop and the Atascadero Police
Department and the County Coroner shall be contacted. The
Ongoing PS CAL
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
Atascadero Community Development Department shall be notified. If
the human remains are identified as being Native American, the
California Native American Heritage Commission (NAHC) shall be
contacted at (916) 653-4082 within 24 hours. A representative from both
the Chumash Tribe and the Salinan Tribe shall be notified and present
during the excavation of any remains.
Mitigation Measure 6.b.1: The grading permit application plans shall
include erosion control measures to prevent soil, dirt, and debris from
entering the storm drain system during and after construction. A
separate plan shall be submitted for this purpose and shall be subject to
review and approval of the City Engineer at the time of Building Permit
application.
BP BS/PS CAL
Mitigation Measure 6.b.2: All cut and fill slopes shall be hydro seeded
with an appropriate erosion control method (erosion control blanket,
hydro-mulch, or straw mulch appropriately anchored) immediately after
completion of earthwork. All disturbed slopes shall have appropriate
erosion control methods in place. The contractor will be responsible for
the clean-up of any mud or debris that is tracked onto public streets by
construction vehicles.
BP BS/PS CAL
Mitigation Measure 6.b.3: The contractor will be responsible for the
clean-up of any mud or debris that is tracked onto public streets by
construction vehicles. An approved device must be placed prior to
commencement of grading activities. This device shall be approved by
the City Engineer.
BP BS/PS CAL
Mitigation Measure 8.h.1: Construction will comply with section the
California Building and Fire Codes. New residences in the City are
required to install fire sprinklers. Fire protection measures shall include
the use of non-combustible exterior construction and roofs and fire-
resistant building materials deemed appropriate by the Fire Marshal and
Chief Building Official.
BP BS/PS CAL
Mitigation Measure 9.d.e.f.1: The developer is responsible for ensuring
that all contractors are aware of all storm water quality measures and
that such measures are implemented. Failure to comply with the
approved construction Best Management Practices will result in the
issuance of correction notices, citations, or stop orders.
BP BS/PS CAL
Mitigation Measure 12.d.1: All construction activities shall comply with
the City of Atascadero Noise Ordinance for hours of operation of
equipment (between 7 am and 9pm).
BP BS/PS LOC
Mitigation Measure 16.a.b.3: Payment of Circulation System Fee (TIF)
shall be made prior to the issuance of building permits for all residential
and non-residential uses that contribute to the deficiencies to the US 101
/ Santa Rosa Road interchange and US 101 / Santa Barbara Road
interchange. Those traffic impact fees shall be collected as follows:
$3,684 per residential unit (high density / current fee) or development
impact fee that is adopted at the time of building permit submittal.
BP CE/PS CAL
Conditions of Approval / Mitigation Monitoring Program
PLN 2014-1522 / CUP 2015-0288 / TRP 2015-0181
Atascadero Family Apartments
10785 El Camino Real / 9355 Avenida Maria
APN 045-321-020,021
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Agency
Requirement
FED: Federal Government
CAL: California
Government
LOC: Local Government
Mitigation Measure 16.f.1: At the discretion of City staff, the applicant
may be required to install a crosswalk on the south leg of El Camino
Real / Patria Circle and utilize the existing median to provide a
pedestrian refuge area.
BP PS CAL / LOC
Mitigation Measure 16.f.2: Bicycle rack to be provided on-site. BP PS CAL
Mitigation Measure 17.d.1: Landscaping plans shall be submitted to the
Community Development Department for review and approval.
Landscaping must consist of drought tolerant species and utilize drip
irrigation. Turf shall not be permitted as a part of the approved
landscaping plan.
BP PS LOC
EXHIBIT B: Master Plan of Development (Site Plan)
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Site Plan in Project File
EXHIBIT C: Proposed Parking Matrix
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
Proposed Parking Calculations – Atascadero Family Apartments
Unit Types Number
of Units
Typical Parking
Requirement -
AMC
Parking
Spaces
Needed-
AMC
State
Mandated
Parking
Ratios– CGC
65015.(p)
Provided
Spaces
1 bedroom unit 22 1.5 spaces per
unit
33 spaces 1 space per
unit
22 spaces
2 bedroom unit 26 2 spaces per unit 38 spaces 2 spaces per
unit
52 spaces
3 bedroom unit 24 2.5 spaces per
unit
65 spaces 2 spaces unit 48 spaces
4 bedroom unit 14 3 spaces per unit 36 spaces 2.5 spaces
per unit
35 spaces
Guest Spaces 1 per 5 units 17 spaces 0 space
Total Number of Parking Spaces Required
under AMC
189 spaces 157 spaces
provided
-32 space
concession
Total Parking Spaces Required per California
Government Code section 65015.(p)
157 spaces 157 Spaces
provided
EXHIBIT D: Landscaping Plan
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT E: Grading and Drainage Plan / Utility Plan
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT E: Grading and Drainage Plan / Utility Plan
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT E: Grading and Drainage Plan / Utility Plan
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT E: Grading and Drainage Plan / Utility Plan
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT F: Floor Plans / Elevations
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT F: Floor Plans / Elevations
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT F: Floor Plans / Elevations
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT F: Floor Plans / Elevations
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT F: Floor Plans / Elevations
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Full Sized Plan in Project File
EXHIBIT G: Color and Materials Board
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
*Additional Colors may be approved by Community Development Director
EXHIBIT H: Native Tree Mitigation
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
EXHIBIT H: Native Tree Mitigation
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
EXHIBIT H: Native Tree Mitigation
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181)
Native Tree Mitigation Chart
Evergreen Native Trees (inches)Deciduous Native Trees (inches)Totals
dbh notes dbh notes
1 0-inches 1 90-inches Multi-trunk #518
2 2 25-inches tree 519-building
3 3 15-inches tree 520-building
4 20-inches tree 521 building
4 5 18-inches tree 522 building
6 19-inches tree 523 driveway
7 11-inches tree 524 driveway
8 17-inches tree 526 driveway
9 20-inches tree 565 rec/fire
10 18-inches tree 566 rec/fire
11 11-inches tree 567 rec/fire
12 16-inches tree 568 rec/fire
13 19-inches tree 569 rec/fire
14 17-inches tree 570 rec/fire
15 37-inches tree 571 building
16 15-inches tree 572 building
17 42-inches tree 573 turnaround
18 21-inches tree 574 multi-trunk
19 18-inches tree 575 multi-trunk
20 40-inches tree 576 multi-trunk
21 10-inches tree 577 bioswale
Total 0-inches Total 499-inches 499-inches
Mitigation Requirement
req'd tree replacements:0 five gal trees req'd tree replacements:333 five gal trees 333 five gal trees
Proposed Replanting 0 five gal trees Proposed Replanting 0 five gal trees 0 five gal trees
0 box trees (24'')0 box trees (24'')0 box trees (24'')
Remaining Mitigation 0 five gal trees Remaining Mitigation 333 five gal trees 333 five gal trees
Tree Fund Payment:-$ Tree Fund Payment:16,633.33$ 16,633.33$
EXHIBIT I: Section Improvements
Master Plan of Development (CUP 2015-0288 / TRP 2015-0181
T:\- 14 PLNs\PLN 2014-1522 Corp for Better Housing\Planning Commission\PLN2014-1522-CorpforBetterHousing.doc