CITY OF ATASCADERO
DESIGN REVIEW COMMITTEE AGENDA
Committee Meeting
Wednesday, September 10, 2014
3:30 PM.
City Hall
Room 106 (1st Floor)
6500 Palma Avenue
Atascadero, California
CALL TO ORDER
Roll Call: Chairperson Bob Kelley
Committee Member Duane Anderson
Committee Member Mark Dariz
Committee Member Heather Moreno
Committee Member Jamie Kirk
APPROVAL OF AGENDA
PUBLIC COMMENT
CONSENT CALENDAR
1. APPROVAL OF DRAFT ACTION MINUTES OF JUNE 25, 2014
P1
City of Atascadero Design Review Committee Agenda Regular Meeting, June 25, 2014
Page 2 of 3
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR
Code with your
smartphone to
view DRC Website
DEVELOPMENT PROJECT REVIEW
2. PLN 2099-0997 / DRC 2013-0038 CUP 2003-0108
9006 WEST FRONT WEST FRONT VILLAGE
3. PLN 2014-1515 / DRC 2014-0057 / TPM 2014-0102 / AMENDMENT TO
CUP 2000-0014 TO ADD A DRIVE-THROUGH RESTAURANT
Property Owner/
Applicants:
H&S Hospitality, LLC
Project Location: 9006 West Front Road
General Plan / Zoning: General Commercial (GC)
Commercial Retail (CR)/PD-23
Project Area: 0.7 Acres / Commercial Lot 3
Existing Use: Vacant
Project Description: The applicant is proposing construction of commercial lot 3 which is adjacent to
the Holiday Inn Express. Proposed building would total 4,880 square feet (sf) and
include 2,876 sf of restaurant space and 1,627 sf banquet room / meeting space.
DRC is to review revised architectural style and make a consistency finding with
the approved master plan of development.
Recommendation: Staff recommends that the DRC find the architectural elevations consistent with
the Master Plan of Development and existing surrounding development. Staff
recommends that the DRC direct the applicant work with Staff on paint color
selection and ensure high quality decorative tile be utilized, and submittal of
landscaping plan consistent with project approvals.
Property Owner: Atascadero 101 Associates, c/o Westar Associates
Applicants: Garing Taylor & Associates
Project Title: Home Depot Center Master Plan of Development Amendment
Proposed Drive-through Restaurant
Project Location: 805 El Camino Real
Project Description: An application to amend the master plan of development for the Home Depot
shopping center. The north west parcel in Phase I is currently approved for
an 18,000 sq. ft. retail building which has not yet been constructed. The
amendment proposes reducing the size of the retail bu ilding to 10,000 sq. ft.
and adding a 4,500 sq. ft. drive-through restaurant. A tentative parcel map is
proposed to subdivide the existing lot into two (2) parcels.
Recommendation: Staff recommends DRC recommend Planning Commission approve the CUP
amendment design and parcel map, subject to minor modifications and conditions
of approval
P2
City of Atascadero Design Review Committee Agenda Regular Meeting, June 25, 2014
Page 3 of 3
http://www.facebook.com/planningatascadero
@atownplanning
Scan This QR
Code with your
smartphone to
view DRC Website
4. PLN 2007-1251 / DRC 2014 – 6905 NAVAJOA PEOPLES SELF HELP
COMMITTEE MEMBER COMMENTS AND REPORTS
DIRECTOR’S REPORT
ADJOURNMENT
The next regularly scheduled DRC meeting will be September 24th, 2014.
Agendas, Minutes and Staff Reports are available online at www.atascadero.org under
City Officials & Commissions, Design Review Committee.
Property Owner: People Self Help Housing Corporation
Applicants: People Self Help Housing Corporation / Tim Roberts Engineering
Project Title: Atascadero Triangle Park Master Plan of Development Amendment / CUP
Amendment / Tentative Parcel Map
Project Location: 6905 Navajoa Avenue
Project Description: An application to amendment the approved master plan of development
for proposed modifications to the private open space feature that was
approved by the City Council in February 2008, as well as review fencing
options based on the proposed change and a potential additional
architectural feature on a proposed unit. A new tentative parcel map /
tentative tract map is proposed to reduce the total number of lots from 12
to 11.
Recommendation: The DRC recommend to the Planning Commission approval of PLN 2007-1243 /
CUP 2007-0219 amending the master plan of development to reduce and modify
the proposed private open space of a previously approved tentative map and
single family project.
P3
This page is
intentionally left
blank.
P4
CITY OF ATASCADERO
DESIGN REVIEW COMMITTEE
DRAFT ACTION MINUTES
Regular Meeting – Wednesday, June 25, 2014
3:00 P.M. City Hall, Room 106 (1st Floor)
6500 Palma Avenue, Atascadero, California
CALL TO ORDER – 2:00 pm
Chairperson Kelley called the meeting to order at 2:01 pm.
ROLL CALL
Present: Chairperson Kelley
Committee Member Anderson
Committee Member Dariz
Committee Member Moreno
Committee Member Kirk
Staff Present: Assistant Planner Alfredo Castillo
Community Development Director Warren Frace
Senior Planner Callie Taylor
Deputy Dir./Chief Bldg Official David Muehlhausen
Planning Intern Sarah Wood
Others Present: Mr. Jim Patterson
Mr. Tillman Moen
Mr. James Oh
Ms. Jenny Kim
Ms. Diane Ourston
Mr. Terry Ourston
Mr. Kurt Ourston
APPROVAL OF AGENDA
MOTION: By Committee Member Dariz and seconded by Committee Member
Anderson to approve the Agenda.
Motion passed 5:0 by a roll-call vote.
PUBLIC COMMENT
None
ITEM NUMBER: 1
DATE: 9/10/14
P5
Design Review Committee Draft Action Minutes
June 25th, 2014 Page 2 of 6
CONSENT CALENDAR
1. APPROVAL OF DRAFT ACTION MINUTES OF MAY 28, 2014
MOTION: By Committee Member Moreno and seconded by Committee
Member Dariz to approve the Consent Calendar.
Motion passed 5:0 by a roll-call vote.
DEVELOPMENT PROJECT REVIEW
2. PLN 2014-1492 / DRC 2014-052 – El Camino Homeless Organization (ECHO)
Emergency Shelter Ordinance Implementation
The Staff Report was presented to the Design Review Committee by Assistant Planner Alfredo
Castillo.
PUBLIC COMMENT
The following people spoke during public comment:
Mr. Jim Patterson, Mr. Tillman Moen
Property Owner: El Camino Homeless Organization (ECHO)
Applicants: El Camino Homeless Organization (ECHO)
Project Title: El Camino Homeless Organization Perimeter Fencing Plan
Project Location: 6370 Atascadero Mall, Atascadero, CA 93422
APN: 030-341-013 County of San Luis Obispo
Project Description: Review of perimeter fencing along Atascadero Avenue for
consistency with the City’s Emergency Shelter Ordinance, section 9-
3.503(d) that requires the DRC to review and approve all on-site
perimeter fencing
Recommendation: Staff Recommends approval of the perimeter on-site fencing plan with
the following proposed modifications:
Installation of a 6-foot high dog eared fence on side property
with step down height to meet proposed front fence;
Decorative cap fencing with treated wood a maximum of 3-feet
in height for front yard fencing;
Installation of additional landscaping on the side and rear
property lines such as cypress or crape myrtle for additional
visual screening.
P6
Design Review Committee Draft Action Minutes
June 25th, 2014 Page 3 of 6
MOTION: The Committee voted unanimously to approve staff’s
recommendations of the project as presented, with the following
conditions:
1. Extend chain link fence behind shelter and add picket fence
on road frontage
2. Work with Staff on landscaping plan & timeframe
Motion passed by 5:0 by a roll call vote.
DEVELOPMENT PROJECT REVIEW
3. PLN 2014-1511 / DRC 2014-0053 – Downtown Korean BBQ Restaurant
(Formerly Hoovers Building Renovation)
The Staff Report was presented to the Design Review Committee by Community Development
Director Warren Frace.
PUBLIC COMMENT
The following people spoke during public comment:
Mr. James Oh, Ms. Jenny Kim
MOTION: The Committee voted unanimously to approve the project with the
condition the Design Review Committee reviews an acoustic
study/report, obtained by the Applicant.
Motion passed by 5:0 by a roll call vote.
Property Owner: ECR Creek Investments
Applicants: Jenny Kim
Project Title: Korean BBQ Restaurant façade renovation and interior improvements
Project Location: 6900 El Camino Real, Atascadero, CA 93422
APN: 030-201-027 County of San Luis Obispo
Project Description: Elevation changes to accommodate exhaust system
Recommendation: Staff recommends the DRC approve the proposed exhaust system
installation on the balcony.
P7
Design Review Committee Draft Action Minutes
June 25th, 2014 Page 4 of 6
DEVELOPMENT PROJECT REVIEW
4. PLN 2014-1494 / CUP 2014-0281 Event Center / 1610 El Camino Real
The Staff Report was presented to the Design Review Committee by Senior Planner Callie Taylor.
PUBLIC COMMENT
The following people spoke during public comment:
Ms. Diane Ourston, Mr. Terry Ourston, Mr. Kurt Ourston
MOTION: The Committee unanimously recommended the project be
reviewed again by the Design Review Committee and then by the
Planning Commission, once the applicant has addressed the
following items. Project to include all staff recommendations plus
the following changes:
a) Number of events Phase 1: six per year; 30 days per year
b) Time limits: Phase 2, improvements requires three years.
Bring back options within 2 years of CUP approval.
c) Hours of Operation: Event end time 10 pm for outdoor events
d) Amplified music: Per noise ordinance. Limited to Weekdays:
8am to 7pm, Friday & Saturday: 9am to 9pm Sunday/holiday
10am to5pm
e) Parking lot: Identify overflow parking area shared with the
Elks. DRC approved all weather surfacing (gravel base) with
edge delineation & signage to control where cars are parked
f) Fencing: Black tubular along front, black vinyl clad the
remainder
g) Trash enclosures: masonry decorative trash enclosures to be
constructed
Property Owner/
Applicants:
Kurt Ourston / Squirreland Entertainment
Project Location: 1610 El Camino Real, Atascadero, CA 93422
APN’s: 049-131-045,072 County of San Luis Obispo
General Plan / Zoning: Commercial Park (CPK)
Project Area: 1.68 acres (2 lots)
Existing Use: Single-family residence
Proposed Use: Conditional Use Permit for Public Assembly and Entertainment
use.
P8
Design Review Committee Draft Action Minutes
June 25th, 2014 Page 5 of 6
Motion passed by 5:0 by a roll call vote.
DEVELOPMENT PROJECT REVIEW
5. PLN 2099-0989 / DRC 2014-0049 – Principal Mixed-Use
The Staff Report was presented to the Design Review Committee by Assistant Planner Alfredo
Castillo.
PUBLIC COMMENT
The following people spoke during public comment:
Mr. Hamish Marshall
MOTION: The Committee unanimously requested this project be reviewed
again by the Design Review Committee, once the applicant has
addressed the following items:
a) Limited commercial is okay
b) Change car wash architecture to match residential theme
c) Add commercial parking
d) Add residential parking
Motion passed by 5:0 by a roll call vote
Property Owner: Principle Partners LLC
Applicants: AuzCo Developments / Wallace Group
Project Title: Principal Mixed Use – Site Design / Entitlement Revisions
Project Location: 9105,9107,909 Principal Avenue; 9300 Pino Solo Avenue
Project Description: Proposed Amendments to an approved master plan of development
that includes the following:
Thirty-eight (38) dwelling units with the following breakdown:
o 9 detached single family units
o 11 duplex units
o 6 mixed-use units (2nd floor residences);
7,500 sf 1st floor office use;
corner car wash
Recommendation: Staff recommends the applicant work with Staff to further refine site
plan and uses and return to DRC
P9
Design Review Committee Draft Action Minutes
June 25th, 2014 Page 6 of 6
COMMITTEE MEMBER COMMENTS AND REPORTS
None
DIRECTOR’S REPORT
The next DRC meeting is tentatively scheduled for August 13th.
ADJOURNMENT – 4:37 pm.
MINUTES PREPARED BY:
_______________________________________
Warren Frace, Community Development Director
t:\~ design review committee\minutes\minutes 2014\draft action minutes 6.25-14.docx
P10
ITEM NUMBER:
2
DATE: 9-10-14
Atascadero Design Review Committee
Report In Brief - Community Development Department
Alfredo R. Castillo, AICP, Assistant Planner, (805) 470-3436, acastillo@atascadero.org
West Front Village – DRC Consistency Review
Commercial Lot 3
Owner: H&S Hospitality, LLC
Address: 9006 West Front Road.
Project #: PLN-2099-0997 / CUP 2003-
0108 / DRC 2013-0038
General Plan: General Commercial (GC)
Zoning: Commercial Retail (CR) / PD-
23
Project Area: 0.7 Acres / Commercial Lot 3
Existing Use: Vacant
Design Review Items
Design review of revised architectural style, including revised floor plans and elevations
compared to previously approved project.
Recommendation:
Staff recommends that the DRC find the architectural elevations consistent with the Master
Plan of Development and existing surrounding development. The DRC recommends that
the applicant work with Staff on paint color selection and ensure high quality decorative tile
be utilized, and submittal of landscaping plan consistent with project approvals.
P11
ITEM NUMBER:
2
DATE: 9-10-14
Master Plan of Development – Commercial Portion
Proposed Site
Background
West Front Village, was approved by City Council as a General Plan Amendment, Zone
Change with a Master Plan of Development (CUP 2003-0108) and Tentative Tract Map
(2003-0035). The project is a horizontal mixed-use development consisting of office, retail,
restaurant, and hotel areas located along West Front Avenue and a residential component
located off Portola Avenue. This project was amended by the City Council in 2009 that
included a new Vesting Tentative Map (VTM) for 18 of the 32 residential units, a revised
affordable housing plan, and revisions to the project conditions.
In the spring of 2013, Costal Community Builders purchased the remaining residential
component (32 residential units) and the remaining retail and office parcels that have not
been developed. Coast Community Builders sold off the remaining commercial portion of
the development and was granted an amendment to the residential portion of the project in
September of 2013.
New owners of commercial lot 3 are wishing to develop the vacant commercial pad into a
restaurant with a banquet room and are seeking a consistency finding with the approved
master plan of development from the DRC.
Existing Site Plan
West Front Village includes the development of 32 small lot single-family / duplex homes, a
detention basin and a small passive park with a play structure to be completed with the
residential (condition 11).
Jack-in-the-
Box
(complete)
Holiday Inn
Express
(Complete)
Vacant with permits
ready to be issued
Business Park
Lots (Vacant)
Residential
Portion
P12
ITEM NUMBER:
2
DATE: 9-10-14
The non-residential portion includes the existing Jack-in-the Box parcel (parcel 1), a
commercial-retail pads that are currently vacant in parcels 2 and 3, and the Holiday Inn
Express which occupies parcel 4. The northern portion of the site adjacent to the duplex
units is a proposed business park site. The approved master plan includes the provision for
two (2) business park buildings (12,700 square feet) accessed through an existing off-site
driveway serving adjacent commercial properties. These building have yet to be
constructed. The applicant is proposing construction of commercial lot 3 which is adjacent to
the Holiday Inn Express. The proposed building on lot 3 would total 4,880 square feet (sf)
and include 2,876 sf of restaurant space and 1,627 sf banquet room / meeting space. The
proposed location of the building is consistent with the approved master plan of
development.
The location of parking is consistent with the master plan of development. The applicant is
proposing 39 parking spaces to be location on Commercial Lot 3. Additional parking may be
accommodated on the Holiday Inn site through the existing shared parking agreement
consistent with the master plan of development and Covenants, Conditions, and Restrictions
(CC& Rs) for the commercial development portion of the project.
Proposed Site Plan – Commercial Lot 3
P13
ITEM NUMBER:
2
DATE: 9-10-14
Additionally, the application is proposing landscaping in the proposed landscaping fingers of
the parking lot. The drainage area / swale is already landscaped as this area is a wetland
remediation area that has been completed as a part of project approvals. Staff is
recommending that the DRC direct the applicant to work with Staff on a landscaping plan
consistent with the master plan of development that includes similar tree and shrub species
and use of pavers, where needed or required.
Rear project fencing includes a decorative wood fence that was approved as a part of the
2013 amendments to the residential portion of the project. Landscaping plantings will be
required along the fenced portion of the development adjacent to the trash / recycling
receptacles.
Proposed Elevations
The approved elevations for commercial lot 3 have not changed since the project approval
in 2005. The approved elevations included Spanish style buildings. Colors consistent with
Spanish style buildings include the use of browns and beige. The approved elevations
included the use of Spanish style clay roofing, arched windows, dark stone veneer along the
base of the building, decorative cornices, wood columns creating a decorative long covered
porch, and other Spanish style elements. The approved elevation, utilizes a projected
square tower decorative trim with a moderate pitched-hipped red-mission tile roof. These
elevations have remained unchanged as the development moved forward with the Holiday
Inn Express and the Jack-in the Box restaurant.
The applicant is proposing changes to the approved elevations. The proposed changes are
not a radical change from the approved elevations. However, Staff is seeking the DRC’s
review of the proposed changes and determine of the proposed elevations are in
conformance with the approved architecture theme for the development.
2005 Approved Elevations
P14
ITEM NUMBER:
2
DATE: 9-10-14
The proposed elevations include the placement of towers, consistent with Spanish style
architecture, at the corner of the front façade. This corner tower is designed to face both
West Front Road and the Holiday Inn Express and act as an entry feature to the proposed
banquet room / conference space. An additional tower is to be located at the west end of the
building near the proposed primary entry of the restaurant space.
Decorative elements of the proposed elevations include the use of decorative tile and metal
awnings and brick instead of the dark stone veneer. This is consistent with the existing
Holiday Inn Express and the Jack-in-the Box developments in the master plan of
development. The proposed architectural changes retain primary features from the originally
approved plans that include a covered patio. The stone veneer that was the base of the
wood posts has been replaced by bricks. The covered patio is proposed to be an outdoor
eating area. Additional areas of stucco will be included in a smooth finish. Staff is
recommending that the applicant work with Staff on ensuring high quality decorative tile be
utilized where proposed on the exterior elevations as well as final color selection of the
building, specifically pop-outs and stucco wainscot.
2014 Applicant Proposed Elevations
P15
ITEM NUMBER:
2
DATE: 9-10-14
Proposed Floor Plan
The proposed floor plan includes a total of 2,876 sf of total restaurant space that includes
both table and booth seating, full working kitchen, bathrooms and a proposed bar. An
additional 495 sf of outdoor seating area is also included. This is to be located under the
proposed patio. An additional 1,363 sf of banquet / meeting room is proposed. This use will
be ancillary to the restaurant and allow for larger private gatherings away from the
restaurant. Adjacent to the banquet room is a 264 sf storage room for use of the restaurant
space.
2014 Proposed Rear Elevation
Proposed Floor Plan
Banquet Room
P16
ITEM NUMBER:
2
DATE: 9-10-14
Staff Recommendation:
The proposed revisions to the architectural elevations for lot 3 are consistent with the type of
architecture that was approved in 2005 and amended in 2009 and 2013. The use of the
Spanish style architecture with brick façade is consistent with the neighboring Holiday Inn
Express and the colors of the buildings are consistent. Staff recommends that the DRC
make a consistency finding that the proposed architecture is consistent with the approved
master plan of development and the applicant work with Staff during the building permit
process on the following:
1. Landscaping Plan consistent with the approved master plan of development
2. Use of high quality decorative tile as shown in the elevations;
3. Final color schemes consistent with surrounding non-residential project
architecture;
4. Exterior lighting will note create glare toward residential areas.
Attachments:
Attachment 1: Aerial Map
Attachment 2: Existing Commercial Development
Attachment 3: Approved Master Plan of development Landscaping Plan
P17
ITEM NUMBER:
2
DATE: 9-10-14
Attachment 1: Aerial Map
Proposed Commercial
lot development
P18
ITEM NUMBER:
2
DATE: 9-10-14
Attachment 2: 2009 Existing Commercial Development
View of Holiday Inn From West Front Road
View of Jack In the Box facing Commercial Lot 3
P19
ITEM NUMBER:
2
DATE: 9-10-14
View of Holiday Inn Facing Proposed Development
P20
ITEM NUMBER:
2
DATE: 9-10-14
Attachment 3: Approved Master Plan of Development Landscaping Plan
P21
ITEM NUMBER:
2
DATE: 9-10-14
Attachment 3: Approved Master Plan of Development Landscaping Plan
P22
This page is
intentionally left
blank.
P23
ITEM NUMBER:
3
DATE: 9-10-14
Atascadero Design Review Committee
Report In Brief - Community Development Department
Callie Taylor, Senior Planner, (805) 470-3448, ctaylor@atascadero.org
Home Depot Center Master Plan of Development Amendment
Proposed Drive-through Restaurant
PLN 2014-1515 / Amendment to CUP 2000-0014 / TPM 2014-0102/ DRC 2014-0057
805 El Camino Real
Owner: Atascadero 101 Associates,
c/o Westar Associates
Applicant: Garing Taylor & Associates
Address: 805 El Camino Real
APN: 049-045-022
General Plan: Commercial Park (CPK)
Zoning: Commercial Park (CPK)
Planned Development #9
Project Area: 2.16 acre lot
Existing Use: Parking lot & vacant
graded building pad
Approved Use: 18,000 sq. ft. retail
Proposed: 4,500 sq. ft. drive-through
restaurant & 10,000 sq. ft.
retail
Staff
Recommendation: DRC recommend Planning Commission approve CUP amendment design and
parcel map, subject to minor modifications and conditions of approval
Design Review Items
Proposed drive-through use
Site plan, landscape & parking modifications
Elevations, colors & materials for drive-through & retail buildings
Proposed building mounted signage
Tentative Parcel Map to subdivide existing lot into two (2) parcels
Home
Depot
(Phase I)
Marriott
(Phase II)
Subject Site
P24
ITEM NUMBER:
3
DATE:
9-27-12
Background:
The master plan of development for the project site was originally approved in March
1999. The project included a Planned Development 9 overlay to allow the phased
construction of 239,000 square feet of commercial buildings on 27 acres at the north
end of El Camino Real.
Soon after the original approval, the master plan was amended to include a ±128,000
sq. ft. Home Depot and a 13-lot parcel map. The center included Phase I on the east
side of El Camino Real with the Home Depot, a large retail outparcel, and two (2) drive-
through buildings. Phase II was located on the west side of El Camino Real with two (2)
large retail buildings and one (1) drive-through. The master plan of development and
PD-9 designation apply to both sides of El Camino Real.
1999 Home Depot Center Master Plan of Development
8/3/99 Master Plan of Development as Approved
Phase 1
Phase 2
P25
ITEM NUMBER:
3
DATE:
9-27-12
Several subsequent CUP amendments
have been approved over the past 15
years to modify the master plan of
development.
Phase I is currently constructed with the
Home Depot, Starbucks drive-through
and nail salon, 8,000 sq. ft. retail
outparcel with mattress store, and a
14,600 sq. ft. Staples retail building. All
parking lots, project landscape and site
access points have been installed.
There is one vacant building pad next to
Staples, which is currently approved for
an 18,000 sq. ft. retail building.
Phase II was amended in
2012 to include a 130
room, four-story Marriott
hotel, with a 5,000 sq. ft.
exhibit space for events or
conferences. The hotel is
currently under
construction. Two (2)
retail outparcels were
approved at 8,000 sq. ft.
and 10,000 sq. ft. each.
Site improvements
including the shared
parking lot, site
landscape, monument
and pylon sign are
currently under
construction.
Aerial Photo: Phase I, vacant pad approved
for 18,000 sq. ft. retail next to Staples
Staple
s
Vacant pad
Starbucks
Site Plan: Phase II
Marriott Hotel & 2 retail outparcels
Hotel
Retail
Retail
P26
ITEM NUMBER:
3
DATE:
9-27-12
Proposed CUP Amendment for Drive-through Restaurant:
The current CUP Amendment proposes a 4,500 sq. ft. drive-through restaurant near the
east side of El Camino Real. The restaurant would be located in the existing parking
lot on the vacant parcel next to Staples. The drive-through entrance and exit are
designed to be located within the interior parking lot; therefore drive-through access
would not conflict with any of the center’s main drive aisles or adjacent city streets. A
wide landscape planter is provided on the backside of the drive-through to help with
screening and provide a buffer next to El Camino Real.
The existing graded building pad next to Staples is proposed to be modified to allow a
10,000 sq. ft. retail building, which is a reduction in size from the 18,000 sq. ft. building
which was previously approved for this location with the master plan of development .
Proposed Site Plan for Drive–through restaurant & 10,000 sq. f.t Retail
Proposed
Drive-through
restaurant
Existing
Starbucks
Proposed reduction
to future retail at
this location
Existing
Staples
P27
ITEM NUMBER:
3
DATE:
9-27-12
Parking:
The existing parking lot within the project would be reduced by the addition of the new
drive-through restaurant pad. Three (3) existing rows of parking located on the south
end of the parcel between Staples and El Camino Real would be removed to
accommodate the new drive-through restaurant. One (1) new row of parking would be
added on the north end of the parcel next to the new retail building. The added parking
on the north end of the parcel is made possible due to the reduction in size of the retail
building from the previously approved 18,000 sq. ft. down to 10,000 sq. ft. Although
total number of parking spaces in the center will be reduced, the site is currently over-
parked and a parking calculations summary identifies that adequate parking is available
to meet the Municipal Code requirements for Phase I (east side of El Camino Real).
Phase I (East Side) Parking Summary
Staff has requested that the parking summary be expanded to identify uses on both
sides of El Camino Real. The PD-9 and master plan of development include both the
east and west side of the El Camino Real. A parking agreement is in place to provide
shared use of parking lots on both sides of the development. When the 130 room
Marriott hotel was approved with a 5,000 sq. ft. exhibit space for events or conferences,
minimal parking was provided adjacent to the hotel. A total of 255 parking spaces are
provided on the west side of El Camino Real in Phase II for use by the hotel, event
space, and the two (2) retail outparcels. During events at the hotel it is expected that
overflow parking will be accommodated on the east side of El Camino Real near
Staples and Home Depot, where excess parking areas are provided. Parking
calculations for the entire master plan of development shall be provided prior to
Planning Commission hearing.
P28
ITEM NUMBER:
3
DATE:
9-27-12
Landscape:
A conceptual landscape plan has been submitted. The planting scheme is consistent
with the existing landscape within the shopping center. Shade trees are provided
throughout the parking lot and adjacent to all drive aisles and city streets. A bio swale is
proposed between the drive-through restaurant and El Camino Real, located in a wide
landscaped area near the project’s main entrance. All new plantings shall be drought
tolerant, consistent with the City’s water efficient landscape ordinance. A more detailed
landscape and irrigation plan shall be required to be submitted with building permits.
Any areas which are disturbed by construction shall be relandscaped prior to final.
Proposed Conceptual Landscape Plan
P29
ITEM NUMBER:
3
DATE:
9-27-12
Proposed Drive-through Elevations:
The proposed drive-through restaurant is designed to match the architecture of the
adjacent retail buildings. The building is proposed with two-toned beige and tan stucco
walls, a clay tile roof, reddish toned slate tile as an accent, and canvas awnings which
are similar to those used at Starbucks next door.
Staff is recommending one minor modification to the architectural design of the drive-
through. The west facing center pop out element is designed to add height and interest
to the west elevation. However, when viewed from the side, it has the appearance of a
two-dimensional feature, as it does not extend back into the building to give a three-
dimensional massing. Staff recommends a modification to the roof line to add
depth and three-dimensional architecture as viewed from all sides of the building.
Proposed Drive-through Elevations
Staff
recommends
modification to
west facing pop-
out to add depth
& 3-dimensional
building massing
when viewed
from side
P30
ITEM NUMBER:
3
DATE:
9-27-12
Proposed Retail Elevations:
The 10,000 sq. ft. retail building proposed to be constructed adjacent to Staples is
designed to match the existing Staples building. The two-toned color scheme wraps
around the building with some upper moldings to add articulation on the side and rear
facades. The west elevation includes pop outs and the rear of building steps back in
order to avoid a large blank façade facing El Camino Real. Staff recommends the
elevations for this building be approved as proposed.
Proposed Retail Building Elevations
Proposed Signage:
Building mounted wall signs are identified on the proposed elevations for both buildings.
Wall signs are proposed on all four (4) sides of the drive-through restaurant; the signs
are appropriately scaled to the size of the building. For the retail building, wall signs are
proposed on front and west side elevation facing El Camino Real. Signs shall be
designed to meet the size allowances identified in the existing CUP conditions of
approval, consistent with the existing Staples building and Starbuck drive-through.
Monument signs on El Camino Real and two (2) pylon signs were previously approved
for the project; no new free standing signs are proposed with this CUP amendment.
Staples
P31
ITEM NUMBER:
3
DATE:
9-27-12
Tentative Parcel map
A tentative parcel map has been submitted in order to subdivide the existing 2.16 acre
lot into two (2) parcels. The 10,000 sq. ft. retail building is proposed on Parcel 1, which
would be 1.30 acres. Parcel 2 would contain the drive-through on its own separate 0.86
acre lot. Shared access and parking are provided throughout the development via
existing agreements and easements.
Proposed Tentative Parcel Map
P32
ITEM NUMBER:
3
DATE:
9-27-12
Traffic Study & Environmental Review:
City Staff has requested that the applicant provide a complete traffic analysis in order to
determine if the new drive-through will generate traffic numbers that may have potential
impacts on the adjacent city streets and intersections. Upon receiving the traffic study,
the City Engineer and Planning Staff will be able to determine what type of CEQA
analysis is appropriate for the proposed project, and mitigation measures will be
identified as necessary to address project impacts. Traffic impacts and CEQA analysis
associated with the proposed CUP amendment will be reviewed by the Planning
Commission.
Project Conditions:
Project specific and standard conditions of approval are recommended, including:
The additional parking area on Parcel 1 shall be installed prior to final of the
drive-through restaurant.
A photometric plan shall be submitted with building permits to ensure no off-site
glare. Building mounted light fixtures shall utilize lower wattage bulbs and/or be
shielded fixtures in order to eliminate visible light sources.
A final landscape and irrigation plan shall be submitted, consistent with the water
efficient landscape ordinance. Any landscape areas disturbed by construction
shall be relandscaped prior to final.
A bicycle rack shall be installed at each new building.
The trash enclosure shall be designed with solid masonry, split face block or
stucco, with solid metal doors. Landscape screening shall be installed around
the trash enclosure.
Attachments:
Attachment 1: Aerial Photo of Vons Shopping Center
Attachment 2: Proposed Project Plans (Exhibits)
P33
ITEM NUMBER:
3
DATE:
9-27-12
Attachment 1: Aerial Photo of Home Depot Center: Phases I & II
900 El Camino Real
Master Plan of Development Phase II
Marriott hotel & 2 retail outparcels
Phase I
Home Depot Center
Subject Site of CUP Amendment:
Proposed drive-through restaurant
& 10,000 sq. ft. retail building
P34
ITEM NUMBER:
3
DATE:
9-27-12
Attachment 2: Proposed Project Plans (Exhibits)
See Attached
P35
P36
P37
P38
EL CAMINO REAL, ATASCADERO, CA WESTAR ASSOCIATESEL CAMINO REAL, ATASCADERO, CA WESTAR ASSOCIATESRETAIL BUILDINGSCONCEPTUAL LANDSCAPE PLAN L-1 7-10-14 A B C D E FG H I J K L M N O P Q R S T U V W X Y ZSCALE: 1”= 20’ P39
P40
Project Development
Civil Engineering
SurveyingDEMOLITION NOTES:REFERENCE NOTES: P41
ITEM NUMBER:
4
DATE: 9-10-14
Atascadero Design Review Committee
Report In Brief - Community Development Department
Alfredo R. Castillo, AICP, Assistant Planner, (805) 470-3436, acastillo@atascadero.org
Atascadero Trainable Park – DRC Consistency Review
Private Open Space Park
Owner: People Self Help Housing
Address: 6905 Navajoa Avenue
Project #: PLN-2007-1243 / DRC 2014-
0056 / CUP 2007-0219
General Plan: High Density Residential
Zoning: Residential Multi-Family (RMF-
20) / PD-7 Overlay
Project Area: 2.2 Acres
Existing Use: Vacant, previously approved
master plan of development
Design Review Items
Design review of proposed private open space feature
Provide direction on front fencing options
Provide direction on option porch for residential lot 1
P42
ITEM NUMBER:
4
DATE: 9-10-14
Recommendation:
The DRC recommend to the Planning Commission approval of PLN 2007-1243 / CUP
2007-0219 amending the master plan of development to reduce and modify the proposed
private open space of a previously approved tentative map and single family project.
Background
The project site, referred to in the General Plan as the “Atascadero Avenue Triangle,” is
located just off of Morro Road. The project site is bordered by Navajoa Avenue, Atascadero
Avenue, and San Andres Avenue. The site consists of three underlying Colony lots, totaling
approximately 2.2 acres.
Following the 1992 General Plan Update, the entire site (all three parcels) had a General
Plan Designation of Recreation (REC) and a conflicting Zoning Map Designation of
Residential Multi-Family (RMF-16). During the 2000 General Plan Update, a request was
considered to change the land use designation. The Council decided to designate the corner
near Morro Road for a ½-acre park and designate the remainder of the site for 10 residential
units. The General Plan created a Master Plan of Development Overlay (MPD Overlay #12)
requirement for the site.
The City did not have the funds to purchase the property nor maintain the proposed park.
Because the City did not have the funds or the ability to require development of the park due
to legal issues, the previous developer requested that the City amend the General Plan to
eliminate all requirements for a public park on the site.
The Atascadero Avenue Triangle project was approved in 2008 as a General Plan
Amendment and a Master Plan of Development by the City Council. The proposed
development consists of three (3) underlying colony lots that would be subdivided into a total
of 11 residential units on lots ranging from 5,700 square feet (sf) to 7,000 square feet and
one (1) lot for development an open space park area for private use only. Proposed
residential units ranged from 1,500 sf to 1,600 sf in size. The proposed homes included 2-
car garages with frontage improvements along the existing road system of Atascadero
Avenue, San Andres Road, and Navajoa Avenue.
The previous applicant began the building permit process, with the permits “ready to be
issued” in 2009, however the permits were never issued and the previous owner let the
property go into foreclosure. The property was purchased out of receivership as a part of
bankruptcy auction by People’s Self Help Housing (PSHH) in December 2013. City Staff
met with People’s Self Help Housing in regards to the project approval, specifically the
private open space, and other amendments that need to be completed in order to move
forward with recordation of the Final Map, building permit approval, and ultimately
construction of 11 affordable housing units to a range of income levels ranging from very low
income to moderate income levels. At this time, the applicant is not seeking any design
changes to previously approved elevations, floor plans, or residential unit sizes.
P43
ITEM NUMBER:
4
DATE: 9-10-14
The Design Review Committee is being asked to review the proposed modifications to the
private open space feature that was approved by the City Council in February 2008, as well
as review fencing options based on the proposed change and a potential additional
architectural feature on a proposed unit.
Previous Approved Park Concept
The master plan of development for the intersection of Morro Road / San Andres Road / and
Atascadero Avenue included a private open space park area that was to be designed to act
as a buffer between the residences and Morro Road. The landscape area was proposed to
be fenced and gated for private use of the previous owner. The lot was not proposed for
use by surrounding development know as the “Atascadero Triangle (11 unit planned
development) and was to be privately maintained by the previous owner. The previous
owner’s land holding company fell into bankruptcy and the property was sold as a package
with the adjacent 11 units. Since the City Council approved the project with the private open
space feature, Staff determined that the maintenance cost would fall under the privy of a
Homeowners Association (HOA) or other financial mechanism, consistent with conditions of
approval.
2008 Approved Master Plan of Development
P44
ITEM NUMBER:
4
DATE: 9-10-14
2008 Approved Concept Sketch of Private Park
The approved park concept included pathways with decorative pavement on a 7,000 sf lot.
Other proposed features included a dry pond made of cobble rocks located at the front of
the private open space area, a dry creek meandering through the area to combine with the
landscape with an adjacent residential lot. Larger trees were proposed to line the back of the
area to provide privacy for the adjacent residential properties. A statue was proposed at the
center of the private landscape feature.
2008 Approved Private Park Location
Approved Private
Park Location
P45
ITEM NUMBER:
4
DATE: 9-10-14
2008 Approved Conceptual Site Plan
The proposed private landscape feature also included a decorative wall and fence along the
property line at the corner facing Morro Road. Access gates were proposed to be located on
each street frontage, and would allow the area to be locked for security purposes for private
use of the previous owner.
Proposed Private Open Space Re-Design
Staff met with the new owner / applicant (PSHH) to discuss how to implement the proposed
park and not burden the future property owners with the cost of establishing a financial
mechanism to maintain the open space feature. The applicant proposed elimination of the
private open space lot (lot 3 on tentative parcel map approval) and provide an permanent
open space easement that would allow for two (2) larger corner residential lots that would
maintain a 2,370 sf open space area consistent with the previously approved landscaping
scheme. Staff determined this was a viable option since the tentative map had not expired,
the number of lots did not exceed the number of approved lots (three total) and would
require a review by the DRC with Planning Commission recommendation and City Council
approval.
San Andres Avenue
P46
ITEM NUMBER:
4
DATE: 9-10-14
Proposed 2014 Master Plan of Development – Lots 1, 2, & 3
Park replaced with
private landscape
area
P47
ITEM NUMBER:
4
DATE: 9-10-14
The proposed private open space area maintains the originally approved line of native oak
tree plantings to be supported by native trees and shrubs near the proposed new plantings
(tree mitigation for removals). A deer grass/meadow area is proposed between a
decomposed granite / paver path and a new sidewalk that is drought tolerant and require
little water for establishment. Staff is proposing that the pavers not be utilized and
substituted with well compacted, pea-size gravel and dirt to reduce maintenance costs, and
maintain the appearance of a private “front yard” feature of the open space area.
Additional street trees would be replanted along both San Andres Road and Atascadero
Avenue. Street trees along Atascadero Avenue would consists of historic Sycamore trees,
consistent with existing street trees planted as planned by E.G. Lewis as a part of the
original Atascadero Colony. Street trees along San Andres Road would be more decorative
in nature such as the Chinese Pastiche that provides vibrant foliage during the spring and
fall and are a lower maintenance tree.
With the proposed changes, the open space area still provides a buffer between the planned
residential development and Morro Road / Highway 41, while providing a greater
neighborhood character and cohesion by acting as a well landscaped front yard for two lots
versus the previously approved private use only open space area.
Proposed 2014 Tentative Parcel Map Revision (Lot 1)
Proposed Private
Open Space
Easement Area
P48
ITEM NUMBER:
4
DATE: 9-10-14
Proposed 2014 Private Open Space Landscaping Plan
The applicant is proposing elimination of the decorative feature wall, statue, and security
access gates. These items were consistent with the proposed concept presented and
approved by the City Council, however this would be too costly to maintain for a small HOA
that consisted of mainly very-low to moderate income families.
Fencing Options
The applicant is proposing the use of a four (4) to five (5) tall wrought-iron fence to enclose
the property and ensure that area is well kept and no loitering occurs within the privately
maintained open space. The originally approved private landscape feature also included
wrought-iron fencing in order to minimize loitering for the proposed decorative wall feature,
statue, etc due in part to the sites location, which is near Atascadero High School and at the
time the Atascadero Library. The Library has since relocated to the Downtown Area, and the
property is currently going through a General Plan Amendment to allow for the sale and re-
use of the property for both future residential and commercial development.
Staff is recommending that the wrought-iron fence be replaced with a:
Picket fence with a maximum height of four (4) feet; or
Split rail fence with a maximum height of four (4) feet.
P49
ITEM NUMBER:
4
DATE: 9-10-14
Proposed Fencing Option Location / Lot 1 Wrap-Around Porch
These fences would then extend to both lots 1 and 2 creating a “front yard” open space
feature that is more inviting aesthetically to the neighborhood and consistent with the rural
atmosphere of the City.
Lot 1 Wrap Around-Porch Option
With the private open space easement area becoming more of a front yard entry feature,
Staff is proposing that the lot 1 residential unit utilize similar architectural features as the
proposed Lot 2 residence. This includes a wrap-around porch that would front both the
street and the private open space area. The applicant is in support of this change as it would
use a similar floor plan already developed and there would be minimal cost to produce a
“reverse” of the floor plan. This proposed change provides the future lot 1 resident the ability
to have a view shed of the open space area, as well as maintain an “eye on the street”
approach of neighborhood policing.
Staff Recommendation:
The proposed private open space improvements help eliminate any issues with the previous
project approval. The private open space would provide a well landscaped entry feature to
one of the City’s historic colony neighborhoods while making two (2) of the 11 total lots very
desirable for a future property owner. The proposed change also eliminates the need for a
HOA or other similar type of financing mechanism required to maintain a private open space
area. This will assist in the the affordability of the project which is a “sweat equity”
development that will provide the City with an additional 11 affordable housing units ranging
Proposed 4-foot high
wood fencing option
P50
ITEM NUMBER:
4
DATE: 9-10-14
from very low to moderate income. Staff is recommending that the DRC provide direction
and recommendation on the following:
1. Use of compact soil / gravel in substitution of decomposed granite (dg)/pavers in
the proposed private open space area;
2. Fencing type front the open space area;
3. Optional wrap-around porch to enhance front yard and architecture for lot #1.
Attachments:
Attachment 1: Aerial Map
Attachment 2: 2008 Approved Park Open Space
P51
ITEM NUMBER:
4
DATE: 9-10-14
Attachment 1: Aerial Map
Proposed Private open
Space Revision
P52
ITEM NUMBER:
4
DATE: 9-10-14
Attachment 2: 2008 Approved Private Open Space Plans
P53