Loading...
HomeMy WebLinkAboutPC_2010-11-16_AgendaPacketCITY OF ATASCADERO PLANNING COMMISSION AGENDA Regular Meeting Tuesday, November 16, 2010 - 7:00 P.M. City Hall Council Chambers 6907 El Camino Real Atascadero, California CALL TO ORDER Pledge of Allegiance Roll Call: Chairperson Moreno Vice Chairperson Bentz Commissioner Colamarino Commissioner Schmidt Commissioner Sturtevant Commissioner Ward APPROVAL OF AGENDA PUBLIC COMMENT (This portion of the meeting is reserved for persons wishing to address the Commission on any matter not on this agenda and over which the Commission has jurisdiction. Speakers are limited to three minutes. Please state your name and address for the record before making your presentation. The Commission may take action to direct the staff to place a matter of business on a future agenda.) PLANNING COMMISSION BUSINESS CONSENT CALENDAR (All items on the consent calendar are considered to be routine and non -controversial by City Staff and will be approved by one motion if no member of the Commission or public wishes to comment or ask questions.) City of Atascadero Planning Commission Agenda Regular Meeting, November 16, 2010 Page 2of5 1. APPROVAL OF ACTION MINUTES OF THE REGULAR PLANNING COMMISSION MEETING ON OCTOBER 19, 2010. COMMUNITY DEVELOPMENT STAFF REPORTS 2. PLN 2010-1386, TREE REMOVAL PERMIT FOR 8455 SANTA ROSA ROAD, ATASCADERO CHRISTIAN HOME Property Owner / Atascadero Christian Home, 8455 Santa Rosa Road, Atascadero, CA 93422 Applicant: Certified Arborist: Henry Curtis, 11755 Cenegal, Atascadero, CA 93422 Project Title: PLN 2010-1386 / Tree Removal Permit 2010-0145 Project 8455 Santa Rosa Road, Atascadero, CA 93422 Location: APN 056-301-039 (San Luis Obispo County) Project The applicant has requested removal of one (1) 50 -inch DBH Valley Oak tree located Description approximately 15 feet from residence #N in the Atascadero Christian Home complex. The tree has been evaluated by an arborist and it has been determined that the tree has significant decay in the majority of the scaffolding branches and large cavities in the main branches. Due to the location of the tree in close proximity to a residence, the potential failure of limbs creates a hazardous situation. The tree is proposed for removal with mitigation for replanting of eight (8) 5 gallon native trees on site. PUBLIC HEARINGS DISCLOSURE OF EX PARTE COMMUNICATIONS: Prior to a project hearing Planning Commission Members must disclose any communications they have had on any quasi-judicial agenda items. This includes, but is not limited to, Tentative Subdivision Maps, Parcel Maps, Variances, Conditional Use Permits, and Planned Development Permits. This does not disqualify the Planning Commission Member from participating and voting on the matter, but gives the public and applicant an opportunity to comment on the ex parte communication. (For each of the following items, the public will be given an opportunity to speak. After a staff report, the Chair will open the public hearing and invite the applicant or applicant's representative to make any comments. Members of the public will be invited to provide testimony to the Commission following the applicant. Speakers should state their name and address for the record and can address the Commission for three minutes. After all public comments have been received, the public hearing will be closed, and the Commission will discuss the item and take appropriate action(s).) City of Atascadero Planning Commission Agenda Regular Meeting, November 16, 2010 Page 3of5 3. PLN 2010-1378, MINOR CONDITIONAL USE PERMIT FOR 5000 SAN PALO ROAD Property Owner: Kiker and Pilch, c/o Pilch Family Trust, 1001 Foothill Blvd., San Luis Obispo, CA 93405 Applicant: Ellen Goodwin, SDG Architects, Inc., 762 Higuera St., Ste. 212, San Luis Obispo, CA Project Title: 93401 Project Title: PLN 2010-1378 / Minor Conditional Use Permit 2010-0253 Project 5000 San Palo Road, Atascadero, CA 93422 Location: APN 049-225-008 (San Luis Obispo County) Project Minor Conditional Use Permit to convert a non -operational automobile dealership to medical offices. Description: General Plan: General Commercial (GC) Zoning: Commercial Tourist (CT) Class 1 of the California Environmental Quality Act (CEQA) (Section 15301, Existing Proposed Facilities) exempts minor alteration of existing public or private structures, facilities, Environmental mechanical equipment, or topographical features involving negligible or no expansion of Determination: an existing use. Negligible expansion includes additions to existing structures provided that the addition will not result in an increase of more than 50% of the floor area of the structures before the addition, or 2,500 square feet, whichever is less. 4. PLN 2099-0931, AMENDMENT TO CUP 2002-0074, 9500 LAS LOMAS / CASA BELLA COURT Property TAG Investors, LLC, 2055 Corte Del Nogal, Carlsbad, CA 92011 Owner/Applicant: Project Title: PLN 2099-0931, Amendment to CUP 2002-0074 (Villas of Montecito) Casa Bella Court Project Lots 1-4 and Lots 18-29 Casa Bella Court (Previously 9500 Las Lomas) Atascadero, CA 93422 Location: APN 030-481-009 through 012, and 030-481-026 through 037 (San Luis Obispo County) Project An Amendment is proposed to the Master Plan of Development for the Villas of Montecito. Description: Revisions to Lots 1 and 2 are proposed to move the units closer to Casa Bella (the private internal street) in order to pull units off the slope. Revisions are proposed to the floor plans and elevations of Lots 1-4. Lots 18-29 are proposed to be built as detached single-family homes, rather than the attached duplex units which were originally approved. Elevation and floor plan changes are proposed for Lots 18-29 to coincide with the proposed detached units. There are no changes proposed to the lot line locations or number of bedrooms in the units. General Plan: High Density Residential (HDR) Zoning: Residential Multi -Family -16 with Planned Development 18 overlay (RMF -1 6/PD1 8) The Amendment is consistent with Mitigated Negative Declaration 2002-0038 which was Proposed prepared for the original project and certified by the Atascadero City Council on March 25, Environmental 2003. Determination: City of Atascadero Planning Commission Agenda COMMISSIONER COMMENTS AND REPORTS DIRECTOR'S REPORT ADJOURNMENT Regular Meeting, November 16, 2010 Page 4of5 The next regular meeting of the Planning Commission is scheduled for December 7, 2010, at City Hall, Council Chambers, 6907 El Camino Real, Atascadero. Please note: Should anyone challenge in court any proposed development entitlement listed on this Agenda, that person may be limited to raising those issues addressed at the public hearing described in this notice or in written correspondence delivered to the Planning Commission at, or prior to this public hearing. City of Atascadero Planning Commission Agenda Regular Meeting, November 16, 2010 Page 5of5 City of Atascadero WELCOME TO THE ATASCADERO PLANNING COMMISSION MEETING The Planning Commission meets in regular session on the first and third Tuesday of each month at 7:00 p.m. at City Hall, Council Chambers, 6907 EI Camino Real, Atascadero. Matters are considered by the Commission in the order of the printed Agenda. Copies of the staff reports or other documentation relating to each item of business referred to on the Agenda are on file in the office of the Community Development Department and are available for public inspection during City Hall business hours at the Front Counter of City Hall, 6907 EI Camino Real, Atascadero, and on our website, www.atascadero.org. An agenda packet is also available for public review at the Atascadero Library, 6850 Morro Road. All documents submitted by the public during Commission meetings that are either read into the record or referred to in their statement will be noted in the minutes and available for review in the Community Development Department. Commission meetings are video-taped and audio recorded, and may be reviewed by the public. Copies of meeting recordings are available for a fee. Contact the City Clerk for more information (470-3400). In compliance with the Americans with Disabilities Act, if you need special assistance to participate in a City meeting or other services offered by this City, please contact the City Manager's Office or the City Clerk's Office, both at (805) 470-3400. Notification at least 48 hours prior to the meeting or time when services are needed will assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service. TO SPEAK ON SUBJECTS NOT LISTED ON THE AGENDA Under Agenda item, "PUBLIC COMMENT", the Chairperson will call for anyone from the audience having business with the Commission to approach the lectern and be recognized. 1. Give your name for the record (not required) 2. State the nature of your business. 3. All comments are limited to 3 minutes. 4. All comments should be made to the Chairperson and Commission. 5. No person shall be permitted to make slanderous, profane or negative personal remarks concerning any other individual, absent or present. This is when items not on the Agenda may be brought to the Commission's attention. A maximum of 30 minutes will be allowed for Public Comment Portion (unless changed by the Commission). TO SPEAK ON AGENDA ITEMS (from Title 2, Chapter 1 of the Atascadero Municipal Code) Members of the audience may speak on any item on the agenda. The Chairperson will identify the subject, staff will give their report, and the Commission will ask questions of staff. The Chairperson will announce when the public comment period is open and will request anyone interested to address the Commission regarding the matter being considered to step up to the lectern. If you wish to speak for, against or comment in any way: 1. You must approach the lectern and be recognized by the Chairperson. 2. Give your name (not required). 3. Make your statement. 4. All comments should be made to the Chairperson and Commission. 5. No person shall be permitted to make slanderous, profane or negative personal remarks concerning any other individual, absent or present. 6. All comments limited to 3 minutes. If you wish to use a computer presentation to support your comments, you must notify the Community Development Department at 470-3402 at least 24 hours prior to the meeting. Digital presentations brought to the meeting on a USB drive or CD is preferred. Access to hook up your laptop to the City's projector can also be provided. You are required to submit to the Recording Secretary a printed copy of your presentation for the record. Please check in with the Recording Secretary before the meeting begins to announce your presence and turn in the printed copy. The Chairperson will announce when the public comment period is closed, and thereafter, no further public comments will be heard by the Commission. ITEM NUMBER: 1 DATE: 11-16-10 CITY OF ATASCADERO PLANNING COMMISSION DRAFT ACTION MINUTES Regular Meeting — Tuesday, October 19, 2010 — 7:00 P.M. City Hall Council Chambers 6907 EI Camino Real, Atascadero, California CALL TO ORDER - 7:00 p.m. Chairperson Moreno called the meeting to order at 7:00 p.m. and Commissioner Ward led the Pledge of Allegiance. ROLL CALL Present: Chairperson Moreno, Vice Chairperson Bentz, Commissioners Colamarino, Jack, Schmidt, Sturtevant, and Ward Absent: None Others Present: Recording Secretary Annette Manier Staff Present: Community Development Director Warren Frace and Assistant Planner Alfredo Castillo APPROVAL OF AGENDA MOTION: By Commissioner Jack and seconded by Vice Chairperson Bentz to approve the agenda. Motion passed 7.0 by a roll -call vote. PUBLIC COMMENT None PC Draft Action Minutes of 10/19/10 Page 1 of 4 PLANNING COMMISSION BUSINESS None CONSENT CALENDAR 1. APPROVAL OF ACTION MINUTES OF THE PLANNING COMMISSION MEETING ON OCTOBER 5, 2010. MOTION: By Vice Chairperson Bentz and seconded by Commissioner Jack to approve the Consent Calendar. Motion passed 7.0 by a roll -call vote. COMMUNITY DEVELOPMENT STAFF REPORTS 2. PLN 2010-1384, TREE REMOVAL PERMIT FOR 5448 ATALAYA STREET Property Owner: Thomas P. Jeremiassen, Chapter 11 Trustee for Estate Financial Inc., c/o ECR 24, LLC, 2049 Century Park East, Ste. 2300, Los Angeles, CA 90067 Applicant: Michael Fredericks Paving Co., PO Box 573, Atascadero, CA 93423 Certified Arborist: A & T Arborists, 1565 EI Camino Real, Atascadero, CA 93422 Project Title: PLN 2010-1384 / TRP 2010-0144 Project 5448 Atalaya Street, Atascadero, CA 93422 Location: APN 049-047-022 (San Luis Obispo County) Project The applicant has requested the removal of one 42 inch DBH Coast Live Oak Description: (Quercus agrifolia) located in the center planter of Atalaya Street, nearest EI Camino Real. The tree has been evaluated by a Certified Arborist and it has been determined that the tree is 90% dead due to construction impacts with no mitigation care. The tree is located in a high traffic area and the current condition creates a hazardous situation. The tree is proposed for removal with mitigation for replanting of native trees in the development. General Plan: SFR -X Zoning: RSF-X Assistant Planner Alfredo Castillo gave the staff report and answered questions from the Commission. Assistant Planner Castillo referred to and distributed an Arborist Report from A&T Arborists (Exhibit A). PC Draft Action Minutes of 10/19/10 Page 2of4 DISCLOSURE OF EX PARTE COMMUNICATIONS: • Commissioner Ward visited the site, but was unclear on where the subject tree was located. • Commissioner Jack visited the site and agrees that the tree is dead. • Commissioner Schmidt received an Arborist Report as did the rest of the Commissioners, which was not delivered in his packet. (Exhibit A) • Chairperson Moreno spoke with the Arborist, Steve Alvarez regarding the tree and its condition. MOTION: By Commissioner Sturtevant and seconded by Vice Chairperson Bentz to adopt Resolution PC 2010-0020 approving PLN 2010-1384, Tree Removal Permit 2010- 0144 to allow the removal of one (1) hazardous live oak totaling 42 -inches dbh located within the Tract 2640 (Oak Grove Phase II) subject to conditions of approval. Motion passed 7:0 by a roll -call vote. 3. PLN 2006-1133. ANNUAL HOUSING REPORT Applicant: City of Atascadero, 6907 EI Camino Real, Atascadero, CA 93422 Project Title: PLN 2006-1133 Annual Housing Report Project Citywide Location: Project This is an annual progress report required by the California Department of Description: Housing and Community Development in regards to the City's adopted 2003 Housing Element. This report is to monitor the implementation of the City's General Plan Housing Element and progress toward meeting the City's 2007- 2014 Regional Housing Needs Allocation (RHNA). Assistant Planner Alfredo Castillo gave the staff report and explained that there will be no action required on the item tonight. Community Development Director Frace and Assistant Planner Castillo answered questions from the Commission. The Housing Element will be coming back to the Planning Commission in December. PUBLIC HEARINGS None PC Draft Action Minutes of 10/19/10 Page 3of4 COMMISSIONER COMMENTS AND REPORTS Commissioner Schmidt inquired about signs for the Santa Rosa Rehabilitation project, tracking of sediment in regards to storm water, and redevelopment agency funds with respect to the Housing Element. Director Frace addressed Commissioner Schmidt's questions. DIRECTOR'S REPORT • Director Frace announced that the Nov. 2, 2010 meeting will be cancelled. The next meeting will be on Nov. 16, 2010. • Director Frace gave an update on the Historic City Hall project. • Director Frace gave an update on the Eagle Ranch project and said the RFQ for an EIR Consultant went out last week. • The Housing Element will be coming back to the Planning Commission in December. ADJOURNMENT - 8:04 p.m. The meeting of November 2, 2010 will be cancelled. The next regular meeting of the Planning Commission is scheduled for November 16, 2010, at City Hall, Council Chambers, 6907 EI Camino Real, Atascadero. MINUTES PREPARD BY: Annette Manier, Recording Secretary The following exhibit is available in the Community Development Department: Exhibit A —A& T Arborists Report \\cityhall\cdvlpmnt\- pc minutes\pc minutes 10\pc draft actn minutes 10 19 10.doc PC Draft Action Minutes of 10/19/10 Page 4 of 4 ITEM NUMBER: 2 DATE: 11-16-10 Atascadero Planning Commission Staff Report — Community Development Department Alfredo R. Castillo, AICP, Assistant Planner, 470-3436, acasti/lo@atascadero.org PLN 2010-1386 Hazardous Tree Removal Permit 2010-0145 8455 Santa Rosa (Atascadero Christian Home / Silva) SUBJECT: The proposed project includes a request to remove one (1) 50 -inch DBH Valley Oak, located residence #N at the Atascadero Christian Home. The tree is in decline and in poor condition, creating a potential hazard for the existing residence that is approximately 15 feet away, as certified by the project arborist. RECOMMENDATION: Staff Recommends: The Planning Commission adopt Resolution PC 2010-0023 to allow the removal of one (1) hazardous Live Oak totaling 50 inches DBH subject to conditions of approval. Situation and Facts: 1. Property Owner: Atascadero Christian Home, 8455 Santa Rosa Road, Atascadero, CA 93422 2. Applicant: Paul Silva, 8455 Santa Rosa Road, Atascadero, CA 93422 3. Project Address: 8455 Santa Rosa Road #N, Atascadero, CA 93422 APN 056-301-039 4. Certified Arborist: Henry Curtis, Whit's Turn Tree Care, 11755 Cenegal, Atascadero, CA 93422 5. General Plan Designation: Single Family Residential (SFR) 6. Zoning District: Residential Single Family (RSF-Y) ITEM NUMBER: 2 DATE: 11-16-10 7. Site Area: 14.86 acres 8. Existing Use: Residential Care Facility ANALYSIS: An application has been submitted by Atascadero Christian Home for the removal of one (1) 50" Live Oak. The tree is located approximately 15 feet from the front entrance of residence #N and is planted within a landscape planter adjacent to the driveway. Atascadero Christian Home retained Henry Curtis of Whit's Turn Tree Care, a certified arborist, to complete an arborist report on the tree due to safety concerns by the on-site maintenance staff. The arborist stated that the tree has serious root damage due to years of construction near the oak. In addition, the tree has been trimmed numerous times and has not properly healed from these trimming and recommends that the tree be removed for safety reasons as soon as possible. The applicant requested an emergency tree removal permit. Staff observed the subject tree and had questions regarding the tree's health due to the observance of growth and foliage. Staff requested a second evaluation by the City's arborist to assist in determining the severity of the proposed tree removal permit. The City arborist reached similar conclusions with the applicant's arborist. The City arborist noted that the tree appears to have significant and sever decay in the majority of the scaffolding branches and large cavities in the main" crotches. This r condition could sustainably weaken its structure and stability of the tree. With the proximity of the existing residence, then City arborist also ` r concluded that tree be removed, however since there was no cracking, splitting, or upheaval imminent failure was not likely, 50" valley Oak e 1 and recommended proposed for removal that the applicant utilize the normal permitting process. ITEM NUMBER: 2 DATE: 11-16-10 Tree Mitigation Tree Removal Permit fees are not required for the removal of hazardous trees. The regular fee for a Tree Removal Permit which requires Planning Commission hearing is $755. The fee has been waived for the subject application. The Atascadero Municipal Code requires mitigation for all trees approved for removal. AMC Section 9-11.105 identifies specific conditions of approval which are required with the approval of a tree removal. Planning Commission can approve one or more of the following conditions as mitigation: AMC Section 9-11.105: Tree removal permits shall be conditioned by one or more of the following methods: (i) Depending on the characteristics of the site the applicant may plant replacement trees on site. This method shall include payment in advance for three (3) site inspections during a four (4) year establishment period; (ii) Payment of fee to the Tree Replacement Fund; (iii) Establishment of conservation easements, which will restrict removal of any tree within a designated area of the property. (Ord. 350 § 2 (part), 1998) In accordance with Section 9-11.105 of the Atascadero Native Tree Ordinance, staff has included a condition in the attached resolution which requires either replanting or payment of fees to the tree fund. The applicant shall either replant eight (8), five -gallon native trees on-site, or make a mitigation payment of $416.67 into the tree fund, or combination thereof. Evergreen Native Trees (inches) Deciduous Native Trees (inches) Totals dbh notes dbh notes 1 50 -inches 1 2 2 3 3 15 15 Total 50 -inches Total 0 -inches 50 -inches Mitigation Requirement req'd tree replacements: 8 five gal trees req'd tree replacements 0 five gal trees Proposed Replanting 8 five gal trees Proposed Replanting 0 five gal trees 8 five gal trees 0 fifteen gal trees 0 fifteen gal tree� Of iftee n gal trees 0 box trees (24") 0 box trees (24i') 0 box trees (24") Remaining Mitigation 0 five gal trees Remaining Mitigation 1 0 five gal tre#gs 0 five gal trees Tree Fund Payment: $ 416.67 Tree Fund Payment: $ - �♦ $ 416.67 ITEM NUMBER: 2 DATE: 11-16-10 FINDINGS: In considering any tree removal request, at least one of the required findings must be made. Staff has identified the following finding as appropriate for the application request. The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an Arborist. CONCLUSIONS: A certified arborist has determined that the subject 50 -inch DBH Valley Oak tree is in decline and creates a potential hazard for the existing residence that is approximately 15 feet away. Based on the arborist's evaluation and above analysis, findings can be made to approve the requested removal, subject to the required mitigation. ALTERNATIVES: 1. The Commission may approve the project with additional or revised project conditions. 2. The Commission may deny the project if it is found that the required findings cannot be made. The Commission's motion to deny must include a finding basis for denial. 3. The Commission may continue the hearing and refer the item back to staff for additional information or analysis. Direction should be given to staff and the applicant on required information. ATTACHMENTS: Attachment 1 — Location Map (General Plan & Zoning) Attachment 2 — Aerial Photo Attachment 3 — Site Photos Attachment 4 — Arborist Tree Survey Attachment 5 — City Arborist Report Attachment 6 — Draft Resolution PC 2010-0023 ITEM NUMBER: 2 DATE: 11-16-10 ATTACHMENT 1: Location Map (Zoning Map) PLN 2010-1386 / TRP 2010-0145 Atascadero Christian Home APN 056-301-039 h 8375 8620WW 8690 yo p 8815 5 87200^ 8630 u655 8834 0 8945 RP 8995 6645 89� 99 yh 0^y 01°� 1¢p � 0 6� 8G?5 0°j 0 � 8355 &105 8800 99� 8M 09 5 $ �� �sJ e�51,0 ey o �SryS ��S s 6349 8351 �^' �T? ,�, 0,y 09cQ 7020 7025 8665 ���5 9015 9,05 `rr 8575 9065 9115 7000 8625 6� m 9075 6-0.`� 000 85508550 6Rc'o ';&9135 a�10 "09019105 ���0 s O'o \,.. it�S0 e9205 �"o �O o 6�0 190"0. 10 o � 9020 06 9020 a11 a o 9 6 ,titi e Proposed Tree Removal 90209020 3„p 9?05 ,� 9,s 9 °ss in RSF-Y at Atascadero 902%020 9 ?� 9?� $S $-S 0 0 �fQ Christian Home 9�`5 O� 8452 ' J �SS - Ivy 's 5 �ti oryoo `r � s� dam 6S O 1315 ja ,555 9 t2s P �ybi yS X65 � X501 X25 �6p y4� 5 � 1 � • h 0515 �c�5 9545 05�� $ ¢`'S _ Il $ 's $ r• ,g o 9575 � �iP • � -O 9 i J 5522 8330 9045 -9080 `0 960 .1iBo �q 9,S,o Ps 4S$ `$ � s gs?o66870: sets �s� s67_ BSS �' X09 X30 e', 91tiI, -9116$ if 903_ ftO4 B9gq 0�9 X75 8967 8971 10000 9000 9008 Zoning: Residential Single Family (RSF-Y) General Plan Designation: Single Family Residential (SFR) ITEM NUMBER: 2 DATE: 11-16-10 ATTACHMENT 2: Aerial Photo PLN 2010-1384 / TRP 2010-0145 Atascadero Christian Home APN 056-301-039 i' owOt V� 7 4p - Dead tree in front of residence. ri.. I*- t� a �� � - / A-••8fi ITEM NUMBER DATE: 11-16-10 ATTACHMENT 3: Site Photos PLN 2010-1384 / TRP 2010-0145 Atascadero Christian Home APN 056-301-039 View of tree trunk decav Visible pruning that has not healed ATTACHMENT 4: Arborist Tree Survey PLN 2010-1384 / TRP 2010-0145 Atascadero Christian Home APN 056-301-039 Arborist Tree Mitigation Recommendation Tree Location: Atascadero Christian Home 8455 Santa Rosa Road Atascadero CA 93422 In front of Apartment 'N' Tree Type: Genus- Quercus Species- lobata Trunk D.B.H= 50 inches Canopy Radius= 50 feet ITEM NUMBER DATE: 11-16-10 RECEIVED NOV I 0 2010 COMMUNITY DEVELOPMENT Tree Characteristics: The Valley Oak is inside of a planter, on the driveway, the residence and sidewalk surround the tree, and decay and rot are throughout the entire tree. Summary: Years of construction near the Oak such as; the sidewalk, road, and residence has caused severe root damage to the old Valley Oak. There are major signs of decay and rot in the entire tree. This Oak has been trimmed numerous times in the past and still has not healed from any of its wounds and cuts. Evident are many branch failures as well as completely hollow spars from the severe decay. My responsibility as an Arborist is to reduce the hazard of this Valley Oak. In my professional opinion pruning the tree is not an option, as it would do more harm than good. There is no available growth on this tree to allow an area for us to trim back to. Removal is the only option to ensure safety for the residents and employees at the Atascadero Christian Home. Whit -,i Turn Tree Care Arboriet. Henry Curtre WE -6345-A 805-674-8147 ITEM NUMBER DATE: 11-16-10 ATTACHMENT 4: Arborist Tree Survey PLN 2010-1384 / TRP 2010-0145 Atascadero Christian Home APN 056-301-039 KORO S_ ITEM NUMBER DATE: 11-16-10 ATTACHMENT 5: City Arborist Report PLN 2010-1384 / TRP 2010-0145 Atascadero Christian Home APN 056-301-039 Memorandum DAVEY. RESI1IRCE GRIUP To: CaIIie Taylor, City Of Atascadero AI&B-7 T- &OW From: Michael J. Bova, Davey Resource Group Date: November 11, 2010 Re; Hazard Tree Inspection for 8455 Santa Rosa Road As requested, Davey Resource Group (DRG) inspected the tree at the above location on November 11, 2010. A Hazard Tree Removal permit had been submitted to the City on November 10, 2010 and DRG was assigned to review the condition of the tree and verify the information provided on the accompanying arborist report from Whit's Turn Tree Care. Observations Upon inspection, the location was found to be a mostly level, developed lot with multiple single-family residences throughout the Atascadero Christian Home complex. The specific site contains one large valley oak (Quercus labaia) tree approximately 1.5' from the front of the residence in a landscape planter area adjacent to the driveway of unit "N". The valley oak was found to be 50 inches in diameter at breast height (DBH) and approximately 50 feet in height, The canopy diameter was estimated at 5"0 feet and originated from a single trunk with a slight (15 degree) lean towards the driveway. There was evidence of previous limb failures in the upper canopy and at least 2 large (> 24 inches) limb removals in the lower canopy. Numerous cavities and unhealed wounds were observed throughout the scaffolding branches indicating significant decay within the leaders. There was no outward evidence of decay on the main trunk. The tree presented with average to sparse live foliage and significant sucker growth was evident at terminal leaders where previous large cuts were made. There was minimal deadwood in the canopy indicating some routine maintenance had occurred within the last 5 years. Overall, the foliage and canopy of the tree appeared to be in fair condition while the limb structure and health was determined to be in poor condition. Conclusions Predicting tree failure is not possible, but identifying certain characteristics that make a tree more prone to failure is a common method for evaluating a tree condition. Based on the visual observations, it appears that this tree has significant and severe decay in the majority of the scaffolding branches and large cavities in the main crotches. This condition can sustainably weaken the structure and stability of this tree and, combined with the high target value of the residence and driveway, it is highly recommended to remove this tree as soon as possible. Since there was no evidence of cracking, splitting or upheaval, imminent failure is not predicted but removal should occur prior to winter storms. Please contact me with any questions or concerns. Michael J. Bova Project Coordinator Davey Resource Croup ISA Certified Arborist, WE3372A ITEM NUMBER DATE: 11-16-10 ATTACHMENT 5: City Arborist Report PLN 2010-1384 / TRP 2010-0145 Atascadero Christian Home APN 056-301-039 ITEM NUMBER: 2 DATE: 11-16-10 ATTACHMENT 6: Draft Resolution PC 2010-0023 PLN 2010-1386 / TRP 2010-0145 DRAFT RESOLUTION NO. PC 2010-0023 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO APPROVING PLN 2010-1386 / TRP 2010-0145, TO ALLOW THE REMOVAL OF ONE (1) HAZARDOUS VALLEY OAK TOTALING 50 INCHES DBH LOCATED 8455 SANTA ROSA ROAD #N AT APN 056-301-039 (ATASCADERO CHRISTIAN HOME / SILVA) WHEREAS, an application was received from Atascadero Christian Home, 8455 Santa Rosa Road, Atascadero, CA 93422, (Property Owner) and Paul Silva, 8455 Santa Rosa Road, Atascadero, CA 93422 (Applicant), for a Tree Removal Permit to remove one (1) hazardous Valley Oak totaling 50 inches DBH; and, WHEREAS, the Planning Commission reviewed the proposed Tree Removal Permit application on November 16, 2010, at 7:00 p.m. and considered testimony and reports from staff, the applicants, and the public; and, NOW THEREFORE, the Planning Commission of the City of Atascadero, California takes the following actions: SECTION 1. Findings for tree removal. The Planning Commission finds as follows: ■ The tree is dead, diseased or injured beyond reclamation, as certified by a tree condition report from an Arborist SECTION 2. Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on November 16, 2010, resolved to approve Tree Removal Permit 2010-0145, subject to the following: EXHIBIT A: Conditions of Approval EXHIBIT B: Tree Mitigation Chart ITEM NUMBER: 2 DATE: 11-16-10 On motion by Commissioner , and seconded by Commissioner , the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: NOES: ABSENT: ADOPTED: ABSTAINED: CITY OF ATASCADERO, CA Heather Moreno Planning Commission Chairperson ATTEST: Warren Frace Planning Commission Secretary ITEM NUMBER DATE: 11-16-10 EXHIBIT A: Conditions of Approval / Mitigation Monitoring PLN 2010-1386 / TRP 2010-0145 Conditions of Approval Timing Responsibility (Monitoring PLN 2010-1386 / TRP 2010-0144 FM; Fral Map BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department Atascadero Christian Home APN 056-301-039 TO: Temporary Occupancy CE: City Engineer F0: Final Occupancy WW: wastewater CA: City Attorney Standard Planning Conditions 1. The approval of this application shall become final, subject to the completion of Tree removal PS the conditions of approval, fourteen (14) days following the Planning Commission approval unless prior to the time, an appeal to the decision is filed as set forth in Section 9-1.111(b) of the Zoning Ordinance. 2. The applicant and/or subsequent owners shall defend, indemnify, and hold On going PS harmless the City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the proposed development. 3. The applicant shall pay $416.67 into the tree mitigation fund or replant Tree removal PS eight (8), 5 -gallon native trees on-site, or combination of fees and replanting. Mitigation shall be paid prior to removal of the tree. ITEM NUMBER DATE: 11-16-10 EXHIBIT B: Tree Mitigation Chart Evergreen Native Trees (inches) Deciduous Native Trees (inches) Totals dbh notes dbh notes 1 50 -inches 1 2 2 3 3 15 15 Total 50 -inches Total 0 -inches 50 -inches Mitigation Requirement req'd tree replacements: 8 five gal trees req'd tree replacements 0 five gal trees Proposed Replanting 8 five gal trees Proposed Replanting 0 five gal trees 8 five gal treirs, 0 fifteen gal trees 0 fifteen gal trees 0 fifteen gal trees" 0 box trees (24") 0 box trees (24"),� 0 box trees (24") 1 Remaining Mitigation 0 five gal trees Rernaining Mitigation 0 five gal trees 0 five gal trees Tree Fund Payment: $ 416.67 Tree Fund Payment: $ - �� $ 416.67 ITEM NUMBER: 3 DATE: 11-16-10 Atascadero Planning Commission Staff Report - Community Development Department Alfredo R. Castillo, AICP, Assistant Planner, 470-3436, acastillo@atascadero.org PLN 2010-1378 Minor Conditional Use Permit 2010-0253 Conversion of Automobile / Boat Sales to Medical Offices 5000 San Palo Road (Pilch Family Trust) SUBJECT: The proposed project consists of an application for a Minor Conditional Use Permit to convert an approximately one (1) acre automobile / recreational vehicle dealership building and outdoor sales lot to medical offices at 5000 San Palo Road. RECOMMENDATION: Staff Recommends: The Planning Commission adopt Resolution PC 2010-0021 approving Minor Conditional Use Permit 2010-0253 based on findings and subject to Conditions of Approval. Situation and Facts 1. Applicant: SDG Architecture, 762 Higuera Street, San Luis Obispo, CA 93401 2. Owner: Pilch Family Trust, 1001 Foothill Blvd., San Luis Obispo, CA 93405 3. Project Address: 5000 San Palo Road, Atascadero, CA 93422 APN 049-225-008 4. General Plan Designation: General Commercial (GC) 5. Zoning District: Commercial Tourist (CT) 6. Site Area: 0.95 acres 7. Existing Use: Vacant 8. Environmental Status: Section 15301 Categorical Exemption: Existing Facilities DISCUSSION: Background A Conditional Use Permit (CUP 99-002) was approved by the Planning Commission on April 20, 1999 to allow the construction of a 2,880 square foot building and a 20,000 square -foot sales lot area for automobile sales on the subject site at 5000 San Palo Road. The project was appealed to the City Council on April 26, 1999 due to concerns about levels of traffic in the area and the potential for customers to test drive vehicles in the nearby residential neighborhood. The project was approved by the City Council on May 25, 1999 and the site was developed as proposed. On April 4, 2000, the CUP was amended to allow an additional 15,000 square -foot automobile sales lot on an adjacent 0.5 acre site at 6000 San Palo Road (now addressed as 4800 San Palo Road) in conjunction with the automobile dealership. The combined sites were used as an automobile indoor/outdoor sales lot until early 2007 when the dealership closed. In 2007, the Planning Commission approved PLN 2007-1271 to allow for the sale and repair of boats and other watercraft recreational vehicles at 5000 San Palo Road (subject property) as well as approved PLN 2007-1253 that allow for the sale of manufactured homes at 4800 San Palo Road, the adjacent sales lot that was also used as a part of the dealership. Royer's Cycle and Marine opened up a sales lot at 5000 San Palo Road in 2008 however the business closed within a year of opening. Manufactured Home Sales of California still operates at 4800 San Palo Road. The property was listed as an asset as a part of Chapter 7 Bankruptcy case filed by Kelly Gearhart. In August of 2010, the property was used to settle a claim against one of Mr. Gearhart's holding companies. The Pilch Family accepted this property as a part of the bankruptcy settlement to his debtors. The Pilch Family is proposing the conversion of the sales lot to medical office uses. Surrounding Land Use and Setting: North: Highway 101 South: Single Family Residential -Z (SFR -Z) East: Highway 101 West: Commercial Tourist (CT) Aerial Photo ,r r. ' 4 to �' � • IA— +� f7 t t - A •mss 41 44 .� '` 'k • / + 101 p ANALYSIS: Project Site;. c ,t_:n_. #� 5000 San Palo 4800 San Palo Manufactured Homes Sales Lot The proposed project consists of a request to convert an indoor/outdoor automobile sales use to medical offices at 5000 San Palo Road. Medical offices fall under the definition of "Health Care Services" per the Atascadero Municipal Code (AMC) 9-3.701. Health Care Services are listed as a conditional use in the Commercial Tourist (CT) � l: Y r��~ tea. � � � / /• ANALYSIS: Project Site;. c ,t_:n_. #� 5000 San Palo 4800 San Palo Manufactured Homes Sales Lot The proposed project consists of a request to convert an indoor/outdoor automobile sales use to medical offices at 5000 San Palo Road. Medical offices fall under the definition of "Health Care Services" per the Atascadero Municipal Code (AMC) 9-3.701. Health Care Services are listed as a conditional use in the Commercial Tourist (CT) zoning district. The applicant is requesting a CUP to convert the existing indoor automobile sales/retail building to medical offices with an additional 1,500 +/- sf of office space by enclosing an existing covered area of the existing building. Existing Site Conditions The site is approximately one (1) acre in size. It consists of the existing building pad located in the western portion of the site. This building originally was constructed to be used as offices and sales area for Central Coast Auto which later became a Mitsubishi dealership. The space included offices, waiting areas, sales areas, and a detail/repair shop used for auto repairs. The building also includes large 20 -foot overhangs on two - sides of the building that was used to display new and used automobiles for sale. The remaining portions of the lot have been paved. This area was utilized as the sales lot and customer parking. Light posts and drainage inlets are located within the paved portions of the parking lot. Large Overhangs and view of previous sales lot The site has been extensively graded to accommodate the sales lot and is relatively flat. Near the edge of the right of way of San Palo Road, the site has been graded with a 2:1 slope. This slope was required to be landscaped as a part of previous approvals, however since the property has been vacant, the existing landscaping has died due to lack of irrigation. The existing site has two points of access. The primary point of access is from the southern end of the site; this existing driveway access is on the entire subject property. However the adjacent driveway at the San Palo Inn on the northern end is currently not a legally granted easement available to the project. Staff has proposed Condition 6 in Drivewav Locations Ilk e 10 {;4 v' `w 1 Secondary I access point Primary access •' with shared access rhe Conditions of Annmval that rerniire-. the nnnlirnnt to nrnvide a recinmral arc easement at the northern driveway prior to issuance of final building permit. Bss The second point of access is located at the western portion of the site behind the existing building. The secondary access is from a driveway that connects to San Palo Road. This drive is located on the adjacent site, the San Palo Inn and provides access to the Inn's casitas located directly behind the proposed medical offices and connects to Views of project entryways. San Palo Inn Entry on the left, San Palo Road on the right. mom the property. Similar to the primary access, this access is currently not legally granted via a recorded easement. The applicant at this time is not proposing additional access via this driveway at this time, however, it is to the benefit of both the applicant and the property owners of the San Palo Inn to resolve access issues and record these easements for future property owners and tenants. Proposed Site Changes The applicant is proposing various modifications to the existing site with the proposed building renovation. This includes the addition of trash enclosures, hardscaping, landscaping, patient drop off, and monument signage. A new trash enclosure is now included consistent with AMC 9-4.125(4) adjacent to the property line on the western portion of the site. Although the applicant has not provided a detail of the trash enclosure, Staff is proposing a condition (Condition 7) that stipulates that the trash enclosure's design be reflective the architecture and articulation of the existing building. Additional hardscaping is also proposed with the Location of new trash enclosure proposed new site plan. This hardscaping includes colored stamped concrete for the accessible path of travel from the sidewalk/right-of-way (condition 8), and a new large colored stamped concrete for a patio and walkway behind the building for use by either employees or patients (condition 8). This is an added project amenity as proposed by the applicant. The applicant has also proposed additional landscaping throughout the site including replanting of low-lying shrubs along San Palo Road consistent with the original CUP approval, as well as additional landscaping throughout the site including new six (6) foot wide landscape planters throughout the parking lot to increase shade and minimize the "heat island" effect, consistent with AMC 9-4.119(f). This requires planters every eight (8) parking spaces and may include additional shrubs. Additional landscaping is also included in the rear of the property with the proposed stamped concrete walkway and patio, as Proposed Patient Drop-off well as the perimeter of the building to soften blank walls and lack of windows. New landscaping that will be installed will have to meet the City's water efficient landscape ordinance as well as plant native trees and plants (condition 9). A patient drop-off area has also been proposed to be located at the front of this building. This drop off area is approximately 10 feet wide and is adjacent to the covered walkway that will remain in place. 3, J:.ry n n ON( I L Nr4 '.4LL (K KLAIAI� PATIENT DROP-OFF �'f?�. FLF n4�ryC TKASII r,( IOSLIKr II LMI IIF 5(;KLL"U WV L1NUSI APING PFK ATAWAUFKO (:ITY ML.K IRu -000F TITLF 94.125.4. II NFW LIGHT IC)tii o.. \, 3E't: c proposed new site plan. This hardscaping includes colored stamped concrete for the accessible path of travel from the sidewalk/right-of-way (condition 8), and a new large colored stamped concrete for a patio and walkway behind the building for use by either employees or patients (condition 8). This is an added project amenity as proposed by the applicant. The applicant has also proposed additional landscaping throughout the site including replanting of low-lying shrubs along San Palo Road consistent with the original CUP approval, as well as additional landscaping throughout the site including new six (6) foot wide landscape planters throughout the parking lot to increase shade and minimize the "heat island" effect, consistent with AMC 9-4.119(f). This requires planters every eight (8) parking spaces and may include additional shrubs. Additional landscaping is also included in the rear of the property with the proposed stamped concrete walkway and patio, as Proposed Patient Drop-off well as the perimeter of the building to soften blank walls and lack of windows. New landscaping that will be installed will have to meet the City's water efficient landscape ordinance as well as plant native trees and plants (condition 9). A patient drop-off area has also been proposed to be located at the front of this building. This drop off area is approximately 10 feet wide and is adjacent to the covered walkway that will remain in place. 3, J:.ry n n ON( I L Nr4 '.4LL (K KLAIAI� PATIENT DROP-OFF �'f?�. FLF n4�ryC Proposed Site Plan 93 °!2 §1§6j�7iil!�fpYjftt pp�E�Efe�lEl1f f�° #ifjj'v� § 6� ftl!`��4#IE A new monument sign is proposed at the southeast corner of the site. This monument sign is consistent with signage requirements in the AMC. The monument sign will include stucco finish and contain matching colors and textures similar to the existing building (condition 11). The monument sign will be 5 feet in height with letters project less than 1 -inch from the monument sign. The sign is not proposed to be illuminated internally or externally at this time. The applicant has proposed to keep the 6 -foot decorative wrought iron security fencing along San Palo Road that was approved for the sale lot use as a part of CUP / PLN 2007-1271 for security purposes only due to potential theft of parts off the boats. Staff is recommending the removal of black wrought iron fence (condition 10) to improve the project appearance of the site and be consistent with other commercial / office uses. Existing decorative wrought iron fencing 'fad 4icrml >implicrty: The Arche The Arche Fence Panel accompanies almost any gate style, and was designed to match our . Arche panels feature 2 horizontal frame members and round spear point Was. Fence panel is 8 R. wide, 5.5 R. tall with pickets spaced 6 in. apart. Standard color: Black i:M' CJt With the additional landscaping and replanting of plants in place of deceased landscaping in the front setback along the public right-of-way remove the need for the fence. The applicant is also proposing to leave in place the black -vinyl chain link fence in the rear of the property adjacent to the San Palo Inn. The fence is of high quality for this type of fencing and staff is recommending this fence remain in place. Architectural Elevations and Renovations The applicant is proposing to renovate the existing building into medical offices. This will include converting the existing detail/repair shop portion into offices and examination rooms and a break room. The majority of the renovations will take place inside the building with little exterior changes. The applicant is also proposing to enclose the covered walkway on the north and west elevations of the building to create additional office space. The applicant is proposing additional windows and facades to match the existing building. The applicant is proposing to partition off the existing building into three (3) separate offices. The first floor would contain two distinct office suites, and the 2nd floor would house the 3rd office suite. The applicant will keep the existing Spanish style roof and stucco. The applicant is proposing to modify the existing stucco beige color to a darker brown "La Habra" color that provides greater building variation from the surrounding existing development (condition 12). Existing Floor Plan Proposed Floor Plan EXISTING 1ST FLR. = 2,400 S.F. --" (PROPOSED REMODEL) STAR REST: OFRCE . _ `. '_.. `\''>' 9'-8• x S'-0' — STOR. 9'-G a A'_I I' rXAMI FKAM4 iXAMe '1.6x'1 -t '. .,9'•6'x/r-•11Y4YN I�•9•(- � I FN SION. neuxn� SUITE 101 4'.6 -whir I VY L -`J 'y j.77. ..`,- MAIN LOBBY 7 `•. i WAMNGAOBBY rzll lx,. a1 r ORICE N RSE ':'IXW 2 3 AM8NI 13 -.IW 141-6" � STAFF BREAK 0• — ORKf 11'-N• x I •I'-4' 10'- x 1 4'-1' - i — 19'-6• x 13'-6• - -�$x -1 In•.3• ra•� ' -rc x s-6• j FS -U -1 -TE -1-0-21 .T % COVERED WALKWAY I 11811 I "'-WARING!IOBBY 10'-3"x9%2•' / �,1f{l,� _____.______________'T' ____________ '. PNBIk- -- ADMIN: - - —� RECfVFIV, tR C ON 1 t'-! RBTROOM\ t2 r••x � IU' -3•x'1'-6• PROPOSED FIRST FLOOR Alascadero Medical Offices, 5000 San Palo Road 1.4, IW • 1-41' Findings for a Conditional Use Permit The Planning Commission must make the following five findings in order to approve a CUP for the medical office use within the commercial tourist zone. If the Commission chooses to deny the project, site specific findings for denial must be sited. 1. The proposed project or use is consistent with the General Plan. 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance). 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use. 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development. 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. Based on staff's analysis in the preceding sections and the conditions in the attached resolution, it appears that all of the required findings for approval of a Conditional Use Permit can be made. ENVIRONMENTAL DETERMINATION The project qualifies for a Categorical Exemption under CEQA Section 15301:Existing Facilities and minor modification. CONCLUSION: The applicant is proposing to reuse a vacant automobile sales lot and create medical offices by remodeling the existing building. The applicant is proposing additional project amenities such as a patient drop off area, landscaping and hardscaping. The proposed project is consistent with the General Plan and Atascadero Municipal Code. Based on the above analysis and incorporated conditions, staff believes that the findings for approval of a Conditional Use Permit can be made. ALTERNATIVES: 1. The Commission may recommend modifications to the project and/or conditions of approval for the project. 2. The Commission may determine that more information is needed on some aspect of the project and may refer the item back to the applicant and staff to develop the additional information. The Commission should clearly state the type of information that is required and move to continue the item to a future date. 3. The Commission may deny the project. The Commission must specify the reasons for denial of the project and make an associated finding with such action. ATTACHMENTS: Attachment 1: Location Map, General Plan, and Zoning Attachment 2: Aerial Photo Attachment 3: Proposed Elevations Attachment 4: Proposed Floor Plans Attachment 5: Proposed Color Board Attachment 6: Categorical Exemption Attachment 7: Draft Resolution PC 2010-0021 Attachment 1: Location Map, General Plan and Zoning JgSS (100 D N, 9F / o 4553 45554555 5620 56556^y 4555 4555 y \ \ 4555 5695 o 45554555 5695 4555�Qy 6 Q O 5672 �v6 rO 01 0 p VI o 482' `r 4805 01 Project Site 5000 San Palo I\k �- 6225 I 6305 ,50 4060 Zoning: Commercial Tourist (CT) General Plan Designation: General Commercial (GC) "0405 Attachment 2: Aerial Photo ' 4% 04 ` --:, . �4 � 4 �. ` Project Site 5000 San Palo AL 1101 `�. �: y Attachment 3: Proposed Elevations -------------------- 7 EXISTING NORTH ELEVATION ® M� FROFO',U) NORTH EXISTING SOUTH CUVATION PROPOSED SOUTH Attachment 4: Proposed Floor Plans mu 171 Atascauero Medical Offices 5000 San Palo Road Atascadero, California 93422 w SE jilt= ; SE �F fit eo C A Atascauero Medical Offices 5000 San Palo Road Atascadero, California 93422 w SE jilt= ; SE �F fit C Atascauero Medical Offices 5000 San Palo Road Atascadero, California 93422 w SE jilt= ; SE �F fit ATTACHMENT 5: Proposed Color Board _D Q, Qn _ [�Q Q O � d n m _ y � x• O o �• ;000 Z X A (\ �n m Q' O • MIR !2 / v, • Z 0 FF o H p II r- N m m 7 GA Q Ln O � --q m p � O T+ x o- I ® WO Ln a 0 A� mm (-• s C I� _ o, n m Z ® z °' o o n o n - 1 D A y � 'pO as H � n � p - =n LA 0 C n m = X Dm rn � N A OZp Z n� -M C 3 "n c0 X T m — Z n� 0 2 O r � o AO I ATTACHMENT 6: CEQA Exemption z.. yrK r�1SG�DEgO rf, CITY OF A TAS CADERO NOTICE OF EXEMPTION 6907 E1 Camino Real Atmcadero, CA 93422 805.461.5000 Date Received for Filing TO: ® File FROM: Alfredo R. Castillo, AICP Assistant Plainer City of Atascadero 6907 El Camino Real Atascadero, CA 93422 SUBJECT: Filing of Notice of Determination in Compliance with Section 21152 of the Public Resources Code. Proiect Title: Conditional Use Pemiit 2010-0253 Proiect Location: 5000 San Palo Road, Atascadero, ("A 93422, San Luis Obispo County Project Description: The project consists of converting an automobile dealership to medical office uses. Name ofPublic Agency Approving Project: City ofAtascadero Name of Person or Agenc�arn7ng Out Project: Pilch Funnily Trust (applicant) Exempt Status: ❑ Muristetial (Sec. 15073) ❑ Emergency Prgject (Sec. 1507 (b) and (c)) ❑ Declared Emergency (Sec. 15061 (a)) ❑ Gene al Pude Exemption (Sec. 15061.c) ® CategoncanyyExempt (Sec. 15301) Reasons why proiect is exemit: Class 1 of the California Environmental Quality Act (CEQA) (Section 15301, Existing Facilities) exempts minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible including Additions to existing structures provided that the addition will not result inan increase of more than 50 percent of the floor area of the structures before the addition, or 2,500 square feet, whichever is less. Contact Person: Alfredo R. Castillo, AICP, Assistant P mer I' 5'1470-3436 Date: November 1, 2010 /r— Alfi•edo R. Castillo, AICP Assistant Planner ATTACHMENT 7: Draft Resolution PC 2010-0021 DRAFT RESOLUTION PC 2010-0021 RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO APPROVING MINOR CONDITIONAL USE PERMIT 2010-0253 / PLN 2010-1378 TO ALLOW MEDICAL OFFICE USES WITHIN THE COMMERICAL TOURIST ZONE AT APN 049-225-008 (5000 San Palo Road / SDG Architecture / Pilch Family Trust) WHEREAS, an application has been received from Applicant, SDG Architecture, (762 Higuera Street, Suite 212, San Luis Obispo, CA 93401) and Property Owner, Pilch Family Trust (1001 Foothill Blvd, San Luis Obispo, CA 93405) to consider a project consisting of a Minor Conditional Use Permit to establish a medical office uses (CUP 2010-0253); and, WHEREAS, the site's General Plan Designation is General Commercial (GC); and, WHEREAS, the site's Zoning is Commercial Tourist (CT); and, WHEREAS, a Minor Conditional Use Permit is required to establish medical office use within the Commercial Tourist zone; and, WHEREAS, the proposed project qualifies for an Categorical Exemption consistent with CEQA section 15301: Existing Facilities, and: minor modifications; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Minor Conditional Use Permit application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Conditional Use Permit; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on November 16, 2010, studied and considered the Minor Conditional Use Permit 2010-0253, and, NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the following actions: SECTION 1. Findings of Environmental Exemption. The Planning Commission finds as follows: 1. The proposed project has been found Categorically Exempt under Class 1, Section 15301 and Existing Facilities, and minor modifications of the California Environmental Quality Act. SECTION 2. Findings for approval of Minor Conditional Use Permit. The Planning Commission finds as follows: 1. The proposed project or use is consistent with the General Plan and the City's Appearance Review Manual; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance); and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. SECTION 3. Approval. The Planning Commission of the City of Atascadero, in a regular session assembled on November 16, 2010 resolved to approve the Minor Conditional Use Permit 2010-0253 subject to the following: EXHIBIT A: Conditions of Approval EXHIBIT B: Site Plan EXHIBIT C: Elevations EXHIBIT D: Color Board On motion by Commissioner , and seconded by Commissioner the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: NOES: ABSTAIN: ABSENT: ADOPTED: CITY OF ATASCADERO, CA Heather Moreno Planning Commission Chairperson Attest: Warren M. Frace Planning Commission Secretary EXHIBIT A: Conditions of Approval (PLN 2010-1387/CUP 2010-0253) Conditions of Approval Timing Responsibility Mitigation PLN -2010-1378 / CUP 2010-0253 /Monitoring Measure PS: Planning Services 5000 SAN PALO BL: Business License GP: Grading Permit BS: Building Services FD: Fire Department BP: Building Permit PD: Police Department FI: Final Inspection CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney Planning Department Standard Conditions 1. This Conditional Use Permit shall be for medical offices Ongoing PS described on the attached exhibits (B,C,D) and located on parcel 049-225-008 regardless of owner. 2. The approval of this use permit shall become final and effective Ongoing PS for the purposes of issuing building permits fourteen (14) days following the Planning Commission approval unless prior to the time, an appeal to the decision is filed as set forth in Section 9- 1.111(b) of the Zoning Ordinance. 3. The Community Development Department shall have the BP/FM PS, CE authority to approve the following minor changes to the project that (1) modify the site plan project by less than 10%, (2) result in a superior site design or appearance, and/or (3) address a construction design issue that is not substantive to the Master Plan of Development. The Planning Commission shall have the final authority to approve any other changes to the Master Plan of Development unless appealed to the City Council. 4. Approval of this Conditional Use Permit shall be valid for twenty- BP/FM PS four (24) months after its effective date. At the end of the period, the approval shall expire and become null and void unless the project has received a building permit. 5. The applicant shall defend, indemnify, and hold harmless the Ongoing City of Atascadero or its agents, officers, and employees against any claim or action brought to challenge an approval by the City, or any of its entities, concerning the subdivision. Planning Department Specific Conditions 6. Prior to the issuance of final building permit, the owner of the FO PS subject parcel (049-225-008) shall provide reciprocal access easement with the adjacent property owner at 4900 San Palo Road (APN 049-225-017) for southern driveway. 7. Trash /recycle enclosures design shall be approved prior to the BP PS issuance of a building permit by the Planning Division. The design shall incorporate the architectural style, color, and finishes similar to the existing building. 8. Color and stamped concrete shall be utilized to establish a clear BP PS accessible path as well as be utilized in the proposed walkway Conditions of Approval Timing Responsibility Mitigation PLN -2010-1378 / CUP 2010-0253 /Monitoring Measure PS: Planning Services 5000 SAN PALO BL: Business License GP: Grading Permit BS: Building Services FD: Fire Department BP: Building Permit PD: Police Department FI: Final Inspection CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney and patio in the rear of the building. 9. All new landscaping and landscaping material shall utilize BP PS drought tolerant or native plant species consistent with the City's Water Efficient Landscaping Ordinance. 10. Removal of decorative wrought iron fencing along San Palo FO PS Road prior to final building permit. 11. Appropriate color and architectural details consistent with the BP PS existing building shall be utilized on proposed monument signage. 12. Building colors shall be consistent with Exhibit D as approved by BP PS the Planning Commission. Building Division Conditions 13. Restroom in Suite 102 will need to comply with landing and BP, FI BS disabled access requirements. 14. Suite 201 egress path of travel cannot exceed 100 ft. BP, FI BS Public Works Project Conditions City Engineer Project Conditions 15. Prior to the issuance of building permits the applicant shall GP, BP CE provide plans detailing the construction of curbs, accessible path of travel and the proposed parking lot modifications. The plans shall include elevation data to show that proposed parking lot modifications will function with the existing drainage system. The plans shall clearly show the existing drainage inlets and structures and all proposed changes. City Engineer Standard Conditions 16. Drainage easements shall be obtained by the applicant as GP, BP CE needed to accommodate both public and private drainage facilities. 17. Prior to the issuance of building permits the applicant shall GP, BP CE submit plans and supporting calculations/reports including street improvements, underground utilities, composite utilities, and grading/drainage plans prepared by a registered civil engineer for review and approval by the City Engineer. 18. Prior to the issuance of building permits the applicant shall GP, BP CE submit calculations to support the design of any structures or pipes. Closed conduits shall be designed to convey the 10 -year flow with gravity flow, the 25 -year flow with head, and provide Conditions of Approval Timing Responsibility Mitigation PLN -2010-1378 / CUP 2010-0253 /Monitoring Measure PS: Planning Services 5000 SAN PALO BL: Business License GP: Grading Permit BS: Building Services FD: Fire Department BP: Building Permit PD: Police Department FI: Final Inspection CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney safe conveyance for the 100 -year overflow. 19. Prior to the issuance of building permits the applicant shall GP, BP CE provide for the detention and metering out of developed storm runoff so that it is equal to or less than undeveloped storm runoff. 20. Drainage basins shall be designed to desilt, detain and meter GP, BP CE storm flows as well as release them to natural runoff locations. 21. A mechanism for funding and maintenance of the storm drain GP, BP CE facilities shall be provided. 22. Prior to the issuance of building permits the applicant shall show GP, BP CE the method of dispersal at all pipe outlets. Include specifications for size & type. 23. Prior to the issuance of building permits the applicant shall show GP, BP CE method of conduct to approved off-site drainage facilities. 24. Concentrated drainage from off-site areas shall be conveyed GP, BP CE across the project site in drainage easements. Acquire drainage easements where needed. Drainage shall cross lot lines only where a drainage easement has been provided. If drainage easement cannot be obtained the storm water release must follow the exact historic path, rate and velocity as prior to the subdivision. 25. Applicant shall submit erosion control plans and a Storm Water GP, BP CE Pollution Prevention Plan (SWPPP). The Regional Water Quality Control Board shall approve the SWPPP. 26. All public improvements shall be constructed in conformance GP, BP CE with the City of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer 27. All utilities shall be undergrounded on project frontage GP, BP CE 28. A mechanism must be provided to fund the maintenance of all GP, BP CE sewer mains throughout the project area. The developer shall establish a benefit maintenance assessment district, or similar funding mechanism, approved by the City, to provide sufficient funds, on an annual basis, to pay for the maintenance activities on the sewer mainline and related facilities within the project area. 29. All onsite sewer mains shall be privately owned and maintained. FM CE Conditions of Approval Timing Responsibility Mitigation PLN -2010-1378 / CUP 2010-0253 /Monitoring Measure PS: Planning Services 5000 SAN PALO BL: Business License BS: Building Services GP: Grading Permit FD: Fire Department BP: Building Permit PD: Police Department FI: Final Inspection CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 30. Drainage piping serving fixtures which have flood level rims BP CE located below the elevation of the next upstream manhole cover of the public or private sewer serving such drainage piping shall be protected from backflow of sewage by installing an approved type backwater valve. Fixtures above such elevation shall not discharge through the backwater valve. EXHIBIT B: Site Plan (PLN 2010-1387/CUP 2010-0253) ills 9 fill ti1�t�i 5ti€�°•jyt fff °� �^ ks 4s gg}s d 3 Il� 1 � s Ld- Q O cc 0 C6 Q H 47f tj I •• Z •� I Z O i Mii !.a AM C Q QJ n1 nJ r'4f o E a v 1 tj I •• Z tj I •• Z •� I Z O i EXHIBIT C: Elevations (PLN 2010-1387/CUP 2010-0253) IEXWING NORM ELEVATION r. 11 n PROPOSED NORTH .. .i*fllk. EXISTING SOUTH 13"ATION PROPOSED SOUTH EXHIBIT D: Color Board (PLN 2010-1387/CUP 2010-0253) • n •� ti N _D A n� O a � Q o � a m x 3 0 =: 0 ;000z x 3 `� n R+ g 1 z z CD n ) y O m 0 O O x d° --IW a. � rn D m m c a n O z z °- o o n o n 1 D w r � tQ y O N Q' =� C (D d O_ N 14 X n O CO�� �o C n m 2 X DXM Co N X O 2;0 z n� -M C: 3 "n c0 X T m • z r.� 0 2 O 0 -4 o AO I ITEM NUMBER: 4 DATE: 11-16-10 Planning Commission Staff Report Staff Report - Community Development Department Callie Taylor, Associate Planner, 470-3448, ctaylor@atascadero.org PLN 2099-0931 Amendment to Villas at Montecito Master Plan of Development (CUP 2002-0074) Amendment Lots 1-4 & 18-29 Casa Bella Court (Previously 9500 Las Lomas) (Tag Investors, LLC) RECOMMENDATIONS: Staff recommends the Planning Commission adopt Resolution PC 2010-0022 approving an Amendment to the Master Plan of Development (CUP 2002-0074) for the Villas at Montecito to allow revisions to the site plan, elevations, and floor plans, based on findings and subject to Conditions of Approval. REPORT -IN -BRIEF: The proposed Amendment includes revisions to the Master Plan of Development for the Villas at Montecito. Revisions to Lots 1 and 2 are proposed to move the units closer to Casa Bella (the private internal street) to pull units off the slope at the back of the lot. Revisions are proposed to the floor plans and elevations of Lots 1 through 4. Lots 18 through 29 are proposed to be built as detached single-family units, rather than the attached townhomes which were originally approved in 2003. Elevation and floor plan changes are proposed for Lots 18 through 29 to coincide with the detached homes. Proposed elevations are consistent with the City's Appearance Review Manual. There are no changes proposed to number of lots, the lot line locations, or the number of bedrooms in the units. DISCUSSION: Situation and Facts: 1. Applicant: Bob Cummings, 2055 Corte Del Nogal, Carlsbad, CA 92011 2. Property Owner: TAG Investors, LLC, 2055 Corte Del Nogal, Carlsbad, CA 92011 3. Project Address: Lots 1 - 4 and Lots 18 - 29 Casa Bella Court (Previously 9500 Las Lomas) APN 030-481-009 through 012, and 030-481-026 through 037 4. General Plan Designation 5. Zoning District: 6. Site Area: 7. Existing Use: 8. Environmental Status Background: High Density Residential (HDR) Residential Multi -Family -16 with Planned Development 18 overlay (RMF -16 / PD 18) 2.94 acres (total residential site area in development) Vacant land; graded building pads Consistent with Certified Mitigated Negative Declaration 2002-0038 In 2003, a zone text change was approved at 9500 Las Lomas to establish a Planned Development #18 overlay zone with a corresponding Master Plan of Development (CUP) that would allow a 28 -unit townhome development to be constructed on 2.94 acres of the original site. The approval also included a General Plan Amendment and corresponding zone change to establish a CR (Commercial Retail) zoning district on a portion of the original lot for an 8,892 square foot commercial office building space. A Tentative Tract Map was approved to create a 30 -lot subdivision. Lot 5 was designated for the office building, and lot 30 was vacant common area and open space, leaving 28 lots as residential parcels. In addition, 15 oak tree removals and a road abandonment were approved in conjunction with the original project in 2003. The Master Plan of Development was approved in the form of a Conditional Use Permit, as required by the Zoning Ordinance. Amendments to the Master Plan of Development can be made by the Planning Commission, independent of Council action (CUP Condition 3). Most of the lots (24 out of the 28) were approved in 2003 as attached duplex units or "paired homes" on individual lots. Each unit was approved with a two car attached garage with additional uncovered spaces provided on-site to fulfill the guest parking requirement. Three different floor plans were approved for the twenty- eight (28) townhomes; all were designed as 3 -bedroom -units: • Unit A: 1,628 square feet. Lots 18 - 29 • Unit B: 1,384 square feet. Lots 1, 2, 3, 4, 7, 8, 9, 10, 12, 13, 14, 15 • Unit C: 1,561 square feet. Lots 6, 11, 16, 17 In 2006, the previous developer began construction on 12 of the residential units (Lots 6 through 17). The units were not completed, and the property was sold to TAG Investors, LLC earlier this year. TAG Investors, LLC has been actively working to complete construction on Lots 6 through 17 over the past several months. 2003 Approved Site Plan 1 1 >I \ % LT Y Id f j Office Building site located off k EI Camino Real (Lot 5) L�. rerl N6�CQIO�EfE awwx cNnv re...o M61 OMm MILT IY"11 7 � 1'AVR•n' NB'1 CLM:IIEfE 76. MlN Mono Lots 1 — 4 & Lots 18 — 29 vacant O o Lots 6 — 17 currently under _ .i construction = J 4ANrA RosA •ctaa— aATe AVENUE wa<nv Y Id f j Office Building site located off k EI Camino Real (Lot 5) L�. rerl N6�CQIO�EfE awwx cNnv re...o M61 OMm MILT IY"11 7 � 1'AVR•n' NB'1 CLM:IIEfE 76. MlN Mono Lots 1 — 4 & Lots 18 — 29 vacant O ANALYSIS: The proposed Amendment includes revisions to the Villas at Montecito Master Plan of Development in order to make site plan, floor plan, and elevation changes to the unbuilt units on Lots 1 through 4 and Lots 18 through 29. Proposed Amended Site Plan 1 D.9' • 17 Lot I �'�n d Fes. •'!3' it ' �• i �j ' = Lots 18 through 29: Site plan revisions to detach units and build single-family 1 homes instead of townhomes .� Lot 1 . I (' ■Floor plan &elevation changes Lot 1 ++ \ Lot 1 \ ♦, �t ♦� i Lott �► � � 1C% <,`� _Y ti' ♦ i Lot 11 -- LotLot I i Lot Lo Lot 8 Lot 1� o. Lot 5 Lot b �f Lots 3 & 4: Floor plan & elevation revisions Lots 1 & 2: ■ Site plan revisions to reduce front setback a ■ Floor plan & elevation �• revisions Lots 1 & 2: Site Plan Revisions Revisions are proposed to the attached townhome units on Lots 1 and 2 in order to move the units closer to Casa Bella Court (the private internal street). The applicant is proposing to reduce the front setback from 18 feet to 6 feet. The site is steeply sloped at the back of the lot. By bringing the units forward, the building would not stand out as high on the site, the large footings required for the hillside construction would be simplified, and more useable backyard space would be created for the occupant. 2003 Approved Site Plan Lots 1 & 2 xKY>'MY 1 18' front setback approved 2003 2010 Proposed Site Plan Lots 1 & 2 Comparison of Lots 1 & 2 Approved vs. Proposed Sections Y�oPos�y Esu�niuG 0 i L --s I-+ Z I ' I ' ` Brings unit forward off the hillside` Moving the units forward on Lots 1 and 2 reduces the length of the driveways, thereby eliminating the two (2) parking spaces in the driveway of each unit. The PD -18 requires that at least one guest parking space be provided on site for each unit. Most of the lots in the development are designed to accommodate 2 guest parking spaces in the driveway (36 driveway parking spaces provided on 18 lots). The remaining 10 lots which do not provide guest parking in the driveways utilize the 14 shared guest parking spaces on Casa Bella Court. Off street parking on surrounding public streets is not counted towards the required parking. As shown in the table below, the four (4) parking spaces in the driveways of Lots 1 and 2 can be eliminated and the project will still meet the requirements for parking per the PD -18 standards. With approval of the proposed site plan amendment, 16 of the 28 lots will have parking in the private driveways, and the remaining 12 lots with shorter driveways will utilize the 14 shared guest parking spaces on Casa Bella Court. Parkinq Table: Lots 1- 4 Floor Plan and Elevation Revisions (Unit Type B): Revisions are proposed to the floor plans and elevations Unit Type B, which is used on Lots 1 through 4. The applicant has proposed adding a deck to the rear and sides of the units to provide private outdoor space on the sloped site. The portion of the second floor that currently is designed to be built over the side deck would be removed to simplify the massiveness of the footing otherwise required for this corner of the unit. This equivalent square footage will be moved to the area above the garage. The floor plan has been reconfigured for a more functional layout which the developer believes will appeal to more buyers. The square footage is proposed at 1658 sq. ft., which is less than a 2% increase in size from the original 2003 approval for Unit Type B. The number of bedrooms in the units remains the same. The project architect has detailed the elevations with pop outs and reliefs to give depth and interest to the facades. The changes are consistent with the standards of the appearance review manual, and staff believes that the proposed elevations changes will produce a well balanced and architecturally appealing fagade. Required by PD -18: Currently Permitted Proposed Number of Residential 28 28 28 Units (3 Bedrooms Each) Garage Parking Spaces 56 56 56 Driveway Parking 36 32 Spaces (provided on 18 lots) (provided on 16 lots) Shared Parking Spaces 14 14 off Casa Bella To be used by the 10 To be used by the 12 lots which do not lots which do not have driveway spaces have driveway spaces Total Guest Parking 28 50 46 one Derlot Total Parking Spaces in 84 106 102 Development Lots 1- 4 Floor Plan and Elevation Revisions (Unit Type B): Revisions are proposed to the floor plans and elevations Unit Type B, which is used on Lots 1 through 4. The applicant has proposed adding a deck to the rear and sides of the units to provide private outdoor space on the sloped site. The portion of the second floor that currently is designed to be built over the side deck would be removed to simplify the massiveness of the footing otherwise required for this corner of the unit. This equivalent square footage will be moved to the area above the garage. The floor plan has been reconfigured for a more functional layout which the developer believes will appeal to more buyers. The square footage is proposed at 1658 sq. ft., which is less than a 2% increase in size from the original 2003 approval for Unit Type B. The number of bedrooms in the units remains the same. The project architect has detailed the elevations with pop outs and reliefs to give depth and interest to the facades. The changes are consistent with the standards of the appearance review manual, and staff believes that the proposed elevations changes will produce a well balanced and architecturally appealing fagade. Lots 18 - 29 Revisions (Unit Type A): The applicant is proposing to revise the Master Plan of Development in order to construct single-family detached units on Lots 18 through 29, rather than the attached duplex units which were originally approved in 2003. The units were originally designed as townhomes on individual lots, and therefore no changes are needed to the lot lines in order to change the site plan and product type as proposed. The front setbacks would remain at 18 foot minimum, and two parking spaces would be provided in the driveway of each unit. The twelve units on Lots 18 through 29 on the east side of Casa Bella Court would be designed with minimum three (3) foot side setbacks to the interior property lines. In order to accommodate access and landscaping between the units, fences would only be installed in the rear yards or where setbacks between buildings are greater than ten feet (to accommodate 5 -foot side yards for each unit when enclosed, Condition 11e). Trash cans must be stored in the area designated in the garage, or behind fences in the backyard (Condition 11f). Windows will be designed to avoid direct views between the units (Condition 6i). 2003 Approved Site Plan Lots 18 — 29 Proposed Site Plan Lots 18 - 29 Detached single family units Lot t Lot t t Lot 1 / LO Lot Lot 8 Lot 7 4e / r o Lot 6 �L4 v 4 Section: 2003 Currently Approved Unit A & Site Plan for Lots 18 - 29 FPt�avEo gugAlu6T PIodJ A Section: 2010 Proposed Unit A & Site Plan for Lots 18 - 29 ---- ----------- I i BATH 2 M BATH i = lu i = z---- -- p EXISTING GRADE TYP. I i O �—NEA GRADE TYP. m ; DINING KITCHEN STUDY S AV6. bF H*HE T 6---------= -� LOYVE6T POINT WHERE - — BUILDING SECTION EXT. V*ALLS TOUCH / 1 MONTECITO VILLAS FINI9HGRADE 4 GARAGE �r/LOTS i rr� r I � — THE BARRATT TT GROUP � zaiaoeo iorzaio I f- l ane -i v I �1 Elevation and floor plan changes are proposed for Unit Type A (Lots 18 through 29) in order to coincide with the modified detached homes. The units would be built into the hillside, with garages located on the bottom floor and two levels of living space above, with an appearance of a detached row house. Proposed elevations utilize architectural details, windows, trim, roof lines, and massing in a style which is consistent with the City's appearance review standards. Staff believes that the proposed changes create a superior architectural product type. I'RpAIT MRVATION - U*UT 'A' --- - t erxn ve-�ra Unit A Proposed _ ��yP} TQQROOF Y Unit A As Currently Approved 2( 003) Lots 18 — 29 FWOH FL12M Previously approved as three P N"FA story attached homes Front elevation facing Casa Bella W4� {l/} �- 0/itP6C Y PNWI PLOOt ro Unit A Proposed Detached 3 story single-family 2 Alternative Designs units proposed Findings Master Plan of Development (Conditional Use Permit) A Master Plan of Development is required for a Planned Development in the form of a Conditional Use Permit. The Conditional Use Permit process provides the opportunity for the public and the Planning Commission to review the specifics of land use proposals, such as architectural design, site design, landscape, signage, and specific standards of the zoning ordinance. The Planning Commission must make the following five findings to approve the requested Conditional Use Permit Amendment: 1. The proposed project or use is consistent with the General Plan and the City's Appearance Review Manual. Staff Comment: The revised project is consistent with the General Plan policies for infill development and increased densities in urban areas where City services exist. The proposed elevation changes provide architectural details, scale, and massing which is consistent with the Appearance Review Manual, thereby enhancing the appearance of the project. 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including the Planned Development Ordinance. Staff Comment: The project revisions are designed to meet the original PD -18 requirements, including the guest parking standards, as well as all provisions of the Zoning Ordinance. 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use. Staff Comment: The proposed development will not be detrimental to the general public or working people's health, safety, or welfare. Only minor revisions to the site plan, elevations, and floor plans of the previously approved units are proposed. 4. The proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development. Staff Comment: The project has been designed to be consistent with the existing residential and commercial neighborhood character. Proposed elevation changes will enhance the appearance of the previously approved project and the immediate neighborhood. 5. The proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. Staff Comment: The proposed project and use is consistent with the traffic projections and road improvements anticipated within the General Plan. No additional units or bedrooms are proposed with the CUP Amendment, and therefore there will be no increase in traffic from the originally approved project. 6. The Master Plan of Development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area; and Staff Comment: The Master Plan of Development ensures that the project is constructed with high quality architectural design and landscape, justifying the 2003 Planned Development approval. The combination of attached and detached homes in this high density zoning district provides an appropriate transition to the single family neighborhoods further back from EI Camino Real. 7. The proposed project is in compliance with any pertinent City policy or criteria adopted by ordinance or resolution of the City Council. Staff Comment: The proposed project is consistent with City and Council policies. Based on staff's analysis in the preceding sections, and as conditioned, it appears that all of the required findings for approval of a Master Plan of Development (Conditional Use Permit) can be made. As previously conditioned, changes to the Master Plan of Development or project conditions can be made by the Planning Commission without Council action. The original CUP conditions and mitigation measures shall remain in place for the Amended project. Additional conditions and exhibits have been added to the Amended CUP resolution to address the proposed changes. Added conditions are shown as underlined in the attached resolution. Proposed Environmental Determination The proposed CUP Amendment is consistent with Mitigated Negative Declaration 2002- 0038 which was prepared for the original project and certified by the Atascadero City Council on March 25, 2003. As analyzed within the Initial Study and Mitigated Negative Declaration, the proposed residential use would have no significant environmental impacts with the incorporated mitigation, and the project would be consistent with the General Plan, adopted EIR and mitigation monitoring program. The proposed project amendments are minor in nature and will not create additional units, bedrooms, or environmental impacts. Changes are proposed only to the floor plans and elevations, and placement of the homes on the site, and therefore, the Amendment is consistent with approved Mitigated Negative Declaration 2002-0038. Conclusion The proposed project includes an Amendment to the Master Plan of Development (CUP) for the Villas at Montecito. Revisions are proposed to the front setback on Lots 1 and 2, and the floor plans and elevations of unit type A (Lots 18 — 29) and unit B (Lots 1 — 4.) Lots 18 through 29 are proposed to be built as detached single-family units, rather than the attached townhome units which were originally approved in 2003. The proposed elevation changes are consistent with the City's appearance review manual. The facades are well balanced with appropriate scale, massing, and architectural detailing. There are no changes proposed to number of lots, the lot line locations, or the number of bedrooms in the units. The proposed Master Plan of Development changes are consistent with the requirements identified in the PD -18 and the Zoning Ordinance. ALTERNATIVES 1. The Planning Commission may approve the Amendment to Conditional Use Permit 2002-0074 with modified conditions of approval. 2. The Planning Commission may deny Conditional Use Permit 2002-0074 based on appropriate findings. To deny the application, the Commission must find that it is inconsistent with one of the required findings. The motion to deny must include a finding for denial. 3. The Planning Commission may continue the application and refer the project back to staff for additional information or analysis. Direction should be given to staff and the applicant. ATTACHMENTS: Attachment 1: Location Map, Zoning and General Plan Attachment 2: Developer's Statement Attachment 3: Draft Resolution PC 2010-0022 Attachment 1: Location Map, General Plan and Zoning General Plan Designation: High Density Residential (HDR) Zoning District: Residential Multi -Family -16 with Planned Development 18 overlay (RMF -16 / PD 18) Attachment 2: Developer's Statement 40 BARRATT GROUP The Villas at Montecito Lots 1 — 4 requested revisions to approved plans The Barratt Group requests to revise the approved plans and elevations for lots 1 — 4, and relocate the units on lots 1 and 2. The request for lots 1 and 2: 1. Move the units towards the private drive to get the units off the slope as much as possible. Currently the approved units as built would be approximately six feet out of ground at the rear of the home. 2. The proposed units will not encroach onto or over the existing 6' Public Utility Easements. 3. There will be 4 potential parking spaces in driveways that will be eliminated. The project exceeds the required parking minimums and there is nearby guest parking provided. The request for lots 1 — 4: 1. Add a deck to the rear and sides of the units — there is no remaining flat yard space due to the topography of these lots, so the decks would be the outdoor space for these units 2. Remove a portion of the second floor that currently is built over the side deck, to reduce some of the mass at the back of the unit, relative to its downhill side. 3. Relocate second floor space to the area above the garage that is currently roof in the approved plans. To mitigate the impact to the street scene, we have incorporated massing and architectural features that will enhance the new facade. 2055 Co RTE DEL NOC.AL P4 � 760 842 5565 RARRAT't.COM C.ARLSBAD. CA ; 92011 Fcommvq-4TV!!-DEVELOPMENT EMU ' - 4 2010 BARRATT CROTID The Villas at Montecito Lots 18 - 29 requested revisions to approved plans The Barratt Group requests to revise the approved plans and elevations for lots 18 – 29 and change the product type from attached paired homes to single family detached homes. The request for lots 18 - 29: 1. Revise unit plans and exterior elevations into detached units, with a minimum side yard of 3' clear to face of finish wall from property line. 2. The proposed units would be allowed by the building code to have a V-0" maximum eave projection into the 3' side yard setback. The exterior elevations show how this will look with the architectural style. 3. The parking and bedroom count will remain the same as the approved plans, as will the front setback to building. 4. Fencing would occur only to enclose the rear yard. There will not be any side yard fencing between units, so as to accommodate access, landscaping and utility meters. The trash area will be within each garage, and mechanical units (A/C units) will be located inside the fenced back yard areas. 5. The windows along the "narrow" side yard are primarily small square windows (18" x 18" or 24" x 24") and predominately will not align with the windows from an adjacent "entry" side yard. This is depicted on the floor plans where a partial plan of a neighboring home is shown. 6. These buildings shall conform to the applicable building codes. 2055 CUR7b DEL NODAL en / 760 8+2 G5G5 9ARRATT.COM AR:.S➢AD, CA / 92011 ATTACHMENT 3: Draft Resolution PC 2010-0022 Amendment to 2002-0074 DRAFT RESOLUTION PC 2010-0022 RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ATASCADERO, CALIFORNIA, AMENDING AN AMENDMENT TO CONDITIONAL USE PERMIT 2002-0074 (MASTER PLAN OF DEVELOPMENT) ON APN 030-481-009 through 012, and 030-481-026 through 037 Lots 1-4 and Lots 18-29 Casa Bella Court (Previously 9500 Las Lomas) (TAG Investors, LLC) WHEREAS, an application has been received from Bob Cummings (2055 Corte Del Nogal, Carlsbad, CA 92011) Applicant, and TAG Investors, LLC (2055 Corte Del Nogal, Carlsbad, CA 92011), Property Owner, to consider a project consisting of an Amendment to the Master Plan of Development (CUP 2002-0074) at Lots 1-4 and Lots 18-29 Casa Bella Court (Previously 9500 Las Lomas) (APN 030-481-009 through 012, and 030-481-026 through 037); and, WHEREAS, the site's current General Plan Designation is High Density Residential (HDR); and, WHEREAS, the site's current zoning district is Residential Multi -Family -16 with Planned Development 18 overlay (RMF -16 / PD 18); and, WHEREAS, the PD -18 requires the adoption of a Master Plan of Development, approved in the form of a Conditional Use Permit; and, WHEREAS, the City Council approved the original Master Plan of Development (CUP 2002-0074) for the site on March 25, 2003; and, WHEREAS, the proposed Conditional Use Permit Amendment is in substantial conformance with Certified Mitigated Negative Declaration 2002-0038 prepared for the original project and made available for public review in accordance with the requirements of the California Environmental Quality Act (CEQA); and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Conditional Use Permit Amendment application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of Development Amendment; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on November 16, 2010, studied and considered the Master Plan of Development Amendment (Amendment to CUP 2002-0074), after first studying and considering Certified Mitigated Negative Declaration 2002-0038 (on file at City Hall), and NOW, THEREFORE, the Planning Commission of the City of Atascadero takes the following actions: SECTION 1. Findings for Approval of Conditional Use Permit Amendment. The Planning Commission finds as follows: 1. The proposed project or use is consistent with the General Plan and the City's Appearance Review Manual; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including provisions of the PD -23 Overlay Zone; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. The proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 5. The proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element; and 6. The Master Plan of Development standards or processing requirements will enhance the opportunity to best utilize special characteristics of an area and will have a beneficial effect on the area; and 7. The proposed project is in compliance with any pertinent City policy or criteria adopted by ordinance or resolution of the City Council. SECTION 2. Approval. The Atascadero Planning Commission, in a regular session assembled on November 16, 2010, resolved to approve an Amendment to Conditional use Permit 2002- 0074, A Master Plan of Development for Planned Development 18, subject to the following: EXHIBIT A: CONDITIONS OF APPROVAL EXHIBIT B: 2003 SITE PLAN & Site Statistics (portions superseded) EXHIBIT B 2: 2010 Amended Site Plan (Master Plan of Development) EXHIBIT B 3: Lots 1 & 2 Site Plan Detail (20 10 Amended) EXHIBIT C: LANDSCAPE Plan EXHIBIT D: GRADING AND DRAINAGE PLAN EXHIBIT E: 2003 SITE SECTIONS (portions superseded) EXHIBIT E 2: 2010 Amended Site Sections Lots 18 -29 (Unit A EXHIBIT E 3: 2010 Amended Site Sections Lots 1 & 2 (Unit B) EXHIBIT F: STREET SECTIONS EXHIBIT G: ELEVATIONS & FLOOR PLANS EXHIBIT G 1: 2010 Amended Unit A (Lots 18 — 29) EXHIBIT G 2: 2010 Amended Unit B (Lots 1 — 4) EXHIBIT G 3: 2003 Unit B (Constructed on Lots 7, 8, 9, 10, 12, 13, 14, 15) EXHIBIT G 4: 2003 Unit C (Constructed on Lots 6, 11, 16, 17) EXHIBIT G 5: Commercial Office Buildin (g (Lot 5) EXHIBIT H: COLOR AND MATERIALS EXHIBIT L• TREE INVENTORY On motion by Commissioner , and seconded by Commissioner the foregoing resolution is hereby adopted in its entirety by the following roll call vote: AYES: ( ) NOES: ( ) ABSTAIN: ( ) ABSENT: ( ) ADOPTED: CITY OF ATASCADERO, CA Heather Moreno Planning Commission Chairperson Attest: Warren M. Frace Planning Commission Secretary EXHIBIT A: Conditions of Approval / Mitigation Monitoring Program PD -18 Master Plan of Development Amendment (CUP 2002-0074)/ZCH 2002-0032 Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 Planning Services 1. The approval of this use permit shall become final and PS effective following City Council approval. (Approved by City Council March 25, 2003) 2. Approval of this Master Plan of Development shall be valid FM PS concurrently with the life of Tentative Tract Map 2002- 0021 and then indefinitely following final map. The Master Plan of Development approval shall expire and become null and void unless a final map is recorded consistent with the Master Plan of Development. 3. Changes to the Master Plan of Development shall be On-going PS approved by the Planning Commission and do not require Council action. 4. The Community Development Department shall have the BP/FM PS authority to approve the following minor changes to the project the (1) modify the site plan project by less than 10%, (2) result in a superior site design or appearance, and/or (3) address a construction design issue that is not substantive to the Master Plan of Development. The Planning Commission shall have the final authority to approve any other changes to the Master Plan of Development and any associated Tentative Maps. 5. All subsequent Tentative Tract Maps and construction BP/FM PS permits shall be consistent with the Master Plan of Development contained herein. 6. All exterior elevations, finish materials and colors shall be BP PS consistent with the Master Plan of Development as shown in Exhibit G and Exhibit H with the following modifications: a. Commercial Office Building colors and detailing, including roof tile, windows, and use of exterior accent tile treatment shall match the existing commercial buildings, subject to planning staff Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PO -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 approval. b. The Commercial Office Building colors and detailing, including roof tile, windows, and use of exterior tile accent treatment will match the existing commercial buildings, the wood arbor and entry roof structure be further extended to provide additional covered area, the wood arbor be stained a earth tone color, the window trim accent color and roof fascia be painted a contrasting accent color, and the rear retaining wall be integral to the building per the building elevations. c. All trash storage, recycle storage, and air conditioning units will be screened from view behind fenced or landscaped enclosures. d. All front yard areas within the project site will be landscaped by the developer. e. All street frontages along Principal, Las Lomas and Montecito Avenues and common open space areas shall be landscaped by the developer. f. ResidentialTown house back yards will be landscaped by the individual property owners. All common area maintenance shall be maintained by the homeowner's association. q. The garage doors shall be architectural grade and either match the wood entry doors or be painted to match the selected body color h. Roof overhang / eves shall be included on all elevations, including Lots 18 — 29, which are approved with reduced setbacks. J. Side elevations on Lots 18 — 29 shall be designed so that windows of adjacent homes do not align. Privacy between the units shall be created through the use of taller clerestory windows (installed above eve level) and small square windows which are offset from the adjacent residence. 7. All site development shall be consistent with the maximum BP/FM PS intensities and standards identified in the statistical project summary as shown on Exhibit B, or as amended in the Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD-18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 2010 site plan identified in Exhibit B2 and B3.. 8. All site work, grading and site improvements shall be BP/FM PS consistent with the Master Plan of Development as shown in Exhibit GB through E, and Exhibit I. 9. Native oaks trees shall be preserved and protected during BP PS construction unless approved for removal. Tree protection shall be in place prior to the issuance of any construction permits and the arborist shall be under contract to monitor tree protection. The following recommendations from the project arborist shall be applied: Tree Protection: During construction, after the necessary trees that are to be removed, the following shall be accomplished and checked by the Arborist and/or a City Representative. Snow/Construction fencing shall be erected at the drip line of all trees that are to be preserved. The supporting tee posts shall be placed no further apart that 6' due to sagging and should remain in place during the entire construction process. Any construction within the drip lines shall have the Arborist and/or a City Representative present to direct the operation and protect both the root and branch systems. If tree trunks are close to construction are not protected by snow/construction fencing they shall be protected with 2"x4" boards 6' long plus wired together the tree at 6" o.c. all the way around the tree. If the board length is not possible due to branches or tree curvature then shorter boards may be used. Utilities: If utilities are to be run close to a tree that is to be saved the trenching shall be stopped at the drip line and the trench is to be dug either by hand or boring might be necessary. The boring shall be at a depth of no less than 3' deep. If roots are encountered over 3" in diameter they shall be cut by hand in a straight line perpendicular to the direction of the root. If there are many roots in this situation the Arborist and/or City Representative shall be called and possibly boring shall become necessary. Hardscape: Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 If the hardscape is to be placed within the drip line of the tree care shall be taken so that root damage is maintained at a minimum. If roots are cut by equipment that are over 3" in diameter they shall be then recut by hand perpendicular to the direction of the travel of that root. If the roots are to be paved over they shall be done so with the porous pavers. These pavers shall be laid, in road areas, on 3" of un -compacted Class 2 base. This base shall have a leveling course of sand 1" deep placed over the top and then the porous pavers placed on top. In the sidewalk areas, within the drip line of trees, the area shall be graded to the correct grade and not compacted. A leveling course of sand shall be placed over the new grade and the porous pavers added so that the final grade is at the correct elevation. The edges of the paves shall be retained in place by concrete curbs. In lawn or shrub areas the curbs shall be 6" x6" concrete. In road areas the curbs shall be placed at 2" below grade and reinforced with the recommended rebar size and quantity. The above grade size of the curb shall be as required by the Project Engineer. The curbs shall be pegged with 1'x1'x1' pothole every four to six linear feet, to place the peg out of the root area. Building Envelopes: If the foundations of the buildings are within the drip line of trees to be saved the foundations shall span across areas of roots as recommended by the Engineer and approved by the Engineer, Arborist and/or the City Representative on the site. The depth and size of the foundation pilings shall be determined by the Project Engineer. Any new tree impacts resulting from the 2010 site plan revisions on Lots 1 -4 and Lots 18 — 29 shall be analyzed by an arborist and mitigated during building permits. 10. A final landscape and irrigation plan shall be approved BP PS prior to the issuance of building permits and included as part of site improvement plan consistent with EXHIBIT D, and as follows: ■ All exterior meters, air conditioning units and mechanical equipment shall be screened with landscape material. Trash/recycle container areas shall Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 be screened with fencing or landscape. ■ All front yards and common areas, and all street frontages shall be landscaped by the developer. All landscape maintenance shall be the responsibility of the individual property owner. All common areas and street frontages shall be maintained by the Homeowner's Association. • The street trees (town house front yard trees, and the street trees along Principal, Las Lomas, and Montecito) shall be 24 -inch box size and double staked. ■ Five trees shall be added along the east side of the proposed office building. ■ Proposed tree wells between town house driveways shall be 5'x 5'minimum inside dimension. ■ Native street trees shall be planted along Las Lomas Avenue. ■ The lot #30 pedestrian pathway shall be constructed of decomposed granite or similar material. ■ The lot #30 shall include supplemental landscaping and native tree and shrub planting with appropriate automatic irrigation, subject to staff approval. ■ All street frontages along Principal, Las Lomas and Montecito Avenues and common open space areas shall be landscaped by the developer. 11. All project fencing shall be installed consistent with BP PS Exhibits A, B, and C subject to the following modifications. A final fencing plan shall be approved prior to the issuance of building permits for individual site improvements: a. The perimeter fence along Lot 30 shall be Fence Detail #1 (see-through metal picket). Fence Detail #3 (combination wall/picket) shall be applied to each town house lot backing Principal, Las Lomas, and Montecito Avenues. b. The south gate shall be a full-time automatic exit -only gate. c. A pedestrian access gate will be located at the Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 Principal Avenue entrance and at the western perimeter location along residential lot #9. d. The proposed split -face CMU material shall be a deep earth tone color or high quality design with finish cap, subject to staff approval. e. Fences shall not be installed on interior side property lines of Lots 18- 29, unless a minimum setback of 5 feet is provided between each adjacent unit and the interior property line. Where setbacks are less than 5 feet to the property line, a reciprocal access easement shall be provided to allow access for adjacent units within the side setback area. Fencing may be used in the rear yards of Lots 18 — 29 to provide private yard areas. d.f. All trash cans shall be stored in the garage or behind fences in the back yard. 12. Retaining wall design & material shall compliment the GP PS design theme and colors of the commercial -office building. BP 13. Provisions for on-site pedestrian circulation reciprocal GP PS access between the adjacent westerly property shall be BP required at the location identified on the site plan. 14. Apply the following tree mitigation, noting that planting GP PS of native trees may be credited against the following fee calculation, subject to staff approval: (Mitigation Fee Table Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services 9500 Las Lomas Avenue BL: Business License GP: Grading Permit BS: Building Services FD: Fire Department PO -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 Evergreen Native Trees (inches) Deciduous Native Trees (inches) Totals dbh _ notes dbh notes 1 138 -inches live oak 1 308 -inches w hite oak 2 2 3 3 4 4 5 5 6 e 7 6 8 Total 138 -inches Total 308 -inches 446 -inches Mitigation Requirement Tree Fund Payment: $ 1,150.00 Tree Fund Payment: $ 5,133.33 $ 6,283.33 15. Two units shall be reserved as deed restricted FM, BP PS, CE affordable unit affordable unit in the moderate category for a 15 year period. Prior to recordation of final map, the applicant shall enter into a legal agreement with the City to reserve '/z of the units for sale to residents or workers within the City of Atascadero. One of the units shall be the deed restricted affordable units. The agreement shall include the following provisions: a) The units shall be offered for sale to residents or workers within the City of Atascadero for a minimum of 60 -days. During this time period offers may only be accepted from Atascadero residents or workers. b) The applicant shall provide reasonable proof to the City that at least one of the qualified buyers is a resident or worker within the City Limits of Atascadero. c) The Atascadero resident or worker restriction shall apply to the initial sale only. Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PO -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 a) The applicant shall identify which units will be reserved. b) The City Attorney shall approve the final form of the agreement. 16. The project applicant shall establish a Homeowners FM, BP PS, CE Association for the town homes project to be funded by residences and to be responsible for the maintenance, repair and replacement of all on-site common areas and facilities, and enforcement of the town house community CC&R's. CC&R's are required with Final Map. 17. One guest parking spaces shah -Maybe eliminated along FM, BP PS, CE lot #30 if necessary to provide sufficient room for the proposed pathway. 18. A reciprocal access and parking agreement shall be FM, BP PS, CE required connecting the proposed office building lot to the adjacent parking lot property. Building Services 19.. A soils investigation prepared by a licensed BP FM Geotechnical Engineer is to be provided for the project. The report is to be provided at the time of building permit submittal along with the building plans for review by the Building Division. Recommendations contained in the report are to be incorporated into the project plans. Fire Marshal 20. Dimension the width of driveway. A minimum 20' total BP BS width with a minimum head clearance of 13'-6" is to be provided to each building location. Access drives with slopes less than 12% are to have an all-weather surface. 21. Show location of existing and any proposed fire BP BS hydrants. As presented, the project requires one fire hydrant located central to the site along the proposed road.. 22. Provide a letter from the Atascadero Mutual Water BP BS Company stating the minimum expected water available to the site. Amount available must meet min. requirement specified in the California Fire Code. 23. Note approved address signage is to be provided. BP BS Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 24. Note on plans that fire lanes shall be delineated to BP BS restrict parking as required by the Fire Authority. City Engineer Standard Conditions 25. All public improvements shall be constructed in GP, BP CE conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings and/or as directed by the City Engineer. 26. In the event that the applicant is allowed to bond for GP, BP CE the public improvements required as a condition of the final map, the applicant shall enter into a Subdivision Improvement Agreement with the City Council. 27. An engineer's estimate of probable cost shall be GP, BP CE submitted for review and approval by the City Engineer to determine the amount of the bond. 28. The Subdivision Improvement Agreement shall record GP, BP CE concurrently with the Final Map. 29. An encroachment permit shall be obtained prior to the GP, BP CE issuance of building permit. 30. The applicant shall enter into a Plan Check/inspection GP, BP CE agreement with the City. 31. A six (6) foot Public Utility Easement (PUE) shall be GP, BP CE provided where needed 32. The applicant shall be responsible for the relocation GP, BP CE and/or alteration of existing utilities. 33. The applicant shall install all new utilities (water, gas, GP, BP CE electric, cable TV and telephone) underground. Utilities shall be extended to the property line frontage of each lot or its public utility easement. 34. The applicant shall monument all property corners for GP, BP CE construction control and shall promptly replace them if disturbed. 35. The applicant shall acquire title interest in any off-site GP, BP CE land that may be required to allow for the construction of the improvements. The applicant shall bear all costs associated with the necessary acquisitions. The applicant shall also gain concurrence from all adjacent property owners whose ingress and egress is affected by these improvements. 36. Slope easements shall be provided as needed to GP, BP CE accommodate cut of fill slopes. Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PO -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 37. Drainage easements shall be provided as needed to GP, BP CE accommodate both public and private drainage facilities. 38. A preliminary subdivision guarantee shall be GP, BP CE submitted for review in conjunction with the processing of the map. 39. All existing and proposed utility, pipeline, open space, GP, BP CE or other easements are to be shown on the parcel map. If there are building or other restrictions related to the easements, they shall be noted on the parcel map. The applicant shall show all access restrictions on the parcel map. 40. The final map shall be signed by the City Engineer GP, BP CE prior to the map being placed on the agenda for City Council acceptance. 41. Prior to recording the final map, the applicant shall GP, BP CE submit a map drawn in substantial conformance with the approved tentative map and in compliance with all conditions set forth herein. The map shall be submitted for review and approval by the City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. 42. Prior to recording the final map, the applicant shall set GP, BP CE monuments at all new property corners. A registered civil engineer or licensed land surveyor shall indicate by certificate on the parcel map, that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. 43. Prior to recording the parcel map, the applicant shall GP, BP CE pay all outstanding plan check/inspection fees. 44. Prior to recording the map, the applicant shall complete GP, BP CE all improvements required by these conditions of approval. 45. Prior to recording the parcel map, the applicant shall GP, BP CE have the map reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company indicating their review of the map. The letter shall identify any new easements that may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the parcel map. 46. Upon recording the final map, the applicant shall GP, BP CE provide the City with a black line clear Mylar (0.4 mil) copy and a blue line print of the recorded map and a Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 digital copy of the map. 47. Prior to the final inspection of any public improvements, GP, BP CE the applicant shall submit a written statement from a registered civil engineer that all work has been completed and is in full compliance with the approved plans. 48. Prior to the final inspection, the applicant shall submit a GP, BP CE written certification from a registered civil engineer or land surveyor that all survey monuments have been set as shown on the final map. GP, BP CE City Engineer Site Specific Conditions 49. Prior to approving the road abandonment, the GP, BP CE applicant shall have the application reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company which indicates their review of the application. The letter shall identify any new easements which may be requires by the utility company. A copy of the letter shall be submitted to the City. New easements shall be recorded prior to or concurrently with the road abandonment. 50. Provisions for on-site pedestrian circulation reciprocal GP, BP CE access between the adjacent westerly property shall be required at the location identified on the site plan. Public Improvements 51. All public improvements shall be design by a registered GP, BP CE Civil Engineer and constructed in conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer. 52. Concrete curb, gutter and sidewalk are required to be GP, BP CE constructed along the project frontage on Principal Ave, Las Lomas Ave and Montecito Ave. The existing pavement shall be saw cut a minimum of 3 feet from the new gutter lip and removed. New asphalt shall be laced to City Standard. Cross fall on the road surface Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 to the gutter shall be City Standards. No parking sign will be installed along these frontages. A 4 -foot clear path of travel will be provided on the sidewalk at all times. 53. This project is required to overlay Principal Ave from EI GP, BP CE Camino Real to the private entrance driveway with a minimum of 2 inch of Asphalt. The existing asphalt will be ground from the gutter lip to 6 feet back, to allow for a smooth transition to the gutter. Private Improvements 54. All onsite improvements are private except for utilities. GP, BP CE The homeowner association will be responsible all maintenance, including, road, drainage and grading. The project C,C&R's shall detail this maintenance. Traffic 55. Applicant will be required to participate in costs of GP, BP CE modeling traffic impacts from this project via the City traffic model. City Engineer will forward project data to the City's consultant for inclusion in the model. Solid Waste 56. Turn around for solid waste collection vehicles will be GP, BP CE provided per Atascadero Waste Alternative standards Drainage 57. This project proposes to drain storm water offsite to GP, BP CE existing gutters on EI Camino Real and Principal Ave per the Preliminary Grading Plan and Drainage Calculations produced by Westland Engineering. The storm water will than be conveyed in the gutter to an existing drop inlet on EI Camino Real north of Principal Ave. The storm water flows from the drop inlet are conveyed in an existing earthen swale through several private properties, under Pino Solo Ave., through Chalk Mountain Golf Course, under the UPRR tracks and to the Salinas River. Listed below are specific conditions for the drainage of this project. 58. Detailed plans and calculations will be provided for the GP, BP CE onsite proposed drainage system and the offsite drainage system through the commercial center below this project. Easements for all flows through the Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PO -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 commercial center from the Villa at Montecito will be required. Flows will not be allowed to cross over sidewalks or driveway approaches. 59. A under sidewalk drain, or other device, will be used to GP, BP CE convey the flows from the private drive to Principal Ave. 60. The combined flow in the gutters on EI Camino Real GP, BP CE and Principal Ave will not over top the curb in a 10 -year event. Where the discharge gutter capacity is exceeded a storm drain or other facilities shall be provided to convey the excess flow. 61. The down stream culverts under private driveways and GP, BP CE Pino Solo Ave will be upsized, if necessary, to take the increased flows. 62. If any of these conditions cannot be met, then on site GP, BP CE detention basins, other mitigation to mitigate the down stream impacts will be required. 63. All requirements of Section 5 "Storm Drainage" of the GP, BP CE Engineering Department standard specifications and drawings will be met. 64. Obtain approval by the City Engineer of the grading & GP, BP CE drainage plan and the storm drain design & facilities. Revised grading and drainage plans shall be submitted with building permits for Lots 1-4 and Lots 18 — 29 to address the 2010 site plan changes. 65. Submit calculations to support the design of any GP, BP CE structures or pipes. Closed conduits shall be designed to convey the 10 year flow with gravity flow, the 25 year flow with head, and provide safe conveyance for the 100 year overflow. 66. Show the method of dispersal at all pipe outlets. Include GP, BP CE specifications for size & type. 67. Show method of conduct to approved off-site drainage GP, BP CE facilities. 68. Concentrated drainage from off-site and onto offsite GP, BP CE areas shall be conveyed across the project site in drainage easements. Acquire drainage easements where needed. Drainage shall cross lot lines only where a drainage easement has been provided. Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 Wastewater Department 69. Applicant shall pay sewer Extension (Annexation), GP, BP CE Connection and Reimbursement fees (if applicable) upon issuance of building permit. 70. Gravity mains and other sewer facilities within the GP, BP CE subdivision shall be privately owned and maintained. Any residences that can not gravity feed into the private sewer main will required private lift stations. The maintenance and operation of the lift stations will be the private owners responsibility. 71. Gravity mains within the subdivision shall be eight (8) GP, BP CE inches in diameter. 72. Gravity mains shall terminate in manholes. GP, BP CE 73. Whenever possible, sewer mains shall be laid out in a GP, BP CE straight line between structures. 74. Drainage piping serving fixtures which have flood level GP, BP CE rims located below the elevation of the next upstream manhole cover of the public or private sewer serving such drainage piping shall be protected from backflow of sewage by installing an approved type backwater valve Fixtures above such elevation shall not discharge through the backwater valve. 75. Final project inspection shall be contingent upon GP, BP CE completion of the public sewer extension and Public Works final inspection. 76. Applicant shall have six (6) months from public sewer GP, BP CE extension final inspection to submit accurate record (as - built) drawings and a reimbursement map/agreement that has been approved by the Director of Public Works. After the six-month deadline, all right to receive reimbursement from others connecting the public sewer extension shall be waived. 77. A City of Atascadero Sewer Extension Performance GP, BP CE Agreement shall be executed. Atascadero Mutual Water Company 78. Prior to the issuance of building permits, the applicant GP, BP CE shall submit plans showing the water distribution facilities required to serve the project for review and Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PD -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 approval by the Atascadero Mutual Water Company (AMWC). The plans shall show all facilities required for fire protection. The plans shall show all cross - connection devices required to isolate the fire protection and landscape irrigation systems from the domestic water system. 79. Prior to the issuance of building permits, the applicant GP, BP CE shall obtain a "Will Serve" letter from the Atascadero Mutual Water Company for the newly created lots. 80. Prior to starting construction of the water system GP, BP CE improvements, the applicant shall pay all installation and connection fees required by AMWC 81. All water distribution facilities shall be constructed in GP, BP CE conformance with AMWC standards, policies and approved procedures. All cross connection devices shall be constructed in conformance with AWWA and Department of Health Services standards. 82. The applicant shall show how domestic and fire GP, BP CE suppression service will be provided to commercial building. 83. Show landscape meters for common area GP, BP CE landscaping. 84. Show details for main extension tie in points at GP, BP CE Montecito Ave and Principal Ave. Main extension shall be a minimum of 8" C900 CL 150 PVC pipe. Show size of main extension, and existing water mains, on plans. 85. Condominiums require separate water meters for each GP, BP CE individual unit. Show locations of all water meters per AMWC standards. Separate private easements are recommended for units that do not front along roadway containing water main. 86. Show all fire suppression appurtenances that GP, BP CE Atascadero Fire Department is conditioning for this project. Mitigation Measures Mitigation Measure 1.c: All lighting shall be designed to BP PS 1.0 eliminate any off site glare. All exterior site lights shall utilize full cut-off, "hooded" lighting fixtures to prevent offsite light spillage and glare. Any luminaire pole height shall not exceed 30 -feet in height, limit intensity to 2.0 foot candles at ingress /egress, and otherwise 0.6 foot candle minimum to 1.0 maximum in parking areas. Fixtures shall be shield cut-off type. Avoid wall mount fixtures at rear of commercial building, except at exits. Mitigation Measure 3.b: The project shall be conditioned to BP PS 3.b comply with all applicable District regulations pertaining to the control of fugitive dust (PM -10) as contained in section 6.4 of the Air Quality Handbook. All site grading and demolition plan Conditions of Approval / Mitigation Monitoring Program 9500 Las Lomas Avenue PO -18 Master Plan of Development 2010 Amendment CUP 2002-0074/ZCH 2002-0032 Timing BL: Business License GP: Grading Permit BP: Building Permit FI: Final Inspection TO: Temporary Occupancy F0: Final Occupancy Responsibility /Monitoring PS: Planning Services BS: Building Services FD: Fire Department PD: Police Department CE: City Engineer WW: Wastewater CA: City Attorney Mitigation Measure notes shall list the following regulations: A. All material excavated or graded shall be sufficiently watered to prevent excessive amounts of dust. Watering shall occur at least twice daily with complete coverage, preferably in the late morning and after work is finished for the day. B. All clearing, grading, earth moving, or excavation activities shall cease during periods of high winds (i.e. greater than 20 mph averaged over one hour) so as to prevent excessive amounts of dust. All material transported off-site shall be either sufficiently watered or securely covered to prevent excessive amounts of dust. The area disturbed by clearing, grading, earth moving, or excavation operations shall be minimized so as to prevent excessive amounts of dust. Permanent dust control measured identified in the approved project revegetation and landscape plans shall be implemented as soon as possible following completion of any soil disturbing activities. Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading shall be sown with fast -germinating native grass seed and watered until vegetation becomes established. All disturbed areas not subject to revegetation shall be stabilized using approved chemical soil binders, jute netting, or other methods in advance by the APCD. All roadways, driveways, sidewalks, etc. to be paved shall be completed as soon as possible. In addition, structural foundations shall be completed as soon as possible following building pad construction. On-site vehicle speed shall be limited to 15 mph for any unpaved surface. All unpaved areas with vehicle traffic shall be watered at least twice per day, using non -potable water. Streets adjacent to the project site shall be swept daily to remove silt which may have accumulated from construction activities so as to prevent excessive amounts of dust from leaving the site. Wheel washers may be required when significant offsite import or export of fill is involved. M. Large canopy shade trees shall be provided along street frontages and within parking areas to shade paved areas and minimize urban heat build-up. Mitigation Measure 4.e.1: Prior to Planning Commission BP BS 4.e.1 consideration of the proposed project, a Tree Protection Plan shall be prepared by a Certified Arborist and submitted for attachment to the Planning Commission staff report for the proposed project. All tree removals shall be mitigated according to the Atascadero Tree Ordinance, and the Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PO -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 proposed Tree Retention/Removal Inventory by payment into the Tree Mitigation Fund. The plan shall include recommended performance standards for preservation of all trees proposed for retention during construction and implementation. Mitigation Measure 4.e.2: Prior to approval of the Precise BP, GP PS 4.e.2 Grading Plan, a Tree Protection Plan prepared by a Certified Arborist shall be submitted and approved for the proposed project. All tree removals shall be mitigated according to the Atascadero Tree Ordinance, by payment into the Tree Mitigation Fund, and on-site native tree planting per the proposed Tree Retention/Removal Inventory. Mitigation Measure 4.e.3: The building permit site plan shall BP, GP PS 4.e.3 identify all protection and enhancement measures recommended by the Certified Arborist in the Tree Protection Plan. Tree protection fencing shall be installed at the locations called out in the Tree Protection Plan. Mitigation Measure 4.e.4: The developer shall contract with a BP, GP PS 4.e.4 certified arborist during all phases of project implementation. The certified arborists shall be responsible for monitoring the project during all phases of construction through project completion, as follows: (a) A written agreement between the arborist and the developer outlining a arborist monitoring schedule for each construction phase through final inspection shall be submitted to and approved by planning staff prior to the issuance of building/grading permits. (b) Arborist shall schedule a pre -construction meeting with engineering /planning staff, grading equipment operators, project superintendent to review the project conditions and requirements prior to any grubbing or earth work for any portion of the project site. All tree protection fencing and trunk protection shall be installed for inspection during the meeting. Tree protection fencing shall be installed as identified in the tree protection plan. Trees requiring this protection are: #1, 7, 8, 9, 10, 20, 21, 22, 25, 26, 27, 28, 30, 34, 35, 36, 37, 38, 44, 45, 46, 49, 50, 51, 52, 53, 54. 55, and 56 as identified on the Tree Protection Inventory. (c) As specified by the arborist report and City staff: ■ Remove all berry vines and trees designated for removal by hand; ■ Prune all trees to be saved for structural strength and crown cleaning by a licensed and certified arborist; ■ Remove all debris and spoils from the lot cleaning and tree pruning. ■ All trenching or grading within the protected root zone area, outside of the tree protection fence shall require hand trenching or preserve and protect roots that are Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PO-18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 larger than 2 inches in diameter. ■ No grading or trenching is allowed within the fenced protected area. ■ Any roots that are 4 inches in diameter or larger are not to be cut until inspected and approved by the on- site arborist. (d) Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented, the trees designated for protection were protected during construction, and the construction-related tree protection measures are no longer required for tree protection. Mitigation Measure 4.e.5: The project landscape shall include BP, GP PS 4.e.5 requiring 24-inch box sized street trees for all street trees planted along any private or public streets and as identified on the preliminary landscape plan. Mitigation Measure 5.b: Should any cultural resources be GP BS 5.b unearthed during site development work, the provisions of CEQA -Section 15064.5, will be followed to reduce impacts to a non-significant level. Mitigation Measure 6.b.1: The Building Permit Application GP PS, BS, CE 6.b.1 plans shall include erosion control measures to prevent soil, dirt, and debris from entering the storm drain system during and after construction. A separate plan shall be submitted for this purpose and shall be subject to review and approval of the City Engineer at the time of Building Permit application. Mitigation Measure 6.b.2: All cut and fill slopes shall be GP BS 6.b.2 hydroseeded with an appropriate erosion control method (erosion control blanket, hydro-mulch, or straw mulch appropriately anchored) immediately after completion of earthwork between the months of October 15 through April 15. All disturbed slopes shall have appropriate erosion control methods in place. Duration of the project: The contractor will be responsible for the clean-up of any mud or debris that is tracked onto public streets by construction vehicles. Mitigation Measure 6.c.d: A soils report shall be required to be GP PS, BS, CE 6.c.d submitted with a future building permit by the building department. The building plans will be required to follow the recommendations of the soils report to assure safety for occupants and buildings. Mitigation Measure 8.e.f.1: Drainage calculations are required GP PS, BS, CE 8.0.1 per section 5 of Atascadero Engineering Standards. The "Retention Areas" will be sized for the detention of the 50 year developed storm runoff, while metering out the 2 year undeveloped storm runoff. Mitigation Measure 8.e.f.2: A Stormwater Pollution Prevention BP, GP PS, BS 8.e.f.2 Plan (SWPPP)/Erosion Control Plan shall be submitted and approved by the City Engineer prior to the issuance of the building permit. The plan shall include storm water measures for the operation and maintenance of the project for the review Conditions of Approval / Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS: Planning Services BL: Business License BS: Building Services 9500 Las Lomas Avenue GP: Grading Permit FD: Fire Department PO -18 Master Plan of Development BP: Building Permit FI: Final Inspection PD: Police Department CE: City Engineer TO: Temporary Occupancy WW: Wastewater F0: Final Occupancy CA: City Attorney 2010 Amendment CUP 2002-0074/ZCH 2002-0032 and approval of the City Engineer. The Building Permit application plans shall identify Best Management Practices (BMPs) appropriate to the uses conducted on site that effectively prohibit the entry of pollutants into storm water runoff. Mitigation Measure 8.e.f.3: The developer is responsible for GP BS, CE 8.0.3 ensuring that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices, citations, or stop orders. Mitigation Measure 11.d: All construction activities shall GP BS, CE 11A comply with the City of Atascadero Noise Ordinance for hours of operation. Construction activities shall be limited to the following hours of operation: • 7 a.m. to 7 p.m. Monday through Friday • 9 a.m. to 6 p.m. Saturday • No construction on Sunday Further, particularly loud noises shall not occur before 8 a.m. on weekdays and not at all on weekends. The hours of construction may be modified by the Community Development Director upon a determination that unusually loud construction activities are having a significant impact on the neighbors. Failure to comply with the above-described hours of operation may result in withholding of inspections and possible construction prohibitions, subject to the review and approval of the Community Development Director. A sign shall be posted on-site with the hours of operation and a telephone number of the person to be contacted in the event of any violations. The details of such a sign shall be approved by staff during the Grading Plan/Building Permit review process. EXHIBIT B: 2003 Original Site Plan PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 0. ai 9 n3$�Q K 6D6p Y66 ' fa' 0 6 ' "' 6666 fa 66 b a a' YY6 fad a 66 RD4. 1 i's13 m $ :> 8 Rif. ,$sY 16#$3 u 6AAA � :i#I < fl>86 a i�14 < a8 6 #:al < sa 9966 fR ;$iY € eE}Im �YaY I R1'_I.:Y : a 666 YY°6 1 3114. h9:h taro. a.6 $ 6t1. � e $ $ e6t1 < :6aY 'oi `r ppp l I pyt�Ijj§ P 11014 " t1j"1j$1 t pyjjlj� I, j § Cg*�f! hA`�4ii w�t��§32GCJ yy aa> bDb6 { "' 6 6 'S5 fas o 6 " b b >' 0 ' h 0 4 S5 I I a m .66r $ 1116 � :AYA A #Y#4 m - Y4Y $ aeal m 9YKY 'I < 6666 y .Y D ye} $ 3#_ :9Ah iF64 < _ �6 $ i:lf J�99 , i 1111 c666 I hll i 6)06 $ nizi . wn 'a'R � lz I P4 66Da 4 "til < nY § $ Nit. Y; • 999h A 94 _h4A I a#9< m I.a C99h EXHIBIT B 2: 2010 Amended Site Plan PD -18 Master Plan of Development (CUP 2002-0074) EXHIBIT B 3: 2010 Amended Site Plan: Lots 1 & 2 Detail EXHIBIT C: Landscape Plan (Approved for 2003 Original Site Plan) PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 �. i Alm' n?t —®�...q,.h5�w� Y/Wi9il U81 �,3.96i-0-i9i f5Yb) Revisions required with Building Permits for Lots 1 - 4 8t Lots 18 — 29 to match amended site plans S9L299i- •,ate- --6 va .. ;.:. �. ._ oit,�aioop[is esfRA aR.ti 3<2+l -d "is'�.. EXHIBIT D: Grading and Drainage Plan (per 2003 Original Site Plan) PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 EXHIBIT E: K SITE SECTIONS PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 I1lg I E IE � S g gI gg ' SI g 1, R RR I ; 8 B Bi 8 d� B 8 I I III III --- _� _ ✓ I -- -�—I-'-- _ s R BIS la I I Ih� I I i p III k w IIIA I III I p yy qIq( ppa I3 §„ t y!� I� I I I � O II II ,,,a +--F-,-+- - o EXHIBIT E 2: 2010 Amended Site Sections: Lots 18 - 29 (Unit A) PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 I I I I I I I I I I I I g W d O J K W IC)co Q Z U p �ujOm� J W Z I`\\ 1 V ui m o F I I I I I I I I I I I I EXHIBIT E 3: 2010 Amended Site Sections: Lots 1 - 2 (Unit B) PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 EXHIBIT F: STREET SECTIONS PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 Note: All sidewalk along Las Lomas, Montecito, and Principal Avenues are to be concrete. • N d! Ma m ime ai In a V y N 0 � g scene la g ;tea Ei4 - N4 Removed from Project; Original 2003 Unit A not constructed & superseded by 2010 Amended Elevations & Floor Plans Removed from Project; Original 2003 Unit A not constructed & superseded by 2010 Amended Elevations & Floor Plans EXHIBIT G 1: 2010 Amended UNIT A ELEVATIONS AND FLOOR PLANS; LOTS 18 - 29 PD -18 Master Plan of Development (CUP 2002-0074) Unit A First Floor (Garage) BEDROOM 3 AREA ANALYSIS STUDY 1- - Second Floor Init A alternate Third Floor RESIDENTIAL AREA PLAN 1A FIRST FLOOR 133.54 SECOND FLOOR 1041.95 THIRD FLOOR 698.64 TOTAL LIVING AREA 1875.09 G,4R4GE 1 547.45 STUDY 1- - Second Floor Init A alternate Third Floor I I Ant ,=I IN Frmi,- - -55 IN lim EN I IN 0 m m rmm Mm EXHIBIT G 3: 2003 UNIT B ELEVATIONS AND FLOOR PLANS_.; CONSTRUCTED ON LOTS 7, 8, 9, 10, 12, 13, 14, 15 PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 EXHIBIT G 3: 2003 UNIT B ALTERNATE ELEVATIONS AND FLOOR PLANS_ CONSTRUCTED ON LOTS 7, 8, 9, 10, 12, 13, 14, 15 PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 EXHIBIT G 4: 2003 UNIT C ELEVATIONS AND FLOOR PLANS, :ONSTRUCTED ON LOTS 6, 11, 16, 17 ID -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 EXHIBIT G 4: 2003 UNIT C ALTERNATIE ELEVATIONS AND FLOOR PLANS, CONSTRUCTED ON LOTS 6, 11, 16, 17 PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 EXHIBIT G 5: COMMERCIAL OFFICE BUILDING ELEVATIONS AND FLOOR PLANS (LOTS 5) PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 EXHIBIT H: EXTERIOR COLOR & MATERIAL SAMPLE BOARD PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 See File for Colors Km1vp (cuy tytel 0324 flan MWnx) VkM MU, tna rw dm ►name wnaar mane kAWd ivwwu ml%wd NtNl) Glean 64wrg dear 64i#p :7NCOfs "y S AKW x -Tl MUM POW-" La Hila xbb Scutum" MofA t33 ire Nory L Hamra La Habra stuc4o X-'30 Crvstd mute 1 LA Halm Stucco x -SW Terra Tan LA Habra EXHIBIT I: TREE INVENTORY PD -18 Master Plan of Development (CUP 2002-0074)/ZCH 2002-0032 E � \�, Y _ l q `. 1 SANTA AygryUE � _ at ' d cito Trees to be Removed or Retained Tree N Removed Retained Tree N R. -cd Retained 1 X 31x 2 \ 32 X 3 X 33 X 4 a 34 X 5 x 35 X 6 X 36 X 7 X 37 X 8 X 3"x 9 X 39 X 10 X 40 X 11 X 41 X 12 X 42 X 13 X 43 X 14 X 44 X 15 X 45 X 16 X 46 X 17 X 47 X 18 X 48 X 19x 49 X 20 X 50 X 21 X 51 X 22 X 52 X 23 X 53 X 24 X 54 X 25 X 55 X 26 X 56 X 27 X 57 This tree has fallen down since 28x the original tree analysis was 29 X conducted. 30 X