HomeMy WebLinkAboutResolution 2004-029 RESOLUTION NO. 2004-029
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF ATASCADERO, CALIFORNIA, APPROVING
VESTING TENTATIVE TRACT MAP 2003-0043, A SIX LOT MAP
CONSISTENT WITH A PD-7 OVERLAY ZONE
OF APN 031-183-002
(7755 NAVAJOA AVE/HUCKOBEY)
WHEREAS, an application has been received from Jack Huckobey (5050 Portola Rd,
Atascadero, CA 93422) Applicant and Property Owner to consider a project consisting of a zone
change from RMF-10 (Residential Multi-Family) to RMF-10 / PD-7 (Residential Multi-Family
with Planned Development Overlay#7) with the adoption of a Master Plan of Development, and
a four lot residential Tentative Parcel Map on APN 031-183-002 and,
WHEREAS, the site's General Plan Designation is MDR (Medium-Density Residential);
and,
WHEREAS, the site's current zoning district is RMF-10 (Residential Multi-Family);
and,
WHEREAS, the Planning Commission has recommended that a site be rezoned to
include a PD-7 overlay with a Master Plan of Development thereby allowing a six lot
subdivision of the site; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act(CEQA)have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Tract Map application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on October 7, 2003, studied and considered Tentative Tract Map 2003-0043,
after first studying and considering the Proposed Mitigated Negative Declaration prepared for the
project; and,
WHEREAS, the Atascadero City Council, at a Public Hearing held on December 9,
2003, studied and considered Vesting Tentative Tract Map 2003-0043, after first studying and
considering the Draft Mitigated Negative Declaration prepared for the project; and,
NOW, THEREFORE BE IT RESOLVED, by the City Council of the City of
Atascadero:
City of Atascadero
Resolution No.2004-029
Page 2 of 12
SECTION 1. Findings of Approval for Tentative Parcel Mau
1. The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
2. The design and improvement of the proposed subdivision is consistent with the General
Plan and applicable zoning requirements.
3. The proposed subdivision, as conditioned, is consistent with the proposed Planned
Development Overlay District#7 Master Plan of Development (CUP 2003-0087).
4. The site is physically suitable for the type of development proposed.
5. The site is physically suitable for the density of development proposed.
6. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
7. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
SECTION 2. Approval. The Atascadero City Council in a regular session assembled on
December 9, 2003, resolves to approve Vesting Tentative Tract Map (TTM 2003-0043) subject
to the following:
1. Exhibit A: Vesting Tentative Tract Map 2003-0043
2. Exhibit B: Conditions of Approval/Mitigation Monitoring Program.
City of Atascadero
Resolution No.2004-029
Page 3 of 12
On motion by Council Member Scalise and seconded by Council Member Claly, the
foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Clay, O'Malley, Pacas, and Scalise
NOES: Mayor Luna
ABSENT: None
ADOPTED: March 23, 2004
CITY ATASCAD O
By:-
Dr.
y. Dr. eorge Luna, Mayor
ATTEST:
Marcia McClure Torgerson, C.M.C., CUt Clerk
APPROVED AS TO FORM:
Roy A. anley, City Attorfey
City of Atascadero
Resolution No.2004-029
Page 4 of 12
Exhibit A:Vesting Tentative Tract Map 2003-0043
I- full I It,
fit,
� r t
O I I
t S I I 4
}
1 �
Jill
} !
YAYN
F iCt � F I
t
aw g�
I
aa.wr
'l
l
City of Atascadero
Resolution No.2004-029
Page 5 of 12
Exhibit B:Conditions Of Approval/Mitigation Monitoring Program
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Pem t BS:Building Services
7755 Navajoa Ave SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
T0:Temporary Occupancy WW:Wastewater
TTM 2003-0043 FI:Final inspection CA Cily Attomey
F0:Final Occupancy AMWC:Water Comp.
Planning Services
1. The approval of this Tentative Parcel Map shall not FM PS
become final and effective following approval of Zone
Change 2002-0036 and CUP 2003-0087.
2. Approval of this Tentative Parcel Map shall be valid FM PS
for two years after its effective date. At the end of the
period,the approval shall expire and become null and
void unless an extension of time is granted pursuant
to a written request received prior to the expiration
date.
3. The Community Development Department shall have FM PS
the authority to approve minor changes to the project
that(1)result in a superior site design or appearance,
and/or (2) address a design issue that is not
substantive to the Tentative Tract Map and that the
Final Map is in substantial conformance with the
Tentative Map.
4. The Parcel Map shall be subject to additional fees for FM PS
park or recreation purposes (QUIMBY Act) as
required by City Ordinance.
5. The granting of this entitlement shall apply to the Ongoing PS
property located at 7755 Navajoa Ave(APN 031-183-
002)regardless of owner.
6. The Final Map shall be drawn in substantial FM PS
conformance with the approved tentative map,and in
compliance with all conditions set forth herein, shall
be submitted for review and approval in accordance
with the Subdivision Map Act and the City's
Subdivision Ordinance.
7. The subdivider shall defend, indemnify, and hold FM PS
harmless the City of Atascadero or its agents,
officers, and employees against any claim or action
brought to challenge an approval by the city,or any of
its entities,concerning the subdivision.
8. Affordable Housing Requirement: The applicant shall FM PS,CE
either set aside one housing unit at the moderate
category rate for a period of 30 years and pay in-lieu
fees for the factional portion owed in excess of one
City of Atascadero
Resolution No.2004-029
Page 6 of 12
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
7755 Navajoa Ave SIF Building
Subdivision`"t FD:Fire DepaNr nt
Improvement Plans PD:P*e DepaMient
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
T0:Temporary Occupancy WW:Wastewater
TTM 2003-0043 FI:Final inspectbn CA:City Abrney
FO:Final Occupancy AMWC:Water Comp.
unit, or pay an in-lieu fee based on 2.50% of the
valuation of each of the market rate units.
Building Services
9. A soils investigation prepared by a licensed FM PS,BS,CE
Geotechnical Engineer is to be provided for the
project. The report is to be provided at the time of
building permit submittal along with the building
plans for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
Fire Marshal
10. A minimum 16'paved with 20'total clear width FM PS,CE
access with a minimum head clearance of 13'-6"is
to be provided to each building location. Twenty-
foot clear width may be provided with use of turf
block or low-lying shrubs along the west side for
emergency vehicle access.
11. The location of all existing and proposed fire FM CE
hydrants shall be shown on subsequent building
permit applications.
12. A letter shall be provided from Atascadero Mutual FM CE
Water Company stating the minimum expected
water available to the site. Amount available must
meet minimum requirement specified in the
California Fire Code.
13. Address signage design shall be provided prior to FM CE
issuance of any subsequent building permits.
14. Fire lanes shall be delineated to restrict parking as FM CE
required by the Fire Authority.
City Engineer
Site Specific Conditions
15. The applicant shall construct new curb,gutter and BP PS/PW
sidewalk,in accordance with City Standards,as
shown on improvement plans,along entire
frontage.
16. The applicant shall overlay or slurry seal the entire BP PW
street frontage of Navajoa,in accordance with City
Standards.
The applicant shall retain the onsite 50 year developed BP/GP/FM PW
storm and meter out the 2-year historic storm in the
historic release location.The basin shall have a overland
escape route for storm events over the 50 year event.The
City of Atascadero
Resolution No.2004-029
Page 7 of 12
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Peank PS:Planning Services
BP:Budding Permit BS:Building Services
7755 Navajos Ave SIP:Subdivision FD:Fire Depararsm
Improvement Flans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:Ck Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2003-0043 FI:Final inspection CA City Attorney
F0:Final Occupancy AMWC:Water Cone.
overland escape route shall not damage other properties.
The Storm water from Navajoa Ave shall be allowed to
enter the site and be released at a historic location.
17. The applicant shall pay sewer Extension BP PW
(Annexation)and Connection fees upon issuance
of building permit.
18. A homeowners association,or other funding and FM PW
maintenance agreement shall be submitted for
approval by the City Engineer and City Attorney
prior to recording the final map. The agreement
shall cover scheduled maintenance of the pervious
avers,and maintenance of the drainage facilities.
19. Existing drainage patterns from adjacent BP PW
properties shall not be obstructed.
20. All drainage from improvements shall cross FM PW
property lines within drainage easements.
City Engineer
Standard Conditions
21. In the event that the applicant is allowed to bond for BP BS
the public improvements required as a condition of
this map,the applicant shall enter into a
Subdivision Improvement Agreement with the City
Council.
22. An engineers estimate of probable cost shall be BP PW
submitted for review and approval by the City
Engineer to determine the amount of the bond.
23. The Subdivision Improvement Agreement shall BP PW
record concurrently with the Final Map.
24. All public improvements shall be constructed in BP PW
conformance with the City of Atascadero
Engineering Department Standard Specifications
and Drawings or as directed by the City Engineer.
25. The applicant shall enter into a Plan BP BS
Check/Inspection agreement with the City.
26. The applicant shall be responsible for the relocation BP PW
and/or alteration of existing utilities.
27. The applicant shall install all new utilities (water, SP BS
gas, electric, cable TV and telephone)
underground. Utilities shall be extended to the
property line frontage of each lot or its public utility
easement.
28. The applicant shall monument all property corners BP PW
for construction control and shall promptly replace
them if disturbed.
City of Atascadero
Resolution No.2004-029
Page 8 of 12
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Swbas
BP:Building Permit BS:Building Services
7755 Navajoa Ave SIP:Subdivision FD:FireDepannent
Inprovemerd Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
T0:Temporary Occupancy WW:Wastewater
TTM 2003-0043 Fl:Final ins moon Ca city Annoy
F0:Final Occupancy AMWC:Water Comp.
29. A preliminary subdivision guarantee shall be BP PW
submitted for review in conjunction with the
processing of the parcel map.
30. All existing and proposed utility, pipeline, open BP PS/PW
space, or other easements are to be shown on the
parcel map. If there are building or other
restrictions related to the easements, they shall be
noted on the parcel map. The applicant shall show
all access restrictions on the parcel map.
31. Prior to recording the parcel map, the applicant BP PS/PW
shall submit a map drawn in substantial
conformance with the approved tentative map and
in compliance with all conditions set forth herein
shall be submitted for review and approval by the
City in accordance with the Subdivision Map Act
and the City's Subdivision Ordinance.
32. Prior to recording the parcel map, the applicant's BP PW
surveyor shall set monuments at all new property
corners or shall indicate, by certificate on the final
map, that corners have been set or shall be set by
a date specific and that they will be sufficient to
enable the survey to be retraced.
33. Prior to recording the parcel map, the applicant BP BS
shall pay all outstanding plan check/inspection
fees.
34. Prior to recording the parcel map, the applicant BP PW
shall have the map reviewed by all applicable
public and private utility companies (cable,
telephone, gas, electric, Atascadero Mutual Water
Company). The applicant shall obtain a letter from
each utility company,which indicates their review of
the map. The letter shall identify any new
easements, which may be required by the utility
company. A copy of the letter shall be submitted to
the City. New easements shall be shown on the
parcel map.
35. Upon recording the final map, the applicant shall BP PW
provide the City with a black line clear Mylar (0.4
mil)copy and a blue line print of the recorded map.
36. Prior to the final inspection of any public BP PW
improvements, the applicant shall submit a written
statement from a registered civil engineer that all
work has been completed and is in full compliance
with the approved plans.
City of Atascadero
Resolution No.2004-029
Page 9 of 12
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Penn PS:Planning Services
BP:Building Penmit BS:Building Services
7755 Navajoa Ave SIP:Subdivision FD:FreDepartrnent
Irrpmement Plans PD:Police Department
Vesting Tentative Tract Map Fre:Final Map CE:Ciy Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2003-0043 Fl:Final inspection cn Ck Attorney
F0:Final Occupancy AMWC:Water Comp.
Atascadero Mutual Water Company
37. Prior to the recordation of the Final Parcel Map,the BP BS
applicant shall submit plans showing the water
distribution facilities required to serve the project for
review and approval by the Atascadero Mutual
Water Company.All new water distribution facilities
shall be constructed in conformance with
Atascadero Mutual Water Company Standards.
38. Prior to the recordation of the Final Map,the BP BS
applicant shall obtain a"Will Serve"letter from the
Atascadero Mutual Water Company.
39. Prior to issuance of building permits,the applicant BP BS
shall pay all installation and connection fees
required by the Atascadero Mutual Water
Company.
40. Show all fire suppression appurtenances required BP BS
by the Atascadero Fire Department.
41. Prior to the recordation of the Final Parcel Map,the BP BS
applicant shall submit plans showing the water
distribution facilities required to serve the project for
review and approval by the Atascadero Mutual
Water Company.All new water distribution facilities
shall be constructed in conformance with
Atascadero Mutual Water Company Standards.
42. A 5-foot drainage easement shall be recorded BP PW
on the final map along the south property line
of Parcel A and Parcel B and the east
property line of Parcel B.
43. Existing drainage patterns from adjacent BP PW
properties shall not be obstructed.
44. All drainage from improvements shall cross BP PW
property lines within drainage easements.
Mitigation Measures
Mitigation Measure 1.c.1: If exterior lighting is proposed,it BP PS 1.c.1
shall be designed to eliminate any off site glare. All exterior
site lights shall utilize full cut-off,"hooded"lighting fixtures to
prevent offsite light spillage and glare. Any luminaire pole
height shall not exceed 16-feet in height, limit intensity to 2.0
foot candles at ingress/egress,and otherwise 0.6 foot candle
minimum to 1.0 maximum within the private street. Fixtures
shall be shield cut-off type and compatible with historic setting,
subject to staff approval.
City of Atascadero
Resolution No.2004-029
Page 10 of 12
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
7755 Navajoa Ave SIP:SubdWiDn FD:Fire Department
Ir prmement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary 00Cupancy WW:Wastewater
TTM 2003-0043 FI:Final inspectim CA Cay Momey
F0:Final Occupancy AMWC:Water Cone.
Mitigation Measure 1.c.2: Proposed residences shall utilize a
variety of colors and a minimum of two accent base materials
throughout the project.Color Schemes shall be comprised of a
minimum of three complimentary colors and shall be used to
accentuate building trim and architectural features.
Mitigation Measure 3.b.1: The project shall be conditioned to SP BS 3.b.1
comply with all applicable District regulations pertaining to the
control of fugitive dust(PM-10)as contained in sections 6.3,
6.4 and 6.5 of the April 2003 Air Quality Handbook.
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune
according to manufacturer's specifications.
• Fuel all off-road and portable diesel powered
equipment, including but not limited to bulldozers,
graders,cranes,loaders,scrapers,backhoes,
generator sets,compressors,auxiliary power units,
with ARB certified motor vehicle diesel fuel(Non-
taxed version suitable for use off-road).
• Maximize to the extent feasible,the use of diesel
construction equipment meeting the ARB's 1996 or
newer certification standard for off-road heavy-duty
diesel engines.
• Install diesel oxidation catalysts(DOC),catalyzed
diesels particulate filters(CDPF)or other District
approved emission reduction retrofit services
(Required for projects grading more than 4.0 acres of
continuously worked area).
Section 6.4: Activity Management Techniques
• Develop a comprehensive construction activity
management plan designed to minimize the amount
of large construction equipment operating during any
given time period.
• Schedule of construction truck trips during non-peak
hours to reduce peak hour emissions.
• Limit the length of the construction workday period, if
necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading,
demolition and building plan notes:
A. Reduce the amount of the
disturbed area where possible.
B. Use of water trucks or sprinkler
systems in sufficient quantities to prevent airborne dust
from leaving the site. Increased watering frequency would
be required whenever wind speeds exceed 15 mph.
Reclaimed(non-potable)water should be used whenever
City of Atascadero
Resolution No.2004-029
Page 11 of 12
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permil PS:Planning S&-&w
BP:Building Pernit BS:Building Services
7755 Navajoa Ave SIP:SubdWionn FD:Fire Dep drneot
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE.City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2003-0043 FI:Final inspection CA City Altomey
F0:Final Occupancy AMWC:Water Comp.
possible.
C. All dirt stockpile areas should
be sprayed daily as needed.
D. Permanent dust control
measures identified in the approved project re-vegetation
and landscape plans should be implemented as soon as
possible following completion of any soil disturbing
activities.
E. Exposed ground areas that are
plann4ed to be reworked at dates greater than one month
after initial grading should be sown with a fast-germinating
native grass seed and watered until vegetation is
established.
F. All disturbed soil areas not
subject to re-vegetation should be stabilized using
approved chemical soil binder,jute netting,or other
methods approved in advance by the APCD.
G. All roadways,driveways,
sidewalks,etc,to be paved should be complete as soon as
possible. In addition,building pads should be laid as soon
as possible after grading unless seeding or soil binders are
used.
H. Vehicle speed for all
construction vehicles shall not exceed 15 mph on any
unpaved surface at the construction site.
I. All trucks hauling dirt,sand,
soil,or other loose materials are to be covered or should
maintain at least two feet of freeboard(minimum vertical
distance between top of load and top of trailer) in
accordance with CVC Section 23114.
J. Install wheel washers where
vehicles enter and exit unpaved roads onto streets,or was
off trucks and equipment leaving the site.
K. Sweep streets at the end of
each day if visible soil material is carried onto adjacent
paved roads. Water sweepers with reclaimed water should
be used where feasible.
L. The contractor or builder shall
designate a person or persons to monitor the dust control
program and to order increased watering,as necessary,to
prevent transport of dust off site. The name and telephone
number of such persons shall be provided to the APCD
prior to land use clearance for map recordation and land
use clearance for finish grading of any structure.
Mitigation Measure 4.e:All tree removals shall be mitigated as GP BS 4.e.1
prescribed by the Atascadero Native Tree Ordinance.
($2900.00)
City of Atascadero
Resolution No.2004-029
Page 12 of 12
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pem ll PS:Planning Services
BP:Building Permit BS:Building Services
7755 Navajoa Ave SIP:Subdivision FD:FireDepamnem
Improvement Plans PD:Poke Department
Vesting Tentative Tract Map FM:Final Lisp CE:City Engineer
TO:Temporary Occtpancy WW:Wastewater
TTM 2003.0043 FI:Final inspection CA City attorney
F0:Final Occupancy AMWC:Water Camp.
Mitigation Measure 6.b: The grading permit application plans GP BS 4.e.2
shall include erosion control measures to prevent soil,dirt,and
debris from entering the storm drain system during and after
construction. A separate plan shall be submitted for this
purpose and shall be subject to review and approval of the City
Engineer at the time of Building Permit application.
Mitigation Measure 6.c.d: A soils report shall be required to be GP BS 4.e.3
submitted with a future building permit by the building
department.The building plans will be required to follow the
recommendations of the soils report to assure safety for
residents and buildings.
Mitigation Measure 8.e.f: The developer is responsible for GP BS 4.e.4
ensuring that all contractors are aware of all storm water
quality measures and that such measures are implemented.
Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction
notices,citations,or stop work orders.
Mitigation Measure 11.d: All construction activities shall GP BS 4.e.5
comply with the City of Atascadero Noise Ordinance for hours
of operation.
Construction activities shall be limited to the following hours of
operation:
• 7 a.m.to 7 p.m. Monday through Friday
• 9 a.m.to 6 p.m. Saturday
• No construction on Sunday
Further,particularly loud noises shall not occur before 8 a.m.
on weekdays and not at all on weekends.
The hours of construction may be modified by the Community
Development Director upon a determination that unusually
loud construction activities are having a significant impact on
the neighbors.
Failure to comply with the above-described hours of operation
may result in withholding of inspections and possible
construction prohibitions,subject to the review and approval of
the Community Development Director.
A sign shall be posted on-site with the hours of operation and
a telephone number of the person to be contacted in the event
of any violations. The details of such a sign shall be approved
by staff during the Grading Plan/Building Permit review
process.