HomeMy WebLinkAboutResolution 2004-036 RESOLUTION NO. 2004-036
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
VESTING TENTATIVE PARCEL MAP 2003-0052, A FOUR LOT MAP
CONSISTENT WITH A PD-7 OVERLAY ZONE
OF APN 029-081-010
(5528 TUNITAS AVE, 5559 ROSARIO AVE. /MEHRING)
WHEREAS, an application has been received from William Mehring (11190 Santa
Lucia Rd, Atascadero, CA 93422) Applicant and Property Owner to consider a project consisting
of a zone change from RMF-10 (Residential Multi-Family) to RMF-10 / PD-7 (Residential
Multi-Family with Planned Development Overlay #7) with the adoption of a Master Plan of
Development, and a five lot residential Tentative Parcel Map on APN 029-081-010 and,
WHEREAS, the site's General Plan Designation is MDR (Medium-Density Residential);
and,
WHEREAS, the site's current zoning district is RMF-10 (Residential Multi-Family);
and,
WHEREAS, the Planning Commission has recommended that a site be rezoned to
include a PD-7 overlay with a Master Plan of Development thereby allowing a four lot
subdivision of the site; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA)have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Parcel Map application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on April 7, 2004, studied and considered Tentative Parcel Map 2003-0052,
after first studying and considering the Proposed Mitigated Negative Declaration prepared for the
project; and,
WHEREAS, the Atascadero City Council, at a Public Hearing held on April 27, 2004,
studied and considered Vesting Tentative Parcel Map 2003-0052, after first studying and
considering the Draft Mitigated Negative Declaration prepared for the project; and,
City of Atascadero
Resolution No.2004-036
Page 2 of 15
NOW,THEREFORE BE IT RESOLVED,by the City Council of the City of Atascadero:
SECTION 1. Findings of Approval for Tentative Parcel Map, the City Council finds
as follows:
1. The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
2. The design and improvement of the proposed subdivision is consistent with the General
Plan and applicable zoning requirements.
3. The proposed subdivision, as conditioned, is consistent with the proposed Planned
Development Overlay District#7 Master Plan of Development(CUP 2003-0118).
4. The site is physically suitable for the type of development proposed.
5. The site is physically suitable for the density of development proposed.
6. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
7. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
SECTION 2. Approval. The Atascadero City Council in a regular session assembled
on April 27, 2004, resolves to approve Vesting Tentative Parcel Map (TPM 2003-0052) subject
to the following:
1. Exhibit A: Vesting Tentative Parcel Map 2003-0052
2. Exhibit B: Conditions of Approval/Mitigation Monitoring Program.
City of Atascadero
Resolution No.2004-036
Page 3 of 15
On motion by Mayor Pro Tem Scalise and seconded by Council Member Clay, the foregoing
Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Clay, O'Malley, Pacas, Scalise and Mayor Luna
NOES: None
ABSENT: None
ADOPTED: April 27, 2004
CITY ATASCAD O
By: 41 .
Dr. eorge Luna, Mayor
ATTEST:
bLl�I - &�� _-
Marcia McClure Torgerson, C.M.C., di&Clerk
APPROVED AS TO FORM:
yqr" 7 44
Ro fp
anley, City Att ey
City of Atascadero
Resolution No.2004-036
Page 5 of 15
Exhibit B:Conditions Of Approval/Mitigation Monitoring Program
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
BL:5528 Tunitas Ave./5559 Rosario Ave. GP GraBusding
license BS:SerBuilding GP:Grading Permit BS:Building
PD-7 Master Plan of Development BP:Building Permit Services
FI:Final Inspection FD:Fire Department
TPM 2003-0052 TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WW:Wastewater
CA City Attorney
Planning Services
1. The approval of this Tentative Parcel Map shall not FM PS
become final and effective following approval of Zone
Change 2003-0071 and CUP 2003-0118.
2. Approval of this Tentative Parcel Map shall be valid FM PS
for two years after its effective date. At the end of the
period,the approval shall expire and become null and
void unless an extension of time is granted pursuant
to a written request received prior to the expiration
date.
3. The Community Development Department shall have FM PS
the authority to approve minor changes to the project
that(1)result in a superior site design or appearance,
and/or (2) address a design issue that is not
substantive to the Tentative Tract Map and that the
Final Map is in substantial conformance with the
Tentative Map.
4. The Parcel Map shall be subject to additional fees for FM PS
park or recreation purposes (QUIMBY Act) as
required by City Ordinance.
5. The granting of this entitlement shall apply to the On going PS
property located at APN 029-081-010 regardless of
owner.
6. The Final Map shall be drawn in substantial FM PS
conformance with the approved tentative map,and in
compliance with all conditions set forth herein, shall
be submitted for review and approval in accordance
with the Subdivision Map Act and the City's
Subdivision Ordinance.
7. The subdivider shall defend, indemnify, and hold FM PS
harmless the City of Atascadero or its agents,
officers, and employees against any claim or action
brought to challenge an approval by the city,or any of
its entities,concerning the subdivision.
8. Affordable Housing Requirement: The applicant shall FM PS,CE
either set aside one housing unit at the moderate
category rate for a period of 30 years and pay in-lieu
fees for the factional portion owed in excess of one
City of Atascadero
Resolution No.2004-036
Page 6 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
BL:5528 Tunitas Ave./5559 Rosario Ave. GP Btua"�u�"t BS:Buis
GP:Grading Permit BS:Building
PD-7 Master Plan of Development BP:Building Permit services
FI: Final Inspection FD:Fire Department
TPM 2003-0052 TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WW:wastewater
CA City Attorney
unit, or pay an in-lieu fee based on 5.00% of the
construction valuation of each of the market rate
units.
9. Workforce Housing FM PS,CE
Prior to recordation of final map,the applicant shall enter into a
legal agreement with the City to reserve t/z of the units for sale
to residents or workers within the City of Atascadero, including
the affordable units. The agreement shall include the following
provisions:
■ The units shall be offered for sale to residents or
workers within the City of Atascadero for a
minimum of 60-days. During this time period offers
may only be accepted from Atascadero residents or
workers;
■ The applicant shall provide reasonable proof to the
City that at least one of the qualified buyers is a
resident or worker within the City Limits of
Atascadero;
• The Atascadero resident or worker restriction shall
apply to the initial sale only;
■ The applicant shall identify which units will be
reserved;and
■ The City Attorney shall approve the final form of the
agreement.
Building Services
10. A soils investigation prepared by a licensed FM PS,BS,CE
Geotechnical Engineer is to be provided for the
project. The report is to be provided at the time of
building permit submittal along with the building
plans for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
Fire Marshal
11. The location of all existing and proposed fire FM CE
hydrants shall be shown on subsequent building
permit applications.
12. A letter shall be provided from Atascadero Mutual FM CE
Water Company stating the minimum expected
water available to the site. Amount available must
meet minimum requirement specified in the
California Fire Code.
City of Atascadero
Resolution No.2004-036
Page 7 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
BL:Business License Services
5528 Tunitas Ave./5559 Rosario Ave.
GP:Grading Permit BS:Building
PD-7 Master Plan of Development BP:Building Permit Services
TPM 2003-0052 FI: Final Inspection FD:Fire Department
TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WW:Wastewater
CA City Attorney
13. Address signage design shall be provided prior to FM CE
issuance of any subsequent building permits.
City Engineer
Site Specific Conditions
14. In the event that the applicant is allowed to bond for BP PW
the public improvements required as a condition of
this map,the applicant shall enter into a
Subdivision Improvement Agreement with the City
Council.
15. An engineer's estimate of probable cost shall be BP/GP/FM PW
submitted for review and approval by the City
Engineer to determine the amount of the bond.
16. The Subdivision Improvement Agreement shall BP PW
record concurrently with the Final Map.
17. All public improvements shall be constructed in FM PW
conformance with the City of Atascadero
Engineering Department Standard Specifications
and Drawings or as directed by the City Engineer.
18. The applicant shall enter into a Plan BP PW
Check/Inspection agreement with the City.
19. The applicant shall be responsible for the relocation FM PW
and/or alteration of existing utilities.
20. The applicant shall install all new utilities (water, FM PW
gas, electric, cable TV and telephone)
underground. Utilities shall be extended to the
property line frontage of each lot or its public utility
easement.
21. The applicant shall monument all property corners
for construction control and shall promptly replace
them if disturbed.
22. A preliminary subdivision guarantee shall be BP BS
submitted for review in conjunction with the
processing of the parcel map.
23. All existing and proposed utility, pipeline, open BP PW
space, or other easements are to be shown on the
parcel map. If there are building or other
restrictions related to the easements, they shall be
noted on the parcel map. The applicant shall show
all access restrictions on the parcel map.
City of Atascadero
Resolution No.2004-036
Page 8 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
5528 Tunitas Ave./5559 Rosario Ave. GP Business License services
GP:Grading Permit BS:Building
PD-7 Master Plan of Development BP:Building Permit Services
FI: Final Inspection FD:Fire Department
TPM 2003-0052 TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WW:Wastewater
CA:City Attorney
24. Prior to recording the parcel map, the applicant BP PW
shall submit a map drawn in substantial
conformance with the approved tentative map and
in compliance with all conditions the City in
accordance with the Subdivision Map Act and the
City's Subdivision Ordinance forth herein shall
submit set for review and approval.
25. Prior to recording the parcel map, the applicant's BP PW
surveyor shall set monuments at all new property
corners or shall indicate, by certificate on the final
map, that corners have been set or shall be set by
a date specific and that they will be sufficient to
enable the survey to be retraced.
26. Prior to recording the parcel map, the applicant BP BS
shall pay all outstanding plan check/inspection
fees.
27. Prior to recording the parcel map, the applicant BP PW
shall have the map reviewed by all applicable
public and private utility companies (cable,
telephone, gas, electric, Atascadero Mutual Water
Company). The applicant shall obtain a letter from
each utility company,which indicates their review of
the map. The letter shall identify any new
easements, which may be required by the utility
company. A copy of the letter shall be submitted to
the City. New easements shall be shown on the
parcel map.
28. Upon recording the final map, the applicant shall BP BS
provide the City with a black line clear Mylar (0.4
mil)copy and a blue line print of the recorded map.
29. Prior to the final inspection of any public BP PW
improvements, the applicant shall submit a written
statement from a registered civil engineer that all
work has been completed and is in full compliance
with the approved plans.
City Engineer BP PW
Site Specific Conditions
30. The applicant shall construct new curb,gutter,and BP PS/PW
sidewalk,in accordance with City Standards,along
entire frontage. The back of sidewalk shall be
placed at the property line, unless the City
Engineer deems a different alignment is
appropriate.
City of Atascadero
Resolution No.2004-036
Page 9 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
BL:5528 Tunitas Ave./5559 Rosario Ave. GP Business Permit a Services
GP:Grading Permit BS:Building
PD-7 Master Plan of Development BP:Building Permit Services
FI: Final Inspection FD:Fire Department
TPM 2003-0052 TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WW:Wastewater
CA City Attorney
31. The applicant shall overlay Tunitas to the centerline BP PS/PW
plus ten feet, in accordance with City Standards.
32. The applicant shall address storm water detention BP PW
prior to grading and drainage approval.
33. The applicant shall pay sewer Extension BP BS
(Annexation)and Connection fees upon issuance
of building permit.
34. Existing drainage patterns from adjacent properties BP PW
shall not be obstructed.
35. All drainage from improvements shall cross BP PW
property lines within drainage easements. Five-
foot drainage easements shall be shown on final
map.
Wastewater Department Standard Conditions BP PW
36. Existing SS lateral shall be located at the Parcel 2
property line/Tunitas R.O.W. and capped for
future Parcel 1 use.
37. Each building shall be individually connected to the
public sewer via a 4"gravity lateral,or as approved
by the City Engineer.
Atascadero Mutual Water Company
38. Before the issuance of building permits,or the BP BS
recording of the Final Map,the applicant shall
submit plans to AMWC for the water distribution
facilities needed to serve the project. AMWC shall
review and approve the plans before construction
begins on the water system improvements. All new
water distribution facilities shall be constructed in
conformance with AMWC Standards and Details
and the California Waterworks Standards(Code of
Regulations Title 22, Division 4,Chapter 16). All
cross-connection devices shall conform to AWWA
and California Department of Health Services
standards.
39. Prior to the issuance of building permits,the BP BS
applicant shall obtain a"Will Serve"letter from the
Atascadero Mutual Water Company for the newly
created Lots.
40. Before the start of construction on the water system BP BS
improvements,the applicant shall pay all
installation and connection fees required by
AMWC. Subject to the approval of AMWC,the
applicant may enter in to a"deferred connection"
agreement.
City of Atascadero
Resolution No.2004-036
Page 10 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
es
5528 Tunitas Ave./5559 Rosario Ave. BI_:Business License Buil
GP:Grading PerBS:mit BS:Building
PD-7 Master Plan of Development BP:Building PerrTit Services
FI: Final Inspection FD:Fire Department
TPM 2003-0052 TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:qty Engineer
WW:Wastewater
CA City Attorney
41. Before the issuance of building or permits,the BP BS
applicant shall provide AMWC with easements for
those water facilities proposed for operation and
maintenance by AMWC that are constructed
outside of publicly maintained right-of-ways.
AMWC shall review the form and content of the
easements before recordation.
42. The applicant is responsible for designing and BP BS/PW
constructing water system improvements that will
provide water at pressures and flows adequate for
the domestic and fire protection needs of the
project.
Mitigation Measures
Mitigation Measure 3.b.1: The project shall be conditioned to BP BS 3.b.1
comply with all applicable District regulations pertaining to the
control of fugitive dust(PM-10)as contained in sections 6.3,
6.4 and 6.5 of the April 2003 Air Quality Handbook.
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune
according to manufacturer's specifications.
• Fuel all off-road and portable diesel powered
equipment, including but not limited to bulldozers,
graders,cranes,loaders,scrapers,backhoes,
generator sets,compressors,auxiliary power units,
with ARB certified motor vehicle diesel fuel(Non-
taxed version suitable for use off-road).
• Maximize to the extent feasible,the use of diesel
construction equipment meeting the ARB's 1996 or
newer certification standard for off-road heavy-duty
diesel engines.
Install diesel oxidation catalysts(DOC),catalyzed
diesels particulate filters(CDPF)or other District
approved emission reduction retrofit services
(Required for projects grading more than 4.0 acres of
continuously worked area).
Section 6.4: Activity Management Techniques
• Develop a comprehensive construction activity
management plan designed to minimize the amount
of large construction equipment operating during any
given time period.
• Schedule of construction truck trips during non-peak
hours to reduce peak hour emissions.
• Limit the length of the construction workday period, if
necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
City of Atascadero
Resolution No.2004-036
Page 11 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
5528 Tunitas Ave./5559 Rosario Ave. GP Business Lioense services
GP:Grading Permit BS:Building
PD-7 Master Plan of Development BP:Building Permit services
FI:Final Inspection FD:Fire Department
TPM 2003-0052 TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WW:Wastewater
CA City Attorney
All of the following measures shall be included on grading,
demolition and building plan notes:
A. Reduce the amount of the disturbed area where possible.
B. Use of water trucks or sprinkler systems in sufficient
quantities to prevent airborne dust from leaving the site.
Increased watering frequency would be required
whenever wind speeds exceed 15 mph. Reclaimed(non-
potable)water should be used whenever possible.
C. All dirt stockpile areas should be sprayed daily as needed.
D. Permanent dust control measures identified in the
approved project re-vegetation and landscape plans
should be implemented as soon as possible following
completion of any soil disturbing activities.
E. Exposed ground areas that are plann4ed to be reworked
at dates greater than one month after initial grading should
be sown with a fast-germinating native grass seed and
watered until vegetation is established.
F. All disturbed soil areas not subject to re-vegetation should
be stabilized using approved chemical soil binder,jute
netting,or other methods approved in advance by the
APCD.
G. All roadways, driveways,sidewalks,etc,to be paved
should be complete as soon as possible. In addition,
building pads should be laid as soon as possible after
grading unless seeding or soil binders are used.
H. Vehicle speed for all construction vehicles shall not
exceed 15 mph on any unpaved surface at the
construction site.
I. All trucks hauling dirt,sand,soil,or other loose materials
are to be covered or should maintain at least two feet of
freeboard(minimum vertical distance between top of load
and top of trailer) in accordance with CVC Section 23114.
J. Install wheel washers where vehicles enter and exit
unpaved roads onto streets,or was off trucks and
equipment leaving the site.
K. Sweep streets at the end of each day if visible soil
material is carried onto adjacent paved roads. Water
sweepers with reclaimed water should be used where
feasible.
L. The contractor or builder shall designate a person or
persons to monitor the dust control program and to order
increased watering,as necessary,to prevent transport of
dust off site. The name and telephone number of such
persons shall be provided to the APCD prior to land use
clearance for map recordation and land use clearance for
finish grading of any structure.
City of Atascadero
Resolution No.2004-036
Page 12 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
5528 Tunitas Ave./5559 Rosario Ave. BL Business License BS:Buis
GP:Grading PermBS:it Building
PD-7 Master Plan of Development BP:Building Permit Services
FI:Final Inspection FD:Fire Department
TPM 2003-0052 TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WW:Wastewater
CA City Attorney
Mitigation Measure 4.e.1: The building permit site plan shall GP PS/BS 4.e.1
identify all protection and enhancement measures
recommended by the Certified Arborist in the Tree Protection
Plan.Tree protection fencing shall be installed at the locations
called out in the Tree Protection Plan.
Mitigation Measure 4.e.2: The Precise Grading Plan shall GP PSBS 4.e.2
identify tree protection fencing around the drip line of each
existing on-site tree and/or native shrub mass within 20 feet of
construction activity.
Mitigation Measure 4.e.3: Grading and excavation and BP PS/BS 4.e.3
grading work shall be consistent with the City of Atascadero
Tree Ordinance. Special precautions when working around
native trees include:
1. All existing trees outside of the limits of work shall
remain.
2. Earthwork shall not exceed the limits of the project
area.
3. Low branches in danger of being torn from trees shall
be pruned prior to any heavy equipment work being
done.
4. Vehicles and stockpiled material shall be stored
outside the drip line of all trees.
5. All trees within the area of work shall be fenced for
protection with 4-foot chain link,snow or safety
fencing placed per the approved tree protection plan.
Tree protection fencing shall be in place prior to any
site excavation or grading. Fencing shall remain in
place until completion of all construction activities.
6. Any roots that are encountered during excavation
shall be clean cut by hand and sealed with an
approved tree seal.
City of Atascadero
Resolution No.2004-036
Page 13 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
5528 Tunitas Ave./5559 Rosario Ave. BIL:Business License Buis
GP:Grading Permit
wt BS:Building
PD-7 Master Plan of Development BP:Building Permit Services
FI: Final Inspection FD:Fire Department
TPM 2003-0052 TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WIN:Wastewater
CA City Attorney
Mitigation Measure 4.e.4: The developer shall contract with a GP PSBS 4.e.4
certified arborist during all phases of project implementation.
The certified arborists shall be responsible for monitoring the
project during all phases of construction through project
completion,as follows:
(a). A written agreement between the arborist and the
developer outlining a arborist monitoring schedule for
each construction phase through final inspection shall be
submitted to and approved by planning staff prior to the
issuance of building/grading permits.
(b). Arborist shall schedule a pre-construction meeting with
engineering/planning staff,grading equipment operators,
project superintendent to review the project conditions and
requirements prior to any grubbing or earth work for any
portion of the project site. All tree protection fencing and
trunk protection shall be installed for inspection during the
meeting. Tree protection fencing shall be installed at the
line of encroachment into the tree's root zone area.
(c). As specified by the arborist report and City staff:
■ Fencing: Must be a minimum of 4'high,chain link,
and snow or safety fence,staked at the drip-line or
line of encroachment for each tree or group of trees.
Tree fencing shall be erected before demolition,
grading,or construction begins and remains in place
until final inspection of the project permit,except for
work specifically required in the approved plans in
which case the project arborist or Planning Staff must
be consulted.
■ Soil Aeration Methods: Soils under drip-lines that
have been compacted by heavy equipment and/or
construction activities must be returned to their
original state before all work is completed. Methods
include water jetting,adding organic matter,and
boring small holes with an auger(18"deep,24 apart
with a 2-4"auger)and the application of moderate
amounts of nitrogen fertilizer. The arborist shall
advise.
• Chip Mulch: All areas within the drip-line of the trees
that cannot be fenced shall receive a 4-6"layer of
chip mulch to retain moisture,soil structure and
reduce the effects of soil compaction.
■ Trenching within the Drip-line: All trenching under
drip-lines of native trees shall be hand dug,augured
or bored. All major roots shall be avoided whenever
possible. All exposed roots larger than 1"in diameter
shall be'clean cut with a sharp pruning tool and not
left ragged.
City of Atascadero
Resolution No.2004-036
Page 14 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
5528 Tunitas Ave./5559 Rosario Ave. GP Business enTit BS:SerBuis
GP:Grading Permit ��Building
PD-7 Master Plan of Development BP:Building Pemrt Services
FI: Final Inspection FD:Fire Department
TPM 2003-0052 TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WW:Wastewater
CA City Attorney
■ Grading within drip-line: Grading should not
encroach within the drip-line. If grading is necessary,
construction of retaining walls or tree wells or other
protection measures may be necessary to insure the
survivability of the trees. Chip mulch 4-6"in depth
may also be required in these areas. Grading should
not disrupt the normal drainage pattern around the
trees. Fills should not create a ponding condition and
excavations should not leave the tree on a rapidly
draining mound.
■ Exposed Roots: Any exposed roots shall be
recovered the same day they were exposed.
• Paving within the Drip-line: Pervious surfacing is
required within the drip line of any oak trees.
■ Compaction: Vehicles and all heavy equipment shall
not be driven under the trees,as this will contribute to
soil compaction.
• Existing Surfaces: The existing ground surface within
the drip-line of all oak trees shall not be cut,filled,
compacted or pared.
■ Construction materials and waste: No liquid or solid
construction waste shall be dumped on the ground
within the drip-line of any oak tree.
■ Arborist Monitoring: During construction an arborist
shall be present when encroaching within the drip line
of any Oak tree.
(d). Upon project completion and prior to final occupancy a
final status report shall be prepared by the project arborist
certifying that the tree protection plan was implemented,
the trees designated for protection were protected during
construction, and the construction-related tree protection
measures are no longer required for tree protection. The
arborist shall also certify the health of the two mature oak
trees on site and provide recommendations for future
action if necessary.
Mitigation Measure 4.e.5:All tree removals shall be mitigated 4.e.5
as prescribed by the Atascadero Native Tree Ordinance.
($500.00)
City of Atascadero
Resolution No.2004-036
Page 15 of 15
Conditions of Approval/ Timing Responsibility Mitigation Measure
Mitigation Monitoring Program /Monitoring
PS:Planning
5528 Tunitas Ave./5559 Rosario Ave. BL:Business License Services
GP:Grading Perm t BS:Building
PD-7 Master Plan of Development BP:Building Permit services
TPM 2003-0052 Fl: Final Inspection FD:Fire Department
TO:Temporary Occupancy PD:Police
FO:Final Occupancy Department
CE:City Engineer
WN:wastewater
CA City Attorney
Mitigation Measure 6.b.1: The grading permit application GP BS 6.b.1
plans shall include erosion control measures to prevent soil,
dirt,and debris from entering the storm drain system during
and after construction. A separate plan shall be submitted for
this purpose and shall be subject to review and approval of the
City Engineer at the time of Building Permit application.
Mitigation Measure 6.c.1: A soils report shall be required to be GP BS 6.0
submitted with a future building permit by the building
department.
Mitigation Measure 8.e.f.1: The developer is responsible for GP SS 8.e.f.1
ensuring that all contractors are aware of all storm water
quality measures and that such measures are implemented.
Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction
notices,citations, or stop work orders.
Mitigation Measure 11.d.1: All construction activities shall GP BS 11.d.1
comply with the City of Atascadero Noise Ordinance for hours
of operation.