HomeMy WebLinkAboutPC_2006-06-06_AgendaPacketCITY OF ATASCADERO
PLANNING COMMISSION AGENDA
Regular Meeting
Tuesday, June 6, 2006 — 7:00 P.M.
City Hall
Council Chambers
6907 El Camino Real
Atascadero, California
CALL TO ORDER
Pledge of Allegiance
Roll Call: Chairperson Beraud
Vice Chairperson O'Keefe
Commissioner Fonzi
Commissioner Jones
Commissioner Kelley
Commissioner Porter
Commissioner Slane
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
DISCLOSURE OF EX PARTE COMMUNICATIONS:
Prior to a project hearing Planning Commission Members must disclose any communications
they have had on any quasi-judicial agenda items. This includes, but is not limited to, tentative
subdivision maps, parcel maps, variances, conditional use permits, and planned development
permits. This does not disqualify the Planning Commission Member from participating and
voting on the matter, but gives the public and applicant an opportunity to comment on the ex
parte communication.
PUBLIC COMMENT
(This portion of the meeting is reserved for persons wishing to address the Commission on any matter not
on this agenda and over which the Commission has jurisdiction. Speakers are limited to five minutes.
Please state your name and address for the record before making your presentation. The Commission may
take action to direct the staff to place a matter of business on a future agenda)
City of Atascadero Planning Commission Agenda
CONSENT CALENDAR
Regular Meeting June 6, 2006
Page 2 of 6
(All items on the consent calendar are considered to be routine and non -controversial by City Staff and will
be approved by one motion if no member of the Commission or public wishes to comment or ask questions.)
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON MAY 16, 2006.
2. APPROVAL OF TIME EXTENSION ON CUP 2003-0106, EOC SHELTER
COMMUNITY DEVELOPMENT STAFF REPORTS
3. TREE REMOVAL PERMIT 2006-0091, ATASCADERO CREEK
Owner:
Atascadero Unified School District, 5601 W. Mall, Atascadero, CA 93422
Applicant
City of Atascadero Public Works Department, 6907 EI Camino Real, Atascadero, CA 93422
Certified
A&T Arborists, P O Box 1311, Templeton, CA 93465
Arborist:
TRP 2006-0084
Project Title
TRP 2006-0091 (Atascadero Creek Bank Restoration/ City of Atascadero)
Project
Creek Bank behind Atascadero City Hall, 6907 EI Camino Real, Atascadero, CA 93422
Location
APN:029-361-003
Project
A request to remove nine existing native trees: eight (8) native Black Walnut trees totaling 102.5
Description
inches (dbh) and one Coast Live Oak tree totaling 49 inches (dbh), for the restoration of
Atascadero Creek.
4. TREE REMOVAL PERMIT 2006-0084, KUDEN
Owner•
John Kuden, 2095 Valle Vista, San Luis Obispo, CA 93405
Certified
A&T Arborists, P O Box 1311, Templeton, CA 93465
Arborist:
Project Title
TRP 2006-0084
Project
9380 Mountain View Dr., Atascadero, CA 93422
Location
APN:056-322-024
Project
A request to remove two existing native trees: one (1) Live Oak tree and one (1) Blue Oak tree,
Description
and account for the non -permitted removal of a 36" Coastal Live Oak tree for the development
of a single-family residence.
City of Atascadero Planning Commission Agenda
PUBLIC HEARINGS
Regular Meeting June 6, 2006
Page 3 of 6
(For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public
hearing and invite the applicant or applicant's representative to make any comments. Members of the public will be invited to provide
testimony to the Commission following the applicant. Speakers should state their name and address for the record and can address the
Commission for five minutes. After all public comments have been received, the public hearing will be closed, and the Commission
will discuss the item and take appropriate action(s).)
5. TTM 2004-0061/PLN 2099- 0581
(CONTINUED FROM 5-16-06)
Applicant:
Rancho De Paraiso LLC, 6465 Alta Pradera Ln, Atascadero, CA 93422
Project Title:
TTM 2004-0061, Subdivision of 2 lots
Project
6750 San Gabriel Road, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 054-191-035, 036
Project
The project consists of an application to subdivide an existing lot of record. The original 8.41
Description:
acre parcel is to be divided into separate lots, one totaling 3.56 acres gross and the other
totaling 4.85 acres gross. No native trees are proposed for removal with the subdivision of
this land and both parcels will take access off San Gabriel Road.
General Plan Designation: RS
Proposed
Zoning District: RE
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is
Environmental
proposed. The proposed Mitigated Negative Declaration is available for public review at
Determination:
6907 EI Camino Real, Community Development Department from 8:00 a.m. to 5:00 p.m.,
Monday through Friday.
6. AMENDMENT TO CUP 2003-0089/TTM 2004-0050/PLN-2099-0221
(CONTINUED FROM 5-16-06)
Applicant:
Kelly Gearhart, 6205 Alcantara Ave., Atascadero, CA 93422
Project Title:
Amendment to CUP 2003-0089/TTM 2004-0050
Project
7955 Curbaril Ave., Atascadero, CA 93422
Location:
APN 031-161-024
Project
The proposed project consists of an Amendment to the Master Plan of Development for the
Description:
Curbaril Business Park to allow the construction of a bank building on the corner of Curbaril
and Morro Rd.
General Plan Designation: General Commercial (GC)
Zoning District: Commercial Professional (CP)
Proposed
Environmental
Consistent with the previously certified Mitigated Negative Declaration.
Determination:
City of Atascadero Planning Commission Agenda
7. TPM -2005-0077 PLN -2099-0204
Regular Meeting June 6, 2006
Page 4 of 6
Owner:
Sidney G. Moses, 8100 Coromar Avenue, Atascadero CA 93422
Project Title:
TPM 2005-0077, Minor subdivision on >20% slopes
Project
8100 Coromar Avenue, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 056-091-029
Location:
Portion of Lot 15A Block 7 Atascadero Colony
Project
The project consists of an application to subdivide an existing 1.49 acre lot into two (2) lots
Description:
containing 0.50 acres and 0.74 acres. The site contains several native oak trees, an existing
single family residence located toward the rear of the property, two sheds and a pool.
Proposed
Existing improvements will be retained on proposed Parcel 1 consisting of 0.74 acres. The
Environmental
proposed undeveloped Parcel 2 contains a 23.4% average slope with a 16.7% average slope
Determination:
within the proposed building envelope. Future access and development of a single family
residence for Parcel 2 will impact approximately ten (10) native oak trees and result in the
removal of six (6) Live Oaks (approximate). Parcel 2 will have access to Coromar Avenue by
an access easement located on Parcel 1. The subject site is within a sewer service area.
General Plan Designation: SFR -X
Zoning District: RSF-X
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is
Environmental
proposed. The certified Mitigated Negative Declaration is available for public review at 6907
Determination:
EI Camino Real, Community Development Department from 8:00 a.m. to 5:00 p.m., Monday
through Friday.
8. TPM-2005-0081/PLN-2099-0453
Owner:
J. Kelly and Theresa M. Farris, 4680 Shadow Canyon Rd., Templeton, CA 93465
Applicant:
Chris Seaberg, 2165 Wilton Dr., Cambria, CA 93428
Project Title:
TPM -2005-0081
Project
7255 Navajoa Ave., Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 031-051-009
Project
A proposed condominium map over an existing lot of record to create two airspace units on one
Description:
common lot. The existing residence and attached garage would remain and be converted to a
condominium unit. An additional single story residence and attached garage is proposed.
Proposed
Categorical Exemption; Class 3
Environmental
Determination:
COMMISSIONER COMMENTS AND REPORTS
9. APPEALS OF PLANNING COMMISSION DECISIONS TO CITY COUNCIL
THE PLANNING COMMISSION WILL DISCUSS THE CITY'S CURRENT
POLICY THAT ALLOWS INDIVIDUAL COMMISSIONERS TO APPEAL
DECISIONS TO THE CITY COUNCIL WITHOUT A FEE.
City of Atascadero Planning Commission Agenda
DIRECTOR'S REPORT
ADJOURNMENT
Regular Meeting June 6, 2006
Page 5 of 6
The next regular meeting of the Planning Commission will be on June 20, 2006 at City Hall,
Council Chambers, 6907 El Camino Real, Atascadero.
Please note: Should anyone challenge in court any proposed development entitlement listed
on this Agenda, that person may be limited to raising those issues addressed at the public
hearing described in this notice or in written correspondence delivered to the Planning
Commission at, or prior to this public hearing.
City of Atascadero Planning Commission Agenda Regular Meeting June 6, 2006
Page 6 of 6
City of Atascadero
WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING
The Planning Commission meets in regular session on the first and third Tuesday of each month at 7:00
p.m., at City Hall, Council Chambers, 6907 EI Camino Real, Atascadero. Matters are considered by the
Commission in the order of the printed Agenda.
Copies of the staff reports or other documentation relating to each item of business referred to on the
Agenda are on file in the office of the Community Development Department and are available for public
inspection during City Hall Annex business hours at the Community Development counter and on our
website, www.atascadero.org. An agenda packet is also available for public review at the Atascadero
Library, 6850 Morro Road. All documents submitted by the public during Commission meetings that are
either read into the record or referred to in their statement will be noted in the minutes and available for
review in the Community Development Department.
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in
a City meeting or other services offered by this City, please contact the City Manager's Office, (805)
461-5000, or the City Clerk's Office, (805) 461-5000. Notification at least 48 hours prior to the meeting or
time when services are needed will assist the City staff in assuring that reasonable arrangements can be
made to provide accessibility to the meeting or service.
TO SPEAK ON AGENDA ITEMS
Members of the audience may speak on any item on the agenda. The Chairperson will identify the
subject, staff will give their report, and the Commission will ask questions of staff. The Chairperson will
announce when the public comment period is open and will request anyone interested to address the
Commission regarding the matter being considered to step up to the podium. If you wish to speak for,
against, or comment in any way:
• You must approach the podium and be recognized by the Chairperson
• Give your name and address (not required)
• Make your statement
• All comments should be made to the Chairperson and Commission
• All comments limited to 5 minutes (unless changed by the Commission)
• No one may speak for a second time until everyone wishing to speak has had an opportunity
to do so, and no one may speak more than twice on any item.
If you wish to use a computer presentation to support your comments, you must notify the Community
Development Department at least 24 hours prior to the meeting. Access to hook up your laptop to the
City's projector will be provided. You are required to submit to the Recording Secretary a printed copy
of your presentation for the record. Please check in with the Chairperson before the meeting begins to
announce your presence and turn in the printed copy.
The Chairperson will announce when the public comment period is closed, and thereafter, no further
public comments will be heard by the Council.
TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA
Under Agenda item, "PUBLIC HEARINGS", the Chairperson will call for anyone from the audience having
business with the Commission to:
• Please approach the podium and be recognized
• Give your name and address (not required)
• State the nature of your business
This is the time items not on the Agenda may be brought to the Commission's attention. A maximum of
30 minutes will be allowed for Community Forum (unless changed by the Commission).
CALL TO ORDER
ITEM NUMBER: 1
DATE: 6-6-06
CITY OF ATASCADERO
PLANNING COMMISSION
DRAFT MINUTES
Regular Meeting
Tuesday, May 16, 2006 — 7:00 P.M.
Chairperson Beraud called the meeting to order at 7:00 p.m. and Commissioner Slane
led the Pledge of Allegiance.
ROLL CALL
Present: Commissioners Fonzi, Jones, Kelley, Porter, Slane, O'Keefe and
Chairperson Beraud
Absent: None
Staff Present: Community Development Director Warren Frace, Deputy
Community Development Director Steve McHarris, Civil Engineer
Joe Chouinard, Associate Planner Kelly Gleason, Planning
Technician Paul Tabone and Recording Secretary Grace Pucci.
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
MOTION: By Commissioner Porter and seconded by Commissioner
Jones to approve the agenda.
Motion passed 7:0 by a roll -call vote.
PUBLIC COMMENT
None
PC Draft Minutes 05/16/06
Page 1 of 10
CONSENT CALENDAR
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON MAY 2, 2006.
2. APPROVAL OF FINAL MAP 2005-0127, 8350 AND 8380 ATASCADERO AVE.
LLA 2004-0061) CONSTANZO/MILLAR/SWITZER
3. APPROVAL OF TIME EXTENSION ON TTM 2004-0047, R. W. HERTEL &
SONS
Items pulled: Vice Chairperson O'Keefe, Item #3.
Chairperson Beraud requested a change to the Minutes of May 2, 2006, page 2, Motion
for Item #4: add that staff is to report back to the Planning Commission on the arborist's
report.
MOTION: By Commissioner Fonzi and seconded by Commissioner
Kelley to approve Items #1 as amended and Item #2.
Motion passed 5:0 by a roll -call vote. (Jones, Slane abstained)
Item #3: Vice Chairperson O'Keefe stated she will vote no on this project as an
expression of disappointment because when the project came before the Commission
they were told it would be a balanced project with regard to cut and fill, however 70,000
cubic yards of fill have left the site and of that 7,000 cubic yards were dumped into the
Salinas River.
Chairperson Beraud requested a change to Condition No. 11.e. on page 24: change
2.5% to 5%.
Commissioner Kelley stated that the project had taken place over the last 3 years during
which there have been significant increases in building costs and he questioned if it is
fair to place an additional financial burden on them at this time.
MOTION: By Chairperson Beraud and seconded by Commissioner Fonzi
to approve the Time Extension on TTM 2004-0047 with the
correction to Condition 11.e. to read: In -lieu fees using 2:5%
of the building valuation for the five (5) apartment units.
Motion passed 6:1 by a roll -call vote. (O'Keefe opposed)
PC Draft Minutes 05/16/06
Page 2 of 10
COMMUNITY DEVELOPMENT STAFF REPORTS
4. TREE REMOVAL PERMIT 2006-0087,13750 OLD MORRO ROAD
Planning Technician Paul Tabone gave the staff report and with Civil Engineer Joe
Chouinard answered questions of the Commission.
Ex Parte Communications
■ Vice Chairperson O'Keefe stated she had spoken with the owner and suggested he
speak to staff regarding access to a future barn on the property.
PUBLIC COMMENT
Tim Roberts, civil engineer and applicant's representative, spoke about the uniqueness
of the project and explained how the access to the site was determined. Mr. Roberts
answered questions of the Commission.
Scott McMahan, applicant, spoke about how he came to acquire the lot, the tree
removals, the proposed culvert and the possible construction of a barn.
Chairperson Beraud closed the Public Comment period.
MOTION: By Commissioner Kelley and seconded by Commissioner
Fonzi to adopt Resolution PC 2006-0050 to approve the
request to remove forty-eight native oak trees subject to the
guidelines and mitigation required by the Atascadero
Municipal Code and Native Tree Ordinance and that the
applicant work with staff on a combination of mitigation fees,
replanting the trees, and initiating a tree preservation
easement, and that he be allowed to use an arched culvert in
the roadway design, and if there is an impact to the drainage
way the applicant will be responsible for notifying the Regional
Water Quality Control Board and pay a $60 fee to qualify for a
nationwide permit, and contact the Department of Fish and
Game to make a determination on the potential for a stream
bed alteration permit and provide the City with evidence of that
prior to construction in that area.
Motion passed 7:0 by a roll -call vote.
PUBLIC HEARINGS
5. CUP AMENDMENT 2002-0071, AMENDMENT CALVARY CHAPEL
Applicant: Atascadero Calvary Chapel, 6955 Portola, Atascadero, CA 93422
PC Draft Minutes 05/16/06
Page 3 of 10
Owners:
Atascadero Calvary Chapel, 6955 Portola Road, Atascadero, CA 93422
Steven Shively, 5260 Cabrillo Ave., Atascadero, CA 93422
Project Title:
Conditional Use Permit 2002-0071 Amendment
Project
6955 Portola Road, Atascadero CA
Location:
APN 054-071-001 and 054-083-004
Project
The proposed project consists of a request to expand an existing church facility to allow
Description:
overflow parking on an adjacent single-family residential parcel. The application includes a
decomposed granite parking area, drainage facilities, and landscaping.
General Plan Designation: Single -Family Residential (SFR)
Zoning District: Residential Single Family -Z (RSF-Z)
Proposed
CATEGORICAL EXEMPTION: The project qualifies for a Class 3 Categorically Exemption
Environmental
under the provisions of the California Environmental Quality Act, CEQA section 15303.
Determination
Class 3.c. New construction or conversion of small structures.
Community Development Director Warren Frace gave the staff report and answered
questions of the Commission.
PUBLIC COMMENT
Ditas Esperanza, civil engineer and applicant's representative, stated that the applicant
agrees with all the conditions of approval.
Jerry James stated he lives adjacent to the site in question and expressed concern
regarding the drainage plan, the impact to the neighborhood from increased traffic flow,
and the occupancy load for the structure.
Areon Liter addressed the vegetation removal at the site, and the increased water runoff
created by the church. She would like to see the character of the street maintained.
Terry Hargrave stated several concerns with the project including: lack of a professional
arborist, water run off from the site, the unsightly nature of the decomposed granite
slab, the safety of the drainage basin, signage, and the legal responsibility for the
economic impact to the neighborhood.
Steve De Stellen, speaking for himself and several other neighbors who could not be
here tonight, stated that the church people have been working hard to improve the site,
that there is no problem from traffic and that they have no complaints regarding the
proposed project.
Linda (no last name given) spoke about the impacts to the neighborhood from the
church including traffic, lights, visual aspect of the parking lot, and loss of wildlife from
the site.
PC Draft Minutes 05/16/06
Page 4 of 10
Steve Shively, Pastor of the Church, spoke about the proposed landscaping and the
removal of foliage from the site. He stated it is their desire to improve the site and the
water runoff, and explained that he is working with staff to improve the lighting. Pastor
Shively answered questions of the Commission.
Chairperson Beraud closed the Public Comment period.
Vice Chairperson O'Keefe commented that what was presented was not a professional
landscape plan as requested by the Commission and she is concerned with the choices
for plant material, she would like more drought tolerant and native plants.
MOTION: By Commissioner Fonzi and seconded by Commissioner
Kelley to adopt Resolution PC 2006-0017 approving
Conditional Use Permit Amendment 2002-0071 based on
findings and subject to Conditions of Approval with one of the
conditions being that the applicant will work with staff and a
professional landscaper to provide adequate landscaping
utilizing drought tolerant plants and if at any future time the
CUP is amended the easement could be reconveyed.
Motion passed 6:1 by a roll -call vote. (O'Keefe opposed)
Vice Chairperson O'Keefe stated for the record that she voted no because this did not
meet the requirement for the professional landscape plan and the project continues to
have an impact to the neighborhood from things like lighting in addition to the
landscaping.
6. TENTATIVE TRACT MAP 2004-0061
Owner:
Rancho De Paraiso LLC, 6465 Alta Pradera Ln, Atascadero, CA 93422
Project Title:
TTM 2004-0061, Subdivision of 2 lots
Project
6750 San Gabriel Road, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 054-191-035, 036
Project
The project consists of an application to subdivide an existing lot of record. The original
Description:
8.41 acre parcel is to be divided into separate lots, one totaling 3.56 acres gross and the other
totaling 4.85 acres gross. No native trees are proposed for removal with the subdivision of
this land and both parcels will take access off San Gabriel Road.
General Plan Designation: RS
Zoning District: RE
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is
Environmental
proposed. The proposed Mitigated Negative Declaration is available for public review from
Determination:
4/27/06 through 5/16/06 at 6907 El Camino Real, Community Development Department
from 8:00 a.m. to 5:00 p.m., Monday through Friday.
PC Draft Minutes 05/16/06
Page 5 of 10
MOTION: By Commissioner Fonzi and seconded by Commissioner
Porter to continue this item to a date certain of June 6, 2006.
Motion passed 7:0 by a voice vote.
Chairperson Beraud recessed the hearing at 8:35 p.m.
Chairperson Beraud called the meeting back to order at 8:42 p.m.
7. CONDITIONAL USE PERMIT 2006-0182, AMENDMENT
Owner:
Michael Steiner, 108 Erna Way, Pismo Beach, CA 93449
Project Title:
CUP 2006-0182, Amendment to the PD 16 Master Plan of Development (CUP 2002-0078)
for construction of a single-family residence on slopes greater than 10%.
Project
6255 Alta Pradera Lane, Atascadero, CA 93422
Location:
(San Luis Obispo County) 054-192-019
Project
The project consists of an application to amend a previously recorded Master Plan of
Description:
Development to allow construction of a one-story, single-family residence outside of a
previously approved building envelope on an existing lot of record. The project will require
approximately 577 cubic yards of cut and approximately 533 cubic yards of fill. Three
native oak trees are proposed for removal and the residence will take access from Alta
Pradera Lane.
General Plan Designation: RE
Zoning District: RS/PD-16
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is
Environmental
proposed. The proposed Mitigated Negative Declaration is available for public review from
Determination:
4/27/06 through 5/16/06 at 6907 El Camino Real, Community Development Department
from 8:00 a.m. to 5:00 p.m., Monday through Friday.
Planning Technician Paul Tabone gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Mark Davis, applicant's representative and engineer, explained the calculation for the
slopes and the change to the building envelope. Mr. Davis answered questions of the
Commission.
Michael Steiner, applicant, spoke about the plans for the development of the property
and the reasons for designing a single story home.
Steven Alvarez, arborist, spoke about the large tree with the 60% impact and its
chances for survival and related that the applicant had contacted him prior to
purchasing the property and had designed the project with tree protection in mind.
PC Draft Minutes 05/16/06
Page 6 of 10
Chairperson Beraud closed the Public Comment period.
MOTION: By Commissioner Kelley and seconded by Commissioner
Fonzi to adopt Resolution PC 2006-0046 to approve Mitigated
Negative Declaration 2006-0010 and adopt Resolution PC 2006-
0047 to amend the PD -16 Master Plan of Development and the
request to remove three (3) native oak trees subject to
conditions of approval, and that a mitigation deposit will be
collected for the 4t" tree, to be returned to the applicant if the
tree survives, and the change to the conditions of approval
that all required setbacks for the future pool from the retaining
wall and septic areas must meet all applicable city standards.
Motion passed 6:1 by a roll -call vote. (Beraud opposed)
8. AMENDMENT TO CUP 2003-0089/TTM 2004-0050
Owner:
Kelly Gearhart, 6205 Alcantara Ave., Atascadero, CA 93422
Project Title:
Amendment to CUP 2003-0089/TTM 2004-0050
Project
7955 Curbaril Ave., Atascadero, CA 93422
Location:
APN 031-161-024
Project
The proposed project consists of an Amendment to the Master Plan of Development for the
Description:
Curbaril Business Park to allow the construction of a bank building on the corner of Curbaril
and Morro Rd.
General Plan Designation: General Commercial (GC)
Zoning District: Commercial Professional (CP)
Proposed
Consistent with the previously certified Mitigated Negative Declaration.
Environmental
Determination
Commissioner Porter stepped down from consideration of this item stating he has a
conflict of interest in that he is employed by Heritage Oaks Bank.
Associate Planner Kelly Gleason gave the staff report and answered questions of the
Commission.
PUBLIC COMMENT
Gerard Howard stated he does not think a bank on the outskirts of town makes sense,
and was concerned that the drive through teller would significantly increase traffic and
create safety issues in the neighborhood.
Chairperson Beraud closed the Public Comment period.
PC Draft Minutes 05/16/06
Page 7 of 10
Commissioner Fonzi was concerned with the problems of added noise, pollution and
lights that will be created in a residential area by the drive-through ATM. She would like
to see it removed.
Vice Chairperson O'Keefe agreed with Commissioner Fonzi and was concerned by the
cumulative impacts of drive-throughs throughout town.
Commissioner Kelley commented that it is safer to use the drive through at night rather
than walking up to the ATM. He also stated that mixed use projects encourage
residential and business uses next to each other.
Commissioner Jones suggested that as Atascadero grows, dissipating the use of
facilities over 24 hours has a less cumulative impact that utilizing them during rush
hours.
Chairperson Beraud stated she is not in favor of drive-throughs and does not support
having it at this location as it is too close a residential neighborhood.
Commissioner Slane agreed that it is safer to use the drive-through ATM at night and
doesn't believe there will be an impact to the neighborhood.
MOTION: By Commissioner Kelley and seconded by Commissioner
Slane to adopt Resolution PC 2006-0051 approving Conditional
Use Permit 2003-0089 Amendment subject to Conditions of
approval and mitigation monitoring, and; adopt Resolution PC
2006-0052 approving Tentative Tract Map 2004-0050
Amendment, subject to conditions of approval and mitigation
monitoring.
Motion failed 3:3 by a roll -call vote. (Fonzi, O'Keefe, Beraud
opposed)
Commissioner Fonzi stated for the record that she voted against the motion because of
the drive-through ATM only.
Vice Chairperson O'Keefe stated for the record that she voted against the motion
because of the drive-through ATM only.
MOTION: By Commissioner Fonzi and seconded by Vice Chairperson
O'Keefe to adopt Resolution PC 2006-0051 approving
Conditional Use Permit 2003-0089 Amendment subject to
Conditions of approval and mitigation monitoring, and; adopt
Resolution PC 2006-0052 approving Tentative Tract Map 2004-
0050 Amendment, subject to conditions of approval and
mitigation monitoring, and with the condition that the drive-
through ATM's be eliminated.
PC Draft Minutes 05/16/06
Page 8 of 10
Motion failed 3:3 by a roll -call vote. (Jones, Kelley, Slane
opposed)
Commissioner Kelley reiterated that safety is the main issue in support of the drive-
through ATM, and that this is a service people in town want.
Commissioner Fonzi stated that the drive-through ATM has a special impact as it is in a
residential neighborhood, and she stands in support of those already living there as this
is new construction impacting those already in their homes.
MOTION: By Commissioner Fonzi and seconded by Chairperson Beraud
to adopt Resolution PC 2006-0051 approving Conditional Use
Permit 2003-0089 Amendment subject to Conditions of
approval and mitigation monitoring, and; adopt Resolution PC
2006-0052 approving Tentative Tract Map 2004-0050
Amendment, subject to conditions of approval and mitigation
monitoring, and with the condition that the drive -up ATM be
eliminated for this particular bank at this location.
Motion failed 3:3 by a roll -call vote. (Jones, Kelley, Slane
opposed)
MOTION: By Commissioner Jones and seconded by Commissioner
Kelley to continue this item to the next Planning Commission
meeting and have staff come back making sure there is a
representative for the hearing, and that there is an alternative
plan for Commissioner consideration, and with information on
how many people are expected to use the ATM, and that staff
include the construction and elevations of what this drive-
through structure looks like.
Motion passed 6:0 by a roll -call vote.
Commissioner Porter rejoined the hearing.
COMMISSIONER COMMENTS AND REPORTS
Commissioner Kelley suggested a future agenda item that would be a discussion by the
Planning Commission as to how they would like to address the appeal process for
Commissioners that is currently in place, and if it should be modified or kept as is.
There was Commission consensus to place the appeal process for
Commissioners on a future agenda for discussion.
PC Draft Minutes 05/16/06
Page 9 of 10
Commissioner Jones asked if anything was scheduled for the 2 units of continuing
education training required for the Commission. Director Frace stated the City Attorney
and City Clerk are working on a training session, but it is not yet scheduled.
Commissioner Fonzi questioned whether written comments should be given for the
parking study. Director Frace stated the study was informational, however if
Commissioners have comments they should give those to staff who will forward them to
the agency.
DIRECTOR'S REPORT
Community Development Director Warren Frace reported that the appeal for the fence
variance was denied, and that there is a workshop on May 30th, 6:00 p.m. regarding the
Annex project at Del Rio and EI Camino Real, at which the City Council and Planning
Commission will be seated. The purpose of the workshop is for the property owner to
present his concepts and ideas, to take public comment and for the Commission and
Council to give direction. Director Frace reviewed the agenda for the June 6th Planning
Commission meeting.
Chairperson Beraud announced she would be on vacation next month and will miss
both Planning Commission meetings.
ADJOURNMENT
Chairperson Beraud adjourned the meeting at 9:40 p.m. to the next regularly scheduled
meeting of the Planning Commission on June 6, 2006.
►�i1���1►[H:7.x��1:��7��7_1�J�l►�ill►l�ji�•'i�:7_��_1:���1: �'E
Grace Pucci, Recording Secretary
\\Cityhall\cdvlpmnt\— PC Minutes\PC Minutes 06\PC Draft Minutes 5-16-06.GP.doc
PC Draft Minutes 05/16/06
Page 10 of 10
ITEM NUMBER: 2
DATE: 6-6-06
Planning Commission Staff Report
Consent Agenda
Time Extension CUP 2003-0106
965 EI Camino Real
(Economic Opportunity Commission)
SUBJECT:
Consideration of a one-year Time Extension for Conditional Use Permit 2003-0106, a
request for a 32 -bed overnight shelter.
RECOMMENDATION:
Staff Recommends:
Adopt Resolution PC 2006-0056, thereby approving a one-year Time Extension of
Conditional Use Permit 2003-0106 in compliance with Section 9-2.118 of the
Atascadero Municipal Code.
SITUATION AND FACTS:
1. Applicant: Economic Opportunity Commission,
1030 Southwood Drive, San Luis Obispo, CA 93401
Phone: 544-4355
2. Project Address: 965 EI Camino Real, Atascadero, CA 93422
(APN 049-041-010)
3. General Plan Designation: Suburban Estate (SE)
4. Zoning District: Residential Suburban (RS)
5. Existing Use: Headstart Preschool and supporting facilities
6. Environmental Status: Categorical Exemption CEQA section 15303
Class 3(c).
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
DISCUSSION:
Background:
On June 8, 2004, the City Council approved a Conditional Use Permit (CUP 2003-0106)
to co -locate a 32 -bed overnight shelter on property owned by the Economic Opportunity
Commission (EOC) and currently used for the Head Start Preschool following an Appeal
of the Planning Commission's action to approve the project in May of 2004.
Entitlement permits expire after one year unless a building permit has been issued, the
entitled use has been established or a request for a time extension has been filed prior
to the expiration date of the approval.
On May 31, 2005, the Community Development Director approved a one-year Time
Extension after making the necessary findings required by the provisions of Section 9-
2.118 of the Atascadero Municipal Code, extending the project deadline to June 8,
2006.
EOC is currently requesting a second Time Extension, as identified in the "Explanation
of Request for Extension of CUP 2003-0106" in Attachment 2 to this staff report. The
primary reason for this request is to accommodate extensive negotiations between
EOC, the federal and state governments, and the former property owners. Negotiations
are concluding but have created project delays beyond EOC's control.
Analysis:
The City's Zoning Ordinance provides that:
Section 9-2.118(b)
Continuinq Time Extensions. The Planning Commission may grant additional
extensions after an initial extension, provided that each such extension shall not exceed
one (1) year. Continuing extension may be granted when the applicant has filed a written
request with the Planning Department on or before the date of expiration of the initial
extension, and provided that the Planning Commission makes the following findings:
(1) That substantial site work could not be completed as set forth in Section 9-2.114
because of circumstances beyond the control of the applicant, and
(2) The findings specified in Section 9-2.118(a). (Ord. 68 § 9-2.118, 1983) (shown below
as (1) and (2):
(1) There have been no changes to the provisions of the General Plan or zoning
regulations applicable to the project since the approval of the entitlement; and
(2) There have been no changes in the character of the site or its surroundings
which affect how the standards of the General Plan or zoning regulations apply to the
project.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER: 2
DATE: 6-6-06
Time Extension Findings:
1. Substantial site work could not be completed as set forth in Section 9-2.114 because of
circumstances beyond the control of the applicant.
Staff Comment: In August of 2004, EOC lost the original grant for the project due to
timing issues (see Attachment 3). Since that time, EOC has been wading through the
State grant process and was recently awarded a grant that should allow EOC to move
forward with the project.
2. There have been no changes to the provisions of the General Plan or zoning regulations
applicable to the project since the approval of the entitlement.
Staff Comment: A review of General Plan Amendments and Zoning Code updates
indicates there have not been any changes to these documents that would impact the
project.
3. There have been no changes in the character of the site or its surroundings which affect
how the standards of the General Plan or zoning regulations apply to the project.
Staff Comment: There have been no changes to the character of the site or its
surroundings that would change the application of the General Plan and Zoning
regulations. All original conditions (see Attachment 4) of approval will continue to be in
full force and effect until the project's completion.
Project History:
Original Approval
Time Extension 1
Time Extension 2
CONCLUSION:
Applied 5/16/05
Applied 5/17/06
Approval
June 8, 2004
May 31, 2005
June 6, 2006
Expiration
June 8, 2005
June 8, 2006
June 8, 2007
The City Council found the proposed project, as conditioned, consistent with the 2002
General Plan and Zoning Ordinance. Provisions of the General Plan and Zoning
Ordinance relating to the project land use have not been amended since the project's
original approval. The project continues to meet the City's goals, policies, and
regulations. Staff recommends the Planning Commission approve the Time Extension.
ALTERNATIVES:
1. The Commission may approve the Time Extension subject to additional or revised
project conditions.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER: 2
DATE: 6-6-06
2. The Commission may deny the Time Extension if it is found to be inconsistent with
the General Plan or any of the other required findings. The Commission's motion to
deny must include a finding basis for denial.
3. The Commission may continue the hearing and refer the item back to staff for
additional information or analysis. Direction should be given to staff and the
applicant on required information.
PREPARED BY: Kerry Margason, Associate Planner
ATTACHMENTS:
Attachment 1 -- Location Map (General Plan & Zoning)
Attachment 2 - Time Extension Request Letter
Attachment 3 — Project Update Letter, dated August 2004
Attachment 4 - Original Conditions of Approval
Attachment 5 — Draft Resolution PC 2006-0056
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 1: Location Map (General Plan / Zoning)
CUP 2004-0106
965 EI Camino Real
Zoning District: Residential Suburban (RS)
Land Use Designation: Suburban Estate (SE)
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 2: Time Extension Request Letter
EXPLANATION OF REQUESW- OR EXTENSION OF CUP 2003-01
On June 8, 2004, the Atascadero City Council upheld a Planning Commission decision to issue a
Conditional Use Permit (CUP) for the Economic Opportunity Commission of San Luis Obispo County
(EOC) to construct an overnight shelter at 965 El Camino Real, Atascadero.
On May 31, 2005 the Atascadero Community Development Director approved a one year extension of
the time limit required to receive a building permit following the CUP effective date. This extended
the term of the CUP to June 8, 2006.
NEED FOR EXTENSION:
Since receiving the CUP, EOC has secured an Emergency Housing Assistance Program Capital
Development (EHAPCD) construction grant from the California Department of Housing and
Community Development (HCD). A Standard Agreement was executed between HCD and EOC on
September 21, 2005. The EHAPCD construction award brought additional conditions to be met,
resulting in extensive negotiations between EOC, the federal and state governments, and the former
property owners. Negotiations are concluding but have created project delays beyond EOC's control.
During the EHAPCD negotiations, a pro bono construction team headed by RRM continued to develop
the construction documents needed for plan check and to pull required permits. Because construction
documents are being developed on a pro bono basis, it has been beyond the control of EOC to meet the
June 8, 2006 deadline for pulling the first construction permit.
COMPLIANCE WITH CUP CONDITIONS:
When submitted, the application for a building permit will be in complete compliance with all
conditions of the CUP, and will show no substantive changes from the project approved for the CUP.
There will be slight modifications to the roof line, and it is proposed that the building will move ten
feet farther away from the retaining wall on the north property line.
BENEFITS TO THE COMMUNITY AND SUPPORT FOR PROJECT:
Homelessness is a growing problem countywide and statewide. The countywide Homeless
Enumeration Count and Survey Project conducted in October 2005 identified 1034 homeless persons
in North County. This is 43% of the countywide homeless population even though North County
represents less than 34% of the county's total population. Of these 1034 homeless persons, nearly 50%
were children and youth under the age of 21.
Building adequate affordable housing to meet the needs of all San Luis Obispo County residents will
take many years. In the meantime, public health and safety dictate provision of emergency facilities to
shelter homeless families and individuals. Construction of a permanent shelter in the North County
has been a clearly identified need since the late 1990s and completion of this project will be of great
benefit and importance to the North County communities.
Community organizations and volunteers have rallied to serve North County's homeless population.
ECHO'S all volunteer, faith -based temporary shelter has been operating since December 2001, in
anticipation of EOC's permanent shelter being built. The Atascadero and Templeton churches that
opened their facilities for the dinner/intake program and overnight shelter had no idea they would need
to provide their sites for this long. Currently the shelter rotates between only four churches, including
the church that hosts the dinner program year-round. The churches have been generous and patient but
they did not anticipate such heavy utilization of their facilities. They strongly support development of
a permanent facility and have agreed to continue providing their sites while the permanent shelter is
being built.
EOC's Board and staff are committed to development of a permanent North County overnight shelter
and respectfully request an extension of our CUP for an additional 12 months.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 3: Project Update Letter, dated August 2004
_D 10
August 23, 2004
TO: Wade McKinney, Warren Frace, Brady Cherry, John Couch
FROM: Biz Steinberg and North County Shelter Team
RE: Update on North County Family Shelter Project
As you know, EOC has been working for nearly four years to build a homeless shelter for the North County.
The project is a complex one, and despite many obstacles, is progressing to fruition. Most recently, we have
encountered a funding challenge, but are already at work resolving it. This update is provided as a briefing
on the North County Shelter Project.
Project activities related to negotiation of EHAP construction deadline
December 2003 A 6.5 earthquake hit North County, impacting Atascadero Planning staff with
City Hall damage and other earthquake mitigation projects.
January 2004 Atascadero City Council requested EOC to pursue an emergency extension o
the construction completion deadline.
April -August 2004 EOC negotiated with State for emergency extension of completion date.
August 2004 Requested extension was not allowed by State Statute. State disencumbered
EHAP award.
Status of project
As noted above, we have worked closely with staff of the State Department of Housing and Community
Development regarding our requested extension, and to explore numerous alternatives to retain our EHAP
award including purchasing manufactured units versus "stick" construction (won't meet deadline), or
securing a local construction loan to be "retired" by EHAP funds (not an allowable use of funds). By the
time our CUP application was placed on the April 20 Atascadero Planning Commission agenda, we had
intensified negotiations with the State for an emergency extension of the January 2005 construction
completion deadline. Negotiations ended in mid-August when the State disencumbered the award.
At the August 19 EOC Board meeting, we had a lengthy discussion about the steps necessary to keep this
project moving forward. The Board voted to authorize EOC staff to:
■ continue with project development activities,
• update our community partners on status of the project,
■ pursue 2005 EHAP funds,
■ proceed with development of required construction documents,
■ continue to support the shelter program operated by El Camino Homeless Organization (ECHO).
This morning we met with representatives of ECHO and the Homeless Housing Project (HHP) to share this
update. The meeting was positive and very productive. Their commitment to the project and community is
unwaivering. It is important that EOC, ECHO, HHP, the cities ofAtascadero and Paso Robles, the County,
and other community partners keep a positive perspective. The EHAP construction award prompted us to
move forward on a project that we had dreamed of but not yet designed. Throughout this complex project,
EOC has been driven by a completion deadline that was very tight given the site search (6 months), Head
Start permission (12 months), community review process (11 months), and other twists and turns of this
project.
ATTACHMENT 3: Project Update Letter, dated August 2004
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
e
7defivery.
tant to focus on what we have accomplished.
tart Branch supports our project andrepresents many opportunities for collaborative service
fortunate to have completed our CUP process within six months of the December 2003
earthquake that severely impacted Atascadero's Planning staff and City Council.
■ State EHAP staff have encouraged us to apply for 2005 funding and believe that, with our CUP in hand,
we will be considered very competitive for a new award. They also assured us that relinquishing the
current grant will not be held against us in the application process. Ours is not the only EHAP contract
being disencumbered. State staff say that each year a number of communities are unable to meet their
construction deadlines, given the complexity of building community support and securing necessary
construction approvals.
We have appreciated the partnership and cooperation of all our community partners throughout this process.
EOC and ECHO have worked so hard to make the permanent shelter a reality and EOC is committed to
developing new construction resources. Our Board has directed us to assure the community -- especially
ECHO, the City of Atascadero and other North County partners -- that EOC's commitment is strong and that
this project is viable. The shelter will open later than anticipated but it will open.
ATTACHMENT 3: Project Update Letter, dated August 2004
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
%I
EI North County Shelter Pr�ct Activities as of 8/20/04:
December 2000
Community partners met to consider applying for State shelter construction
April 2003
funding. EOC was selected as the most viable applicant.
January 2001
EOC developed preliminary architectural and engineering documents for shelter
July 2003
project.
February 2001
EOC applied for State Emergency Housing Assistance Program (EHAP)
December 2003
funding.
February -December 2001
EOC conducted extensive search to identify other potentially viable sites; no
January 2004
superior sites were found so EOC signed the EHAP contract in December.
Contract effective date is January 17, 2002; completion deadline is January 17.
April 2004
2004.
January -December 2002 EOC advocated for local and federal Head Start approval to co -locate on
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
Atascadero Head Start site; permission granted in December.
April 2003
EHAP granted a 12 -month extension; new deadline set for January 17, 2005.
May -July 2003
EOC held three community workshops to refine facility and program design.
July 2003
EOC submitted application to City of Atascadero for Conditional Use Permit
(CUP).
December 2003
A 6.5 earthquake hit North County, impacting Atascadero Planning staff with
City Hall damage and other earthquake mitigation projects.
January 2004
Atascadero City Council requested EOC to pursue an emergency extension of
the construction completion deadline.
April 2004
Atascadero Planning Commission approved CUP; decision appealed to City
Council.
June 2004
Atascadero City Council denied appeal and approved CUP.
May -August 2004
EOC negotiated with State for emergency extension of completion date.
August 2004
Requested extension was not allowed by State Statute. State disencumbered
EHAP award.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
Attachment 4: Original Conditions of Approval
CUP 2003-0106
Condition of Approval
Timing
Responsibility
CUP 2003-0106
/Monitoring
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Department
TO: Temporary
PD: Police Department
Occupancy
CE: City Engineer
F0: Final Occupancy
WW: Wastewater
CA: City Attorney
Planning Services Conditions
1. The approval of this use permit shall become final and effective for the
On Going
PS
purposes of issuing building permits, provided the required conditions of
approval have been satisfied, fourteen (14) days following the Planning
Commission approval unless prior to that time, an appeal to the decision is
filed as set forth in Section 9-1.111(b) of the Zoning Ordinance.
2. Approval of this Conditional Use Permit shall be valid for twelve (12) months
On Going
PS
after its effective date. At the end of the period, the approval shall expire and
become null and void unless the applicant has received a building permit,
established the approved use or applied for an extension of entitlement.
3. The granting of this Conditional Use Permit shall apply to 965 EI Camino
On Going
PS
Real, APN 049-041-010, regardless of owner.
4. This Conditional Use Permit allows for construction and operation of a 32
On Going
PS
bed, overnight shelter (item f). The uses already established on the site
are made a part of the Master Plan of Development as shown on the
attached site plan and as follows:
a. Building A — Head Start 1,554 sq. ft. +/-
b. Building B — Head Start 1,906 sq. ft.
C. Building C - Existing Residence 1,214 sq. ft. +/-
d. Building D — Storage 400 sq. ft. +/-
e. Building E — Storage 1,191 sq. ft. +/-
f. Overnight shelter 3,272 sq. ft. +/-
5. All site improvements, structures, colors, materials and landscaping shall
BP
PS
be consistent with the attached exhibits. Dogwood and Liquid Amber
trees shall be replaced with more drought tolerant and evergreen tree
species.
6. Preschool uses are limited to typical preschool activities between the
On Going
PS
hours of 7:30 a.m. and 5:30 p.m. Preschool parent activities, such as
Center meetings and parenting classes, are scheduled at other times, as
needed. Preschool children will be accompanied by a parent, guardian or
teacher at all times while on the site. Children of shelter clients shall be in
the care of a parent, guardian or, as appropriate, EOC staff person at all
times while on the site.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
Condition of Approval
Timing
Responsibility
CUP 2003-0106
/Monitoring
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Department
TO: Temporary
PD: Police Department
Occupancy
CE: City Engineer
F0: Final Occupancy
WW: Wastewater
CA: City Attorney
7. Shelter uses are limited to overnight sleeping, showering, participating in
On Going
PS
educational or support activities, and eating breakfast. Any expansion of
the shelter, additional use of the shelter facilities or expansion or
modification of the other uses existing onsite will require amendment of
the Conditional Use Permit.
The following uses of the shelter facility are not allowed: client screening,
serving of dinner, use by clients between 7:30 a.m. and 6:00 p.m.
8. In accordance with Sections 9-2.109(3) and 9-8.105 of the Municipal Code
On Going
PS
of the City of Atascadero, violations or failure to implement the conditions
of approval or violations of public health and safety laws, such as, but not
limited to, excessive noise, traffic, parking violations, loitering, vandalism,
theft, nuisances, etc. constitute a violation of this conditional use permit
and are subject to reconsideration by the Planning Commission. The
Planning Commission has the authority to add, modify, change or delete
any conditions of approval or revoke the conditional use permit.
9. The shelter shall be operated by the Economic Opportunity Commission
On Going
PS
(EOC) unless otherwise approved by the Planning Commission.
10. Prior to Final Inspection of the proposed new construction, the EOC shall
On Going
PS
submit a copy of a Caretaker's agreement to the Community Development
Director for review and approval.
11. The EOC shall establish a Neighborhood Advisory Group to act as a
On Going
PS
liaison to the neighborhood and overall community. EOC shall be
responsible for appointments to the Neighborhood Advisory Group and
shall provide the Community Development Department with a current list
of members and the telephone number of the key contact person. Duties
of the Neighborhood Advisory Group shall include, but not be limited to:
a. Regular public meetings to hear any City or neighborhood
complaints.
b. Formulate responses/solutions to all complaints.
C. Report results of all meetings to the Community Development
Director including meeting minutes, attendees and any proposed
responses/resolutions for complaint issues.
During the first six months of operation meetings shall be held monthly.
Thereafter meetings shall occur quarterly, unless the Community
Development Director determines that less frequent meetings are
warranted.
12. All recommendations of the Tree Preservation Report, prepared by
BP/GP
PS
Carolyn Leach, dated August 1, 2003 and the amendment dated August 8,
2003 and all provisions of the City of Atascadero's native tree ordinance
shall be followed during the construction process. Where there is conflict
between the Arborist's recommendation and City standards/requirements,
City standards/requirements shall be followed.
BP/GP
PS
13. If the Planning Commission approves the removal of Tree 9 as shown in
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
Condition of Approval
Timing
Responsibility
CUP 2003-0106
/Monitoring
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Department
TO: Temporary
PD: Police Department
Occupancy
CE: City Engineer
F0: Final Occupancy
WW: Wastewater
CA: City Attorney
the Tree Preservation Report, the applicant shall submit a tree
replacement plan for replanting 9 five gallon or 3 fifteen gallon native stock
Oak trees. The plan shall place emphasis on screening the project from
the residential property to the east and shall be approved by the
Community Development Department prior to installation. Tree 9 shall not
be removed prior to establishment of the plantings, as determined by an
Arborist (approximately 2-3 years).
BP/GP
PS
14. Prior to issuance of building permits, an onsite meeting shall be held to
inspect all tree protection measures. The meeting shall include the
Arborist, the grading contractor, the property owner/supervisor and a
member of the Community Development Department. Prior to the
meeting, all tree protection measures shall be installed and visibly evident.
The Arborist's recommendations include:
a. Install driveway on top of existing grade, without scarification,
grubbing or subsurface excavation within the drip line area of
trees 3, 4, and 5.
b. Alternative paving materials, such as pavers, shall be used within
the drip line area of trees 3, 4, and 5.
C. Install underground utilities using a directional bore method.
Pavers will not be required under the drip lines of native trees. Other
options for the driveway shall be examined. There shall be very limited
landscaping under oak tree drip lines with a focus on keeping the drip line
areas in a "natural" state.
15. All onsite parking shall be in the designated parking areas shown on
On Going
PW
Exhibit C.
16. There shall be no onsite parking of RV's for temporary camping/living
On Going
PW
quarters.
17. The trash enclosure for the Shelter shall be of decorative, split -faced block
BP
PS
with solid metal doors.
Police Department Conditions
18. The EOC shall submit a management program to the Police Chief for
FO
PD/PS
approval, prior to occupancy. The plan must include the following:
a. A program description, including provision of qualified
supervisors and a description of all onsite activities and services.
b. Procedures for training staff and volunteers to recognize
violations of the law or potentially dangerous situations.
C. Provisions for monitoring access to the site and surrounding
areas during daytime hours, when the shelter is not in operation.
d. Provisions for responding to police or citizen complaints.
e. Name and 24 hour telephone number of a "responsible party in
charge" for all aspects of the Overnight Shelter program. The
name and telephone number shall also be provided to the City of
Atascadero Community Development Department.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
Condition of Approval
Timing
Responsibility
CUP 2003-0106
/Monitoring
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Department
TO: Temporary
PD: Police Department
Occupancy
CE: City Engineer
F0: Final Occupancy
WW: Wastewater
CA: City Attorney
19. Prior to issuance of building permits, EOC shall provide the City Police Chief
On Going
PD/PS
with written copies of policies and procedures for screening Overnight Shelter
clients. Emphasis will be placed on the rules and procedures for sex
offenders. These policies and procedures shall be reviewed and approved by
the City Police Department prior to final occupancy. All future proposed
changes to the policies and procedures shall be approved by the City Police
Chief.
20. Prior to issuance of a certificate of occupancy, EOC shall provide the City
On Going
PD/PS
Police Chief with documentation of an agreement with the County Sheriffs
Department for sex offender screening.
"real
On Going
PD/PS
21. If the County Sheriffs Department cannot provide time" sex offender
screening prior to the opening of the shelter, EOC will establish procedures
for initial screening, to be approved by the City Police Chief, with follow up
screening by the County Sheriffs Department.
All shelter clients shall be screened by the County Sheriffs Department for
sex offender status by the next available date for such screening after
presentation at the shelter.
Any client or potential client identified by the County Sheriffs Department as a
sex offender, at any level, shall be prohibited from staying at the shelter or
using its facilities.
22. The EOC shall continue to work diligently with the County Sheriffs Office to
On Going
PD/PS
provide `real time" sex offender screening.
On Going
PD/PS
23. Prior to issuance of a certificate of occupancy, the City Police Chief shall
review and approve rules and procedures to address the following:
a. Procedures and penalties for bringing weapons to the shelter
b. Penalties for violation of rules
c. "Walkaways"
d. Client screening
e. `Terms of stay"
f. Daytime loitering
These procedures shall clearly define nuisance thresholds related to loitering,
noise, and parking, in addition to violation procedures for criminal acts. All
rules and procedures shall clearly state any and all consequences for violation
of Shelter rules, procedures and policies.
All future proposed changes to the policies and procedures shall be approved
by the City Police Department.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
Condition of Approval
Timing
Responsibility
CUP 2003-0106
/Monitoring
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Department
TO: Temporary
PD: Police Department
Occupancy
CE: City Engineer
F0: Final Occupancy
WW: Wastewater
CA: City Attorney
On Going
PD/PS
24. There shall be one (1) "trained staff member" onsite at all times during hours
of operation. "Trained staff members" shall be trained in first aid, CPR,
emergency mental health procedures and sex offender screening. "Trained
staff members" shall be employed by the managing agency of the shelter
(EOC).
Volunteers will not qualify as a "trained staff member."
At no time shall there be less than two (2) person staffing of the shelter during
the hours of 6:00 p.m. to 7:30 a.m.
25. Prior to issuance of building permits, the City Police Chief shall review and
On Going
PD/PS
approve a copy of an agreement with the County Mental Health Department
for responding to after hour calls at the shelter.
26. The City of Atascadero Police Department shall have the right to inspect the
On Going
PD/PS
shelter facility and/or review the client list at all times, as deemed necessary
by the Chief of Police.
27. All outdoor areas of the shelter shall be monitored by security cameras during
On Going
PD/PS
hours of operation. In lieu of security cameras, the shelter may have a
licensed security guard onsite during hours of operation.
If security cameras are used, all tapes shall be backed up within 24 hours and
shall be retained for a minimum of 15 days.
28. All outdoor areas shall be lighted by building -mounted down lights for visibility
On Going
PS
during nighttime hours. A lighting plan that prevents off-site glare shall be
submitted for review and approval by the Community Development
Department.
29. All outdoor activities shall be limited to the hours of 6:00 p.m. to 10:00 p.m.
On Going
PS
and must be within the fenced patio area. In no case, shall there be any
outside activity on the premises after 10:00 p.m.
30. The outdoor patio area shall be fenced and screened from offsite views. All
On Going
PD/PS
access to the outdoor area shall be through the shelter structure.
31. All shelter clients shall be screened and processed at the off site "dinner
On Going
PD/PS
place' prior to transportation to the shelter. There shall be no 'walk-ins' or
onsite screening of shelter clients at the shelter site. Shelter personnel shall
provide transportation to the shelter site for clients without transportation.
Clients with transportation shall "caravan" behind the shelter vehicles to the
shelter site.
32. All clients shall caravan behind the shelter vehicles to the site after the dinner
On Going
PD/PS
program. Any late arrivals shall meet shelter personnel as detailed in an
"offsite pickup plan", approved by the City Police Chief and be escorted to the
shelter site.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
Condition of Approval
Timing
Responsibility
CUP 2003-0106
/Monitoring
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Department
TO: Temporary
PD: Police Department
Occupancy
CE: City Engineer
F0: Final Occupancy
WW: Wastewater
CA: City Attorney
On Going
PD/PS
33. Shelter clients are not allowed on the grounds or in the shelter neighborhood
during non -shelter hours. Persons not authorized to be onsite will be
considered trespassers and the proper authorities will be notified.
On Going
PD/PS
34. At the time of morning departure, all shelter clients, without vehicles, shall be
transported offsite, per a regional transportation plan to be developed and
approved by the City Police Chief. The City Police Chief may review and
amend this plan on an "as needed" basis.
On Going
PD
35. Daytime loitering or congregation of clients, onsite, in surrounding
neighborhood, on commercial properties, on public streets, or in the Salinas
River and Graves Creek areas shall not be permitted. EOC shall be
responsible for the morning transportation and distribution of clients to
appropriate locations to prevent this from occurring.
Fire Marshal Standard Conditions
36. All proposed new buildings will require a fully automatic supervised fire
BP/On
FM/PS
sprinkler system.
Going
FO/On
FM/PS
37. All proposed new buildings will require an automatic fire alarm system with
Going
manual pull stations throughout.
FO/On
FM/PS
38. Smoke detection devices are required in all sleeping areas and shall be
Going
interconnected.
FO
FM/BS
39. A minimum of one fire hydrant will be required at the driveway entrance.
40. Fire Lanes: When approved by the Fire Chief, temporary access roads of a width,
FO
FM/PW
vertical clearance, and surface, which provide access for fire department
apparatus, can be used until permanent roads are installed. Fire lanes shall be at
least 20 feet in width. Fire lane signs are required to be installed along access
roadways, in locations where vehicle parking would encroach on the required clear
width of roadway. A specific fire lane sign is required at the entrance to projects,
which have designated parking spaces. "Fire Lane — Tow -Away Zone" signs shall
be posted at 50 foot intervals, unless an "All Roads are Fire Lanes - Park in
Designated Spaces Only" sign is posted, in which case the "Fire Lane — Tow -Away
Zone" signs may be posted at 100 foot intervals.
FO
FM/PW
41. When required, all raised curbs along access roadways shall be painted
red with white "FIRE LANE" letters stenciled on the face at a minimum of
30 -foot intervals. Where the fire lane roadway does not have curbs, a
solid red line shall be painted on the pavement with "FIRE LANE" letters
stenciled at 30 -foot intervals. The line and letters shall be of sufficient size
to be visible from a vehicle in the fire lane. Where parking is to be allowed
along the traveled way, at least 8 feet of improved width shall be provided.
If curbs are not provided, the shoulder shall be constructed to the same
specifications as the traveled way.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
Condition of Approval
Timing
Responsibility
CUP 2003-0106
/Monitoring
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Department
TO: Temporary
PD: Police Department
Occupancy
CE: City Engineer
F0: Final Occupancy
WW: Wastewater
CA: City Attorney
Standard Public Works Conditions
42. All public improvements shall be constructed in conformance with the City of
BP
PW
Atascadero Engineering Department Standard Specifications and Drawings
or as directed by the City Engineer.
43. The applicant shall enter into a Plan Check/Inspection agreement with the
BP
PW
City.
44. The applicant shall be responsible for the relocation and/or alteration of
BP
PW
existing utilities.
45. Existing drainage patterns from adjacent properties shall not be
BP
PW
obstructed.
Specific Public Works Conditions
46. The applicant shall address storm water detention to the satisfaction of the
BP
PW
City Engineer, prior to grading and drainage approval.
47. The applicant shall pay sewer Extension (Annexation) and Connection
BP
PW
fees upon issuance of building permit. All existing buildings must be
connected to sewer. Applicant shall submit fixture unit count of existing
and proposed structures to determine fee.
48. The applicant shall abandon all existing septic tanks and leach fields.
BP
PW
49. The applicant shall follow the recommendations of the "Sight Distance
BP
PW
Analysis", which requires the modification of the southerly retaining wall.
50. The applicant shall install curb, gutter and sidewalk along the EI Camino
BP/GP
PW
Real property frontage per City standards.
Atascadero Mutual Water Company
51. Before the issuance of building permits, the applicant shall submit plans to
BP/GP
AMWC/BS
AMWC for the water distribution facilities needed to serve the project.
AMWC shall review and approve the plans before construction begins on
the water system improvements. All water distribution facilities shall be
constructed in conformance with AMWC Standards and Details and the
California Waterworks Standards (Code of Regulations Title 22, Division
4, Chapter 16). All cross -connection devices shall conform to AWWA and
California Department of Health Services standards.
BP/GP
AMWC/BS
52. Before the start of construction on the water system improvements, the
applicant shall pay all installation and connection fees required by
AMWC. Subject to the approval of AMWC, the applicant may enter in
to a "deferred connection" agreement.
BP/GP
AMWC/BS
53. Before issuance of building permits, the applicant shall obtain a "Will
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
Condition of Approval
Timing
Responsibility
CUP 2003-0106
/Monitoring
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Department
TO: Temporary
PD: Police Department
Occupancy
CE: City Engineer
F0: Final Occupancy
WW: Wastewater
CA: City Attorney
Serve" letter from AMWC for the newly created lots within the subdivision.
BP/GP
AMWC/BS
54. The applicant shall provide AMWC with easements for those water
facilities proposed for operation and maintenance by AMWC that are
constructed outside of publicly maintained right-of-ways. AMWC shall
review the form and content of the easements before recordation.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 5: Draft Resolution PC 2006-0056
CUP 2003-0106
965 EI Camino Real (EOC Family Shelter)
DRAFT RESOLUTION NO. PC 2006-0056
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO APPROVING A ONE-YEAR TIME EXTENSION
OF AN APPROVED CONDITIONAL USE PERMIT
(CUP 2003-106, 965 El Camino Real EOC Family Shelter)
WHEREAS, an application has been received from the applicant and property owner,
Economic Opportunity Commission of San Luis Obispo County, Inc.,1030 Southwood Drive,
San Luis Obispo, CA, 93401 to consider a one year time extension for Conditional Use Permit
2003-0106 to establish an Overnight Shelter; and
WHEREAS, the proposed project is located within the SE (Suburban Estate) land use
designation of the City of Atascadero's General Plan Land Use Diagram; and,
WHEREAS, the proposed project is located within the RS (Residential Suburban)
zoning district where residential care facilities are subject to the approval of a Conditional Use
Permit; and,
WHEREAS, the City Council held a duly noticed public hearing to consider the
proposed Conditional Use Permit application and the Tree Removal request on June 8th, 2004 at
7:00 p.m., and approved the project subject to findings and conditions; and,
WHEREAS, the Community Development Director approved a one year time extension
on May 31St, 2005, thereby extending the life of the Conditional Use Permit to June 8, 2006; and
WHEREAS, the project applicants applied for a second time extension on May 17th,
2006 which requires Planning Commission approval; and,
WHEREAS, the Planning Commission held a duly noticed public hearing to consider the
proposed time extension to Conditional Use Permit 2003-0106 on June 6, 2006 at 7:00 p.m., and
considered testimony and reports from staff, the applicants, and the public, and,
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1: FINDINGS. The Planning Commission makes the following findings:
1. There have been no changes to the provisions of the General Plan or zoning
regulations applicable to the project since the approval of the entitlement; and
2. There have been no changes in the character of the site or its surroundings that affect
how the standards of the General Plan or zoning regulations apply to the project.
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Time Extensions\CUP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER: 2
DATE: 6-6-06
3. That substantial site work could not be completed as set forth in Section 9-2.114
because of circumstances beyond the control of the applicant; and
4. All original conditions of approval, as approved by the City Council on June 8th, 2004
remain in full force and effect.
SECTION 2: TIME EXTENSION APPROVAL The Planning Commission does hereby
approve a one-year time extension of CUP 2003-0106, to expire on June 8, 2007.
On motion by Commissioner and seconded by Commissioner , the
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSENT:
ADOPTED:
CITY OF ATASCADERO, CA
Ellen Beraud
Planning Commission Chairperson
ATTEST:
Warren M. Frace
Planning Commission Secretary
\\Cityhall\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0106 965 EI Camino Real\Tii ;UP 2003-0106
2nd Time Extension.PC staff report.doc
ITEM NUMBER: 3
DATE: 6-6-06
Atascadero Planning Commission
Staff Report - Community Development Department
Tree Removal Permit
TRP 2006-0091
(Atascadero Creek Bank Restoration/ City of Atascadero)
SUBJECT:
A request to remove eleven (11) native Black Walnut trees totaling 101 inches (dbh)
for the restoration of Atascadero Creek.
RECOMMENDATION:
Staff recommends:
The Planning Commission adopt Resolution PC 2006-0055 to approve the request to
remove eleven native trees subject to the guidelines and mitigation required by the
Atascadero Municipal Code and Native Tree Ordinance.
Situation and Facts:
1. Owner:
2. Applicant:
2. Certified Arborist
3. Project Address:
BACKGROUND:
Atascadero Unified School District, 5601 W. Mall
Atascadero, CA 93422
City of Atascadero Public Works Department, 6907 EI
Camino Real, Atascadero, CA 93422
Steve Alvarez, P.O. Box 1311 Templeton, CA 93465
Creek Bank behind Atascadero City Hall, 6907 EI Camino
Real, Atascadero, CA 93422 APN: 029-361-003
Atascadero Creek has eroded the creek bank beneath City Hall and the creek bank
must be restored. The project has been analyzed per CEQA (PPN-2004-0160) has
and includes an extensive biological assessment has been prepared by Althouse and
Meade.
ITEM NUMBER: 3
DATE: 6-6-06
ANALYSIS:
Erosion of the creek bank has caused a hazard for the back corner of Atascadero
City Hall (see pictures below). Tree removals are required to allow restoration and
stabilize the eroded creek bank. The proposed restoration includes relocating a
portion of a gravel bar, keying in large rocks, constructing a concrete wall, and
replanting the creek bank with native willows and other bank vegetation. The creek
bank restoration project is needed to repair the erosion damage and ensure future
creek bank stability. The City of Atascadero's Native Tree Ordinance requires that
mitigation for proposed native tree removals be implemented as a condition of
approval. Staff recommends that the applicant pay mitigation fees into the native tree
fund.
/E x S/onw�c,e
AT9ScA p�,¢O G¢EEK LES TO,e A7I o�`/ r Y/ � —
�u CONccvT SEG T/�/ AT CORi`/Ert c/ry H?L r_ By/c0/�/l. � _
� I SII gsS
/i�Ev/ L ovC IAI�t C
I
I
1
� gSo
$ FT w/or TEtRdCE '� I I
(E4LTH uvErt �2iP% � .1
Vr'GrTATco I 'I
EY 6/1 =uv0� — .eGCK StbPE PRo TEC)/0A/ I
--` E H/ c /ie�ire c r• I I I
t
P
E x CA/110N
LJ 83s
ITEM NUMBER: 3
DATE: 6-6-06
FINDINGS:
Pursuant to the Tree Ordinance (Ordinance No. 214), "decisions on native tree
removals of 24 -inch dbh-size or larger shall be made by the Planning Commission."
In considering any Tree Removal Permit request, at least one of the findings must be
made. Staff has identified finding (i) and finding (v)) as appropriate for the application
request:
(i) The tree is dead, diseased or injured beyond reclamation, as certified by a tree
condition report from an arborist; and
(v). The tree is obstructing proposed improvements that cannot be reasonably
designed to avoid the need for tree removal, as certified by a report from the Site
Planner and determined by the Community Development Department based on
the following factors:
• Early consultation with the City;
• Consideration of practical design alternatives;
• Provision of cost comparisons (from applicant) for practical design
alternatives;
• If saving tree eliminates all reasonable uses of the property; or
• If saving the tree requires the removal of more desirable trees.
CONCLUSION:
The applicant has submitted a Tree Protection/Removal Plan with an Arborist Report.
According to the arborist, all trees proposed for removal have been determined to be
obstructing proposed improvements.
PREPARED BY: Paul Tabone, Planning Technician
ATTACHMENTS:
Attachment 1: Aerial and Site Photos
Attachment 2: Arborist Report
Attachment 3: Draft Resolution PC 2006-0027
Exhibit A: Conditions of Approval
Exhibit B: Tree Removal Plan
ITEM NUMBER
DATE: 6-6-06
Attachment 1: Aerial and Site Photos
ITEM NUMBER: 3
DATE: 6-6-06
Attachment 2: Arborist Report
A & Tl ARBOR=STS
P.O. BOX 1311 TEMPLETOft CA 93465 (8") 434.0131
5-26-06
City of Atascadero
Atascadero Creek Bank Restoration
This tree protection plan is in regard to the erosion under City Hall adjacent to
Atascadero Creek. Bank stabilization is necessary to protect the integrity of the
northwest corner of the building. Currently, stream erosion has severely undermined the
building by at least ten feet. Plans are to re -stabilize the building and divert the creek
preventing future erosion. Only native trees identified in the Atascadero Native Tree
Ordinance are addressed in this report. Native trees at this location are black walnuts
(Juglans hindsi:) and coast live oaks (Quercus agrifolia). Several black walnuts slightly
upstream from the corner of the building will have to be removed in order to re -stabilize
the bank under the building. Total number of removals are I 1 with a total diameter of
101 inches. The removal process shall be performed in a manner that will not impact the
nearby black walnuts that are to be saved. In other words, they shall not be pushed over
by a bulldozer. Preferably they will be climbed and lowered without breaking limbs of
trees that are to be saved. Trees #104 and #105 shall have their canopies raised and
major deadwood removed prior to the removal of the nearby trees. Tree #151 may
require some canopy raising for the access road. This pruning work shall be addressed
during the mandatory pre -construction meeting. Two small black walnuts, #227 and
#228, may have to be removed for the access road. These trees have not been surveyed
so there exact locarion is not known- They have been included as removals at this time.
It is the responsibility of the city to provide a copy of this tree protection plan to any
and all contractors and subs that work within the drip fine of any native tree. It is
highly recommended that each contractor sign and acknowledge this tree protection
plan.
This project shall require an on-site pre -construction meeting with the city, grading
contractor and the arborist. Topics will include fencing, monitoring andrequirements for a positive final occupancy letter.
All trees potentially impacted by this project are numbered and identified on both the
grading plan and the spreadsheet. Trees are numbered on the grading plans and in the
field with an aluminum tag In the field, trees to be saved have yellow tape and trees to
be removed have red tape per the current plan.
Tree Rating System
A rating system of I-10 was used for visually establishing the overall condition of each
tree on the spreadsheet. The rating system is defined as follows:
Rating_ Condition
ITEM NUMBER: 3
DATE: 6-6-06
Attachment 2: Arborist Report
0 Deceased
1 Evidence of massive past failures, extreme disease and is in severe
decline.
2 May be saved with attention to class 4 pruning, insect/pest
eradication and future monitoring.
3 Some past failures, some pests or structural defects that may be
mitigated by class IV pruning.
4 May have had minor past failures, excessive deadwood or minor
structural defects that can be mitigated with pruning.
5 Relatively healthy tree with little visual structural and or pest
defects.
6 Healthy tree that probably can be left in its natural state.
7-9 Have had proper arboricultural pruning and attention or have no
apparent structural defects.
10 Specimen tree with perfect shape, structure and foliage in a
protected setting (i.e. park, arboretum).
The following mitigation measures/methods must be fully understood and followed by
anyone working within the drip line of any native tree. Any necessary clarification will
be provided by us (the arborists) upon request.
L Fencing: The proposed fencing shall be shown on the grading plan. It must
be a minimum of 4' high chain link, snow or safety fence staked at the edge of the drip
line or line of encroachment for each tree or group of trees. The fence shall be up before
any construction or earth moving begins. The city or their designee shall be responsible
for maintaining an erect fence throughout the construction period. The arborist(s), upon
notification, will inspect the fence placement once it is erected. After this time, fencing
shall not be moved without arborist inspection/approval. If the orange plastic fencing is
used, a minimum of four zip ties shall be used on each stake to secure the fence. All
efforts shall be made to maximize the distance from each saved tree. The fencing must
be constructed prior to the city pre -constriction meeting for inspection by the city and the
arborists.
2. Soil Aeration Methods: Soils within the drip line that have been compacted
by heavy equipment and/or construction activities must be returned to their original state
before all work is completed. Methods include waterjetting, adding organicmatter, and
boring small holes with an auger (18" deep, 2-3' apart with a 2-4" auger) and the
application of moderate amounts of nitrogen fertilizer. The arborist(s) shall advise.
3. Chip Mulch: All areas within the drip line of the trees that cannot be fenced
shall receive a 4-6" layer of chip mulch to retain moisture, soil structure and reduce the
effects of soil compaction. Tree ##I5I shall receive mulch under the drip line prior to
access road usage. During routine monitoring, the mulch layer shall be inspected for
proper depth. Additional mulch may be required from time to time.
4. Trenching Within Drip Line: All trenching for foundations within the drip
line of native trees shall be hand dug. All major roots shall be avoided whenever
ITEM NUMBER: 3
DATE: 6-6-06
Attachment 2: Arborist Report
possible. All exposed roots larger than 1" in diameter shall be clean cut with sharp
Pruning tools and not left ragged. A Mandatory greeting between the arborists and
grading/trenching contractor(s) shall take place prior to work start. This activity shall be
monitored by the arborist(s) to insure proper root pruning is talking place. This project
does not require actual trenching per se, however, there will be some creek bank removal
prior to the stabilization process to remove the black walnut stumps. Proper root pruning
shall take place for the saved trees.
5. Grading Within The Drip Line. Grading should not encroach within the drip
line unless authorized. Grading should not disrupt the normal drainage pattern around the
trees. Fills should not create a ponding condition and excavations should not leave the
tree on a rapidly draining mound.
6. Exposed ][toots: Any exposed roots shall be re-covered the same day they
were exposed. If they cannot, they must be covered with burlap or another suitable
material and wetted down 2x per day until re -buried.
7. Equipment Operation: Vehicles and all heavy equipment shall not be
driven under the trees, as this will contribute to soil compaction. Also there is to be no
parking of equipment or personal vehicles in these areas. All areas behind fencing are off
limits unless pre -approved by the arborist. The exception will be tree #151 for the access
road.
9. )Existing Surfaces: The existing ground surface within the drip line of all
native trees shall not be cut, filled, compacted or pared, unless shown on the grading
plans and approved by the arborist.
9. Construction Materials And Waste: No liquid or solid construction waste
shall be dumped on the ground within the drip lune of any native tree. The drip line areas
are not for storage of materials either.
10. Arborist MDnitoring: A ISA certified arborist shall be present for selected
activities (trees identified on spreadsheet and items bulleted below). The monitoring
does not necessarily have to be continuous but observational at times during these
activities. It is the responsibility of the owner(s) or their designee to inform us prior to
these events so we can make arrangements to be present. It is the responsibility of the
owner to contract (prior to construction) a locally licensed and insured arborist that will
document all monitoring activities.
• pre -construction fence placement
• All work near trees #151, 104, 105, 106. and 107
• All grading and trenching near trees requiring monitoring on the spreadsheet in
addition to any activities the project arborist deems necessary.
11- Pre -Construction Meeting: An on-site pre -constriction greeting with the
Arborist(s), City Officials, Planning Staff. Lyndee Althouse and the earth moving team
shall be required for this project. Prior to final occupancy, a letter from the arborist(s)
shall be required verifying the health/condition of all impacted trees and providing any
ITEM NUMBER: 3
DATE: 6-6-06
Attachment 2: Arborist Report
recommendations for any additional mitigation. The letter shall verify that the arborist(s
were on site for all grading and/or trenching activity that encroached into the drip line of
the selected native trees, and that all work done in these areas was completed to the
standards set forth above.
12. Pruning: Class 4 pruning includes -Crown reduction pruning shall consist of
reduction of tops, sides or individual limbs. A trained arborist shall perform all pruning.
No pruning shall take more than 25% of the live crown of any native tree. Any trees that
may need ping for road/home clearance shall be pruned prior to any grading activities
to avoid any branch tearing. Class 3 pruning includes — hazard pruning is recommended
where safety considerations are paramount. This consists of removal of dead, diseased,
decaying and obviously weak branches 2 inches in diameter and greater. Class 2 pruning
is recommended where aesthetic conditions are secondary to structural integrity and tree
health concerns. It shall consists of removal of dead dying, decaying, interfering,
obstructing and weak branches as well as selective thinning to lesson wind resistance.
Class 1 pruning has emphasis on aesthetics with removal of dead, dying, decaying weak
branches and selective thinning to lesson wind resistance.
13. Fertilization and Cultural Practices: As the project moves toward
completion, the arborist(s) may suggest either fertilization and/or rnycorrhiza applications
that will benefit tree health. Mycorrhiza offers several benefits to the host plant,
including fasters growth, improved nutrition, greater drought resistance, and protection
from pathogens.
The included spreadsheet includes trees listed by number, species and multiple sterns if
applicable, diameter and breast height (4.5), condition (scale from poor to excellent),
status (avoided, impacted, removed, exempt), percent of drip line impacted, mitigation
required (fencing, root pruning, monitoring), construction impact (trenching, grading),
recommended pruning and individual tree notes.
If all the above mitigation measums are followed, we feel there will be no additional
long-term significant impacts to the remaining native trees.
Please let us know if we can be of any future assistance to you for this project.
Steven G. Alvarez
Certified Arborist #WC 0511
Chip Tamagni
Certified Arbo ' WE 6436-A
ITEM NUMBER: 3
DATE: 6-6-06
Attachment 2: Arborist Report
T�r
-9 W Z Z W W W w W W W LU 11.F W LU
V- W 0 Z z Z z z z U z z z z z Z z z z
W z z z Z 000 Q 0 0 0 0 0 0 0 0 0
z z a z z z z z z z z z
10Z
a�
W TT
I
a oo� ww www�w w E
H cr i
WX
W
0go 2 n o
¢0 w z a a d
uj � ` d u_ LL, li LL Li UL LL u,. C
LL -
CL
0
ul
a
�o�
caoc�c�t�c�C9c�(9a)ocaC9c�C7c7c�ca0 �
()N� v c� c�
W F- $
�c zc�
a_ d J d Q 0 0 0 0 0 \ of �Q o
w d p g a o 0 0 0 0 0 0 0 00 0 0 0 0 0 c8 o
a v Cl) c� c� c*� c*) c� M o 0
a a e. -
v, �
V
O
O -7 CD q to Lo tnv) v- r
Z w
O
CN }� w
pto CO 0 03
� G (3 `-cr) N K o X Q � N N N M u� Co Cfl N cv
ch $
� g
N w 0 3r � Sy 3: � 3 � O Ste" O O � � �' � � S' � � 3
F- W m m m (tl m J qp J -J m m a7 m m CD m [D m•
W �
W N e- N M er
o00000o4"�o��'ocol•oNo4aO.a
N N N N N F- F-- !- F■-
(UCAV)CO)
ITEM NUMBER: 3
DATE: 6-6-06
Attachment 3: Draft Resolution PC 2006-0008
DRAFT RESOLUTION PC 2006-0055
A RESOLUTION OF THE PLANNING COMMISSION
OF ATASCADERO APPROVING A TREE REMOVAL PERMIT
TO ALLOW THE REMOVAL OF ELEVEN NATIVE TREES
LOCATED ON LEWIS AVENUE APN 029-361-003
(TRP 2006-0091)
WHEREAS, an application for a Tree Removal Permit has been received from
Atascadero Unified School District, (Owner), and Steve Kahn, City of Atascadero Public
Works Department, 6907 El Camino Real, Atascadero CA 93422 (Applicant) to allow the
removal of nine native oak trees located on Lewis Avenue, APN 029-361-003, and,
WHEREAS; the Planning Commission reviewed the proposed Tree Removal
application on June 6, 2006, and considered testimony and reports from staff, the applicants,
and the public; and,
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Findings for Approval of Tree Removal Permit. The Planning
Commission finds as follows:
Trees proposed for removal are obstructing proposed improvements that cannot be
reasonably designed to avoid the need for tree removal, as certified by a report from a
certified arborist and determined by the Community Development Department based
on the following factors:
• Early consultation with the City;
• Consideration of practical design alternatives;
• Provision of cost comparisons (from applicant) for practical design
alternatives;
• If saving tree eliminates all reasonable uses of the property; or
• If saving the tree requires the removal of more desirable trees; and,
SECTION 2. Approval. The Planning Commission hereby approves Tree Removal
Permit 2005-0086 subject to the following Conditions and Exhibits:
Exhibit A: Conditions of Approval
Exhibit B: Tree Table
Exhibit C: Tree Plan
ITEM NUMBER: 3
DATE: 6-6-06
On motion by Commissioner , and seconded by Commissioner the
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ABSTAIN: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Ellen Beraud
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
ITEM NUMBER:
DATE: 6-6-06
Exhibit A: Conditions of Approval
Tree Removal - TRP 2006-0086
Conditions of Approval
Timing
Responsibility
Mitigation
TRP 2006-0086
/Monitoring
Measure
PR: dorm Removal
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Deparhent
TO: Temporary Occupancy
PD: Police Department
F0: Final Occupancy
CE: City Engineer
WW: Wastewater
CA: City Attorney
Planning Services
1. The applicant shall mitigate the removal or impact of the
PR
PS
trees in accordance with the requirements of the
Atascadero Native Tree Ordinance.
2. Trees #104 and #105 shall have their canopies raised
BP
PS
and major deadwood removed prior to the removal of
the nearby trees.
3. This project shall require an on-site preconstruction
BP
PS
meeting with the city, grading contractor, and arborist.
Exhibit B: Tree Table
Tree Removal - TRP 2006-0091
Evergreen Native Trees (inches)
15 Deposit
Total 181 -inches
Mitigation Requirement
Deciduous Native Trees (inches)
dbh notes
1
2
3
4
5
Total 0 -inches
Tree Fund Payment: $ 1,504.17 Tree Fund Payment: $
ITEM NUMBER: 3
DATE: 6-6-06
Totals
181 -inches
$ 1,504.17
dbh notes
1
38 -inches
2
38 -inches
3
38 -inches
4
10 -inches
5
13 -inches
6
3 -inches
7
3 -inches
8
2 -inches
9
3 -inches
10
5 -inches
11
8 -inches
12
6 -inches
13
12 -inches
14
2 -inches
15 Deposit
Total 181 -inches
Mitigation Requirement
Deciduous Native Trees (inches)
dbh notes
1
2
3
4
5
Total 0 -inches
Tree Fund Payment: $ 1,504.17 Tree Fund Payment: $
ITEM NUMBER: 3
DATE: 6-6-06
Totals
181 -inches
$ 1,504.17
ITEM NUMBER
DATE: 6-6-06
Exhibit B: Tree Plan
ITEM NUMBER:
DATE: 6-6-06
ITEM NUMBER: 4
DATE: 6-6-06
Atascadero Planning Commission
Staff Report - Community Development Department
Tree Removal Permit
TRP 2006-0084
(9380 Mountain View Drive / Kuden)
SUBJECT:
A request to remove two existing native trees: one (1) Live Oak tree and one (1) Blue
Oak tree, and account for the non -permitted removal of a 36" Coastal Live Oak tree
for the development of a single-family residence.
RECOMMENDATION:
Staff recommends:
The Planning Commission adopt Resolution PC 2006-0023 to approve the request to
remove two native oak trees, and approve the previous non -permitted removal of a
native oak tree subject to the guidelines and mitigation required by the Atascadero
Municipal Code and Native Tree Ordinance.
Situation and Facts:
1. Applicant/Owner: John Kuden, P O Box 3605, San Luis Obispo, CA 93406
2. Certified Arborist: A&T Arborists, P.O. Box 1311 Templeton, CA 93465
3. Project Address: 9380 Mountain View Drive, Atascadero, CA 93422
APN: 056-322-024
4. Zoning: Residential Single Family -Y (RSF-Y)
5. General Plan: Single Family Residential -Y (SFR -Y)
ITEM NUMBER: 4
DATE: 6-6-06
BACKGROUND:
The applicant is currently in the process of obtaining building permits for a single-
family dwelling at the subject property. The proposed residence contains
approximately 2,344 square feet of living space and a 576 square foot garage on a
step foundation with caissons. The proposed residence is single level and will take
access from Mountain View Drive.
The residence and driveway improvements require 250 cubic yards of cut and 100
cubic yards of fill, with a total site disturbance of approximately 7,400 square feet.
Trenching for utilities is identified below the drip lines of two native trees along
Mountain View Drive. The Arborist has included several mitigations, such as using
an air spade or hand digging, putting up additional tree fencing, and leaving a four -
foot swath between the two trees in jeopardy during project construction (Attachment
3, Arborist Letter).
PREVIOUS TREE REMOVAL
According to the project arborist, a dead 36" Coastal Live Oak Tree was removed
from the subject property without a tree removal permit in fall 2005. A Tree Removal
Permit is required to bring the tree removal into conformance with the Atascadero
Native Tree Ordinance.
ANALYSIS:
According to the Arborist, tree #4 is a 12" (dbh) Live Oak and the tree #11 is a 3"
(dbh) Blue Oak (Attachment 2, Arborist Report). Several revisions have been made
to the plans, and alternative building areas have been proposed. According to the
applicant, the proposed area is the best location for a single-family residence. Due to
the steep slope of the subject property, both existing trees are proposed for removal
to allow for the construction of the proposed single-family residence. As identified
above, tree #15, a dead 36" Coastal Live Oak, was removed without a permit.
The City of Atascadero's Native Tree Ordinance requires that mitigation for native
tree removals be implemented as a condition of approval. Staff recommends that the
applicant pay mitigation fees into the native tree fund, as well as a penalty fee for the
non -permitted removal of tree #15.
FINDINGS:
Pursuant to the Tree Ordinance (Ordinance No. 214), "decisions on native tree
removals of 24 -inch dbh-size or larger shall be made by the Planning Commission."
In considering any tree removal permit request, at least one of the findings must be
made. Staff has identified finding (i) (tree #15) and finding (v) (trees #4&12) as
appropriate for the application request:
ITEM NUMBER: 4
DATE: 6-6-06
(i) The tree is dead, diseased or injured beyond reclamation, as certified by a tree
condition report from an arborist; and
(v). The tree is obstructing proposed improvements that cannot be reasonably
designed to avoid the need for tree removal, as certified by a report from the Site
Planner and determined by the Community Development Department based on
the following factors:
• Early consultation with the City;
• Consideration of practical design alternatives;
• Provision of cost comparisons (from applicant) for practical design
alternatives;
• If saving tree eliminates all reasonable uses of the property; or
• If saving the tree requires the removal of more desirable trees.
CONCLUSION:
The applicant has submitted a Tree Protection/Removal Plan with an Arborist Report.
According to the arborist, tree #15 was pronounced dead before removal and trees
#4 & #12 have been determined to be obstructing proposed improvements and
dead/diseased according to the Arborist. The non -permitted removal of tree #15 will
be subject to penalty fees.
PREPARED BY: Paul Tabone, Planning Technician
ATTACHMENTS:
Attachment 1: Aerial Photo
Attachment 2: Arborist Report
Attachment 3: Arborist Letter
Attachment 4: Draft Resolution PC 2006-0023
Exhibit A: Conditions of Approval
Exhibit B: Tree Protection Plan
Attachment 1: Aerial Photo
ITEM NUMBER: 4
DATE: 6-6-06
JW
IAP
ITEM NUMBER: 4
DATE: 6-6-06
Attachment 2: Arborist Report
A & T ARSORISTS
P.O. BOX 1311 TEMPLETON CA 93465--1 —
($l)5) 434-01:11 ---'
9-08-05
John Kuden
Mountian View Project
This tree protection plan is for the above named lot in Atascadero, CA. The property is
slightly sloping into a ravine area with coast live oaks (Quercus agrifolia), valley oaks
(Quercus lobata), and blue oaks (Quercus douglasii). The proposed home will be
constructed in the open area on the lot with minimal tree removals. Required removals
include a 12 inch diameter live oak and a 3 inch diameter blue oak. The maximum drip
line impact for any the remaining trees is 15%. Tree 415 will not be impacted by the
project, however, it will need a major crown reduction due to the numerous cavities.
Tree #2 is located on the neighbor's property and will also need some crown reduction
due to cavities. Permission to prune shall be secured by John Kuden. Trees #9, 10 and
12 will need some side trimming to allow for proper grading clearance. All utilities shall
be routed outside of the drip lines. Sewer lines shall be routed outside of the drip lines
also.
It is the responsibility of the owner to provide a copy of this tree protection plan to any
and all contractors and subs that work within the drip line of any native tree. It is highly
recommended that each contractor sign and acknowledge this tree protection plan.
This project shall require an on-site pre -construction meeting with the city, owner,
grading contractor and the arborist. Topics will include fencing, monitoring and
requirements for a positive final occupancy letter.
All trees potentially impacted by this project are numbered and identified on both the
grading plan and the spreadsheet. Trees are numbered on the grading plans and in the
field with an aluminum tag. Tree protection fencing is shown on the grading plan. In the
field, trees to be saved have yellow tape and trees to be removed leave red tape.
Tree Rating System
A rating system of 1-10 was used for visually establishing the overall condition of each
tree on the spreadsheet. The rating system is defined as follows:
Rating Condition
Deceased
Evidence of massive past failures, extreme disease and is in severe
decline.
May be saved with attention to class 4 pruning, insect/pest
eradication and future monitoring.
ITEM NUMBER: 4
DATE: 6-6-06
Attachment 2: Arborist Report
Some past failures, some pests or structural defects that may be
mitigated by class IV pruning.
4 May have had minor past failures, excessive deadwood or minor
structural defects that can be mitigated with pruning.
5 Relatively healthy tree with little visual structural and or pest
defects.
6 Healthy tree that probably can be left in its natural state.
7-9 Have had proper arboricultural pruning and attention or have no
apparent structural defects.
10 Specimen tree with perfect shape, structure and foliage in a
protected setting (i.e. park, arboretum).
The following mitigation measures/methods must be fully understood and followed by
anyone working within the drip line of any native tree. Any necessary clarification will
be provided by us (the arborists) upon request.
1. Fencing: The proposed fencing shall be shown in orange ink on the grading
plan. It must be a minimum of 4' high chain link, snow or safety fence staked at the edge
of the drip line or line of encroachment for each tree or group of trees. The fence shall be
up before any construction or earth moving begins. The owner shall be responsible for
maintaining an erect fence throughout the construction period. The arborist(s), upon
notification, will inspect the fence placement once it is erected. After this time, fencing
shall not be moved without arborist inspection/approval. If the orange plastic fencing is
used, a minimum of four zip ties shall be used on each stake to secure the fence. All
efforts shall be made to maximize the distance from each saved tree. The fencing must
be constructed prior to the city pre -construction meeting for inspection by the city and the
arborists.
2. Soil Aeration Methods: Soils within the drip line that have been compacted
by heavy equipment and/or construction activities must be returned to their original state
before all work is completed. Methods include water jetting, adding organic matter, and
boring small holes with an auger (18" deep, 2-3' apart with a 2-4" auger) and the
application of moderate amounts of nitrogen fertilizer. The arborist(s) shall advise.
3. Chip Mulch: All areas within the drip line of the trees that cannot be fenced
shall receive a 4-6" layer of chip mulch to retain moisture, soil structure and reduce the
effects of soil compaction.
4. Trenching Within Drip Line: All trenching for foundations within the drip
line of native trees shall be hand dug. All major roots shall be avoided whenever
possible. All exposed roots larger than I" in diameter shall be clean cut with sharp
pruning tools and not left ragged. A Mandatory meeting between the arborists and
grading/trenching contractor(s) shall take place prior to work start. This activity shall be
monitored by the arborist(s) to insure proper root pruning is talking place.
5. Grading Within The Drip Line: Grading should not encroach within the drip
line unless authorized. Grading should not disrupt the normal drainage pattern around the
trees. Fills should not create a ponding condition and excavations should not leave the
tree on a rapidly draining mound.
ITEM NUMBER: 4
DATE: 6-6-06
Attachment 2: Arborist Report
6. Exposed Roots: Any exposed roots shall be re-covered the same day they
were exposed. If they cannot, they must be covered with burlap or another suitable
material and wetted down 2x per day until re -buried.
7. Paving Within The Drip Line: Pervious surfacing is preferred within the
drip line of any native tree. However, certain situations exist where pavers may not be
the best mitigation. If the roadway is to be used for commercial vehicles, the over -
excavation for the base sometimes exceeds twenty four inches. This excavation would
remove the roots. Non-commercial use of pavers is more appropriate as the excavation is
much less. However, in areas where the arborist feels the soil is shallow, paver
installation will cause damage to the very roots being protected. Pavers must be
interlocking with a minimum of 10% void space backfilled with pea gravel. Geo -textile
fabric shall be permeable. The arborists would like to inspect the material prior to
installation. Not applicable for this project.
8. Equipment Operation: Vehicles and all heavy equipment shall not be
driven under the trees, as this will contribute to soil compaction. Also there is to be no
parking of equipment or personal vehicles in these areas. All areas behind fencing are off
limits unless pre -approved by the arborist.
9. Existing Surfaces: The existing ground surface within the drip line of all oak
trees shall not be cut, filled, compacted or pared, unless shown on the grading plans and
approved by the arborist.
10. Construction Materials And Waste: No liquid or solid construction waste
shall be dumped on the ground within the drip line of any native tree. The drip line areas
are not for storage of materials either.
11. Arborist Monitoring: An arborist shall be present :For selected activities
(trees identified on spreadsheet and items bulleted below). The monitoring does not
necessarily have to be continuous but observational at times during these activities. It is
the responsibility of the owner(s) or their designee to inform us prior to these events so
we can make arrangements to be present. It is the responsibility of the owner to contract
(prior to construction) a locally licensed and insured arborist that will document all
monitoring activities.
• pre -construction fence placement
• any utility or drainage trenching within any drip line
• All grading and trenching near trees requiring monitoring on the spreadsheet
12. Pre -Construction Meeting: An on-site pre -construction meeting with the
Arborist(s), Owner(s), Planning Staff, and the earth moving team shall be required for
this project. Prior to final occupancy, a letter from the arborist(s) shall be required
verifying the health/condition of all impacted trees and providing any recommendations
for any additional mitigation. The letter shall verify that the arborist(s) were on site for
all grading and/or trenching activity that encroached into the drip line of the selected
ITEM NUMBER: 4
DATE: 6-6-06
Attachment 2: Arborist Report
V
es, and that all work done in these areas was completed to the standards set forth
runing: Class 4 pruning includes -Crown reduction pruning shall consist of
reduction of tops, sides or individual limbs. A trained arborist shall perform all pruning.
No pruning shall take more than 25% of the live crown of any native tree. Any trees that
may need pruning for road/home clearance shall be pruned prior to any grading activities
to avoid any branch tearing.
14. Landscape: All landscape under the drip -line shall be drought tolerant or native
varieties. Lawns shall be avoided. All irrigation trenching shall be routed around drip
lines; otherwise above ground drip -irrigation shall be used. It is the owner's
responsibility to notify the landscape contractor regarding this mitigation.
15. Utility Placement: All utilities and sewer/storm drains shall be placed down
the roads/driveways and when possible outside of the drip lines. The arborist shall
supervise trenching within the drip line. All trenches in these areas shall be exposed
by air spade or hand dug with utilities routed under/over the roots. Roots greater
than 2 inches in diameter shall not be cut.
16. Fertilization and Cultural Practices: As the project moves toward
completion, the arborist(s) may suggest either fertilization and/or mycorrhiza applications
that will benefit tree health. Mycorrhiza offers several benefits to the host plant,
including faster growth, improved nutrition, greater drought resistance, and protection
from pathogens.
The included spreadsheet includes trees listed by number, species and multiple stems if
applicable, diameter and breast height (4.5'), condition (scale from poor to excellent),
status (avoided, impacted, removed, exempt), percent of drip line impacted, mitigation
required (fencing, root pruning, monitoring), construction impact (trenching, grading),
recommended pruning and individual tree notes.
If all the above mitigation measures are followed, we feel there will be no additional
long-term significant impacts to the remaining native trees.
Please let us know if we can be of any future assistance to you for this project.
Steven G. Alvarez
Certified Arborist #WC 0511
Chip Tamagni
Certified Arborist WE 6436-A
ITEM NUMBER: 4
DATE: 6-6-06
Attachment 2: Arborist Report
---------------------
m
c
m
c
c
r
J
�
_0
r
�
LL
C1
Z
�
U
U
U
I—
C
(6
(0
f6
U
C
CO
N
(6
N
(6
�
�
N
3
z
Q
�
U
U
U
�
a
�
N
_
3
2
i a
U 2
a
w F
g
w
�
o�
W
Q�
w
O
w
o
w
w
C/)
w
O
W
0
0
0
z
r
�-
z
�-
z
z
z
<�
W
w
W
�
W
w
z
b 7
dN
U O
Q
Q op
Q
a
'�
�
�
�
d.
m
rn
rn
W H
W
lh
O
C
�'
�'
2�
C
R'
�'
�'
�'
�'
C
C
C
5
Z
CL
~
�
�
�-
Lt_
LL
�
LL
l.L
LL-
li
g
a
�i
Q = a
O
z a a
H
~
O
a
O
O
O
Q rc p
'
wcc
U
�
C7
C7
C7
C�
C7
y o
O
cr
W
F
o c m
U f a
w
Z
J
U
d
o
0
0
o
p
0
cc
a$
0
0
0
0
,n
o
0
0
0
oe
0
I.-
Q
Q
-
-
-
-
�
-
Q
Q
Q
U
W
O
0
LU
F
a s
W
�
p
c7
N
M��
t77
V
N
V
c#
N
M
V
M
N
0 6
w z2
F..
Z
O
U
3 n s
a
U
d w d 0
Y
=
3
w b a
c?
�
m0
M�
6i
N
O
O
c+')
O
a o 'a
�
o
a o
�
�
N
N
�
N
N
00
U i Q ~
Z
Q
U W W
CN
w,w-J
X
O
O
X
o
X
X
o
X
X
p
O
X
O
d
E
° w� i 0-
0 0 p
Y
(n
m
m
m
m
m
w
UU O
`-
w
��
r
N
M
r--
o®
oa
o
r
CIA
M
oD
0)
�O
ITEM NUMBER: 4
DATE: 6-6-06
Attachment 3: Arborist Letter
F-i-&-T-A-HBORISTS
1 P.O. BOX 1311 TEMPLETON, CA 93465 (805) 4340131
4-3-06
John Kuden
Jcff Dillon
Mountain Vic%% Road Project
Utility Trenching
Be options= limited for connecting to the existing utilities at this future home site.
Staying completely out of the drip lines would he next to impossible. The best route with
the teast impact to the trees is anglint north towards Mountain VieNt Road and basieall}
splitting the difference between the two valley oak trees (Quercmt lohaja). Additional
'ening will be required leaving a :our Iow. wide swath ie between the two tr"s for the
trenching activities. All trenching shall be either hand dug or air spade lea%ing all root,
intact that are two inches or greater in diameter and routing conduit aver; under the roots.
The exposed trench shalt be photo dmumented by the arborists for the final occupant}
letter. The owner or thea designec be responsible in nwil%ink ince arborists for 01S
monitoring activin .
4r.ip Tamagni. ertifted Arborist *Wl: 6436-A
e •�2 -�
Ste%en Alvarez Certified Ailxvist 4W E 0,;1 1
ITEM NUMBER: 4
DATE: 6-6-06
Attachment 3: Draft Resolution PC 2006-0008
DRAFT RESOLUTION PC 2006-0023
A RESOLUTION OF THE PLANNING COMMISSION
OF ATASCADERO APPROVING A TREE REMOVAL PERMIT
TO ALLOW THE REMOVAL OF THREE NATIVE TREES
LOCATED ON MOUNTAIN VIEW DRIVE APN 056-322-024
(TRP 2006-0084)
WHEREAS, an application for a Tree Removal Permit has been received from John
Kuden, P.O. Box 3605, San Luis Obispo, CA 93406 (applicant and owner) to allow the
removal of three native oak trees located on Mountain View Drive, APN 056-322-024, and,
WHEREAS; the Planning Commission reviewed the proposed Tree Removal
application on June 6, 2006, and considered testimony and reports from staff, the applicants,
and the public; and,
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Findings for Approval of Tree Removal Permit. The Planning
Commission finds as follows:
Before removal, tree #15 was dead, diseased or injured beyond reclamation, as
certified by a tree condition report from an arborist; and
Trees #4 and 12 are obstructing proposed improvements that cannot be reasonably
designed to avoid the need for tree removal, as certified by a report from the Site
Planner and determined by the Community Development Department based on the
following factors:
• Early consultation with the City;
• Consideration of practical design alternatives;
• Provision of cost comparisons (from applicant) for practical design
alternatives;
• If saving tree eliminates all reasonable uses of the property; or
• If saving the tree requires the removal of more desirable trees; and,
SECTION 2. Approval. The Planning Commission hereby approves Tree Removal
Permit 2005-0084 subject to the following Conditions and Exhibits:
ITEM NUMBER: 4
DATE: 6-6-06
Exhibit A: Conditions of Approval
Exhibit B: Tree Removal Plan
On motion by Commissioner , and seconded by Commissioner the
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ABSTAIN: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Ellen Beraud
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
T:\- TRP - Tree Removal Permits\TRP 06\TRP 2006-0084\TRP 2006-0084.PC-SR.pt.doc
ITEM NUMBER:
DATE: 6-6-06
Exhibit A: Conditions of Approval
Tree Removal - TRP 2006-0084
Conditions of Approval
Timing
Responsibility
Mitigation
TRP 2006-0084
/Monitoring
Measure
PR: dorm Removal
PS: Planning Services
BL: Business License
BS: Building Services
BP: Building Permit
FD: Fire Deparhent
TO: Temporary Occupancy
PD: Police Department
F0: Final Occupancy
CE: City Engineer
WW: Wastewater
CA: City Attorney
Planning Services
1. The applicant shall mitigate the removal or impact of the
PR
PS
trees in accordance with the requirements of the
Atascadero Native Tree Ordinance.
2. The applicant shall pay all required mitigation and
PR/BP
PS
penalty fees due to non -permitted tree removal.
3. Per the project arborist report, all trenching shall be
PR/BP
PS
either hand dug or airs spade leaving all roots intact that
are two inches or greater in diameter and routing conduit
over/under the roots.
4. Per the project arborist letter, additional tree fencing
PR/BP
PS
shall be required leaving a four -foot swath in between
the two trees for the trenching activities.
Exhibit A continued: Conditions of Approval
Tree Removal - TRP 2006-0084
Evergreen Native Trees (inches)
Mitigation Requirement
Tree Fund Payment: $ 725.00
Deciduous Native Trees (inches)
dbh notes
1
2
3
4
5
6
Total 0 -inches
Tree Fund Payment: $
ITEM NUMBER: 4
DATE: 6-6-06
Totals
87 -inches
$ 725.00
*The 36 -inch tree is added again for the purpose of calculating double fees for its
non -permitted tree removal. All fees total $725.00
dbh notes
1
36 -inches
2
12 -inches
3
3 -inches
4
36 -inches
5
6
7
8
9
10
11
12
13
14
15
Deposit
Total
87 -inches
Mitigation Requirement
Tree Fund Payment: $ 725.00
Deciduous Native Trees (inches)
dbh notes
1
2
3
4
5
6
Total 0 -inches
Tree Fund Payment: $
ITEM NUMBER: 4
DATE: 6-6-06
Totals
87 -inches
$ 725.00
*The 36 -inch tree is added again for the purpose of calculating double fees for its
non -permitted tree removal. All fees total $725.00
Exhibit B: Tree Protection Plan
Tree Removal - TRP 2006-0084
�
J
l
C
ITEM NUMBER: 4
DATE: 6-6-06
Fe..,i_.k R,!
• ji
1 �
FBFL�-L_ Ta 7Rct i'e--, w)
C
¢.r6d �j.q�•oS 'Y ��T rtG�OG..iQ.rx-�
v7
LEiT£�. 'tT,T60 y.3.or .nuc.,
�
M* -r
l�t�.�iK�.t}Tui�i
�'(�..1r.L�e.s Foie. c.�ri � �n 6e py,,�.�—.,•.�',•�
MV-T'�fs�aF—
ITEM NUMBER: 5
DATE: 6-6-06
Atascadero Planning Commission
Staff Report - Community Development Department
Tentative Tract Map 2004-0061 (Tract 2694)
(6750 San Gabriel Rd./ Rancho De Paraiso, LLC)
SUBJECT:
The proposed project consists of an application for a Tentative Tract Map to subdivide
an existing lot of record at 6750 San Gabriel Road into two residential lots of 3.56 acres
and 4.85 acres.
RECOMMENDATION:
Staff Recommends:
Adopt Resolution PC 2006-0049 certifying Mitigated Negative Declaration 2005-0029
and approving Tentative Tract Map 2004-0061 (Tract 2694) to establish two (2)
residential lots on an existing legal lot of record based on findings and subject to
Conditions of Approval.
SITUATION AND FACTS:
1. Applicant / Representative: Rancho De Paraiso LLC, 6465 Alta Pradera Lane,
Atascadero, CA 93422
2. Project Address: 6750 San Gabriel Road, Atascadero, CA 93422
(San Luis Obispo County) APN 054-191-035,036
3. General Plan Designation: RE (Rural Estate)
4. Zoning District: RS (Residential Suburban)
5. Site Area: 8.41 acres
ITEM NUMBER: 5
DATE: 6-6-06
6. Existing Use: One existing single-family residence with detached
garage and individual on-site septic system.
7. Environmental Status: Proposed Mitigated Negative Declaration 2005-0029.
Background:
Surroundina Land Use and Settina
The site is located in the RS Zoning District adjacent to single-family homes to the
North, South, and West, and the Chevron site to the East. The site's surrounding
settings include moderate to steep slopes and
native trees. The North portion of the site has Existing Tree i Open
an open space and tree preservation easement, space Easement area
which is crossed by a blue line creek and the ,
Chevron pipeline. /\P
North: Residential Suburban
South: Residential Suburban
East: Residential Suburban
West: Residential Suburban
Previous Applications
u
Residential Suburban 3'
9� o
The property was originally a Colony lot which has been through two (2) lot line
adjustments in the past few years, resulting in the need to process this request as a
tentative tract map. During review and approval of the previous applications, open
space easements were required to protect native trees.
Site Design
Minimum Lot Size
The RS Zoning District requires a minimum lot size of 2.5 to 10 acres, depending on
performance factors. The proposed lots meet this requirement as shown on the
Minimum Lot Size Calculations in Attachment 3 to this report.
Building Envelope
The applicant is proposing a building envelope with an average slope of 19.985%
towards the western side of the property. There are several native trees within the
building envelope that will potentially be impacted at the time of construction.
ITEM NUMBER: 5
DATE: 6-6-06
— \ l
rY
As Proposed Open Space Easement
a
Proposed Driveway Location
Proposed Building Envelope
Natural Drainaae Swale:
Large Drainage Swale Area
There is a large drainage swale which runs in an east/west direction along the southern
portion of the property. It is anticipated the swale will need a culvert at the point of
access crossing.
Native Trees:
Construction of the proposed driveway will result in the loss of approximately seven
Blue Oaks and one Valley Oak ranging in size from 9 to 20 inches diameter at breast
height (DBH). It is unknown what the impacts will be to the several native trees within
the proposed building envelope.
The Planning Commission is not being asked to approve tree removals at this time. All
construction drawings are preliminary and tree protection measures are sure to change
when final construction documents are prepared. Staff has added condition of approval
15 which requires the applicant to have all tree removal requests approved by the
Planning Commission.
ITEM NUMBER: 5
DATE: 6-6-06
In addition to the applicant's proposed open space easement area, staff had included
condition of approval no. 11 requiring an open space easement over an oak studded
area along the eastern edge of the property as shown in Exhibit A to the draft resolution.
The Arborist's Report, prepared by A&T Arborists in September of 2005, specifically
requires that future building and construction remain outside the dripline of Tree 29, a
48" Blue Oak. Condition of approval 16 has been added to the approving resolution.
Public Improvements:
Individual septic systems will serve the property and water is available from the
Atascadero Mutual Water Company.
Environmental Review:
An Initial Study was prepared for the project and a Mitigated Negative Declaration is
proposed for certification.
CONCLUSIONS:
The proposed subdivision map, as conditioned, is consistent with the 2002 General
Plan. The proposed subdivision is consistent with the General Plan Rural Estate land
use designation and Residential Suburban zoning regulations, based on development
standards. Staff recommends the Planning Commission approve the Tentative Tract
Map as conditioned.
ALTERNATIVES:
1. The Commission may recommend modifications to the project and/or conditions
of approval for the project.
2. The Commission may determine that more information is needed on some
aspect of the project and may refer the item back to the applicant and staff for
additional analysis. The Commission should clearly state the type of information
that is required and move to continue the item to a future date.
3. The Commission may deny the project. The Commission should specify the
reasons for denial of the project and make an associated finding with such
action.
PREPARED BY: Kerry Margason, Associate Planner
ITEM NUMBER
DATE: 6-6-06
ATTACHMENTS:
Attachment 1:
Location Map, Zoning and General Plan
Attachment 2:
Proposed Mitigated Negative Declaration
Attachment 3:
Tree Protection Report and Spreadsheet
Attachment 4:
Minimum Lot Size Calculations
Attachment 5: Average Slope Calculations
Attachment 6: Parcel 2 Building Envelope Slope Calculation
Attachment 7: Draft Resolution PC 2006-0049
Attachment 1: Location Map, General Plan and Zoning
�sGOV,61do Road
ITEM NUMBER:
DATE: 6-6-06
ITEM NUMBER
DATE: 6-6-06
Attachment 2: Proposed Mitigated Negative Declaration
Attachment 3: Tree Protection Report and Spreadsheet
drc T AR8ORZSTS
�A W%1Nti/YNLItTON.GOIM• (l0f141F01J�
r�cr
s -.7o -0S DEC 12005
nary Iarx,n
Trnmti,e Tract 2641 Pane12
IcOMMUMIry pF91lOR1{MI
Ilia use,p",etbn plan is far the de-Inpnem of the obo —n—ad parcel In Aurneadm,,
('alaf mai. Mis Parcel hi i plains for a drivew-y and o building a IoN. Trm neat w
the drnrwwy are coded with )elk,, tope fin,tsd u- -d "tape lr rcm,avd tsar.
All trees within the building emekpe are only rmmbeml wnh a tag -,he cant Mra
keratin L14OWNEWINNOINW. all p iranally reno,ed or mystiela'd lose, wilhan the
building enwil"' were imrni,,,W with reaped m V. --let diameter at hremt height :vat
general lKahh cnnda-lit I..rat impn'ts or p.amtbl rctoaal+ arc ml known m this rm•
ro,Ine are no
him fowl pima. 7 his in,enory douW kMf l a vol,ubk ural an deciding
which tsar JxwW M rcmrwM and which trate.-1.1.1d he and. Consideration ahold
he given a, sa,e ro nanny of the high. rating urea to,ndnkn S or h.ter) -s piviblr.
()hviomly the Iwnctkal Minding ,err may rwce,�narc the rcnowl of high. rated tsar In
order to illtmrate the enraiti ri, of the Ina•+, t rating a or k,, are highlighted in
yellow. I ree, rating S or higher arc highlighted m blit. [has hapefully will allow
—hit-" detigmng lone. f •r thine rates to .elect Go,Mint accordingly. 'It— me no
an
pwttad on this ka nor -m Icach field. Iuturc co—lemIk,n should he gin
arta drip lines to the griareo ryteot Puaiibk. (htt-er .'ion for the Mme fnaing
should h da. igr" to ha• no ell— than 25% an,, any drip lin•. Ior eaongk w 10 heh
dianner ,ree dxmwn't have any enroah—. cko.rr than 7. S tart farm the trunk.
Inure ming -u1-111.11 be ---,yto detmma the east numbs of trees that will —d
to be mm,ml from the lea -king with specific mitigation, to mw individual trees.
Ili arc 1o.. 1.,r oaks ({barna. ugrll ilial, .alley oaks ((herrn /oMuo) and blue oak.
((h-_ if on the site. vel— oak arm wall nod to be --d for .,ad portion
nfthb project with o tool damrrat-of 8a areh— the large. —,,at has :n dklm of
16 andira
spesifi Natigati'm
The driveway from tree a I to ince a8 spell he dc+igne d and --rusted .,only 4 .she,
of po I n -no -d Mkr to boar ,dn
adi,n. f hx auk arm arc quite sense iar m
1
alienations w all CIT"M to mimmirc impacts nnut Is, followed
agog arlrcaswl2
. wl, and ala. Tree all is nest. the rain ora Pl-nn,N
dnimge MM - rip rop mop anise. Ile tree wen h,r tree w Iv ,fn01r pbrad a. r
•way form 1h. tr ro practicably possible. I ser i'2v b o bna.k tree end ill enbns
hall Inc rn-de n, ase i1. Uecisioro will need o he made on whKth. tar buildthe Mme
north or •r•uh.1 this tree.
.eke to sttvrc ale 11as, All cllon, shall hemala• to raturrom Ile drwtrar from each
-led Ior. I IK lnmg errant h ennstnanad pro, In the city para rwnankn meeting lir
inyech,n by the e.ly-rad ale arh,ri.a
2. hall A<nlfoa Method.: soak wehin the drip lin that have hen comptcted
by hm,) o liar or I aulor,orntrunkn armies moa be retuned k, then original stars
hlrc all -ork n comPMnl. \Iclhd+islalc water jilting, aWitlg orgarnk natitt. and
borirp ural; Mies with on nugtt 118' Jeep. 2• t' opal wish w 2-•f' augttl and the
applkmion of mderalc .an„wr of nitrogen knilirer. 7 he arMristlsl shill adaoK
3. ('hip M•kb: All arca, ..hi.,he drip Ian ol'Ihe trm that aamoa be fcnr)
shall reo or a a-6' la)tt of chop mulch to nRem m,bturc, sod .rnlmc rod rcJrnvc the
eflW., of uul Cumprili,n.
J. n
Tttehht Within Drip Llre: All lnenalung Ior lo—dmx wehin IM dry,
n of r
liain, hull behood dot . All major nwar fall he ,on ded wtwm,,,
Moaibk. Allumexposed n.r+Lager man I' b dimneler shell boas clearer cul with .hvr
Prink mob andartk0ragged AMwwdnhu na o9he, the.ho. and
=i-1111 chfrg eh. Yana) Hall nLe place Mur Io ..,rk ran. I her atrvar Jull h
moneor,d try Ile mboria(s) to anwre poM, nal perming as ,alkang place.
_q. Gradiat Within I be Drip Line: (ar:xl.ng .h•uld not ran o h walon the dor
a unl
leca li.,varl. (irudin,g +hwW err Jnrup ale mmol drainage pnttcm wound lit
ores Idh Jxould err create u pondmi; enndni . and eaca,mon, .Mold err ka,e the
ucr on o rapidly J.... tag ma d.
6. Eaposal kn•n: any -jr oed n -e, stall he re o,ered the .arae Jan Iley
cap nod I I they canrol, they must h coacrcJ wnh hulas or anther witMk
material ural w ',d down 2" per day train rs=d.
P-lait N'i1Na The Drip Line: Perron nufa.ryl as I el d witha,dK
drop is of any tome ire only .f grade changer can be kept to an abn,ime mmunum.
111,w satuali oar a where to,m o1 hethe be. miligalkn. II the
nadway a+to he used f r bl sehiks, the ostt-rvcaamim for the inn,
nrNa twamty four sI. this ,miner would n-moe the o.rs Non.
ebi a of ry,rn c uPtwuptu,c m the es.... l on o meh len. l l.,,e,w,
r.rc the a bo—, fi l+rsi
the al o J alto , raper rmtallaiirm will c-- damage
Iu r, .1
the ,env leak hog imreared. Palen rant he imerkKkilg wnh u mm.mum of 111'.
„oil ,pace bcLf lkd wi,h Ma I;ruaa•1. first-tcatik fable stall he perneahlc. the
arh,ri.s would like hp ,meal 11e roar..' prior h, a ra.IL ha. I I naJ .uri:ne
rn-rroachnem can M LmteJ l less,han _5sk ol'Ihe drip lea, ry,rn me err rnca.,n
tl. f:qutpmcnt ()penlba: \'cheks and roll heavy cgmpnem dell err h
or,+en under the tsar as llua wall n.mn h,lc to seal erns uln. Al. Ib- it to be nu
are affilor eq•aparnt or prrtowwl v<Ykk. b abase ami. All arca, hhan,1fcnmg
arc oD hmns unit„ Mr-appnwcd M ale m o ..
9. h:dsllnt sarlace,uIM esa.mg gerund arfa w.thin the drip lasofalloal,
in— ,hail on, be or. filled, ean".ed or rued. tolaa aMwn on the gln1mg plans wad
approsrd by the arI-.
ITEM NUMBER
DATE: 6-6-06
1 hi. pnolrra +h-11 rrruirc -n -ddu-.-"I'pacr npnn for the sass. hornr kr ton
.n.l -n nn -stirs per- o 1rso,un mrctang wuh rhe clip, er-dout rnarnenr -nJ 1h,
-rM.rfat. '1 nIJr. wall inrludr fencing, ...aporia.. -I rrquiremem. for -rano l,e
nn.l ocrar•nr. truer.
All teras-, lwolcm w111� unp.w1-1 to 11or, M•.w-al .-a-111-1 -1 wkrrnlical -1 both u,
grndrpan mrd she sprcaJ.heet. I rm ars numhnvl ret she grnlaNt slam and in ale
field with an ulum.aura tag. lite raga on Inco an she M.W 1ng no
kno have ro pegging
tope ar thio line rad mf `r tsar and impacted .rasa no len [--,he
Ma.p>wd road fasts rrJ Inpe ! rnxwnh d retinal tape I.•rc—Id
lorcel
Tare Daflwt sy.tm
A rating a), ,. of 1 -Ir war used for ,.malty hlq it, the warrall r ,niki a „f rash
tree on she +tonsaalhca't Ite mung .ysncm .s dclinc.lmlullwn:
Et.t�1 y (nnJrn
n Ili ca.rJ
1 I:.vxlerar of mann— ino ladum, catrcmc diwcnlc and a, an .carr.•
lectin.
May h sasedo. an wnh ,rntkm to cbu a pruning, ,n1crVPelt
eroJkn n aril future nxana -o
l tine (`a. failure s pert. err stmctun,l lkfreta 1h,m nroy h
it agotard by clava*Iv,Munrng
a Flan In c half n .r pan (uilun a denfwsawl for minor
ural delret hat car, M rnrtigalN w,th pronmg.
S gelm,+ely leah by the wah Intl vi_l Jner_ nerd err fart
1kfa1+.
6 l leahhy un• that p.ohahly a -an Is, kit -.1, natural +Ina•.
7-9 Ilnae in11 proper nMrkulmml twunl., and attcrai.n or In+e n,
apparent .nKurrnl 1klrtt+.
In tiParinen tree wnh perfnr +haps, o—lare nod fool. g ,n n
pwnravl x -ding I,e. Inrk, astasia m.
the lolk,wing n,atigw festa nenw,nr. i,eihd+snot he hilly unkrarl-d wd f.IkrweJ Iw
anyone warkrng -athin the drip lin ofan a uer. Any nwaea. clarilir..... will
;:Yom
ray uv (the arhon.11 upon rcquc..r,
I.......
I IK M1wyw,1 lis.ng liar the h,ne,Inll for Ja,wn m olangc . k
m the grnJmp plane r f o1Mba em known f r the MnK. 1 M fen mg lr the
n.eJ 1s 1on ale p1.—."11 mu. M a m.nrmum of J' high chain link... for —lety (enc
uakcJ a the edge ol'tit dnp lme aor fine ofenc.—h rrat for rich use or gawp of trees
l le frac .tall h rap hire onY cnn.raKt6n ur conn nerving ilegina. 'lhe rat' or then
des."_ 0.11 toe ra yw•nr,hk for maamaanang art erne fcnr'hem-1 om the eonvaaari n
pend. It.._ hor,,u, nuaf -motion will anapect the r ne
plucrmnnl
clefmires
If teorange pl, fera-a 11dmm,mumof lar nPtev ru-1 h anNe aipt pit
oval.
u,ed „n rash
10. C raintracsiow Mwteria6 And Wrote: No liquid or solid construction waste
fall be dutopcd on the ground within the drip lane ofany mise I_ 11e drip line areas
are mq for storage of materials either.
11.Arborha Monitoringrcse: An arfwuea shall he r 9 liar wk -tcd .hanker
Item idrminud un .,PmW+hmt and 'nems hulkted below). The munimring down nil
'easarily Mae In be cnotinu,w but ot-n i,ral or times during their -,is gib D is
the rrsMnroibilnY ofthe owrner(s) of their desigrwe l inform u. Mi,r to tlesc c cat+ n,
an make arrangement to he prcaent. h is the responsibility of the owner to ason-ci
(prior lin eon. yionl a kwally licenced and amn,red arborist that will docunem all
—,.timing aclivilki
• (we-eorot pion le—, placenenl
• any utility or dram,,ge lrenhing within any drip line
• All gmding and trenching near %secs rrquaring monitoring on the srnnJJKet
12. Pr -C -r afraelbn Minion: An on-site per rorriruetkn meeting with the
Mlarim(s). City (brink, Planning stall: and the earth roving from shall he ,qua W
for this inject. Prior to final occur racy. a letter from the arhurisI(s) spell be rcquind
verifying the heahNcondnkn ufali impactedto and providing any rceomnKrdati re,
fnr my aJJninol mitigmim. T1s letter hall ,rrafy 1Mt the whoraJ(s) were on site Iia
Ll
figrading and/or enhima
t tivaty flan ennhe
,mcd ami the dnip line of the selected
le
natires, and trthat all s,vrk dna an these arras a.aa conq,letcaf uo 1h. slardard+ set f rah
aloe.
I t. Pranint: ('Inns J Musing asindcs-C'rown mM
lucuon uning shall cumio of
redatim of top., ,idc, or individual limbs, A trained arbormt Ball perform all Miming.
No Musing shot' take more tit n 25"4 of the lave crown of- strove I -e. Any trees that
may rx ed perming for rond/xomc rkamnr shall he paned prior to any grading aeusttacs
to avoid any Manch fearing. Class l pruning ialudir by d pruning is ret ommcrwkd
where safety considermkro arc P aram unt. This curoi.s of remival of dead, M
diseased.
decaying mrd oh,i,udy weak hnnhes 2 inches in diameter and grcarer. C l.'s 2 using
is nKndal
ed here condanns arc,erondwy to stmetural integrity and Inca•
health co -erns. 11 —11 e" i t, of removal ofdead Jying. decaying• interfering.
.t.—ung and sneak Mashes as well as ackclise thinning 10 lesson wind n ia,amc.
Clan I pruning has emPha,is on nesthrtks with nerno-I nfdead. Jying, daca)mg weak
hrmales aril selective thinning 10 k n wind rc nru ec.
14.Iaad-e•pe: All lard<cape under the drip4me shall be drought tolerant err jai a
varklaes. lawns shall be almdN. All irrigation trenching shop be muted :ununl drip
It_";
oth cm,w shove ground drip-arriguii n shall he used. It is theowner',
ncywmibihty In arab de Landscape Contralr regarding this mitigation.
I.S. I10"lly Plaermenl: All utilities and sewcn'sturm drain +halt be placed &,wet
the roa dsldriseways and when possible outside of the drip lines. 7 M arMrist Ball
supervaw tre,nchmg as ilhin the drip Iia. All Inaches h, Ih_ areas shall be rap -ad
Attachment 3 Continued: Tree Protection Report and Spreadsheet
by air spade or hand dug with utilities routed under/over the roots. Roots greater
than 2 inches in diameter shall not he cut.
16. Fertiliration and Cultural Practices: As the project moves toward
completion, the arborist(s) may suggest either fertilisation and/or mycorrhizu applications
that will benefit tree health. M-vcorrhva olTers several benefits to the host plant.
including faster growth, improved nutrition, greater drought resistance, and protection
from pathogens.
The included spreadsheet includes trees listed by number, species and multiple stems if
applicable, diameter and hreast height (4.5'), condition (scale from poor to excellent).
status (avoided, impacted, removed, exempt), percent of drip line impacted (unkown at
this time), mitigation required (tensing, root pruning, monitoring), construction impact
(trenching, grading)• recommended pruning and individual tree notes.
Please let us Mow if we can be of any future assistance to you for this project
Steven G. Alvarez
Certified Arborist u WC 0511
Chip 'I arnagni
Certified Arborist #WE 6436-A
TREE PROTECTION SPREAD SHEET parcel 2
ITEM NUMBER: 5
DATE: 6-6-06
1 2 3 4 5 6 7 R 9 1n 11
TREE
TREE
TRUNK
TREE
CONST DRIP -LINE CONST MITIGATIO
MONT
PRUNINGI
FIELD
A
SPECIES
DBH
CONDITIOh
STATUS %IMPACT IMPACT
PROPOSAL REQUIRED CLASS
NOTES
1
VO
26
4
1
25%
GR
F, RP, M
YES
IV
minimal grade
change
2
BO
22
5
1
20%
GR
F, RP, M
YES
IV
minimal grade
change
3
BO
13
3
R
100%
GR
NO
4
BO
16
4
R
100%
GR
NO
5
BO
1 18
5
1 1
10% 1
GR
fencing
NO
IV
mistletoe
6
BO
34
6
1
<5%
GR
fencing
NO
7
BO
20
4
1
10%
GR
fencin
NO
IV
8
BO
9
2
R
100%
GR
NO
9
BO
15
5
R
100%
GR
NO
10
BO
11
4
R
100%
GR
NO
11
BO
5
5
R
100%
GR
NO
12
VO
16
4
1
10%
FILL
fencing
YES
tree well
13
VO
20
4
1
10%
FILL
fencing
YES
tree well or rip rap
14
BO
9
3
1
<5%
GR
fencing
NO
15
BO
36
5
1
<5%
GR
fencing
NO
16
BO
35
0
A
0%
fencing
NO
17
BO
15
4
R
100%
GR
NO
18
BO
49
6
A
0%
NO
19
BO
30
3
1
35%
FILL
F. M
YES
tree well
20
BO
22
5
A
0%
fencing
NO
. iRle. YOBnY La0CxW6E f8h1 ouE NDIID. I. 00N6TNUCD014BWAO T GRADEIO CCIWADTEIN TRENCNNO
2. WE TWE 001460141NYE C w 0 -WINK OM 8. W "T1DN P"JMWNTS EENU10. WW0104 NOOIMIUNNIG
8. TeinetDoAiMRG.r a• Ap80n5TY0IlfOM10pE0UNE0 VE&W
• mECDNDIIKIN t.E 10. MEIL— t0. fN:ftSC WDM1AINO C1A38 t�
S- CONST iXC SU" AVOOED. BWAOTED Ata0VA1 tf • f[1D 140118
6-o 1-1 MNCEMOCAN MI)DWINE
Attachment 3 Continued: Tree Protection Report and Spreadsheet
TREE PROTECTION SPREAD SHEET parcel 2
ITEM NUMBER
DATE: 6-6-06
10 11
TREE
TREE
TRUNK
TREE
CONST DRIP -LINE CONST MITIGATIOh
MONT
PRUNINGI FIELD
a
SPECIES
DBH
CONDITIOh
STATUS %IMPACT IMPACT PROPOSAL REQUIRED
CLASS NOTES
21
LO
22
6
A 0% fencing
NO
22
BO
24
6
A 0% fencing
NO
23
BO
52
5
?
crack in tree
24
BO
36
3
A 0% fencing
NO
25
BO
16
4
?
26
BO
18
5
?
27
BO
15
4
?
28
LO
23
4
?
29
BO
48
7
?
MUST SAVE
30
BO
42
4
?
cavities
31
BO
9
2
?
suppressed
32
BO
21
5
?
33
BO
13
4
?
34
BO
20
3
?
poor crotches. splits
35
BO
24
5
?
36
BO
18
4
?
cavities
37
BO
23
2
?
38
BO
18
4
?
39
40
—ME. 1. ! VADM: CpAI'ACigN TRCNCNNG
2-112E TYPE C—ONNAME EWO•WWTEW 0•MRgA REOVAEMEMS ICNC MOIIMI 4ROOTPRDNEq.
J.mR D rrRoR' 9•ARSON61 NOIMORMGRWRED rE SnlO
1 • T1EE COIORg11 1 • "M 101" LLCMI 10- RERSCROED PRIMNG CE U 1+
s• CONSTRVCTONSIATO8 AVOOED. ENACTED REMO� IEIDNOIFS
0• DRPaEE VERCENTOE WAC2ODRV-
9!30/2005
ITEM NUMBER:
DATE: 6-6-06
Attachment 4: Minimum Lot Size Calculations
Minimum Lot Size Criteria For the Residential Suburban Zone-
oneL
Legal
al
PROPOSED PARCEL I AT 04-05610
054-191-030 tbrouph 036
3.56 AC
Jim Menesez Lot Size Factors
APN
Lot Size
Contact
".000=.20. 8-10.01)0=15
10-12,000 =.30.12- 14.000=.40,
14-16,000= -50.16-18,000=.60.
D6hlnce from Center of
I8-20,000=.75,
Communes.
>20.000=.90
8.000.10,000
0.25
-20rm.vmch=.50
20.39 min/mch=.75
Sepik Sult.bl4h (perk
40-59 min/inch= 1,00
assumed
10.105.=.5.
r.tcl
160 milvinch= 1.50
already built
1,00
21.21%= 1.0, 26.30%=115,
0.10%=.1, II.207e=,75.
21-25%=1.0, 26-30.=1.25,
26,30%
1.25
A. er.ze slop.•
31-35%=1.75, 3640%=2.00
21-25%
1.00
-J!- then 15%=.40 Paved
City accepted mad =.40 Paved
rood Icy. th.n 15%=.40 Paved
tuad - Than 15:8 =.50 All
we.[he, Ice,. than 15y: = .75 All
we.lher more, than 15%= 1.00
...... Cu.dlnn.
Unlmpmwd iecs than 15%= 1.25
0.40
Acc- C-ditinn
lJmmpru.cd more that 155: = 1.5
11.411
lot 0- within 1,5011'
a 1'M larr.l
.\.mze I.nl Sln• -1-1.1500
Feet Wm)
3.30
0.66
mimmum
[.of Size=
Minimum Lot Size Criteria For the Residential Suburban Zone
Legal
PROPOSED PARCEL 2 AT 044)569
054.191-030 through 036
3,.WAC f-- OS
Jim Meneaez Lot Size Factor,
APN
Lot Size,
Contact
0-8.000=.20. P-10.000=.25
10-12.000=30,12-14,000-40,
14-16.000 = .10.16.18,000 =.60.
Distance koa Ceakr of
18-20,000= 75,
>20,000=.90
8.000-10.000
0.25
mwi =
20.39 mlly-h=.75
40.59 mm, inch= 1.00
ESkP31-35%=1.75.
6011u inch=150
120-etinch
10.105.=.5.
u-20%=.75,
21.21%= 1.0, 26.30%=115,
3640%=2.00
26,30%
1.25
cny a.vepted toad =.40 P"
-J!- then 15%=.40 Paved
and n.re than 15`. =.30 An
,rather lo. than 11%=.71 All
.ealhcr n.ve Ih. IS%- 1.00
Un- rued ka. then 15%= 125
...... Cu.dlnn.
Um.M,, d--lh. I%=1.5
0.40
r.er1 nl ,Ire %. Ilho
L
a 1'M larr.l
&30
0,66
tntnnrn
LotShm" 1 4.060
ITEM NUMBER: 5
DATE: 6-6-06
Attachment 5: Average Slope Calculations
Wilson Land Surveys
76W Morro Road. Atuvcadcm, CA 93422
Phone: (805) 466-2445 • Fax: (805) 466-0812 • Email: kenw(drteenginecring.aan
Average Slope Calculations
Subject Property:
PROPOSED PARCEL 1 ATAL 04-0569
Formula:
Slope = (Contour Interval ' Length ' .00229) / acres
Length = total contour length in inches ' plot scale
Specifics:
Contour Interval =
Length =
Area =
Plot Scale 1" _
Average Slope=
5 feet
134 inches
3.56 acres
50
21.5 %
Wilson Land Surveys
761X) %1 -ml Road, Alaxadcw. CA 93422
Phone: (805) 466-2445 e Fax: (805) 466-0812 • Email: kcnw(r1irlccnginccring.aim
Average Slope Calculations
Subject Property:
PROPOSED PARCEL 2 ATAL 04-0569
Formula:
Slope = (Contour Interval ' Length ' .00229) / acres
Length = total contour length in inches ' plot scale
Specifics:
Contour Interval =
Length =
Area =
Plot Scale 1" _
Average Slope=
5 Ifeet
251 inches
4.M acres
50
29.6 1 %
ITEM NUMBER
DATE: 6-6-06
Attachment 6: Building Envelope Slope Calculations
Wilson Land Surveys
7600 Morro Road, Atascadero, CA 93422
Phone: (805) 466-2445 • Fax: (805) 466-0812 • Email: kenw@wilsonlandsurveys.com
Average Slope Calculations
Subject Property:
BUILDING ENVELOPE PARCEL 2
Formula:
Slope = (Contour Interval *
Length * .00229) / acres
Length = total contour length
in inches * plot scale
Specifics:
Contour Interval =
5 feet
Length =
28.8 inches
Area =
0.66 acres
Plot Scale 1" =
40
Average Slope=
19.99
ITEM NUMBER: 5
DATE: 6-6-06
Attachment 7: Draft Resolution PC 2006-0049
DRAFT RESOLUTION PC 2006-0049
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA CERTIFYING
MITIGATED NEGATIVE DECLARATION 2005-0029 AND APPROVING
TENTATIVE TRACT MAP 2004-0061 TO SUBDIVIDE AN EXISTING
LOT OF RECORD AT 6750 SAN GABRIEL ROAD INTO TWO
RESIDENTIAL LOTS WITH ASSOCIATED TREE REMOVALS FOR
CONSTRUCTION OF AN ACCESS WAY
APN 054-191-035,036 PORTIONS
(6750 San Gabriel Rd. /Rancho de Paraiso, LLC)
WHEREAS, an application has been received from Rancho De Paraiso, LLC (6465 Alta
Pradera Lane, Atascadero, CA 93422), applicant and property owner, for a Tentative Tract Map
for a 2 -lot subdivision; and,
WHEREAS, the General Plan designation is Rural Estate (RE); and,
WHEREAS, the site's existing zoning district is Residential Suburban (RS) Zoning
designation; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2005-0029 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Tract Map application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on June 6, 2006 studied and considered Tentative Tract Map 2004-0061,
after first studying and considering the Proposed Mitigated Negative Declaration prepared for the
project; and,
ITEM NUMBER: 5
DATE: 6-6-06
NOW THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Certification of Mitigated Negative Declaration. The Planning
Commission finds as follows:
1. The Negative Declaration has been completed in compliance with requirements of
the California Environmental Quality Act; and,
2. The project does not have the potential to degrade the environment; and
3. The project will not achieve short-term to the disadvantage of long-term
environmental goals; and,
4. The project does not have impacts which are individually limited, but
cumulatively considerable; and,
5. The project will not cause substantial adverse effects on human beings either
directly or indirectly.
SECTION 2. Findings of Approval for Tentative Tract Map 2004-0061, the Planning
Commission finds as follows:
1. The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
2. The design and improvement of the proposed subdivision is consistent with the General
Plan and applicable zoning requirements.
3. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
4. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
5. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
6. The installation of a standard street, either alone or in conjunction with neighboring
properties is not feasible.
7. The flag lot is justified by topographical conditions.
ITEM NUMBER: 5
DATE: 6-6-06
SECTION 3. Approval. The Planning Commission of the City of Atascadero, in a
regular session assembled on May 16, 2006, resolved to certify Mitigated Negative Declaration
2004-0061 and approve Tentative Tract Map (TTM 2004-0061) subject to the following:
1. Exhibit A: Mitigated Negative Declaration 2005-0029
2. Exhibit B: Tentative Tract Map 2004-0061
3. Exhibit C: Conditions of Approval
On motion by Commissioner , and seconded by Commissioner
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ABSTAIN: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Ellen Beraud
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
the
Exhibit A: Mitigated Negative Declaration 2005-0029
See Following
ITEM NUMBER
DATE: 6-6-06
Exhibit A: Tentative Tract Map 2004-0061
MVWOl-=
ITEM NUMBER: 5
DATE: 6-6-06
P.
r�+
l
T/
I
R
1 ;
_ t
~ Jai
1 �
Al
All 1
Tree Preservation
Easements
AR
b
t�>jt6
e°Y eey
7
SS S3 �
a�pS
ITEM NUMBER: 5
DATE: 6-6-06
P.
r�+
l
T/
I
R
1 ;
_ t
~ Jai
1 �
Al
All 1
Tree Preservation
Easements
AR
ITEM NUMBER:
DATE: 6-6-06
Exhibit B: Conditions of Approval & Mitigation Measures
Conditions of Approval
Timing
Responsibility
BL: Business
/Monitoring
6750 San Gabriel Rd.
License
GP: Grading
PS: Planning
Services
Subdivision Map
Permit
BP: Building
BS: Building
Services
TTM 2004-0061
Permit
FI: Final
FD: Fire Department
PD: Police
Inspection
TO: Temporary
Department
CE: City Engineer
Occupancy
FO: Final
ww. wastewater
Occupancy
CA: City Attorney
Planning Services
1. The approval of this application shall become final, subject to the completion of
FM
PS
the conditions of approval, fourteen (14) days following the Planning
Commission approval unless prior to that time, an appeal to the decision is filed
as set forth in Section 9-1.111(b) of the Zoning Ordinance.
2. Approval of this Tentative Tract Map shall be valid for two years after its
FM
PS
effective date. At the end of the period, the approval shall expire and become
null and void unless an extension of time is granted pursuant to a written
request received prior to the expiration date.
3. The Community Development Department shall have the authority to approve
FM
PS
minor changes to the project that (1) result in a superior site design or
appearance, and/or (2) address a design issue that is not substantive to the
Tentative Tract Map and that the Final Map is in substantial conformance with
the Tentative Map.
4. The Parcel Map shall be subject to additional fees for park or recreation
FM
PS
purposes (QUIMBY Act) as required by City Ordinance.
5. The granting of this entitlement shall apply to the property located at APN 054-
On going
PS
191-035,036 portions regardless of owner.
6. The Final Map shall be drawn in substantial conformance with the approved
FM
PS
tentative map, and in compliance with all conditions set forth herein, shall be
submitted for review and approval in accordance with the Subdivision Map Act
and the City's Subdivision Ordinance.
7. The subdivider shall defend, indemnify, and hold harmless the City of
FM
PS
Atascadero or its agents, officers, and employees against any claim or action
brought to challenge an approval by the city, or any of its entities, concerning
the subdivision.
8. All buildings constructed on Parcel 2 shall be within the building envelope as
Ongoing
PS
shown on the Tentative Tract Map, including septic tanks, Ieachfields and
expansion areas.
9. All proposed construction on Parcel 2 shall be designed to avoid native trees.
Ongoing
PS
10. All buildings constructed on Parcel 1 shall be located on the first 200 feet of the
Ongoing
PS
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval
Timing
Responsibility
/Monitoring
BL: Business
6750 San Gabriel Rd.
License
GP: Grading
PS: Planning
services
Subdivision Map
Permit
BP: Building
BS: Building
Services
TTM 2004-0061
FIeF Final
FD: Fire Department
PD: Police
Inspection
TO: Temporary
Department
CE: City Engineer
Occupancy
FO: Final
wyy. Wastewater
CA: City Attorney
Occupancy
parcel as measured from the San Gabriel Road edge of right of way.
11. The owner shall record open space and tree preservation easements
FM
PS
consistent with the proposed easement shown on the tentative map within
Parcel 2 and over the tree area as designated on the tentative map attached
hereto as Exhibit A.
12. The Flag portion of Lot 2 shall be 24 feet wide, with 20 feet of paving and 2 foot
GP/BP
PS
shoulders on each side.
13. All proposed structures shall maintain a minimum 10 foot setback from the flag
Ongoing
PS
portion of Lot 2.
14. A reflectorized master house number sign and individual reflectorized address
Ongoing
PS
signs are to be posted per fire department regulations.
15. Prior to issuance of construction permits, the applicants shall process a tree
GP/BP
PS
removal permit, to be approved by the Planning Commission. Any tree
removal, including the proposed removal of one 2" native tree shall be
approved by the Planning Commission prior to issuance of any construction
permits.
16. Future construction activities shall not fall within the dripline of Tree No. 29, a
GP/BP
PS/BS
48" Blue Oak as shown on the spreadsheet prepared as a part of the Tree
Protection Report, dated September 30, 2005, and signed by A&T Arborists.
Fire Marshal
BP
FM
17. A dry standpipe system will be required to provide a water supply to within 150'
of proposed structures.
City Engineer Standard Conditions
18. In the event that the applicant is allowed to bond for the public
BP
BS
improvements required as a condition of this map, the applicant shall enter
into a Subdivision Improvement Agreement with the City Council.
19. An engineer's estimate of probable cost shall be submitted for review and
BP
PW
approval by the City Engineer to determine the amount of the bond.
20. The Subdivision Improvement Agreement shall record concurrently with the
FM
PW
Final Map.
21. All public improvements shall be constructed in conformance with the City of
BP
PW
Atascadero Engineering Department Standard Specifications and Drawings
or as directed by the City Engineer.
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval
Timing
Responsibility
/Monitoring
BL: Business
6750 San Gabriel Rd.
License
GP: Grading
PS: Planning
Services
Subdivision Map
Permit
BP: Building
BS: Building
Services
TTM 2004-0061
FIeF Final
FD: Fire Department
PD: Police
Inspection
TO: Temporary
Department
CE: City Engineer
Occupancy
FO: Final
wyy. Wastewater
CA: City Attorney
Occupancy
22. The applicant shall enter into a Plan Check/Inspection agreement with the
BP
BS
City.
23. The applicant shall be responsible for the relocation and/or alteration of
BP
PW
existing utilities.
24. The applicant shall install all new utilities (water, gas, electric, cable TV and
BP
BS
telephone) underground. Utilities shall be extended to the property line
frontage of each lot or its public utility easement.
25. The applicant shall monument all property corners for construction control
BP
PW
and shall promptly replace them if disturbed.
26. A preliminary subdivision guarantee shall be submitted for review in
BP
PW
conjunction with the processing of the parcel map.
27. All existing and proposed utility, pipeline, open space, or other easements
BP
PS/PW
are to be shown on the parcel map. If there are building or other restrictions
related to the easements, they shall be noted on the parcel map. The
applicant shall show all access restrictions on the parcel map.
28. Prior to recording the tract map, the applicant shall submit a map drawn in
FM
PS/PW
substantial conformance with the approved tentative map and in compliance
with all conditions set forth herein shall be submitted for review and approval
by the City in accordance with the Subdivision Map Act and the City's
Subdivision Ordinance.
29. Prior to recording the tract map, the applicant's surveyor shall set
FM
PW
monuments at all new property corners or shall indicate, by certificate on the
final map, that corners have been set or shall be set by a date specific and
that they will be sufficient to enable the survey to be retraced.
30. Prior to recording the tract map, the applicant shall have the map reviewed
FM
PW
by all applicable public and private utility companies (cable, telephone, gas,
electric, Atascadero Mutual Water Company). The applicant shall obtain a
letter from each utility company, which indicates their review of the map.
The letter shall identify any new easements, which may be required by the
utility company. A copy of the letter shall be submitted to the City. New
easements shall be shown on the parcel map.
31. Upon recording the final map, the applicant shall provide the City with a
FM
PW
black line clear Mylar (0.4 mil) copy and a blue line print of the recorded
map.
32. Prior to the final inspection of any public improvements, the applicant shall
BP
PW
submit a written statement from a registered civil engineer that all work has
been completed and is in full compliance with the approved plans.
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval
Timing
Responsibility
/Monitoring
BL: Business
6750 San Gabriel Rd.
License
GP: Grading
PS: Planning
Services
Subdivision Map
Permit
BP: Building
BS: Building
Services
TTM 2004-0061
FIeF Final
FD: Fire Department
PD: Police
Inspection
TO: Temporary
Department
CE: City Engineer
Occupancy
FO: Final
wyy. Wastewater
CA: City Attorney
Occupancy
Atascadero Mutual Water Company
33. Before the start of construction on the water system improvements, the
GP, BP
CE
applicant shall submit plans to AMWC for the water distribution facilities
needed to serve the project. All water distribution facilities shall be
constructed in conformance with AMWC Standards and Details and the
California Waterworks Standards (Code of Regulations Title 22, Division 4,
Chapter 16). All cross -connection devices shall conform to AWWA and
California Department of Health Services standards.
34. Before the start of construction on the water system improvements, the
GP, BP
CE
applicant shall pay all installation and connection fees required by AMWC.
Subject to the approval of AMWC, the applicant may enter in to a "deferred
connection" agreement.
35. Before issuance of building permits, the applicant shall obtain a "Will Serve"
GP, BP
CE
letter from AMWC.
36. The applicant shall provide AMWC with easements for those water facilities
GP, BP
CE
proposed for operation and maintenance by AMWC that are constructed
outside of publicly maintained right-of-ways. AMWC shall review the form
and content of the easements before recordation.
37. The applicant shall obtain a separate landscape -irrigation meter from
GP, BP
CE
AMWC for the common areas within the project.
Mitigation Measure 1.b Any future trees in construction areas or proposed for removal
BP
BS/PS
1.b
shall be mitigated according to the Atascadero Native Tree Ordinance.
Mitigation Measure 3.b.1: Future construction for the project site shall be conditioned
BP
BS/PS
3.b.1
to comply with all applicable District regulations pertaining to the control of fugitive
dust (PM -10) as contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality
Handbook.
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune according to manufacturer's
specifications.
• Fuel all off-road and portable diesel powered equipment, including but not limited
to bulldozers, graders, cranes, loaders, scrapers, backhoes, generator sets,
compressors, auxiliary power units, with ARB certified motor vehicle diesel fuel
(Non -taxed version suitable for use off-road).
• Maximize to the extent feasible, the use of diesel construction equipment
meeting the ARB's 1996 or newer certification standard for off-road heavy-duty
diesel engines.
Section 6.4: Activity Management Techniques
0 Develop a comprehensive construction activity management plan designed to
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval
6750 San Gabriel Rd.
Subdivision Map
TTM 2004-0061
Timing
BL: Business
License
GP: Grading
Permit
BP: Building
FIeF Final
Inspection
TO: Temporary
Occupancy
FO: Final
Occupancy
Responsibility
/Monitoring
PS: Planning
Services
BS: Building
Services
FD: Fire Department
PD: Police
Department
CE: City Engineer
wyy. Wastewater
CA: City Attorney
minimize the amount of large construction equipment operating during any given
time period.
• Schedule of construction truck trips during non -peak hours to reduce peak hour
emissions.
• Limit the length of the construction workday period, if necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading, demolition and building
plan notes:
• Reduce the amount of the disturbed area where possible.
• Use of water trucks or sprinkler systems in sufficient quantities to prevent
airborne dust from leaving the site. Increased watering frequency would be
required whenever wind speeds exceed 15 mph. Reclaimed (non -potable) water
should be used whenever possible.
• All dirt stockpile areas should be sprayed daily as needed.
• Permanent dust control measures identified in the approved project re -vegetation
and landscape plans should be implemented as soon as possible following
completion of any soil disturbing activities.
• Exposed ground areas that are plann4ed to be reworked at dates greater than
one month after initial grading should be sown with a fast -germinating native
grass seed and watered until vegetation is established.
• All disturbed soil areas not subject to re -vegetation should be stabilized using
approved chemical soil binder, jute netting, or other methods approved in
advance by the APCD.
• All roadways, driveways, sidewalks, etc, to be paved should be complete as
soon as possible. In addition, building pads should be laid as soon as possible
after grading unless seeding or soil binders are used.
• Vehicle speed for all construction vehicles shall not exceed 15 mph on any
unpaved surface at the construction site.
• All trucks hauling dirt, sand, soil, or other loose materials are to be covered or
should maintain at least two feet of freeboard (minimum vertical distance
between top of load and top of trailer) in accordance with CVC Section 23114.
• Install wheel washers where vehicles enter and exit unpaved roads onto streets,
or was off trucks and equipment leaving the site.
• Sweep streets at the end of each day if visible soil material is carried onto
adjacent paved roads. Water sweepers with reclaimed water should be used
where feasible.
• The contractor or builder shall designate a person or persons to monitor the dust
control program and to order increased watering, as necessary, to prevent
transport of dust off site. The name and telephone number of such persons shall
be provided to the APCD prior to land use clearance for map recordation and
land use clearance for finish grading of any structure.
Mitigation Measure 4.e.1: The building permit site plan shall identify all protection
BP
MPS
4.e.1
and enhancement measures on the grading and drainage plan.
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval
Timing
Responsibility
/Monitoring
BL: Business
6750 San Gabriel Rd.
License
GP: Grading
PS: Planning
Services
Subdivision Map
Permit
BP: Building
BS: Building
Services
TTM 2004-0061
FIeF Final
FD: Fire Department
Inspection
PD: Police
Department
TO: Temporary
Occupancy
CE: City Engineer
FO: Final
wyy. Wastewater
CA: City Attorney
Occupancy
Mitigation Measure 4.e.2: Grading and excavation work shall be consistent with the
BP
MPS
4.e.2
City of Atascadero Tree Ordinance. Special precautions when working around native
trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be pruned prior to any
heavy equipment work being done.
4. Vehicles and stockpiled material shall be stored outside the dripline of all
trees.
5. All trees within the area of work shall be fenced for protection with 4 -foot
chain link, snow or safety fencing placed per the approved tree protection
plan. Tree protection fencing shall be in place prior to any site excavation or
grading. Fencing shall remain in place until completion of all construction
activities.
6. Any roots that are encountered during excavation shall be clean cut by hand
and sealed with an approved tree seal.
Mitigation Measure 5.d.1: Should any cultural resources be unearthed during site
GP/BP
PS/BS
5.d.1
development work, the provisions of CEQA -Section 15064.5, will be followed to
reduce impacts to a non-significant level.
BP
BS/PS
6.b.1
Mitigation Measure 6.b.1: During construction and prior to final inspection, all cut and
fill slopes shall be hydro seeded with an appropriate erosion control method (erosion
control blanket, hydro -mulch, or straw mulch appropriately anchored) immediately
after completion of earthwork between the months of October 15 through April 15.
All cut and fill slopes shall be landscaped and hydroseeded with a native seed mix
prior to final occupancy. Duration of the prosect: The contractor will be responsible
for the clean up of any mud or debris that is tracked onto public streets by
construction vehicles.
Mitigation Measure 6.d.1: Prior to future construction, a soils report shall be required
BP
BS
6.c.d.1
to be submitted with a building permit by the building department. The building plans
will be required to follow the recommendations of the soils report to assure safety for
residents and buildings.
Mitigation Measure 11.d.1: All future construction activities shall comply with the City
BP/GP
PS
11.d.1
of Atascadero Noise Ordinance for hours of operation.
Mitigation Measure 13.1 All future construction shall incorporate fire sprinklers.
BP/GP
PS,BS,FD
13.1
ITEM NUMBER: 6
DATE: 6-6-06
Atascadero Planning Commission
Staff Report - Community Development Department
Curbaril Office Development
Master Plan of Development (CUP 2003-0089) /
Tentative Tract Map 2004-0050
(Morro Rd. / Curbaril Ave. — Gearhart)
SUBJECT:
The proposed project consists of an application for an Amendment to a Conditional Use
Permit and Tentative Tract Map to accommodate the construction of a commercial bank
on the corner of Curbaril and Morro Rd.
RECOMMENDATION:
Staff Recommends:
1. The Planning Commission adopt Resolution PC 2006-0051 approving
Conditional Use Permit 2003-0089 Amendment subject to conditions of approval
and mitigation monitoring, and;
2. The Planning Commission adopt Resolution PC 2006-0052 approving Tentative
Tract Map 2004-0050 Amendment, subject to conditions of approval and
mitigation monitoring.
SITUATION AND FACTS:
1. Applicant / Owner: Kelly Gearhart, 6205 Alcantara Ave, Atascadero, CA
93422
2. Project Address: 7955 Curbaril Ave., Atascadero
APN 031-161-024 (San Luis Obispo County)
3. General Plan Designation: General Commercial (GC)
4. Zoning District:
5. Site Area:
6. Existing Use:
7. Environmental Status
DISCUSSION:
Project Definition
ITEM NUMBER: 6
DATE: 6-6-06
Commercial Professional (CP)
1.46 acres gross
Existing vacant structure
Proposed Mitigated Negative Declaration 2004-0054
The proposed Amendment is a request to consolidate two of the approved nine
commercial parcels to allow construction of a commercial bank building at the corner of
Curbaril Avenue and Morro Road.
Background
On June 7, 2005, the Planning Commission reviewed and approved a commercial
development consisting of nine commercial office buildings at the corner of Curbaril and
Morro Rd. The applicant is requesting an amendment to allow a commercial bank
building and associated drive-through ATM facility.
The item was heard by the Planning Commission on May 16, 2006 and was referred
back to staff and the applicant for additional information. The Planning Commission
requested the following:
1. Drive-through ATM design information
Applicant's Response: No structure is proposed over the drive-through ATM
facilities. The stand alone ATM's will be located in the island
as shown on the previously submitted plans.
2. An alternate site plan without an ATM drive-through facility.
Applicant's Response: The project request remains as originally requested for
approval with the drive-through ATM.
Appearance Review
Site Design
ITEM NUMBER: 6
DATE: 6-6-06
Funding Land Use and
9.:
i: Commercial Professional
is Commercial Retail/High
Density Residential
Residential Single-family
(1 ac min lot size)
Commercial Professional
with some existing Multi-
family uses
The site plan has been redesigned to include a drive-through ATM and commercial
bank building at the corner of Curbaril and Morro Rd. All parking lot areas will be
landscaped consistent with the previous approval.
Architecture, Materials, Color
The applicant is proposing a one story building that is architecturally consistent with the
previously approved design theme. The proposed commercial bank building consists of
stucco exterior with concrete tile roofing and tile awnings over windows.
Circulation and Parking
Project circulation remains the same with the exception of the drive-through ATM
facility. The project provides required parking based on Municipal Code standards.
ITEM NUMBER: 6
DATE: 6-6-06
v
r r
cURRARIL �`—
Tentative Tract Map Amendment
The proposed Amendment will reduce the number of individual lots to eight to allow all
of the proposed bank improvements to be on one parcel. Shared parking and access
easements will remain over the revised parking area and project entrance.
Proposed Environmental Determination
The proposed minor Amendment is consistent with the previously certified Mitigated
Negative Declaration.
Conclusion
The proposed Amendment is consistent with the previously approved project and will
facilitate the construction of a commercial bank and drive-through ATM at the corner of
Curbaril Ave. and Morro Rd.
ITEM NUMBER: 6
DATE: 6-6-06
ALTERNATIVES
1. The Commission may recommend modifications to the project and/or conditions
of approval for the project.
2. The Commission may determine more information is needed on some aspect of
the project and may refer the item back to the applicant and staff to develop the
additional information. The Commission should clearly state the type of
information that is required and move to continue the item to a future date.
3. The Commission may deny the project. The parcel would retain its designation
of Commercial Professional. The Commission should specify the reasons for
denial of the project and make an associated finding with such action.
PREPARED BY: Kelly Gleason, Associate Planner
ATTACHMENTS:
Attachment 1:
Location Map, Zoning and General Plan
Attachment 2:
Draft Resolution PC 2006-0051
Attachment 3:
Draft Resolution PC 2006-0052
ITEM NUMBER:
DATE: 6-6-06
Attachment 1: Location Map, General Plan and Zoning
Existing General Plan Designation:
General Commercial
Existing Site Zoning:
Commercial Professional/PD-3
ITEM NUMBER: 6
DATE: 6-6-06
ATTACHMENT 2: Draft Resolution PC 2006-0051
DRAFT RESOLUTION PC 2006-0051
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING AN
AMENDMENT TO CONDITIONAL USE PERMIT 2003-0089 (MASTER
PLAN OF DEVELOPMET) ON APN 031-161-024
(Curbaril Business Center - Gearhart)
WHEREAS, an application has been received from Kelly Gearhart (6205 Alcantara Ave;
Atascadero, CA 93422), Applicant/Owner, for a Conditional Use Permit Amendment and
corresponding Tentative Tract Map Amendment on APN 031-161-024; and,
WHEREAS, the site's General Plan Designation is GC (General Commercial); and,
WHEREAS, the site's zoning district is CPPD -3 (Commercial Professional with a
Planned Development 3 overlay zone); and,
WHEREAS, the proposed minor amendment is consistent with the previously certified
Mitigated Negative Declaration for the project; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing was held by the Planning
Commission of the City of Atascadero at which hearing evidence, oral and documentary, was
admitted on behalf of said Amendments; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on May 16, 2006, studied and considered the proposed Conditional Use
Permit Amendment; and,
NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings for approval of Conditional Use Permit Amendment. The
Planning Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
ITEM NUMBER: 6
DATE: 6-6-06
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including provisions of the Planned Development 3 Overlay Zone; and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a
regular session assembled on May 16, 2006, resolved to approve the Master Plan of
Development (CUP 2003-0089) Amendment subject to the following:
EXHIBIT A:
Conditions of Approval
EXHIBIT B:
Amended Master Plan of Development/Site Plan
EXHIBIT C:
Amended Landscape Plan
EXHIBIT D:
Amended Grading and Drainage Plan
EXHIBIT E:
Amended Utility Plan
EXHIBIT F:
Bank Elevations and Floor Plans
ITEM NUMBER: 6
DATE: 6-6-06
On motion by Commissioner , and seconded by Commissioner
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ADOPTED:
CITY OF ATASCADERO, CA
Ellen Beraud
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
the
ITEM NUMBER:
DATE: 6-6-06
Exhibit A: Conditions of Approval/Mitigation Monitoring
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2003-0089
/Monitoring
Measure
PS: Planning Services
Curbaril Office Development
p
BL: Business
License
BS: Building Services
FD: Fire Department
GP: Grading
PD: Police Department
Permit
CE: City Engineer
BP: Building
WW: Wastewater
Permit
CA: City Mornay
FI: Final
Inspection
TO: Temporary
Occupancy
F0: Final
Occupancy
Planning Department Standard Conditions
1. This conditional use permit amendment shall be for a bank building and associated
PS
ATM drive-through.
2. The approval of this use permit shall become final and effective for the purposes of
FM
PS
issuing building permits fourteen (14) days following the Planning Commission
approval unless prior to the time, an appeal to the decision is filed as set forth in
Section 9-1.111(b) of the Zoning Ordinance.
3. The Community Development Department shall have the authority to approve the
BP/FM
PS
following minor changes to the project that (1) modify the site plan project by less
than 10%, (2) result in a superior site design or appearance, and/or (3) address a
construction design issue that is not substantive to the Master Plan of Development.
The Planning Commission shall have the final authority to approve any other
changes to the Conditional Use Permit.
4. The granting of this entitlement shall apply to the property located at 7955 Curbaril
On going
PS
Ave. (APN 031-161-024) regardless of owner.
5. Approval of this Conditional Use Permit shall be valid for twelve (12) months after its
13P/FM
PS
effective date. At the end of the period, the approval shall expire and become null
and void unless the project has received a building permit.
6. The applicant and/or subsequent owners shall defend, indemnify, and hold
ongoing
harmless the City of Atascadero or its agents, officers, and employees against any
claim or action brought to challenge an approval by the city, or any of its entities,
concerning the proposed development.
7. All subsequent Tract Map and construction permits shall be consistent with the
Master Plan of Development contained herein.
8. Prior to final map, the applicant shall submit CC&Rs or similar maintenance
mechanism for review and approval by the Community Development Department.
The maintenance agreement shall record with the Final Map and shall include the
following:
■ Provisions for maintenance of all common areas including access, parking,
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2003-0089
/Monitoring
Measure
PS:Planning Services
Curbaril Office Development
BL: Business
License
BS: Building Services
FD: Fire Department
GP: Grading
PD: Police Department
Permit
CE: City Engineer
BP: Building
WW: Wastewater
Permit
CA: City Attorney
FI: Final
Inspection
TO: Temporary
Occupancy
F0: Final
Occupancy
perimeter walls, and landscaping.
• A detailed list of each individual owner's responsibilities for maintenance of
the individual units.
■ A provision for review and approval by the City Community Development
Department for any changes to the maintenance agreement that relate to
the above requirements prior to the changes being recorded or taking effect.
9. All signage shall be consistent with EXHIBIT F:
10. All exterior elevations, finish materials, and colors shall be consistent with the
BP
PS
Master Plan of Development as shown in EXHIBIT B with the following
modifications:
• All exterior material finishes shall be durable, high quality, and consistent with
the architectural appearance;
• Any exterior light fixtures shall be compatible with building design, subject to
staff approval.
• Stucco siding shall be smooth finish. No machine finishes will be permitted.
• Colors compatible with the overall design theme shall be required to be
submitted during building permit review and shall be subject to staff approval.
• Windows throughout the project shall be consistent. Windows shall be wood,
anodized bronze, or similar dark color and shall be consistent with EXHIBIT H.
• All roofing shall be consistent with the architectural style.
• All buildings shall include consistent accent features and materials including
building bases, tile accent features, and finish roof details.
11. Interior roof access shall be required to be shown on the building permit submittal.
No exterior ladders for roof access shall be permitted unless both interior and
exterior access is required per building code.
12. Buildings shall include a minimum of 3 colors and shall be used to accentuate
BP/FM
PS
architectural features as appropriate, subject to staff approval.
13. All site work, grading, and site improvements shall be consistent with the Master
BP/FM
PS
Plan of Development and grading and drainage plan as shown in EXHIBIT B and D
with the following modifications:
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval / Mitigation Monitoring Program
Timing
Responsibility
Mitigation
CUP 2003-0089
/Monitoring
Measure
PS:Planning Services
Curbaril Office Development
BL: Business
License
BS: Building Services
FD: Fire Department
GP: Grading
PD: Police Department
Permit
CE: City Engineer
BP: Building
WW: Wastewater
Permit
CA: City Attorney
FI: Final
Inspection
TO: Temporary
Occupancy
F0: Final
Occupancy
14. A final landscape and irrigation plan shall be approved prior to building permit
BP
PS
issuance and shall be included as part of site improvement plan consistent with
EXHIBIT C and including the below listed modifications/clarifications:
15. All Conditions of approval from the original Conditional Use Permit shall apply where
applicable.
Fire Marshal
16. A NFPA 13 Fire Safety Sprinkler system is required to be installed conforming to
BP
FD/BS
CBC, UFC, and City of Atascadero standards. System shall be designed by a
licensed contractor and reviewed and approved by a licensed Fire Protection
Engineer prior to submitting plans to the Fire Department.
17. Address signage design shall be provided prior to issuance of any building
BP
FD/PS
permits.
Exhibit B: Amended Master Plan of Development
A!NAP()A
A�NU�
ITEM NUMBER
DATE: 6-6-06
A
CD
n
*t
z
m
Exhibit C: Amended Landscape Plan
f? t)
ITEM NUMBER: 6
DATE: 6-6-06
S
a
0
a -9 <v 9M �� 2" 02 + o nn r> Q.
oZ
O PO i2 mo
0Z <; 9mj OO <> a
m i D� m0 79 LC ry rm ym Om 09 m O> OZ ;r
9 Z C O C ;>
-Sin a3 XC 2 �D (Az z>
c 0C :Eon r r0 �> za D Zn X zi
m —r S9 r m�^ >
ESN 0; m Z G C= N r 0 OC mS N -i9 H ;m
9 2 m 0 D ff Z Z m = t 9 n m w 0 m Z
2 O
m =
m> _0 Z
O < w 0 ; 0 Z; N O > P
j D DV > O O
g 2 D K C C `�1 C O
fnn m x C N p x
9 y 9 O > '� 0
` > c n e o f
r =
ITEM NUMBER: 6
DATE: 6-6-06
Exhibit D: Amended Grading and Drainage Plan
i � t V RpAp
1! s STS re "'P411Ar e
r
_ A:
r
I '
f
r
Y
art � 1
r� �I
Hr �
A'NAPO,.
j
ITEM NUMBER: 6
DATE: 6-6-06
Exhibit E: Amended Utility Plan
ITEM NUMBER
DATE: 6-6-06
Exhibit F: Amended Elevations and Floor Plans
R
I
ITEM NUMBER: 6
DATE: 6-6-06
Exhibit F: Amended Elevations and Floor Plans
0
CO3
e--
ITEM NUMBER: 6
DATE: 6-6-06
Exhibit F: Amended Elevations and Floor Plans
Z�-
7
.
6�
u f 3
rr
cli
L
Z�-
ITEM NUMBER: 6
DATE: 6-6-06
ATTACHMENT 3: Draft Resolution PC 2006-0052
DRAFT RESOLUTION PC 2006-0052
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING AN
AMENDMENT TO TENTATIVE TRACT MAP 2004-0050 CONSISTENT
WITH A MASTER PLAN OF DEVELOPMENT
ON APN 031-161-024
(Curbaril Business Center - Gearhart)
WHEREAS, an application has been received from Kelly Gearhart (6205 Alcantara Ave;
Atascadero, CA 93422), Applicant/Owner, for a Conditional Use Permit Amendment and
corresponding Tentative Tract Map Amendment on APN 031-161-024; and,
WHEREAS, the site's General Plan Designation is GC (General Commercial); and,
WHEREAS, the site's zoning district is CPPD -3 (Commercial Professional with a
Planned Development 3 overlay zone); and,
WHEREAS, the proposed amendment is consistent with the previously certified
Mitigated Negative Declaration for the project; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing was held by the Planning
Commission of the City of Atascadero at which hearing evidence, oral and documentary, was
admitted on behalf of said Tentative Map Amendment; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on May 16, 2006, studied and considered Tentative Tract Map (TTM 2004-
0050) Amendment; and,
NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings of Approval for Tentative Tract Map Amendment, the
Planning Commission finds as follows:
ITEM NUMBER: 6
DATE: 6-6-06
1. The proposed subdivision, design and improvements as conditioned, is consistent with
the General Plan and applicable zoning requirements, including provisions of the PD -3
overlay district.
2. The proposed subdivision, as conditioned, is consistent with the proposed Master Plan of
Development (CUP 2003-0089).
3. The site is physically suitable for the type of development proposed.
4. The site is physically suitable for the density of development proposed.
5. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
6. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
7. Covenants, Conditions and Restrictions (CC&R's) or equivalent shall be required that
incorporate the Master Plan of Development conditions of approval to ensure that the site
retains the proposed qualities (architecture, colors, materials, plan amenities, fencing, and
landscaping) over time.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a
regular session assembled on May 16, 2006, resolved to approve an Amendment to Tentative
Tract Map (TTM 2004-0050) subject to the following:
EXHIBIT A: Tentative Tract Map
EXHIBIT B: Conditions of Approval/Mitigation Monitoring
ITEM NUMBER: 6
DATE: 6-6-06
On motion by Commissioner , and seconded by Commissioner
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ADOPTED:
CITY OF ATASCADERO, CA
Ellen Beraud
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
the
ITEM NUMBER: 6
DATE: 6-6-06
Exhibit A: Tentative Tract Map
IA
IIIIu I IIS 11 1
�1
,7
n ii I
ITEM NUMBER:
DATE: 6-6-06
Exhibit B: Conditions of Approval / Mitigation Monitoring
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
TTM 2004-0050
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Improvement Plans
PD: Police Department
FM: Final Map
CE: City Engineer
Curbaril Office Development
TO:
OccupTemporary
y
: Wastewater
CA City Attorney
Fl: Final inspection
AMWC: Water Camp.
F0: Final Occupancy
Planning Services
1. The approval of this Tentative Parcel Map shall not become final and
FM
PS
effective following approval of Conditional Use Permit 2003-0089
Amendment.
2. Approval of this Tentative Parcel Map shall be valid for two years after
FM
PS
its effective date. At the end of the period, the approval shall expire
and become null and void unless an extension of time is granted
pursuant to a written request received prior to the expiration date.
3. The Community Development Department shall have the authority to
FM
PS
approve minor changes to the project that (1) result in a superior site
design or appearance, and/or (2) address a design issue that is not
substantive to the Tentative Tract Map and that the Final Map is in
substantial conformance with the Tentative Map.
4. The Parcel Map shall be subject to additional fees for park or
FM
PS
recreation purposes (QUIMBY Act) as required by City Ordinance.
5. The granting of this entitlement shall apply to the property located at
On going
PS
7955 Curbaril Ave. (APN 031-161- 024) regardless of owner.
6. The Final Map shall be drawn in substantial conformance with the
FM
PS
approved tentative map, and in compliance with all conditions set forth
herein, shall be submitted for review and approval in accordance with
the Subdivision Map Act and the City's Subdivision Ordinance.
7. The subdivider shall defend, indemnify, and hold harmless the City of
FM
PS
Atascadero or its agents, officers, and employees against any claim or
action brought to challenge an approval by the city, or any of its
entities, concerning the subdivision.
8. The final map shall be consistent with the approved Master Plan of
Development (CUP 2003-0089) for the project site including building
envelope locations.
9. Prior to final map, the applicant shall submit CC&Rs or similar
maintenance mechanism for review and approval by the Community
Development Department. The maintenance agreement shall record
with the Final Map and shall include the following:
■ Provisions for maintenance of all common areas including access,
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
TTM 2004-0050
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Improvement Plans
PD: Police Department
FM: Final Map
CE: City Engineer
Curbaril Office Development
0 upancyrary
: Wastewater
CA City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
parking, perimeter walls, and landscaping.
■ A detailed list of each individual owner's responsibilities for
maintenance of the individual units.
■ A provision for review and approval by the City Community
Development Department for any changes to the maintenance
agreement that relate to the above requirements prior to the
changes being recorded or taking effect.
STANDARD CONDITIONS
10. All public improvements shall be constructed in conformance with the
BP, GP
CE
City of Atascadero Engineering Department Standard Specifications
and Drawings or as directed by the City Engineer.
11. In the event that the applicant is allowed to bond for the public
FM
CE
improvements required as a condition of this map, the applicant shall
enter into a Subdivision Improvement Agreement with the City Council.
12. An engineer's estimate of probable cost shall be submitted for review
FM
CE
and approval by the City Engineer to determine the amount of the
bond.
13. The Subdivision Improvement Agreement shall record concurrently
FM
CE
with the Final Map.
14. The applicant shall be responsible for the relocation and/or alteration of
BP, GP
CE
existing utilities.
15. The applicant shall install all new utilities (water, gas, electric, cable TV
BP, GP
CE
and telephone) underground. Utilities shall be extended to the property
line frontage of each lot or its public utility easement.
16. The applicant shall monument all property corners for construction
FM
CE
control and shall promptly replace them if disturbed.
17. The applicant shall acquire title interest in any off-site land that may be
FM
CE
required to allow for the construction of the improvements. The
applicant shall bear all costs associated with the necessary
acquisitions. The applicant shall also gain concurrence from all
adjacent property owners whose ingress and egress is affected by
these improvements.
18. Slope easements shall be provided as needed to accommodate cut of
FM
CE
fill slopes.
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
TTM 2004-0050
BP: Building Permit
SIP: Subdivision
BS: Building Services
FD: Fire Department
Improvement Plans
PD: Police Department
FM: Final Map
CE: City Engineer
Curbaril Office Development
0 upancyrary
: Wastewater
CA City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
19. Drainage easements shall be provided as needed to accommodate
FM
CE
both public and private drainage facilities.
20. The final map shall be signed by the City Engineer prior to the map
FM
CE
being placed on the agenda for City Council acceptance.
21. Prior to recording the tract map, the applicant shall submit a map
FM
CE
drawn in substantial conformance with the approved tentative map and
in compliance with all conditions set forth herein. The map shall be
submitted for review and approval by the City in accordance with the
Subdivision Map Act and the City's Subdivision Ordinance.
22. Prior to recording the tract map, the applicant shall set monuments at
FM
CE
all new property corners. A registered civil engineer or licensed land
surveyor shall indicate by certificate on the parcel map, that corners
have been set or shall be set by a date specific and that they will be
sufficient to enable the survey to be retraced.
23. Prior to recording the tract map, the applicant shall pay all outstanding
plan check/inspection fees.
24. Prior to recording the map, the applicant shall complete all
FM
CE
improvements required by these conditions of approval
25. Prior to recording the tract map, the applicant shall have the map
FM
CE
reviewed by all applicable public and private utility companies (cable,
telephone, gas, electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility company indicating their
review of the map. The letter shall identify any new easements that
may be required by the utility company. A copy of the letter shall be
submitted to the City. New easements shall be shown on the map.
26. Upon recording the final map, the applicant shall provide the City with a
FM
CE
black line clear Mylar (0.4 mil) copy and a blue line print of the
recorded map.
27. Prior to the final inspection of any public improvements, the applicant
FM
CE
shall submit a written statement from a registered civil engineer that all
work has been completed and is in full compliance with the approved
plans.
28. Prior to the final inspection, the applicant shall submit a written
BP, GP
CE
certification from a registered civil engineer or land surveyor that all
survey monuments have been set as shown on the final map.
29. An encroachment permit shall be obtained prior to any work within City
BP, GP
CE
rights of way.
ITEM NUMBER:
DATE: 6-6-06
Conditions of Approval /
Timing
Responsibility
Mitigation
Mitigation Monitoring Program
/Monitoring
Measure
GP: Grading Permit
PS: Planning Services
BP: Building Permit
BS: Building Services
TTM 2004-0050
SIP: Subdivision
FD: Fire Department
Improvement Plans
PD: Police Department
FM: Final Map
CE: City Engineer
Curbaril Office Development
0 upancyrary
: Wastewater
CA City Attorney
FI: Final inspection
AMWC: Water Comp.
F0: Final Occupancy
30. Prior to the issuance of building permits the applicant shall submit a
BP, GP
CE
grading and drainage plan prepared by a registered civil engineer for
review and approval by the City Engineer.
\\Cityball\cdvlpmnt\- CUP - Conditional Use Permits\CUP 03\CUP 2003-0089 Curbaril-Morro Rd.office park\meeting_02\CUP 2003-0089. PC -
SR 2nd mecting.kg.doc
ITEM NUMBER: 7
DATE: 6-6-06
Atascadero Planning Commission
Staff Report — Community Development Department
Tentative Parcel Map 2005-0077 (AT 05-0330)
8100 Coromar Avenue
(Moses)
SUBJECT:
The project consists of an application to subdivide an existing 1.49 acre lot (net) into two
(2) lots containing 0.50 acres and 0.74 acres (net) each. The site is currently developed
with a single family residence with attached garage, pool, and two sheds. The site
contains several native oak trees. The proposed undeveloped Parcel 2 contains a
23.4% average slope with a 16.7% average slope within the proposed building
envelope. Future access and development of a single family residence for Parcel 2 will
impact approximately ten (10) Native Oak Trees and result in the removal of six (6) Live
Oaks (approximate). Parcel 2 will have access to Coromar Avenue by an access
easement located on Parcel 1. The subject site is within a sewer service area.
RECOMMENDATION:
Staff Recommends:
The Planning Commission adopt Resolution PC 2006-0054 certifying the proposed
Mitigated Negative Declaration 2006-0011 and approving Tentative Parcel Map 2005-
0077 (AT 05-0330), a request to subdivide one lot totaling 1.49 acres into two (2)
parcels containing 0.50 acres and 0.74 acres each, based on findings and subject to
conditions.
SITUATION AND FACTS:
1. Owner: Sidney Moses
8100 Coromar Avenue, Atascadero, CA 93422
Contact: Wilson Land Surveys, Inc.
7600 Morro Road, Atascadero, CA 93422
2. Project Address: 8100 Coromar Avenue, Atascadero, CA 93422
APN # 056-041-029
3. General Plan Designation: Single Family Residential, 1/2 acre minimum (SFR -X)
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
4. Zoning District:
5. Site Area:
6. Existing Use:
7. Environmental Status:
DISCUSSION:
Background:
ITEM NUMBER: 7
DATE: 6-6-06
Residential Single Family, 1/2 acre minimum (RSF-X)
1.49 acre (approximately 64,660 square feet, net)
One single family residence with attached garage,
pool, and two sheds
Proposed Mitigated Negative Declaration posted April
5, 2006 - review period ends April 25, 2006.
Project Site zoP�c
P
!o
ad o ,M v
9L O U
J,z r
9 "✓W
m p �
i
� a
0
� l
The lot at 8100 Coromar Avenue was created in 1951 when the original colony lot 15-A
in Block 7 was spilt into 2 parcels.
In September of 1988, a subdivision of the lot at 8100 Coromar Avenue was proposed
before Planning Commission. The request was submitted by Judi and David Bishop to
subdivide the 1.5 acres into two parcels of 20,000 and 44,500 square feet each.
The 1988 application (TPM 10-88, 8100 Coromar Road, Judi & David Bishop) was
denied. Planning Commission found that the creation of the proposed parcels
conformed with the Zoning Ordinance and the General Plan Land Use Map designation,
but did not conform to General Plan policies 10 & 11. These policies stated that "Lot
splits shall be thoroughly evaluated and be in accordance with community plans and
principles" and "Attention shall be paid to the aesthetic result of land divisions. Building
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
sites shall be encouraged on natural slopes, with minimum disruption of native
vegetation and watersheds, and efficient layout of access and utilities." Planning
Commission also found the subdivision was not consistent with character of the
immediate neighborhood and the flag lot was not justified by the topographical
conditions. In addition, Commission found the site was not physically suitable for the
type of development or density of the development proposed.
ID
Op
14
It
Vt
� � } r. •� i \ �"0p. \. NQS 56• a
MI
Previous map proposed in 1988, ����N A'�P
prior to any on-site construction
c
R
TMP 10-88 (Denied by Planning Commission in Sept. 1988)
The property has since been sold and developed with one single family residence. The
current owner, Sidney Moses, is submitting a reconfigured Tentative Parcel Map for a
lot split on this site. The Atascadero General Plan had been updated since the last
submittal in 1988. Staff has compared the 1988 findings for denial with the updated
General Plan and the new proposed parcel map for the site, as noted in the discussion
under subdivision design below.
Site Description:
The site is sloped and has several large native oaks on the property. The site is
currently developed with a single-family residence, a pool, and two sheds.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
-
r
• �` � ,,x �`� 4 ,titer � � � t .. l•.r '}
��-
i'.
ITEM NUMBER: 7
DATE: 6-6-06
Subdivision Design:
m AFI 's
- - —BLOCK
�zl� — \
IN
I di
ny, • I \ �, / I y
\ '
Ir
OWNER
Proposed Tentative Parcel Map 2005-0077
The subdivision will divide one existing lot into two parcels. The existing improvements
on the site will be confined to the driveway and Parcel 2 where a new single family
residence is proposed. The tentative parcel map has identified an adequate building
site for the new residence which avoids most of the trees and steep slopes located on
the site. While the average slope of the entire lot would be 23.4%, the slope of the
building envelope would be 16.7%, and would be accessed off the same driveway as
the existing house. Only one tree (a 24" white oak) is located within the proposed
building envelope. Care has been taken to preserve the other trees on the new parcel
from the building envelope. Atascadero Mutual Water Company will provide water to
the new residence, and future utilities to the new lot will be required to be placed
underground.
The lot size at 8100 Coromar is currently 1.49 acres net. Proposed Parcel 1 would be
0.74 acres net, and proposed Parcel 2 would be 0.5 acres gross. The remaining 0.25
acres not accounted for in these calculations consists of a driveway that runs along the
edge of the parcel to the back of the lot. The driveway would be owned by Parcel 1 (the
existing house) and an access easement would be recorded to allow Parcel 2 to use the
driveway as well. However, the area of the driveway can not be applied to the total net
area of the parcels when determining minimum acreage for lot splits, which explains
why the net acreage is proposed as 0.74 acres, rather than the 0.99 acres which it
would be if the driveway was included. Both lots meet the minimum acreage for a lot
split in the SFR -X zone.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
The site is currently developed with a 12 foot paved road which leads up the side of the
lot to the existing single family residence. As required by both the fire department and
the flag lot subdivision design requirements for the tentative parcel map, the driveway is
conditioned to be at least 24 feet wide with 20 feet of pavement, unless otherwise
approved by the Planning Commission. Widening the driveway would require the
removal of up to six oak trees and new retaining walls up to six feet high for the 50 cubic
feet of cut and the 10 cubic feet of fill needed. The tree mitigation has been attached to
the draft resolution and condition 24 has been added for mitigation fees. In addition
staff is recommending a tree preservation open space easement along the eastern side
of Parcel 2 as shown on exhibit C and required by condition 27 of the draft resolution.
Staff has compared the new Tentative Parcel Map and the current General Plan with
the map and the findings from 1988. The new map proposes a shared driveway and
restricted building envelope; these issues were not addressed in the previous map. In
recent years flag lots of this type, density, and topography have become more common
along Coromar Avenue, as can be seen in the project location map. The 2002 General
Plan and Zoning maps designate the property for "Single Family Residential" uses.
Subdivision of this property does not change this designation. The parcels are zoned
Residential Single Family with a minimum lot size of 1/2 acre (RSF-X). The project is
consistent with the current General Plan and Zoning Ordinance.
Public Improvements:
The City Engineer has required the applicant to incorporate overside drains on the
widened driveway with erosion control measures to minimize impacts on Coromar
Avenue. Applicant shall slurry seal Coromar Avenue along the entire property frontage,
from the centerline plus ten feet.
Environmental Review:
A Proposed Mitigated Negative Declaration is attached to this report for the Planning
Commission review.
The Initial Study concluded there would be no significant harm to the environment as a
result of this subdivision. A proposed Mitigated Negative Declaration has been prepared
for the project and certification of the Mitigated Negative Declaration is included in draft
Planning Commission Resolution 2006-0054.
General Plan :
Staff has reviewed the project with the 2002 General Plan Land Use, Open Space, and
Conservation Goals, Policies, and Programs and has noted the following:
• Policy 1.1 Program 2: Concentrate higher density development downtown and
within the Urban Core
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
• Policy 7.1 Program 4: Require lot line adjustments and tentative subdivision
maps on site with 25 percent or greater native tree canopy cover to establish
locations of building sites, driveways and leach fields that will minimize native
tree impacts.
• Policy 15.1: Growth should be directed to areas where services can be provided
in a cost effective manner.
The project location is within the urban core, just west of EI Camino Real. A building
envelope is provided which limits tree removals, and city sewer services are provided.
CONCLUSIONS:
The subdivision is consistent with the 2002 General Plan and Zoning Ordinance. The
parcel configurations are consistent with the Subdivision Ordinance requirements and
the size and shape of the proposed lots are consistent with the character of the
immediate neighborhood. If approved, the project would allow for the construction of
one additional single-family residence. Staff recommends the Planning Commission
approve the Tentative Parcel Map as conditioned.
ALTERNATIVES:
1. The Commission may approve the subdivision subject to additional or revised
project conditions. The Commission's motion to approve needs to include any new
or revised project conditions.
2. The Commission may deny the subdivision if it is found to be inconsistent with the
General Plan or any of the other required findings. The Commission's motion to
deny must include a finding basis for denial.
3. The Commission may continue the hearing and refer the item back to staff for
additional information or analysis. Direction should be given to staff and the
applicant on required information.
PREPARED BY: Callie Ford, Assistant Planner
ATTACHMENTS:
Attachment 1 — Location Map (General Plan & Zoning)
Attachment 2 — Proposed Mitigated Negative Declaration
Attachment 3 — Aerial Map
Attachment 4 — Tentative Parcel Map
Attachment 5 — Average Slope Calculations
Attachment 6 — Arborist Report
Attachment 7 — Response to Comments
Attachment 8 — Draft Resolution PC 2006-0054
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
ATTACHMENT 1: Location Map (General Plan / Zoning)
TPM 2005-0077
8100 Coromar Avenue
Project Site
v'
Zone: Residential Single Family - 1/2 acre
minimum (RSF-X)
Land Use Designation: Single Family
Residential, 1/2 acre minimum (SFR -X)
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 2: Proposed Mitigated Negative Declaration
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
ATTACHMENT 3: Aerial Map, TPM 2005-0077
8100 Coromar Avenue
r APO'
F' ��!ll���
a ��� s. ''�� r •� 1 ,�
-1
Project Site •
R �, ..,�_'`}, �� �� J .tin - .�* • i.,
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
ATTACHMENT 4: Tentative Parcel Map, TPM 2005-0077
8100 Coromar Avenue
p•..s• a .o.�B a..e' I !h'�•
TiI Ild
i
i
a
I
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
ATTACHMENT 5 Average Slope Calculations:
Proposed Parcel 2 & Proposed Parcel 2 Building Envelope
TPM 2005-0077, 8100 Coromar Avenue
Wilson Land Surveys, Inc.
7600 Mom, Road. Awa adcro, CA 93422
Phonc: (805) 466-2445 • Fax: (805) 466-0812 • Email: robbiehal@hotmaiL.om
Average Slope Calculations
Subject Property:
Proposed Parcel 2 AT 05-0330
Formula:
Slope = (Contour Interval ' Length ' .00229) / acres
Length = total contour length in inches ' plot scale
Specifics:
Contour Interval =
Length =
Area=
Plot Scale 1"=
Average Slope=
1 feet
254 inches
0.498 acres
20
23.4 %
Wilson Land Surveys, Inc.
7600 Mono Road, Ata=dcro. CA 93422
Phonc: (805) 466-2445 • Fax: (805) 466-0812 • Email: robbichal(dlhotmail.con
Average Slope Calculations
Subject Property:
Proposed Parcel 2 AT 05-0330 Building Envelope
Formula:
Slope = (Contour Interval ' Length ' .00229) / acres
Length = total contour length in inches' plot scale
Specifics:
Contour Interval =
Length =
Area =
Plot Scale 1' _
Average Slope=
1 =feet
68.5 inches
0.188 acres
20
16.7 %
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 6: Arborist Report
TPM 2005-0077, 8100 Coromar Avenue
Pg. 01/ Brazeal's Tree Consulting February 17, 2006
Sid Moses/8100 Coromar Road/Atas.
Assignment:
Prepare an Arborist report that will show all the trees impacted by this proposed project
that will include, a tree inventory, the method of protection and the number of trees
proposed for removal.
Purpose of this report:
The purpose of this report is for the protection and preservation of the trees that will be
impacted as mandated by the City of Atascadero's tree protection and tree preservation
ordinance.
Observation:
This project is to improve the existing driveway from a twelve -foot wide drive to a
twenty -foot wide drive.
Several trees exist along this drive that will be impacted to different degrees and six trees
are proposed to be removed.
Most of the trees that exist on this site are California Coastal Live Oaks with a scattering
of Blue Oaks.
The majority of the trees on this site are healthy and are typical for this area.
I have included five pictures in this report of the access drive that include a partial view
of the impacted trees.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
Pg. 02/ Brazeal's Tree Consulting February 17, 2006
Sid Moses/8100 Coromar Road/Atas.
Tree Inventory
TREE # - SPECIES - DBH - COND. - STATUS - % IMPACT - IMPACT - MITIGATETION
1.
LO
27"
7
remove
100
Grading
none
2.
LO
09"
8
remove
100
Grading
none
3.
LO
04"
7
remove
100
Grading
none
4.
LO
24"
8
remove
100
Grading
none
5.
LO
18"
8
remove
100
Grading
none
6.
LO
15"
8
remove
100
Grading
none
6A.
LO
27"
8
impact
40
Grading
TPF
7.
LO
24/22"
4
avoid
20
Grading
TPF
8.
LO
21"
7
avoid
10
Grading
TPF
9.
LO
35"
8
impact
40
Grading
TPF
10.
LO
21"
6
avoid
20
Grading
TPF
11.
LO
24"
7
impact
30
Grading
TPF
12.
LO
15"
7
impact
30
Grading
R/W
13.
LO
14"
8
impact
30
Grading
R/W
14.
LO
7"
7
avoid
15
Grading
TPF
15.
LO
25/20"
7
impact
40
Grading
R/W
16.
LO
19"
7
impact
20
Grading
TPF
17.
LO
10
8
avoid
10
Grading
TPF
18.
BO
35"
8
impact
40
Grading
TPF
19.
LO
22"
6
avoid
20
Grading
TPF
20.
LO
6"-9"
7
impact
50
Grading
R/W
21.
BO
multi
7
impact
40
Grading
R/W
22.
LO
37"
8
avoid
20
Grading
TPF
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Pg 03/ Brazeal's Tree Consulting February 17, 2006
Sid Moses/8100 Coromar Road/Atas.
TREE # ONE (by the pole)
ACCESS DRIVEWAY IMPROVEMENT & UTILITY INSTALATION
8100 COROMAR ROAD
PORTION LOT 15A, BLOCK 7, APN 056-041-029
ATASCADERO, CALIFORNIA
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
lTf ,1 ' ��' r 'y� . r . • '!►t.• /h fit •„� ry •. ypr 41W R ++1/ r. i r{ li,ti
ofr
Ax
��•��� iii' �j.•3'eP' �� - r w c rL r•
�- ms's•,. - - _ .
ITEM NUMBER
DATE: 6-6-06
.Pg 05/ Brazeal's Tree Consulting February 17, 2006
Sid Moses/8100 Coromar Road/Atas.
TREES # 4, 5 & 6 (to be removed)
ACCESS DRIVEWAY IMPROVEMENT & UTILITY INSTALATION
8100 COROMAR ROAD
PORTION LOT 15A, BLOCK 7, APN 056-041-029
ATASCADERO, CALIFORNIA
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Pg 06/ Brazeal's Tree Consulting February 17, 2006
Sid Moses/8100 Coromar Road/Atas.
TREE # 15 (left side)
ACCESS DRIVEWAY IMPROVEMENT & UTILITY INSTALATION
8100 COROMAR ROAD
PORTION LOT 15A, BLOCK 7, APN 056-041-029
ATASCADERO, CALIFORNIA
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Pg 07/ Brazeal's Tree Consulting February 17, 2006
Sid Moses/8100 Coromar Road/Atas.
TREE # 18 (right side)
ACCESS DRIVEWAY IMPROVEMENT & UTILITY INSTALATION
8100 COROMAR ROAD
PORTION LOT 15A, BLOCK 7, APN 056-041-029
ATASCADERO, CALIFORNIA
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Pg 08/ Brazeal's Tree Consulting February 17, 2006
Sid Moses/8100 Coromar Road/Atas.
CONCLUSIONS
1. Twenty-two native oak trees will be impacted by the proposed development of
this site.
2. Six of the twenty-two trees are proposed for removal and the remaining sixteen
trees will require tree protection.
The tree protection recommendations listed in this report will be adequate for the
protection of the sixteen native trees impacted by this development.
RECOMMENDATIONS
1. To insure the health and longevity of the impacted trees on this site, follow
the guidelines of this report and the guidelines of the Atascadero Tree
Regulations, Ordinance #350.
2. Do not grub, grade or fill within any tree's dripline except where indicated on
the site grading and drainage plans.
3. Do not create any basins within any tree's dripline that will collect or hold
water, natural or domestic.
4. Install all tree protection before the commencement of any type of construction
activity.
5. Do not store any materials or park any equipment on this site prior to the tree
protection fencing installation.
6. Do not store any chemicals that are toxic to trees where it could spill or leech
into the existing tree's root zone areas.
auql�'-eL
Jack Brazeal
Registered Consulting Arborist, #377
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 7: Response to Comments for Mitigated Negative Declaration 2006-0011
TIPM 2005-0077, 8100 Coromar Avenue
ATTACHMENT 6
RESPONSE TO COMMENTS FOR MITIGATED
NEGATIVE DECLARATION #2006-0011
(TPM 2005-0077)
Air Pollution Control District (APCD), dated April 25, 2006
Comments:
Naturally Occurring Asbestos - The project site is located in a candidate area for
Naturally Occurring Asbestos (NOA), which has been identified as a toxic air
contaminant by the California Air Resources Board (ARB). This may include
development of an Asbestos Dust Mitigation Plan and an Asbestos Health and
Safety Program for approval by the APCD. Please refer to the APCD web page
at httpJ/www.slocleanair.org/business/asbestos. asp for more information or
contact Tim Fuhs of our Enforcement Division at 781-5912.
Response: The project has been conditioned (Mitigation Measure 3.b.2) to
comply with APCD rules and regulations regarding naturally occurring asbestos.
2. Effective February 25, 2000, the APCD prohibited developmental burning of
vegetative material within San Luis Obispo County. Under certain
circumstances where no technically feasible alternatives are available, limited
developmental burning under restrictions may be allowed. This requires prior
application, payment of fee based on the size of the project, APCD approval, and
issuance of a burn permit by the APCD and the local fire department authority.
The applicant is required to furnish the APCD with the study of technical
feasibility (which includes costs and other constraints) at the time of application.
If you have any questions regarding these requirements, contact Karen Brooks of
our Enforcement Division at 781-5912.
Response: The project has been conditioned (Mitigation Measure 3.b.3) to
comply with all rules, regulations and application procedures for any proposed
burning of vegetative material on the project site.
3. Residential Wood Combustion - Under APCD Rule 504, only APCD approved
wood burning devices can be installed in new dwelling units.
• All EPA -Certified Phase II wood burning devices;
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
• Catalytic wood burning devices which emit less than or equal to 4.1 grams per
hour of particulate matter which are not EPA -Certified but have been verified
by a nationally -recognized testing lab;
• Non -catalytic wood burning devices which emit less than or equal to 7.5 grams
per hour of particulate matter which are not EPA -Certified but have been
verified by a nationally -recognized testing lab;
• Pellet -fueled woodheaters; and
• Dedicated gas-fired fireplaces.
Response: The project has been conditioned (Mitigation Measure 3.b.4) to
comply with all rules, regulations and application procedures for any proposed
burning of vegetative material on the project site.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 8: Draft Resolution PC 2006-0054
TPM 2005-0077, 8100 Coromar Avenue
DRAFT RESOLUTION NO. PC 2006-0054
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ATASCADERO APPROVING
TENTATIVE PARCEL MAP 2005-077 (AT 05-0330),
ESTABLISHING A SUBDIVITION OF ONE EXISTING
RESIDENTIAL LOT INTO TWO PARACELS
8100 COROMAR AVENUE
(MOSES)
WHEREAS, an application was received from Sidney Moses 8100 Coromar Avenue,
Atascadero, CA 93422 (Owner/Applicant), for a Tentative Parcel Map to establish a subdivision
of an existing 1.49 acre lot into two (2) lots containing 0.50 acres and 0.74 acres net each; and,
WHEREAS, the proposed project has a General Plan Designation of Single Family
Residential, minimum lot size 1/2 acre (SFR -X) and is in conformance with the Land Use
Element of the General Plan and all other applicable General Plan policies; and,
WHEREAS, the site is located in the Residential Single Family, minimum lot size 1/2
acre (RSF-X) which allows for the proposed use and density when certain findings are made;
and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2006-0011 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission held a duly noticed public hearing to consider the
proposed Tentative Parcel Map application on June 6, 2006 at 7:00 p.m. and considered
testimony and reports from staff, the applicants, and the public.
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Certification of Negative Declaration. The Planning Commission of the
City of Atascadero, hereby certifies Mitigated Negative Declaration 2006-0011 based on the
following findings:
1. The Negative Declaration has been completed in compliance with requirements of the
California Environmental Quality Act; and,
2. The project does not have the potential to degrade the environment; and
3. The project will not achieve short-term to the disadvantage of long-term
environmental goals; and,
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
4. The project does not have impacts which are individually limited, but cumulatively
considerable; and,
5. The project will not cause substantial adverse effects on human beings either directly
or indirectly.
SECTION 2. Findings for approval of subdivision and flag lot design. The Planning
Commission finds as follows:
1. The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
2. The design and improvement of the proposed subdivision is consistent with the
General Plan and applicable zoning requirements.
3. The site is physically suitable for the type of development proposed.
4. The site is physically suitable for the density of development proposed.
5. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or
their habitat.
6. The design of the subdivision will not conflict with easements acquired by the public
at large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
7. The proposed subdivision design and type of improvements proposed will not cause
serious public health problems.
8. The proposed subdivision will be accomplished without detriment to the adjacent
properties.
9. The installation of a standard street, either alone or in conjunction with neighboring
properties is not feasible.
10. The flag lot is justified by topographical conditions.
11. The subdivision is consistent with the character of the immediate neighborhood.
12. The proposed accessway improvements meet the intent of the subdivision ordinance
and are adequate for safe emergency vehicle access.
SECTION 3. Findings for tree removal. The Planning Commission finds as follows:
1. The tree is obstructing proposed improvements that cannot be reasonably designed to
avoid the need for tree removal, as certified by a report from the Site Planner and
determined by the Community Development Department based on the following
factors:
• Early consultation with the City;
• Consideration of practical design alternatives;
• Provision of cost comparisons (from applicant) for practical design
alternatives;
• If saving tree eliminates all reasonable uses of the property; or
• If saving the tree requires the removal of more desirable trees.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 7
DATE: 6-6-06
SECTION 4. Approval. The Planning Commission does hereby approve Tentative
Parcel Map 2005-0077 to establish a Tentative Parcel Map to establish a subdivision of an
existing 1.49 acre lot into two (2) lots containing 0.50 acres and 0.74 acres net each, subject to
the following Conditions and Exhibits:
EXHIBIT A: Mitigated Negative Declaration
EXHIBIT B: Conditions of Approval
EXHIBIT C: Tentative Parcel Map 2005-0077
EXHIBIT D: Tree Mitigation Form
On motion by Commissioner and seconded by Commissioner
, the foregoing resolution is hereby adopted in its entirety by the following
roll call vote:
AYES: ( )
NOES: ( )
ABSENT: ( )
ADOPTED:
ABSTAINED:
CITY OF ATASCADERO, CA
Ellen Beraud
Planning Commission Chairperson
ATTEST:
Warren Frace
Planning Commission Secretary
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
EXHIBIT A: Proposed Mitigated Negative Declaration
Draft Resolution PC 2006-0054
TPM 2005-0077
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
EXHIBIT B: Conditions of Approval / Mitigation Monitoring
TPM 2005-0077
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0077
PS: Planning Services
BL: Business License
BS: Building Services
Address: 8100 Coromar Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
Standard Planning Conditions
1. The approval of this application shall become final, subject to the
FM
PS
completion of the conditions of approval, fourteen (14) days
following the Planning Commission approval unless prior to the
time, an appeal to the decision is filed as set forth in Section 9-
1.111(b) of the Zoning Ordinance.
2. Approval of this Tentative Parcel Map shall be valid for two years
FM
PS
after its effective date. At the end of the period, the approval shall
expire and become null and void unless a final map has been
recorded or an extension of time is granted pursuant to a written
request received prior to the expiration date.
3. The Community Development Department shall have the authority
FM
PS
to approve minor changes to the project that (1) result in a superior
site design or appearance, and/or (2) address a construction
design issue that is not substantive to the Tentative Parcel Map.
4. A parcel map drawn in substantial conformance with the approved
FM
PS
tentative map, and in compliance with all conditions set forth
herein, shall be submitted for review and approval in accordance
with the Subdivision Map Act and the City's Subdivision Ordinance.
5. The subdivider shall defend, indemnify, and hold harmless the City
Ongoing
CA
of Atascadero or its agents, officers, and employees against any
claim or action brought to challenge an approval by the city, or any
of its entities, concerning the subdivision.
6. The parcel map shall be subject to additional fees for park or
FM
PS
recreation purposes (QUIMBY Act) as required by City Ordinance.
Project Planning Conditions
7. Where the accessway shall be at least twenty-four (24) feet wide
FM
PS
with twenty (20) feet of pavement (20 foot paved drive with two (2)
foot shoulders)
8. Each lot shall have yards as required by the zoning regulations,
FM
PS
including a ten (10) foot setback along any accessway, whether
easement or lot line.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0077
PS: Planning Services
BL: Business License
BS: Building Services
Address: 8100 Coromar Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
9. The lot farthest from the street shall own the accessway in fee.
FM
PS
Other lots using the accessway shall have an access and utility
easement over it, unless otherwise approved by the advisory
agency.
10. Lots utilizing the accessway of a flag lot will be required to enter
BP
PS
into a road maintenance agreement to insure perpetual
maintenance and repair of the accessway.
11. A reflectorized house number master sign shall be located at the
BP
PS
intersection of the street and accessway and individual
reflectorized address signs shall be placed on the right-hand side
of the driveway to each individual lot
12. All lighting shall be designed to eliminate any off site glare. All
BP
PS
1.d.1
exterior site lights shall utilize full cut-off, "hooded" lighting
fixtures to prevent offsite light spillage and glare. Any luminaire
pole height shall not exceed 14 -feet in height, limit intensity to
2.0 foot candles at ingress /egress, and otherwise 0.6 foot
candle minimum to 1.0 maximum in parking areas. Fixtures
shall be shield cut-off type.
13. The project shall be conditioned to comply with all applicable
GP/BP
PS
3.16.1
District regulations pertaining to the control of fugitive dust (PM -
10) as contained in sections 6.3, 6.4 and 6.5 of the April 2003
Air Quality Handbook. The contractor or builder shall designate
a person or persons to monitor the dust control program and to
order increased watering, as necessary, to prevent transport of
dust off site. The name and telephone number of such persons
shall be provided to the APCD prior to land use clearance for
map recordation and land use clearance for finish grading of
any structure.
14. 13.Naturally Occurring Asbestos (NOA) has been identified by
GP/BP
PS
3.b.2
the state Air Resources Board as a toxic air contaminant.
Serpentine and ultramafic rocks are very common in the state
and may contain naturally occurring asbestos. Under the State
Air Resources Board Air Toxics Control Measure (ATCM) for
Construction, Grading, Quarrying, and Surface Mining
Operations, prior to any grading activities at the site, the project
proponent shall ensure that a geologic evaluation is conducted
to determine if naturally occurring asbestos is present within the
area that will be disturbed. If naturally occurring asbestos is
found at the site the applicant must comply with all
15. requirements outlined in the Asbestos ATCM for Construction,
Grading, Quarrying, and Surface Mining Operations. These
requirements may include but are not limited to 1) an Asbestos
Dust Mitigation Plan which must be approved by the District
before construction begins, and 2) an Asbestos Health and
Safety Program will also be required for some projects.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0077
PS: Planning Services
BL: Business License
BS: Building Services
Address: 8100 Coromar Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
16. The applicant shall comply with all rules, regulations and
GP/BP
PS/PW/BS
3.b.3
application procedures for any proposed burning of vegetative
material on the project site.
17. The applicant shall comply with all requirements of the APCD
BP
PS/BS
3.b.4
regarding installation of Residential Wood Combustion devices.
Under APCD Rule 504, only APCD approved wood burning
devices can be installed in new dwelling units.
18. The Grading Plan/Tree Protection Plan shall identify tree
BP/GP
PS
4.e.1
protection fencing around the drip line of each existing on-site
tree and/or native shrub mass within 50 feet of construction
activity unless monitored and approved by a certified arborist.
19. Excavation and grading work shall be consistent with the City of
BP/GP
PS
4.e.2
Atascadero Tree Ordinance and Guidelines. Special
precautions when working around native trees include:
i. All existing trees outside of the limits of work shall remain.
ii. Earthwork shall not exceed the limits of the project area.
iii. Low branches in danger of being torn from trees shall be
pruned prior to any heavy equipment work being done.
iv. Vehicles and stockpiled material shall be stored outside the
dripline of all trees.
v. All trees within the area of work shall be fenced for
protection with 4 -foot chain link, snow or safety fencing
placed per the approved tree protection plan. Tree
protection fencing shall be in place prior to any site
excavation or grading. Fencing shall remain in place until
completion of all construction activities.
vi. Any roots that are encountered during excavation shall be
clean cut by hand and sealed with an approved tree seal.
20. Should any cultural resources be unearthed during site
BP
PS
5.b.1
development work, the provisions of CEQA -Section 15064.5, will
be followed to reduce impacts to a non-significant level.
21. In the event of the accidental discovery or recognition of any
BP/GP
PS
5.d.1
human remains, the following steps shall be taken:
■ There shall be no further excavation or disturbance of the site or
any nearby area reasonably suspected to overlie adjacent
human remains until the coroner of the county in which the
remains are discovered has been contacted to determine that
no investigation of the cause of death is required, and to
determine if the remains are of Native American heritage. If the
remains are of Native American Heritage, the coroner shall
contact the Native American Heritage Commission within 24
hours.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0077
PS: Planning Services
BL: Business License
BS: Building Services
Address: 8100 Coromar Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
22. All cut and fill slopes shall be hydro seeded with an appropriate
BP
BS/PS
6.b.1
erosion control method (erosion control blanket, hydro -mulch, or
straw mulch appropriately anchored) immediately after
completion of earthwork between the months of October 15
through April 15. All disturbed slopes shall have appropriate
erosion control methods in place. Duration of the project: The
contractor will be responsible for the clean up of any mud or
debris that is tracked onto public streets by construction
vehicles.
23. All disturbed areas, not shown on the project landscape plan for
BP
BS/PS
6.16.2
landscaping shall be hydro seeded with a native seed mix.
Erosion control measures shall include an erosion control
blanket for all 2:1 fill slopes. Affected areas that previously
contained native shrubs and vegetation shall be replanted with
similar plant species per the approved landscape plan. Duration
of the project: The contractor will be responsible for the clean-up
of any mud or debris that is tracked out on to public or private
access drive by construction vehicles.
24. Prior to issuance of construction permits all tree mitigation fees
GP/BP
PS
shall be paid
25. All recommendations and tree protection measures, as outlined
GP/FM
BS/PS
in the Tree Protection Report, prepared by Jack Brazeal, dated
February 17, 2006 shall be implemented prior to and during all
construction activity on the project site.
26. During construction of the driveways and structures, all utilities
GP/BP
PS/BS
shall be located within roadways and driveways and outside the
driplines of native trees.
27. Concurrently with recordation of the final map the applicant shall
FM
PS
record a tree preservation and open space easement over the
oak woodland area as shown on exhibit C attached hereto.
City Engineer Standard Conditions
8. All public improvements shall be constructed in conformance
FM/FO
PW
with the City of Atascadero Engineering Department Standard
Specifications and Drawings and/or as directed by the City
Engineer.
9. In the event that the applicant is allowed to bond for the public
FM
PW
improvements required as a condition of this map, the applicant
shall enter into a Subdivision Improvement Agreement with the
City Council.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0077
PS: Planning Services
BL: Business License
BS: Building Services
Address: 8100 Coromar Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
10. An engineer's estimate of probable cost shall be submitted for
FM
PW
review and approval by the City Engineer to determine the
amount of the bond.
11. The Subdivision Improvement Agreement shall record
FM
PW
concurrently with the Final Map.
12. An encroachment permit shall be obtained prior to the issuance
BP
PW
of building permit.
13. A six (6) foot Public Utility Easement (PUE) shall be provided
FM
PW
contiguous to the Coromar Avenue property frontage.
14. The applicant shall be responsible for the relocation and/or
BP
PW
alteration of existing utilities.
15. The applicant shall install all new utilities (water, gas, electric,
BP
PW
cable TV and telephone) underground. Utilities shall be
extended to the property line frontage of each lot or its public
utility easement.
16. The applicant shall monument all property corners for
FM
PW
construction control and shall promptly replace them if disturbed.
17. The applicant shall acquire title interest in any off-site land that
FM
PW
may be required to allow for the construction of the
improvements. The applicant shall bear all costs associated with
the necessary acquisitions. The applicant shall also gain
concurrence from all adjacent property owners whose ingress
and egress is affected by these improvements.
18. If, after all reasonable attempts and diligent efforts, the
FM
PW
Applicant is still unable to gain a landowner's consent to any
required acquisitions, offers of dedication, easements, rights of
way and/or rights of entry, the City shall lend the Power of
Eminent Domain, or take other action, as a final solution.
19. Slope easements shall be provided as needed to accommodate
FM
PW
cut or fill slopes.
20. Drainage easements shall be provided as needed to
FM
PW
accommodate both public and private drainage facilities.
21. A preliminary subdivision guarantee shall be submitted for review
FM
PW
in conjunction with the processing of the parcel map.
22. All existing and proposed utility, pipeline, open space, or other
FM
PW
easements are to be shown on the parcel map. If there are
building or other restrictions related to the easements, they shall
be noted on the parcel map. The applicant shall show all access
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0077
PS: Planning Services
BL: Business License
BS: Building Services
Address: 8100 Coromar Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
restrictions on the parcel map.
23. The final map shall be signed by the City Engineer prior to the
FM
PW
map being placed on the agenda for City Council acceptance.
24. Prior to recording the parcel map, the applicant shall submit a
FM
PW
map drawn in substantial conformance with the approved
tentative map and in compliance with all conditions set forth
herein. The map shall be submitted for review and approval by
the City in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
25. Prior to recording the parcel map, the applicant shall set
FM
PW
monuments at all new property corners. A registered civil
engineer or licensed land surveyor shall indicate by certificate on
the parcel map, that corners have been set or shall be set by a
date specific and that they will be sufficient to enable the survey
to be retraced.
26. Prior to recording the parcel map, the applicant shall pay all
FM
PW
outstanding plan check/inspection fees.
27. Prior to recording the parcel map, the applicant shall complete all
FM
PW
improvements required by these conditions of approval.
28. Prior to recording the parcel map, the applicant shall have the
FM
PW
map reviewed by all applicable public and private utility
companies (cable, telephone, gas, electric, Atascadero Mutual
Water Company). The applicant shall obtain a letter from each
utility company indicating their review of the map. The letter
shall identify any new easements that may be required by the
utility company. A copy of the letter shall be submitted to the
City. New easements shall be shown on the parcel map.
29. Upon recording the final map, the applicant shall provide the City
FM
PW
with a black line clear Mylar (0.4 mil) copy and a blue line print of
the recorded map.
30. Prior to the final inspection of any public improvements, the
BP
PW
applicant shall submit a written statement from a registered civil
engineer that all work has been completed and is in full
compliance with the approved plans.
31. Prior to the final inspection, the applicant shall submit a written
BP
PW
certification from a registered civil engineer or land surveyor that
all survey monuments have been set as shown on the final map.
32. Prior to the issuance of building permits the applicant shall
BP, GP
PW
submit plans and supporting calculations/reports including street
improvements, underground utilities, composite utilities, and
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0077
PS: Planning Services
BL: Business License
BS: Building Services
Address: 8100 Coromar Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
Fl: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
grading/drainage plans prepared by a registered civil engineer
for review and approval by the City Engineer
City Engineer Project Conditions
33. Proposed driveway to incorporate overside drains with erosion
FM/BP
PW
control measures to minimize impacts on Coromar Avenue.
Location of drains to be determined by City Engineer at the time
of building permit application.
34. Applicant shall slurry seal Coromar Avenue across the property
FM/BP
PW
frontage. Extent of improvements to be from edge of pavement
to centerline of street plus 10 feet.
35. Each residential building shall have separate sewer connections
FM/BP
PW
to the main.
36. A drainage report prepared by a civil engineer shall be submitted
FM/BP
PW
for review and approval of the City Engineer, prior to building
permit issuance or recordation of the final map. A detention
basin shall be provided for all increased runoff in accordance
with the City Municipal Code and Engineering Standards.
Atascadero Mutual Water Company Project Conditions
57. Before recordation of the final map, the applicant shall submit
FM
AMWC
plans to AMWC for the water distribution facilities needed to
serve the project. AMWC shall review and approve the plans
before construction begins on the water system improvements.
All new water distribution facilities shall be constructed in
conformance with AMWC Standards and Details and the
California Waterworks Standards (Code of Regulations Title 22,
Division 4, Chapter 16). All cross -connection devices shall
conform to AWWA and California Department of Health
Services standards.
58. Before the start of construction on the water system
FM
AMWC
improvements, the applicant shall pay all installation and
connection fees required by AMWC. Subject to the approval of
AMWC, the applicant may enter in to a "deferred connection"
agreement.
59. Before issuance of building permits, the applicant shall obtain a
FM
AMWC
"Will Serve" letter from AMWC for the newly created lots within
the subdivision.
60. Separate water meters for domestic water service are required
FM
AMWC
for each individual unit.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER
DATE: 6-6-06
EXHIBIT C: Tentative Parcel Map 2005-0077
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
EXHIBIT D: Tree Mitigation Form
Date:
May 31, 2006
Address:
8100 Coromar Avenue
Applicant:
Sid Moses
Owner:
Sid Moses
Tree protection required? yes
Total number of trees impacted: 10
Removals: 6
Number greater than 24'DBH: 2
PC Permit Required?
Status:
Replacements
required:
Evergreen Native Trees (inches)
dbh notes
1 27 -inches Tree #1
2 9 -inches Tree #2
3 4 -inches Tree#3
4 24 -inches Tree#4
5 18 -inches Tree#5
6 15 -inches Tree#6
Total 97 -inches
Mitigation Requirement
Tree Fund Payment: $
ITEM NUMBER: 7
DATE: 6-6-06
Prepared by: Callie Ford
Permit #: TPM 2005-0077
Telephone: (805)466-1995
Telephone: -
Arborist review required? yes
number less than 24' DBH: 4
yes
in process
Deciduous Native Trees (inches)
dbh notes
1
2
3
4
5
6
Total 0 -inches
808.33 Tree Fund Payment: $
Totals
97 -inches
$ 808.33
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0077 8100 Coromar\TPM 2005-0077 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
Atascadero Planning Commission
Staff Report — Community Development Department
Tentative Parcel Map 2005-0081 (AT 05-0316)
7255 Navajoa Avenue
(Seaberg / Farris)
SUBJECT:
A proposed condominium map over an existing lot of record to create two airspace units
on one common lot. The existing residence and attached garage would remain and be
converted to a condominium unit. An additional single story residence and attached
garage is proposed.
RECOMMENDATION:
Staff Recommends:
The Planning Commission adopt Resolution PC 2006-0053 approving Tentative Parcel
Map 2005-0081 (AT 05-0316), a request to establish two airspace units on one common
lot, based on findings and subject to conditions.
SITUATION AND FACTS:
1. Owners: Kelly and Theresa Farris
4680 Shadow Canyon Rd., Templeton, CA 93465
Applicant: Chris Seaberg
2165 Wilton Dr., Cambria, CA 93428
Contact: Wilson Land Surveys, Inc.
7600 Morro Rd. Atascadero, CA 93422
2. Project Address: 7255 Navajoa Avenue, Atascadero, CA 93422
APN # 031-051-009
3. General Plan Designation: Medium Density Residential
4. Zoning District: Residential Multi -family - 10 (Maximum 10 du/ac)
5. Site Area: .198 acre (approximately 8624 square feet, net)
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
6. Existing Use: One residence with attached garage
7. Environmental Status: Categorical Exemption; Class 3
DISCUSSION:
Background:
The property fronts on Navajoa Avenue, which has a mix of single-family and multi-
family residential. The land use designation is MDR (Medium Density Residential, 10
units per acre) and the Zoning District is RMF -10 (Residential Multi -Family, 10 units per
acre). Properties to the north, south, and west are all zoned RMF -10. The property
backs up to a Commercial Professional Zone which faces Highway 41 to the east. The
parcel is relatively flat. City sewer will serve the property, and water is available from
the Atascadero Mutual Water Company.
Native Trees:
There are two native oak trees impacted by the project:
Tree #1 is a 12 inch live oak located at the back of the lot, about a foot from the property
line on the applicant's parcel. During the building permit process, the applicant received
a tree removal permit to remove this tree if necessary. The tree will be significantly
impacted by the over excavation of the house pad on the second unit. The applicant will
try to save the tree if possible; tree protection fencing will be installed, and care will be
taken during the construction process in an attempt reduce the impacts to the tree.
Tree mitigation fees have been paid to address the issue in the event that the tree does
not survive even with these precautions.
Tree #2, an 18 inch live oak, is located on the adjacent property at the rear of the lot (to
the east.) The tree is located about three feet from the shared property line and the
canopy extends over the applicant's property at 7255 Navajoa. The tree will be
impacted by the new unit construction, and tree protection fencing will be installed as
noted on the grading plan.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
, +
Tree #1 —
�•,Y
removal permit
00
issued
I K
�
Tree #2 —
located on
�,� .. �,;..;,,,,� L d
�'-
adjacent
_ .-
1- Tz` =
- - y _
—
property
Condominium Design:
The proposed map will create two airspace units on one legal lot of record. The two
proposed units would be approximately 1225 and 1280 square feet. Each unit will have
a small, private yard and a one -car garage. Individual paved driveways, utility meters,
trash service, and laundry are proposed for each unit. The new second driveway will be
constructed with a decorative pavement, and the existing driveway to unit one will be
decorative pavement as well.
Five parking spaces are provided on site in order to meet the parking requirements for
the multifamily condominium design. The two bedroom units require two spaces each,
and one additional space must be provided for guests. The one -car garages provide
one space each, and three additional parking spaces are provided on site to meet the
parking requirements. There are two parallel spaces along the side and one at the back
of the new second driveway.
The subdivision is consistent with the General Plan Medium Density Residential Land
Use Designation and Residential Multi -Family Zoning regulations. The property is 0.198
acres, and therefore meets the density requirements of the RMF -10 zone (10 units per
acre maximum) to add a second unit. With the addition of the second unit, the property
will be built to its maximum density. A building permit for a second single family
residence on a multi family lot has been issued for the property (BLD 2005-5515, issued
12/12/05.) The approval of the Tentative Parcel Map proposed for the condominium
conversion would establish two airspace units on one common lot, thus allowing each
unit to be sold as individual condominium units.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
Unit 1: Existing House
Unit 2: New unit in back
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
Condominium Conversion Requirements:
The City's Municipal Code requires structures, driveways, landscaped areas, common
areas, and facilities be refurbished and restored to a safe and usable condition. All
deficiencies are to be corrected prior to recordation of the Final Map (Title 11,
Subdivisions; Chapter 12).
Based on the Property Condition Report and the Pest Inspection Report, the existing
house is in fair condition. The walls, roof, and foundation are in good condition. The
house will need some changes to bring it up to current code requirements. This
includes new windows, insulation, appliances, flooring, bathroom fixtures, minor
electrical and mechanical equipment, and updating the driveway and landscaping. Staff
has added Conditions of Approval 15.a. through 15.k. to address these concerns.
Scenic Coast Termite Control found subterranean termites, dry rot, and moisture
damage on site. All areas of concern in the pest report shall be addressed and
repaired, and then be reinspected by a pest control operator to be deemed repaired.
Condition of Approval number 15.k. has been included to insure an updated pest report
is received prior to recordation of the final map.
Public Improvements:
The project has been conditioned to construct curb, gutter, and sidewalk along the
Navajoa Avenue frontage. Applicant shall slurry seal Navajoa Avenue along the entire
property frontage, from the centerline plus ten feet. (Conditions of Approval 42 and 43.)
The project will be required to address all storm water runoff from the site in
conformance with the City Engineering Standards. The applicant is proposing to detain
runoff by means of a storm water retention chamber to be located under the new
second driveway. Preliminary calculations presented by the applicant support this
design and final calculations will be required at the building permit stage as delineated
in Condition of Approval 47.
Environmental Review:
A Class 3 Categorical Exemption is attached to this report for the Planning Commission
review.
CONCLUSION:
The proposed condominium map, as conditioned, is consistent with the 2002 General
Plan and Zoning Ordinance and the airspace configurations are consistent with the
requirements of the Subdivision Ordinance. Staff recommends the Planning
Commission approve the Tentative Parcel Map as conditioned.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
ALTERNATIVES:
1. The Commission may approve the map subject to additional or revised project
conditions. The Commission's motion to approve needs to include any new or
revised project conditions.
2. The Commission may deny the map if it is found to be inconsistent with the General
Plan or any of the other required findings. The Commission's motion to deny must
include a finding basis for denial.
3. The Commission may continue the hearing and refer the item back to staff for
additional information or analysis. Direction should be given to staff and the
applicant on required information.
PREPARED BY: Callie Ford, Assistant Planner
ATTACHMENTS:
Attachment 1
— Location Map (General Plan & Zoning)
Attachment 2
— Aerial Map
Attachment 3
— Tentative Parcel Map
Attachment 4 — Proposed Grading Plan
Attachment 5
— Tree Removal Permit
Attachment 6
— Property Condition and Pest Reports
Attachment 7
— Draft Resolution PC 2006-0053
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
ATTACHMENT 1: Location Map (General Plan / Zoning)
TPM 2005-0081
7255 Navajoa Avenue
----------- Highway Santa Ynez ay 41
Navajoa
Project Site
Zone: Residential Multi -family - 10 du/ac
(RMF -10)
Land Use Designation: Medium Density
Residential (MDR)
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ATTACHMENT 2: Aerial Map
TPM 2005-0081
7255 Navajoa Avenue
ITEM NUMBER: 8
DATE: 6-6-06
Navajoa
Highway 41
R' Project Site
L_
I
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ATTACHMENT 3: Tentative Parcel Map
TPM 2005-0081
7255 Navajoa Avenue
ITEM NUMBER: 8
DATE: 6-6-06
I
j�
Y @ 0, b $ C
LU
i i 9@ 6 PI z` X60$ e j
U P
Z J 1f0008$O o Gomm,, l II a Ad
— r
—�-
_ — 3Ab boMAb �— o _
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
CC�CC1 yy Rgap
{ 1
I E
�p7 YY
W a FS
ihb I b�
?3A3a ALINnvwyoo
z z 330
A13038
I
V
— r
—�-
_ — 3Ab boMAb �— o _
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
ATTACHMENT 4 Proposed Grading Plan (Shows Parking & Tree Protection)
TPM 2005-0081
7255 Navajoa Avenue
t.
a
SQL e
_
W oIs
WW CQ
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 5: Tree Removal Permit
7255 Navajoa Avenue
A".
,
a,y — TRP #I` SSS 15
CITY OF ATASCADERO
TREE REMOVAL PERMIT
SECTION 11.05 B.5
Applicant; Arborist- b
NameName
0 nt K l 0 Cf— -31 S,w3ackLa,, - --
Mailint> ddres cling Ad rens
lf, .�c �� �.342� _ a sn k S.�d} X344
City, State, Zip City, State, Zip
_
Phone Phone
jh I+
CiVLZ4iJCCGt{jAitiT1 ��
Reason for Removal: nfaJ
Site Address: SS !�k c nca 41)v—
Site APN:
LIST ALL TREES TO BE REMOVED:
#
SPECIES
SIZE (dbh)
NUMBER TO
CONDITION OF
BE REMOVED
TREE
j ]
12.
3.
4.
5.
6.
Property owner certifies that they have read and understood Atascadero Municipal Code Section 9-
11.]OS.Tree removal is not to facilitate future development. --j
A plot plan shall be inc uded showing all proposed improvements on the property, trees to be removed,
and o remain shall correspond with the numbem above.
7hArees
c
/- 12 0� tic )-2 "2-") ^ G
Si gt ture of Property (honer Date ature of Ce W Arborist -' Date
ca. �t\\ 1 Z - Z I --os _
S1gn e, ity of Atasc dero Date Certification #: IN C I N' > i
COMMUNITY DEVELOPMENT DEPARTMENT 6907 El Camino Real, Atascadero, CA 93422 (805) 461-5000
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 6: Property Condition Report
Pest Report
TPM 2005-0081
7255 Navajoa Avenue
RRECE'
IV1,ED }
CHRIS SEABERG APR 0 r 2006
SEABERG CONSTRUCTION COMMUNITY DEVELOPMENT
2165 Wilton Drive, CAMBRIA, CA 93428
Phone & Fax: (805) 927-0765 Cell Phone: (805) 235-1965
PROPERTY CONDITION REPORT
For 7255 Navajoa Avenue
YEAR BUILT: 1964
FOUNDATION: Slab on grade with perimeter footing. The foundation seems to be in
good condition with very little settling. The garage slab has typical cracking with some
finish deterioration which can be repaired with a thin overlay of high PST concrete. Cost
$1,000.00.
VENTILATION: (.fable end vents and eave vents are functioning properly and are
adequate.
UTILITIES: Residence has electricity, natural gas, water, phone and cable TV.
WALLS: 2 x 4 construction with 5/8 plywood siding with grooves at 4" on center and 1/2"
drywall. The walls are in good condition and should last many more years if kept painted
and free from wood destroying pests.
ROOD: 30 year composition roof installed within the last 5 years. No leaks detected.
Roof should have a minimum 20 -year useable life left.
WINDOWS: Windows are aluminum frame, single pane windows which do not meet the
current requirements. They are recommended to be replaced with vinyl frame, dual pane
windows with a low h: glazing. Cost $4,500.00.
INSULATION: There is attic insulation equivalent to R-19 and no wall insulation. It is
recommended that additional attic insulation be added to achieve an R-30 rating AND
that the wall cavities be filled with an R-13 rating. This will bring the residence into
conformity with energy compliance. Cost $2,500.00
MECHANICAL EQUIPMENT: Heat is currently provided by a central wall heater unit.
It is working well but will require a setback thermostat to meet energy compliance. The
water heater is in good condition and should last several more years. Cost $100.00.
ELECTRICAL: Residence has had an electrical update in the past and has a newer 100 -
amp panel with Romex wiring. It is recommended that GFCI outlets be installed in the
bathroom and kitchen. This should provide for a safe long lasting electrical system. It is
also required that smoke detectors be added. Cost $100.00 - $300.00
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
FLOORING: All flooring is in poor condition and should be replaced. Cost $3,500.00
PLUMBING: The home has been updated to copper plumbing at least where visible. It
appears to be in good condition. The drain waste vent systems appears to be working
well with no known problems.
KITCHEN: The countertop has been replaced in the last few months as well as the sink
and faucet. Some additional cabinet work will be required. Cost $500.00.
APPLIANCF.;S: It is recommended that the current appliances, range and dishwasher, be
replaced with new energy and water conserving models. Cost $1,300.00
BATHROOM: Toilet should be replaced with a 1.6 GPF model and a new tub surround is
required to be installed. Cost $700.00
PEST REPORT: All areas of concern noted in the report shall be addressed and repaired.
All work shall be addressed and repaired. All work shall be reinspected by a licensed
pest control operator to be deemed repaired_ Cost $3,000 including items left unbid in
report.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
WOOD DESTROYING PESTS AND ORGANISMS INSPEOTION REP RT
Building No. Street, City, Zip Date of Inspection No. of Pages
7255 Navajoa, Ataseadero, CA, 9342.2 07/08/05 6
SCENIC COAST TERMITE CONTROL
1202 Tex-ebinth Lane ' '
Templeton; CA 93465 RECE(i!F r
Ph: (805) 226-8686 Fax: (805) 434-0511 �-• t)tt
2 2
Firm Registration No. RR 4149 Report No. 1408A Escrow No.
ordered By: Morro Bay Realtv 805 Main Street Morro Bay CA 93442 ~
Cindy Petrovich
Report Sent To: Morro Bay RealtV 805 Main Street Morro Bay CA 93442
Cindy Petrovich ---
Property owner: C/O Cindy Petrovich 7255 Navajoa Atasoadero CA 93422
Party of interact;
COMPLETE REPORT 0 LIMITED REP -ORT -LJ SUPPLEMENTAL REPORT ❑ REINSPECTION REPORT []
Ganoral Description_ Inspected one story single family wood sided dwelling, attached garage
Inspection Tag Posted: Garage
Othor Inspection Tags: None noted
An inspection hes been made oFthe struetvrms s own on r e diagram In accordance with the Strueturei Pest Corltro et.
Detached porches, dstttchod steps, detached decks and tiny other structures not on the diagram were not inspected.
If a'y of above Termites
ox sl a e checked, it lndleaTSBTchaich rise w�erb visible proShfDartls�n a®essibie0are2s�lRead the® port for details o check d it ❑ms.
bI F)CiPA1•1 NOT TO SChLE
3D
pflrra
.�c 3E:
4D 4E
4C 3E 9E,
4F- C� 9H
4 E:
3@ 3B
4E
3R
Inspected B Michael Gross OPR.9965 Signature
P y I.1"nse No. _
You are entitled to obtnlrr vvpinu w an repurtu mrd uv:nylc4vn n8,;— on toil, Pr P-ly reported to the 3tiv.:curel Fent CNnhg1 mq q ii rd qro ic�c J$ tw41. Toobtain copies contact: Structural RoarControl Board, 1418Howe Avenue, Suite 1B, Sacramento, California 86826-3204.
NOTE: Uuestiom or problems eoncoming the above report should be directed to the manager of the company. Unresolved arreerlona or problems with services
oeltormed may be directed to the Strua ml Pest Control Bond at (9101561-8708, (8001737-6'188 or www.peetboard.ca gov. 43M-41 (Rev. 101011
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
2nd PAGE OF STANDARD INSPECTION XliPORT ON PROPERTY AT:
7255 Navajoa, Atascadero, CA, 93422
FsL•:LDING NO. STREET, CITY, SATE, ZIP
ITEM NUMBER
DATE: 6-6-06
07/08/05 1408A
INSPECTION DATE REPORT 110.
WMA'.' IS A WOOD DESTROYING PESTS & ORGANISMS R£FOR'i? READ THIS DOCUMENT, _T EXDLAINS THE SCOPE AND LIMITATIONS Oi• A
STRUCTURAL PEST CONTROL INSPEC-ION AND A WOOD DESTROYINC PESTS & ORGANISMS REPORT. The contents of a Wood D~_ troytng
Pests & Organisms Inspection Report is governed by the Structural Pe!A t Cortrol Act and its rules and regulations. A
Wood Destroying Pests & Organisms Report contains=incings as to the presence or absence oma' evidence of wood
destroying insects or organisms in visible and -ccessible ora&s on the data of inspection and contains:
recommendations for correcting any infestations. infections or concitions found. The Structpral Pest Control Act
reculres inspect'on of only -hose areas which are visible and aceessiDle at the time or inspection. Some areas of t�X:
structure are not accessible to inspect, such as the interior of hollow we -.Is. spaces between floors, areas concealed
by carpeting and/or linoleum, built-in applianecn or r_abinet work. lnfcstations or infect ons may be active `n these
ar,-as w'thout visible anc accessible evidence. Areas that wsrN not inspected are notcid in the report. If you desire
m
Inforation about areas that were not inspected, a further inspection may be performed at additional cost. Some
structures may not comply with building code requirements or may have structural, plumbing, 67•sotrica-, heatirN, air
conditioning or other defects that do not pertain to wood cestroying Organisms. A Wood Dostroy'ng pests ano Organisms
Report does not contain information about such de=ects, as they are not within the scope of the license of the
inspector or the company issuing this. report. NOTE: It is recommenced that building Dermis be obtained for all work
requiring Permits prior to beginning tha'recommendec repairs. For informst+on cowerning the builcing deoartmert and
permit raquiremants, contact the local bui'ding deoartmant. 'Work performed as required under permit from the building
departnoent should be approved, accepted and signed off by the cooartmont prior to conside•-ing work to be completed,
NO -E: WE DO NOT REMOVE FLOOR CbVRINGS AT THE TIME OF OUR INSPECTION, WE ASSLh1E NO P,_SPONS=BTLITY FOR ANY DAMAGE TO
ANY WOOD FLOORS 'THAT IS DETECTED AFTER THE FLOOR COVERINGS HAVE BEEN REMOVED. TIiCS'; AREAS W:LL K INSPECTED TF THEY
ARE MADE ACCESSIB•.E PRIOR TO OUR INSPECTION, SHOWERS OVER 'INISHED CEILIKr.S ARE NOT WATER TESTED UNLESS WATER ,STAINS
ARE EVIDENT BELCW, IN WHICH CASSE, RECOMMENDATIONS WILL, BE FADE -OR FURTHER TESTING. IF IT IS FOUND THAT DAMAGE
EXTENDS INTO PR:VICUSLY INACCESSIBLE AREAS, OR AREAS CONCEALED BY FURNITURE, PERSONAL SE!ONGINGS, E"C., A
SUPPLEMENTAL REPORT WILL BE ISSUED AS TO THE FINDINGS AND ADDITIONAL COSTS. NOTE: THE EXTERIOR SURFACE OF THE ROOF
WILL NOT BE INSPECTED. WE MAKE A VISUAL INSPECTION FROM THE GROUND LEVEL ONLY. IF YOU WANT THE WATER TIGHTNESS OF TIi'E
ROOF DL•'IEMMINED, YOU SHOULD CONTACT A ROOFING CONTRACTOR WHO IS LICENSED BY THE CON'TRACTOR'S STATE LICENSE BOARD.
NOTICE. ,.Reports on this structure prepared by various registered companies should list :.he Ears f'ndings (i.e.
r9
temi-; irfaststions, termite damage, fungus damage, etc.). However, recommendations to correot these findings may
vary from owpany to company. You have a r•iyht to seek a second opinlon from another company,
NOTE: TH_ CHARGE FOR SERVICE THAT TH-S COMPANY 9v6CO.NTRACTS TO ANOTHER REGISTERED COMPANY MAY :NCLUD� 1'1`_ COMPANY'S
CHARGES FOR ARRAiGING AND ADMINISTERING SUCH SERV -.CES 71sT ARE IN ADDITION TO THE DIRECT' COSTS ASSOCIATED W11H PAYING
THE SUBCONTRACTOR. vOU MAY ACCEPT SCENIC COAST-ERMITE'S BID OR YOU MAY CONTRACT DIR=CTLY WITH ANOTHER REGIS-ERED
COMPANY. SCENIC CORS- TERMITE WILL NOT BE RESPONSIBLE FOR ANY ACT OR OMISSION IN THE PERFORMARCE OF WORK THA- YOU
DIRECTLY CONTRACT WITH ANOTHER TO PERFORM.
WHEN WORN: 75 RECOMMENDED-. A ,REINSPECTION WILL BE MADE IF REQUESTED WITHIN' FOUR (4) MONTHS 0= ORIG_1iAL REPORT, FOR AN
ADDITIONAL FEE. WE CA\NOT GUARANTEE i%URK DONE BY OTHERS CP, THEIR AGENTS.
A SEPARATED REPORT HAS BEEN REQUESTED; IT IS DEFINED AS SECTION 1 & 2 COP'0:110\S EVIDENT ON THE DATE OF INSPECTIGIc
SECTION It Contains. items wnere there is evidence of active infestatior., infection or conditions that have resultod
in or From infestation or i rection.
SECTION 2: Section 2 items are conditions deemed likely to lead to infestation or infection, nut where no visible
evidonce of such was.fourd.
FURTHER INSPECTION: Further inspection items are defined as recammendations =o inspect areas which during the original
insprction cid nor, allow the ansae-C'ecr access to tom Dletca tns inspection and cannot oe dafined as Section 1 or 2.
ASBESTOS STATEMEN7- Reference A82040, $62572 and the General Industry Safety Order 5208. This reoort does not incluse
repairs that require contact with materials containing asbestos. Scenic Coast Term'te, or it's emp'oyees, are not-
state
ot
state licensed 'n asbestos analysis. and canrot .make representations about possible presence or non -presence of
asDestos containing materials. There nay be health related issues associated with the findings reflected in this
report. We are not qualified to and do not renter an opinion conoerw ng any such health issues. The inspection
reflected by this report was limited to the visible and accessible areas only. Ouestions concerning health related
issues, which may be associated with the findings or reccmmoneations reflected in this report, the presence of mold,
the release of mold spores or concerning rdoor air quality should be directed t0 a Certified Industrial Hygienist,
N011M TO OWNER: :ander the California Mechanics '_ion Law, any structural pest control operator who contacts to do
work for you, any contractor, subcontractor. laborer, suopliers oe other parson who, helps to improve your Property,
but is not paid for his work or supplies, has a richt to erforce a claim against your property. ThiE. means that aftw
a covert hearing, your property could be sold by a court officer and the proceeds of the sale used to satisfy Lhe
indebtedness. This can happen even if you have pais your contractor in full if the subcontractor, laborer or
SuoDliers remain unpaid. To preserve their right to fi'e a claim or lien against your property, certa•n claimants
such as subcontractors or material suppliers are regJlred to provide you with a document entitled "Preliminary
Notice". General contrartnrs and laborers 'or wages do not F.ave to provide this notice. A Prelim`.rary Nutir- is not a
'lien against your property, -Its purpose is to notify you of persons who may have a right to file a Iie,1 against your
property if they are not paid.
SCENIC COAST TERAU TE CONTROL --- License No. PIS 4149
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
3rd PAGE OF STANDARD INSPECTION REPORT ON PROPERTY AT:
7255 Navajoa, Ataseadero, CA, 93422 07,108/05 _ 1408A
BL•IIr)INC NO. STREET, CITY, STATE, ZIF INS°ECTI0\ DAT` REPORT NI
SUBTERRANEAN TEI2ml Es:
Item 1A: Live subterranean termites were detected at wall base in garage, see 1A.
RECa4MDATION: Z'ft carpets, Drill through floors on one side of interior
partition walls and on exterior walls where necessary and. pressure treat
soil under with a registered termiticide as per lZbel specification. Plug
and seal holes. R,a-lay carpeting after treatment. Trench and treat around
P.xterior of building at base of stucco. Drill and treat along any cold joint
in concrete floor of garage.
NI12; If linoleum floor coverings exist in the concrete slab liv
areas, they may be damaged as a result of the drilling and treating. Care
will be taken to minimize any damage, Scenic Coast Termite Control assumes
no responsibility for any damage incurred to the floor coverings as a result --
of the drilling and treating process.
****** This is a section 1 item ******
FUNGUS/yRYRO1:.-
Item 3A: Faulty grade and earth to wood contact noted at base of siding around the
front bay window, see 3A on diagram,
REC ON: Lower the grade level 2-4" below top of foundation to
slope away from the structure and repair any damaged siding.
****** This is a Section 1 Item ****X*
Ttem 3R: Dry rot detected ;n eaves at left front of structure as per 31i on diagram.
R990vE VDATION: Remove and replace dry rot in eaves as necessary.
****** This is a Section 1 Item ******
Item 3C: Dry rot detected in corner of roof fascia at left rear of structure as per
3C on diagram.
RECONdnE, IATION: Remove and replace dry rot in eaves as necessary.
*****x This is a Section 1 Item x*x***
Item 3D: Dry rot was detected throughout patio roof fratning and supports, see 3D on
diagram.
REC L4-4-FNDA N:. Remove. patio framing.
HM: A new patio cover can be. installed and a bid will be provided upon
request.
****** This is a Section 1 Item ******
Item 3E: Dry rot was detected in wood trim at left rear of structure, see 3E.
RE92d &A.TION: Remove and replace damaged trim.
****** This is a Section 1 Item ******
SCENIC COAST TERMITE CONTROL --- License No. PR 4149
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
7255 Navajoa, Atascadero, CA, 93422 07/08/05 14088
BUILDING NO. STREET, CITY. STATE, ZIP INSPECTION DATE REPORT NO.
FUNGU31DRYROT:
Item 3F: Dry rot has damaged the wood members beneath the tile counter in the
kitchen, see 3F on diagram_
RECOMMEMATION: F.eplace all. dry :rot and repair or replace tile as
necessary.
NOTE: A new counter and/or new bile can be installed. A bid will be
provided upon request, based on type of materials.
****** This is a Section 1 Item *X****
OTHIER FLNDNGS:
Item 4A: The wood trim and siding is warped and loose at right side of garage, see 4A
on diagram. However, no dry rot was detected.
RECOMvIENDATION Pe—secure. and reseal trim and siding as necessary.
.LLelll 4b: wdt;er*Scaa.x�s-ueLse�Lef Wq- 4 L1AJT82m( g *see 4n on niagram.
RFGNDAIION: Employ a state licensed roofer or contractor to inspect
the entire roof over the areas of water staining and make any necessary
repairs to make the root water Eight.
****** This is a Section 2 Item ******
Item 4C: A plunbing leak was noted under the main bath sink, see 4C on diagram.
REQg2MPATTQN: Repair the leak- as found to be necessary.
****** This is a Section 2 Item ******
Item 4D: The marlite wall covering at tub enclosure is checked/damaged and improperiY
sealed possibly allowing water to enter into the wall cavity, see 4D.
ppQj ENDAT10N: Remove the glass doors. Remove the marlite wall covering
and backing for further inspection, if no further damage is exposed, install
new moisture resistant sheetrock and marlite wall covering.
NOTE; THE ORIGINAL FIXTURES WILL BE USED UNLESS OTHERWISE REQgEST
A price for a new fiberglass tub enclosure will be given upon request.
**)<*** This is a Section 2 Item ******
Item 4E: There is an inaccessible bathtub plumbing void, see 4E on diagram.
RECOMMENDATION: Install a permanent access to the tub void to allow for
further inspection. 'Treat th':s area with PREMISE 75, a registered
termiticide as per label specifications.
******.This is a Section 1 Item ******
SCENFC ('OAST TERN11TE CONTROL --- License No. FR 4149
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
Sth PAGE OF STANDARD INSPECTION REPORT ON PROPERTY AT:
7265 Navajos, Atascadero, CA, 93422 0/!08106 1408A
BUIL.DING N0. STRE2-T, CITY, STATE, IIF !NSPECTjO� DATE r<=POR H0.
OTHER FINDINGS:
Item 4F: Waterstains'were noted on the roof structure in the attic area indicating
possible roof leakage around roof vents and fireplace, see 4F m diagram_
1Z8MME ATION: The owner is to employ a licensed roofing contractor to
inspect and repair the roof as fotutd to be necessary,
****** This is a Section 2 Item x*k***
SECTION 1 SL,01ION 2 FURTI] R INSPECT,
1A: $ 725.00 4A: $ 30.00
3A: $- 110.00. 42: No Bid
3B: $ 125.OD 4C: $ 25.00
3C: $ 85.00 4D: No Bid
3D: $ 185.00 4F: No Bid
3E: $ 60.00
3F: No Bid
4E: $ 45.00
SCENIC COAST TETI2ITE CONTROL --- License No, PR 4149
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
ATTACHMENT 7: Draft Resolution PC 2006-0053
TPM 2005-0081
7255 Navajoa Avenue
DRAFT RESOLUTION NO. PC 2006-0053
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ATASCADERO APPROVING
TENTATIVE PARCEL MAP 2005-0081 (AT 05-0316), ESTABLISHING
TWO AIRSPACE UNITS ON ONE COMMON LOT
7255 NAVAJOA AVENUE
(SEABERG/FARRIS)
WHEREAS, an application was received from Chris and Jacquelyn Seaberg, 2165
Wilton Dr., and Kelly and Theresa Farris, 4680 Shadow Canyon Rd., Templeton, CA 93465
(Owner/Applicant), for a Tentative Parcel Map to establish two airspace units on one common
lot; and,
WHEREAS, the proposed project has a General Plan Designation of Medium Density
Residential (MDR) and is in conformance with the Land Use Element of the General Plan and all
other applicable General Plan policies; and,
WHEREAS, the site is located in the Residential Multi -family — 10 du/ac (RMF -10)
which allows for the proposed use and density when certain findings are made; and,
WHEREAS, a Class 3 Categorical Exemption was prepared for the project in accordance
with the requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission held a duly noticed public hearing to consider the
proposed Tentative Parcel Map application on June 6, 2006 at 7:00 p.m. and considered
testimony and reports from staff, the applicants, and the public.
NOW, THEREFORE, the Planning Commission takes the following actions:
SECTION 1. Findings for approval of condominium conversion map. The Planning
Commission finds as follows:
1. The proposed map, as conditioned, is consistent with the General Plan and applicable
zoning requirements.
2. The design and improvement of the proposed map, as conditioned, is consistent with the
General Plan and applicable zoning requirements.
3. The site is physically suitable for the density of development proposed.
4. The design and improvement of the proposed map will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
5. The map is consistent with the character of the immediate neighborhood.
6. The design of the condominium map will not conflict with easements acquired by the
public at large for access through, or the use of property within, the proposed
subdivision; or substantially equivalent alternative easements are provided.
7. The proposed condominium map design and type of improvements proposed will not
cause serious public health problems.
8. The proposed conversion will not displace a significant number of low-income or
moderate -income households or senior citizens at a time when no equivalent housing is
readily available in the City.
9. Each tenant received written notification of intention to convert at least 60 days prior to
the filing of the tentative map pursuant to Section 66452.
10. Each tenant and each person applying for the rental of the units has received all
applicable notices and rights now or hereafter required by Section 66427.
11. Each tenant will be notified within 10 days of approval of the final map for the proposed
conversion.
12. The applicant has given a written statement promising to give 180 days' written
notification to each tenant of owner's intention to convert prior to termination of tenancy
due to the proposed conversion.
13. Each of the tenants has been, or will be given, notice of an exclusive right to contract for
the purchase of his or her respective unit upon the same terms and conditions that such
unit will be initially offered to the general public or terms more favorable to the tenant.
This right shall run for a period of not less than 90 days from the date of issuance of the
subdivision public report pursuant to Section 11018.2 of the Business and Professions
Code, unless the tenant gives prior written notice of his or her intention not to exercise
the right.
SECTION 3. Approval. The Planning Commission does hereby approve Tentative
Parcel Map 2004-0064 to establish two airspace units on one common lot, subject to the
following Conditions and Exhibits:
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
EXHIBIT A: Categorical Exemption
EXHIBIT B: Conditions of Approval
EXHIBIT C: Tentative Parcel Map 2005-0081
On motion by Commissioner and seconded by Commissioner
, the foregoing resolution is hereby adopted in its entirety by the following
roll call vote:
AYES:
NOES:
ABSENT:
ADOPTED:
ABSTAINED:
CITY OF ATASCADERO, CA
Ellen Beraud
Planning Commission Chairperson
ATTEST:
Warren Frace
Planning Commission Secretary
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
EXHIBIT A: Categorical Exemption
TPM 2005-0081
ITEM NUMBER: 8
DATE: 6-6-06
CITY OF ATASCADER0
NOTICE OF EXEMPTION
6907 El Camino Real Atascadero, CA 93422 805.461.5000
Date Received for Filing
TO: ® File
❑ Office of Planning and Research
1400 Tenth Street
Sacramento, CA 95814
FROM: Callie Ford, Assistant Planner
City of Atascadero
6907 El Camino Real
Atascadero, CA 93422
SUBJECT: Filing of Notice of Determination in Compliance with Section 21152 of the
Public Resources Code.
Project Title: Tentative Parcel Map 2005-0081; Condominium Conversion
Project Location (Include County: 7255 Navajoa Avenue, Atascadero, 93422; San Luis
Obispo County
Project Description: A proposed condominium map over an existing lot of record to create two
airspace units on one common lot. The existing residence and attached garage would remain and
be converted to a condominium unit. An additional single story residence and attached garage is
proposed.
Name of Public Agency pproving Project: City of Atascadero
Name of Person or Agency C4,Mng Out Project: Chris Seaberg, Applicant, (805) 927-0765
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 8
DATE: 6-6-06
Exempt Status:
❑ Ministerial (Sec. 15073) ❑ Emergency Project (Sec. 1507 (b) and (c))
❑ Declared Emergency (Sec. 15061 (a)) ❑ General Rule Exemption (Sec. 15061.c)
® Categorically Exempt (Sec. 15303(a))
Reasons why project is exempt: Class 3 of the California Environmental Quality Act (CEQA)
(Section 15303(a), New Construction or Conversion of Small Structures) exempts the conversion
of existing small structures from one use to another where only small modifications are made in
the exterior of the structure. Class 3 also exempts the construction of limited numbers of new,
small structures . Up to three single family residences may be constructed or converted under
this exemption.
Contact Person: Callie Ford, Assistant Planner, (805)470-3448
Date: May 18, 2006
Callie Ford
Assistant Planner
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
EXHIBIT B: Conditions of Approval / Mitigation Monitoring
TPM 2005-0081
Conditions of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0081
PS: Planning Services
BL: Business License
BS: Building Services
Address: 7255 Navajoa Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
Standard Planning Conditions
1. The approval of this application shall become final, subject to the
FM
PS
completion of the conditions of approval, fourteen (14) days
following the Planning Commission approval unless prior to the
time, an appeal to the decision is filed as set forth in Section 9-
1.111(b) of the Zoning Ordinance.
2. Approval of this Tentative Parcel Map shall be valid for two years
FM
PS
after its effective date. At the end of the period, the approval shall
expire and become null and void unless a final map has been
recorded or an extension of time is granted pursuant to a written
request received prior to the expiration date.
3. The Community Development Department shall have the authority
FM
PS
to approve minor changes to the project that (1) result in a superior
site design or appearance, and/or (2) address a construction
design issue that is not substantive to the Tentative Parcel Map.
4. A parcel map drawn in substantial conformance with the approved
FM
PS
tentative map, and in compliance with all conditions set forth
herein, shall be submitted for review and approval in accordance
with the Subdivision Map Act and the City's Subdivision Ordinance.
5. The subdivider shall defend, indemnify, and hold harmless the City
Ongoing
CA
of Atascadero or its agents, officers, and employees against any
claim or action brought to challenge an approval by the city, or any
of its entities, concerning the subdivision.
6. The parcel map shall be subject to additional fees for park or
FM
PS
recreation purposes (QUIMBY Act) as required by City Ordinance.
Project Planning Conditions
7. Prior to final map, the applicant shall submit CC&R's for review and
FM
PS/PW
approval by the Community Development Department. The
CC&R's shall record with the Final Map and shall include the
following:
a. Exclusive use easements for the private yard areas.
b. Provisions for maintenance of all common areas including
access, parking, street trees, any fencing and landscaping.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0081
PS: Planning Services
BL: Business License
BS: Building Services
Address: 7255 Navajoa Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
c. A detailed list of each individual homeowner's responsibilities
for maintenance of the individual units.
d. Provision for screening and maintenance of individual trash
receptacles.
e. Fencing Standards
f. A provision for review and approval by the City Community
Development Department for any changes to the CC&R's that
relate to the above requirements prior to the changes being
recorded or taking effect.
8. This map shall be for the approval of airspace units only. The final
FM
PS
map shall show one common lot and two airspace units.
9. Prior to recordation of the final parcel map, the applicant shall
FM
PS
submit a condominium plan for recording concurrently with the final
parcel map. A qualified licensed professional shall prepare the
final parcel map and the condominium plan.
10. Should the units be rented prior to the recordation of the final map,
FM
PS
all requirements set forth in Government Code Section 66427.1
shall be met.
11. The maximum percent of coverage for the lot, excluding decks less
BP
PS
than 30 inches from the ground, shall be 40%.
12. Each unit will be provided a minimum of 100 square feet of
FO
PS/BS
enclosed storage space, exclusive of closets.
13. Each unit will be responsible for its individual trash receptacle and
FO
PS/BS
shall keep it screened from public view, except on trash pickup day.
14. Prior to final inspection for the proposed units, the owner shall plant
FO
PS/BS
one 15 -gallon oak tree at the northwest corner of the property.
15. The second driveway will be installed with decorative concrete as
noted on plan. The existing driveway will be upgraded with
decorative concrete as well.
16. In accordance with the Property Condition Report, the following
FO
PS/BS
shall be completed prior to recordance of the final map:
a. Replace windows (currently aluminum single pane) with dual
pane, low E glazing windows that meet current code
requirements.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0081
PS: Planning Services
BL: Business License
BS: Building Services
Address: 7255 Navajoa Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
b. Additional attic insulation is to be added to achieve an R-30
rating and wall cavities are to be filled with an R-13 rating
insulation to bring the residence into conformity with energy
compliance.
c. Repair cracking and deterioration in garage slab with a thin
overlay of high PSI concrete.
d. Install a setback thermostat to meet energy compliance.
e. GFCI outlets are to be installed in the bathroom and kitchen.
f. Smoke detectors are to be added.
g. All flooring is in poor condition and is to be replaced.
h. Appliances, range and dishwasher to be replaced with new
energy and water conserving models.
i. Toilet to be replaced with a 1.6 GPF model and a new tub
surround is to be installed
j. The landscaping shall be upgraded in the front of the existing
house. The bald spot on the lawn will be replanted to
discourage people from parking on the lawn as they do
currently.
k. All areas of concern noted in pest report shall be addressed
and repaired. All work shall be addressed and repaired. All
work shall be reinspected by a licensed pest control operator
to be deemed repaired.
17. If exterior lighting is proposed, it shall be designed to eliminate
BP
PS
any off site glare. All exterior site lights shall utilize full cut-off,
"hooded" lighting fixtures to prevent offsite light spillage and
glare. Any luminaire pole height shall not exceed 16 -feet in
height, limit intensity to 2.0 foot candles at ingress/egress, and
otherwise 0.6 foot candle minimum to 1.0 maximum within the
private street. Fixtures shall be shield cut-off type and
compatible with historic setting, subject to staff approval.
18. Should any cultural resources be unearthed during site
BP
PS
development work, the provisions of CEQA -Section 15064.5,
will be followed to reduce impacts to a non-significant level.
City Engineer Standard Conditions
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0081
PS: Planning Services
BL: Business License
BS: Building Services
Address: 7255 Navajoa Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
19. All public improvements shall be constructed in conformance
FM/FO
PW
with the City of Atascadero Engineering Department Standard
Specifications and Drawings and/or as directed by the City
Engineer.
20. In the event that the applicant is allowed to bond for the public
FM
PW
improvements required as a condition of this map, the applicant
shall enter into a Subdivision Improvement Agreement with the
City Council.
21. An engineer's estimate of probable cost shall be submitted for
FM
PW
review and approval by the City Engineer to determine the
amount of the bond.
22. The Subdivision Improvement Agreement shall record
FM
PW
concurrently with the Final Map.
23. An encroachment permit shall be obtained prior to the issuance
BP
PW
of building permit.
24. A six (6) foot Public Utility Easement (PUE) shall be provided
FM
PW
contiguous to the Navajoa Avenue property frontage.
25. The applicant shall be responsible for the relocation and/or
BP
PW
alteration of existing utilities.
26. The applicant shall install all new utilities (water, gas, electric,
BP
PW
cable TV and telephone) underground. Utilities shall be
extended to the property line frontage of each lot or its public
utility easement.
27. The applicant shall monument all property corners for
FM
PW
construction control and shall promptly replace them if disturbed.
28. The applicant shall acquire title interest in any off-site land that
FM
PW
may be required to allow for the construction of the
improvements. The applicant shall bear all costs associated with
the necessary acquisitions. The applicant shall also gain
concurrence from all adjacent property owners whose ingress
and egress is affected by these improvements.
29. Slope easements shall be provided as needed to accommodate
FM
PW
cut or fill slopes.
30. Drainage easements shall be provided as needed to
FM
PW
accommodate both public and private drainage facilities.
31. A preliminary subdivision guarantee shall be submitted for review
FM
PW
in conjunction with the processing of the parcel map.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0081
PS: Planning Services
BL: Business License
BS: Building Services
Address: 7255 Navajoa Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
32. All existing and proposed utility, pipeline, open space, or other
FM
PW
easements are to be shown on the parcel map. If there are
building or other restrictions related to the easements, they shall
be noted on the parcel map. The applicant shall show all access
restrictions on the parcel map.
33. The final map shall be signed by the City Engineer prior to the
FM
PW
map being placed on the agenda for City Council acceptance.
34. Prior to recording the parcel map, the applicant shall submit a
FM
PW
map drawn in substantial conformance with the approved
tentative map and in compliance with all conditions set forth
herein. The map shall be submitted for review and approval by
the City in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
35. Prior to recording the parcel map, the applicant shall set
FM
PW
monuments at all new property corners. A registered civil
engineer or licensed land surveyor shall indicate by certificate on
the parcel map, that corners have been set or shall be set by a
date specific and that they will be sufficient to enable the survey
to be retraced.
36. Prior to recording the parcel map, the applicant shall pay all
FM
PW
outstanding plan check/inspection fees.
37. Prior to recording the parcel map, the applicant shall complete all
FM
PW
improvements required by these conditions of approval.
38. Prior to recording the parcel map, the applicant shall have the
FM
PW
map reviewed by all applicable public and private utility
companies (cable, telephone, gas, electric, Atascadero Mutual
Water Company). The applicant shall obtain a letter from each
utility company indicating their review of the map. The letter
shall identify any new easements that may be required by the
utility company. A copy of the letter shall be submitted to the
City. New easements shall be shown on the parcel map.
39. Upon recording the final map, the applicant shall provide the City
FM
PW
with a black line clear Mylar (0.4 mil) copy and a blue line print of
the recorded map.
40. Prior to the final inspection of any public improvements, the
BP
PW
applicant shall submit a written statement from a registered civil
engineer that all work has been completed and is in full
compliance with the approved plans.
41. Prior to the final inspection, the applicant shall submit a written
BP
PW
certification from a registered civil engineer or land surveyor that
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0081
PS: Planning Services
BL: Business License
BS: Building Services
Address: 7255 Navajoa Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
all survey monuments have been set as shown on the final map.
City Engineer Project Conditions
42. All frontage improvements shall be constructed on Navajoa
BP
PW
Avenue along the property frontage to the 405 Local street
section. Improvements shall include constructing curb, gutter
and sidewalk along the property frontage.
43. Applicant shall slurry seal Navajoa Avenue along the entire
FM/BP
PW
property frontage, from the centerline plus ten feet.
44. Driveway approach shall be constructed to current ADA
FM/BP
PW
regulations. This includes a 4 -foot landing at the back of the
driveway approach. Proposed public pedestrian easement shall
be increased to include landing.
45. Buildings shall be connected by three individual 4" sewer
FM/BP
PW
laterals, or a single 6" sewer lateral.
46. All sewer laterals serving buildings where the finish floor is less
FM/BP
PW
than 12 -inches above the next upstream manhole shall be fitted
with a backflow prevention device.
47. A drainage report prepared by a civil engineer shall be submitted
FM/BP
PW
for review permit issuance or recordation of the final map. A
detention/retention basin shall be provided for all increased
runoff in accordance and approval of the City Engineer, prior to
building with the City Municipal Code and Engineering
Standards.
48. Applicant to submit grading & drainage plans and the storm drain
BP, GP
CE
design & facilities.
49. Applicant to submit calculations to support the design of any
BP, GP
CE
structures or pipes. Closed conduits shall be designed to convey
the 10 -year flow with gravity flow, the 25 -year flow with head, and
provide safe conveyance for the 100 year overnow.
50. Existing drainage patterns from adjacent properties shall not be
BP, GP
CE
obstructed.
51. The Applicant shall widen Navajoa in conformance with City
BP, GP
CE
Standard 405 for Local Streets across the entire property
frontage.
52. The applicant shall pay sewer Extension (Annexation) and
BP, GP
CE
Connection fees upon issuance of building permit.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0081
PS: Planning Services
BL: Business License
BS: Building Services
Address: 7255 Navajoa Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
53. Drainage piping serving fixtures which have flood level rims
BP, GP
CE
located below the elevation of the next upstream manhole cover
of the public or private sewer serving such drainage piping shall
be protected from backflow of sewage by installing an approved
type backwater valve Fixtures above such elevation shall not
discharge through the backwater valve.
54. Each building shall be separately and independently connected
BP, GP
CE
with the public sewer.
Atascadero Mutual Water Company Project Conditions
57. Before recordation of the final map, the applicant shall submit
FM
AMWC
plans to AMWC for the water distribution facilities needed to
serve the project. AMWC shall review and approve the plans
before construction begins on the water system improvements.
All new water distribution facilities shall be constructed in
conformance with AMWC Standards and Details and the
California Waterworks Standards (Code of Regulations Title 22,
Division 4, Chapter 16). All cross -connection devices shall
conform to AWWA and California Department of Health
Services standards.
58. Before the start of construction on the water system
FM
AMWC
improvements, the applicant shall pay all installation and
connection fees required by AMWC. Subject to the approval of
AMWC, the applicant may enter in to a "deferred connection"
agreement.
59. Before issuance of building permits, the applicant shall obtain a
FM
AMWC
"Will Serve" letter from AMWC for the newly created lots within
the subdivision.
60. Separate water meters for domestic water service are required
FM
AMWC
for each individual condominium unit.
61. The applicant shall obtain a separate landscape -irrigation meter
FM
AMWC
from AMWC for the common areas within the project.
Landscaping for common areas shall be drought -tolerant. The
landscaping for common areas shall conform to the mitigation
measures noted in Table II -7, Hydrology and Water Quality, of
the General Plan 2025. The applicant shall keep the use of turf
grass in common area landscaping and in other areas to a
minimum.
62. Before construction of the water system improvements, AMWC
FM
AMWC
shall review and approve the landscape plans for the common
areas within the project.
63. The applicant is responsible for designing and constructing
FM
AMWC
water system improvements that will provide water at pressures
and flows adequate for the domestic and fire protection needs of
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER
DATE: 6-6-06
Conditions Of Approval
Timing
Responsibility
Mitigation
/Monitoring
Measure
TPM 2005-0081
PS: Planning Services
BL: Business License
BS: Building Services
Address: 7255 Navajoa Avenue
GP: Grading Permit
BP: Building Permit
FD: Fire Department
PD: Police Department
FI: Final Inspection
CE: City Engineer
TO: Temporary
WW: Wastewater
Occupancy
CA: City Attorney
F0: Final Occupancy
the project.
\\Cityhall\cdvlpmnt\- TPM - Tentative Parcel Maps\TPM 05\TPM 2005-0081 7255 Navajoa\TPM 2005-0081 staff report.doc
ITEM NUMBER: 9
DATE: 6-6-06
9. APPEALS OF PLANNING COMMISSION DECISIONS TO CITY
COUNCIL
THE PLANNING COMMISSION WILL DISCUSS THE CITY'S
CURRENT POLICY THAT ALLOWS INDIVIDUAL
COMMISSIONERS TO APPEAL DECISIONS TO THE CITY COUNCIL
WITHOUT A FEE.