Loading...
HomeMy WebLinkAboutResolution 26-83 RESOLUTION NO. 26-83 ' RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ATASCADERO REQUESTING THE STATE DEPARTMENT OF TRANSPORTATION AND ' FEDERAL HIGHWAY ADMINISTRATION TO APPROVE A FEDERAL AID URBAN PROJECT FOR THE CITY OF ATASCADERO The following resolution is now offered and read: WHEREAS, the Congress of the United States has in the 1982 U.S. Surface Transportation Act declared it to be in the national interest ' for Federal funds to be expended for highway projects on the Federal Aid Urban System; and WHEREAS, before Federal Aid will be available for urban system projects within the urban area, the Federal Aid Urban Project must be designated, NOW, THEREFORE, IT IS HEREBY RESOLVED AS FOLLOWS: 1) The City Council of the City of Atascadero request that the proposed Federal Aid Project as shown on the attached Exhibits be approved by the State Department of Transportation and the Federal Highway Administration as a Federal Aid Urban Project. 2) Copies of this Resolution shall be forwarded to San Luis Obispo County Engineering Department for transmittal to the California Department of Transportation. On motion by Councilman Wilkins and seconded by Councilman Mackey the foregoing resolution is hereby adopted in its entirety on the following ' vote: AYES: Councilmen Mackey , Molina , Stover , Wilkins and Mayor Nelson NOES: None ABSENT: None tADOPTED: June 13 , 1983 ROLFE NE SO , Mayor ATTEST: PATSY• A., HEI-STE J, Deputy City Clerk APPROVED AS TO FO 1: APPROVED AS TO CONTENT: ALLEN RIMES, City Attorney ;Y7.1W74ARDEN, City Manager r EXHIBIT I r City of Atascadero Public Works Department Proposed Federal Aid Urban Program for the Urban Area of the City of Atascadero PROJECT: E1 Camino Real - West Mall to Santa Cruz Road For approximately 0.9 mile between West Mall and San Anselmo Road, repair and overlay existing 4-lane road with 0.2' of Type B asphalt concrete. From San Anselmo Road to Santa Cruz Road for a distance of approximately 2.3 miles, overlay existing 2- lane road with 0.2' of Type B asphalt concrete. Project in- cludes preparation of roadway surface for overlay as well as ' raising sewer manholes and survey monuments. PROJECT COST: $350,000 ' Design Criteria West Mall to San Anselmo San Anselmo to Santa Cruz rADT (83) = 6,800 D = 60% ADT (83) = 2,500 D = 60% ' ADT (03) =13,600 T = 5% ADT (03) = 5,000 T = 10% DHV = 1,360 V = 35 mph DHV = 500 V = 45 mph T.I. = 8.0 T.I. = 8.0 1 1 r r 1 1 1 r 1 'TFY OF ATASCA&RO p q�a A> A ale DEPARTMENT OF PUBLIC WORKS n 1919 9 — Bs�g t �hHrSr� 4 rt r a � n ' O • n� 41•J i � _ F♦ N C v ' r �\ --.-q�/moi.'p e f, f;� ^f�e�u y' L �♦ ,�,` \�; pjy� t G (t • a.e e ,y u roa• 1 ♦w'n a f�,.. "' �,z.D �R� i� - � rot ` ,6 d dam •- j � `��i��, ti�Q.� �� \ c h 1 � _'� 4►a # x w:f:ltlsa� � j• t�, f�i�, REVISIONS Date FAQ OJECT EL CAM I N O REAL -- FAU Y0153 PROVED: TD—AT DRAWN: CHECKED PROVED: