Loading...
HomeMy WebLinkAboutPC Resolution 2015-0012EXHIBIT A: Conditions of Approval / Mitigation Monitoring PLN 2015-1537 / TRP 2015-0180 Exhibit B Conditions of Approval PLN 2015-1537 / TRP 2015-0180 Timing FM: Final Map GP: Grading Permit BP: Building Permit TO: Temporary Occupancy FI: Final inspection FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney AMWC: Water Comp. Mitigation Measure 1. The approval of this application shall become final, subject to the completion of the conditions of approval, fourteen (14) days following the Planning Commission approval unless prior to the time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. Tree removal PS 2. The applicant and/or subsequent owners shall defend, indemnify, and hold harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the proposed development. Ongoing PS 3. The applicant shall mitigate the tree removal by replanting nineteen (19) native trees, payment of the mitigation fee, or a combination thereof as shown in Exhibit B. If the applicant chooses to replant on- site, they shall work with City staff and a Certified Arborist for selection of tree species and replanting sites. Larger box trees may be substituted for five-gallon replacement trees per the Atascadero Native Tree guidelines. Depending on the mitigation measures selected, payment to the mitigation fee shall occur before native trees are removed; native tree replanting shall be completed within 60-days of removal. FO PS / BS 4. The applicant must provide irrigation to tree replanting sites. Irrigation shall be drip irrigation to be approved by City staff. FO PS/ BS t:\- 15 plns\pln 2015-1537 3861 ardilla ppn\pc reso 2015-0012.docx Exhibit B Site Plan PLN 2015-1537/TRP 2015-0180 Tree #22: Coast live oak, 8” DBH Tree #10: Coast live oak, 42” DBH Tree #11: Coast live oak, 17” DBH Tree #12: Coast live oak, 6” DBH Tree #17: Coast live oak, 8” DBH Tree #1: California black walnut, 4” DBH Tree #2: California black walnut, 5” DBH Tree #3: California black walnut, 3” DBH Tree #4: California black walnut, 4” DBH Exhibit C Native Tree Mitigation PLN 2015-1537/TRP 2015-0180 00 Evergreen Native Trees (inches)Deciduous Native Trees (inches)Totals dbh notes dbh notes 1 42-inches tree #10 1 4-inches tree #1 2 17-inches tree #11 2 5-inches tree #2 3 6-inches tree #12 3 3-inches tree #3 4 8-inches tree #17 4 4-inches tree #4 5 8-inches tree #22 5 6 6 Total 81-inches Total 16-inches 97-inches Mitigation Requirement req'd tree replacements:14 five gal trees req'd tree replacements:5 five gal trees 19 five gal trees Proposed Replanting 0 five gal trees Proposed Replanting 0 five gal trees 0 five gal trees 0 box trees (24'')0 box trees (24'')0 box trees (24'') Remaining Mitigation 14 five gal trees Remaining Mitigation 5 five gal trees 19 five gal trees Tree Fund Payment:675.00$ Tree Fund Payment:266.67$ 941.67$ Bond payment for tree #31, impacted 45% :