HomeMy WebLinkAboutPC_2003-03-18_AgendaPacketCITY OFATASCADERO
PLANNING COMMISSION AGENDA
Regular Meeting
March 18, 2003 — 7:00 P.M.
City of Atascadero
6500 Palma Ave. — 4th Floor, - Atascadero, California
CALL TO ORDER
Pledge of Allegiance
Roll Call: Chairperson Fonzi
Vice Chairperson Kelley
Commissioner Bentz
Commissioner Beraud
Commissioner Jones
Commissioner O'Keefe
Commissioner Porter
PUBLIC COMMENT
(This portion of the meeting is reserved for persons wishing to address the Commission on any matter not
on this agenda and over which the Commission has jurisdiction. Speakers are limited to five minutes.
Please state your name and address for the record before making your presentation. The Commission may
take action to direct the staff to place a matter of business on a future agenda)
CONSENT CALENDAR
(All items on the consent calendar are considered to be routine and non -controversial by City Staff and will
be approved by one motion if no member of the Commission or public wishes to comment or ask questions.)
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON MARCH 4, 2003.
COMMUNITY DEVELOPMENT STAFF REPORTS
PUBLIC HEARINGS
(For each of the following items, the public will be given an opportunity to speak. After a staff report, the
Chair will open the public hearing and invite the applicant or applicant's representative to make any
comments. Members of the public will be invited to provide testimony to the Commission following the
applicant. Speakers should state their name and address for the record and can address the Commission for
five minutes. After all public comments have been received, the public hearing will be closed, and the
Commission will discuss the item and take appropriate action(s).)
2. Conditional Use Permit 2002-0080: Ataseadero Avenue / Morro Road Mixed Use
Applicant:
Kelly Gearhart, 6205 Alcantara Avenue, Atascadero, CA 93422
Project Title:
Conditional Use Permit 2002-0080
Project
Southeast corner of Morro Road and Atascadero Avenue, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 031-052-024
Project
The project consists of a mixed use commercial office and multi -family residential
Description:
development on single parcels totaling 1.4 acres. The commercial office buildings
will have a total of 7100 square feet with a 24 space parking lot. The residential
portion will consist of seven semi -attached multi -family dwellings with 21 parking
spaces. A single shared driveway will provide access to Morro Road (SR 41) and
two Atascadero Avenue Road. The site will have coordinated architecture and
20,000 sf of landscaping. The existing site is a vacant pasture will minimal slope
and limited vegetation. General Plan: General Commercial, Zoning District
Commercial Professional / PD -3.
Proposed
PROPOSED NEGATIVE DECLARATION 2003-0009:
Environmental
Based on the findings of the initial study, the Community Development Department
Determination
recommends that the Planning Commission find that no significant harm would
come to the environment from approval of this project. The proposed Negative
Declaration is available for public review at 6500 Palma Avenue, Community
Development Department, Room 104, from 8:00 a.m. to 5:00 p.m., Monday through
Friday.
Staff
Adoption of Planning Commission Resolution 2003-0040 approving Conditional
Recommends
Use Permit 2002-0080, allowing a mixed use office and multi -family residential
project at 7005 Morro Road subject to findings and conditions.
3. Conditional Use Permit 2002-0079: Morro Road Mixed Use
Applicant:
Kelly Gearhart, 6205 Alcantara Avenue, Atascadero, CA 93422
Project Title:
Conditional Use Permit 2002-0079
Project
Southeast of the corner of Morro Road and Atascadero Avenue, Atascadero, CA
Location:
93422 (San Luis Obispo County) APN 031-036, 037
Project
The project consists of a mixed use commercial office and multi -family residential
Description:
development on two separate parcels totaling 1.1 acres. The commercial office
buildings will have a total of 5400 square feet with a 14 space parking lot. The
residential portion will consist of eight semi -attached multi -family dwellings with
16 parking spaces. A single shared driveway will provide access to Morro Road
(SR 41). The site will have coordinated architecture and 14,000 sf of landscaping.
The existing site is a vacant pasture will minimal slope and limited vegetation.
General Plan: General Commercial, Zoning District Commercial Professional / PD-
COMMISSIONER COMMENTS & REPORTS
ADJOURNMENT
The next regular meeting of the Planning Commission will be April 1, 2003 at City Hall in the 4th
Floor Rotunda, 6500 Palma Avenue, Atascadero.
Please note: Should anyone challenge in court any proposed development entitlement listed
on this Agenda, thatperson may be limited to raising those issues addressed at the public
hearing described in this notice or in written correspondence delivered to the Planning
Commission at/or prior to this public hearing.
\\CityhaII\CDvlpmnt\— PC Agendas\PC 2003\PC Agenda. 03-18-03.am.doc
3.
Proposed
PROPOSED NEGATIVE DECLARATION 2003-0009:
Environmental
Based on the findings of the initial study, the Community Development Department
Determination
recommends that the Planning Commission find that no significant harm would
come to the environment from approval of this project. The proposed Negative
Declaration is available for public review at 6500 Palma Avenue, Community
Development Department, Room 104, from 8:00 a.m. to 5:00 p.m., Monday through
Friday
Staff
Adoption of Planning Commission Resolution 2003-0039 approving Conditional
Recommends
Use Permit 2002-0079, allowing a mixed use office and multi -family residential
project at 7225 Morro Road subject to findings and conditions.
COMMISSIONER COMMENTS & REPORTS
ADJOURNMENT
The next regular meeting of the Planning Commission will be April 1, 2003 at City Hall in the 4th
Floor Rotunda, 6500 Palma Avenue, Atascadero.
Please note: Should anyone challenge in court any proposed development entitlement listed
on this Agenda, thatperson may be limited to raising those issues addressed at the public
hearing described in this notice or in written correspondence delivered to the Planning
Commission at/or prior to this public hearing.
\\CityhaII\CDvlpmnt\— PC Agendas\PC 2003\PC Agenda. 03-18-03.am.doc
City ofAtascadero
WELCOME TO THE ATASCADER0 PLANNING COMMISSION MEE TING
The Planning Commission meets in regular session on the first and third Tuesday of each month
at 7: 00 p.m., in the Rotunda of City Hall. Matters are considered by the Commission in the
order of the printed Agenda.
Copies of the staff reports or other documentation relating to each item of business referred to on the Agenda are on
file in the office of the Community Development Department and are available for public inspection during City
Hall business hours at the Permit Center counter. An agenda packet is also available for public review at the
Atascadero Library, 6850 Morro Road. All documents submitted by the public during Commission meetings that
are either read into the record or referred to in their statement will be noted in the minutes and available for review
in the Community Development Department office.
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in a City
meeting or other services offered by this City, please contact the City Manager's Office, (805) 461-5010, or the
City Clerk's Office, (805) 461-5074. Notification at least 48 hours prior to the meeting or time when services are
needed will assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the
meeting or service.
TO SPEAK ON AGENDA ITEMS
Members of the audience may speak on any item on the agenda. The Chairperson will identify the subject, staff will
give their report, and the Commission will ask questions of staff. The Chairperson will announce when the public
comment period is open and will request anyone interested to address the Commission regarding the matter being
considered to step up to the podium. If you wish to speak for, against or comment in any way:
• You must approach the podium and be recognized by the Chairperson
• Give your name and address (not required)
• Make your statement
• All comments should be made to the Chairperson and Commission
• All comments limited to 5 minutes (unless changed by the Commission)
• No one may speak for a second time until everyone wishing to speak has had an opportunity to do so,
and no one may speak more than twice on any item.
The Chairperson will announce when the public comment period is closed, and thereafter, no further public
comments will be heard by the Commission.
TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA
Under Agenda item, "PUBLIC HEARINGS," the Chairperson will call for anyone from the audience having
business with the Commission to:
• Please approach the podium and be recognized
• Give your name and address (not required)
• State the nature of your business
This is the time items not on the Agenda may be brought to the Commission's attention. A maximum of 30 minutes
will be allowed for Community Forum (unless changed by the Commission).
Cdvlpmnt/PC Agenda/ -Welcome and meeting information1doc
ITEM NUMBER: 1
DRAFT
DATE: 3-18-03
CITY OFATASCADERO
PLANNING COMMISSION MINUTES
Regular Meeting
March 4, 2003 — 7:00 P.M.
CALL TO ORDER
Chairperson Fonzi called the meeting to order at 7:02 p.m. and Commissioner Porter led the
Pledge of Allegiance.
PLANNING COMMISSION BUSINESS
A. Administration of Oath of Office
City Clerk Marcia McClure Torgerson administered the Oath of Office to Planning Commission
Members Robert Jones, Joan O'Keefe, and Ellen Beraud.
ROLL CALL
Present: Commissioners Beraud, Jones, O'Keefe, Porter, Bentz, Kelley and Chairperson
Fonzi
Absent: None
Staff: Community Development Director Warren Frace, City Engineer Steve Kahn,
Associate Planner Glenn Rider, Planning Services Manager Steve McHarris,
Assistant Planner Kelly Davis, Atascadero City Firefighter Peter Gaw and
Recording Secretary Grace Pucci.
PUBLIC COMMENT
Eric Greening, 7365 Valle Avenue, welcomed the new Commissioners and thanked the
Commissioners who had attended the Smart Growth Conference. Mr. Greening spoke about his
conclusion that the fear of high density may be unwarranted but it is still warranted if the
patterns of auto use are the same as they are with low density. He encouraged the Commission
to look at every mechanism they can when approving developments with higher density to
encourage a modal shift, i.e. designs of streetscapes that would encourage pedestrian usage and
incorporating more areas for shade into the designs.
Chairperson Fonzi closed the Public Comment period.
Community Development Director requested that agenda Items #8 and 9 be switched.
MOTION: By Commissioner Jones and seconded by Vice Chairperson Kelley to switch
Items #8 and 9.
AYES: Commissioners Jones, Kelley, Bentz, Beraud, Porter, O'Keefe and Chairperson
Fonzi
NOES: None
ABSTAIN: None
Motion passed 7.0 by a roll -call vote.
CONSENT CALENDAR
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON FEBRUARY 4, 2003.
MOTION: By Commissioner Jones and seconded by Commissioner Bentz to approve the
Consent Calendar.
AYES: Commissioner Jones, Bentz, Porter, Kelley and Chairperson Fonzi
NOES: None
ABSTAIN: Commissioners Beraud and O'Keefe
Motion passed 5:0 by a roll -call vote.
COMMUNITY DEVELOPMENT STAFF REPORTS
2. TREE REMOVAL PERMIT (TRP) #2003-0027: 5516 Tunitas Ave.
Request to remove two (2) native walnut trees over 24 -inches dbh located at 5516
Tunitas Ave. (APN 029-081-003)
Staff Recommends:
The Planning Commission adopt Resolution PC 2003-0032 to approve the request
to remove two native walnut trees subject to the guidelines and mitigation required
by the Atascadero Native Tree Ordinance.
Assistant Planner Kelly Davis provided the staff report and answered questions of the
Commission.
MOTION: By Vice Chairperson Kelley and seconded by Commissioner Porter to adopt
Resolution PC 2003-0032 to approve the request to remove two native walnut trees
subject to the guidelines and mitigation required by the Atascadero Native Tree
Ordinance.
AYES: Commissioners Kelley, Porter, O'Keefe, Jones, Beraud, Bentz and Chairperson
Fonzi
NOES: None
ABSTAIN: None
Motion passed 7: 0 by a roll -call vote.
3. TREE REMOVAL PERMIT (TRP) #2003-0028: 7305 SANTA CRUZ ROAD
Request to remove one (1) native oak tree over 24 -inches dbh at 7305 Santa Cruz
Road.
Staff Recommends:
The Planning Commission adopt Resolution PC 2003-0026 to approve the request
to remove one 32 -inch native oak subject to the guidelines and mitigation
required by the Atascadero Native Tree Ordinance.
Assistant Planner Kelly Davis provided the staff report and answered questions of the
Commission.
MOTION: By Vice Chairperson Kelley and seconded by Commissioner Jones to adopt
Resolution PC 2003-0026 to approve the request to remove one native oak tree
subject to the guidelines and mitigation required by the Atascadero Native Tree
Ordinance.
AYES: Commissioners Kelley, Jones, Beraud, Porter, Bentz, O'Keefe and Chairperson
Fonzi
NOES: None
ABSTAIN: None
Motion passed 7:0 by a roll -call vote.
PUBLIC HEARINGS
4. GENERAL PLAN AMENDMENT 2003-0003; ZONE CHANGE 2003-0038
Applicant:
Bruce Black, P.O. Box 867 Cambria, CA 93428
Project Title:
7905 Curbaril Avenue General Plan Amendment 2003-0003, Zone Change 2003-0038 —
Conversion of existing 1,925 square foot building from office use to single-family
residence
Project Location:
7905 Curbaril Avenue, Atascadero, CA 93422
(San Luis Obispo County); APN 031-183-027
Project
The project consists of an application to amend the existing GC (General Commercial)
Description:
General Plan land use designation to MDR (Medium Density Residential, 10 units/acre), and
to change the CP (Commercial Professional) zoning district to RMF -10 (Residential Multi -
Family, 10 units/acre). The project site is currently developed with a 1,925 square foot
building, landscaping, and paved driveway with parking.
Proposed
PROPOSED NEGATIVE DECLARATION 2003-0005:
Environmental
Based on the findings of the initial study, the Community Development Department
Determination
recommends that the Planning Commission find that no significant harm would come to the
environment from approval of this project. The proposed Negative Declaration is available
for public review at 6500 Palma Avenue, Community Development Department, Room 104,
from 8:00 a.m. to 5:00 p.m., Monday through Friday
Staff
1. Adopt Resolution No. PC 2003-0017 recommending that the City Council certify
Proposed Negative Declaration 2003-0005; and,
Recommendation
2. Adopt Resolution No. PC 2003-0018 recommending that the City Council introduce an
ordinance for first reading to approve General Plan Amendment 2003-0003 based on
findings; and,
3. Adopt Resolution No. PC 2003-0019 recommending that the City Council introduce an
ordinance for first reading to approve Zone Change 2003-0038 based on findings.
Planning Services Manager Steve McHarris provided the staff report and answered questions of
the Commission.
PUBLIC COMMENT
Bruce Black, 7905 Curbaril, applicant, expressed his concern regarding a willow tree on the
property which he fears might have to be removed or compromised to comply with the sidewalk
requirement. Mr. Black noted that there are no other sidewalks in the neighborhood.
Chairperson Fonzi closed the Public Comment period.
MOTION: By Commissioner Bentz and seconded by Vice Chairperson Kelley to adopt
Resolution No. PC 2003-0017 recommending that the City Council certify
Proposed Negative Declaration 2003-0005; and adopt Resolution No. PC 2003-
0018 recommending that the City Council approve General Plan Amendment
2003-0003 based on findings; and adopt Resolution No. PC 2003-0019
recommending that the City Council introduce an ordinance for first reading to
approve Zone Change 2003-0038 based on finding, with the following change to
Conditions of Approval:
Condition of Approval #4: Portions of the rear yard asphalt paving behind
the condition #3 gate may remain for vehicle parking and turn-around.
The remaining area shall be renovated to feplaee a minimum 500% ef the
asphalt paviwith ential lancseape planting. The ,.e i i - . e
area shall be renovated with residential patio pa-ver-s or- similar- patio
pavement tfeatment,tiniess -et# landseapea with plar A mater-;-&-1
subject to staff approval.
AYES: Commissioners Bentz, Kelley, Porter, Jones, Beraud, O'Keefe and Chairperson
Fonzi
NOES: None
ABSTAIN: None
Motion passed 7.0 by a roll -call vote.
5. GENERAL PLAN AMENDMENT 2003-0004; ZONE CHANGE 2002-0032; ROAD
ABANDONMENT 2002-0011; CONDITIONAL USE PERMIT 2002-0074;
TENTATIVE TRACT MAP 2002-0021,9500 LAS LOMAS AVE.:
Applicant:
Rex Hendrix, P.O. Box 6062, Atascadero, CA 93423
Project Title:
General Plan Amendment 2003-0004/Zone Change 2002-0032/ Road Abandonment
2002-0011/Conditional Use Permit 2002-0074/Tentative Tract Map 2002-0021 — The
Villas at Montecito, a 28 -unit townhouse development and a 6,400 square foot office
building
Project Location:
9500 Las Lomas Avenue, Atascadero, CA 93422
(San Luis Obispo County) APN 030-481-005, 030-481-006
Project
The proposed project consists of a General Plan Amendment and a Planned Development Zone Change
Description:
with a Conditional Use Permit, Tentative Tract Map to allow a 28 -unit townhouse development and a
6,400 square foot commercial office building. The site is gently sloped and primarily undeveloped with
several native oak trees. A westerly portion of the site is commercially developed and is proposed to be
reconfigured with the addition of one office building. Abandonment of a portion of the westerly side of
the Las Lomas Avenue right-of-way will be abandoned. The site is bounded by El Camino Real,
Principal Avenue, Las Lomas Avenue and Montecito Avenue. Public water and sewer are available to
the site, and will serve the project. Removal of native oak trees is required.
Proposed
PROPOSED NEGATIVE DECLARATION 2003-0038:
Environmental
Based on the findings of the initial study, the Community Development Department
Determination
recommends that the Planning Commission find that no significant harm would come to the
environment from approval of this project. The proposed Mitigated Negative Declaration is
available for public review at 6500 Palma Avenue, Community Development Department,
Room 104, from 8:00 a.m. to 5:00 p.m., Monday through Friday
Staff
Adopt Resolution No. PC 2003-0020 recommending that the City Council certify Proposed
Mitigated Negative Declaration 2002-0038; and,
Recommendation
Adopt Resolution No. PC 2003-0021 recommending that the City Council approve General
Plan Amendment 2003-0024 based on findings; and,
Adopt Resolution No. PC 2003-0022 recommending that the City Council introduce an
ordinance for first reading to approve Zone Change 2002-0032 based on findings; and
Adopt Resolution No. PC 2003-0023 recommending the City Council approve Road
Abandonment 2002-0011, based on findings and subject to Conditions of Approval and
Mitigation Monitoring; and,
Adopt Resolution No. PC 2003-0024 recommending that the City Council approve the
Master Plan of Development (CUP 2002-0074) based on findings and subject to Conditions
of Approval and Mitigation Monitoring; and,
Adopt Resolution No. PC 2003-0025 recommending the City Council approve Vesting
Tentative Tract Map 2002-0021, based on findings and subject to Conditions of Approval
and Mitigation Monitoring.
For the record the following corrections were noted: Pages 193 through 207 were misprinted
and the actual address should be 9500 Las Lomas Avenue and page one of the staff report should
be corrected to show Zone Change 2003-0033.
Planning Services Manager Steve McHarris provided the staff report and with Atascadero City
Firefighter Peter Gaw answered questions of the Commission.
PUBLIC COMMENT
Bob Tomaszensky, architect and applicant's representative, 1329 Broad Street, San Luis Obispo,
thanked staff for their efforts on the project and answered questions raised by the Commission.
Mr. Tomaszensky stated the applicant's concerns regarding Conditions of Approval Nos. 6.g., i.
j., k., 9., 12.b., 16., and 18. Mr. Tomaszensky answered questions of the Commission.
Rex Hendrix, applicant, discussed his concerns with Condition of Approval No. 16, the deed
restricted affordable units in the moderate category. Mr. Hendrix answered questions of the
Commission.
Commissioner Jones stated that the City Council must call the shot on the affordable housing
issue. He would like staff to come up with some rules for this type of housing, as the
Commission has nothing to go by at this time.
Vince Lavorgna stated he is currently building a home in Atascadero and spoke about the issue
of a gated community and the types of equipment the Fire Department could use to open the
gates when needed. Regarding affordable housing, he feels that the prices projected for the units
in this project are affordable when compared to housing in the community in general.
Larry Bell, 9025 Pino Solo Avenue, expressed his concern regarding this project in a written
statement handed to the Commission. (Attachment A)
Eric Greening indicated that the project has a lot of good points but he had several concerns
regarding long-term monitoring of the trees, the barrier and illusion of security created by a gated
community, units 1 and 2 are close to a pet kennel and will potential buyers be appraised about
the noise factor and will there be acoustic screening to buffer the noise, and regarding
affordability he feels it is time to bite the bullet with an inclusionary housing ordinance.
Dirk Mulder, Las Lomas Avenue, stated he lives across the street from this project and outlined
his concerns in a written statement. (Attachment B)
Kelsey Richardson and Haley Kraus, Las Lomas Avenue, students at Atascadero High School,
stated their concerns regarding building more houses in an already crowded community. They
would not like to see housing on this site, but rather would like to see it left in its natural state.
Kim Malone, 9275 Pino Solo, requested that the entrance to the project be moved approximately
200 yards toward El Camino Real to lessen the traffic impacts. She discussed other traffic issues
of concern and stated she was not in favor of a gated community.
Tim Malone, 9275 Pino Solo, stated his concerns regarding traffic and felt there should be a
crosswalk or crossing guard to protect children walking or biking to school. He asked where
guests to the project would park.
Thomas Lewis stated he was in mortgage lending and felt that more affordable housing was good
business for everyone, however he was uncertain that this project would lend itself to affordable
housing. He expressed concern that no rules were in place for affordable housing and felt it was
unfair to make this applicant a guinea pig.
Mary McCowan, 9000 Pino Solo, expressed her concerns with traffic and felt Principal Way
should be widened along with Las Lomas and Montecito. She is also concerned about the health
of the trees on the property.
Eric Greening stated that children from this project in the ages of kindergarten through sixth
grade would be attending Santa Rosa school, which would not be far enough for them to get bus
service. If they were on foot or bicycling, they would be traveling on one of the most dangerous
and unsafe routes to school. He asked if the applicant could help with this problem.
Chairperson Fonzi closed the Public Comment period.
Mrs. O'Keefe asked about a comment in the staff report in which it states that the foundation
shall span across roots.
Ted Elder, arborist, stated this is often done when the engineers design the footings so that
pylons can be placed to span across the root system in order to eliminated cutting off the roots.
Mr. Elder further stated that every tree on the site is labeled both in the book and out in the field.
Vice Chairperson Kelley expressed his support for fencing and gating the property due to the fact
that there are open areas and a homeowners association, and this increases the chance that there
could be litigation due to the public walking through the project. Regarding affordable housing,
he stated he is 100% in favor of it, but he does not feel it was added to the project at the proper
time and he therefore does not feel the applicant should be liable and incur a financial loss for
requirements that are not in place yet. Vice Chairperson Kelley stated he hoped that the City
Council and planning department would put a rush on giving the Commission some guidelines
and rules to go by for affordable housing.
Commissioner O'Keefe felt due to the impact to the trees there should be bonding in place for
this project. She stated she likes the project but could not support it without the two deed -
restricted affordable units.
Commissioner Bentz asked staff to address the changes to the Conditions of Approval as
requested by the applicant. He stated that he likes this proposal and that it would add to the area.
He does not feel it should be the responsibility of the applicant to provide a safe route to school
for children in the project.
Commissioner Jones addressed the issue of affordable housing and stated he would like some
rules brought forward as soon as possible, and does not feel it is fair to impose it on the
developer. He stated an additional concern regarding the ingress and egress on Principal Avenue
and felt there should be another on Montecito.
Vice Chairperson Kelley gave staff a printout of the latest Affordable Housing Standards by the
San Luis Obispo County Department of Planning and Building (Attachment C) and asked if
these figures would be used. Mr. McHarris indicated that they would.
Commissioner Beraud felt that the City Council has set a precedent by encouraging some
affordable housing in new projects. She feels even if there are no set guidelines at this time, it
will be required in the future and she would support a motion that would require some workforce
housing.
Chairperson Fonzi asked staff to address issues raised by the public. She stated that she likes the
project in general and feels the only problem is with the affordable housing; she has mixed
feelings about the issue. She would like to have some rules in place and does not like to require
it of the applicant without him knowing exactly what he is required to do, and yet she feels the
housing is definitely needed. Additionally, she has strong feelings against a gated community.
MOTION: By Commissioner Bentz and seconded by Commissioner O'Keefe to adopt
Resolution No. PC 2003-0020 recommending that the City Council certify
Proposed Mitigated Negative Declaration 2002-0038; and, adopt Resolution No.
PC 2003-0021 recommending that the City Council approve General Plan
Amendment 2003-0024 based on findings; and, adopt Resolution No. PC 2003-
0022 recommending that the City Council introduce an ordinance for first reading
to approve Zone Change 2002-0032 based on findings; and adopt Resolution No.
PC 2003-0023 recommending the City Council approve Road Abandonment
2002-0011, based on findings and subject to Conditions of Approval and
Mitigation Monitoring; and, adopt Resolution No. PC 2003-0024 recommending
that the City Council approve the Master Plan of Development (CUP 2002-0074)
based on findings and subject to Conditions of Approval and Mitigation
Monitoring; and, adopt Resolution No. PC 2003-0025 recommending the City
Council approve Vesting Tentative Tract Map 2002-0021, based on findings and
subject to Conditions of Approval and Mitigation Monitoring and that the
following changes be made to the Conditions of Approval in the staff report:
1. Drop Conditions of Approval No. 6.g., i., j. and k.
2. Condition of Approval No. 12 b.: Condition to be dropped and to show as on
existing plans.
3. Condition of Approval No. 18: Two One guest parking spaces shall be
eliminated along lot #30 to provide sufficient room for the proposed pathway
and an additional pathway adjacent to lot #21.
4. The City Engineer is requested to put no parking around the perimeter of the
development.
AYES: Commissioners Bentz, O'Keefe, Porter, Beraud and Chairperson Fonzi
NOES: Commissioners Jones and Kelley
ABSTAIN: None
Motion passed 5:2 by a roll -call vote.
Chairperson Fonzi recessed the hearing at 9:50 p.m.
Chairperson Fonzi called the meeting back to order at 9:58 p.m.
6. TENTATIVE PARCEL MAP 2002-0034; 8105 COROMAR AVE.
Applicant:
Phillip Basye, 709 Sandydale Dr., Nipomo, CA 93444
Project Title:
Tentative Parcel Map 2002-0034
Project Location:
8105 Coromar Ave., Atascadero, CA 93422, San Luis Obispo County
APN 056-031-036
Project
A proposed subdivision of an existing 1.34 -acre lot into two individual parcels of .77 and
Description:
.52 net acres. The site is currently developed with a single-family residence and detached
shed. The existing residence will be confined to one lot. An existing shed shall be removed
to allow the new lot to be developed with a new single-family residence. The parcels are
slight to moderately sloped and contain several native oak trees. The newly created parcel
averages slopes of less than 10%. The property will be served by City sewer, and water is
available from Atascadero Mutual Water Company. General Plan Designation:
Single Family Residential (SFR).
Zoning District: Residential Single Family -Y (RSF-X)
Staff
The Planning Commission adopt Resolution No. 2003-0031, certifying the proposed
Mitigated Negative Declaration 2003-0004 and approving Tentative Parcel Map 2002 -
Recommendation
0034, a request to subdivide one lot totaling 1.34 acres into two parcels of 0.77 and 0.52 -
acre (all lot areas are gross area), based on findings and subject to conditions.
Assistant Planner Kelly Davis provided the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Phillip Basye, 709 Sandydale Drive, Nipomo, applicant, stated that he agrees and supports
everything in the staff report and requested the Commission approve the resolution.
Chairperson Fonzi closed the Public Comment period.
MOTION: By Commissioner Jones and seconded by Vice Chairperson Kelley to approve
Tentative Parcel Map 2002-0034, located at 8105 Coromar Avenue subject to
staff conditions and to adopt Resolution No. PC 2003-0031 certifying the
proposed Mitigated Negative Declaration 2003-0004 which includes the approval
of the Tentative Parcel Map.
AYES: Commissioners Jones, Kelley, O'Keefe, Porter, Beraud, Bentz and Chairperson
Fonzi
NOES: None
ABSTAIN: None
Motion passed 7.0 by a roll -call vote.
7. CONDITIONAL USE PERMIT 2002-0084/TENTATIVE PARCEL MAP 2002-
0032; 2605 TRAFFIC WAY
Applicant:
Kelly Gearhart, 6205 Alcantara Avenue, Atascadero, CA 93422
Project Title:
Conditional Use Permit 2002-0084/Tentative Parcel Map 2002-0032
Project Location:
2605 Traffic Way
Project
Proposed 4 -lot subdivision and Conditional Use Permit for a two membership assembly
Description:
buildings, a public park, and single-family residential lot. Four native oak trees are proposed
for removal.
Proposed
PROPOSED MITIGATED NEGATIVE DECLARATION 2003-0006:
Environmental
Based on the findings of the initial study, the Community Development Department
Determination
recommends that the Planning Commission find that no significant harm would come to the
environment from approval of this project. The proposed Mitigated Negative Declaration is
available for public review at 6500 Palma Avenue, Community Development Department,
Room 104, from 8:00 a.m. to 5:00 p.m., Monday through Friday
Staff
Adopt Resolution No. PC 2003-0027 certifying Proposed Mitigated Negative Declaration
2002-00; and,
Recommendation
Adopt Resolution No. PC 2003-0028 approving CUP 2002-0084 based on findings and
subject to Conditions of Approval and Mitigation Monitoring; and,
Adopt Resolution No. PC 2003-0029 approving Tentative Parcel Map 2002-0032, based on
findings and subject to Conditions of Approval and Mitigation Monitoring.
Associate Planner Glenn Rider provided the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Kelly Gearhart, 6205 Alcantara Avenue, applicant, stated he was in agreement with the staff
report and answered questions of the Commission.
Chairperson Fonzi referred to a letter she had received from Mr. Greg Boyer that the
Commission has read and asked that the letter be attached to the Minutes. (Attachment D)
David Gabler, 2780 Ferrocarril, requested that Condition #11. d. regarding parking lot
maintenance be separated from the issue of construction noise. Further he requested that a
specific condition be added limiting the noise from the assembly buildings to a level that is
respectful of the surrounding residential neighborhood and the school, and another condition
requiring outdoor lighting be turned off after the occupants have left the facility for the night.
Thomas Lewis, referred to the swap for the Printery mentioned in the report and asked who
currently owned the Printery.
Chairperson Fond closed the Public Comment period.
MOTION: By Commissioner Jones and seconded by Commissioner Porter to adopt
Resolution No. PC 2003-0027 certifying Proposed Mitigated Negative
Declaration 2002-0006; and, adopt Resolution No. PC 2003-0028 approving CUP
2002-0084 based on findings and subject to Conditions of Approval and
Mitigation Monitoring; and, adopt Resolution No. PC 2003-0029 approving
Tentative Parcel Map 2002-0032, based on findings and subject to Conditions of
Approval and Mitigation Monitoring.
AYES: Commissioners Jones, Porter, Beraud, Bentz, O'Keefe, Kelley and Chairperson
Fonzi
NOES: None
ABSTAIN: None
Motion passed 7.0 by a roll -call vote.
8. ZONE CHANGE 2003-0042: MIXED USE CODE TEXT AMENDMENT IN
COMMERCIAL DISTRICTS
Applicant:
City of Atascadero
Project Title:
Zone Change 2003-0042: Zoning Code Text Amendment to conditionally allow Mixed Use
commercial and multifamily development in the Commercial Retail and Commercial
Professional districts.
Project
Zone Change: Citywide: Commercial Retail (CR) and Commercial Professional (CP) zoning
Location:
districts.
Project
The project consists of a proposed text amendment to the City Zoning Ordinance to
Description:
conditionally allow mixed-use multi -family development in the CR and CP zoning
districts consistent with General Plan Programs LOC 3.1.7 and LOC 3.1.9. .
General Plan Designation: GC: General Commercial
Zoning District: Commercial Retail (CR) and Commercial Professional (CP) zoning districts.
Proposed
The proposed project has been analyzed adequately in the 2002 General Plan EIR pursuant to
Environmental
applicable standards and impacts have been avoided or mitigated pursuant to that EIR.
Determination:
Staff
The Planning Commission adopt Resolution 2003-0034, recommending that the City Council
Recommends of the City of Atascadero adopt the proposed amendments to the Zoning Ordinance.
Community Development Director Warren Frace provided the staff report and answered
questions of the Commission.
PUBLIC COMMENT
Larry Keebo, 7400 Balboa, stated he has two parcels on El Camino Real and is working with
staff on a project to build the Atascadero Wine and Visitors Center and a townhouse project. He
stated concern about the businesses that are going in around this proposed development and feels
that some areas on the north end of town need to be excluded from the mixed-use zoning. Mr.
Keebo answered questions of the Commission. Community Development Director Frace
addressed Mr. Keebo's concerns.
Kelly Gearhart clarified the zoning for the Del Rio Road area. He felt in theory the multi -family
zoning was good, however the commercial market is good now and must be built. Mr. Gearhart
indicated that the knolls in that area are not good for residential development due to a
groundwater problem.
Chairperson Fonzi closed the Public Comment period.
MOTION: By Commissioner Jones and seconded by Commissioner Bentz to recommend to
the City Council that they approve the Zone Change 2003-0042 to amend the
zoning ordinance to allow mixed-use multi -family residential in the CR and CP
zoning districts subject to the conditions that have been set forth in the staff report
and that they make specifically findings of consistency with the 2002 General
Plan EIR.
AYES: Commissioners Jones, Bentz, Porter, O'Keefe, Kelley and Chairperson Fonzi
NOES: Commissioner Beraud
ABSTAIN: None
Motion passed 6:1 by a roll -call vote.
9. CONDITIONAL USE PERMIT 2002-0085; 7250 SANTA YSABEL
Applicant:
Kelly Gearhart, 6205 Alcantara Avenue, Atascadero, CA 93422
Project Title:
Conditional Use Permit 2002-0085
Project Location:
7250 Santa Ysabel
Project
Proposed multi—family residential building located in the Commercial Retail zone district as
Description:
part of an contiguous mixed use development.
Proposed
PROPOSED MITIGATED NEGATIVE DECLARATION 2003-0007:
Environmental
Based on the findings of the initial study, the Community Development Department
Determination
recommends that the Planning Commission find that no significant harm would come to the
environment from approval of this project. The proposed Mitigated Negative Declaration is
available for public review at 6500 Palma Avenue, Community Development Department,
Room 104, from 8:00 a.m. to 5:00 p.m., Monday through Friday
Staff Adopt Resolution No. PC 2003-0030 approving CUP 2002-0085 based on findings and
subject to Conditions of Approval and Mitigation Monitoring; and,
Recommendation
Associate Planner Glenn Rider provided the staff report and answered questions of the
Commission.
Commissioner Beraud indicated that she does not find this project to be a pleasing fit for the area
and does not feel she can support the removal of the impacted tree.
PUBLIC COMMENT
Kelly Gearhart, applicant, stated that he was in agreement with the staff report. He indicated that
the project was designed to keep the tree that is to be removed, but it was found to be in poor
health. Also, Mr. Gearhart stated that all the neighbors are aware of the project as it is in their
CC&R's, and there are several four-plexes in the neighborhood. Mr. Gearhart answered
questions of the Commission.
Chairperson Fond closed the Public Comment period.
Commissioner O'Keefe stated it was her opinion that this project would impact the residential
development in the area and she would therefore be unable to make the finding that states, "The
project will not be inconsistent with the character of the immediate neighborhood," and for this
reason would be unable to approve the project.
Chairperson Fonzi asked that if the project is approved, another condition be added to prohibit
the use of dumpsters on the site.
MOTION: By Vice Chairperson Kelley and seconded by Commissioner Jones to adopt P.C.
Resolution No. 2003-0007 approving CUP 2002-0085 to construct a four unit
multi -family residential structure at 7250 Santa Ysabel Avenue subject to findings
and conditions, adding a condition to prohibit the use of dumpsters, and subject to
the following special findings:
1. The project will not result in an over concentration of multi -family residential
development within a commercial district.
2. The project is compatible with and will not negatively impact surrounding
commercial uses.
3. The project will not be located on a prime commercial intersection or site that
would best be reserved for exclusive commercial development.
AYES: Commissioners Kelley, Jones, Porter, Bentz and Chairperson Fonzi
NOES: Commissioners Beraud and O'Keefe
ABSTAIN: None
Motion passed 5:2 by a roll -call vote.
COMMISSIONER COMMENTS & REPORTS
None
ADJOURNMENT
Chairperson Fonzi adjourned the meeting at 11:50 p.m. to the next regularly scheduled meeting
on March 18, 2003.
MEETING RECORDED BY AND MEETING PREPARED BY:
Grace Pucci, Recording Secretary
The following exhibits are available for review in the Community Development Department:
Attachment A —
Larry Bell, written comments
Attachment B —
Dirk Mulder, written comments
Attachment C —
San Luis Obispo County Affordable Housing Standards
Attachment D —
Letter to Commission from Greg Boyer
\\Cityhall\CDvlpmnt\— PC Minutes\PC Minutes 03\PC Minutes 03.04.03.gp.doc
Planning Commission Staff R
Public Hearing
ITEM NUMBER:
DATE:
ort
Conditional Use Permit 2002-0080
Atascadero Brick Yard Mixed Use Development Phase I
7005 Morro Road
(Kelly Gearhart / Wilson Land Surveys)
SUBJECT:
3-18-03
Brick Yard Phase I CUP 2002-0080: The project consists of a mixed use commercial
office and multi -family residential development on single parcels totaling 1.4 acres. The
commercial office buildings will have a total of 7100 square feet with a 24 space parking
lot. The residential portion will consist of seven semi -attached multi -family dwellings
with 21 parking spaces. A single shared driveway will provide access to Morro Road
(SR 41) and two Atascadero Avenue Road. The site will have coordinated architecture
and 20,000 sf of landscaping. The existing site is a vacant pasture will minimal slope and
limited vegetation. General Plan: General Commercial, Zoning District Commercial
Professional / PD -3.
RECOMMENDATION:
Staff Recommends:
1. Adoption of Planning Commission Resolution 2003-0040 approving Conditional Use
Permit 2002-0080, allowing a mixed use office and multi -family residential project at
7005 Morro Road subject to findings and conditions.
SITUATION AND FACTS:
1. Applicant and Owner: Kelly Gearhart, 6205 Alcantara Avenue,
Atascadero, CA 93422, 805-674-3711
2. Project Address: 7005 Morro Road, Atascadero, CA 93422, APN
3. General Plan Designation:
4. Zoning District:
5. Site Area:
6. Existing Use:
7. Environmental Determination:
DISCUSSION:
Background:
ITEM NUMBER: 2
DATE: 3-18-03
031-052-024
General Commercial
Commercial Professional / PD -3
1.40. acres
Vacant
Proposed Mitigated Negative Declaration 2003-
0010 posted February 27, 2003.
Mixed Used:
The City of Atascadero adopted a series of Smart Growth principles as the basis of the
2025 General Plan. The Smart Growth principles call for the efficient use and reuse of
existing lands within a City and for more compact, pedestrian scaled development. One
way to achieve this goal is with mixed use development. Mixed use development allows
commercial, office, and residential uses to be mixed on the same site either vertical or
horizontally. This approach to development has the added benefit of putting people's
residences in closer proximity to jobs, shopping and transit which reduces dependency on
the automobile. Although mixed use development was common in downtown
commercial districts throughout the United States prior to World War II, adoption of
uniform zoning ordinances in the 1950's usually prohibited the practice in favor of
segregated land use patterns that favored suburban development patterns. As a response
to dwindling inventories of vacant land and vanishing farmlands, communities are now
beginning to allow mixed use development once again in commercial districts.
The final General Plan included a number of goals and programs which allow for mixed
use development along Morro Road and El Camino Real. The General Plan calls for the
adoption of an ordinance to conditionally allow mixed use multi -family residential uses
in the Commercial Retail and Commercial Professional zoning districts. The proposed
code text amendment would implement the following sections of the General Plan.
General Plan Mixed Use Policies
Mixed Use Designations
This section provides a description of each of the official mixed use land use
designations and the corresponding zoning districts. The mixed use districts are
ITEM NUMBER: 2
DATE: 3-18-03
primarily commercial districts where multi -family residential uses may be
appropriate on a conditional basis.
General Commercial (GC)
This designation includes office, neighborhood, retail and tourist commercial
zoning districts.
Office areas allow a range of professional, business, and administrative
service uses with small-scale retail uses. Mixed-use development with
attached multi -family residential up to 16 du/ac maybe conditionally
permitted by zoning.
Neighborhood commercial areas accommodate daily shopping and service
needs of surrounding residents, with businesses such as small markets,
convenience stores, drug stores, salons, and other personal services.
Neighborhood convenience centers should be concentrated at intersections of
collector or arterial streets.
Retail commercial zoning districts are provided to meet both the
comparison and convenience shopping needs of residents in the City and
surrounding area. The intended principal tenants of retail commercial
areas include specialty and department stores and supermarkets. Retail
nodes should be located at the intersections of arterial streets (including
state highways) and major collector streets. A master plan of development
is required for prime undeveloped commercial sites to prevent fragmented
development from occurring that would comprise the retail potential of
these sites. Mixed-use multi -family residential development maybe
conditionally allowed up to 16 du/ac based on zoning. Exclusive
development of multi -family may be allowed along the EI Camino Real
corridor provided they are located on mid -block infill lots that are not best
reserved for commercial development. Along Morro Road, mixed use
multi -family and commercial projects are permitted in the GC land use
provide a commercial or office use is provided along the street frontage.
The tourist commercial zoning districts provides for uses that serve the traveling
public, such as motels, restaurants, automotive services, and other compatible
uses. Tourist commercial nodes are appropriately located along Highway 101
interchanges.
Corresponding zoning districts are CP, CN, CR and CT with appearance
review required.
ITEM NUMBER: 2
DATE: 3-18-03
Goal LOC 3. Transform the existing El Camino Real "strip"
into a distinctive, attractive and efficient
commercial, office and industrial park area which
can provide for the long-term economic viability
of the community.
Policy 3.1: Encourage retail businesses at efficient and attractive nodes along EI
Camino Real and Morro Road with mixed office and residential uses
between those nodes.
Programs:
1. Designate the southeast corner of the Curbaril Avenue and ECR intersection for a master planned retail
commercial use.
2. Designate and protect the east side of the Del Rio Road and EI Camino Real intersection for a master
planned retail commercial use.
3. Designate parcels northwest of the Santa Barbara and EI Camino Real intersection known as Dove
Creek for a mixed-use planned development.
4. Designate the area between San Jacinto Avenue and Rosario Avenue along EI Camino Real for
neighborhood commercial and office uses.
5. Develop incentives to attract new businesses to under utilized locations along EI Camino Real.
6. Require new development to comply with provisions of the Appearance Review Manual specific to the
EI Camino Real corridor, including the incorporation of landscaping and pedestrian walkways and
providing reciprocal driveway access easements between sites, where feasible.
7. Conditionally allow, mixed-use or exclusive multi -family infill development in the mid -block
portions of General Commercial areas along EI Camino Real.
8. Preserve primary intersections for commercial development with a land use overlay that
requires the approval of an overall Master Site Development Plan prior to approval of any
development plans.
9. Conditionally allow, mixed-use office and multi -family development along Morro Road, provided
each development has an office or commercial frontage use with recessed parking.
10. Utilize the Capital Improvement Program to prioritize street tree planting, streetscape improvements and
street repair projects along EI Camino Real.
11. Amend and maintain the zoning ordinance to require Conditional Use Permit approvals of bars, dance
halls, night clubs, drive through restaurants, and service stations (all gasoline sales uses).
12. Develop street design standards for EI Camino Real that provide for street trees, landscaping and
pedestrian comfort.
ITEM NUMBER: 2
DATE: 3-18-03
Site Design /Landscaping:
The site is located at 7005 Morro Road, at the corner of Atascadero Avenue. The site is a
flat pasture with no native oak trees. The project is designed to take primary access from
a shared driveway on Morro Road with two secondary access drives on Atascadero
Avenue. Three office commercial buildings with a total square footage of 7,100 sf will
front Morro Road with parking to the rear consistent with the mixed use requirement.
The rear of the lot will contain seven multi -family dwellings. The dwellings will have
private fenced side yards for outdoor recreation. The entire site will be landscape
including a landscape buffer island in the center of the site. This island will have a
landscape berm and numerous trees planted to provide separation between the
commercial and residential uses. The parking areas will be divided into a residential and
commercial area. The uncovered residential parking and driveways will be delineated
with interlocking pavers. A reciprocal access easement will be provided to adjoining
parcel to the east to allow a future through connection. Decorative light poles and
benches will be incorporated into the site plan as well.
ATASCADERO BRICK YARD PHASE I
ATASCADERO, CA.
------------------------------------------------------------
REV
----. Nnnr.q
�1'/„' ,.nom ��l�►�� `�
ITEM NUMBER: 2
DATE: 3-18-03
Commercial Architecture
The commercial buildings have been designed with pedestrian scale and street proximity
in mind. The buildings will be set 10 -feet back from the sidewalk with landscape
planters and large storefront style windows facing Morro Road. The buildings will have
brick exteriors and tile roofs reminiscent of the Atascadero's Colony buildings. Raised
corner towers, recessed entries and decorative wall lights will also be incorporated into
the buildings. In staff's opinion the buildings provide a excellent example of the mixed
use principles of the General Plan.
These buildings will feature taller corner tower features than those on the Phase II
project. Staff is recommending that the corner building fronting Atascadero Avenue
include an additional window and a wing wall type feature to better accentuate the corner
of the project.
ITEM NUMBER: 2
DATE: 3-18-03
Residential Architecture
The residential buildings are two story dwellings with two bedrooms and an attached
two -car garage. The units will have lap side on all elevations with trim banding of
windows, doors and porches. Each unit will have a private fenced side yard. The units
will have a single-family appearance with porches fronting Atascadero Avenue for
consistency with the adjoining single family district. Although the units are detached
with a single family appearance they will be located on a common lot available as a rental
housing stock. Staff is recommending that three elevation and color variations of the unit
be provided.
Parking.-
On
arking_On site parking will be provided for the project, and the parking has been designed to
meet requirements as provided in the Atascadero Zoning Ordinance. The project has
been designed with 24 commercial spaces at a ratio of 1 space / 300 sf. There are a total
of 21 residential parking spaces including two covered space per unit and 2 guest spaces.
ITEM NUMBER: 2
DATE: 3-18-03
Traffic and Circulation:
The proposed access to the development is from Morro Road an existing developed
arterial roadway. Secondary access points will be provided onto Atascadero Avenue.
The project will provide for road improvements, consisting of a new curb, gutter and
sidewalk to be developed in conjunction with the project. The expected trip generation of
a small mixed project is consistent with the General Plan EIR and is not considered
significant. The project is not anticipated to create a significant volume of traffic. .
Public Improvements:
The City Engineer has conditioned public improvements along the Morro Road and
Atascadero Avenue frontages as the project. These improvements consist of curbs,
gutter, sidewalks and road widening. All on site improvements will be constructed with
buildings as part of the building permit process. Since Morro Road is a State Highway
encroachment permits will be required from Caltrans.
Conditional Use Permit Findings:
The site is in the Commercial Professional zoning district where the mixed-use projects
are conditionally allowed. The following findings are required to be made by the
Planning Commission to approve a conditional use permit. In addition, there are three
special mixed use findings that must also be made. It appears to staff that all of the
required findings could be made for the project.
Conditional Use Permit Findings
1. The proposed use is consistent with the General Plan.
2. The proposed use satisfies all applicable provisions of the Zoning Ordinance.
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in this particular case, be
detrimental to the health, safety or welfare of the general public or persons
residing or working in the neighborhood of the use, or be detrimental or injurious
to the property or improvements in the vicinity and the use.
4. The proposed use will not be inconsistent with the character of the immediate
neighborhood or contrary to its orderly development.
5. The proposed use will not generate a volume of traffic beyond the safe capacity of
all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
Mixed Use Findings
6. The project will not result in an over concentration of multi -family residential
development within a commercial district.
7. The project is compatible with and will not negatively impact surrounding
commercial uses.
ITEM NUMBER:
DATE: 3-18-03
8. The project will not be located on a prime commercial intersection or site that
would best be reserved for exclusive commercial development.
Environmental Review:
The Initial Study concluded that there would be no significant harm to the environment as
a result of this Conditional Use Permit, when mitigation measures are implemented.
Proposed Mitigated Negative Declaration 2003-0010 has been prepared for the project
and certification of the Mitigated Negative Declaration is included in draft Planning
Commission Resolution.
CONCLUSION:
The proposed use is consistent with the mixed-use policies of the General Plan and
satisfies all applicable provisions of the Zoning Ordinance. The project will not be
detrimental to the health, safety or welfare of the general public and the proposed use is
consistent with the character of the immediate neighborhood. Additionally, the proposed
use will not generate a volume of traffic beyond the safe capacity of all roads providing
access to the project.
ALTERNATIVES:
The Planning Commission may approve Conditional Use Permit 2002-0080 with
modified conditions of approval.
2. The Planning Commission may deny Conditional Use Permit 2002-0080 based on
appropriate findings. To deny the application, the Commission must find that it is
inconsistent with one of the required findings. The motion to deny must include a
finding for denial.
3. The Planning Commission may continue the application and refer the project back
to staff for additional information or analysis. Direction should be given to staff
and the applicant.
W .111 Do '_: 1
ATTACHMENTS:
Warren M. Frace, Community Development Director
Attachment 1: Zoning and General Plan Diagram
Attachment 2: Draft Resolution PC 2003-0040
ITEM NUMBER: 2
DATE: 3-18-03
Attachment 1: Zoning and General Plan Designation
7005 Morro Road
Zoning District: Commercial Professional / PD -3
General Plan Designation: General Commercial
Attachment 2: Draft Planning Commission Resolution
DRAFT
RESOLUTION NO. PC 2003-0040
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ATASCADERO APPROVING CONDITIONAL USE
PERMIT 2002-0080 TO CONSTRUCT A MIXED USE COMPLEX
WITH 79100 +/- SQUARE -FEET OF COMMERCIAL OFFICE SPACE
AND SEVEN MULTI -FAMILY RESIDENTIAL UNITS AT 7005
MORRO ROAD
(APN 031-052-024)
(CUP 2002-0080 / Gearhart)
WHEREAS, an application has been received Kelly Gearhart, 6205 Alcantara
Avenue, Atascadero, CA 93422 (Property Owner and Applicant), to consider
Conditional Use Permit 2001-0079; To construct a Mixed Use Complex with 7,100 +/-
square -feet of Commercial Office Space and seven multi -family residential units at 7005
Morro Road (APN 031-052-024); and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2003-
0010 were prepared for the project and made available for public review in accordance
with the requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the site's General Plan Designation is GC (General Commercial);
and,
WHEREAS, the site's current zoning district is CP / PD -3 (Commercial
Professional with a Planned Development #3 overlay); and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject
Conditional Use Permit application was held by the Planning Commission of the City of
Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of
said projects; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a Public
Hearing held on March 18, 2003, studied and considered CUP 2002-0080, after first
studying and considering the Draft Mitigated Negative Declaration prepared for the
project, and,
Draft Resolution PC 2003-0040
March 18, 2003
Page 2 of 21
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Certification of Mitigated NeEative Declaration. The Planning
Commission of the City of Atascadero, hereby certifies Mitigated Negative Declaration
2003-0010 based on the following findings:
1. The Mitigated Negative Declaration has been completed in compliance
with requirements of the California Environmental Quality Act; and,
2. The project does not have the potential to degrade the environment, when
mitigation measures are implemented; and,
3. The project will not achieve short-term to the disadvantage of long-term
environmental goals, when mitigation measures are implemented; and,
4. The project does not have impacts which are individually limited, but
cumulatively considerable, when mitigation measures are implemented;
and,
5. The project will not cause substantial adverse effects on human beings
either directly or indirectly, when mitigation measures are implemented.
SECTION 2. Findings for approval of Conditional Use Permit. The Planning
Commission finds as follows:
1. The proposed project is consistent with the General Plan; and,
2. The proposed project satisfies all applicable provisions of the Zoning
Ordinance; and,
3. The establishment, and subsequent operation or conduct of the use will
not, because of the circumstances and conditions applied in this particular
case, be detrimental to the health, safety, or welfare of the general public
or persons residing or working in the neighborhood of the use, or be
detrimental or injurious to property or improvements in the vicinity of the
use; and,
4. The proposed project will not be inconsistent with the character of the
immediate neighborhood or contrary to its orderly development; and,
5. The proposed project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to
be improved in conjunction with the project, or beyond the normal traffic
volume of the surrounding neighborhood that would result from the full
development in accordance with the Land Use Element.
6. The project will not result in an over concentration of multi -family
residential development within a commercial district.
Draft Resolution PC 2003-0040
March 18, 2003
Page 3 of 21
7. The project is compatible with and will not negatively impact surrounding
commercial uses.
8. The project will not be located on a prime commercial intersection or site
that would best be reserved for exclusive commercial development.
BE IT FURTHER RESOLVED, that the Planning Commission does hereby
approve Conditional Use Permit 2002-0080 subject to the following Exhibits:
EXHIBIT A:
Mitigated Negative Declaration
EXHIBIT B:
Conditions of Approval
EXHIBIT C:
Site Plan
EXHIBIT D:
Conceptual Landscape Plan
EXHIBIT E:
Commercial Elevations
EXHIBIT F:
Commercial Color and Materials
EXHIBIT G:
Residential Elevations / Floor Plan
EXHIBIT H:
Conceptual Utility and Grading Plan
On motion by Commissioner , and seconded by Commissioner
the foregoing resolution is hereby adopted in its entirety by
the following roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ABSTAIN: ( )
ADOPTED:
CITY OF ATASCADERO, CA
David Bentz
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
Draft Resolution PC 2003-0040
March 18, 2003
Page 4 of 21
EXHIBIT A: Draft Mitigated Negative Declaration 2003-0009
CITY OF ATASCADERO
PROPOSED MITIGATED
NEGATIVE DECLARATION #2003-0010
6500 Palma Avenue Atascadero, CA 93422 805/461-5035
Applicant:
Kelly Gearhart, 6205 Alcantara Avenue, Atascadero, CA 93422
Project Title:
Conditional Use Permit 2002-0080
Project
Southeast corner of Morro Road and Atascadero Avenue, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 031-052-024
Project
Thi �rojctc�nit_�f a mix_�as�mmer�il office_nd multi -family ridntial
Description:
development Qninglaparcl totaling 1 4_acra __Thi cQmmer�ial_office_builtng_will_hav a
al of 71ref t with 2_� rkin I Ther i n i I ion will on i i of
s_e_ n„�„ mi- ttaQhQd_ m,mil"w lling6.,wiih 21 p rking pac A i�red
r'vew i v'd s o rr R 41 d two ro n T
i i v o int rc it�0 f la a i a in i is a
vacant pasture will minimal slo a and limited ve etation. General Plan: General Commercial
Zonin District Commercial Professional / PD -3.
FINDINGS:
1. The project does not have the potential to degrade the environment when mitigation
measures are incorporated into the project.
2. The project will not achieve short-term to the disadvantage of long-term environmental
goals.
3. The project does not have impacts which are individually limited, but cumulatively
considerable.
4. The project will not cause substantial adverse effects on human beings either directly or
indirectly.
DETERMINATION:
Based on the above findings, and the information contained in the initial study 2003-0009 (made a part
hereof by reference and on file in the Community Development Department), it has been determined that the
above project will not have an adverse impact on the environment when the following proposed mitigation
measures are incorporated into the project (see attachment).
PREPARED BY: Warren Frace, Community Development Director
DATE POSTED: February 27, 2003
PUBLIC REVIEW ENDS: March 18, 2003
Attachments: 1. Initial Study
Draft Resolution PC 2003-0040
March 18, 2003
Page 5 of 21
EXHIBIT B: Conditions of Approval
CUP 2002-0080
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CUP 2002-0080
PS: Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
FO: Final Occupancy
CA: City Attorney
Standard Conditions
1. The approval of this use permit shall become final and
BP
PS
effective for the purposes of issuing building permits,
provided the required conditions of approval have been
satisfied, fourteen (14) days following the Planning
Commission approval unless prior to the time, an appeal to
the decision is filed as set forth in Section 9-1.111(b) of the
Zoning Ordinance.
2. Approval of this Conditional Use Permit shall be valid for
BP
PS
twelve (12) months after its effective date. At the end of the
period, the approval shall expire and become null and void
unless the applicant has received a building permit or
applied for an extension of entitlement.
3. The granting of this Conditional Use Permit shall apply to
Ongoing
PS
APN 031-052-024, regardless of owner.
4. The Community Development Department shall have the
BP
PS
authority to approve minor changes to the project that (1)
increase the square footage of the project by less than 10%,
(2) result in a superior site design or appearance, and/or (3)
address a construction design issue that is not substantive
to the Conditional Use Permit.
Project Conditions
5. Outdoor Recreation Areas. Outdoor recreational open space
BP
PS
shall be provided at a ratio of three hundred (300) square
feet per unit. This open space may be provided either as (1)
a private amenity designed for exclusive use of a dwelling
unit or (2) as common open space provided that no
individual open space is less than one thousand (1,000)
square feet.
6. Enclosed Storage. Each dwelling unit shall be provided a
BP
PS
minimum of one hundred (100) cubic feet of enclosed
storage space, exclusive of closets, which may be located in
either a principal or accessory building.
7. Covered parking. One (1) covered parking space (carport or
BP
PS
garage) shall be required per dwelling unit of the total off-
street parking required by Section 9-4.118. (Ord. 149 § 2
(part), 1987)
Draft Resolution PC 2003-0040
March 18, 2003
Page 6 of 21
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CVP 2002-0080
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
8. Laundry Facilities. Laundry facilities shall be provided in the
BP
PS
form of laundry hook-ups within each individual dwelling unit
9. Maintenance Requirement. A maintenance agreement for
BP
PS
all landscaping, building exteriors, accessory structures,
parking areas and other common facilities shall be approved
by the Community Development Director and City Attorney
prior to final occupancy
10. All Mixed Use Multi -Family Residential Uses shall be
BP
PS
consistent with the Residential Multi -Family Development
standards contained in Section 9-3.176.
11. Mixed use development along Morro Road shall provide
BP
PS
office or commercial uses along the Morro Road frontages
with parking and residential uses recessed from the street.
The commercial buildings shall be constructed either
concurrently or prior to the residential buildings. In now case
shall the residential buildings be built prior the commercial
buildings.
12. Minimum Lot Requirements. The minimum number of
BP
PS
residential units on an individual residential lot shall be four
(4) residential units. A minimum of two (2) residential units
may be allowed on a lot that includes a commercial building.
All subdivision and condo maps shall be consistent with the
requirements of the Conditional Use Permit.
13. The applicant shall record a lot line adjustment to remove
BP
PS
any conflicts with building locations consistent with the
Master Site Plan
14. All subsequent Tentative Maps and construction permits
BP/FM
PS
shall be consistent with the Master Plan of Development
contained herein.
15. All exterior elevations, finish materials and colors shall be
BP
PS
consistent with the Master Plan of Development as shown in
Exhibit E, F and G with the following changes:
a) The corner elevation of building C will be enhanced with
additional windows and a wing wall feature
b) .A total of three elevation and color scheme variations will
be provided for the multi -family units.
16. All uncovered residential parking shall be delineated with
interlocking pavers and reserved signage.
Draft Resolution PC 2003-0040
March 18, 2003
Page 7 of 21
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CVP 2002-0080
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
17. All site development and landscaping shall be consistent
BP
PS
with Exhibit C and D with the following additions:
a) London Plane trees shall be planted along the street
frontage.
b) Evergreen trees shall be planted every 30 -feet on center
along the rear property line.
18. All site work, grading and site improvements shall be
BP
PS
consistent with the Master Plan of Development as shown in
Exhibit G and H.
19. All exterior lighting shall consist of decorative full cut off
BP/FO
PS
1.a.1.
lighting fixtures with flat or recessed lens. Parking lot lights
will be shielded to prevent off site glare.
20. An outdoor employee eating areas with a permanent
BP/FO
PS
3AA
decorative table/picnic bench and shade trees will be
provided as shown on the site plan
21. Bicycle storage racks shall be provided for the site. The bike
BP/FO
PS
3.d.3.
racks shall be located in a convenient and secure location.
22. West facing shade trees shall be planted at 30 -foot intervals
BP/FO
PS
3.d.1.
along the perimeter of the parking spaces between the
parking lot and the commercial buildings. The trees shall be
shown on a revised landscape plan.
23. A reciprocal access, drainage, utility, and parking easement
FO
PS
shall be recorded for the site.
24. All HVAC equipment shall be ground mounted and screened
Ongoing
PS
from public view
25. All electrical meters and utility equipment shall be painted to
BP/FO
PS
match the building and screened with landscaping.
26. All commercial signage shall be subject to the following:
BP
PS
a) Individual tenant signs shall be located on building walls
as shown on the project elevations.
b) A common monument may be provided on Morro Road
for tenant identification.
27. The project shall be conditioned to comply with all applicable
BP
PS
District regulations pertaining to the control of fugitive dust
PM -10 as contained in section 6.4 of the Air Quality
Draft Resolution PC 2003-0040
March 18, 2003
Page 8 of 21
Conditions of Approval / Mitigation Monitoring
Program
CVP 2002-0080
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA City Attorney
Mitigation
Measure
Handbook. All site grading and demolition plans notes shall
list the following regulations:
A. All material excavated or graded shall be
sufficiently watered to prevent excessive amounts
of dust. Watering shall occur at least twice daily
with complete coverage, preferably in the late
morning and after work is finished for the day.
B. All clearing, grading, earth moving, or excavation
activities shall cease during periods of high winds
(i.e. greater than 15 mph averaged over one hour)
so as to prevent excessive amounts of dust.
C. All material transported off-site shall be either
sufficiently watered or securely covered to prevent
excessive amounts of dust.
D. The area disturbed by clearing, grading, earth
moving, or excavation operations shall be
minimized so as to prevent excessive amounts of
dust.
E. Permanent dust control measured identified in the
approved project revegetation and landscape
plans shall be implemented as soon as possible
following completion of any soil disturbing
activities.
F. Exposed ground areas that are planned to be
reworked at dates greater than one month after
initial grading shall be sown with fast -germinating
native grass seed and watered until vegetation
becomes established.
G. All disturbed areas not subject to revegetation
shall be stabilized using approved chemical soil
binders, jute netting, or other methods in advance
by the APCD.
H. All roadways, driveways, sidewalks, etc. to be
paved shall be completed as soon as possible. In
addition, structural foundations shall be completed
as soon as possible following building pad
construction.
I. On-site vehicle speed shall be limited to 15 mph
for any unpaved surface.
J. All unpaved areas with vehicle traffic shall be
watered at least twice per day, using non -potable
water.
K. Streets adjacent to the project site shall be swept
daily to remove silt which may have accumulated
from construction activities so as to prevent
excessive amounts of dust from leaving the site.
Draft Resolution PC 2003-0040
March 18, 2003
Page 9 of 21
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CVP 2002-0080
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
L. Wheel washers may be required when significant
offsite import or export of fill is involved.
28. All lighting shall be designed to eliminate any off site glare.
BP
PS
1.a.1.
All exterior site lights shall utilize full cut-off, "hooded" lighting
fixtures to prevent offsite light spillage and glare.
29. All construction activities on the site shall comply with City
BP
PS
Noise Ordinance for hours of operations. Permitted
construction hours will be noted on all construction plans.
Fire Department Conditions
30. Provide a minimum 28 -foot inside radius and 48 -foot outside
BP
BS
radius for fire truck access. A fire truck turn around
hammerhead shall be provided within the commercial
parking lot area.
31. Fire hydrant spacing shall be provided per the requirements
BP
BS
of the Uniform Fire Code.
32. All curbs shall indicate "Fire Lane — No Parking" on interior
BP
BS
driveways.
33. Provide a Knox Box for Fire Department access at each
BP
BS
commercial building. Note on plan that location of the Knox
Box is to be at discretion of the Fire Authority. Contact the
Fire Authority for purchase forms. Provide emergency
contact information and an access key for Knox Box prior to
calling for final inspection.
Building Services Conditions
34. On-site retaining walls are to be designed by a registered
BP
BS
Civil Engineer or Architect. Wall designs shall address
specific site conditions. Provide calculations and detailing of
each and every wall configuration proposed. Consider any
surcharge loads, such as those due to sloping backfill or
buildings.
35. A soils investigation prepared by a licensed Geotechnical
BP
BS
Engineer is to be provided for the project. The report shall
address, at minimum, the soils and geology as it relates to
the driveway, the building pad and residence, the septic
system, and any proposed retaining walls. The report is to
be provided at the time of building permit submittal along
with the building plans for review by the Building Division.
Recommendations contained in the report are to be
Draft Resolution PC 2003-0040
March 18, 2003
Page 10 of 21
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CVP 2002-0080
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
incorporated into the project plans.
36. An accessible route shall be provided and maintained by the
BP
BS
applicant connecting all accessible entrances at all buildings,
accessible parking facilities, transportation facilities,
passenger loading zones, taxi stands, public streets and
sidewalks as required by CABO/ANSI A117.1. This shall
apply to all structures on all separate properties.
City Engineer Public Improvements (Project Frontage)
37. Morro Road. Full frontage improvements are required with
BP
CE
this development. Caltrans and the City of Atascadero
shall approve the design. These include curb, gutter, and
sidewalk and pave out of an additional travel lane with
adequate width for parking and bicycles. Morro Road was
recently overlayed by Caltrans. The new paving shall
match the existing edge of the recent overlay. Public
Improvement plans shall be submitted detailing the
design. Cross sections shall be submitted detailing the
existing and proposed cross fall on EI Camino Real.
38. Atascadero Ave. Atascadero Ave has a Minor Arterial
BP
CE
designation in the Circulation Element. Full frontage
improvements of this road are required with this
development. This includes curb, gutter, sidewalk and
pave out to standard drawing no. 406.
The existing surface of Atascadero Ave is in poor
condition and the wearing surface is gone. Per
Atascadero Municipal Code Section 9-4.160 the entire
width of existing Atascadero Ave will be overlayed with 2
inches of asphalt per City Engineering Standards.
Public Improvement plans shall be submitted detailing the
design. Cross sections shall be submitted detailing the
existing and proposed cross fall on EI Camino Real.
39. Intersection of Morro Road and Atascadero Ave. The
exiting signal shall be relocated to the approval of the City
Engineer and Caltrans. The design shall conform to
Caltrans and City of Atascadero Engineering Standards. A
striping plan shall be submitted with the off site
construction document for the entire intersection.
40. All public improvements shall be constructed in
BP
CE
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings or as
directed by the City Engineer.
Drainage
41. This project proposes to use an existing storm drain on
BP
CE
the east side of Morro Road for storm water conveyance.
Draft Resolution PC 2003-0040
March 18, 2003
Page 11 of 21
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CVP 2002-0080
BL: Business License
PS:Planning Services
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
The existing storm drain is a 48" Corrugated Plastic Pipe
(CCP). Above the 48" CCP, a 24" CCP is to be
constructed. The 24" CCP will be used to collect on site
and off site storm water and convey it to the 48" CCP.
The storm drain system will be designed plans and
drainage calculations for the Highway 41/Atascadero Ave
Storm Drain by North Coast Engineering on file at the
City of Atascadero Public Works Department. The plans
are dated May 13, 1997 and the calculations are dated
February 1997.
Existing offsite storm waters flow across the property this
project is located on. Improvements for this project shall
be designed to convey these flows to the 48" CCP in
Morro Road.
Existing surface and underground storm flows enter this
property from Atascadero Ave. Improvements for this
project shall be designed to convey these flows to the 48"
CCP in Morro Road.
42. Drainage calculation. Drainage calculations shall be
BP
CE
produced considering all areas tributary to this property.
These calculations shall be in conformance the City of
Atascadero Engineering Standards. Submit calculations to
support the design of any structures or pipes. Closed
conduits shall be designed to convey the 10 -year flow with
gravity flow; the 25 -year flow with head, and provide safe
conveyance for the 100 -year overflow.
43. A Storm Water Pollution Prevention Plan shall be
BP
CE
produced and approved by the Regional Water Quality
Control Board and the City of Atascadero. These plans
shall recommend mitigation measure during and after
construction to eliminate point and non point source
pollution into the 48" CCP. The use on onsite grading
feature to pond and percolate storm water is
recommended. A filter system, mechanical or non, shall
be installed with this project. This system shall comply
with the intent of National Pollution Discharge Elimination
System, Phase II requirements.
44. Obtain approval by the City Engineer of the grading &
BP
CE
drainage plan and the storm drain design & facilities.
45. Acquire drainage easements where needed. Drainage
BP
CE
shall cross lot lines only where a drainage easement has
been provided.
46. Concentrated drainage from off-site areas shall be
BP
CE
conveyed across the project site in drainage easements.
City Engineer Standard Conditions
47. The applicant shall enter into a Plan Check & Inspection
BP
CE
Draft Resolution PC 2003-0040
March 18, 2003
Page 12 of 21
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CVP 2002-0080
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
agreement with the City.
48. The applicant shall be responsible for the protection,
BP
CE
relocation and/or alteration of existing utilities.
49. The applicant shall install all new utilities (water, gas,
BP
CE
electric, cable TV and telephone) underground.
50. The applicant shall monument all property corners for
BP
CE
construction control and shall promptly replace them if
disturbed.
51. Prior to issuance of building permits, the applicant shall
BP
CE
submit a grading and drainage plan with a separate sheet(s)
devoted to sedimentation and erosion control, prepared
by a registered civil engineer for review and approval by the
City Engineer.
52. Prior to the final inspection, all outstanding plan check and
BP
CE
inspection fees shall be paid.
53. Prior to the final inspection, the applicant shall submit a
BP
CE
written statement from a registered civil engineer that all
work has been completed and is in full compliance with the
approved plans and the Uniform Building Code (UBC).
Wastewater Conditions
54. Drainage piping serving fixtures which have flood level rims
BP
WW
located below the elevation of the next upstream manhole
cover of the public or private sewer serving such drainage
piping shall be protected from backflow of sewage by
installing an approved type backwater valve Fixtures above
such elevation shall not discharge through the backwater
valve.
55. The sewer laterals across Morro Road shall be constructed
BP
WW
per Caltrans Standards and inspected by Caltrans and the
City of Atascadero.
56. All sewer main taps will be done by the City of Atascadero.
BP
WW
The developers shall pay a sewer tap fee.
57. Sewer connection permit shall be issued separately (from
BP
WW
building permit) after public sewer extension has been
completed and has received a satisfactory final Public
Works inspection. Final project inspection shall be
contingent upon completion of the public sewer extension
and Public Works final inspection.
Draft Resolution PC 2003-0040
March 18, 2003
Page 13 of 21
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CVP 2002-0080
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
Solid Waste
58. Atascadero Waste Alternative shall approve the location,
BP
CE
size and design of all solid waste facilities. The facilities shall
include room for recycling and green waste containers. The
location of the facilities will take into account the collection of
the solid waste.
Atascadero Mutual Water Company (AMWC):
59. Prior to the issuance of building permits, the applicant shall
BP
AMWC
submit plans showing the water distribution facilities required
to serve the project for review and approval by the
Atascadero Mutual Water Company. The plans shall show
all facilities required for fire protection. The plans shall show
all cross -connection devices required to isolate the fire
protection and landscape irrigation systems form domestic
water systems. Prior to approval of the water system plans
by Atascadero Mutual Water Company, the applicant shall
pay all current installation and connection fees required by
the Atascadero Mutual Water Company.
60. Prior to recording the parcel map the applicant shall obtain a
BP
AMWC
"Will Serve" letter from Atascadero Mutual Water Company.
61. All water distribution facilities shall be constructed in
BP
AMWC
conformance with Atascadero Mutual Water Company
standards, policies and approved procedures. All cross -
connection devices shall be constructed in conformance with
AWWA and Department of Health Services standards.
62. If on site fire hydrants are required by the fire department, a
BP
AMWC / BS
water main line extension may be required.
63. Separate services shall be provided for each parcel. If
BP
AMWC
buildings are to be condos separate meters for each unit will
be required.
Draft Resolution PC 2003-0040
March 18, 2003
Page 14 of 21
EXHIBIT C: Site Plan
S
rP
r
I.
= t
�
E
1�
a�
j MAW.",
Wm0p.
was W- im mw
rl
Wmv Vic
y4.
Draft Resolution PC 2003-0040
March 18, 2003
Page 16 of 21
EXHIBIT E: Commercial Elevations
LO
Draft Resolution PC 2003-0040
March 18, 2003
Page 17 of 21
EXHIBIT E: Commercial Elevations
0
K
10-1
O� 3
SOUTH ELEVATION
BUILDING #1
5UU I h tLLVA I IUN
BUILDING "A"
Return
parapet wall
corners
io
io1
n
j I .
J
16' 0"
io
Draft Resolution PC 2003-0040
March 18, 2003
Page 18 of 21
EXHIBIT F: Commercial Color and Materials
X31 PURE NOM (BABE IM
❑ 7/B" STUCCO
B/WIRE/PAPERLATHE
w/ MONTEREY FINISH
(LA HABRA SANDSTONE")
Q
3/8" STUCCO
0/MASONRY
w/ MONTEREY FINISH
(LA HABRA -PURE IVORY-)
PRECAST CONCRETE WAINSCOTE 1
TYR m WEST ELEVATION
O "STONE KOTE'
SIMULATED CONCRETE
WINDOW TRIM p
(TYP. T WINDOWS ON WEST)
THIN BRICK VENEER
"CITYHALL"
BY ROBINSON BRICK CO.
STOREFRONT ALUMINUM FRAMES
(BRONZE-ANOD.) TYPICAL
1-
rel EPS ARCHITECTURAL SHAPE
w/ STUCCO FINISH
(LA HABRA "SANDSTONE")
O-STONE KOTE-
ROSETTE
TYPICAL 0 LIGHTS
10 "Monier" Espana
CONCRETE ROOF TILE
(Sunrise)
11 16 " "800se neck" Lamp
12 -Monier" Espana
CONCRETE ROOF TILE
(Sunrise)
Draft Resolution PC 2003-0040
March 18, 2003
Page 19 of 21
EXHIBIT G: Residential Elevations / Floor Plan
I
a
0
ID_
_y
0
Draft Resolution PC 2003-0040
March 18, 2003
Page 20 of 21
EXHIBIT G: Residential Color and Materials
Draft Resolution PC 2003-0040
March 18, 2003
Page 21 of 21
EXHIBIT H: Conceptual Utility and Grading Plan
two'i��
1b;
r�
_ 6C3�
R� S`1•i
��
ATASCADOW &A" YARD M%X 1
IARY GRAD04 DRAKACE, ! UMM PW
_ —
AnOr�0Y00�Man�4rG
��
CITY OF ATASCNXM CA.
Draft Resolution PC 2003-0040
March 18, 2003
Page 22 of 21
Planning Commission Staff R
Public Hearing
ITEM NUMBER: 3
DATE: 3-18-03
ort
Conditional Use Permit 2002-0079
Atascadero Brick Yard Mixed Use Development Phase II
7225 Morro Road
(Kelly Gearhart / Wilson Land Surveys)
SUBJECT:
Brick Yard Phase II CUP 2002-0079: The project consists of a mixed use commercial
office and multi -family residential development on two separate parcels totaling 1.1
acres. The commercial office buildings will have a total of 5400 square feet with a 14
space parking lot. The residential portion will consist of eight semi -attached multi -family
dwellings with 16 parking spaces. A single shared driveway will provide access to
Morro Road (SR 41). The site will have coordinated architecture and 14,000 sf of
landscaping. The existing site is a vacant pasture will minimal slope and limited
vegetation. General Plan: General Commercial, Zoning District Commercial
Professional / PD -3.
RECOMMENDATION:
Staff Recommends:
1. Adoption of Planning Commission Resolution 2003-0039 approving Conditional Use
Permit 2002-0079, allowing a mixed use office and multi -family residential project at
7225 Morro Road subject to findings and conditions.
SITUATION AND FACTS:
1. Applicant and Owner: Kelly Gearhart, 6205 Alcantara Avenue,
Atascadero, CA 93422, 805-674-3711
2. Project Address: 7225 Morro Road, Atascadero, CA 93422, APN
3. General Plan Designation:
4. Zoning District:
5. Site Area:
6. Existing Use:
7. Environmental Determination:
DISCUSSION:
Background:
ITEM NUMBER: 3
DATE: 3-18-03
031-052-036, 037
General Commercial
Commercial Professional / PD -3
1.10. acres
Vacant
Proposed Mitigated Negative Declaration 2003-
0009 posted February 27, 2003.
Mixed Used:
The City of Atascadero adopted a series of Smart Growth principles as the basis of the
2025 General Plan. The Smart Growth principles call for the efficient use and reuse of
existing lands within a City and for more compact, pedestrian scaled development. One
way to achieve this goal is with mixed use development. Mixed use development allows
commercial, office, and residential uses to be mixed on the same site either vertical or
horizontally. This approach to development has the added benefit of putting people's
residences in closer proximity to jobs, shopping and transit which reduces dependency on
the automobile. Although mixed use development was common in downtown
commercial districts throughout the United States prior to World War II, adoption of
uniform zoning ordinances in the 1950's usually prohibited the practice in favor of
segregated land use patterns that favored suburban development patterns. As a response
to dwindling inventories of vacant land and vanishing farmlands, communities are now
beginning to allow mixed use development once again in commercial districts.
The final General Plan included a number of goals and programs which allow for mixed
use development along Morro Road and El Camino Real. The General Plan calls for the
adoption of an ordinance to conditionally allow mixed use multi -family residential uses
in the Commercial Retail and Commercial Professional zoning districts. The proposed
code text amendment would implement the following sections of the General Plan.
General Plan Mixed Use Policies
Mixed Use Designations
This section provides a description of each of the official mixed use land use
designations and the corresponding zoning districts. The mixed use districts are
ITEM NUMBER:
DATE: 3-18-03
primarily commercial districts where multi -family residential uses may be
appropriate on a conditional basis.
General Commercial (GC)
This designation includes office, neighborhood, retail and tourist commercial
zoning districts.
Office areas allow a range of professional, business, and administrative
service uses with small-scale retail uses. Mixed-use development with
attached multi -family residential up to 16 du/ac maybe conditionally
permitted by zoning.
Neighborhood commercial areas accommodate daily shopping and service
needs of surrounding residents, with businesses such as small markets,
convenience stores, drug stores, salons, and other personal services.
Neighborhood convenience centers should be concentrated at intersections of
collector or arterial streets.
Retail commercial zoning districts are provided to meet both the
comparison and convenience shopping needs of residents in the City and
surrounding area. The intended principal tenants of retail commercial
areas include specialty and department stores and supermarkets. Retail
nodes should be located at the intersections of arterial streets (including
state highways) and major collector streets. A master plan of development
is required for prime undeveloped commercial sites to prevent fragmented
development from occurring that would comprise the retail potential of
these sites. Mixed-use multi -family residential development maybe
conditionally allowed up to 16 du/ac based on zoning. Exclusive
development of multi -family may be allowed along the EI Camino Real
corridor provided they are located on mid -block infill lots that are not best
reserved for commercial development. Along Morro Road, mixed use
multi -family and commercial projects are permitted in the GC land use
provide a commercial or office use is provided along the street frontage.
The tourist commercial zoning districts provides for uses that serve the traveling
public, such as motels, restaurants, automotive services, and other compatible
uses. Tourist commercial nodes are appropriately located along Highway 101
interchanges.
Corresponding zoning districts are CP, CN, CR and CT with appearance
review required.
ITEM NUMBER: 3
DATE: 3-18-03
Goal LOC 3. Transform the existing El Camino Real "strip"
into a distinctive, attractive and efficient
commercial, office and industrial park area which
can provide for the long-term economic viability
of the community.
Policy 3.1: Encourage retail businesses at efficient and attractive nodes along EI
Camino Real and Morro Road with mixed office and residential uses
between those nodes.
Programs:
1. Designate the southeast corner of the Curbaril Avenue and ECR intersection for a master planned retail
commercial use.
2. Designate and protect the east side of the Del Rio Road and EI Camino Real intersection for a master
planned retail commercial use.
3. Designate parcels northwest of the Santa Barbara and EI Camino Real intersection known as Dove
Creek for a mixed-use planned development.
4. Designate the area between San Jacinto Avenue and Rosario Avenue along EI Camino Real for
neighborhood commercial and office uses.
5. Develop incentives to attract new businesses to under utilized locations along EI Camino Real.
6. Require new development to comply with provisions of the Appearance Review Manual specific to the
EI Camino Real corridor, including the incorporation of landscaping and pedestrian walkways and
providing reciprocal driveway access easements between sites, where feasible.
7. Conditionally allow, mixed-use or exclusive multi -family infill development in the mid -block
portions of General Commercial areas along EI Camino Real.
8. Preserve primary intersections for commercial development with a land use overlay that
requires the approval of an overall Master Site Development Plan prior to approval of any
development plans.
9. Conditionally allow, mixed-use office and multi -family development along Morro Road, provided
each development has an office or commercial frontage use with recessed parking.
10. Utilize the Capital Improvement Program to prioritize street tree planting, streetscape improvements and
street repair projects along EI Camino Real.
11. Amend and maintain the zoning ordinance to require Conditional Use Permit approvals of bars, dance
halls, night clubs, drive through restaurants, and service stations (all gasoline sales uses).
12. Develop street design standards for EI Camino Real that provide for street trees, landscaping and
pedestrian comfort.
ITEM NUMBER: 3
DATE: 3-18-03
Site Design /Landscaping:
The site is located at 7225 Morro Road, west of Atascadero Avenue. The site is a flat
pasture with no native oak trees. The site backs up to existing single family
development. The project is designed to take all access from a shared driveway on Morro
Road. Two office commercial buildings with a total square footage of 5,500 sf will front
Morro Road with parking to the rear consistent with the mixed use requirement. The rear
of the lot will contain eight multi -family dwellings. The dwellings will have private
fenced rear yards for outdoor recreation. The entire site will be landscape including a
landscape buffer island in the center of the site. This island will have a landscape berm
and numerous trees planted to provide separation between the commercial and residential
uses. The parking areas will be divided into a residential and commercial area. The
uncovered residential parking and driveways will be delineated with interlocking pavers.
A reciprocal access easement will be provided to adjoining parcel to the east to allow a
future through connection. Decorative light poles and benches will be incorporated into
the site plan as well.
�^7'Tt _ lir ►.moi i'"a'd .:-ti+,14;P`S�M""' 4.0.�.�...�.W�
4 w JQ 4`1sC•
dM
PA%Vla
Pill,���II��
` _CCYe1CML MD IIOMIML
1lIY L►e
M FEM LINE
. �J
SM ACC® AND
vnLffy amseR
LA OYCA!®
�GRIMM COVER
ITEM NUMBER:
DATE: 3-18-03
Commercial Architecture
The commercial buildings have been designed with pedestrian scale and street proximity
in mind. The buildings will be set 10 -feet back from the sidewalk with landscape
planters and large storefront style windows facing Morro Road. The buildings will have
brick exteriors and tile roofs reminiscent of the Atascadero's Colony buildings. Raised
corner towers, recessed entries and decorative wall lights will also be incorporated into
the buildings. In staff's opinion the buildings provide a excellent example of the mixed
use principles of the General Plan.
ITEM NUMBER: 3
DATE: 3-18-03
Residential Architecture
The residential buildings are one-story dwellings with two bedrooms and an attached
garage. The units will have lap side on all elevations with trim banding of windows,
doors and porches. The units will utilize a single neutral color scheme for compatible
with the commercial uses. Each unit will have a private fenced rear yard. It does appear
that the units will provide a suitable transition between the commercial use on Morro
Road and the existing single-family use located at the rear of the site.
w.rrao.�
Parking.-
On
arking_On site parking will be provided for the project, and the parking has been designed to
meet requirements as provided in the Atascadero Zoning Ordinance. The project has
been designed with 14 commercial spaces at a ratio of 1 space / 400 sf. There are a total
of 18 residential parking spaces including one covered space per unit and 2 guest spaces.
ITEM NUMBER: 3
DATE: 3-18-03
Traffic and Circulation:
The proposed access to the development is from Morro Road an existing developed
arterial roadway. The project will provide for road improvements, consisting of a new
curb, gutter and sidewalk to be developed in conjunction with the project. The expected
trip generation of a small mixed project is consistent with the General Plan EIR and is not
considered significant. The project is not anticipated to create a significant volume of
traffic. .
Public Improvements:
The City Engineer has conditioned public improvements along the Morro Road frontage
as the project. These improvements consist of curbs, gutter, sidewalks and road
widening. All on site improvements will be constructed with buildings as part of the
building permit process. Since Morro Road is a State Highway encroachment permits
will be required from Caltrans.
Conditional Use Permit Findings:
The site is in the Commercial Professional zoning district where the mixed-use projects
are conditionally allowed. The following findings are required to be made by the
Planning Commission to approve a conditional use permit. In addition, there are three
special mixed use findings that must also be made. It appears to staff that all of the
required findings could be made for the project.
Conditional Use Permit Findings
1. The proposed use is consistent with the General Plan.
2. The proposed use satisfies all applicable provisions of the Zoning Ordinance.
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in this particular case, be
detrimental to the health, safety or welfare of the general public or persons
residing or working in the neighborhood of the use, or be detrimental or injurious
to the property or improvements in the vicinity and the use.
4. The proposed use will not be inconsistent with the character of the immediate
neighborhood or contrary to its orderly development.
5. The proposed use will not generate a volume of traffic beyond the safe capacity of
all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
Mixed Use Findings
6. The project will not result in an over concentration of multi -family residential
development within a commercial district.
7. The project is compatible with and will not negatively impact surrounding
commercial uses.
ITEM NUMBER:
DATE: 3-18-03
8. The project will not be located on a prime commercial intersection or site that
would best be reserved for exclusive commercial development.
Environmental Review:
The Initial Study concluded that there would be no significant harm to the environment as
a result of this Conditional Use Permit, when mitigation measures are implemented.
Proposed Mitigated Negative Declaration 2003-0009 has been prepared for the project
and certification of the Mitigated Negative Declaration is included in draft Planning
Commission Resolution.
CONCLUSION:
The proposed use is consistent with the mixed-use policies of the General Plan and
satisfies all applicable provisions of the Zoning Ordinance. The project will not be
detrimental to the health, safety or welfare of the general public and the proposed use is
consistent with the character of the immediate neighborhood. Additionally, the proposed
use will not generate a volume of traffic beyond the safe capacity of all roads providing
access to the project.
ALTERNATIVES:
The Planning Commission may approve Conditional Use Permit 2002-0079 with
modified conditions of approval.
2. The Planning Commission may deny Conditional Use Permit 2002-0079 based on
appropriate findings. To deny the application, the Commission must find that it is
inconsistent with one of the required findings. The motion to deny must include a
finding for denial.
3. The Planning Commission may continue the application and refer the project back
to staff for additional information or analysis. Direction should be given to staff
and the applicant.
W .111 Do '_: 1
ATTACHMENTS:
Warren M. Frace, Community Development Director
Attachment 1: Zoning and General Plan Diagram
Attachment 2: Draft Resolution PC 2003-0039
ITEM NUMBER:
DATE: 3-18-03
Attachment 1: Zoning and General Plan Designation
7225 Morro Road
Zoning District: Commercial Professional / PD -3
General Plan Designation: General Commercial
Attachment 2: Draft Planning Commission Resolution
DRAFT
RESOLUTION NO. PC 2003-0039
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ATASCADERO APPROVING CONDITIONAL USE
PERMIT 2002-0079 TO CONSTRUCT A MIXED USE COMPLEX
WITH 59500 +/- SQUARE -FEET OF COMMERCIAL OFFICE SPACE
AND EIGHT MULTI -FAMILY RESIDENTIAL UNITS AT 7225
MORRO ROAD
(APN 031-052-036, 037)
(CUP 2002-0079 / Gearhart)
WHEREAS, an application has been received Kelly Gearhart, 6205 Alcantara
Avenue, Atascadero, CA 93422 (Property Owner and Applicant), to consider
Conditional Use Permit 2001-0079; To construct a Mixed Use Complex with 5,500 +/-
square -feet of Commercial Office Space and eight multi -family residential units at 7225
Morro Road (APN 031-052-036, 037); and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2003-
0009 were prepared for the project and made available for public review in accordance
with the requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the site's General Plan Designation is GC (General Commercial);
and,
WHEREAS, the site's current zoning district is CP / PD -3 (Commercial
Professional with a Planned Development #3 overlay); and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject
Conditional Use Permit application was held by the Planning Commission of the City of
Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of
said projects; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a Public
Hearing held on March 18, 2003, studied and considered CUP 2002-0079, after first
studying and considering the Draft Mitigated Negative Declaration prepared for the
project, and,
Draft Resolution PC 2003-0039
March 18, 2003
Page 2 of 20
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Certification of Mitigated NeEative Declaration. The Planning
Commission of the City of Atascadero, hereby certifies Mitigated Negative Declaration
2003-0009 based on the following findings:
1. The Mitigated Negative Declaration has been completed in compliance
with requirements of the California Environmental Quality Act; and,
2. The project does not have the potential to degrade the environment, when
mitigation measures are implemented; and,
3. The project will not achieve short-term to the disadvantage of long-term
environmental goals, when mitigation measures are implemented; and,
4. The project does not have impacts which are individually limited, but
cumulatively considerable, when mitigation measures are implemented;
and,
5. The project will not cause substantial adverse effects on human beings
either directly or indirectly, when mitigation measures are implemented.
SECTION 2. Findings for approval of Conditional Use Permit. The Planning
Commission finds as follows:
1. The proposed project is consistent with the General Plan; and,
2. The proposed project satisfies all applicable provisions of the Zoning
Ordinance; and,
3. The establishment, and subsequent operation or conduct of the use will
not, because of the circumstances and conditions applied in this particular
case, be detrimental to the health, safety, or welfare of the general public
or persons residing or working in the neighborhood of the use, or be
detrimental or injurious to property or improvements in the vicinity of the
use; and,
4. The proposed project will not be inconsistent with the character of the
immediate neighborhood or contrary to its orderly development; and,
5. The proposed project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to
be improved in conjunction with the project, or beyond the normal traffic
volume of the surrounding neighborhood that would result from the full
development in accordance with the Land Use Element.
6. The project will not result in an over concentration of multi -family
residential development within a commercial district.
Draft Resolution PC 2003-0039
March 18, 2003
Page 3 of 20
7. The project is compatible with and will not negatively impact surrounding
commercial uses.
8. The project will not be located on a prime commercial intersection or site
that would best be reserved for exclusive commercial development.
BE IT FURTHER RESOLVED, that the Planning Commission does hereby
approve Conditional Use Permit 2002-0079 subject to the following Exhibits:
EXHIBIT A:
Mitigated Negative Declaration
EXHIBIT B:
Conditions of Approval
EXHIBIT C:
Site Plan
EXHIBIT D:
Conceptual Landscape Plan
EXHIBIT E:
Commercial Elevations
EXHIBIT F:
Commercial Color and Materials
EXHIBIT G:
Residential Elevations / Floor Plan
EXHIBIT H:
Conceptual Utility and Grading Plan
On motion by Commissioner , and seconded by Commissioner
the foregoing resolution is hereby adopted in its entirety by
the following roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ABSTAIN: ( )
ADOPTED:
CITY OF ATASCADERO, CA
David Bentz
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
Draft Resolution PC 2003-0039
March 18, 2003
Page 4 of 20
EXHIBIT A: Draft Mitigated Negative Declaration 2003-0009
CITY OF ATASCADERO
PROPOSED MITIGATED
NEGATIVE DECLARATION #2003-0009
6500 Palma Avenue Atascadero, CA 93422 805/461-5035
Applicant:
Kelly Gearhart, 6205 Alcantara Avenue, Atascadero, CA 93422
Project Title:
Conditional Use Permit 2002-0079
Project
Southeast of the corner of Morro Road and Atascadero Avenue, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 031-036, 037
Project
The project consists of a mixed use commercial office and multi -family residential
Description:
development on two separate parcels totaling 1.1 acres. The commercial office buildings will
have a total of 5400 square feet with a 14 space parking lot. The residential portion will
consist of eight semi -attached multi -family dwellings with 16 parking spaces. A single shared
driveway will provide access to Morro Road (SR 41). The site will have coordinated
architecture and 14,000 sf of landscaping. The existing site is a vacant pasture will minimal
slope and limited vegetation. General Plan: General Commercial, Zoning District
Commercial Professional / PD -3.
FINDINGS:
1. The project does not have the potential to degrade the environment when mitigation
measures are incorporated into the project.
2. The project will not achieve short-term to the disadvantage of long-term environmental
goals.
3. The project does not have impacts which are individually limited, but cumulatively
considerable.
4. The project will not cause substantial adverse effects on human beings either directly or
indirectly.
DETERMINATION:
Based on the above findings, and the information contained in the initial study 2003-0009 (made a part
hereof by reference and on file in the Community Development Department), it has been determined that the
above project will not have an adverse impact on the environment when the following proposed mitigation
measures are incorporated into the project (see attachment).
PREPARED BY: Warren Frace, Community Development Director
DATE POSTED: February 27, 2003
PUBLIC REVIEW ENDS: March 18, 2003
Attachments: 1. Initial Study
Draft Resolution PC 2003-0039
March 18, 2003
Page 5 of 20
EXHIBIT B: Conditions of Approval
CUP 2002-0079
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CUP 2002-0079
PS: Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
FO: Final Occupancy
CA: City Attorney
Standard Conditions
1. The approval of this use permit shall become final and
BP
PS
effective for the purposes of issuing building permits,
provided the required conditions of approval have been
satisfied, fourteen (14) days following the Planning
Commission approval unless prior to the time, an appeal to
the decision is filed as set forth in Section 9-1.111(b) of the
Zoning Ordinance.
2. Approval of this Conditional Use Permit shall be valid for
BP
PS
twelve (12) months after its effective date. At the end of the
period, the approval shall expire and become null and void
unless the applicant has received a building permit or
applied for an extension of entitlement.
3. The granting of this Conditional Use Permit shall apply to
Ongoing
PS
APN 031-052-036, 037, regardless of owner.
4. The Community Development Department shall have the
BP
PS
authority to approve minor changes to the project that (1)
increase the square footage of the project by less than 10%,
(2) result in a superior site design or appearance, and/or (3)
address a construction design issue that is not substantive
to the Conditional Use Permit.
Project Conditions
5. Outdoor Recreation Areas. Outdoor recreational open space
BP
PS
shall be provided at a ratio of three hundred (300) square
feet per unit. This open space may be provided either as (1)
a private amenity designed for exclusive use of a dwelling
unit or (2) as common open space provided that no
individual open space is less than one thousand (1,000)
square feet.
6. Enclosed Storage. Each dwelling unit shall be provided a
BP
PS
minimum of one hundred (100) cubic feet of enclosed
storage space, exclusive of closets, which may be located in
either a principal or accessory building.
7. Covered parking. One (1) covered parking space (carport or
BP
PS
garage) shall be required per dwelling unit of the total off-
street parking required by Section 9-4.118. (Ord. 149 § 2
(part), 1987)
Draft Resolution PC 2003-0039
March 18, 2003
Page 6 of 20
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CUP 2002-0079
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
8. Laundry Facilities. Laundry facilities shall be provided in the
BP
PS
form of laundry hook-ups within each individual dwelling unit
9. Maintenance Requirement. A maintenance agreement for
BP
PS
all landscaping, building exteriors, accessory structures,
parking areas and other common facilities shall be approved
by the Community Development Director and City Attorney
prior to final occupancy
10. Screening Wall. A solid wall or fence not less than six (6)
BP
PS
feet in height shall be placed and maintained on interior lot
lines abutting property zoned for single-family residential
use.
11. All Mixed Use Multi -Family Residential Uses shall be
BP
PS
consistent with the Residential Multi -Family Development
standards contained in Section 9-3.176.
12. Mixed use development along Morro Road shall provide
BP
PS
office or commercial uses along the Morro Road frontages
with parking and residential uses recessed from the street.
The commercial buildings shall be constructed either
concurrently or prior to the residential buildings. In now case
shall the residential buildings be built prior the commercial
buildings.
13. Minimum Lot Requirements. The minimum number of
BP
PS
residential units on an individual residential lot shall be four
(4) residential units. A minimum of two (2) residential units
may be allowed on a lot that includes a commercial building.
All subdivision and condo maps shall be consistent with the
requirements of the Conditional Use Permit.
14. The applicant shall record a lot line adjustment to remove
BP
PS
any conflicts with building locations consistent with the
Master Site Plan
15. All subsequent Tentative Maps and construction permits
BP/FM
PS
shall be consistent with the Master Plan of Development
contained herein.
16. All exterior elevations, finish materials and colors shall be
BP
PS
consistent with the Master Plan of Development as shown in
Exhibit E, F and G.
17. All uncovered residential parking shall be delineated with
interlocking pavers and reserved signage.
18. All site development and landscaping shall be consistent
BP
PS
with Exhibit C and D with the following additions:
Draft Resolution PC 2003-0039
March 18, 2003
Page 7 of 20
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CUP 2002-0079
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
a) London Plane trees shall be planted along the street
frontage.
b) Evergreen trees shall be planted every 30 -feet on center
along the rear property line.
19. All site work, grading and site improvements shall be
BP
PS
consistent with the Master Plan of Development as shown in
Exhibit G and H.
20. All exterior lighting shall consist of decorative full cut off
BP/FO
PS
1.a.1.
lighting fixtures with flat or recessed lens. Parking lot lights
will be shielded to prevent off site glare.
21. An outdoor employee eating areas with a permanent
BP/FO
PS
3AA
decorative table/picnic bench and shade trees will be
provided as shown on the site plan
22. Bicycle storage racks shall be provided for the site. The bike
BP/FO
PS
3.d.3.
racks shall be located in a convenient and secure location.
23. West facing shade trees shall be planted at 30 -foot intervals
BP/FO
PS
3.d.1.
along the perimeter of the parking spaces between the
parking lot and the commercial buildings. The trees shall be
shown on a revised landscape plan.
24. A reciprocal access, drainage, utility, and parking easement
FO
PS
shall be recorded for the site.
25. All HVAC equipment shall be ground mounted and screened
Ongoing
PS
from public view
26. All electrical meters and utility equipment shall be painted to
BP/FO
PS
match the building and screened with landscaping.
27. All commercial signage shall be subject to the following:
BP
PS
a) Individual tenant signs shall be located on building walls
as shown on the project elevations.
b) A common monument may be provided on Morro Road
for tenant identification.
28. The project shall be conditioned to comply with all applicable
BP
PS
District regulations pertaining to the control of fugitive dust
(PM -10) as contained in section 6.4 of the Air Quality
Handbook. All site grading and demolition plans notes shall
list the following regulations:
Draft Resolution PC 2003-0039
March 18, 2003
Page 8 of 20
Conditions of Approval / Mitigation Monitoring
Program
CUP 2002-0079
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
Fl: Final Inspection
TO: Temporary Occupancy
F0: Final Occupancy
Responsibility
/Monitoring
PS:Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Mitigation
Measure
A. All material excavated or graded shall be
sufficiently watered to prevent excessive amounts
of dust. Watering shall occur at least twice daily
with complete coverage, preferably in the late
morning and after work is finished for the day.
B. All clearing, grading, earth moving, or excavation
activities shall cease during periods of high winds
(i.e. greater than 15 mph averaged over one hour)
so as to prevent excessive amounts of dust.
C. All material transported off-site shall be either
sufficiently watered or securely covered to prevent
excessive amounts of dust.
D. The area disturbed by clearing, grading, earth
moving, or excavation operations shall be
minimized so as to prevent excessive amounts of
dust.
E. Permanent dust control measured identified in the
approved project revegetation and landscape
plans shall be implemented as soon as possible
following completion of any soil disturbing
activities.
F. Exposed ground areas that are planned to be
reworked at dates greater than one month after
initial grading shall be sown with fast -germinating
native grass seed and watered until vegetation
becomes established.
G. All disturbed areas not subject to revegetation
shall be stabilized using approved chemical soil
binders, jute netting, or other methods in advance
by the APCD.
H. All roadways, driveways, sidewalks, etc. to be
paved shall be completed as soon as possible. In
addition, structural foundations shall be completed
as soon as possible following building pad
construction.
I. On-site vehicle speed shall be limited to 15 mph
for any unpaved surface.
J. All unpaved areas with vehicle traffic shall be
watered at least twice per day, using non -potable
water.
K. Streets adjacent to the project site shall be swept
daily to remove silt which may have accumulated
from construction activities so as to prevent
excessive amounts of dust from leaving the site.
L. Wheel washers may be required when significant
Draft Resolution PC 2003-0039
March 18, 2003
Page 9 of 20
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CUP 2002-0079
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
offsite import or export of fill is involved.
29. All lighting shall be designed to eliminate any off site glare.
BP
PS
1.a.1.
All exterior site lights shall utilize full cut-off, "hooded" lighting
fixtures to prevent offsite light spillage and glare.
30. All construction activities on the site shall comply with City
BP
PS
Noise Ordinance for hours of operations. Permitted
construction hours will be noted on all construction plans.
Fire Department Conditions
31. Provide a minimum 28 -foot inside radius and 48 -foot outside
BP
BS
radius for fire truck access. A fire truck turn around
hammerhead shall be provided within the commercial
parking lot area. This area shall be marked with "Fire Lane
— No Parking".
32. The landscape planter on the main driveway shall be
BP
BS
shortened to provide a minimum 28 -foot interior radius
33. The radius at the east corner of the center planter shall be
BP
BS
increased to improve turning radii.
34. Fire hydrant spacing shall be provided per the requirements
BP
BS
of the Uniform Fire Code.
35. All curbs shall indicate "Fire Lane — No Parking" on interior
BP
BS
driveways.
36. Provide a Knox Box for Fire Department access at each
BP
BS
commercial building. Note on plan that location of the Knox
Box is to be at discretion of the Fire Authority. Contact the
Fire Authority for purchase forms. Provide emergency
contact information and an access key for Knox Box prior to
calling for final inspection.
Building Services Conditions
37. On-site retaining walls are to be designed by a registered
BP
BS
Civil Engineer or Architect. Wall designs shall address
specific site conditions. Provide calculations and detailing of
each and every wall configuration proposed. Consider any
surcharge loads, such as those due to sloping backfill or
buildings.
38. A soils investigation prepared by a licensed Geotechnical
BP
BS
Engineer is to be provided for the project. The report shall
address, at minimum, the soils and geology as it relates to
Draft Resolution PC 2003-0039
March 18, 2003
Page 10 of 20
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CUP 2002-0079
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
the driveway, the building pad and residence, the septic
system, and any proposed retaining walls. The report is to
be provided at the time of building permit submittal along
with the building plans for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
39. An accessible route shall be provided and maintained by the
BP
BS
applicant connecting all accessible entrances at all buildings,
accessible parking facilities, transportation facilities,
passenger loading zones, taxi stands, public streets and
sidewalks as required by CABO/ANSI A117.1. This shall
apply to all structures on all separate properties.
City Engineer Public Improvements (Project Frontage)
40. Morro Road. Full frontage improvements are required with
BP
CE
this development. Caltrans and the City of Atascadero
shall approve the design. These include curb, gutter, and
sidewalk and pave out of an additional travel lane with
adequate width for parking and bicycles. Morro Road was
recently overlayed by Caltrans. The new paving shall
match the existing edge of the recent overlay. Public
Improvement plans shall be submitted detailing the
design. Cross sections shall be submitted detailing the
existing and proposed cross fall on EI Camino Real.
41. All public improvements shall be constructed in
BP
CE
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings or as
directed by the City Engineer.
Drainage
42. This project proposes to use an existing storm drain on
BP
CE
the east side of Morro Road for storm water conveyance.
The existing storm drain is a 48" Corrugated Plastic Pipe
(CCP). Above the 48" CCP, a 24" CCP is to be
constructed. The 24" CCP will be used to collect on site
and off site storm water and convey it to the 48" CCP.
The storm drain system will be designed plans and
drainage calculations for the Highway 41/Atascadero Ave
Storm Drain by North Coast Engineering on file at the
City of Atascadero Public Works Department. The plans
are dated May 13, 1997 and the calculations are dated
February 1997.
Existing offsite storm waters flow across the property this
project is located on. Improvements for this project shall
be designed to convey these flows to the 48" CCP in
Morro Road.
Draft Resolution PC 2003-0039
March 18, 2003
Page 11 of 20
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CUP 2002-0079
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
43. Drainage calculation. Drainage calculations shall be
BP
CE
produced considering all areas tributary to this property.
These calculations shall be in conformance the City of
Atascadero Engineering Standards. Submit calculations to
support the design of any structures or pipes. Closed
conduits shall be designed to convey the 10 -year flow with
gravity flow; the 25 -year flow with head, and provide safe
conveyance for the 100 -year overflow.
44. A Storm Water Pollution Prevention Plan shall be
BP
CE
produced and approved by the Regional Water Quality
Control Board and the City of Atascadero. These plans
shall recommend mitigation measure during and after
construction to eliminate point and non point source
pollution into the 48" CCP. The use on onsite grading
feature to pond and percolate storm water is
recommended. A filter system, mechanical or non, shall
be installed with this project. This system shall comply
with the intent of National Pollution Discharge Elimination
System, Phase II requirements.
45. Obtain approval by the City Engineer of the grading &
BP
CE
drainage plan and the storm drain design & facilities.
46. Acquire drainage easements where needed. Drainage
BP
CE
shall cross lot lines only where a drainage easement has
been provided.
47. Concentrated drainage from off-site areas shall be
BP
CE
conveyed across the project site in drainage easements.
City Engineer Standard Conditions
48. The applicant shall enter into a Plan Check & Inspection
BP
CE
agreement with the City.
49. The applicant shall be responsible for the protection,
BP
CE
relocation and/or alteration of existing utilities.
50. The applicant shall install all new utilities (water, gas,
BP
CE
electric, cable TV and telephone) underground.
51. The applicant shall monument all property corners for
BP
CE
construction control and shall promptly replace them if
disturbed.
52. Prior to issuance of building permits, the applicant shall
BP
CE
submit a grading and drainage plan with a separate sheet(s)
devoted to sedimentation and erosion control, prepared
by a registered civil engineer for review and approval by the
City Engineer.
53. Prior to the final inspection, all outstanding plan check and
BP
CE
inspection fees shall be paid.
Draft Resolution PC 2003-0039
March 18, 2003
Page 12 of 20
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CUP 2002-0079
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
54. Prior to the final inspection, the applicant shall submit a
BP
CE
written statement from a registered civil engineer that all
work has been completed and is in full compliance with the
approved plans and the Uniform Building Code (UBC).
Wastewater Conditions
55. Drainage piping serving fixtures which have flood level rims
BP
WW
located below the elevation of the next upstream manhole
cover of the public or private sewer serving such drainage
piping shall be protected from backflow of sewage by
installing an approved type backwater valve Fixtures above
such elevation shall not discharge through the backwater
valve.
56. The sewer laterals across Morro Road shall be constructed
BP
WW
per Caltrans Standards and inspected by Caltrans and the
City of Atascadero. SS laterals crossing over water main
shall be constructed using "special pipe" while traversing
D.O.H. Zone "C". The new manhole in Morro Road Shall be
constructed to City Standard. The onsite wastewater
collection system to the manhole in Morro Road is privately
owned and not the City's responsibility to maintain.
57. All sewer main taps will be done by the City of Atascadero.
BP
WW
The developers shall pay a sewer tap fee.
58. Sewer connection permit shall be issued separately (from
BP
WW
building permit) after public sewer extension has been
completed and has received a satisfactory final Public
Works inspection. Final project inspection shall be
contingent upon completion of the public sewer extension
and Public Works final inspection.
Solid Waste
59. Atascadero Waste Alternative shall approve the location,
BP
CE
size and design of all solid waste facilities. The facilities shall
include room for recycling and green waste containers. The
location of the facilities will take into account the collection of
the solid waste.
Atascadero Mutual Water Company (AMWC):
60. Prior to the issuance of building permits, the applicant shall
BP
AMWC
submit plans showing the water distribution facilities required
to serve the project for review and approval by the
Atascadero Mutual Water Company. The plans shall show
all facilities required for fire protection. The plans shall show
all cross -connection devices required to isolate the fire
protection and landscape irrigation systems form domestic
Draft Resolution PC 2003-0039
March 18, 2003
Page 13 of 20
Conditions of Approval / Mitigation Monitoring
Timing
Responsibility
Mitigation
Program
/Monitoring
Measure
CUP 2002-0079
PS:Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
water systems. Prior to approval of the water system plans
by Atascadero Mutual Water Company, the applicant shall
pay all current installation and connection fees required by
the Atascadero Mutual Water Company.
61. Prior to recording the parcel map the applicant shall obtain a
BP
AMWC
"Will Serve" letter from Atascadero Mutual Water Company.
62. All water distribution facilities shall be constructed in
BP
AMWC
conformance with Atascadero Mutual Water Company
standards, policies and approved procedures. All cross -
connection devices shall be constructed in conformance with
AWWA and Department of Health Services standards.
63. If on site fire hydrants are required by the fire department, a
BP
AMWC / BS
water main line extension may be required.
64. Separate services shall be provided for each parcel. If
BP
AMWC
buildings are to be condos separate meters for each unit will
be required.
Draft Resolution PC 2003-0039
March 18, 2003
Page 14 of 20
EXHIBIT C: Site Plan
Draft Resolution PC 2003-0039
March 18, 2003
Page 15 of 20
EXHIBIT D: Conceptual Landscape Plan
Draft Resolution PC 2003-0039
March 18, 2003
Page 16 of 20
EXHIBIT E: Commercial Elevations
SOUTH ELEVATION
BUILDING "A"
-- C
Draft Resolution PC 2003-0039
March 18, 2003
Page 17 of 20
EXHIBIT F: Commercial Color and Materials
X31 PURE NOM (BABE IM
❑ 7/B" STUCCO
B/WIRE/PAPERLATHE
w/ MONTEREY FINISH
(LA HABRA SANDSTONE")
Q
3/8" STUCCO
0/MASONRY
w/ MONTEREY FINISH
(LA HABRA -PURE IVORY-)
PRECAST CONCRETE WAINSCOTE 1
TYR m WEST ELEVATION
O "STONE KOTE'
SIMULATED CONCRETE
WINDOW TRIM p
(TYP. T WINDOWS ON WEST)
THIN BRICK VENEER
"CITYHALL"
BY ROBINSON BRICK CO.
STOREFRONT ALUMINUM FRAMES
(BRONZE-ANOD.) TYPICAL
1-
rel EPS ARCHITECTURAL SHAPE
w/ STUCCO FINISH
(LA HABRA "SANDSTONE")
O-STONE KOTE-
ROSETTE
TYPICAL 0 LIGHTS
10 "Monier" Espana
CONCRETE ROOF TILE
(Sunrise)
11 16 " "800se neck" Lamp
12 -Monier" Espana
CONCRETE ROOF TILE
(Sunrise)
Draft Resolution PC 2003-0039
March 18, 2003
Page 18 of 20
EXHIBIT G: Residential Elevations / Floor Plan
[o]
0
ALAW-g
bo db �
i
€=a 00
—==;
;
00
i
e
z z
Draft Resolution PC 2003-0039
March 18, 2003
Page 19 of 20
EXHIBIT G: Residential Color and Materials
Draft Resolution PC 2003-0039
March 18, 2003
Page 20 of 20
EXHIBIT H: Conceptual Utility and Grading Plan
�..y�l:
r�t�uriii�p•�rirrr�•�iiiri�r�•rpir+iiriiit�a/pHp
rYMWr7rNP"_.4-rirrr
(( WI.rWrrrlMr
r���
.,
off••
r�irrw—'
C
iridrri�iriil5�'s�lie5eikt5A
Draft Resolution PC 2003-0039
March 18, 2003
Page 21 of 20