HomeMy WebLinkAboutPC_2005-10-18_AgendaPacketCALL TO ORDER
CITY OF ATASCADERO
PLANNING COMMISSION AGENDA
Regular Meeting
October 18, 2005 — 7:00 P.M.
City of Atascadero
Pavilion on the Lake
9315 Pismo Ave. - Atascadero, California
Pledge of Allegiance
Roll Call: Chairperson Porter
Vice Chairperson Beraud
Commissioner Fonzi
Commissioner Jones
Commissioner Kelley
Commissioner O'Keefe
Commissioner Patel
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
PUBLIC COMMENT
(This portion of the meeting is reserved for persons wishing to address the Commission on any matter not
on this agenda and over which the Commission has jurisdiction. Speakers are limited to five minutes.
Please state your name and address for the record before making your presentation. The Commission may
take action to direct the staff to place a matter of business on a future agenda)
CONSENT CALENDAR
(All items on the consent calendar are considered to be routine and non -controversial by City Staff and will
be approved by one motion if no member of the Commission or public wishes to comment or ask questions)
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON SEPTEMBER 6, 2005.
2. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON SEPTEMBER 20, 2005.
City of Atascadero Planning Commission Agenda
Regular Meeting October 18, 2005
Page 2 of 5
3. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON OCTOBER 4, 2005.
COMMUNITY DEVELOPMENT STAFF REPORTS
PUBLIC HEARINGS
(For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public
hearing and invite the applicant or applicant's representative to make any comments. Members of the public will be invited to provide
testimony to the Commission following the applicant. Speakers should state their name and address for the record and can address the
Commission for five minutes. After all public comments have been received, the public hearing will be closed, and the Commission
will discuss the item and take appropriate action(s).)
4. TENTATIVE PARCEL MAP 2005-0070,5750 ROSARIO AVE.
Owner:
David Graves, 4155 Carrizo Road, Atascadero, CA 93422
Project Title:
Tentative Parcel Map 2005-0070
Project
5750 Rosario Avenue, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 029-321-015
Project
A request to establish three airspace condominium units on an existing lot of record. The existing
Description:
structures on the property are to be demolished prior to the proposed development of three detached
dwelling units, approximately 1,200 square feet each. No native trees will be removed.
General Plan Designation: Multi Family Residential - 10 (RMF -10)
Zoning District: Medium Density Residential (MDR)
Proposed
The project qualifies for a Categorical Exemption per CEQA Section 15315: Minor Land Divisions.
Environmental
Determination:
4. CONDITIONAL USE PERMIT 2000-0022 RECONSIDERATION
TO BE CONTINUED
Owner:
Jimmie D. Shores, P O Box 216, Atascadero, CA 93423
Project Title:
San Anselmo Carwash - Reconsideration of Conditional Use Permit 2000-0022.
Project
6125 San Anselmo Road, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 049-225-024
Project
The proposed project is a reconsideration of an approved Conditional Use Permit to allow for an additional
Description:
ingress/egress on San Anselmo near the northwest comer of the site. The ingress/egress request includes
installation of a berm median that limits movement to right turns only.
General Plan Designation: GC (General Commercial)
Zoning District: (CT) Commercial Tourist
Proposed
CEQA Categorical Exemption Section 15301 — Existing Facilities.
Environmental
Determination:
City of Atascadero Planning Commission Agenda Regular Meeting October 18, 2005
Page 3 of 5
6. TENTATIVE PARCEL MAP 2005-0072,5155 ESCARPA AVE.
TO BE CONTINUED
Applicant:
Barak Miles, 5255 Traffic Way, Ste. 104, Atascadero, CA 93422
Owners:
Jeff Hansen, P O Box 1710, Atascadero, CA 93423
Barak Miles, 5255 Traffic Way, Ste. 104, Atascadero CA 93422
Project Title:
Tentative Parcel Map 2005-0072
Project
5155 Escarpa Ave., Atascadero, CA 93422
Location:
(San Luis Obispo County) ATN 029-161-008
Project
A proposed subdivision of an existing 3.37 gross acre lot into three individual parcels of 1.01, 1.15, and 1.21
Description:
gross acres. The site is currently contains a single-family residence that will remain on proposed parcel 1. The
parcels consist of moderate to steep slopes and contain native trees and vegetation. Onsite septic will serve the
property and water is available from Atascadero Mutual Water Company.
General Plan Designation: Single Family Residential (SFR -Y)
Zoning District: Residential Single Family (RSF-Y)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Negative Declaration is available for public review at 6905 El Camino Real, Suite 6, Community
Determination:
Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
7. ZONE CHANGE 2003-0044, CONDITIONAL USE PERMIT 2003-0093,
TENTATIVE PARCEL MAP 2003-0039
Applicant:
Michael Jackson, 5502 Ensenada Ave., Atascadero, CA 93422
Project Title:
Zone Change 2003-0044, Conditional Use Permit 2003-0093, Vesting Tentative Parcel Map 2003-
0039 with a planned development overlay.
Project
5502 Ensenada Ave, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 028-361-014
Project
The proposed project consists of an application for a Zone Change, Conditional Use Permit, and
Description:
Tentative Parcel Map to establish three new single-family homes with one existing single-family home
located on individual lots that will be developed under the requirements of the PD -7 Overlay District
within the Residential Multi -Family (RMF -10) Zoning District. The project includes one home per lot
each with a two -car garage and a single guest parking space. Five native trees are proposed for
removal. The project proposes construction 20 -feet from a blue -line creek. The proposed residences
will be served by City sewer.
General Plan Designation: Medium Density Residential — MDR
Zoning District: Residential Multiple Family — RMF -10
Proposed
Based on the initial study prepared for the project, a Negative Declaration is proposed. The proposed
Environmental
Negative Declaration is available for public review at 6905 El Camino Real, Suite 6, Community
Determination:
Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
City of Atascadero Planning Commission Agenda
Regular Meeting October 18, 2005
Page 4 of 5
8. CONDITIONAL USE PERMIT 2005-0161,8900 EL CAMINO REAL
Applicant:
Jay DeCou, DeCou Lumber Co., P.O. Box 698, Atascadero, CA 93423
Project Title:
Conditional Use Permit 2005-0161
Project
8900 El Camino Real Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 056-051-033
Project
The proposed project consists of an application for a Conditional Use Permit for the construction of
Description:
two 4000 square foot storage buildings. The buildings are proposed to be constructed in two phases.
The site is located on 0.93 acres within the Commercial Service Zone.
General Plan Designation: Service Commercial (SC)
Zoning District: Commercial Service (CS)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Mitigated Negative Declaration is available for public review at 6905 El Camino Real, Suite
Determination:
6, Community Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
COMMISSIONER COMMENTS AND REPORTS
DIRECTOR'S REPORT
ADJOURNMENT
The next regular meeting of the Planning Commission will be on November 1, 2005 at the
Pavilion on the Lake, 9315 Pismo Avenue, Atascadero.
Please note: Should anyone challenge in court any proposed development entitlement listed
on this Agenda, that person may be limited to raising those issues addressed at the public
hearing described in this notice or in written correspondence delivered to the Planning
Commission at, or prior to this public hearing.
City of Atascadero Planning Commission Agenda Regular Meeting October 18, 2005
Page 5 of 5
City of Atascadero
WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING
The Planning Commission meets in regular session on the first and third Tuesday of each month at 7:00
p.m., at the Pavilion on the Lake, 9315 Pismo Ave., Atascadero. Matters are considered by the
Commission in the order of the printed Agenda.
Copies of the staff reports or other documentation relating to each item of business referred to on the
Agenda are on file in the office of the Community Development Department and are available for public
inspection during City Hall Annex business hours at the Community Development counter and on our
website, www.atascadero.org. An agenda packet is also available for public review at the Atascadero
Library, 6850 Morro Road. All documents submitted by the public during Commission meetings that are
either read into the record or referred to in their statement will be noted in the minutes and available for
review in the Community Development Department.
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in
a City meeting or other services offered by this City, please contact the City Manager's Office, (805)
461-5000, or the City Clerk's Office, (805) 461-5000. Notification at least 48 hours prior to the meeting or
time when services are needed will assist the City staff in assuring that reasonable arrangements can be
made to provide accessibility to the meeting or service.
TO SPEAK ON AGENDA ITEMS
Members of the audience may speak on any item on the agenda. The Chairperson will identify the
subject, staff will give their report, and the Commission will ask questions of staff. The Chairperson will
announce when the public comment period is open and will request anyone interested to address the
Commission regarding the matter being considered to step up to the podium. If you wish to speak for,
against, or comment in any way:
• You must approach the podium and be recognized by the Chairperson
• Give your name and address (not required)
• Make your statement
• All comments should be made to the Chairperson and Commission
• All comments limited to 5 minutes (unless changed by the Commission)
• No one may speak for a second time until everyone wishing to speak has had an opportunity
to do so, and no one may speak more than twice on any item.
If you wish to use a computer presentation to support your comments, you must notify the Community
Development Department at least 24 hours prior to the meeting. Access to hook up your laptop to the
City's projector will be provided. You are required to submit to the Recording Secretary a printed copy
of your presentation for the record. Please check in with the Chairperson before the meeting begins to
announce your presence and turn in the printed copy.
The Chairperson will announce when the public comment period is closed, and thereafter, no further
public comments will be heard by the Council.
TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA
Under Agenda item, "PUBLIC HEARINGS", the Chairperson will call for anyone from the audience having
business with the Commission to:
• Please approach the podium and be recognized
• Give your name and address (not required)
• State the nature of your business
This is the time items not on the Agenda may be brought to the Commission's attention. A maximum of
30 minutes will be allowed for Community Forum (unless changed by the Commission).
CALL TO ORDER
ITEM NUMBER: 1
DATE: 10-18-05
CITY OF ATASCADERO
PLANNING COMMISSION
DRAFT MINUTES
Regular Meeting
September 6, 2005 — 7:00 P.M.
At Chairperson Porter's request Vice Chairperson Beraud called the meeting to order at
7:03 p.m. Commissioner Patel led the Pledge of Allegiance.
ROLL CALL
Present: Commissioners Fonzi, Kelley, O'Keefe, Patel, Beraud and
Chairperson Porter
Absent: Commissioner Jones
Staff Present: Community Development Director Warren Frace, Public Works
Director/City Engineer Steve Kahn, Deputy Community
Development Director Steve McHarris, Associate Planner Kelly
Gleason, Associate Planner Kerry Margason, Assistant Planner
Lisa Wilkinson, and Recording Secretary Grace Pucci.
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
Commissioner O'Keefe suggested that Item #7 be moved to follow Item #3, with Items
#5 and 6 to follow and Item #4 heard last.
MOTION: By Commissioner O'Keefe and seconded by Commissioner
Kelley to approve the agenda as amended.
Motion passed 6:0 by a roll -call vote.
PC Draft Minutes 09/06/05
Page 1 of 12
PUBLIC COMMENT
Susan Litteral expressed concern with drainage issues for a previously approved tract
map on San Rafael Road.
City Engineer Steve Khan addressed Ms. Litteral's concerns.
Commissioner Jones joined the hearing at 7: 05 p.m.
Vice Chairperson Beraud closed the Public Comment period.
CONSENT CALENDAR
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON AUGUST 16, 2005.
MOTION: By Commissioner Fonzi and seconded by Commissioner
Kelley to approve Item #1.
Motion passed 6:0 by a roll -call vote. (Porter abstained)
COMMUNITY DEVELOPMENT STAFF REPORTS
2. TREE REMOVAL PERMIT 2005-0075
Applicant
Centex Homes, 735 Tank Farm Road, SLO, CA 93401
Project Title
Tree Removal Permit 2005-0075
Project Location
EI Camino Real / Santa Barbara Road, Atascadero, CA 93422
Project
Description
Request to remove one 40" native oak tree for required street improvements.
Staff
Recommendation
The Planning Commission approve the requested removal.
Associate Planner Kelly Gleason gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT — None
MOTION: By Commissioner Fonzi and seconded by Commissioner
Kelley to adopt Resolution PC 2005-0068 to approve the
request to remove one (1) native oak tree subject to conditions
of approval.
Motion passed 7:0 by a roll -call vote.
PC Draft Minutes 09/06/05
Page 2 of 12
3. TREE REMOVAL PERMIT 2005-0077
Applicant
Gaylen Little, Hidden Oaks Village, 941 Buena Fortuna Circle, Atascadero, CA 93422
Project Title
Tree Removal Permit 2005-0077
Project Location
Buena Fortuna Circle, Atascadero, CA 93422
Project
Description
Request to remove one dead 28" blue oak tree.
Staff
Recommendation
The Planning Commission approve the requested removal.
Assistant Planner Lisa Wilkinson gave the staff report and answered questions of the
Commission.
Commissioner O'Keefe expressed concern that the mitigation does not follow the tree
ordinance.
PUBLIC COMMENT
Steve Alvarez, applicant's arborist, answered questions of the Commission.
Vice Chairperson Beraud closed the Public Comment period.
MOTION: By Commissioner O'Keefe and seconded by Commissioner
Kelley to adopt Resolution PC 2005-0071 to approve the
request to remove one (1) native oak tree subject to conditions
of approval and that the full amount of the mitigation be paid.
Motion passed 7:0 by a roll -call vote.
Commissioner O'Keefe stated for the record that she made the motion as she did
because the developers made every effort to protect the trees on a difficult site. She
would like to see another oak tree, but that decision is up to the owners of the property.
PUBLIC HEARINGS
7. CONDITIONAL USE PERMIT AMENDMENT 2000-0024
Owner
Loraine Russell, P O Box 257, Atascadero, CA 93423
Project Title
Conditional Use Permit Amendment 2000-0024
Project
6340 Alcantara Ave. / Tecorida Ave., Atascadero, CA 93422, San Luis Obispo County
Location
APN 030-292-065
Project
A request to change affordable housing condition to allow in -lieu fee payment pursuant to current Council
Description
policy.
PC Draft Minutes 09/06/05
Page 3 of 12
General Plan Designation: MDR
Zoning District: RMF -10 / PD7
Associate Planner Kelly Gleason gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT — None
MOTION: By Commissioner Kelley and seconded by Commissioner
O'Keefe to Adopt Resolution PC 2005-0069 to approve the
amendment to CUP 2000-0024 modifying the affordable
housing condition to be consistent with current City Council
Policy and add a condition of approval requiring sidewalks
along the Tecorida Avenue frontage.
Motion passed 7:0 by a roll -call vote.
5. GENERAL PLAN AMENDMENT 2005-0014, MARCHANT
Applicant
Kelly and Tamara Gearhart, 6205 Alcantara Avenue, Atascadero, CA 93422
Project Title
GPA 2005-0014, CUP 2005-0156, TTM 2005-0066, ZCH 2005-0098 Airspace Condominium Map
Project
5000, 5020, 5060 Marchant Avenue, Atascadero, CA 93422
Location
APN 030-213-011, 012, 013, 014
Project
The proposed project consists of an application for a General Plan Amendment, Conditional Use
Description
Permit, Zone Change, and Tentative Tract Map for the construction of twelve new condominium units
with a condominium map. Proposed condos range from 767 square feet to 1,996 square feet. Each
residential unit will include a one -car garage and one parking space in each driveway. The project will
take access off of Marchant Avenue, as well as a Phase I development on Tecorida Avenue which has
been previously built by the applicant. No native trees are proposed for removal.
General Plan Designation: General Commercial (GC)
Zoning District: Commercial Tourist (CT)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Mitigated Negative Declaration is available for public review at 6905 El Camino Real, Suite
Determination
6, Community Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
Deputy Community Development Director Steve McHarris gave the staff report and
answered questions of the Commission.
PUBLIC COMMENT
Kelly Gearhart, applicant, answered questions of the Commission.
Vice Chairperson Beraud closed the Public Comment period.
Commissioner O'Keefe asked for assurance that the trees in the open space easement
area have protection placed at the drip line on all sides.
PC Draft Minutes 09/06/05
Page 4 of 12
Commissioner Fonzi stated that the affordable housing should include other than just
one bedroom units—to be determined by staff.
Vice Chairperson Beraud suggested incorporating additional sidewalks, from the
existing sidewalk at Marchant to the most southerly unit, to create a more safe
pedestrian access to all units.
MOTION: By Commissioner Kelly and seconded by Chairperson Porter
to adopt Resolution PC 2005-0062 recommending that the City
Council certify Proposed Mitigated Negative Declaration 2005-
0042; and, adopt Resolution PC 2005-0063 recommending that
the City Council approve General Plan Amendment 2005-0014
based on findings; and, adopt Resolution PC 2005-0064
recommending that the City Council approve Zone Map
Change 2005-0098 based on findings; and, adopt Resolution
PC 2005-0065 recommending that the City Council introduce
an ordinance for first reading by title only, to approve Zone
Text Amendment 2005-0102 modifying PD -10 overlay district
code text based on findings; and, adopt Resolution PC 2005-
0066 recommending that the City Council approve Conditional
Use Permit Amendment 2005-0156 (Master Plan of
Development) based on findings and subject to Conditions of
Approval and Mitigation Monitoring; and, adopt Resolution PC
2005-0067 recommending that the City Council approve
Tentative Tract Map 2005-0066 based on findings and subject
to Conditions of Approval and Mitigation Monitoring and that
the applicant will work with staff regarding the affordable
housing issue that they will include more than one -bedroom
units, and the applicant will work with staff to put in a sidewalk
where feasible.
Motion passed 7:0 by a roll -call vote.
6. TENTATIVE PARCEL MAP 2005-0069, 8585 SAN RAFAEL ROAD
Applicant
David Graves, DLG Development, 4155 Carrizo Road, Atascadero, CA 93422
Project Title
Tentative Parcel Map 2005-0069
Project
8585 San Rafael Road, Atascadero, CA 93422, San Luis Obispo County
Location
APN 056-36 1 -001
Project
A proposed subdivision of an existing 5.36 gross acre lot into two individual parcels of 2.50 and 2.86
Description
gross acres. The site currently contains a single-family residence with a detached shop/garage that will
remain on proposed Parcel 1, allowing the new lot to be developed as a single-family residence. The lot
split will be in a "flag" lot configuration with Parcel 2 gaining access from San Rafael Rd. through a 24'
driveway. The existing site consists of gentle slopes with a blue -line creek crossing the proposed Parcel 1
from south to north. Proposed Parcel 2 is currently an open grass pasture. Onsite septic will serve the
PC Draft Minutes 09/06/05
Page 5 of 12
Associate Planner Kerry Margason gave the staff report and answered questions of the
Commission.
In response to a Commission question regarding the bike lanes, City Engineer Steve
Kahn proposed the applicant be required to do a 401 per the condition and strike the
class two bikeways.
PUBLIC COMMENT
David Graves, applicant, addressed questions raised by the Commission.
Susan Litteral clarified the area where the flooding occurs and spoke about consistency
with the neighborhood.
Ray Cordero stated his concerns with the culvert the applicant proposes to put on the
property.
Vice Chairperson Beraud closed the Public Comment period.
Public Works Director Steve Kahn addressed questions raised during the Public
Comment period.
There was Commission discussion regarding drainage issues and siting of the
driveway.
MOTION: By Commissioner O'Keefe and seconded by Commissioner
Jones to continue this item so that the drainage issues and
flow of water be worked out.
Motion passed 5:2 by a roll -call vote. (Kelley, Porter opposed)
Vice Chairperson Beraud recessed the hearing at 8:02 p.m.
Vice Chairperson Beraud called the meeting back to order at 8:12 p.m.
PC Draft Minutes 09/06/05
Page 6 of 12
property with relocation of the existing leach field. Water is available from Atascadero Mutual Water
Company.
General Plan Designation: Rural Estate (RE)
Zoning District: Residential Suburban (RS)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Negative Declaration is available for public review at 6905 El Camino Real, Suite 6,
Determination
Community Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
Associate Planner Kerry Margason gave the staff report and answered questions of the
Commission.
In response to a Commission question regarding the bike lanes, City Engineer Steve
Kahn proposed the applicant be required to do a 401 per the condition and strike the
class two bikeways.
PUBLIC COMMENT
David Graves, applicant, addressed questions raised by the Commission.
Susan Litteral clarified the area where the flooding occurs and spoke about consistency
with the neighborhood.
Ray Cordero stated his concerns with the culvert the applicant proposes to put on the
property.
Vice Chairperson Beraud closed the Public Comment period.
Public Works Director Steve Kahn addressed questions raised during the Public
Comment period.
There was Commission discussion regarding drainage issues and siting of the
driveway.
MOTION: By Commissioner O'Keefe and seconded by Commissioner
Jones to continue this item so that the drainage issues and
flow of water be worked out.
Motion passed 5:2 by a roll -call vote. (Kelley, Porter opposed)
Vice Chairperson Beraud recessed the hearing at 8:02 p.m.
Vice Chairperson Beraud called the meeting back to order at 8:12 p.m.
PC Draft Minutes 09/06/05
Page 6 of 12
4. GENERAL PLAN AMENDMENT 2003-0005, WEST FRONT
Applicant
Richard Shannon, West Front Properties, 5070 San Benito Rd., Atascadero, CA 93422
Owner
Colony Associates, 4100 W. Alameda Ave. Suite 103, Burbank, CA 91505
Project Title
West Front Village: General Plan Amendment 2003-0005, Planned Development Zone Code Text
2003-0058, Mixed -Use Planned Development Zone Change 2004-0088, Master Plan of Development
(CUP 2003-0108), Tentative Tract Map 2003-0035.
Project
8870 West Front Road, 8760, 8840 Portola Road (APN 056-131-015, 17, 018, and 019) each within
Location
the City of Atascadero (San Luis Obispo County).
Project
The proposed project consists of a General Plan Amendment, Zone Change, establishment of a Planned
Description
Development Overlay Zone, a corresponding Master Plan of Development (CUP), and a Vesting
Tentative Tract Map that would allow for a horizontal mixed-use commercial and residential development
on a 13.35 -acre site. The project site fronts both West Front Road and Portola Road and includes 14
single-family residential homes, 18 multi -family residential duplex units, a 79 -unit hotel, and 10,000
square feet of commercial retail/restaurant and gas station/fast food buildings. The project includes a
future 5 -lot single-family residential subdivision with retention of an existing historic colony home, adobe
building, associated outbuildings, and native oak trees at the rear of the site for an overall project total of
37 residential units. The site contains 18 native oak trees of which 14 are proposed for removal.
General Plan Designation: GC — General Commercial
Zoning District: CR — Commercial Retail
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Mitigated Negative Declaration is available for public review at 6905 El Camino Real, Suite 6,
Determination
Community Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
Commissioner Patel stepped down from consideration of this item stating he has a
potential conflict because he is an existing hotel operator, had challenged this project in
the past and has proposed a motel project in the vicinity of this project. (Exhibit A)
Deputy Community Development Director Steve McHarris gave the staff report and
answered questions of the Commission. A memorandum of recommended corrections
to the staff report and conditions of approval was distributed to the Commission.
(Exhibit B)
PUBLIC COMMENT
John Knight, RRM Design Group, applicant's representative, gave a brief overview of
the project.
Pat Blodey, applicant's architect, answered questions of the Commission
John Rosetti, applicant, addressed questions raised by the Commission.
Karen Smith raised several issues of concern including traffic on West Front, setbacks,
sidewalks and bike lanes along West Front, lighting from the project, noise impacts and
landscaping.
PC Draft Minutes 09/06/05
Page 7 of 12
Denise Morey expressed concern regarding notification for this project and traffic
impacts to the neighborhood.
Ron Grove stated his concern with traffic impacts from the commercial portion of this
project, especially in a residential area.
Robert Gober spoke about the increased traffic impact to the area from this project.
Rich Moore expressed his concerns regarding signage at the site, traffic impacts and
inconsistency of development with the surrounding neighborhood.
Ron Holland spoke about the hotel for the site, which he will own/build, and addressed
the issue of truck noise on the site.
Hal Carden spoke in favor of the project, which he thinks is appropriate for this site.
Richard Shannon, applicant, spoke about the traffic lights they will be installing on Santa
Rosa Road at the freeway ramps as well as the commercial uses on the site.
Jason McCorey spoke in favor of the project, particularly the affordable housing
component.
Mary Stall expressed her concern regarding the traffic impacts that will be created by
this project. She would like this area to remain residential.
John Knight addressed questions raised during the Public Comment period.
Karen Smith commented that the noticing for this project could have been better.
Vice Chairperson Beraud closed the Public Comment period.
City Engineer Steve Kahn addressed traffic issues raised during the Public Comment
period.
Vice Chairperson Beraud recessed the hearing at 9:52 p.m.
Vice Chairperson Beraud called the meeting back to order at 10:00 p.m.
Commission comments were as follows:
Commissioner Fonzi:
1. Has concerns with traffic, but was reassured by the City Engineer's comments.
2. Would like conditions for lighting and signage; the 50 foot pylon signs are
excessive
3. The hotel is an attractive prospect; the bed tax revenue is helpful.
4. Likes the transition from the commercial area to the residential area.
PC Draft Minutes 09/06/05
Page 8 of 12
5. Overall is in favor of the project with a few improvements.
Commissioner Kelley:
1. The project is well designed; it will be up to the City Council to determine if this is
the proper location for it.
2. Commercial development is needed in the city.
3. Traffic is a concern, but the signals will help move traffic along.
4. Would like to see Coromar Court narrowed, to slow down traffic, and restrict
parking to one side to create additional green space.
5. Disappointed that traffic study did not address Coromar; he would like to see a
stripe down the center of the road and stop signs.
6. Affordable housing is difficult to achieve given cost of building materials, etc.
Commissioner O'Keefe:
1. There has been considerable improvement in the design and layout, and all
recommendations from the joint meeting have been met.
2. Traffic is a problem given the proximity of EI Camino Real and Highway 101.
3. Disappointed that the Commission was not given the interior layouts of the
houses
4. The 50 foot pylon signs are too high.
5. Is very concerned with the financial numbers the applicant provided to justify
conversion of commercial to residential and would like the applicant to produce a
report that contains considerably more information.
Chairperson Porter
1. Increased traffic is his biggest concern; the proposed traffic signals will help
control some of that.
2. His primary concern is generating adequate retail and tax revenues from the
commercial projects fronting West Front.
3. Must ensure that restaurant is on the market after the hotel is complete.
4. Overall he feels comfortable sending the project to the Council.
Commissioner Jones:
1. Project is stronger now, particularly the housing element.
2. Traffic control devices will produce some results when installed.
3. Must have real calculations reagarding what the foot candle and lumen output
will be on the signs and what they will look like, however, it is important to have
signage that will get people off the freeway and into the businesses.
4. Wants a condition outlining uses for the project similar to those the Commission
came up with for Dove Creek.
Vice Chairperson Beraud
1. Agrees that the pylon height is excessive; 40 feet is high enough.
2. She supports narrowing Coromar Court and restricting parking to one side
increasing green space in the duplex area.
PC Draft Minutes 09/06/05
Page 9 of 12
3. Supports City Council and staff reviewing the allowable uses to ensure they will
meet the sales tax generation goal.
4. The financial justification report is inadequate; it must be made clearer and be
available to the public.
5. Must include a condition that the business park color theme be a darker tone to
reduce glare from the walls facing the residential areas.
MOTION: By Commissioner Jones and seconded by Commissioner
Kelley to adopt Resolution PC 2005-0056 recommending that
the City Council certify Proposed Mitigated Negative
Declaration 2005-0165; and, Resolution PC 2005-0057
recommending that the City Council approve General Plan
Amendment 2003-0005 based on findings; and, Resolution PC
2005-0058 recommending that the city Council introduce an
ordinance for first reading by title only, to approve Zone Code
Text Change 2003-0058 establishing a PD -23 overlay district
based on findings; and, Resolution No. PC 2005-0059
recommending that the City Council introduce an ordinance
for first reading by title only, to approve Zone Change 2003-
0088 based on findings; and, Resolution No. PC 2005-0060
recommending that the City Council approve Master Plan of
Development (CUP 2003-0108) based on findings and subject
to Conditions of Approval and Mitigation Monitoring; and
Resolution No. PC 2005-0061 recommending that the City
Council approve Tentative Tact Map 2003-0035 based on
findings and subject to Conditions of Approval and Mitigation
Monitoring; with the addition of the following conditions:
1) Additional traffic control evaluation on Portola.
2) Eliminate specific non tax uses from pages 75 and 76 and
use the Dove Creek model for Council's consideration.
3) Require the applicant to work with staff to adjust colors and
textures of the business park.
4) Work with staff to come up with accurate modeling of what
the signs look like at night based on their foot candle and
their lumen output, and have those mockups for the public
hearing before City Council.
5) Applicant to work with staff to narrow Coromar Court to two
lanes of traffic with a fire lane and increase the green area.
6) Coromar Street, from Portola to Curbaril, to have a center
line and install stop signs at the intersection of Via Tortuga
and Coromar.
7) Staff to review the two year marketing period for the
restaurant to make sure it is enforceable and in place.
Motion passed 5:1 by a roll -call vote. (O'Keefe opposed and
Patel abstained)
PC Draft Minutes 09/06/05
Page 10 of 12
Commissioner O'Keefe stated for the record that she voted no because she doesn't
believe that the financial numbers were provided to justify the conversion of residential
to commercial.
Vice Chairperson Beraud recessed the hearing at 10: 23 p.m.
Vice Chairperson Beraud called the meeting back to order at 10:25 p.m.
COMMISSIONER COMMENTS AND REPORTS
Commissioner O'Keefe questioned who was responsible for repairs of the pavement on
Santa Barbara Road and asked about the water at Dove Creek where grading is
currently in progress. City Engineer Steve Kahn addressed the questions.
Commissioner Jones felt it would be helpful to have a goal and tracking tool for the
Commission, when large housing projects come forward, to balance the housing
inventory against the General Plan for those areas that should be tracked.
Commissioner Kelley stated that having workshops on large projects has helped to
make them go smoother. He would like to see notification to neighbors on public
workshops as well as hearings on projects that have significant impacts to
neighborhoods.
Commissioner Fonzi complimented Vice Chairperson Beraud on how she handled
tonight's meeting.
Chairperson Porter also thanked Vice Chairperson Beraud, stating he had cataract
surgery this morning and would have had difficulty running the meeting.
DIRECTOR'S REPORT
Community Development Director Warren Frace reviewed the agenda for the next
Planning Commission meeting.
ADJOURNMENT
Vice Chairperson Beraud adjourned the meeting at 10:30 p.m. to the next regularly
scheduled meeting of the Planning Commission on September 20, 2005.
PC Draft Minutes 09/06/05
Page 11 of 12
MEETING RECORDED AND MINUTES PREPARED BY:
Grace Pucci, Recording Secretary
The following exhibits are available for review in the Community Development Department:
Exhibit A — Commissioner Patel, Conflict Statement
Exhibit B — Staff Memorandum for Item #4
\\Cityhall\cdvlpmnt\— PC Minutes\PC Minutes 05\PC Draft Minutes 9-6-05.gp.doc
PC Draft Minutes 09/06/05
Page 12 of 12
CALL TO ORDER
ITEM NUMBER: 2
DATE: 10-18-05
CITY OF ATASCADERO
PLANNING COMMISSION
DRAFT MINUTES
Regular Meeting
September 20, 2005 — 7:00 P.M.
Chairperson Porter called the meeting to order at 7:10 p.m. and Commissioner Jones
led the Pledge of Allegiance
ROLL CALL
Present: Commissioners Fonzi, Jones, Kelley, Patel, Beraud and
Chairperson Porter
Absent: Commissioner O'Keefe
Staff Present: Community Development Director Warren Frace, Public Works
Director / City Engineer Steve Kahn, Deputy Community
Development Director Steve McHarris, Associate Planner Kelly
Gleason, Assistant Planner Lisa Wilkinson and Recording
Secretary Annette Manier.
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
MOTION: By Commissioner Fonzi and seconded by Vice Chairperson
Beraud to approve the agenda.
Motion passed 6:0 by a roll -call vote.
PUBLIC COMMENT
Eric Greening spoke about the high cost of energy and suggested possible actions the
city could take to address the issue.
PC Draft Minutes 09/20/05
Page 1 of 8
Chairperson Porter closed the Public Comment period.
CONSENT CALENDAR
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON SEPTEMBER 6, 2005.
Vice Chairperson Beraud referred to the motion for Item #5 on page 5 of the Minutes.
She asked that the secretary review the tapes for clarification of the final sentence of
the motion to determine if lot numbers were included for location of the sidewalk.
MOTION: By Vice Chairperson Beraud and seconded by Commissioner
Jones to continue this item.
Motion passed 6:0 by a roll -call vote.
COMMUNITY DEVELOPMENT STAFF REPORTS
2. TREE REMOVAL PERMIT 2005-0078
Applicant
James Blizzard, P O Box 6157, Los Osos, CA 93412
Project Title
Tree Removal Permit 2005-0078
Project Location
East Mall, Atascadero, CA 93422
Project
Description
Request to remove one native oak tree located along the East Mall frontage on a vacant commercial
parcel located in the Downtown.
Staff
Recommendation
The Planning Commission approve the requested removal.
Associate Planner Kelly Gleason gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT — None
MOTION: By Commissioner Fonzi and seconded by Vice Chairperson
Beraud to adopt Resolution PC 2005-0073 to approve the
request to remove one (1) native oak tree subject to conditions
of approval.
Motion passed 6:0 by a roll -call vote.
PC Draft Minutes 09/20/05
Page 2 of 8
PUBLIC HEARINGS
3. TENTATIVE PARCEL MAP 2005-0070. 5750 ROSARIO
Owner:
David Graves, 4155 Carrizo Rd., Atascadero, CA 93422
Project Title:
Tentative Parcel Map 2005-0070
Project
5750 Rosario Ave., Atascadero, CA 93422
Location:
APN 029-321-015
Project
A request to establish three airspace condominium units on an existing lot of record. The existing structures on
Description:
the property are to be demolished prior to the proposed development of three detached dwelling units,
approximately 1,200 square feet each. No native trees will be removed.
General Plan Designation: Multi Family Residential - 10 (RMF -10)
Zoning District: Medium Density Residential (MDR)
Proposed
The project qualifies for a Categorical Exemption per CEQA Section 15315: Minor Land Divisions.
Environmental
Determination:
Assistant Planner Lisa Wilkinson gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Matt Beautz, applicant's representative, answered questions of the Commission.
Beverly Aho, Rosario resident, spoke about the style of the proposed homes and would
like to see them look more like the Colony homes in the neighborhood. She also spoke
about drainage issues for this site.
Matt Beautz explained several options the applicant could use to address Mrs. Aho's
drainage concerns.
Chairperson Porter closed the Public Comment period.
Vice Chairperson Beraud referred to a letter received from Greg Ravatt, AIA, Rosario
Resident, (Exhibit A), and stated her agreement with his comments about the design of
the houses. She would like the decorative aspects of the project upgraded to blend with
the surrounding neighborhood.
There was Commission discussion regarding placement of the front unit on the site,
parking, and style of the proposed homes.
PC Draft Minutes 09/20/05
Page 3 of 8
MOTION: By Commissioner Fonzi and seconded by Vice Chairperson
Beraud to continue this item to the next convenient agenda
once the staff has it ready.
Motion passed 6:0 by a roll -call vote.
4. TENTATIVE TRACT MAP 2005-0070, 7925 SANTA YSABEL AVE.
Applicant:
D. A. Fetyko, Inc., P O Box 422, San Luis Obispo, CA 93406
Project Title:
Tentative Tract Map 2005-0070
Project
7925 Santa Ysabel Ave., Atascadero, CA 93422
Location:
APN 030-101-022
Project
A request to establish four airspace condominium units on an existing lot of record. The residential units
Description:
are currently under construction. No native trees will be removed.
General Plan Designation: Multi Family Residential - 16 (RMF -16)
Zoning District: High Density Residential (HDR)
Proposed
The project qualifies for a Categorical Exemption per CEQA Section 15315: Minor Land Divisions.
Environmental
Determination:
Commissioner Fonzi stepped down from consideration of this item stating she has a
potential conflict of interest because she lives in close proximity to this project.
Associate Planner Kelly Gleason gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Andy Fetyko, applicant, answered questions of the Commission.
Eric Greening asked about access to and from Curbaril into the project, the prevailing
speed on this section of Curbaril, and the site distance.
Yolanda Tarzon expressed her concerns regarding the impacts to her property from this
project.
Chairperson Porter closed the Public Comment period.
MOTION: By Commissioner Kelley and seconded by Commissioner
Jones to adopt Resolution PC 2005-0074 approving Tentative
Tract Map 2005-0070, to establish four airspace condominium
units on one common lot, based on findings and subject to
conditions.
Motion passed 5:0 by a roll -call vote.
PC Draft Minutes 09/20/05
Page 4 of 8
Commissioner Fonzi rejoined the meeting.
5. TENTATIVE PARCEL MAP 2005-0071, 3600 TRAFFIC WAY
Owner:
Gene Barre, P O Box 176, Templeton, CA 93465
Project Title:
Tentative Parcel Map 2005-0071
Project
3600 Traffic Way, Atascadero, CA 93422
Location:
APN 049-033-004
Project
A request to subdivide 2.07 acres into two (2) lots consisting of 1.07 and 1.0 gross acres. The subdivision
Description:
design consists of a flag lot and one lot containing frontage on Traffic Way.
General Plan Designation: Single Family Residential -Y (SFR -Y) (1 -acre minimum)
Zoning District: Residential Single Family -Y (RSF-Y)
Proposed
The project qualifies for a Categorical Exemption per CEQA Section 15315: Minor Land Divisions.
Environmental
Determination:
Commissioner Fonzi stepped down from consideration of this item stating she has a
conflict of interest as the applicant is a distant relative of hers.
Assistant Planner Lisa Wilkinson gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Pamela Jardini, applicant's representative, stated they are in agreement with the staff
report and conditions of approval. Ms. Jardini answered questions of the Commission.
Chairperson Porter closed the Public Comment period.
MOTION: By Commissioner Kelley and seconded by Chairperson Porter
to adopt Resolution PC 2005-0076 approving Tentative Parcel
Map 2005-0071, subject to conditions of approval.
Motion passed 5:0 by a roll -call vote.
Commissioner Fonzi rejoined the meeting.
6. CONDITIONAL USE PERMIT 2005-0148,4180 EL CAMINO REAL
Applicant: CKE Restaurants, Inc., 401 W. Carl Karcher Way, Anaheim, CA 92801
PC Draft Minutes 09/20/05
Page 5 of 8
Owner:
Kmart Corporation, 3100 W. Big Beaver Rd., Troy, MI 48084
Project Title:
Conditional Use Permit 2005-0148
Project
4180 El Camino Real, Atascadero, CA 93422
Location:
APN 049-221-063
Project
The proposed project consists of an application for a Conditional Use Permit for a drive-through
Description:
restaurant located on 0.83 acres within the Commercial Retail Zone. The proposal includes a main
dining building with outdoor patio areas for restaurant patrons and a drive-through facility along the El
Camino Real and San Anselmo frontages. The site is currently vacant and located within the existing
K -Mart shopping center.
General Plan Designation: General Commercial (GC)
Zoning District: Commercial Retail (CR)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Mitigated Negative Declaration is available for public review from 8/31/05 through 9/19/05
Determination:
at 6905 El Camino Real, Suite 6, Community Development Department, from 8:00 a.m. to 5:00 p.m.,
Monday through Friday.
Associate Planner Kelly Gleason gave the staff report and City Engineer Steve Kahn
spoke about circulation issues; both answered questions of the Commission.
PUBLIC COMMENT
Stewart Voeltz, CKE Restaurants, indicated they are in agreement with everything as
stipulated with the exception of Mitigation Measure 15.a.b.1, which they are unable to
meet at this time. Mr. Voeltz submitted a letter regarding his concerns (Exhibit B) and
answered questions of the Commission.
Kelly Gearhart made a suggestion for improvements to the San Anselmo intersection to
improve traffic impacts.
Eric Greening spoke about the traffic impacts to this area, tree replacement and
questioned the timetable for improvements to the interchange.
Lorenzo Reyes, applicant's representative, stated their disappointment that this item
might be continued because of traffic mitigation requirements.
Eric Greening stated that it is important to provide for safe pedestrian and bicycle
ingress and egress at this site.
Chairperson Porter closed the Public Comment period.
Chairperson Porter adjourned the meeting at 9:03 p.m.
Chairperson Porter called the hearing back to order at 9:15 p.m.
Commissioner concerns/comments included:
1. Pedestrian access to restaurant should be improved.
PC Draft Minutes 09/20/05
Page 6 of 8
2. Trees should be saved, if they cannot, trees similar to those removed should be
used.
3. Should look at the bulb out idea for the intersection.
4. Would like information on the nexus between impacts and costs of traffic
mitigations.
5. Would like to see a copy of traffic study.
6. Placement of drive through window.
7. Would like applicant to bring back their traffic study, traffic engineer and traffic
statistics from some of their other restaurants in cities similar to Atascadero.
8. Fagade facing EI Camino Real is uninteresting, would like to see more muted
colors/deeper tones, not white.
9. Signage is excessive.
MOTION: By Commissioner Kelley and seconded by Commissioner
Fonzi to continue this project and for staff to address issues
raised by the Commission.
Motion passed 6:0 by a roll -call vote.
7. CONDITIONAL USE PERMIT 2005-0162, DE ANZA ESTATES
Owner:
Kelly Gearhart, 6205 Alcantara Ave., Atascadero, CA 93422
Project Title:
PD -9 Master Plan of Development Amendment (DeAnza Residential Project)
Conditional Use Permit 2005-0162
Project
DeAnza Estates Open Space Parcel. The site is on the north of North Ferrocarril Road adjacent
Location:
to the confluence of Graves Creek and the Salinas Rives.
Project
The proposed project consists of an amendment to the Master Plan of Development to allow a storm water
Description:
detention basin adjacent to Graves Creek and the Salinas River in an open space area.
Proposed
The proposed amendment has been determined to be consistent with the project's certified Mitigated
Environmental
Negative Declaration.
Determination:
Assistant Planner Lisa Wilkinson gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Kelly Gearhart, applicant, answered questions of the Commission.
Eric Greening asked about archeological issues for the project.
Chairperson Porter closed the Public Comment period.
PC Draft Minutes 09/20/05
Page 7 of 8
MOTION: By commissioner Kelley and seconded by Commissioner
Fonzi to adopt Resolution PC 2005-0076 to approve
Conditional Use Permit Amendment 2005-0162 based on
findings and subject to conditions of approval, and with the
following change to Condition of Approval No. 8: Additional
fencing to city standards shall be incorporated around the
existing basin.
Motion passed 6:0 by a roll -call vote.
COMMISSIONER COMMENTS AND REPORTS
Commissioner Fonzi questioned the grading taking place around a tree located at a
project on Curbaril and Morro Road. Kelly Gearhart explained the current status of the
tree.
Commissioner Patel asked about several issues including the sign ordinance, and
status of the Sunken Gardens project. Director Frace and Public Works Director Steve
Kahn addressed the questions.
There was Commission discussion regarding the issue of conversion of apartments into
condominiums.
DIRECTOR'S REPORT
Community Development Director Warren Frace reviewed the agenda for the next
Planning Commission meeting.
ADJOURNMENT
Chairperson Porter adjourned the meeting at 9:47 p.m. to the next regularly scheduled
meeting of the Planning Commission on October 4, 2005.
MINUTES PREPARED BY:
Grace Pucci, Recording Secretary
The following exhibits are available for review in the Community Development Department:
Exhibit A — Greg Ravatt, AIA, letter
Exhibit B — Stewart Voeltz, letter
PC Draft Minutes 09/20/05
Page 8 of 8
CALL TO ORDER
ITEM NUMBER: 3
DATE: 10-18-05
CITY OF ATASCADERO
PLANNING COMMISSION
DRAFT MINUTES
Regular Meeting
October 4, 2005 — 7:00 P.M.
Chairperson Porter called the meeting to order at 7:01 p.m. and Commissioner Kelley
led the Pledge of Allegiance.
ROLL CALL
Present: Commissioners Fonzi, Kelley, O'Keefe, Patel, Beraud and
Chairperson Porter
Absent: Commissioner Jones
Staff Present: Community Development Director Warren Frace, Deputy Public
Works Director Jeff Van den Eikhof, Associate Planner Kelly
Gleason, Associate Planner Kerry Margason and Recording
Secretary Grace Pucci.
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
MOTION: By Commissioner O'Keefe and seconded by Commissioner
Kelley to approve the agenda.
Motion passed 6:0 by a roll -call vote.
PUBLIC COMMENT
None
PC Draft Minutes 10/04/05
Page 1 of 7
CONSENT CALENDAR
None
COMMUNITY DEVELOPMENT STAFF REPORTS
Community Development Director Warren Frace gave an update on the Dove Creek
project and answered questions of the Commission.
Grant Robins, Syntex Homes, spoke about grading at the Dove Creek project and
answered questions of the Commission.
PUBLIC HEARINGS
1. CONDITIONAL USE PERMIT 2000-0022 RECONSIDERATION
TO BE CONTINUED TO OCTOBER 18, 2005
Owner:
Jimmie D. Shores, P O Box 216, Atascadero, CA 93423
Project Title:
San Anselmo Carwash - Reconsideration of Conditional Use Permit 2000-0022.
Project
6125 San Anselmo Road, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 049-225-024
Project
The proposed project is a reconsideration of an approved Conditional Use Permit to allow for an additional
Description:
ingress/egress on San Anselmo near the northwest corner of the site. The ingress/egress request includes
installation of a berm median that limits movement to right turns only.
General Plan Designation: GC (General Commercial)
Zoning District: (CT) Commercial Tourist
Proposed
CEQA Categorical Exemption Section 15301 — Existing Facilities.
Environmental
Determination:
2. CONDITIONAL USE PERMIT 2004-0137 AMENDMENT
Applicant &
Ted Jacobson, 5806 Traffic Way, Atascadero, CA 93422
Owner:
Judy Jacobson, c/o Ted Jacobson, 5806 Traffic Way, Atascadero, CA 93422
Project Title:
Conditional Use Permit 2004-0137 Amendment
Project
9700 El Camino Real, Atascadero, CA 93422
Location:
APN 056-081-032
Project
A request to amend the previously approved Master Plan of Development to include a larger pad for future
construction and modified parking lot circulation.
PC Draft Minutes 10/04/05
Page 2 of 7
Description:
David Graves, 4155 Carrizo Road, Atascadero, CA 93422
Proposed
In substantial conformance with previously certified Mitigated Negative Declaration and Initial Study
Environmental
2005-0022.
Determination:
8585 San Rafael Road, Atascadero, CA 93422
Commissioner Patel stepped down from consideration of this item stating he has a
conflict of interest because he has sold property to the applicant.
Associate Planner Kelly Gleason gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Ted Jacobson, applicant, answered questions of the Commission.
Chairperson Porter closed the Public Comment period.
MOTION: By Commissioner Kelley and seconded by Commissioner
O'Keefe to adopt Resolution PC 2005-0080 approving the
proposed amendment to Conditional Use Permit 2004-0137
(Master Plan of Development) based on findings and subject to
Conditions of Approval and Mitigation Monitoring, and adding
a condition that in the landscaping plan there be a low hedge
between the sidewalk and parking lot.
Motion passed 5:0 by a roll -call vote.
Commissioner Patel rejoined the hearing.
3. TENTATIVE PARCEL MAP 2005-0069, 8585 SAN RAFAEL ROAD
Applicant $
David Graves, 4155 Carrizo Road, Atascadero, CA 93422
Owner:
Project Title:
Tentative Parcel Map 2005-0069
Project
8585 San Rafael Road, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 056-361-001
Project
A proposed subdivision of an existing 5.36 gross acre lot into two individual parcels of 2.50 and 2.86 gross
Description:
acres. The site currently contains a single-family residence with a detached shop/garage that will remain on
proposed Parcel 1, allowing the new lot to be developed as a single-family residence. The lot split will be in a
"flag" lot configuration with Parcel 2 gaining access from San Rafael Rd. through a 24' driveway. The
existing site consists of gentle slopes with a blue -line creek crossing the proposed Parcel 1 from south to north.
Proposed Parcel 2 is currently an open grass pasture. Onsite septic will serve the property with relocation of
the existing leach field. Water is available from Atascadero Mutual Water Company.
General Plan Designation: Rural Estate (RE)
Zoning District: Residential Suburban (RS)
PC Draft Minutes 10/04/05
Page 3 of 7
Proposed Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental proposed Negative Declaration is available for public review at 6905 El Camino Real, Suite 6, Community
Determination: Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
Associate Planner Kerry Margason gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT — None
MOTION: By Commissioner Kelley and seconded by Commissioner
Fonzi to adopt Resolution PC 2005-0070 certifying Mitigated
Negative Declaration 2005-0037 and approving Tentative
Parcel Map 2005-0069 dividing one parcel into two parcels,
based on findings and subject to conditions of approval, and
with the following additional finding:
. Construction of a Class II Bikeway along this portion of San
Rafael Road would be premature in that other sections of the
ikeway have not vet been constructed and it is anticipated
that it will be some time before additional portions of the
bikeway could be built.
Motion passed 6:0 by a roll -call vote.
4. TENTATIVE PARCEL MAP 2005-0070,5750 ROSARIO
TO BE CONTINUED
Owner:
David Graves, 4155 Carrizo Road, Atascadero, CA 93422
Project Title:
Tentative Parcel Map 2005-0070
Project
5750 Rosario Avenue, Atascadero, CA 93422
Location:
APN 029-321-015
Project
A request to establish three airspace condominium units on an existing lot of record. The existing
Description:
structures on the property are to be demolished prior to the proposed development of three detached
dwelling units, approximately 1,200 square feet each. No native trees will be removed.
General Plan Designation: Multi Family Residential - 10 (RMF -10)
Zoning District: Medium Density Residential (MDR)
Proposed
The project qualifies for a Categorical Exemption per CEQA Section 15315: Minor Land Divisions.
Environmental
Determination:
PC Draft Minutes 10/04/05
Page 4 of 7
5. TENTATIVE TRACT MAP 2005-0071, COLONY SQUARE
Applicant:
R2L Architects, Robert Richmond, 444 Higuera Street, Ste. 201, San Luis Obispo, CA 93401
Owner:
El Camino Associates, 143 Beachcomber Drive, Pismo Beach, CA 93449
Project Title:
Tentative Tract Map 2005-0071
Project
6901 and 6905 El Camino Real, 6999 Santa Ysabel Ave.
Location:
APN 029-361-018, 020, 022
(San Luis Obispo County)
Project
Tentative Tract Map for lot reconfiguration and commercial and residential condos consistent with the
Description:
Colony Square Master Plan of Development.
Proposed
Reviewed under Certified Negative Declaration 2005-0020
Environmental
Determination:
Associate Planner Kelly Gleason gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Paul Reicher, EDA, applicant's representative, spoke about the project and answered
questions of the Commission.
Chairperson Porter closed the Public Comment period.
Chairperson Porter recessed the hearing at 7:58 p.m.
Chairperson Porter called the meeting back to order at 8:06 p.m.
PUBLIC COMMENT
Paul Reicher requested the Resolution be revised to allow for commercial
condominiums in addition to the residential.
Chairperson Porter closed the Public Comment period.
MOTION: By Commissioner Fonzi and seconded by Commissioner
O'Keefe to adopt Resolution PC 2004-0050 approving Vesting
Tentative Tract Map 2005-0071, a request to establish a
subdivision and 67 residential airspace condominium units
and an unknown number of commercial condominium units
consistent with the approved Colony Square Master Plan of
Development (CUP 2004-0127) based on findings and subject
PC Draft Minutes 10/04/05
Page 5 of 7
to conditions of approval and mitigation monitoring, and with
the following changes:
1. Add to Condition of Approval No. 10: f) that CC&R's will
apply to commercial condominiums and will include
sharing and use of meters.
2. That the "unknown number of commercial condominiums"
also be applied to page 125, the Resolution title.
Motion passed 6:0 by a roll -call vote.
6. TENTATIVE PARCEL MAP 2005-0072, 5155 ESCARPA AVE.
TO BE CONTINUED
Applicant:
Barak Miles, 5255 Traffic Way, Ste. 104, Atascadero, CA 93422
Owners:
Jeff Hansen, P O Box 1710, Atascadero, CA 93423
Barak Miles, 5255 Traffic Way, Ste. 104, Atascadero CA 93422
Project Title:
Tentative Parcel Map 2005-0072
Project
5155 Escarpa Ave., Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 029-161-008
Project
A proposed subdivision of an existing 3.37 gross acre lot into three individual parcels of 1.01, 1. 15, and 1.21
Description:
Foss acres. The site is currently contains a single-family residence that will remain on proposed parcel 1. The
parcels consist of moderate to steep slopes and contain native trees and vegetation. Onsite septic will serve the
property and water is available from Atascadero Mutual Water Company.
General Plan Designation: Single Family Residential (SFR -Y)
Zoning District: Residential Single Family (RSF-Y)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Negative Declaration is available for public review at 6905 El Camino Real, Suite 6, Community
Determination:
Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
COMMISSIONER COMMENTS AND REPORTS
Vice Chairperson Beraud referred to the map for the Escarpa proposed subdivision and
asked about the slope for the project. She also asked if any progress had been made in
resolving the issue with the Carlton signage. Director Frace addressed the questions.
DIRECTOR'S REPORT
Community Development Director Warren Frace reviewed the agenda for the next
Planning Commission meeting. He also reported that the Community Development
Department has hired a firm that specializes in affordable housing to help with changes
to the City's inclusionary housing requirements and condominium conversions.
PC Draft Minutes 10/04/05
Page 6 of 7
ADJOURNMENT
Chairperson Porter adjourned the meeting at 8:19 p.m. to the next regularly scheduled
meeting of the Planning Commission on October 18, 2005.
MEETING RECORDED AND MINUTES PREPARED BY:
Grace Pucci, Recording Secretary
PC Draft Minutes 10/04/05
Page 7 of 7
ITEM NUMBER: 4
DATE: 10-18-05
Planning Commission Staff Report
Public Hearing
Tentative Parcel Map 2005-0070
5750 Rosario Avenue
(Graves)
SUBJECT:
A proposed condominium map over an existing lot of record to create three airspace
units on one common lot. There is an existing single-family unit on the property and
detached garage proposed for removal.
RECOMMENDATION:
Staff Recommends:
The Planning Commission adopt Resolution PC 2005-0072 approving Tentative Parcel
Map 2005-0070, a request to establish three airspace units on one common lot, based
on findings and subject to conditions.
SITUATION AND FACTS:
1. Applicant/Owners: David Graves, 4155 Carrizo Rd., Atascadero, CA
93422
2. Project Address: 5750 Rosario Avenue, Atascadero, CA 93422
3. General Plan Designation: Medium Density Residential
4. Zoning District: Residential Multi -Family - 10 (Maximum 10 du/ac)
5. Site Area: 0.29 acre (approximately 12,763 square feet)
6. Existing Use: Single -Family residence
7. Environmental Status: Class 15 Categorical Exemption
ITEM NUMBER: 4
DATE: 10-18-05
DISCUSSION:
Background:
On September 20, 2005, the Planning Commission requested modifications to the
proposed condominium design, including rotating Unit #1 to front Rosario Avenue and
additional design elements characteristic with the neighborhood.
The subject site is located in the RMF -10 Zone and contains one single-family residence
with a detached accessory structure. The site is surrounded by a single-family
residence to the south and west, and three condominium units on the parcel to the east.
The site is relatively flat and contains three (3) native oak trees. The proposed
development will require 150 cubic yards of cut and 75 cubic yards of fill.
Figure 1: Property to the west Figure 2: Subject site
Condominium Design:
Figure 3: Unit to be demolished
The proposed map will create three airspace units on one legal lot of record. Each unit
will contain approximately 1,317 square feet including one (1) covered parking space
and an unenclosed porch. Unit #3 has been modified to meet the ten (10) foot rear yard
setback requirement. Each unit is equipped with laundry hook-ups and is conditioned to
provide 100 cubic feet of enclosed storage space (condition 11). The redesigned site
plan contains a twenty (20) foot wide access drive serving all three units.
Appearance Review
As recommended, the applicant has designed Unit
#1 to face Rosario Avenue. The redesigned
elevations incorporate traditional porch features,
transom windows, and clapboard siding material.
In addition to the changes, staff recommends that
the exterior parking spaces between Unit #2 and
Unit #3 be of decorative pavement in lieu of
landscaping between structures.
SII
ITEM NUMBER: 4
DATE: 10-18-05
Public Improvements:
The project has been conditioned to construct curb, gutter and sidewalk along the
Rosario Avenue frontage.
Environmental Review:
Staff has determined that the project is consistent with the California Environmental
Quality Act (CEQA) as a Class 15 Categorical Exemption for minor land subdivisions.
CONCLUSION:
The proposed condominium map, as conditioned, is consistent with the 2002 General
Plan and Zoning Ordinance and the airspace configurations are consistent with the
requirements of the Subdivision Ordinance. Staff recommends the Planning
Commission approve the Tentative Parcel Map as conditioned.
ALTERNATIVES:
1. The Commission may approve the map subject to additional or revised project
conditions. The Commission's motion to approve needs to include any new or
revised project conditions.
2. The Commission may deny the map if it is found to be inconsistent with the General
Plan or any of the other required findings. The Commission's motion to deny must
include a finding basis for denial.
3. The Commission may continue the hearing and refer the item back to staff for
additional information or analysis. Direction should be given to staff and the
applicant on required information.
PREPARED BY: Lisa Wilkinson, Assistant Planner
ATTACHMENTS:
Attachment 1 -- Location Map (Zoning)
Attachment 2 -- Arborist Letter
Attachment 3 -- Elevations
Attachment 4 -- Draft Resolution PC 2005-0072
ITEM NUMBER: 4
DATE: 10-18-05
ATTACHMENT 1: Location Map (Zoning)
TPM 2005-0070
5750 Rosario Avenue
Zone: Residential Multi -family -
10 du/ac (RMF -10)
i
Land Use Designation: Medium
15 Density Residential (MDR)
ITEM NUMBER: 4
DATE: 10-18-05
ATTACHMENT 2: Arborist Letter
TPM 2005-0070
5750 Rosario Avenue
�robetl Tree *urgery
Arborist Report
Re; Graves Construction September 1, 2005
5750 Rosario
Atascadero, CA
Tree #1 Live Oak, Quercus Agrifolia, right front, has a multi stem at 12", 9", 1111,
20", 12", 12" & 14" diameters at breast height is in good condition. It has an existing 6'
away from the main stem. This wall shall remain untouched do to critical root zone
protection. I recommend a light structure prune for this tree to remove excess weight and
all unsafe limbs such as deadwood etc.
The proposed new building footprint shall be no closer than 10' from main stem.
Tree protection shall be provided outside building footprint along drip line to curb or
sidewalk. Care should be taken when existing house and foundation is removed to not
encroach on the recommendation of 10' away from the main stem to reduce impact on
the C.R.Z. Any roots 2" or greater shall be flush cut and sealed not torn by equipment.
While demolition on this portion of the project is being performed I would like to
be on site to make sure my recommendations are being followed.
Tree #2 Live Oak, Quercus Agrifolia, right rear, is 10" diameter at breast height
and is in good condition. The contractor proposes a 2' 8" retaining wall 6' from the main
stem to retain the dirt along the C.R.Z. This will be o.k. it will help the tree's roots. Any
roots 2" or greater shall be flush cut and sealed not torn by equipment.
During excavation around this tree I would like to be on site to make sure my
recommendations are being followed.
Respectively,
Chuc Scovell
Ce fled Arborist #346
ITEM NUMBER
DATE: 10-18-05
ATTACHMENT 3: Elevations
TPM 2005-0070
5750 Rosario Avenue
ITEM NUMBER: 4
DATE: 10-18-05
ATTACHMENT 4: Draft Resolution PC 2005-0072
TPM 2005-0070
5750 Rosario Ave.
DRAFT RESOLUTION NO. PC 2005-0072
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ATASCADERO APPROVING
TENTATIVE PARCEL MAP 2005-0070, ESTABLISHING
THREE AIRSPACE UNITS ON ONE COMMON LOT
AT 5750 ROSARIO AVENUE
(Graves)
WHEREAS, an application was received from David Graves, 4155 Carrizo Road,
Atascadero, California 93422 (Owner/Applicant), to consider a Tentative Parcel Map for three
airspace condominiums on one common lot); and,
WHEREAS, the proposed project has a General Plan Designation of Medium Density
residential (MDR) and is in conformance with the Land Use Element of the General Plan and all
other applicable General Plan policies; and,
WHEREAS, the site is located in the Residential Multi -Family — 10 du/ac (RMF -10)
which allows for the proposed use and density when certain findings are made; and,
WHEREAS, a Categorical Exemption (Class 15) was prepared for the project in
accordance with the requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission held a duly noticed public hearing to consider the
proposed Tentative Parcel Map application on September 20, 2005 at 7:00 p.m. and considered
testimony and reports from staff, the applicants, and the public; and,
WHEREAS, the Planning Commission held a duly noticed public hearing to consider the
proposed Tentative Parcel Map application on October 18, 2005 at 7:00 p.m. and considered
testimony and reports from staff, the applicants, and the public; and,
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Findings for approval of condominium map. The Planning Commission
finds as follows:
1. The proposed map, as conditioned, is consistent with the General Plan and applicable
zoning requirements.
2. The design and improvement of the proposed map, as conditioned, is consistent with the
General Plan and applicable zoning requirements.
3. The site is physically suitable for the density of development proposed.
ITEM NUMBER: 4
DATE: 10-18-05
4. The design and improvement of the proposed map will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
5. The map is consistent with the character of the immediate neighborhood.
6. The design of the condominium map will not conflict with easements acquired by the
public at large for access through, or the use of property within, the proposed
subdivision; or substantially equivalent alternative easements are provided.
7. The proposed condominium map design and type of improvements proposed will not
cause serious public health problems.
SECTION 2. Approval. The Planning Commission does hereby approve Tentative
Parcel Map 2005-0070 to establish three airspace units on one common lot, subject to the
following Conditions and Exhibits:
EXHIBIT A: Categorical Exemption
EXHIBIT B: Conditions of Approval
EXHIBIT C: Tentative Parcel Map 2005-0070 (AT 05-0201)
On motion by Commissioner and seconded by Commissioner
, the foregoing resolution is hereby adopted in its entirety by the following
roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ADOPTED:
ABSTAINED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
ATTEST:
Warren Frace
Planning Commission Secretary
EXHIBIT A: Categorical Exemption
TPM 2005-0070
• ►1
ITEM NUMBER: 4
DATE: 10-18-05
0 •
COMMUNITY DEVELOPMENT
DEPARTMENT
C E Q A REVIEW
FINDING OF EXEMPTION
Date Received for Filing
FROM: City of Atascadero _ t
6905 EI Camino Real Suite 6
Atascadero, CA 93422
SUBJECT: Filing of Notice of Determination in Compliance with Section 21152 of tfie public Resources Code
Project Title
TENTATIVE PARCEL MAP 2005-0070: DAVID GRAVES
Project Location (Include County
5750 Rosario Avenue
Atascadero, California 93422 (San Luis Obispo County)
Project Description: A Tentative Parcel Map application for three (3) condominium airspace units on
one common lot in the Residential Multi -family (RMF -10) zoning district. No native trees are
proposed for removal. City sewer serves the property and water is provided by the Atascadero
Mutual Water Company.
Name of Public Agency Approving_Prgject
City of Atascadero
Name of Person or Agency Carrying Out Project
David Graves
4155 Carrizo Road
Atascadero, CA 93422
Exempt Status:
❑ Ministerial (Sec. 21080 (b)(l); 15268)
❑ Declared Emergency (Sec. 21080(b)(3); 15269(a))
❑ Emergency Project (Sec.21080 (b)(4); 15269(b)(c))
® Categorical Exemption (Sec. 15315, minor land divisions)
Reasons why proiect is exempt: Class 15 of the California Environmental Quality Act (CEQA) (Section 15315)
exempts the division of property in urbanized areas zoned for residential use into four or fewer parcels when the
division is in conformance with the General Plan and zoning, no variances or exceptions are required, all services
and access to the proposed parcels to local standards are available, the parcel was not involved in a division of a
larger parcel within the previous 2 years, and the parcel does not have an average slope greater than 20 percent..
Date: September I, 2005 ��Q
Lisa Wilkinson
Assistant Planner
Contact Person: Warren Frace, Community Development Director, City of Atascadero 805.461.5000
ITEM NUMBER
DATE: 10-18-05
EXHIBIT B: Conditions of Approval
TPM 2005-0070
Conditions of Approval
Timing
Responsibility
Mitigation
TPM 2005-0070
/Monitoring
Measure
PS: Planning Services
Address: 5750 Rosario Ave.
BL: Business License
GP: Grading Permit
BS: Building Services
FD: Fire Department
BP: Building Permit
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
Standard Planning Conditions
1. The approval of this application shall become final, subject to
PM
PS
the completion of the conditions of approval, fourteen (14)
days following the Planning Commission approval unless prior
to the time, an appeal to the decision is filed as set forth in
Section 9-1.111(b) of the Zoning Ordinance.
2. Approval of this Tentative Parcel Map shall be valid for two
PM
PS
years after its effective date. At the end of the period, the
approval shall expire and become null and void unless an
extension of time is granted pursuant to a written request
received prior to the expiration date.
3. The Community Development Department shall have the
PM
PS
authority to approve minor changes to the project that (1)
result in a superior site design or appearance, and/or (2)
address a construction design issue that is not substantive to
the Tentative Parcel Map.
4. A parcel map drawn in substantial conformance with the
PM
PS
approved tentative map, and in compliance with all conditions
set forth herein, shall be submitted for review and approval in
accordance with the Subdivision Map Act and the City's
Subdivision Ordinance.
5. The subdivider shall defend, indemnify, and hold harmless the
Ongoing
CA
City of Atascadero or its agents, officers, and employees
against any claim or action brought to challenge an approval
by the city, or any of its entities, concerning the subdivision.
6. The applicant shall submit a condominium plan, for review and
PM
PS/PW
approval by the Community Development Department and
Public Works Department. The condominium plan shall
record concurrently with the final parcel map.
7. The parcel map shall be subject to additional fees for park or
PM
PS
recreation purposes (QUIMBY Act) as required by City
Ordinance.
Project Planning Conditions
8. Prior to final map, the applicant shall submit CC&R's for
FM
PS/PW
review and approval by the Community Development
Department. The CC&R's shall record with the Final Map and
ITEM NUMBER
DATE: 10-18-05
Conditions Of Approval
Timing
Responsibility
Mitigation
TPM 2005-0070
/Monitoring
Measure
PS: Planning Services
Address: 5750 Rosario Ave.
BL: Business License
GP: Grading Permit
BS: Building Services
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
shall include the following:
a. Exclusive use easements for the private yard areas.
b. Provisions for maintenance of all common areas
including access, parking, street trees, any fencing
and landscaping.
C. A detailed list of each individual homeowner's
responsibilities for maintenance of the individual
units.
d. A provision for review and approval by the City
Community Development Department for any
changes to the CC&R's that relate to the above
requirements prior to the changes being recorded or
taking effect.
9. This map shall be for the approval of airspace units only. The
FM
PS
final map shall show one common lot and three airspace units.
10. Should the units be constructed and rented prior to the
FM
PS
recordation of the final map, all requirements set forth in
Government Code Section 66427.1 shall be met.
11. Each unit will be provided 100 square feet of enclosed storage
FO
PS/BS
space, exclusive of closets.
12. Unit #3 is required to maintain the standard 10 -foot rear yard
BP
PS/BS
setback. A setback inspection is required prior to placement
of concrete.
13. The applicant shall submit a landscape and irrigation plan
BP
PS
utilizing drought tolerant species.
14. Exterior parking spaces between Unit #2 and Unit #3 shall be
BP
PS
of decorative pavement in lieu of landscaping between
structures.
15. The color scheme shall be approved by the Community
BP
PS
Development Department prior to issuance of building permits.
City Engineer Project Conditions
16. Applicant shall overlay or slurry seal Rosario Avenue along the
BP
CE
entire property frontage, from the centerline plus ten feet. Final
street repair shall be determined by the City Engineer upon
submittal of the Public Improvement Plans.
ITEM NUMBER
DATE: 10-18-05
Conditions Of Approval
Timing
Responsibility
Mitigation
TPM 2005-0070
/Monitoring
Measure
PS: Planning Services
Address: 5750 Rosario Ave.
BL: Business License
GP: Grading Permit
BS: Building Services
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
17. All frontage improvements shall be constructed on Rosario
BP
CE
Avenue. Improvements shall include widening Rosario Avenue
and constructing curb, gutter and sidewalk along the property
frontage. The sidewalks shall be a minimum of 5 -feet wide with
a minimum of 48 -inches of clearance. Clearance requirement
shall include mailboxes, signs, utility poles, and other obstacles.
18. Applicant shall provide a public access easement at the back of
FM
CE
the driveway, as shown on the Tentative Map, to allow for ADA
compliance.
19. Applicant shall submit drainage calculations in accordance to the
BP
CE
City Engineering Standards, for review and approval by the City
Engineer, prior to construction of improvements.
City Engineer Standard Conditions
20. All public improvements shall be constructed in conformance
FM
CE
with the City of Atascadero Engineering Department Standard
Specifications and Drawings and/or as directed by the City
Engineer.
21. In the event that the applicant is allowed to bond for the public
FM
CE
improvements required as a condition of this map, the applicant
shall enter into a Subdivision Improvement Agreement with the
City Council.
22. An engineer's estimate of probable cost shall be submitted for
FM
CE
review and approval by the City Engineer to determine the
amount of the bond.
23. The Subdivision Improvement Agreement shall record
FM
CE
concurrently with the Final Parcel Map.
24. An encroachment permit shall be obtained prior to the issuance
BP
CE
of a building permit.
25. A six (6) foot Public Utility Easement (PUE) shall be provided
FM
CE
contiguous to the Rosario Avenue property frontage.
26. The applicant shall be responsible for the relocation and/or
BP
CE
alteration of existing utilities.
27. The applicant shall install all new utilities (water, gas, electric,
BP
CE
cable TV and telephone) underground. Utilities shall be
extended to the property line frontage of each lot or its public
utility easement.
28. The applicant shall monument all property corners for
FM
CE
construction control and shall promptly replace them if disturbed.
ITEM NUMBER
DATE: 10-18-05
Conditions Of Approval
Timing
Responsibility
Mitigation
TPM 2005-0070
/Monitoring
Measure
PS: Planning Services
Address: 5750 Rosario Ave.
BL: Business License
GP: Grading Permit
BS: Building Services
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
29. The applicant shall acquire title interest in any off-site land that
FM
CE
may be required to allow for the construction of the
improvements. The applicant shall bear all costs associated with
the necessary acquisitions. The applicant shall also gain
concurrence from all adjacent property owners whose ingress
and egress is affected by these improvements.
30. Slope easements shall be provided as needed to accommodate
FM
CE
cut of fill slopes.
31. Drainage easements shall be provided as needed to
FM
CE
accommodate both public and private drainage facilities.
32. A preliminary subdivision guarantee shall be submitted for review
FM
CE
in conjunction with the processing of the final parcel map.
33. All existing and proposed utility, pipeline, open space, or other
FM
CE
easements are to be shown on the final parcel map. If there are
building or other restrictions related to the easements, they shall
be noted on the parcel map. The applicant shall show all access
restrictions on the final parcel map.
34. The final parcel map shall be signed by the City Engineer prior to
FM
CE
the map being placed on the agenda for City Council
acceptance.
35. Prior to recording the final parcel map, the applicant shall submit
FM
CE
a map drawn in substantial conformance with the approved
Tentative Parcel Map and in compliance with all conditions set
forth herein. The map shall be submitted for review and approval
by the City in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
36. Prior to recording the final parcel map, the applicant shall set
FM
CE
monuments at all new property corners. A registered civil
engineer or licensed land surveyor shall indicate by certificate on
the final parcel map, that corners have been set or shall be set
by a date specific and that they will be sufficient to enable the
survey to be retraced.
37. Prior to recording the final parcel map, the applicant shall pay all
FM
CE
outstanding plan check/inspection fees.
38. Prior to recording the final parcel map, the applicant shall
FM
CE
complete all improvements required by these conditions of
approval.
39. Prior to recording the final parcel map, the applicant shall have
FM
CE
the map reviewed by all applicable public and private utility
companies (cable, telephone, gas, electric, Atascadero Mutual
Water Company). The applicant shall obtain a letter from each
ITEM NUMBER
DATE: 10-18-05
Conditions Of Approval
Timing
Responsibility
Mitigation
TPM 2005-0070
/Monitoring
Measure
PS: Planning Services
Address: 5750 Rosario Ave.
BL: Business License
GP: Grading Permit
BS: Building Services
FD: Fire Department
BP: Building Permit
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
utility company indicating their review of the map. The letter
shall identify any new easements that may be required by the
utility company. A copy of the letter shall be submitted to the
City. New easements shall be shown on the parcel map.
40. Upon recording the final parcel map, the applicant shall provide
FM
CE
the City with a black line clear Mylar (0.4 mil) copy and a blue
line print of the recorded map.
41. Prior to the final inspection of any public improvements, the
BP
CE
applicant shall submit a written statement from a registered civil
engineer that all work has been completed and is in full
compliance with the approved plans.
42. Prior to the final inspection, the applicant shall submit a written
BP
CE
certification from a registered civil engineer or land surveyor that
all survey monuments have been set as shown on the final map.
Atascadero Mutual Water Company Project Conditions
43. Before recordation of the final map, the applicant shall
FM
AMWC
submit plans to AMWC for the water distribution facilities
needed to serve the project. AMWC shall review and
approve the plans before construction begins on the water
system improvements. All new water distribution facilities
shall be constructed in conformance with AMWC Standards
and Details and the California Waterworks Standards
(Code of Regulations Title 22, Division 4, Chapter 16). All
cross -connection devices shall conform to AWWA and
California Department of Health Services standards.
44. Before the start of construction on the water system
improvements, the applicant shall pay all installation and
connection fees required by AMWC. Subject to the
approval of AMWC, the applicant may enter in to a
"deferred connection" agreement.
45. Before issuance of building permits, the applicant shall
obtain a "Will Serve" letter from AMWC for the newly
created units within the subdivision.
46. Separate water meters for domestic water service are
required for each individual lot within the subdivision.
47. The applicant is responsible for designing and constructing
water system improvements that will provide water at
pressures and flows adequate for the domestic and fire
protection needs of the project.
48. A separate landscape meter is required for common
landscape areas of 5000 square feet or more.
ITEM NUMBER: 4
DATE: 10-18-05
EXHIBIT C: Tentative Parcel Map
TPM 2005-0070 (AT 05-0201)
Fj
lie
oil
ITEM NUMBER: 5
DATE: 10-18-05
Planning Commission Staff Report
Staff Report - Community Development Department
Reconsideration of Conditional Use Permit 2000-0022
6125 San Anselmo Avenue
Amendment of CUP 2000-0022
(Jim Shores)
SUBJECT:
The proposed project consists of an Amendment to Conditional Use Permit 2000-0022
revising the Master Plan of Development to: (1) address site development
inconsistencies; (2) propose a new shade structure over the vacuum stations; (3)
remove the card lock gas station from the Master Plan of Development; and (4) propose
a new median in San Anselmo Road in lieu of removing a non -permitted ingress/egress
driveway.
RECOMMENDATION:
Staff Recommends:
The Planning Commission adopt Resolution PC 2005-78 approving Reconsideration of
Conditional Use Permit 2000-0022, subject to conditions of approval.
SITUATION AND FACTS:
1. Applicant / Property Owner Jim Shores
P.O. Box 216
Atascadero, CA 93423 (805/466-2767)
2. Representative: Russ Thompson, Engineer
7600 Morro Road
Atascadero, CA 93422 (805/462-1375)
3. Project Address: 6135 San Anselmo Road, Atascadero, CA 93422
APN 049-225-024
4. General Plan Designation: GC (General Commercial)
5. Zoning District: CT (Commercial Tourist)
6. Site Area: .53± acres
ITEM NUMBER: 5
DATE: 10-18-05
7. Existing Use: Temporary Occupancy for Carwash
8. Environmental Status: Class 1, Categorical Exemption Section 15315
DISCUSSION:
Background:
The site is located at 6135 San Anselmo Road, west of Highway 101. The property is
approximately .53± acres and is surrounded by similar sized lots. The project lies within
a block of commercial uses including Union 76 Gasoline Station to the east, Arco
AM/PM Gasoline Station and In & Out Burger Drive -Through Restaurant to the north,
Kentucky Fried Chicken Drive -Through Restaurant and a motel to the south, and
residential properties. The site is currently developed as a carwash facility with three
small retail buildings along San Anselmo Road.
The retail buildings and majority of the site improvements were constructed prior to
purchase by the current applicant. However, the overall project site improvements have
not been finaled by the City.
ITEM NUMBER: 5
DATE: 10-18-05
Summary:
The proposed project is a request to revise the Master Plan of Development to (1)
address site development inconsistencies; (2) propose a new shade structure over the
vacuum stations; (3) remove the card lock gas station from the Master Plan of
Development; and (4) propose a new median in San Anselmo Road in lieu of removing
a non -permitted ingress/egress driveway. The new median would limit ingress and
egress to and from the site to a right turn only.
Non -permitted
driveway
The items under reconsideration are stated below. Following each item is the condition
number within the original, approved conditions of approval for reference. These
original conditions required the following:
1. Installation of a 10 -foot wide landscape planting area with a raised berm between
the parking area and the San Anselmo sidewalk(Condition 12c);
2. All mechanical, heating and air conditioning equipment to be architecturally
compatible and screened from public view (Condition 15);
3. Installation of London Plane street trees 30 feet on center (Condition 19.a) along
San Anselmo;
4. Incorporation of native oak trees into the landscape plan (Condition 19. c.);
5. Car wash blower and vacuum stations to comply with the City's Noise Ordinance
(Conditions 37 and 38);
6. Site access be limited to one driveway at the intersection of San Anselmo and
Monterey Road and shared access off of San Palo. Driveway apron on San
Anselmo Road adjacent to Union 76 to be removed (Condition 39);
ITEM NUMBER: 5
DATE: 10-18-05
7. Installation of a masonry and iron picket fence and landscape planter on the
western edge of the property consistent with the fence on the eastern edge of the
property (Condition 11);
8. Installation of facia trim to the car wash building (Condition 11 and exhibits);
9. All lighting to be decorative gooseneck style as approved and downshielded to
prevent offsite glare (Condition 13b and 24 and Approved Exhibits); and
10. Installation of the monument sign to be surrounded with architectural masonry
material (Condition 16).
11. Installation of bicycle parking spaces.
In addition, the project was conditioned to be consistent with the approved exhibits as
attached to the original staff report. Inconsistencies with approved exhibits include the
non -permitted installation of a third vacuum station, failure to construct the curbing
around the rear parking area, and failure to install a landscape planter with additional
oak trees along the western property line.
Lack of 10' landscape
berm (Gond 12c)
bac
ITEM NUMBER
DATE:
Non -permitted equipment in
sidewalk (Cond 15)
. rlo- . _
5
10-18-05
ITEM NUMBER: 5
DATE: 10-18-05
Analysis:
The above-described site and building deficiencies were constructed without
authorization from the Planning Commission or staff. The deficiencies were noted upon
a call for final inspection by the applicant. At that time, staff noted that the site was not
constructed according to the approved plans and deficiencies were cited. Each issue
area is further analyzed below. The project had been operating on a temporary
occupancy permit and the project has not been finaled to date.
(1) Site Development Inconsistencies
Site development inconsistencies were constructed by both the original developer
through completion of the three retail buildings, and the current applicant through
completion of the car wash facility. Although the retail buildings were permitted and
finaled, the project was still considered under construction and subject to completion
and correction of all site improvements (i.e. landscaping, pavement, curbing, signage,
fencing, lighting, etc). Staff does not have the authority to waive these inconsistencies.
The Planning Commission must review each item and determine if the item can be
waived or modified per original CUP approval, or have the CUP Master Plan amended
to reflect the non -permitted improvements constructed to date. The items for
consideration are as follows:
1. Installation of a 10 -foot wide landscape planting area along the parking lot with a
raised berm along San Anselmo (Original CUP Condition 12c).
Staff Comment: The parking lot was constructed without this landscape berm.
Staff recommends that the only opportunity for additional landscape is with the
installation of additional trees and shrubbery at other locations on the site as
identified in item 3 below and as conditioned in New CUP Condition 13.
2. All mechanical, heating and air conditioning equipment to be architecturally
compatible and screened from public view (Original CUP Condition 15).
Staff Comment: After completion of the three retail buildings, the owner
constructed ground -mounted air conditioning units on the sidewalks to the side of
each building without permits. Staff recommends that the concrete sidewalks be
removed and infilled with landscaping (New CUP Condition 15).
3. Installation of London Plane street trees 30 feet on center along San Anselmo
(Original Condition 19.a).
Staff Comment: As the public sidewalk contains no tree planters and no
landscape berm was provided along San Anselmo, staff recommends planting
ITEM NUMBER: 5
DATE: 10-18-05
two London Plan Trees in the parking lot planter along the public sidewalk
between two of the retail buildings (New CUP Condition 13).
4. Incorporation of native oak trees into the landscape plan (Original Condition 19.
C.).
Staff Comment: Native oak trees have not been planted on site to date. Staff
recommends planting several native oak trees (minimum of 5) at the rear of the
site within the level area between the base of the slope and the paved parking
area (New CUP Condition 18).
5. Car wash blower and vacuum stations to comply with the City's Noise Ordinance
(Original CUP Conditions 37 and 38).
Staff Comment: Staff's observation is that the ground -mounted vacuum cleaners
are not noise problematic. However, an overhead rack of five exposed high
powered blower fans in the automated car wash stall presents significant noise
impacts on and off site. Staff recommends that the fans be removed and
redesign to reduce noise and provide architectural screening. Staff recommends
that the applicant propose a noise -sensitive blower unit, subject to staff review
and approval (New CUP Condition 11).
6. Site access be limited to one driveway at the intersection of San Anselmo and
Monterey Road and shared access off of San Palo. Driveway apron on San
Anselmo Road adjacent to Union 76 to be removed (Condition 39);
Staff Comment: In accordance with a traffic study that was prepared to address
the third access point, the applicant has submitted a design for a median to be
installed in San Anselmo that would prevent left -turn vehicular movement.
Planning staff is recommending that the design be modified as to width and
appearance, requiring a minimum of 2'6" in width with cobblestone filler, similar
to the median in Del Rio Road, east of the Highway 101 on ramp.
7. Installation of a high quality masonry and iron picket fence and landscape planter
on the western edge of the property consistent with the fence on the eastern
edge of the property (Original Condition 11 and approved Exhibits).
Staff Comment: Staff recommends that the existing wood fence be replaced
with an upgraded architectural fence. The Commission may comment on
whether the fence should match the easterly fence or may be constructed of a
different, high quality material. Staff recommends that the height of the fence not
exceed three feet and that the fence be constructed of high-quality durable
material (New CUP Condition 9).
ITEM NUMBER: 5
DATE: 10-18-05
8. Installation of fascia trim to the car wash building (Original Condition 11 and
exhibits).
Staff Comment: Staff recommends installing the fascia trim per plan and painting
it a putty color to match the existing retail building fascia (New CUP Condition 8).
9. All lighting to be decorative gooseneck style as approved and down shielded to
prevent offsite glare (Condition 13b and 24 and Approved Exhibits)
Staff Comment: Staff's observation is that the overhead wall mounted security
lights on the car wash facility present a significant light and glare impact on and
off site. Staff recommends that the lights be reduced to one per each stall and
re -mounted in a location above the fascia within the inside of each stall. All
exposed wall lighting shall be shielded. If a light is required over the change
machine, it is recommended that it be an architectural gooseneck lamp as
originally approved (New CUP Condition 10).
10. Installation of the monument sign to be surrounded with an architectural masonry
material.
Staff Comment: Staff recommends adding a masonry surround per plan to
match the existing car wash building fascia (New CUP Condition 12).
11. Installation of bicycle parking spaces at a ratio of one bicycle parking space for
every 10 -vehicle parking spaces. (Condition 26)
Staff Comment: Staff has conditioned the project to install the required,
commercial grade bicycle racks. (New CUP Condition 16)
(2) Proposed Shade Structure
The applicant proposes to install a shade structure over the vacuum stations. The
structure would be designed to conform to the existing architectural style of the
development, as shown in Exhibit C attached to the draft resolution.
(3) Original Card Lock Gas Station
The card lock station has not been constructed on the site. After completion of the
three retail buildings and car wash facility, it appears that removal of the Card Lock Gas
Fueling facility is necessary to insure that onsite vehicular and pedestrian circulation
operates in a safe and orderly manner. Staff has included a condition to remove the
card lock station from the Master Plan of Development and add curbing and parking lot
striping to the rear paved portion of the site (New CUP Conditions 14 and 17).
ITEM NUMBER: 5
DATE: 10-18-05
(4) Proposed San Anselmo Road median or remove the non -permitted
ingress/egress driveway.
The original project approval allowed two ingress/egress points, one at the intersection
of Monterey Road and one shared access onto San Palo Road. During development of
the site, a third ingress/egress driveway was constructed without City permits (see map
below). The applicant requests retention of the third ingress/egress point. To date, staff
has been unable to resolve this issue noting that the driveway was constructed without
permits and the driveway apron is out of alignment with the driveway causing exiting
vehicles to drive over the six-inch curb rather than over the driveway apron. At present,
the car wash facility has been operating only under temporary occupancy status.
Public Works staff has identified a partial solution by recommending construction of a
median in San Anselmo to create a right -in / right -out movement for this driveway. If a
median is constructed, the Planning staff recommends that the median be a minimum of
2 feet 6 inches wide and be filled with cobblestone, consistent with the median in Del
Rio Road (New CUP Condition 7). Staff also notes that the site is posted with signs
that direct traffic entering and leaving the site which has proven ineffective.
ITEM NUMBER: 5
DATE: 10-18-05
SAN
Ingress/egress Point 3
(Reconsideration)
4
Z
' P.4. 01-90
1 I
0,9YAC.
1 !
I 12
I t I r;c
0.66= AC.
!
Ingress/egress Point 2
(original approval)
22
\/
py•
/ 3
16
3.2 A
0.53 AC.
D
�
2
r
• »'C 17776 �
Ingress/egress Point 1
G
(original approval)
54 —64
MONTEREY
RD
z
ITEM NUMBER: 5
DATE: 10-18-05
Conditional Use Permit Findings:
There are five standard Conditional Use Permit findings that need to be made for the
project. With implementation of the conditions of approval, Staff has determined that all
of the following findings can be made:
The proposed use is consistent with the General Plan.
Staff Response: The revised site plan continues to meet the requirements of the
General Plan.
2. The proposed use satisfies all applicable provisions of the Zoning Ordinance.
ITEM NUMBER: 5
DATE: 10-18-05
Staff Response: The revised site plan continues to meet the requirements of the
Zoning Ordinance.
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in this particular case, be
detrimental to the health, safety or welfare of the general public or persons
residing or working in the neighborhood of the use, or be detrimental or injurious
to the property or improvements in the vicinity of the use.
Staff Response: As conditioned, the project will not be detrimental to the health,
safety or welfare of the general public or people residing or working in the
neighborhood of the use, or be detrimental or injurious to the property or
improvements in the vicinity of the use. The use of the median in San Anselmo
Road will reduce left turns into the project site, thereby reducing the number of
vehicles that could turn across traffic.
4. The proposed use will not be inconsistent with the character of the immediate
neighborhood or contrary to its orderly development.
Staff Response: The proposed use is consistent with the character of the
immediate neighborhood of fast food restaurants, and gas stations.
5. The proposed use will not generate a volume of traffic beyond the safe capacity
of all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
Staff Response: The proposed use will not generate a volume of traffic beyond
the safe capacity of the roads.
Environmental Review:
A Mitigated Negative Declaration was certified for the original Conditional Use Permit on
October 2, 2001. Staff has determined that with implementation of the new CUP
conditions regarding noise, lighting, circulation, site improvements, and landscaping,
this reconsideration request would be consistent with the original Mitigated Negative
Declaration. All mitigation measures of the original Negative Declaration will continue to
apply to this project site.
ITEM NUMBER: 5
DATE: 10-18-05
CONCLUSION:
The proposed use is consistent with the General Plan and satisfies all applicable
provisions of the Zoning Ordinance. The project as conditioned will not be detrimental
to the health, safety or welfare of the general public and the proposed use is consistent
with the character of the immediate neighborhood.
ALTERNATIVES:
1. The Planning Commission may approve this Reconsideration of Conditional Use
Permit 2002-0022 with modified conditions of approval.
2. The Planning Commission may deny Conditional Use Permit 2002-0022 based
on appropriate findings. To deny the application, the Commission must find that
it is inconsistent with one of the required findings. The motion to deny must
include a finding for denial.
3. The Planning Commission may continue the application and refer the project
back to staff for additional information or analysis. Direction should be given to
staff and the applicant.
PREPARED BY: Kerry Margason, Associate Planner
ATTACHMENTS:
Attachment 1:
Zoning and General Plan Designation
Attachment 2:
Original Conditions of Approval
Attachment 3:
Draft Resolution PC 2005-0078
ITEM NUMBER: 5
DATE: 10-18-05
Attachment 1: Zoning and General Plan Designation
CUP 2000-0022
6125 San Anselmo Road
Zoning District: CT (Commercial Tourist)
General Plan Designation: GC (General Commercial)
ATTACHMENT 2: Original Conditions of Approval for CUP 2000-0022
Reconsideration of CUP 2000-0022
EXHIBIT A: CONDITIONS OF APPROVAL / MITIGATION MONITORING PROGRAM
CUP 2000-0022
Condition of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2000-0022
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
F0: Final Occupancy
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Planning Services
1. The approval of this use permit shall become final and
GP
PS
effective for the purposes of issuing building permits
BP
fourteen (14) days following the Planning Commission
approval unless prior to the time, an appeal to the
decision is filed as set forth in Section 9-1.111(b) of the
Zoning Ordinance.
2. Approval of this Conditional Use permit shall be valid for
BP
PS
twelve (12) months after its effective date. At the end of
the period, the approval shall expire and become null and
void unless the project has received a building permit.
3. The Community Development Department shall have the
BP
PS
authority to approve minor changes to the project that (1)
increase the intensity of the project by less than 10%, (2)
result in a superior site design or appearance, and/or (3)
address a construction design issue that is not substantive
to the Conditional Use Permit / Master Plan of
Development.
4. Handicapped access to the motel units shall be provided
BP
PS
with a mechanical lift system instead of ramps. The lift
system shall be painted and landscaped to match the rest
of the site.
5. The motel units shall be utilized for transient occupancy
Prior BP
PS
only at all times. A deed restriction specifying the
CA
restricted transient use of these structures shall be
recording prior to the issuance of building permits.
6. An open space easement shall be recorded across the
Prior BP
PS
hillside areas of the slope to protect native trees and
restrict future development.
7. A lot line adjustment shall be recorded prior to issuance of
Prior BP
PS
building permits to reconfigure the existing parcels
consistent with Exhibit B.
Condition of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2000-0022
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
F0: Final Occupancy
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
8. Outstanding native tree mitigation fees in the amount of
Prior BP
PS
$1083.33 shall be paid prior to issuance of building
permits.
All other native tree removals shall be mitigated in
accordance with the Native Tree Ordinance.
9. Prior to the issuance of building permits the applicant shall
Prior BP
PS
record all necessary cross access easements to provide
CE
access between the two sites and San Palo Road across
the KFC site.
10. Reciprocals access and parking easements shall be
FO
PS
recorded across all site parcels prior to final occupancy of
CE
the first unit.
11. All site improvements, lighting, landscaping, and building
BP
PS
elevations including colors, material and finishes shall be
FO
consistent or superior to those shown in attached Exhibits
B through I.
12. The Site Plan as shown in Exhibit B shall be modified as
BP
PS
follows:
a) Curb lines at the base of the hillside shall be moved
away from native trees.
b) The trash enclosure and electronics room shall be
relocated as shown on Exhibit B.
c) A 10 -foot wide landscape planting with a raised berm
shall be installed along all parking lot areas fronting
San Anselmo.
d) The San Anselmo site plan shall be revised to include
18 parking spaces.
e) Decorative masonry trash can enclosures shall be
provided in the location of the car wash vacuums.
13. The Architectural Elevations as shown in Exhibits D, E, F,
BP
PS
G and H shall be modified as follows:
a) The car wash and all accessory structures shall be
constructed with a stucco finish consistent with the
materials palette for the project.
b) Thematic gooseneck style lights shall be added to all
buildings entry features and free standing lighting as
decorative elements.
Condition of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2000-0022
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
F0: Final Occupancy
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
c) Storefront windows and decorative windows shall be
added to the street frontages of the commercial
buildings.
14. All roof -mounted equipment shall be screened from view
BP
PS
in all directions. All roof -mounted equipment which
FO
generates noise, solid particles, odors, etc., shall cause
the objectionable material to be directed away from
residential properties.
15. All ducts, meters, air conditioning equipment and all other
BP
PS
mechanical equipment, whether on the ground, on the
FO
structure or elsewhere, shall be screened from public view
with materials architecturally compatible with the main
structure. Gas and electric meters, electric transformers,
and large water piping systems shall be completely
screened from public view with approved architectural
features and/or landscape plantings.
16. All building and/or free standing site signs will be subject
BP
PS
to the approval of a Master Sign Program.
17. All wall and pole mounted lights shall use shielded, cut-off
BP
PS
lights to prevent off site glare.
FO
18. All outdoor storage facilities and trash enclosures will be
BP
PS
constructed of decorative masonry materials and have
solid metal gates. The perimeter of all such facilities shall
be landscaped when visible to the public.
19. The Community Development Department will approve a
BP
PS
final landscape and irrigation plan prior to the issuance of
any building permit. Landscape plans and specification
will be prepared by a professional landscape architect and
indicate the location, size, quantity and planting
requirements of all plant materials. The plans will include
details for an automatic underground irrigation system.
The landscape construction plan shall be consistent with
the incorporation of the following features at a minimum:
a) Large canopy London Plane Tree (Plantanus
acerifolia) street trees will be planted along the San
Anselmo street frontages at 30 -feet on -center.
b) Parking lot trees are required to have large canopies
and good shading characteristics
c) Native variety oak tree shall be incorporated into the
landscape plan.
d) All parking lot planter areas will include a reasonable
combination of trees, shrubs and ground cover
Condition of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2000-0022
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
F0: Final Occupancy
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
plantings
e) All slopes in excess of 2:1 shall be planted with slope
stabilizing plant materials and installed with jute or
nylon mesh.
f) A minimum 10 -foot wide landscape planter with a
raised berm shall be provided along the entire project
street frontages.
g) Areas of turf planting shall be limited to no more than
10% of landscaped areas.
h) The hillside in front the motel units shall be
landscaped with a combination of ground cover,
shrubs and trees.
20. All existing native trees on site shall be preserved and
BP
PS
protected during construction. Tree protection plans shall
Certified
be submitted with all grading and building permits. Trees
Arborist
that cannot be preserved shall be mitigated per the
requirements of the Native Tree Regulations.
The applicant shall retain a certified arborist to monitor
tree protection and on-site construction within the vicinity
of native oak trees. In no case shall construction occur
with tree protection fences without the arborist being
present.
21. Prior to issuance of a Certificate of Occupancy for the first
BP
PS
building, the project sponsor shall provide mail
FO
receptacles for the commercial units as required by the
U.S. Postmaster.
22. Construction activities shall be limited from 7 a.m. to 9
GP
PS
p.m. seven days a week.
BP
Mitigation Measures
23. All hillside portions of the project area beyond the
BP
PS
1.C.1
current development plans shall be kept as perpetual
open space areas. An open space easement or similar
protections shall be provided.
24. All exterior lighting shall be designed to eliminate off-
BP
PS
1.d.1
site glare. Lighting shall utilize full cut off "shoe box"
style lighting. Pole lighting will utilize (LS) Rudd Lacw
series or Mc Graw Edison TWAC or TWAC contour
series or superior products designed to reduce off-site
glare. All other building exterior light fixtures to be
approved by the Community Development Department
for location and design.
Condition of Approval / Mitigation Monitoring Program
CUP 2000-0022
Timing
GP: Grading Permit
BP: Building Permit
TO: Temporary Occupancy
F0: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Mitigation
Measure
25. The project shall comply with all applicable District
GP
PS
3.b.1.
regulations pertaining to the control of fugitive dust (PM-
BP
10) as contained in section 6.4 of Air Quality Handbook.
All site grading and demolition plans notes shall list the
following regulations:
a) All material excavated or graded shall be sufficiently
watered to prevent excessive amounts of dust. Watering
shall occur at least twice daily with complete coverage,
preferably in the late morning and after work is finished for
the day.
b) All clearing, grading, earth moving, or excavation activities
shall cease during periods of high winds (i.e. greater than
20 mph averaged over one hour) so as to prevent
excessive amounts of dust.
c) All material transported off-site shall be either sufficiently
watered or securely covered to prevent excessive
amounts of dust.
d) The area disturbed by clearing, grading, earth moving, or
excavation operations shall be minimized so as to prevent
excessive amounts of dust.
e) Permanent dust control measured identified in the
approved project revegetation and landscape plans shall
be implemented as soon as possible following completion
of any soil disturbing activities.
f) Exposed ground areas that are planned to be reworked at
dates greater than one month after initial grading shall be
sown with fast -germinating native grass seed and watered
until vegetation becomes established.
g) All disturbed areas not subject to revegetation shall be
stabilized using approved chemical soil binders, jute
netting, or other methods in advance by the APCD.
h) All roadways, driveways, sidewalks, etc. to be paved shall
be completed as soon as possible. In addition, structural
foundations shall be completed as soon as possible
following building pad construction.
i) On-site vehicle speed shall be limited to 15 mph for any
unpaved surface.
j) All unpaved areas with vehicle traffic shall be watered at
least twice per day, using non -potable water.
k) Streets adjacent to the project site shall be swept
daily to remove silt which may have accumulated
from construction activities so as to prevent
excessive amounts of dust from leaving the site.
1) Wheel washers may be required when significant off-site
import or export of fill is involved.
26. Provide on site bicycle parking racks at a ratio of one
BP
PS
3.c.1.
bicycle parking space for every 10 -car parking spaces.
Bike racks will be provided in convenient and secure
location.
Condition of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2000-0022
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
F0: Final Occupancy
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
27. Shade tree planting shall be used along southern
BP
PS
3.c.2
exposures of buildings and in parking areas to reduce
summer cooling needs.
28. Large canopy shade trees shall be provided along
BP
PS
3.c.3.
street frontages and within parking areas to shade
paved areas and minimize urban heat build-up.
29. All buildings shall have double paned windows.
BP
PS
3.c.4.
30. Use energy efficient exterior and interior lighting.
BP
PS
3.c.5.
31. A permit from San Luis Obispo County Air Pollution
BP
PS
3.d.1.
Control District (APCD) will be required for installation of
gasoline dispensing facility. The APCD permit will be
required prior to issuance of building permit.
32. The site plan will be redesigned to preserve and protect
BP
PS
4.e.1.
these trees consistent with Arborists recommendations
during and following project construction. A tree
protection plan and construction guidelines will be
required for working around native trees on the site.
33. All native tree removals shall comply with the
BP
PS
4.e.2.
Atascadero Native Tree Ordinance.
34. Design of all gasoline facilities and underground storage
BP
PS
7.b.1.
tanks shall meet or exceed all requirements as required
by the San Luis Obispo County Environmental Health
Department and Air Pollution Control District. Permits
(County Environmental Health) for placement of
underground tanks shall be secured prior to approval of
a building permit from the City of Atascadero.
35. All site drainage will be required to utilize an interceptor
BP
CE
8.e.1.
drain designed to filter all oils and similar pollutants from
PS
site drainage.
36. Gas pump facility will be designed to eliminate
BP
CE
8.e.2.
immediate drainage. Pump islands will be designed
PS
slightly lower than site, or similar options that will
accomplish eliminating immediate runoff from the fuel
pump area.
37. The vacuum systems shall be installed with best
BP
PS
11.0.1.
available sound muffling devices. Vacuum
specifications with manufacture's noise ratings shall be
submitted with building permits.
38. The car wash and vacuums shall be in compliance with
BP
PS
11.c.2.
the City Noise Ordinance and not be operated between
the hours of 10 p.m. and 6 a.m.
39. Site access will be limited to the following:
BP
PS
15.a.1.
One driveway at the intersection of San Anselmo and
Monterey Road.
Condition of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2000-0022
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
F0: Final Occupancy
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Shared access of the existing KFC driveway on San
Palo.
40. Shared access easements shall be approved by the
BP
PS
15.a.2.
City Engineer and City Attorney prior to the issuance of
building permits.
41. The existing driveway apron on San Anselmo Avenue
BP
PS
15.a.3.
adjacent to Union 76 will be removed.
42. Prior to issuance of building permits, applicant shall
BP
PS
16.e.1.
prepare plans to expand the capacity of the sewer
system to the satisfaction of the City Engineer.
Fire Department
43. The applicant shall provide a hazardous materials
FO
FD
management plan (HMMP) per section 307.1.6 of the
U.B.C.
44. The fueling facility shall be designed to meet all current
BP
FD
codes including Chapter 79 of the U.F.C.
45. All building fire flow requirements shall be approved per
BP
FD
the requirements of the UBC and Fire Department.
46. Fire hydrants shall be provided as required by the Fire
BP
FD
Department.
Wastewater Department
47. All proposed uses shall be connected to the City sewer
WW
BP
system.
48. Plans to upgrade pumps in Pump Station No. 11 (San
WW
BP
Palo) to transport flow increase from the entire project
(Car Wash, Motel Units, and Retail Commercial) shall be
submitted concurrently with building permits. Wastewater
flow calculations shall be submitted as required by the
City Engineer.
49. To accommodate increased flow impact on sanitary sewer
WW
BP
main into which Pump Station No. 11 discharges, one of
the following options shall be completed prior to final
occupancy:
a) Construct the EI Camino Real gravity sewer main
extension (currently under design) to allow re-routing
of the flow from Pump station No. 1.
b) Upgrade sanitary sewer main along EI Camino Real
between Manhole R-7 to Manhole 1-5.
Condition of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2000-0022
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
F0: Final Occupancy
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
c) Upgrade Pump Controls at both Pump Station No. 11
and at Pump Station No. 1 by the installation of
Isaacs Smart Switches, one 603T transmitter and
one 601 R receiver. These devices will insure that
both pump stations do not pump simultaneously.
City Engineer
50. A three -chamber sand and grease interceptor shall be
BP
CE
installed between the fuel facility and the existing drainage
system.
51. A maintenance agreement will be required for the sand
BP
CE
and grease interceptor.
52. All fuel dispensers shall be located on a concrete pad.
BP
CE
53. The concrete pad shall be sloped to drain to the inlet of
BP
CE
the sand and grease interceptor.
54. San Anselmo Avenue shall be restriped as required by the
BP
CE
City Engineer to accommodate project circulation
requirements. A striping plan for San Anselmo Avenue
shall be submitted concurrently with building plans.
55. Complete site grading and drainage plans shall be
BP
CE
submitted concurrently with building permit applications.
56. No structures shall be constructed over any storm
BP
CE
drainage facilities or easements. Site plans shall be
redesigned or the drainage line and easement shall be
relocated to the satisfaction of the City Engineer.
City Engineer Standard Conditions
57. All public improvements shall be constructed in
BP
CE
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings or
as directed by the City Engineer.
58. The applicant shall enter into a Plan Check & Inspection
agreement with the City.
59. The applicant shall be responsible for the protection,
relocation and/or alteration of existing utilities.
60. The applicant shall install all new utilities (water, gas,
electric, cable TV and telephone) underground.
61. The applicant shall monument all property corners for
construction control and shall promptly replace them if
disturbed.
Condition of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2000-0022
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TO: Temporary Occupancy
FD: Fire Department
F0: Final Occupancy
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
62. Prior to issuance of building permits, the applicant shall
submit a grading and drainage plan with details on
sedimentation and erosion control, prepared by a
registered civil engineer for review and approval by the
City Engineer.
63. Prior to the final inspection, all outstanding plan check
and inspection fees shall be paid.
64. Prior to the final inspection, the applicant shall submit a
written statement from a registered civil engineer that all
work has been completed and is in full compliance with
the approved plans, Atascadero Engineering Standards
and the Uniform Building Code.
Atascadero Mutual Water Company
65. Prior to the issuance of building permits, the applicant
BP
AMWC
shall submit plans that showing the water distribution
facilities required to serve the project for review and
approval by the AMWC. The plans shall show all facilities
required to isolate fire protection and landscape irrigation
systems from the domestic water system. Prior to
approval of the water system, the applicant shall pay all
installation and connection fees required by the
Atascadero Mutual Water Company.
66. Prior to the issuance of building permits, the applicant
BP
AMWC
shall obtain a "Will Serve" letter from Atascadero Mutual
Water Company.
67. All water distribution facilities shall be constructed in
FO
AMWC
conformance with the Atascadero Mutual Water Company
standards and policies. All cross connection devices shall
be constructed in conformance with the AWWA and
Department of Health Services standards.
Planning Commission Conditions
68. Signage shall be provided on and around the site
BP
PS
prohibiting the parking of commercial trucks consistent
with the City Municipal Code.
69. A pedestrian crosswalk shall be painted across the
BP
PS
driveway between the motel units and the parking lot.
- end of conditions -
ATTACHMENT 3: Draft Resolution PC 2005-0078
Reconsideration of CUP 2000-0022
RESOLUTION NO. PC 2005-0078
A RESOLUTION OF THE ATASCADERO PLANNING COMMISSION APPROVING
RECONSIDERATION OF CONDITIONAL USE PERMIT 2000-0022
A REQUEST TO AMEND THE MASTER DEVELOPMENT PLAN
ALLOWING A THIRD POINT OF INGRESS/EGRESS
6135 SAN ANSELMO ROAD (APN 049-225-024)
(CUP 2000-0022 / Jim Shores)
WHEREAS, an application has been received from Jim Shores, Post Office Box 216,
Atascadero, California 93423 (Applicant and Owner), to reconsider Conditional Use Permit
2000-0022, allowing for a third point of ingress/egress for the San Anselmo Car Wash facility
and installation of a shade structure over the vacuum stations (APN 049-225-024); and,
WHEREAS, the site's General Plan Designation is GC (General Commercial); and,
WHEREAS, the site's current zoning district is CT (Commercial Tourist); and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject
Reconsideration of Conditional Use Permit application was held by the Planning Commission of
the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf
of said project; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a Public Hearing
held on October 18, 2005, studied and reconsidered CUP 2000-0022, and,
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Findings for approval of Conditional Use Permit. The Planning Commission
finds as follows:
1. The proposed project, as conditioned, is consistent with the General Plan; and,
2. The proposed project, as conditioned, satisfies all applicable provisions of the
Zoning Ordinance; and,
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in this particular case, be
detrimental to the health, safety, or welfare of the general public or people
residing or working in the neighborhood of the use, or be detrimental or injurious
to property or improvements in the vicinity of the use; and,
4. The proposed project, as amended and conditioned, will not be inconsistent with
the character of the immediate neighborhood or contrary to its orderly
development; and,
5. The proposed project, as amended and conditioned, will not generate a volume of
traffic beyond the safe capacity of all roads providing access to the project, either
existing or to be improved in conjunction with the project, or beyond the normal
traffic volume of the surrounding neighborhood that would result from the full
development in accordance with the Land Use Element.
6. The installation of a median in the San Anselmo Road frontage is necessary in
order to direct traffic in a safe and orderly manner.
7. Removal of the Card Lock Gas Fueling facility is necessary to insure onsite
vehicular and pedestrian circulation continues to operate in a safe and orderly
manner.
BE IT FURTHER RESOLVED, that the Planning Commission does hereby approve
the Reconsideration of Conditional Use Permit 2000-0022 subject to the following Exhibits:
EXHIBIT A: Conditions of Approval
EXHIBIT B: Site Plan
On motion by Commissioner , and seconded by Commissioner
the foregoing resolution is hereby adopted in its entirety by the following roll call
vote:
AYES:
Commissioners
U
NOES:
Commissioner
U
ABSENT:
Commissioner
U
ABSTAIN: none (�
ADOPTED: October 18, 2005
CITY OF ATASCADERO, CALIFORNIA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
EXHIBIT A: Conditions of Approval
Reconsideration of CUP 2000-0022
Conditions of Approval
Timing
Responsibility
Reconsideration of CUP 2000-0022
/Monitoring
San Anselmo Commercial Tourist Project
PS: Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
FO: Final Occupancy
Standard Conditions
1. The approval of this reconsideration of a
BP
PS
conditional use permit shall become final and
effective for the purposes of issuing building
permits, provided the required conditions of
approval have been satisfied, fourteen (14) days
following the Planning Commission approval
unless prior to the time, an appeal to the decision
is filed as set forth in Section 9-1.111(b) of the
Zoning Ordinance.
2. The granting of this Reconsideration of a
Ongoing
PS
Conditional Use Permit shall apply to APN 049-
225-024, regardless of owner.
3. The Community Development Department shall
BP
PS
have the authority to approve minor changes to
the project that (1) result in a superior site design
or appearance, and/or (2) address a construction
design issue that is not substantive to the
Reconsideration of the Conditional Use Permit.
Project Conditions
4. The site uses shall comply with all of the original
On going
PS
conditions and mitigation measures of
Conditional Use Permit 2000-0022, except as
revised in this resolution.
5. The Card Lock Fueling Facility shall be removed
FO
PS
from the approved Master Plan of Development
and shall not be constructed on this site.
6. One 15 -gallon Coastal Live Oak tree, additional
FO
PS
drought resistant shrubs, and mulch shall be
Conditions of Approval
Timing
Responsibility
Reconsideration of CUP 2000-0022
/Monitoring
San Anselmo Commercial Tourist Project
PS: Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
FO: Final Occupancy
added to the front planter area.
7. The median shall be a minimum of 2'6" wide and
FO
PS
shall have a cobblestone center.
s. All fascia trim shall be added to the buildings in
FO
PS
accordance with the Exhibits and Conditions of
CUP 2000-0022.
9. The split rail and wood fences along the western
BP
PS
property edge shall be removed and replaced
with a 3 -foot high architectural hi -quality,
decorative fence, to be reviewed and approved
by staff prior to installation.
10. The wall pack security lighting on the car wash
BP
PS
structure shall be removed and replaced with the
approved decorative gooseneck lights or the wall
pac lighting shall be relocated within each car
wash stall in a position within and above the
fascia level. Final locations of lighting shall be
reviewed and approved by staff prior to
installation. All exposed wall lighting shall be
shielded.
11. The blowers on the drive through car wash
FO
PS
building shall be baffled and screened from view
or replaced with an integral unit in order to
substantially reduce noise emission.
12. The top and sides of the existing monument sign
FO
PS
shall be enclosed with decorative masonry
material that matches or compliments the car
wash structure.
13. Two 15 -gallon London Plane trees shall be
FO
PS
planted between the sidewalk and the parking
area that fronts on San Anselmo Road.
14. The raised curb shall be constructed along the
FO
PS
rear line of the parking area behind the retail
Conditions of Approval
Timing
Responsibility
Reconsideration of CUP 2000-0022
/Monitoring
San Anselmo Commercial Tourist Project
PS: Planning Services
BL: Business License
BS: Building Services
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
FO: Final Occupancy
buildings and the carwash. All gravel shall be
removed from outside the raised curb, drip
irrigation shall be installed and mulch shall be
added under the drip lines of all native trees in
the area.
15. The concrete sidewall between the public
FO
PS
sidewalk and the ground mounted air
conditioning unit adjacent to each retail building
shall be removed. Infill shall be placed in the
removal area with mulch and matching
landscape shrubs.
16. Commercial grade bicycle racks shall be installed
FO
PS
adjacent to the retail buildings. There shall be
one bicycle parking space for each ten vehicle
parking spaces.
17. The parking area shall be stripped to identify all
FO
PS
parking spaces and drive aisles.
18. A minimum of 5 native oak trees shall be planted
FO
PS
along the base of the slope along the rear of the
lots.
Public Works Conditions
19. A median shall be installed in San Anselmo
BP
BS
Road, in accordance with Exhibit D and
Condition of Approval 7 above.
EXHIBIT B: Site Plan
IQIU5 `10ilk
Median Location
}tr ,
'f
gC!gg
9�"'+e�'Y i�c Al�d°I I' ll� I , iE�tB j°e 9I�f 5� °°•° f
zl r"
X111!(1► �p I!", Ip 1111
i ! II� z I�� (�'� I i�F• 4g' selgl�� °� 1° ' t li�� g:!!� !r oil
� �Ipp,T g;�� !(I��ey iiif•' !I ij .!° �'�3e� ; �i3:Ir(: !+lotl C� a A !' }(" � •Il ° �g;E�� E�€ "� t�
i ��I 6�•' SY�� I�yrE !A9 f� e� tggAeiie 5� 9s45t �y €i�' g A @� � � � l4� i,'�� �2F�� Pic !�F (�i ��
vc irA
New Coastal Live Oak
Location
EXHIBIT C: Example of New Roof and Shade Structure Plan Drawing
i
IProposed Shade Structure Plan Drawing I
CowCgEM TILE
10 WATC-�i
CAOZ VVA-5�t 54-P6-
UNVER MF-TAL a-," PAECTAL FACIA TO
5ILVIEp- /WtrMe P0,WT OL-ACr- MASH CAiZ WASR
marc kt Cane WAS 13LVG-
EXHIBIT D: Street Improvements—Median Curb
z
w
a
0
0
z
8
t�ljell rn $
La
II ! F31ipt�,�A
'-.I F,1
lq 11111 II � e l
l 11 ii 1 15 •g a
j I aa SYi L
�Q6 to il�r[1
m I �
1.3
I3
� I
I I Imo, 1I71 E
Q '�, s 111 tc; •. 1
• 9
il7ll j ll,ll . I I
Hl� /
< 22
a �• W
I
II�@°y g.l !
f i {ia Ertl Pix? ° (r!� t PIF h{u• ij �i 1t i6:E E� 7 t� 4 �� �ii.9�y.7 ilE; (i t
y i 7 9 Ity t I r Ee !
li'i!7
`rl I7fE
7 'fill �E �{l�i S . ��° 1�• E! E' 1 � il� E p �i•EI f E jI{' 1 E" itj P { :_ • i� :E
ilr Alin P1 fJyl7t I Pa 7 ttlI all {� IE EEe'I 1 p t! �•� /�i �� �F 1r.1�Ei `i,l� q 1� {. E fill
lii'I P II. Ei P7 ��g' gq� { 5l' t q E E �g¢=E1�14 IEi�� L {.y i
{til { !� ° I� ili7 fIL{ ,y177ry ij II E y ii l7 all
{u it ,C 1'11.1•jE Ill" {! ill,;, .11{ jt� if
7 lE PI' fiQ�E• r irI r°' It' I{510 y:lti �I I ill,;,
li lE {i Pla��
!Ii pE� itE{ i,. pPpII t l.E! �l P lPle �tl (,E`•9' iE�6�� E� I I���E,{
t ° 1` {io! Iypt p{y� �jj( �Ejr,•e5e l till y�Qjj{i `i1 if!,l �{ l EPr� �r�!• I •t',l
7.�ti1 y1E i�19 �.� ifil� ILII 1 �E�l�! y�lErF lt� f��77�E /y�7tl 7�I yl' y NEI i I! i� IiE !��
17 loii c y
TO BE CONTINUTED
ITEM NUMBER
DATE: 10-18-05
TENTATIVE PARCEL MAP 2005-0072,5155 ESCARPA AVE.
Applicant:
Barak Miles, 5255 Traffic Way, Ste. 104, Atascadero, CA 93422
Owners:
Jeff Hansen, P O Box 1710, Atascadero, CA 93423
Barak Miles, 5255 Traffic Way, Ste. 104, Atascadero CA 93422
Project Title:
Tentative Parcel Map 2005-0072
Project
5155 Escarpa Ave., Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 029-161-008
Project
A proposed subdivision of an existing 3.37 gross acre lot into three individual parcels of 1.0 1, 1. 15, and 1.21
Description:
gross acres. The site is currently contains a single-family residence that will remain on proposed parcel 1. The
parcels consist of moderate to steep slopes and contain native trees and vegetation. Onsite septic will serve the
property and water is available from Atascadero Mutual Water Company.
General Plan Designation: Single Family Residential (SFR -Y)
Zoning District: Residential Single Family (RSF-Y)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Negative Declaration is available for public review at 6905 El Camino Real, Suite 6, Community
Determination:
Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0072 5155 Escarpa\TO BE CONTINUED.doc
ITEM NUMBER: 7
DATE: 1 n-1 s -ns
Atascadero Planning Commission
Staff Report - Community Development Department
Ensenada Avenue PD -7
ZCH 2003-0044 / CUP 2003-0093 / TPM 2003-0039
(Jackson)
RECOMMENDATIONS:
The Planning Commission can take the following actions to approve the project:
1. Adopt Resolution PC 2005-0083 recommending that the City Council certify
Proposed Mitigated Negative Declaration 2005-0051; and,
2. Adopt Resolution PC 2005-0084 recommending that the City Council introduce an
ordinance for first reading by title only, to approve Zone Change 2003-0044 based
on findings; and,
3. Adopt Resolution PC 2005-0085 recommending that the City Council approve
Conditional Use Permit 2003-0093 (Master Plan of Development) based on findings
and subject to Conditions of Approval and Mitigation Monitoring; and,
4. Adopt Resolution PC 2005-0086 recommending that the City Council approve
Vesting Parcel Tract Map 2003-0039 based on findings and subject to Conditions of
Approval and Mitigation Monitoring.
REPORT -IN -BRIEF:
The proposed project consists of a Zone Map Amendment to establish a PD -7 Overlay
Zone over the subject site with a corresponding Master Plan of Development (CUP) and
vesting Tentative Parcel Map that would allow a 4 -unit single-family residential planned
development.
ITEM NUMBER: 7
DATE: 10-18-05
DISCUSSION:
Situation and Facts:
1. Applicant / Representative: Michael Jackson.
5502 Ensenada Ave
Atascadero, CA 93422
2. Project Address: 5502 Ensenada Ave (APN 028-361-014) (San Luis Obispo
County).
3. General Plan Designation: MDR (Medium Density Residential)
4. Zoning District: RMF -10 (Residential Multi -family - 10)
5. Site Area: 0.66 acres
6. Existing Use: single-family residence
7. Environmental Status: Proposed Mitigated Negative Declaration 2005-0051
Background
Surrounding Land Use and Setting:
North: Residential Multi -Family
South: Residential Multi -Family
East: Residential Multi -Family
West: Residential Single Family
ITEM NUMBER: 7
DATE: 1 n-1 R -ns
The project site is within the Medium Density Residential General Plan land use
designation and is zoned Residential Multi -family -10, which allows for a maximum
density of 10 units per acre. The properties along Ensenada Ave currently consist of
existing single-family residences.
The proposed project has been the subject of some controversy regarding processing
time. The below timeline is provided with the dates of application and staff's response.
Staff notes that each set of staff corrections have been focused on PD -7 appearance
review standards, and drainage design issues with the City Engineer.
Review Process Timeline
2-26-2003 -
Project submitted
4-3-2003 -
Corrections released
6-29-2004 -
Notice of intent to withdraw sent
12-2-2004 -
Project resubmitted
12-22-2004 -
Corrections released
4-7-2005 -
Project resubmitted
4-29-2005 -
Corrections released
ANALYSIS:
As a Planned Development, the Planning Commission must find that the project
provides high quality architectural, landscape, and site design to warrant the granting of
special development standards.
Three new single-family homes are proposed on site, with the existing residence to
remain. The homes are 1,175 square -feet with an attached 522 square -foot two car
garage. The existing home includes construction of a 560 square foot recreational
vehicle garage. The project takes access off of Ensenada Avenue.
ITEM NUMBER: 7
DATE: 1 n-1 s -ns
Appearance Review
Site Plan. Circulation. and Parkin
The project includes points of access off of Ensenada Ave. The existing home will be
primarily served by the existing driveway location. The proposed recreational vehicle
garage to the existing unit will be access off of the shared driveway. The three
proposed units will access off of the proposed shared driveway. Each unit has a two
car garage and provides one additional parking space on each lot. Staff has
conditioned that the applicant provide full frontage improvements along Ensenada Ave
(Condition CUP 26 / TTM 20).
During the period of review for this project, the standards for driveway width were
modified by the Fire Department to require a 20 -foot wide access driveway for all PD -7
projects. As such, the project does not currently meet the PD -7 side setback standard
on lot 4. According to the applicant, the project should not be re -designed to
accommodate this newer requirement. Staff has conditioned that the walkway to the
unit be integrated into the driveway to provide the required width and that the walkway
be constructed of decorative paving material. This will result in reduced landscaeping
and setback between the entry driveway and Unit 4. If the Planning Commission
chooses to recommend approval of the project, a special finding is included that due to
modified Fire Department standards during the review period, the project qualifies for a
waiver of the PD -7 site development setback standards.
Architecture, Materials, and Color
Each round of staff corrections to the applicant have included a request to provide
upgraded architecture to justify the subdivision as a planned development. To date, the
project has been designed in an ordinary suburban style. The applicant is proposing to
construct three new residences that include stucco siding and veneer on the front of the
units.
:=G.1.
n PRONT EL"A770N
u l lnit 1
ITEM NUMBER: 7
DATE: 1 n-1 s -ns
rfiV1111 CLCYAIIVIY :.or1 El
Unit
r-'� FRONT ELEVATION
FRONT ELEVATION ,m�
- l Jnit 4
Unit
On June 1, 2004, the City Council adopted a Planned Development policy that included
standards for high quality architecture and landscape design. Subsequent Planned
Development projects have met this standard by providing varied architecture, a variety
of siding materials, colony style architectural elements, and enhanced entry features
oriented to the main street frontage. Staff has the following concerns regarding the
proposed architecture that makes it both ordinary and suburban as it relates to the
adopted City Council Policy.
1. Repetitive Architecture
Staff Comment: All of units proposed are the same floor plan with different color
schemes. The proposed residences lack building material and fagade variety both
individually and collectively. The units are designed with minimal articulation along
each fagade.
Sam
n -I
Ing
-
FRONT ELEVATION ,m�
- l Jnit 4
Unit
On June 1, 2004, the City Council adopted a Planned Development policy that included
standards for high quality architecture and landscape design. Subsequent Planned
Development projects have met this standard by providing varied architecture, a variety
of siding materials, colony style architectural elements, and enhanced entry features
oriented to the main street frontage. Staff has the following concerns regarding the
proposed architecture that makes it both ordinary and suburban as it relates to the
adopted City Council Policy.
1. Repetitive Architecture
Staff Comment: All of units proposed are the same floor plan with different color
schemes. The proposed residences lack building material and fagade variety both
individually and collectively. The units are designed with minimal articulation along
each fagade.
ITEM NUMBER: 7
DATE: 1 n-1 s -ns
2. Lack of Character Defining Elements
Staff Comment: The proposed architecture does not incorporate elements such as
upgraded windows, varied roof forms, emphasized porches, and traditional colony
style elements such as dormers, bracketed eaves, and paired window styles as seen
on previous Planned Development Projects. The proposed porches lack definition in
terms of roof articulation and change.
Atascadero Creek
The proposed project is located adjacent to Atascadero Creek and the associated
Creek Reservation. The General Plan requires a 35 -foot setback for all structures from
the creek reservation line. Encroachment into this setback area may be approved by the
Planning Commission based on the following factors:
■ A soils survey finds that the existing and future creek conditions and locations will
not be detrimental to the project as proposed, and
■ A biologist survey finds that encroachment into the required setback area will not
negatively affect any established riparian habitat.
According to the project biologist, the proposed project will not negatively affect the
adjacent creek habitat area. A soils report was prepared by Buena Geotechnical
Services which concluded that the stability of the creek bank will not be negatively
impacted b the proposed development.
Landscape Design
The preliminary landscape plan has been designed to meet the minimum requirements
of the Atascadero Municipal code. Several large oak trees will be retained on-site.
Native trees and shrubs are proposed throughout the front yard areas and all common
areas.
Native Tree Mitiaation/Preservation
A tree removal application for 3 native trees is included with the proposed development,
2 of which are in excess of 24" dbh. A condition of approval has been included
requiring that the applicant pay mitigation fees into the Tree Replacement Fund or
provide equivalent re -plantings on site, as required by the Atascadero Native Tree
Ordinance and as shown in the following chart (Condition CUP 19).
ITEM NUMBER: 7
DATE: 1 n-1 R-ni;
Evergreen Native Trees (inches) Deciduous Native Trees (inches) F Totals
dbh
notes
dbh
notes
1 24 -inches
1 16 -inches
2
2 36 -inches
3
3
4
4
5
5
6
6
Total 24 -inches
Total 52 -inches
76 -inches
Mitigation Requirement
req'd tree replacements:
8 five gal trees
req'd tree replacements:
35 five gal trees
43 five gal trees
Proposed Replanting
0 five gal trees
Proposed Replanting
0 five gal trees
0 five gal trees
0 box trees (24")
0 box trees (24")
0 box trees (24")
Remaining Mitigation 8 five gal trees Remaining Mitigation 35 five gal treesI 43 five gal trees
Tree Fund Payment: $ 400.00 Tree Fund Payment: $ 1,733.33 $ 2,133.33
Site Drainage
The site drains into Atascadero Creek. All increases in run-off will be filtered and
detained on-site before metering flow into the adjacent creek.
Sanitary sewer will be connected to existing sewer facilities in Ensenada Ave.
Fiscal Impact
The following conditions of approval are included to mitigate the fiscal impacts of the
project on the City of Atascadero.
Condition CUP 16/TTM 8
• The emergency services and facility maintenance costs listed below shall be 100%
funded by the project in perpetuity. The service and maintenance costs shall be funded
through a community facilities district established by the City at the developer's cost. The
funding mechanism must be in place prior to or concurrently with acceptance of the final
maps. The funding mechanism shall be approved by the City Attorney, City Engineer
and Administrative Services Director prior to acceptance of any final map. The
administration of the above mentioned funds shall be by the City. Developer agrees to
participate in the community facilities district and to take all steps reasonably required by
the City with regard to the establishment of the district and assessment of the property.
a) All Atascadero Police Department service costs to the project.
b) All Atascadero Fire Department service costs to the project.
ITEM NUMBER:
DATE: 10-18-05
c) Off-site common City of Atascadero park facilities maintenance service costs
related to the project.
Condition CUP 17/TTM 9
All tract maintenance costs listed below shall be 100% funded by the project in perpetuity.
The service and maintenance cost shall be funded through a Home Owners Association
established by the developer subject to City approval. The Home Owners Association must
be in place prior to, or concurrently with acceptance of any final maps. The Home Owners
Association shall be approved by the City Attorney, City Engineer and Administrative
Services Director prior to acceptance of any Final Map. The administration of the above
mentioned funds, and the coordination and performance of maintenance activities, shall be
the responsibility of the Home Owners Association.
a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access
roads, emergency access gates, and sewer mains within the project.
b) All parks, trails, recreational facilities and like facilities.
c) All open space and native tree preservation areas.
d) All drainage facilities and detention basins.
e) All creeks, flood plains, floodways, wetlands, and riparian habitat areas.
f) All common landscaping areas, street trees, medians, parkway planters,
manufactured slopes outside private yards, and other similar facilities.
g) All frontage landscaping and sidewalks along arterial streets.
Inclusionary and Workforce Housing
The City Council has implemented an interim Inclusionary Affordable Housing Program
to include a fixed percentage of units within residential developments that require a
legislative approval to be reserved as deed restricted affordable units. This interim
program requires that the proposed project provide a minimum of 1 affordable unit deed
restricted at the moderate income rate or that an in -lieu fee be paid based on the
construction valuation of all 4 units within the project. A condition of approval has been
added to ensure that this requirement is met (Condition CUP 12/13 TTM 11/12).
Project Benefits
One of the
project mu
modification
required findings for approval
st "offer certain redeeming
of a planned development rezone is that the
the requested
on Planned
mmission must
Development
features to compensate for
11The table shown below outlines the Council policy
Development benefits. In order to approve this project, the Planning Co
find that the project offers all of the tier 1 benefits to qualify for a Planned
project.
ITEM NUMBER: 7
DATE: 1 n-1 R -n5
PD Location
Tier 1 Benefits
Tier 2 Benefits
Inside of Urban Core
a) Affordable / Workforce Housing
a) Pocket Parks in larger projects
b) High Quality Architectural Design
b) Trails / Walkways for Pedestrian
Custom PD's
c) High Quality Landscape Design
Connectivity
d) Buffering between Urban and
c) Historic Preservation
Suburban zones (large lot sizes,
increased setbacks, landscape
buffers, etc.)
e) Higher density to meet Housing
Element goals
Tentative Tract Map
A 4 -lot Vesting Tentative Parcel Map (TPM 2003-0039) is proposed as part of the
project consistent with the proposed Master Plan of Development. The Parcel Map has
been conditioned by staff and the City Engineer to meet all City standards including on -
and off-site street improvements. If approved, the applicant will be required to record
CC&R's with the map that will include maintenance and access of common areas
(Condition CUP 18/TTM 10).
General Plan Consistency
The proposed project is consistent with the following General Plan Land Use and
Housing Element Policies:
Land Use Policy 1.1: "Preserve the rural atmosphere of the community and assure
"elbow room" in areas designed for lower density development by guiding new
development into the Urban Core to conform to the historic Colony land use patterns of
the City and to respect the natural environment, hillside area and existing
neighborhoods".
Land Use Program 1.1.7: "Within the Urban Core encourage infill development or
revitalization or reuse of land already committed to urban development where utilities
and public services exist.
The proposed project is consistent with above mentioned goals and policies of the Land
Use Element.
Findings
Planned Development Overlay
ITEM NUMBER: 7
DATE: 1 n-1 R-05
As specified in the City's General Plan and Zoning Ordinance, the following specific
findings for the proposed Zone Change shall be made in order to approve the proposed
project:
1. The proposed Zone Change is in conformance with the adopted General Plan
Goals, Policies, and Programs and the overall intent of the General Plan.
2. The proposed Zone Change is compatible with existing development,
neighborhoods and the environment.
3. The proposed Zone Change will not create any new significant and unavoidable
impacts to traffic, infrastructure, or public service impacts.
4. The proposed Zone Change is consistent with the project -specific Mitigated
Negative Declaration.
5. The project offers certain redeeming features to support the request for the
modification of development standards.
Conditional Use Permit (Master Plan of DeveloDment
A Master Plan of Development is required for the Planned Development in the form of a
Conditional Use Permit. The proposed Master Plan of Development sets development
standards related to architectural design, site design, landscape, and specific
development standards required by the zoning ordinance. The Planning Commission
must make the following five findings to recommend approval of the proposed Master
Plan of Development:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual.
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including the Planned Development Ordinance.
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety, or welfare of the general public or persons residing
or working in the neighborhood of the use, or be detrimental or injurious to property
or improvements in the vicinity of the use.
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development.
5. That the proposed use or project will not generate a volume of traffic beyond the
safe capacity of all roads providing access to the project, either existing or to be
improved in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
ITEM NUMBER: 7
DATE: 1 n-1 s -ns
Tree Removals
1. The tree is obstructing proposed improvements that cannot be reasonably
designed to avoid the need for tree removal, as certified by a report from the Site
Planner and determined by the Community Development Department based on
the following factors:
■ Early consultation with the City;
■ Consideration of practical design alternatives;
■ Provision of cost comparisons (from applicant) for practical design
alternatives;
■ If saving tree eliminates all reasonable uses of the property; or
■ If saving the tree requires the removal of more desirable trees.
Proposed Environmental Determination
A Draft Mitigated Negative Declaration was circulated to public agencies and interested
members of the public on September 29, 2005. The environmental analysis identified
concerns regarding potential impacts to aesthetics, land use and planning, noise, and
biological resources. Mitigation measures pertaining to these resources are included. A
finding is proposed that this project would not have a significant effect on the
environment based upon the implementation of the identified mitigation measures.
Conclusion
The proposed project is a four unit single-family planned development within the multi-
family zone. The zoning district allows for PD -7 developments if all the required
standards can be met and if a finding can be made that the project offers redeeming
features such as high quality architecture and landscape design to support modification
of the multi -family development standards.
ALTERNATIVES
1. The Commission may recommend modifications to the project and/or conditions
of approval for the project to the City council.
2. The Commission may determine that more information is needed on some
aspect of the project and may refer the item back to the applicant and staff to
develop the additional information. The Commission should clearly state the type
of information that is required and move to continue the item to a future date.
3. The Commission may recommend the City Council deny the project. The parcel
would retain its designation of Residential Multi -family. The Commission should
ITEM NUMBER: 7
DATE: 1 n-1 st-nr%
specify the reasons for denial of the project and recommend an associated
finding with such action.
PREPARED BY: Kelly Gleason, Associate Planner
ATTACHMENTS:
Attachment 1:
Location, General Plan, and Zoning Map
Attachment 2:
Proposed Mitigated Negative Declaration and Initial Study
Attachment 3:
Draft Resolution 2005-0083
Attachment 4:
Draft Resolution 2005-0084
Attachment 5:
Draft Resolution 2005-0085
Attachment 6:
Draft Resolution 2005-0086
ITEM NUMBER:
DATE: 10-18-05
Attachment 1: Location Map, General Plan and Zoning
Project Site
Atascadero
Creek
Existing:
General Plan Designation: Medium Density residential
Zoning: Residential Multi -Family — 10
Proposed:
General Plan Designation: Medium Density residential
Zoning: Residential Multi-Family-10/PD-7
ITEM NUMBER
DATE: 10-18-05
Attachment 2: Proposed Mitigated Negative Declaration and Initial Study
See Following
ITEM NUMBER: 7
DATE: 1 n-1 R -n5
ATTACHMENT 3: Draft Resolution PC 2005-0083
Approval of Draft Mitigated Negative Declaration
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL CERTIFY PROPOSED MITIGATED
NEGATIVE DECLARATION 2005-0051 PREPARED FOR ZONE
CHANGE 2003-0044, TENTATIVE PARCEL MAP 2003-0039 AND
CONDITIONAL USE PERMIT 2003-0093
ON APN 028-361-014
(Jackson)
WHEREAS, an application has been received from Michael Jackson (5502 Ensenada
Ave, Atascadero, CA 93422) Applicant and Property Owner, to consider a project consisting of a
Zone Change from RMF -10 (Residential Multi -family - 10) to RMF-10/PD-7 (Residential Multi -
Family -10 with Planned Development Overlay #7) with corresponding Master Plan of
Development and Vesting Tentative Parcel Map on a 0.66 -acre site located at 5502 Ensenada
Ave (APN 028-361-014); and,
WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2005-0051
were prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission of the City of Atascadero held a public hearing
on October 18, 2005 following the close of the review period to consider the Initial Study and
Proposed Mitigated Negative Declaration; and,
WHEREAS, the Planning Commission has determined that the project will have no
significant impacts with project specific mitigation measures incorporated; and,
NOW THEREFORE, the Planning Commission of the City of Atascadero, hereby
resolves to recommend that the City Council certify Proposed Mitigated Negative Declaration
2005-0051 based on the following Findings, and as shown in Exhibit A:
1. The Proposed Mitigated Negative Declaration has been completed in compliance with
CEQA; and,
2. The Proposed Mitigated Negative Declaration was presented to the Planning
Commission, and the information contained therein was considered by the Planning
Commission, prior to recommending action on the project for which it was prepared; and,
ITEM NUMBER: 7
DATE: i n_i a_nr%
3. The project does not have the potential to degrade the environment when mitigation
measures are incorporated into the project; and,
4. The project will not achieve short-term to the disadvantage of long-term environmental
goals; and,
5. The project does not have impacts which are individually limited, but cumulatively
considerable; and,
6. The project will not cause substantial adverse effects on human beings either directly or
indirectly; and,
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
ITEM NUMBER
DATE: 10-18-05
Exhibit A Proposed Mitigated Negative Declaration 2005-0051
See Following
ITEM NUMBER: 7
DATE: 1 n-1 R-05
ATTACHMENT 4: Draft Resolution PC 2005-0084
Approval of Proposed Zoning Map Change
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL APPROVE ZONE CHANGE 2003-0044,
AMENDING THE OFFICIAL ZONING MAP DESIGNATION OF
APN 028-361-014 FROM RMF -10 (RESIDENTIAL MULTI -FAMILY —10)
TO RMF-10/PD-7 (RESIDENTIAL MULTI -FAMILY —10/PLANNED
DEVELOPMENT OVERLAY #7)
(Jackson)
WHEREAS, an application has been received from Michael Jackson (5502 Ensenada
Ave, Atascadero, CA 93422) Applicant and Property Owner, to consider a project consisting of a
Zone Change from RMF -10 (Residential Multi -family - 10) to RMF-10/PD-7 (Residential Multi -
Family -10 with Planned Development Overlay #7) with corresponding Master Plan of
Development and Vesting Tentative Parcel Map on a 0.66 -acre site located at 5502 Ensenada
Ave (APN 028-361-014); and,
WHEREAS, the site's General Plan Designation is MDR (Medium Density Residential);
and,
WHEREAS, the site's current zoning district is RMF -10 (Residential Multi -family -10);
and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2005-0051 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission has determined that it is in the best interest of the
City to enact this amendment to the Official Zoning Map to protect the health, safety, and
welfare of its citizens by applying orderly development of the City; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone
Change application was held by the Planning Commission of the City of Atascadero at which
ITEM NUMBER: 7
DATE: 1 n_7 S_n5
hearing evidence, oral and documentary, was admitted on behalf of said Zoning amendments;
and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on October 18, 2005, studied and considered Zone Change 2003-0044, after
first studying and considering the Proposed Mitigated Negative Declaration prepared for the
project, and,
NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings for Approval of a Zone Change to the Official Zoning Map of
Atascadero Changing the existing site zoning to RMF-10/PD7. The Planning Commission
finds as follows:
1. Modification of development standards or processing requirements is warranted to
promote orderly and harmonious development.
2. Modification of development standards or processing requirements will enhance the
opportunity to best utilize special characteristics of an area and will have a beneficial
effect on the area.
3. Benefits derived from the overlay zone cannot be reasonably achieved through
existing development standards or processing requirements.
4. The proposed project offers certain redeeming features to compensate for the
requested zone change.
SECTION 2. Recommendation of Approval. The Planning Commission of the City of
Atascadero, in a regular session assembled on October 18, 2005, resolved to recommend that the
City Council introduce for first reading by title only, an ordinance that would rezone the subject
site consistent with the following:
1. Exhibit A: Location Map
2. Exhibit B: Zone Map Amendment Diagram
ITEM NUMBER: 7
DATE: 10-18-05
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
ITEM NUMBER: 7
DATE: 1 n_1 sa_ni;
Exhibit B: Zone Map Amendment Diagram
Existing:
General Plan Designation: Medium Density residential
Zoning: Residential Multi -Family — 10
Proposed:
General Plan Designation: Medium Density residential
Zoning: Residential Multi-Family-10/PD-7
ATTACHMENT 5: Draft Resolution PC 2005-0085
Approval of Proposed Master Plan of Development
DRAFT RESOLUTION PC 2005-0085
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL APPROVE CONDITIONAL USE PERMIT
2003-0093 (MASTER PLAN OF DEVELOPEMNT)
ON APN 028-361-014
(Jackson)
WHEREAS, an application has been received from Michael Jackson (5502 Ensenada
Ave, Atascadero, CA 93422) Applicant and Property Owner, to consider a project consisting of a
Zone Change from RMF -10 (Residential Multi -family - 10) to RMF-10/PD-7 (Residential Multi -
Family -10 with Planned Development Overlay #7) with corresponding Master Plan of
Development and Vesting Tentative Parcel Map on a 0.66 -acre site located at 5502 Ensenada
Ave (APN 028-361-014); and,
WHEREAS, the site's General Plan Designation is MDR (Medium Density Residential);
and,
WHEREAS, the Planning Commission has recommended that the site's Zoning District
be changed from RMF -10 (Residential Multi -Family -10) to RMF-10/PD-7 (Residential Multi-
Family-10/Planned Development Overlay #7); and,
WHEREAS, the PD -7 requires the adoption of a Master Plan of Development, approved
in the form of a Conditional Use Permit; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2005-0051 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone
Change application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of
Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on October 18, 2005, studied and considered the Conditional Use Permit
2003-0093 (Master Plan of Development), after first studying and considering the Proposed
Mitigated Negative Declaration prepared for the project, and
NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings for Approval of Creek Setback Encroachment. The Planning
Commission finds as follows:
1. Encroachment into the required 35 -foot setback will not be detrimental to the adjacent
riparian corridor nor will the proposed structures be negatively affected by the current
and/or future creek conditions based on the provided biologist survey.
SECTION 2. Findings for Approval of Conditional Use Permit. The Planning
Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including provisions of the PD -7 Overlay Zone; and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. The proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. The proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
6. The Master Plan of Development standards or processing requirements will enhance
the opportunity to best utilize special characteristics of an area and will have a
beneficial effect on the area; and
7. Benefits derived from the Master Plan of Development and PD -25 overlay zone
cannot be reasonably achieved through existing development standards or processing
requirements; and,
8. The side setback for unit 4 is reduced to 5 -feet due to modifications in the fire
standards during the project review period.
SECTION 3. Findings for Approval of Tree Removal. The Planning Commission finds as
follows:
1. The trees are obstructing proposed improvements that cannot be reasonably designed
to avoid the need for tree removal, as certified by a report from the Site Planner and
determined by the Community Development Department based on the following
factors:
■ Early consultation with the City;
■ Consideration of practical design alternatives;
■ Provision of cost comparisons (from applicant) for practical design alternatives;
■ If saving tree eliminates all reasonable uses of the property; or
■ If saving the tree requires the removal of more desirable trees.
SECTION 4. Recommendation of Approval. The Planning Commission of the City of
Atascadero, in a regular session assembled on October 18, 2005, resolved to recommend that the
City Council approve Conditional Use Permit 2003-0093 (Master Plan of Development) and
Tree Removal Permit subject to the following:
EXHIBIT A:
Conditions of approval / Mitigation Monitoring Program
EXHIBIT B:
Master Plan of Development
EXHIBIT C:
Landscape Plan
EXHIBIT D:
Unit 1
EXHIBIT E:
Unit 2
EXHIBIT F:
Unit 3
EXHIBIT G:
Unit 4
EXHIBIT H:
Biologist Letter
EXHIBIT I:
Color and Materials Unit 1
EXHIBIT J:
Color and Materials Unit 2
EXHIBIT K:
Color and Materials Unit 3
EXHIBIT L:
Color and Materials Unit 4
EXHIBIT M:
Arborist Report
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program
PD -7 Master Plan of Development (CUP 2003-0093)
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD -7
BL: Business
License
PS: Planning Services
BS: Building Services
PD -7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW: Wastewater
CA: City Attorney
F0: Final
Occupancy
Planning Services
1. The approval of this zone change and use permit shall become final and
FM
PS
effective following City Council approval.
2. The approval of this use permit shall become final and effective for the
FM
PS
purposes of issuing building permits thirty (30) days following the City
Council approval of ZCH 2003-0044 upon second reading, unless prior to
that time, an appeal to the decision is filed as set forth in Section 9-1.111(b)
of the Zoning Ordinance.
3. The Community Development Department shall have the authority to
13P/FM
PS, CE
approve the following minor changes to the project that (1) modify the site
plan project by less than 10%, (2) result in a superior site design or
appearance, and/or (3) address a construction design issue that is not
substantive to the Master Plan of Development.
Any other changes to the Master Plan of Development shall be subject to City
Council approval.
4. Approval of this Conditional Use Permit shall be valid for twelve (12) months
BP / FM
PS
after its effective date. At the end of the period, the approval shall expire and
become null and void unless the project has received a building permit.
5. The applicant shall defend, indemnify, and hold harmless the City of
Ongoing
PS
Atascadero or its agents, officers, and employees against any claim or action
brought to challenge an approval by the city, or any of its entities, concerning
the subdivision
6. All subsequent Tentative Map and construction permits shall be consistent
BP/FM
PS, CE
with the Master Plan of Development contained herein.
7. All exterior elevations, finish materials and colors shall be consistent with the
BP
PS
Master Plan of Development as shown in EXHIBIT D through E and I
through L.
8. All site work, grading, and site improvements shall be consistent with the
BP/FM
PS, BS, CE
Master Plan of Development as shown in EXHIBIT B with the following
modifications:
■ Full frontage improvements shall be provided along Ensenada Ave.
■ The shared driveway shall be 20 -feet paved. The four feet closest to unit 4
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD -7
BL: Business
License
PS: Planning Services
BS: Building Services
PD -7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW; Wastewater
CA: City Attorney
FO: Final
Occupancy
shall be paved in a decorative material and shall serve as a walkway for unit
4.
9. All project fencing shall be installed consistent with EXHIBIT C subject to the
GP/BP
PS
following modifications:
■ No fencing over 6 -feet shall be permitted within the front setback. All
fencing 6 -feet in height shall be set back from the unit facades.
■ All fencing shall be recessed from the fagade of the units along all street
and parking court frontages.
10. A final landscape and irrigation plan shall be approved prior to the issuance
of building permits and included as part of site improvement plan consistent
with EXHIBIT C.
11. The developer and/or subsequent owner shall assume responsibility for the
continued maintenance of all landscape and common areas, consistent with
EXHIBIT C.
12. Affordable Housing Requirement: The applicant shall deed restrict a
GP/BP
PS, CA
minimum of 1 residential unit for 30 years at a moderate income rate or shall
pay an in -lieu fee based on 5% of the construction valuation of all 4 units
within the development, prior to or concurrently with the final map.
13. Workforce Housing: Prior to recordation of final map, the applicant shall
BP
PS, CA
enter into a legal agreement with the City to reserve 1/2 of the units for sale to
residents or workers within the City of Atascadero, including the affordable
units. The agreement shall include the following provisions:
■ The units shall be offered for sale to residents or workers within the City
of Atascadero for a minimum of 60 -days. During this time period offers
may only be accepted from Atascadero residents or workers;
■ The applicant shall provide reasonable proof to the City that at least one
of the qualified buyers is a resident or worker within the City Limits of
Atascadero;
■ The Atascadero resident or worker restriction shall apply to the initial
sale only;
■ The applicant shall identify which units will be reserved; and
The City Attorney shall approve the final form of the agreement.
14. A Tree Protection Plan shall be submitted with subsequent building permits
GP/BP
PS
for encroachment within the drip line of native trees located on the subject
parcel and any adjacent properties. The applicant will contract with a certified
arborist to monitor all activity within the drip lines of existing native oak trees.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD -7
BL: Business
License
PS: Planning Services
BS: Building Services
PD -7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW; Wastewater
CA: City Attorney
FO: Final
Occupancy
15. An address marker to include address for all units shall be located at the
GP/BP
PS
public street access point. The address marker shall be compatible with the
project architecture.
16. The emergency services and facility maintenance costs listed below shall
BP
PS
be 100% funded by the project in perpetuity. The service and
maintenance costs shall be funded through a community facilities district
established by the City at the developer's cost. The funding mechanism
must be in place prior to or concurrently with acceptance of the final
maps. The funding mechanism shall be approved by the City Attorney,
City Engineer and Administrative Services Director prior to acceptance of
any final map. The administration of the above mentioned funds shall be
by the City. Developer agrees to participate in the community facilities
district and to take all steps reasonably required by the City with regard to
the establishment of the district and assessment of the property.
■ All Atascadero Police Department service costs to the project.
■ All Atascadero Fire Department service costs to the project.
■ Off-site common City of Atascadero park facilities maintenance service
costs related to the project.
17. All tract maintenance costs listed below shall be 100% funded by the project
BP
PS
in perpetuity. The service and maintenance cost shall be funded through a
Home Owners Association established by the developer subject to City
approval. The Home Owners Association must be in place prior to, or
concurrently with acceptance of any final maps. The Home Owners
Association shall be approved by the City Attorney, City Engineer and
Administrative Services Director prior to acceptance of any Final Map. The
administration of the above mentioned funds, and the coordination and
performance of maintenance activities, shall be the responsibility of the
Home Owners Association.
a) All streets, bridges, sidewalks, streetlights, street signs, roads,
emergency access roads, emergency access gates, and sewer mains
within the project.
b) All parks, trails, recreational facilities and like facilities.
c) All open space and native tree preservation areas.
d) All drainage facilities and detention basins.
e) All creeks, flood plains, floodways, wetlands, and riparian habitat
areas.
f) All common landscaping areas, street trees, medians, parkway
planters, manufactured slopes outside private yards, and other similar
facilities.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD -7
BL: Business
License
PS: Planning Services
BS: Building Services
PD -7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW; Wastewater
CA: City Attorney
FO: Final
Occupancy
g) All frontage landscaping and sidewalks along arterial streets
18. Prior to final map, the applicant shall submit CC&Rs for review and approval
BP
PS, BS
by the Community Development Department. The CC&R's shall record with
the Final Map and shall include the following:
a) Provisions for maintenance of all common areas including access,
parking, street trees, fencing and landscaping in perpetuity.
b) A detailed list of each individual homeowner's responsibilities for
maintenance of the individual units.
c) Residents shall keep all trash receptacles within the unit's designated
trash storage area.
d) Garages shall be maintained and used for vehicle parking.
e) No boats, RV's or other type of recreation vehicle may occupy a guest
or resident parking space, excepting the RV garage added to unit 1.
f) A provision for review and approval by the City Community
Development Department for any changes to the CC&R's that relate to
the above requirements prior to the changes being recorded or taking
effect.
19. Approval of this permit shall include the removal of 3 Native Trees. The
BP
PS, BS
applicant shall be required to pay mitigation fees or provide replantings on-
site per the requirements of the Atascadero Native Tree Ordinance. Any
additional removals shall be subject to Planning Commission approval.
City Engineer Conditions
20. These conditions of approval are based on Vesting Tentative Parcel Map AT
04-0549 submittal by Vaughan Surveys, Inc Sheets 1 thru 3. When there is a
conflict between these conditions and the submitted drawings, the conditions
of approval shall govern
PROJECT SPECIFIC CONDITIONS
Drainage:
21. Provide for the detention of the 50 year developed storm runoff, while
BP, GP
CE
metering out the 2 year undeveloped storm runoff. The roofs of the
houses and hard surfaces shall drain directly into the basins. Drainage
basins shall be designed to desilt, detain and meter storm flows as well as
release them to natural runoff locations.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD-7
BL: Business
License
PS: Planning Services
BS: Building Services
PD-7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW; Wastewater
CA: City Attorney
FO: Final
Occupancy
22. Concentrated drainage from off-site areas shall be conveyed across the
BP, GP
CE
project site in drainage easements. Acquire drainage easements where
needed. Drainage shall cross lot lines only where a drainage easement
has been provided. If drainage easement cannot be obtained the storm
water release must follow the exact historic path, rate and velocity as prior
to the subdivision.
23. Applicant shall submit erosion control plans and a Storm Water Pollution
BP, GP
CE
Prevention Plan (SWPPP). The Regional Water Quality Control Board
shall approve the SWPPP.
24. All requirements of Section 5 "Storm Drainage" of the Engineering
BP, GP
CE
Department standard specifications and drawings will be met.
25. Obtain approval by the City Engineer of the grading & drainage plan and
BP, GP
CE
the storm drain design & facilities.
Public Improvements and Maintenance:
26. Construct new concrete curb, gutter and sidewalk per City Engineering
FM
CE
Standards #418 and 419 along the entire property frontage. Back of sidewalk
to be at property line. Sidewalk to provide a 4 foot clear path of travel. Utility
poles to be 18 inches clear from face of curb or 1 foot clear behind sidewalk.
Decomposed granite horse trail will not be allowed. Saw cut existing asphalt
and pave to new gutter lip. The road cross fall shall be 2% unless approved
different by City Engineer. In no case shall cross fall be less than 1 % nor
greater than 5%. Driveway approaches for the two driveways to be per City
Engineering Standard #423. Public Improvement plans to be stamped by a
Registered Civil Engineer.
SANITARY SEWER CONDITIONS
27. Collection sites for solid waste and turn around for solid waste collection
BP, GP
WW
vehicles will be approved by Atascadero Waste Alternative.
WASTEWATER
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD -7
BL: Business
License
PS: Planning Services
BS: Building Services
PD -7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW; Wastewater
CA: City Attorney
FO: Final
Occupancy
28. The new sewer manhole will be placed in the center of Capistrano Ave
and the projection of the center of Ensenada Ave. The sewer main from
the end of the existing main to this manhole will be in a public sewer
easement, be 8 inches in diameter and have a slope as flat as possible.
This public sewer main extension shall be designed and constructed to
City Standards. The design of the system shall meet with the Public
Works Department prior to deign to review the project and develop a clear
understanding of the criteria.
29. Each house shall be served by a private 4 inch sewer lateral from the
main to the house. The laterals may be installed in the same trench.
30. Applicant shall pay sewer Extension (Annexation), Connection and
Reimbursement fees (if applicable) upon issuance of building permit.
31. Drainage piping serving fixtures which have flood level rims located below
the elevation of the next upstream manhole cover of the public or private
sewer serving such drainage piping shall be protected from backflow of
sewage by installing an approved type backwater valve Fixtures above
such elevation shall not discharge through the backwater valve.
STANDARD CONDITIONS
32. All public improvements shall be constructed in conformance with the City of
BP, GP
CE
Atascadero Engineering Department Standard Specifications and Drawings
or as directed by the City Engineer.
33. In the event that the applicant is allowed to bond for the public improvements
FM
CE
required as a condition of this map, the applicant shall enter into a
Subdivision Improvement Agreement with the City Council.
34. An engineer's estimate of probable cost shall be submitted for review and
FM
CE
approval by the City Engineer to determine the amount of the bond.
35. The Subdivision Improvement Agreement shall record concurrently with the
FM
CE
Final Map.
36. The applicant shall be responsible for the relocation and/or alteration of
BP, GP
CE
existing utilities.
37. The applicant shall install all new utilities (water, gas, electric, cable TV and
BP, GP
CE
telephone) underground. Utilities shall be extended to the property line
frontage of each lot or its public utility easement.
38. The applicant shall monument all property corners for construction control
FM
CE
and shall promptly replace them if disturbed.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD -7
BL: Business
License
PS: Planning Services
BS: Building Services
PD -7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW; Wastewater
CA: City Attorney
FO: Final
Occupancy
39. The applicant shall acquire title interest in any off-site land that may be
FM
CE
required to allow for the construction of the improvements. The applicant
shall bear all costs associated with the necessary acquisitions. The applicant
shall also gain concurrence from all adjacent property owners whose ingress
and egress is affected by these improvements.
40. Slope easements shall be provided as needed to accommodate cut of fill
FM
CE
slopes.
41. Drainage easements shall be provided as needed to accommodate both
FM
CE
public and private drainage facilities.
42. The final map shall be signed by the City Engineer prior to the map being
FM
CE
placed on the agenda for City Council acceptance.
43. Prior to recording the tract map, the applicant shall submit a map drawn in
FM
CE
substantial conformance with the approved tentative map and in compliance
with all conditions set forth herein. The map shall be submitted for review and
approval by the City in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
44. Prior to recording the tract map, the applicant shall set monuments at all new
FM
CE
property corners. A registered civil engineer or licensed land surveyor shall
indicate by certificate on the parcel map, that corners have been set or shall
be set by a date specific and that they will be sufficient to enable the survey
to be retraced.
45. Prior to recording the tract map, the applicant shall pay all outstanding plan
check/inspection fees.
46. Prior to recording the map, the applicant shall complete all improvements
FM
CE
required by these conditions of approval
47. Prior to recording the tract map, the applicant shall have the map reviewed
FM
CE
by all applicable public and private utility companies (cable, telephone, gas,
electric, Atascadero Mutual Water Company). The applicant shall obtain a
letter from each utility company indicating their review of the map. The letter
shall identify any new easements that may be required by the utility
company. A copy of the letter shall be submitted to the City. New
easements shall be shown on the map.
48. Upon recording the final map, the applicant shall provide the City with a black
FM
CE
line clear Mylar (0.4 mil) copy and a blue line print of the recorded map.
49. Prior to the final inspection of any public improvements, the applicant shall
FM
CE
submit a written statement from a registered civil engineer that all work has
been completed and is in full compliance with the approved plans.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD -7
BL: Business
License
PS: Planning Services
BS: Building Services
PD -7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW; Wastewater
CA: City Attorney
FO: Final
Occupancy
50. Prior to the final inspection, the applicant shall submit a written certification
BP, GP
CE
from a registered civil engineer or land surveyor that all survey monuments
have been set as shown on the final map.
51. An encroachment permit shall be obtained prior to any work within City rights
BP, GP
CE
of way.
52. Prior to the issuance of building permits the applicant shall submit a grading
BP, GP
CE
and drainage plan prepared by a registered civil engineer for review and
approval by the City Engineer.
Atascadero Mutual Water Company
53. Before recordation of the final map, the applicant shall submit plans to
AMWC for the water distribution facilities needed to serve the project.
AMWC shall review and approve the plans before construction begins on
the water system improvements. All new water distribution facilities shall
be constructed in conformance with AMWC Standards and Details and
the California Waterworks Standards (Code of Regulations Title 22,
Division 4, Chapter 16). All cross -connection devices shall conform to
AWWA and California Department of Health Services standards.
54. Before the start of construction on the water system improvements, the
applicant shall pay all installation and connection fees required by AMWC.
55. Before issuance of building permits, the applicant shall obtain a "Will
Serve" letter from AMWC for the newly created lots within the subdivision.
56. Separate water meters for domestic water service are required for each
individual lot created within the subdivision.
57. The applicant is responsible for designing and constructing water system
improvements that will provide water at pressures and flows adequate for
the domestic and fire protection needs of the project.
Mitigation Measures
BP
PS
1.d.1
Mitigation Measure 1.d.1: If exterior lighting is proposed, it shall be designed to
eliminate any off site glare. All exterior site lights shall utilize full cut-off, "hooded"
lighting fixtures to prevent offsite light spillage and glare. Any luminaire pole height
shall not exceed 20 -feet in height, limit intensity to 2.0 foot candles at
ingress/egress, and otherwise 0.6 foot candle minimum to 1.0 maximum within the
private street. Fixtures shall be shield cut-off type and compatible with historic
setting, subject to staff approval.
Mitigation Measure 3.b.1: The project shall be conditioned to comply with all
BP
BS
3.b.1
applicable District regulations pertaining to the control of fugitive dust (PM -10) as
contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality Handbook.
Conditions of Approval /
Mitigation Monitoring Program
Ensenada Ave PD -7
PD -7 Master Plan of Development
Timing
BL: Business
License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary
Occupancy
FO: Final
Occupancy
Responsibili
ty
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW; Wastewater
CA: City Attorney
Mitigation
Measure
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune according to
manufacturer's specifications.
• Fuel all off-road and portable diesel powered equipment, including but not
limited to bulldozers, graders, cranes, loaders, scrapers, backhoes,
generator sets, compressors, auxiliary power units, with ARB certified
motor vehicle diesel fuel (Non -taxed version suitable for use off-road).
• Maximize to the extent feasible, the use of diesel construction equipment
meeting the ARB's 1996 or newer certification standard for off-road
heavy-duty diesel engines.
• Install diesel oxidation catalysts (DOC), catalyzed diesels particulate filters
(CDPF) or other District approved emission reduction retrofit services
(Required for projects grading more than 4.0 acres of continuously worked
area).
Section 6.4: Activity Management Techniques
• Develop a comprehensive construction activity management plan
designed to minimize the amount of large construction equipment
operating during any given time period.
• Schedule of construction truck trips during non -peak hours to reduce peak
hour emissions.
• Limit the length of the construction workday period, if necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading, demolition and building
plan notes:
A. Reduce the amount of the disturbed area where possible.
B. Use of water trucks or sprinkler systems in sufficient quantities to prevent
airborne dust from leaving the site. Increased watering frequency would be
required whenever wind speeds exceed 15 mph. Reclaimed (non -potable)
water should be used whenever possible.
C. All dirt stockpile areas should be sprayed daily as needed.
D. Permanent dust control measures identified in the approved project re -
vegetation and landscape plans should be implemented as soon as possible
following completion of any soil disturbing activities.
E. Exposed ground areas that are plann4ed to be reworked at dates greater than
one month after initial grading should be sown with a fast -germinating native
grass seed and watered until vegetation is established.
F. All disturbed soil areas not subject to re -vegetation should be stabilized using
approved chemical soil binder, jute netting, or other methods approved in
advance by the APCD.
G. All roadways, driveways, sidewalks, etc, to be paved should be complete as
soon as possible. In addition, building pads should be laid as soon as possible
after grading unless seeding or soil binders are used.
H. Vehicle speed for all construction vehicles shall not exceed 15 mph on any
unpaved surface at the construction site.
I. All trucks hauling dirt, sand, soil, or other loose materials are to be covered or
should maintain at least two feet of freeboard (minimum vertical distance
between top of load and top of trailer) in accordance with CVC Section 23114.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD -7
BL: Business
License
PS: Planning Services
BS: Building Services
PD -7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW; Wastewater
CA: City Attorney
FO: Final
Occupancy
J. Install wheel washers where vehicles enter and exit unpaved roads onto
streets, or was off trucks and equipment leaving the site.
K. Sweep streets at the end of each day if visible soil material is carried onto
adjacent paved roads. Water sweepers with reclaimed water should be used
where feasible.
L. The contractor or builder shall designate a person or persons to monitor the
dust control program and to order increased watering, as necessary, to
prevent transport of dust off site. The name and telephone number of such
persons shall be provided to the APCD prior to land use clearance for map
recordation and land use clearance for finish grading of any structure.
Mitigation Measure 4.b.e.1: All recommendations of the soils report and biologist
Gil
PS, BS, CE
4.e.b.1
survey shall be implemented. Foundation design and overexcavation and re -
compaction shall follow the recommendations of the soils report. Site drainage
shall be designed to avoid concentration of flows into Atascadero Creek.
Mitigation Measure 4.e.1: The building permit site plan shall identify all protection
GP
PS, BS, CE
4.e.1
and enhancement measures recommended by the Certified Arborist in the Tree
Protection Plan. Tree protection fencing shall be installed at the locations called out
in the Tree Protection Plan.
Mitigation Measure 4.e.2: The Precise Grading Plan shall identify tree protection
GP
PS, CE
4.e.2
fencing around the dripline of each existing on-site tree and/or native shrub mass
within 20 feet of construction activity.
Mitigation Measure 4.e.3: Grading and excavation and grading work shall be
GP, BP
PS, BS
4.e.3
consistent with the City of Atascadero Tree Ordinance. Special precautions when
working around native trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be pruned prior to
any heavy equipment work being done.
4. Vehicles and stockpiled material shall be stored outside the dripline of all
trees.
5. All trees within the area of work shall be fenced for protection with 4 -foot
chain link, snow or safety fencing placed per the approved tree protection
plan. Tree protection fencing shall be in place prior to any site excavation
or grading. Fencing shall remain in place until completion of all
construction activities.
6. Any roots that are encountered during excavation shall be clean cut by
hand and sealed with an approved tree seal.
Mitigation Measure 4.e.4: The developer shall contract with a certified arborist
BP
PS, BS
4.e.4
during all phases of project implementation. The certified arborists shall be
responsible for monitoring the project during all phases of construction through
project completion, as follows:
(a). A written agreement between the arborist and the developer outlining a
arborist monitoring schedule for each construction phase through final
inspection shall be submitted to and approved by planning staff prior to the
issuance of building/grading permits.
Conditions of Approval /
Mitigation Monitoring Program
Ensenada Ave PD -7
PD -7 Master Plan of Development
Timing
BL: Business
License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary
Occupancy
FO: Final
Occupancy
Responsibili
ty
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW; Wastewater
CA: City Attorney
Mitigation
Measure
(b). Arborist shall schedule a pre -construction meeting with engineering /planning
staff, grading equipment operators, project superintendent to review the project
conditions and requirements prior to any grubbing or earth work for any portion
of the project site. All tree protection fencing and trunk protection shall be
installed for inspection during the meeting. Tree protection fencing shall be
installed at the line of encroachment into the tree's root zone area.
(c). As specified by the arborist report and City staff:
■ Fencing: Must be a minimum of 4' high, chain link, and snow or safety
fence, staked at the drip -line or line of encroachment for each tree or
group of trees. Tree fencing shall be erected before demolition, grading,
or construction begins and remains in place until final inspection of the
project permit, except for work specifically required in the approved plans
in which case the project arborist or Planning Staff must be consulted.
■ Soil Aeration Methods: Soils under drip -lines that have been compacted
by heavy equipment and/or construction activities must be returned to
their original state before all work is completed. Methods include water
jetting, adding organic matter, and boring small holes with an auger (18"
deep, 2-3' apart with a 24" auger) and the application of moderate
amounts of nitrogen fertilizer. The arborist shall advise.
■ Chip Mulch: All areas within the drip -line of the trees that cannot be
fenced shall receive a 4-6" layer of chip mulch to retain moisture, soil
structure and reduce the effects of soil compaction.
■ Trenching within the Drip -line: All trenching under drip -lines of native
trees shall be hand dug, augured or bored. All major roots shall be
avoided whenever possible. All exposed roots larger than 1" in diameter
shall be 'clean cut with a sharp pruning tool and not left ragged.
■ Grading within drip -line: Grading should not encroach within the drip -line.
If grading is necessary, construction of retaining walls or tree wells or
other protection measures may be necessary to insure the survivability of
the trees. Chip mulch 4-6" in depth may also be required in these areas.
Grading should not disrupt the normal drainage pattern around the trees.
Fills should not create a ponding condition and excavations should not
leave the tree on a rapidly draining mound.
■ Exposed Roots: Any exposed roots shall be recovered the same day they
were exposed.
■ Paving within the Drip -line: Pervious surfacing is required within the
dripline of any oak trees.
■ Compaction: Vehicles and all heavy equipment shall not be driven under
the trees, as this will contribute to soil compaction.
■ Existing Surfaces: The existing ground surface within the drip -line of all
oak trees shall not be cut, filled, compacted or pared.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
Ensenada Ave PD -7
BL: Business
License
PS: Planning Services
BS: Building Services
PD -7 Master Plan of Development
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
TO: Temporary
CE: City Engineer
Occupancy
WW; Wastewater
CA: City Attorney
FO: Final
Occupancy
■ Construction materials and waste: No liquid or solid construction waste
shall be dumped on the ground within the drip -line of any oak tree.
■ Arborist Monitoring: During construction an arborist shall be present when
encroaching within the dripline of any Oak tree.
(d). Upon project completion and prior to final occupancy a final status report shall
be prepared by the project arborist certifying that the tree protection plan was
implemented, the trees designated for protection were protected during
construction, and the construction -related tree protection measures are no
longer required for tree protection.
Mitigation Measure 6.b.1: The grading permit application plans shall include
GP
BS
6.b.1
erosion control measures to prevent soil, dirt, and debris from entering the storm
drain system during and after construction. A separate plan shall be submitted for
this purpose and shall be subject to review and approval of the City Engineer at the
time of Building Permit application.
Mitigation Measure 6.c.d.1: A soils report shall be required to be submitted with a
GP
PS, BS, CE
6.c.d.1
future building permit by the building department.
Mitigation Measure 8.e.f.1: Should the disturbed area total one acre or greater, a
GP
PS,CE
8.e.f.1
Stormwater Pollution Prevention Plan (SWPPP)/Erosion Control Plan shall be
submitted and approved by the City Engineer prior to the issuance of the building
permit. The plan shall include storm water measures for the operation and
maintenance of the project for the review and approval of the City Engineer.
Should the area of disturbance total less than one acre in area, the applicant shall
include methods of erosion control and temporary site runoff control, subject to the
approval of the City Engineer.
Mitigation Measure 8.e.f.2: The Building Permit application plans shall identify Best
BP
PS, CE
8.e.f.2
Management Practices (BMPs) appropriate to the uses conducted on site that
effectively prohibit the entry of pollutants into storm water runoff.
Mitigation Measure 8.e.Q: The developer is responsible for ensuring that all
BP
PS, BS
8.0.3
contractors are aware of all storm water quality measures and that such measures
are implemented. Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction notices, citations, or
stop orders
Mitigation Measure 8.g.h.i.1: All structures will be required to be constructed
BP
PS/CE/BS
8.g.h.1.1
outside of the 100 -yr flood plane and will be required to meet building code
requirements to ensure that all portions of the structures are outside of this area.
Conditions of Approval /
Mitigation Monitoring Program
Ensenada Ave PD -7
PD -7 Master Plan of Development
Timing
BL: Business
License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO: Temporary
Occupancy
FO: Final
Occupancy
Responsibili
ty
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW; Wastewater
CA: City Attorney
Mitigation
Measure
Mitigation Measure 11.d: All construction activities shall comply with the City of
BP, GP
PS, BS
11.d
Atascadero Noise Ordinance for hours of operation.
Construction activities shall be limited to the following hours of operation:
• 7 a.m. to 7 p.m. Monday through Friday
• 9 a.m. to 6 p.m. Saturday
• No construction on Sunday
Further, particularly loud noises shall not occur before 8 a.m. on weekdays and not
at all on weekends.
The hours of construction may be modified by the Community Development
Director upon a determination that unusually loud construction activities are having
a significant impact on the neighbors.
Failure to comply with the above-described hours of operation may result in
withholding of inspections and possible construction prohibitions, subject to the
review and approval of the Community Development Director.
A sign shall be posted on-site with the hours of operation and a telephone number
of the person to be contacted in the event of any violations. The details of such a
sign shall be approved by staff during the Grading Plan/Building Permit review
process.
EXHIBIT B: Master Plan of Development/Grading Plan
20 -foot
paved
minimum
• ant> npphvas��
O,aO��so�tl
uo,loniasaa
00.^•. G
�g.
2
lgil
a
BSc
_
�
� i�
]t
39
• ant> npphvas��
O,aO��so�tl
uo,loniasaa
00.^•. G
EXHIBIT C: Landscape Plan
� 6� 'iAY YGYIBilO i0if Q
lf►oo�soos Iqb t1Llf1 f IIW7gY1'�w � O
,---------- I� '7d 1 4CNYS
y
a a a o a. e z. 7_• e
EXHIBIT D: Floor Plan / Elevations Unit 1
uWNnwwoo
11 � T 9(lb
A13038
z
0
W
J
9
i
EXHIBIT E: Floor plans / Elevations Unit 2
aA99
Rdi II f Noe>vvr 3xw
I�_
I
�Ct1]
1
_,
1
I� I
�4�' i l l i■j
, ' ei�°���i I■�
� �
! ■
Il�li;� ��i;E�ll
rr
��'f 1, it ■ �_ � 1,
I ��� ' I �
�
I�_
I
�Ct1]
1
EXHIBIT F: Elevations Unit 3
Nogx- 'r I W s z q
� Y
1N3 WdOl3A3O .J -W nn WOO
5002 z T 9nd
C13A
\
0
iE
P
i
1
� 1
fig
10.2HI
{
Q
Lf �
i.,
LINT,.
EXHIBIT G: Floor Plan / Elevations Unit 4
"and b'aVNO9N4 LOSS
_
N09>r-/Vr MA
3
Will
I�IN.0
a il'�;'Xgryryyy
`�
yl��'INi�I
•
LI
Vi,
ilk
�, sl'• �,� " ISI
lMill
i !9
! ��
I
99
� 1 •�
f P,�� � �1 jEjiYl
�� �
I
EXHIBIT H: Biologist Survey
ARRA DELTA CORPORA AN
935 Riverside Avenue; Suite 21
Paso Robles, California 93446
(805)239-9293
Fax: (905) 239-9309
Email: siemdlt(a?tcsn.wt
_ Robb Eidemiller
June 6, 2003
A !ECS} ED President and CEO
Ms. Kelly Davis JUN 1 0 2003
City of Atascadero
6500 Palma Avenue COMMUNITY DEVELOPMENT
Atascadero, CA 93422
RE: Biological & Soil Stability Survey for 5502 Ensenada Avenue, Atascadero, San Luis Obispo Count,
California, 93422.
Dear Ms. Davis:
Sierra Delta Corporation C'SDC") conducted a site investigation for the Subject Property located at 5502
Ensenada Avenue, Atascadero, California, on June 4, 2003. The Subject Property is located along the east bank
of Atascadero Creek, within the City of Atascadero. SDC referenced Mr. Jacksons' development plans for the
Subject Property and identified the areas of proposed development prior to the site reconnaissance. During the
site investigation, the location of the creek and riparian areas were identified in relation to the proposed
development.
The City of Atascadero has a creek setback ordinance, Policy 8.2 of the General Plan, which establishes
setbacks for development along creeks. This policy, which stated that a 20 foot creek setback shall be in effect
along Atascadero Creek, was recently revised to incorporate a 35 foot creek setback measured from the creek
reservation. The policy further states that exceptions can be made if the creek, riparian areas and site
improvements will not be negatively impacted by the exception. Based on the site reconnaissance and the revieNN
of the proposed development plans, SDC found the following:
• The proposed development for the Subject Property located at 5--502 Ensenada Avenue, in the
City of Atascadero, will not have a negative impact to the creek, riparian areas, or stability of
the creek bank
Current on-site structures (a portion of a house and a chain link fence) are located within 10 feet of the creek
reservation. The new development plan proposes that all structures have at least a setback of 20 feet from the
creek reservation. Due to this proposed setback and prior development on the Subject Properly, there should not
be a negative impact to the creek, riparian areas or stability of the creek reservation.
Should you have any questions or additional information requests, please contact the undersigned at
805.239.9293.
Respectfully,
&WWQQA DCCL •TA
CWPOQA "ON
Robb Eidemiller
RlUdg
cc: Mike Jackson
— Your Future is Today... We Help Make it Happen!
EXHIBIT I: Color and materials Unit 1
0
le
*See project file for colors**
w
o
�
�5
v
Z
�
�a
A.
�
V
J
lu
z
4
LL
*See project file for colors**
w
�5
�a
A.
�
N N
*See project file for colors**
EXHIBIT J: Color and Materials Unit 2
n
U
-5
�3
:S
� kk E
EXHIBIT K: Color and Materials Unit 3
0
e3
s
v
75
v
N
�
-Q
S>
a
N NN
c
kN
EXHIBIT L: Color and Materials Unit 4
a
l�
� v
fl
4N
T
n� 'n
ippry �
EXHIBIT M: Arborist Report
0 0
802 PASO ROBLES STREET PASO ROBLES, CALIFORNIA 93446 805/239-1239 FAX 805/239-3742
ARBOR
TR■E SURGERY
February 11, 2003
Mike Jackson
5502 Ensenada Ave
Atascadero, CA 93422
This Tree Protection Plan is in regards to the development on Parcel # APN 028-361-014
the comer of Ensenada Avenue and Capistrano Ave within the City of Atascadero CA.
The overall site condition is good and it has several large heritage oak trees. Several Oak
trees will be impacted by the construction activities, please see attached spreadsheet for
specifics. The Plans drafted by R. Thompson Consulting were used to identify the trees
for this project. I have signed the lower right corner of the plans to verify their use. To
obtain a clear understanding of the tree protection measures, it is suggested that during all
phases of construction the plans and the report be used to review the site with any and all
personal that will be working on the project. In addition I would recommend that all
management and supervisory personal sign the plans and the report to acknowledge the
measures at hand.
The following trees I through 11 have been identified as needing protection measures
during construction. This construction site has one tree planned for removal. A
corresponding number 1-11 has been noted on the plans as subject trees were identified in
a clockwise manor starting from the northern most subject tree.
The following Tree Protection standards shall be in place and practiced for trees 1-11
during all phases of construction and until the project is completed.
1. Fencing: Must be a minimum of 4' high, chain link, snow or safety fence, staked at
the dripline or line of encroachment for each tree or group of trees, fence must be up
before any construction or earth moving begins. For areas where this is not possible,
aeration of the soil (after development is complete) shall be required.
2. Soil Aeration Methods: Soils under the driplines that has been compacted by heavy
equipment and/or construction activities must be returned to their original state before
all work is completed. Methods include water jetting, adding organic matter, and
boring small holes with an auger (18" deep, 2-3' apart with a 24' auger) and the
application of moderate amounts of nitrogen fertilizer. Applicant's arborist shall
advise.
3. Chip Mulch: All areas within the driplines of the trees that cannot be fenced shall
receive a 4-6" layer of chip mulch to retain moisture, soil structure and reduce the
affects of soil compaction.
EXHIBIT M: Arborist Report
0
FF4. Trenching Within The Dripline: All trenching under the driplines of native trees
shall be hand -dug, augured or bored, and all major roots shall be avoided whenever
possible. All exposed roots larger than 1" in diameter shall be `cut clean" with a
sharp pruning tool and not ragged.
5. Grading Within The Dripline: Grading should not encroach within the dripline. If
grading is necessary, construction of retaining walls or tree wells or other protection
measures may be necessary to insure the survivability of the trees. Chip mulch, 4-6"
in-depth may also be required in these areas. Grading should not disrupt the normal
drainage pattern around the trees. Fills should not create a pounding condition and
excavations should not leave the tree on a rapidly draining mound.
6. Exposed Roots: Any exposed roots shall be recovered the same day they were
exposed.
7. Paving Within The Driplines: Pervious surfacing is preferred within the dripline of
any oak trees.
8. Compaction: Vehicles and all heavy equipment shall not be driven under the trees,
as this will contribute to soil compaction.
9. Existing Surfaces: The existing ground surface within the dripline of all Oak trees
shall not be cut, filled, compacted or pared.
10. Construction Materials and Waste: No liquid or solid excess or waste construction
materials shall be dumped on the ground or into any area between the dripline of any
Oak trees.
11. Arborist Monitoring: During construction an arborist shall be present when
encroaching within the dripline of any Oak tree. Trees # 1-11 have moderate to high
probability of root encroachment.
12. Pre -Construction Meeting: An on-site pre -construction meeting with the Arborist,
Owner, Planning Staff, and the earth moving team shall be required for this project.
Prior to final occupancy, a letter from the arborist shall be required verifying the
health/condition of all impacted trees and providing any recommendations for any
additional mitigation. The letter shall verify that the arborist was on-site for all grading
activity that encroached into the dripline of the native trees, and that all work in these
areas was done to standards and methods set by the arborist.
Please let me know if I may be of any future assistance to you for this project.
Steven G. Alvarez
�o
Certified Arborist #WC -0511
EXHIBIT m:Arborist Report
■
L]
L�
B
g§
§
LL @2:
\
\
\
\
\
\
%
\
2
!
0
2
§
»
!
!
!
«
5
-
-
-
-
-
-
k
OM
k$
z
z
z
z
z
z
z
z
z
z
z
§
5
0
0
0
0
0
00
00
00
u
z
z
z
z
z
z
z
z
z
z
z
E
z
k
m
m
m
m@
m
z
z
z
m
z
2
§
ƒ
\
ƒ
\
/
\
0z
z
z
z
z�
o
$
«
S
a-
=
I
E
®
_
�
±
k
=
z
z
2§
0
2
0
0
§
w
2
2
3
2
2
C
z
z
z
z}/
o
0
o
e
c\
u/
o
0
of
z
\
k
$
$
$
J
$
$
$
$
$
z
«
§
%
2
2
0
0
0
G
2
2
2/
k
�a
Q
R
)
)
)
)
§
)
/
§
\
/
/
'§
2
y
}
}
y
¥
}
§
¥
/
;
;
o�
A
2
2$$;
m$;
m
m
§
§
»www
»
w
w
»
m
r
�§
±�
,gym
C,4
e
G=
r
G-»%
4
4
G
�
w»
X»
n
m
r
•§
\
/
\
\
\
\
\
\
\
\
\
\
U)
')
--
n#
g
m
I-
co
e
L�
B
ATTACHMENT 6: Draft Resolution PC 2005-0086
Approval of Proposed Vesting Tentative Tract Map
DRAFT RESOLUTION PC 2005-0086
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL APPROVE VESTING TENTATIVE PARCEL
MAP 2003-0039, A FOUR LOT SUBDIVISION CONSISTENT WITH A
MASTER PLAN OF DEVELOPMENT ON APN 028-361-014
(Jackson)
WHEREAS, an application has been received from Michael Jackson (5502 Ensenada
Ave, Atascadero, CA 93422) Applicant and Property Owner, to consider a project consisting of a
Zone Change from RMF -10 (Residential Multi -family - 10) to RMF-10/PD-7 (Residential Multi -
Family -10 with Planned Development Overlay #7) with corresponding Master Plan of
Development and Vesting Tentative Parcel Map on a 0.66 -acre site located at 5502 Ensenada
Ave (APN 028-361-014); and,
WHEREAS, the Planning Commission has recommended that the site's Zoning District
be changed from RMF -10 (Residential Multi -Family -10) to RMF-10/PD-7 (Residential Multi-
Family-10/Planned Development Overlay #7); and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2005-0051 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Vesting
Tentative Parcel Map application was held by the Planning Commission of the City of
Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said
Master Plan of Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on October 18, 2005, studied and considered Tentative Parcel Map 2003-
0039, after first studying and considering the Proposed Mitigated Negative Declaration prepared
for the project, and
NOW THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings of Approval for Vesting Tentative Parcel Map, the Planning
Commission finds as follows:
1. The proposed subdivision, design and improvements as conditioned, is consistent with
the General Plan and applicable zoning requirements, including provisions of the PD -7
overlay district.
2. The proposed subdivision, as conditioned, is consistent with the proposed Planned
Development Overlay District #7 Master Plan of Development (CUP 2003-0093).
3. The site is physically suitable for the type of development proposed.
4. The site is physically suitable for the density of development proposed.
5. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
6. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
7. Covenants, Conditions and Restrictions (CC&R's) or equivalent shall be required that
incorporate the Master Plan of Development conditions of approval to ensure that the site
retains the proposed qualities (architecture, colors, materials, plan amenities, fencing, and
landscaping) over time.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
SECTION 2. Recommendation of Approval. The Planning Commission of the City of
Atascadero, in a regular session assembled on October 18, 2005, resolved to recommend that the
City Council approve Vesting Tentative Parcel Map (TPM 2003-0039) subject to the following:
1. Exhibit A: Vesting Tentative Parcel Map 2003-0039
2. Exhibit B: Conditions of Approval / Mitigation Monitoring Program.
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
Exhibit A: Vesting Tentative Tract Map
o�
aD •C i Creek Reservation
I �d ! r Atosc°derO
9� Fix � $ `a x
At
\
/ ✓/ / A,
lit
�0
1
\
co vh��
0
N
1L 5L
® I�� Ensenada Ava. L I a 4
O \ �
�a Ill !Ig
�a
��3 Yug
nY�S
151
Exhibit B: Conditions of Approval / Mitigation Monitoring Program
Tentative Tract Map 2004-0055
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
T0: Temporary
occupancy
CE: City Engineer
FI: Final inspection
WW: Wastewater
CA: City Attorney
FO: Final
Occupancy
AMWC: Water Comp.
Planning Services
1. The approval of this use permit shall become final and effective for the
FM
PS
purposes of issuing building permits thirty (30) days following the City Council
approval of ZCH 2003-0044 upon second reading, unless prior to that time, an
appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning
Ordinance.
2. Approval of this Tentative Parcel Map shall be valid for two years after its
FM
PS
effective date. At the end of the period, the approval shall expire and become
null and void unless an extension of time is granted pursuant to a written
request received prior to the expiration date.
3. The Community Development Department shall have the authority to approve
FM
PS
minor changes to the project that (1) result in a superior site design or
appearance, and/or (2) address a design issue that is not substantive to the
Tentative Tract Map and that the Final Map is in substantial conformance with
the Tentative Map.
4. The granting of this entitlement shall apply to the property located at (APN 028-
On going
PS
361-014) regardless of owner.
5. The Final Map shall be drawn in substantial conformance with the approved
FM
PS
tentative map, and in compliance with all conditions set forth herein, shall be
submitted for review and approval in accordance with the Subdivision Map Act
and the City's Subdivision Ordinance.
6. The subdivider shall defend, indemnify, and hold harmless the City of
FM
PS
Atascadero or its agents, officers, and employees against any claim or action
brought to challenge an approval by the city, or any of its entities, concerning
the subdivision.
7. The Tract Map shall be subject to additional fees for park or recreation
FM
PS
purposes (QUIMBY Act) as required by City Ordinance.
8. The emergency services and facility maintenance costs listed below shall
BP
PS
be 100% funded by the project in perpetuity. The service and
maintenance costs shall be funded through a community facilities district
established by the City at the developer's cost. The funding mechanism
must be in place prior to or concurrently with acceptance of the final
maps. The funding mechanism shall be approved by the City Attorney,
City Engineer and Administrative Services Director prior to acceptance of
any final map. The administration of the above mentioned funds shall be
by the City. Developer agrees to participate in the community facilities
district and to take all steps reasonably required by the City with regard to
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
TO: Temporary
occupancy
CE: City Engineer
FI: Final inspection
WW: Wastewater
CA: City Attorney
F0: Final
Occupancy
AMWC: Water Comp.
the establishment of the district and assessment of the property.
■ All Atascadero Police Department service costs to the project.
■ All Atascadero Fire Department service costs to the project.
■ Off-site common City of Atascadero park facilities maintenance service
costs related to the project.
9. All tract maintenance costs listed below shall be 100% funded by the
BP
PS
project in perpetuity. The service and maintenance cost shall be funded
through a Home Owners Association established by the developer
subject to City approval. The Home Owners Association must be in
place prior to, or concurrently with acceptance of any final maps. The
Home Owners Association shall be approved by the City Attorney, City
Engineer and Administrative Services Director prior to acceptance of
any Final Map. The administration of the above mentioned funds, and
the coordination and performance of maintenance activities, shall be the
responsibility of the Home Owners Association.
■ All streets, bridges, sidewalks, streetlights, street signs, roads,
emergency access roads, emergency access gates, and sewer mains
within the project.
■ All parks, trails, recreational facilities and like facilities.
■ All open space and native tree preservation areas.
■ All drainage facilities and detention basins.
■ All creeks, flood plains, floodways, wetlands, and riparian habitat
areas.
■ All common landscaping areas, street trees, medians, parkway
planters, manufactured slopes outside private yards, and other similar
facilities.
■ All frontage landscaping and sidewalks along arterial streets
10. Prior to final map, the applicant shall submit CC&Rs for review and
BP
PS
approval by the Community Development Department. The CC&R's
shall record with the Final Map and shall include the following:
a) Provisions for maintenance of all common areas including access,
parking, street trees, fencing and landscaping in perpetuity.
b) A detailed list of each individual homeowner's responsibilities for
maintenance of the individual units.
c Residents shall keep all trash receptacles within the unit's
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
TO: Temporary
occupancy
CE: City Engineer
WW: Wastewater
FI: Final inspection
F0: Final
CA: City Attorney
Occupancy
AMWC: Water Comp.
designated trash storage area.
d) Garages shall be maintained and used for vehicle parking.
e) No boats, RV's or other type of recreation vehicle may occupy a
guest or resident parking space, excepting the RV garage added to
unit 1.
f) A provision for review and approval by the City Community
Development Department for any changes to the CC&R's that
relate to the above requirements prior to the changes being
recorded or taking effect.
11. Affordable Housing Requirement: The applicant shall deed restrict a
GP/BP
PS, CA
minimum of 1 residential unit for 30 years at a moderate income rate or
shall pay an in -lieu fee based on 5% of the construction valuation of all 4
units within the development, prior to or concurrently with the final map
12. Workforce Housing: Prior to recordation of final map, the applicant shall
BP
PS, CA
enter into a legal agreement with the City to reserve 1/2 of the units for
sale to residents or workers within the City of Atascadero, including the
affordable units. The agreement shall include the following provisions:
■ The units shall be offered for sale to residents or workers within the City of
Atascadero for a minimum of 60 -days. During this time period offers may
only be accepted from Atascadero residents or workers;
■ The applicant shall provide reasonable proof to the City that at least one of
the qualified buyers is a resident or worker within the City Limits of
Atascadero;
■ The Atascadero resident or worker restriction shall apply to the initial sale
only;
■ The applicant shall identify which units will be reserved; and
The City Attorney shall approve the final form of the agreement.
13. The developer and/or subsequent owner shall assume responsibility for
Ongoing
PS
the continued maintenance of all landscape and common areas.
City Engineer Conditions
14. These conditions of approval are based on Vesting Tentative Parcel
Map AT 04-0549 submittal by Vaughan Surveys, Inc Sheets 1 thru 3.
When there is a conflict between these conditions and the submitted
drawings, the conditions of approval shall govern
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
TO: Temporary
occupancy
CE: City Engineer
FI: Final inspection
WW: Wastewater
CA: City Attorney
F0: Final
Occupancy
AMWC: Water Comp.
PROJECT SPECIFIC CONDITIONS
Drainage:
15. Provide for the detention of the 50 year developed storm runoff, while
BP, GP
CE
metering out the 2 year undeveloped storm runoff. The roofs of the
houses and hard surfaces shall drain directly into the basins.
Drainage basins shall be designed to desilt, detain and meter storm
flows as well as release them to natural runoff locations.
16. Concentrated drainage from off-site areas shall be conveyed across
BP, GP
CE
the project site in drainage easements. Acquire drainage easements
where needed. Drainage shall cross lot lines only where a drainage
easement has been provided. If drainage easement cannot be
obtained the storm water release must follow the exact historic path,
rate and velocity as prior to the subdivision.
17. Applicant shall submit erosion control plans and a Storm Water
BP, GP
CE
Pollution Prevention Plan (SWPPP). The Regional Water Quality
Control Board shall approve the SWPPP.
18. All requirements of Section 5 "Storm Drainage" of the Engineering
BP, GP
CE
Department standard specifications and drawings will be met.
19. Obtain approval by the City Engineer of the grading & drainage plan
BP, GP
CE
and the storm drain design & facilities.
Public Improvements and Maintenance:
20. Construct new concrete curb, gutter and sidewalk per City Engineering
FM
CE
Standards #418 and 419 along the entire property frontage. Back of
sidewalk to be at property line. Sidewalk to provide a 4 foot clear path of
travel. Utility poles to be 18 inches clear from face of curb or 1 foot clear
behind sidewalk. Decomposed granite horse trail will not be allowed.
Saw cut existing asphalt and pave to new gutter lip. The road cross fall
shall be 2% unless approved different by City Engineer. In no case shall
cross fall be less than 1 % nor greater than 5%. Driveway approaches for
the two driveways to be per City Engineering Standard #423. Public
Improvement plans to be stamped by a Registered Civil Engineer.
SANITARY SEWER CONDITIONS
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
TO: Temporary
occupancy
CE: City Engineer
FI: Final inspection
WW: Wastewater
CA: City Attorney
F0: Final
Occupancy
AMWC: Water Comp.
21. Collection sites for solid waste and turn around for solid waste collection
BP, GP
WW
vehicles will be approved by Atascadero Waste Alternative.
WASTEWATER
22. The new sewer manhole will be placed in the center of Capistrano
Ave and the projection of the center of Ensenada Ave. The sewer
main from the end of the existing main to this manhole will be in a
public sewer easement, be 8 inches in diameter and have a slope as
flat as possible. This public sewer main extension shall be designed
and constructed to City Standards. The design of the system shall
meet with the Public Works Department prior to deign to review the
project and develop a clear understanding of the criteria.
23. Each house shall be served by a private 4 inch sewer lateral from the
main to the house. The laterals may be installed in the same trench.
24. Applicant shall pay sewer Extension (Annexation), Connection and
Reimbursement fees (if applicable) upon issuance of building permit.
25. Drainage piping serving fixtures which have flood level rims located
below the elevation of the next upstream manhole cover of the public
or private sewer serving such drainage piping shall be protected from
backflow of sewage by installing an approved type backwater valve
Fixtures above such elevation shall not discharge through the
backwater valve.
STANDARD CONDITIONS
26. All public improvements shall be constructed in conformance with the
BP, GP
CE
City of Atascadero Engineering Department Standard Specifications and
Drawings or as directed by the City Engineer.
27. In the event that the applicant is allowed to bond for the public
FM
CE
improvements required as a condition of this map, the applicant shall
enter into a Subdivision Improvement Agreement with the City Council.
28. An engineer's estimate of probable cost shall be submitted for review
FM
CE
and approval by the City Engineer to determine the amount of the bond.
29. The Subdivision Improvement Agreement shall record concurrently with
FM
CE
the Final Map.
30. The applicant shall be responsible for the relocation and/or alteration of
BP, GP
CE
existing utilities.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
TO: Temporary
occupancy
CE: City Engineer
WW: Wastewater
FI: Final inspection
F0: Final
CA: City Attorney
Occupancy
AMWC: Water Comp.
31. The applicant shall install all new utilities (water, gas, electric, cable TV
BP, GP
CE
and telephone) underground. Utilities shall be extended to the property
line frontage of each lot or its public utility easement.
32. The applicant shall monument all property corners for construction
FM
CE
control and shall promptly replace them if disturbed.
33. The applicant shall acquire title interest in any off-site land that may be
FM
CE
required to allow for the construction of the improvements. The applicant
shall bear all costs associated with the necessary acquisitions. The
applicant shall also gain concurrence from all adjacent property owners
whose ingress and egress is affected by these improvements.
34. Slope easements shall be provided as needed to accommodate cut of
FM
CE
fill slopes.
35. Drainage easements shall be provided as needed to accommodate both
FM
CE
public and private drainage facilities.
36. The final map shall be signed by the City Engineer prior to the map
FM
CE
being placed on the agenda for City Council acceptance.
37. Prior to recording the tract map, the applicant shall submit a map drawn
FM
CE
in substantial conformance with the approved tentative map and in
compliance with all conditions set forth herein. The map shall be
submitted for review and approval by the City in accordance with the
Subdivision Map Act and the City's Subdivision Ordinance.
38. Prior to recording the tract map, the applicant shall set monuments at all
FM
CE
new property corners. A registered civil engineer or licensed land
surveyor shall indicate by certificate on the parcel map, that corners
have been set or shall be set by a date specific and that they will be
sufficient to enable the survey to be retraced.
39. Prior to recording the tract map, the applicant shall pay all outstanding
plan check/inspection fees.
40. Prior to recording the map, the applicant shall complete all
FM
CE
improvements required by these conditions of approval
41. Prior to recording the tract map, the applicant shall have the map
FM
CE
reviewed by all applicable public and private utility companies (cable,
telephone, gas, electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility company indicating their
review of the map. The letter shall identify any new easements that
may be required by the utility company. A copy of the letter shall be
submitted to the City. New easements shall be shown on the map.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
TO: Temporary
occupancy
CE: City Engineer
FI: Final inspection
WW: Wastewater
CA: City Attorney
F0: Final
Occupancy
AMWC: Water Comp.
42. Upon recording the final map, the applicant shall provide the City with a
FM
CE
black line clear Mylar (0.4 mil) copy and a blue line print of the recorded
map.
43. Prior to the final inspection of any public improvements, the applicant
FM
CE
shall submit a written statement from a registered civil engineer that all
work has been completed and is in full compliance with the approved
plans.
44. Prior to the final inspection, the applicant shall submit a written
BP, GP
CE
certification from a registered civil engineer or land surveyor that all
survey monuments have been set as shown on the final map.
45. An encroachment permit shall be obtained prior to any work within City
BP, GP
CE
rights of way.
46. Prior to the issuance of building permits the applicant shall submit a
BP, GP
CE
grading and drainage plan prepared by a registered civil engineer for
review and approval by the City Engineer.
Atascadero Mutual Water Company
47. Before recordation of the final map, the applicant shall submit plans
to AMWC for the water distribution facilities needed to serve the
project. AMWC shall review and approve the plans before
construction begins on the water system improvements. All new
water distribution facilities shall be constructed in conformance with
AMWC Standards and Details and the California Waterworks
Standards (Code of Regulations Title 22, Division 4, Chapter 16). All
cross -connection devices shall conform to AWWA and California
Department of Health Services standards.
48. Before the start of construction on the water system improvements,
the applicant shall pay all installation and connection fees required by
AMWC.
49. Before issuance of building permits, the applicant shall obtain a "Will
Serve" letter from AMWC for the newly created lots within the
subdivision.
50. Separate water meters for domestic water service are required for
each individual lot created within the subdivision.
51. The applicant is responsible for designing and constructing water
system improvements that will provide water at pressures and flows
adequate for the domestic and fire protection needs of the project.
Mitigation Measures
Conditions of Approval /
Mitigation Monitoring Program
Vintage Homes
Vesting Tentative Tract Map
TTM 2004-0055
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision
Improvement Plans
FM: Final Map
TO: Temporary
occupancy
FI: Final inspection
F0: Final
Occupancy
Responsibili
ty
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Mitigation
Measure
BP
PS
1.d.1
Mitigation Measure 1.d.1: If exterior lighting is proposed, it shall be designed to
eliminate any off site glare. All exterior site lights shall utilize full cut-off, "hooded"
lighting fixtures to prevent offsite light spillage and glare. Any luminaire pole height
shall not exceed 20 -feet in height, limit intensity to 2.0 foot candles at
ingress/egress, and otherwise 0.6 foot candle minimum to 1.0 maximum within the
private street. Fixtures shall be shield cut-off type and compatible with historic
setting, subject to staff approval.
Mitigation Measure 3.b.1: The project shall be conditioned to comply with all
BP
BS
3.b.1
applicable District regulations pertaining to the control of fugitive dust (PM -10) as
contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality Handbook.
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune according to
manufacturer's specifications.
• Fuel all off-road and portable diesel powered equipment, including but not
limited to bulldozers, graders, cranes, loaders, scrapers, backhoes,
generator sets, compressors, auxiliary power units, with ARB certified
motor vehicle diesel fuel (Non -taxed version suitable for use off-road).
• Maximize to the extent feasible, the use of diesel construction equipment
meeting the ARB's 1996 or newer certification standard for off-road
heavy-duty diesel engines.
• Install diesel oxidation catalysts (DOC), catalyzed diesels particulate filters
(CDPF) or other District approved emission reduction retrofit services
(Required for projects grading more than 4.0 acres of continuously worked
area).
Section 6.4: Activity Management Techniques
• Develop a comprehensive construction activity management plan
designed to minimize the amount of large construction equipment
operating during any given time period.
• Schedule of construction truck trips during non -peak hours to reduce peak
hour emissions.
• Limit the length of the construction workday period, if necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading, demolition and building
plan notes:
A. Reduce the amount of the disturbed area where possible.
B. Use of water trucks or sprinkler systems in sufficient quantities to prevent
airborne dust from leaving the site. Increased watering frequency would
be required whenever wind speeds exceed 15 mph. Reclaimed (non -
potable) water should be used whenever possible.
C. All dirt stockpile areas should be sprayed daily as needed.
D. Permanent dust control measures identified in the approved project re -
vegetation and landscape plans should be implemented as soon as
possible following completion of any soil disturbing activities.
E. Exposed ground areas that are plann4ed to be reworked at dates greater
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
TO: Temporary
occupancy
CE: City Engineer
WW: Wastewater
FI: Final inspection
F0: Final
CA: City Attorney
Occupancy
AMWC: Water Comp.
than one month after initial grading should be sown with a fast -
germinating native grass seed and watered until vegetation is established.
F. All disturbed soil areas not subject to re -vegetation should be stabilized
using approved chemical soil binder, jute netting, or other methods
approved in advance by the APCD.
G. All roadways, driveways, sidewalks, etc, to be paved should be complete
as soon as possible. In addition, building pads should be laid as soon as
possible after grading unless seeding or soil binders are used.
H. Vehicle speed for all construction vehicles shall not exceed 15 mph on
any unpaved surface at the construction site.
I. All trucks hauling dirt, sand, soil, or other loose materials are to be
covered or should maintain at least two feet of freeboard (minimum
vertical distance between top of load and top of trailer) in accordance with
CVC Section 23114.
J. Install wheel washers where vehicles enter and exit unpaved roads onto
streets, or was off trucks and equipment leaving the site.
K. Sweep streets at the end of each day if visible soil material is carried onto
adjacent paved roads. Water sweepers with reclaimed water should be
used where feasible.
L. The contractor or builder shall designate a person or persons to monitor
the dust control program and to order increased watering, as necessary,
to prevent transport of dust off site. The name and telephone number of
such persons shall be provided to the APCD prior to land use clearance
for map recordation and land use clearance for finish grading of any
structure.
Mitigation Measure 4.b.e.1: All recommendations of the soils report and biologist
GP/BP
PS, BS, CE
4.e.b.1
survey shall be implemented. Foundation design and overexcavation and re -
compaction shall follow the recommendations of the soils report. Site drainage
shall be designed to avoid concentration of flows into Atascadero Creek.
Mitigation Measure 4.e.1: The building permit site plan shall identify all protection
GP
PS, BS, CE
4.e.1
and enhancement measures recommended by the Certified Arborist in the Tree
Protection Plan. Tree protection fencing shall be installed at the locations called out
in the Tree Protection Plan.
Mitigation Measure 4.e.2: The Precise Grading Plan shall identify tree protection
GP
PS, CE
4.e.2
fencing around the dripline of each existing on-site tree and/or native shrub mass
within 20 feet of construction activity.
Mitigation Measure 4.e.3: Grading and excavation and grading work shall be
GP, BP
PS, BS
4.e.3
consistent with the City of Atascadero Tree Ordinance. Special precautions when
working around native trees include:
7. All existing trees outside of the limits of work shall remain.
8. Earthwork shall not exceed the limits of the project area.
9. Low branches in danger of being torn from trees shall be pruned prior to
any heavy equipment work being done.
10. Vehicles and stockpiled material shall be stored outside the dripline of all
trees.
11. All trees within the area of work shall be fenced for protection with 4 -foot
chain link, snow or safety fencing placed per the approved tree protection
Conditions of Approval /
Mitigation Monitoring Program
Vintage Homes
Vesting Tentative Tract Map
TTM 2004-0055
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision
Improvement Plans
FM: Final Map
TO: Temporary
occupancy
FI: Final inspection
F0: Final
Occupancy
Responsibili
ty
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Mitigation
Measure
plan. Tree protection fencing shall be in place prior to any site excavation
or grading. Fencing shall remain in place until completion of all
construction activities.
12. Any roots that are encountered during excavation shall be clean cut by
hand and sealed with an approved tree seal.
Mitigation Measure 4.e.4: The developer shall contract with a certified arborist
BP
PS, BS
4.e.4
during all phases of project implementation. The certified arborists shall be
responsible for monitoring the project during all phases of construction through
project completion, as follows:
(a). A written agreement between the arborist and the developer outlining a
arborist monitoring schedule for each construction phase through final
inspection shall be submitted to and approved by planning staff prior to the
issuance of building/grading permits.
(b). Arborist shall schedule a pre -construction meeting with engineering /planning
staff, grading equipment operators, project superintendent to review the project
conditions and requirements prior to any grubbing or earth work for any portion
of the project site. All tree protection fencing and trunk protection shall be
installed for inspection during the meeting. Tree protection fencing shall be
installed at the line of encroachment into the tree's root zone area.
(c). As specified by the arborist report and City staff:
■ Fencing: Must be a minimum of 4' high, chain link, and snow or safety
fence, staked at the drip -line or line of encroachment for each tree or
group of trees. Tree fencing shall be erected before demolition, grading,
or construction begins and remains in place until final inspection of the
project permit, except for work specifically required in the approved plans
in which case the project arborist or Planning Staff must be consulted.
■ Soil Aeration Methods: Soils under drip -lines that have been compacted
by heavy equipment and/or construction activities must be returned to
their original state before all work is completed. Methods include water
jetting, adding organic matter, and boring small holes with an auger (18"
deep, 24 apart with a 24" auger) and the application of moderate
amounts of nitrogen fertilizer. The arborist shall advise.
■ Chip Mulch: All areas within the drip -line of the trees that cannot be
fenced shall receive a 4-6" layer of chip mulch to retain moisture, soil
structure and reduce the effects of soil compaction.
■ Trenching within the Drip -line: All trenching under drip -lines of native
trees shall be hand dug, augured or bored. All major roots shall be
avoided whenever possible. All exposed roots larger than 1" in diameter
shall be 'clean cut with a sharp pruning tool and not left ragged.
■ Grading within drip -line: Grading should not encroach within the drip -line.
If grading is necessary, construction of retaining walls or tree wells or
other protection measures may be necessary to insure the survivability of
the trees. Chip mulch 4-6" in depth may also be required in these areas.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
TO: Temporary
occupancy
CE: City Engineer
FI: Final inspection
WW: Wastewater
CA: City Attorney
F0: Final
Occupancy
AMWC: Water Comp.
Grading should not disrupt the normal drainage pattern around the trees.
Fills should not create a ponding condition and excavations should not
leave the tree on a rapidly draining mound.
■ Exposed Roots: Any exposed roots shall be recovered the same day they
were exposed.
■ Paving within the Drip -line: Pervious surfacing is required within the
dripline of any oak trees.
■ Compaction: Vehicles and all heavy equipment shall not be driven under
the trees, as this will contribute to soil compaction.
■ Existing Surfaces: The existing ground surface within the drip -line of all
oak trees shall not be cut, filled, compacted or pared.
■ Construction materials and waste: No liquid or solid construction waste
shall be dumped on the ground within the drip -line of any oak tree.
■ Arborist Monitoring: During construction an arborist shall be present when
encroaching within the dripline of any Oak tree.
(d). Upon project completion and prior to final occupancy a final status report shall
be prepared by the project arborist certifying that the tree protection plan was
implemented, the trees designated for protection were protected during
construction, and the construction -related tree protection measures are no
longer required for tree protection.
Mitigation Measure 6.b.1: The grading permit application plans shall include
GP
BS
6.b.1
erosion control measures to prevent soil, dirt, and debris from entering the storm
drain system during and after construction. A separate plan shall be submitted for
this purpose and shall be subject to review and approval of the City Engineer at the
time of Building Permit application.
Mitigation Measure 6.c.d.1: A soils report shall be required to be submitted with a
GP
PS, BS, CE
6.c.d.1
future building permit by the building department.
Mitigation Measure 8.e.f.1: Should the disturbed area total one acre or greater, a
GP
PS,CE
8.0.1
Stormwater Pollution Prevention Plan (SWPPP)/Erosion Control Plan shall be
submitted and approved by the City Engineer prior to the issuance of the building
permit. The plan shall include storm water measures for the operation and
maintenance of the project for the review and approval of the City Engineer.
Should the area of disturbance total less than one acre in area, the applicant shall
include methods of erosion control and temporary site runoff control, subject to the
approval of the City Engineer.
Mitigation Measure 8.e.f.2: The Building Permit application plans shall identify Best
BP
PS, CE
8.e.f.2
Management Practices (BMPs) appropriate to the uses conducted on site that
effectively prohibit the entry of pollutants into storm water runoff.
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
GP: Grading Permit
Vintage Homes
BP: Building Permit
SIP: Subdivision
PS: Planning Services
BS: Building Services
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
FD: Fire Department
PD: Police Department
TTM 2004-0055
TO: Temporary
occupancy
CE: City Engineer
FI: Final inspection
WW: Wastewater
CA: City Attorney
F0: Final
Occupancy
AMWC: Water Comp.
Mitigation Measure 8.e.f.3: The developer is responsible for ensuring that all
BP
PS, BS
8.e.f.3
contractors are aware of all storm water quality measures and that such measures
are implemented. Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction notices, citations, or
stop orders
Mitigation Measure 8.g.h.i.1: All structures will be required to be constructed
BP
PS/CE/BS
8.g.h.1.1
outside of the 100 -yr flood plane and will be required to meet building code
requirements to ensure that all portions of the structures are outside of this area.
Mitigation Measure 11.d: All construction activities shall comply with the City of
BP, GP
PS, BS
11.d
Atascadero Noise Ordinance for hours of operation.
Construction activities shall be limited to the following hours of operation:
• 7 a.m. to 7 p.m. Monday through Friday
• 9 a.m. to 6 p.m. Saturday
• No construction on Sunday
Further, particularly loud noises shall not occur before 8 a.m. on weekdays and not
at all on weekends.
The hours of construction may be modified by the Community Development
Director upon a determination that unusually loud construction activities are having
a significant impact on the neighbors.
Failure to comply with the above-described hours of operation may result in
withholding of inspections and possible construction prohibitions, subject to the
review and approval of the Community Development Director.
A sign shall be posted on-site with the hours of operation and a telephone number
of the person to be contacted in the event of any violations. The details of such a
sign shall be approved by staff during the Grading Plan/Building Permit review
process.
ITEM NUMBER:
R
DATE: 10-18-05
Atascadero Planning Commission
Staff Report - Community Development Department
8900 EI Camino Real
Conditional Use Permit 2005-0161
(DeCou)
SUBJECT:
The proposed project consists of an application for a Conditional Use Permit to
establish a storage yard at the above location. The proposal includes two new 4,000
square -foot metal buildings, retention of the existing building, site landscaping, and on-
site parking.
RECOMMENDATION:
Staff Recommends:
Adopt Resolution PC 2005-0082 approving Conditional Use Permit 2005-0161 based on
findings and subject to Conditions of Approval.
SITUATION AND FACTS:
1. Applicant / Representative: Jay DeCou, 6705 Santa Lucia Road, Atascadero, CA
93422
2. Project Address: 8900 EI Camino Real, Atascadero, CA 93422
(San Luis Obispo County) APN 056-051-033
3. General Plan Designation: Service Commercial (SC)
4. Zoning District: Commercial Service (CS)
5. Site Area: 0.93 acres
6. Existing Use: Commercial
7. Environmental Status: Proposed Mitigated Negative Declaration 2005-0031
DISCUSSION:
Project Definition
The proposed project consists of a request to establish a storage yard use at 8900 EI
Camino Real. The application includes the proposed construction of two 4,000 square -
foot metal storage buildings, site screening, and parking lot. Each of the two proposed
new buildings will be part of a phased development plan with the rear most building
scheduled for phase II of the Master Plan of Development.
Background
Surrounding Land Use and
Setting:
North: Commercial Retail
South: Service Commercial
East: Service Commercial
West: Service Commercial
The project site is within the Service Commercial General Plan Land Use Designation
and Commercial Service Zoning District, which conditionally allows storage yards if
required findings can be made. The project site is developed with a single-family
residential building which is currently being used as the proposed business offices.
Appearance Review
The site plan has been designed to meet the requirements of the Atascadero Municipal
Code and the appearance review requirements of the General Plan. The site includes
perimeter landscaping and fencing designed to screen the proposed use and structures.
The frontage along EI Camino Real includes landscaping and street trees, consistent
with appearance review requirements.
Site Plan. Circulation. Parkin
The site plan includes 8 paved parking spaces located adjacent to the proposed new
buildings. Access will be provided off of EI Camino Real with one driveway for ingress
and one for egress. The proposed circulation meets the requirements of the City
Engineer and Fire Marshall.
Landscape screening is proposed along the south property line. The landscaping
includes Arizona cypress planted 30 -feet on -center.
Architecture. Materials. Color
The applicant is proposing to construct two 4,000 square -foot metal buildings behind the
existing building. The applicant is proposing a mid -tone gray color for both the roof and
wall panels. The proposed elevations are shown below.
P � I iI I� hill — I � I i i • I� II1r1 I' � I I I �—T-'•
II�
• Fl . 0.'.;,.;,n _ ..-...ta.s..�
General Plan Consistency
SPY ryu. F `ymlr I laery. t
I I.
� .-erp3:. �n�-u f. Y�✓t
The proposed project is consistent with the following General Plan Land Use Element
Policies:
Land Use Program 1.1.7: "Within the Urban Core encourage infill development or
revitalization or reuse of land already committed to urban development where utilities
and public services exist.
Implementing General Plan programs requires appearance review of architectural
design, materials and color, and landscaping to fit with the existing setting and natural
environment. As analyzed above, the proposed project, as conditioned is consistent
with the General Plan.
Findings
Conditional Use Permit
A Conditional Use Permit is required for all conditionally allowed uses to ensure
compatibility with the surrounding neighborhood and mitigatable impacts such as traffic,
noise, and overall project appearance. The Conditional Use Permit process provides
the opportunity for the public and the Planning Commission to review the specifics of
land use proposals, such as architectural design, site design, landscape, signage, and
specific standards of the zoning ordinance. The Planning Commission must make the
following five findings to approve a Conditional Use Permit:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual.
Staff Comment: The use is consistent with the General Commercial designation of
the General Plan and General Plan Land Use Element Policy 1.1.7.
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance).
Staff Comment: As conditioned, the project satisfies all conditional use permit
provisions for a storage yard use.
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety, or welfare of the general public or persons residing
or working in the neighborhood of the use, or be detrimental or injurious to property
or improvements in the vicinity of the use.
Staff Comment: The proposed storage yard development will not be detrimental to
the general public or working persons health, safety, or welfare.
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development.
Staff Comment: The project has been designed to include upgraded landscaping
along EI Camino Real and landscape screening along the south of the site. The
surrounding area is developed with Commercial service type uses and is zoned for
such.
5. That the proposed use or project will not generate a volume of traffic beyond the
safe capacity of all roads providing access to the project, either existing or to be
improved in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
Staff Comment: The proposed project and use is consistent with the traffic
projections and road improvements anticipated within the General Plan. The project
site is an infill commercial site along a currently developed portion of EI Camino
Real.
Based on staff's analysis in the preceding sections, it appears that all of the required
findings for approval of a Conditional Use Permit can be made.
Proposed Environmental Determination
Proposed Mitigated Negative Declaration 2005-0031 was circulated to other agencies
and members of the public on September 21, 2005. Staff is recommending certification
of proposed Mitigated Negative Declaration 2005-0031.
Conclusion
The proposed project represents an infill commercial development along EI Camino
Real within the Service Commercial Zoning District. The proposed project is consistent
with the General Plan and Atascadero Municipal Code, as analyzed within this staff
report. It is staff's opinion that the proposed project, as conditioned allows the Planning
Commission to make all of the required findings for project approval.
ALTERNATIVES
1. The Commission may recommend modifications to the project and/or conditions
of approval for the project.
2. The Commission may determine that more information is needed on some
aspect of the project and may refer the item back to the applicant and staff to
develop the additional information. The Commission should clearly state the type
of information that is required and move to continue the item to a future date.
3. The Commission may deny the project. The Commission should specify the
reasons for denial of the project and make an associated finding with such
action.
PREPARED BY: Kelly Gleason, Associate Planner
ATTACHMENTS:
Attachment 1: Location Map, Zoning and General Plan
Attachment 2: Proposed Mitigated Negative Declaration and Initial Study
Attachment 3: Draft Resolution PC 2005-0082
sopp,
6 lk
sdo
Attachment 2: Draft Mitigated Negative Declaration and Initial Study
See Following
ATTACHMENT 3: Draft Resolution PC 2005-0082
DRAFT RESOLUTION PC 2005-0082
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
CONDITIONAL USE PERMIT 2005-0161 AT 8900 EL CAMINO REAL
APN 056-051-033
(DeCou)
WHEREAS, an application has been received from Jay DeCou (6705 Santa Lucia Rd,
Atascadero, CA 93422) Applicant and Property Owner to consider a project consisting of a
Conditional Use Permit to establish a storage yard use (CUP 2005-0159); and,
and,
WHEREAS, the site's current General Plan Designation is Service Commercial (SC);
WHEREAS, the site's current Zoning is Commercial Service (CS); and,
WHEREAS, a Conditional Use Permit to establish a Storage Yard within the
Commercial Service zone is required; and,
WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2005-0031
were prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of
Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on October 18, 2005, studied and considered the Conditional Use Permit
2005-0161, and,
NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings for Certification of the Proposed Mitigated Negative
Declaration. The Planning Commission finds as follows:
1. The project does not have the potential to degrade the environment when mitigation
measures are incorporated into the project's mitigation monitoring program as
conditions of approval; and,
2. The project will not achieve short-term to the disadvantage of long term
environmental goals; and,
3. The project does not have impacts which are individually limited, but cumulatively
considerable; and,
4. The project will not cause substantial adverse effects on human beings either directly
or indirectly.
SECTION 2. Findings for approval of Conditional Use Permit. The Planning
Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
SECTION 3. Approval. The Planning Commission of the City of Atascadero, in a regular
session assembled on October 18, 2005, resolved to approve the Conditional Use Permit 2005-
0161 (Master Plan of Development) subject to the following:
EXHIBIT A:
Proposed MND
EXHIBIT B:
Conditions of Approval
EXHIBIT C:
Site Plan
EXHIBIT E:
Elevations
EXHIBIT F:
Landscape Plan
EXHIBIT G:
Color and Materials Board
On motion by Commissioner , and seconded by Commissioner
the foregoing resolution is hereby adopted in its entirety by the following roll
call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
Exhibit A Proposed Mitigated Negative Declaration
See Following
EXHIBIT B: Conditions of Approval
(CUP 2005-0161)
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
8900 El Camino Real
BL: Business
License
PS: Planning Services
BS: Building Services
CUP 2005-0161
GP: Grading
Permit
FD: Fire Department
BP: Building
PD: Police Department
CE: City Engineer
Permit
FI: Final
WN: Wastewater
Inspection
CA: City Attorney
TO: Temporary
Occupancy
F0: Final
Occupancy
Planning Services
1. This conditional use permit shall be for a storage yard use and associated
FM
PS
offices as described on the attached exhibits and located on parcel 028-
421-001 regardless of owner. Approval includes a phased plan for two
4,000 metal storage buildings on-site.
2. The approval of this use permit shall become final and effective for the
FM
PS
purposes of issuing building permits fourteen (14) days following the
Planning Commission approval unless prior to the time, an appeal to the
decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance.
3. The Community Development Department shall have the authority to
BP/FM
PS, CE
approve the following minor changes to the project that (1) modify the site
plan project by less than 10%, (2) result in a superior site design or
appearance, and/or (3) address a construction design issue that is not
substantive to the Master Plan of Development. The Planning Commission
shall have the final authority to approve any other changes to the Master
Plan of Development and any associated Tentative Maps unless appealed
to the City Council.
4. Approval of this Conditional Use Permit shall be valid for twelve (12) months
BP/FM
PS
after its effective date. At the end of the period, the approval shall expire
and become null and void unless the project has received a building permit.
Phase II shall be constructed within 5 -years of this approval. Approval of
Phase II shall expire at that time and become null and void, requiring a
Conditional Use Permit amendment to reinstate. Any such proposal shall
comply with all future zoning ordinances standards.
5. The applicant shall defend, indemnify, and hold harmless the City of
Ongoing
Atascadero or its agents, officers, and employees against any claim or
action brought to challenge an approval by the city, or any of its entities,
concerning the subdivision.
6. Any subsequent Tentative Map and construction permits shall be consistent
BP/FM
PS, CE
with the Master Plan of Development contained herein.
7. All exterior elevations, finish materials, and colors shall be consistent with
BP
PS
the Master Plan of Development as shown in EXHIBIT E and G with the
following modifications:
Conditions of Approval /
Timing
Responsibili
Mitigation
Mitigation Monitoring Program
ty
Measure
/Monitoring
8900 El Camino Real
BL: Business
License
PS: Planning Services
BS: Building Services
CUP 2005-0161
GP: Grading
Permit
FD: Fire Department
BP: Building
PD: Police Department
CE: City Engineer
Permit
FI: Final
WW: Wastewater
Inspection
CA: City Attorney
TO: Temporary
Occupancy
F0: Final
Occupancy
■ All exterior material finishes shall be durable, high quality, and consistent
with the architectural appearance.
■ Any exterior light fixtures shall be compatible with building design, subject
to staff approval.
8. All site work, grading, and site improvements shall be consistent with the
BP/FM
PS, BS, CE
Master Plan of Development as shown in EXHIBIT C.
9. A final landscape and irrigation plan shall be approved prior to the issuance
BP
PS, BS
of building permits and included as part of site improvement plan consistent
with EXHIBIT F, and as follows:
■ All areas shown on the landscape plan shall be landscaped prior to the
final of any single building permit on-site.
Building Services
10. A soils investigation prepared by a licensed Geotechnical Engineer is to
GP
PS
be provided for the project. The report is to be provided at the time of
BP
building permit submittal along with the building plans for review by the
Building Division. Recommendations contained in the report are to be
incorporated into the project plans.
PUBLIC WORKS
11. The applicant shall submit an erosion and clean water plan for review by
the City Engineer prior to the issuance of building permits.
EXHIBIT C: Site Plan
vm
°'�'0rro er ON30V35YIY!O A11.7 f
r_:_iY �•; 3n oainr�sv +r 'lr3tl oxlnr�i3 0064 g
oa�ar�srn0380
32y l0
Jj E
];•% - iln 'FMti '9ti-il 1RJ '211�nd(
AYf !
u3iB0•J 'f OIN3 yQ
M'W 39YNIM i DNIUMD'3LS 03SO 10111
g
Y
+ 0 d
EL CAMINQ_ RFAL__
�i,ll
w
EXHIBIT D: Elevations
0 0
i
'
� I
t
.�HI
,
:.l
c1c }
I p,
0 0
EXHIBIT E: Landscape Plan
I
ff
l
I
5
EXHIBIT F: Color and Materials Board
C•OR AND MATERIAL / SAMPL*OARD FOR
DECOU LUMBER CO. INC. (FOR TAYLOR RENTAL)
8900 EL CAMINO REAL ATASCADERO, CA.
D
JU1y 13 ZO45
BAM,��Nn
Y OEVE(.OpMENT
COMP SHINGLE ROOF AT EXISTING FRONT BUILDING
J
Ott WH0
WALL / SIDING COLOR AT FRONT BUILDING (EX.) TRIM / FASCIA COLOR AT FRONT BUILDING (EX.
WALL / ROOF PANEL COLOR AT PROPOSED STORAGE BUILDING
See project file for specific proposed color selections