PLN 2015-1537 / TRP 2015-0180
Exhibit B
Conditions of Approval
PLN 2015-1537 / TRP 2015-0180
Timing
FM: Final Map
GP: Grading Permit
BP: Building Permit
TO: Temporary
Occupancy
FI: Final inspection
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Mitigation
Measure
1. The approval of this application shall become final, subject to the
completion of the conditions of approval, fourteen (14) days following the
Planning Commission approval unless prior to the time, an appeal to the
decision is filed as set forth in Section 9-1.111(b) of the Zoning
Ordinance.
Tree
removal
PS
2. The applicant and/or subsequent owners shall defend, indemnify, and
hold harmless the City of Atascadero or its agents, officers, and
employees against any claim or action brought to challenge an approval
by the City, or any of its entities, concerning the proposed development.
Ongoing PS
3. The applicant shall mitigate the tree removal by replanting nineteen
(19) native trees, payment of the mitigation fee, or a combination
thereof as shown in Exhibit B. If the applicant chooses to replant on-
site, they shall work with City staff and a Certified Arborist for selection
of tree species and replanting sites. Larger box trees may be
substituted for five-gallon replacement trees per the Atascadero Native
Tree guidelines.
Depending on the mitigation measures selected, payment to the
mitigation fee shall occur before native trees are removed; native tree
replanting shall be completed within 60-days of removal.
FO PS / BS
4. The applicant must provide irrigation to tree replanting sites. Irrigation
shall be drip irrigation to be approved by City staff.
FO PS/ BS
t:\- 15 plns\pln 2015-1537 3861 ardilla ppn\pc reso 2015-0012.docx
Exhibit B Site Plan
PLN 2015-1537/TRP 2015-0180
Tree #22: Coast live oak, 8” DBH
Tree #10: Coast live oak, 42” DBH
Tree #11: Coast live oak, 17” DBH
Tree #12: Coast live oak, 6” DBH
Tree #17: Coast live oak, 8” DBH
Tree #1: California black walnut, 4” DBH
Tree #2: California black walnut, 5” DBH
Tree #3: California black walnut, 3” DBH
Tree #4: California black walnut, 4” DBH
Exhibit C Native Tree Mitigation
PLN 2015-1537/TRP 2015-0180
00
Evergreen Native Trees (inches)Deciduous Native Trees (inches)Totals
dbh notes dbh notes
1 42-inches tree #10 1 4-inches tree #1
2 17-inches tree #11 2 5-inches tree #2
3 6-inches tree #12 3 3-inches tree #3
4 8-inches tree #17 4 4-inches tree #4
5 8-inches tree #22 5
6 6
Total 81-inches Total 16-inches 97-inches
Mitigation Requirement
req'd tree replacements:14 five gal trees req'd tree replacements:5 five gal trees 19 five gal trees
Proposed Replanting 0 five gal trees Proposed Replanting 0 five gal trees 0 five gal trees
0 box trees (24'')0 box trees (24'')0 box trees (24'')
Remaining Mitigation 14 five gal trees Remaining Mitigation 5 five gal trees 19 five gal trees
Tree Fund Payment:675.00$ Tree Fund Payment:266.67$ 941.67$
Bond payment for tree #31, impacted 45% :