HomeMy WebLinkAboutDRC_2014-10-29_Agenda
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR
Code with your
smartphone to
view DRC Website
CITY OF ATASCADERO
DESIGN REVIEW COMMITTEE AGENDA
Committee Meeting
Wednesday, October 29, 2014
2:30 PM.
City Hall
Room 106 (1st Floor)
6500 Palma Avenue
Atascadero, California
CALL TO ORDER
Roll Call: Chairperson Bob Kelley
Committee Member Duane Anderson
Committee Member Mark Dariz
Committee Member Heather Moreno
Committee Member Jamie Kirk
APPROVAL OF AGENDA
PUBLIC COMMENT
CONSENT CALENDAR
1. APPROVAL OF DRAFT ACTION MINUTES OF OCTOBER 15, 2014
City of Atascadero Design Review Committee Agenda Regular Meeting, October 29, 2014
Page 2 of 2
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR
Code with your
smartphone to
view DRC Website
DEVELOPMENT PROJECT REVIEW
2. PLN 2014-1531 / DRC 2014-0060, 6760 EL CAMINO REAL(MOLLY PITCHER)
COMMITTEE MEMBER COMMENTS AND REPORTS
DIRECTOR’S REPORT
ADJOURNMENT
The next tentatively scheduled DRC meeting will be November 12, 2014.
Agendas, Minutes and Staff Reports are available online at www.atascadero.org
under City Officials & Commissions, Design Review Committee.
Property Owner: Hubert Laprade, 12680 San Cayetano, Atascadero CA 93422
Applicants: Kendall Bryson, Molly Pitcher Brewing Co.
6760 El Camino Real, Atascadero CA 93422
Project Location: 6750 & 6760 El Camino Real, Atascadero CA 93422 APN 030-192-020
General Plan / Zoning: Downtown (D) / Downtown Commercial (DC)
Project Area: 0.38 acre lot
Existing Use: Brewery and beer tavern
Project Description: A cargo container is proposed to be installed at the back of the subject site as a
permanent structure for use as additional cold storage. The structure is proposed at
160 square feet in size. Per Atascadero Municipal Code Section 9-6.103(g), one (1)
cargo container may be permitted at the rear half of a commercial lot, subject to
appearance review by the City’s Design Review Committee. The DRC may require
architectural enhancements or screening of the cargo container as necessary in order
to create compatibility with the appearance review standards and the Downtown
Revitalization plan. All requirements of the California Building Code and Fire Codes
must be met and a building permit obtained prior to installation for the cargo
container.
Recommendation: Staff recommends that the DRC approve the installation of a permanent storage
container at the rear of the subject site, subject to enhancements or screening.
Options to meet appearance standards include:
1) paint exterior of container to match main building; and/or,
2) screen container with landscaping; and/or,
3) add architectural enhancements to exterior of container.