Loading...
HomeMy WebLinkAboutDRC_2015-01-20_AgendaPacket http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view DRC Website CITY OF ATASCADERO DESIGN REVIEW COMMITTEE AGENDA Committee Meeting Tuesday, January 20, 2015 3:30 PM. City Hall Room 106 (1st Floor) 6500 Palma Avenue Atascadero, California CALL TO ORDER Roll Call: Chairperson Bob Kelley Committee Member Duane Anderson Committee Member Mark Dariz Committee Member Roberta Fonzi Committee Member Jamie Kirk APPROVAL OF AGENDA PUBLIC COMMENT CONSENT CALENDAR 1. APPROVAL OF DRAFT ACTION MINUTES OF DECEMBER 10, 2014 City of Atascadero Design Review Committee Agenda Regular Meeting, January 20, 2015 Page 2 of 3 http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view DRC Website DEVELOPMENT PROJECT REVIEW 2. PLN 2014-1519 / DRC 2014-0049 / CUP 2003-0117 / TTM 2014-0107 PRINCIPAL MIXED USE – SITE DESIGN / PROJECT REVISIONS Property Owner: Principle Partners, LP, 835 Aerovista Place, Suite 230, San Luis Obispo, CA 93401 Applicant: Oasis Associates, Inc. C.M. Florence, 3427 Miguelito Court, San Luis Obispo, CA 93401 Certified Arborist: Ted Elder, CDPC, 6659 Morro Road, Atascadero, CA 93422 Project Title: PLN 2014-1519 / DRC 2014-0049 / TTM 2014-0107 Principal Mixed-Use Planned Development Amendment / Tentative Subdivision Map Project Location: 9105 Principal, Atascadero CA 93422 (San Luis Obispo County) APN: 030-491-013, 019, 020 Project Description: Proposed re-design of a previously approved project that includes a mix of small lot, single-family detached, and single-family attached (duplex) homes on individual lots. A commercial component is included with office spaces / residential units (mixed-use) and a proposed car-wash facility. The following is a breakdown of proposed uses within the master plan of development:  Single-Family residences (20 units);  Duplex Units (12 units);  2nd floor residential mixed-use units (6 units);  1st floor commercial mixed-use units (3,215 sf)  Carwash (1,945 sf proposed structures) on a 12,495 sf lot;  Drainage facilities  Tot-lot  Passive open space areas General Plan Designation: General Commercial / Medium Density Residential Zoning District: Residential Multi-Family (RMF-10) / General Commercial / PD-24 Proposed Environmental Determination: Initial Study / Mitigated Negative Declaration Staff Recommendation: DRC recommends to the Planning Commission approval with direction provided by the DRC. City of Atascadero Design Review Committee Agenda Regular Meeting, January 20, 2015 Page 3 of 3 http://www.facebook.com/planningatascadero @atownplanning Scan This QR Code with your smartphone to view DRC Website COMMITTEE MEMBER COMMENTS AND REPORTS DIRECTOR’S REPORT ADJOURNMENT The next scheduled DRC meeting is yet to be determined. Agendas, Minutes and Staff Reports are available online at www.atascadero.org under City Officials & Commissions, Design Review Committee. DRC Draft Action Minutes of 12/10/2014 Page 1 of 4 CITY OF ATASCADERO DESIGN REVIEW COMMITTEE DRAFT ACTION MINUTES Regular Meeting – Wednesday, December 10, 2014 3:00 P.M. City Hall, Room 106 6500 Palma Avenue, Atascadero, California CALL TO ORDER – 3:00 p.m. Chairperson Kelley called the meeting to order at 3:00 p.m. ROLL CALL Present: Chairperson Bob Kelley Committee Member Duane Anderson Committee Member Mark Dariz Committee Member Heather Moreno Committee Member Jamie Kirk Staff Present: Community Development Director Warren Frace Senior Planner Callie Taylor Assistant Planner Alfredo Castillo Others Present: Jenny Kim Robert Fisher APPROVAL OF AGENDA MOTION: By Committee Member Dariz and seconded by Committee Member Anderson to approve the Agenda. Motion passed 5:0 by a roll-call vote. PUBLIC COMMENT None ITEM NUMBER: 1 DATE: 1/20/15 DRC Draft Action Minutes of 12/10/14 Page 2 of 4 CONSENT CALENDAR 1. APPROVAL OF DRAFT ACTION MINUTES OF OCTOBER 29, 2014 MOTION: By Committee Member Dariz and seconded by Committee Member Moreno to approve the Consent Calendar. Motion passed 4:0 by a roll-call vote. (Kirk abstained.) DEVELOPMENT PROJECT REVIEW 2. PLN 2014-1511 / DRC 2014-0053 – Kochi BBQ Exterior & Site Appearance Senior Planner Taylor gave the staff report and answered questions from the Committee. PUBLIC COMMENT The following people spoke during public comment: Jenny Kim. Property Owner/Applicant: Jenny Kim, ECR Creek Investments, 6900 El Camino Real, Atascadero, CA 93422 Project Title: PLN 2014-1511 / DRC 2014-0053, Korean BBQ Restaurant improvements Project Location: 6900 El Camino Real, Atascadero, CA 93422 APN 030-201-027 (County of San Luis Obispo) Project Description: DRC follow up review regarding elevation changes to accommodate exhaust system. Number of exhaust fans reduced, and screening elements proposed on balcony to partially enclose mechanical equipment. No acoustical study provided. Site does not currently have a trash storage enclosure large enough to accommodate both trash and recycling dumpsters. Applicant has provided alternative proposal for storage of recycling dumpster behind building in fenced mechanical area, to be moved near parking lot for pick up by employees as needed. Zoning: Downtown Commercial (DC) General Plan Designation: Downtown (D) Staff Recommendation: Staff recommends the DRC approve the exterior appearance of the exhaust system fan units with screening on the balcony as proposed by applicant, without further acoustical analysis. Staff recommends the DRC require installation of a permanent screening enclosure for the recycling dumpster on site. DRC to specify enclosure location and construction material if required. DRC Draft Action Minutes of 12/10/14 Page 3 of 4 Chairperson Kelley closed the Public Comment period. While the blower horsepower, noise, smoke, and odor issues were discussed, the DRC agreed with the Staff Recommendation #1 that the reduction from 4 blowers to 2 blowers and the addition of wall enclosures on the balcony would mitigate the noise issues and no acoustical study is required. The DRC agreed not to require construction of a new recycling enclosure because the recycle bin could be moved on collection day to the pickup spot; however, a Performance Agreement must be signed with a stipulation that a permanent enclosure will be required for non-compliance (i.e. if dumpster left in parking lot past 24 hours.) MOTION: By Committee Member Moreno and seconded by Committee Member Kirk to approve Staff Recommendation #1, approving the exhaust system without additional acoustical analysis, and waiving the requirement for construction of a 2nd trash enclosure, subject to a performance agreement that the recycling dumpster not be stored in the parking area. Non-compliance will trigger construction on the enclosure. Motion passed by 5:0 by a roll call vote. DEVELOPMENT PROJECT REVIEW 3. PLN 2014-1532 / DRC 2014-0062, AMENDMENT TO PREVIOUSLY APPROVED CUP FOR 5700 SAN BENITO ROAD Property Owner: Michael Fredrick, PO Box 573, Atascadero, CA 93423 Applicant: Robert Fisher, Architect Project Title: PLN 2014-1532 / DRC 2014-0062 / Amendment to CUP 1988-003 Project Location: 5700 San Benito Rd, Atascadero CA 93422 APN 049-201-040 (San Luis Obispo County) Project Description Amendment to a previously approved Master Plan of Development. Proposed Amendment includes a proposed 4,950 square foot (sf) metal vehicle storage shed, and amendments to the previously approved master plan for consistency with approved building permits and locations. Zoning: Commercial Park (CPK) / Planned Development Overlay (PD-1) General Plan Designation: Commercial Park (CPK) Staff Recommendation: Staff recommends that the DRC recommends Planning Commission approval of proposed master plan of development amendments to Conditional Use Permit (CUP) 1988-003 with proposed modifications to the site plan including additional landscaping and meeting the required building setback for proposed equipment shelter. DRC Draft Action Minutes of 12/10/14 Page 4 of 4 Assistant Planner Castillo gave the staff report, including a history of the CUP, and answered questions from the Committee. PUBLIC COMMENT The following people spoke during public comment: Robert Fisher. Chairperson Kelley closed the Public Comment period. Discussion ensued on the 10’ setback, if red banding could be added to all buildings, and how much additional landscaping might be required. MOTION: By Committee Member Dariz and seconded by Committee Member Moreno approving the following: (1) Additional trees to be planted in the gaps behind the proposed building. (2) Building to be set back 10 feet from US 101 property line. (3) Red color accent band allowed, consistent with main building on-site. Motion passed 5:0 by a roll-call vote. COMMITTEE MEMBER COMMENTS AND REPORTS Chairperson Kelley reported that he will be attending the upcoming fire demonstration. DIRECTOR’S REPORT None. ADJOURNMENT – 3:54 p.m. MINUTES PREPARED BY: _______________________________________ Warren Frace, Community Development Director t:\~ design review committee\minutes\minutes 2014\draft action drc minutes 12.10-14.docx ITEM NUMBER: 2 DATE: 1-20-15 Atascadero Design Review Committee Report In Brief - Community Development Department Alfredo R. Castillo, AICP Assistant Planner, (805) 470-3436, acastillo@atascadero.org PLN 2014-1519/ DRC 2014-0049 / CUP 2003-0117 / TTM 2014-0107 Principal Mixed Use – Site Design / Project Revisions Owner/Applicant: Principle Partners, LLC / Auzco Developments Address: 9105,9107,909 Principal Avenue; 9300 Pino Solo Avenue APN: 030-491-001, 013, 019,020, General Plan: High Density Residential (HDR) / General Commercial (GC) Zoning: Residential Multi-Family-10 (RMF-10) / Commercial Retail (CR) / PD-22 Project Area: 5.3 acres Existing Use: Vacant / Abandoned house Proposed Use 20 Single-Family Residences; 12 duplex units; six (6) mixed-use units (6 residential / 3,125 sf office); 1,945 sf carwash Staff Recommendation: DRC recommends to the Planning Commission approval with direction provided by the DRC Design Review Items  Site Design / Layout  Architectural Design  Non-Residential Uses Review  Noise Impacts ITEM NUMBER: 2 DATE: 1-20-15 Background: The “Principal Mixed-Use” (GPA 2003-0008/TTM 2003-0044/ZCH 2003-0070/CUP 2003-0117) was approved by the City Council on October 12, 2004 with a certified Mitigated Negative Declaration and a Planned Development Overlay Zone (PD -24). An amendment to the plan to include the 9300 Pino Solo portion of the project (TTM 2005 - 0068 / CUP 2005-0155) was approved by the Planning Commission on May 17, 2005. The project approval included the following: 9105 Principal Avenue Portion (approved 2004)  16 duplex units  24 triplex units  5 live work units 45 Residential Units total  16,550 Commercial tenant space 9300 Pino Solo Avenue Portion (approved 2005)  4 duplex units Currently Approved Project Totals 49 total residential units 16,550 Non-residential commercial / office space 2005 – Amended Approved Plan Commercial / Retail Pino Solo Portion ITEM NUMBER: 2 DATE: 1-20-15 The owner/applicant has re-evaluated the project’s economic feasibility and wishes to amend the master plan project with a reduced dwelling unit count, reduce the amount of commercial square footage, add a new mix of dwelling unit types, and add a new auto service commercial uses. The applicant presented their proposed revisions to the DRC at its June 25, 2014 meeting. At that meeting, the applicant presented the following project revisions:  Revised Master Plan of Development consistent with PD-24:  Reduced number of total units from 45 to 38  Add auto carwash  Revised tentative tract (subdivision map);  Revised architectural elevations;  Revised landscaping plan. The DRC reviewed the proposed project and provided the following direction and input:  Supported the concept of reduced commercial square footage;  Supported the concept of a car wash located at the corner of El Camino Real / Principal Avenue;  Recommended that the car wash architecture should be changed to compliment the remainder of the project;  Requested additional commercial parking for the carwash and non-residential uses;  Requested additional parking for residential uses; DRC directed the applicant to work with Staff and return with the proposed changes. The applicant has formally submitted an application and has worked with Staff to address the recommended changes by the DRC, as well as, meet requirements set forth by the Atascadero Municipal Code and State regulatory requirements. Current DRC Action: DRC is being asked to review and provide a recommendation to the Planning Commission and provide any additional input on the items that are noted in the Staff report. ITEM NUMBER: 2 DATE: 1-20-15 Item #1: Site Design The originally approved master plan contained a mix of duplexes, triplexes throughout the project with access from both Gusta Road and Principal Avenue. This comprised of the area designated as Residential Multi-Family (RMF-10). A commercial component was also included at the corner of Principal Avenue and El Camino Real. Commercial Uses were envisioned to be both commercial and retail uses at this corner including a mix of live / work units. These commercial uses were required by the City Council because the site had been previously designated General Commercial uses with a Commercial Retail (CR) designation. The applicant is now proposing a mix of small lot, single-family detached, and single- family attached (duplex) on individual lots. The commercial component is included with office spaces and a proposed car-wash facility. The following is a breakdown of proposed uses within the master plan of development:  Single-Family residences (20 units);  Duplex Units (12 units);  2nd floor residential mixed-use units (6 units);  1st floor commercial mixed-use units (3,215 sf)  Carwash (1,945 sf proposed structures) on a 12,495 sf lot;  Drainage facilities  Tot-lot  Passive open space areas ITEM NUMBER: 2 DATE: 1-20-15 2015 – Proposed Site Plan Mixed-Use Office / Residential Proposed Car Wash 2015 Proposed Amendment Proposed Open Space Proposed Drainage Area Open Space 1 Open Space 2 Tot Lot SFR unit Duplex Primary Access Secondary Commercial Access Proposed Landscape Screening El Camino Real ITEM NUMBER: 2 DATE: 1-20-15 Access to the proposed development is proposed off of Principal Avenue. The primary commercial access (carwash) is shown off of a new driveway nearest to the Principal / El Camino Real intersection. The 2nd access point, “Street A”, is the primary street for residential use access. Street “B” is considered an internal street connecting the proposed mixed-use office / residential portion, to the remainder of the development. Residential units are located along the primary Street “A”. There are a mix of single family residences and duplexes along this street. Additional units are located on two (2) courts and “Street B”. Street “B” is proposed to dead end at Pino Solo. While the connection would be preferable, due to grade changes at the proposed intersection, a connection is not proposed as a part of the Master Plan. An additional change includes the elimination of the proposed driveway on Gusta Road. The Gusta Road access has been eliminated due to a number of factors including grade changes, crossing of a known wetland, and potential issues with right-of-way encroachment. The applicant proposes to utilize porous pavers throughout the site for on -street parking, along the entire length of the proposed “courts”, within driveways, and to delineate pedestrian crossings. The porous pavers provide a dual purpose of meeting both high quality design within the Planned Development, as well as, meeting the requirements to reduce post-construction stormwater run-off on-site as required by the Regional Water Quality Control Board (RWQCB). The applicant is proposing three (3) passive open space areas located throughout the development.  Tot Lot – The open space is proposed to contain a tot lo t, a park bench, and preserve a 48-inch oak tree.  Open Space 1 preserves a multi-branch oak tree and currently proposes a neighborhood garden to be maintained by residents / Homeowners Association (HOA);  Open Space 2 small passive open space area with bench. Item #2 – Parking At its June 2014 meeting, the DRC identified parking as an issue for small lot / attached residential development and directed the applicant to work with Staff on providing additional parking on the site for residential and commercial use. The applicant has worked with Staff to add additional parking as required by the municipal code for the commercial uses, as well as, additional on-street and off-street parking throughout the development to accommodate future resident and guest parking. The following table indicated the number of required spaces consistent with the Atascadero Municipal Code (AMC): ITEM NUMBER: 2 DATE: 1-20-15 The AMC calculates residential parking on a per bedroom basis in the multi -family zone. For the commercial portions of the project, parking is calculated on a per square foot basis, with the exception of the car wash, which is calculated based on the number of bays. Based on the uses provided by the applicant, a total of 110 parking spaces would be required. The applicant has shown a total of 103 dedicated parking spaces. Staff has determined that the dedicated parking are spaces exclusively for parking that includes parking within garages, designated lots, and designated on-street parking areas. The applicant has also included an additional 64 parking spaces on driveways. Staff is looking for direction on how to quantify driveway parking. If directed by the DRC, the driveway parking may be included to meet and exceed the parking requirements for the project. The minimum proposed driveway length is 20-feet. This typically can accommodate a vehicle, with the exception of larger trucks or SUVs. Proposed Parking Calculations – Principal Mixed-Use Number of Units / Use Parking Requirement Parking Spaces Required Provided Spaces 17 Dwelling Units 3 spaces / 4 bedrooms 51 spaces 34 spaces within Garages 34 spaces on private driveways 15 Dwelling Units 2.5 spaces / 3 bedrooms 38 spaces 30 spaces within Garages 30 spaces on private driveways 3 Dwelling Units 2 spaces / 2 bedroom 6 spaces 6 spaces within garage 2 Dwelling Units 1.5 spaces / 1 bedroom 3 spaces 2 spaces within garage Guest Spaces 1 per 5 units 8 spaces 18 spaces on proposed HOA lots 6 spaces on-street General Office 1 per 400 sf 8 spaces 8 vehicular spaces provided 3 motorcycle spaces provided Car Wash 4 per Bay 4 spaces 5 spaces provided Total Number of Parking Spaces Required 110 spaces 103 Spaces dedicated 64 driveway spaces Total - 167 Spaces dedicated and with private driveways ITEM NUMBER: 2 DATE: 1-20-15 Proposed Mixed-Use Elevations Item #3: Architectural Design At its June 2014 meeting, the DRC directed the applicant to revise the proposed architecture of the Car Wash to better fit the architectural character of the neighborhood. The applicant has revised the architectural elevations and provided conceptual floor plans for all commercial and residential uses. The DRC endorsed the preliminary architecture for the residential and mixed-use portions. Those are included as a part of this report. Mixed-Use (Carriage Product) The mixed-use project depicts a craftsman style architecture with the use of plank wood siding, gable roofs, and high quality grade roofing materials. Planned developments constructed over the last 10 years have utilized this type of architecture that is similar to the historic colony homes located throughout the City. The applicant is proposing a high quality architectural design on all four elevations. The 1 st story of the mixed-use will contain office spaces. The 2nd floor is proposed to include residential uses. Residential Use Office Use ITEM NUMBER: 2 DATE: 1-20-15 Proposed Mixed-Use Elevations / Floor Plans Garage serve 2nd floor residential units ITEM NUMBER: 2 DATE: 1-20-15 Duplex (paired homes) Elevations Duplexes / Single Family Residences Similar architectural craftsman architecture is proposed for the residential product portion of the project with the use of elements such as use of wood siding, gable roofs, and high quality grade roofing materials. Staff is recommending that a condition be carried over from the previous approval, that the developer be required to utilize architectural grade garage doors and that the doors be painted with colors similar to or coordinated with approved color and materials board. Architectural grade doors / painted ITEM NUMBER: 2 DATE: 1-20-15 Duplex (paired homes) Floor Plans ITEM NUMBER: 2 DATE: 1-20-15 Single Family Homes Elevations ITEM NUMBER: 2 DATE: 1-20-15 Single Family Homes Floor Plans ITEM NUMBER: 2 DATE: 1-20-15 June 2014 Car Wash Elevation January 2015 Proposed Re-Design – Car Wash Car Wash Per DRC request, the applicant has re-designed the proposed car-wash with a traditional architectural style theme that is more consistent with the neighborhood . The proposed architectural theme is a modern agrarian theme with the use of corrugated metal and other elements that provide for a modern, but rustic look to the proposed use along the street frontage. Staff is seeking DRC input on the proposed design of the car- wash and its recommendation to the Planning Commission. Corrugated metal siding and roofing ITEM NUMBER: 2 DATE: 1-20-15 January 2015 Elevations / Floor Plan – Car Wash Pay Kiosk / Attendant Location ITEM NUMBER: 2 DATE: 1-20-15 Acoustical Noise Study – Proposed Carwash Item #4: Proposed Car Wash Noise As a part of formal submittal, Staff requested that the applicant provide an acoustical study for noise generated from the car-wash, particularly the blowers used to dry automobiles at the exit of the car wash. The applicant has provided the study that shows the extent at which noise will be generated by the proposed car wash, as well as noise generated by the vacuums that will be located adjacent to the parking lot for the car wash. Staff is concerned with the noise that will be generated to the proposed exiting blowers and vacuums located in the parking lot. The study provided Staff with a noise contour map of the noise generated from the car wash use. The proposed project produces a LEq level (average hourl y measurement) of 58 decibels (db) without any mitigation to the noise generating sources. This is in excess of 6 decibels as calculated through the City’s noise standard of adjusted equal ambient noise, consistent with AMC section 9-14.05(b). The most impacted residences are the mixed-use units, as well as, a few units near Court “2”. ITEM NUMBER: 2 DATE: 1-20-15 Sound Examples is DB Floor Plan – Proposed Carwash The study proposes the following mitigation measures be added to surrounding residential units to reduce noise impacts, which will be incorporated as a part of the project’s mitigated negative declaration. Mitigation Measures that would be incorporated to the residential units would include the following: 1. Installation of mechanical ventilation systems (residential); 2. Exterior doors facing east must be solid core with sweeps and seals to create a “total” closure (residential); 3. Exterior walls must be constructed of stucco, minimum of 7/8-inch three coats over plywood 5/8-inch on exterior elevations (residential); 4. Minimum of 5/8-inch drywall for interior spaces (residential); 5. Include windows that provide greater than 25 decibel Noise Level Reduction (NLR) on all units within 60-feet of proposed carwash (residential); 6. Voids around windows to be filled with insulation and wood blocking, and the perimeter of windows thoroughly caulked (residential); 7. Vents and openings to be minimized on sides of buildings exposes to El Camino Real and if vents are required, must be designed with acoustical baffles (residential). The report also included mitigations at the source of the noise (the blowers) in addition to incorporating residential mitigation. The study identified two potential noise reducing design changes: 1. Placing the blowers deeper within the tunnel; Blower Location ITEM NUMBER: 2 DATE: 1-20-15 Staff is not sure if locating the blower may be infeasible based on review of the provided floor plan of the internal carwash structure. Staff has yet to discuss whether this is a feasible change to the design. Alternatively, the consultant recommended another mitigation. 2. Constructing a noise wall that extends 8-feet from the edge of the exit that is several feet higher than the proposed blower. Potential Wall 12’-6” Wall Location ITEM NUMBER: 2 DATE: 1-20-15 Based on preliminary drawings, it is unclear the height of the blower. The study suggested that the wall be “several feet” higher than the height of the blower. Typically the height of the blower needs to be several feet above the height of automobiles that utilize the carwash, which would result in a wall that could range from 10 to 14 -feet in height, if not larger. This could result in additional aesthetic issues from both El Camino Real and the proposed mixed-use portion. The DRC should discuss this issue and provide direction to the applicant. In addition, the use of vacuums is proposed in the p arking lot. These vacuums will be located adjacent to the carwash tunnel and produce 45dB of noise from approximately 50-feet away. The speed of the motors will vary depending upon the number of users and will run at peak speed when multiple cars are utilizing them. The noise from the vacuums are included in the noise contour maps and the proposed mitigation on the residential units will reduce noise levels for consistency with the municipal code. The applicant has not provided Staff with hours of operation of the proposed carwash. The City’s Noise Ordinance contains two separate noise standards for the Daytime and Nightime levels. Based on the submitted noise study, it appears that the proposed use cannot meet City Standards for nighttime use (9pm to 7am). Staff recommends that the DRC recommend the car wash be limited to operate from 7am to 9pm daily. The acoustical study noted that with even with incorporation of mitigation measures, that “sounds from [the] carwash operations [will not be] undetectable (page 5, Acoustic Study). It notes that people will be able to hear the carwash equipment turn off and on, including vacuums, car doors closing, etc. Staff is recommending all residential and car wash mitigations be included to reduce noise levels to the maximum extent. Item #5: Landscaping Plan / Fencing The applicant has submitted a landscaping plan as a part of the DRC review. The landscaping plan consists of drought tolerant trees, shrubs, and groundcovering. The applicant is proposing to preserve native trees where feasible, however 145-inches DBH of coast live oak native trees are proposed to be removed (5 native trees total). The applicant has indicated on the landscaping plan that 30 replacement oak trees will be planted throughout the site that are a minimum of 15-gallon in size. The applicant has also provided a fencing plan. Staff has worked with the applicant to address some concerns that neighboring properties have in regards to the development. The applicant proposed planting of additional evergreen trees at a minimum of 24-inches box size adjacent to fences to create a “vegetative” screening along existing residential rear yards. The DRC should provide any input on the screening methodology proposed by the applicant. In addition to the proposed plantings, the applicant is showing six-foot wood decorative fencing is proposed throughout the site with the exception of wood picket fencing to be located near the proposed garden and open metal fencing to be located adjacent to ITEM NUMBER: 2 DATE: 1-20-15 drainage basins. The fencing types to be located throughout the project are included in Attachment 5. Conclusion Staff is recommending that the DRC recommend approval of the project to the Planning Commission with recommendations on the following items. If the DRC wishes, it can direct Staff to return the item to DRC for additional review. DRC Items for Recommendations 1. Additional input on site plan, if any. 2. Provide recommendation for parking. Does the project meet parking per the Municipal Code and how to quantify parking. 3. Provide input on architectural elevations for carwash and residential portions. 4. Provide recommendations for noise mitigation measures for the car wash. 5. Provide direct for screening of nearby existing residences. Attachments: Attachment 1: Location Map Attachment 2: Proposed Master Plan of Development Attachment 3: Proposed Site Plan – Carwash Attachment 4: Vesting Tentative Subdivision (tract) Map Attachment 5: Proposed Landscaping Plan Attachment 6: Acoustic Study t:\- 14 plns\pln 2014-1519 - auzco principal mixed-use\drc jan 2015\drc 2014-0049-pmujan15.ac.docx ITEM NUMBER: 2 DATE: 1-20-15 Attachment 1: Location Map Proposed Site ITEM NUMBER: 2 DATE: 1-20-15 Attachment 2: 2015 Proposed Master Plan of Development ITEM NUMBER: 2 DATE: 1-20-15 Attachment 3: 2015 Vesting Tentative Subdivision (tract) Map ITEM NUMBER: 2 DATE: 1-20-15 Attachment 4: Proposed Site Plan – Carwash ITEM NUMBER: 2 DATE: 1-20-15 Attachment 5: Proposed Landscaping Plan ITEM NUMBER: 2 DATE: 1-20-15 Attachment 5: Proposed Landscaping Plan ITEM NUMBER: 2 DATE: 1-20-15 Attachment 5: Proposed Landscaping Plan ITEM NUMBER: 2 DATE: 1-20-15 Attachment 6: Acoustic Study ITEM NUMBER: 2 DATE: 1-20-15 Attachment 6: Acoustic Study ITEM NUMBER: 2 DATE: 1-20-15 Attachment 6: Acoustic Study ITEM NUMBER: 2 DATE: 1-20-15 Attachment 6: Acoustic Study ITEM NUMBER: 2 DATE: 1-20-15 Attachment 6: Acoustic Study ITEM NUMBER: 2 DATE: 1-20-15 Attachment 6: Acoustic Study ITEM NUMBER: 2 DATE: 1-20-15 Attachment 6: Acoustic Study