HomeMy WebLinkAboutPC_2007-12-18_AgendaPacketCITY OF ATASCADERO
PLANNING COMMISSION AGENDA
Regular Meeting
Tuesday, December 18, 2007 — 7:00 P.M.
City Hall
Council Chambers
6907 El Camino Real
Atascadero, California
CALL TO ORDER
Pledge of Allegiance
Roll Call: Chairperson O'Keefe
Vice Chairperson Fonzi
Commissioner Jack
Commissioner O'Grady
Commissioner Slane
Commissioner Marks
Commissioner Heatherington
Chairperson will read the decorum guidelines
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
DISCLOSURE OF EX PARTE COMMUNICATIONS:
Prior to a project hearing Planning Commission Members must disclose any communications
they have had on any quasi-judicial agenda items. This includes, but is not limited to, Tentative
Subdivision Maps, Parcel Maps, Variances, Conditional Use Permits, and Planned Development
Permits. This does not disqualify the Planning Commission Member from participating and
voting on the matter, but gives the public and applicant an opportunity to comment on the ex
parte communication.
PUBLIC COMMENT
(This portion of the meeting is reserved for persons wishing to address the Commission on any matter not
on this agenda and over which the Commission has jurisdiction. Speakers are limited to five minutes.
Please state your name and address for the record before making your presentation. The Commission may
take action to direct the staff to place a matter of business on a future agenda)
City of Atascadero Planning Commission Agenda
CONSENT CALENDAR
Regular Meeting December 18, 2007
Page 2 of 4
(All items on the consent calendar are considered to be routine and non -controversial by City Staff and will
be approved by one motion if no member of the Commission or public wishes to comment or ask questions)
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON OCTOBER 16, 2007.
2. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON NOVEMBER 20, 2007
3. APPROVAL OF THE 2008 PLANNING COMMISSION MEETING SCHEDULE
COMMUNITY DEVELOPMENT STAFF REPORTS
PUBLIC HEARINGS
(For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public
hearing and invite the applicant or applicant's representative to make any comments. Members of the public will be invited to provide
testimony to the Commission following the applicant. Speakers should state their name and address for the record and can address the
Commission for five minutes. After all public comments have been received, the public hearing will be closed, and the Commission
will discuss the item and take appropriate action(s).)
4. PLN 2007-1230, CONDITIONAL USE PERMIT, 7085 EL CAMINO REAL
Owner:
Atascadero Enterprises, LLC, 2505 Theatre Dr. Ste. A, Paso Robles, CA 93446
Applicant:
CKE Restaurants, Inc, 401 W. Carl Karcher Way, Anaheim, CA 92801
Project Title:
Carl's Jr. Drive-through Restaurant—PLN 2007-1230/CUP 2007-0217
Project
7085 El Camino Real, Atascadero, CA 93422
Location:
APN 030-081-008 (San Luis Obispo County)
Project
The proposed project consists of an application for a Conditional Use Permit (CUP) to allow a drive -
Description:
through restaurant on a currently vacant commercial pad in an existing shopping center. The proposed
restaurant will share the site with the previously approved Lube -n -Go facility, which is currently under
construction. No native trees are proposed for removal and the project will take access from El Camino
Real and off a shared access easement on the adjacent shopping center parcel. The access driveway off of
El Camino Real will be shared with the Lube -n -Go facility. An exit only driveway is proposed for the
drive-through component of the restaurant onto El Camino Real.
General Plan Designation: General Commercial (GC)
Zoning District: Commercial Retail (CR)
Proposed
Based on the initial study prepared for the project, a Mitigated Negative Declaration is proposed. The
Environmental
proposed Mitigated Negative Declaration is available for public review at 6907 El Camino Real,
Determination:
Community Development Department, from 8:00 a.m. to 5:00 p.m., Monday through Friday.
City of Atascadero Planning Commission Agenda Regular Meeting December 18, 2007
Page 3 of 4
5. PLN 2007-1216, CONDITIONAL USE PERMIT FOR 7580 CASTANO AVE.
Owner:
Leonard Byrd, 7580 Castano Ave., Atascadero, CA 93422
Project Title:
PLN 2007-1216 / Conditional Use Permit 2007-0215
Project
7580 Castano Ave., Atascadero, CA 93422
Location:
APN 029-141-015 (San Luis Obispo County)
Project
The proposed project consists of an application for a Conditional Use Permit (CUP) to allow a front
Description:
setback reduction for on a sloping lot an oversized garage. The garage is proposed at 680 square feet,
which exceeds 50% of the size of the main residence on site, and therefore requires Planning Commission
approval.
General Plan Designation: Single Family Residential -Y
Zoning District: Residential Single Family -Y
Proposed
Exempt per CEQA Section 15303: New Construction or Conversion of Small Structures
Environmental
Determination:
COMMISSIONER COMMENTS AND REPORTS
DIRECTOR'S REPORT
ADJOURNMENT
There will be no meeting on January 1, 2008. The next regular meeting of the Planning
Commission will be on January 15, 2008 at City Hall, Council Chambers, 6907 El Camino Real,
Atascadero.
Please note: Should anyone challenge in court any proposed development entitlement listed
on this Agenda, that person may be limited to raising those issues addressed at the public
hearing described in this notice or in written correspondence delivered to the Planning
Commission at, or prior to this public hearing.
City of Atascadero Planning Commission Agenda Regular Meeting December 18, 2007
Page 4 of 4
City of Atascadero
WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING
The Planning Commission meets in regular session on the first and third Tuesday of each month at 7:00
p.m., at City Hall, Council Chambers, 6907 EI Camino Real, Atascadero. Matters are considered by the
Commission in the order of the printed Agenda.
Copies of the staff reports or other documentation relating to each item of business referred to on the
Agenda are on file in the office of the Community Development Department and are available for public
inspection during City Hall Annex business hours at the Community Development counter and on our
website, www.atascadero.org. An agenda packet is also available for public review at the Atascadero
Library, 6850 Morro Road. All documents submitted by the public during Commission meetings that are
either read into the record or referred to in their statement will be noted in the minutes and available for
review in the Community Development Department.
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in
a City meeting or other services offered by this City, please contact the City Manager's Office, (805)
461-5000, or the City Clerk's Office, (805) 461-5000. Notification at least 48 hours prior to the meeting or
time when services are needed will assist the City staff in assuring that reasonable arrangements can be
made to provide accessibility to the meeting or service.
TO SPEAK ON AGENDA ITEMS
Members of the audience may speak on any item on the agenda. The Chairperson will identify the
subject, staff will give their report, and the Commission will ask questions of staff. The Chairperson will
announce when the public comment period is open and will request anyone interested to address the
Commission regarding the matter being considered to step up to the podium. If you wish to speak for,
against, or comment in any way:
• You must approach the podium and be recognized by the Chairperson
• Give your name and address (not required)
• Make your statement
• All comments should be made to the Chairperson and Commission
• All comments limited to 5 minutes (unless changed by the Commission)
• No one may speak for a second time until everyone wishing to speak has had an opportunity
to do so, and no one may speak more than twice on any item.
If you wish to use a computer presentation to support your comments, you must notify the Community
Development Department at least 24 hours prior to the meeting. Access to hook up your laptop to the
City's projector will be provided. You are required to submit to the Recording Secretary a printed copy
of your presentation for the record. Please check in with the Chairperson before the meeting begins to
announce your presence and turn in the printed copy.
The Chairperson will announce when the public comment period is closed, and thereafter, no further
public comments will be heard by the Council.
TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA
Under Agenda item, "PUBLIC HEARINGS", the Chairperson will call for anyone from the audience having
business with the Commission to:
• Please approach the podium and be recognized
• Give your name and address (not required)
• State the nature of your business
This is the time items not on the Agenda may be brought to the Commission's attention. A maximum of
30 minutes will be allowed for Community Forum (unless changed by the Commission).
CALL TO ORDER
ITEM NUMBER: 1
DATE: 12-18-07
CITY OF ATASCADERO
PLANNING COMMISSION
DRAFT MINUTES
Regular Meeting
Tuesday, October 16, 2007 — 7:00 P.M.
Chairperson O'Keefe called the meeting to order at 7:00 p.m. and Commissioner Marks
led the Pledge of Allegiance.
ROLL CALL
Present: Commissioners Marks, O'Grady, Slane, and Chairperson O'Keefe
Absent: Commissioners Heatherington, Jack, and Vice Chairperson Fonzi
(all absences excused)
Others Present: Recording Secretary Grace Pucci
Staff Present: Community Development Director Warren Frace, Public Works
Director / City Engineer Steve Kahn, Community Services Director
Brady Cherry, Deputy Community Development Director Steve
McHarris, Deputy Public Works Director Geoff English, and
Associate Planner Kerry Margason.
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
MOTION: By Commissioner O'Grady and seconded by Commissioner
Marks to approve the agenda.
Motion passed 4:0 by a roll -call vote.
PC Draft Minutes 10/16/07
Page 1 of 10
Chairperson O'Keefe read the decorum guidelines.
DISCLOSURE OF EX PARTE COMMUNICATIONS:
Commissioner Marks stated he visited the sites on Items #2, 3, and 4. He talked to
Main Street Board Members Maria Hooper and Barbie Butz, Main Street Executive
Director Steve Martin, and the applicant on Item #4.
Chairperson O'Keefe stated she met with Mr. Gearhart and his consultant Jamie Kirk at
the property because she needed questions answered for Item #5.
Commissioner O'Grady visited all project sites, and with regard to Item #5, spoke with
Council Member Ellen Beraud regarding the Council study session and specifically her
interpretation of its position regarding tier one and tier two benefits.
PUBLIC COMMENT
None
CONSENT CALENDAR
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON OCTOBER 2, 2007.
2. APPROVAL OF TIME EXTENSION ON TENTATIVE TRACT MAP 2005-0068,
9300 PINO SOLO AND TTM 2003-0044, 9105 PRINCIPLE AVE., (PRINCIPLE
PARTNERS, LP/WALLACE GROUP)
Items pulled: Commissioner O'Grady, Item #2
MOTION: By Commissioner O'Grady and seconded by Commissioner
Marks to approve Item #1
Motion passed 3:0 by a roll -call vote. (Slane abstained)
Item #2
Commissioner O'Grady stated he would like to add a condition that would require this
project to comply with the proposed Condominium Ordinance once it is approved, with
the exception of construction started prior to the approval.
Community Development Director Warren Frace indicated it would be problematic to
add this condition because the final outcome of the Ordinance is not known and won't
be for about two months.
PC Draft Minutes 10/16/07
Page 2 of 10
MOTION: By Commissioner O'Grady and seconded by Commissioner
Slane to approve Item #2
Motion passed 4:0 by a roll -call vote.
COMMUNITY DEVELOPMENT STAFF REPORTS
PUBLIC HEARINGS
3. PLN 2099-1108,6575 SYCAMORE ROAD BMX TRACK
Applicant:
Atascadero BMX (ABMX)
Tom Jordan, Jordan Environmental Services, 8255 Graves Creek Rd, Atascadero, CA 93422
Owner:
Atascadero Mutual Water Company
5005 EI Camino Real, Atascadero, CA 93422
Project Title:
PLN 2099-1108, Zone Change 2005-0108, Conditional Use Permit 2005-0168
Project
6575 Sycamore Road, Atascadero, CA 93422
Location:
(San Luis Obispo County)
Lot 10, 4 -RM -80A (APN 028-111-003) and Lot 11 4 -RM -81 A (APN 028-121-001)
Project
The project consists of an application for a Zone Text Amendment, a Zone Map Change, and
Description:
a Conditional Use Permit to establish a Planned Development Overlay Zone that would allow
a dirt track for Bicycle Motocross (BMX) on an existing lot owned by Atascadero Mutual
Water Company adjacent to the Salinas River. The Planned Development Overlay Zone
Change would be site specific and include a Master plan of Development (CUP) that would
include the construction of a BMX Track, a registration and concession building, portable
restroom facilities, and a utility building. Overflow parking is proposed within the Caltrans
right-of-way under the existing Highway 41 bridge across the Salinas River. No lighting is
proposed as part of this project.
General Plan Designation: Industrial (1)
Zoning District: Industrial Park (IP)
Proposed
Based on the Initial Study prepared for the project, a Mitigated Negative Declaration is
Environmental
proposed. The proposed Mitigated Negative Declaration is available for public review at 6907
Determination:
EI Camino Real, Community Development Department, from 8:00 a.m. to 5:00 p.m., Monday
through Friday.
Deputy Community Development Director Steve McHarris provided the staff report and
answered questions of the Commission.
Community Services Director Brady Cherry gave a brief history of this project and
answered questions of the Commission.
all TI[00191lyiILTA 14►III I
Tom Jordan, representing Atascadero BMX, spoke about BMX, the proposed track and
structures, insurance, parking, and answered questions of the Commission.
PC Draft Minutes 10/16/07
Page 3 of 10
Brett Riley explained that he has opened several BMX tracks, and spoke about what it
takes to get a track running and keep it operating.
Jerry Clay spoke in support of the track and addressed issues of noise, hours of
operation, and safety.
Susan Schroll stated she has been involved in BMX for six years and spoke about what
it has meant to her son, other youth, and families in the area.
Adam Verges stated he participates in the sport, spoke in support of the track, and
explained the viewpoint of the younger members of the community regarding this track.
Kevin Sousa said he lives close to this location, that the sound from the track is minimal,
and that this would be a safe area for bicyclists.
Terra Quinn expressed her support for the track and that BMX is a family oriented sport,
positive for the community, and involves the children more than any other sport.
Chairperson O'Keefe closed the Public Comment period.
MOTION: By Commissioner Slane and seconded by Commissioner
O'Grady to adopt Resolution PC 2007-0083 recommending the
City Council certify Proposed Mitigated Negative Declaration
2006-0015; and, adopt Resolution PC 2007-0084
recommending the City Council introduce an ordinance for
first reading by title only, to approve Zone Text Change 2005-
0108 to establish Planned Development Overlay Zone #31;
and, adopt Resolution PC 2007-0085 recommending the City
Council introduce an ordinance for first reading by title only,
to approve Zone Map Change 2007-0143 based on findings:
and, adopt Resolution PC 2007-0086 recommending the City
Council approve Conditional Use Permit 2005-0168 (Master
Plan of Development) based on findings and subject to
Conditions of Approval and Mitigation Monitoring, and with the
condition that there will be non -motorized bikes only, and only
one speaker for amplification.
Motion passed 4:0 by a roll -call vote.
Chairperson O'Keefe recessed the hearing at 8:17 p.m.
Chairperson O'Keefe called the meeting back to order at 8:25 p.m.
PC Draft Minutes 10/16/07
Page 4 of 10
4. PLN 2007-1244, 6040 EL CAMINO REAL
Owner:
Patrick Gaughan, 10630 San Marcos Road, Atascadero, CA 93422
Applicant:
Kevin Gogstetter, 2470 Homestead Road, Templeton, CA 93465
Project Title:
PLN 2007-1244, CUP 2007-0218
Project
6040 EI Camino Real, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 030-191-001
Project
The proposed project consists of an application for a Conditional Use Permit to establish an
Description:
indoor auto and vehicle dealership for the purpose of selling motorcycles within an existing
building at 6040 EI Camino Real.
General Plan Designation: Downtown (D)
Zoning District: Downtown Commercial (DC)
Proposed
Class 1, Categorical Exemption Section 15301: Existing Facilities
Environmental
Determination:
Deputy Community Development Director Steve McHarris gave the staff report and
answered questions of the Commission.
PUBLIC COMMENT
Kevin Gogstetter, applicant, addressed issues raised by the Commission and spoke
about his plans for the building.
Chuck Ward spoke against the CUP because the proposed project or use is
inconsistent with the character of the immediate neighborhood and its orderly
development, and because of noise issues.
Pat Gaughan, owner of the property, spoke about his use of the property over the last
25 years and stated he has never heard an objection in all that time.
Karen Gogstetter, applicant, spoke about the hours of operation for this business, and
that the motorcycles will not be started or worked on at this location so there will not be
a noise issue for the hotel.
Jamie Kirk stated she participated in developing the City's Downtown Guidelines, and
that this type of use was considered at that time. She believes this is an appropriate
use and that the building is what it is and has been upgraded from the previous use.
Chairperson O'Keefe closed the Public Comment period.
Commissioner Slane stated he would rather see a business go in at this location than
have a vacant site, and is in favor of approving this project.
PC Draft Minutes 10/16/07
Page 5 of 10
Commissioner O'Grady commented that this is a prime location in the downtown and
this building and this use is inimical to potential investors and developers in Atascadero
and does not measure up to the standards that have been recently raised in the City.
Chairperson O'Keefe stated she has a problem with this request because a CUP goes
with the property and there are uses that don't fit in with the downtown. She indicated
she could not make the finding that this use fits in with the immediate neighborhood or
with the General Plan goals for the downtown.
MOTION: By Commissioner O'Grady and seconded by Chairperson
O'Keefe to deny the project for the reasons that it is
inconsistent with the provisions of the General Plan and is
also not in character with the neighborhood.
*** Motion passed 2:1 by a roll -call vote. (Slane opposed,
Marks abstained)
Vote invalid due to a lack of a quorum, see City Attorney note
below.
Commissioner Marks made the following statement for the record: "Over the years use
of dirt bikes in neighborhoods has had such a negative impact on my family that at this
point I don't think I can evaluate this agenda item without substantial negative bias and I
think I must abstain from voting."
*** City Attorney Note:
According to the record, Commissioner Marks decided not to vote because he felt
that his prior experiences related to motorcycle use rendered him not capable of
fairly judging the issues. As such, under the case of Cohan v Thousand Oaks, he
declared a conflict based upon due process grounds. A CUP is a quasi judicial
hearing, not a legislative hearing. In a quasi judicial hearing the hearing officers
(commissioners) have to be able to hear all the evidence with an open mind and
not be unduly swayed by their own prior experiences or feelings. In this case the
commissioner felt unduly swayed. Once he stated his conflict, there were only
three (3) participating commissioners. Three is not a quorum on a seven member
board and therefore even though a majority of the three voted in favor, the motion
cannot count as an action as no quorum was present.
PC Draft Minutes 10/16/07
Page 6 of 10
5. PLN -2099-0818,13000 ATASCADERO AVENUE
Owner:
Kelly Gearhart, 6205 Alcantara Ave., Atascadero, CA 93422
Project Title:
Eagle Creek Golf Course
General Plan Amendment / Zone Change / Planned Development Amendment and Not
Parcel Map
PLN -2099-0818, General Plan Amendment 2005-0016, Zone Change 2005-0111,
Conditional Use Permit 2005-0175, Tentative Parcel Map 2005-0080
Project
13000 Atascadero Road, Atascadero, CA 93422
Location:
(San Luis Obispo County) APN 045-391-015, 016
Project
The proposed project consists of a General Plan Amendment of 10.0 acres from CREC
Description:
(Commercial Recreation) to RSF-Y (Residential Single -Family 1.0 acre min), Zone Change of
10.0 acres from LS (Special Recreation) to SFR -Y (Single -Family Residential 1.0 acre min),
Amendment of the Master Plan of Development for Planned Development -8 to replace an
existing golf course with two Single -Family Residences, and Parcel Map to subdivide 10.1 acres
into two lots. The proposed project is located within the 100 -year flood plain.
General Plan Designation: REC (Recreation)
Zoning District: L (Recreation)
Proposed
Based on the above findings, and the information contained in the Initial Study 2007-0022 (made
Environmental
a part hereof by reference and on file in the Community Development Department), it has been
Determination:
determined that the above project will not have an adverse impact on the environment when the
following proposed mitigation measures are incorporated into the project.
Community Development Director Warren Frace gave the staff report and answered
questions of the Commission.
PUBLIC COMMENT
Jamie Kirk, applicant's representative, gave a PowerPoint presentation on the project
and requested several changes to the Conditions of Approval regarding livestock and
right-of-way. Ms. Kirk answered questions of the Commission.
Lynne Dee Althouse, project biologist, and Casey Patterson, landscape architect, spoke
about the design for the site and answered questions of the Commission.
Kelly Gearhart spoke about the maintenance of the Open Space area, and suggested a
maintenance bond could be set in place, checked and renewed annually.
Doug Pierto, representing 17 homeowners in the Eagle Creek area, spoke about their
concerns, made several suggestions, and stated the project as presented represents
effective consensus building and that the neighbors appreciated having the opportunity
to participate in the planning process.
PC Draft Minutes 10/16/07
Page 7 of 10
David Tissue stated the existing project has CC&R's which prohibit grazing animals. He
commented that all who live there would like to see this project move forward as quickly
as possible and that in its presents state the project is very viable and feasible.
Chairperson O'Keefe closed the Public Comment period.
MOTION: By Chairperson O'Keefe and seconded by Commissioner
O'Grady to adopt Draft Resolution 2007-0089 recommending
the City Council certify Proposed Mitigated Negative
Declaration 2007-0022; and, adopt Draft Resolution 2007-0090
recommending the City Council approve General Plan
Amendment 2005-0016 based on findings; and, adopt Draft
Resolution 2007-0091 recommending the City Council
introduce for first reading, by title only, a draft ordinance
approving Zone Text Change 2005-0111 amending the PD -8
Overlay District based on findings; and, adopt Draft Resolution
2007-0092 recommending the City Council introduce for first
reading, by title only, a draft ordinance approving Zoning Map
Change 2005-0111 based on findings; and, adopt Draft
Resolution 2007-0093 recommending the City Council approve
Conditional Use Permit 2005-0175 (Master Plan of
Development) based on findings and subject to Conditions of
Approval and Mitigation Monitoring; and, adopt Draft
Resolution 2007-0094 recommending the City Council approve
Vesting Tentative Parcel Map 2005-0080 based on findings and
subject to Conditions of Approval and Mitigation Monitoring
and adding the following conditions:
1. A requirement to add that the CC&R's be consistent with
the existing tract; this condition added to the CUP and Map
resolutions.
2. A requirement for a six year maintenance and management
plan subject to city approval with a maintenance bond; this
condition added to the CUP and Map.
3. A condition that the existing fence be repaired; amendment
to Condition #10 of the CUP.
4. Limited grazing of animals allowed for annual fuel
management will be permitted; this condition added to the
zone change text, the CUP and the Map.
Motion passed 4:0 by a roll -call vote.
6. PLN 2006-1111, CONDOMINIUM ORDINANCE UPDATE
Applicant:
City of Atascadero, 6907 EI Camino Real, Atascadero, CA 93422, Phone: 461-5000
Project Title:
PLN -2006-1111 /Zone Change 2006-0118
PC Draft Minutes 10/16/07
Page 8 of 10
Project
Location•
The proposed zoning changes would affect the RMF -10 and RMF -16 Multi -Family Zoning
Districts Citywide.
Project
The purpose of the hearing is to review a draft Condominium Ordinance resulting from the Joint
Description:
Planning Commission and City Council meeting on February 20, 2007. The City's existing
condominium regulations are proposed to be updated and codified in Title 9 of the City's
Municipal Code. The Planning Commission will be making recommendations to the City Council
on the Draft Ordinance.
Associate Planner Kerry Margason gave the staff report and answered questions of the
Commission.
Barbara Kautz of Goldfarb and Lipman gave a presentation on the Condominium
Ordinance and answered questions of the Commission.
PUBLIC COMMENT
Mark Gibbs asked if there were a plan regarding the percentage of condo conversions
that would be for inclusionary housing.
Chairperson O'Keefe closed the Public Comment period.
MOTION: By Commissioner O'Grady and seconded by Commissioner
Marks to adopt Resolution PC 2007-0087, recommending that
the City Council introduce an Ordinance for first reading by
title only to approve PLN 2006-1111 (Zone Change 2006-0118)
based on findings, and with the following conditions:
1. Conditional Use Permit will be required for all
condominiums and condominium conversions regardless
of size.
2. Change of noticing requirements to conform to state law.
3. For condominium conversions of four or less the
requirements for physical condition, noticing and tenant
protections would apply.
4. Removal of 9-12.101(i) regarding condominium plans.
5. Affordable units within the Redevelopment Project Area
would meet redevelopment standards.
6. Tenant protections apply not only to existing tenants, but
to all tenants.
Motion passed 4:0 by a roll -call vote.
COMMISSIONER COMMENTS AND REPORTS
Chairperson O'Keefe referred to the Andy Fetyko project on the north end of EI Camino
Real and stated that the windows of this historic house have not been covered and
there has already been rain. She asked staff if something could be done.
PC Draft Minutes 10/16/07
Page 9 of 10
Community Development Director Frace
direct the applicant to secure the site
Protection Plan and also to secure the
damage.
DIRECTOR'S REPORT
indicated that staff's approach would be to
for the winter in terms of the Storm Water
Colony House to minimize water and other
Director Frace reported that the Santa Ana map denied by the Planning Commission
was appealed to the City Council, which upheld the Commission's decision and denied
the map. He stated the agenda for the next Commission meeting is still being organized
and that meeting would be in three weeks.
ADJOURNMENT
Chairperson O'Keefe adjourned the meeting at 10:51 p.m. to the next regularly
scheduled meeting of the Planning Commission on November 6, 2007.
MINUTES PREPARED BY:
Grace Pucci, Recording Secretary
\\Cityhall\cdvlpmnt\— PC Minutes\PC Minutes 07\PC Draft Minutes 10-16-07.doc
PC Draft Minutes 10/16/07
Page 10 of 10
CALL TO ORDER
ITEM NUMBER: 2
DATE: 12-18-07
CITY OF ATASCADERO
PLANNING COMMISSION
DRAFT MINUTES
Regular Meeting
Tuesday, November 20, 2007 — 7:00 P.M.
Chairperson O'Keefe called the meeting to order at 7:00 p.m. and Commissioner Jack
led the Pledge of Allegiance.
ROLL CALL
Present: Commissioners Heatherington, Jack, Marks, O'Grady, Slane, Fonzi
and Chairperson O'Keefe.
Absent: None
Others Present: Recording Secretary Grace Pucci
Staff Present: Community Development Director Warren Frace, Public Works
Director / City Engineer Steve Kahn, and Senior Planner Kelly
Gleason.
Chairperson O'Keefe read the decorum guidelines.
PLANNING COMMISSION BUSINESS
APPROVAL OF AGENDA
MOTION: By Commissioner Jack and seconded by Vice Chairperson
Fonzi to approve the agenda.
Motion passed 7:0 by a roll -call vote.
PC Draft Minutes 11/20/07
Page 1 of 5
DISCLOSURE OF EX PARTE COMMUNICATIONS:
■ Commissioner Marks stated he visited the site for Item #2.
■ Vice Chairperson Fonzi stated she spoke with Assistant City Manager Jim Lewis on
Item #2.
■ Commissioner O'Grady stated he visited the site for Item #2 but spoke with no one.
PUBLIC COMMENT
None
CONSENT CALENDAR
1. APPROVAL OF MINUTES OF THE REGULAR PLANNING COMMISSION
MEETING ON NOVEMBER 6, 2007.
MOTION: By Commissioner Heatherington and seconded by
Commissioner Marks to approve Item #1.
Motion passed 7:0 by a roll -call vote.
COMMUNITY DEVELOPMENT STAFF REPORTS
PUBLIC HEARINGS
2. PLN 2007-1248, ZONE TEXT AMENDMENT PD -9
Owner•
Atascadero 101 Associates, 2925 Bristol St., Costa Mesa, CA 92626
Applicant•
Peter Koetting, Westar Associates, 2925 Bristol St., Costa Mesa, CA 92626
Project Title:
PLN 2007-1248, ZCH 2007-0144 Zone Text Amendment PD -9
Project
800 through 955 ECR (049-045-001, 002, 003, 012, 013, 017, 018, 019, 020, 021, 022)
Location:
San Luis Obispo County
Project
Commercial Park / PD -9 Zoning District
Description:
The proposed project consists of an application for a Zone Text Amendment to add "Hotels,
Motels" to the list of conditionally allowed uses in the Planned Development -9 Overlay
District. The PD -9 Overlay District currently allows for a variety of commercial retail and
commercial service uses to be developed in conjunction with a Master Plan of Development.
The PD -9 Overlay Zoning District is site specific for the Home Depot Center.
Proposed
Based on the initial study prepared for the project, a Negative Declaration is proposed. The
Environmental
proposed Negative Declaration is available for public review from 10/24/07 through 11/11/07
Determination:
at 6907 EI Camino Real, Community Development Department, from 8:00 a.m. to 5:00 p.m.,
Monday through Friday.
PC Draft Minutes 11/20/07
Page 2 of 5
Senior Planner Kelly Gleason gave the staff report and with Community Development
Director Warren Frace answered questions of the Commission.
PUBLIC COMMENT — None
Commissioner Heatherington expressed concern with the number of hotels in
Atascadero at this time and questioned the occupancy rates for the existing hotels. She
stated a hotel at this location was not pedestrian friendly and believes it is premature for
this use at this time.
Chairperson O'Keefe stated she would like to see paragraph one of the draft resolution
eliminated because all the currently proposed hotels are not located in places where
pedestrians would be walking, therefore, it does not make sense to have it in the
resolution.
MOTION: By Commissioner Jack and seconded by Commissioner Marks
to adopt Resolution PC 2007-0097, recommending that the City
Council introduce an Ordinance for first reading, by title only,
to approve amendments to the conditionally allowed use for
the PD -9 Overlay Zone based on findings, with the addition of
1) adding eating and drinking places with drive-through
facilities to the list of conditionally allowed uses, 2) eliminate
paragraph 1 of the draft resolution, and 3) section F from the
PD 9 amended to read: "Any development shall be served by
a city sewer system."
Motion passed 6:1 by a roll -all vote. (Heatherington opposed)
COMMISSIONER COMMENTS AND REPORTS
Chairperson O'Keefe questioned what goes under Planning Commission Business and
what goes under Commissioner Comments and Reports. Community Development
Director Warren Frace explained the difference.
Vice Chairperson Fonzi asked staff to indicate in their reports when a project lies within
the Redevelopment District boundary. In addition, she expressed concern regarding the
format for the minutes which seem to only record dissenting opinions, and which she
feels is unbalanced. The Recording Secretary explained the format for the minutes.
Director Frace suggested this issue be raised at the quarterly meeting with the Mayor
and Mayor Pro Tem.
Commissioner Marks referred to a lot split which came before the Commission in the
past and asked how binding decisions are when based on what the property owner is
telling the Commission.
PC Draft Minutes 11/20/07
Page 3 of 5
Director Frace explained the requirements for determining if a condition were binding
and indicated staff would do some research on this specific site and report back.
Commissioner Marks asked about the requirements for first floor uses in the downtown
and business signs on trucks and trailers.
Director Frace explained first floor uses in the downtown, the code addressing business
signs on vehicles, and stated that a note had been sent to Code Enforcement regarding
the specific restaurant sign in question.
Commissioner Marks spoke about a complaint he had received from a citizen who is
continually disturbed by a crowing rooster in the morning.
Director Frace stated that crowing roosters are not allowed under the code and the
citizen should come to City Hall and file a Code Violation Complaint Form.
Commissioner Marks referred to the Mitsubishi dealership that has been closed and
remarked that the landscaping has deteriorated and looks shoddy.
Director Frace stated that the landscaping was part of the conditions and staff will notify
the owner of the concern.
Commissioner Marks requested an update on the windows at Mission Oaks that have
been painted over.
Director Frace explained there is no specific code outside of the Downtown Zone to
address this issue, and that staff is planning a visit to the site in hopes of getting them to
improve their curb appeal.
Commissioner O'Grady observed that Code Enforcement in Atascadero seems to be a
side job of the Fire Department. He would like it to be more of a priority and suggested
the City hire a contractor on an hourly basis to drive the area and discover violations.
Commissioner O'Grady also suggested the City Attorney look at and update the
documents used by the Commission at their meetings to ensure they have up-to-date
information.
DIRECTOR'S REPORT
Community Development Director Warren Frace stated there were no agenda items
scheduled at this time for the next Planning Commission meeting. He also reported
that the Commission Norms were approved by the City Council and have been
distributed.
PC Draft Minutes 11/20/07
Page 4 of 5
ADJOURNMENT
Chairperson O'Keefe adjourned the meeting at 8:03 p.m. to the next regularly
scheduled meeting of the Planning Commission on December 4, 2007.
MINUTES PREPARED BY:
Grace Pucci, Recording Secretary
\\Cityhall\cdvipmnt\- PC Minutes\PC Minutes 07\PC Draft Minutes 11-20-07.doc
PC Draft Minutes 11/20/07
Page 5 of 5
ITEM NUMBER: 3
DATE: 12-18-07
CITY OF ATASCADERO
COMMUNITY DEVELOPMENT DEPARTMENT
DRAFT Planning Commission
Meeting Schedule 2008
MEETING DATE MEETING TYPE
TIME
LOCATION:
ChambersCity Hall
Council
6907 El Camino Real
Atascadero
January 1 HOLIDAY, no mtg
January 15
Regular
7:00 p.m.
"
February 5
Regular
7:00 p.m.
"
February 19
Regular
7:00 p.m.
"
March 4
Regular
7:00 p.m.
"
March 18
Regular
7:00 p.m.
April 1
Regular
7:00 p.m.
"
April 15
Regular
7:00 p.m.
"
May 6
Regular
7:00 p.m.
"
May 20
Regular
7:00 p.m.
"
June 3
Regular
7:00 p.m.
It
June 17
Regular
7:00 p.m.
It
July 1
Regular
7:00 p.m.
it
July 15
Regular
7:00 p.m.
It
August 5
Regular
7:00 p.m.
11
August 19
Regular
7:00 p.m.
"
September 2
Regular
7:00 p.m.
"
September 16
Regular
7:00 p.m.
"
October 7
Regular
7:00 p.m.
"
October 21
Regular
7:00 p.m.
November 4
Regular
7:00 p.m.
"
November 18
Regular
7:00 p.m.
"
December 2
Regular
7:00 p.m.
"
December 16
Regular
7:00 p.m.
T:\PC Meeting Schedule\PC Meeting Schedule 2008_DRAFT.doc
6907 EL CAMINO REAL, ATASCADERO, CA 93422 . (805) 461-5000 • FAX (805) 461-7612
ITEM NUMBER: 4
DATE: 12-1 R -n7
Atascadero Planning Commission
Staff Report - Community Development Department
PLN 2007-1230
7085 EI Camino Real
Carl's Jr.
(Atascadero Enterprises / CKE Restaurants, Inc.)
RECOMMENDATION:
Staff Recommends Planning Commission:
Adopt Resolution PC 2007-0098, certifying Proposed Mitigated Negative Declaration
2007-0025 and approve Conditional Use Permit 2007-0217 to allow a drive-through
restaurant at 7085 EI Camino Real based on findings and subject to conditions of
approval and mitigation monitoring.
REPORT -IN -BRIEF:
The proposed project consists of an application for a Conditional Use Permit (CUP) to
allow a drive-through restaurant on a currently vacant commercial pad in the existing
Vons Shopping Center. The proposed restaurant will share the site with the previously
approved Lube -n -Go facility, which is currently under construction. No native trees are
proposed for removal and the project will take access from EI Camino Real and off a
shared access easement on the adjacent shopping center parcel. The access driveway
off of EI Camino Real will be shared with the Lube -n -Go facility. An exit only driveway is
proposed for the drive-through component of the restaurant onto EI Camino Real.
DISCUSSION:
Situation and Facts:
1. Owner: Atascadero Enterprises, 2505 Theatre Drive,
Ste. A, Paso Robles, CA 93446
2. Applicant: CKE Restaurants Inc, 401 W. Carl Karcher Way,
Anaheim, CA 92801
3. Project Address 7085 EI Camino Real, Atascadero, CA
4. General Plan Designation
5. Zoning District:
6. Site Area
7. Existing Use
8. Environmental Status
DISCUSSION:
Promect Definition
ITEM NUMBER:
DATE:
General Commercial
Commercial Retail
Lube -n -Go currently under construction
Proposed Mitigated Negative Declaration
2007-0025
The proposed project consists of a request to establish a drive-through restaurant
located at a vacant commercial site within the Vons Shopping Center at 7085 EI Camino
Real. The Master Plan of Development includes a main dining building with outdoor
patio areas for restaurant patrons and a drive-through facility facing the interior of the
site.
Background
Surrounding Land -Use and Setting
North: Vons Shopping Center
& Residential
South: 101 Freeway
East: Vons Shopping Center &
Residential
West: Vons Shopping Center
& Downtown
On May 19, 2005, the
Planning Commission voted 5-
2 to approve a proposed Lube `N' Go with carwash facility at the project site.
ITEM NUMBER: 4
DATE: 12-1 R-07
On November 1, 2005, the Planning Commission approved minor revisions to the
building elevations and site plan which included conditions of approval in anticipation
of a drive-through restaurant being constructed on the approved commercial pad.
The proposed Conditional Use Permit application would allow of build -out of the site
with a drive-through restaurant. The access driveways and parking would be shared
throughout the site. The applicant has also received shared parking agreements from
the adjacent parcels in the center.
ANALYSIS:
Drive-through restaurants are a conditionally allowed use in the Commercial Retail
Zone. The Conditional Use Permit process
allows the Planning Commission and
interested members of the community a
chance to review the project and mitigate
any potential impacts. In general,
conditional uses require additional review
based on the nature of the use itself rather
than just the appearance of the building and
site as reviewed as part of a Master Plan of
Development.
Site Plan / Parkina / Landscaai
The proposed drive-through restaurant is in
an existing shopping center with shared
access and parking agreements. The
building is oriented to EI Camino Real with
an outdoor seating patio along the EI
Camino Real frontage. Parking lot shade
trees are provided throughout the project
area with drought tolerant landscaping and
ornamental grasses used in smaller
planters.
The drive-through lane and service window
are located on the northern elevation of the
building with right -turn -only egress provided
onto EI Camino Real. The proposed
building is elevated approximately 3.5 -feet
above sidewalk grade to meet site drainage and parking lot slope requirements set by
the elevation of the adjacent Lube -n -Go facility.
ITEM NUMBER: 4
DATE: 12-1 R-07
Appearance Review
The proposed restaurant is designed to be architecturally compatible with the approved
Lube -n -Go building. Architectural features includes tower elements with tile roofs, stone
veneer accents at the building base, stylized trim details, and decorative awnings. In
addition, the proposed building includes trellis and arbor accents located around the
building to increase landscape opportunities and provide a layering of architectural
elements that break up the main building fagade. Building colors are earth -toned and
chosen to be consistent with the colors on the approved Lube -n -Go building.
V�COD SINN
WEST ELEVATION
I OLDSEDONA I
TORip SE SHELL
Ili: .;_�.....�II.� STED CHESTNU
F��++ +"•y�•1�.��� I
FUNKTROA
ALUM TRIM
TORTOISESHELL SCARLET SUPREME CULTURED STONE
EAST ELEVATION
ITEM NUMBER: 4
DATE: 12-1 R-07
Signage
The applicant is proposing one sign on each elevation resulting in three signs facing the
parking lot and one sign facing EI Camino Real. Each sign would be internally lit. The
larger signs located on the east, south, and west elevation would be approximately 46
square -feet. The smaller sign on the south elevation would be approximately 35 square -
feet. As proposed, the applicant is requesting a total of 173 square -feet of building
signage, 48 square -feet above the maximum signage permitted without approval of a
CUP. The applicant is requesting that the Planning Commission approve this request for
additional signage.
Signage would also be located on the approved monument sign which would be shared
by the drive-through restaurant and the Lube -n -Go business. The proposed monument
sign conforms to the Atascadero Municipal Code and previous project approval.
General Plan Consistency
The proposed project is consistent with the following General Plan Land Use Element
Policies:
Land Use Program 1.1.7: "Within the Urban Core encourage infill development or
revitalization or reuse of land already committed to urban development where utilities
and public services exist.
Land Use Policy 2.1: "Ensure that new development is compatible with existing and
surrounding neighborhoods".
Implementing General Plan programs requires appearance review of architectural
design, materials and color, and landscaping to improve the appearance along EI
Camino Real, and incorporate architectural themes into the site and building design. As
analyzed above, the proposed project, as conditioned is consistent with the General
Plan.
In staff's opinion the proposed drive-through restaurant is consistent with the goals and
policies of the Land Use Element. As conditioned, the project incorporates elements
that are consistent with the scale and character of the surrounding commercial uses and
consistent with the General Plan's appearance review requirements, providing attractive
architecture and landscape design.
ITEM NUMBER: 4
DATE: 12-1 R -n7
Findings
Conditional Use Permit
A Conditional Use Permit is required for all drive-through restaurants. The Conditional
Use Permit process provides the opportunity for the public and the Planning
Commission to review the specifics of land use proposals, such as appropriateness of
use, architectural design, site design, landscape, signage, and specific standards of the
Zoning Ordinance. The Planning Commission must make the following five findings to
approve a Conditional Use Permit:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual.
Staff Comment: The use is consistent with the General Commercial designation of
the General Plan and General Plan Land Use Element Policy 1.1.7 and 2.1.
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance) including the Planned Development Ordinance.
Staff Comment: As conditioned, the project satisfies all conditional use permit and
Planned Development zoning code provisions for a commercial development.
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety, or welfare of the general public or persons residing
or working in the neighborhood of the use, or be detrimental or injurious to property
or improvements in the vicinity of the use.
Staff Comment: The proposed commercial development will not be detrimental to
the general public or working persons health, safety, or welfare.
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development.
Staff Comment: The project has been designed to enhance the appearance along
EI Camino Real with high quality architecture and compatible landscaping. The
project site has been designed with the buildings oriented to the street frontage with
parking to the rear, providing a pedestrian oriented development.
5. That the proposed use or project will not generate a volume of traffic beyond the
safe capacity of all roads providing access to the project, either existing or to be
improved in conjunction with the project, or beyond the normal traffic volume of the
ITEM NUMBER: 4
DATE: 12-1 R -n7
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
Staff Comment: The proposed project and use, as conditioned, is consistent with
the traffic projections and road improvements anticipated within the General Plan.
Based on staff's analysis in the preceding sections, it appears that all of the required
findings for approval of a Conditional Use Permit can be made.
Proposed Environmental Determination
A Draft Mitigated Negative Declaration was circulated to public agencies and interested
members of the public on November 9, 2007. The Environmental Analysis identified
concerns regarding potential impacts to aesthetics, noise, and traffic. Mitigation
measures pertaining to these resources are included. It is the opinion of staff that the
combination of design features incorporated into the proposed project, mitigation
measures, and conditions of approval will reduce any potential environmental impacts to
a level of insignificance. A finding is proposed that this project would not have a
significant effect on the environment based upon the implementation of the identified
mitigation measures.
Staff is recommending that the Commission certify Proposed Mitigated Negative
Declaration 2007-0025.
Conclusion
The proposed project represents an infill commercial project within the Commercial
Retail Zone. The Master Plan of Development covers all site development, landscaping
and architectural design standards for the project. The proposed project is consistent
with the General Plan and Atascadero Municipal Code, as analyzed within this Staff
Report. It is staff's opinion that the proposed project, as conditioned, allows the
Planning Commission to make all of the required findings for project approval.
ALTERNATIVES
1. The Commission may recommend modifications to the project and/or conditions
of approval for the project.
2. The Commission may determine that more information is needed on some
aspect of the project and may refer the item back to the applicant and staff to
develop the additional information. The Commission should clearly state the type
of information that is required and move to continue the item to a future date.
ITEM NUMBER: 4
DATE: 12-1 R-07
3. The Commission may deny the project. The parcel would retain its designation
of Commercial Retail. The Commission should specify the reasons for denial of
the project and make an associated finding with such action.
PREPARED BY: Kelly Gleason, Senior Planner
ATTACHMENTS:
Attachment 1: Location Map, Zoning and General Plan
Attachment 2: Proposed Mitigated Negative Declaration and Initial Study
Attachment 3: Draft Resolution 2007-0098
ITEM NUMBER: 4
DATE: 19.1 a_m
Attachment 1: Location Map, General Plan and Zoning
Zoning District: Commercial Retail
General Plan Designation: General Commercial
ITEM NUMBER
DATE: 12-18-07
Attachment 2: Proposed Mitigated Negative Declaration and Initial Study
ITEM NUMBER: 4
DATE: 12-18-07
Attachment 3: Draft Resolution PC 2007-0098
DRAFT RESOLUTION PC 2007-0098
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO CERTIFYING PROPOSED
MITIGATED NEGATIVE DECLARATION 2007-0025 AND APPROVING
PLN 2007-1230/CONDITIONAL USE PERMIT 2007-0217 ON
APN 030-081-024
(7085 El Camino Real / Carl's Jr.)
WHEREAS, an application has been received from Atascadero Enterprises, LLC, (2505
Theatre Dr. Ste. A, Paso Robles, CA 93446), Owner and CKE Restaurants, Inc. (401 W. Carl
Karcher Way, Anaheim, CA 92801) Applicant, to consider a project consisting of a Conditional
Use Permit (CUP 2007-0217) for a drive-through restaurant at 7085 El Camino Real (APN 030-
081-024); and,
and,
WHEREAS, the site's current General Plan Designation is General Commercial (GC);
WHEREAS, the site's current zoning district is Commercial Retail (CR); and,
WHEREAS, Drive-through restaurants are a Conditional Use in the Commercial Retail
zone; and,
WHEREAS, an Initial Study and Proposed Mitigated Negative Declaration 2007-0025
were prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on December 18, 2007, studied and considered the Conditional Use Permit
2007-0217, after first studying and considering the Proposed Mitigated Negative Declaration
prepared for the project, and,
ITEM NUMBER: 4
DATE: 12-1 R -n7
NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings for Certification of the Proposed Mitigated Negative
Declaration. The Planning Commission finds as follows:
1. The project does not have the potential to degrade the environment when mitigation
measures are incorporated into the project's mitigation monitoring program as
conditions of approval; and,
2. The project will not achieve short-term to the disadvantage of long term
environmental goals; and,
3. The project does not have impacts which are individually limited, but cumulatively
considerable; and,
4. The project will not cause substantial adverse effects on human beings either directly
or indirectly.
SECTION 2. Findings for approval of Conditional Use Permit. The Planning
Commission finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
SECTION 3. Approval. The Planning Commission of the City of Atascadero, in a regular
session assembled on December 18, 2007, resolved to approve the Conditional Use Permit 2007-
0217 subject to the following:
On motion
roll call vote:
ITEM NUMBER: 4
DATE: 12-1 R-07
EXHIBIT A:
Proposed Mitigated Negative Declaration
EXHIBIT B:
Conditions of Approval
EXHIBIT C:
Site Plan
EXHIBIT D:
Landscape Plan
EXHIBIT E:
Floor Plans
EXHIBIT F:
Elevations
EXHIBIT G:
Color and Materials Board
by Commissioner , and seconded by Commissioner
the foregoing resolution is hereby adopted in its entirety by the following
AYES: ( )
NOES: ( )
ABSTAIN: ( )
ABSENT: ( )
ADOPTED:
CITY OF ATASCADERO, CA
Joan O"Keefe
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
ITEM NUMBER:
DATE: 12-18-07
Exhibit A Proposed Mitigated Negative Declaration 2005-0047
See Following
ITEM NUMBER:
DATE: 12-18-07
EXHIBIT B: Conditions of Approval / Mitigation Monitoring Program
Conditional Use Permit 2007-0217
Conditions of Approval /
Timing
Responsib
Mitigation
Mitigation Monitoring Program
ility
Measure
/Monitorin
BL: Business License
9
7085 El Camino Real
GP: Grading Permit
Conditional Use Permit
BP: Building Permit
FI: Final Inspection
PS: Planning
Services
PLN 2007-1230/CUP 2007-0217
TO: Temporary
Occupancy
BS: Building
Services
FO: Final Occupancy
FD: Fire
Department
PD: Police
Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
Planning Services
1. This conditional use permit shall be for a drive-through restaurant and
FM
PS
associated site improvements as described on the attached exhibits and
located on parcel 030-081-024 regardless of owner.
2. The approval of this use permit shall become final and effective for the
FM
PS
purposes of issuing building permits fourteen (14) days following the
Planning Commission approval unless prior to the time, an appeal to the
decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance.
3. The Community Development Department shall have the authority to
BP / FM
PS, CE
approve the following minor changes to the project that (1) modify the site
plan project by less than 10%, (2) result in a superior site design or
appearance, and/or (3) address a construction design issue that is not
substantive to the Master Plan of Development. The Planning Commission
shall have the final authority to approve any other changes to the Master
Plan of Development and any associated Tentative Maps unless appealed
to the City Council.
4. Approval of this Conditional Use Permit shall be valid for twelve (12) months
BP / FM
PS
after its effective date. At the end of the period, the approval shall expire
and become null and void unless the project has received a building permit.
5. The applicant shall defend, indemnify, and hold harmless the City of
Ongoing
Atascadero or its agents, officers, and employees against any claim or
action brought to challenge an approval by the city, or any of its entities,
concerning the subdivision.
6. All subsequent Tentative Map and construction permits shall be consistent
BP/FM
PS, CE
with the Master Plan of Development contained herein.
7. All exterior elevations, finish materials, and colors shall be consistent with
BP
PS
the Master Plan of Development as shown in EXHIBIT C, D and F with the
following modifications:
■ All exterior material finishes shall be durable, high quality, and consistent
ITEM NUMBER:
DATE: 12-18-07
Conditions of Approval /
Timing
Responsib
Mitigation
Mitigation Monitoring Program
ility
Measure
/Monitorin
BL: Business License
9
7085 El Camino Real
GP: Grading Permit
Conditional Use Permit
BP: Building Permit
FI: Final Inspection
PS: Planning
Services
PLN 2007-1230/CUP 2007-0217
TO: Temporary
occupancy
BS: Building
Services
F0: Final Occupancy
FD: Fire
Department
PD: Police
Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
with the architectural appearance.
■ All trash storage, recycle storage, and air conditioning units shall be
screened from view behind architecturally compatible or landscaped
enclosures;
■ Any exterior light fixtures shall be compatible with building design, subject
to staff approval.
• The stone veneer on the tower elements shall extend to the top of the
awnings and shall include a decorative cap.
■ The stone veneer base shall be a minimum of 3.5 -feet high and shall
include a decorative cap.
■ The parapet cap/trim molding shall be decorative in nature and shall be
subject to staff approval.
■ The tower roofs shall overhang a minimum of 2 -feet. All portions of the
roof (tile, rafter tails, etc) shall extend this distance.
■ Accent banding shall be consistent with the parapet cap, subject to staff
approval.
■ Final color selection shall include compatible earth toned colors, subject
to staff approval. Colors shall be consistent with the approved adjacent
building.
8. All site work, grading, and site improvements shall be consistent with the
BP/FM
PS, BS,
Master Plan of Development as shown in EXHIBIT C and D, and shall
CE
include the following:
■ Outdoor eating/patio area shall include a minimum of 2 high quality tables
with chairs and shall be installed prior to final.
■ The retaining wall along the sidewalk shall be clad in stone veneer to
match the building base.
9. A final landscape and irrigation plan shall be approved prior to the issuance
BP
PS, BS
of building permits and included as part of site improvement plan consistent
with EXHIBIT D, and as follows:
• All exterior meters, air conditioning units, and mechanical equipment
ITEM NUMBER:
DATE: 12-18-07
Conditions of Approval /
Timing
Responsib
Mitigation
Mitigation Monitoring Program
ility
Measure
/Monitorin
BL: Business License
9
7085 El Camino Real
GP: Grading Permit
Conditional Use Permit
BP: Building Permit
FI: Final Inspection
PS: Planning
Services
PLN 2007-1230/CUP 2007-0217
TO: Temporary
occupancy
BS: Building
Services
F0: Final Occupancy
FD: Fire
Department
PD: Police
Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
shall be screened with landscape material.
■ All areas shown on the landscape plan shall be landscaped by the
developer prior to the final of any single building permit on-site.
■ A minimum of one shade tree shall be provided along the EI Camino
Real frontage within the proposed patio area.
■ Street and landscape trees shall be minimum 15 -gallon size and double
staked.
■ All landscaping shall be drought tolerant or shall consist of ornamental
grasses for screening including along the drive-through side of the
building and around the proposed trash enclosure. Grasses shall also
be included along the drive-through side retaining wall planter.
■ The retaining wall along the drive-through side shall be constructed of
dark color split face block or similar
10. The developer and/or subsequent owner shall assume responsibility for the
GP
PS
continued maintenance of all landscape and common areas, consistent with
BP
EXHIBIT D.
11. The monument sign shall include materials and colors compatible with the
approved building design, including a stone veneer base and decorative
cap, subject to staff approval.
12. The main distribution panel shall be exterior type and shall not be located
within an enclosure that limits the accessibility of the site or minimizes
proposed landscaping.
13. The drive-through signage shall be located in the larger planter areas
adjacent to the rear property line, subject to staff approval. No signage shall
be located on neighboring properties without permission from the adjacent
property owner.
Public Works Conditions
Public Improvements:
14. There will be a two -foot wide planter in front of the retaining wall adjacent to
EI Camino real. The planter must be installed on the applicant's property.
The public works director may allow the planter to be in the right-of-way of
the applicant can show that it is totally infeasible to locate the planter on
ITEM NUMBER:
DATE: 12-18-07
Conditions of Approval /
Timing
Responsib
Mitigation
Mitigation Monitoring Program
ility
Measure
/Monitorin
BL: Business License
9
7085 El Camino Real
GP: Grading Permit
Conditional Use Permit
BP: Building Permit
FI: Final Inspection
PS: Planning
Services
PLN 2007-1230/CUP 2007-0217
TO: Temporary
occupancy
BS: Building
Services
F0: Final Occupancy
FD: Fire
Department
PD: Police
Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
their property. Irrigation water will not be allowed to drain across the
sidewalk. All irrigation, regardless of the location of the planter, will be
supplied by the applicant in perpetuity.
Standard Conditions:
15. The applicant shall be responsible for the protection, relocation and/or
alteration of existing utilities.
16. The applicant shall install all new utilities (water, gas, electric, cable TV and
telephone) underground.
17. The applicant shall monument all property corners for construction control
and shall promptly replace them if disturbed.
18. Prior to issuance of building permits, the applicant shall submit a grading
and drainage plan with a separate sheet(s) devoted to sedimentation and
erosion control, prepared by a registered civil engineer for review and
approval by the City Engineer.
19. Prior to the final inspection, all outstanding plan check and inspection fees
shall be paid.
20. Prior to the final inspection, the applicant shall submit a written statement
from a registered civil engineer that all work has been completed and is in
full compliance with the approved plans and the Uniform Building Code
(UBC).
Mitigation Measures
Mitigation Measure 1.d.1: All exterior lighting, including parking lot lighting,
BP
BS, PS,
1.c.1
shall be designed to eliminate any off site glare. All exterior site lights shall
CE
utilize full cut-off, "hooded" lighting fixtures to prevent offsite light spillage and
glare. Any luminaire pole height shall not exceed 14 -feet in height, limit
intensity to 2.0 foot candles at ingress/egress, and otherwise 0.6 foot candle
minimum to 1.0 maximum within the site. Fixtures shall be shield cut-off type
with design compatible with the planned downtown gateway designation,
subject to staff approval.
Mitigation Measure 3.b.1: No person shall engage in any construction or
BP
BS, PS,
1.c.2
grading operation on property
CE
where the area to be disturbed is one (1.0) acre or less unless all of the
following dust mitigation measures are initiated at the start and maintained
throughout the duration of the construction or grading activity:
ITEM NUMBER:
DATE: 12-18-07
Conditions of Approval /
Timing
Responsib
Mitigation
Mitigation Monitoring Program
ility
Measure
/Monitorin
BL: Business License
9
7085 El Camino Real
GP: Grading Permit
Conditional Use Permit
BP: Building Permit
FI: Final Inspection
PS: Planning
Services
PLN 2007-1230/CUP 2007-0217
TO: Temporary
occupancy
BS: Building
Services
F0: Final Occupancy
FD: Fire
Department
PD: Police
Department
CE: City Engineer
WW: Wastewater
CA: City Attorney
(A) Construction vehicle speed at the work site must be limited to fifteen
(15) miles per hour or less;
(B) Prior to any ground disturbance, sufficient water must be applied to
the area to be disturbed to prevent visible emissions from crossing the
property line;
(C) Areas to be graded or excavated must be kept adequately wetted to
prevent visible emissions from crossing the property line;
(D) Storage piles must be kept adequately wetted, treated with a
chemical dust suppressant, or covered when material is not being added
to or removed from the pile;
(E) Equipment must be washed down before moving from the property
onto a paved public road; and
(F) Visible track -out on the paved public road must be cleaned using wet
sweeping or a HEPA filter equipped vacuum device within twenty-four
(24) hours.
Mitigation Measure 6.b.1: The grading permit application plans shall include
BP
BS, PS,
1.d.1
erosion control measures to prevent soil, dirt, and debris from entering the
CE
storm drain system during and after construction. A separate plan shall be
submitted for this purpose and shall be subject to review and approval of the
City Engineer at the time of Building Permit application.
Mitigation Measure 6.c.1: A soils report shall be required to be submitted with a
BP, GP
BS, PS,
3.b.1
future building permit by the building department.
CE
Mitigation Measure 8.e.f.1: The developer is responsible for ensuring that all
GP
PS, BS,
6.b.1
contractors are aware of all storm water quality measures and that such
CE
measures are implemented. Failure to comply with the approved construction
Best Management Practices will result in the issuance of correction notices,
citations, or stop orders.
Mitigation Measure 15A.1: All traffic control design features required by the
BP, GP
PS, BS,
6.c.1
project traffic engineer and the City Engineer will be implemented during the
CE
building permit process. Ingress and egress will be limited to right -in, right -out
movements only.
EXHIBIT C: Master Plan of Development/Site Plan
ECEIVED
NOV 2 2007
HUNITY DEVELOPMENT
6
ITEM NUMBER: 4
DATE: 12-18-07
F' F 9i ai;i Fwa si .�
� S '
r "' -»saves S xxx'x
CKE VERSION - PHOTOTYPE T24 - CW 2001
Sp6 i WEPuw I o CKE�
I D I I3I°I r r I`I
� mo-wls
EXHIBIT D: Landscape Plan
ITEM NUMBER: 4
DATE: 17-1 st—n7
PLANT LEGEND
TREE SYMBOLS
s.HRuB/PERENWAL SYMBOLS
ITEM NUMBER
DATE: 12-18-07
EXHIBIT E: Floor Plan
(ME V91&aN-F'ROTU�rYt ILn-wu aur
R 1 tl tl i D D D D D Flom P.
II I`rrrlI II I lii
� � �� _
C -r
s
ti
+i�tl
t
t
t
•ate ---
{'
;Fjj
R
;R
A
�
(ME V91&aN-F'ROTU�rYt ILn-wu aur
R 1 tl tl i D D D D D Flom P.
II I`rrrlI II I lii
� � �� _
ITEM NUMBER:
DATE 1218-07
EXHIBIT RElevations
> e. 411
_ .
|§ / ƒ� [ _A |
k
�
�
!
fit �
c.
�
/
\"o,
r
-;a
I
if
-
7
|
|
[-
�
%
®
|
` •
ii
�
"
/ ƒ
![
.
.
--- -
-
�
%
>
{
•
!
�
\I
�'
> e. 411
_ .
|§ / ƒ� [ _A |
ITEM NUMBER
DATE 1218-7
EXHIBIT RElevations
>
�'v
;\^ �[ | 11T[Nfl
.
!!
!!
}
G
�
j
J
:(
_
§
_
;
§
- x
q \
till!
| -
- •
��
ƒF�iA q�m
,
¢¢
>
�'v
;\^ �[ | 11T[Nfl
.
ITEM NUMBER: 4
DATE: 19-1 R_n7
EXHIBIT G: Color and Materials Board
See project file for specific proposed color selections
m
i m
m jl D
I ii
r if
m Rl
O Isl D
2 i LtJ
LrJ.
O
Z
�l
O
!LL?LLL z:' C Z
m
< r
�l
m EJ —
yyAg G EJ
rBfE#k�p �J >
F Fz Z —�
lel
rEiFiEEEL!
See project file for specific proposed color selections
ITEM NUMBER: 5
DATE: 12-18-07
Atascadero Planning Commission
Staff Report - Community Development Department
PLN 2007-1216
7580 Castano Avenue
Front Setback Reduction and Oversized Garage
(Byrd)
SUBJECT:
The proposed project consists of a Conditional Use Permit to allow an oversized garage
and a front setback reduction on a sloping lot.
RECOMMENDATION:
Staff Recommends:
Adopt Resolution PC 2007-0057 approving Conditional Use Permit 2007-0215 (PLN
2007-1216) based on findings and subject to Conditions of Approval.
SITUATION AND FACTS:
1. Owner/ Applicant: Leonard Byrd
7580 Castano Ave, Atascadero, CA 93422
2. Project Address: 7580 Castano Ave, Atascadero, CA 93422
(San Luis Obispo County) APN 029-141-015
3. General Plan Designation: Single Family Residential -Y
4. Zoning District: Residential Single Family -Y
5. Site Area: 0.3 acres
6. Existing Use: One single-family residence
7. Environmental Status: Exempt per CEQA Section 15303: New Construction or
Conversion of Small Structures
DISCUSSION:
Background
Project Site
r
Surrounding Land Use and Setting:
North: Residential Single Family -Y
South: Residential Single Family -Y
East: Residential Single Family -Y
West: Residential Single Family -Y
The project location is zoned Residential Single Family -Y (minimum lot size is one
acre). The project site is 0.3 acres and is currently developed with one 1122 sq. ft.
single-family residence, one storage shed, and the subject garage.
The Conditional Use Permit request for the oversized garage and front setback
reduction is regarding the detached garage on the property. The subject garage was
originally cited as a code enforcement case in 2005 for a structure built without permits.
In September of 2005, the applicant applied for a building permit to legalize the 17 -foot
by 26 1/2 -foot, two story structure (901 square feet total size.) Due to it's location in the
front setback and the size of the structure, as built permits could not be issued without
approval of a Conditional Use Permit.
In May of 2007, the applicant submitted a Conditional Use Permit application for an
oversized accessory structure and front setback reduction on a sloping lot. The Public
Works Department requested a front property line survey. The applicant obtained a
survey which showed that front wall of the structure extended in into the public right-of-
way 1'/2 feet.
The current proposal includes a partial demo of the structure to comply with conditions
of approval to maintain a minimum 5 -foot front setback. If the CUP is not approved, the
entire structure will need to be removed.
ANALYSIS:
Zonina Ordinance Conformance
Accessory Structure Size: The Atascadero Municipal Code limits the size of accessory
structures to 50% of the size of the main residence. Since the main residence on the
property is 1122 square feet, Conditional Use Permit approval is required in order to
permit any accessory structure over 561 square feet. The proposed structure includes
a partially enclosed patio space above the garage, and therefore requires approval for
the structure to exceed 50% of the size of the main structure.
9-6.106 Residential accessory uses.
"Floor Area. The gross floor area of a detached accessory structure is not
to exceed fifty percent (50%) of the gross floor area of the principal
structure." "Detached accessory structures that exceed size requirements
are subject to the approval of a minor conditional use permit. "
Front Setback: Front setbacks in the Residential Single Family Zone are required to be
25 feet from the edge of the right-of-way. The Municipal Code allows a front setback
reduction of up to 5 feet from the right-of-way for a garage on a sloping lot, with
Administrative Use Permit or Conditional Use Permit approval.
9-4.106 Front setbacks.
"Sloping Lot Adjustment. In any case where the elevation of the natural
grade on a lot at a point fifty (50) feet from the centerline of the adjacent
street right-of-way is seven (7) feet above or below the elevation of the
centerline, a private garage may be located, at the discretion of the
applicant, as close as five (5) feet to the street property line, pursuant to
Section 9-1.112 of this title, provided that portions of the dwelling other
than the garage shall be established at the setback otherwise required. "
Site and Buildina Desian
The site survey done on the subject property showed that the subject structure is
actually built 1'/2 feet into the right-of-way. Therefore, in order to meet the minimum 5 -
foot setback allowed with the Conditional Use Permit, the applicant is proposing to
remove 6'/2 feet from the front of the structure. The as built structure would be reduced
in size from 26 1/2 feet deep to 20 feet deep. The total square footage of the structure,
including the second story patio, would therefore be a total of 680 square feet. The
proposed application includes a request to allow the additional 119 square feet above
the allowed 50% of the main residence. A building permit would be required to be
obtained prior to any work being done on the building.
The site survey also found the retaining wall next to the garage is located just over 3
feet into the right-of-way. As a condition of the Use Permit, the retaining wall must be
removed from the right-of-way and permits must be obtained for construction of a new
retaining wall as required by the Building Code and Municipal Code.
A topographic survey has not been done on the site, however, the difference in grade
levels can be seen by the height of the stairs on the side of the garage and the slope as
the hill continues behind the garage. The Municipal Code requires that there must be a
minimum of a 7 -foot difference in grade between the center line of the right-of-way and
a point 50 feet in from the centerline. Based on the height of the stairs and the location
of the garage in relation to the hill behind, there appears to be approximately an 8 foot
elevation change at a point 50 feet from the centerline of the street.
Existing Floor Plan
(Structure built in right-of-way)
•.. ■
17'
� i G,r�t< C�ITrIi i i
ir/ 3/e i. •t/,
I
a .fry il.
R •.■ � oPLN IAaAl.E i�-
i � � ��•� EFIS'f/N4 5��3 F�ovlt i
1 --
li t1(STINh ,',rfEM w0.ty
I •,
�.1 (F -)IV W -Wt,
Foocwq W i4ryi
bnR7�1S
I -
911�' 4 nt
Proposed Floor Plan
(Must remove 6 % feet from the front of the garage to meet 5' setback)
oy�N e,49A E i
•• I•• : E!C 15r/N() S(
•• I �'. y • SIC rST/Nc1 .i�A3-FLool� i
2+
Si+p Phn+nc
Looking west toward the as -built garage.
d
Looking north along Castano Avenue.
r-IUPUZPUU OILW r-ldll
0 61-
-A* Gig
C.
It 41 7, RM
NOI
lCOMMUNI
05 a O Wir
Site Survey
♦ Edge f r.o.w Center line of street
(40' total width)
Retaining wall must
be removed from the
r.o.w. and pulled
back to the property
line N
Existing Concrete Wall
CIO
6'/2 feet must be
removed from the
front of the garage to
meet the 5' setback Existing Block Wa11
(9—age)
Findinas Conditional Use Permit
A Conditional Use Permit is required for granting of the requested additional 119 square
feet to the detached garage structure. The Conditional Use Permit is also required for
granting of the requested front setback reduction from the allowed 25 feet to 5 feet for a
garage on a sloping lot. The Planning Commission must make the following findings to
approve the oversized garage and sloping lot setback adjustment. If the Commission
chooses to deny the project, site specific findings for denial must be sited.
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual.
Staff Comment: The use is consistent with the Single -Family Residential
designation of the General Plan and the Appearance Review Manual.
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance).
Staff Comment: As conditioned, the project satisfies all zoning code provisions
related to single-family development with Planning Commission approval of the
exceptions, including size and location.
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety, or welfare of the general public or persons residing
or working in the neighborhood of the use, or be detrimental or injurious to property
or improvements in the vicinity of the use.
Staff Comment: The proposed development will not be detrimental to the general
public or working persons health, safety, or welfare. By removing 6'/2 feet from the
front of the structure, the structure will not have potential to interfere with the public
right-of-way of cause any sight distance problems.
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development.
Staff Comment: The project is consistent with the surrounding neighborhood uses
and development on sloped sites.
5. That the proposed use or project will not generate a volume of traffic beyond the
safe capacity of all roads providing access to the project, either existing or to be
improved in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
Staff Comment: The proposed project and use is consistent with the traffic
projections and road improvements anticipated within the General Plan.
6. The proposed project will not result in the authorization of a use not otherwise
allowed.
Staff Comment: With the partial demo of the building which is conditioned with this
project, the structure will be brought into conformance with all applicable building
and zoning codes.
7. The proposed project will not result in a project that is not in compliance with any
pertinent City policy or criteria adopted by ordinance or resolution of the City
Council.
Staff Comment: The Municipal Code allows for a front setback reduction on a
sloping lot and oversized garage with Planning Commission approval. If Planning
Commission approved the use permit and building permits are obtained, the site will
be brought into conformance with all City ordinances and policies.
Based on staff's analysis in the preceding sections, it appears that all of the required
findings for approval of a Conditional Use Permit can be made.
Proposed Environmental Determination
The proposed project qualifies as Exempt per CEQA Section 15303: New Construction
or Conversion of Small Structures.
Conclusion
In order to close the code enforcement case on the property and bring the structure into
zoning and building code conformance, the applicant is requesting a front setback
reduction and approval for an oversized garage. To meet the 5 -foot setback from the
right-of-way, the project is conditioned to remove 6'/2 feet from the front of the structure.
The total size of the structure is proposed to be 680 square feet, which exceeds 50% of
the size of 1122 square foot residence, and therefore requires Planning Commission
approval. With the conditioned partial demo and Planning Commission approval,
building permits could be issued and the structure could be brought in to conformance
with all applicable building and Municipal Code regulations.
ALTERNATIVES:
1. The Commission may approve the request for a Conditional Use Permit.
2. The Commission may continue the hearing and refer the item back to staff for
additional information or analysis. Direction should be given to staff and the
applicant on required information.
3. The Commission may deny the request if it is found to be inconsistent with the
General Plan or any of the other required findings. The Commission's motion to
deny must include a finding basis for denial. If the request is denied, the entire
structure would be required to be removed.
PREPARED BY: Callie Taylor, Associate Planner
ATTACHMENTS:
Attachment 1: Location Map, Zoning and General Plan
Attachment 2: Categorical Exemption
Attachment 3: Draft Resolution PC 2007-0057
Attachment 1: Location Map, General Plan and Zoning
'5ite
Zoning: RSF-Y (Residential Single Family -Y)
General Plan Designation: SFR -Y (Single Family Residential -Y)
ATTACHMENT 2: Categorical Exemption
-s��, sewn7Jz-
CITY OF ATASCADERO
NOTICE OF EXEMPTION
6907 EI Camino Real Atascadero, CA 93422 805.461.5000
TO: ® File Daie Reeeivedfor-ilin
RECEIVED
FROM: City of Atascadero DEC 10 2007
Community Development Department
6907 EI Camino Real
Atascadero, CA 93422 COMMUNITY DEVELOPMENT
SUBJECT: Filing of Notice of Determination in Compliance with Section 21152 of the Public Resources Code
Project Title
CUP 2007-0215 /PLN 2007-1216
Project Location (Include County)
7580 Castano, Atascadero, CA 93412 (San Luis Obispo County)
Project Description
A 680 square foot, detached accessory garage which exceeds 50% of the square footage of the main residence. The
applicant is requesting a .sloping lot front setback reduction to allow the structure to be located five feet form the
right of way.
Name of Public Agency Approving Project
City of Atascadero
Name of Person or Agency Carrying Out Project
Leonard Byrd; 7580 Castano, Atascadero, CA 93421
Exempt Status:
❑ Ministerial (Sec. 21080 (b)(1); 15268)
❑ Declared Emergency (Sec. 21080(b)(3); 15269(a))
❑ Emergency Project(Sec.21080 (b)(4);15269(b)(c))
® Categorical Exemption (Sec. 15303 (e), New Construction or Conversion of Small Structures)
Reasons why project is exempt:
Class 3 of the California Environmental Quality Act (CEQA) (Section 15303, New Construction or Conversion of
Small Structures) exempts construction and location of limited numbers of new, small facilities or structures,
including accessory structures such as garages and carports
(i
Date: December 10, 2007
Callie Taylor
Associate Planner
ATTACHMENT 3: Draft Resolution PC 2007-0057
DRAFT RESOLUTION PC 2007-0057
RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF ATASCADERO APPROVING PLN 2007-1216 /
CONDITIONAL USE PERMIT 2007-0215 ON APN 029-141-015
(7580 Castano Avenue / Byrd)
WHEREAS, an application has been received from Leonard Byrd (7580 Castano Ave,
Atascadero, CA 93422) Applicant and Property Owner to consider a project consisting of a
Conditional Use Permit for an oversized detached garage and a front setback reduction (2007-
0215); and,
WHEREAS, the site's General Plan Designation is SFR -Y (Single Family Residential);
and,
WHEREAS, the site's current zoning district is RSF-Y (Residential Single Family -Y);
and,
WHEREAS, a Conditional Use Permit is required to allow an accessory structure larger
than 50% of the primary structure's square footage, and to allow a reduction of the front setback
on a sloped lot; and,
WHEREAS, the proposed project qualifies for an Categorical exemption consistent with
CEQA section 15303 New Construction or Conversion of Small Structures; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional
Use Permit application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said entitlements; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on December 18, 2007, studied and considered Conditional Use Permit
2007-0215; and,
NOW THEREFORE, the Planning Commission of the City of Atascadero takes the
following actions:
SECTION 1. Findings of Environmental Exemption. The Planning Commission finds as
follows:
1. The proposed project has been found Categorically Exempt under Class 3, Section 15303
of the California Environmental Quality Act.
SECTION 2. Findings for approval of oversized garage. The Planning Commission
finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance); and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
SECTION 3. Findings for approval of sloping lot adjustment. The Planning
Commission finds as follows:
1. The proposed project, as conditioned, is consistent with the General Plan.
2. The proposal, as conditioned, will not be detrimental to the health, safety, or welfare of
the general public or persons residing or working in the neighborhood of the use, or be
detrimental or injurious to property or improvements in the vicinity of the use.
3. The proposal will be consistent with the character of the immediate neighborhood.
4. The proposed project will not result in the authorization of a use not otherwise allowed.
5. The proposed project will not result in a project that is not in compliance with any
pertinent City policy or criteria adopted by ordinance or resolution of the City Council.
SECTION 4. Approval. The Planning Commission of the City of Atascadero, in a regular
session assembled on December 18, 2007, resolved to approve Conditional Use Permit 2007-
0215 to, subject to the following:
EXHIBIT A: Conditions of Approval
EXHIBIT B: Site Survey
EXHIBIT C: Site Plan
EXHIBIT D: Floor Plan & Section
On motion by Commissioner , and seconded by Commissioner
foregoing resolution is hereby adopted in its entirety by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
ADOPTED:
CITY OF ATASCADERO, CA
Joan O'Keefe
Planning Commission Chairperson
Attest:
Warren M. Frace
Planning Commission Secretary
the
EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program
(CUP 2007-0215)
Conditions of Approval /
Timing
Responsibility
Mitigation Monitoring Program
/Monitoring
PS: Planning Services
BL: Business License
BS: Building Services
7580 Castano Avenue
GP: Grading Permit
FD: Fire Depadment
PLN 2007-1216/CUP 2007-0215
BP: Building Permit
FI: Final Inspection
PD: Police Department
CE: City Engineer
TO: Temporary Occupancy
WW: Wastewater
F0: Final Occupancy
CA: City Attorney
Planning Services
1. This conditional use permit shall be for a front setback reduction for an
BP
PS
oversized garage located on parcel 029-141-015 regardless of owner.
2. The approval of this use permit shall become final and effective for the
BP
PS
purposes of issuing building permits fourteen (14) days following the
Planning Commission approval unless prior to the time, an appeal to the
decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance.
3. The Community Development Department shall have the authority to
BP
PS, CE
approve the following minor changes to the project that (1) modify the site
plan project by less than 10%, and/or (2) result in a superior site design or
appearance.
4. Approval of this Conditional Use Permit shall be valid for twelve (12) months
BP
PS
after its effective date. At the end of the period, the approval shall expire and
become null and void unless the project has received a building permit.
5. The applicant and/or subsequent owners shall defend, indemnify, and hold
On going
PS
harmless the City of Atascadero or its agents, officers, and employees
against any claim or action brought to challenge an approval by the city, or
any of its entities, concerning the proposed development.
6. Applicant shall obtain all required building permits to bring the structure into
BP
PS, CE, BS
conformance.
7. A minimum setback of 5 feet shall be maintained from the right-of-way. The
BP, FI
PS, BS, CE
structure shall be brought into conformance with this provision by removing 6
'/2 feet from the front of the existing structure.
8. The retaining wall shall be removed from the right-of-way. A building permit
BP, FI
CE, BS
shall be obtained for the relocation or removal of retaining wall as required by
the Municipal Code.
9. Applicant to install a City standard 425 driveway approach from the existing
BP, FI
CE
concrete driveway to the edge of street pavement.
10. All buildings and retaining walls to be re -located outside of street right -of-
BP, FI
CE
way
11. The size of the structure shall not exceed 680 sq. ft. (20 feet by 17 feet, 2
BP
PS
stories in height) as shown in Exhibit D.
EXHIBIT B: Site Survey
Found Iron Pipe—,
(centerline) /
/ ZO
n0
v
Existing Concrete Wall
RIECE V r
AUG 0 3 2007
''OMMUNTt DEVELOPlE T
�9
cJa
O
9G
G
lip
.6•,69 � ids
I '.i•
Existing Block Wall
(garage)
F.
.jV, Exp. Sept 30, ZD08 �
20
No. 4562 �q
GRAP,fC SCS lgrF
S S OF CA1�F���
0
1 in=b = 70 !;.
Joe ,"i c.
EXHIBIT C: Site Plan
'fp' v,
4, -9
At
RECEIVED
NOV 2 0 2007
COMMUNITY DEVELOPMENT
EXHIBIT D: Floor Plan & Section
arc V-
,1��c W-
�4�.ori-Q��,�— nsz m Econ
3/1 QMH 4
-�ug (2Sl5tLVt_ �'U
JL4 SS A
_ dP
t
LjxyTso•J
2u'
t 17'
' .tt
I �
�I
" � OPEN �f1RAC.E.
rsrl"o S� z
t,/ (5T I NCc &r( -.o- w A"L
(tJ)15 wxi 6 D
FoccnlU uJ (i)�ti )-
tbArUT