HomeMy WebLinkAboutDRC_2014-10-15_AgendaPacket
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR
Code with your
smartphone to
view DRC Website
CITY OF ATASCADERO
DESIGN REVIEW COMMITTEE AGENDA
Committee Meeting
Wednesday, October 15, 2014
3:30 PM.
City Hall
Room 106 (1st Floor)
6500 Palma Avenue
Atascadero, California
CALL TO ORDER
Roll Call: Chairperson Bob Kelley
Committee Member Duane Anderson
Committee Member Mark Dariz
Committee Member Heather Moreno
Committee Member Jamie Kirk
APPROVAL OF AGENDA
PUBLIC COMMENT
CONSENT CALENDAR
1. APPROVAL OF DRAFT ACTION MINUTES OF SEPTEMBER 10, 2014
1
City of Atascadero Design Review Committee Agenda Regular Meeting, October 15, 2014
Page 2 of 3
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR
Code with your
smartphone to
view DRC Website
DEVELOPMENT PROJECT REVIEW
2. PLN 2007-1251 / DRC 2014-0056, 6905 NAVAJOA (PEOPLE’S SELF HELP HOUSING)
COMMITTEE MEMBER COMMENTS AND REPORTS
DIRECTOR’S REPORT
ADJOURNMENT
The next regularly scheduled DRC meeting will be October 29, 2014.
Agendas, Minutes and Staff Reports are available online at www.atascadero.org
under City Officials & Commissions, Design Review Committee.
Property Owner/
Applicant:
Sheryl Flores, People’s Self Help Housing, 3533 Empleo St., San Luis
Obispo, CA 93401
Project Location: 6905 Navajoa Ave., Atascadero, CA 93422
(San Luis Obispo County) APN 030-283-007
Existing Use: Vacant
Project Description: The applicant is proposing an Amendment to the approved Master Plan of
Development for proposed modifications to the private open space feature that
was approved by the City Council in February 2008. DRC to review open space
options base on previous September 2014 meeting. A new Tentative Parcel
Map/Tentative Tract Map is proposed to reduce the total number of lots from 12
to 11.
General Plan Designation: HDR
Zoning: RMF-20
Staff Recommendation: Staff recommends that the DRC recommend to the Planning Commission
approval of PLN 2007-1243 / CUP 2007-0219 amending the Master Plan of
Development to reduce and modify the proposed private open space of a
previously approved tentative map and single-family project.
2
DRC Draft Action Minutes of 9/10/14
Page 1 of 5
CITY OF ATASCADERO
DESIGN REVIEW COMMITTEE
DRAFT ACTION MINUTES
Regular Meeting – Wednesday, September 10, 2014
3:30 P.M. City Hall, Room 106
6500 Palma Avenue, Atascadero, California
CALL TO ORDER – 3:30 pm
Chairperson Kelley called the meeting to order at 3:33 pm.
ROLL CALL
Present: Chairperson Kelley
Committee Member Anderson
Committee Member Dariz
Committee Member Moreno
Committee Member Kirk
Staff Present: Assistant Planner Alfredo Castillo
Community Development Director Warren Frace
Senior Planner Callie Taylor
Others Present: Jerry Holland
Thom Jess
Heather Wiebe
Amar Sohi
Jeff Emmrick
Sheryl Flores
APPROVAL OF AGENDA
MOTION: By Committee Member Dariz and seconded by Committee Member
Anderson to approve the Agenda.
Motion passed 5:0 by a roll-call vote.
PUBLIC COMMENT
None
ITEM NUMBER: 1
DATE: 10-15-14
3
DRC Draft Action Minutes of 9/10/14
Page 2 of 5
CONSENT CALENDAR
1. APPROVAL OF DRAFT ACTION MINUTES OF JUNE 25, 2014
MOTION: By Committee Member Dariz and seconded by Committee Member
Moreno to approve the Consent Calendar.
Motion passed 5:0 by a roll-call vote.
DEVELOPMENT PROJECT REVIEW
2. PLN 2099-0997 / DRC 2013-0038, 9006 WEST FRONT (WEST FRONT VILLAGE)
Assistant Planner Castillo gave the staff report and answered questions from the Committee.
PUBLIC COMMENT
The following people spoke during public comment: Jerry Holland, Amar Sohi, Thom Jess, and
Heather Wiebe.
Chairperson Kelley closed the Public Comment period.
MOTION: By Committee Member Moreno and seconded by Committee
Member Anderson to approve the project as staff recommended
with no conditions.
Motion passed by 5:0 by a roll call vote.
Property Owner/Applicant: H&S Hospitality, LLC, 1335 Monterey, San Luis Obispo, CA 93401
Project Location: 9006 West Front Road, Atascadero, CA 93422
(San Luis Obispo County) APN 056-131-021
Project Area: 0.7 Acres / Commercial Lot 3
Existing Use: Vacant
Project Description: The applicant is proposing construction of commercial lot 3 which is adjacent to
the Holiday Inn Express. Proposed building would total 4,880 square feet (sf) and
include 2,876 sf of restaurant space and 1,627 sf banquet room / meeting space.
DRC is to review revised architectural style and make a consistency finding with
the approved Master Plan of Development.
General Plan Designation: GC
Commercial Retail: CR/PD-23
Recommendation: Staff recommends that the DRC find the architectural elevations consistent with
the Master Plan of Development and existing surrounding development. Staff
recommends that the DRC direct the applicant work with Staff on paint color
selection and ensure high quality decorative tile be utilized, and submittal of
landscaping plan consistent with project approvals.
4
DRC Draft Action Minutes of 9/10/14
Page 3 of 5
DEVELOPMENT PROJECT REVIEW
3. PLN 2014-1515 / DRC 2014-0057 / TPM 2014-0102 / AMENDMENT TO CUP 2000-0014 TO
ADD A DRIVE-THROUGH RESTAURANT
Senior Planner Taylor gave the staff report and answered question from the Committee.
PUBLIC COMMENT
The following people spoke during public comment: Jeff Emmrick.
Chairperson Kelley closed the Public Comment period.
MOTION: By Committee Member Kirk and seconded by Committee Member
Dariz to approve the project as per staff recommendations with
the addition of the following items:
a) Double depth of roof/hip or gable
b) Cross walk to hotel needed – refer to City Engineer for review
c) Project is recommended for approval to the Planning
Commission
Motion passed by 5:0 by a roll call vote.
Property Owner: Atascadero 101 Associates, c/o Westar Associates, 2925 Bristol St, Costa Mesa, CA
92626
Applicants: Garing Taylor & Associates, 141 S. Elm St, Arroyo Grande, CA 93420
Project Title: Home Depot Center Master Plan of Development Amendment
Proposed Drive-through Restaurant
Project Location: 805 El Camino Real, Atascadero, CA 93422
(San Luis Obispo County) APN 049-045-022
Project Description: An application to amend the Master Plan of Development for the Home
Depot shopping center. The northwest parcel in Phase I is currently
approved for an 18,000 sq. ft. retail building which has not yet been
constructed. The Amendment proposes reducing the size of the retail
building to 10,000 sq. ft. and adding a 4,500 sq. ft. drive-through restaurant.
A Tentative Parcel Map is proposed to subdivide the existing lot into two (2)
parcels.
Recommendation: Staff recommends DRC recommend Planning Commission approve the CUP
amendment design and parcel map, subject to minor modifications and conditions
of approval.
5
DRC Draft Action Minutes of 9/10/14
Page 4 of 5
DEVELOPMENT PROJECT REVIEW
4. PLN 2007-1251 / DRC 2014-0056 – 6905 NAVAJOA PEOPLES SELF HELP HOUSING
Assistant Planner Castillo gave the staff report and answered questions from the Committee.
PUBLIC COMMENT
The following people spoke during public comment: Sheryl Flores.
Chairperson Kelley closed the Public Comment period.
MOTION: The Committee unanimously recommended the project be
reviewed again by the Design Review Committee once staff has
completed additional project analysis and the following items
have been addressed:
a) Affordable landscape options – Staff to review option for City
maintenance responsibilities
b) Boundary issues with neighborhood to be reviewed
Motion passed by unanimous consensus.
Property Owner: People Self Help Housing Corporation, 3533 Empleo St., San Luis Obispo, CA 93401
Applicants: People Self Help Housing Corporation, 3533 Empleo St., San Luis Obispo, CA 93401
Tim Roberts Engineering, 2015 Vista de la Vina, Templeton, CA 93465
Project Title: Atascadero Triangle Park Master Plan of Development Amendment / CUP
Amendment / Tentative Parcel Map
Project Location: 6905 Navajoa Avenue, Atascadero, CA 93422
(San Luis Obispo County) APN 030-283-007
Project Description: An application to amend the approved Master Plan of Development for
proposed modifications to the private open space feature that was
approved by the City Council in February 2008, as well as review fencing
options based on the proposed change and a potential additional
architectural feature on a proposed unit. A new Tentative Parcel Map /
Tentative Tract Map is proposed to reduce the total number of lots from
12 to 11.
Recommendation: The DRC recommends to the Planning Commission approval of PLN 2007-1243
/ CUP 2007-0219 amending the Master Plan of Development to reduce and
modify the proposed private open space of a previously approved tentative map
and single-family project.
6
DRC Draft Action Minutes of 9/10/14
Page 5 of 5
COMMITTEE MEMBER COMMENTS AND REPORTS
None
DIRECTOR’S REPORT
The Korean BBQ Restaurant will be reviewed again by the Design Review Committee on a future
agenda.
ADJOURNMENT – 4:30 pm.
MINUTES PREPARED BY:
_______________________________________
Warren Frace, Community Development Director
t:\~ design review committee\minutes\minutes 2014\draft action minutes 9-10-14.docx
7
1
ITEM NUMBER:
2
DATE: 10-15-14
Atascadero Design Review Committee
Report In Brief - Community Development Department
Alfredo R. Castillo, AICP, Assistant Planner, (805) 470-3436, acastillo@atascadero.org
Second Review
Atascadero Triangle Park – DRC Review
Private Open Space Feature Options
Owner: People Self Help Housing, 3533
Empleo St., San Luis Obispo,
CA 93401
Address: 6905 Navajoa Avenue,
Atascadero, CA 93422
Project #: PLN-2007-1243 / DRC 2014-
0056 / CUP 2007-0219
General Plan: High Density Residential
Zoning: Residential Multi-Family (RMF-
20) / PD-7 Overlay
Project Area: 2.2 Acres
Existing Use: Vacant, previously approved
Master Plan of Development
Design Review Items
Review of Proposed Open Space Options
Recommendation to PC
8
ITEM NUMBER:
2
DATE: 10-15-14
Staff Recommendation:
The DRC recommend to the Planning Commission approval of PLN 2007-1243 / CUP
2007-0219 amending the Master Plan of Development to modify the proposed private open
space of a previously approved tentative map and single-family project based on direction
given by the DRC.
September 10, 2014 DRC Meeting
The DRC met to discuss this item at its September 10, 2014 meeting. The DRC focused on
the maintenance cost of the reduced open space / landscape area. The DRC raised
concerns regarding the potential additional burden the landscape maintenance would create
for the two homeowners. At the meeting the DRC directed staff to provide additional options
for consideration by the DRC.
9
ITEM NUMBER:
2
DATE: 10-15-14
Proposed 2014 Master Plan of Development – Lots 1, 2, & 3
Open Space Options
Staff met with the new owner/applicant, Sheryl Flores of People’s Self Help Housing
(PSHH), to discuss how to implement the proposed park and not burden the future property
owners with the cost of establishing a financial mechanism to maintain the area. The
applicant originally proposed elimination of the private open space lot (lot 3 on Tentative
Parcel Map approval) and provide a permanent open space area through an easement that
would allow for two (2) larger corner residential lots that would maintain an open space area
consistent with the previously approved landscaping scheme.
In response to DRC direction, staff has prepared five (5) options for the corner open space
feature for the DRC’s consideration:
1. Option #1 – Original Applicant Proposed Plan
2. Option #2 – Modify Applicant Plan
3. Option #3 – City Maintained Open Space
4. Option #4 – Community Garden
5. Option #5 – General Plan Amendment to add addition single-family residential unit
Five options provided for DRC
consideration
10
ITEM NUMBER:
2
DATE: 10-15-14
Option 1 – Applicant Original Proposal September 2014
Option #1 – Original Applicant Proposed Plan
The first option is the previously submitted applicant’s option. This would include planting of
a row of native trees, low maintenance shrubs and ground cover consistent with the
originally approved concept plan. An easement would be placed on the two (2) properties to
ensure maintenance of the area and no additional structures are placed within the open
space area. Fencing would include 3-foot high maximum wood fence along the perimeter
and along the property lines to delineate location of property. The fencing change is in
response to the DRC comments. The individual property owners of each lot would maintain
the private open space area. The landscaping would be selected for low maintenance and
drought tolerance.
11
ITEM NUMBER:
2
DATE: 10-15-14
Option #2 –Applicant Plan with reduced landscaping
A second option is a reduced open space easement area that the owners would maintain.
This would include a reduction in the amount of shrubs and tree plantings to only three (3)
native trees with minimal plantings of drought tolerant shrubs and/or ground covering that
may include ground cover manzanita, prostrate junipers, or other very hardy, drought
tolerant type shrubs that use minimal water and are easy to maintain. Similar to option #1,
fencing would line the front yards and along the side yards to delineate what that property
owner is responsible for and an open space easement is to be recorded.
Proposed Option #2 – Reduced Landscaping
6-foot solid fence
3-foot
picket
fence
10-wide landscape area
-Fewer Native Trees
-Native shrubs/ground cover
-cobble rocks
12
ITEM NUMBER:
2
DATE: 10-15-14
Option #3 – City Maintained Space
Some DRC members expressed an interest in City Maintenance of the open space area.
The applicant has produced a conceptual plan showing how this would look. In this plan, the
City could maintain the open space area outside of the fenced yards. The area would
include Native Tree plantings with either cobble rock mulch or drought tolerant ground cover
to be included. Additional shrubs near the oak trees would be necessary to ensure survival
of the tree. Maintenance of this area would fall on the City. This would include:
Installation of a water meter;
Water for the native trees and shrubs;
Tree pruning, leaf blowing, and other maintenance associated with keep the area
clean and well maintained;
Trash Pick-up.
Staff has a number of concerns regarding City maintenance including:
Adding additional maintenance responsibilities to Public Works staff;
Creating a policy inconsistency with numerous approved project where the City
rejected public maintenance and required the project to create a maintenance
funding mechanism;
Creating a public space that could attract loitering and become a policing issue.
Proposed Option #3 – Proposed City Maintained
3-foot picket fence
13
ITEM NUMBER:
2
DATE: 10-15-14
Option 4: Community Garden
Some DRC members expressed an interest in a community garden. This is an option that
staff explored initially when People’s Self Help Housing acquired the project out of
bankruptcy. While a Community Garden may become an asset, there are many issues
surrounding a proposed community garden that would need further exploration. That
includes the following:
If the responsibility of maintenance falls on PSHH, that would necessitate the
creation of an HOA, which would create additional expense for all the homeowners in
the development;
If maintenance responsibility falls on the City, additional concerns would be raised;
Ensuring the garden is well kept will fall on volunteers. This can become an issue if
no one volunteers;
The public space could attract loitering and become a policing issue;
Staff has a number of concerns regarding City maintenance of a community garden:
Adding additional maintenance responsibilities to Public Works staff to ensure the
site is free of weeds and is well kept;
Cost of installation of a water meter for a garden;
Creating a policy inconsistency with numerous approved project where the City
rejected public maintenance and required the project to create a maintenance
funding mechanism;
A potential nuisance and policing issue, specifically with loitering.
Option 5: General Plan Amendment to allow additional single-family residential
unit.
A final option is to recommend a General Plan Amendment that would allow an additional
single family residential unit versus open space. This option would eliminate the need for
any open space and provide PSHH an additional affordable housing unit. Issues with the
General Plan Amendment include:
Processing of the application including City Council authorization, Planning
commission and final City Council approvals do not fit the time line for construction
for PSHH;
Further project delays may put project funding in jeopardy;
Additional cost to the applicant to process a General Plan Amendment include
engineering, architecture, environmental review, and City application fees ($9,000+/-)
No certainty on neighborhood concerns, if any, for an additional residential unit on-
site;
14
ITEM NUMBER:
2
DATE: 10-15-14
Open Space
Option
Maintenance
Responsibility Pros Cons
Option 1 –
Applicant
Proposal
Property Owners
Lots 1 & 2
Consistent with general plan and
previously approved project
Provides green space buffer
Added gateway feature to project
Sense of pride and ownership
Native tree replanting
Native shrubs and drought
tolerant plantings
Additional maintenance falls on
property owner
Option 2 –
Reduced
Private Open
Space Area
Property Owners
Lots 1 & 2
Consistent with General Plan
Provides native tree plantings
Provides a smaller green space
area at the corner
DRC will need to make a
consistency finding
Maintenance falls on property
owner
Reduced open space area
compared to previously
approved project
Option 3 – City
Maintained
Open Space
Area
City Open Space area will be
maintained long term
Additional City maintenance
responsibilities and costs ;
Creates a policy inconsistency
with numerous approved
project
Creates a public area with
potential nuisance and policing
issue, specifically with loitering.
Option 4 –
Community
Garden
City or Home
Owners
Association
Provides potential gateway and
community asset
PC / CC would need to find
consistency with General plan
Question of who will maintain
garden: City, HOA, volunteers?
Costs to provide water and
irrigation
Potential nuisance issues
Option 5 –
General Plan
Amendment
Eliminates Open
Space
Provides an additional affordable
housing unit
Time constraints due to
processing
Funding issues
Cost of application and
additional design work
15
ITEM NUMBER:
2
DATE: 10-15-14
Proposed Lot 1 Wrap-Around Porch
Previous Meeting Discussion Items
Lot 1 Wrap Around-Porch Option
With the private open space easement area becoming more of a front yard entry feature,
Staff is proposing that the lot 1 residential unit utilize similar architectural features as the
proposed Lot 2 residence. This includes a wrap-around porch that would front both the
street and the private open space area. The applicant is in support of this change as it would
use a similar floor plan already developed and there would be minimal cost to produce a
“reverse” of the floor plan. This proposed change provides the future lot 1 resident the ability
to have a view shed of the open space area, as well as maintain an “eye on the street”
approach of neighborhood policing.
Staff Recommendation:
1. Staff is recommending either Open Space Option 1 or Option 2.
2. Lot 1 to have the same wrap around porch as Lot 2.
Lot
1
16
ITEM NUMBER:
2
DATE: 10-15-14
Project Background (Previous staff report)
The project site, referred to in the General Plan as the “Atascadero Avenue Triangle,” is
located just off of Morro Road. The project site is bordered by Navajoa Avenue, Atascadero
Avenue, and San Andres Avenue. The site consists of three underlying Colony lots, totaling
approximately 2.2 acres.
Following the 1992 General Plan Update, the entire site (all three parcels) had a General
Plan Designation of Recreation (REC) and a conflicting Zoning Map Designation of
Residential Multi-Family (RMF-16). During the 2000 General Plan Update, a request was
considered to change the land use designation. The Council decided to designate the corner
near Morro Road for a ½-acre park and designate the remainder of the site for 10 residential
units. The General Plan created a Master Plan of Development Overlay (MPD Overlay #12)
requirement for the site.
The City did not have the funds to purchase the property nor maintain the proposed park.
Because the City did not have the funds or the ability to require development of the park due
to legal issues, the previous developer requested that the City amend the General Plan to
eliminate all requirements for a public park on the site.
The Atascadero Avenue Triangle project was approved in 2008 as a General Plan
Amendment and a Master Plan of Development by the City Council. The proposed
development consists of three (3) underlying colony lots that would be subdivided into a total
of 11 residential units on lots ranging from 5,700 square feet (sf) to 7,000 square feet and
one (1) lot for development an open space park area for private use only. Proposed
residential units ranged from 1,500 sf to 1,600 sf in size. The proposed homes included 2-
car garages with frontage improvements along the existing road system of Atascadero
Avenue, San Andres Road, and Navajoa Avenue.
The previous applicant began the building permit process, with the permits “ready to be
issued” in 2009, however, the permits were never issued and the previous owner let the
property go into foreclosure. The property was purchased out of receivership as a part of
bankruptcy auction by People’s Self Help Housing (PSHH) in December 2013. City staff met
with People’s Self Help Housing in regards to the project approval, specifically the private
open space, and other amendments that need to be completed in order to move forward
with recordation of the Final Map, building permit approval, and ultimately construction of 11
affordable housing units to a range of income levels ranging from very low income to
moderate income levels. At this time, the applicant is not seeking any design changes to
previously approved elevations, floor plans, or residential unit sizes.
17
ITEM NUMBER:
2
DATE: 10-15-14
The Design Review Committee is being asked to review the proposed modifications to the
private open space feature that was approved by the City Council in February 2008, as well
as review fencing options based on the proposed change and a potential additional
architectural feature on a proposed unit.
Previous Approved Park Concept
The Master Plan of Development for the intersection of Morro Road / San Andres Road /
and Atascadero Avenue included a private open space park area that was to be designed to
act as a buffer between the residences and Morro Road. The landscape area was proposed
to be fenced and gated for private use of the previous owner. The lot was not proposed for
use by surrounding development know as the “Atascadero Triangle (11 unit planned
development) and was to be privately maintained by the previous owner. The previous
owner’s land holding company fell into bankruptcy and the property was sold as a package
with the adjacent 11 units. Since the City Council approved the project with the private open
space feature, Staff determined that the maintenance cost would fall under the privy of a
Homeowners Association (HOA) or other financial mechanism, consistent with conditions of
approval.
2008 Approved Master Plan of Development
18
ITEM NUMBER:
2
DATE: 10-15-14
2008 Approved Concept Sketch of Private Park
2008 Approved Private Park Location
Approved Private
Park Location
19
ITEM NUMBER:
2
DATE: 10-15-14
2008 Approved Conceptual Site Plan
The approved park concept included pathways with decorative pavement on a 7,000 sf lot.
Other proposed features included a dry pond made of cobble rocks located at the front of
the private open space area, a dry creek meandering through the area to combine with the
landscape with an adjacent residential lot. Larger trees were proposed to line the back of the
area to provide privacy for the adjacent residential properties. A statue was proposed at the
center of the private landscape feature.
The proposed private landscape feature also included a decorative wall and fence along the
property line at the corner facing Morro Road. Access gates were proposed to be located on
each street frontage, and would allow the area to be locked for security purposes for private
use of the previous owner.
Attachments:
Attachment 1: Aerial Map
Attachment 2: 2008 Approved Park Open Space
Atascadero Avenue
S
a
n
A
n
dr
e
s
A
v
e
n
u
e
Lot1
Lot2
20
ITEM NUMBER:
2
DATE: 10-15-14
Attachment 1: Aerial Map
Proposed Private open
Space Revision
21
ITEM NUMBER:
2
DATE: 10-15-14
Attachment 2: 2008 Approved Private Open Space Plans
22