HomeMy WebLinkAboutPC_2005-07-19_AgendaPacketCALL TO ORDER
CITY OF ATASCADERO
PLANNING COMMISSION AGENDA
Regular Meeting
July 19, 2005 — 7:00 P.M.
City of Atascadero
Pavilion on the Lake
9315 Pismo Ave. - Atascadero, California
Pledge of Allegiance
Roll Call: Chairperson Porter
Vice Chairperson Beraud
Commissioner Fonzi
Commissioner Jones
Commissioner Kelley
Commissioner O'Keefe
Commissioner Patel
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
PUBLIC COMMENT
(This portion of the meeting is reserved for persons wishing to address the Commission on any matter not
on this agenda and over which the Commission has jurisdiction. Speakers are limited to five minutes.
Please state your name and address for the record before making your presentation. The Commission may
take action to direct the staff to place a matter of business on a future agenda)
CONSENT CALENDAR
(All items on the consent calendar are considered to be routine and non -controversial by City Staff and will
be approved by one motion if no member of the Commission or public wishes to comment or ask questions)
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON JUNE 21, 2005.
COMMUNITY DEVELOPMENT STAFF REPORTS
City of Atascadero Planning Commission Agenda
PUBLIC HEARINGS
Regular Meeting July 19, 2005
Page 2 of 6
(For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public
hearing and invite the applicant or applicant's representative to make any comments. Members of the public will be invited to provide
testimony to the Commission following the applicant. Speakers should state their name and address for the record and can address the
Commission for five minutes. After all public comments have been received, the public hearing will be closed, and the Commission
will discuss the item and take appropriate action(s).)
2. ZONE CHANGE 2005-0100, TITLE 9 PLANNING AND ZONING TEXT
AMENDMENTS
Applicant:
City of Atascadero, 6905 El Camino Real, Suite 6, Atascadero, CA 93422, Phone: 461-5000
Project Title:
Zone Change 2005-0100, Title 9 Planning and Zoning Text Amendments
Project
Minimum Landscape Areas: All Residential Multi -Family and Commercial Zones
Location:
Reference Title 11 Chapter 6 into Title 9 Chapter 1 under Lot Line Adjustment: Citywide
Project
Fencing and Screening Standards: Citywide
Project
The project consists of a revision to portions of Title 9 Planning and Zoning, of the Atascadero
Description:
Municipal Code (AMC). The amendments include the following: define a minimum landscaping area
applied to Residential Multi -Family and Commercial Zoning designations (AMC 9-4.125); incorporate
existing portions of Title 11 Subdivisions, Chapter 6 Flag Lots (deep lot subdivisions) into Title 9-
1.118 and Title 9-4 for Lot Line Adjustments; and update fencing and screening standards (AMC 9-
Proposed
4.128).
Proposed
Based on the initial study prepared for the project, a Negative Declaration is proposed. The proposed
Environmental
Negative Declaration is available for public review from 6/28/05 through 7/17/05 at 6905 El Camino
Determination:
Real, Suite 6, Community Development Department from 8:00 a.m. to 5:00 p.m., Monday through
Friday.
3. CONDITIONAL USE PERMIT 2002-0076 AMENDMENT
Applicant:
Gary Bang, 7935 El Camino Real, Atascadero, CA 93422, Phone: 461-1818
Project Title:
Conditional Use Permit 2002-0076, 21,840 square foot Harley-Davidson commercial building
Project
7935 San Luis Avenue, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 030-241-066
Project
The proposed Conditional Use Permit Amendment consists of a request to increase pole sign area from 76
Description:
square feet to 109 square feet, while eliminating a smaller sign on the existing sign pole, which has a sign
area of 26 square feet. In addition, the applicant also requests to add non -illuminated lettering on the
south side of the building and illuminated lettering on the west side of the building.
General Plan Designation: Service Commercial
Zoning District: Commercial Service
Proposed
Environmental
Consistent with Certified Mitigated Negative Declaration 2002-0076 and Initial Study.
Determination:
City of Atascadero Planning Commission Agenda
4. CONDITIONAL USE PERMIT 2003-0090 AMENDMENT
Regular Meeting July 19, 2005
Page 3 of 6
Applicant:
D. A. Fetyko, P.O. Box 1999, Atascadero, CA 93423, Phone: 547-1103
Project Title:
Conditional Use Permit 2003-0090 Amendment
Project
5460 Mariquita Avenue, Atascadero, CA 93422
Location:
(San Luis Obispo County) (APN 029-292-024)
Project
The proposed Conditional Use Permit Amendment consists of a request to remove the window trim
Description:
condition for the three new homes as approved with the original Master Plan of Development and
subsequent building permits associated with the Planned Development No. 7 residential project.
Zoning District: RMF -10 (Residential Multiple Family)/PD 7
Proposed
not be illuminated.
Environmental
Consistent with Certified Mitigated Negative Declaration 2003-0011
Determination:
Zoning District: Residential Suburban (RS)
5. CONDITIONAL USE PERMIT 2005-0160: CHURCH STEEPLE
Applicant:
Corp. of Presiding Bishop of Church of Jesus Christ of Latter-day Saints, Phone: 466-8103
Project Title:
Conditional Use Permit 2005-0160
Project
2600 Ramona Road, Atascadero, CA 93422 APN 049-201-027
Location:
Project
The proposed project consists of a Conditional Use Permit application for a church steeple to exceed
Description:
the 50'-0" height limit for uninhabited structures in the Residential Suburban zone. The existing
church is 31'-0" in height. The proposed steeple will be an additional 40'-4", totaling 71'-4" from
ground level. The church fronts Ramona Road and is visible from US Highway 101. The steeple will
not be illuminated.
General Plan Designation: Suburban Estate (SE)
Zoning District: Residential Suburban (RS)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Mitigated Negative Declaration is available for public review from 6/28/05 through 7/17/05
Determination:
at 6905 El Camino Real, Suite 6, Community Development Department, from 8:00 a.m. to 5:00 p.m.,
Monday through Friday.
City of Atascadero Planning Commission Agenda
Regular Meeting July 19, 2005
Page 4 of 6
6. ZONE CHANGE 2005-0099:1155 EL CAMINO REAL, OAKHAVEN
Applicant:
Wehn Group LLC, 934 Sycamore Canyon, Paso Robles, CA 93446, Phone: 239-2475
Project Title:
Zone Change 2005-0099, CUP 2005-0157, TTM 2005-0067, The Village at Oakhaven
Project
1565 El Camino Real, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 049-042-018
Project
The proposed project consists of an application for a Zone Change, Conditional Use Permit, and
Description:
Tentative Tract Map for the construction of 62 new single-family attached homes on individual lots
that will be developed under the requirements of a custom Planned Development Overlay District
Proposed
within the RMF -16 Zoning District. Proposed homes range in size from 1100 to 1510 square feet.
Environmental
The project includes one home per lot each with a one -car garage and one parking space in each
Determination:
driveway. Four native trees are proposed for removal. The project will take access off of El Camino
Real.
General Plan Designation: High Density Residential (HDR)
Zoning District: Residential Multi -Family -16 (RMF -16)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Mitigated Negative Declaration is available for public review from 6/29/05 through 7/19/05
Determination:
at 6905 El Camino Real, Suite 6, Community Development Department, from 8:00 a.m. to 5:00 p.m.,
Monday through Friday.
7. CONDITIONAL USE PERMIT 2003-0112 / TTM 2003-0037 AMENDMENT
Applicant:
City of Atascadero, 6905 El Camino Real, Suite 6, Atascadero, CA 93422, Phone: 461-5000
Project Title:
Conditional Use Permit 2003-0112 and Tentative Tract Map 2003-0037 Amendment
Project
1325 El Camino Real, Atascadero, CA 93422
Location:
(San Luis Obispo County) (APN 049-101-009, 049-101-010)
Project
The proposed Conditional Use Permit and Tentative Tract Map Amendment consists of a request to
Description:
eliminate conditions prohibiting the sewer from extending to future adjacent projects.
Zoning District: RSF-X (Residential Single Family — X / PD -17)
Proposed
Environmental
Consistent with Certified Mitigated Negative Declaration 2004-0010
Determination:
COMMISSIONER COMMENTS AND REPORTS
DIRECTOR'S REPORT
City of Atascadero Planning Commission Agenda
ADJOURNMENT
Regular Meeting July 19, 2005
Page 5 of 6
The next regular meeting of the Planning Commission will be on August 2, 2005 at the Pavilion
on the Lake, 9315 Pismo Avenue, Atascadero.
Please note: Should anyone challenge in court any proposed development entitlement listed
on this Agenda, that person may be limited to raising those issues addressed at the public
hearing described in this notice or in written correspondence delivered to the Planning
Commission at, or prior to this public hearing.
City of Atascadero Planning Commission Agenda Regular Meeting July 19, 2005
Page 6 of 6
City of Atascadero
WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING
The Planning Commission meets in regular session on the first and third Tuesday of each month at 7:00
p.m., at the Pavilion on the Lake, 9315 Pismo Ave., Atascadero. Matters are considered by the
Commission in the order of the printed Agenda.
Copies of the staff reports or other documentation relating to each item of business referred to on the
Agenda are on file in the office of the Community Development Department and are available for public
inspection during City Hall Annex business hours at the Community Development counter and on our
website, www.atascadero.org. An agenda packet is also available for public review at the Atascadero
Library, 6850 Morro Road. All documents submitted by the public during Commission meetings that are
either read into the record or referred to in their statement will be noted in the minutes and available for
review in the Community Development Department.
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in
a City meeting or other services offered by this City, please contact the City Manager's Office, (805)
461-5000, or the City Clerk's Office, (805) 461-5000. Notification at least 48 hours prior to the meeting or
time when services are needed will assist the City staff in assuring that reasonable arrangements can be
made to provide accessibility to the meeting or service.
TO SPEAK ON AGENDA ITEMS
Members of the audience may speak on any item on the agenda. The Chairperson will identify the
subject, staff will give their report, and the Commission will ask questions of staff. The Chairperson will
announce when the public comment period is open and will request anyone interested to address the
Commission regarding the matter being considered to step up to the podium. If you wish to speak for,
against or comment in any way:
• You must approach the podium and be recognized by the Chairperson
• Give your name and address (not required)
• Make your statement
• All comments should be made to the Chairperson and Commission
• All comments limited to 5 minutes (unless changed by the Commission)
• No one may speak for a second time until everyone wishing to speak has had an opportunity
to do so, and no one may speak more than twice on any item.
If you wish to use a computer presentation to support your comments, you must notify the Community
Development Department at least 24 hours prior to the meeting. Access to hook up your laptop to the
City's projector will be provided. You are required to submit to the Recording Secretary a printed copy
of your presentation for the record. Please check in with the Chairperson before the meeting begins to
announce your presence and turn in the printed copy.
The Chairperson will announce when the public comment period is closed, and thereafter, no further
public comments will be heard by the Council.
TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA
Under Agenda item, "PUBLIC HEARINGS", the Chairperson will call for anyone from the audience having
business with the Commission to:
• Please approach the podium and be recognized
• Give your name and address (not required)
• State the nature of your business
This is the time items not on the Agenda may be brought to the Commission's attention. A maximum of
30 minutes will be allowed for Community Forum (unless changed by the Commission).
\\Cityhall\cdvlpmnt\— PC Agendas\PC 2005\PC Agenda. 7-19-05.word.am.doc
CALL TO ORDER
ITEM NUMBER: 1
DATE: 7-19-05
CITY OF ATASCADERO
PLANNING COMMISSION
DRAFT MINUTES
Regular Meeting
June 21, 2005 — 7:00 P.M.
Chairperson Porter called the meeting to order at 7:02 p.m. and Commissioner Jones
led the Pledge of Allegiance.
Rr)l I rAl I
Present: Commissioners Fonzi, Jones, Kelley, O'Keefe, Patel, Beraud and
Chairperson Porter
Absent: None
Staff Present: Community Development Director Warren Frace, Deputy
Community Development Director Steve McHarris, Associate
Planner Kelly Gleason, Assistant Planner Lisa Wilkinson and
Recording Secretary Grace Pucci.
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
MOTION: By Commissioner Fonzi and seconded by Vice Chairperson
Beraud to approve the agenda.
Motion passed 7:0 by a roll -call vote.
PUBLIC COMMENT
None
PC Draft Minutes 06/21/05
Page 1 of 5
CONSENT CALENDAR
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON JUNE 7, 2005.
MOTION: By Commissioner Fonzi and seconded by Vice Chairperson
Beraud to approve Item #1.
Motion passed 7:0 by a roll -call vote.
COMMUNITY DEVELOPMENT STAFF REPORTS
PUBLIC HEARINGS
2. CONDITIONAL USE PERMIT 2004-0125 AMENDMENT
Applicant:
Atascadero Mutual Water Co., 5005 El Camino Real, Atascadero, CA 93422
Project Title:
Conditional Use Permit 2004-0125 Amendment
Project
14595 El Monte Road, Atascadero, CA 93422
Location:
APN 050-361-005
Project
An amendment to the Conditional Use Permit requesting the withdrawal of condition #8,
Description:
which states: "The Atascadero Mutual Water Company shall provide a minimum water
pressure of 45 PSI to 14555 El Monte Road..."
General Plan Designation: RS
Zoning District: SE
Proposed
Environmental
Consistent with the Certified Mitigated Negative Declaration 2004-0017
Determination:
Assistant Planner Lisa Wilkinson gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Glenn Small, Atascadero Mutual Water Company, answered questions of the
Commission.
Chairperson Porter closed the Public Comment period.
MOTION: By Commissioner O'Keefe and seconded by Commissioner
Fonzi to adopt Resolution No. PC 2005-0040 approving
Conditional Use Permit based on findings and Conditions of
Approval.
Motion passed 7:0 by a roll -call vote.
PC Draft Minutes 06/21/05
Page 2 of 5
3. CONDITIONAL USE PERMIT 2005-0151
Applicant:
Terry Otis, 6480 Alta Pradera, Atascadero, CA 93422
Project Title:
Conditional Use Permit 2005-0151
Project
7685 Navajoa Ave, Atascadero, CA 93422
Location:
APN 031-153-014
Project
A request for a density bonus to allow the construction of one additional unit on a multi -
Description•
family site in accordance with the State Density Bonus program. The site density currently
Description:
allows for the construction of 3 units. The applicant is requesting that the State Density
Bonus allowance of 35% be granted to allow a total of 4 units on the project site.
General Plan Designation: MDR
Zoning District: RMF -10
Proposed
The project qualifies for a Categorical Exemption per CEQA Section 15332: In -fill
Environmental
Development Projects.
Determination:
Commissioner Kelley stepped down from consideration of this item stating that he has a
businesses relationship with the applicant.
Associate Planner Kelly Gleason gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT — None
MOTION: By Commissioner O'Keefe and seconded by Commissioner
Fonzi to adopt Resolution PC 2005-0039 certifying approving
Conditional Use Permit 2005-0151 based on findings and
subject to Conditions of Approval.
Motion passed 6:0 by a roll -call vote.
Commissioner Kelley rejoined the meeting.
4. TENTATIVE TRACT MAP 2005-0069
Owner:
Levon Investments, 200 E. Carillo St. Ste. 200, Santa Barbara, CA 93101
Applicant:
Kelly Gearhart, 6205 Alcantara Ave., Atascadero, CA 93422
Project Title:
Tentative Tract Map 2005-0069
Project
2000-2300 El Camino Real (Factory Outlets)
Location:
APN 049-141-056
Project
A request to convert approximately 89,000 square feet of existing commercial buildings to
Description:
condominiums. All public facilities are in place and new construction is not proposed at this
time.
PC Draft Minutes 06/21/05
Page 3 of 5
Community Development Director Warren Frace gave the staff report and answered
questions of the Commission. A letter from the Atascadero Mutual Water Company
containing additional requested conditions was distributed to the Commission.
PUBLIC COMMENT
Kelly Gearhart, applicant, answered questions of the Commission.
Michael Shearer, marketing representative for the project, explained the types of uses
they are seeking for this center. Mr. Shearer answered questions of the Commission.
Glenn Small, Atascadero Mutual Water District, explained why the Water Company has
requested the additional conditions. Mr. Small answered questions of the Commission.
Chairperson Porter closed the Public Comment period.
Commissioner Kelley stated he would like a stipulation that the water situation can be
taken care of in a property owners association.
MOTION: By Commissioner Kelley and seconded by Commissioner
Fonzi to adopt Resolution PC 2005-0038 approving Tentative
Tract Map 2005-0069 (Tract 2749), a request to establish
airspace units on one common lot, based on findings and
subject to conditions, and with the following added to
Condition of Approval No. 9: The water usage shall be taken
care of with the tenants through a property owners
association.
Motion passed 7:0 by a roll -call vote.
COMMISSIONER COMMENTS AND REPORTS
Commissioner Jones distributed a copy of a publication that deals with energy efficiency
in renovation and captures all the definitions that deal with window efficiencies and
other technologies.
DIRECTOR'S REPORT
PC Draft Minutes 06/21/05
Page 4 of 5
General Plan Designation: CPK
Zoning District: CPK
Proposed
The project qualifies for a Categorical Exemption per CEQA Section 15301: Existing
Environmental
Facilities.
Determination:
Community Development Director Warren Frace gave the staff report and answered
questions of the Commission. A letter from the Atascadero Mutual Water Company
containing additional requested conditions was distributed to the Commission.
PUBLIC COMMENT
Kelly Gearhart, applicant, answered questions of the Commission.
Michael Shearer, marketing representative for the project, explained the types of uses
they are seeking for this center. Mr. Shearer answered questions of the Commission.
Glenn Small, Atascadero Mutual Water District, explained why the Water Company has
requested the additional conditions. Mr. Small answered questions of the Commission.
Chairperson Porter closed the Public Comment period.
Commissioner Kelley stated he would like a stipulation that the water situation can be
taken care of in a property owners association.
MOTION: By Commissioner Kelley and seconded by Commissioner
Fonzi to adopt Resolution PC 2005-0038 approving Tentative
Tract Map 2005-0069 (Tract 2749), a request to establish
airspace units on one common lot, based on findings and
subject to conditions, and with the following added to
Condition of Approval No. 9: The water usage shall be taken
care of with the tenants through a property owners
association.
Motion passed 7:0 by a roll -call vote.
COMMISSIONER COMMENTS AND REPORTS
Commissioner Jones distributed a copy of a publication that deals with energy efficiency
in renovation and captures all the definitions that deal with window efficiencies and
other technologies.
DIRECTOR'S REPORT
PC Draft Minutes 06/21/05
Page 4 of 5
Director Frace reminded the Commission that the July 5, 2005 meeting is cancelled and
reviewed the agenda for the next regular meeting on July 19t"
ADJOURNMENT
Chairperson Porter adjourned the meeting at 7:50 p.m. to the next regularly scheduled
meeting of the Planning Commission on July 19, 2005.
MEETING RECORDED AND MINUTES PREPARED BY:
Grace Pucci, Recording Secretary
PC Draft Minutes 06/21/05
Page 5 of 5
ITEM NUMBER: 2
DATE: 7.19.05
Atascadero Planning Commission
Staff Report - Community Development Department
Title 9 Planning and Zoning Text Amendment
ZCH 2005-0100
(City of Atascadero)
SUBJECT:
A Zone Change consisting of a Text Amendment to update portions of Title 9, Planning
and Zoning, of the Atascadero Municipal Code.
RECOMMENDATION:
Staff recommends the Planning Commission review proposed text changes, provide
comments to staff and forward to the City Council as follows:
1. The Planning Commission adopt Resolution PC 2005-0043, recommending that
the City Council introduce an ordinance for first reading, by title only, to approve
Zone Change 2005-0100 based on findings.
SITUATION AND FACTS:
1. Applicant: City of Atascadero
2. General Plan Designation: Citywide
3. Zoning District: Citywide
4. Environmental Status: Initial Study and Proposed Negative
Declaration #2005-0043.
Summary:
The proposed text amendments consist of three general amendments made to Title 9
(Planning and Zoning Ordinance) that encompass the following: 1.) Fence height, 2.)
Design standards for flag lots, and 3.) Landscaping standards in multi -family and
ITEM NUMBER
DATE: 7.19.05
commercial zones. The proposed text amendment consists of additions as underlined
and deleted portions are noted by a strikethrough in the text.
Fencinq Standards
Currently, an Administrative Use Permit (AUP) is required for a fence, hedge, or wall to
be five (5) feet in height based on findings made by the Community Development
Director. The proposed text amendment will allow the above fencing exception within
the RS (Residential Suburban), RR (Rural Residential), and RSF-Z (Residential Single
Family — Z) zone designations without requiring an AUP hearing. All other zoning
designations will require an AUP. In general, the RS, RR, and RSF-Z zones are low-
density areas largely contained within the outlying areas of the city. Rural type uses
such as farm animal raising and agriculture are permitted (based on lot size) and often
necessitate taller than 3'-0" fencing within the front setback. Without compromising
visibility, safety, and aesthetics, the required findings remain in effect.
The proposed text amendment to fencing standards include changes made to Title 9-
4.104 (Exceptions to setback standards) ( and 9-4.128 Standards for Fencingand Deleted: (a) renew, hedges finish six
� feet or less in height above site finsh
Screening Materials). The amendment will consolidate the fencing standards into a
grade, when located in a required side or
single location within the zoningordinance, streamline the fencingrequirements within
g q
the City, and provide definitions for measuring fence height.
rear setback.¶
(b) Fences, hedges or walls three feet or
less in height, when located in a required
front setback.¶
(1) Allowed Adjustment: The exemption
Exceptions to setback standards.
for9-4.104 do no e walls in the front
set fences, that
setback that do not exceed three (3) feet
The minimum setback reto
q uirements of this title a 1 to all uses exce t the followin
pp y p g
(see also Section 9-4.110):
;n height maybe expanded, pm -scant
Section 9-1.112 (Adjustment), to include
fences, hedges or walls up to five (5) feet
Uncovered decks, terraces, steps, earthworks and other similar landscaping or design
elements placed directly on finished grade that do not exceed an average height of thirty
in height, provided the following findings
are made in the affirmative by the
community Development Director:¶
(30) inches above the surrounding finished grade, provided that no such wood structure
shall extend closer than eighteen (18) inches to a property line.
(i) Pillars, posts, or other supportingportions of the fence do not exceed a
height of six (6) feet, and¶
(ii) Sight -obscuring portions of the fence
exceeding six (6) inches in width do not
9-4.128 Fencing and screening.
exceed two (2) feet in width and are
separated from each other by at least
Standards for fencing and screening are established by this section to protect certain uses
from intrusion, to protect the public from uses that may be hazardous, and to increase
sixteen leas fees and¶
(iii) At least eighty percent (80%)
visibility will be retained through
compatibility between different land uses by visual screening. Fencing is the enclosure
of an area by the materials identified in subsection (c) of this section. Screening is the
portions of the fence that exceed three (3)
feet in height; and¶
(iv) The fence is architecturally
enclosure of an area by a visual barrier, which may include solid fencing or other
materials as specified in subsection (c) of this section,
compatible with existing structures on the
property and consistent in character and
appearance with other fences and
(a) Fencing and Screening: Where Required. Within the urban services line the uses and
areas listed in this subsection shall be fenced and/or screened as indicated. Unless
structures in the neighborhood; and¶
(v) The fence will not impair safe sight
distance for vehicular traffic nor result in
otherwise specified, fencing and screening are to be a minimum height of six (6) feet.
any other potential adverse impact on
human health and safety.¶
Deleted: c
ITEM NUMBER
DATE: 7.19.05
Fencing and screening materials of a height greater than three (3) feet shall not be
located within a required front setback or side setback adjacent to a street.
(1) Mechanical Equipment. When located outside of a building, support equipment
including air conditioning and heating devices, but not including plumbing or exhaust
vents, or chimneys, shall be screened to the height of the particular piece of equipment,
as follows:
(i) Roof -mounted Equipment. To be screened by architectural features from the view of
abutting streets.
(ii) Equipment at Grade. When located on the ground adjacent to a building, mechanical
equipment shall be screened by landscaping, a solid wall or fencing from the view of the
street or surrounding properties.
This subsection does not apply to single-family residential uses.
(2) Outdoor Storage. To be screened on all sides by a wall or fencing.
(3) Public Utility Substations. To be screened on all sides in a manner that will provide
an effective visual barrier as well as the necessary safety clearances required by order of
the California Public Utilities Commission.
(4) Side and Rear Lot Lines. The side and rear property lines of all nonresidential uses
are to be screened as follows:
(i) Adjacent to a Residential Use or Zone. A solid wall or fencing shall be located on
side and rear property lines of any nonresidential or nonagricultural use abutting a
residential use or zone.
(5) Swimming Pools. Yard areas with private swimming pools are to be fenced to
discourage unsupervised access and use by small children. Such fencing is to be a
minimum of four (4) feet high and equipped with a self-closing and self -latching gate.
Latching devices are to be located at a minimum height of four (4) feet. Such fencing
may be omitted where building walls abut the pool area, provided that the entire
perimeter of the pool area is secured.
(b) Exceptions to Fencing and Screening Requirements.
(1) Buildings Abutting Property Lines. Required screening or fencing may be omitted
along any lot line where a building wall exists immediately abutting the lot line.
(2) Location Adjustment. Where property fencing or screening is required, the location
may be adjusted (see Section 9-1.112 so the fencing may be constructed at or within the
setback line, provided the areas between the fence and the property lines are landscaped,
or in rural areas, retained in their natural vegetative state.
(3) Planning Commission Modification. Any of the requirements of this section may be
waived or modified through conditional use permit approval, provided the Planning
Commission first finds that specifically identified characteristics of the site or site
vicinity would make required fencing or screening unnecessary or ineffective.
(c) Standards for Fencing and Screening Materials. All fencing and screening shall be
llowed as follows•
41 Height. Fence and screen height shall be permitted as follows:
(i) RS / RSF-Z Zones
a. fencing within a required front or corner yard setback can be up to 5 feet in height \
provided that the top two feet remain a minimum of 80% visibility. \
Deleted: constructed
Deleted: (1) Permit to Exceed Height.
Conditional use permit approval is
required where fencing is proposed to be
greater than six (6) feet in height.¶
(2) Location. Fencing shall not be located
within any required front setback except
Where such fencing is three (3) feet or
less in height.¶
Deleted: 3
Formatted: Indent: Left: 0.56"
ITEM NUMBER
DATE: 7.19.05
b. fencing within a required side or rear setback may be a maximum of 6 -feet in height
(ii) RSF-Y / RSFA / RMF -10 / RMF -16
a. fencing within a required front or corner yard setback can be a maximum of 3 -feet in
height.
b. fencing within a required side or rear yard setback shall be a maximum of 6 -feet in
height.
(iii) Gateposts and other superstructures over site entrances and exits may be to
twelve 12) feet in height,
finished grade of the uphill lot.
(2) Permit to Exceed Height. A Minor Conditional use permit approval is required
where fencing is proposed to be greater than six (6) feet in height. 1
a) Screening Materials Substitution. Where screening is required to be a solid wall or I1
fence, the following materials may be substituted through adjustment (see Section 9-
1. 112),
-1.112), except where screening is required adjacent to a residential use or zone: I
(i) Landscape Screen. Screening plant materials may be substituted for a wall or fence, 1
where:
(A) Proposed plant materials are certified in writing by a registered landscape architect
as having the capability of achieving sixty (60) percent of total view blockage within
eighteen (18) months of planting, and one hundred (100) percent of total view blockage
within thirty-six (36) months of planting; and
(B) The applicant agrees in writing to install solid fencing after the expiration of thirty-
six (3 6) months, in the event that the landscaping has not totally blocked the view of
areas required to be screened.
(ii) Berms. A landscaped berm may be substituted for a wall or fence provided that the
combination of berm and landscaping is no less than the required height of the fence or
wall, and that the berm is constructed with a maximum slope of 3:1, with side slopes
designed and planted to prevent erosion, and with a rounded surface a minimum of two
(2) feet in width at the highest point of the berm, extending the length of the berm. The
berm shall be planted with shrubs, lawn or groundcover.
(iii),Chain-link fencing. Vinyl coated ghain-link fencing with gvergreen landscape
screen planting may be substituted for a solid wall or fence in commercial and industrial
zones except where screening fencing is required adjacent to residential uses and zones.
Flag Lot Standards for Lot Line Adiustments
Currently, there are no specific standards for lot line adjustments provided in Title 9
Planning and Zoning. The Subdivision Map Act limits local agencies to review Lot Line
Adjustments based upon the general plan, zoning and building ordinances (Subdivision
Map Act section 66412. Map Act Exclusions).
The purpose of adding a section that reflects the requirements set forth in Title 11-6.26
Flag lots (deep lot subdivisions), is to assure that the relocation of lot lines coincide with
the purpose and intent of the Zoning Ordinance, which "minimizes adverse effects on
Deleted:
Deleted: 3
Deleted: 3) Height. Walls and fences
are not to be higher than six (6) feet
Deleted: , except fences located at or
within required setback lines may be up
to twelve (12) feet in height
1 Deleted:. Gateposts and other
Isuperstructures over site entrances and
exits may be up to twelve (12) feet in
height.¶
I Deleted:
I1 Formatted: Font: Not Bold
1 Formatted: Font: Not Bold
IFormatted: Font: Not Bold
� Deleted:
Deleted: 4
Deleted: Slatted
Deleted: C
Deleted: redwood slats
ITEM NUMBER
DATE: 7.19.05
the public resulting from the inappropriate creation, location, use or design of building
sites, structures, or other land uses by providing appropriate standards for
development" (AMC 9-1.101(b)). The text change will elucidate the requirement that lot
line adjustments not create an adverse effect, such as land locking a developed parcel
of land from a dedicated street.
The proposed text amendment will incorporate the following section:
-4.164 Lot Line Adjustment Review for Flag Lots.
(a) The adjustment of all property lines containing a flag lot shall be permitted in
accordance with the following design standards.
(1) The original lot shall have frontage on a dedicated street.
(2) The accessway to the rear lot shall be at least twenty (20) feet wide (developed to
City standards) for residential zones, except where the accessway is more than one
hundred fifty (150) feet long, it shall be at least twenty-four -four (24) feet wide with twenty
(20) feet of pavement. For all other zones, the accessway shall be at least thirty (30) feet
wide with a paved roadway at least twenty-four (24) feet wide.
(3) The lot farthest from the street shall own the accessway in fee. Other lots using the
accessway shall have an access and utility easement over it..
(4) Lots utilizing the accessway of a flaglot may be required to enter into a road
maintenance agreement to insure perpetual maintenance and repair of the accessway.
Landscaping Standards
Formatted: Font: (Default) Times
New Roman, 12 pt, Not Bold
Formatted: Font: Not Bold
Formatted: Font: Not Bold
Formatted: Font: Not Bold
The purpose of amending the landscaping standards is to provide both staff and project
applicants with direction and recommendations for landscaping areas within the multi-
family and commercial zones. The proposed text amendment consists of the following
changes Formatted: Not Highlight
9-4.116 Location of parking on a site.
Required parking spaces may be located as needed on a proposed site, subject to the design and
construction standards of Sections 9-4.117 and 9-4.119 and the following:
(a) Use of Front Setback. Required parking spaces are not to be located within the required front
setback - - Deleted: , except as provided by section
(b) Use of Side and Rear Setbacks. Side and rear setbacks may be used for vehicle parking 9-4.106(b)(1).
except on the street side of a corner lot and except where landscapingis s required by section�9-Formatted: Not Highlight
4.125.
Formatted: Font color: Black
,9-4.119 Parki blot construction standards. Formatted: Indent: Left: 0", First
line: 0.5"
ITEM NUMBER
DATE: 7.19.05
All parking areas containing three (3) or more off-street parking spaces are to be improved as
follows, except as otherwise provided by this section.
(a) Surfacing. All parking areas are to be surfaced with an asphalt, concrete, chip seal, or crushed
rock surface, as specified in the following chart or as required by property development
standards listed in this code. Where concrete or asphalt are required, brick or other masonry
paving units may be substituted, including,turf block.
Minimum Required Surface Parking Lot Turnover
Location 7#igh Medium Low
Inside urban Asphalt or Asphalt or Asphalt or
services line concrete concrete concrete
Outside urban
Asphalt or
Asphalt or
Crushed rock
�or
services line
concrete
concrete
chip seal
(b) Lining and Marking. Parking spaces in paved parking areas shall be marked with paint
striping, a minimum of two (2) inches in width. Parking spaces in other types of lots may be
identified by wheel stop barriers.
(c) Wheel Stops. Wheel stops or continuous concrete or asphalt curbing are required in all
parking lots to define the perimeter of the parking area and to protect landscaping from vehicle
encroachment. In addition, wheel stops are required for each parking space in a high turnover
parking lot. Wheel stops shall be provided as follows:
(1) Materials and Installation. Wheel stops shall be constructed of concrete, continuous concrete
curbing, asphalt, timber, or other durable material not less than six (6) inches in height, or an
approved functional equivalent. Wheel stops are to be securely installed and maintained as a
safeguard against damage to adjoining vehicles, machinery or abutting property.
(2) Setback. Wheel stops or other vehicle barriers shall be located approximately three (3) feet
from the front of the parking space.
(3) Functional Equivalent. Wherever possible, functional equivalents in the form of raised
sidewalks or curbs surrounding planters or similar may be used in lieu of wheel stops.
(d) Vertical Clearance. Covered parking spaces are to have a vertical clearance of at least seven
(7) feet six (6) inches above the parking lot surface for all uses except residential.
(e) Slope. The finished grade of a parking lot is not to exceed five (5) percent slope, unless
approved by adjustment (Section 9-1.112).
(f) Landscaping. A minimum of ten (10) percent of the interior of all parking lots shall be
landscaped, in addition to any perimeter landscaping required by subsection (g) of this section.
Shade trees are to be provided at approximately thirty (30) foot intervals along parking rows.
Landscape fingers shall be a minimum of 6 -feet wide shall be provided everY eight (8) parking
spaces. These landscaping requirements do not apply to parking lots that are underground or
within buildings.
Deleted: vertically oriented concrete
block with the block cells planted with
grass
ITEM NUMBER
DATE: 7.19.05
(g) Screening.
(1) From Residential Areas. Parking lots that abut a residential zone shall be separated from such
property by a landscaping strip with a minimum width of five (5) feet and a six (6) foot high /
solid fence or wall. /
(2) From Streets. Parking lots abutting a public street shall be separated from the street right -of- / /
way by a landscaping strip with a minimum width of en 10 feet, and, where parking spaces are/
arranged to head toward the street, by a minimum three (3) foot high solid fence decorative wall
or landscape equivalent located on the parking lot side of the landscaping strip,
J9-4.12
r
�a) Minimum Landscaped Area. -
(1)In the following zoning districts, minimum landscape coverage based on the net site area are
as follows:
Single-family zoning districts: none (see Chapter 5 for second unit landscaping requirements)
(ii) Multi -family Toning districts: Twenty —five percent (25%)
(iii) Cnmmeroinl 7nnino district-, (exohulino nnwntnwn Cnmmercinl)• Ten nernent (1(1°/1
v Planned Development overla onindistricts: As required by the Master Plan of
Development and Conditions of Approval. \
(2) Determination of Landscape Coverage Area. Landscape coverage area shall include all areas
not covered by pavement or buildings including, but not limited to, open -space areas, planters
and setback areas. Decorative pavement used within a common open -space area for recreational
purposes may be included in the landscape coverage calculation.
(3) Criteria for Reduced Landscaping. To encourage design excellence, the Community
Development Director, Planning Commission, or City Council (depending on approval process)
may decrease the minimum landscaped area, upon the following criteria:
(i) Professionally designed landscaping, designs of special merit, decorative site elements, and
preserving existing mature native trees are highly encouraged and considered in an ap lip cant's \
request to reduce required landscaping.
on approval process) mqy grant a reduction of an applicant's landscape requirement by a total of
up to fifty percent upon an applicant's demonstration of the criteria listed below:
(A) Retention of existing on-site native trees with a minimum of 25% canopy cover retained over
the project site.
(B) Use of decorative pavement material such as pavers or colored stamped concrete over a
minimum of 25% of the paved area of the site.
(C). Installation of a varietv of tree and plant materials including ornamental species and native
trees.
(D) Use of box sized trees throughout the project site.
(b) Where Required. The sites of all projects requiring approval, except for single-famil
dwellings, are to be landscaped as follows;;
Deleted: five
Deleted: (5)
Deleted: , or by a landscape berm, three
(3) feet high
Formatted: Font color: Black
Deleted: Required landscaping
Deleted: The sites of all projects
requiring approval, except for single-
family dwellings, are to be landscaped as
follows
Formatted: Indent: Left: 0"
Formatted: Font: 12 pt
Formatted: Indent: First line: 0"
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Indent: Left: 0"
Deleted: a
Deleted: Landscaping is to be p> ._: (il
ITEM NUMBER
DATE: 7.19.05
(1) Setbacks. All setback areas required by Section 9.4.103 or Chapter 9-6. except where
enclosed and screened from the view of public streets and adjoining properties by solid fencing
in accordance with Section 9-4.128 and except where a required setback is traversed by a
driveway or sidewalk.
(2) Unused Areas. All areas of a building site not identified on a site plar> intended for a specificD2leted:
m a plot plan, precise plan, or
use or purpose, except where enclosed and blocked from the view of public streets by solid
conditional use permit application as
fencing and/or buildings.
(3) Parking Areas. As required by subsections (f) and (g) of Section 9-4.119.
(4) Trash Enclosures. All trash enclosures shall be screened with landscaping unless built into
the building.
(5) Street Trees. Street trees shall be provided along all public and private street frontages at a
minimum of 30 -feet on center.
(fi) SLecial Use Sites. As required by Chapter 9-6 for specific land uses, for the purposes of '
Deleted: 4
screening, buffering or general landscaping.
Formatted: Indent: Left: 0"
Q) Where Required by Conditions of Approval. As set forth in conditions of approval adopted
Deleted: 5
pursuant to Section 9-2.109(c)(2).
(8) A minimum 5 -foot landscape strip must be provided within the side yard setback of all
commercial and multi -family project sites except in locations where a reciprocal access easement
exists with the adjacent lot or commercial building is located. This side yard width may be
reduced to 3 -feet if decorative concrete pavement is utilized.
(c) Exceptions to required landscgVingi1) Agriculture Zone. Except where required for a special
Formatted: Indent: Left: 0"
use by Chapter 9-6, setback and unused area landscaping in accordance with subdivisions (1) and
Deleted: b
(2) of subsection (a) of this section is not required where such areas are cultivated or maintained
Deleted:.¶
in native vegetation.
(2) Planning Commission Modification. Where conditional use permit approval is required, the
Planning Commission may waive, modify or increase the landscaping requirements of this
sections
Deleted: subject to the following
�f a finding can be made that pxistin& ye&etation topography or structural arran ementpreclude
findings:
the need for landscaping.Deleted:
(i)
Deleted: Existing
,9-4.126 Standards for landscaping materials._
Formatted: Font color: Black
Landscape paterials used and their installation and maintenance is sub 'ect to the followin .
JJ $
Formatted: Indent: Left: 0", First
line: 0.5"
provisions, except sin>;le-family residences within asingle-family residential zone:la) Allowable
Formatted: Indent: Left: 0"
Materials. Landscaping shall include some combination of the following materials, where
Deleted: Where landscaping is required
appropriate to achieve the intended or required purpose of the landscaping (e.g., screening, etc.):
by section 9-4.125 the
(1) Trees, shrubs, groundcover, vines, flowers or lawns (drought resistant plantings are preferred
Deleted::q
in order to minimize water use for landscaping);
(2),pecorative Pavement, mulch, decorative boulders, or other decorative materials
Deleted: Brick, bark, timber, decorative
accordance with landscape coverage standards listed in section 9-4.125.
rock
(3) Natural features such as rock outcrops;
Deleted: , provided that materials other
(4) Structural features including fountains, pools, walls and fences. _
than plantings are not [o exceed fifty (50)
percent of the total area of lanaseaping;
(b) Excluded Materials. Landscaping proposed to satisfy the requirements of this title shall not
Deleted: , amvork
include any plant materials which:
ITEM NUMBER
DATE: 7.19.05
(1) Have root structures, that in their mature state may damage or interfere with the normal use
of existing public or private underground electrical lines, cables, or conduits, pipes or other
underground structures; or public or private sidewalks, curbs, gutters or paved parking and
turnaround areas, drainage improvements, or adjacent structures, foundations or landscape
materials.
(2) Will have diminished potential for survival because of proposed locations or grouping that do
not satisfy the needs of the plant material necessary for healthy growth.
(3) Because of proposed location and type, will create a potential hazard of brush or forest fire.
(4) Will obstruct the vision of vehicle operators or pedestrians at points of intersection between
pedestrian and vehicular traffic.
(c) Irrigation Required. Where landscaping is required to be installed by Section 9.125,,an
automatic irri ag tion system shallbe provided. Irrigation plans shall be included on landscape
l
(d) Concrete Curbing. Where landscaping is required to be installed by Section 9-4.125, such
landscaping shall be enclosed by raised concrete curbing or an approved functional equivalent.
(e) Timing of Installation. All required plantings shall be in place prior to final unless a bond is
approved by the Community Development Director,
(f) Proper Maintenance Required. All required plantings shall be maintained in good growing
condition, and in any case where a required planting has not survived, shall be replaced with new
plant materials. A maintenance agreement may be recorded against the property in a form
approved by the Community Development Director.
Proposed Environmental Determination
An Initial Study and proposed Negative Declaration for the project has been prepared
with the recommended findings that there will be no significant adverse environmental
impacts associated with this project application.
Conclusion
The proposed text amendments are consistent with the General Plan and which is
implemented by the zoning ordinance. The proposed changes will clarify fencing,
landscaping, and lot line adjustment requirements.
ALTERNATIVES
The Commission may recommend modifications of the text amendments to the
City council.
2. The Commission may determine that more information is needed on some
aspect of the project and may refer the item back to the applicant and staff to
Deleted: such landscaping shall include
provisions for irrigation, which may be
by means of hose bibs located not more
than fifty (50) feet from all areas of
required landscaping, or by
Deleted: , provided that where
landscaping is substituted for screening
fencing as provided by Section 9-
4.128(a)(4)(i), an automatic irrigation
system is required.
Deleted: before establishment of a use
or issuance of a certificate of occupancy,
except for single-family dwellings and
mobilehomes
ITEM NUMBER
DATE: 7.19.05
develop the additional information. The Commission should clearly state the type
of information that is required and move to continue the item to a future date.
3. The Commission may recommend the City Council deny the project. The
Commission should specify the reasons for denial of the project and recommend
an associated finding with such action.
PREPARED BY: Lisa Wilkinson, Assistant Planner
Kelly Gleason, Associate Planner
ATTACHMENTS:
Attachment 1: Initial Study and Draft Negative Declaration
Attachment 2: Draft Resolution 2005-0043
Attachment 3: Draft Resolution 2005-0051
ITEM NUMBER
DATE: 7.19.05
ATTACHMENT 1: Initial Study and Draft Negative Declaration 2005-0043
SEE FOLLOWING
ITEM NUMBER: 2
DATE: 7.19.05
ATTACHMENT 2: Draft Resolution PC 2005-0043
DRAFT RESOLUTION PC 2005-0043
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL CERTIFY PROPOSED NEGATIVE
DECLARATION 2004-0043 PREPARED FOR ZONE CHANGE 2005-0100
(Citywide/City of Ataseadero)
WHEREAS, an application has been received from the City of Atascadero (6905 El
Camino Real, Suite 6), to consider a project consisting of Zone Change Text Amendments; and,
WHEREAS, an Initial Study and Proposed Negative Declaration 2004-0043 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission of the City of Atascadero held a public hearing
on July 19, 2005 following the close of the review period to consider the Initial Study and
Proposed Negative Declaration; and,
WHEREAS, the Planning Commission has determined that the project will have no
significant impacts with project specific mitigation measures incorporated; and,
NOW THEREFORE, the Planning Commission of the City of Atascadero, hereby
resolves to recommend that the City Council certify Proposed Negative Declaration 2004-0043
based on the following Findings, and as shown in Exhibit A:
1. The Proposed Mitigated Negative Declaration has been completed in compliance with
CEQA; and,
2. The Proposed Mitigated Negative Declaration was presented to the Planning
Commission, and the information contained therein was considered by the Planning
Commission, prior to recommending action on the project for which it was prepared; and,
3. The project does not have the potential to degrade the environment when mitigation
measures are incorporated into the project; and,
4. The project will not achieve short-term to the disadvantage of long-term environmental
goals; and,
ITEM NUMBER: 2
DATE: 7.19.05
5. The project does not have impacts which are individually limited, but cumulatively
considerable; and,
6. The project will not cause substantial adverse effects on human beings either directly or
indirectly; and,
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
Exhibit A Proposed Negative Declaration 2005-0043
—siu? a T
- ,0so+DM
ITEM NUMBER
DATE: 7.19.05
Wr
CITY OF ATASCADERO PROPOSED
NEGATIVE DECLARATION #2005-0043
6905 EI Camaro Real, Suite 6. Atascadcro, CA 93422 805/461-5000
Applicant:
City of Atascadero. 6905 EI Camino Real, Suite 6. Atascadero, CA 91422 Phone: 805461-5000
Project Title:
Zone Change 2005.0100, Title 9 Planning and Zoning Text Amendments
Project
Jbmmum landscape areas: all Residential Multi -Family and Conuncrcial zones.
Location:
Reference Title I I Chapter 6 into Title 9 Chapter 1 under Lot Line Adjustmcm: Citywide
Fencing and Screening Standards: City-wide
Project
The project consists of a revision to portions of Title 9 Planning and Zoning, of the Atascadcro
Description:
Municipal Code (AMC). The amendments include the following: define a minimum landscaping area
applied to Residential Multi -Family and Commercial zoning designations (AMC 9.4.125); incorporate
existing portions of Title I 1 Subdivisions, Chapter 6 Flag Lots (deep lot subdivisions) into Title 9-
1.119 and Title 9.4 for Lot Line Adjustments; and update fencing and screening standards (AMC 9-
4.128).
Findings:
I. The project does not have the potential to degrade the environment.
2. The project will not achieve short-term to the disadvantage of long-term environmental goals.
3. The project docs not have impacts which are individually limited, but cumulatively considerable.
4. The project will not cause substantial adverse effects on human beings either directly or indirectly.
Determination:
Based on the above findings, and the information contained in the initial study 2005-0043 (made a part hereof by
reference and on file in the Community Development Department), it has been determined that the above project will
not have an adverse impact on the environment.
Prepared By: Lisa Wilkinson, Assistant Planner
Date Posted: June 28, 2005
Public Review Ends: July 17, 2005
Attachments: Initial Study 2005-0043
t,.,.vw.rrnne. n. o.,.n.o„nru
6905 EL CAMINO REAL, SUITE. 6 • ATASCADERO, CA 93422 • (805) 461-5000 • FAX 461-7612
ITEM NUMBER: 2
DATE: 7.19.05
ATTACHMENT 3: Draft Resolution PC 2005-0051
DRAFT RESOLUTION PC 2005-0051
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL AMEND THE ATASCADERO MUNICIPAL
CODE BY APPROVING ZONE CHANGE 2005-0100 TO ESTABLISH
DEVELOPMENT STANDARDS FOR FENCE HEIGHT, LOT LINE
ADJUSTMENTS AFFECTING FLAG LOTS, AND LANDSCAPE
REQUIREMENTS
(Citywide/City of Atascadero)
WHEREAS, an application has been received from the City of Atascadero (6905 El
Camino Real, Suite 6), to consider Zone Change Text Amendments to establish development
standards for fence height, lot line adjustments affecting flag lots, and landscape requirements;
and,
WHEREAS, an Initial Study and Draft Negative Declaration 2004-0043 were prepared
for the project and made available for public review in accordance with the requirements of the
California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission has determined that it is in the best interest of the
City to enact this amendment to the Zoning Code Text to protect the health, safety, and welfare
of its citizens by applying orderly development and expanding housing opportunities within the
City; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Text
Change application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said zoning text
amendments; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a Public Hearing
held on July 19, 2005, studied and considered Zone Change 2005-0100, after first studying and
considering the Draft Negative Declaration prepared for the project, and,
ITEM NUMBER
DATE: 7.19.05
NOW THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings for Approval of a Zone Text Change. The Planning
Commission finds as follows:
1. The zone change is consistent with General Plan policies and all other applicable
ordinances and policies of the City.
2. Amendment of the zoning ordinance will provide for the orderly and efficient use of
lands where such development standards are applicable.
3. The zone change will not, in itself, result in significant environmental impacts.
SECTION 2. Recommendation of Approval. The Planning Commission of the City of
Atascadero, in a regular session assembled on July 19, 2005 resolved to recommend that the City
Council introduce for first reading by title only, an ordinance that would amend the City Zoning
code text with the following:
9-4.104 Exceptions to setback standards.
The minimum setback requirements of this title apply to all uses except the following (see also
Section 9-4.110):
,W) Ur covered decks, terraces, steps, earthworks and other similar landscaping or design
elements placed directly on finished grade that do not exceed an average height of thirty (30) I
inches above the surrounding finished grade, provided that no such wood structure shall extend
closer than eighteen (18) inches to a property line.
9-4.128 Fencing and screening.
Standards for fencing and screening are established by this section to protect certain uses from
intrusion, to protect the public from uses that may be hazardous, and to increase compatibility
between different land uses by visual screening. Fencing is the enclosure of an area by the
materials identified in subsection (c) of this section. Screening is the enclosure of an area by a
visual barrier, which may include solid fencing or other materials as specified in subsection (c)
of this section,
(a) Fencing and Screening: Where Required. Within the urban services line the uses and areas
listed in this subsection shall be fenced and/or screened as indicated. Unless otherwise specified,
fencing and screening are to be a minimum height of six (6) feet. Fencing and screening
materials of a height greater than three (3) feet shall not be located within a required front
setback or side setback adjacent to a street.
Deleted: (a) Fences, hedges or walls six
feet or less in height above site finish
grade, when located in a required side or
rear setback.¶
(b) Fences, hedges or walls three feet or
less in height, when located in a required
front setback.¶
(1) Allowed Adjustment: The exemption
for fences, hedges or walls in the front
setback that do not exceed three (3) feet
in height may be expanded, pursuant to
Section 9-1.112 (Adjustment), to include
fences, hedges or walls up to five (5) feet
in height, provided the following findings
are made in the affmnative by the
Community Development Director:¶
(i) Pillars, posts, or other supporting
portions of the fence do not exceed a
height of six (6) feet; and¶
(ii) Sight -obscuring portions of the fence
exceeding six (6) inches in width do not
exceed two (2) feet in width and are
separated from each other by at least
sixteen (16) feet; and¶
(iii) At least eighty percent (80%)
visibility will be retained through
portions of the fence that exceed three (3)
feet in height; and¶
(iv) The fence is architecturally
compatible with existing structures on the
property and consistent in character and
appearance with other fences and
structures in the neighborhood; and¶
(v) The fence will not impair safe sight
distance for vehicular traffic nor result in
any other potential adverse impact on
human health and safety.¶
Deleted: c
ITEM NUMBER
DATE: 7.19.05
(1) Mechanical Equipment. When located outside of a building, support equipment including air
conditioning and heating devices, but not including plumbing or exhaust vents, or chimneys,
shall be screened to the height of the particular piece of equipment, as follows:
(i) Roof -mounted Equipment. To be screened by architectural features from the view of abutting
streets.
(ii) Equipment at Grade. When located on the ground adjacent to a building, mechanical
equipment shall be screened by landscaping, a solid wall or fencing from the view of the street or
surrounding properties.
This subsection does not apply to single-family residential uses.
(2) Outdoor Storage. To be screened on all sides by a wall or fencing.
(3) Public Utility Substations. To be screened on all sides in a manner that will provide an
effective visual barrier as well as the necessary safety clearances required by order of the
California Public Utilities Commission.
(4) Side and Rear Lot Lines. The side and rear property lines of all nonresidential uses are to be
screened as follows:
(i) Adjacent to a Residential Use or Zone. A solid wall or fencing shall be located on side and
rear property lines of any nonresidential or nonagricultural use abutting a residential use or zone.
(5) Swimming Pools. Yard areas with private swimming pools are to be fenced to discourage
unsupervised access and use by small children. Such fencing is to be a minimum of four (4) feet
high and equipped with a self-closing and self -latching gate. Latching devices are to be located at
a minimum height of four (4) feet. Such fencing may be omitted where building walls abut the
pool area, provided that the entire perimeter of the pool area is secured.
(b) Exceptions to Fencing and Screening Requirements.
(1) Buildings Abutting Property Lines. Required screening or fencing may be omitted along any
lot line where a building wall exists immediately abutting the lot line.
(2) Location Adjustment. Where property fencing or screening is required, the location may be
adjusted (see Section 9-1.112 so the fencing may be constructed at or within the setback line,
provided the areas between the fence and the property lines are landscaped, or in rural areas,
retained in their natural vegetative state.
(3) Planning Commission Modification. Any of the requirements of this section may be waived
or modified through conditional use permit approval, provided the Planning Commission first
finds that specifically identified characteristics of the site or site vicinity would make required
fencing or screening unnecessary or ineffective.
(c) Standards for Fencing and Screening Materials. All fencing and screening shall be 11,E owed as
follows:
,0) Height. Fence and screen height shall be permitted as follows:
(i) RS / RSF-Z Zones
a. fencing within a required front or corner yard setback can be up to 5 feet in height provided
that the top two feet remain a minimum of 80% visibility.
b. fencing within a required side or rear setback may be a maximum of 6 -feet in height
(ii) RSF-Y / RSF-X / RMF -10 / RMF -16
a. fencing within a required front or corner yard setback can be a maximum of 3 -feet in height.
b. fencing within a required side or rear yard setback shall be a maximum of 6 -feet in height.
Deleted: constructed
Deleted: (1) Permit to Exceed Height.
Conditional use permit approval is
required where fencing is proposed to be
greater than six (6) feet in height.¶
(2) Location. Fencing shall not be located
within any required front setback except
where such fencing is three (3) feet or
less in height.¶
Deleted: 3
Formatted: Indent: Left: 0"
Formatted: Indent: Left: 0"
ITEM NUMBER
DATE: 7.19.05
(iii) Gateposts and other superstructures over site entrances and exits may be up to twelve (12)
feet in height.
grade of the uphill lot.
(2) Permit to Exceed Height. A Minor Conditional use permit approval is required where
fencing is proposed to be greater than six (6) feet in height. 1
(3) Screening Materials Substitution. Where screening is required to be a solid wall or fence, the I
following materials may be substituted through adjustment (see Section 9-1.112), except where 1
screening is required adjacent to a residential use or zone: I
(i) Landscape Screen. Screening plant materials may be substituted for a wall or fence, where:
(A) Proposed plant materials are certified in writing by a registered landscape architect as having
the capability of achieving sixty (60) percent of total view blockage within eighteen (18) months
of planting, and one hundred (100) percent of total view blockage within thirty-six (3 6) months
of planting; and
(B) The applicant agrees in writing to install solid fencing after the expiration of thirty-six (36)
months, in the event that the landscaping has not totally blocked the view of areas required to be
screened.
(ii) Berms. A landscaped berm may be substituted for a wall or fence provided that the
combination of berm and landscaping is no less than the required height of the fence or wall, and
that the berm is constructed with a maximum slope of 3:1, with side slopes designed and planted
to prevent erosion, and with a rounded surface a minimum of two (2) feet in width at the highest
point of the berm, extending the length of the berm. The berm shall be planted with shrubs, lawn
or groundcover.
(iii),Chain-link fencing Vinyl coated,&in-link fencingwwith,gvergreen landscape screen
lap nting may be substituted for a solid wall or fence in commercial and industrial zones except
where screening fencing is required adjacent to residential uses and zones.
.94.164 Lot Line Adjustment Review for Flag Lots.
(a) The adjustment of all property lines containing a flag lot shall be permitted in accordance
with the following design standards.
(1) The original lot shall have frontage on a dedicated street.
(2) The accessway to the rear lot shall be at least twenty (20) feet wide (developed to City
standards) for residential zones, except where the accessway is more than one hundred fifty
(150) feet long, it shall be at least twenty-four (24) feet wide with twenty (20) feet of pavement.
For all other zones, the accessway shall be at least thing (30) feet wide with a paved roadway at
least twenty-four (24) feet wide.
(3) The lot farthest from the street shall own the accessway in fee. Other lots using the
accessway shall have an access and utility easement over it,
(4) Lots utilizing the accessway of a flaglot ma, by e required to enter into a road maintenance
agreement to insure perpetual maintenance and repair of the accessway.
Deleted: (
Deleted: 3
Deleted: 3) Height. Walls and fences
are not to be higher than six (6) feet
Deleted: , except fences located at or
within required setback lines may be up
to twelve (12) feet in height
Deleted:. Gateposts and other
superstructures over site entrances and
exits may be up to twelve (12) feet in
height.¶
Deleted:
Formatted: Font: Not Bold
Formatted: Font: Not Bold
Formatted: Font: Not Bold
Deleted:
Deleted: 4
Deleted: Slatted
Deleted: C
Deleted: redwood slats
Formatted: Font: (Default) Times
New Roman, 12 pt, Not Bold
Formatted: Font: Not Bold
Formatted: Font: Not Bold
Formatted: Font: Not Bold
ITEM NUMBER
DATE: 7.19.05
9-4.116 Location of parking on a site.
Required parking spaces may be located as needed on a proposed site, subject to the design and
construction standards of Sections 9-4.117 and 9-4.119 and the following:
(a) Use of Front Setback. Required parking spaces are not to be located within the required front
setback Deleted. , except as provided by section
(b) Use of Side and Rear Setbacks. Side and rear setbacks may be used for vehicle parking 9-4.106(b)(1).
except on the street side of a corner lot and except where landscapingis s required by section - Formatted: root Hignliynt
4.125.
Location High Medium Low
Inside urban
Formatted: Font color: Black
J94.119 Parki blot construction standards.
Formatted: Indent: Left: 0", First
All parking areas containing—three—(3) or more off-street parking spaces are to be improved as
line: 0.5"
follows, except as otherwise provided by this section.
concrete
(a) Surfacing. All parking areas are to be surfaced with an asphalt, concrete, chip seal, or crushed
rock surface, as specified in the following chart or as required by property development
standards listed in this code. Where concrete or asphalt are required, brick or other masonry
paving units may be substituted, including turf block.
Deleted: vertically oriented concrete
block with the block cells planted with
grass
Minimum Required Surface Parking Lot Turnover
Location High Medium Low
Inside urban
Asphalt or
Asphalt or
Asphalt or
services line
concrete
concrete
concrete
Outside urban Asphalt or Asphalt or Crushed rock
services line concrete concrete �or chip seal
(b) Lining and Marking. Parking spaces in paved parking areas shall be marked with paint
striping, a minimum of two (2) inches in width. Parking spaces in other types of lots may be
identified by wheel stop barriers.
(c) Wheel Stops. Wheel stops or continuous concrete or asphalt curbing are required in all
parking lots to define the perimeter of the parking area and to protect landscaping from vehicle
encroachment. In addition, wheel stops are required for each parking space in a high turnover
parking lot. Wheel stops shall be provided as follows:
(1) Materials and Installation. Wheel stops shall be constructed of concrete, continuous concrete
curbing, asphalt, timber, or other durable material not less than six (6) inches in height, or an
approved functional equivalent. Wheel stops are to be securely installed and maintained as a
safeguard against damage to adjoining vehicles, machinery or abutting property.
(2) Setback. Wheel stops or other vehicle barriers shall be located approximately three (3) feet
from the front of the parking space.
ITEM NUMBER
DATE: 7.19.05
(3) Functional Equivalent. Wherever possible, functional equivalents in the form of raised
sidewalks or curbs surrounding planters or similar may be used in lieu of wheel stops.
(d) Vertical Clearance. Covered parking spaces are to have a vertical clearance of at least seven
(7) feet six (6) inches above the parking lot surface for all uses except residential.
(e) Slope. The finished grade of a parking lot is not to exceed five (5) percent slope, unless
approved by adjustment (Section 9-1.112).
(f) Landscaping. A minimum of ten (10) percent of the interior of all parking lots shall be
landscaped, in addition to any perimeter landscaping required by subsection (g) of this section.
Shade trees are to be provided at approximately thirty (30) foot intervals along parking rows.
Landscape fingers shall be a minimum of 6 -feet wide shall be provided every eight (8) parking
spaces. These landscaping requirements do not apply to parking lots that are underground or
within buildings.
(g) Screening.
(1) From Residential Areas. Parking lots that abut a residential zone shall be separated from such
property by a landscaping strip with a minimum width of five (5) feet and a six (6) foot high /
solid fence or wall. /
(2) From Streets. Parking lots abutting a public street shall be separated from the street right-of-
way by a landscaping strip with a minimum width of en 10 feet; and, whereaarking spaces are
arranged to head toward the street, by a minimum three (3) foot high solid fence decorative wall
or landscape equivalent located on the parking lot side of the landscaping stripes /
,9-4.1252 Landscape Standards. /
.(a) Minimum Landscaped Area. -
(1)In the following zoning districts, minimum landscape coverage based on the net site area are
as follows:
Single-family zoning districts: none (see Chapter 5 for second unit landscaping requirementsJU =
(ii) Multi -family zoning districts: Twenty -five percent (2K/O
(iii) Commercial tonin¢ district-, (exchtdincFDnwntnwn Commereiall• Ten nercent (1(1%)
Development and Conditions of Approval.
not covered by pavement or buildings including, but not limited to, open -space areas, planters,
and setback areas. Decorative pavement used within a common open -space area for recreational
purposes may be included in the landscape coverage calculation.
(3) Criteria for Reduced Landscaping. To encourage design excellence, the Community
may decrease the minimum landscaped area, upon the following criteria:
(i) Professionally designed landscaping, designs of special merit, decorative site elements, and
preserving existing mature native trees are highly encouraged and considered in an applicant's
request to reduce required landscaping.
Deleted: five
Deleted: (5)
Deleted: , or by a landscape berm, three
(3) feet high
Formatted: Font color: Black
Deleted: Required landscaping
Deleted: The sites of all projects
requiring approval, except for single-
family dwellings, are to be landscaped as
follows
Formatted: Indent: Left: 0"
Formatted: Font: 12 pt
Formatted: Indent: First line: 0"
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
Formatted: Font: 12 pt
ITEM NUMBER
DATE: 7.19.05
(ii) The Communi Develo ment Director Planning Commission or City Council de endin Formatted: Font: 12 pt J
on approval process) may grant a reduction of an applicant's landscape requirement by a total ofFormatted: Font: 12 pt
Lip to fifty percent upon an applicant's demonstration of the criteria listed below: Formatted: Font: 12 pt
(A) Retention of existing on-site native trees with a minimum of 25% canopy cover retained over Formatted: Font: 12 pt
the project site.
Formatted: Font: 12 pt
(B) Use of decorative pavement material such as pavers or colored Stamped concrete over a
minimum of 25% of the paved area of the site. Formatted: Font: 12 pt
(C). Installation of a variety of tree and plant materials including ornamental species and native Formatted: Font: 12 pt
trees.
(D) Use of box sized trees throughout the project site. Formatted: Font: 12 pt
�) Where Required. The sites of all projects requiring approval, except for single-family t Formatted: Indent: Left: 0"
dwellings, are to be landscaped as follows~; Deleted: a
(1) Setbacks. All setback areas required by Section 9.4.103 or Chapter 9-6. except where Deleted: Landscaping is to be provided
enclosed and screened from the view of public streets and adjoining properties by solid fencing in the following locations
in accordance with Section 9-4.128 and except where a required setback is traversed by a
driveway or sidewalk.
(2) Unused Areas. All areas of a building site not identified on a site pla intended for a specific
Deleted: in a plot plan, precise plan, or
use or purpose, except where enclosed and blocked from the view of public streets by solid
conditional use permit application as
fencing and/or buildings.
(3) Parking Areas. As required by subsections (f) and (g) of Section 9-4.119.
(4) Trash Enclosures. All trash enclosures shall be screened with landscaping unless built into
the building.
(5) Street Trees. Street trees shall be provided along all public and private street fronts eg s at a
minimum of 30 -feet on center.
(6) SLecial Use Sites. As required by Chapter 9-6 for specific land uses, for the Rurposes of t
Formatted: Indent: Left: 0"
screening, buffering or general landscaping.
Deletes: a
(7) Where Required by Conditions of Approval. As set forth in conditions of approval adopted
Deletes: s
pursuant to Section 9-2.109(c)(2).
(8) A minimum 5 -foot landscape strip must be provided within the side yard setback of all
commercial and multi -family project sites except in locations where a reciprocal access easement
exists with the adjacent lot or commercial building is located. This side yard width may be
reduced to 3 -feet if decorative concrete pavement is utilized.
(F) Exceptions to required landscapinJl) Agriculture Zone. Except where required for a special
Formatted: Indent: Left: 0"
use by Chapter 9-6, setback and unused area landscaping in accordance with subdivisions (1) and
Deleted: Mb
(2) of subsection (a) of this section is not required where such areas are cultivated or maintained
—
Deleted:.¶
in native vegetation.
(2) Planning Commission Modification. Where conditional use permit approval is required, the
Planning Commission may waive, modify or increase the landscaping requirements of this
section
Deleted: subject to the following
�f a finding can be made that gxisting vegetation topography or structural arrangement preclude—
findings:
the need for landscaping.
Deleted: (i)
Deleted: Existing
,9-4.126 Standards for landsca ing materials.
Formatted: Font color: Black
Formatted: Indent: Left: 0", First
line: 0.5"
ITEM NUMBER
DATE: 7.19.05
Landscaper�I aterials used and their installation and maintenance is subject to the following
provisions, except single-family residences within a single-family residential zone: la� Allowable
Materials. Landscaping shall include some combination of the following materials, where
appropriate to achieve the intended or required purpose of the landscaping (e.g., screening, etc.):
(1) Trees, shrubs, groundcover, vines, flowers or lawns (drought resistant plantings are preferred
in order to minimize water use for landscaping);
(2) Decorative Pavement, mulch, decorative boulders, or other decorative materials n accordance
with landscape coverage standards listed in section 9-4.125.
(3) Natural features such as rock outcrops;
(4) Structural features including fountains, -Donds, walls and fences.
(b) Excluded Materials. Landscaping proposed to satisfy the requirements of this title shall not
include any plant materials which:
(1) Have root structures, that in their mature state may damage or interfere with the normal use
of existing public or private underground electrical lines, cables, or conduits, pipes or other
underground structures; or public or private sidewalks, curbs, gutters or paved parking and
turnaround areas, drainage improvements, or adjacent structures, foundations or landscape
materials.
(2) Will have diminished potential for survival because of proposed locations or grouping that do
not satisfy the needs of the plant material necessary for healthy growth.
(3) Because of proposed location and type, will create a potential hazard of brush or forest fire.
(4) Will obstruct the vision of vehicle operators or pedestrians at points of intersection between
pedestrian and vehicular traffic.
(c) Irrigation Required. Where landscaping is required to be installed by Section 9.125,,an
automatic irrigation system shall be provided. Irrigation plans shall be included on landscape
(d) Concrete Curbing. Where landscaping is required to be installed by Section 9-4.125, such
landscaping shall be enclosed by raised concrete curbing or an approved functional equivalent.
(e) Timing of Installation. All required plantings shall be in place prior to final unless a bond is
approved by the Community Development Director,
(f) Proper Maintenance Required. All required plantings shall be maintained in good growing
condition, and in any case where a required planting has not survived, shall be replaced with new
plant materials. A maintenance agreement may be recorded against the property in a form
approved by the Community Development Director.
Formatted: Indent: Left: 0"
Deleted: Where landscaping is required
by Section 9-4.125 the
Deleted: :T
Deleted: Brick, bark, timber, decorative
rock
Deleted: , provided that materials other
than plantings are not to exceed fifty (50)
percent of the total area of landscaping;
Deleted: pools, artwork
Deleted: such landscaping shall include
provisions for irrigation, which may be
by means of hose bibs located not more
than fifty (50) feet from all areas of
required landscaping, or by
Deleted: , provided that where
landscaping is substituted for screening
fencing as provided by Section 9-
4.128(a)(4)(i), an automatic irrigation
system is required.
Deleted: before establishment of a use
or issuance of a certificate of occupancy,
except for single-family dwellings and
mobilehomes
ITEM NUMBER
DATE: 7.19.05
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
Page 7: [1] Deleted kgleason 7/14/2005 9:19:00 AM
Landscaping is to be provided in the following locations
ITEM NUMBER: 3
DATE: 7-19-05
IL
X�
Atascadero Planning Commission
Staff Report - Community Development Department
Conditional Use Permit 2002-0076 Amendment
Gary Bang Harley Davidson Motorcycle Dealership
(7935 San Luis Avenue, Bang)
SUBJECT:
The proposed Conditional Use Permit Amendment consists of a request to modify the
approved sign program to allow additional building signage and an increase in pole sign
area.
RECOMMENDATION:
1. The Planning Commission adopt Resolution PC 2005-0053 to approve the
amendment to CUP 2002-0076 modifying the building and pole sign standards.
SITUATION AND FACTS:
1. Applicant / Representative: Gary Bang Harley Davidson
7935 San Luis Avenue, Atascadero, CA 93423
2. Project Address: 7935 San Luis Avenue, Atascadero, CA 93422
(San Luis Obispo County) 030-241-066
3. General Plan Designation: Service Commercial (SC)
4. Zoning District: Commercial Service (CS)
5. Site Area: Approx 1.82 Acres
6. Existing Use: Harley Davidson Dealership
7. Environmental Status: Consistent with Certified Mitigated Negative Declaration
2002-0041
ITEM NUMBER: 3
DATE: 7-19-05
DISCUSSION:
Background
On December 17, 2002, the Planning Commission approved Conditional Use Permit
2002-0076 to establish a Harley Davidson Dealership at 7935 San Luis Avenue. The
original approved sign plan specified that pole sign area would be 76 square feet and
signs on the west and south sides of buildings would be permitted as they are today.
On May 27, 2005, the applicant applied for an amendment to Conditional Use
Permit 2002-0076 requesting that the pole sign area be enlarged and additional
lettering be added to the west and south sides of the building.
Project Definition
The applicant is proposing to modify the building and pole signage as follows:
1. Building Signage
The applicant is proposing to add signage to the South and West fagade of the
building as shown below. The proposed additional entrance signage will be
illuminated while the south fagade will include non -illuminated signage.
West Fagade:
Proposed
(Illuminated)
Existing
ITEM NUMBER: 3
DATE: 7-19-05
South Fagade:
Proposed
(non -Illuminated)
.� �.
Existing
2. Pole Sign
The applicant is proposing to consolidate two previously approved signs and
increase the area of the Harley Davidson logo sign as shown below.
Previously Approved Signage
9
76 S.F. SIGN AREA '
26 S.F. SIGN AREA
1 a;
IiCIt MOTOR PC
-t STEEL POLE t
ILLUMNATED POLE MOUNTED SIGN (DOUBLE SIDED)
TO BE LOCATED DIRECTLY BEHIND CORNER KIOSK
102 square -feet
combined sign
area
Proposed Signage
ITEM NUMBER: 3
DATE: 7-19-05
Environmental Determination
The proposed request is consistent with Certified Mitigated Negative Declaration 2002-
0041.
CONCLUSION:
The proposed request is consistent with the architectural scale of the building.
Staff recommends that the Planning Commission approve resolution PC 2005-
0053to amend the sign program for the site.
ALTERNATIVES:
1. The Planning Commission may deny the proposed amendment.
2. The Planning Commission may continue the hearing and refer the project back to
staff for further analysis. Direction should be given to staff and the applicant on
required additional information.
PREPARED BY: Kelly Gleason, Associate Planner
ATTACHMENTS:
Attachment 1: Location Map (General Plan & Zoning)
Attachment 2: Draft Resolution PC 2005-0053
ITEM NUMBER
DATE: 7-19-05
Attachment 1: Location Map, General Plan and Zoning
Zoning: Commercial Service
General Plan: Service Commercial
Attachment 2: Draft Resolution PC 2005-0053
DRAFT
RESOLUTION PC 2005-0053
RESOLUTION OF THE ATASCADERO PLANNING
COMMISSION APPROVING AMENDMENT TO CONDITIONAL USE
PERMIT 2002-0076 TO INCREASE POLE AND BUILDING SIGN AREA
ON AN EXISTING COMMERCIAL BUILDING
(7935 San Luis Avenue / Bang)
WHEREAS, an application has been received from Gary Bang (7935 San Luis Ave,
Atascadero, CA 93422), Applicant and Property Owner, to consider a project consisting of an
amendment to Conditional Use Permit 2002-0076 to allow additional pole and building signage
on APN 030-241-066 and,
WHEREAS, the proposed project is located within the SC (Service Commercial) land
use designation of the City of Atascadero's General Plan Land Use Diagram; and,
WHEREAS, the proposed project is located within the CS (Commercial Service) Zoning
District,
WHEREAS, the project is consistent with certified Mitigated Negative Declaration
2002-0041; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on July 19, 2005, studied and considered the proposed Conditional Use
Permit Amendment; and,
WHEREAS, the Planning Commission has determined that the proposed request is
consistent with the Master Plan of Development on the subject site; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Findings of Environmental Consistency. The Planning Commission
finds as follows:
The proposed project has been analyzed adequately in Certified Mitigated Negative
Declaration 2002-0041 for the original Conditional Use Permit for the project site
development.
SECTION 2. Findings for Approval of Conditional Use Permit Amendment. The
Planning Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed projector use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because of
the circumstances and conditions applied in the particular case, be detrimental to the
health, safety, or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in
the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the Land Use
Element.
SECTION 3. Approval of Conditional Use Permit Amendment. The Planning
Commission does hereby approve an amendment to Conditional Use Permit 2002-0076 to
increase pole sign area as well as enhance south and west signs with additional sign lettering
(APN 030-241-066), consistent with the following Exhibits:
EXHIBIT A: Sign Locations on-site
EXHIBIT B: Approved Existing Sign Program
EXHIBIT C: Proposed Illuminated Pole Sign
EXHIBIT D: Proposed Wall Lettering
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ABSTAIN: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
Exhibit A: Sign Locations
Exhibit B: Approved Existing Signs
BUILDING AND SITE SIGNWORK FOR
GARY BANG HARLEY-DAVIDSON
N.E. CORNER CURBARIL AND SAN LUIS AVENUES ATASCADERO. CA.
20'•0-
72 S.F. SIGN AREA
ILLUMINATED BUILDING SIGN: TO BE LOCATED AT
GABLE END OF BUILDING ON CURBARIL AVENUE SIDE
IUTALEIOAVIDSON
44 S.F. SIGN AREA
ILLUMINATED BUILDING SIGNS (3 TOTAL) : TO BE LOCATED
ON STEEL GRILLEWORK AT ENTRY AREA TOWER / KIOSK
10'-0'
0
0
76 S.F. SIGN AREA
26 S.F. SIGN AREA
1
a
61CAM M010RC1CL "
T-7' —
STEEL POLE
ILLUMINATED POLE MOUNTED SIGN (DOUBLE SIDED) :
TO BE LOCATED DIRECTLY BEHIND CORNER KIOSK
Exhibit C: Proposed Illuminated Pole Sign
Er'
rRLEY-DQ
=*--4 1 I--_/ T ---f,�
Total sign area: 109 I
square feet
POE[
N -I 1/2'
L53/'
56'-0*
S1'-0'
16' POLL
-- 2• EUM CONNA
COKWE FOOTM
Exhibit D: Proposed Wall Lettering
West
Wall
SMw SWAM
WOO
D&N
M&MCT!��
Total Sign
Area: 11.83
'ON= r -e r -e r-.• r.r r -r Ir -e r -.r r .• square feet
Mw f/ Uff MIR
I Vr aiam r -r r r -r r -r ra• r r -C r_r
South
Wall
Non -
Illuminated
Illuminated
Proposed
(Illuminated)
Existing
roposed
on -Illuminated)
Existing
ITEM NUMBER: 4
DATE: 7-19-05
Atascadero Planning Commission
Staff Report - Community Development Department
Master Plan of Development Amendment
Conditional Use Permit Amendment 2003-0090
(5460 Mariquita Avenue/ Fetyko)
SUBJECT:
The proposed Conditional Use Permit Amendment consists of a request to remove the
window trim condition for the three new homes as approved with the original Master
Plan of Development and subsequent building permits associated with the Planned
Development No. 7 residential project.
RECOMMENDATION:
The Planning Commission may either approve or deny the request, as follows:
1. The Planning Commission adopt Resolution PC 2005-0041 to approve CUP
2003-0090 amending Master Plan of Development (Conditional Use Permit
2003-0090) to eliminate window trim on the three new homes on parcels A, B,
and C, based on findings and subject to conditions of approval.
Denial would require the applicant to apply window trim as originally approved by the
City Council.
SITUATION AND FACTS:
1. Applicant / Representative: D. A. Fetyko, Inc.
P.O. Box 1999, Atascadero, CA 93423
2. Project Address: 5460 Mariquita Avenue, Atascadero, CA 93422
(San Luis Obispo County) (APN 029-292-024)
3. General Plan Designation: Medium -Density Residential (10 units/acre)
4. Zoning District: RMF -10 (Residential Multiple Family)/PD 7
5. Site Area: (4 Single -Family Residential Lots)
ITEM NUMBER: 4
DATE: 7-19-05
6. Existing Use: Single -Family Residential Planned Development No. 7
subdivision
7. Environmental Status: Consistent with Certified Mitigated Negative Declaration
2003-0011
DISCUSSION:
Background
On September 23, 2003, the City Council approved the Mariquita Planned
Development #7. The PD -7 includes a Conditional Use Permit in the form of a
Master Plan of Development that establishes the site plan, landscape, architecture,
development standards, and site amenities.
On October 14, 2003, City Council reviewed and approved the proposed
subdivision, per the Master Plan of Development and conditions of approval.
During building permit plan check, staff verified that the building plans matched
the approved Master Plan of Development, including the window trim that was
clearly identified on the building plans.
During project construction, the applicant failed to apply the window trim as
identified on the building plans. On March 18, 2005, the applicant requested staff
provide a final inspection of the project site. Upon inspection, staff noted that
window trim was to be installed as identified on the approved building plans and
Master Plan of Development.
On June 8, 2005, the applicant applied for an Amendment to the Master Plan of
Development, requesting that the window trim be removed.
Analysis
Applicant's Justification: According to the applicant: (1) the window trim should not be
a requirement; and (2) the window trim could not be added without disturbing the stucco
fagade around each window.
Staff Response: The approved Master Plan of Development contains special amenities
that in whole, create a high-quality subdivision. The Planned Development/Master Plan
of Development is an approval for smaller lots in exchange for improved design
elements. Architectural detailing typically includes either recessed windows or applied
window trim. The proposed project was originally designed by the architect to respect
the preservation of the existing on-site colony house as a historic resource. The
proposed architecture and materials were incorporated into the project as mitigation
toward reducing potentially significant impacts to historic resources to a level of
insignificance. Staff's position is that the window trim was a design feature that helped
the new units blend with the historic colony house. Staff's understanding is that foam
ITEM NUMBER: 4
DATE: 7-19-05
window trim can be applied with a bonding agent to each home without disturbing the
existing stucco finish.
During the building permit process, staff reviews Planned Developments with special
attention to the Master Plan of Development amenities to assure that the project
development meets the Planning Commission and City Council approval expectations.
In addition, staff remains flexible when certain materials or technologies are available
that will allow substitution of materials or design elements to achieve the same design
intent as contained within the Master Plan of Development. Although not permitted by
staff, the Planning Commission may make minor changes to the Master Plan of
Development per condition # 4 which states:
"The Community Development Department shall have the authority to approve
the following minor changes to the project: (1) modify the site plan project by
less than 10%, (2) result in a superior site design or appearance, and/or (3)
address a construction design issue that is not substantive to the Master Plan of
Development. The Planning Commission shall have the final authority to
approve any other changes to the Master Plan of Development and any
associated Tentative Maps."
The Planning Commission must determine if there is legitimate justification for the
applicant's request.
Environmental Determination
The proposed request is inconsistent with Certified Mitigated Negative Declaration
2003-0011 due to the historic resource (colony home) analysis which was partially
based upon proposed architectural treatment of the adjacent new homes.
CONCLUSION:
The proposed request is an unusual method to waive an architectural feature of a
Single -Family Residential Planned Development. As the request would eliminate a
standard that is consistently applied to all other Planned Developments, and is
inconsistent with the Environmental Analysis for historic resources, staff is
recommending that the request to delete window trim be denied.
ALTERNATIVES:
1. The Planning Commission may add conditions to the proposed request.
2. The Planning Commission may continue the hearing and refer the project back to
staff for further analysis. Direction should be given to staff and the applicant on
required additional information.
ITEM NUMBER: 4
DATE: 7-19-05
PREPARED BY: Steve McHarris, Deputy Community Development Director
ATTACHMENTS:
Attachment 1: Location Map (General Plan & Zoning)
Attachment 2: Draft Resolution PC 2005-0041
Exhibit A: Conditions of Approval
Exhibit B: Approved CUP Site Plan
Exhibit C: Approved Building Elevations
ITEM NUMBER: 4
DATE: 7-19-05
Attachment 1: Location Map, General Plan and Zoning
5460 Mariquita Avenue
Zoning District: RMF -10 (Residential Multiple Family/ PD -7
General Plan: Medium -Density Residential (10 units/acre)
PA
Project
Site
a
Attachment 2: Draft Resolution PC 2005-0041
DRAFT
RESOLUTION PC 2005-0041
RESOLUTION OF THE ATASCADERO PLANNING
COMMISSION APPROVING CONDITIONAL USE PERMIT
AMENDMENT 2003-0090 TO DELETE WINDOW TRIM ON PARCELS, A,
B, AND C FROM THE APPROVED MASTER PLAN OF DEVELOPMENT
AND BUILDING PERMIT PLANS
(5460 Mariquita Avenue - Fetyko)
WHEREAS, an application has been received from D. A. Fetyko (P.O. Box
1999, Atascadero, CA 93423), Applicant and Property Owner to consider a project consisting of
a minor amendment to a Master Plan of Development for CUP 2003-0090 on APN 029-292-024
and,
WHEREAS, the proposed project is located within the MDR (Medium Density
Residential) land use designation of the City of Atascadero's General Plan Land Use Diagram;
and,
WHEREAS, the proposed project is located within the RMF-10/PD-7 (Residential
Multiple Family/Planed Development #7) Zoning District where originally approved window
trim is proposed to be deleted from parcels A, B, and C, subject to the approval of a Conditional
Use Permit Amendment; and,
WHEREAS, the project is consistent with certified Mitigated Negative Declaration
2003-0011; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on July 19, 2005, studied and considered the proposed Conditional Use
Permit Amendment; and,
WHEREAS, the Planning Commission has determined that the proposed request is
consistent with the Master Plan of Development on the subject site; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
NOW, THEREFORE, the Planning Commission takes the following actions:
Planning Commission Resolution 2005-0041
July 19, 2005
SECTION 1. Findings of Environmental Consistency. The Planning Commission
finds as follows:
1. The proposed project has been analyzed adequately in the General Plan 2025 EIR
pursuant to applicable standards and impacts have been avoided or mitigated pursuant to
that EIR.
2. The proposed project has been analyzed adequately in Certified Mitigated Negative
Declaration 2003-0011 for the original Zone Change and Conditional Use Permit for the
project site development.
SECTION 2. Findings for Approval of Conditional Use Permit Amendment. The
Planning Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
Planning Commission Resolution 2005-0041
July 19, 2005
SECTION 3. Approval of Conditional Use Permit Amendment. The Planning
Commission does hereby approve Conditional Use Permit 2003-0090 to delete the window trim
treatment from all 3 new homes within the project site (APN 029-292-024), consistent with the
following Exhibits:
EXHIBIT A: Conditions of Approval
EXHIBIT B: Site Plan
EXHIBIT C: Approved Building Permit Elevation Plan (Informational)
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
Planning Commission Resolution 2005-0041
July 19, 2005
EXHIBIT A: Conditions of Approval (Informational)
CUP Amendment (CUP 2003-0090)
Master Plan of Development Amendment
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business License
BS: Building Services
5460 Mariquita Avenue
GP: Grading Permit
FD: Fire Department
PD -7 Master Plan of Development
BP: Building Permit
FI: Finallnspecion
PD: Police Department
CE: City Engineer
CUP 2003-0090/ZCH 2003-0040
TO: Temporary Occupancy
FO: Final Occupancy
WW: Wastewater
CA: City Attorney
Planning Services
1. The approval of this zone change and use permit shall
PS
become final and effective following City Council approval.
2. Approval of this Master Plan of Development shall be valid
FM
PS
concurrently with the life of Tentative Parcel Map 2003-
0036 and then indefinitely following final map. The Master
Plan of Development approval shall expire and become
null and void unless a final map is recorded consistent
with the Master Plan of Development.
3. Changes to the Master Plan of Development shall be
On-going
PS
approved by the Planning Commission and do not require
Council action.
4. The Community Development Department shall have the
BP/FM
PS
authority to approve the following minor changes to the
project the (1) modify the site plan project by less than
10%, (2) result in a superior site design or appearance,
and/or (3) address a construction design issue that is not
substantive to the Master Plan of Development. The
Planning Commission shall have the final authority to
approve any other changes to the Master Plan of
Development and any associated Tentative Maps.
5. All subsequent Tentative Parcel Map and construction
BP/FM
PS
permits shall be consistent with the Master Plan of
Development contained herein.
6. All exterior elevations, finish materials and colors shall be
BP
PS
consistent with the Master Plan of Development as shown
in Exhibit F, H, I, and J.
7. All site development shall be consistent with the maximum
BP/FM
PS
intensities described in the statistical project summary as
shown on Exhibit C.
8. All site work, grading and site improvements shall be
BP/FM
PS
consistent with the Master Plan of Development as shown
in B, D and E.
9. A final landscape and irrigation plan shall be approved
BP
PS
prior to the issuance of building permits and included as
part of site improvement plan consistent with EXHIBIT D.
All exterior meters, air conditioning units and mechanical
Planning Commission Resolution 2005-0041
July 19, 2005
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business License
BS: Building Services
5460 Mariquita Avenue
GP: Grading Permit
FD: Fire Department
PD -7 Master Plan of Development
BP: Building Permit
FI: Final Inspection
PD: Police Department
CE: City Engineer
CUP 2003-0090/ZCH 2003-0040
TO:Temporary Occupancy
FO: Final Occupancy
WW: Wastewater
CA: City Attorney
equipment shall be screened with landscape material.
Trash/recycle container areas shall be screened with
fencing or landscape.
All front yards shall be landscaped by the developer. All
landscape maintenance shall be the responsibility of the
individual property owner.
Two additional 15 -gallon street trees to be double staked
shall be planted along Mariquita Avenue (Parcels C & D).
10. All project fencing shall be installed consistent with
BP
PS
EXHIBIT D subject to the following modifications.
a. The front yards adjacent to Mariquita Avenue
(Parcels C & D) shall not be enclosed with any
fencing which exceeds 3 -feet in height.
b. The design of all fencing shall be compatible with the
overall project design, subject to staff approval
11. Retaining walls visible for the street shall incorporate
GP
PS
design & materials to match or compliment the texture and
BP
color of the primary residence. Rear yard retaining walls
may be designed to blend with the proposed landscaping.
12. Affordable Housing Requirement: The applicant shall
FM, BP
PS, CE
either set aside one housing unit at the moderate category
rate for a period of 30 years, or pay an in -lieu fee based
on 2.50% of the valuation of each of the market rate units.
13. All exterior material finishes (stucco, materials, lighting,
BP
PS
garage doors) shall be durable, high quality, and
consistent with the historically compatible appearance.
14. The colony house lot shall include a deed restriction
FM
PS, CE
preventing the site from being subdivided or from being
altered, which degrades the historic significance of the
property.
Building Services
15. A soils investigation prepared by a licensed
BP
FM
Geotechnical Engineer is to be provided for the
project. The report is to be provided at the time of
building permit submittal along with the building plans
for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
Fire Marshal
Planning Commission Resolution 2005-0041
July 19, 2005
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business License
BS: Building Services
5460 Mariquita Avenue
GP: Grading Permit
FD: Fire Department
PD -7 Master Plan of Development
BP: Building Permit
FI: Final Inspection
PD: Police Department
CE: City Engineer
CUP 2003-0090/ZCH 2003-0040
TO:Temporary Occupancy
FO: Final Occupancy
WW: Wastewater
CA: City Attorney
16. A minimum 12' paved with 16' total clear width access
BP
PS, BS
with a minimum head clearance of 13'-6" is to be
provided to each building location. Sixteen -foot clear
width may be provided with use of turf block along the
south side for emergency vehicle access.
17. Show location of existing and any proposed fire
BP
BS
hydrants. Units A & B shall include fire suppression
sprinklers.
18. Provide a letter from the Atascadero Mutual Water
BP
BS
Company stating the minimum expected water
available to the site. Amount available must meet
min. requirement specified in the California Fire Code.
19. Note approved address signage is to be provided.
BP
BS
20. Note on plans that fire lanes shall be delineated to
BP
BS
restrict parking as required by the Fire Authority.
City Engineer
Standard Conditions
21. In the event that the applicant is allowed to bond for
BP
BS
the public improvements required as a condition of
this map, the applicant shall enter into a Subdivision
Improvement Agreement with the City Council.
22. An engineer's estimate of probable cost shall be
BP
PW
submitted for review and approval by the City
Engineer to determine the amount of the bond.
23. The Subdivision Improvement Agreement shall record
BP
PW
concurrently with the Final Map.
24. All public improvements shall be constructed in
BP
PW
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings or
as directed by the City Engineer.
25. The applicant shall enter into a Plan Check/Inspection
BP
BS
agreement with the City.
26. The applicant shall be responsible for the relocation
BP
PW
and/or alteration of existing utilities.
27. The applicant shall install all new utilities (water, gas,
BP
BS
electric, cable TV and telephone) underground.
Utilities shall be extended to the property line frontage
of each lot or its public utility easement.
28. The applicant shall monument all property corners for
BP
PW
construction control and shall promptly replace them
if disturbed.
29. A preliminary subdivision guarantee shall be
BP
PW
submitted for review in conjunction with the
Planning Commission Resolution 2005-0041
July 19, 2005
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business License
BS: Building Services
5460 Mariquita Avenue
GP: Grading Permit
FD: Fire Department
PD -7 Master Plan of Development
BP: Building Permit
FI: Final Inspection
PD: Police Department
CE: City Engineer
CUP 2003-0090/ZCH 2003-0040
TO:Temporary Occupancy
FO: Final Occupancy
WW: Wastewater
CA: City Attorney
processing of the parcel map.
30. All existing and proposed utility, pipeline, open space,
BP
PS/PW
or other easements are to be shown on the parcel
map. If there are building or other restrictions related
to the easements, they shall be noted on the parcel
map. The applicant shall show all access restrictions
on the parcel map.
31. Prior to recording the parcel map, the applicant shall
BP
PS/PW
submit a map drawn in substantial conformance with
the approved tentative map and in compliance with all
conditions set forth herein shall be submitted for
review and approval by the City in accordance with
the Subdivision Map Act and the City's Subdivision
Ordinance.
32. Prior to recording the parcel map, the applicant's
BP
PW
surveyor shall set monuments at all new property
corners or shall indicate, by certificate on the final
map, that corners have been set or shall be set by a
date specific and that they will be sufficient to enable
the survey to be retraced.
33. Prior to recording the parcel map, the applicant shall
BP
BS
pay all outstanding plan check/inspection fees.
34. Prior to recording the parcel map, the applicant shall
BP
PW
have the map reviewed by all applicable public and
private utility companies (cable, telephone, gas,
electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility
company, which indicates their review of the map.
The letter shall identify any new easements, which
may be required by the utility company. A copy of the
letter shall be submitted to the City. New easements
shall be shown on the parcel map.
35. Upon recording the final map, the applicant shall
BP
PW
provide the City with a black line clear Mylar (0.4 mil)
copy and a blue line print of the recorded map.
36. Prior to the final inspection of any public
BP
PW
improvements, the applicant shall submit a written
statement from a registered civil engineer that all
work has been completed and is in full compliance
with the approved plans.
City Engineer
Site Specific Conditions
37. The applicant shall construct new curb and gutter, in
BP
PS/PW
accordance with City Standards, as shown on
improvement plans, along entire frontage.
Planning Commission Resolution 2005-0041
July 19, 2005
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business License
BS: Building Services
5460 Mariquita Avenue
GP: Grading Permit
FD: Fire Department
PD -7 Master Plan of Development
BP: Building Permit
FI: Final Inspection
PD: Police Department
CE: City Engineer
CUP 2003-0090/ZCH 2003-0040
TO:Temporary Occupancy
FO: Final Occupancy
WW: Wastewater
CA: City Attorney
38. The applicant shall sawcut and remove existing
BP
PW
asphalt concrete roadway as shown on plans and
repave to new curb and gutter, in accordance with
City Standards.
39. The applicant shall address stormwater detention
BP
PW
prior to grading and drainage approval.
40. The applicant shall pay sewer Extension (Annexation)
BP
PW
and Connection fees upon issuance of building
permit.
41. Each building shall be individually connected to the
BP
PW
public sewer via a 4" gravity lateral to which each
individual 2" forcemain will be connected.
42. Building plans shall be include detail of sewage
BP
BS
sumps and pumps, control panel and alarm systems.
43. A 5 -foot drainage easement shall be recorded on the
BP
PW
final map along the south property line of Parcel A
and Parcel B and the east property line of Parcel B.
44. Existing drainage patterns from adjacent properties
BP
PW
shall not be obstructed.
45. All drainage from improvements shall cross property
BP
PW
lines within drainage easements.
Atascadero Mutual Water Company
46. Prior to the recordation of the Final Parcel Map, the
BP
BS
applicant shall submit plans showing the water
distribution facilities required to serve the project for
review and approval by the Atascadero Mutual Water
Company. All new water distribution facilities shall be
constructed in conformance with Atascadero Mutual
Water Company Standards.
47. Prior to the recordation of the Final Map, the applicant
BP
BS
shall obtain a " Will Serve " letter from the Atascadero
Mutual Water Company.
48. Prior to issuance of building permits, the applicant
BP
BS
shall pay all installation and connection fees required
by the Atascadero Mutual Water Company.
49. Show all fire suppression appurtenances required by
BP
BS
the Atascadero Fire Department.
Mitigation Measures
Mitigation Measure 1.c.1: If exterior lighting is proposed, it
BP
PS
1.C.1
shall be designed to eliminate any off site glare. All exterior
site lights shall utilize full cut-off, "hooded" lighting fixtures to
Planning Commission Resolution 2005-0041
July 19, 2005
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business License
BS: Building Services
5460 Mariquita Avenue
GP: Grading Permit
FD: Fire Department
PD -7 Master Plan of Development
BP: Building Permit
FI: Final Inspection
PD: Police Department
CE: City Engineer
CUP 2003-0090/ZCH 2003-0040
TO:Temporary Occupancy
FO: Final Occupancy
WW: Wastewater
CA: City Attorney
prevent offsite light spillage and glare. Any luminaire pole
height shall not exceed 16 -feet in height, limit intensity to 2.0
foot candles at ingress/egress, and otherwise 0.6 foot candle
minimum to 1.0 maximum within the private street. Fixtures
shall be shield cut-off type and compatible with historic setting,
subject to staff approval.
Mitigation Measure 3.b: The project shall be conditioned to
BP
BS
3.b
comply with all applicable District regulations pertaining to the
control of fugitive dust (PM -10) as contained in section 6.4 of
the Air Quality Handbook. All site grading and demolition
plans notes shall list the following regulations:
A. All material excavated or graded shall be sufficiently
watered to prevent excessive amounts of dust. Watering
shall occur at least twice daily with complete coverage,
preferably in the late morning and after work is finished for
the day.
B. All clearing, grading, earth moving, or excavation activities
shall cease during periods of high winds (i.e. greater than
20 mph averaged over one hour) so as to prevent
excessive amounts of dust.
C. All material transported off-site shall be either sufficiently
watered or securely covered to prevent excessive
amounts of dust.
D. The area disturbed by clearing, grading, earth moving, or
excavation operations shall be minimized so as to prevent
excessive amounts of dust.
E. Permanent dust control measured identified in the
approved project revegetation and landscape plans shall
be implemented as soon as possible following completion
of any soil disturbing activities.
F. Exposed ground areas that are planned to be reworked at
dates greater than one month after initial grading shall be
sown with fast -germinating native grass seed and watered
until vegetation becomes established.
G. All disturbed areas not subject to revegetation shall be
stabilized using approved chemical soil binders, jute
netting, or other methods in advance by the APCD.
H. All roadways, driveways, sidewalks, etc. to be paved shall
be completed as soon as possible. In addition, structural
foundations shall be completed as soon as possible
following building pad construction.
I. On-site vehicle speed shall be limited to 15 mph for any
unpaved surface.
J. All unpaved areas with vehicle traffic shall be watered at
least twice per day, using non -potable water.
K. Streets adjacent to the project site shall be swept daily to
remove silt which may have accumulated from
construction activities so as to prevent excessive amounts
of dust from leaving the site.
L. Wheel washers may be required when significant offsite
import or export of fill is involved.
M. Large canopy shade trees shall be provided along street
frontages and within parking areas to shade paved areas
and minimize urban heat build-up.
it'gation Measure 4.e.1: An arberists report shall be required
GP
BS
4.e.1
Planning Commission Resolution 2005-0041
July 19, 2005
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business License
BS: Building Services
5460 Mariquita Avenue
GP: Grading Permit
FD: Fire Department
BP: Building Permit
PD: Police Department
PD -7 Master Plan of Development
Ft Final Inspection
CE: City Engineer
CUP 2003-0090/ZCH 2003-0040
TO:Temporary Occupancy
FO: Final Occupancy
WW: Wastewater
CA: City Attorney
nPFi�rnr te pFejeGt 'FrInplomon+ +iron. The-epert shall melon+ifyeaCh
a+ive tree p ed fnr r al and a nh tree within the
projeet-area subjeet to potential i ant. The Freels
pro..Wer enda+iens for tree pruning, tree ernten+inn of
existing native trees to r and identify native tree
a6+/replacement mitigation r the A+aseadero Municipal
ni+iga+inn nnee en �2. mi+ � plaR shy
'den+ify all prnten+ien and enhannep.ent measures
FeGeMmended by the Gertifi ed Arberis+ in the Tree Droten+inn
Plan. Tree ern+en+ien forming shall he installed at the Ione+io
Galled out in the TFee Drotee+inn Plan.
GP
BS
4.e.2
Mitigation Measure 4.e.3: The proposed front yard landscape
GP
BS
4.e.3
trees shall be minimum 15 -gallon size and double staked.
Mitigation Measare 4 e,41. The
(b..t,a developer shall sentrast with a
nr+ified arborist duringall phases of n eat implem n+a+inn
The certified arbor's+s shall heresponsible form nitering the
Nere ee+ d , all phases of cons+ru a+ion three gh p ee+
oompletion, as follows:
(a) A written agreemeRt between the arborist and the
develeper nl i+lining a arborist m nitnring snhedi le fer
nh n ns+n In+inn phase +hrei ugh final in en+ien shall he
submitted to and approved by planning staff prier to the
of building/grading permits.
/b\ Arborist shell sehed ,len pre ns+ru Gtinn Fn etinn with
requirements prier to a grubbing n arth w nrk fnr a
portion f the prejeGt site. Alltreepr ten+inn fenning d
tri Rk pre+en+ien shall he installed far in en+ien du ging +he
meeting. Tree pFetec+inn fenGing shall nsst1Lallled at -the
line of encreachmen+ in+e the tree's Feet zene area.
/e\ Ass eifed by the eFboFis+ report and Gi+y staff:
s pre n ell +reel +n be s ped fnr s+r' of ral strength and
;
f ReFne..e all dehris ands oils free. the let nleaning
nd tree
f All trenching o Fading within the pre+enter! Feet zene
outside of the tree preten+ien fence shall require
hand trenching OF pFeserve and proteet roots that n re
larger than 7 inches in diameter.
f Ale grading or +rennh'n is allowed uii+h'n the formed
PFGteeted area:
f Anv ren+s that a e 4 i she n diameter er larger a re
net to he G -1 -It i n+il i en+ed and a ed by the n
si+e arborisut
sr
f Apply a additional r nda+inns of the p eat
arborist:
/.dl I Inns n ec+ n nletien and n r+o final nnngpanny a
GP
BS
4.e.4
Planning Commission Resolution 2005-0041
July 19, 2005
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business License
BS: Building Services
5460 Mariquita Avenue
GP: Grading Permit
FD: Fire Department
PD -7 Master Plan of Development
BP: Building Permit
Ft Final Inspection
PD: Police Department
CE: City Engineer
CUP 2003-0090/ZCH 2003-0040
TO:Temporary Occupancy
FO: Final Occupancy
WW: Wastewater
CA: City Attorney
eiti44ne that the tree nreteetien plan w implemented,
the trees rleslenaterl for nreteetien were reteeted rluring
nstn.etien and the a r! nstruGtien_ relatetree ereteetie
v
o longeF Fequired far tree preteGtien.
Mitigation Measure 5.a.1: The proposed project shall
GP
PS, BS, CE
5.a.1
incorporate the Secretary of the Interior's Standards and
Illustrated Guidelines for Rehabilitating Historic Buildings. The
standards shall apply to the exterior rehabilitation of the
Colony house, construction of the new detached garage for the
colony house, design of the proposed three homes, and
proposed landscape improvements to the overall project site,
subject to staff review and approval.
Mitigation Measure 5.a.2: Final design of the new detached
GP
PS, BS, CE
5.a.2
garage for the colony house shall be compatible with the
existing colony house and single -car garage, including
matching exterior materials and colors.
Mitigation Measure 5.a.3: The proposed project shall include
GP
PS, BS, CE
5.a.3
Covenants, Conditions and Restrictions (CC&R's) that
incorporate the planned development conditions of approval to
ensure that the site retains the historic qualities (historic
buildings, architecture, colors, materials, fencing, and
landscaping) over time.
Mitigation Measure 5.b: Should any cultural resources be
GP
PS, BS, CE
5.b
unearthed during site development work, the provisions of
CEQA -Section 15064.5, will be followed to reduce impacts to
a non-significant level.
Mitigation Measure 6.b.1: The grading permit application
GP
PS, BS, CE
6.b.1
plans shall include erosion control measures to prevent soil,
dirt, and debris from entering the storm drain system during
and after construction. A separate plan shall be submitted for
this purpose and shall be subject to review and approval of the
City Engineer at the time of Building Permit application.
Mitigation Measure 6.c.d: A soils report shall be required to be
GP
BS
6.c.d
submitted with a future building permit by the building
department.
Mitigation Measure 8.e.f.1: A Stormwater Pollution Prevention
GP
PS, BS, CE
8.0.1
Plan (SWPPP)/Erosion Control Plan shall be submitted and
approved by the City Engineer prior to the issuance of the
building permit. The plan shall include storm water measures
for the operation and maintenance of the project for the review
and approval of the City Engineer. The Building Permit
application plans shall identify Best Management Practices
(BMPs) appropriate to the uses conducted on site that
effectively prohibit the entry of pollutants into storm water
runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for
GP
PS, BS, CE
8.0.2
ensuring that all contractors are aware of all storm water
quality measures and that such measures are implemented.
Planning Commission Resolution 2005-0041
July 19, 2005
Conditions of Approval /
Mitigation Monitoring Program
5460 Mariquita Avenue
PD -7 Master Plan of Development
CUP 2003-0090/ZCH 2003-0040
Timing
BL: Business License
GP: Grading Permit
BP: Building Permit
FI: Final Inspection
TO:Temporary Occupancy
FO: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Mitigation
Measure
Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction
notices, citations, or stop orders.
Mitigation Measure 11.d: All construction activities shall
BP, GP
PS, BS
11.d
comply with the City of Atascadero Noise Ordinance for hours
of operation.
Construction activities shall be limited to the following hours of
operation:
• 7 a.m. to 7 p.m. Monday through Friday
• 9 a.m. to 6 p.m. Saturday
• No construction on Sunday
Further, particularly loud noises shall not occur before 8 a.m.
on weekdays and not at all on weekends.
The hours of construction may be modified by the Community
Development Director upon a determination that unusually
loud construction activities are having a significant impact on
the neighbors.
Failure to comply with the above-described hours of operation
may result in withholding of inspections and possible
construction prohibitions, subject to the review and approval of
the Planning Commission.
A sign shall be posted on-site with the hours of operation and
a telephone number of the person to be contacted in the event
of any violations. The details of such a sign shall be approved
by staff during the Grading Plan/Building Permit review
process.
Planning Commission Resolution 2005-0041
July 19, 2005
Exhibit B: Approved Conditional Use Permit House Elevations (Informational)
South Elevation L
wrm mroowa WITH
D(VKMM AS INDICATED
Approved Plans
showing window trim
on all windows
Planning Commission Resolution 2005-0041
July 19, 2005
Exhibit D: Existing Building Elevation Photographs
' ■E; i� �"
W.■ ■ M4
i
�Awllllo*
*arm
Mal
ITEM NUMBER: 5
DATE: 7-19-05
Atascadero Planning Commission
Staff Report - Community Development Department
Church Steeple
Conditional Use Permit 2005-0160
(2600 Ramona Road/ LDS Church)
SUBJECT:
A request to exceed the 50'-0" height limit to allow a church steeple 71'-0" in height.
V01V*K01 1/ I ll ► 1 MAN 0
Staff Recommends:
The Planning Commission adopt Resolution PC 2005-0042 to approve Conditional Use
Permit 2005-0160 based on findings and subject to conditions of approval.
SITUATION AND FACTS:
1. Applicant/ Owner: Corp. of Presiding Bishop of the Church of Jesus Christ
of Latter -Day Saints
P.O. Box 2073, Orcutt, CA 93457
2. Project Address: 2600 Ramona Road, Atascadero, CA 93422
(San Luis Obispo County) APN 049-201-027
3. General Plan Designation: Rural Estates
4. Zoning District: Residential Suburban
5. Site Area: Approximately 5 acres
6. Existing Use: Church/Religious Assembly
7. Environmental Status: Mitigated Negative Declaration #2005-0030
ITEM NUMBER: 5
DATE: 7-19-05
DISCUSSION:
Background
The proposed project consists of a Conditional Use Permit application for a 70 -foot high
church steeple to exceed the 50'-0" height limit requirement for uninhabited structures.
An existing freestanding 49'-0" spire, located near the entry of the church, is proposed
for removal with the construction of the new steeple.
Analysis
As proposed, the steeple will be located on the church building at the center of the main
roofline, and will project an additional 40'-4" from the existing 31'-0" building height,
totaling 71'-4" from ground level (Exhibit B). The steeple will incorporate an almond
base color, bronze shutters, and a bronze steeple to synchronize with the building's
exterior (figure 1). No exterior or interior illumination is proposed.
Figure 1: Existing Spire and example of proposed steeple.
Height and Scale
The proposed steeple extends considerably beyond the roofline of the church building
that could have the potential to impact the present view shed of the surrounding area,
as there are no comparable structures of this height built within the immediate vicinity.
However, staff's opinion is that the scale and proportion of the existing church building
of the steeple, although out of proportion with the flat lying area, is closer in proportion
to the existing 26,432 square foot church. The church building is located approximately
120'-0" from US highway 101 (see Attachment 2&3).
Very few structures in Atascadero (habitable or uninhabited) have been permitted by the
City to exceed 50'-0" in height. A preliminary study of structures that exceed 50'-0" is
provided in figure 2 for comparison purposes.
ITEM NUMBER: 5
DATE: 7-19-05
Structure
Location
Height
Telecommunication
Monopole
6490 EI Camino Real
63'-0"
Administration Building
6500 Palma Avenue
93'-6"
Shell Station Sign
9155 San Gabriel Road
56'-0"
Carlton Hotel
6005 EI Camino Real
54'-0"
Figure 2: Height Comparison Chart
Environmental Determination
A Draft Mitigated Negative Declaration was circulated to public agencies and residents
within 1,000 feet of the property on June 28, 2005. The environmental analysis
identified the steeple height as a potential concern when introduced onto the site.
However, the proposed steeple architectural design, color, high-quality materials,
proportion and placement on the large church building appear to mitigate any
environmental concerns under CEQA. A finding is proposed that this project would not
have a significant effect on the environment.
Staff is recommending that the Commission certify Proposed Mitigated Negative
Declaration 2005-0030.
ITEM NUMBER: 5
DATE: 7-19-05
CONCLUSION:
Exceptions to the height limitations for uninhabited structures requires the Planning
Commission first finds the project will not result in substantial detrimental effects on the
enjoyment and use of adjoining properties and that the modified height will not exceed
the lifesaving equipment capabilities of the Fire Department. Staff believes that the
Planning Commission can make the findings for approval for this specific request based
on the evidence that the architectural design, color, high-quality materials, proportion
and placement on the large church building roofline meets the appearance review as
analyzed by staff. The Fire Department has reviewed and approved the proposed
steeple height. The proposed project is consistent with the General Plan and
Atascadero Municipal Code, as analyzed within this staff report. Staff finds that the
proposed project, as conditioned, meets the required findings necessary for Planning
Commission approval.
ALTERNATIVES:
1. The Commission may modify the project and/or conditions of approval for the
project.
2. The Commission may determine that more information is needed on some
aspect of the project and may refer the item back to the applicant and staff to
develop the additional information. The Commission should clearly state the type
of information that is required and move to continue the item to a future date.
3. The Commission may deny the project. The Commission should specify the
reasons for denial of the project and recommend an associated finding with such
action.
PREPARED BY: Lisa Wilkinson, Assistant Planner
ATTACHMENTS:
Attachment 1: Vicinity and Zoning Map
Attachment 2: Draft Resolution PC 2005-0042
ITEM NUMBER
DATE: 7-19-05
Attachment 1: Vicinity and Zoning
ns -
Gael
!� Project Site: 31a0"i
2600 Ramona Rd.,
0
�MA
° ROaC
Zoning: RS
General Plan Designation: Suburban Estate
ITEM NUMBER
DATE: 7-19-05
Attachment 2: Aerial view (with 10 foot contours)
ITEM NUMBER
DATE: 7-19-05
Attachment 3: Site Photographs
Photo 1: View from vehicle heading northbound on Highway 101.
Photo 2: Southwest view from Ramona Road.
ITEM NUMBER: 5
DATE: 7-19-05
Attachment 4: Draft Resolution PC 2005-0042
DRAFT RESOLUTION PC 2005-0042
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO APPROVING CONDITIONAL USE
PERMIT 2005-0160 TO REMOVE THE EXISTING SPIRE AND REPLACE
WITH A NEW 71'-0" TALL STEEPLE.
(LDS Church)
WHEREAS, an application has been received from Corp. of Presiding Bishop of the
Church of Jesus Christ of Latter -Day Saints (P.O. Box 2073, Orcutt, CA 93457), Applicant and
Property Owner, to consider a request to exceed the 50'-0 height limit for a new 71'-0" tall
steeple; and,
WHEREAS, the site's General Plan Land Use Designation is SE (Suburban Estate); and,
WHEREAS, the site's Zoning District is RS (Residential Suburban); and,
WHEREAS, a Mitigated Negative Declaration has been prepared for the project in
accordance with the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit application was held by the Planning Commission of the City of Atascadero, at
which hearing evidence, both oral and documentary, was admitted on behalf of said project; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on July 19, 2005, studied and considered the proposed Conditional Use
Permit; and,
NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings of Environmental Determination The Planning Commission
finds as follows:
1. The project will not result in substantial detrimental effects on the enjoyment and use of
adjoining properties; and,
ITEM NUMBER
DATE: 7-19-05
2. The proposed steeple architectural design, color, high-quality materials, proportion and
placement on the large church building appear to mitigate any environmental concerns
under CEQA; and,
3. The modified height will not exceed the lifesaving equipment capabilities of the Fire
Department.
SECTION 2. Findings for Approval of Conditional Use Permit. The Planning
Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed projector use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because of
the circumstances and conditions applied in the particular case, be detrimental to the
health, safety, or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in
the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the Land Use
Element.
6. That the proposed architectural design, color, high-quality materials, proportion and
placement on the large church building roofline meets the City's appearance review as
analyzed by staff.
SECTION 3. Approval. The Planning Commission of the City of Atascadero, in a
regular session assembled on July 19, 2005, resolved to approve Conditional Use Permit 2005-
0160 subject to the following:
EXHIBIT A: Conditions of Approval
EXHIBIT B: Site Plan/Elevations
EXHIBIT C: Initial Study and Mitigated Negative Declaration
ITEM NUMBER: 5
DATE: 7-19-05
On motion by Commissioner , and seconded by Commissioner the
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
ITEM NUMBER
DATE: 7-19-05
EXHIBIT A: Conditions of Approval
(CUP 2005-0160)
Conditions of Approval /
Timing
Responsibility
Notes
Mitigation Monitoring Program
/Monitoring
PS: Planning Services
BL: Business
BS: Building Services
License
FD: Fire Department
CUP 2005-0160
GP: Grading Permit
BP: Building Permit
PD: Police Department
CE: City Engineer
FI: Final Inspection
WW: Wastewater
TO: Temporary
CA: City Attorney
Occupancy
F0: Final
Occupancy
Planning Services
1. This Conditional Use Permit shall be for the addition of a steeple to
BP
PS
the existing church building on parcel 049-201-027 (2600 Ramona
Road), regardless of owner.
2. The approval of this use permit shall become final and effective for
BP
PS
the purposes of issuing building permits fourteen (14) days
following the Planning Commission approval unless prior to that
date, an appeal to the decision is filed as set forth in Section 9-
1.111(b) of the Zoning Ordinance.
3. Approval of this Conditional Use Permit shall be valid for twelve
BP
PS
(12) months after its effective date. At the end of the period, the
approval shall expire and become null and void unless the
applicant has received a building permit or applied for an extension
of entitlement.
4. Approval of this Conditional Use Permit shall be consistent with
Ongoing
PS
Atascadero Municipal Code Zoning Ordinance. Any violations of
the CUP shall be subject to review and reconsideration by the
Planning Commission at a noticed public hearing.
5. The Community Development Department shall have the authority
BP
PS
to approve minor changes to the project that address a construction
design issue that is not substantive to the land use.
6. The property owner shall defend, indemnify, and hold harmless the
Ongoing
ALL
City of Atascadero or its agents, officers, and employees against
any claim or action brought to challenge an approval by the city, or
any of its entities, concerning the Conditional Use Permit.
Mitigation Measures
Mitigation Measure 1.c: The proposed steeple shall include the use of paint
BP
PS
1.c
and roof colors consistent with the architectural style and design of
the existing church.
Mitigation Measure 1.d: The proposed steeple shall not be directly externally
BP
PS
1.d
or internally illuminated.
ITEM NUMBER
DATE: 7-19-05
Conditions of Approval /
Timing
Responsibility
Notes
Mitigation Monitoring Program
/Monitoring
PS: Planning Services
BL: Business
BS: Building Services
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
CUP 2005-0160
BP: Building Permit
CE: City Engineer
FI: Final Inspection
WW: Wastewater
TO: Temporary
CA: City Attorney
Occupancy
F0: Final
Occupancy
Mitigation Measure 11.d.1: All construction activities shall comply with the
BP
PS, BS
11A
City of Atascadero Noise Ordinance for hours of operation.
ITEM NUMBER
DATE: 7-19-05
EXHIBIT B: Site Plan / Elevations
(CUP 2005-0160)
T-U4DERS6NEDRONA
(ELEV. 171--e) T�SE FLWSMD E-ECW4
C C1,LY. SHOP
Nu
1w 108,-2')
SIDE AEW
ITEM NUMBER
DATE: 7-19-05
EXHIBIT C: Initial Study and Mitigated Negative Declaration
(CUP 2005-0160)
(See following)
ITEM NUMBER: 6
DATE: 7.19.05
Atascadero Planning Commission
Staff Report - Community Development Department
1155 E/ Camino Real Custom Planned Development:
The Village at Oakhaven
ZCH 2005-0099/CUP 2005-0157/TTM 2005-0067
Wehn Group, LLC
RECOMMENDATIONS:
Staff Recommends Planning Commission:
1. Adopt Resolution PC 2005-0044 recommending that the City Council certify
Proposed Mitigated Negative Declaration 2005-0028; and,
2. Adopt Resolution PC 2005-0045 recommending that the City Council introduce an
ordinance for first reading by title only, to approve Zone Text Change 2005-0099
establishing a Planned Development 26 Overlay District based on findings; and,
3. Adopt Resolution PC 2005-0046 recommending that the City Council introduce an
ordinance for first reading by title only, to approve Zone Change 2005-0101 based
on findings; and,
4. Adopt Resolution PC 2005-0047 recommending that the City Council approve
Conditional Use Permit 2005-0157 (Master Plan of Development) based on findings
and subject to Conditions of Approval and Mitigation Monitoring; and,
5. Adopt Resolution PC 2005-0048 recommending that the City Council approve
Vesting Tentative Tract Map 2005-0067 based on findings and subject to Conditions
of Approval and Mitigation Monitoring.
ITEM NUMBER: 6
DATE: 7 in nr%
REPORT -IN -BRIEF:
The proposed project consists of a Zone Text Change to establish a new site-specific
Planned Development #26 overlay zone, and Zone Map Amendment to establish a
Planned Development Overlay Zone #26 on the subject site with a corresponding
Master Plan of Development (CUP) and vesting Tentative Tract Map that would allow a
62 -unit attached residential planned development. The project site is currently
developed with a single-family residence.
DISCUSSION:
Situation and Facts:
1. Applicant / Representative: Ruth Wehn, Wehn Group, LLC.
1919 Creston Road
Paso Robles, CA 93446
2. Project Address: 1155 EI Camino Real (APN 049-042-018) (San Luis Obispo
County).
3. General Plan Designation: HDR (High Density Residential)
4. Zoning District: RMF -16 (Residential Multi -family - 16)
5. Site Area: 5.47 acres
6. Existing Use: single-family residence
7. Environmental Status: Proposed Mitigated Negative Declaration 2005-0028
ITEM NUMBER: 6
DATE: 7.19.05
Background
Surrounding Land Use and Setting:
North: Residential Suburban East: Residential Suburban
South: Residential Multi -family West: Residential Suburban
RS
Proposed
RMF -16 Project Site
RS
RS
C�
RSF-X/Pn-17
CP
The project site is within the High Density Residential General Plan land use
designation and is zoned Residential Multi -family -16, which allows for a maximum
density of 16 units per acre. The properties along EI Camino are developed with
existing single-family residences and multi -family developments.
Based on density standards set forth in the General Plan (LOC 2.1.5) related to property
size, slope, and access conditions, the project site qualifies as a prime multi -family site
which supports attached multi -family developments.
ITEM NUMBER: 6
DATE: 7.19.05
ANALYSIS:
The proposed site plan has been designed to meet the requirements of the Atascadero
Municipal Code and the appearance review requirements of the General Plan. Sixty-
two new town homes are proposed on the project site. The units range from 1,150
square feet to 1,510 square feet of living space with a minimum one car attached
garage.
As a Planned Development, the Planning Commission must find that the project
provides high quality architectural, landscape, and site design to warrant the granting of
special development standards.
Appearance Review
Site Plan, Circulation, and Parking
The proposed project includes sixty-two townhome units organized around open space
features and existing mature native oak trees. The project includes 4 common open
space areas, one of which is designed as a central neighborhood park. The project
includes one- and two-way streets to provide efficient and controlled circulation through
the site. In addition, the project also includes the following desirable site features:
• Decorative project entry incorporating pavers and a landscaped median.
• Retention of existing mature native trees on site.
• Minimum 40 -foot wide landscape buffer along the EI Camino Real frontage.
Based on multi -family parking requirements, a minimum of 147 spaces is required to be
provided on site for the proposed residential units. The proposed project includes a
minimum one car attached garage for each unit, additional parking provided in unit
driveways, and 25 common access parking spaces provided throughout the site. As
proposed, the project meets multi -family parking standards.
Sidewalks are proposed along one side of the internal project streets. Full frontage
improvements, including widening, is required along the EI Camino Real frontage.
Architecture. Materials. and Color
The project has been designed to incorporate clusters of two- and three-story residential
units that include a variety of traditional style architectural elements such as stylized
columns, a variety of window grid pattern windows, bay windows, board and batt siding,
decorative stone veneer, and trellis features. As proposed, the project includes 3 unit
types each with a minimum of 3 different color schemes. Minor conditions of approval
have been included regarding the exterior material finish (Conditions CUP 7).
ITEM NUMBER: 6
DATE: 7.19.05
The three story units measure a maximum of 38.5 feet which exceeds the maximum
permitted height in the residential zone (30 -foot maximum / 2 -stories maximum). With
the establishment of the PD -26 overlay zone and approval of the Conditional Use
Permit establishing the Master Plan of Development, the project may exceed this limit
based on the following findings:
1. The proposed project will not result in substantial detrimental effects on the
enjoyment and use of adjoining properties; and,
2. The modified height will not exceed the lifesaving equipment capabilities of
the Fire Department.
As proposed, the third floor living space is within the 30 -foot maximum height limit. In
addition, the three story units have been designed to minimize the number of windows
on the third floor. The setbacks along the north and south property lines has been
increased to 12 -feet (5 -feet required) and the east property edge has been designed
with a 35 -foot setback and buffer landscaping as discussed below. Properties to the
north and south are currently developed with high density residential uses or are zoned
for high density development. The fire department has reviewed and approved the
project plans.
Landscape Design
The preliminary landscape plan has been designed to retain existing mature native oak
trees and enhance site elements. Proposed landscaping includes drought tolerant
shrubs and accent plants, with a combination of evergreen and deciduous trees placed
throughout the site.
The City Council has established a policy related to buffering of multi -family projects
from single-family residential uses. The proposed project abuts a single-family
residential parcel to the east. As such, the applicant is proposing a buffering scheme
that includes a 35 -foot minimum building setback, installation of evergreen screen trees
and shrubs, and an open space area occupying approximately 40% of the eastern
property edge.
Staff is recommending that the three-story unit adjacent to the single-family zone be
substituted with a two story unit to achieve a more effective transition between the
proposed high density development and the single-family land use (Condition 9). In
staff's opinion, the proposed landscape plan and palette, as conditioned, meets the
Planned Development appearance review requirements.
Native Tree Mitigation/Preservation
A tree removal application for 4 native trees is included with the proposed development,
3 which are in excess of 24" dbh. A condition of approval has been included requiring
that the applicant pay mitigation fees into the Tree Replacement Fund or provide
ITEM NUMBER: 6
DATE: 7 to nr%
equivalent re -plantings on site, as required by the Atascadero Native Tree Ordinance
and as shown in the following chart (Condition CUP 21).
Evergreen Native Trees (inches) Deciduous Native Trees (inches) I Totals
dbh notes dbh notes
1 1 18 -inches
2 2 99 -inches
3 3 55 -inches
4 4 63 -inches
5 5
6 6
Total 0 -inches Total 235 -inches 235 -inches
Mitigation Requirement
req'd tree replacements:
0 five gal trees
req'd tree replacements:
157 five gal trees
157 five gal trees
Proposed Replanting
0 five gal trees
Proposed Replanting
0 five gal trees
0 five gal trees
0 box trees (24")
0 box trees (24")
0 box trees (24")
Remaining Mitigation
0 five gal trees
Remaining Mitigation
157 five gal trees
157 five gal trees
Tree Fund Payment: $
Tree Fund Payment: $
7,833.33
$ 7,833.33
Site Drainage
Historically, the site drains to the west end of the project site. The project is designed to
maintain historic flow and will be detained in two landscaped basins adjacent to EI
Camino Real.
\A/--1-----1--
Sanitary sewer will be connected to existing sewer facilities in EI Camino Real.
Fiscal Impact
Based on findings from the Taussig Study, revenue from new residential development
including property tax revenues; vehicle licensing fees, sales taxes, and other revenues
are insufficient to cover the maintenance and emergency services costs of new
development. Based on the revenue projections from the Taussig Study, the City has
developed standard conditions of approval for new development projects that require
the cost of maintenance and emergency services to be funded by the project through a
combination of road assessment districts, landscape and lighting districts and
community facilities districts (Conditions CUP 18 and 19/ TTM 8 and 9).
ITEM NUMBER: 6
DATE: 7.19.05
The following conditions of approval are included to mitigate the fiscal impacts of the
project on the City of Atascadero.
Condition CUP 18/TTM 8
• The emergency services and facility maintenance costs listed below shall be 100%
funded by the project in perpetuity. The service and maintenance costs shall be funded
through a community facilities district established by the City at the developer's cost. The
funding mechanism must be in place prior to or concurrently with acceptance of the final
maps. The funding mechanism shall be approved by the City Attorney, City Engineer
and Administrative Services Director prior to acceptance of any final map. The
administration of the above mentioned funds shall be by the City. Developer agrees to
participate in the community facilities district and to take all steps reasonably required by
the City with regard to the establishment of the district and assessment of the property.
a) All Atascadero Police Department service costs to the project.
b) All Atascadero Fire Department service costs to the project.
c) Off-site common City of Atascadero park facilities maintenance service costs
related to the project.
Condition CUP 19/TTM 9
■ All tract maintenance costs listed below shall be 100% funded by the project in perpetuity.
The service and maintenance cost shall be funded through a Home Owners Association
established by the developer subject to City approval. The Home Owners Association must
be in place prior to, or concurrently with acceptance of any final maps. The Home Owners
Association shall be approved by the City Attorney, City Engineer and Administrative
Services Director prior to acceptance of any Final Map. The administration of the above
mentioned funds, and the coordination and performance of maintenance activities, shall be
the responsibility of the Home Owners Association.
a) All streets, bridges, sidewalks, streetlights, street signs, roads, emergency access
roads, emergency access gates, and sewer mains within the project.
b) All parks, trails, recreational facilities and like facilities.
c) All open space and native tree preservation areas.
d) All drainage facilities and detention basins.
e) All creeks, flood plains, floodways, wetlands, and riparian habitat areas.
f) All common landscaping areas, street trees, medians, parkway planters,
manufactured slopes outside private yards, and other similar facilities.
g) All frontage landscaping and sidewalks along arterial streets.
Planned Development Overlay #26
The proposed project requires the establishment of a new site-specific Planned
Development Overlay Zone to allow for the requested subdivision. Based on the
ITEM NUMBER: 6
DATE: 7.19.05
General Plan requirements and proposed project description, staff has prepared the
following standards for the proposed Planned Development Overlay Zone. Adoption of
the Planned Development Overlay Zone text is required for the project to proceed. The
Commission could make recommendations to the Council to modify the proposed
Custom PD text.
9-3.671 Establishment of Planned Development Overlay Zone #26
This Planned Development Overlay Zone on APN 049-042-018 in the Residential Multi -family
zone. The maximum residential density within the planned development shall not exceed the
density allowed by the underlying zoning district and provisions of the Atascadero Municipal
Code. The following development standards shall be met by the entitled project within the PD -26
overlay zone:
a) All site development shall require the approval of a Master Plan of Development. All
construction and development shall conform to the approved Master Plan of Development,
as conditioned.
b) The Tentative Tract Map and any subsequent amendments for the site shall be consistent
with an approved Master Plan of Development. All construction and development shall
conform to the approved Master Plan of Development, as conditioned.
c) No subsequent tentative parcel or tract map shall be approved unless found to be
consistent with the approved Master Plan of Development.
d) Appearance of each dwelling unit, site landscaping, site development, and amenities shall
be consistent with the Atascadero Appearance Review Manual. All landscaping shown on
the approved landscape plan will be installed by the developer and shall be maintained as
approved. Buffer landscaping along the eastern property line shall be maintained by the
individual property owners in perpetuity.
e) Each unit shall include the following:
■ 300 cubic feet of shelved storage area. (Bedroom and entry/coat closets shall not
count toward this requirement).
■ Dedicated space for laundry facilities with hookups.
f) All utilities, including electric, telephone, and cable, within the PD and along the project
frontages shall be installed and/or relocated underground.
g) Engineered drainage detention basins shall be located within a common or designated
area. All basins shall be landscaped, shall be no deeper than 2 feet, and shall be unfenced.
Upon approval of the city engineer, retaining walls may be allowed in the drainage basin
area.
h) Exterior walls or fencing shall be consistent throughout the project. Design and appearance
of fences and/or walls shall be compatible with the design of the dwelling units. Fence
posts shall be metal or pressure treated wood. Wood preservative/sealer shall be applied to
fence panels.
i) All mechanical equipment, including HVAC units and utility meters, shall be screened from
view from adjacent streets and properties.
ITEM NUMBER: 6
DATE: 7.19.05
j) Trash shall be stored in individual garages.
If the above text is established, the project, as conditioned, would be consistent with
those standards. Based on the above language, the Planned Development Zoning
District incorporates, by reference, the Master Plan of Development and Vesting
Tentative Tract Map which documents the proposed architectural styles, site
configuration, lot coverage, setbacks, landscaping, and project amenities for the project.
Inclusionary and Workforce Housing
The City Council has implemented an interim Inclusionary Affordable Housing Program
to include a fixed percentage of units within residential developments that require a
legislative approval to be reserved as deed restricted affordable units. This interim
program requires that the proposed project provide a minimum of 12 affordable units
deed restricted at the moderate income rate. A condition of approval has been added to
ensure that this requirement is met (Condition CUP 14, 15/TTM 11, 12).
Project Benefits
One of the required findings for approval of a planned development rezone is that the
project must "offer certain redeeming features to compensate for the requested
modification." The table shown below outlines the Council policy on Planned
Development benefits. In order to approve this project, the Planning Commission must
find that the project offers all of the tier 1 benefits to qualify for a Planned Development
project.
PD Location
Tier 1 Benefits
Tier 2 Benefits
Inside of Urban Core
a) Affordable / Workforce Housing
a) Pocket Parks in larger projects
b) High Quality Architectural Design
b) Trails /Walkways for Pedestrian
Custom PDs
c) High Quality Landscape Design
Connectivity
d) Buffering between Urban and
c) Historic Preservation
Suburban zones (large lot sizes,
increased setbacks, landscape
buffers, etc.)
e) Higher density to meet Housing
Element goals
Tentative Tract Map
A 62 -lot Vesting Tentative Tract Map (TTM 2005-0067) is proposed as part of the
project consistent with the proposed Master Plan of Development and proposed PD -26
Overlay Zone. The Tract Map has been conditioned by staff and the City Engineer to
meet all City standards including on- and off-site street improvements. The applicant
will be required to record CC&R's with the map that will include maintenance and
access of common areas (Condition CUP 20/TTM 10).
ITEM NUMBER: 6
DATE: 7.19_n5
General Plan Consistency
The proposed project is consistent with the following General Plan Land Use and
Housing Element Policies:
Land Use Policy 1.1: "Preserve the rural atmosphere of the community and assure
"elbow room" in areas designed for lower density development by guiding new
development into the Urban Core to conform to the historic Colony land use patterns of
the City and to respect the natural environment, hillside area and existing
neighborhoods".
Land Use Program 1.1.7: "Within the Urban Core encourage infill development or
revitalization or reuse of land already committed to urban development where utilities
and public services exist.
Land Use Policy 2.1: "Ensure that new development is compatible with existing and
surrounding neighborhoods".
Land Use Policy 2.1.5: Supports attached multi -family developments on prime multi-
family sites throughout the City. Based on qualifying factors set forth in the General
Plan, this site qualifies for prime multi -family status.
Housing Element Policy 4.3: "Encourage attractive architecture and site landscaping
that respect terrain and native trees".
In staff's opinion the proposed project is consistent with the goals and policies of the
Land Use Element and the Housing Element. The project will provide 62 attached
single-family residential units including 12 affordable units within the high-density
residential zone. As conditioned, the project incorporates elements that are consistent
with the scale and character of the surrounding residential neighborhood and the goals
and policies of the General Plan.
Findings
Establishment of PD26
1. Modification of development standards or processing requirements is warranted
to promote orderly and harmonious development.
2. Modification of development standards or processing requirements will enhance
the opportunity to best utilize special characteristics of an area and will have a
beneficial effect on the area.
3. Benefits derived from the overlay zone cannot be reasonably achieved through
existing development standards or processing requirements.
ITEM NUMBER: 6
DATE: 7.19.05
Planned Development Overlay
As specified in the City's General Plan and Zoning Ordinance, the following specific
findings for the proposed Zone Change shall be made in order to approve the proposed
project:
1. The proposed Zone Change is in conformance with the adopted General Plan
Goals, Policies, and Programs and the overall intent of the General Plan.
2. The proposed Zone Change is compatible with existing development,
neighborhoods and the environment.
3. The proposed Zone Change will not create any new significant and unavoidable
impacts to traffic, infrastructure, or public service impacts.
4. The proposed Zone Change is consistent with the project -specific Mitigated
Negative Declaration.
Conditional Use Permit (Master Plan of DeveloDment
A Master Plan of Development is required for the Planned Development in the form of a
Conditional Use Permit. The proposed Master Plan of Development sets development
standards related to architectural design, site design, landscape, signage, and specific
development standards required by the zoning ordinance. The Planning Commission
must make the following five findings to recommend approval of the proposed Master
Plan of Development:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual.
Staff Comment: The use is consistent with the General Commercial designation of
the General Plan and General Plan Land Use Element Policy 1.1, 1.1.7, 2.1, and
Housing Element Policy 4.3.
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including the Planned Development Ordinance.
Staff Comment: As conditioned, the project satisfies all Conditional Use Permit and
Planned Development zoning code provisions.
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety, or welfare of the general public or persons residing
or working in the neighborhood of the use, or be detrimental or injurious to property
or improvements in the vicinity of the use.
Staff Comment: The proposed residential development will not be detrimental to the
general public or working person's health, safety, or welfare.
ITEM NUMBER: 6
DATE: 7.19.05
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development.
Staff Comment: The proposed project is compatible with the surrounding
neighborhood by providing a higher density residential development that includes
increased setbacks, multiple open space areas, and high quality architecture. The
project has been designed to enhance the appearance along EI Camino Real with
compatible architecture and project landscaping.
5. That the proposed use or project will not generate a volume of traffic beyond the
safe capacity of all roads providing access to the project, either existing or to be
improved in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
Staff Comment: The proposed project and use is consistent with the traffic
projections and road improvements anticipated within the General Plan and as
proposed by the applicant.
Tree Removals
1. The tree is obstructing proposed improvements that cannot be reasonably
designed to avoid the need for tree removal, as certified by a report from the Site
Planner and determined by the Community Development Department based on
the following factors:
■ Early consultation with the City;
■ Consideration of practical design alternatives;
■ Provision of cost comparisons (from applicant) for practical design
alternatives;
■ If saving tree eliminates all reasonable uses of the property; or
■ If saving the tree requires the removal of more desirable trees.
Proposed Environmental Determination
A Draft Mitigated Negative Declaration was circulated to public agencies and interested
members of the public on June 29, 2005. The environmental analysis identified
concerns regarding potential impacts to aesthetics, land use and planning, noise,
biological resources, and traffic. Mitigation measures pertaining to these resources are
included. A finding is proposed that this project would not have a significant effect on
the environment based upon the implementation of the identified mitigation measures.
ITEM NUMBER: 6
DATE: 7.19.05
Conclusion
In staff's opinion, proposed development is consistent with the General Plan and
compatible with the surrounding neighborhood. The project incorporates appearance
review of architectural design, materials, and landscaping, and incorporates
architectural themes into the site and building design, as conditioned. Native trees have
been preserved where feasible and required conditions and mitigation measures have
been appropriately incorporated into the project. As analyzed within the project Initial
Study and Draft Mitigated Negative Declaration, the proposed Master Plan of
Development would have no significant environmental impacts and will not be
detrimental to the general public or working persons health, safety, or welfare. Based
on staff's analysis in the preceding sections, it appears that all of the required findings
for project approval can be made.
ALTERNATIVES
1. The Commission may recommend modifications to the project and/or conditions
of approval for the project to the City council.
2. The Commission may determine that more information is needed on some
aspect of the project and may refer the item back to the applicant and staff to
develop the additional information. The Commission should clearly state the type
of information that is required and move to continue the item to a future date.
3. The Commission may recommend the City Council deny the project. The parcel
would retain its designation of Residential Multi -family. The Commission should
specify the reasons for denial of the project and recommend an associated
finding with such action.
PREPARED BY: Kelly Gleason, Associate Planner
ATTACHMENTS:
Attachment 1:
Location, General Plan, and Zoning Map
Attachment 2:
Tree Protection Plan & Table
Attachment 3:
Proposed Mitigated Negative Declaration and Initial Study
Attachment 4:
Draft Resolution 2005-0044
Attachment 5:
Draft Resolution 2005-0045
Attachment 6:
Draft Resolution 2005-0046
Attachment 7:
Draft Resolution 2005-0047
Attachment 8:
Draft Resolution 2005-0048
ITEM NUMBER: 6
DATE: 7 in nr%
Attachment 1: Location Map, General Plan and Zoning
Existing General Plan Designation: HDR
Existing Zoning District: RMF -16
Proposed General Plan Designation: HDR
Proposed Zoning Designation: RMF -16 / PD -XX
RS
Proposed
Project Site
MF -16
.v
RS
RS
�
Df
T
o`
a
CQ
r; I
RSF-X/PD-17
M CPK
AMU
Existing General Plan Designation: HDR
Existing Zoning District: RMF -16
Proposed General Plan Designation: HDR
Proposed Zoning Designation: RMF -16 / PD -XX
Attachment 2: Tree Protection Plan & Table
56
wa
ITEM NUMBER: 6
DATE: 7.19.05
1 2 3 4 5 6 7 8 9 10 11
TREE
TREE
TRUNK
TREE
CONST
DRIP -LINE
CONST
MITIGATION1
MONT
PRUNING
FIELD
#
SPECIES
DBH
CONDITION
STATUS % IMPACT
IMPACT
PROPOSAL REQUIRED
CLASS
NOTES
1
LOX 2
80
4
1
15%
GR,TR
F, RR M
YES
IV
2
BW
18
3
R
100%
GR
NO
3
LO X 3
73
4
1
25%
GR, TR
F, RP, M
YES
IV
remove tree house
4
LO X 3
99
3
R
100% 1
GR
NO
cavity in north scaffold
5
LO
46
5
1
30%D
GR, TR
F. RP, M
YES
IV
6
LO
43
4
1
30%
GR, TR
F, RP, M
YES
IV
cavity
7
LO
32
5
1
30%
GR, TR
F, RP, M
YES
IV
8
LO
44
5
1
35%
GR, TR
F, RP, M
YES
IV
shed around tree
9
LO
49
4
1
20%
GR, TR
F. RP. M
YES
IV
10
LO
64
3
1
10%
GR, TR
NO
IV
past failures/ hangers
11
LO
55
3
R
100%
GR, TR
F, RP, M
YES
IV
tip dieback
12
LO
6
2
A
0%
NO
sprouts on 6" stump
13
LO
63
1
R
20%
TR
NO
very hazardous
14
LO
55
3
1
5%
GR
NO
IV
15
LO
60
4
A
0%
NO
IV
cavity
16
LO
52
4
1
25%
GR, TR
F. RP, M
YES
IV
cavity
17
18
19
20
1 = TREE I. MOSTLY CLOCKWISE FROM DUE NORTH i = CONSTRUCTION IMPACT TYPE GRADING. COMPACTION, TRENCHING
2 = TREE TYPE COMMON NAME IE W O = WHITE OAK 8 = MITIGATION REQUIREMENTS FENCING, MONITORING ROOTPRUNING.
3 T TRVNK DIAMETER ® 4-6" 9 = ARBORIST MONITORING REQUIRED YESMO
a T TREE CONDITION' I • POOR 10 T EXCELLENT 10- PERSCRIBED PRUNING CLASS 1J
5 T CONSTRUCTION STATUS AVOIDED. IMPACTED REMOVAL 11 = F LETO NOTES
6= DRIP -LINE PERCENT OF IMPACTED DRIPLINE
ITEM NUMBER
DATE: 7.19.05
Attachment 3: Proposed Mitigated Negative Declaration and Initial Study
See Following
ITEM NUMBER: 6
DATE: 7.19_n5
ATTACHMENT 4: Draft Resolution PC 2005-0044
Approval of Draft Mitigated Negative Declaration
DRAFT RESOLUTION PC 2005-0044
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL CERTIFY PROPOSED MITIGATED
NEGATIVE DECLARATION 2005-0028 PREPARED FOR ZONE
CHANGE 2005-0099, TENTATIVE TRACT MAP 2005-0067 AND
CONDITIONAL USE PERMIT 2005-0157
ON APN 049-042-018
(1155 El Camino Real Wehn LLC.)
WHEREAS, an application has been received from Wehn Group LLC (934 Sycamore
Canyon, Paso Robles, CA 93446) Applicant and Property Owner, to consider a project consisting
of a Zone Change from RMF -16 (Residential Multi -family -16) to RMF-16/PD26 (Residential
Multi -Family -16 with a Planned Development Overlay 26) with corresponding Master Plan of
Development and Vesting Tentative Tract Map on a 5.47 -acre site located at 1155 El Camino
Real,(APN 049-042018); and,
WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2005-0028
were prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission of the City of Atascadero held a public hearing
on July 19, 2005 following the close of the review period to consider the Initial Study and
Proposed Mitigated Negative Declaration; and,
WHEREAS, the Planning Commission has determined that the project will have no
significant impacts with project specific mitigation measures incorporated; and,
NOW THEREFORE, the Planning Commission of the City of Atascadero, hereby
resolves to recommend that the City Council certify Proposed Mitigated Negative Declaration
2005-0028 based on the following Findings, and as shown in Exhibit A:
1. The Proposed Mitigated Negative Declaration has been completed in compliance with
CEQA; and,
2. The Proposed Mitigated Negative Declaration was presented to the Planning
Commission, and the information contained therein was considered by the Planning
Commission, prior to recommending action on the project for which it was prepared; and,
ITEM NUMBER: 6
DATE: 7 in nr%
3. The project does not have the potential to degrade the environment when mitigation
measures are incorporated into the project; and,
4. The project will not achieve short-term to the disadvantage of long-term environmental
goals; and,
5. The project does not have impacts which are individually limited, but cumulatively
considerable; and,
6. The project will not cause substantial adverse effects on human beings either directly or
indirectly; and,
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
ITEM NUMBER
DATE: 7.19.05
Exhibit A Proposed Mitigated Negative Declaration 2005-0028
rsisCITY OF ATASCADERO
�(' a"� Z
�Eeo; PROPOSED MITIGATED
NEGATIVE DECLARATION #2005-0028
6905 El Camino Real, Suite 6 Atascadero, CA 93422 805/461-5000
Applicant:
Wchn Group LLC, 934 Sycamore Canyon, Paso Robles, CA 93446 Phone: 805-239-2475
Project Title:
Zone Change 2005-0099, CUP 2005-0157, TTM 2005-0067, The Village at Oakhaven
Project
1565 EI Camino Real, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 049-042-018
Project
The proposed project consists of an application for a Zone Change, Conditional Use Permit, and
Description:
Tentative Tract Map for the construction of 62 new single-family attached homes on individual lots
that will be developed under the requirements of a custom Planned Development overlay district
within the RMF -16 Zoning District. Proposed homes range in size from 1100 to 1510 square feet.
The project includes one home per lot each with a one -car garage and one parking space in each
driveway. Four native trees are proposed for removal. The project will take access off of EI Camino
Real.
General Plan Designation: High Density Residential (HDR)
Zoning District: Residential Multi -Family -16 (RMF -16)
Findings:
I. The project does not have the potential to degrade the environment.
2. The project will not achieve short-term to the disadvantage of long-term environmental goals.
3. The project docs not have impacts which are individually limited, but cumulatively considerable.
4. The project will not cause substantial adverse effects on human beings either directly or indirectly.
5.
Determination:
Based on the above findings, and the information contained in the initial study 2005-0028 (made a part hereof by reference and
on file in the Community Development Department), it has been determined that the above project will not have an adverse
impact on the environment when the following proposed mitigation measures are incorporated into the project (see attachment).
Prepared By:
Date Posted:
Public Review Ends:
Attachments:
Kelly Gleason, Associate Planner
June 29, 2005
July 19, 2005
Location / Zoning Map
Aerial Photo
Site Plan/Master Plan of Development
Floor Plan A
Floor Plan A Sections and Elevations
Floor Plan B
Floor Plan B Sections and Elevations
Floor Plan C
Floor Plan C Sections and Elevations
Project sections and entry sketch
Preliminary Landscape Plan
Tree Protection Plan
Vesting Tentative Tract Map
Grading, Drainage and Utility Plan (2 sheets)
Initial Study 2005-0028
ZCH 2005-0095.1155 KKISMHD.p PNi 1»ie i�.,i..ax Pnl
6905 EL CAMINO REAL, SUITE 6 • ATASCADERO, CALIFORNIA 93422 • (805) 461-5000 • FAX 461-7612
ITEM NUMBER: 6
DATE: 7.19_n5
ATTACHMENT 5: Draft Resolution PC 2005-0045
Approval of Draft Mitigated Negative Declaration
DRAFT RESOLUTION PC 2005-0045
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL AMEND THE ATASCADERO MUNICIPAL
CODE BY APPROVING ZONE CHANGE 2005-0099 TO ESTABLISH A
PLANNED DEVELOPMENT OVERLAY #26
(1155 El Camino Real / Wehn Group LLC)
WHEREAS, an application has been received from Wehn Group LLC (934 Sycamore
Canyon, Paso Robles, CA 93446) Applicant and Property Owner, to consider a project consisting
of a Zone Change from RMF -16 (Residential Multi -family -16) to RMF-16/PD26 (Residential
Multi -Family -16 with a Planned Development Overlay 26) with corresponding Master Plan of
Development and Vesting Tentative Tract Map on a 5.47 -acre site located at 1155 El Camino
Real,(APN 049-042018); and,
WHEREAS, Article 28 of the Atascadero Municipal Code allows for the creation of
Planned Development Overlay Zones to promote orderly and harmonious development and to
enhance the opportunity to best utilize special site characteristics; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2005-0028 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission has determined that it is in the best interest of the
City to enact this amendment to the Zoning Code Text to protect the health, safety, and welfare
of its citizens by applying orderly development and expanding housing opportunities within the
City; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Text
Change application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said zoning text
amendments; and,
ITEM NUMBER:
DATE: 7.19.05
WHEREAS, the Planning Commission of the City of Atascadero, at a Public Hearing
held on July 19, 2005 studied and considered Zone Change 2005-0099, after first studying and
considering the Draft Mitigated Negative Declaration prepared for the project, and,
NOW THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings for Approval of a Zone Text Chante Creating a PD -26
Planned Development Overlay District. The Planning Commission finds as follows:
Modification of development standards or processing requirements is warranted
to promote orderly and harmonious development.
2. Modification of development standards or processing requirements will enhance
the opportunity to best utilize special characteristics of an area and will have a
beneficial effect on the area.
Benefits derived from the overlay zone cannot be reasonably achieved through
existing development standards or processing requirements.
SECTION 2. Recommendation of Approval. The Planning Commission of the City of
Atascadero, in a regular session assembled on July 19, 2005 resolved to recommend that the City
Council introduce for first reading by title only, an ordinance that would amend the City Zoning
code text with the following:
9-3.671 Establishment of Planned Development Overlay Zone #26
This Planned Development Overlay Zone on APN 049-042-018 in the Residential Multi -family
zone. The maximum residential density within the planned development shall not exceed the
density allowed by the underlying zoning district and provisions of the Atascadero Municipal
Code. The following development standards shall be met by the entitled project within the PD -26
overlay zone:
a) All site development shall require the approval of a Master Plan of Development. All
construction and development shall conform to the approved Master Plan of Development,
as conditioned.
b) The Tentative Tract Map and any subsequent amendments for the site shall be consistent
with an approved Master Plan of Development. All construction and development shall
conform to the approved Master Plan of Development, as conditioned.
c) No subsequent tentative parcel or tract map shall be approved unless found to be
consistent with the approved Master Plan of Development.
d) Appearance of each dwelling unit, site landscaping, site development, and amenities shall
be consistent with the Atascadero Appearance Review Manual. All landscaping shown on
the approved landscape plan will be installed by the developer and shall be maintained as
approved. Buffer landscaping along the eastern property line shall be maintained by the
individual property owners in perpetuity.
ITEM NUMBER:
DATE: 7.19.05
e) Each unit shall include the following:
300 cubic feet of shelved storage area. (Bedroom and entry/coat closets shall not
count toward this requirement).
Dedicated space for laundry facilities with hookups.
f) All utilities, including electric, telephone, and cable, within the PD and along the project
frontages shall be installed and/or relocated underground.
g) Engineered drainage detention basins shall be located within a common or designated
area. All basins shall be landscaped, shall be no deeper than 2 feet, and shall be unfenced.
Upon approval of the city engineer, retaining walls may be allowed in the drainage basin
area.
h) Exterior walls or fencing shall be consistent throughout the project. Design and appearance
of fences and/or walls shall be compatible with the design of the dwelling units. Fence
posts shall be metal or pressure treated wood. Wood preservative/sealer shall be applied to
fence panels.
i) All mechanical equipment, including HVAC units and utility meters, shall be screened from
view from adjacent streets and properties.
j) Trash shall be stored in individual garages.
ITEM NUMBER: 6
DATE: 7.19.05
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
ITEM NUMBER
DATE: 7.19.05
ATTACHMENT 6: Draft Resolution PC 2005-0046
Approval of Proposed Zoning Map Change
DRAFT RESOLUTION PC 2005-0046
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL APPROVE ZONE CHANGE 2005-0101,
AMENDING THE OFFICIAL ZONING MAP DESIGNATION OF
APN 049-042-018 FROM RMF -16 (RESIDENTIAL MULTI -FAMILY —16)
TO RMF -16 /PD -26 (RESIDENTIAL MULTI -FAMILY —16/ PLANNED
DEVELOPMENT OVERLAY #26)
(1155 El Camino Real / Wehn Group, LLC)
WHEREAS, an application has been received from Wehn Group LLC (934 Sycamore
Canyon, Paso Robles, CA 93446) Applicant and Property Owner, to consider a project consisting
of a Zone Change from RMF -16 (Residential Multi -family -16) to RMF -16/ PD26 (Residential
Multi -Family -16 with a Planned Development Overlay 26) with corresponding Master Plan of
Development and Vesting Tentative Tract Map on a 5.47 -acre site located at 1155 El Camino
Real,(APN 049-042018); and,
WHEREAS, the site's General Plan Designation is HDR (High Density Residential);
and,
WHEREAS, the site's current zoning district is RMF -16 (Residential Multi -family -16);
and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2005-0028 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission has determined that it is in the best interest of the
City to enact this amendment to the Official Zoning Map to protect the health, safety, and
welfare of its citizens by applying orderly development of the City; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone
Change application was held by the Planning Commission of the City of Atascadero at which
ITEM NUMBER: 6
DATE: 7.19_n5
hearing evidence, oral and documentary, was admitted on behalf of said Zoning amendments;
and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on July 19, 2005 studied and considered Zone Change 2005-0101, after first
studying and considering the Proposed Mitigated Negative Declaration prepared for the project,
and,
NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings for Approval of a Zone Change to the Official Zoning Map of
Atascadero Changing the existing site zoning to RMF -16/ PD -26. The Planning Commission
finds as follows:
1. Modification of development standards or processing requirements is warranted to
promote orderly and harmonious development.
2. Modification of development standards or processing requirements will enhance the
opportunity to best utilize special characteristics of an area and will have a beneficial
effect on the area.
3. Benefits derived from the overlay zone cannot be reasonably achieved through
existing development standards or processing requirements.
4. The proposed project offers certain redeeming features to compensate for the
requested zone change.
SECTION 2. Recommendation of Approval. The Planning Commission of the City of
Atascadero, in a regular session assembled on July 19, 2005, resolved to recommend that the
City Council introduce for first reading by title only, an ordinance that would rezone the subject
site consistent with the following:
1. Exhibit A: Location Map/Zone Map Amendment Diagram
ITEM NUMBER: 6
DATE: 7.19.05
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
ITEM NUMBER:
DATE: 7.19.05
Exhibit A: Location Map/Zone Map Amendment Diagram
RS
Proposed Project Site
RMF -16 (Change from RMF -16 to
RMF -16 with PD 26)
RS
RS
c
c
7�
{
RSF-X/PD-17
CPK
ExistingDesignation:
-Residential Multi -family - 16
Proposed Designation:
- Residential Multi -Family -16/ PD 26
ATTACHMENT 7: Draft Resolution PC 2005-0047
Approval of Proposed Master Plan of Development (CUP)
DRAFT RESOLUTION PC 2005-0047
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL APPROVE CONDITIONAL USE PERMIT
2005-0157 (MASTER PLAN OF DEVELOPEMNT)
ON APN 049-042-018
(1155 El Camino Real/Wehn Group LLC)
WHEREAS, an application has been received from Wehn Group LLC (934 Sycamore
Canyon, Paso Robles, CA 93446) Applicant and Property Owner, to consider a project consisting
of a Zone Change from RMF -16 (Residential Multi -family -16) to RMF -16/ PD26 (Residential
Multi -Family -16 with a Planned Development Overlay 26) with corresponding Master Plan of
Development and Vesting Tentative Tract Map on a 5.47 -acre site located at 1155 El Camino
Real,(APN 049-042-018); and,
WHEREAS, the Planning Commission has recommended that the site's Zoning District
be changed from RMF -16 (Residential Multi -Family -16) to RMF -16 with PD26 (Residential
Multi -Family -16 with a Planned Development Overlay 26); and,
WHEREAS, the Custom Planned Development Overlay requires the adoption of a
Master Plan of Development, approved in the form of a Conditional Use Permit; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2005-0028 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone
Change application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of
Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on July 19, 2005 studied and considered the Conditional Use Permit 2005-
0 1 57(Master Plan of Development), after first studying and considering the Proposed Mitigated
Negative Declaration prepared for the project, and
NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings for Approval of Conditional Use Permit. The Planning
Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including provisions of the PD -26 Overlay Zone; and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. The proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. The proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
6. The Master Plan of Development standards or processing requirements will enhance
the opportunity to best utilize special characteristics of an area and will have a
beneficial effect on the area; and
7. Benefits derived from the Master Plan of Development and Custom PD overlay zone
cannot be reasonably achieved through existing development standards or processing
requirements; and,
8. The proposed project will not result in substantial detrimental effects on the
enjoyment and use of adjoining properties; and,
9. The modified height will not exceed the lifesaving equipment capabilities of the Fire
Department
SECTION 2. Findings for Approval of Tree Removal. The Planning Commission finds as
follows:
1. The trees are obstructing proposed improvements that cannot be reasonably designed
to avoid the need for tree removal, as certified by a report from the Site Planner and
determined by the Community Development Department based on the following
factors:
■ Early consultation with the City;
■ Consideration of practical design alternatives;
■ Provision of cost comparisons (from applicant) for practical design alternatives;
■ If saving tree eliminates all reasonable uses of the property; or
■ If saving the tree requires the removal of more desirable trees.
SECTION 3. Recommendation of Approval. The Planning Commission of the City of
Atascadero, in a regular session assembled on July 19, 2005 resolved to recommend that the City
Council approve Conditional Use Permit 2005-0157 (Master Plan of Development) and Tree
Removal Permit subject to the following:
EXHIBIT A: Conditions of approval / Mitigation Monitoring Program
EXHIBIT B: Master Plan of Development
EXHIBIT C: Floor Plan A
EXHIBIT D: Floor Plan A Sections and Elevations
EXHIBIT E:
Floor Plan B
EXHIBIT F:
Floor Plan B Sections and Elevations
EXHIBIT G:
Floor Plan C
EXHIBIT H:
Floor Plan C Sections and Elevations
EXHIBIT I:
Project Site Sections and Entry
EXHIBIT J:
Preliminary Landscape Plan
EXHIBIT K:
Tree Protection Plan
EXBIBIT L: Grading, Drainage and Utility Plan (2 sheets)
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program
Planned Development -26 /CUP 2005-0157/ZCH 2005-0101/TTM 2005-0067
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL: Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
FI: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
Planning Services
1. The approval of this zone change and use permit shall become final and
FM
PS
effective following City Council approval.
2. The approval of this use permit shall become final and effective for the
FM
PS
purposes of issuing building permits thirty (30) days following the City Council
approval of ZCH 2005-0099 and ZCH 2005-0101 upon second reading,
unless prior to that time, an appeal to the decision is filed as set forth in
Section 9-1.111(b) of the Zoning Ordinance.
3. The Community Development Department shall have the authority to approve
BP/FM
PS, CE
the following minor changes to the project that (1) modify the site plan project
by less than 10%, (2) result in a superior site design or appearance, and/or
(3) address a construction design issue that is not substantive to the Master
Plan of Development.
Any other changes to the Master Plan of Development shall be subject to City
Council approval. Any associated Tentative Maps unless shall be subject to
Planning Commission approval.
4. Approval of this Conditional Use Permit shall be valid for twelve (12) months
BP/FM
PS
after its effective date. At the end of the period, the approval shall expire and
become null and void unless the project has received a building permit.
5. The applicant shall defend, indemnify, and hold harmless the City of
Ongoing
PS
Atascadero or its agents, officers, and employees against any claim or action
brought to challenge an approval by the city, or any of its entities, concerning
the subdivision
6. All subsequent Tentative Map and construction permits shall be consistent
BP/FM
PS, CE
with the Master Plan of Development contained herein.
7. All exterior elevations, finish materials and colors shall be consistent with the
BP
PS
Master Plan of Development as shown in EXHIBIT B, D, F and H with the
following modifications:
■ All exterior material finishes (siding, trim, doors, windows, light fixtures,
garage doors) shall be durable, high quality, and consistent with the
architectural appearance.
■ Stucco siding shall be smooth troweled or light sand finish.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
■ Roofs shall be architectural grade dimensional shingles.
8. All site development shall comply with the standards of the Planned
BP
PS, BS
Development 26 Overlay District.
9. All site work, grading, and site improvements shall be consistent with the
BP/FM
PS, BS, CE
Master Plan of Development as shown in EXHIBIT B and L., with the
following modifications:
■ Where feasible and as approved by the fire department, looped streets
or portions thereof shall be designed as on -way streets.
■ Should the width of pavement decrease around the proposed
neighborhood park, sidewalks shall be provided around the open space
area.
■ Unit 25 shall be substituted with a two story unit design.
10. All project fencing shall be installed consistent with EXHIBIT B, I and J subject
GP/BP
PS
to the following modifications:
■ Fencing material and treatment shall comply with the PD26 standards.
■ Final fence location shall be subject to staff approval.
11. Final selection of colors and materials shall be subject to staff approval.
GP/BP
PS
12. A final landscape and irrigation plan shall be approved prior to the issuance of
building permits and included as part of site improvement plan consistent with
EXHIBIT J, and as follows:
■ All exterior meters, air conditioning units and mechanical equipment
shall be screened with landscape material.
■ All areas shown on the landscape plan shall be landscaped by the
developer prior to the final of any single building permit on-site.
■ Final tree list shall be submitted with building permits, subject to staff
approval.
• Street and open space trees shall be minimum 15 -gallon size and
double staked.
■ Front yard areas shall be landscaped with drought tolerant species,
subject to staff approval.
13. The developer and/or subsequent owner shall assume responsibility for the
continued maintenance of all landscape and common areas, consistent with
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
EXHIBIT J.
14. Affordable Housing Requirement: The applicant shall deed restrict a
GP/BP
PS, CA
minimum of 12 residential units for 30 years, prior to or concurrently with the
final map, at a moderate income rate.
All units shall be distributed throughout the project, subject to staff approval.
15. Workforce Housing: Prior to recordation of final map, the applicant shall enter
BP
PS, CA
into a legal agreement with the City to reserve 1/2 of the units for sale to
residents or workers within the City of Atascadero, including the affordable
units. The agreement shall include the following provisions:
■ The units shall be offered for sale to residents or workers within the
City of Atascadero for a minimum of 60 -days. During this time period
offers may only be accepted from Atascadero residents or workers;
■ The applicant shall provide reasonable proof to the City that at least
one of the qualified buyers is a resident or worker within the City
Limits of Atascadero;
■ The Atascadero resident or worker restriction shall apply to the initial
sale only;
■ The applicant shall identify which units will be reserved; and
The City Attorney shall approve the final form of the agreement.
16. A Tree Protection Plan shall be submitted with subsequent building permits
GP/BP
PS
for encroachment within the drip line of native trees located on the subject
parcel and any adjacent properties. The applicant will contract with a certified
arborist to monitor all activity within the drip lines of existing native oak trees.
17. An address marker to include address for all units shall be located at the
GP/BP
PS
public street access point. The address marker shall be compatible with the
project architecture.
18. The emergency services and facility maintenance costs listed below shall
BP
PS
be 100% funded by the project in perpetuity. The service and
maintenance costs shall be funded through a community facilities district
established by the City at the developer's cost. The funding mechanism
must be in place prior to or concurrently with acceptance of the final maps.
The funding mechanism shall be approved by the City Attorney, City
Engineer and Administrative Services Director prior to acceptance of any
final map. The administration of the above mentioned funds shall be by
the City. Developer agrees to participate in the community facilities district
and to take all steps reasonably required by the City with regard to the
establishment of the district and assessment of the property.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
■ All Atascadero Police Department service costs to the project.
■ All Atascadero Fire Department service costs to the project.
■ Off-site common City of Atascadero park facilities maintenance service
costs related to the project.
19. All tract maintenance costs listed below shall be 100% funded by the project
BP
PS
in perpetuity. The service and maintenance cost shall be funded through a
Home Owners Association established by the developer subject to City
approval. The Home Owners Association must be in place prior to, or
concurrently with acceptance of any final maps. The Home Owners
Association shall be approved by the City Attorney, City Engineer and
Administrative Services Director prior to acceptance of any Final Map. The
administration of the above mentioned funds, and the coordination and
performance of maintenance activities, shall be the responsibility of the Home
Owners Association.
a) All streets, bridges, sidewalks, streetlights, street signs, roads,
emergency access roads, emergency access gates, and sewer
mains within the project.
b) All parks, trails, recreational facilities and like facilities.
c) All open space and native tree preservation areas.
d) All drainage facilities and detention basins.
e) All creeks, flood plains, floodways, wetlands, and riparian habitat
areas.
f) All common landscaping areas, street trees, medians, parkway
planters, manufactured slopes outside private yards, and other
similar facilities.
g) All frontage landscaping and sidewalks along arterial streets
20. Prior to final map, the applicant shall submit CC&Rs for review and approval
BP
PS, BS
by the Community Development Department. The CC&R's shall record with
the Final Map and shall include the following:
a) Provisions for maintenance of all common areas including access,
parking, street trees, fencing and landscaping in perpetuity.
b) A detailed list of each individual homeowner's responsibilities for
maintenance of the individual units.
c) Residents shall keep all trash receptacles within the unit's
designated trash storage area.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
d) Garages shall be maintained and used for vehicle parking.
e) No boats, RV's or other type of recreation vehicle may occupy a
guest or resident parking space, including within an individual
garage.
f) A provision for review and approval by the City Community
Development Department for any changes to the CC&R's that relate
to the above requirements prior to the changes being recorded or
taking effect.
21. Approval of this permit shall include the removal of 4 Native Trees, totaling 76
BP
PS, BS
inches dbh. The applicant shall be required to pay mitigation fees or provide
replantings on-site per the requirements of the Atascadero Native Tree
Ordinance. Any additional removals shall be subject to Planning Commission
approval.
City Engineer Conditions
PROJECT SPECIFIC CONDITIONS
Drainage:
22. Obtain approval by the City Engineer of the grading & drainage plan and the
BP, GP
CE
storm drain design & facilities.
23. Submit calculations to support the design of any structures or pipes. Closed
BP, GP
CE
conduits shall be designed to convey the 10 -year flow with gravity flow, the
25 -year flow with head, and provide safe conveyance for the 100 year
overflow.
24. Provide for the detention of the 50 year developed storm runoff, while
BP, GP
CE
metering out the 2 year undeveloped storm runoff. Metered runoff must follow
existing drainage patterns.
25. Show the method of dispersal at all pipe outlets. Include specifications for size
BP, GP
CE
& type. Drainage calculations must show where water flows offsite, and
analyze downstream facilities to ensure adequate capacity.
26. Acquire drainage easements where needed. Drainage shall cross lot lines
BP, GP
CE
only where a drainage easement has been provided.
27. Concentrated drainage from off-site areas shall be conveyed across the
BP, GP
CE
project site in drainage easements. Acquire drainage easements where
needed. Drainage shall cross lot lines only where a drainage easement has
been provided. If drainage easement can not be obtained the storm water
release must follow the exact historic path, rate and velocity as prior to the
subdivision.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
Public Improvements and Maintenance:
28. The applicant must provide for the repair and maintenance of on-site shared
FM
CE
improvements. This includes roads, sidewalks, street trees, streetlights,
private sewer system, drainage facilities, recreation areas and common
landscaping. The two methods that may be used are:
a. Homeowners Association. This private organization would be responsible
for the maintenance, repair and replacement of the facilities.
b. Assessment District and Landscape and Lighting District. Funds for the
maintenance, repair and replacement of the facilities would be collected on
the property tax bill and distributed to the City.
The City Engineer and City Attorney shall approve the final form prior to
recordation.
29. All public improvements shall be constructed in conformance with the City of
BP, GP
CE
Atascadero Engineering Department Standard Specifications and Drawings or
as directed by the City Engineer.
30. The grade lines for all improvements shown on the tentative map may be
BP, GP
CE
subject to change or adjustment by the City Engineer
31. Construction plans shall include plan and profile of sanitary sewer, storm drain
1313, GP
CE
lines, and waterlines.
32. Full frontage improvements are required with this development. These include
BP, GP
CE
curb, gutter, sidewalk and paveout. Public Improvement plans shall be
submitted detailing the design. Final alignment and configuration of EI
Camino Real shall be determined by the City Engineer. This may require
reconfiguration of roadway to allow for parking, bicycle lanes, and / or turn
lane.
33. All handicap ramps shall be constructed to current ADA requirements,
13P, GP
CE
including the use of truncated domes.
34. Prior to issuance of building permits, the applicant shall submit a grading and
BP, GP
CE
drainage plan with a separate sheet(s) devoted to sedimentation and
erosion control, prepared by a registered civil engineer for review and
approval by the City Engineer.
SANITARY SEWER CONDITIONS
35. The Public Works Department shall approve all wastewater facilities prior to
BP, GP
CE
construction. This includes pumps, force mains, cleanouts, manholes and
connections.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
36. Applicant shall pay sewer extension (annexation) fees upon issuance of
13P, GP
CE
building permit. Sewer Connection and Reimbursement fees shall be payable
upon actual connection of the building sewer to the public sewer system.
37. Gravity mains and other sewer facilities within the subdivision shall be
BP, GP
CE
privately owned and maintained.
38. Gravity mains within the subdivision shall be eight (8) inches in diameter.
1313, GP
CE
39. Gravity mains onsite shall end in a manhole.
BP, GP
CE
STANDARD CONDITIONS
40. All public improvements shall be constructed in conformance with the City of
BP, GP
CE
Atascadero Engineering Department Standard Specifications and Drawings or
as directed by the City Engineer.
41. In the event that the applicant is allowed to bond for the public improvements
FM
CE
required as a condition of this map, the applicant shall enter into a Subdivision
Improvement Agreement with the City Council.
42. An engineer's estimate of probable cost shall be submitted for review and
FM
CE
approval by the City Engineer to determine the amount of the bond.
43. The Subdivision Improvement Agreement shall record concurrently with the
FM
CE
Final Map.
44. The applicant shall be responsible for the relocation and/or alteration of
13P, GP
CE
existing utilities.
45. The applicant shall install all new utilities (water, gas, electric, cable TV and
1313, GP
CE
telephone) underground. Utilities shall be extended to the property line
frontage of each lot or its public utility easement.
46. The applicant shall monument all property corners for construction control and
FM
CE
shall promptly replace them if disturbed.
47. The applicant shall acquire title interest in any off-site land that may be
FM
CE
required to allow for the construction of the improvements. The applicant shall
bear all costs associated with the necessary acquisitions. The applicant shall
also gain concurrence from all adjacent property owners whose ingress and
egress is affected by these improvements.
48. Slope easements shall be provided as needed to accommodate cut of fill
FM
CE
slopes.
49. Drainage easements shall be provided as needed to accommodate both
FM
CE
public and private drainage facilities.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
50. The final map shall be signed by the City Engineer prior to the map being
FM
CE
placed on the agenda for City Council acceptance.
51. Prior to recording the tract map, the applicant shall submit a map drawn in
FM
CE
substantial conformance with the approved tentative map and in compliance
with all conditions set forth herein. The map shall be submitted for review and
approval by the City in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
52. Prior to recording the tract map, the applicant shall set monuments at all new
FM
CE
property corners. A registered civil engineer or licensed land surveyor shall
indicate by certificate on the parcel map, that corners have been set or shall
be set by a date specific and that they will be sufficient to enable the survey to
be retraced.
53. Prior to recording the map, the applicant shall complete all improvements
FM
CE
required by these conditions of approval
54. Prior to recording the tract map, the applicant shall have the map reviewed by
FM
CE
all applicable public and private utility companies (cable, telephone, gas,
electric, Atascadero Mutual Water Company). The applicant shall obtain a
letter from each utility company indicating their review of the map. The letter
shall identify any new easements that may be required by the utility company.
A copy of the letter shall be submitted to the City. New easements shall be
shown on the map.
55. Upon recording the final map, the applicant shall provide the City with a black
FM
CE
line clear Mylar (0.4 mil) copy and a blue line print of the recorded map.
56. Prior to the final inspection of any public improvements, the applicant shall
FM
CE
submit a written statement from a registered civil engineer that all work has
been completed and is in full compliance with the approved plans.
57. Prior to the final inspection, the applicant shall submit a written certification
BP, GP
CE
from a registered civil engineer or land surveyor that all survey monuments
have been set as shown on the final map.
58. An encroachment permit shall be obtained prior to any work within City rights
BP, GP
CE
of way.
59. Prior to the issuance of building permits the applicant shall submit a grading
BP, GP
CE
and drainage plan prepared by a registered civil engineer for review and
approval by the City Engineer.
Atascadero Mutual Water Company
60. Before the issuance of building permits, the applicant shall submit plans to
AMWC for the water distribution facilities needed to serve the project.
AMWC shall review and approve the plans before construction begins on
the water system improvements. All water distribution facilities shall be
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
constructed in conformance with AMWC Standards and Details and the
California Waterworks Standards (Code of Regulations Title 22, Division 4,
Chapter 16). All cross -connection devices shall conform to AWWA and
California Department of Health Services standards.
61. Before the start of construction on the water system improvements, the
applicant shall pay all installation and connection fees required by AMWC.
Subject to the approval of AMWC, the applicant may enter in to a "deferred
connection" agreement.
62. Before issuance of building permits, the applicant shall obtain a "Will
Serve" letter from AMWC for the newly created lots within the subdivision.
63. The applicant shall provide AMWC with easements for those water
facilities proposed for operation and maintenance by AMWC that are
constructed outside of publicly maintained right-of-ways. AMWC shall
review the form and content of the easements before recordation.
64. The water mains required to serve the project shall be laid out in a grid or
looped pattern and shall connect to the existing water mains system in EI
Camino Real at two points of connection.
65. The applicant shall provide AMWC with easements for those water
facilities proposed for operation and maintenance by AMWC that are
constructed outside of publicly maintained right-of-ways. AMWC shall
review the form and content of the easements before recordation.
66. The applicant shall submit a hydraulic analysis to AWMC for the water
system improvements for the project. The analysis should take into
account the fire flows required by the Uniform Fire Code and requirements
of the California Waterworks Standards. The applicant is responsible for
designing and constructing water system improvements that will provide
water at pressures and flows adequate for the domestic and fire protection
needs of the project
67. The applicant is responsible for designing and constructing water system
improvements that will provide water at pressures and flows adequate for
the domestic and fire protection needs of the project.
68. The applicant shall obtain a separate landscape -irrigation meter from
AMWC for the common areas within the project.
69. Before construction of the water system improvements, AMWC shall
review and approve the landscape plans for the common areas within the
project. The landscape plan submittal shall incorporate the following
■ Plant list w/ Water Use Classification of Landscape Species
(WUCOLS) rating specified. Preference shall be given to plants with
very low VL and low L WUCOLS ratings.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
■ Justification for use of plants with WUCOLS rating of M or greater.
■ Total landscaped area including hardscapes (patios, walks & decks)
and planted areas and excluding sidewalks, driveways, streets or
parking.
• The size and shape of turf areas shall promote for efficient irrigation
shall be no less than 8 -feet wide. Turf type shall be warm -season
grasses. Turf areas shall be kept to a minimum and shall be limited to
functional areas only. A goal of the landscape design should be a
total turf area of no more than 10% of the total landscaped area
70. Before construction of the water system improvements, AMWC shall
review and approve the irrigation plans for the common areas within the
project. The irrigation plan submittal shall include the following
■ Landscape irrigation meter location and size.
■ Backflow prevention device type, location, and manufacturer
■ Flow and precipitation rate for each circuit
■ Irrigation schedules including schedules for establishment
period and post establishment period
■ Total anticipated water application per circuit per month for
both schedules
■ Total landscape water application.
■ Use drip irrigation where ever possible
■ A check valve shall be installed on the lowest head in each
sprinkler circuit
Mitigation Measures
Mitigation Measure 1.c.1: The project shall maintain a minimum 35 -foot
BP
PS
1.c.1
setback from the eastern property line. A mi9nimum 10 -foot wide landscape
buffer shall be installed by the developer prior to final and a deed restriction
shall be recorded against parcel 24, 25, and 26 requiring continued
maintenance of the landscape buffer. The buffer area shall include evergreen
screen trees such as live oaks and/or cedars.
Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any off site
BP
PS
1.d.1
glare. All exterior site lights shall utilize full cut-off, "hooded" lighting fixtures to
prevent offsite light spillage and glare. Any luminaire pole height shall not
exceed 14 -feet in height, limit intensity to 2.0 foot candles at ingress /egress,
and otherwise 0.6 foot candle minimum to 1.0 maximum in parking areas.
Fixtures shall be shield cut-off type.
Mitigation Measure 3.b.1: The project shall be conditioned to comply with all
BP
BS
3.b.1
applicable District regulations pertaining to the control of fugitive dust (PM -10)
as contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality
Handbook.
■ Asbestos has been identified by the state Air Resources Board as a
toxic air contaminant. Serpentine and ultramafic rocks are very common
in the state and may contain naturally occurring asbestos. Under the
State Air Resources Board Air Toxics Control Measure (ATCM) for
Construction, Grading, Quarrying, and Surface Mining Operations, prior
to any grading activities at the site, the project proponent shall ensure
that a geologic evaluation is conducted to determine if naturally
Conditions of Approval /
Mitigation Monitoring Program
The Village at Oakhaven
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Timing
BL Business
License
GP: Grading Permit
BP: Building Permit
Fl: Final Inspection
TO: Temporary
Occupancy
F0: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Mitigation
Measure
occurring asbestos is present within the area that will be disturbed. If
Naturally Occurring Asbestos (NOA) is found at the site the applicant
must comply with all requirements outlined in the Asbestos ATCM for
Construction, Grading, Quarrying, and Surface Mining Operations. . If
NOA is not present, an exemption request must be filed with the District.
If NOA is found at the site the applicant must comply with all
requirements outlined in the Asbestos ATCM. This may include
development of an Asbestos Dust Mitigation Plan and an Asbestos
Health and Safety Program for approval by the APCD. Should Naturally
Occurring Asbestos be identified within the area of construction, and the
worked area will be less than or equal to one acre, then the dust control
measures identified below are required. If the disturbed area is greater
than one acre, additional requirements may include but are not limited to
1) an Asbestos Dust Mitigation Plan which must be approved by the
District before construction begins, and 2) an Asbestos Health and
Safety Program will also be required for some projects.
■ Dust Control Measures for Construction and Grading Operation Projects
One Acre or Less: No person shall engage in any construction or
grading operation on property where the area to be disturbed is one
(1.0) acre or less unless all of the following dust mitigation measures are
initiated at the start and maintained throughout the duration of the
construction or grading activity:
(A) Construction vehicle speed at the work site must be limited to
fifteen(15) miles per hour or less;
(B) Prior to any ground disturbance, sufficient water must be applied
to the area to be disturbed to prevent visible emissions from
crossing the property line;
(C) Areas to be graded or excavated must be kept adequately wetted
to prevent visible emissions from crossing the property line;
(D) Storage piles must be kept adequately wetted, treated with a
chemical dust suppressant, or covered when material is not being
added to or removed from the pile;
(E) Equipment must be washed down before moving from the
property onto a paved public road; and
(F) Visible track -out on the paved public road must be cleaned using
wet sweeping or a HEPA filter equipped vacuum device within
twenty-four 24 hours
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
Mitigation Measure 3.b.1: Naturally Occurring Asbestos (NOA) has been
BP
PS
3.b.1
identified by the state Air Resources Board as a toxic air contaminant.
Serpentine and ultramafic rocks are very common in the state and may contain
naturally occurring asbestos. Under the State Air Resources Board Air Toxics
Control Measure (ATCM) for Construction, Grading, Quarrying, and Surface
Mining Operations, prior to any grading activities at the site, the project
proponent shall ensure that a geologic evaluation is conducted to determine if
naturally occurring asbestos is present within the area that will be disturbed. If
naturally occurring asbestos is found at the site the applicant must comply with
all requirements outlined in the Asbestos ATCM for Construction, Grading,
Quarrying, and Surface Mining Operations. These requirements may include
but are not limited to 1) an Asbestos Dust Mitigation Plan which must be
approved by the District before construction begins, and 2) an Asbestos Health
and Safety Program will also be required for some projects.
Mitigation Measure 4.e.1: The Grading Plan shall identify tree protection
BP
PS
4.e.1
fencing around the dripline, or as recommended by the project arborist, of each
existing on-site or off-site native tree.
Mitigation Measure 4.e.2: Grading and excavation and grading work shall be
GP
PS
4.e.2
consistent with the City of Atascadero Tree Ordinance. Special precautions
when working around native trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be pruned prior
to any heavy equipment work being done.
4. Vehicles and stockpiled material shall be stored outside the dripline of
all trees.
5. All trees within the area of work shall be fenced for protection with 4 -
foot chain link, snow or safety fencing placed per the approved tree
protection plan. Tree protection fencing shall be in place prior to any
site excavation or grading. Fencing shall remain in place until
completion of all construction activities.
6. Any roots that are encountered during excavation shall be clean cut
by hand and sealed with an approved tree seal.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
Mitigation Measure 4.e.3: The developer shall contract with a certified arborist
GP
PS
4.e.3
during all phases of project implementation. The certified arborists shall be
responsible for monitoring the project during all phases of construction through
project completion, as follows:
(a) A written agreement between the arborist and the developer outlining a
arborist monitoring schedule for each construction phase through final
inspection shall be submitted to and approved by planning staff prior to the
issuance of building/grading permits.
(b) Arborist shall schedule a pre -construction meeting with engineering
/planning staff, grading equipment operators, project superintendent to
review the project conditions and requirements prior to any grubbing or
earth work for any portion of the project site. All tree protection fencing
and trunk protection shall be installed for inspection during the meeting.
Tree protection fencing shall be installed at the line of encroachment into
the tree's root zone area.
(c) As specified by the arborist report and City staff:
■ Prune all trees in active development areas to be saved for structural
strength and crown cleaning by a licensed and certified arborist;
■ Remove all debris and spoils from the lot cleaning and tree pruning.
■ In locations where paving is to occur within the tree canopy, grub only
and do not grade nor compact. Install porous pavers over a three-inch
bed of 1/4 inch granite covered with one -inch pea gravel for screeding.
If curbs are required, use pegged curbs to secure the porous pavers.
Pegged curbs are reinforced six to eight curbs poured at grade with a
one -foot by one -foot pothole every four to six linear feet.
• All trenching or grading within the protected root zone area, outside of
the tree protection fence shall require hand trenching or preserve and
protect roots that are larger than 2 inches in diameter.
■ No grading or trenching is allowed within the fenced protected area.
■ Any roots that are 4 inches in diameter or larger are not to be cut until
inspected and approved by the on-site arborist.
(d) Upon project completion and prior to final occupancy a final status report
shall be prepared by the project arborist certifying that the tree protection
plan was implemented, the trees designated for protection were protected
during construction, and the construction -related tree protection measures
are no longer required for tree protection.
Mitigation Measure 5.b.1: Should any cultural resources be unearthed during
GP, BP
PS, BS
site development work, the provisions of CEQA -Section 15064.5, will be
followed to reduce impacts to a non-significant level.
Mitigation Measure 6.b: The grading permit application plans shall include
GP
CE
6.16
erosion control measures to prevent soil, dirt, and debris from entering the
storm drain system during and after construction. A separate plan shall be
submitted for this purpose and shall be subject to review and approval of the
City Engineer at the time of Building Permit application. (See section 8 of the is
document).
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
PS: Planning Services
BL Business
BS: Building Services
The Village at Oakhaven
License
FD: Fire Department
GP: Grading Permit
PD: Police Department
BP: Building Permit
CE: City Engineer
ZCH 2005-0101, CUP 2005-0157, TTM 2005-0067
Fl: Final Inspection
TO: Temporary
WW: Wastewater
CA: City Attorney
Occupancy
F0: Final Occupancy
Mitigation Measure 6.c.d: A soils report shall be required to be submitted with
GP
BS
6.c.d
a future building permit by the building department. The building plans will be
required to follow the recommendations of the soils report to assure safety for
residents and buildings.
Mitigation Measure 8e.f.1: A Stormwater Pollution Prevention Plan
BP
CE
8.e.f
(SWPPP)/Erosion Control Plan shall be submitted and approved by the City
Engineer prior to the issuance of the building permit. The plan shall include
storm water measures for the operation and maintenance of the project for the
review and approval of the City Engineer. The Building Permit application
plans shall identify Best Management Practices (BMPs) appropriate to the uses
conducted on site that effectively prohibit the entry of pollutants into storm
water runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for ensuring that all
BP
BS,PS,CE
8.ef.2
contractors are aware of all storm water quality measures and that such
measures are implemented. Failure to comply with the approved construction
Best Management Practices will result in the issuance of correction notices,
citations, or stop work orders.
Mitigation Measure 11.d: All construction activities shall comply with the City of
Ongoing
BS/PS
11.d
Atascadero Noise Ordinance for hours of operation.
Mitigation Measure 15.a.b.1: Full frontage improvements shall be required
BP
BS, PS
15.a.b.1
along EI Camino Real. Internal project circulation shall be designed to enhance
flow and minimize traffic conflicts by implementing traffic calming measures
and utilizing one-way streets as appropriate and as approved by the
Community Development Director.
Mitigation Measure 15.c.1: The Contractor shall maintain one lane for traffic at
Ongoing
BS, PS
15.0
all times. Traffic control shall be in accordance with the current Caltrans
manual for traffic control and work area traffic control handbook. No street or
lane closures shall be permitted unless previously arranged for and granted by
the City Engineering Department.
EXHIBIT B: Master Plan of Development/Site Plan
�W ,.
Site I'lanl
Master flan of Development
EXHIBIT C: Floor Plan A
I
I
I I
I
I
I
I t
I
—77
0
I
tiunn mry - flan A
I I
I
�JJI
I I
I
B
I .. ..
J
J--
J
-- --
I ha A. nn •,l
--
A 1st Floor
2nd Floor
3rd Floor
Plan A - Floor Plans
EXHIBIT 0: Floor Plan A Sections and Elevations
– — — - ----------
I Lu, A2 V1.1.1 A4
Front Lie%-,itions
4
D F-
u
Typical Building Sections
Sul,
i k) 11 S
EXHIBIT E: Floor Plan B
I
I
I
1
1
_
Living
Room I
I {'6" x 13 9"
Marler
Bedroom
12'-0" x 13'• 10"
_
I>
Summary - Plan B
... O
-
1100SF
'--Ston•
:.
2 Bedroom, 1.5 Bath
!
L1. I
1Car Gangs
J
I
I
I
I "t 5i- 12, r,+ = 2048,1
Drivihvay
B
,
2nd[:1—, ;WsF
to+r
I
I
I
1st Fhx,r ;90SF
Total Living II50SF
Gamgc 360SF
Deck 30s:
A
1st Floor
2nd Floor
590 SF
Sn0 tiF
Plan B - Floor Plans
EXHIBIT F: Floor Plan B Sections and Elevations
f;tilit] ilit, Sections
I oft Side Right Side
Typical llevation-
Phn 13 - Elevation,) &- IMilding SectINIS
EXHIBIT G: Floor Plan C
i i I
i I
IIL
� 5ununar� - flan C�
1st Floor
95U$r i (ar ll,u,ny i„rerr b�I}I
11r111 C - Floor Plan<
EXHIBIT H: Floor Plan C Sections and Elevations
r
I l
x --
m
1,,:, r „
tiectlons
I \ I'i( SII I Ire ations
Plan C - Elevations & Buildin0- Sections
EXHIBIT I: Project Site Sections and Entry
k
EXHIBIT J: Preliminary Landscape Plan
nine emus 1N'.Ih 11-V tri ..I, ...t�„r.�\,l,
® `re6mrnary l ,uwlxaFe �'ian
EXHIBIT K: Tree Protection Plan
EXHIBIT L: Grading, Drainage and Utility Plan
09
w
z
w m
LLJ
- 1 1!1
, jemp"o
'it
LIM
M
11
sl
20
J F-<
0
z
w C4
<
W-
C)
w
z
z
z�!
LLJ
- 1 1!1
< w
>
< 'T
t- 7)
J F-<
0
z
w C4
<
W-
C)
0<
w <
<
z
sa
�-- .13 ffig
It
F—
2
U) fli
LLJ
>
ii
Lw
It
EXHIBIT L: Grading, Drainage and Utility Plan
1
-1
1
Tj
1
ATTACHMENT 8: Draft Resolution PC 2005-0047
Approval of Proposed Vesting Tentative Tract Map
DRAFT RESOLUTION PC 2005-0047
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, RECOMMENDING
THAT THE CITY COUNCIL APPROVE VESTING TENTATIVE TRACT
MAP 2005-0067, A SIXTY-TWO LOT SUBDIVISION CONSISTENT WITH
A MASTER PLAN OF DEVELOPMENT ON APN 049-042-018
(1155 El Camino Real / Wehn Group LLC)
WHEREAS, an application has been received from Wehn Group LLC (934 Sycamore
Canyon, Paso Robles, CA 93446) Applicant and Property Owner, to consider a project consisting
of a Zone Change from RMF -16 (Residential Multi -family -16) to RMF -16/ PD26 (Residential
Multi -Family -16 with a Planned Development Overlay 26) with corresponding Master Plan of
Development and Vesting Tentative Tract Map on a 5.47 -acre site located at 1155 El Camino
Real,(APN 049-042-018); and,
WHEREAS, the Planning Commission has recommended that the site's Zoning District
be changed from RMF -16 (Residential Multi -Family -16) to RMF-16/PD 26 (Residential Multi-
Family-16/Planned Development Overlay 26); and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2005-0028 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Vesting
Tentative Tract Map application was held by the Planning Commission of the City of Atascadero
at which hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of
Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on July 19, 2005 studied and considered Tentative Tract Map 2005-0067,
after first studying and considering the Proposed Mitigated Negative Declaration prepared for the
project, and
NOW THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings of Approval for Vesting Tentative Tract Map, the Planning
Commission of the City of Atascadero finds as follows:
1. The proposed subdivision, design and improvements as conditioned, is consistent with
the General Plan and applicable zoning requirements, including provisions of the PD -26
overlay district.
2. The proposed subdivision, as conditioned, is consistent with the proposed Planned
Development Overlay District -26 Master Plan of Development (CUP 2005-0167).
3. The site is physically suitable for the type of development proposed.
4. The site is physically suitable for the density of development proposed.
5. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
6. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
7. Covenants, Conditions and Restrictions (CC&R's) or equivalent shall be required that
incorporate the Master Plan of Development conditions of approval to ensure that the site
retains the proposed qualities (architecture, colors, materials, plan amenities, fencing, and
landscaping) over time.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
SECTION 2. Recommendation of Approval. The Planning Commission of the City of
Atascadero, in a regular session assembled on July 19, 2005, resolved to recommend that the
City Council approve Vesting Tentative Tract Map (TTM 2005-0067) subject to the following:
1. Exhibit A: Vesting Tentative Tract Map 2005-0067
2. Exhibit B: Conditions of Approval / Mitigation Monitoring Program.
BE IT FURTHER RESOLVED that a copy of this Resolution be delivered forthwith by
the Planning Commission Secretary to the City Council of the City of Atascadero.
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
Exhibit A: Vesting Tentative Tract Map
"DZ
^ R -- +• r
R
N
� • ' e�•orw•
7 p �,_. 1
�
15
all
fes._
�\
M►r� -•��;C
Q
b
--
Exhibit B: Conditions of Approval / Mitigation Monitoring Program
Tentative Tract Map 2005-0067
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
Improvement Plans
FM: Final Map
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
FO: Final Occupancy
Planning Services
1. The approval of this use permit shall become final and effective for the
FM
PS
purposes of issuing building permits thirty (30) days following the City
Council approval of ZCH 2005-0099 and ZCH 2005-0101 upon second
reading, unless prior to that time, an appeal to the decision is filed as set
forth in Section 9-1.111(b) of the Zoning Ordinance.
2. Approval of this Tentative Tract Map shall be valid for two years after its
FM
PS
effective date. At the end of the period, the approval shall expire and
become null and void unless an extension of time is granted pursuant to a
written request received prior to the expiration date.
3. The Community Development Department shall have the authority to
FM
PS
approve minor changes to the project that (1) result in a superior site
design or appearance, and/or (2) address a design issue that is not
substantive to the Tentative Tract Map and that the Final Map is in
substantial conformance with the Tentative Map.
4. The granting of this entitlement shall apply to the property located at (APN
On going
PS
049-042-018) regardless of owner.
5. The Final Map shall be drawn in substantial conformance with the
FM
PS
approved tentative map, and in compliance with all conditions set forth
herein, shall be submitted for review and approval in accordance with the
Subdivision Map Act and the City's Subdivision Ordinance.
6. The subdivider shall defend, indemnify, and hold harmless the City of
FM
PS
Atascadero or its agents, officers, and employees against any claim or
action brought to challenge an approval by the city, or any of its entities,
concerning the subdivision.
7. The Tract Map shall be subject to additional fees for park or recreation
FM
PS
purposes (QUIMBY Act) as required by City Ordinance.
8. The emergency services and facility maintenance costs listed below
BP
PS
shall be 100% funded by the project in perpetuity. The service and
maintenance costs shall be funded through a community facilities
district established by the City at the developer's cost. The funding
mechanism must be in place prior to or concurrently with acceptance of
the final maps. The funding mechanism shall be approved by the City
Attorney, City Engineer and Administrative Services Director prior to
acceptance of any final map. The administration of the above
mentioned funds shall be by the City. Developer agrees to participate
in the community facilities district and to take all steps reasonably
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
required by the City with regard to the establishment of the district and
assessment of the property.
■ All Atascadero Police Department service costs to the project.
■ All Atascadero Fire Department service costs to the project.
■ Off-site common City of Atascadero park facilities maintenance
service costs related to the project.
9. All tract maintenance costs listed below shall be 100% funded by the
BP
PS
project in perpetuity. The service and maintenance cost shall be funded
through a Home Owners Association established by the developer subject
to City approval. The Home Owners Association must be in place prior to,
or concurrently with acceptance of any final maps. The Home Owners
Association shall be approved by the City Attorney, City Engineer and
Administrative Services Director prior to acceptance of any Final Map.
The administration of the above mentioned funds, and the coordination
and performance of maintenance activities, shall be the responsibility of
the Home Owners Association.
■ All streets, bridges, sidewalks, streetlights, street signs, roads,
emergency access roads, emergency access gates, and sewer
mains within the project.
■ All parks, trails, recreational facilities and like facilities.
■ All open space and native tree preservation areas.
■ All drainage facilities and detention basins.
■ All creeks, flood plains, floodways, wetlands, and riparian
habitat areas.
■ All common landscaping areas, street trees, medians,
parkway planters, manufactured slopes outside private yards,
and other similar facilities.
■ All frontage landscaping and sidewalks along arterial streets
10. Prior to final map, the applicant shall submit CC&Rs for review and
BP
PS
approval by the Community Development Department. The CC&R's shall
record with the Final Map and shall include the following:
a) Provisions for maintenance of all common areas including
access, parking, street trees, fencing and landscaping in
perpetuity.
b) A detailed list of each individual homeowner's responsibilities for
maintenance of the individual units.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
c) Residents shall keep all trash receptacles within the unit's
designated trash storage area.
d) Garages shall be maintained and used for vehicle parking.
e) No boats, RV's or other type of recreation vehicle may occupy a
guest or resident parking space, including within an individual
garage.
f) A provision for review and approval by the City Community
Development Department for any changes to the CC&R's that
relate to the above requirements prior to the changes being
recorded or taking effect.
11. Affordable Housing Requirement: The applicant shall deed restrict a
GP/BP
PS, CA
minimum of 12 residential units for 30 years, at the moderate income rate:
All units shall be distributed throughout the project, subject to staff
approval.
12. Workforce Housing: Prior to recordation of final map, the applicant shall
BP
PS, CA
enter into a legal agreement with the City to reserve 1/2 of the units for sale
to residents or workers within the City of Atascadero, including the
affordable units. The agreement shall include the following provisions:
■ The units shall be offered for sale to residents or workers within the
City of Atascadero for a minimum of 60 -days. During this time period
offers may only be accepted from Atascadero residents or workers;
■ The applicant shall provide reasonable proof to the City that at least
one of the qualified buyers is a resident or worker within the City
Limits of Atascadero;
■ The Atascadero resident or worker restriction shall apply to the initial
sale only;
■ The applicant shall identify which units will be reserved; and
The City Attorney shall approve the final form of the agreement.
13. The developer and/or subsequent owner shall assume responsibility for
Ongoing
PS
the continued maintenance of all landscape and common areas.
14. Deed notification shall be recorded against lots 24, 25, and 26 expressing
the requirements and maintenance responsibilities of the landscape
buffer.
City Engineer Conditions
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
PROJECT SPECIFIC CONDITIONS
Drainage:
71. Obtain approval by the City Engineer of the grading & drainage plan and
BP, GP
CE
the storm drain design & facilities.
72. Submit calculations to support the design of any structures or pipes.
BP, GP
CE
Closed conduits shall be designed to convey the 10 -year flow with gravity
flow, the 25 -year flow with head, and provide safe conveyance for the
100 year overflow.
73. Provide for the detention of the 50 year developed storm runoff, while
BP, GP
CE
metering out the 2 year undeveloped storm runoff. Metered runoff must
follow existing drainage patterns.
74. Show the method of dispersal at all pipe outlets. Include specifications for
BP, GP
CE
size & type. Drainage calculations must show where water flows offsite,
and analyze downstream facilities to ensure adequate capacity.
75. Acquire drainage easements where needed. Drainage shall cross lot
BP, GP
CE
lines only where a drainage easement has been provided.
76. Concentrated drainage from off-site areas shall be conveyed across the
BP, GP
CE
project site in drainage easements. Acquire drainage easements where
needed. Drainage shall cross lot lines only where a drainage easement
has been provided. If drainage easement can not be obtained the storm
water release must follow the exact historic path, rate and velocity as
prior to the subdivision.
Public Improvements and Maintenance:
77. The applicant must provide for the repair and maintenance of on-site
FM
CE
shared improvements. This includes roads, sidewalks, street trees,
streetlights, private sewer system, drainage facilities, recreation areas
and common landscaping. The two methods that may be used are:
a. Homeowners Association. This private organization would be
responsible for the maintenance, repair and replacement of the facilities.
b. Assessment District and Landscape and Lighting District. Funds for the
maintenance, repair and replacement of the facilities would be collected
on the property tax bill and distributed to the City.
The City Engineer and City Attorney shall approve the final form prior to
recordation.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
78. All public improvements shall be constructed in conformance with the City
BP, GP
CE
of Atascadero Engineering Department Standard Specifications and
Drawings or as directed by the City Engineer.
79. The grade lines for all improvements shown on the tentative map may be
BP, GP
CE
subject to change or adjustment by the City Engineer
80. Construction plans shall include plan and profile of sanitary sewer, storm
BP, GP
CE
drain lines, and waterlines.
81. Full frontage improvements are required with this development. These
BP, GP
CE
include curb, gutter, sidewalk and paveout. Public Improvement plans
shall be submitted detailing the design. Final alignment and
configuration of EI Camino Real shall be determined by the City
Engineer. This may require reconfiguration of roadway to allow for
parking and bicycle lanes.
82. All handicap ramps shall be constructed to current ADA requirements,
BP, GP
CE
including the use of truncated domes.
83. Prior to issuance of building permits, the applicant shall submit a grading
BP, GP
CE
and drainage plan with a separate sheet(s) devoted to sedimentation
and erosion control, prepared by a registered civil engineer for review
and approval by the City Engineer.
SANITARY SEWER CONDITIONS
84. The Public Works Department shall approve all wastewater facilities prior
BP, GP
CE
to construction. This includes pumps, force mains, cleanouts, manholes
and connections.
85. Applicant shall pay sewer extension (annexation) fees upon issuance of
BP, GP
CE
building permit. Sewer Connection and Reimbursement fees shall be
payable upon actual connection of the building sewer to the public sewer
system.
86. Gravity mains and other sewer facilities within the subdivision shall be
BP, GP
CE
privately owned and maintained.
87. Gravity mains within the subdivision shall be eight (8) inches in diameter.
BP, GP
CE
88. Gravity mains onsite shall end in a manhole.
BP, GP
CE
STANDARD CONDITIONS
89. All public improvements shall be constructed in conformance with the City
BP, GP
CE
of Atascadero Engineering Department Standard Specifications and
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
Drawings or as directed by the City Engineer.
90. In the event that the applicant is allowed to bond for the public
FM
CE
improvements required as a condition of this map, the applicant shall
enter into a Subdivision Improvement Agreement with the City Council.
91. An engineer's estimate of probable cost shall be submitted for review and
FM
CE
approval by the City Engineer to determine the amount of the bond.
92. The Subdivision Improvement Agreement shall record concurrently with
FM
CE
the Final Map.
93. The applicant shall be responsible for the relocation and/or alteration of
BP, GP
CE
existing utilities.
94. The applicant shall install all new utilities (water, gas, electric, cable TV
BP, GP
CE
and telephone) underground. Utilities shall be extended to the property
line frontage of each lot or its public utility easement.
95. The applicant shall monument all property corners for construction control
FM
CE
and shall promptly replace them if disturbed.
96. The applicant shall acquire title interest in any off-site land that may be
FM
CE
required to allow for the construction of the improvements. The applicant
shall bear all costs associated with the necessary acquisitions. The
applicant shall also gain concurrence from all adjacent property owners
whose ingress and egress is affected by these improvements.
97. Slope easements shall be provided as needed to accommodate cut of fill
FM
CE
slopes.
98. Drainage easements shall be provided as needed to accommodate both
FM
CE
public and private drainage facilities.
99. The final map shall be signed by the City Engineer prior to the map being
FM
CE
placed on the agenda for City Council acceptance.
100. Prior to recording the tract map, the applicant shall submit a map drawn
FM
CE
in substantial conformance with the approved tentative map and in
compliance with all conditions set forth herein. The map shall be
submitted for review and approval by the City in accordance with the
Subdivision Map Act and the City's Subdivision Ordinance.
101. Prior to recording the tract map, the applicant shall set monuments at all
FM
CE
new property corners. A registered civil engineer or licensed land
surveyor shall indicate by certificate on the parcel map, that corners have
been set or shall be set by a date specific and that they will be sufficient
to enable the survey to be retraced.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
102. Prior to recording the map, the applicant shall complete all improvements
FM
CE
required by these conditions of approval
103. Prior to recording the tract map, the applicant shall have the map
FM
CE
reviewed by all applicable public and private utility companies (cable,
telephone, gas, electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility company indicating their
review of the map. The letter shall identify any new easements that may
be required by the utility company. A copy of the letter shall be submitted
to the City. New easements shall be shown on the map.
104. Upon recording the final map, the applicant shall provide the City with a
FM
CE
black line clear Mylar (0.4 mil) copy and a blue line print of the recorded
map.
105. Prior to the final inspection of any public improvements, the applicant
FM
CE
shall submit a written statement from a registered civil engineer that all
work has been completed and is in full compliance with the approved
plans.
106. Prior to the final inspection, the applicant shall submit a written
BP, GP
CE
certification from a registered civil engineer or land surveyor that all
survey monuments have been set as shown on the final map.
107.An encroachment permit shall be obtained prior to any work within City
BP, GP
CE
rights of way.
108. Prior to the issuance of building permits the applicant shall submit a
BP, GP
CE
grading and drainage plan prepared by a registered civil engineer for
review and approval by the City Engineer.
Atascadero Mutual Water Company
109. Before the issuance of building permits, the applicant shall submit plans
to AMWC for the water distribution facilities needed to serve the project.
AMWC shall review and approve the plans before construction begins
on the water system improvements. All water distribution facilities shall
be constructed in conformance with AMWC Standards and Details and
the California Waterworks Standards (Code of Regulations Title 22,
Division 4, Chapter 16). All cross -connection devices shall conform to
AWWA and California Department of Health Services standards.
110. Before the start of construction on the water system improvements, the
applicant shall pay all installation and connection fees required by
AMWC. Subject to the approval of AMWC, the applicant may enter in
to a "deferred connection" agreement.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
111. Before issuance of building permits, the applicant shall obtain a "Will
Serve" letter from AMWC for the newly created lots within the
subdivision.
112. The applicant shall provide AMWC with easements for those water
facilities proposed for operation and maintenance by AMWC that are
constructed outside of publicly maintained right-of-ways. AMWC shall
review the form and content of the easements before recordation.
113.The water mains required to serve the project shall be laid out in a grid
or looped pattern and shall connect to the existing water mains system
in EI Camino Real at two points of connection.
114. The applicant shall provide AMWC with easements for those water
facilities proposed for operation and maintenance by AMWC that are
constructed outside of publicly maintained right-of-ways. AMWC shall
review the form and content of the easements before recordation.
115.The applicant shall submit a hydraulic analysis to AWMC for the water
system improvements for the project. The analysis should take into
account the fire flows required by the Uniform Fire Code and
requirements of the California Waterworks Standards. The applicant is
responsible for designing and constructing water system improvements
that will provide water at pressures and flows adequate for the domestic
and fire protection needs of the project
116. The applicant is responsible for designing and constructing water
system improvements that will provide water at pressures and flows
adequate for the domestic and fire protection needs of the project.
117.The applicant shall obtain a separate landscape -irrigation meter from
AMWC for the common areas within the project.
118. Before construction of the water system improvements, AMWC shall
review and approve the landscape plans for the common areas within
the project. The landscape plan submittal shall incorporate the following
■ Plant list w/ Water Use Classification of Landscape Species
(WUCOLS) rating specified. Preference shall be given to plants
with very low (VL) and low (L) WUCOLS ratings.
■ Justification for use of plants with WUCOLS rating of M or greater.
■ Total landscaped area including hardscapes (patios, walks &
decks) and planted areas and excluding sidewalks, driveways,
streets or parking.
■ The size and shape of turf areas shall promote for efficient
irrigation shall be no less than 8 -feet wide. Turf type shall be
warm -season grasses. Turf areas shall be kept to a minimum and
shall be limited to functional areas only. A goal of the landscape
design should be a total turf area of no more than 10% of the total
landscaped area
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
119. Before construction of the water system improvements, AM WC shall
review and approve the irrigation plans for the common areas within the
project. The irrigation plan submittal shall include the following
■ Landscape irrigation meter location and size.
■ Backflow prevention device type, location, and
manufacturer
■ Flow and precipitation rate for each circuit
■ Irrigation schedules including schedules for establishment
period and post establishment period
■ Total anticipated water application per circuit per month
for both schedules
■ Total landscape water application.
■ Use drip irrigation where ever possible
■ A check valve shall be installed on the lowest head in
each sprinkler circuit
Mitigation Measures
Mitigation Measure 1.c.1: The project shall maintain a minimum 35 -foot
BP
PS
1.c.1
setback from the eastern property line. A mi9nimum 10 -foot wide landscape
buffer shall be installed by the developer prior to final and a deed restriction
shall be recorded against parcel 24, 25, and 26 requiring continued
maintenance of the landscape buffer. The buffer area shall include
evergreen screen trees such as live oaks and/or cedars.
Mitigation Measure 1.d.1: All lighting shall be designed to eliminate any off
BP
PS
1.d.1
site glare. All exterior site lights shall utilize full cut-off, "hooded" lighting
fixtures to prevent offsite light spillage and glare. Any luminaire pole height
shall not exceed 14 -feet in height, limit intensity to 2.0 foot candles at
ingress /egress, and otherwise 0.6 foot candle minimum to 1.0 maximum in
parking areas. Fixtures shall be shield cut-off type.
Mitigation Measure 3.b.1: The project shall be conditioned to comply with all
BP
BS
3.b.1
applicable District regulations pertaining to the control of fugitive dust (PM -
10) as contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality
Handbook.
• Asbestos has been identified by the state Air Resources Board as a
toxic air contaminant. Serpentine and ultramafic rocks are very
common in the state and may contain naturally occurring asbestos.
Under the State Air Resources Board Air Toxics Control Measure
(ATCM) for Construction, Grading, Quarrying, and Surface Mining
Operations, prior to any grading activities at the site, the project
proponent shall ensure that a geologic evaluation is conducted to
determine if naturally occurring asbestos is present within the area
that will be disturbed. If Naturally Occurring Asbestos (NOA) is found
at the site the applicant must comply with all requirements outlined in
the Asbestos ATCM for Construction, Grading, Quarrying, and
Surface Mining Operations. . If NOA is not present, an exemption
request must be filed with the District. If NOA is found at the site the
applicant must comply with all requirements outlined in the Asbestos
Conditions of Approval /
Mitigation Monitoring Program
The Village at Oakhaven
Vesting Tentative Tract Map
TTM 2005-0067
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision
FMFi Final Improvement Plans
TO: Temporary
Occupancy
FI: Final inspection
F0: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Mitigation
Measure
ATCM. This may include development of an Asbestos Dust
Mitigation Plan and an Asbestos Health and Safety Program for
approval by the APCD. Should Naturally Occurring Asbestos be
identified within the area of construction, and the worked area will be
less than or equal to one acre, then the dust control measures
identified below are required. If the disturbed area is greater than one
acre, additional requirements may include but are not limited to 1) an
Asbestos Dust Mitigation Plan which must be approved by the District
before construction begins, and 2) an Asbestos Health and Safety
Program will also be required for some projects.
■ Dust Control Measures for Construction and Grading Operation
Projects One Acre or Less: No person shall engage in any
construction or grading operation on property where the area to be
disturbed is one (1.0) acre or less unless all of the following dust
mitigation measures are initiated at the start and maintained
throughout the duration of the construction or grading activity:
(A) Construction vehicle speed at the work site must be limited to
fifteen(15) miles per hour or less;
(B) Prior to any ground disturbance, sufficient water must be
applied to the area to be disturbed to prevent visible emissions
from crossing the property line;
(C) Areas to be graded or excavated must be kept adequately
wetted to prevent visible emissions from crossing the property
line;
(D) Storage piles must be kept adequately wetted, treated with a
chemical dust suppressant, or covered when material is not
being added to or removed from the pile;
(E) Equipment must be washed down before moving from the
property onto a paved public road; and
(F) Visible track -out on the paved public road must be cleaned
using wet sweeping or a HEPA filter equipped vacuum device
within twenty-four 24 hours
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
Mitigation Measure 3.b.1: Naturally Occurring Asbestos (NOA) has been
BP
PS
3.b.1
identified by the state Air Resources Board as a toxic air contaminant.
Serpentine and ultramafic rocks are very common in the state and may
contain naturally occurring asbestos. Under the State Air Resources Board
Air Toxics Control Measure (ATCM) for Construction, Grading, Quarrying,
and Surface Mining Operations, prior to any grading activities at the site, the
project proponent shall ensure that a geologic evaluation is conducted to
determine if naturally occurring asbestos is present within the area that will
be disturbed. If naturally occurring asbestos is found at the site the
applicant must comply with all requirements outlined in the Asbestos ATCM
for Construction, Grading, Quarrying, and Surface Mining Operations.
These requirements may include but are not limited to 1) an Asbestos Dust
Mitigation Plan which must be approved by the District before construction
begins, and 2) an Asbestos Health and Safety Program will also be required
for some projects.
Mitigation Measure 4.e.1: The Grading Plan shall identify tree protection
BP
PS
4.e.1
fencing around the dripline, or as recommended by the project arborist, of
each existing on-site or off-site native tree.
Mitigation Measure 4.e.2: Grading and excavation and grading work shall
GP
PS
4.e.2
be consistent with the City of Atascadero Tree Ordinance. Special
precautions when working around native trees include:
7. All existing trees outside of the limits of work shall remain.
8. Earthwork shall not exceed the limits of the project area.
9. Low branches in danger of being torn from trees shall be pruned
prior to any heavy equipment work being done.
10. Vehicles and stockpiled material shall be stored outside the dripline
of all trees.
11. All trees within the area of work shall be fenced for protection with
4 -foot chain link, snow or safety fencing placed per the approved
tree protection plan. Tree protection fencing shall be in place prior
to any site excavation or grading. Fencing shall remain in place
until completion of all construction activities.
12. Any roots that are encountered during excavation shall be clean cut
by hand and sealed with an approved tree seal.
Conditions of Approval /
Mitigation Monitoring Program
The Village at Oakhaven
Vesting Tentative Tract Map
TTM 2005-0067
Timing
GP: Grading Permit
BP: Building Permit
SIP: Subdivision
FMFi Final Improvement Plans
TO: Temporary
Occupancy
FI: Final inspection
F0: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: Fire Department
PD: Police Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
AMWC: Water Comp.
Mitigation
Measure
Mitigation Measure 4.e.3: The developer shall contract with a certified
GP
PS
4.e.3
arborist during all phases of project implementation. The certified arborists
shall be responsible for monitoring the project during all phases of
construction through project completion, as follows:
(a) A written agreement between the arborist and the developer outlining a
arborist monitoring schedule for each construction phase through final
inspection shall be submitted to and approved by planning staff prior to
the issuance of building/grading permits.
(b) Arborist shall schedule a pre -construction meeting with engineering
/planning staff, grading equipment operators, project superintendent to
review the project conditions and requirements prior to any grubbing or
earth work for any portion of the project site. All tree protection fencing
and trunk protection shall be installed for inspection during the meeting.
Tree protection fencing shall be installed at the line of encroachment
into the tree's root zone area.
(c) As specified by the arborist report and City staff:
■ Prune all trees in active development areas to be saved for
structural strength and crown cleaning by a licensed and certified
arborist;
■ Remove all debris and spoils from the lot cleaning and tree pruning.
■ In locations where paving is to occur within the tree canopy, grub
only and do not grade nor compact. Install porous pavers over a
three-inch bed of % inch granite covered with one -inch pea gravel
for screeding. If curbs are required, use pegged curbs to secure the
porous pavers. Pegged curbs are reinforced six to eight curbs
poured at grade with a one -foot by one -foot pothole every four to six
linear feet.
■ All trenching or grading within the protected root zone area, outside
of the tree protection fence shall require hand trenching or preserve
and protect roots that are larger than 2 inches in diameter.
■ No grading or trenching is allowed within the fenced protected area.
■ Any roots that are 4 inches in diameter or larger are not to be cut
until inspected and approved by the on-site arborist.
(d) Upon project completion and prior to final occupancy a final status
report shall be prepared by the project arborist certifying that the tree
protection plan was implemented, the trees designated for protection
were protected during construction, and the construction -related tree
protection measures are no longer required for tree protection.
Mitigation Measure 5.b.1: Should any cultural resources be unearthed
GP, BP
PS, BS
during site development work, the provisions of CEQA -Section 15064.5, will
be followed to reduce impacts to a non-significant level.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
The Village at Oakhaven
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Vesting Tentative Tract Map
FMFi Final Improvement Plans
PD: Police Department
CE: City Engineer
TTM 2005-0067
TO: Temporary
Occupancy
WW: Wastewater
CA: City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
Mitigation Measure 6.b: The grading permit application plans shall include
GP
CE
6.b
erosion control measures to prevent soil, dirt, and debris from entering the
storm drain system during and after construction. A separate plan shall be
submitted for this purpose and shall be subject to review and approval of the
City Engineer at the time of Building Permit application. (See section 8 of the
is document).
Mitigation Measure 6.c.d: A soils report shall be required to be submitted
GP
BS
6.c.d
with a future building permit by the building department. The building plans
will be required to follow the recommendations of the soils report to assure
safety for residents and buildings.
Mitigation Measure 8e.f.1: A Stormwater Pollution Prevention Plan
BP
CE
8.e.f
(SWPPP)/Erosion Control Plan shall be submitted and approved by the City
Engineer prior to the issuance of the building permit. The plan shall include
storm water measures for the operation and maintenance of the project for
the review and approval of the City Engineer. The Building Permit
application plans shall identify Best Management Practices (BMPs)
appropriate to the uses conducted on site that effectively prohibit the entry of
pollutants into storm water runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for ensuring that
BP
BS,PS,CE
8.ef.2
all contractors are aware of all storm water quality measures and that such
measures are implemented. Failure to comply with the approved
construction Best Management Practices will result in the issuance of
correction notices, citations, or stop work orders.
Mitigation Measure 11.d: All construction activities shall comply with the
Ongoing
BS/PS
11.d
City of Atascadero Noise Ordinance for hours of operation.
Mitigation Measure 15.a.b.1: Full frontage improvements shall be required
BP
BS, PS
15.a.b.1
along EI Camino Real. Internal project circulation shall be designed to
enhance flow and minimize traffic conflicts by implementing traffic calming
measures and utilizing one-way streets as appropriate and as approved by
the Community Development Director.
Mitigation Measure 15.c.1: The Contractor shall maintain one lane for traffic
Ongoing
BS, PS
15.c.1
at all times. Traffic control shall be in accordance with the current Caltrans
manual for traffic control and work area traffic control handbook. No street
or lane closures shall be permitted unless previously arranged for and
granted by the City Engineering Department.
ITEM NUMBER: 7
DATE: 7-19-05
Atascadero Planning Commission
Staff Report - Community Development Department
Conditional Use Permit 2003-0112 /
Tentative Tract Map 2003-0037 Amendment
(1325 EI Camino Real, City Engineer)
SUBJECT:
The proposed Conditional Use Permit and Tentative Tract Map Amendment consists of
a request to eliminate conditions of approval which prohibit sewer extension to adjacent
projects.
RECOMMENDATION:
1. The Planning Commission adopt Resolution PC2005-0052 to approve the
proposed amendment.
SITUATION AND FACTS:
1. Applicant / Representative: City of Atascadero
2. Project Address: 1325 EI Camino Real, Atascadero, CA 93422
(San Luis Obispo County) APN 049-101-009, 049-101-
010
3. General Plan Designation: SFR -X
4. Zoning District: RSF-X / PD -17
5. Site Area: 7.09 acres
6. Existing Use: Approved 31 unit single family subdivision currently
under construction
7. Environmental Status: Consistent with Certified Mitigated Negative Declaration
2004-0010
ITEM NUMBER
DATE: 7-19-05
Background
On January 27, 2004, the City Council approved a Planned Development 17 Overlay
District with associated Conditional Use Permit and Tentative Tract Map for a 31 -unit
single-family development on the subject site. At that time, the project included a
condition that restricted extension of the private sewer system to future adjacent
projects.
The City Engineer is sponsoring an amendment to this condition to allow
extension of the sewer, should the appropriate maintenance mechanism be in
place.
Proposed Amendment
The conditions of approval are proposed to be amended as follows:
Condition CUP 40 / TTM 40: The sanitary sewer main on the south end of Copado Way_
may extend to the adjoining property or Carrizo Road. fano shared private
sewer system will require a maintenance agreement that includes all
residents benefiting from the private system.
The proposed amendment will allow the project site to the South to connect to the
private sewer system. Should the currently approved project to the South connect to the
private sewer system, sewer will not be extended up Carrizo Rd at this time. Properties
in both tracts will be required to participate in a joint maintenance district, or similar
mechanism, to ensure continued maintenance of the private sewer system.
Environmental Determination
The proposed request is consistent with Certified Mitigated Negative Declaration 2004-
0010.
CONCLUSION:
The proposed request amendment will allow connectivity of the private sewer
system to adjacent future projects. Staff recommends that the Planning
Commission approve resolution PC 2005-0052 to amend the conditions of
approval for Tract 2577 related to sewer extension to adjacent projects.
Deleted: ,
Deleted: shall not
Deleted: Development south of
project shall connect to future sewer
main, which shall run up Carrizo
Road from EI Camino Real
ITEM NUMBER
DATE: 7-19-05
ALTERNATIVES:
The Planning Commission may deny the amendment. If denied, the condition will
remain as approved and sewer for the project to the south will be required to be
extended up Carrizo Rd.
2. The Planning Commission may continue the hearing and refer the project back to
staff for further analysis. Direction should be given to staff on required additional
information.
PREPARED BY: Kelly Gleason, Associate Planner
ATTACHMENTS:
Attachment 1: Location Map (General Plan & Zoning)
Attachment 2: Draft Resolution PC 2005-0052
\\Cityhall\cdvlpmnt\-ZCH - Zone Change\ZC 03\ZCH 2003-0063 PD -171325 EI Camino Real\CUP.TTM Amendment\CUP AMENDMENT.PC-SR.kg.doc
ITEM NUMBER
DATE: 7-19-05
Attachment 1: Location Map, General Plan and Zoning
Project I�
U.S. Hwy 101 N. I I Site
RMF -16
�, RS
,1
RSF-X
EI Camino Real Carrizo Road
RSF-X
RS CPK
General Plan
SFR -X
Zoning District
RSF-X / PD -17
Attachment 2: Draft Resolution PC 2005-00052
DRAFT
RESOLUTION PC 2005-0052
RESOLUTION OF THE ATASCADERO PLANNING
COMMISSION APPROVING AN AMENDMENT TO CONDITIONAL USE
PERMIT 2003-0112 AND TENTATIVE TRACT MAP 2003-0037 TO
MODIFY CONDITION 40 TO ALLOW EXTENSION OF THE PRIVATE
SEWER SYSTEM TO ADJACNET PROJECTS
(1325 El Camino Real / City of Atascadero)
WHEREAS, an application has been received from the City of Atascadero (6905 El
Camino Real, Suite 6, Atascadero, CA 93422), Applicant, to consider a project consisting of an
amendment to Conditional Use Permit 2003-0112 and Tentative Tract Map 2003-0037 to allow
extension of the private sewer system to adjacent projects; and,
WHEREAS, the proposed project is located within the SFR -X (Single -Family
Residential - X) land use designation of the City of Atascadero's General Plan Land Use
Diagram; and,
WHEREAS, the proposed project is located within the RSF-X / PD -17 (Residential
Single -Family — X / Planned Development Overlay Zone #17) zoning district,
WHEREAS, the project is consistent with certified Mitigated Negative Declaration
2004-0010; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on July 19, 2005, studied and considered the proposed Conditional Use
Permit Amendment; and,
WHEREAS, the Planning Commission has determined that the proposed request is
consistent with the Master Plan of Development on the subject site; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Findings of Environmental Consistency. The Planning Commission
finds as follows:
1. The proposed project has been analyzed adequately in Certified Mitigated Negative
Declaration 2002-0041 for the original Conditional Use Permit for the project site
development.
SECTION 2. Findings for Approval of Conditional Use Permit Amendment. The
Planning Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because of
the circumstances and conditions applied in the particular case, be detrimental to the
health, safety, or welfare of the general public or persons residing or working in the
neighborhood of the use, or be detrimental or injurious to property or improvements in
the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved in
conjunction with the project, or beyond the normal traffic volume of the surrounding
neighborhood that would result from full development in accordance with the Land Use
Element.
SECTION 3. Approval of Conditional Use Permit Amendment. The Planning
Commission does hereby approve an amendment to Conditional Use Permit 2003-0112 to
modify condition 40 of the CUP and TTM to allow extension of the private sewer system to
adjacent projects, consistent with the following:
EXHIBIT A: Amended Conditions of Approval — CUP 2003-0112
EXHIBIT B: Amended Conditions of Approval — TTM 2003-0037
On motion by Commissioner , and seconded by Commissioner the foregoing
resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ABSTAIN: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Greg Porter
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
EXHIBIT A: Conditions of Approval - Conditional Use Permit 2003-0112
Master Plan of Development & Tentative Tract Map Amendment
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business License
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: Fire Department
PO -17 Master Plan of Development
BP: Building Penn@
FI: Finallnspeclim
PD: Police Department
CE: City Engineer
CUP 2003-0112/ZCH 2003-0063
OTOpantancorry
py
CX' Wastewater
CA CRy Attorney
F0: Final Occupancy
Planning Services
1. The approval of this Zone Change and Use Permit shall become
BP
PS
final and effective following City Council approval.
2. Approval of this Master Plan of Development shall be valid
FM
PS
concurrently with the life of Tentative Tract Map 2003-0037 and
then indefinitely following final map. The Master Plan of
Development approval shall expire and become null and void
unless a final map is recorded consistent with the Master Plan of
Development.
3. Changes to the Master Plan of Development shall be approved by
On-going
PS
the Planning Commission and do not require Council action.
4. The Community Development Department shall have the authority
BP/FM
PS
to approve the following minor changes to the project the (1)
modify the site plan project by less than 10%, (2) result in a
superior site design or appearance, and/or (3) address a
construction design issue that is not substantive to the Master
Plan of Development. The Planning Commission shall have the
final authority to approve any other changes to the Master Plan of
Development and any associated Tentative Maps unless
appealed to the City Council.
5. All subsequent Tentative Tract Map and construction permits shall
BP / FM
PS
be consistent with the Master Plan of Development contained
herein.
6. All exterior elevations, finish materials and colors shall be
BP
PS
consistent with the Master Plan of Development as shown in
Exhibits B - H.
7. All site development shall be consistent with the maximum
BP/FM
PS
intensities described in the statistical project summary as shown
on Exhibit D.
8. All site work, grading and site improvements shall be consistent
BP/FM
PS
with the Master Plan of Development as shown in Exhibit G
9. A final landscape and irrigation plan shall be approved prior to the
BP
PS
issuance of building permits and included as part of site
improvement plan consistent with EXHIBIT B, C, and D. All
exterior meters, air conditioning units and mechanical equipment
shall be screened with landscape material. Trash/recycle
container areas shall be screened with fencing or landscape.
The developer shall landscape all front and street -facing side
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
PD -17 Master Plan of Development
BP: Building Pennit
FI: Finallnspecbm
PD: Police Department
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final Occupancy
yards. All landscape maintenance shall be the responsibility of the
individual property owner.
All proposed tree locations, species, and sizes shall be as
identified in Exhibits C and E. Trees shall be double staked.
Lot 1: Drainage detention basins shall be landscaped by the
developer and maintained by either the property owner or the
homeowner's association. The open space area shall be
landscaped with drought tolerant vegetation and shall be designed
as a passive neighborhood park feature.
Additional landscape buffering in the form of 15 -gallon trees and
shrubs shall be planted along the rear yard properties of lots 15,
16, 17, 18, as feasible with plant selection, quantity and placement
subject to staff approval.
Landscaping underneath the canopy of existing native oak trees
shall utilize a 4 to 6 inch thick layer of mulch. Only compatible
native or drought resistant plant materials with special low-water
irrigation systems may be installed under the tree canopy, subject
to review and written approval of the project tree arborist, and
subject to final staff approval.
10. All project fencing shall be installed consistent with EXHIBIT E
BP
PS
subject to the following modifications.
The design of all fencing shall be compatible with the overall
project design, subject to staff approval
11. Affordable Housing Requirement: The applicant shall designate
FM, BP
PS, CE
six deed -restricted units for a 30 -year period as follows: six
moderate -income units. Such units shall be located throughout the
project and shall be subject to planning staff approval.
12. Affordable Workforce Housing
FM, BP
PS, CE
Prior to recordation of final map, the applicant shall enter into a
legal agreement with the City to reserve Yz of the units for sale to
residents or workers within the City of Atascadero, including the
affordable units. The agreement shall include the following
provisions:
The units shall be offered for sale to residents or workers within
the City of Atascadero for a minimum of 60 -days. During this
time period offers may only be accepted from Atascadero
residents or workers;
The applicant shall provide reasonable proof to the City that at
least one of the qualified buyers is a resident or worker within
the City Limits of Atascadero;
The Atascadero resident or worker restriction shall apply to the
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
PD -17 Master Plan of Development
BP: Building Pennit
FI: Finallnspecbm
PD: Police Department
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final Occupancy
initial sale only;
The applicant shall identify which units will be reserved; and
The City Attorney shall approve the final form of the agreement.
13. All exterior material finishes (brick, stone, clapboard siding, plaster
BP
PS
siding, materials, lighting, garage doors) shall be durable, high
quality, and consistent with the architectural appearance of each
home.
A variety of garage doors shall be used, be of superior
architectural design quality, and be of stained wood finish or
painted to match the residence main body color.
14. Street terminus shall require the following, subject to staff
BP, FM
PS, CE
approval:
Deed notification to each property on the subject street that the
street will be extended in the future to possible future residential
development.
15. Tree mitigation shall include payment by the applicant of up to
BP, FM
PS, CE
$4,329.17 into the City tree replacement fund.
A mitigation bond payment equal to the mitigation fee shall be
collected for all native trees with impacts of greater than 5%. The
bond shall be held for 18 months following the project final.
16. The colony house shall be located on lot #32. Front yard and
BP, FM
PS, CE
street -facing side yard shall be landscaped by the applicant. The
lot shall include a deed restriction preventing the site from being
altered in any manner that would degrade the significance of this
historic house. The HS (Historic Structure) overlay zone
designation shall also be applied to Lot 32.
Any future alterations to the site or the residence will require a
Precise Plan application to be reviewed and approved by the
Planning Department.
17. The applicant shall apply the Taussig fiscal impact model to the
BP, FM
PS, CE
project to identify the increase in City service cost resulting from
project implementation and assess those properties to offset any
potential revenue losses to the City.
Building Services
18. A soils investigation prepared by a licensed Geotechnical
BP
FM
Engineer is to be provided for the project. The report is to be
provided at the time of building permit submittal along with the
building plans for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
PD -17 Master Plan of Development
BP: Building Pennit
FI: Finallnspecbm
PD: Police Department
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
T0: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final 0—pancy
Fire Marshal
19. Final street name selection shall be consistent with the future
BP
PS, BS
street extension, subject to staff approval.
20. Provide a letter from the Atascadero Mutual Water Company
BP
BS
stating the minimum expected water available to the site.
Amount available must meet min. requirement specified in the
California Fire Code.
21. Note approved address signage is to be provided.
BP
BS
22. Note on plans that fire lanes shall be delineated to restrict
BP
BS
parking as required by the Fire Authority.
City Engineer Project Conditions
Drainage:
23. All drainage facilities shall be designed and constructed in
BP
PW
accordance with the current City of Atascadero Engineering
Standards.
24. The applicant shall submit drainage calculations for review and
approval of the City Engineer.
25. All drainage basins shall detain the difference in the 2 -year
BP
PW
storm runoff or the undeveloped site and the 50 -year storm
runoff of the developed site. The outlet pipe or channel shall be
sized for the 2 -year storm peak runoff rate for the undeveloped
site at full capacity.
26. The applicant shall address storm water detention to the
BP/FM
PW
satisfaction of the City Engineer, prior to grading and drainage
approval, or approval of the final map.
27. A homeowners association, or other funding and maintenance
FM
PW
agreement shall be submitted for approval by the City Engineer
and the City Attorney prior to recording the final map. The
agreement shall cover scheduled maintenance of the pervious
avers, and maintenance of the drainage facilities.
28. Existing drainage patterns from adjacent properties shall not be
BP
PW
obstructed.
29. All drainage from improvements shall cross property lines within
BP
PW
drainage easements.
30. Drainage at the rear of the lots must be carried across property
BP
PW
lines in a closed conduit.
Frontage Improvements:
BP
PW
31. Project shall include construction of curb, gutter and sidewalk
BP
PW
along entire EI Camino Real frontage.
32. Alignment of frontage improvements shall be approved by the
BP
PW
City Engineer.
33. The entry location of project on EI Camino Real shall be located
BP
PW
in such a location as to provide adequate site distance for
vehicles exiting project.
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
private Sewer system will require a maintenance agreement that
PS: Planning Services
Measure
includes all residents benefiting from the rivate s stem.
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
PD -17 Master Plan of Development
BP: Building Pennit
FI: Finallnspecbm
PD: Police Department
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final O=pancy
34. All utilities shall be undergrounded on EI Camino Real
BP
PW
Improvement Maintenance:
Street Improvements and landscaping.
35. All street improvements shall be constructed in accordance with
BP
PW
City of Atascadero Engineering Standards.
36. Prior to recording the final map, provisions for the repair and
FM
PW
maintenance of all street and landscaping improvements shall
be included in the CC&R's for this tract. Included shall be a
mechanism to maintain the streets and landscaping, such as a
homeowners association. The City Engineer and City Attorney
shall approve the final form prior to recordation.
Wastewater:
36. All onsite sewer mains shall be privately owned and maintained.
BP
PW
37. Prior to recording the final map, provisions for the repair and
BP
PW
maintenance of the private SS shall be included in the CC&R's
for this tract. Included shall be a mechanism to maintain the
private sewer and structures, such as a homeowners
association. The City Engineer and City Attorney shall approve
the final form prior to recordation.
38. Applicant shall pay sewer extension (Annexation), Connection
BP
PW
and Reimbursement fees (if applicable) upon issuance of
building permit.
39. Gravity mains within the subdivision shall be eight (8) inches in
BP
PW
diameter.
40. The sanitary sewer main on the south end of Copado Way May
BP
PW
extend to the adjoining property or Carrizo Road. Any shared
private Sewer system will require a maintenance agreement that
includes all residents benefiting from the rivate s stem.
41. Drainage piping serving fixtures which have flood level rims BP PW
located below the elevation of the next upstream manhole cover
of the public or private sewer serving such drainage piping shall
be protected from backflow of sewage by installing an approved
type backwater valve. Fixtures above such elevation shall not
discharge through the backwater valve.
42. All sanitary sewer (SS) mains shall terminate in manholes BP PW
unless extension of the main, at some later date, is anticipated.
If extension of a SS main is anticipated, said SS main may
terminate in a cleanout providing the next downstream manhole
is less than 300 linear feet from the cleanout and that the point
of termination is not a reasonable location for a SS main angle
In the event that the applicant is allowed to bond for the public
improvements required as a condition of this map, the applicant
shall enter into a Subdivision Improvement Agreement with the
City Council.
Deleted: ,
Deleted: shall not
Deleted: Development south of
project shall connect to future sewer
main, which shall run up Carrizo
Road from EI Camino Real
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
PD -17 Master Plan of Development
BP: Building Pennit
FI: Finallnspecbm
PD: Police Department
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final Occupancy
44. An engineer's estimate of probable cost shall be submitted for
BP
PW
review and approval by the City Engineer to determine the
amount of the bond.
45. The Subdivision Improvement Agreement shall record
FM
PW
concurrently with the Final Map.
46. All public improvements shall be constructed in conformance
BP
PW
with the City of Atascadero Engineering Department Standard
Specifications and Drawings or as directed by the City
Engineer.
47. The applicant shall enter into a Plan Check/Inspection
BP
BS
agreement with the City.
48. The applicant shall be responsible for the relocation and/or
BP
PW
alteration of existing utilities.
49. The applicant shall install all new utilities (water, gas, electric,
BP
BS
cable TV and telephone) underground. Utilities shall be
extended to the property line frontage of each lot or its public
utility easement.
50. The applicant shall monument all property corners for
BP
PW
construction control and shall promptly replace them if
disturbed.
51. A preliminary subdivision guarantee shall be submitted for
BP
PW
review in conjunction with the processing of the parcel map.
52. All existing and proposed utility, pipeline, open space, or other
BP
PS/PW
easements are to be shown on the parcel map. If there are
building or other restrictions related to the easements, they shall
be noted on the parcel map. The applicant shall show all
access restrictions on the parcel map.
53. Prior to recording the tract map, the applicant shall submit a
FM
PS/PW
map drawn in substantial conformance with the approved
tentative map and in compliance with all conditions set forth
herein shall be submitted for review and approval by the City in
accordance with the Subdivision Map Act and the City's
Subdivision Ordinance.
54. Prior to recording the tract map, the applicant's surveyor shall
FM
PW
set monuments at all new property corners or shall indicate, by
certificate on the final map, that corners have been set or shall
be set by a date specific and that they will be sufficient to
enable the survey to be retraced.
55. Prior to recording the tract map, the applicant shall pay all
FM
BS
outstanding plan check/inspection fees.
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
PD -17 Master Plan of Development
BP: Building Pennit
FI: Finallnspecbm
PD: Police Department
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final O=pancy
56. Prior to recording the tract map, the applicant shall have the
FM
PW
map reviewed by all applicable public and private utility
companies (cable, telephone, gas, electric, Atascadero Mutual
Water Company). The applicant shall obtain a letter from each
utility company, which indicates their review of the map. The
letter shall identify any new easements, which may be required
by the utility company. A copy of the letter shall be submitted to
the City. New easements shall be shown on the parcel map.
57. Upon recording the final map, the applicant shall provide the
FM
PW
City with a black line clear Mylar (0.4 mil) copy and a blue line
print of the recorded map.
58. Prior to the final inspection of any public improvements, the
BP
PW
applicant shall submit a written statement from a registered civil
engineer that all work has been completed and is in full
compliance with the approved plans.
Atascadero Mutual Water Company
59. Prior to the recording of the Final Map or the issuance of
BP
BS
building permits, the applicant shall submit plans showing the
water distribution facilities required to serve the project for
review and approval by the Atascadero Mutual Water Company
(AMWC). All water distribution facilities shall be constructed in
conformance with AMWC standards and details and the
California Waterworks Standards (Code of Regulations Title 22,
Division 4, Chapter 16). All cross -connection devices shall
conform to AWWA and California Department of Health
Services standards.
60. Prior to starting the construction of water system improvements,
BP
BS
the applicant shall pay all installation and connection fees
required by AMWC. Subject to the approval of the AMWC, the
applicant may enter into a deferred connection agreement.
61. Prior to the issuance of building permits, the applicant shall
BP
BS
obtain a "Will Serve' letter from the Atascadero Mutual Water
Company.
62. The water mains required to serve the project shall be laid out
BP
BS
in a grid or looped pattern and shall connect to the existing
water mains system, if possible.
63. The applicant shall provide AMWC with easements for those
water facilities proposed for operation and maintenance by
AMWC that are constructed outside of publicly maintained right-
of-ways. AMWC shall review the form and content of the
easements prior to recordation of the final map.
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
PD -17 Master Plan of Development
BP: Building Pennit
FI: Finallnspecbm
PD: Police Department
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final Occupancy
64. The applicant shall submit a hydrolic analysis with the first plan
chack submittal of the water system improvements for the
project. The analysis should take into account the fire flows
required by the Uniform Fire Code and requirements of the
California Waterworks Standards. The applicant is responsible
for designing and constructing water system improvements that
will provide water at pressures and flows adequate for the
domestic and fire protection needs for the project.
65. The applicant shall obtain a separate landscape -irrigation
meter(s) from AMWC for the common areas within the project.
66. Landscaping for the common areas shall be drought -tolerant.
Before construction of the water system improvements, AMWC
shall review and approve the landscape plans for the common
areas within the project. The landscape plan submittal shall
incorporate the following:
• Plant list with Water Use Classification of Landscape
Species (WUCOLS) rating specified. Preference shall
be given to plants with very low (VL) and low (L)
WUCOLS ratings.
• Justification for use of plants with WUCOLS rating of M
or greater.
• Total landscaped area including hardscapes (patios,
walks, and decks) and planted areas and excluding
sidewalks, driveways, streets, and/or parking areas.
• The size and shape of turf areas shall promote for
efficient irrigation shall be no less than 8 -feet wide.
Turf type shall be warm -season grasses. Turf areas
shall be kept to a minimum and shall be limited to
functional areas only. A goal of the landscape design
should be a total turf area of no more than 10% of the
total landscaped area.
67. Before construction of the water system improvements, AMWC
shall review and approve the irrigation plans for the common
areas within the project. The irrigation plan submittal shall
include the following:
• Landscape irrigation meter location and size.
• Backflow prevention device type, location, and
manufacturer.
• Flow and precipitation rate for each circuit.
• Irrigation schedules including schedules for
establishment period and post establishment period.
• Total anticipated water application per circuit per
month for both schedules.
• Total landscape water application.
• Use of drip irrigation wherever possible.
• A check valve shall be installed on the lowest head in
each sprinkler circuit.
Mitigation Measures
Mitigation Measure 1.c.1: The following landscape mitigations shall
BP
BS, PS, CE
1.0
apply:
Proposed fencing location and height shall comply with
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
PD -17 Master Plan of Development
BP: Building Pennit
FI: Finallnspecbm
PD: Police Department
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final Occupancy
Atascadero Municipal Code.
• The project landscaping shall include residential front yards,
street facing side yards, EI Camino Real frontage, and a
minimum 1 street tree per front yard and side street facing yard.
• The on-site storm water and drainage detention basin shall be
landscaped with plant materials compatible with the surrounding
area while allowing the basin to function as engineered for
storm water management.
• All proposed trees shall be shade trees of a minimum 15 -gallon
size and double staked.
Mitigation Measure 1.c.2: The proposed homes shall include the use of
BP
BS, PS, CE
1.c.2
earth -tone paint and roof colors designed to blend with the surrounding
residential environment and reduce the potential for reflected light and
glare.
Mitigation Measure 1.d.1: If exterior street lighting is proposed, it shall
BP
BS, PS, CE
1.d.1
be designed to eliminate any off site glare. All exterior site lights shall
utilize full cut-off, "hooded" lighting fixtures to prevent offsite light spillage
and glare. Any luminaire pole height shall not exceed 16 -feet in height,
limit intensity to 2.0 foot candles at ingress/egress, and otherwise 0.6
foot candle minimum to 1.0 maximum within the private street. Fixtures
shall be shield cut-off type and compatible with neighborhood setting,
subject to staff approval.
In addition, individual exterior home -owner lighting shall be restricted
through CC&R's and individual lot deed -restriction to prohibit high-
intensity lighting in excess of one -foot candle, limited in fixture height to
not exceed 10 feet, and utilize full cut-off, "hooded" lighting fixtures to
prevent offsite light spillage and glare.
Mitigation Measure 3.b.1: The project shall be conditioned to comply
BP, GP
BS, PS, CE
3.b.1
with all applicable District regulations pertaining to the control of fugitive
dust (PM -10) as contained in sections 6.3, 6.4 and 6.5 of the April 2003
Air Quality Handbook.
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune according to
manufacturer's specifications.
• Fuel all off-road and portable diesel powered equipment,
including but not limited to bulldozers, graders, cranes, loaders,
scrapers, backhoes, generator sets, compressors, auxiliary
power units, with ARB certified motor vehicle diesel fuel (Non -
taxed version suitable for use off-road).
• Maximize to the extent feasible, the use of diesel construction
equipment meeting the ARB's 1996 or newer certification
standard for off-road heavy-duty diesel engines.
• Install diesel oxidation catalysts (DOC), catalyzed diesels
particulate filters (CDPF) or other District approved emission
reduction retrofit services (Required for projects grading more
than 4.0 acres of continuously worked area).
Conditions of Approval /
Mitigation Monitoring Program
1325 EI Camino Real
PD -17 Master Plan of Development
CUP 2003-0112/ZCH 2003-0063
Timing
BL: Business U—se
GP: Grading Permit
BP: Building Pennit
FI: Finallnspecbm
TO: Temporary
occupancy
F0: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: F2 Depadment
PD: Police Department
CE City Engineer
WW: Wastewater
CA: City Attorney
Mitigatio
n
Measure
Section 6.4: Activity Management Techniques
• Develop a comprehensive construction activity management
plan designed to minimize the amount of large construction
equipment operating during any given time period.
• Schedule of construction truck trips during non -peak hours to
reduce peak hour emissions.
• Limit the length of the construction workday period, if
necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading, demolition
and building plan notes:
A Reduce the amount of the disturbed area where possible.
B Use of water trucks or sprinkler systems in sufficient quantities
to prevent airborne dust from leaving the site. Increased
watering frequency would be required whenever wind speeds
exceed 15 mph. Reclaimed (non -potable) water should be
used whenever possible.
C All dirt stockpile areas should be sprayed daily as needed.
D Permanent dust control measures identified in the approved
project re -vegetation and landscape plans should be
implemented as soon as possible following completion of any
soil disturbing activities.
E Exposed ground areas that are plann4ed to be reworked at
dates greater than one month after initial grading should be
sown with a fast -germinating native grass seed and watered
until vegetation is established.
F All disturbed soil areas not subject to re -vegetation should be
stabilized using approved chemical soil binder, jute netting, or
other methods approved in advance by the APCD.
G All roadways, driveways, sidewalks, etc, to be paved should be
complete as soon as possible. In addition, building pads should
be laid as soon as possible after grading unless seeding or soil
binders are used.
H Vehicle speed for all construction vehicles shall not exceed 15
mph on any unpaved surface at the construction site.
I All trucks hauling dirt, sand, soil, or other loose materials are to
be covered or should maintain at least two feet of freeboard
(minimum vertical distance between top of load and top of
trailer) in accordance with CVC Section 23114.
J Install wheel washers where vehicles enter and exit unpaved
roads onto streets, or was off trucks and equipment leaving the
site.
K Sweep streets at the end of each day if visible soil material is
carried onto adjacent paved roads. Water sweepers with
reclaimed water should be used where feasible.
The contractor or builder shall designate a person or persons to monitor
the dust control program and to order increased watering, as necessary,
to prevent transport of dust off site. The name and telephone number of
such persons shall be provided to the APCD prior to land use clearance
for map recordation and land use clearance for finish grading of an
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
BP: Building Pennit
PD: Police Department
PD -17 Master Plan of Development
FI: Finallnspecbm
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final Ooarpancy
structure.
Mitigation Measure 4.e.1: The building permit site plan shall identify all
BP
PS, BS, CE
4.e.1
protection and enhancement measures recommended by the Certified
Arborist in the Tree Protection Plan. Tree protection fencing shall be
installed at the locations called out in the Tree Protection Plan.
Mitigation Measure4.e.2: All tree removals shall be mitigated as
BP
PS, BS, CE
4.e.2
prescribed by the Atascadero Native Tree Ordinance.
Conditions of Approval /
Mitigation Monitoring Program
1325 EI Camino Real
PD -17 Master Plan of Development
CUP 2003-0112/ZCH 2003-0063
Timing
BL: Business U—se
GP: Grading Permit
BP: Building Pennit
FI: Finallnspecbm
TO: Temporary
occupancy
F0: Final Ooarpancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: F2 Depadment
PD: Police Department
CE City Engineer
WW: Wastewater
CA: City Attorney
Mitigatio
n
Measure
Mitigation Measure 4.e.3: The developer shall contract with a certified
BP, GP
PS, BS, CE
4.e.3
arborist during all phases of project implementation. The certified
arborists shall be responsible for monitoring the project during all phases
of construction through project completion, as follows:
(a) A written agreement between the arborist and the developer outlining
a arborist monitoring schedule for each construction phase through
final inspection shall be submitted to and approved by planning staff
prior to the issuance of building/grading permits.
(b) Arborist shall schedule a pre -construction meeting with engineering
/planning staff, grading equipment operators, project superintendent
to review the project conditions and requirements prior to any
grubbing or earth work for any portion of the project site. All tree
protection fencing and trunk protection shall be installed for
inspection during the meeting. Tree protection fencing shall be
installed at the line of encroachment into the tree's root zone area.
(c) As specified by arborist report and City staff: (See Attachment 4)
• Fencing: Must be a minimum of 4' high, chain link, snow or
safety fence staked at the drip -line or line of encroachment for
each tree or group of trees. Tree fencing shall be erected
before demolition, grading, or construction begins. The owner
shall be responsible for maintaining an erect fence throughout
the construction period. The arborist(s) shall inspect the fence
placement once it is erected. This is mandatory for this project.
• Soil Aeration Methods: Soils under drip -lines that have been
compacted by heavy equipment and/or construction activities
must be returned to their original state before all work is
completed. Methods include water jetting, adding organic
matter, and boring small holes with an auger (18" deep, 2-3'
apart with a 24" auger) and the application of moderate
amounts of nitrogen fertilizer. The arborist shall advise.
• Chip Mulch: All areas within the drip -line of the trees that
cannot be fenced shall receive a 4-6" layer of chip mulch to
retain moisture, soil structure and reduce the effects of soil
compaction.
• Trenching within the Drip -line: All trenching under drip -lines of
native trees shall be hand dug, augured or bored. All major
roots shall be avoided whenever possible. All exposed roots
larger than 1" in diameter shall be 'clean cut with a sharp
pruning tool and not left ragged.
• Grading within drip -line: Grading should not encroach within
the drip -line. If grading is necessary, construction of retaining
walls or tree wells or other protection measures may be
necessary to insure the survivability of the trees. Chip mulch 4-
6" in depth may also be required in these areas.
Conditions of Approval /
Mitigation Monitoring Program
1325 EI Camino Real
PD -17 Master Plan of Development
CUP 2003-0112/ZCH 2003-0063
Timing
BL: Business U—se
GP: Grading Permit
BP: Building Pennit
FI: Finallnspecbm
TO: Temporary
occupancy
F0: Final Occupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: F2 Depadment
PD: Police Department
CE City Engineer
WW: Wastewater
CA: City Attorney
Mitigatio
n
Measure
• Grading should not disrupt the normal drainage pattern around
the trees. Fills should not create a pending condition and
excavations should not leave the tree on a rapidly draining
mound. Grading shall be done by hand underneath the drip -
lines to avoid tearing any roots.
• Exposed Roots: Any exposed roots shall be recovered the
same day they were exposed. If they cannot, they must be
covered with burlap or another suitable material and wetted
down 2X per day.
• Paving within the Drip -line: Pervious surfacing is preferred
within the dripline of any oak trees. Arborist(s) will advise.
• Eauioment Operation: Vehicles and all heavy equipment shall
not be driven under the trees, as this will contribute to soil
compaction.
• Existing Surfaces: The existing ground surface within the drip -
line of all oak trees shall not be cut, filled, compacted or pared.
• Construction materials and waste: No liquid or solid
construction waste shall be dumped on the ground within the
drip -line of any oak tree.
• Arborist Monitoring: An arborist shall be present for selected
activities (trees identified on spreadsheet — See attachment 5)
and pre -construction fence placement. The monitoring does not
necessarily have to be continuous but observational at times
during the above activities.
• Pre -Construction Meeting: An on-site pre -construction meeting
with the Arborist, owner, planning staff, and the earth moving
team shall be required for this project. Prior to final occupancy,
a letter from the arborist shall be required verifying the
health/condition of all impacted trees and providing any
recommendations for any additional mitigation. The letter shall
verify that the arborist was on site for all grading and/or
trenching activity that encroached into the drip -line of the
selected native trees, and that all work done in these areas was
completed to the standards set forth above.
The total number of native trees to be removed for this project is
13 with a dbh of 379.5 inches.
(d). Upon project completion and prior to final occupancy a final status
report shall be prepared by the project arborist certifying that the tree
protection plan was implemented, the trees designated for protection
were protected during construction, and the construction -related tree
protection measures are no longer required for tree protection.
Conditions of Approval /
Timing
Responsibility
Mitigatio
Mitigation Monitoring Program
/Monitoring
n
PS: Planning Services
Measure
BL: Business U—se
BS: Building Services
1325 EI Camino Real
GP: Grading Permit
FD: F2 Depadment
PD-17 Master Plan of Development
BP: Building Pennit
FI: Finallnspecbm
PD: Police Department
CE City Engineer
CUP 2003-0112/ZCH 2003-0063
TO: Temporary
occupancy
WW: Wastewater
CA: City Attorney
F0: Final Occupancy
Mitigation Measure 5.a.1: The proposed project shall incorporate the
BP
PS, BS
5.a.1
Secretary of the Interior's Standards and Illustrated Guidelines for
Rehabilitating Historic Buildings. The standards shall apply to the
exterior rehabilitation of the Colony house and proposed landscape
improvements to the overall project site, subject to staff review and
approval.
Mitigation Measure 5.a.2: Replacement of any exterior materials or
BP
PS, BS
5.a.2
design features on the original colony house shall be consistent with the
Secretary of the Interior's Standards and Illustrated Guidelines for
Rehabilitating Historic Buildings. This shall include the replacements of
any doors and windows with solid wood framing of similar design and
appearance. Vinyl, vinyl-cladding, and metal materials are not permitted.
Mitigation Measure 5.a.3: The proposed project shall include Covenants,
BP
PS, BS
5.a.3
Conditions and Restrictions (CC&R's) or equivalent mechanism that
incorporate the planned development conditions of approval to ensure
that the site retains the historic qualities (historic buildings, architecture,
colors, materials, fencing, and landscaping) overtime.
Mitigation Measure 5.a.4: The new detached garage to be constructed
BP
PS, BS
5.b.1
on the colony house lot shall be of similar design as the existing original
wood sided garage with wood doors and windows. The garage shall
incorporate a pair of single or double-hung wood windows on each side
and wood door design. A wood door may be added to any side. The
garage door shall be constructed of wood and have an architectural
appearance similar to the existing paired garage doors. The garage door
may be of roll-up function. The garage driveway shall have a 20-foot
minimum depth driveway.
Mitigation Measure 5.b.1: Should any cultural resources be unearthed
BP
PS, BS
5.b.1
during site development work, the provisions of CEQA -Section 15064.5,
will be followed to reduce impacts to a non-significant level.
Mitigation Measure 6.b.1: The grading permit application plans shall
GP
PS, BS, CE
6.b.1
include erosion control measures to prevent soil, dirt, and debris from
entering the storm drain system during and after construction. A
separate plan shall be submitted for this purpose and shall be subject to
review and approval of the City Engineer at the time of Building Permit
application.
Mitigation Measure 6.c.1: A soils report shall be required to be submitted
BP, GP
PS, BS, CE
6.c.1
with a future building permit by the building department.
Mitigation Measure 8e.f.1: A Storm water Pollution Prevention Plan
GP
PS, BS, CE
8.e.f.1
(SWPPP)/Erosion Control Plan shall be submitted and approved by the
City Engineer prior to the issuance of the building permit. The plan shall
include storm water measures for the operation and maintenance of the
project for the review and approval of the City Engineer. The Building
Permit application plans shall identify Best Management Practices
(BMPs) appropriate to the uses conducted on site that effectively prohibit
the entry of pollutants into storm water runoff.
Conditions of Approval /
Mitigation Monitoring Program
1325 EI Camino Real
PD -17 Master Plan of Development
CUP 2003-0112/ZCH 2003-0063
Timing
BL: Business U—se
GP: Grading Permit
BP: Building Pennit
FI: Finallnspecbm
T0: Temporary
occupancy
F0: Final Qxupancy
Responsibility
/Monitoring
PS: Planning Services
BS: Building Services
FD: F2 Depadment
PD: Police Department
CE City Engineer
WW: Wastewater
CA: City Attorney
Mitigatio
n
Measure
Mitigation Measure 8.e.f.2: The developer is responsible for ensuring
GP
PS, BS, CE
8.e.f.2
that all contractors are aware of all storm water quality measures and
that such measures are implemented. Failure to comply with the
approved construction Best Management Practices will result in the
issuance of correction notices, citations, or stop orders.
Mitigation Measure 11.d.1: All construction activities shall comply with
BP, GP
PS, BS, CE
11A.1
the City of Atascadero Noise Ordinance for hours of operation, and as
follows:
Construction activities shall be limited to the following hours of operation:
. 7 a.m. to 7 p.m. Monday through Friday
• 9 a.m. to 6 p.m. Saturday
. No construction on Sunday
Further, particularly loud noises shall not occur before 8 a.m. on
weekdays and not at all on weekends.
The Community Development Director upon a determination that
unusually loud construction activities are having a significant impact on
the neighbors may modify the hours of construction.
Failure to comply with the above-described hours of operation may result
in withholding of inspections and possible construction prohibitions,
subject to the review and approval of the Community Development
Director.
A sign shall be posted on-site with the hours of operation and a
telephone number of the person to be contacted in the event of any
violations. Staff shall approve the details of such a sign during the
Grading Plan/Building Permit review process.
EXHIBIT B: Conditions of Approval — Tentative Tract Map 2003-0037
Master Plan of Development & Tentative Tract Map Amendment
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Parmit
PS: Planning Services
1325 EI Camino Real
BP. Building Penh
SIP: Subdivision
BS: Building Services
FD: Fire Department
Tentative Tract Map
ImprovenieudVesting
FM: Final Map
PD: Police Departrnem
CE:
CE: City Engineer
TPM 2003-0037
T0: Temporary
Oce„pancy
WN': Wastewater
CA: C4Atmmey
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
Planning Services
1. The approval of this Tentative Tract Map shall not become final
FM
PS
and effective following approval of Zone Change 2003-0063
and CUP 2003-0112.
2. Approval of this Tentative Tract Map shall be valid for two
FM
PS
years after its effective date. At the end of the period, the
approval shall expire and become null and void unless an
extension of time is granted pursuant to a written request
received prior to the expiration date.
3. The Community Development Department shall have the
FM
PS
authority to approve minor changes to the project that (1) result
in a superior site design or appearance, and/or (2) address a
design issue that is not substantive to the Tentative Tract Map
and that the Final Map is in substantial conformance with the
Tentative Map.
4. The Tract Map shall be subject to additional fees for park or
FM
PS
recreation purposes (QUIMBY Act) as required by City
Ordinance.
5. The applicant shall record CC&R's for the subdivision subject
FM
PS
to the review and approval of the City Engineer, City Attorney
and Planning Services. The CC&R's shall identify the
maintenance responsibilities of all private driveways, sewer
facilities, drainage facilities, common parking areas, site
lighting, landscape areas, fencing, and other common facilities.
The CC&R's shall also state that all exterior colors, exterior
materials, yard fencing and site landscaping shall be consistent
with the overall master plan of development.
6. The granting of this entitlement shall apply to the property
Ongoing
PS
located at 1325 EI Camino Real (APN 049-101-009, 010)
regardless of owner.
7. The Final Map shall be drawn in substantial conformance with
FM
PS
the approved tentative map, and in compliance with all
conditions set forth herein, shall be submitted for review and
approval in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
8. The subdivider shall defend, indemnify, and hold harmless the
F
PS
City of Atascadero or its agents, officers, and employees
against any claim or action brought to challenge an approval
Conditions of Approval I
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
1325 EI Camino Real
BP: Building Pend
SIP: SubdMsion
BS: Building Sendcac
FD: Fire Deparrnent
Vesting Tentative Tract Map
FP oinal entMap lens
PD: Policeginsar ent
CE: CAy Engineer
TPM 2003-0037
T0: Temporary
Oxupancy
WW: Wastewater
CA: Cty Ariomey
FI: Finalinspecton
AMWC: Water Canp.
F0: Final 0—panty
by the city, or any of its entities, concerning the subdivision.
9. Affordable Housing Requirement: The applicant shall
F
PS,
designate six deed -restricted units for a 30 -year period as
follows: six moderate -income units. Such units shall be located
E
throughout the project and shall be subject to planning staff
approval.
10. Street terminus shall require the following, subject to staff
GP
PS, CE
approval:
Deed notification to each property that the project street will
be extended in the future to possible future residential
development to the north and south.
11. The applicant will be required to record CC&R's for the map
FM
PS, CE
that will include maintenance and access of common areas.
12. Deed notice shall be recorded with each lot notifying each
FM
PS, CE
property owner that the on-site roadway shall be extended to
serve future subdivisions to the north and south.
13. The colony house shall be located on lot #32. Front yard and
FM
PS, CE
street -facing side yard shall be landscaped by the applicant.
The lot shall include a deed restriction preventing the site from
being altered in any manner that would degrade the
significance of this historic house. The HS (Historic Structure)
overlay zone designation shall also be applied to Lot 32.
Any future alterations to the site or the residence will require
a Precise Plan application to be reviewed and approved by
the Planning Department.
14. Tree mitigation shall include payment by the applicant of up to
BP, FM
PS, CE
$4,329.17 into the City tree replacement fund.
A mitigation bond payment equal to the mitigation fee shall be
collected for all native trees with impacts of greater than 5%.
The bond shall be held for 18 months following the project final.
15. Lot 1: Drainage detention basins shall be landscaped by the
BP
PS
developer and maintained by either the property owner or the
homeowner's association. The open space area shall be
landscaped with drought tolerant vegetation and shall be
designed as a passive neighborhood park feature.
16. The applicant shall apply the Taussig fiscal impact model to the
BP, FM
PS, CE
project to identify the increase in City service cost resulting
from project implementation and assess those properties to
offset any potential revenue losses to the City.
Building Services
17. A soils investigation prepared by a licensed Geotechnical
FM
PS, BS, CE
Engineer is to be provided for the project. The report is to
be provided at the time of building permit submittal along
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
1325 EI Camino Real
BP: Building Pend
SIP: SubdMsion
BS: Building Sendcac
FD: Fire Deparrnent
Vesting Tentative Tract Map
FP oinal entMap lens
PD: Policeginsar ent
CE: CAy Engineer
TPM 2003-0037
T0: Temporary
Oxupancy
WW: Wastewater
CA: Cty Ariomey
FI: Finalinspecton
AMWC: Water Canp.
F0: Final 0—panty
with the building plans for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
Fire Marshal
18. Final street name selection shall be consistent with the
FM
PS, CE
future street extension, subject to staff approval
19. Provide a letter from the Atascadero Mutual Water Company
FM
CE
stating the minimum expected water available to the site.
Amount available must meet minimum requirement specified
in the California Fire Code.
20. Note that approved address signage is to be provided.
FM
CE
21. Note on plans that fire lanes shall be delineated to restrict
FM
CE
parking as required by the Fire Authority.
City Engineer Project Conditions
Drainage:
22. All drainage facilities shall be designed and constructed in
BP
PW
accordance with the current City of Atascadero Engineering
Standards.
23. The applicant shall submit drainage calculations for review
BP
PW
and approval of the City Engineer.
24. All drainage basins shall detain the difference in the 2 -year
BP
PW
storm runoff or the undeveloped site and the 50 -year storm
runoff of the developed site. The outlet pipe or channel shall
be sized for the 2 -year storm peak runoff rate for the
undeveloped site at full capacity.
25. The applicant shall address storm water detention to the
BP/FM
PW
satisfaction of the City Engineer, prior to grading and
drainage approval, or approval of the final map.
26. A homeowners association, or other funding and
FM
PW
maintenance agreement shall be submitted for approval by
the City Engineer and the City Attorney prior to recording the
final map. The agreement shall cover scheduled
maintenance of the pervious pavers, and maintenance of the
drainage facilities.
27. Existing drainage patterns from adjacent properties shall not
BP
PW
be obstructed.
28. All drainage from improvements shall cross property lines
BP
PW
within drainage easements.
29. Drainage at the rear of the lots must be carried across
BP
PW
property lines in a closed conduit.
Frontage Improvements:
BP
PW
30. Project shall include construction of curb, gutter and
BP
PW
sidewalk along entire EI Camino Real frontage.
Conditions of Approval I
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
1325 EI Camino Real
BP: Building Pend
slip: SubdMsion
BS: Building Sendcac
FD: Fire Deparrnent
Vesting Tentative Tract Map
FP oinal entMap lens
PD: Policeginsar ent
CE: CAy Engineer
TPM 2003-0037
T0: Temporary
Oxupancy
WW: Wastewater
CA: Cty Ariomey
FI: Final inspection
AMWC: Water Canp.
F0: Final 0—panty
31. Alignment of frontage improvements shall be approved by
BP
PW
the City Engineer.
32. The entry location of project on EI Camino Real shall be
BP
PW
located in such a location as to provide adequate site
distance for vehicles exiting project.
33. All utilities shall be undergrounded on EI Camino Real
BP
PW
Improvement Maintenance:
Street Improvements and landscaping.
34. All street improvements shall be constructed in accordance
BP
PW
with City of Atascadero Engineering Standards.
35. Prior to recording the final map, provisions for the repair and
FM
PW
maintenance of all street and landscaping improvements
shall be included in the CC&R's for this tract. Included shall
be a mechanism to maintain the streets and landscaping,
such as a homeowners association. The City Engineer and
City Attorney shall approve the final form prior to
recordation.
Wastewater:
36. All onsite sewer mains shall be privately owned and
BP
PW
maintained.
37. Prior to recording the final map, provisions for the repair and
BP
PW
maintenance of the private SS shall be included in the
CC&R's for this tract. Included shall be a mechanism to
maintain the private sewer and structures, such as a
homeowners association. The City Engineer and City
Attorney shall approve the final form prior to recordation.
38. Applicant shall pay sewer extension (Annexation),
BP
PW
Connection and Reimbursement fees (if applicable) upon
issuance of building permit.
39. Gravity mains within the subdivision shall be eight (8) inches
BP
PW
in diameter.
40. The sanitary sewer main on the south end of Copado Way.
BP
PW
Lna r�extend to the adjoining property or Carrizo Road. Zny
shared private sewer system will require a maintenance
agreement that includes all residents benefiting from the
rivate system.
41. Drainage piping serving fixtures which have flood level rims
BP
PW
located below the elevation of the next upstream manhole
cover of the public or private sewer serving such drainage
piping shall be protected from backflow of sewage by
installing an approved type backwater valve. Fixtures above
such elevation shall not discharge through the backwater
valve.
42. All sanitary sewer (SS) mains shall terminate in manholes
BP
PW
unless extension of the main, at some later date, is
anticipated. If extension of a SS main is anticipated, said SS
main may terminate in a cleanout providing the next
downstream manhole is less than 300 linear feet from the
Deleted: ,
Deleted: shall not
Deleted: Development south of
project shall connect to future sewer
main, which shall run up Carrizo
Road from EI Camino Real
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
1325 EI Camino Real
BP: Building Pend
SIP: SubdMsion
BS: Building Sendcac
FD: Fire Deparrnent
Vesting Tentative Tract Map
FP oinal entMap lens
PD: Policeginsar ent
CE: CAy Engineer
TPM 2003-0037
T0: Temporary
Oxupancy
WW: Wastewater
CA: Cty Ariomey
FI: Finalinspecton
AMWC: Water Canp.
F0: Final 0—panty
cleanout and that the point of termination is not a reasonable
location for a SS main angle point or intersection.
City Engineer Standard Conditions
43. In the event that the applicant is allowed to bond for the
BP
BS
public improvements required as a condition of this map, the
applicant shall enter into a Subdivision Improvement
Agreement with the City Council.
44. An engineer's estimate of probable cost shall be submitted
BP
PW
for review and approval by the City Engineer to determine
the amount of the bond.
45. The Subdivision Improvement Agreement shall record
FM
PW
concurrently with the Final Map.
46. All public improvements shall be constructed in conformance
BP
PW
with the City of Atascadero Engineering Department
Standard Specifications and Drawings or as directed by the
City Engineer.
47. The applicant shall enter into a Plan Check/Inspection
BP
BS
agreement with the City.
48. The applicant shall be responsible for the relocation and/or
BP
PW
alteration of existing utilities.
49. The applicant shall install all new utilities (water, gas,
BP
BS
electric, cable TV and telephone) underground. Utilities
shall be extended to the property line frontage of each lot or
its public utility easement.
50. The applicant shall monument all property corners for
BP
PW
construction control and shall promptly replace them if
disturbed.
51. A preliminary subdivision guarantee shall be submitted for
BP
PW
review in conjunction with the processing of the parcel map.
52. All existing and proposed utility, pipeline, open space, or
BP
PS/PW
other easements are to be shown on the parcel map. If
there are building or other restrictions related to the
easements, they shall be noted on the parcel map. The
applicant shall show all access restrictions on the parcel
map.
53. Prior to recording the tract map, the applicant shall submit a
FM
PS/PW
map drawn in substantial conformance with the approved
tentative map and in compliance with all conditions set forth
herein shall be submitted for review and approval by the City
in accordance with the Subdivision Map Act and the City's
Subdivision Ordinance.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
1325 EI Camino Real
BP: Building Pend
SIP: SubdMsion
BS: Building Sendcac
FD: Fire Deparrnent
Vesting Tentative Tract Map
FP oinal entMap lens
PD: Policeginsar ent
CE: CAy Engineer
TPM 2003-0037
T0: Temporary
Oxupancy
WW: Wastewater
CA: Cty Ariomey
FI: Final inspection
AMWC: Water Canp.
F0: Final 0—panty
54. Prior to recording the tract map, the applicant's surveyor
FM
PW
shall set monuments at all new property corners or shall
indicate, by certificate on the final map, that corners have
been set or shall be set by a date specific and that they will
be sufficient to enable the survey to be retraced.
55. Prior to recording the tract map, the applicant shall pay all
FM
BS
outstanding plan check/inspection fees.
56. Prior to recording the tract map, the applicant shall have the
FM
PW
map reviewed by all applicable public and private utility
companies (cable, telephone, gas, electric, Atascadero
Mutual Water Company). The applicant shall obtain a letter
from each utility company, which indicates their review of the
map. The letter shall identify any new easements, which
may be required by the utility company. A copy of the letter
shall be submitted to the City. New easements shall be
shown on the parcel map.
57. Upon recording the final map, the applicant shall provide the
FM
PW
City with a black line clear Mylar (0.4 mil) copy and a blue
line print of the recorded map.
58. Prior to the final inspection of any public improvements, the
BP
PW
applicant shall submit a written statement from a registered
civil engineer that all work has been completed and is in full
compliance with the approved plans.
Atascadero Mutual Water Company
59. Prior to the recording of the Final Map or the issuance of
BP
BS
building permits, the applicant shall submit plans showing
the water distribution facilities required to serve the project
for review and approval by the Atascadero Mutual Water
Company (AMWC). All water distribution facilities shall be
constructed in conformance with AMWC standards and
details and the California Waterworks Standards (Code of
Regulations Title 22, Division 4, Chapter 16). All cross -
connection devices shall conform to AWWA and California
Department of Health Services standards.
60. Prior to starting the construction of water system
BP
BS
improvements, the applicant shall pay all installation and
connection fees required by AMWC. Subject to the approval
of the AMWC, the applicant may enter into a deferred
connection agreement.
61. Prior to the issuance of building permits, the applicant shall
BP
BS
obtain a "Will Serve' letter from the Atascadero Mutual
Water Company.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
1325 EI Camino Real
BP: Building Pend
SIP: SubdMsion
BS: Building Sendcac
FD: Fire Deparrnent
Vesting Tentative Tract Map
FP oinal entMap lens
PD: Policeginsar ent
CE: CAy Engineer
TPM 2003-0037
T0: Temporary
Oxupancy
WW: Wastewater
CA: Cty Ariomey
FI: Final inspection
AMWC: Water Canp.
F0: Final 0—panty
62. The water mains required to serve the project shall be laid
BP
BS
out in a grid or looped pattern and shall connect to the
existing water mains system, if possible.
63. The applicant shall provide AMWC with easements for those
water facilities proposed for operation and maintenance by
AMWC that are constructed outside of publicly maintained
right-of-ways. AMWC shall review the form and content of
the easements prior to recordation of the final map.
64. The applicant shall submit a hydrolic analysis with the first
plan chack submittal of the water system improvements for
the project. The analysis should take into account the fire
flows required by the Uniform Fire Code and requirements of
the California Waterworks Standards. The applicant is
responsible for designing and constructing water system
improvements that will provide water at pressures and flows
adequate for the domestic and fire protection needs for the
project.
65. The applicant shall obtain a separate landscape -irrigation
meter(s) from AMWC for the common areas within the
project.
66. Landscaping for the common areas shall be drought -
tolerant. Before construction of the water system
improvements, AMWC shall review and approve the
landscape plans for the common areas within the project.
The landscape plan submittal shall incorporate the following:
• Plant list with Water Use Classification of Landscape
Species (WUCOLS) rating specified. Preference shall
be given to plants with very low (VL) and low (L)
WUCOLS ratings.
• Justification for use of plants with WUCOLS rating of M
or greater.
• Total landscaped area including hardscapes (patios,
walks, and decks) and planted areas and excluding
sidewalks, driveways, streets, and/or parking areas.
• The size and shape of turf areas shall promote for
efficient irrigation shall be no less than 8 -feet wide. Turf
type shall be warm -season grasses. Turf areas shall be
kept to a minimum and shall be limited to functional
areas only. A goal of the landscape design should be a
total turf area of no more than 10% of the total
landscaped area.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
1325 EI Camino Real
BP: Building Pend
SIP: SubdMsion
BS: Building Services
FD: Fire Deparrnent
Vesting Tentative Tract Map
FP oinal entMap lens
PD: Policeginsar ent
CE: CAy Engineer
TPM 2003-0037
T0: Temporary
Ox,pancy
WW: Wastewater
CA: C6y Attomey
FI: Finalinspecton
AMWC: Water Canp.
F0: Final 0—panty
67. Before construction of the water system improvements,
AMWC shall review and approve the irrigation plans for the
common areas within the project. The irrigation plan
submittal shall include the following:
• Landscape irrigation meter location and size.
• Backflow prevention device type, location, and
manufacturer.
• Flow and precipitation rate for each circuit.
• Irrigation schedules including schedules for
establishment period and post establishment period.
• Total anticipated water application per circuit per month
for both schedules.
• Total landscape water application.
• Use of drip irrigation wherever possible.
• A check valve shall be installed on the lowest head in
each sprinkler circuit.
Mitigation Measures
Mitigation Measure 1.c.1: The following landscape mitigations shall
BP
BS, PS, CE
1.c.1
apply:
• Proposed fencing location and height shall comply with
Atascadero Municipal Code.
• The project landscaping shall include residential front yards,
street facing side yards, EI Camino Real frontage, and a
minimum 1 street tree per front yard and side street facing
yard.
• The on-site storm water and drainage detention basin shall
be landscaped with plant materials compatible with the
surrounding area while allowing the basin to function as
engineered for storm water management.
• All proposed trees shall be shade trees of a minimum 15 -
gallon size and double staked.
Mitigation Measure 1.c.2: The proposed homes shall include the use
BP
BS, PS, CE
1.c.2
of earth -tone paint and roof colors designed to blend with the
surrounding residential environment and reduce the potential for
reflected light and glare.
Mitigation Measure 1.d.1: If exterior street lighting is proposed, it
BP
BS, PS, CE
1.d.1
shall be designed to eliminate any off site glare. All exterior site lights
shall utilize full cut-off, "hooded" lighting fixtures to prevent offsite light
spillage and glare. Any luminaire pole height shall not exceed 16 -feet
in height, limit intensity to 2.0 foot candles at ingress/egress, and
otherwise 0.6 foot candle minimum to 1.0 maximum within the private
street. Fixtures shall be shield cut-off type and compatible with
neighborhood setting, subject to staff approval.
In addition, individual exterior home -owner lighting shall be restricted
through CC&R's and individual lot deed -restriction to prohibit high-
intensity lighting in excess of one -foot candle, limited in fixture height
to not exceed 10 feet, and utilize full cut-off, "hooded" lighting fixtures
to prevent offsite light spillage and glare.
Conditions of Approval I
Mitigation Monitoring Program
1325 EI Camino Real
Vesting Tentative Tract Map
TPM 2003-0037
Timing
GP: Grading Permit
BP: Building Pend
slip: SubdMsion
FP oinal entMap Plans
T0: Temporary
Ox,pancy
FI: Finalinspecton
F0: Final 0—panty
Responsibility
/Monitoring
PS: Planning Services
BS: Building Sendcac
FD: Fire Deparrnent
PD: Policeginsar ent
CE: CAy Engineer
WW: Wastewater
CA: C6y Attomey
AMWC: Water Canp.
Mitigation
Measure
Mitigation Measure 3.b.1: The project shall be conditioned to comply
BP, GP
BS, PS, CE
3.b.1
with all applicable District regulations pertaining to the control of
fugitive dust (PM -10) as contained in sections 6.3, 6.4 and 6.5 of the
April 2003 Air Quality Handbook.
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune according
to manufacturer's specifications.
• Fuel all off-road and portable diesel powered equipment,
including but not limited to bulldozers, graders, cranes,
loaders, scrapers, backhoes, generator sets, compressors,
auxiliary power units, with ARB certified motor vehicle diesel
fuel (Non -taxed version suitable for use off-road).
• Maximize to the extent feasible, the use of diesel
construction equipment meeting the ARB's 1996 or newer
certification standard for off-road heavy-duty diesel engines.
• Install diesel oxidation catalysts (DOC), catalyzed diesels
particulate filters (CDPF) or other District approved emission
reduction retrofit services (Required for projects grading
more than 4.0 acres of continuously worked area).
Section 6.4: Activity Management Techniques
• Develop a comprehensive construction activity management
plan designed to minimize the amount of large construction
equipment operating during any given time period.
• Schedule of construction truck trips during non -peak hours
to reduce peak hour emissions.
• Limit the length of the construction workday period, if
necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading, demolition
and building plan notes:
A Reduce the amount of the disturbed area where possible.
B Use of water trucks or sprinkler systems in sufficient
quantities to prevent airborne dust from leaving the site.
Increased watering frequency would be required whenever
wind speeds exceed 15 mph. Reclaimed (non -potable)
water should be used whenever possible.
C All dirt stockpile areas should be sprayed daily as needed.
D Permanent dust control measures identified in the approved
project re -vegetation and landscape plans should be
implemented as soon as possible following completion of
any soil disturbing activities.
E Exposed ground areas that are plann4ed to be reworked at
dates greater than one month after initial grading should be
sown with a fast -germinating native grass seed and watered
until vegetation is established.
F All disturbed soil areas not subject to re -vegetation should
be stabilized using approved chemical soil binder, jute
netting, or other methods approved in advance by the
APCD.
Conditions of Approval I
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
1325 EI Camino Real
BP: Building Pend
SIP: SubdMsion
BS: Building Sendcac
FD: Fire Deparrnent
Vesting Tentative Tract Map
FP oinal entMap Plans
PD: Policeginsar ent
CE: CAy Engineer
TPM 2003-0037
T0: Temporary
Ox,pancy
WW: Wastewater
CA: C6y Attomey
FI: Finalinspecton
AMWC: Water Canp.
F0: Final 0—panty
G All roadways, driveways, sidewalks, etc, to be paved should
be complete as soon as possible. In addition, building pads
should be laid as soon as possible after grading unless
seeding or soil binders are used.
H Vehicle speed for all construction vehicles shall not exceed
15 mph on any unpaved surface at the construction site.
I All trucks hauling dirt, sand, soil, or other loose materials are
to be covered or should maintain at least two feet of
freeboard (minimum vertical distance between top of load
and top of trailer) in accordance with CVC Section 23114.
J Install wheel washers where vehicles enter and exit unpaved
roads onto streets, or was off trucks and equipment leaving
the site.
K Sweep streets at the end of each day if visible soil material
is carried onto adjacent paved roads. Water sweepers with
reclaimed water should be used where feasible.
The contractor or builder shall designate a person or persons to
monitor the dust control program and to order increased watering, as
necessary, to prevent transport of dust off site. The name and
telephone number of such persons shall be provided to the APCD
prior to land use clearance for map recordation and land use
clearance for finish grading of any structure.
Mitigation Measure 4.e.1: The building permit site plan shall identify
BP
PS, BS, CE
4.e.1
all protection and enhancement measures recommended by the
Certified Arborist in the Tree Protection Plan. Tree protection fencing
shall be installed at the locations called out in the Tree Protection
Plan.
Mitigation Measure4.e.2: All tree removals shall be mitigated as
BP
PS, BS, CE
4.e.2
prescribed by the Atascadero Native Tree Ordinance. ($8,658.33)
Conditions of Approval /
Mitigation Monitoring Program
1325 EI Camino Real
Vesting Tentative Tract Map
TPM 2003-0037
Timing
GP: Grading Permit
BP: Building Pend
slip: SubdMsion
FP oinal entMap Plans
T0: Temporary
Ox,pancy
FI: Finalinspecton
F0: Final 0—panty
Responsibility
/Monitoring
PS: Planning Services
BS: Building Sendcac
FD: Fire Deparrnent
PD: Policeginsar ent
CE: CAy Engineer
WW: Wastewater
CA: C6y Attomey
AMWC: Water Canp.
Mitigation
Measure
Mitigation Measure 4.e.3: The developer shall contract with a
BP, GP
PS, BS, CE
4.e.3
certified arborist during all phases of project implementation. The
certified arborists shall be responsible for monitoring the project
during all phases of construction through project completion, as
follows:
(a) A written agreement between the arborist and the developer
outlining a arborist monitoring schedule for each construction
phase through final inspection shall be submitted to and
approved by planning staff prior to the issuance of
building/grading permits.
(b) Arborist shall schedule a pre -construction meeting with
engineering /planning staff, grading equipment operators, project
superintendent to review the project conditions and requirements
prior to any grubbing or earth work for any portion of the project
site. All tree protection fencing and trunk protection shall be
installed for inspection during the meeting. Tree protection
fencing shall be installed at the line of encroachment into the
tree's root zone area.
(c) As specified by arborist report and City staff: (See Attachment 4)
• Fencing: Must be a minimum of 4' high, chain link, snow or
safety fence staked at the drip -line or line of encroachment
for each tree or group of trees. Tree fencing shall be
erected before demolition, grading, or construction begins.
The owner shall be responsible for maintaining an erect
fence throughout the construction period. The arborist(s)
shall inspect the fence placement once it is erected. This is
mandatory for this project.
• Soil Aeration Methods: Soils under drip -lines that have been
compacted by heavy equipment and/or construction
activities must be returned to their original state before all
work is completed. Methods include waterjetting, adding
organic matter, and boring small holes with an auger (18"
deep, 2-3' apart with a 24" auger) and the application of
moderate amounts of nitrogen fertilizer. The arborist shall
advise.
• Chip Mulch: All areas within the drip -line of the trees that
cannot be fenced shall receive a 4-6" layer of chip mulch to
retain moisture, soil structure and reduce the effects of soil
compaction.
• Trenching within the Drip -line: All trenching under drip -lines
of native trees shall be hand dug, augured or bored. All
major roots shall be avoided whenever possible. All
exposed roots larger than 1" in diameter shall be 'clean cut
with a sharp pruning tool and not left ragged.
• Grading within drip -line: Grading should not encroach within
the drip -line. If grading is necessary, construction of
retaining walls or tree wells or other protection measures
may be necessary to insure the survivability of the trees.
Chip mulch 4-6" in depth may also be required in these
areas.
Conditions of Approval /
Mitigation Monitoring Program
1325 EI Camino Real
Vesting Tentative Tract Map
TPM 2003-0037
Timing
GP: Grading Permit
BP: Building Pend
SIP: SubdMsion
FP oinal entMap Plans
T0: Temporary
Ox,pancy
FI: Finalinspecton
F0: Final 0—panty
Responsibility
/Monitoring
PS: Planning Services
BS: Building Sendcac
FD: Fire Deparrnent
PD: Policeginsar ent
CE: CAy Engineer
WW: Wastewater
CA: City Attomey
AMWC: Water Canp.
Mitigation
Measure
• Grading should not disrupt the normal drainage pattern
around the trees. Fills should not create a pending condition
and excavations should not leave the tree on a rapidly
draining mound. Grading shall be done by hand underneath
the drip -lines to avoid tearing any roots.
• Exposed Roots: Any exposed roots shall be recovered the
same day they were exposed. If they cannot, they must be
covered with burlap or another suitable material and wetted
down 2X per day.
• Paving within the Drip -line: Pervious surfacing is preferred
within the dripline of any oak trees. Arborist(s) will advise.
• Equipment Operation: Vehicles and all heavy equipment
shall not be driven under the trees, as this will contribute to
soil compaction.
• Existing Surfaces: The existing ground surface within the
drip -line of all oak trees shall not be cut, filled, compacted or
pared.
• Construction materials and waste: No liquid or solid
construction waste shall be dumped on the ground within the
drip -line of any oak tree.
• Arborist Monitoring: An arborist shall be present for selected
activities (trees identified on spreadsheet — See attachment
5) and pre -construction fence placement. The monitoring
does not necessarily have to be continuous but
observational at times during the above activities.
• Pre -Construction Meeting: An on-site pre -construction
meeting with the Arborist, owner, planning staff, and the
earth moving team shall be required for this project. Prior to
final occupancy, a letter from the arborist shall be required
verifying the health/condition of all impacted trees and
providing any recommendations for any additional mitigation.
The letter shall verify that the arborist was on site for all
grading and/or trenching activity that encroached into the
drip -line of the selected native trees, and that all work done
in these areas was completed to the standards set forth
above.
The total number of native trees to be removed for this
project is 13 with a dbh of 379.5 inches.
(d). Upon project completion and prior to final occupancy a final
status report shall be prepared by the project arborist certifying that
the tree protection plan was implemented, the trees designated for
protection were protected during construction, and the construction -
related tree protection measures are no longer required for tree
protection.
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
1325 EI Camino Real
BP: Building Pend
SIP: SubdMsion
BS: Building Sendcac
FD: Fire Deparrnent
Vesting Tentative Tract Map
FP oinal entMap Plans
PD: Policeginsar ent
CE: CAy Engineer
TPM 2003-0037
T0: Temporary
Ox,pancy
WW: Wastewater
CA: C6y Attomey
FI: Finalinspecton
AMWC: Water Canp.
F0: Final 0—panty
Mitigation Measure 5.a.1: The proposed project shall incorporate the
BP
PS, BS
5.a.1
Secretary of the Interior's Standards and Illustrated Guidelines for
Rehabilitating Historic Buildings. The standards shall apply to the
exterior rehabilitation of the Colony house and proposed landscape
improvements to the overall project site, subject to staff review and
approval.
Mitigation Measure 5.a.2: Replacement of any exterior materials or
BP
PS, BS
5.a.2
design features on the original colony house shall be consistent with
the Secretary of the Interior's Standards and Illustrated Guidelines for
Rehabilitating Historic Buildings. This shall include the replacements
of any doors and windows with solid wood framing of similar design
and appearance. Vinyl, vinyl -cladding, and metal materials are not
permitted.
Mitigation Measure 5.a.3: The proposed project shall include
BP
PS, BS
5.a.3
Covenants, Conditions and Restrictions (CC&R's) or equivalent
mechanism that incorporate the planned development conditions of
approval to ensure that the site retains the historic qualities (historic
buildings, architecture, colors, materials, fencing, and landscaping)
over time.
Mitigation Measure 5.a.4: The new detached garage to be
BP
PS, BS
5.b.1
constructed on the colony house lot shall be of similar design as the
existing original wood sided garage with wood doors and windows.
The garage shall incorporate a pair of single or double -hung wood
windows on each side and wood door design. A wood door may be
added to any side. The garage door shall be constructed of wood
and have an architectural appearance similar to the existing paired
garage doors. The garage door may be of roll -up function. The
garage driveway shall have a 20 -foot minimum depth driveway.
Mitigation Measure 5.b.1: Should any cultural resources be
BP
PS, BS
5.b.1
unearthed during site development work, the provisions of CEQA -
Section 15064.5, will be followed to reduce impacts to a non-
significant level.
Mitigation Measure 6.b.1: The grading permit application plans shall
GP
PS, Bs, CE
6.b.1
include erosion control measures to prevent soil, dirt, and debris from
entering the storm drain system during and after construction. A
separate plan shall be submitted for this purpose and shall be subject
to review and approval of the City Engineer at the time of Building
Permit application.
Mitigation Measure 6.c.1.: A soils report shall be required to be
BP, GP
PS, BS, CE
6.c.1
submitted with a future building permit by the building department.
Mitigation Measure 8e.f.1: A Storm water Pollution Prevention Plan
GP
PS, BS, CE
8.e.f.1
(SWPPP)/Erosion Control Plan shall be submitted and approved by
the City Engineer prior to the issuance of the building permit. The
plan shall include storm water measures for the operation and
maintenance of the project for the review and approval of the City
Engineer. The Building Permit application plans shall identify Best
Management Practices (BMPs) appropriate to the uses conducted on
site that effectively prohibit the entry of pollutants into storm water
runoff.
Conditions of Approval /
Mitigation Monitoring Program
1325 EI Camino Real
Vesting Tentative Tract Map
TPM 2003-0037
Timing
GP: Grading Permit
BP: Building Pend
SIP: SubdMsion
FP oinal entMap Plans
T0: Temporary
Ox,pancy
FI: Final inspection
F0: Final 0—panty
Responsibility
/Monitoring
PS: Planning Services
BS: Building Sendcac
FD: Fire Deparrnent
PD: Policeginsar ent
CE: CAy Engineer
WW: Wastewater
CA: C6y Attomey
AMWC: Water Canp.
Mitigation
Measure
Mitigation Measure 8.e.f.2: The developer is responsible for ensuring
GP
PS, BS, CE
8.e.f.2
that all contractors are aware of all storm water quality measures and
that such measures are implemented. Failure to comply with the
approved construction Best Management Practices will result in the
issuance of correction notices, citations, or stop orders.
Mitigation Measure 11.d.1: All construction activities shall comply
BP, GP
PS, BS, CE
11.d.1
with the City of Atascadero Noise Ordinance for hours of operation,
and as follows:
Construction activities shall be limited to the following hours of
operation:
7 a.m. to 7 p.m. Monday through Friday
• 9 a.m. to 6 p.m. Saturday
• No construction on Sunday
Further, particularly loud noises shall not occur before 8 a.m. on
weekdays and not at all on weekends.
The Community Development Director upon a determination that
unusually loud construction activities are having a significant impact
on the neighbors may modify the hours of construction.
Failure to comply with the above-described hours of operation may
result in withholding of inspections and possible construction
prohibitions, subject to the review and approval of the Community
Development Director.
A sign shall be posted on-site with the hours of operation and a
telephone number of the person to be contacted in the event of any
violations. Staff shall approve the details of such a sign during the
Grading Plan/Building Permit review process.