HomeMy WebLinkAboutResolution 2005-004 RESOLUTION NO. 2005-004
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
TENTATIVE TRACT MAP 2004-0048, A TWELVE LOT SUBDIVISION
CONSISTENT WITH A PD-17 MASTER PLAN OF DEVELOPMENT ON
APN 049-101-022 (5310 Carrizo Rd. /Griffin)
WHEREAS, an application has been received from Scott Griffin (5310 Carrizo Rd.,
Atascadero, CA 93422), Applicant and Property Owner, to consider a project consisting of a
zone change from RSF-X (Residential Single-Family) to RSF-X / PD-17 (Residential Single-
Family with Planned Development Overlay #17) with the adoption of a Master Plan of
Development, and a twelve lot residential Tentative Tract Map on APN 049-101-022; and,
WHEREAS, the site's General Plan Designation is SFR-X (Single-Family Residential -
X); and,
WHEREAS, the Planning Commission has recommended that the site's zoning district
be changed from RSF-X to RSF-X/PD17/HS; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2004-0030 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act(CEQA)have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Tract Map application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on December 7, 2004, studied and considered Tentative Tract Map 2004-
0048, after first studying and considering the Proposed Mitigated Negative Declaration prepared
for the project; and,
WHEREAS,the City Council of the City of Atascadero, at a duly noticed
_ Public Hearing
held on January 11, 2005, studied and considered Tentative Tract Map 2004-0048, after first
studying and considering the Proposed Mitigated Negative Declaration prepared for the project;
and,
NOW, THEREFORE, the City Council of the City of Atascadero takes the following
actions:
City of Atascadero
Resolution No.2005-004
Page 2 of 18
SECTION 1. Findings of Approval for Tentative Tract Map, the City Council finds
as follows:
1. The proposed subdivision, design and improvements as conditioned, is consistent with
the General Plan and applicable zoning requirements.
2. The proposed subdivision, as conditioned, is consistent with the proposed Planned
Development Overlay District#17 Master Plan of Development (CUP 2004-0126).
3. The site is physically suitable for the type of development proposed.
4. The site is physically suitable for the density of development proposed.
5. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
6. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
7. Covenants, Conditions and Restrictions (CC&R's) shall be required that incorporate the
planned development conditions of approval to ensure that the site retains the qualities
(architecture, colors, materials, street amenities, fencing, and landscaping) over time.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety, or welfare of the general public.
SECTION 2. Approval. The City Council of the City of Atascadero, in a regular
session assembled on January 11, 2005, resolved to approve Tentative Tract Map (TTM 2004-
0048) subject to the following:
1. Exhibit A: Tentative Tract Map 2004-0048
2. Exhibit B: Conditions of Approval/Mitigation Monitoring Program.
City of Atascadero
Resolution No.2005-004
Page 3 of 18
On motion by Mayor Pro Tem O'Malley and seconded by Council Member Clay, the
foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Clay, Luna, O'Malley, Pacas and Mayor Scalise
NOES: None
ABSENT: None
ADOPTED: January 11, 2005
CITY OF ATASC ERO
By: —
We dy Sc is , Mayor
ATTEST:
Marcia McClure Torgerson, C.M.C., Cit Clerk
APPRQVFr,D AS�T9TORM:
atri n ' t, City Attorney
City of Atascadero
Resolution No.2005-004
Page 4 of 18
Exhibit A:Vesting Tentative Tract Map 2004-0048
S a it I into
j
I ar r
ja i
cri
Illsarc r
t
it I I 11
r
" ..' (MR
N Hot
itIto Off1
N �
i
City of Atascadero
Resolution No.2005-004
Page 5 of 18
Exhibit B:Conditions of Approval/Mitigation Monitoring Program
Tentative Tract Map 2004-0048
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
Building Services
5310 Carrizo Rd sly:SubdaPonn FD:rrink BS:Fire Deepadmerd
Tentative Tract Ma
Improvement I&Plans PD:Police erlment
P �P �Engineer
TO:Temporary WW:Wastewater
TTM 2004-0048 Occupancy Ca City Attomey
FI:Final inspection AMWC:Water Comp.
F0:Final Occupancy
Planning Services
1. The approval of this Tentative Tract Map shall not become final and FM PS
effective following approval of Zone Change 2004-0078 and CUP
2003-0126.
2. Approval of this Tentative Tract Map shall be valid for two years after FM PS
its effective date.At the end of the period,the approval shall expire and
become null and void unless an extension of time is granted pursuant
to a written request received prior to the expiration date.
3. The Community Development Department shall have the authority to FM PS
approve minor changes to the project that (1) result in a superior site
design or appearance, and/or (2) address a design issue that is not
substantive to the Tentative Tract Map and that the Final Map is in
substantial conformance with the Tentative Map.
4. The Tract Map shall be subject to additional fees for park or recreation FM PS
purposes(QUIMBY Act)as required by City Ordinance.
5. The applicant shall record CC&R's for the subdivision subject to the FM PS
review and approval of the City Engineer, City Attorney, and Planning
Services.The CC&R's shall identify the maintenance responsibilities of
all private driveways, sewer facilities, drainage facilities, common
parking areas, site lighting, landscape areas, fencing, and other
common facilities.The CC&R's shall also state that all exterior colors,
exterior materials, yard fencing, and site landscaping shall be
consistent with the overall master plan of development. Any
subsequent changes to the CC&R's, related to items required by the
Master Plan of Development or this approval, shall be subject to City
approval,and including those provisions outlined in Condition 12 of this
section.
6. The granting of this entitlement shall apply to the property located at On going PS
5310 Carrizo Rd(APN 049-101-022)regardless of owner.
7. The subdivider shall defend, indemnify, and hold harmless the City of
Atascadero or its agents,officers,and employees against any claim or
action brought to challenge an approval by the city, or any of its
entities,concerning the subdivision.
8. The Final Map shall be drawn in substantial conformance with the FM PS
approved tentative map, and in compliance with all conditions set forth
herein, shall be submitted for review and approval in accordance with
City of Atascadero
Resolution No.2005-004
Page 6 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Pem9t BS:Building Services
5310 Carrizo Rd SIP:SubdivWn FD:FireDepantmerd
rknent
Tentative Tract Map �r�inal�Map�� C PD:�y Enonneerr
TTM 20040048 TO:Temporary M Wastevater
Occupancy CA Cly Attorney
FI:Final inspection AMWC:Water Comp.
F0:Final OccManq
the Subdivision Map Act and the City's Subdivision Ordinance.
9. Affordable Housing Requirement: The applicant shall designate 2 units FM PS,CE
as moderate-income units, deed-restricted for a 30-year period. Such
units shall be located throughout the project, subject to planning staff
approval.
10. Deed notice shall be recorded with lots 4-12 notifying each property FM PS,CE
owner that the on-site roadway shall be extended to serve future
subdivisions to the west and north.
11. Deed notification shall be applied to each of the new lots,notifying FM PS/CE
homeowners that adjacent residential lots may be used for
agricultural purposes, including keeping of livestock animals,
facilities and equipment.
12. Affordable Workforce Housing FM PS,CE
Prior to recordation of final map,the applicant shall enter into a legal
agreement with the City to reserve t/2 of the units for sale to residents
or workers within the City of Atascadero, including the affordable
units. The agreement shall include the following provisions:
The units shall be offered for sale to residents or workers within
the City of Atascadero for a minimum of 60-days. During this time
period offers may only be accepted from Atascadero residents or
workers;
The applicant shall provide reasonable proof to the City that at
least one of the qualified buyers is a resident or worker within the
City Limits of Atascadero;
The Atascadero resident or worker restriction shall apply to the
initial sale only;
The applicant shall identify which units will be reserved;and
The City Attorney shall approve the final form of the agreement.
13. Prior to final map, the applicant shall submit CC&Rs for review and
approval by the Community Development Department. The CC&R's
shall record with the Final Map and shall include the following:
a. Provisions for maintenance of all common areas including
access,parking,street trees,fencing and landscaping.
b. A detailed list of each individual homeowner's
responsibilities for maintenance of the individual units.
City of Atascadero
Resolution No.2005-004
Page 7 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Penmit PS:Planning Services
BP:Building Pemd BS:Building Services
5310 Carrizo Rd SIP:Subdivision FD:FireDeparanent
InipDepartinent
Tentative Tract Map Hina Map�� CE:y�Engineerr
TTM 20040048 TO:Temporary WKWastewater
Occupancy CA City Attorney
FI:Final inspectlDn AMWC:Water Oomp.
F0:Final Occupancy
c. Individual unit's responsibility for keeping all trash
receptacles within the unit's garage.
d. A provision for review and approval by the City Community
Development Department for any changes to the CC&R's
that relate to the above requirements prior to the changes
being recorded or taking effect.
14. The emergency services and facility maintenance costs listed below FM PS
shall be 100% funded by the project in perpetuity. The service and
maintenance costs shall be funded through a community facilities
district established by the City at the developer's cost. The funding
mechanism must be in place prior to or concurrently with acceptance of
the final maps. The funding mechanism shall be approved by the City
Attorney, City Engineer and Administrative Services Director prior to
acceptance of any final map. The administration of the above
mentioned funds shall be by the City. Developer agrees to participate
in the community facilities district and to take all steps reasonably
required by the City with regard to the establishment of the district and
assessment of the property.
■ All Atascadero Police Department service costs to the project.
■ All Atascadero Fire Department service costs to the project.
■ Off-site common City of Atascadero park facilities maintenance
service costs related to the project.
15. All tract maintenance costs listed below shall be 100%funded by the FM PS
project in perpetuity.The service and maintenance cost shall be funded
through a Home Owners Association established by the developer
subject to City approval. The Home Owners Association must be in
place prior to, or concurrently with acceptance of any final maps. The
Home Owners Association shall be approved by the City Attorney,City
Engineer and Administrative Services Director prior to acceptance of
any Final Map.The administration of the above mentioned funds, and
the coordination and performance of maintenance activities, shall be
the responsibility of the Home Owners Association.
■ All streets,sidewalks,roads,and sewer mains within the project.
■ All drainage facilities and detention basins.
■ All common landscaping areas, street trees, medians, parkway
planters, manufactured slopes outside private yards, and other
similar facilities.
■ All frontage landscaping and sidewalks along arterial streets
16. A deed restriction shall be required for Lot 1 preventing the site from FM PS
being altered in any manner that would degrade the significance of this
City of Atascadero
Resolution No.2005-004
Page 8 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pernik PS:Planning Services
rvicee
5310 Carrizo Rd
BP:
P sebdNi FPerad FD:FireDeeping artn nt
° �� CEygm
Tentative Tract Map �Final :cEne
TTM 2004-0048 TO:Temporary WW:Waatenter
owWancy CA Cily Atiomey
FI:Final inspection AMWC:Water Comp.
F0:Final Occupancy
historic house. Any alterations to the Colony Home shall follow the
Secretary of the Interior standards for rehabilitation of historic
structures
Fire Marshal
17. Fire lanes shall be delineated to restrict parking as required by the BP BS
Fire Authority.
18. The applicant shall provide two fire hydrants at a location approved
by the Fire Department.
Engineering Conditions:
PROJECT SPECIFIC CONDITIONS
Drainage:
19. Obtain approval by the City Engineer of the grading & drainage plan GP,BP CE
and the storm drain design&facilities.
20. Submit calculations to support the design of any structures or pipes. GP,BP CE
Closed conduits shall be designed to convey the 10-year flow with
gravity flow,the 25-year flow with head, and provide safe conveyance
for the 100 year overflow.
21. Provide for the detention of the 50 year developed storm runoff, while GP,BP CE
metering out the 2 year undeveloped storm runoff.
22. Show the method of dispersal at all pipe outlets. Include specifications GP,BP CE
for size&type.
23. Acquire drainage easements where needed. Drainage shall cross lot GP,BP CE
lines only where a drainage easement has been provided.
24. Concentrated drainage from off-site areas shall be conveyed across GP,BP CE
the project site in drainage easements. Acquire drainage easements
where needed. Drainage shall cross lot lines only where a drainage
easement has been provided. If drainage easement can not be
obtained the storm water release must follow the exact historic path,
rate and velocity as prior to the subdivision.
Public Improvements and Maintenance:
City of Atascadero
Resolution No.2005-004
Page 9 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
rvioes
5310 Carrizo Rd s P is �:Building Perrinit BS:Fire ildDs„
Tentative Tract Map IFr`M:Final �� CE:cy E*eer�m
TTM 20040048 TO:Temporary WIN:Wastewater
Oocupancy CA City Attorney
FI:Final inspection AMWC:Water Cone.
F0:Final Occupancy
FM CE
25. The applicant must provide for the repair and maintenance of on-site
shared improvements.This includes roads,sidewalks,street trees,
streetlights,private sewer system,drainage facilities,recreation areas
and common landscaping.The two methods that may be used are:
a.Homeowners Association.This private organization would be
responsible for the maintenance,repair and replacement of the
facilities.
b.Assessment District and Landscape and Lighting District.Funds for
the maintenance,repair and replacement of the facilities would be
collected on the property tax bill and distributed to the City.
The City Engineer and City Attorney shall approve the final form prior
to recordation.
26. All public improvements shall be constructed in conformance with the GP,BP CE
City of Atascadero Engineering Department Standard Specifications
and Drawings or as directed by the City Engineer.
27. Frontage improvements on Carrizo Road shall be constructed GP,BP CE
consistent with the Tentative Tract Map.
28. Prior to issuance of building permits, the applicant shall submit a GP,BP CE
grading and drainage plan with a separate sheet(s) devoted to
sedimentation and erosion control, prepared by a registered civil
engineer for review and approval by the City Engineer.
SANITARY SEWER CONDITIONS
29. The Public Works Department shall approve all wastewater facilities GP,BP WW
prior to construction. This includes pumps, force mains, cleanouts,
manholes and connections.
30. Applicant shall pay sewer extension (annexation) fees upon issuance GP,BP WW
of building permit.Sewer Connection and Reimbursement fees shall be
payable upon actual connection of the building sewer to the public
sewer system.
31. Gravity mains and other sewer facilities within the subdivision shall be GP,BP WW
privately owned and maintained.
32. Gravity mains within the subdivision shall be eight (8) inches in GP,BP WW
diameter.
STANDARD CONDITIONS
City of Atascadero
Resolution No.2005-004
Page 10 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Perm4 PS:Planning Services
BP:Building Pent BS:Building Services
5310 Carrizo Rd SIP:Subdivision FD:Fre Deparinent
InipTentative Tract Map na MapPlans CE:City mon m
T0:Temporary WW:Wastewater
TTM 2004-0048 0-pricy ca city Attorney
FI:Final mspecW AMWC:Water Comp.
F0:Final Occupancy
33. All public improvements shall be constructed in conformance with the GP,BP CE
City of Atascadero Engineering Department Standard Specifications
and Drawings or as directed by the City Engineer.
34. In the event that the applicant is allowed to bond for the public FM CE
improvements required as a condition of this map, the applicant shall
enter into a Subdivision Improvement Agreement with the City Council.
35. An engineer's estimate of probable cost shall be submitted for review FM CE
and approval by the City Engineer to determine the amount of the
bond.
36. The Subdivision Improvement Agreement shall record concurrently FM CE
with the Final Map.
37. The applicant shall be responsible for the relocation and/or alteration of GP,BP CE
existing utilities.
38. The applicant shall install all new utilities(water,gas,electric,cable TV GP,BP CE
and telephone) underground. Utilities shall be extended to the property
line frontage of each lot or its public utility easement.
39. The applicant shall monument all property corners for construction FM CE
control and shall promptly replace them if disturbed.
40. The applicant shall acquire title interest in any off-site land that may be FM CE
required to allow for the construction of the improvements. The
applicant shall bear all costs associated with the necessary
acquisitions. The applicant shall also gain concurrence from all
adjacent property owners whose ingress and egress is affected by
these improvements.
41. Slope easements shall be provided as needed to accommodate cut of FM CE
fill slopes.
42. Drainage easements shall be provided as needed to accommodate FM CE
both public and private drainage facilities.
43. The final map shall be signed by the City Engineer prior to the map FM CE
being placed on the agenda for City Council acceptance.
44. Prior to recording the tract map, the applicant shall submit a map FM CE
drawn in substantial conformance with the approved tentative map and
in compliance with all conditions set forth herein. The map shall be
submitted for review and approval by the City in accordance with the
Subdivision Map Act and the City's Subdivision Ordinance,
45. Prior to recording the tract map, the applicant shall set monuments at FM CE
all new property corners. A registered civil engineer or licensed land
City of Atascadero
Resolution No.2005-004
Page 11 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pem-A PS:Planning Services
SIsa io n�
5310 Carrizo Rd SIP:Subdivision o:Fire
Tentative Tract Map FM�I r Plane CE Police
nt
TTM 20040048 To:Temporary INK Wastewater
Occupancy CA City Attorney
FI:Final inspection AMWC:Water Oonp.
F0:Final Occupancy
surveyor shall indicate by certificate on the parcel map, that corners
have been set or shall be set by a date specific and that they will be
sufficient to enable the survey to be retraced.
46. Prior to recording the tract map,the applicant shall pay all outstanding
plan check/inspection fees
47. Prior to recording the map, the applicant shall complete all FM CE
improvements required by these conditions of approval.
48. Prior to recording the tract map, the applicant shall have the map FM CE
reviewed by all applicable public and private utility companies (cable,
telephone, gas, electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility company indicating their
review of the map. The letter shall identify any new easements that
may be required by the utility company. A copy of the letter shall be
submitted to the City. New easements shall be shown on the map.
49. Upon recording the final map,the applicant shall provide the City with a FM CE
black line clear Mylar(0.4 mil)copy and a blue line print of the recorded
map.
50. Prior to the final inspection of any public improvements, the applicant FM CE
shall submit a written statement from a registered civil engineer that all
work has been completed and is in full compliance with the approved
plans.
51. Prior to the final inspection, the applicant shall submit a written GP,BP CE
certification from a registered civil engineer or land surveyor that all
survey monuments have been set as shown on the final map.
52. An encroachment permit shall be obtained prior to any work within City GP,BP CE
rights of way.
53. Prior to the issuance of building permits the applicant shall submit a GP,BP CE
grading and drainage plan prepared by a registered civil engineer for
review and approval by the City Engineer.
54. No new lots shall be created without access and utilities provided. New FM CE
lots may be phased as access and utilities are provided. No lot
excepting those consistent with the Master Plan of Development,shall
be below the minimum lot size for the underlying zone.
Atascadero Mutual Water Company
City of Atascadero
Resolution No.2005-004
Page 12 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pemtit PS:Planning Services
BP:Building PemM BS:Building Services
5310 Carrizo Rd SIP:Subdivision FD:Fire Department
Tentative Tract Map FMFina�ns CE:�En Department
TO:Temporary WW:Wastewater
TTM 20040048 Occupancy CA City Attorney
FI:Final inspection AMWC:Water Comp.
FO:Final Occupancy
55. Before the issuance of building permits,the applicant shall submit BP BS
plans to AMWC for the water distribution facilities needed to serve
the project. AMWC shall review and approve the plans before
construction begins on the water system improvements. All water
distribution facilities shall be constructed in conformance with
AMWC Standards and Details and the California Waterworks
Standards(Code of Regulations Title 22, Division 4,Chapter 16).
All cross-connection devices shall conform to AWWA and California
Department of Health Services standards.
56. Before the start of construction on the water system improvements, BP BS
the applicant shall pay all installation and connection fees required
by AMWC.Subject to the approval of AMWC,the applicant may
enter in to a"deferred connection"agreement.
57. Before issuance of building permits,the applicant shall obtain a"Will BP BS
Serve"letter from AMWC for the newly created lots within the
subdivision.
58. The water mains required to serve the project shall be laid out in a BP BS
grid or looped pattern and shall connect to the existing water mains
system in Carrizo(8 main)and to Tract 2577(8"main) if possible.
59. The applicant shall provide AMWC with easements for those water
facilities proposed for operation and maintenance by AMWC that are
constructed outside of publicly maintained right-of-ways.AMWC
shall review the form and content of the easements before
recordation.
60. The applicant shall submit a hydraulic analysis with the first plan
check submittal of the water system improvements for the project.
The analysis should take into account the fire flows required by the
Uniform Fire Code and requirements of the California Waterworks
Standards.The applicant is responsible for designing and
constructing water system improvements that will provide water at
pressures and flows adequate for the domestic and fire protection
needs of the project.
61. The applicant shall obtain a separate landscape-irrigation meter(s)
from AMWC for the common areas within the project.
City of Atascadero
Resolution No.2005-004
Page 13 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
vices
5310 Carrizo Rd SP..BSubd&im Filding Permit D:�eldi Building
Impmene PD:
Tentative Tract Map � C 4 Dgneer�m
TTM 20040048 TO:Tenprary INK Wastewater
Cccyiancy CA City Attorney
FI:Final inspectbn AMWC:Water Conp.
FO:Final Occupancy
62. Before construction of the water system improvements,AMWC shall
review and approve the irrigation plans for the common areas within
the project.The irrigation plan submittal shall include the following:
■ Landscape irrigation meter location and size.
■ Backflow prevention device type, location, and
manufacturer
■ Flow and precipitation rate for each circuit
■ Irrigation schedules including schedules for
establishment period and post establishment period
• Total anticipated water application per circuit per month
for both schedules
■ Total landscape water application.
■ Use drip irrigation where ever possible
■ A check valve shall be installed on the lowest head in
each sprinkler circuit.
Mitigation Measures
Mitigation Measure 1.c.1: The following landscape mitigations shall apply: BP BS,PS,CE 1.c.1
■ Proposed fencing location and height shall comply with
Atascadero Municipal Code.
■ The project landscaping shall include residential front yards,street
facing side yards.
■ All proposed trees shall be shade trees of a minimum 15-gallon
size and double staked.
Mitigation Measure 1.c.2: The proposed homes shall include the use of BP BS,PS,CE 1.c.2
earth-tone paint and roof colors designed to blend with the surrounding
residential environment and reduce the potential for reflected light and
glare.
Mitigation Measure 1.d.1: If exterior street lighting is proposed, it shall be BP BS,PS,CE 1.d.1
designed to eliminate any off site glare.All exterior site lights shall utilize
full cut-off,"hooded"lighting fixtures to prevent offsite light spillage and
glare.Any luminaire pole height shall not exceed 14-feet in height,limit
intensity to 2.0 foot candies at ingress/egress,and otherwise 0.6 foot
candle minimum to 1.0 maximum within the private street. Fixtures shall be
shield cut-off type and compatible with neighborhood setting,subject to
staff approval.
In addition, individual exterior home-owner lighting shall be restricted
through CC&R's and individual lot deed-restriction to prohibit high-intensity
lighting in excess of one-foot candle, limited in fixtureheight to not exceed
10 feet,and utilize full cut-off,"hooded"lighting fixtures to prevent offsite
light spillage and glare.
City of Atascadero
Resolution No.2005-004
Page 14 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pemtil PS:Planning Services
5310 Carrizo Rd SIR n melon Frmit D:lime
rtes
� E:Police nrlinent
Tentative Tract Map FM Fina ns C :Cay Engineer
vater
TTM 2004-0048 ��' CkC nno
Fl:Final inspection AMWC:water Comp.
F0:Final Ocwparq
Mitigation Measure 3.b.1: The project shall be conditioned to comply with BP,GP BS,PS,CE 3.b.1
all applicable District regulations pertaining to the control of fugitive dust
(PM-10)as contained in sections 6.3,6.4 and 6.5 of the April 2003 Air
Quality Handbook.
Section 6.3: Construction Equipment
■ Maintain all construction equipment in proper tune according to
manufacturer's specifications.
■ Fuel all off-road and portable diesel powered equipment,including but
not limited to bulldozers,graders,cranes,loaders,scrapers,backhoes,
generator sets,compressors,auxiliary power units,with ARB certified
motor vehicle diesel fuel(Non-taxed version suitable for use off-road).
■ Maximize to the extent feasible,the use of diesel construction
equipment meeting the ARB's 1996 or newer certification standard for
off-road heavy-duty diesel engines.
■ Install diesel oxidation catalysts(DOC),catalyzed diesels particulate
filters(CDPF)or other District approved emission reduction retrofit
services(Required for projects grading more than 4.0 acres of
continuously worked area).
Section 6.4: Activity Management Techniques
■ Develop a comprehensive construction activity management plan
designed to minimize the amount of large construction equipment
operating during any given time period.
■ Schedule of construction truck trips during non-peak hours to reduce
peak hour emissions.
■ Limit the length of the construction workday period, if necessary.
■ Phase construction activities,if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading,demolition and
building plan notes:
A. Reduce the amount of the disturbed area where possible.
B. Use of water trucks or sprinkler systems in sufficient
quantities to prevent airborne dust from leaving the site.
Increased watering frequency would be required whenever
wind speeds exceed 15 mph.Reclaimed(non-potable)water
should be used whenever possible.
C. All dirt stockpile areas should be sprayed daily as needed.
D. Permanent dust control measures identified in the approved
project re-vegetation and landscape plans should be
implemented as soon as possible following completion of any
soil disturbing activities.
E. Exposed ground areas that are planned to be reworked at
dates greater than one month after initial grading should be
sown with a fast-germinating native grass seed and watered
until vegetation is established.
F. All disturbed soil areas not subject to re-vegetation should be
stabilized using approved chemical soil binder,jute netting,or
other methods approved in advance by the APCD.
City of Atascadero
Resolution No.2005-004
Page 15 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building P" BS:Building Services
5310 Carrizo Rd SIP:Subdivision FD:Fre Departmerd
Tentative Tract Map FMrF; lnalMMapPlans CE c Poke Ioe nt
TTM 20040048 TO:Temporary WW:Wastewater
Occupancy CA City Attomey
FI:Final inspection AMWC:Water Comp.
F0:Final Occupancy
G. All roadways,driveways,sidewalks,etc,to be paved should
be complete as soon as possible. In addition,building pads
should be laid as soon as possible after grading unless
seeding or soil binders are used.
H. Vehicle speed for all construction vehicles shall not exceed
15 mph on any unpaved surface at the construction site.
I. All trucks hauling dirt,sand,soil,or other loose materials are
to be covered or should maintain at least two feet of
freeboard(minimum vertical distance between top of load and
top of trailer)in accordance with CVC Section 23114.
J. Install wheel washers where vehicles enter and exit unpaved
roads onto streets,or was off trucks and equipment leaving
the site.
K. Sweep streets at the end of each day if visible soil material is
carried onto adjacent paved roads.Water sweepers with
reclaimed water should be used where feasible.
L. The contractor or builder shall designate a person or persons
to monitor the dust control program and to order increased
watering,as necessary,to prevent transport of dust off site.
The name and telephone number of such persons shall be
provided to the APCD prior to land use clearance for map
recordation and land use clearance for finish grading of any
structure.
Mitigation Measure 4.e.1: The building permit site plan shall identify all BP PS,BS,CE 4.e.1
protection and enhancement measures recommended by the Certified
Arborist in the Tree Protection Plan.Tree protection fencing shall be
installed at the locations called out in the Tree Protection Plan.
Mitigation Measure 4.e.2: The developer shall contract with a certified BP PS,BS,CE 4.e.2
arborist during all phases of project implementation.The certified arborists
shall be responsible for monitoring the project during all phases of
construction through project completion,as follows:
(a) A written agreement between the arborist and the developer outlining
a arborist monitoring schedule for each construction phase through
final inspection shall be submitted to and approved by planning staff
prior to the issuance of building/grading permits.
(b) Arborist shall schedule a pre-construction meeting with engineering
/planning staff,grading equipment operators,project superintendent to
review the project conditions and requirements prior to any grubbing or
earth work for any portion of the project site.All tree protection fencing
and trunk protection shall be installed for inspection during the
meeting.Tree protection fencing shall be installed at the line of
encroachment into the tree's root zone area.
(c) As specified by the arborist report and City staff:
■ Fencing: Must be a minimum of 4'high,chain link,snow or
safety fence staked at the drip-line or line of encroachment for
each tree or group of trees.Tree fencing shall be erected before
City of Atascadero
Resolution No.2005-004
Page 16 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Pemit BS:Building Services
5310 Carrizo Rd SIP:Subdivision FD:Fire Depad erd
Tentative Tract Map IFIVI:FInnalMaPPlans CE:Police m
TTM 20040048 TO:Temporary WW:Wastewater
Occipancy CA Cily Attorney
FI:Final inspection AMWC:Water Comp.
F0:Final Occupancy
demolition,grading,or construction begins.The owner shall be
responsible for maintaining an erect fence throughout the
construction period.The arborist(s)shall inspect the fence
placement once it is erected.This is mandatory for this project.
■ Soil Aeration Methods: Soils under drip-lines that have been
compacted by heavy equipment and/or construction activities
must be returned to their original state before all work is
completed. Methods include water jetting,adding organic matter,
and boring small holes with an auger(18"deep,2-3'apart with a
2-4"auger)and the application of moderate amounts of nitrogen
fertilizer.The arborist shall advise.
■ Chip Mulch: All areas within the drip-line of the trees that cannot
be fenced shall receive a 4-6"layer of chip mulch to retain
moisture,soil structure and reduce the effects of soil compaction.
• Trenching within the Drip-line: All trenching under drip-lines of
native trees shall be hand dug,augured,or bored.All major roots
shall be avoided whenever possible.All exposed roots larger than
1"in diameter shall be clean cut with a sharp pruning tool and not
left ragged.
■ Grading within drip-line: Grading should not encroach within the
drip-line. If grading is necessary,construction of retaining walls
or tree wells or other protection measures may be necessary to
insure the survivability of the trees.Chip mulch 4-6"in depth may
also be required in these areas. Grading should not disrupt the
normal drainage pattern around the trees. Fills should not create a
ponding condition and excavations should not leave the tree on a
rapidly draining mound.Grading shall be done by hand
underneath the drip-lines to avoid tearing any roots.
• Exposed Roots: Any exposed roots shall be recovered the same
day they were exposed. If they cannot,they must be covered with
burlap or another suitable material and wetted down 2X per day.
■ Paving within the Drip-line: Pervious surfacing is preferred within
the dripline of any oak trees.Arborist(s)will advise.
■ Equipment Operation: Vehicles and all heavy equipment shall not
be driven under the trees,as this will contribute to soil
compaction.
■ Existing Surfaces: The existing ground surface within the drip-line
of all oak trees shall not be cut,filled,compacted,or pared.
■ Construction materials and waste: No liquid or solid construction
waste shall be dumped on the ground within the drip-line of any
oak tree.
■ Arborist Monitoring: An arborist shall be present for selected
activities(trees identified on spreadsheet—See attachment 5)and
pre-construction fence placement. The monitoring does not
necessarily have to be continuous but observational at times
during the above activities.
■ Pre-Construction Meeting: An on-site pre-construction meeting
with the Arborist,owner,planning staff,and the earth moving
team shall be required for this project. Prior to final occupancy,a
letter from the arborist shall be required verifying the
health/condition of all impacted trees and providing any
recommendations for any additional mitigation. The letter shall
City of Atascadero
Resolution No.2005-004
Page 17 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Perna PS:Planning Services
BP:Building Pemd BS:Buildirg S@Ntes
5310 Carrizo Rd SIP:Subdivision FD:Fire Depadunt
Tentative Tract Map FM FiinalMa�� CE:c Engin:Poke eer
TTM 20040048 TO:Temporary WW:Wastewater
Occupancy CA:City Attorney
FI:Final inspection AMWC:Water Comp.
F0:Final Occupancy
verify that the arborist was on site for all grading and/or trenching
activity that encroached into the drip-line of the selected native
trees,and that all work done in these areas was completed to the
standards set forth above.
(d). Upon project completion and prior to final occupancy a final status
report shall be prepared by the project arborist certifying that the tree
protection plan was implemented,the trees designated for protection were
protected during construction,and the construction-related tree protection
measures are no longer required for tree protection.
Mitigation Measure 5.a.1: Replacement of any exterior materials or design BP PS,BS 5.a.1
features on the original colony house shall be consistent with the Secretary
of the Interior's Standards and Illustrated Guidelines for Rehabilitating
Historic Buildings.This shall include the replacements of any doors and
windows with solid wood framing of similar design and appearance.Vinyl,
vinyl-cladding,and metal materials are not permitted.
Mitigation Measure 5.a.2: The proposed project shall include Covenants, BP PS,BS 5.a.2
Conditions and Restrictions(CC&R's)or equivalent mechanism that
incorporate the planned development conditions of approval to ensure that
the site retains the historic qualities(historic buildings,architecture,colors,
materials,fencing,and landscaping)over time.
Mitigation Measure 5.a.3: The new attached garage shall be constructed BP PS,BS 5.a.3
on the colony house lot shall be of similar design as the existing original
wood sided house.The garage shall incorporate a pair of single or double-
hung wood windows on each side and wood door design.A wood door
may be added to any side.The garage door shall be constructed of wood
and have an architectural appearance similar to the,colony home
architectural style.The garage door may be of roll-up function.
Mitigation Measure 5.b.1: Should any cultural resources be unearthed BP PS,BS 5.b.1
during site development work,the provisions of CEQA-Section 15064.5,
will be followed to reduce impacts to a non-significant level.
Mitigation Measure 6.b.1: The grading permit application plans shall GP PS,BS,CE 6.b.1
include erosion control measures to prevent soil,dirt,and debris from
entering the storm drain system during and after construction. A separate
plan shall be submitted for this purpose and shall be subject to review and
approval of the City Engineer at the time of Building Permit application.
Mitigation Measure 6.c.1: A soils report shall be required to be submitted BP,GP PS,BS,CE 6.0
with a future building permit by the building department.
City of Atascadero
Resolution No.2005-004
Page 18 of 18
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
SI SbisoM �m5310 Carrizo Rd Subdivision FID:ireDepaannne
Tentative Tract Map F IM Plans CE Police
nt
TO:Temporary WW:Wastewater
TTM 2004-0048 Occupancy ca City Attorney
FI:Final Inspection AMWC:Water Cone.
F0:Final Occupancy
Mitigation Measure 8e.f.1: A Stormwater Pollution Prevention Plan GP PS,BS,CE 8.e f.1
(SWPPP)/Erosion Control Plan shall be submitted and approved by the
City Engineer prior to the issuance of the building permit.The plan shall
include storm water measures for the operation and maintenance of the
project for the review and approval of the City Engineer.The Building
Permit application plans shall identify Best Management Practices(BMPs)
appropriate to the uses conducted on site that effectively prohibit the entry
of pollutants into storm water runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for ensuring that GP PS,BS,CE 8.e.f.2
all contractors are aware of all storm water quality measures and that such
measures are implemented. Failure to comply with the approved
construction Best Management Practices will result in the issuance of
correction notices,citations,or stop orders.
Mitigation Measure 11.d.1: All construction activities shall comply with the BP,GP PS,BS,CE 11.d.1
City of Atascadero Noise Ordinance for hours of operation,and as follows:
Construction activities shall be limited to the following hours of operation:
e 7 a.m.to 7 p.m. Monday through Friday
• 9 a.m.to 6 p.m.Saturday
• No construction on Sunday
Further,particularly loud noises shall not occur before 8 a.m.on weekdays
and not at all on weekends.
The hours of construction maybe modified by the Community
Development Director upon a determination that unusually loud
construction activities are having a significant impact on the neighbors.
Failure to comply with the above-described hours of operation may result in
withholding of inspections and possible construction prohibitions,subject to
the review and approval of the Community Development Director.
A sign shall be posted on-site with the hours of operation and a telephone
number of the person to be contacted in the event of any violations.The
details of such a sign shall be approved by staff during the Grading
Plan/Building Permit review process.