Loading...
HomeMy WebLinkAboutPC_2004-08-17_AgendaPacketCITY OFATASCADERO PLANNING COMMISSION AGENDA Regular Meeting August 17, 2004 — 7:00 P.M. City of Atascadero Pavilion on the Lake 9315 Pismo Ave. - Atascadero, California CALL TO ORDER Pledge of Allegiance Roll Call: Chairperson Kelley Vice Chairperson Jones Commissioner Fonzi Commissioner Peterson Commissioner Beraud Commissioner O'Keefe Commissioner Porter APPROVAL OF AGENDA PUBLIC COMMENT (This portion of the meeting is reserved for persons wishing to address the Commission on any matter not on this agenda and over which the Commission has jurisdiction. Speakers are limited to five minutes. Please state your name and address for the record before making your presentation. The Commission may take action to direct the staff to place a matter of business on a future agenda) CONSENT CALENDAR (All items on the consent calendar are considered to be routine and non -controversial by City Staff and will be approved by one motion if no member of the Commission or public wishes to comment or ask questions) 1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION MEETING ON AUGUST 3, 2004. 2. ACCEPTANCE OF FINAL MAP 2004-0086: ESCONDIDO ROAD AND SAN GABRIEL ROAD. COMMUNITY DEVELOPMENT STAFF REPORTS 3. TREE REMOVAL PERMIT 2004-0050 Applicant Bob Phillips, 3111 Falda Rd., Atascadero, CA 93422 Project Title Phone: 466-1437 Project Title Tree Removal Permit 2004-0050 Project Location 8424 Alta Vista, Atascadero, CA 93422 Project APN 031-112-014 Project Request to remove four (4) Live Oak trees, one of which is over 24 -inches in diameter at breast height (dbh), Description in conjunction with the development of a 2,200 square -foot single family residence with an attached 440 square foot garage located at 8424 Alta Vista Avenue. 4. TREE REMOVAL PERMIT 2004-0054 Applicant Marilyn Fkiaras, 5304 Elmhurst St., Ventura, CA 93003 Project Title Phone: 642-8816 Project Title Tree Removal Permit 2004-0054 Project Location 4110 Traffic Way, Atascadero, CA 93422 Project APN 049-033-010 Project Request to remove seven (7) Live Oak trees, two of which are over 24 -inches in diameter, in conjunction with Description the development of a 1,888 square -foot single family residence with an attached 567 square foot garage located at 4110 Traffic Way. Access is proposed off of Seperado Avenue. PUBLIC HEARINGS (For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public hearing and invite the applicant or applicant's representative to make any comments. Members of the public will be invited to provide testimony to the Commission following the applicant. Speakers should state their name and address for the record and can address the Commission for five minutes. After all public comments have been received, the public hearing will be closed, and the Commission will discuss the item and take appropriate action(s).) 5. DOVE CREEK MIXED-USE DEVELOPMENT, ZONE CHANGE 2003-00499 CONDITIONAL USE PERMIT 2003-0099, TENTATIVE TRACT MAP 2003-0033. Applicant Bermant Development Company, 5383 Hollister Avenue, Suite 150, Santa Barbara, CA 93111, Phone: 964-7200 Project Title Dove Creek Mixed -Use Development, (Zone Change 2003-0049, Conditional Use Permit 2003- 0099, Tentative Tract Map 2003-0033) a single-family residential/commercial center/open space development. Project Santa Barbara Road and El Camino Real, Atascadero, CA 93422 (San Luis Obispo County) Location APN 45-342-03, 45-381-10, 45-381-07, 45-381-09, 45-331-02, 45-331-04, 45-331-08, 45-331-01, 45 -342 -05,45 -342-04,45-342-13,45-342-01,45-342-08,45-342-02,45-352-05. Project The proposed project is a 64 -acre residential and commercial project located in the southern Description portion of the City of Atascadero at the northwest corner of Santa Barbara Road and EI Camino Real. The project includes 279 residential dwelling units clustered in five villages totaling 40 acres separated by open space areas. The three residential product types are detached single-family homes on 5,000 square foot lots, clusters of six homes on a common courtyard, and attached town homes of four and five residences per building. The commercial center includes approximately 60,000 square feet on approximately 6.0 acres in the southeastern corner of the site. There are approximately 18 acres of permanent open space that includes two seasonal creeks and associated floodways, a 1.6 -acre wetland, and wooded oak knoll adjacent to Highway 101. Recreational amenities include a centrally located one - acre park, tot -lot pocket park, and trails connecting to pedestrian walkways. Environmental Based on the initial study prepared for the project, a Mitigated Negative Declaration is Determination proposed. The proposed Negative Declaration is available for public review from 6/17/04 through 8/14/04 at 6905 EI Camino Real, Suite 6, Community Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday. COMMISSIONER COMMENTS AND REPORTS DIRECTOR'S REPORT ADJOURNMENT The next regular meeting of the Planning Commission will be on September 7, 2004, at the Pavilion on the Lake, 9315 Pismo Avenue, Atascadero. Please note: Should anyone challenge in court any proposed development entitlement listed on this Agenda, that person may be limited to raising those issues addressed at the public hearing described in this notice or in written correspondence delivered to the Planning Commission at, or prior to this public hearing. City of Atascadero WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING The Planning Commission meets in regular session on the first and third Tuesday of each month at 7:00 p.m., at the Pavilion on the Lake, 9315 Pismo Ave., Atascadero. Matters are considered by the Commission in the order of the printed Agenda. Copies of the staff reports or other documentation relating to each item of business referred to on the Agenda are on file in the office of the Community Development Department and are available for public inspection during City Hall Annex business hours at the Community Development counter and on our website, www.atascadero.org. An agenda packet is also available for public review at the Atascadero Library, 6850 Morro Road. All documents submitted by the public during Commission meetings that are either read into the record or referred to in their statement will be noted in the minutes and available for review in the Community Development Department. In compliance with the Americans with Disabilities Act, if you need special assistance to participate in a City meeting or other services offered by this City, please contact the City Manager's Office, (805) 461-5000, or the City Clerk's Office, (805) 461-5000. Notification at least 48 hours prior to the meeting or time when services are needed will assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service. TO SPEAK ON AGENDA ITEMS Members of the audience may speak on any item on the agenda. The Chairperson will identify the subject, staff will give their report, and the Commission will ask questions of staff. The Chairperson will announce when the public comment period is open and will request anyone interested to address the Commission regarding the matter being considered to step up to the podium. If you wish to speak for, against or comment in any way: • You must approach the podium and be recognized by the Chairperson • Give your name and address (not required) • Make your statement • All comments should be made to the Chairperson and Commission • All comments limited to 5 minutes (unless changed by the Commission) • No one may speak for a second time until everyone wishing to speak has had an opportunity to do so, and no one may speak more than twice on any item. If you wish to use a computer presentation to support your comments, you must notify the Community Development Department at least 24 hours prior to the meeting. Access to hook up your laptop to the City's projector will be provided. You are required to submit to the Recording Secretary a printed copy of your presentation for the record. Please check in with the Chairperson before the meeting begins to announce your presence and turn in the printed copy. The Chairperson will announce when the public comment period is closed, and thereafter, no further public comments will be heard by the Council. TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA Under Agenda item, "PUBLIC HEARINGS", the Chairperson will call for anyone from the audience having business with the Commission to: • Please approach the podium and be recognized • Give your name and address (not required) • State the nature of your business This is the time items not on the Agenda may be brought to the Commission's attention. A maximum of 30 minutes will be allowed for Community Forum (unless changed by the Commission). ITEM NUMBER: 1 DATE: 8/17/04 CITY OF ATASCADERO PLANNING COMMISSION DRAFT MINUTES Regular Meeting August 3, 2004 — 7:00 P.M. CALL TO ORDER Acting Chairperson Fonzi called the meeting to order at 7:01 p.m. and led the Pledge of Allegiance. ROLL CALL Present: Commissioners Beraud, Fonzi, O'Keefe, Peterson, and Porter. Absent: Vice Chairperson Jones and Chairperson Kelley Staff Present: Community Development Director Warren Frace, Associate Planner Kelly Gleason, Associate Planner Kerry Margason, Assistant Planner Lisa Wilkinson and Recording Secretary Grace Pucci. APPROVAL OF AGENDA Community Development Director Warren Frace announced that Agenda Item #4 was removed by the applicant. MOTION: By Commissioner Beraud and seconded by Commissioner O'Keefe to approve the agenda. Motion passed 5:0 by a roll -call vote. PUBLIC COMMENT None CONSENT CALENDAR 1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION MEETING ON JULY 20. 2004. 2. ACCEPTANCE OF FINAL MAP 2003-0066: 2955 CHICO RD. 3. ACCEPTANCE OF FINAL MAP 2004-0078: 9055 LA CANADA. MOTION: By Commissioner Beraud and seconded by Commissioner Porter to approve Items #1, 2 and 3. Motion passed 5:0 by a roll -call vote. (O'Keefe abstained on Item # 3) COMMUNITY DEVELOPMENT STAFF REPORTS 4. TREE REMOVAL PERMIT 2004-0051:1240 EL CAMINO REAL Applicant: Lixia Zhang, 1240 EI Camino Real, Atascadero, CA 93422 Project Title: Tree Removal Permit 2004-0051 Project 1240 EI Camino Real, APN# 049-093-017 Location: Project Request to remove one (1) White Oak tree over 24 -inches in diameter located at 1240 EI Description: Camino Real. This item was pulled by the applicant. 5. TREE REMOVAL PERMIT 2004-0055: 5215 MERCEDES AVE Applicant: Jesse and Misha Woodard, 5477 Capistrano Avenue, Atascadero, CA 93422 Project Title: Tree Removal Permit #2004-0055 Project 5215 Mercedes Avenue, APN# 028-215-016 Location: Project Request to remove eight (8) native trees, one of which is over 24 -inches in diameter, in Description: conjunction with the development of a 2,851 square -foot single family residence with an attached 612 square foot garage located at 5215 Mercedes Avenue. Assistant Planner Lisa Wilkinson gave the staff report and answered questions of the Commission. PUBLIC COMMENT — None MOTION: By Commissioner Porter and seconded by Commissioner Peterson to adopt Resolution PC 2004-0091 to approve the request to remove eight native trees subject to the guidelines and mitigation required by the Atascadero Native Tree Ordinance and that the mitigation table is changed to reflect the $50 for the blue oak. Motion passed 5:0 by a roll -call vote. 6. TREE REMOVAL PERMIT 2004-0056: 8335 SAN MARCOS ROAD Applicant: Charles and Patricia Bart, 15709 N.W. Rondos Drive, Portland, OR 97229 Project Title: Tree Removal Permit 2004-0056 Project 8335 San Marcos Road, APN# 031-211-008 Location: Project Request to remove six (6) Live Oak trees, three of which are over 24 -inches in diameter, in Description• conjunction with the development of a 2,422 square -foot single family residence with a detached 800 square foot garage located at 8335 San Marcos Road. Assistant Planner Lisa Wilkinson gave the staff report and answered questions of the Commission. PUBLIC COMMENT Patricia Bart, applicant, stated that she has attempted to design a house plan that would accommodate the difficult site. Mrs. Bart answered questions of the Commission. Acting Chairperson Fonzi closed the Public Comment period. MOTION: By Commissioner O'Keefe and seconded by Commissioner Beraud to adopt Resolution PC 2004-0094 to approve the request to remove six native oak trees subject to the guidelines and mitigation required by the Atascadero Native Tree Ordinance. Motion passed 5:0 by a roll -call vote. 7. TREE REMOVAL PERMIT 2004-0054:4110 TRAFFIC WAY Applicant: Marilyn Fkiaras, 5304 Elmhurst Street, Ventura, CA 93003 Project Title: Tree Removal Permit 2004-0054 Project 4110 Traffic Way, APN# 049-033-010 Location: Project Request to remove seven (7) Live Oak trees, two of which are over 24 -inches in diameter, in Description: conjunction with the development of a 1,888 square -foot single family residence with an attached 567 square foot garage located at 4110 Traffic Way. Access is proposed off of Seperado Avenue. Assistant Planner Lisa Wilkinson gave the staff report and answered questions of the Commission. PUBLIC COMMENT Patricia Cooper Holyfield expressed several concerns with the tree removals including: erosion problems, impacts to wildlife, loss of privacy and beauty of area. Harold Galvan stated his concerns regarding the tree removals including: access to site from Separado, responsibility for road repair after construction, and wildlife impacts. Mr. Galvan felt the house could be built below the trees to lessen impacts. Fred Dyste stated his opposition to the elimination of the trees and access off of Separado and would like to see the house constructed further down the slope to keep the trees. Ann Fletcher expressed her concerns including: access from Separado, number of tree removals, erosion of Separado, construction damage to street, and fire access. John Richardson stated his concerns with the tree removals, increased traffic noise, and drainage. He would like to see the home access off of Traffic Way further down the hill. Marilyn Fkiares, applicant, stated she was unaware of the neighbors' concerns, and explained the reasons she had decided to design and site the home as proposed. Tom Fkiares, applicant, explained why the home must be built at the top of the site. Chuck Scovell, arborist, explained how he had determined the tree protection and answered questions of the Commission. Mr. Scovell stated he would revise the tree protection plans to accommodate the utility and sewer lines. Fred Dyski questioned the number of trees marked for removal and felt there were alternatives to the type of construction and placement of the home on the site. Ann Fletcher distributed photographs of the property and its eastern slope to the Commission. (Exhibit A) Patricia Cooper Holyfield spoke about the issue of erosion which could result by removal of the trees. Marilyn Fkiares stated that one of the conditions of approval was that she would repave the street if given permission to come in from Separado. Chuck Scovell explained why the 19 trees had been marked by the surveyors. Acting Chairperson Fonzi closed the Public Comment period. There was Commission discussion of issues raised during the Public Comment period and possible alternatives for the site as well as the need for additional information. MOTION: By Commissioner Beraud and seconded by Commissioner O'Keefe to continue this item and have more information brought back regarding access from Traffic Way and also potential reconfiguring to impact less trees either with stem walls or reconfiguring of the garage to move the house over, and the arborist be provided with the information he needs so that he can do a more complete analysis of the trees that will be impacted and that staff will give him direction as to how to identify the trees, and that the City Engineer be present to discuss the access issues on Separado. Motion passed 5:0 by a roll -call vote. PUBLIC HEARINGS 8. PD -7 ZONE CHANGE 2003-0047; CONDITIONAL USE PERMIT 2003-0097; TENTATIVE PARCEL MAP 2004-0061: 7500 NAVAJOA AVE. Applicant: Lynne Higgins, 7500 Navajoa Ave., Atascadero, CA 93422 Project Title: PD -7; Zone Change 2003-0047, Conditional Use Permit 2003-0097; Tentative Parcel Map 2003- 0061 for a 4 -lot PD -7 subdivision. Project 7500 Navajoa Ave., Atascadero, CA 93422 Location: (San Luis Obispo County) APN 031-152-003 Project The proposed project consists of an application for a Zone Change, Conditional Use Permit, and Description: Tentative Tract Map. The proposed project consists of four new single-family homes located on individual lots that will be developed under the requirements of the PD -7 overlay district within the Residential Multi -Family (RMF -10) zoning district. The project includes one home per lot each with a two -car garage and a single guest parking space. No native trees will be removed. General Plan Designation: Medium Density Residential — MDR Zoning District: Residential Multiple Family— RMF -10 Proposed Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. Environmental The proposed Mitigated Negative Declaration is available for public review from 6/15/04 through Determination: 8/3/04 at 6905 El Camino Real #6, Community Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday. Associate Planner Kelly Gleason gave the staff report and answered questions of the Commission. A memorandum with changes to Resolution 2004-0088 was distributed to the Commission. (Exhibit B) PUBLIC COMMENT Joe Elkins, applicant's architect, explained the original intent of this project and answered questions of the Commission. Joe Donalan asked if this project provided low income housing. Acting Chairperson Fonzi closed the Public Comment period. Associate Planner Gleason addressed the question regarding low income housing raised during the Public Comment period. MOTION: By Commissioner O'Keefe and seconded by Acting Chairperson Fonzi to adopt Resolution No. PC 2004-0087 recommending that the City Council certify the Proposed Mitigated Negative Declaration 2004-0021; and, adopt Resolution No. PC 2004-0088 recommending that the City Council introduce an ordinance for first reading by title only to approve Zone Change 2003-0047 based on findings and with the addition of the staff addendum item; and, adopt Resolution No. PC 2004-0089 recommending that the City Council approve the Master Plan of Development based on findings and subject to Conditions of Approval and Mitigation Monitoring; and, adopt Resolution No. PC 2004-0090 recommending that the City Council approve Tentative Parcel Map 2004-0061 based on findings and subject to Conditions of Approval and Mitigation Monitoring and that no sidewalk be required on the Santa Ynez side of the development. Motion passed 5:0 by a roll -call vote. COMMISSIONER COMMENTS AND REPORTS Commissioner O'Keefe stated she would not be here for the next Commission meeting. Acting Chairperson Fonzi asked if the tree ordinance issue would be on the agenda for the next Planning Commission meeting. Community Development Director Warren Frace stated it would be best to have a full quorum of the Commission speak to this issue and as there are two large projects on the September 7t" agenda it would be best to place this item on the September 21St agenda. There was Commission consensus to tentatively move the tree ordinance issue to September 21St, and to discuss that date at the next Commission meeting. DIRECTOR'S REPORT Director Frace reviewed the next Planning Commission agenda and updated the Commission on the progress of several development projects. ADJOURNMENT Acting Chairperson Fonzi adjourned the meeting at 8:36 p.m. to the next regularly scheduled meeting of the Planning Commission on August 17, 2004. MEETING RECORDED AND MINUTES PREPARED BY: Grace Pucci, Recording Secretary. The following exhibits are available for review in the Community Development Department: Exhibit A — Ann Fletcher, photographs Exhibit B — Staff memorandum with changes to Resolution 2004-0088 ITEM NUMBER: 2 DATE: 8/17/04 Planning Commission Staff Report Acceptance of Final Map 2004-0086 Parcel Map ATAL 03-0285 (LLA 2003-0056) Escondido Road and San Gabriel Road Rancho de Paraiso / Wilson Land Surveys RECOMMENDATION: Staff Recommends: Planning Commission accept Final Map 2004-0086 (Parcel Map ATAL 03-0285) DISCUSSION: On June 11, 2004 the Community Development Department administratively approved Lot Line Adjustment 2003-0056, a Lot Line Adjustment between three lots, based on findings and conditions. According to Section 11-4.42 of the Municipal Code, the Planning Commission is the advisory agency charged with approval of all final maps without dedications. No offers of dedication have been made with this map. Staff has determined that the Final Map is consistent with approved Lot Line Adjustment. ATTACHMENTS: Exhibit A: Parcel Map ATAL 2004-0086 (Parcel Map AT 03- 0285) ITEM NUMBER: 2 DATE: 8/17/04 Exhibit A Final Map 2004-0086 (Parcel Map ATAL 03-0285) Escondido Road and San Gabriel Road Rancho de Paraiso / Wilson Land Surveys SI I, _ - r. 0}1t • � r�+ ITEM NUMBER: 3 DATE: 08/17/04 Atascadero Planning Commission Staff Report - Community Development Department Tree Removal Permit TRP 2004-0050 (Alta Vista Avenue: Phillips) SUBJECT: Request to remove four (4) Live Oak trees, one of which is over 24 -inches in diameter at breast height (dbh), in conjunction with the development of a 2,200 square -foot single- family residence with an attached 440 square foot garage located at 8424 Alta Vista Avenue. RECOMMENDATION: Staff recommends: The Planning Commission adopt Resolution PC 2004-0085 to approve the request to remove four (4) native oak trees subject to the guidelines and mitigation required by the Atascadero Native Tree Ordinance. Situation and Facts: 1. Applicant: Bob Phillips, 3111 Falda Road, Atascadero, CA 93422 2. Certified Arborist: Jeremy Lowney, Certified Arborist #3718, Solid Oak Tree Management, P.O. Box 13521, San Luis Obispo, CA 93406 3. Project Address: Alta Vista Atascadero, CA 93422 APN 031-112-014 ANALYSIS: The project site proposes the removal of four (4) native Live Oak trees for the 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: 3 DATE: 08/17/04 development of a 2,200 square -foot single-family residence with an attached 440 square -foot garage. The site is heavily wooded and contains 30-40% slopes. Retaining wall and stem walls are integrated into the project to further minimize impact to the surrounding trees and natural topography. In an effort to further minimize grading and reduce site disturbance, the applicant has applied for an Administrative Use Permit to allow a sloping lot adjustment for he garage. The adjustment would permit a five (5) foot setback from the property line. The City of Atascadero's Tree Ordinance requires that mitigation for native tree removals be implemented as a condition of approval. Staff is recommending that the applicant pay into the tree mitigation fund to mitigate removal of the trees. The proposed mitigation is shown in the following table. NONDECIDUOUS NATIVE TREE REMOVAL TREE # INCHES TYPE CONDITION LOCATION 14. 26" LIVE OAK GOOD 8424 ALTA VISTA 9. 18" LIVE OAK GOOD 8. 4" LIVE OAK GOOD 11. 4" LIVE OAK GOOD TOTAL = 52" PLANT NINE (9) FIVE GALLON LIVE OAK TREES OR PAY $433.33 INTO TREE MITIGATION FUND FINDINGS: Pursuant to the Tree Ordinance (Ordinance No. 214), "decisions on native tree removals of 24 -inch dbh-size or larger shall be made by the Planning Commission." In considering any tree removal request, at least one of the below stated following findings must be made. Staff has identified finding #5 as appropriate for the application request. 1) The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an Arborist; 2) The tree is crowded by other healthier native trees, thinning (removal) would promote healthier growth in the trees to remain, as certified by a tree condition report from an Arborist; 3) The tree is interfering with existing utilities and/or structures, as certified by a report from the Site Planner; 4) The tree is inhibiting sunlight needed for existing and/or proposed active or passive solar heating or cooling, as certified by a report from the Site Planner, 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: 3 DATE: 08/17/04 5) The tree is obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal, as certified by a report from the Site Planner and determined by the Community Development Department based on the following factors: • Early consultation with the City; • Consideration of practical design alternatives; • Provision of cost comparisons (from applicant) for practical design alternatives; • If saving tree eliminates all reasonable uses of the property; or • If saving the tree requires the removal of more desirable trees. CONCLUSION: The applicant has submitted a Tree Protection Plan and Arborist Report. The trees have been determined to be obstructing the proposed improvements, as determined by the project arborist. PREPARED BY: Lisa Wilkinson, Assistant Planner ATTACHMENTS: Attachment 1: Aerial Photo Attachment 2: Site Alternatives Attachment 3: Draft Resolution PC 2004-0085 Exhibit A: Conditions of Approval Exhibit B: Arborist Letter Exhibit C: Tree Protection Plan 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: DATE: 08/17/04 See following page. 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: DATE: 08/17/04 Attachment 3: Draft Resolution PC 2004-0085 DRAFT RESOLUTION PC 2004-0085 A RESOLUTION OF THE PLANNING COMMISSION OF ATASCADERO APPROVING A TREE REMOVAL PERMIT TO ALLOW THE REMOVAL OF FOUR NATIVE OAK TREES LOCATED AT 8424 ALTA VISTA AVENUE. (TRP 2004-0050/Phillips) WHEREAS, an application for a Tree Removal Pen -nit has been received from Bob Phillips, 3111 Falda Road, Atascadero, CA 93422, to allow the removal of four native oak trees located at 8424 Alta Vista Avenue; and, WHEREAS, the proposed project is located within the Single Family Residential Y land use designation of the City of Atascadero's General Plan Land Use Diagram; and, WHEREAS, the proposed project is located in the Limited Single Family Y (LSF -Y) zoning district; and, WHEREAS; the Planning Commission reviewed the proposed Tree Removal application on August 17, 2004, and considered testimony and reports from staff, the applicants, and the public; and, NOW, THEREFORE, the Planning Commission takes the following actions: SECTION 1. Findings for Approval of Tree Removal Permit. The Planning Commission finds as follows: The tree is obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal, as certified by a report from the Site Planner and determined by the Community Development Department based on the following factors: • Early consultation with the City; • Consideration of practical design alternatives; • Provision of cost comparisons (from applicant) for practical design alternatives; • If saving tree eliminates all reasonable uses of the property; or • If saving the tree requires the removal of more desirable trees; and, SECTION 2. Approval. The Planning Commission hereby approves Tree Removal Permit 2004-0050 subject to the following Conditions and Exhibits: 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: 3 DATE: 08/17/04 Exhibit A: Conditions of Approval Exhibit B: Arborist Letter Exhibit C: Tree Protection Plan On motion by Commissioner , and seconded by Commissioner the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: ADOPTED: CITY OF ATASCADERO, CA Bob Kelley Planning Commission Chairperson Attest: Warren M. Frace Planning Commission Secretary 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: DATE: 08/17/04 Exhibit A: Conditions of Approval Tree Removal - TRP 2004-0050 Conditions of Approval Timing Responsibility Mitigation TRP 2004-0050 /Monitoring Measure PR: Prior to Removal BL: Business License PS: Planning Services BP: Building Permit BS: Building Services TO: Temporary Occupancy FD: Fire Department F0: Final Occupancy PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Planning Services 1. The applicant shall pay $433.33 into the tree PR PS mitigation fund or plant equivalent as mitigation for the tree removal. 2. Replacement trees shall be monitored for a 1 -year FO PS period and maintained as specified by a certified arborist to insure the trees become established. Evergreen Native Trees (inches) Totals d b h notes 1 26 -inches 2 18 -inches 3 4 -inches 4 4 -inches Total 52 -inches 52 -inches Mitigation Requirement Tree replacements: 9 five gal trees OR Tree Fund Payment: $ 433.33 $ 433.33 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc Exhibit B: Arborist Report Tree Removal - TRP 2004-0050 solid Ak Tree Managentert 1 P.O. BOX 13521, SLO CA 93406 (805) 544-7544 (805) 544-1094 fax ITEM NUMBER: DATE: 08/17/04 TO: BOB PHILLIPS CITY OF ATASCADERO - PLANNING DEPARTMENT FROM: JEREMY LOWNF:Y, CERTIFIED ARBORIST 3718 SOLID OAK TREE MANAGEMENT DATE: APRIL 8, 2004 REGARDING: ARBORIST REPORT / TREE PROTECTION PLAN Deacriotion Mr. Phillips has chosen a great location for a new home on the West side of Atascadero located at Lot 72. Block 2B on Alta Vista Road. The lot is 75% covered with oak and other native tree canopy. In order to develop the small home on the property, 4 trees will need to be removed, and 12 trees will be impacted, hone of the impacted trees will die due to the development if protection measures are followed Included is a detailed spreadsheet that identifies the number and issues related to each tree. This report will describe any specific mitigation requirements according to the number of the tree as identified on the map. Also, on the following pages are some suggestions to the developerlbuilder in regards to general tree protection measures 11 itization: Heavy Impact 25% + "free number 13 will be heavily impacted by the development. 013 is a CLO that is 11" in diameter It will be trenched along one side for the footing, and on another side for the sewer line. The combination of the two may impact the tree over time. Roots that are cut should be cut cleanly with a reciprocating saw to stimulate quick healing. Spraying the damaged roots with wound paint (Tree Seal) will help prevent decay and insects. It is highly unlikely that the tree will be killed during the construction process. Construction fencing must be installed as close to the footing as possible. Avoid adding any fill dirt over the root zone. Medium Impacts 10 - 24% Trees number 3,12, 26, 27, 30, 31, 33, and 34 will have a medium impact of between 10 - 24% damage within the root zone. 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: DATE: 08/17/04 #3 12" CLO located at the southwest corner of the garage. The footings for the garage will cut into approximately 20% of the root zone. Fencing next to the footings away from the trunk of the tree will prevent excessive damage to roots. Cut roots cleanly. Treat with wound paint. Avoid compaction around the tree by storing equipment on the east side of the garage. Keep soil level at the natural grade #l2 15" CLO located at the northwest corner. Little root damage will occur, but it is necessary to remove a large portion of the crown because of an intruding branch (10" branch). This may stress the tree. A proper cut on the tree made by a professional will assist in the healing process. The cut should be made at the branch collar. If done properly, the pruning will not harm the tree. Construction fencing will avoid root damage. #26, 427, #30, #31, #33, and #34 These trees lie along the proposed sewer line. The sewer line requires a narrow trench that can (),- positioned and directed in such a way that it minimizes damage to the root zones of the trees. Sphtting the distances between the trunks of trees will reduce the overall damage to the roots for each tree (unless there are non-unifonn root systems). Staying close to the property line on the north end will reduce impacts to the larger of the trees. Removing tree #31 may also be an option to consider in order to protect the other larger oaks. This will also allow the sewer line to hug tite property line where there are fewer trees until splitting the distances between #30 and 427. Digging the trench with a smaller backhoe that has a narrow bucket will also reduce root damage and compaction Cut roots should be cut cleanly and sprayed with wound paint. Construction fencing should be installed on both sides of the sewer line a distance of 8 feet from the center line Ml equipment should remain within the fencing. Lois, Impacti < 10% These trees will have little to no impacts that will not jeopardize the health of the trees if compaction is minimized and the fencing is installed properly. #4, #19, #28, and #29 These trees will only need to be observed and carefully avoided by using construction fencing as close to the drip lines, or as close to the foundation as possible. Some roots may need treatment as well. Monitoring: Monitoring by a certified arborist is necessary during the excavation process. By having an arborist inspect the open trenches, proper treatments can be made to damaged roots. 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: 3 DATE: 08/17/04 Tree Pruning for Eguiument: Trees may need to be pruned carefully to allow for heavy equipment. Cuts to live branches should be minimized and made by a qualified arborist. Trees damaged by equipment are much more destructive than proper cuts made with a chainsaw before hand. Please call me for any questions. Jeremy Lowney 544-7544, 432-0708 (cell) QUALIFICATIONS: Sole Proprietor - Solid Oak Tree Management California State Landscape and Tree Service Contractor (C27) #757086 Certified Arborist WC -3718 Member of the Western Chapter of the International Society of Arboriculture Former Hazardous Tree Inspector, San Luis Obispo County Planning & Building Department Certificates in Tree Risk Management and Lawsuit Prevention, Tree Appraising and Writing Technical Reports, UC Riverside Extension — Continuing Education Seminar Bachelors of Science in Forestry and Natural Resource Management, California Polytechnic State University, SLO 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: 3 DATE: 08/17/04 Exhibit C: Tree Protection Plan Tree Removal - TRP 2004-0050 k � 1 Xt. �I : X 1C i . k � 1 Xt. �I : 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc X 1C . � O O I 1 08-17-04 TRP 2004-0050 Alta Vista.PC-SR 2.doc ITEM NUMBER: 4 DATE: 08/17/04 Atascadero Planning Commission Staff Report - Community Development Department Tree Removal Permit TRP 2004-0054 (4110 Traffic Way: Fkiaras) SUBJECT: Request to remove seven (7) Live Oak trees, two of which are over 24 -inches in diameter, in conjunction with the development of a 1,888 square -foot single family residence with an attached 567 square foot garage located at 4110 Traffic Way. Access is proposed off of Seperado Avenue. RECOMMENDATION: Staff recommends: The Planning Commission adopt Resolution PC 2004-0093 to approve the request to remove seven native oak trees subject to the guidelines and mitigation required by the Atascadero Native Tree Ordinance. Situation and Facts: 1. Applicant/Owner: Marilyn Fkiaras, 5304 Elmhurst Street, Ventura, CA 93003 2. Certified Arborist: Chuck Scovell, Scovell Tree Surgery, 3850 Maricopa Road, Atascadero, CA 93422 3. Project Address: 4110 Traffic Way Atascadero, CA 93422 APN 049-033-010 ANALYSIS: On August 3, 2004, the Planning Commission continued the request to remove seven 08-17-04 TRP 2004-0054.PC-SR2.doc ITEM NUMBER: 4 DATE: 08/17/04 (7) native oak trees and requested that the applicant and staff consider site alternatives and review access constraints on Seperado Avenue. Planning and Public Works staff has evaluated the proposed development and access from Seperado Avenue. Staff has determined that access from Traffic Way would result in more tree removals and increased grading due to the topography of the site. The flag portion of the lot contains several native oak trees and 20-30% slopes. The proposed location for the single-family residence contains approximately 11 % slope and includes the use of foundation stem walls to further minimize grading quantities (Attachment B). Public Works has reviewed access issues and improvement requirements for Seperado Avenue and has determined that the project is consistent with City Standards. The City of Atascadero's Tree Ordinance requires that mitigation for native tree removals be implemented as a condition of approval. Staff is recommending that the applicant replant trees, or pay into the tree replacement fund to mitigate the proposed tree removals. The proposed mitigation is shown in the table below. FINDINGS: Pursuant to the Tree Ordinance (Ordinance No. 214), "decisions on native tree removals of 24 -inch dbh-size or larger shall be made by the Planning Commission." In considering any tree removal request, at least one of the below stated following findings must be made. Staff has identified finding #5 as appropriate for the application request. 1) The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an Arborist; 2) The tree is crowded by other healthier native trees, thinning (removal) would promote healthier growth in the trees to remain, as certified by a tree condition report from an Arborist; 08-17-04 TRP 2004-0054.PC-SR2.doc NONDECIDUOUS NATIVE TREE REMOVAL INCHES TYPE CONDITION TREE NUMBER 1. 30 LIVE OAK GOOD 2 2. 36 LIVE OAK GOOD 3 3. 16 LIVE OAK GOOD 4 4. 16 LIVE OAK GOOD 5 5. 18 LIVE OAK GOOD 6 6. 6 LIVE OAK GOOD 7 7. 12 &10 LIVE OAK GOOD 8 TOTAL =144" PLANT 24 FIVE GALLON NATIVE TREES OR PAY $1,200.00 INTO TREE MITIGATION FUND FINDINGS: Pursuant to the Tree Ordinance (Ordinance No. 214), "decisions on native tree removals of 24 -inch dbh-size or larger shall be made by the Planning Commission." In considering any tree removal request, at least one of the below stated following findings must be made. Staff has identified finding #5 as appropriate for the application request. 1) The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an Arborist; 2) The tree is crowded by other healthier native trees, thinning (removal) would promote healthier growth in the trees to remain, as certified by a tree condition report from an Arborist; 08-17-04 TRP 2004-0054.PC-SR2.doc ITEM NUMBER: 4 DATE: 08/17/04 3) The tree is interfering with existing utilities and/or structures, as certified by a report from the Site Planner; 4) The tree is inhibiting sunlight needed for existing and/or proposed active or passive solar heating or cooling, as certified by a report from the Site Planner; 5) The tree is obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal, as certified by a report from the Site Planner and determined by the Community Development Department based on the following factors: • Early consultation with the City; • Consideration of practical design alternatives; • Provision of cost comparisons (from applicant) for practical design alternatives; • If saving the tree eliminates all reasonable uses of the property; or • If savina the tree reauires the removal of more desirable trees. CONCLUSION: The applicant has submitted a Tree Protection Plan with arborist notation. Staff has determined that the trees are obstructing proposed improvements. PREPARED BY: Lisa Wilkinson, Assistant Planner ATTACHMENTS: Attachment 1: Aerial Photo Attachment 2: Letter from Architect Attachment 3: Draft Resolution PC 2004-0093 08-17-04 TRP 2004-0054.PC-SR2.doc ITEM NUMBER: 4 DATE: 08/17/04 Attachment 1: Aerial of 4110 Traffic Way w k r. J , ` i 08-17-04 TRP 2004-0054.PC-SR2.doc Attachment 2: Letter from Architect See following page. ITEM NUMBER: DATE: 08/17/04 08-17-04 TRP 2004-0054.PC-SR2.doc ITEM NUMBER: 4 DATE: 08/17/04 Attachment 3: Draft Resolution PC 2004-0093 Tree Removal - TRP 2004-0054 DRAFT RESOLUTION PC 2004-0093 A RESOLUTION OF THE PLANNING COMMISSION OF ATASCADERO APPROVING A TREE REMOVAL PERMIT TO ALLOW THE REMOVAL OF SEVEN NATIVE OAK TREES LOCATED AT 4110 TRAFFIC WAY. (TRP 2004-0054/Fkiaras) WHEREAS, an application for a Tree Removal Permit has been received from, Marilyn Fkiaras, 5304 Elmhurst Street, Ventura, CA 93003, to allow the removal of seven native trees located at 4110 Traffic Way; and, WHEREAS, the proposed project is located within the Single Family Residential -X land use designation of the City of Atascadero's General Plan Land Use Diagram; and, WHEREAS, the proposed project is located in the Residential Single Family -X (RESF-I) zoning district; and, WHEREAS; the Planning Commission reviewed the proposed Tree Removal application on August 17, 2004 and considered testimony and reports from staff, the applicants, and the public; and, NOW, THEREFORE, the Planning Commission takes the following actions: SECTION 1. Findings for Approval of Tree Removal Permit. The Planning Commission finds as follows: The tree is obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal, as certified by a report from the Site Planner and determined by the Community Development Department based on the following factors: • Early consultation with the City; • Consideration of practical design alternatives; • Provision of cost comparisons (from applicant) for practical design alternatives; • If saving tree eliminates all reasonable uses of the property; or • If saving the tree requires the removal of more desirable trees; and, 08-17-04 TRP 2004-0054.PC-SR2.doc ITEM NUMBER: 4 DATE: 08/17/04 SECTION 2. Approval. The Planning Commission hereby approves Tree Removal Permit 2004-0054 subject to the following Conditions and Exhibits: Exhibit A: Conditions of Approval Exhibit B: Tree Protection Plan On motion by Commissioner , and seconded by Commissioner the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSENT: ( ) ABSTAIN: ( ) CITY OF ATASCADERO, CA Bob Kelley Planning Commission Chairperson Attest: Warren M. Frace Planning Commission Secretary 08-17-04 TRP 2004-0054.PC-SR2.doc ITEM NUMBER: DATE: 08/17/04 Exhibit A: Conditions of Approval Tree Removal - TRP 2004-0054 Conditions of Approval Timing Responsibility Mitigation TRP 2004-0054 /Monitoring Measure PR: Prior to Removal BL: Business License PS: Planning Services BP: Building Permit BS: Building Services TO: Temporary Occupancy FD: Fire Department F0: Final Occupancy PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Planning Services 1. The applicant shall pay $1,200 into the tree fund as PR PS mitigation for the tree removal or plant 24 5 -gallon Live Oak trees, or equivalent. 2. Replacement trees shall be monitored for a 1 -year FO PS period and maintained as specified by a certified arborist to insure the trees become established. Evergreen Native Trees (inches) Totals dbh notes 1 30 -inches 2 36 -inches 3 16 -inches 4 16 -inches 5 18 -inches 6 6 -inches 7 22 -inches 8 Total 144 -inches 144 -inches Mitigation Requirement Tree replacements: 24 five gal trees or equivalent Tree Fund Payment: $ 1,200.00 $ 1,200.00 08-17-04 TRP 2004-0054.PC-SR2.doc ITEM NUMBER: DATE: 08/17/04 Exhibit B: Tree Protection Plan Tree Removal - TRP 2004-0054 08-17-04 TRP 2004-0054.PC-SR2.doc ITEM NUMBER: 5 DATE: 08-17-04 Atascadero Planning Commission Staff Report — Community Development Department Dove Creek Mixed Use Development Zone Text Change 2003-0049; Zone Map Change 2004-0085; Master Plan of Development (CUP 2003-0099); Vesting Tentative Tract Map 2003-0033 (Santa Barbara Road & EI Camino Real / Bermant Development Company) SUBJECT: The proposed project consists of a request to establish a horizontal mixed-use planned development on a 63.3 -acre site with a corresponding Vesting Tentative Tract Map. The development includes a total of 279 residential units comprised of 137 townhomes, 97 courtyard homes, and 45 single-family residences on individual lots with 37.2 acres of open space. The residential units include 70 density bonus units under the State affordable housing provisions and 9 units requested under the City's General Plan Policy 2.1.1 for exceptionally high design quality. The project also includes a master plan for 60,000 square feet of future neighborhood commercial uses on 6.3 -acres at the corner of Santa Barbara Road and EI Camino Real. The site contains 101 native oak trees of which 12 are proposed for removal. RECOMMENDATION: Staff Recommends: 1. Adopt Resolution No. PC 2004-0095 recommending that the City Council certify Proposed Mitigated Negative Declaration 2004-0026 with revised mitigation measures (Exhibit B); and, 2. Adopt Resolution No. PC 2004-0096 recommending that the City Council introduce an ordinance for first reading to change zoning code text for Planned Development #12 (Zone Change 2003-0049) based on findings; and, 3. Adopt Resolution No. PC 2004-0097 recommending that the City Council introduce an ordinance for first reading to approve Zone Change 2004-0085, a zoning map ITEM NUMBER: 5 DATE: 08-17-04 amendment of the project site to Multi Family Residential — 10 / Commercial Retail / Open Space / PD -12 based on findings and subject to Conditions of Approval and Mitigation Monitoring; and, 4. Adopt Resolution No. PC 2004-0098 recommending that the City Council adopt CUP 2003-0099, by resolution to include the Master Plan of Development (Exhibit A) based on findings and subject to Conditions of Approval and Mitigation Monitoring; and 5. Adopt Resolution No. PC 2004-0099 recommending the City Council approve Vesting Tentative Tract Map 2003-0033, based on findings and subject to Conditions of Approval and Mitigation Monitoring. SITUATION AND FACTS: 1. Applicant / Representative: Bermant Development Company, 5383 Hollister Ave., Ste. 150, Santa Barbara, CA 93111. (Phone 964-7200) 2. Project Address: Santa Barbara Road and EI Camino Real, Atascadero, CA 93422 (San Luis Obispo County)APN 045-342-003, 045-381- 010, 045-381-007, 045-381-009, 045-331-002, 045- 331-004, 045-331-008, 045-331-001, 045-342-005, 045-342-004, 045-342-013, 045-342-001, 045-342-008, 045-342-002, 045-352-005. 3. General Plan Designation: (MU) Mixed Use 4. Zoning District: (CR) Commercial Retail / (PD -12) Planned Development #12 5. Site Area: 63.3 acres 6. Existing Use: Vacant Land 7. Environmental Status: Proposed Mitigated Negative Declaration 2004-0026 ITEM NUMBER: 5 DATE: 08-17-04 DISCUSSION: Background On November 19, 2003, the applicant provided a brief overview of the proposed conceptual project followed by a tour of the project site. Although there was no formal consensus, members of the Commission, Council, and the public provided comments to staff and the applicant for consideration. According to the applicant, each comment was carefully considered and where feasible, incorporated into the proposed project. General comments are identified below. 1. Expand Commercial Scope/Scale — Some concern expressed over the reduction in the 300,000 square feet of commercial development anticipated in the General Plan as compared to the 60,000 square feet proposed. Applicant's Response: City Council approved Mitigated Negative Declaration scope on May 11, 2004 based on proposed 60,000 square feet of commercial building within the project description. 2. Timing of Commercial Development — Concern that the commercial development will not be constructed with or after the housing development. Applicant's Response: Staff has discussed the recently developed commercial timing condition required of mixed-use applications with the applicant and the applicant is strongly opposed. The applicants believes that this issue should have been raised when the Council reviewed the project in November 2003, or prior to authorizing the environmental document in early 2004. 3. Project setbacks should meet standard zoning setbacks. Applicant's Response: City Council approved Mitigated Negative Declaration scope on May 11, 2004, based on variety of housing types with varying setbacks within the proposed project description. 4. Parks with play structures should be included. Applicant's Response: Park area designs have been refined with play structures. 5. Traffic improvements require attention along EI Camino Real and Santa Barbara Road. Applicant's Response: Traffic analysis has been prepared with mitigation and street improvements included along the property frontage, including intersection improvements at EI Camino Real and Santa Barbara Road. ITEM NUMBER: 5 DATE: 08-17-04 6. Density bonus for superior design of the town homes should not be taken for granted. Applicant's Response: Town homes have been modified and enhanced to meet the City's anticipation of superior design. On April 13, 2004, City Council adopted a prime commercial sites map that included the proposed 6.31 -acre commercial site within the proposed project area. On May 11, 2004, City Council authorized staff to process the proposed application. Per Council direction, staff has prepared a draft Initial Study and Draft Mitigated Negative Declaration to assess potential environmental impacts related to the proposed project. The draft document and appendix has been provided to the Planning Commission, interested and jurisdictional public agencies, and has been made available to the public for review and comment on June 17, 2004. The project description and environmental analysis is contained within these draft documents. On July 20, 2004, Planning Commission held a public hearing for the proposed project Mitigated Negative Declaration. Comments focused on timing of the commercial development, traffic circulation, and native plant landscaping. Details of the hearing comments are attached in the Planning Commission meeting minutes. Project Definition ITEM NUMBER: 5 DATE: 08-17-04 The proposed project consists of a request to establish a horizontal mixed-use planned development on a 63.3 -acre site with a corresponding Vesting Tentative Tract Map. The development includes 279 residential units (as summarized below), 37.2 acres of open space and a 6.3 -acre site for 60,000 square feet of commercial buildings. Unit Type Quantity Townhomes 137 Courtyard Homes 97 Townhomes 45 Total 279* Note: The residential units include 70 density bonus units under the State affordable housing provisions and 9 units requested under the City's General Plan Policy 2.1.1 for exceptionally high design quality. The project requires: a Planned Development #12 (PD -12) zone text change to allow residential use on the project site; a zoning map change from Commercial Retail to Open Space and RMF -10 zoning districts within the project site (Attachment 7, Exhibit A); a Conditional Use Permit to establish the Master Plan of Development (Attachment 8, Exhibit C); and a Tentative Tract Map for subdivision of the site into residential lots, commercial properties, common area, and open space areas. The proposed project includes review and approval of the Master Plan of Development consistent with the proposed PD -12 including site plan, subdivision tract map, landscape plan, grading and drainage residential architecture, and conceptual architecture and site design features of the proposed future commercial center. All phases of development require appearance review consistent with Planned Development overlay standards. As with all Planned Development projects, the Planning Commission will have the ability to make future amendments to the Master Plan of Development in the future, independent of Council action. Any future modifications to the site plan or architectural design of the commercial center will require the filing of a Conditional Use Permit application for review and approval by the Planning Commission. ITEM NUMBER: 5 DATE: 08-17-04 Surrounding Land Use and Setting: North: High Density Residential (Current entitlement- 84 -unit condominium development) South: Residential East: Public and vacant West: U.S. Highway 101 General Plan The General Plan has designated the project site as Mixed -Use which allows a mixture of commercial, office, and residential uses with a focus on pedestrian orientation and connections between different uses throughout the project area. The General Plan allows for either a horizontal or vertical mixture of uses with the approval of a Planned Development Overlay Zone and an accompanying Master Plan of Development. The General Plan identified the maximum densities for the specific project site as follows: ■ Maximum commercial development: 300,000 square feet ■ Maximum dwelling unit density: 200 units State Law requires jurisdictions to provide a 25% density bonus for projects that provide either 10% of the base density units as deed restricted very -low income units or 20% of the base density units as deed restricted low-income units. The General Plan allows up to a 35% density bonus if this standard is met. Included in the applicant's proposal are 20 very -low income units in accordance with State density bonus requirements resulting in an additional 70 bonus units. In addition, General Plan Policy 2.1.2 allows for an increase in the maximum site density for the exceptionally high design quality throughout the project. The applicant is requesting that this density bonus be granted to allow for an additional 9 townhomes. The project proposal includes the 200 base density units with an additional 79 units through density bonus provisions. ITEM NUMBER: 5 DATE: 08-17-04 City Council Mixed -Use Policy The City's Mixed -Use policies and requirements have been evolving over the time period that the Dove Creek project has been in process. In June 2004, the City Council established the following policies for mixed-use projects: 1. Implement the Taussig Study on residential portion; 2. Require commercial to be constructed before or simultaneously with the residential portion. Commercial permit(s) must be obtained first and the first permit to be finaled in the project shall be the commercial permit(s); and 3. Require at least 50% of the project to be commercial. The commercial component cannot include mini storage or other non -sales tax producing uses including office. These policies apply to new mixed-use project applications requiring General Plan Amendments. Staff is not clear on whether these policies were intended to apply to the Dove Creek project. The Dove Creek project area was given a special "Mixed Use / Planned Development" general plan designation in 2002 that allowed for a mix of commercial and residential land uses to be established with implementation of a village - type design scheme on the site. Staff has discussed the recently developed commercial timing condition required of mixed-use applications with the applicant and the applicant is strongly opposed. The applicants believes that this issue should have been raised when the Council reviewed the project in November 2003, or prior to authorizing the environmental document in early 2004. The applicant has agreed to a condition of approval to complete all site grading, tontage improvements and stub utilities to the commercial site (CUP Condition 31). Staff has prepared the following analysis of the projects consistency with the Council's mixed-use policies: 1. Implement the Taussig Study on residential portion; The project is consistent with the policy requirement to comply with the Taussig Study. 2. Require commercial to be constructed before or simultaneously with the residential portion. Commercial permit(s) must be obtained first and the first permit to be finaled in the project shall be the commercial permit(s). The project is not consistent with this requirement. If the Council chooses to apply this condition to the project then the following condition of approval will need to be added to the project: Tentative Map Condition: Prior to recordation of any final maps, the applicant shall prepare, and the City shall approve, a development agreement that requires building permits for all commercial structures to be issued prior to, or concurrently with the ITEM NUMBER: 5 DATE: 08-17-04 issuance of the first residential building permit and that those permits shall be finaled prior to, or concurrently with the final occupancy of the first residential building permit. 3. Require at least 50% of the project to be commercial. The commercial component cannot include mini -storage or other non sales tax producing uses including office. The project is not consistent with this requirement. Approximately 10% of the site is devoted to commercial development, the remaining 90% is comprised of residential, open space, and recreational land uses. Compliance with this policy would require a complete redesign of the project. The proposed site plan is consistent with the concept plan presented to Council in November 2003. Mini -storage is not a permitted use under the proposed PD -12, however office uses are. The Council could eliminate office as an allowed use under PD -12. Design and Appearance According to the applicant, the project has been designed to meet the standards of the Atascadero Municipal Code and the Appearance Review Manual. As a Planned Development, the Planning Commission must find that the project provides high quality architectural, landscape, and site design to warrant the granting of special development standards. In addition, the applicant is requesting a 15% density bonus for architectural design features that are above and beyond design standards and requirements of the Planned Development Overlay Zone consistent with the City's General Plan Policy 2.1.2. As a result, the Planning Commission is required to make a specific finding (referenced in resolution PC 2004-0098) that all residential aspects of the project meet the intent of the density bonus provisions. The applicant believes the proposed site plan, landscape plan and architecture meets the requirements for density bonus. Staff has added conditions of approval to insure that findings can be made for the requested bonus as analyzed below. As identified in the project description, the project contains three residential types: 1. 137 townhomes, 2. 97 courtyard homes, and 3. 45 single-family residences on individual lots ITEM NUMBER: 5 DATE: 08-17-04 VILLAGE A - VILLAGE D - VILLAGE E- Townhomes Single Family Townhomes 9 '� Homes s, i% +` • t VILLAGE B- �i • Townhomes . VILLAGE CENTER r • VILLAGE D- ��' AGE C- Courtyard Courtyard Homes Homes Each residential product is designed with two similar architectural styles: Traditional and Americana. The Traditional design theme utilizes gridded windows, clapboard siding, bracketed eaves, and craftsman style embellishments. The Americana design theme is a minimal traditional style architecture which utilizes a stucco exterior finish and wood brackets at the eaves with gridded window banding. All trash storage, recycle storage, and air conditioning units will be screened from view behind fenced or landscaped enclosures (CUP Condition 22). Single Family Homes: Village D u" Village D is comprised of 45 single-family homes with 3 floor plan alternatives. Each streetscape includes a combination of the 3 floor plans with the two proposed architectural styles. Plan A is a single level home and plans B and C are designed as 2 - story residences. Home sizes range from 1,600 square feet to 3,200 square feet exclusive of the garages. The entries of plans A and B are accentuated with porch ITEM NUMBER: 5 DATE: 08-17-04 elements. Plan C includes a covered entry area with the dining area extending forward to minimize the appearance of the garage. The Traditional residences include clapboard siding on all four elevations with shingle accents at the roof gable. The Americana residences include a stucco exterior finish with similar architectural features to the Traditional themed models. Roof forms are varied for each model and architectural style. Courtyard Homes: Village C and D Ol VIEW FROM STREET 03 VIEW FROM AUTOCOURT The courtyard homes consist of clusters of 6 homes providing for a traditional neighborhood design appearance along the street frontage. The frontage units are oriented towards the street with individual garages and driveways. A shared center driveway provides access to the 4 rear units. Each unit is on an individual lot with the rear 4 units in a zero lot line configuration. Six unique floor plans are proposed allowing for each unit within a cluster to have a modified design appearance. Architectural styles alternate between the Traditional and Americana Design motif. Each unit is designed with an entry porch and the rear units are designed to define the terminus of the shared driveway court. ITEM NUMBER: 5 DATE: 08-17-04 Townhome Neighborhoods: Village A, B, and E The townhome villages consist of 4- and 5-plexes designed to include the two architectural design motifs. Both the Americana and Traditional designs include a combination of stucco and clapboard siding along the exterior of the units. All garages are oriented to the main street frontage with entry to the units located between the garage bays. The Traditional units include window shutter accents on the street facing elevation and incorporate brick masonry column bases into the entry porch features. The Americana units include window planters as accent features, and provide stucco portico entries with stucco trim banding. Roof forms vary slightly between the two fagade treatments. Commercial Retail: Village Center ilk`il1-1-7~ j •q�•���1�•_ r�l�_U■►.-SII �,:-�. Vii_ i; ; qi2- - - =7 - -- The proposal includes 60,000 square feet of future commercial retail space located on the 6.3 -acre corner of Santa Barbara Road and EI Camino Real. The applicant is proposing conceptual site plan and architectural elevations as part of the Master Plan of ITEM NUMBER: 5 DATE: 08-17-04 Development. Based on the conceptual design proposal, the commercial center includes 6 retail -oriented buildings with the potential for a 26,500 square foot anchor tenant at the corner of Santa Barbara Road and EI Camino Real. The architecture includes a mixture of the Traditional and Americana design consistent with the proposed residential neighborhoods. Craftsman style columns and clapboard siding are integrated with stucco arches alluding to the residential portion of the project. Staff has conditioned that the center accentuate the more traditional design theme by omitting the stucco archways (Condition MPD 40). Density Bonus for Superior Quality Architectural Design: The applicant is requesting a 15% density bonus for superior quality architectural design, resulting in the addition of 9 additional units to the project. Planning Commission must find that the project exceeds the architectural design quality standards required by the Planned Development Overlay process. It is staff's opinion that the project meets this standard with CUP conditions of approval 44-58 applied to the project. Parkland Reauirements: The City requires the dedication of 5 acres of parkland for every 1,000 residents. Due to its proximity to Paloma Creek Park, the on-site provision of public access to the proposed open space, and the provision of on-site pocket parks, no large active public parkland is proposed on site. The project will satisfy the parkland requirement through payment of in -lieu fees. As proposed, the project includes open space, waling and bicycle trails, and multiple tot lots, as discussed below, and there may be Quimby fee credits granted for such site amenities. Open Space Amenities / Project Landscaping The project includes 37.2 acres of landscaping and natural wetlands and open space areas. A pedestrian circulation network is provided throughout the site which includes trails along the riparian corridors, sidewalks, dedicated pedestrian creek crossings, and shared pathways connecting common open space areas. A pocket tot lot in Villages A, C, and E, and a common park amenity in Village D are included in the plan. There are several engineered drainage detention basins incorporated into open space areas throughout the project site that will be constructed and landscaped to appear as passive and active open space areas. The project also includes decorative entry monument signs located at the main EI Camino Real and Santa Barbara Road entrances, and a landscaped roundabout feature located at the intersection of the two main entrances. ITEM NUMBER: 5 DATE: 08-17-04 The proposed project is adjacent to U.S. Highway 101 and is required to install and maintain landscaping along the highway frontage along and within the Cal Trans right- of-way. The applicant is proposing a combination of dense screen trees, large shrubs, and large evergreen trees consistent with Cal Trans standards (CUP Condition 30). Within the residential areas, landscaping is included for private front yards and shall be installed prior to occupancy of the units (CUP Condition 22). Private back yards will be landscaped by the individual property owners. Landscape maintenance of each private lot will be the responsibility of the individual property owner. Common area landscaping, gate/entry landscaping features, and fencing are included in the project. Street trees are proposed to shade paved areas and pedestrian pathways, reduce urban heat buildup, improve air quality, and provide visual unity to the streetscape. Street trees shall be installed prior to occupancy of the units (CUP Condition 22). Entry streets include 9 -foot wide medians which include shade trees and low-level landscaping. Due to the on-site topography and the proximity to EI Camino Real and Highway 101, the use of sound attenuation walls is required. A condition of approval has been included to design such walls to match or compliment the texture and color of the existing or proposed landscape (CUP Condition 28). Along EI Camino Real, sound walls would be designed to compliment the architecture of the project and would be designed as an integrated project feature, consistent with the Schematic Fencing Plan (Attachment 8, Exhibit C). ITEM NUMBER: 5 DATE: 08-17-04 All project landscaping is detailed in the Master Plan of Development Schematic Landscape Plan. The project site and landscaping has been well designed and only minor conditions of approval have been included regarding landscape materials and the exterior fence treatment along the site perimeter and entrance (CUP Conditions 11, 22, and 33). Native Tree Mitigation/Preservation The entire site area contains 101 oak trees. Project construction is estimated to require the removal of 11 oak trees under the provisions of the Native Tree Ordinance, 10 of which are located within the street frontage right-of-way. The proposed tree mitigation is consistent with the City's Native Tree Ordinance. Avoided and impacted oak trees shall be protected and preserved, per the Tree Protection and Preservation Plan. In order to approve the requested removal, the Planning Commission must find that the trees are obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal. Under the City's tree mitigation payment, the removal of 11 trees (216 total inches dbh) would require the applicant to pay $6,800. This figure may be adjusted to credit the applicant for any proposed five -gallon or greater size native trees planted on site, as shown below. Evergreen Native Trees (inches) 1 2 3 4 5 6 7 8 9 10 11 Total dbh notes 23 -inches 23 -inches Mitigation Requirement req'd tree replacements: Proposed Replanting 8 five gal trees 0 five gal trees Deciduous Native Trees (inches) I Totals 1 2 3 4 5 6 7 8 9 10 11 Total dbh notes 26 -inches 35 -inches 16 -inches 33 -inches 29 -inches 22 -inches 15 -inches 12 -inches 3 -inches 2 -inches 193 -inches req'd tree replacements Proposed Replanting 128 five gal trees 0 five gal trees 216 -inches 136 five gal trees 0 five gal trees Remaining Mitigation 8 five gal trees Remaining Mitigation 128 five gal trees 1 136 five gal trees Tree Fund Payment: $ 383.33 Tree Fund Payment: $ 6,416.67 ITEM NUMBER: 5 DATE: 08-17-04 A native tree protection and a preservation plan is included for trees proposed for retention. Prior to permit issuance, the Tree Protection Plan shall be prepared and implemented by a certified arborist and approved by Planning Services. Tree protection shall be in place prior to the issuance of any construction permits and the arborist shall be under contract to monitor tree protection (CUP Conditions 32, 34, and 35). Subdivision Improvements Site Plan, Circulation, Parking The Master Plan of Development includes a circulation plan identifying five street types within the plan area. Street sections are depicted in Master Plan of Development Sheet C1.4 and as described below: 1. Main Entrance Street Section: Providing access off of Santa Barbara Road and EI Camino Real. The main entrance roads include three travel lanes (one entrance and two exit), a center median, concrete curb and gutter, restricted parking, a detached sidewalk with parkway, and street trees. 2. Residential Entrance Street Section: Providing access to village D and E off of EI Camino Real. The entrance street to Village D and E includes two travel lanes, a center median, concrete curb and gutter, a detached sidewalk with parkway, restricted parking, and street trees. 3. Residential Street Section (36'46' ROW): Village D and portions of Village C Local neighborhood streets include two travel lanes, street parking on both sides, with sidewalk and parkway where specified by the Master Plan of Development. 4. Residential Street Section (32'42' ROW): Village B, C, and D Local neighborhood streets include two travel lanes, parking on one side, and sidewalks where specified by the Master Plan of Development. 5. Residential Street Section (24'34' ROW): Townhome shared drives The shared driveway/street serving the townhomes includes two travel lanes and a sidewalk with parkway where specified in the Master Plan of Development. ITEM NUMBER: 5 DATE: 08-17-04 The project also includes two emergency access roads: one connecting Villages A, B, and C to Villages D and E, and one exiting to San Diego Way adjacent to Village E. Sidewalks are included on the EI Camino Real and Santa Barbara Road frontages to complete the pedestrian circulation network and provide connections to the proposed on-site open space trail system, as identified in the project circulation plan. A Traffic Impact Study was produced for this project by Omni -Means. In the study, there are recommended mitigation measures. Listed below are conditions to implement the mitigation measures: A. Santa Barbara Road/EI Camino Real: Install Traffic Signal This is required to be installed prior to the first unit occupied. The construction costs for the signal will be counted as credit toward the Traffic Impact Fee. B. Santa Barbara Road/US 101 Interchange The study found that the following Improvements are required for the interchange. Also listed is the percent "fair share" that this project is responsible for the improvement. These are to be installed prior to the first unit being occupied or the first commercial building opened. These are improvements that are not identified as needed improvements in the City of Atascadero Circulation Element and the Growth Mitigation Program. Therefore, the growth mitigation fee does not cover the improvements. The developer may record a reimbursement agreement against future trip generation facilities to recoup a portion of the cost of construction. ❑ Santa Barbara Road/US 101 SB Ramps: Install Traffic Signal (39.3%) ❑ Santa Barbara Road/US 101 NB Ramps: Install Traffic Signal (52.4%) The above two signals shall be interconnected. C. Viejo Camino/EI Camino Real: Install Traffic Signal (33.4%) D. San Diego Way/EI Camino Real: Install Traffic Signal (31.4%) The improvements listed in C. and D. are improvements that are not identified as needed improvements in the City of Atascadero Circulation Element and the Growth Mitigation Program. Therefore, the growth mitigation fee does not cover the improvements. The developer is required to submit an engineer's estimate for the cost of construction of the improvements. The developer shall pay the percent "fair share" of the engineer's estimates. These funds will be placed in an account for the improvements. The developer may pay the amount incrementally with each building permit. ITEM NUMBER: 5 DATE: 08-17-04 E. Santa Barbara Road between EI Camino Real and US 101. Construct two- lane road with left turn channelization, bike lanes and a pedestrian sidewalk. F. EI Camino Real between Santa Barbara Road and project north boundary. Construct two southbound and one northbound travel lanes, bike lanes in both directions, median and left turn channelization. All public improvements shall be constructed in conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer. Interior Infrastructure The Master Plan of Development describes at a conceptual level, how and where services will be extended to serve the project site. All infrastructure improvements to serve the site shall be financed and installed by the developer consistent with the Master Plan of Development Preliminary Utility Plan (Sheet C1.5) which provide a schematic plan for the routing and location of facilities within the project area. Improvement Plans will determine the exact sizing and location of facilities, subject to staff review and approval (Conditions 73 — 90). Site Drainaae The On-site storm water drainage system has been designed by Cannon Associates, and support calculations have been provided in a drainage report. The project is design to allow all existing upstream flows to pass through the site. The increase in onsite flow due to the construction of impervious surfaces will be mitigated with detention basins. These basins will detain the flow of up to a 100 -year event and release it at a post construction historic rate. There will be no increase in the volume of flow downstream. The basins will also act as a natural filter to clean the silts and pollution out of the storm water. This project proposes to fill in the FEMA 100 -year floodplain. A standard Letter of Map Revision will be required to be submitted and approved by the City and FEMA. The floodway widths will be created such that the rise of the 100 -year floodwater elevation is no more than one foot on the interior of the site and there is no increase at the EI Camino Real culverts. Water The project can be served by the Atascadero Mutual Water Company (AMWC). The proposed project area will utilize four existing water mains as its points of connection to the existing Atascadero Mutual Water Company system. Two points of connection will ITEM NUMBER: 5 DATE: 08-17-04 occur in Santa Barbara Road, one connection will be made in EI Camino Real, and one will be made in San Diego Way. The connection point in San Diego Way will be upgraded by the developer to AMWC standards. Wastewater The City of Atascadero will provide sanitary sewer service including collection, transmission and treatment for the project area. Development with the project site will require connection to the City's planned sewer system mainline extension included in the City's Sewer Master Plan. The Woodridge Development has assumed the responsibility of installing the mainline extension from the Wastewater Treatment Plant to EI Camino Real fronting this project. The applicant will be required to reimburse the City Woodridge Development their fair share of the sewer extension costs. Fiscal Impact Analysis General Plan Pol General Plan Policy 15.3.8 states, "All residential projects of 100 or more dwellings shall be required to prepare a "fiscal impact report" prior to any discretionary approvals. The fiscal impact report shall analyze all revenues, service costs and facilities costs associated with a project. The City shall require the establishment of facilities districts and/or maintenance districts to cover revenue short falls on a project". Fiscal Impact Report In 2003, the City of Atascadero hired David Taussig and Associates to prepare a fiscal model to satisfy the General Plan requirement for both the Woodlands (Woodridge) and Dove Creek projects. The model was developed with comprehensive input for the Administrative Services, Public Works, Police and Fire Departments to capture the actual cost of providing maintenance and emergency services to new development. The model analyzed the costs associated with road maintenance, storm drainage maintenance, landscape maintenance, lighting maintenance, open space maintenance, recreational facility maintenance, Police emergency services, Fire emergency services and community park maintenance. The model results demonstrated that revenue from new residential development including property tax revenues; vehicle licensing fees, sales taxes, and other revenues are insufficient to cover the maintenance and emergency services costs of new development. Based on the revenue projections from the Woodlands project and Dove Creek, the City has developed standard conditions of approval for new development projects that require the cost of maintenance and emergency services to be funded by the project through a combination of road assessment districts, landscape and lighting districts and ITEM NUMBER: 5 DATE: 08-17-04 community facilities districts. The creation of these assessment districts would mitigate any negative fiscal impacts of a project consistent with General Plan Policy 15.3.8. The Dove Creek project is somewhat different than the Woodlands project regarding the maintenance of onsite roads and common areas. While the Woodlands project will create both road and landscape maintenance districts, Dove Creek proposes to create a homeowners association (HOA) to fund the maintenance of all on-site facilities. The creation of an HOA has the same effect as the maintenance districts to mitigate maintenance costs. The HOA will not fund emergency service costs related to the project, therefore the project will be required to participate in the community facilities district (CFD). The CFD will result in an annual property tax levy of $440 per unit to fund additional police and fire personnel beyond the City's current staffing levels. The City has retained the firm of Muni Financial to setup the CFD, road maintenance and landscape and lighting districts that new projects will be annexed into. The formation of these districts is scheduled to be complete in the Fall of 2004. The Dove Creek property will be required to annex into the CFD prior to recordation of the Final Map. The following conditions of approval are recommended for the Master Plan of Development and Tentative Tract Map to mitigate the fiscal impacts of the project on the City of Atascadero. ■ The emergency services and facility maintenance costs listed below shall be 100% funded by the project in perpetuity. The service and maintenance cost shall be funded through a community facilities district established by the developer subject to City approval. The funding mechanism must be in place prior to or concurrently with acceptance of the any final maps. The funding mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director, prior to acceptance of any final map. The administration of the above mentioned funds shall be by the City. a) All Atascadero Police Department service costs to the project. b) All Atascadero Fire Department service costs to the project. c) Off-site common City of Atascadero park facilities maintenance service costs related to the project. ■ All tract maintenance costs listed below shall be 100% funded by the project in perpetuity. The service and maintenance cost shall be funded through a Home Owners Association established by the developer subject to City approval. The Home Owners Association must be in place prior to, or concurrently with acceptance of any final maps. The Home Owners Association shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any Final Map. The administration of the above mentioned funds, and the coordination and performance of maintenance activities, shall be the responsibility of the Home Owners Association. ITEM NUMBER: 5 DATE: 08-17-04 a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access roads, emergency access gates, and sewer mains within the project. b) All parks, trails, recreational facilities and like facilities. c) All open space and native tree preservation areas. d) All drainage facilities and detention basins. e) All creeks, flood plains, floodways, wetlands, and riparian habitat areas. f) All common landscaping areas, street trees, medians, parkway planters, manufactured slopes outside private yards, and other similar facilities. g) All frontage landscaping along arterial streets and U.S. Highway 101. Proposed Planned Development Overlay Zone #12 Text Change As previously mentioned, the proposed project requires a change in the exiting PD -12 overlay district text of the project site. The revised text will allow the proposed development and uses, as conditioned on the subject site. Based on the General Plan requirements and proposed project description, staff has prepared the following proposed standards for PD -12. Adoption of the Planned Development Overlay Zone text change is required for the project to proceed. The Commission could make recommendations to the Council to modify the proposed PD -12 text. 9-3.657 Planned Development Overlay Zone No. 12: (PD -12). 9-3.657. Establishment of Planned Development Overlay Zone No. 12 (PD 12)L Planned Development Overlay Zone No. 12 is established as shown on the Official Zoning Maps (Section 9-1.102). A Planned Development Overlay Zone No. 12 is established on parcels APNs 045-342-003, 045-381-010, 045-381-007, 045-381-009, 045-331-002, 045-331-004, 045-331-008, 045-331-001, 045-342-005, 045-342-004, 045-342-013, 045- 342-001, 045-342-008, 045-342-002, 045-352-005 with a combined gross acreage of 63.3 acres. The maximum residential density within the planned development shall not exceed 279 residential units. A minimum of 6.31 acres of commercial retail use and 27.7 acres of common and natural open space on the 63.3 -acre project site shall be provided. The development standards contained within the Master Plan of Development Document (CUP 2003-0099), as conditioned shall be applied to all future development within the project area, and as follows: ITEM NUMBER DATE: 08-17-04 (a) The Vesting Tentative Tract Map TTM 2003-0033 and any subsequent amendments for the site shall be consistent with CUP 2003-0099. All construction and development shall conform to the approved Master Plan of Development, as conditioned. (b) No subsequent tentative parcel or tract map shall be approved unless found to be consistent with the approved Master Plan of Development. (c) The commercial area, residential dwelling units, landscaping, walls and fencing shall be subject to review under the City's Appearance Review requirements consistent with the approved Master Plan of Development. (d) Building setbacks lot sizes, landscape area, and lot coverage shall be as identified within the approved Master Plan of Development. (e) Alterations or additions to established dwelling units shall be subject to the density and development standards of the Master Plan of Development. (f) Subsequent amendments to the Master Plan of Development shall be approved by Planning Commission Resolution. ITEM NUMBER: 5 DATE: 08-17-04 (g) The commercial center will retain the Commercial Retail zoning district designation. The following allowable uses are proposed for this district within the PD -12 overlay zone: (a) Broadcast studios: (b) Building_ materials and hardware (indoor only (c) Food and beverage retail sales: (b) Furniture, home furnishings and equipment: (c) General merchandise stores: (d) Mail order and vending: (e) Temporary or seasonal sales (f) Financial services: (g) Health care services: (h) Offices: (i) Small scale manufacturing (i) Temporary offices (k) Personal services: (1) Light repair services: (m) Eating and drinking places: (n) Membership organizations: (o) Horticultural specialties (p) Schools --business and vocational (g) Business support services, where all areas of use are located within a building (r) Farm equipment and supplies (indoor only): (s) Fuel and ice dealers (t) Hotels and motels: (u) Skilled nursing facility (vy) Bed and breakfast: (w) Funeral services: (x) Schools (v) Utility service center: (z) Libraries and museums: (aa) Temporary events (h) All residential and Open Space use shall be consistent with the requirements of the underlying zoning district except as allowed by the Master Plan of Development. If the above text change is established, the project as conditioned would be consistent with those standards. The proposed uses, residential unit types, lot sizes and development standards are described within the Master Plan of Development document, dated July 9, 2004, and as conditioned. The PD -12 Zoning District incorporates by reference the Master Plan of Development and Vesting Tentative Tract Map which documents the proposed architectural styles, lot sizes, lot coverage, setbacks, building envelopes, landscaping, project amenities, and wetland protection and enhancement for the project. Subsequent amendments to the Master Plan of Development will be made by the Planning Commission resolution independent of Council action. ITEM NUMBER: 5 DATE: 08-17-04 Project Benefits One of the required findings for a Planned Development is that the project offer certain redeeming features to compensate for the requested Zone Change. The project will have a number of "redeeming features" which include the following: 1) clustering of residential development; 2) variety of unit types; 3) preservation of sensitive open space and native tree preservation; 4) upgraded architectural and landscape features (as conditioned); 5) publicly accessible trails system; 6) pedestrian connections throughout the project; 7) comprehensive native re -vegetation landscape plan; and 8) inclusion of affordable and workforce housing. Inclusionary and Workforce Housing The following table identifies the City's Interim Inclusionary Housing Policy, adopted by the City Council on June 24, 2003. As bolded and underlined within the table, the proposal to meet the state 35% density bonus exempts the project from additional inclusionary housing requirements. The project is conditioned to comply with the Council's Workforce Housing policy in which 50% of the residential units in each project phase be offered to the local population and workforce (Condition MPD 24). Inclusionary Section Interim Policy A. Project Requirements 1. All residential projects that require legislative approval are subject to the inclusionary requirement as follows: o Projects of 1-10 units: pay in -lieu fee or build units. o Projects of 11 or more units must build units or receive a Council approval to pay in -lieu fees. B. Percent Affordable 1. The percentage of units within a project that must be affordable shall be 20%. 2. The distribution of affordable units in single family land use areas shall be as follows: 0 100% Moderate 3. The distribution of affordable units in multi- family and mixed use commercial land use areas shall be as follows: 0 20% Very Low Income 0 37% Low Income 0 43% Moderate 4. In -lieu fees shall be collected for all fractional units up to 0.499 units, fractional units of 0.50 and greater shall be counted as 1.0 units. 5. All inclusionary units shall be deed restricted for a period of 30 years. C. Exceptions 1. Projects that do not require a legislative approval from the City shall not be subject in the interim policy. 2. Projects that qualify for the State density bonus are exempt from additional ITEM NUMBER: 5 DATE: 08-17-04 Tentative Tract Map A 154 -lot Vesting Tentative Tract Map is proposed as part of the project consistent with the proposed Master Plan of Development and PD -12 Zone Change. The proposed Tract Map does not include the townhomes at this time. The Tract Map has been conditioned by staff and the City Engineer to meet all City standards including on- and off-site street improvements. The applicant will be required to record CC&R's with the map that will include maintenance and access of common areas (Condition 61). General Plan Consistency The project applicant has prepared a Master Plan of Development for City Council approval per the General Plan requirement for the project site. The proposed 279 dwelling units include 70 density bonus units under the State affordable housing provisions and 9 units requested under the City's General Plan Policy 2.1.1 for exceptionally high design quality. The project site is within the General Plan Mixed -Use inclusionary housing requirements. 3. Second units are exempt from the inclusionary requirement. 4. D. Affordable Housing Standards 1. The exterior design and quality standards for affordable units shall be comparable to those of market rate units. Affordable units may be of a smaller size and utilize less expensive interior finishes. 2. Affordable units shall be distributed throughout a project site and not concentrated in one location. 3. Inclusionary units shall be built concurrently with market rate units. A construction timeline shall be approved by the City Council prior to construction. E. In -Lieu Fees 1. In -lieu fees for units and fractions of units shall be based on 2.50% of the valuation of the market rate unit. F. Alternatives 1. The developer may request and the City Council may approve any of the following alternatives to on-site construction or payment of in -lieu fees for inclusionary units: o Off-site construction o Land dedication o Combinations of construction, fees and land dedications. G. Incentives 1. As an incentive to provide affordable units, all inclusionary units shall be treated as density bonus units that are not counted as part of the maximum density entitlement of a site. Tentative Tract Map A 154 -lot Vesting Tentative Tract Map is proposed as part of the project consistent with the proposed Master Plan of Development and PD -12 Zone Change. The proposed Tract Map does not include the townhomes at this time. The Tract Map has been conditioned by staff and the City Engineer to meet all City standards including on- and off-site street improvements. The applicant will be required to record CC&R's with the map that will include maintenance and access of common areas (Condition 61). General Plan Consistency The project applicant has prepared a Master Plan of Development for City Council approval per the General Plan requirement for the project site. The proposed 279 dwelling units include 70 density bonus units under the State affordable housing provisions and 9 units requested under the City's General Plan Policy 2.1.1 for exceptionally high design quality. The project site is within the General Plan Mixed -Use ITEM NUMBER: 5 DATE: 08-17-04 land use designation, which allows horizontal mixed-use developments with the approval of a Master Plan of Development and a Planned Development Overlay zone. The proposed project is consistent with the following General Plan Land Use and Housing Element Policies: Land Use Policy 1.1: "Preserve the rural atmosphere of the community and assure "elbow room" in areas designed for lower density development by guiding new development into the Urban Core to conform to the historic Colony land use patterns of the City and to respect the natural environment, hillside area and existing neighborhoods". ■ Program 10: Require the comprehensive master planning of large development projects to minimize environmental impacts and maximize community compatibility. Projects identified in Table 11-5 and Figure 11-4 shall be required to have an approved Master Plan of Development prior to any site development. The Master Plan of Development may be approved in the form of Conditional Use Permit, Planned Development, or Specific Plan. Land Use Policy 2.1.2: "Develop standards and procedures to allow the Planning Commission to grant up to a 15% density bonus for attached multi -family project of exceptionally high design quality through the Conditional Use Permit process". Housing Element Policy 4.3: "Encourage attractive architecture and ste landscaping that respect terrain and native trees. " Housing Element Policy 1.1: "Encourage steady production of new housing, including mixed-use projects in commercial land use areas, to meet the needs of all household types in the City". Land Use Policy 6.1: "Ensure that development does not degrade scenic and sensitive areas, including historic sites, creeks, riparian corridors, wetlands, woodlands, hillsides, and other valuable habitats." Land Use Policy 8.1: "Ensure that development along Atascadero Creek, Graves Creek, the Salinas River, blue line creeks, natural springs, lakes or other riparian areas does not interrupt natural flows or adversely impact riparian ecosystems and water quality." Land Use Policy 15.3.8: "All residential projects of 100 or more dwellings shall be required to prepare a Fiscal Impact Report prior to any discretionary approvals. The Fiscal Impact Report shall analyze all revenues, service costs, and facilities costs associated with a project. The City shall require the establishment of Facilities Districts and/or Maintenance Districts to cover revenue short falls on a project". ITEM NUMBER: 5 DATE: 08-17-04 In staff's opinion the project is consistent with the goals and policies of the Land Use Element and the Housing Element, with sensitive dte design, inclusion of affordable housing units, and the proposed designation and improvement of 27.7 acres of dedicated open space. As conditioned, the project incorporates clustered site planning, quality architectural design, open space and landscape amenities, tree preservation and habitat restoration, a Home Owner's Association for on-site improvements, and cost recovery for City services. Findings As specified in the City's General Plan and Zoning Ordinance, the following findings for the proposed Zone Text Change, Zone Map Change, Master Plan of Development adoption, and native tree removal must be made in order to recommend approval the proposed project. PD -12 Overlav Zone Text Chan 1. Modification of development standards or processing requirements is warranted to promote orderly and harmonious development. 2. Modification of development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area. 3. Benefits derived from the overlay zone cannot be reasonably achieved through existing development standards or processing requirements. Zone Map Change As specified in the City's General Plan and Zoning Ordinance, the following specific findings for the proposed Zone Change shall be made in order to approve the proposed project: 1. The proposed zone change is in conformance with the adopted General Plan Goals, Policies, and Programs and the overall intent of the General Plan. 2. The proposed zone change is compatible with existing development, neighborhoods and the environment. 3. The proposed zone change will not create any new significant and unavoidable impacts to traffic, infrastructure, or public service impacts. 4. The proposed zone change is consistent with the project -specific Mitigated Negative Declaration. ITEM NUMBER: 5 DATE: 08-17-04 Conditional Use Permit (Master Plan of Development) A Master Plan of Development is required for the Planned Development in the form of a Conditional Use Permit. The Dove Creek Master Plan of Development sets development standards and site design standards related to architectural design, site design, landscape, signage, and specific standards of the zoning ordinance. The Planning Commission must make the following five findings to recommend approval of the proposed Master Plan of Development: 1. The proposed project or use is consistent with the General Plan and the City's Appearance Review Manual. Staff Comment: The use is consistent with the General Commercial designation of the General Plan and General Plan Land Use Element Policy 1.1, 2.1.2, 6.1, 8.1, 15.3.8 and Housing Element Policy 4.3 and 1.1. 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including the Planned Development Ordinance. Staff Comment: As conditioned, the project satisfies all conditional use permit and Planned Development zoning code provisions. 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use. Staff Comment: The proposed mixed-use development will not be detrimental to the general public or working persons health, safety, or welfare. 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development. Staff Comment: The project has been designed to be consistent with the existing neighborhood character, with specific design features along adjacent U.S. Highway 101, EI Camino Real, and Santa Barbara Road. The project has been designed to provide orderly circulation patterns throughout the site and at each entrance and exit. The proposed development is consistent with the City's "Smart Growth Principles", identified as orderly and efficient infill development concentrated along the EI Camino Real corridor. The project site is within the City's Mixed -Use designation, which allows horizontal mixed-use developments with the approval of a Master Plan of Development and a Planned Development Overlay zone. ITEM NUMBER: 5 DATE: 08-17-04 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. Staff Comment: The proposed project and use is consistent with the traffic projections and road improvements anticipated within the General Plan and as proposed by the applicant. Based on staff's analysis in the preceding sections, it appears that all of the required findings for approval of a Master Plan of Development (Conditional Use Permit) can be made. As conditioned, changes to the Master Plan of Development can be made by the Planning Commission in the future without Council action. Tree Removals The tree is obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal, as certified by a report from the Site Planner and determined by the Community Development Department based on the following factors: ■ Early consultation with the City; ■ Consideration of practical design alternatives; ■ Provision of cost comparisons (from applicant) for practical design alternatives; ■ If saving tree eliminates all reasonable uses of the property; or ■ If saving the tree requires the removal of more desirable trees. In staff's opinion, developing the property with a clustered subdivision providing dedicated open space and native tree preservation under a Planned Development Overlay Zone designation is consistent with the General Plan and compatible with the surrounding land uses. In addition, the project is consistent with the goals and policies of the Land Use Element, Housing Element and adopted EIR and mitigation -monitoring program. The project incorporates appearance review of architectural design, materials, street trees, and landscaping to retain the rural residential atmosphere. The project incorporates architectural themes into the site and building design, as conditioned. Native trees have been preserved where feasible and required conditions and mitigation measures have been appropriately incorporated into the project. As analyzed within the project Initial Study and Draft Mitigated Negative Declaration and tiered under the General Plan Environmental Impact Report, the proposed Master Plan of Development would have no significant environmental impacts and will not be detrimental to the general public or working persons health, safety, or welfare. Based on staff's analysis in the preceding sections, it appears that all of the required findings for project approval can be made. ITEM NUMBER: 5 DATE: 08-17-04 Proposed Environmental Determination Under contract to the City, Padre and Associates has prepared an Environmental Impact Assessment in the form of a Draft Mitigated Negative Declaration, tiered from the City of Atascadero General Plan Environmental Impact Report (EIR). The document was circulated to the State Clearinghouse, public agencies and interested members of the public on June 17, 2004. The technical documentation provided by the applicant and analyzed by staff has been incorporated into the environmental documentation. The environmental analysis identifies concerns regarding potential impacts to aesthetics, air quality, biological resource including native tree protection, cultural resources, geology & soils, hydrology & water quality, land use and planning, noise, public services, recreation, transportation/traffic, and utility systems. Mitigation measures pertaining to these resources are included. During the public review period, a comment was received regarding the use of tierring under CEQA for the proposed project. It is the opinion of the City Attorney that the proposed Mitigated Negative Declaration, tiered under the City's General Plan EIR, may rely on the partial exemption provided for in Public Resources Code section 21083.3 and the State CEQA Guidelines section 15183 for projects that are consistent with General Plans (Public Resources Code section 21083.3 with respect to impacts that are not peculiar to the Project). It is the opinion of staff that combination of design features incorporated into the proposed project, mitigation measures, and conditions of approval will reduce any potential environmental impacts to a level of insignificance. Mitigation Measures CUL -1, GEO-2, and GEO-3 have been updated based on staff review of public comments. Staff is also recommending revisions to mitigation measures BIO -6 and PBS -1. A table of recommended mitigation measures is included in Resolution 2004-0095, Exhibit B. Staff is recommending the Commission recommend that the City Council certify Proposed Mitigated Negative Declaration 2004-0026 with amended Mitigation Measures. CONCLUSION The proposed project is generally consistent with the General Plan and Atascadero Municipal Code, as analyzed within this staff report. It is staff's opinion that the proposed project, as conditioned allows the Planning Commission to make all of the required findings to recommend approval to the City Council. In staff's opinion, developing the property with a clustered subdivision, commercial development, open space provisions and native tree preservation under a Planned Development Overlay Zone designation is generally compatible with the surrounding land uses, and generally consistent with the General Plan Land Use Element and ITEM NUMBER: 5 DATE: 08-17-04 Housing Elements. The project incorporates appearance review of architectural design, materials, street trees, and landscaping to meet the requirement of the Municipal Code and in justification of the requested exceptionally high design quality density bonus. As analyzed within the project Initial Study and Draft Mitigated Negative Declaration and tiered under the General Plan Environmental Impact Report, the proposed project, as conditioned, would have no significant environmental impacts and will not be detrimental to the general public or working persons health, safety, or welfare. Based on staff's analysis in the preceding sections, it appears that all of the required findings for project approval can be made. ALTERNATIVES 1. The Commission may recommend modifications to the project and/or conditions of approval for the project to the City Council. 2. The Commission may determine that more information is needed on some aspect of the project and may refer the item back to the applicant and staff to develop the additional information. The Commission should clearly state the type of information that is required and move to continue the item to a future date. 3. The Commission may recommend the City Council deny the project. The parcel would retain its current PD -12 and commercial zoning with mixed-use land use designation. The Commission should specify the reasons for denial of the project and make an associated finding with such action. PREPARED BY: Steve McHarris, Deputy Community Development Director ATTACHMENTS: Attachment 1: Location Map, Zoning and General Plan Attachment 2: Aerial Site Photograph Attachment 3: Traffic Impact Study Attachment 4: Draft Mitigated Negative Declaration and Initial Study Attachment 5: Draft Resolution PC 2004-0095 Attachment 6: Draft Resolution PC 2004-0096 Attachment 7: Draft Resolution PC 2004-0097 Attachment 8: Draft Resolution PC 2004-0098 Attachment 9: Draft Resolution PC 2004-0099 ITEM NUMBER: 5 DATE: 08-17-04 Attachment 1: Location Map Dove Creek �. Proiect • y t Existing Designations: -General Plan: Mixed -Use -Zoning District: Commercial Retail / PD -12 Proposed Designations: -General Plan: Mixed -Use -Zoning District: Commercial Retail, Residential Multi- family — 10, Open Space, Planned Development #12 ITEM NUMBER: 5 DATE: 08-17-04 Attachment 2: Aerial Photo . i• �n+�'� \^.7, �. •''_.`':��Yy'A �.,.� �•� to •.r�' . ••�.. h Dove Creek Proiect ' :fir i •' �: � � � '.• .fi 1001 V. 41, is .. �' '� �� �;�� � �. f,� � ,� .�ety; •. f Attachment 3: Traffic Impact Study See following ITEM NUMBER: DATE: 08-17-04 ITEM NUMBER: DATE: 08-17-04 Attachment 4: Draft mitigated Negative Declaration and Initial Study Distributed under separate cover ITEM NUMBER: 5 DATE: 08-17-04 ATTACHMENTS: Draft Resolution PC 2004-0095 Dove Creek Master Plan of Development (ZCH 2003-0049, ZCH 2004-0085, CUP 2003-0099,TTM 2003-0033) Approval of Draft Mitigated Negative Declaration 2004-0026 DRAFT RESOLUTION PC 2004-0095 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO RECOMMENDING THAT THE CITY COUNCIL CERTIFY PROPOSED MITIGATED NEGATIVE DECLARATION 2004-0026 PREPARED FOR ZONE CHANGE 2003-0049, ZCH 2004-0085, AND VESTING TENTATIVE TRACT MAP 2003-0033 APN 045-342-0039 045-381-010.) 045-381-0079 045-381-0099 045-331-0029 045-331-0049 045-331-0089 045-331-0019 045-342-0059 045-342-0049 045-342-013, 045-342-0019 -342-0089 045-342-0029 045-352-005 (Dove Creek / Bermant Development Company) WHEREAS, an application has been received from Bermant Development Company (5383 Hollister Ave, Suite 150, Santa Barbara, CA 93111) applicant to consider a project consisting of a Zone Change from CR (Commercial Retail) to CR/RMF-10/PD-23 (Commercial Retail/Residential Multifamily-10/Planned Development Overlay -23) on a 63.3 -acre site located at Santa Barbara Rd and El Camino Real, Atascadero, CA 93422 (APN 045-342-003, 045-381- 010, 045-381-007, 045-381-009, 045-331-002, 045-331-004, 045-331-008, 045-331-001, 045- 342-005, 045-342-004, 045-342-013, 045-342-001, 045-342-008, 045-342-002, 045-352-005); and, WHEREAS, a mixed-use project on the project site was analyzed in the General Plan Final Environmental Impact Report, and the Proposed Project Mitigated Negative Declaration 2004-0026 tiers for the Final Environmental Impact Report; and, WHEREAS, the City prepared an environmental impact report ("EIR") (SCH# 2001121027) to review the environmental impacts of the adoption of the City's General Plan Update, dated June 7, 2002; and WHEREAS, the General Plan EIR identified several significant and unavoidable impacts that would occur as a result of the General Plan's implementation. Resources impacted included land use and planning, geology, hydrology and water quality, biological resources, cultural resources, agriculture, circulation, air quality, noise, public services, aesthetics. The City Council, in Resolution # 2002-030 (dated June 25, 2002) adopted a statement of overriding considerations, pursuant to Public Resources Code section 21081, subdivision (a)(3), in conjunction with its approval of the General Plan and certification of the EIR; and ITEM NUMBER: 5 DATE: 08-17-04 WHEREAS, the Dove Creek Mixed -Use Development Project ("Project'), and its potential environmental impacts, was considered in the EIR (pp. 32 and 40; Preferred Land Use Alternative map figures 1 and 2) and listed in the adopted 2002 General Plan (pp II -16, Table II- A); and WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2004-0026 (SCH# 2004071020) were prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the Initial Study/Mitigated Negative Declaration (IS/MND) for the Project tiered from the General Plan Update EIR, and focused on project -specific significant effects which are peculiar to the Project or its site; and WHEREAS, section 21083.3 of the Public Resources Code, and section 15183 of the State CEQA Guidelines (California Code of Regulations, title 14, section 15000 et seq.) provide that a project is exempt from additional environmental review pursuant to CEQA if the project is consistent with the development density established by an existing general plan for which the lead agency prepared and certified an EIR, (Pub. Resources Code, § 21083.3, subds. (a), (b); State CEQA Guidelines, § 15183; Gentry v. City of Murrieta (1995) 36 Cal.AppAth 1359, 1406); and WHEREAS, the IS/MND did not identify any significant, unmitigable environmental impacts which are peculiar to the Project and which were not already analyzed in the General Plan EIR; and WHEREAS, while the City Council acknowledges that the Project is associated with significant and unavoidable air quality impacts and those impacts were disclosed in the IS/MND, the application of Public Resources Code section 21083.3 and State CEQA Guidelines section 15183 make the adoption of an additional statement of overriding considerations for those impacts unnecessary; and WHEREAS, the City commits itself to adopting and implementing all relevant mitigation measures identified in the General Plan EIR sections: land use and planning; geology; hydrology and water quality; biological resources; cultural resources; agriculture; circulation; air quality; noise; public services; and aesthetics. Pursuant to Public Resources Code section 21083.3, subdivision (c), the City Council will adopt a finding in conjunction with the Project approval that applicable general plan mitigation measures will be undertaken; and WHEREAS, the Planning Commission of the City of Atascadero held a public hearing on August 17, 2004 following the close of the review period to consider the Initial Study and Proposed Mitigated Negative Declaration; and, NOW, THEREFORE, the Planning Commission of the City of Atascadero, hereby resolves to recommend that the City Council certify Proposed Mitigated Negative Declaration 2004-0026 based on the following Findings as shown on Exhibit A: ITEM NUMBER: 5 DATE: 08-17-04 1. The Proposed Mitigated Negative Declaration has been completed in compliance with CEQA; and, 2. The Proposed Mitigated Negative Declaration was presented to the Planning Commission, and the information contained therein was considered by the Planning Commission, prior to recommending action on the project for which it was prepared; and, 3. The Proposed Mitigated Negative Declaration incorporates mitigation measure and overriding considerations of the General Plan Environmental Impact Report; and 4. The project does not have the potential to degrade the environment when mitigation measures are incorporated into the project. 5. The project will not achieve short-term to the disadvantage of long-term environmental goals. 6. The project does not have impacts, which are individually limited, but cumulatively considerable. 7. The project will not cause substantial adverse effects on human beings either directly or indirectly. ITEM NUMBER: 5 DATE: 08-17-04 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. On motion by Commissioner , and seconded by Commissioner the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: ADOPTED: CITY OF ATASCADERO, CA Bob Kelley Planning Commission Chairperson Attest: Warren M. Frace Planning Commission Secretary ITEM NUMBER DATE: 08-17-04 Exhibit A Proposed Mitigated Negative Declaration 2004-0026 See following Exhibit B Mitigation Measures (Final) See following ITEM NUMBER: DATE: 08-17-04 ITEM NUMBER: 5 DATE: 08-17-04 ATTACHMENT 6: Draft Resolution PC 2004-0096 ZCH 2003-0049 Establishment of Proposed PD -23 Overlay Zone Code Text DRAFT RESOLUTION PC 2004-0096 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO RECOMMENDING THAT THE CITY COUNCIL APPROVE A TEXT AMENDMENT TO EXISTING PLANNED DEVELOPMENT OVERAY ZONE -12 (ZCH 2003-0049) (Dove Creek / Bermant Development Company) WHEREAS, an application has been received from Bermant Development Company (5383 Hollister Ave, Suite 150, Santa Barbara, CA 93111) applicant to consider a project consisting of a Zone Change from CR (Commercial Retail) to CR/RMF-10/PD-23 (Commercial Retail/Residential Multifamily-10/Planned Development Overlay -23) on a 63.3 -acre site located at Santa Barbara Rd and El Camino Real, Atascadero, CA 93422 (APN 045-342-003, 045-381- 010, 045-381-007, 045-381-009, 045-331-002, 045-331-004, 045-331-008, 045-331-001, 045- 342-005, 045-342-004, 045-342-013, 045-342-001, 045-342-008, 045-342-002, 045-352-005); and, WHEREAS, the site's General Plan Designation is (MU) Mixed -Use; and, WHEREAS, the site's current zoning district is CR (Commercial Retail); and, WHEREAS, the General Plan has designated the project site as an area requiring a comprehensive master plan in order to minimize environmental impacts and maximize community compatibility (General Plan Table II -5) and to promote orderly and harmonious development and to enhance the opportunity to best utilize special site characteristics; and, WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2004-0026 were prepared for the project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the Planning Commission has determined that it is in the best interest of the City to enact this amendment to the Code Text to protect the health, safety and welfare of its citizens by applying orderly development and expanding housing opportunities within the City; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, ITEM NUMBER: 5 DATE: 08-17-04 WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Change application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said zoning amendments; and, WHEREAS, the Planning Commission of the City of Atascadero, at a Public Hearing held on August 17, 2004, studied and considered Zone Text Change 2003-0049, after first studying and considering the Draft Mitigated Negative Declaration prepared for the project, and, NOW, THEREFORE, the Planning Commission takes the following actions: SECTION 1. Findings for Approval of a Zone Change Establishing Planned Development Overlay Zone -23 Code Text. The Planning Commission finds as follows: 1. Modification of development standards or processing requirements is warranted to promote orderly and harmonious development. 2. Modification of development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area. 3. Benefits derived from the overlay zone cannot be reasonably achieved through existing development standards or processing requirements. SECTION 2. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on August 17, 2004 resolved to recommend that the City Council introduce for first reading, by title only, an ordinance that would amend the City Zoning ordinance with the following: 9-3.657 Planned Development Overlay Zone No. 12: (PD -12). 9-3.657. Establishment of Planned Development Overlay Zone No. 12 (PD 12). Planned Development Overlay Zone No. 12 is established as shown on the Official Zoning Maps (Section 9-1.102). A Planned Development Overlay Zone No. 12 is established on parcels APNs 045-342-003, 045-381-010. 045-381-007, 045-381-009, 045-331-002, 045-331-004, 045-331-008, 045-331-001, 045-342-005, 045-342-004, 045-342-013, 045- 342-001, 045-342-008, 045-342-002, 045-352-005 with a combined gross acreage of 63.3 acres. The maximum residential density within the planned development shall not exceed 279 residential units. A minimum of 6.31 acres of commercial retail use and 27.7 acres of common and natural open space on the 63.3 -acre project site shall be provided. The development standards contained within the Master Plan of Development Document (CUP 2003-0099), as conditioned shall be applied to all future development within the project area, and as follows: ITEM NUMBER: 5 DATE: 08-17-04 (a) The Vesting Tentative Tract Map TTM 2003-0033 and any subsequent amendments for the site shall be consistent with CUP 2003-0099. All construction and development shall conform to the approved Master Plan of Development, as conditioned. (b) No subsequent tentative parcel or tract map shall be approved unless found to be consistent with the approved Master Plan of Development. (c) The commercial area, residential dwelling units, landscaping, walls and fencing shall be subject to review under the City's Appearance Review requirements consistent with the approved Master Plan of Development. (d) Building setbacks lot sizes, landscape area, and lot coverage shall be as identified within the approved Master Plan of Development. (e) Alterations or additions to established dwelling units shall be subject to the density and development standards of the Master Plan of Development. (f) Subsequent amendments to the Master Plan of Development shall be approved by Planning Commission Resolution. ITEM NUMBER: DATE: 08-17-04 (a) The commercial center will retain the Commercial Retail zoninq district designation. The following allowable uses are proposed for this district within the PD -12 overlay zone: (a) Broadcast studios: (b) Building_ materials and hardware (indoor only (c) Food and beverage retail sales: (b) Furniture, home furnishings and equipment: (c) General merchandise stores: (d) Mail order and vending: (e) Temporary or seasonal sales (f) Financial services: (g) Health care services: (h) Offices: (i) Small scale manufacturing (i) Temporary offices (k) Personal services: (1) Light repair services: (m) Eating and drinking places: (n) Membership organizations: (o) Horticultural specialties (p) Schools --business and vocational (g) Business support services, where all areas of use are located within a building (r) Farm equipment and supplies (indoor only): (s) Fuel and ice dealers (t) Hotels and motels: (u) Skilled nursing facility (vy) Bed and breakfast: (w) Funeral services: (x) Schools (v) Utility service center: (z) Libraries and museums: (aa) Temporary events (h) All residential and Open Space use shall be consistent with the requirements of the underlying zoning district except as allowed by the Master Plan of Development. ITEM NUMBER: 5 DATE: 08-17-04 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. AYES: NOES: ABSENT: ABSTAIN: ADOPTED: CITY OF ATASCADERO, CA Bob Kelley Planning Commission Chairperson Attest: Warren M. Frace Planning Commission Secretary ITEM NUMBER: 5 DATE: 08-17-04 ATTACHMENT 7: Draft Resolution PC 2004-0097 (ZCH 2004-0085) Approval of Proposed Zoning Map Change DRAFT RESOLUTION PC 2004-0097 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO RECOMMENDING THAT THE CITY COUNCIL APPROVE ZONE CHANGE 2004-0085, AMENDING THE OFFICIAL ZONING MAP DESIGNATION OF APN 045-342-0039 045-381-0109 045-381-0079 045-381-0099 045-331-0025, 045-331-0049 045-331-0089 045-331-0019 045-342-0059 045-342-0049 045-342-0139 045-342-0019 -342-0089 045-342-0029 045-352-005 (Dove Creek / Bermant Development Company) WHEREAS, an application has been received from Bermant Development Company (5383 Hollister Ave, Suite 150, Santa Barbara, CA 93111) applicant to consider a project consisting of a Zone Change from CR (Commercial Retail) to CR/RMF-10/OS/PD-12 (Commercial Retail/Residential Mul& family-10/Open Space/Planned Development Overlay #12) on a 63.3 -acre site located at Santa Barbara Rd and El Camino Real, Atascadero, CA 93422 (APN 045-342-003, 045-381-010, 045-381-007, 045-381-009, 045-331-002, 045-331- 004, 045-331-008, 045-331-001, 045-342-005, 045-342-004, 045-342-013, 045-342-001, 045- 342-008, 045-342-002, 045-352-005); and, WHEREAS, the site's General Plan Designation is (MU) Mixed -Use; and, WHEREAS, the site's current zoning district is CR (Commercial Retail/(PD- 12) Planned Development #12; and, WHEREAS, the Planning Commission has determined that it is in the best interest of the City to enact this amendment to the Official Zoning Map to protect the health, safety and welfare of its citizens by applying orderly development of the City; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Change application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Zoning amendments; and, ITEM NUMBER: 5 DATE: 08-17-04 WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on August 17, 2004, studied and considered Zone Change 2004-0085, after first studying and considering the Proposed Mitigated Negative Declaration prepared for the project, and, NOW, THEREFORE, the Planning Commission takes the following actions: SECTION 1. Findings for Approval of a Zone Change to the Official Zoning Map of Atascadero Chanting the existing CR with a PD -12 Overlay Zoning District to CR/RMF- 10/OS/PD-12 R/RMF10/OS/PD-12 with a PD -12 Overlay ZoninI4 District. The Planning Commission finds as follows: 1. The proposed project or use is consistent with the General Plan; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including the PD -12 Ordinance; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. The proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development. SECTION 2. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on August 17, 2004, resolved to recommend that the City Council introduce for first reading, by title only, an ordinance (ZCH 2004-0085) that would rezone the subject site consistent with the following: 1. Exhibit A: Zone Change Map ITEM NUMBER: 5 DATE: 08-17-04 BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. AYES: ( ) NOES: ( ) ABSENT: ( ) ABSTAIN: ( ) ADOPTED: CITY OF ATASCADERO, CA Bob Kelley Planning Commission Chairperson Attest: Warren M. Frace Planning Commission Secretary Exhibit A: Zone Change Map 2004-0085 OS RMF 10 PD -12 RMF Overlay 10 on entire site * Note: the existing PD -12 Overlay remains ITEM NUMBER: 5 DATE: 08-17-04 OS OS RMF OS 10 RMF 10 }�•tl 1. 1\J , .+� - 0S RMF 10 PROPOSED ZONING AREAS. CR/PE-12........... 6.Oac RMF-10/PD-12... 37.7ac OS/PD-12........... 19.6ac Total................63.3 ac Existing Designations: -General Plan: Mixed -Use -Zoning District: Commercial Retail Proposed Designations: -General Plan: Mixed -Use -Zoning District: Commercial Retail, Residential Multi- family— 10, Open Space, Planned Development #12 ITEM NUMBER: 5 DATE: 08-17-04 ATTACHMENT 8: Draft Resolution PC 2004-0098 Approval of Proposed CUP 2003-0099 (Master Plan of Development) DRAFT RESOLUTION PC 2004-0098 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO RECOMMENDING THAT THE CITY COUNCIL APPROVE CONDITIONAL USE PERMIT 2003-0099 (MASTER PLAN OF DEVELOPMENT) ON APN 045-342-0039 045-381-0101, 045-381-0079 045-381-0099 045-331-0021, 045-331-0049 045-331-0089 045-331-0019 045-342-005, 045-342-0049 045-342-0139 045-342-0019 -342-0089 045-342-0029 045-352-005 (Dove Creek / Bermant Development Company) WHEREAS, an application has been received from Bermant Development Company (5383 Hollister Ave, Suite 150, Santa Barbara, CA 93111) applicant to consider a project consisting of a Zone Change from CR (Commercial Retail) to CR/RMF-10/OS/PD-12 (Commercial Retail/Residential Multr family-10/Open Space/Planned Development Overlay #12) on a 63.3 -acre site located at Santa Barbara Rd and El Camino Real, Atascadero, CA 93422 (APN 045-342-003, 045-381-010, 045-381-007, 045-381-009, 045-331-002, 045-331- 004, 045-331-008, 045-331-001, 045-342-005, 045-342-004, 045-342-013, 045-342-001, 045- 342-008, 045-342-002, 045-352-005); and, WHEREAS, the site's General Plan Designation is (MU) Mixed -Use; and, WHEREAS, the site's current zoning district is CR (Commercial Retail); and, WHEREAS, the Planning Commission has recommended that a site be rezoned to include CR/RMF-10/OS/PD-12 (Commercial Retail/Residential Mul& family-10/Open Space/Planned Development Overlay #12) zoning districts on the project site which requires the adoption of the Dove Creek Master Plan of Development document; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Change application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Woodlands Specific Plan; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on August 17, 2004, studied and considered the proposed project, after first ITEM NUMBER: 5 DATE: 08-17-04 studying and considering the Proposed Mitigated Negative Declaration prepared for the project, and NOW, THEREFORE, the Planning Commission takes the following actions: SECTION 1. Findings for Approval of the Conditional Use Permit. The Planning Commission finds as follows: 1. The proposed project or use is consistent with the General Plan; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including the PD -12 Ordinance; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. The proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 5. The Master Plan of Development document standards or processing requirements is warranted to promote orderly and harmonious development; and 6. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element; and 7. The Master Plan of Development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area; and 8. Benefits derived from the Master Plan of Development and PD -12 overlay zone cannot be reasonably achieved through existing development standards or processing requirements; and 9. The proposed project offers certain redeeming features to compensate for the requested zone change; and 10. All residential units and buildings, as conditioned are of exceptional design quality warranting the granting of a 15% density bonus. SECTION 2. Findings for Approval of Tree Removal. The trees are obstructing proposed improvements that cannot be reasonably designed to avoid the need for tree removal, as certified by a report from the Site Planner and determined by the Community Development Department based on the following factors: ITEM NUMBER: 5 DATE: 08-17-04 ■ Early consultation with the City; ■ Consideration of practical design alternatives; ■ Provision of cost comparisons (from applicant) for practical design alternatives; ■ If saving tree eliminates all reasonable uses of the property; or If saving the tree requires the removal of more desirable trees. SECTION 3. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on August 17, 2004, resolved to recommend that the City Council approve Conditional Use Permit 2003-0099 (Dove Creek Master Plan of Development) and tree removals subject to the following: EXHIBIT A: Conditions of Approval / Mitigation Monitoring EXHIBIT B: Statistical Project Summary EXHIBIT C: Dove Creek Master Plan of Development EXHIBIT D: Dove Creek native Tree Inventory / Preservation Plan BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. AYES: NOES: ABSENT: ABSTAIN: ADOPTED: CITY OF ATASCADERO, CA Bob Kelley Planning Commission Chairperson Attest: Warren M. Frace Planning Commission Secretary ITEM NUMBER: DATE: 08-17-04 EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program Dove Creek (ZCH 2003-0049, ZCH 2004-0085) Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services Dove Creek Master Plan GP: Grading Permit FD: Fire Department PD -12 BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 TO: Temporary Occupancy F0: Final Occupancy WW: Wastewater CA: City Attorney Planning Services 1. The approval of this zone change shall become final On-going PS and effective 30 -days following City Council approval. 2. Precise design standards andguidelines for the On-going PS development of land are contained within the Dove Creek Master Plan of Development and supersede the City's existing zoning code, public works standards, and other regulations, with Conditions of Approval as listed. Where this plan is silent, city codes effective upon the date of adoption of the Master Plan of Development shall apply. 3. Approval of this Master Plan shall be valid concurrently On-going PS with the life of Tentative Tract Map 2003-0033 and then indefinitely following final map. The Master Plan of Development approval shall expire and become null and void unless a final map is recorded consistent with the Master Plan of Development, dated 7/09/04, as conditioned. 4. Any subsequent condition of approval amending the On-going PS Master Plan of Development or Appendix shall be incorporated into the final Master Plan of Development document. 5. The Dove Creek Master Plan of Development and On-going PS Appendix documents (EXHIBITS C), and the Dove Creek Native Tree Inventory shall be adopted by resolution. Changes to the Master Plan shall be approved by the Planning Commission without requiring second readings and codification of the Master Plan Document. 6. The Community Development Department shall have On-going PS, CE the authority to approve the following minor changes to the project the (1) modify the site plan project by less than 10%, (2) result in a superior site design or appearance, and/or (3) address a construction design issue that is not substantive to the Master Plan. The Planning Commission shall have the final authority to approve any other changes to the Master Plan and any ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services Dove Creek Master Plan GP: Grading Permit FD: Fire Department PD -12 BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 TO: Temporary Occupancy FO: Final Occupancy WW: Wastewater CA: City Attorney associated Tentative Maps. 7. All subsequent Tentative Tract Map and construction GP, BP PS, CE permits shall be consistent with the Master Plan of Development contained herein. 8. The existing billboard along U.S. Highway 101 frontage FM PS shall be removed prior to recordation of the final map. 9. Street names shall be determined prior to the FM PS recordation of the final map. All street names shall be reviewed and approved by the Community Development Department, Fire Department, and Police Department. 10. Vehicle bridge design shall incorporate pedestrian BP PS sidewalk and exterior architectural design appearance and materials, including side railing, compatible with the neighborhood design theme, subject to staff approval. 11. Final fencing locations shall be determined prior to the BP PS issuance of building permits, subject to staff approval, and subject to the following modifications: ■ Masonry walls shall be provided where private yard enclosure is adjacent to H, I, or A streets, and where rear yards are adjacent to the alley way located off of P Street, subject to staff approval. ■ Low split rail fencing shall be provided between Village D pocket park and Lot 34. ■ Rear yard fencing shall be 4 -foot high adjacent to the pedestrian path connecting C Street to the nature pathway system. ■ All masonry walls throughout the project shall be of a dark earth toned color, subject to staff approval. 12. Pedestrian creek crossing bridge design shall BP PS incorporate an exterior architectural design appearance and materials compatible with the neighborhood design theme, subject to staff approval. 13. Where parkways are proposed, sidewalks shall be a BP PS minimum of 4 -feet in width with 6 -foot minimum parkways. 14. A multi -trunk Live Oak tree, 72" box size minimum, shall BP PS ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services Dove Creek Master Plan GP: Grading Permit FD: Fire Department PD -12 BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 TO: Temporary Occupancy FO: Final Occupancy WW: Wastewater CA: City Attorney be installed in the main entrance traffic circle. 15. Street lighting shall be limited to 16 -foot high maximum BP PS decorative poles lamps consistent in design features to the traditional village theme of the project. Pole lighting shall be limited to street intersections and pocket park locations. All other lighting shall be limited to pedestrian pathways and shall be low decorative bollard lamps, consistent with the projects traditional village design theme. 16. Pedestrian access shall be provided from Street F to BP PS the proposed packet park. 17. The sidewalk at the north west quadrant of the round- BP PS about shall provide access to the creekside pedestrian pathway. 18. The pedestrian sidewalk adjacent to Street C shall BP PS provide clear dedicated pedestrian access to the pavered fire access portion of the Street. 19. Eliminate on -street parking along P and Q Streets and BP PS add a parkway and detached sidewalk. 20. All site development shall be consistent with the BP PS maximum intensities described in the statistical project summary as shown in EXHIBIT B. 21. All site work, grading and site improvements shall be BP PS consistent with the Master Plan of Development and as shown in the site amenities plan (EXHIBIT C) and tentative tract map. 22. A final landscape, irrigation plan, and native tree BP PS replacement plan shall be approved as part of the subdivision tract site improvement plan consistent with the site amenities plan (EXHIBIT C sheets 1-2.0-1-2.3, L3.0, L3.1, L4.0). All front yard landscaping shall be installed prior to occupancy of the units. Typical landscape and irrigation plans shall be approved prior to building permits, including the following: ■ All trash and recycling bins, exterior meters, air conditioning units, and mechanical equipment shall be ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services Dove Creek Master Plan GP: Grading Permit FD: Fire Department PD -12 BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 TO: Temporary Occupancy FO: Final Occupancy WW: Wastewater CA: City Attorney screened with landscape material. ■ All on-site street frontages (except SFR -3 street), and common open space areas shall be landscaped by the developer; ■ Street, yard and ornamental (non-native) hillside trees shall be minimum 15 -gallon size and double staked. ■ Shade trees shall be provided along all street frontages and shall be installed prior to occupancy of the units. 23. The project shall deed restrict either 10% of the base FM PS, CE density units as Very -Low income units or 20% of the base density units as Low -Income units in accordance with State Density Bonus requirements. Affordable residential units shall be reserved as deed restricted affordable units for a 30 -year period in accordance with State requirements and as consistent with City Council Policy, prior to or concurrently with the final map. 24. Workforce Housing FM PS Prior to recordation of final map, the applicant shall enter into a legal agreement with the City to reserve 1/2 of the units for sale to residents or workers within the City of Atascadero, including the affordable units. The agreement shall include the following provisions: ■ The units shall be offered for sale to residents or workers within the City of Atascadero for a minimum of 60 -days. During this time period offers may only be accepted from Atascadero residents or workers; ■ The applicant shall provide reasonable proof to the City that at least one of the qualified buyers is a resident or worker within the City Limits of Atascadero; ■ The Atascadero resident or worker restriction shall apply to the initial sale only; ■ The applicant shall identify which units will be reserved; and The City Attorney shall approve the final form of the agreement. 25. The emergency services and facility maintenance costs FM PS, CE listed below shall be 100% funded by the project in perpetuity. The service and maintenance cost shall be ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Mitigation Monitoring Program Dove Creek Master Plan PD -12 ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy FO: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure funded through a community facilities district established by the developer subject to City approval. The funding mechanism must be in place prior to or concurrently with acceptance of the any final maps. The funding mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above mentioned funds shall be by the City. a) All Atascadero Police Department service costs to the project. b) All Atascadero Fire Department service costs to the project. c) Off-site common City of Atascadero park facilities maintenance service costs related to the project. 26. All tract maintenance cost listed below shall be 100% FM PS, CE funded by the project in perpetuity. The service and maintenance cost shall be funded through a Home Owners Association established by the developer subject to City approval. The Home Owners Association must be in place prior to, or concurrently with acceptance of the any final maps. The Home Owners Association shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above mentioned funds and the coordination and performance of maintenance activities shall be the responsibility of the Home Owners Association. a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access roads, emergency access gates, and sewer mains within the project. b) All parks, trails, recreational facilities and like facilities. c) All open space and native tree preservation areas. d) All drainage facilities and detention basins. e) All creeks, flood plains, floodways, wetlands, and riparian habitat areas. f) All common landscaping areas, street trees, medians, parkway planters, manufactured slopes outside ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services Dove Creek Master Plan GP: Grading Permit FD: Fire Department PD -12 BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 TO: Temporary Occupancy FO: Final Occupancy WW: Wastewater CA: City Attorney private yards, and other sim ilar facilities. g) All frontage landscaping along arterial streets and US 101 freeway. 27. The project applicant may apply for capital facility fee credits for Master Facilities Plan projects ST -04, ST -06 and ST -19. Credits may only be applied to individual building permits at time of issuance up to the maximum Circulation System fee for each permit per schedule 5.3. The amount of credit will be determined based on the percentage of each facility constructed and the actual construction cost receipts subject to the review and approval of the City Engineer and Administrative Services Director. Credit for street construction will limited to facilities and improvements starting at the lip of gutter. 28. Retaining wall design & material shall match or BP PS compliment the texture and color of the existing or proposed landscape. 29. All mitigation Measures listed in the certified Mitigated BP PS Negative Declaration shall be implemented and adhered to. 30. The applicant shall be responsible for the installation BP PS and maintenance of screen landscaping along the highway 101 frontage and within the Cal Trans right-of- way as shown in EXHIBIT C, subject to staff and agency approval. 31. Prior to occupancy of residential unit #1, all rough site BP PS grading, frontage improvements and utility connections shall be completed for the commercial site Trees 32. All preservation measures outlined in the Native Tree BP PS Inventory prepared for the project shall be implemented. Any changes to the measures recommended by the study shall be subject to staff approval and will require review by the project arborist. 33. The list of proposed landscape materials shall be BP PS revised as follows: ■ The canary island pine shall be deleted from the listing. ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services Dove Creek Master Plan GP: Grading Permit FD: Fire Department PD -12 BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 TO: Temporary Occupancy FO: Final Occupancy WW: Wastewater CA: City Attorney Coastal redwoods shall be listed instead. ■ The southern live oak shall be eliminated from the listing. ■ The carrotwood shall be eliminated from the listing. 34. The project shall comply with the City of Atascadero BP PS native Tree Ordinance with payment into the native tree fund and/or replanting or any combination thereof credited per the native tree ordinance. The fund payment and number of trees planted may vary but shall be compliant with the Native Tree Ordinance. 35. A tree protection plan, prepared by a licensed arborist BP PS shal I be submitted and approved by staff prior to the issuance of any permit, to include the following: ■ Tree protection fencing shall be constructed of welded wire mesh on metal "Y' posts. ■ The project arborist shall be on-site for any work within the driplines of existing native trees. Commercial 36. The front facades of buildings A, C, D, E, and F shall BP PS undulate to create a variety of pedestrian spaces. 37. Trellis features shall be constructed of heavy timber BP PS materials and shall be painted or stained a natural wood tone color. 38. Trellis features shall be added to elevations #7, 15, and BP PS 18. 39. The applicant shall work with staff on selection of BP PS building colors that provide a variety of earth -tone color and texture with accent colors that blend with the natural surroundings and provide a high quality residential neighborhood appearance, consistent with the intent of the Master Plan development standards for the proposed conceptual commercial center, selections subject to staff approval. 40. Stucco arch features shall be replaced by wood sided BP PS tower elements consistent with Elevation #12. 41. Columns shall be consistent throughout the commercial BP PS center and shall be constructed with the double wood ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services Dove Creek Master Plan GP: Grading Permit FD: Fire Department PD -12 BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 TO: Temporary Occupancy FO: Final Occupancy WW: Wastewater CA: City Attorney columns shown on elevation #12. 42. The conceptual commercial fagade design shall BP PS incorporate the following, consistent with the traditional village theme: ■ Windows, false or real, shall be incorporated into Elevations #1, 4, 5, 6, 7, 10, 13, 17, and 20, subject to staff approval. ■ Dormers shall be added to elevations #3, 4, 6, 7, and 17. ■ All storefront windows shall extend below the trim band. ■ Entrances to corner shops shall be added to elevation #9 and #13 to provide access off of the pedestrian plaza. ■ Wood siding shall be added to the tower elements on elevations #5, 7, 8, 17, and 18 ■ Elevation #10 shall incorporate tower feature shown on elevation #16. 43. All materials shall be consistent with the conceptual BP PS architectural elevations shown in EXHIBIT C. Residential 44. The Americana fagade theme shall consist of BP PS architectural grade stucco exterior finish with contrasting trim (material and/or texture), subject to staff approval. 45. The applicant shall work with staff on selection of BP PS building colors that provide a variety of earth -tone color and texture with accent colors that blend with the natural surroundings and provide a high quality residential neighborhood appearance, consistent with the intent of the Master Plan development standards for all residential areas, selecti ons subject to staff approval. 46. The developer shall install all front yard landscaping BP PS and common area landscaping, prior to occupancy of the units. 47. All streets not providing sidewalks shall be considered BP PS courts and shall incorporate special paving, subject to ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services Dove Creek Master Plan GP: Grading Permit FD: Fire Department PD -12 BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 TO: Temporary Occupancy FO: Final Occupancy WW: Wastewater CA: City Attorney staff approval. 48. A decorative masonry base shall be added to the front BP PS and side facades of theAmericana design theme homes. Side treatment shall wrap at a minimum up to where private yard fencing is located. Single Family Residential 49. All corner yard setbacks shall be a minimum of 12 -feet BP PS from the edge of right-of-way. 50. Corner lots shall incorporate equivalent architectural BP PS detailing along the street facing side elevation to include wrapped porches where feasible, subject to staff approval. Courtyard Homes 51. Adequate space shall be maintained between the head BP PS of the guest parking spaces and private yard fencing to accommodate a medium shade tree. 52. High windows shall be incorporated onto side BP PS elevations for all zero lot line units. 53. The homeowners association shall maintain the BP PS landscaped area at the terminus of the shared driveway, unless otherwise approved by the Planning Director or City Engineer. 54. All courtyard homes shall incorporate architectural BP PS concrete tile roofing. No composition shingle roofing shall be permitted. Townhomes 55. Townhome unit A at the corner of J Street and H Street BP PS shall be revised to take access off of J Street. 56. All two -car garage doors shall have an architectural BP PS design that appears as paired single -car garage doors, subject to staff approval. 57. Columns shall be double wood columns with a brick BP PS veneer base consistent with the proposed design theme and subject to staff approval. ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure Drainage PS: Planning Services 68. Provide for the detention of up to the 100 year BL: Business License BS: Building Services Dove Creek Master Plan GP: Grading Permit FD: Fire Department PD -12 BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer ZCH 2003-0049/ZCH 2004-0085 / CUP 2003-0099 TO: Temporary Occupancy FO: Final Occupancy WW: Wastewater CA: City Attorney 58. All townhomes shall incorporate architectural concrete BP PS tile roofing. No composition shingle roofing shall be permitted. Fire Marshal 59. Minimum fire flow required for proposed BP BS development that includes commercial property building footprints of 25,000 square feet, single story will be approximately 2250 GPM for 2 hours. 60. All buildings 5000 square feet or greater require BP BS automatic fire sprinklers -Design of such systems to be either NFPA 13 for commercial or NFPA 13D for residential. 61. Fire hydrant spacing not to exceed 500 feet. BP BS 62. Fire apparatus access roads and water supplies BP BS (fire hydrants) for fire protection is required to be installed and made serviceable prior to and during the time of construction. 63. All access roadways in a Planned Unit BP BS Development (PUD) shall be built/installed according to California Fire Code 2001 Section 902.1, Appendix III -D. 64. Roadways shall extend to within 150 of all BP BS portions of exterior walls of the first story of any building. 65. Assure all roads built with adequate turning radius BP BS of at least 28 feet inside, 48 feet outside. 66. Portable fire extinguishers required on exterior BP BS and centrally located per 75 feet walking distance for all multifamily units. 67. Knox security system for emergency fire dept. BP BS entry required for all commercial construction City Engineer Project Conditions Drainage 68. Provide for the detention of up to the 100 year GP, BP CE developed storm runoff while metering out the historic release rate of the comparable undeveloped storm. ITEM NUMBER: DATE: 08-17-04 No increase in down stream flow rate, up to a 100 - year event, will be allowed, unless a full analysis of downstream drainage impacts is completed and approved from the project boundary to the Salinas River and downstream improvements are constructed to mitigate any downstream impacts to properties. 69. Submit calculations to support the design and GP, BP CE construction of any structures or pipes. Closed conduits shall be designed to convey the 10 -year flow with gravity flow; the 25 -year flow with head, and provide safe conveyance for the 100 -year overflow. 70. Drainage basins shall be designed to desilt, detain GP, BP CE and meter storm flows as well as release them to natural runoff locations. 71. Vegetative earth channels and swales will be used to GP, BP CE convey minor concentrations of storm water from developed areas to drain inlets. 72. Drain Inlets will be designed with permeable surface GP, BP CE of oil and water separator/sediment trap to reduce pollutions. The project HOA will be responsible for the cleaning and maintaining these systems. 73. This project proposes to fill in the FEMA 100 -year GP, BP CE Floodplain. A 100 -year Floodway will be created in the existing 100 -year Floodplain. No structures or fill will be placed within the limits of the floodway. A standard Letter of Map Revision will be submitted and approved by the City and FEMA. The Floodway widths will be created such that the rise of the 100 - year floodwater elevation is no more than one foot on the interior of the site and there is no increase at the EI Camino Real culverts. 74. Structures placed outside the 100 -year Floodway GP, BP CE boundary shall have finished floor elevations a minimum of one foot above the base flood elevation. 75. Concentrated drainage from off-site areas shall be GP, BP CE conveyed across the project site in drainage easements. Acquire drainage easements where needed. Drainage shall cross lot lines only where a drainage easement has been provided. If drainage easement cannot be obtained the storm water release must follow the exact historic path, rate and velocity as prior to the subdivision. 76. Applicant shall submit Sediment and Erosion Control GP, BP CE Plans and a Storm Water Pollution Prevention Plan (SWPPP). The Regional Water Quality Control Board (RWQCB) shall approve the SWPPP. These plans will follow the design and construction these mitigations per the rules of the City of Atascadero, the RWQCB and measures listed in the project environmental document. ITEM NUMBER: DATE: 08-17-04 77. Traffic Mitigation: GP, BP CE A Traffic Impact Study was produced for this project by Omni - Means. In the study there are recommended mitigation measures. Listed below are conditions to implement the mitigation measures: A Santa Barbara Road/EI Camino Real: Install Traffic Signal This is required to be installed prior to the first unit occupied. The construction costs for the signal will be counted as credit toward the Traffic Impact Fee. B. Santa Barbara Road/US 101 Interchange The study found that the following Improvements are required for the interchange. Also list is the percent "fair Share" that this project is responsible for the improvement. These are to be installed prior to the first unit occupies or the first commercial building opened. These are improvements that are not identified as needed improvements in the City of Atascadero Circulation Element and the Growth Mitigation Program. Therefore, the growth mitigation fee does not cover the improvements. The developer may record a reimbursement agreement against future tip generation facilities to recoup a portion of the cost of construction. ■ Santa Barbara Road/US 101 SB Ramps: Install Traffic Signal (39.3%) ■ Santa Barbara Road/US 101 NB Ramps: Install Traffic Signal (52.4%) The above two signals shall be interconnected. C. Viejo Camino/EI Camino Real: Install Traffic Signal (33.4%) D. San Diego Way/EI Camino Real: Install Traffic Signal (31.4%) The improvements listed in C. and D. are improvements that are not identified as needed improvements in the City of Atascadero Circulation Element and the Growth Mitigation Program. Therefore, the growth mitigation fee does not cover the improvements. The developer is required to submit engineers estimate for the cost of construction of the improvements. The developer shall pay the percent "fair Share" of the engineer's estimates. These funds will be placed in an account for the improvements. The developer may pay the amount incrementally with each building permit. E. Santa Barbara Road between EI Camino Real and US 101. Construct two-lane road with left turn channelization, bike lanes and pedestrian sidewalk. F. EI Camino Real between Santa Barbara Road and project north boundary. Construct two southbound and one ITEM NUMBER: DATE: 08-17-04 northbound travel lanes, bike lanes in both directions, median and left turn channelization. All public improvements shall be constructed in conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer. Sewer 78. No sewer system currently exists in proposed project GP, BP CE area. Should Dove Creek be the first development to require connection to the new sewer system mainline extension, the developer of the Dove Creek will be responsible for the financing and construction of the mainline from the treatment plant to the Woodland's point of connection. 79. The mainline shall be built with sufficient capacity to GP, BP CE accommodate development within the Plan Area as well as new development in the area and existing uses. 80. Development using the sewer extension, within ten GP, BP CE (15) years, shall be responsible for reimbursing the Woodlands developer proportionate to their rate of use. 81. A mechanism must be provided to fund and maintain GP, BP CE all sewer mains throughout the project area. 82. If a lift Station is planned with this project the GP, BP CE following will apply: Lift station shall be equipped with an alarm dialer, programmed to notify qualified maintenance personnel when malfunctions occur. Lift Stations shall be equipped with duplex pumps. Catalog cuts of equipment that will be installed in lift station shall be submitted and approved by the City Engineer. Applicant shall submit a lift station emergency/contingency plan that addresses protection of public health and the environment from sewage spills caused by equipment malfunctions and prolonged power outages. Provisions for the repair and maintenance of the private wastewater pump station shall be included in the CC&R's for this tract. Included shall be a mechanism to maintain the private wastewater pump station, such as a homeowners association. The City Engineer and City Attorney shall approve the final form prior to recordation. General 83. Prior to final map recordation, the applicant shall GP, BP CE provide a detailed cost analysis and breakdown of all maintenance required and the amount to be billed to ITEM NUMBER: DATE: 08-17-04 each property annually. The analysis shall include scheduled maintenance including slurry seals, overlays, etc. The analysis shall include administrative fees. 84. Prior to final map recordation, a Homeowner's GP, BP CE Association shall be created and CC&R's recorded providing for the funding and performance of required maintenance, including streets, wastewater pump station and sewer, drainage basins, parks, swales and structures. 85. The applicant shall enter a Subdivision Improvement GP, BP CE Agreement with the City of Atascadero prior to recording the final map. 86. A permanent irrevocable offer of dedication shall be FM CE maintained on the 1.01 -acre parcel (Lot 53) at the intersection of Santa Barbara Rd and Highway 101. City Engineer Standard Conditions 87. In the event that the applicant is allowed to bond for GP, BP CE the public improvements required as a condition of this map, the applicant shall enter into a Subdivision Improvement Agreement with the City Council. 88. An engineer's estimate of probable cost shall be GP, BP CE submitted for review and approval by the City Engineer to determine the amount of the bond. 89. The Subdivision Improvement Agreement shall record GP, BP CE concurrently with the Final Map. 90. The applicant shall enter into a Plan Check/Inspection GP, BP CE agreement with the City. 91. A six (6) foot Public Utility Easement (PUE) shall be GP, BP CE provided contiguous to the road property frontage. 92. The applicant shall acquire title interest in any off-site GP, BP CE land that may be required to allow for the construction of the improvements. The applicant shall bear all costs associated with the necessary acquisitions. The applicant shall also gain concurrence from all adjacent property owners whose ingress and egress is affected by these improvements. 93. Slope easements shall be obtained by the applicant GP, BP CE as needed to accommodate cut or fill slopes. 94. Drainage easements shall be obtained by the GP, BP CE applicant as needed to accommodate both public and private drainage facilities. 95. A preliminary subdivision guarantee shall be GP, BP CE submitted for review in conjunction with the processing of the parcel map. 96. The final m ap shall be signed by the City Engineer prior to the map being placed on the agenda for City Council acceptance. ITEM NUMBER: DATE: 08-17-04 97. Prior to recording the parcel map, the applicant shall GP, BP CE pay all outstanding plan check/inspection fees. 98. Prior to recording the map, the applicant shall GP, BP CE complete all improvements required by these conditions of approval. 99. Prior to recording the parcel map, the applicant shall GP, BP CE set monuments at all new property corners. A registered civil engineer or licensed land surveyor shall indicate by certificate on the parcel map, that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. 100.Prior to recording the parcel map, the applicant shall GP, BP CE subm it a map drawn in substantial conformance with the approved tentative map and in compliance with all conditions set forth herein. The map shall be submitted for review and approval by the City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. 101.All existing and proposed utility, pipeline, open space, GP, BP CE or other easements are to be shown on the final/parcel map. If there are building or other restrictions related to the easements, they shall be noted on the final/parcel map. The applicant shall show all access restrictions on the final/parcel map. 102.Prior to recording the parcel map, the applicant shall GP, BP CE have the map reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company indicating their review of the map. The letter shall identify any new easements that may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the parcel map. 103.Prior to the issuance of building permits the applicant GP, BP CE shall submit plans and supporting calculations/reports including street improvements, underground utilities, composite utilities, and grading/drainage plans prepared by a registered civil engineer for review and approval by the City Engineer. Atascadero Mutual Water Company 104.13efore recordation of the final map, the applicant AMWC shall submit plans to AMWC for the water distribution facilities needed to serve the project. AMWC shall review and approve the plans before construction begins on the water system improvements. All water distribution facilities shall be constructed in conformance with AMWC Standards and Details and the California Waterworks Standards (Code of Regulations Title 22, Division 4, Chapter 16). All ITEM NUMBER: DATE: 08-17-04 cross -connection devices shall conform to AWWA and California Department of Health Services standards. 105.Before the start of construction on the water system AMWC improvements, the applicant shall pay all installation and connection fees required by AMWC. Subject to the approval of AMWC, the applicant may enter in to a "deferred connection" agreement. 106.Before issuance of building permits, the applicant AMWC shall obtain a "Will Serve" letter from AMWC for the newly created lots within the subdivision. 107.The water mains required to serve the project shall be AMWC laid out in a grid or looped pattern and shall connect to the existing water mains system in Santa Barbara Road, EI Camino Real, and San Diego Road. 108.The applicant shall design and construct a AMWC replacement for the existing flinch diameter water main in San Diego Road. The replacement main shall be 6 -inch diameter. The replacement main shall extend from the terminus of the existing 6 -inch main in San Diego Road north of the project boundary and the point -of -connection of the water main extension required for the project. 109.The applicant shall provide AMWC with easements AMWC for those water facilities proposed for operation and maintenance by AMWC that are constructed outside of publicly maintained right-of-ways. AMWC shall review the form and content of the easements before recordation. 110.The applicant shall submit a hydraulic analysis with AMWC the first plan check submittal of the water system improvements for the project. The analysis should take into account the fire flows required by the Uniform Fire Code and requirements of the California Waterworks Standards. The applicant is responsible for designing and constructing water system improvements that will provide water at pressures and flows adequate for the domestic and fire protection needs of the project. 111.The applicant shall obtain a separate landscape- AMWC irrigation meter(s) from AMWC for the common areas within the project. 112.1-andscaping for the common areas shall be drought- AMWC tolerant. Before construction of the water system improvements, AMWC shall review and approve the landscape plans br the common areas within the project. The landscape plan submittal shall incorporate the following: ■ Plant list w/ Water Use Classification of Landscape Species (WUCOLS) rating specified. Preference shall be given to plants with very low (VL) and low (L) WUCOLS ratings. ITEM NUMBER: DATE: 08-17-04 ■ Justification for use of plants with WUCOLS rating of M or greater. ■ Total landscaped area including hardscapes (patios, walks & decks) and planted areas and excluding sidewalks, driveways, streets or parking. ■ The size and shape of turf areas shall promote for efficient irrigation shall be no less than 8 -feet wide. Tun` type shall be warm -season grasses. Turf areas shall be kept to a minimum and shall be limited to functional areas only. A goal of the landscape design should be a total turf area of no more than 10% of the total landscaped area. 113.13efore construction of the water system AMWC improvements, AMWC shall review and approve the irrigation plans for the common areas within the project. The irrigation plan submittal shall include the following: ■ Landscape irrigation meter location and size. ■ Backflow prevention device type, location, and manufacturer ■ Flow and precipitation rate for each circuit ■ Irrigation schedules including schedules for establishment period and post establishment period ■ Total anticipated water application per circuit per month for both schedules ■ Total landscape water application. ■ Use drip irrigation where ever possible ■ A check valve shall be installed on the lowest head in each sprinkler circuit ITEM NUMBER: DATE: 08-17-04 EXHIBIT B: Statistical Project Summary Table 1.1: Land Use Summary Village/ Land Use Description Units Acres % of Land Area A Towiihomes 66 7.9 12.6 B Townhomes 32 4.3 6.9 C Courtyard Homes 48 5.8 9.3 D Single -Family Homes 45 9.1 14.4 E Courtyard Homes 49 6.7 10.6 ITEM NUMBER DATE: 08-17-04 EXHIBIT C: Dove Creek Master Plan of Development See attached document prepared by RRM Design Group dated July 9, 2004 (The Villages at Dove Creek: Master Plan of Development) ITEM NUMBER: 5 DATE: 08-17-04 EXHIBIT D: Dove Creek Native Tree Inventory / Preservation Plan See attached document prepared by Althouse and Meade, Inc dated August 2004 (Native tree Inventory: Dove Creek Mixed Use Development) ITEM NUMBER: 5 DATE: 08-17-04 ATTACHMENT 9: Draft Resolution PC 2004-0099 Dove Creek Master Plan of Development Approval of Proposed Vesting Tentative Tract Map 2003-0033 DRAFT RESOLUTION PC 2004-0099 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO RECOMMENDING THAT THE CITY COUNCIL APPROVE VESTING TENTATIVE TRACT MAP 2003- 00339 A ONE HUNDRED FIFTY FOUR LOT SUBDIVISION CONSISTENT WITH A MASTER PLAN OF DEVELOPMENT ON APN 045-342-0039 045- 381-0109 045-381-0071, 045-381-0099 045-331-0029 045-331-0049 045-331-0089 045-331-0019 045-342-0059 045-342-0049 045-342-0139 045-342-0019 -342-008, 045-342-0029 045-352-005 (Dove Creek / Bermant Development Company) WHEREAS, an application has been received from Bermant Development Company (5383 Hollister Ave, Suite 150, Santa Barbara, CA 93111) applicant to consider a project consisting of a Zone Change from CR (Commercial Retail) to CR/RMF-10/OS/PD-12 (Commercial Retail/Residential Multi family-10/Open Space/Planned Development Overlay #12) on a 63.3 -acre site located at Santa Barbara Rd and El Camino Real, Atascadero, CA 93422 (APN 045-342-003, 045-381-010, 045-381-007, 045-381-009, 045-331-002, 045-331- 004, 045-331-008, 045-331-001, 045-342-005, 045-342-004, 045-342-013, 045-342-001, 045- 342-008, 045-342-002, 045-352-005); and, WHEREAS, the site's General Plan Designation is (MU) Mixed -Use; and, WHEREAS, the site's current zoning district is CR (Commercial Retail); and, WHEREAS, the Planning Commission has recommended that a site be rezoned to include CR/RMF-10/OS/PD-12 (Commercial Retail/Residential Multr family-10/Open Space/Planned Development Overlay #12) zoning districts on the project site which requires the adoption of the Dove Creek Master Plan of Development document; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative Tract Map application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said application; and, ITEM NUMBER: 5 DATE: 08-17-04 WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on August 17, 2004, studied and considered Tentative Tract Map 2003- 0033, after first studying and considering the Proposed Mitigated Negative Declaration prepared for the project; and, NOW, THEREFORE, the Planning Commission takes the following actions: Section 1. Findings of Approval for Tentative Parcel Map, the Planning Commission of the City of Atascadero finds as follows: 1. The proposed subdivision, as conditioned, is consistent with the General Plan and applicable zoning requirements, including all provisions of PD -12. 2. The design and improvement of the proposed subdivision is consistent with the General Plan and applicable zoning requirements. 3. The proposed subdivision, as conditioned, is consistent with the proposed Master Plan of Development (CUP 2003-0099). 4. The site is physically suitable for the type of development proposed. 5. The site is physically suitable for the density of development proposed. 6. The design and improvement of the proposed subdivision will not cause substantial environmental damage or substantially and unavoidably injure fish and wildlife or their habitat. 7. The design of the subdivision will not conflict with easements acquired by the public at large for access through, or the use of property within, the proposed subdivision; or substantially equivalent alternative easements are provided. 8. Covenants, Conditions and Restrictions (CC&R's) or equivalent shall be required that incorporate the Master Plan of Development conditions of approval to ensure that the site retains the proposed qualities (architecture, colors, materials, plan amenities, fencing, and landscaping) over time. 9. The proposed subdivision design and type of improvements proposed will not be detrimental to the health, safety or welfare of the general public. ITEM NUMBER: 5 DATE: 08-17-04 SECTION 2. Recommendation of Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on August 17, 2004, resolved to recommend that the City Council approve Vesting Tentative Tract Map (TTM 2003-0033) subject to the following: 1. Exhibit A: Vesting Tentative Tract Map 2003-0033 2. Exhibit B: Conditions of Approval / Mitigation Monitoring Program. BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by the Planning Commission Secretary to the City Council of the City of Atascadero. AYES: ( ) NOES: ( ) ABSENT: ( ) ABSTAIN: ( ) ADOPTED: CITY OF ATASCADERO, CA Bob Kelley Planning Commission Chairperson Attest: Warren M. Frace Planning Commission Secretary Exhibit A: Vesting Tentative Tract Map 2003-0033 (Sheet 1 of 2) Ilk ITEM NUMBER: 5 DATE: 08-17-04 C 'j I33HS AS u rum r2 ?6 => LLJ CL lO Cl LLJ > C) - gl� > 0 ui 10 ID Cq C; Lu z rum Exhibit A: Vesting Tentative Tract Map 2003-0033 (Sheet 2 of 2) / I ITEM NUMBER: 5 DATE: 08-17-04 I- ', 4 LLJCle LLA 0 :z U . LAJ 11 0 n -A LL. 0 iLLA LLJ 0 0 LAJ :z Lu Cr 0 zP Q V F. C. C4 0 ITEM NUMBER: DATE: 08-17-04 Exhibit B: Conditions of Approval / Mitigation Monitoring Program Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure GP: Grading Permit PS: Planning Services Dove Creek BP: Building Permit SIP: Subdivision BS: Building Services FD: Fire Department Vesting Tentative Tract Map Improvement Plans FM: Final Map PD: Police Department CE: City Engineer TTM 2003-0033 TO: Temporary Occupancy FI: Final inspection WW: Wastewater CA: City Attorney FO: Final Occupancy AMWC: Water Comp. Planning Services 1. The approval of this Tentative Parcel Map shall not FM PS become final and effective following approval of Zone Change 2003-0049 and ZCH 2004-0085. 2. Approval of this Tentative Parcel Map shall be valid for FM PS two years after its effective date. At the end of the period, the approval shall expire and become null and void unless an extension of ime is granted pursuant to a written request received prior to the expiration date. 3. The Community Development Department shall have FM PS the authority to approve minor changes to the project that (1) result in a superior site design or appearance, and/or (2) address a design issue that is not substantive to the Tentative Tract Map and that the Final Map is in substantial conformance with the Tentative Map. 4. The Tract Map shall be subject to additional fees for FM PS park or recreation purposes (QUIMBY Act) as required by City Ordinance. 5. The applicant shall record CC&R's for the subdivision FM PS subject to the review and approval of the City Engineer, City Attorney and the Community Development Director. The CC&R's shall also state that all exterior colors, exterior materials, yard fencing and site landscaping shall be consistent with the overall Master Plan of Development as adopted. 6. The granting of this entitlement shall apply to the On going PS property located at APN 045-342-003, 045-381-010, 045-381-007, 045-381-009, 045-331-002, 045-331-004, 045-331-008, 045-331-001, 045-342-005, 045-342-004, 045-342-013, 045-342-001, 045-342-008, 045-342-002, 045-352-005 regardless of owner. 7. The Final Map shall be drawn in substantial FM PS conformance with the approved tentative map, and in compliance with all conditions set forth herein, shall be submitted for review and approval in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. ITEM NUMBER: DATE: 08-17-04 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure base density units as Low -Income units in accordance GP: Grading Permit PS: Planning Services with State Density Bonus requirements. BP: Building Permit BS: Building Services Dove Creek SIP: Subdivision FD: Fire Department Vesting Tentative Tract Map Improvement Plans FM: Final Map PD: Police Department CE: City Engineer TTM 2003-0033 TO: Temporary Occupancy FI: Final inspection WW: Wastewater CA: City Attorney with City Council Policy, prior to or concurrently with the F0: Final Occupancy AMWC: Water Comp. 8. The subdivider shall defend, indemnify, and hold FM PS harmless the City of Atascadero or its agents, officers, FM PS and employees against any claim or action brought to challenge an approval by the city, or any of its entities, concerning the subdivision. 9. Street names shall be determined prior to the FM PS recordation of the final map. All street names shall be reviewed and approved by the Community Development Department, Fire Department, and Police Department. 10. All subsequent Tentative Tract Map and construction FM PS, CE permits shall be consistent with the Master Plan of Development contained herein. 11. The project shall deed restrict either 10% of the base FM PS, CE density units as Very -Low income units or 20% of the base density units as Low -Income units in accordance with State Density Bonus requirements. Affordable residential units shall be reserved as deed restricted affordable units for a 30 -year period in accordance with State requirements and as consistent with City Council Policy, prior to or concurrently with the final map. 12. Workforce Housing FM PS Prior to recordation of final map, the applicant shall enter into a legal agreement with the City to reserve ''h of the units for sale to residents or workers within the City of Atascadero, including the affordable units. The agreement shall include the following provisions: ■ The units shall be offered for sale to residents or workers within the City of Atascadero for a minimum of 60 -days. During this time period offers may only be accepted from Atascadero residents or workers; ■ The applicant shall provide reasonable proof to the City that at least one of the qualified buyers is a resident or worker within the City Limits of Atascadero; ■ The Atascadero resident or worker restriction shall apply to the initial sale only; ■ The applicant shall identify which units will be reserved; ITEM NUMBER: DATE: 08-17-04 and The City Attorney shall approve the final form of the agreement. 13. The emergency services and facility maintenance costs FM PS, CE listed below shall be 100% funded by the project in perpetuity. The service and maintenance cost shall be funded through a community facilities district established by the developer subject to City approval. The funding mechanism must be in place prior to or concurrently with acceptance of the any final maps. The funding mechanism shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above mentioned funds shall be by the City. ■ All Atascadero Police Department service costs to the project. ■ All Atascadero Fire Department service costs to the project. ■ Off-site common City of Atascadero park facilities maintenance service costs related to the project. 14. All tract maintenance cost listed below shall be 100% FM PS, CE funded by the project in perpetuity. The service and maintenance cost shall be funded through a Home Owners Association established by the developer subject to City approval. The Home Owners Association must be in place prior to, or concurrently with acceptance of the any final maps. The Home Owners Association shall be approved by the City Attorney, City Engineer and Administrative Services Director prior to acceptance of any final map. The administration of the above mentioned funds and the coordination and performance of mainfenance activities shall be the responsibility of the Home Owners Association. ■ All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access roads, emergency access gates, and sewer mains within the project. ■ All parks, trails, recreational facilities and like facilities. ■ All open space and native tree preservation areas. ■ All drainage facilities and detention basins. ■ All creeks, flood plains, floodways, wetlands, and riparian habitat areas. ■ All common landscaping areas, street trees, medians, parkway planters, manufactured slopes outside private yards, and other similar facilities. ITEM NUMBER: DATE: 08-17-04 ■ All frontage landscaping along arterial streets and US 101 freeway. 15. The project applicant may apply for capital facility fee credits for Master Facilities Plan projects ST -04, ST -06 and ST -19. Credits may only be applied to individual building permits at time of issuance up to the maximum Circulation System fee for each permit per schedule 5.3. The amount of credit will be determined based on the percentage of each facility constructed and the actual construction cost receipts subject to the review and approval of the City Engineer and Administrative Services Director. Credit for street construction will limited to facilities and improvements starting at the lip of gutter. Fire Marshal 16. Minimum fire flow required for proposed BP BS development that includes commercial property building footprints of 25,000 square feet, single story will be approximately 2250 GPM for 2 hours. 17. All buildings 5000 square feet or greater require BP BS automatic fire sprinklers -Design of such systems to be either NFPA 13 for commercial or NFPA 13D for residential. 18. Fire hydrant spacing not to exceed 500 feet. BP BS 19. Fire apparatus access roads and water supplies BP BS (fire hydrants) for fire protection is required to be installed and made serviceable prior to and during the time of construction. 20. All access roadways in a Planned Unit BP BS Development (PUD) shall be built/installed according to California Fre Code 2001 Section 902.1, Appendix III -D. 21. Roadways shall extend to within 150 of all BP BS portions of exterior walls of the first story of any building. 22. Assure all roads built with adequate turning radius BP BS of at least 28 feet inside, 48 feet outside. 23. Portable fire extinguishers required on exterior BP BS and centrally located per 75 feet walking distance for all multifamily units. 24. Knox security system for emergency fire dept. BP BS entry required for all commercial construction City Engineer Project Conditions ITEM NUMBER: DATE: 08-17-04 Drainage 25. Provide for the detention of up to the 100 year GP, BP CE developed storm runoff while metering out the historic release rate of the comparable undeveloped storm. No increase in down stream flow rate, up to a 100 - year event, will be allowed, unless a full analysis of downstream drainage impacts is completed and approved from the project boundary to the Salinas River and downstream improvements are constructed to mitigate any downstream impacts to properties. 26. Submit calculations to support the design and GP, BP CE construction of any structures or pipes. Closed conduits shall be designed to convey the 10 -year flow with gravity flow; the 25 -year flow with head, and provide safe conveyance for the 100 -year overflow. 27. Drainage basins shall be designed to desilt, detain GP, BP CE and meter storm flows as well as release them to natural runoff locations. 28. Vegetative earth channels and swales will be used to GP, BP CE convey minor concentrations of storm water from developed areas to drain inlets. 29. Drain Inlets will be designed with permeable surface GP, BP CE of oil and water separator/sediment trap to reduce pollutions. The project HOA will be responsible for the cleaning and maintaining these systems. 30. This project proposes to fill in the FEMA 100 -year GP, BP CE Floodplain. A 100 -year Floodway will be created in the existing 100 -year Floodplain. No structures or fill will be placed within the limits of the floodway. A standard Letter of Map Revision will be submitted and approved by the City and FEMA. The Floodway widths will be created such that the rise of the 100 - year floodwater elevation is no more than one foot on the interior of the site and there is no increase at the EI Camino Real culverts. 31. Structures placed outside the 100 -year Floodway GP, BP CE boundary shall have finished floor elevations a minimum of one foot above the base flood elevation. 32. Concentrated drainage from off-site areas shall be GP, BP CE conveyed across the project site in drainage easements. Acquire drainage easements where needed. Drainage shall cross lot lines only where a drainage easement has been provided. If drainage easement cannot be obtained the storm water release must follow the exact historic path, rate and velocity as prior to the subdivision. 33. Applicant shall submit Sediment and Erosion Control GP, BP CE Plans and a Storm Water Pollution Prevention Plan (SWPPP). The Regional Water Quality Control Board (RWQCB) shall approve the SWPPP. These plans will follow the design and construction these ITEM NUMBER: DATE: 08-17-04 mitigations per the rules of the City of Atascadero, the RWQCB and measures listed in the project environmental document. 34. Traffic Mitigation: GP, BP CE A Traffic Impact Study was produced for this project by Omni - Means. In the study there are recommended mitigation measures. Listed below are conditions to implement the mitigation measures: A Santa Barbara Road/EI Camino Real: Install Traffic Signal This is required to be installed prior to the first unit occupied. The construction costs for the signal will be counted as credit toward the Traffic Impact Fee. B. Santa Barbara Road/US 101 Interchange The study found that the following Improvements are required for the interchange. Also list is the percent "fair Share" that this project is responsible for the improvement. These are to be installed prior to the first unit occupies or the first commercial building opened. These are improvements that are not identified as needed improvements in the City of Atascadero Circulation Element and the Growth Mitigation Program. Therefore, the growth mitigation fee does not cover the improvements. The developer may record a reimbursement agreement against future trip generation facilities to recoup a portion of the cost of construction. ■ Santa Barbara Road/US 101 SB Ramps: Install Traffic Signal (39.3%) ■ Santa Barbara Road/US 101 NB Ramps: Install Traffic Signal (52.4%) The above two signals shall be interconnected. C. Viejo Camino/EI Camino Real: Install Traffic Signal (33.4%) D. San Diego Way/EI Camino Real: Install Traffic Signal (31.4%) The improvements listed in C. and D. are improvements that are not identified as needed improvements in the City of Atascadero Circulation Element and the Growth Mitigation Program. Therefore, the growth mitigation fee does not cover the improvements. The developer is required to submit engineers estimate for the cost of construction of the improvements. The developer shall pay the percent "fair Share" of the engineer's estimates. These funds will be placed in an account for the improvements. The developer may pay the amount incrementally with each building permit. E. Santa Barbara Road between EI Camino Real and US 101. Construct two-lane road with left turn channelization, ITEM NUMBER: DATE: 08-17-04 bike lanes and pedestrian sidewalk. F. EI Camino Real between Santa Barbara Road and project north boundary. Construct two southbound and one northbound travel lanes, bike lanes in both directions, median and left turn channelization. All public improvements shall be constructed in conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer. Sewer 35. No sewer system currently exists in proposed project GP, BP CE area. Should Dove Creek be the first development to require connection to the new sewer system mainline extension, the developer of the Dove Creek will be responsible for the financing and construction of the mainline from the treatment plant to the Woodland's point of connection. 36. The mainline shall be built with sufficient capacity to GP, BP CE accommodate development within the Plan Area as well as new development in the area and existing uses. 37. Development using the sewer extension, within ten GP, BP CE (15) years, shall be responsible for reimbursing the Woodlands developer proportionate to their rate of use. 38. A mechanism must be provided to fund and maintain GP, BP CE all sewer mains throughout the project area. 39. If a lift Station is planned with this project the GP, BP CE following will apply: Lift station shall be equipped with an alarm dialer, programmed to notify qualified maintenance personnel when malfunctions occur. Lift Stations shall be equipped with duplex pumps. Catalog cuts of equipment that will be installed in lift station shall be submitted and approved by the City Engineer. Applicant shall submit a lift station emergency/contingency plan that addresses protection of public health and the environment from sewage spills caused by equipment malfunctions and prolonged power outages. Provisions for the repair and maintenance of the private wastewater pump station shall be included in the CC&R's for this tract. Included shall be a mechanism to maintain the private wastewater pump station, such as a homeowners association. The City Engineer and City Attorney shall approve the final form prior to recordation. General 40. Prior to final map recordation, the applicant shall GP, BP CE provide a detailed cost analysis and breakdown of all ITEM NUMBER: DATE: 08-17-04 maintenance required and the amount to be billed to each property annually. The analysis shall include scheduled maintenance including slurry seals, overlays, etc. The analysis shall include administrative fees. 41. Prior to final map recordation, a Homeowner's GP, BP CE Association shall be created and CC&R's recorded providing for the funding and performance of required maintenance, including streets, wastewater pump station and sewer, drainage basins, parks, swales and structures. 42. The applicant shall enter a Subdivision Improvement GP, BP CE Agreement with the City of Atascadero prior to recording the final map. 43. A permanent irrevocable offer of dedication shall be FM CE maintained on the 1.01 -acre parcel (Lot 53) at the intersection of Santa Barbara Rd and Highway 101. City Engineer Standard Conditions 44. In the event that the applicant is allowed to bond for GP, BP CE the public improvements required as a condition of this map, the applicant shall enter into a Subdivision Improvement Agreement with the City Council. 45. An engineer's estimate of probable cost shall be GP, BP CE submitted for review and approval by the City Engineer to determine the amount of the bond. 46. The Subdivision Improvement Agreement shall record GP, BP CE concurrently with the Final Map. 47. The applicant shall enter into a Plan Check/Inspection GP, BP CE agreement with the City. 48. A six (6) foot Public Utility Easement (PUE) shall be GP, BP CE provided contiguous to the road property frontage. 49. The applicant shall acquire title interest in any off-site GP, BP CE land that may be required to allow for the construction of the improvements. The applicant shall bear all costs associated with the necessary acquisitions. The applicant shall also gain concurrence from all adjacent property owners whose ingress and egress is affected by these improvements. 50. Slope easements shall be obtained by the applicant GP, BP CE as needed to accommodate cut or fill slopes. 51. Drainage easements shall be obtained by the GP, BP CE applicant as needed to accommodate both public and private drainage facilities. 52. A preliminary subdivision guarantee shall be GP, BP CE submitted for review in conjunction with the processing of the parcel map. 53. The final map shall be signed by the City Engineer prior to the map being placed on the agenda for City ITEM NUMBER: DATE: 08-17-04 Council acceptance. 54. Prior to recording the parcel map, the applicant shall GP, BP CE pay all outstanding plan check/inspection fees. 55. Prior to recording the map, the applicant shall GP, BP CE complete all improvements required by these conditions of approval. 56. Prior to recording the parcel map, the applicant shall GP, BP CE set monuments at all new property corners. A registered civil engineer or licensed land surveyor shall indicate by certificate on the parcel map, that corners have been set or shall beset by a date specific and that they will be sufficient to enable the survey to be retraced. 57. Prior to recording the parcel map, the applicant shall GP, BP CE submit a map drawn in substantial conformance with the approved tentative map and in compliance with all conditions set forth herein. The map shall be submitted for review and approval by the City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. 58. All existing and proposed utility, pipeline, open space, GP, BP CE or other easements are to be shown on the final/parcel map. If there are building or other restrictions related to the easements, they shall be noted on the final/parcel map. The applicant shall show all access restrictions on the final/parcel map. 59. Prior to recording the parcel map, the applicant shall GP, BP CE have the map reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company indicating their review of the map. The letter shall identify any new easements that may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the parcel map. 60. Prior to the issuance of building permits the applicant GP, BP CE shall submit plans and supporting calculations/reports including street improvements, underground utilities, composite utilities, and grading/drainage plans prepared by a registered civil engineer for review and approval by the City Engineer. Atascadero Mutual Water Company 61. Before recordation of the final map, the applicant AMWC shall submit plans to AMWC for the water distribution facilities needed to serve the project. AMWC shall review and approve the plans before construction begins on the water system improvements. All water distribution facilities shall be constructed in conformance with AMWC Standards and Details and the California Waterworks Standards (Code of ITEM NUMBER: DATE: 08-17-04 Regulations Title 22, Division 4, Chapter 16). All cross -connection devices shall conform to AWWA and California Department of Health Services standards. 62. Before the start of construction on the water system AMWC improvements, the applicant shall pay all installation and connection fees required by AMWC. Subject to the approval of AMWC, the applicant may enter in to a "deferred connection" agreement. 63. Before issuance of building permits, the applicant AMWC shall obtain a "Will Serve" letter from AMWC for the newly created lots within the subdivision. 64. The water mains required to serve the project shall be AMWC laid out in a grid or looped pattern and shall connect to the existing water mains system in Santa Barbara Road, EI Camino Real, and San Diego Road. 65. The applicant shall design and construct a AMWC replacement for the existing 4 -inch diameter water main in San Diego Road. The replacement main shall be 6 -inch diameter. The replacement main shall extend from the terminus of the existing 6 -inch main in San Diego Road north of the project boundary and the point -of -connection of the water main extension required for the project. 66. The applicant shall provide AMWC with easements AMWC for those water facilities proposed for operation and maintenance by AMWC that are constructed outside of publicly maintained right-of-ways. AMWC shall review the form and content of the easements before recordation. 67. The applicant shall submit a hydraulic analysis with AMWC the first plan check submittal of the water system improvements for the project. The analysis should take into account the fire flows required by the Uniform Fire Code and requirements of the California Waterworks Standards. The applicant is responsible for designing and constructing water system improvements that will provide water at pressures and flows adequate for the domestic and fire protection needs of the project. 68. The applicant shall obtain a separate landscape- AMWC irrigation meter(s) from AMWC for the common areas within the project. 69. Landscaping for the common areas shall be drought AMWC tolerant. Before construction of the water system improvements, AMWC shall review and approve the landscape plans for the common areas within the project. The landscape plan submittal shall incorporate the following: ■ Plant list w/ Water Use Classification of Landscape Species (WUCOLS) rating specified. Preference shall be given to plants with very low (VL) and low (L) WUCOLS ratings. ■ Justification for use of plants with WUCOLS rating of M or greater. ■ Total landscaped area including hardscapes (patios, walks & decks) and planted areas and excluding sidewalks, driveways, streets or parking. ■ The size and shape of turf areas shall promote for efficient irrigation shall be no less than 8 -feet wide. ITEM NUMBER: DATE: 08-17-04 Turf type shall be warm -season grasses. Turf areas shall be kept to a minimum and shall be limited to functional areas only. A goal of the landscape design should be a total turf area of no more than 10% of the total landscaped area. 70. Before construction of the water system AMWC improvements, AMWC shall review and approve the irrigation plans for the common areas within the project. The irrigation plan submittal shall include the following: ■ Landscape irrigation meter location and size. ■ Backflow prevention device type, location, and manufacturer ■ Flow and precipitation rate for each circuit ■ Irrigation schedules including schedules for establishment period and post establishment period ■ Total anticipated water application per circuit per month for both schedules ■ Total landscape water application. ■ Use drip irrigation where ever possible ■ A check valve shall be installed on the lowest head in each sprinkler circuit