HomeMy WebLinkAboutResolution 2004-028 RESOLUTION N0. 2004-028
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ATASCADERO, CALIFORNIA, APPROVING CONDITIONAL USE
PERMIT 2003-0087, ADOPTING A MASTER PLAN OF
DEVELOPMENT FOR A PD-7 OVERLAY ZONING DISTRICT ON
APN 031-183-002
(7755 Navajoa Ave/Huckobey)
WHEREAS, an application has been received from Jack Huckobey (5050 Portola
Rd, Atascadero, CA 93422) Applicant and Property Owner to consider a project
consisting of a zone change from RMF-10 (Residential Multi-Family) to RMF-10 /PD-7
(Residential Multi-Family with Planned Development Overlay#7) with the adoption of a
Master Plan of Development, and a six-lot residential Tentative Parcel Map on APN 031-
183-002 and,
WHEREAS, the site's General Plan Designation is MDR (Medium-Density
Residential); and,
WHEREAS, the site's current zoning district is RMF-10 (Residential Multiple-
Family); and,
WHEREAS, the Planning Commission has recommended that a site be rezoned
to include a PD-7 overlay district which requires the adoption of a Master Plan of
Development; and,
WHEREAS, the laws and regulations relating to the preparation and public
notice of environmental documents, as set forth in the State and local guidelines for
implementation of the California Environmental Quality Act (CEQA) have been adhered
to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone
Change application was held by the Planning Commission of the City of Atascadero at
which hearing evidence, oral and documentary, was admitted on behalf of said Master
Plan of Development; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly
noticed Public Hearing held on Tuesday, October 7, 2003, studied and considered the
Master Plan of Development (CUP 2003-0087), after first studying and considering the
Proposed Mitigated Negative Declaration prepared for the project, and
WHEREAS, the Atascadero City Council, at a Public Hearing held on December
9, 2003, studied and considered the Master Plan of Development (CUP 2003-0087) for
Zone Change 2002-0036, after first studying and considering the Draft Mitigated
Negative Declaration prepared for the project, and,
City of Atascadero
Resolution No.2004-028
Page 2 of 19
NOW, THEREFORE BE IT RESOLVED, by the City Council of the City of
Atascadero:
SECTION 1. Findings for Approval of Master Plan of Development. The City
Council finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
2. The proposed project or use satisfies all applicable provisions of the Title
(Zoning Ordinance)including the PD-7 Ordinance; and,
3. The establishment, and subsequent operation or conduct of the use will not,
because of the circumstances and conditions applied in the particular case, be
detrimental to the health, safety, or welfare of the general public or persons
residing or working in the neighborhood of the use, or be detrimental or
injurious to property or improvements in the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or
the immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond
the safe capacity of all roads providing access to the project, either existing or
to be improved in conjunction with the project, or beyond the normal traffic
volume of the surrounding neighborhood that would result from full
development in accordance with the Land Use Element.
6. Front yard setbacks are approved at 10 feet from the edge of pavement for the
main residence per Exhibit B as a residential courtyard design theme.
SECTION 2. Findings for Approval of Tree Removal Permit. The City Council finds
as follows:
1. The trees were obstructing proposed improvements that could not be
reasonably designed to avoid the need for tree removal, as certified by a report
from the Site Planner and determined by the Community Development
Department.
SECTION 3. Approval. The Atascadero City Council, in a regular session assembled
on December 9, 2003, resolved to approve Conditional use Permit 2003-0087, a Master
Plan of Development for Zone Change 2002-0036 subject to the following:
1. EXHIBIT A: Conditions of Approval/Mitigation Monitoring Program
2. EXHIBIT B: Site &Landscape Plan
3. EXHIBIT C: Fencing Design
City of Atascadero
Resolution No.2004-028
Page 3 of 19
4. EXHIBIT D: Statistical Summary
5. EXHIBIT E: Grading &Drainage Plan
6. EXHIBIT F: Elevations
7. EXHIBIT G: Floor Plan
8. EXHIBIT H: Exterior Color&Material Sample Board
On motion by Council Member Scalise and seconded by Council Member Clay,
the foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Clay, O'Malley, Pacas, and Scalise
NOES: Mayor Luna
ABSENT: None
ADOPTED: March 23, 2004
CITY ATASCAD O
By: ✓
Dr. Ge rge Luna, Mayor
ATTEST:
Mj-4&41 M,-edf'� T-V
Marcia McClure Torgerson, C.M.C., CiJk Clerk
APPROVED AS TO FORM:
lol, 4�jw
Roy . Hanley, dity Att ey
City of Atascadero
Resolution No.2004-028
Page 4 of 19
EXHIBIT A:Conditions of Approval/Mitigation Monitoring Program
PD-7 Master Plan of Development(CUP 2003-0087)/ZCH 2002.0036
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
7755 Navajoa Ave GP:Grading Permit FD:FireDepadment
BP:Building Permit PD:Poke Department
PD-7 Master Plan of Development FI:FinalInspection CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
CUP 2003-00872CH 2002-0036 FO:FirW Occupancy CA:City Attorney
Planning Services
1. The approval of this zone change and use permit PS
shall become final and effective following City Council
approval.
2. Approval of this Master Plan of Development shall be FM PS
valid concurrently with the life of Tentative Tract Map
2003-0043 and then indefinitely following final map. The
Master Plan of Development approval shall expire and
become null and void unless a final map is recorded
consistent with the Master Plan of Development.
3. Changes to the Master Plan of Development shall be On-going PS
approved by the Planning Commission and do not require
Council action.
4. The Community Development Department shall have BP/FM PS
the authority to approve the following minor changes to
the project the(1)modify the site plan project by less than
10%,(2)result in a superior site design or appearance,
and/or(3)address a construction design issue that is not
substantive to the Master Plan of Development. The
Planning Commission shall have the final authority to
approve any other changes to the Master Plan of
Development and any associated Tentative Maps.
5. All subsequent Tentative Tract Map and construction BP/FM PS
permits shall be consistent with the Master Plan of
Development contained herein.
6. All exterior elevations,finish materials and colors shall be BP PS
consistent with the Master Plan of Development as shown
in Exhibit F and H with the following modifications,subject
to staff approval:
■ Staff shall review and approve final color selections
for neighborhood compatibility and consistency with
the approved Master Plan of Development.
■ Windowsill treatment shall be pre-cast or solid wood
elements.
■ Porch railing on units 1 and 4 shall be wood and shall
be painted to match the approved trim color.
• Garage doors shall of architectural grade and shall be
City of Atascadero
Resolution No.2004-028
Page 5 of 19
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
7755 Navajoa Ave GP:Grading Permit FD:Fire Department
BP:Building Pemit PD:Police Department
PD-7 Master Plan of Development Fl:Finallrspedion CE:City Engineer
TO:Tenporary Occupancy WW:Wastewater
CUP 2003-0087/ZCH 2002-0036 FO:Final OccWancy CACiryAttomey
painted to match the body color of each unit.
■ Windows shall be single or double hung vinyl and
shall be complimentary in color to the color schemes
shown in EXHIBIT H.
• Roof material is to be of architectural grade.
7. All site development shall be consistent with the maximum BP/FM PS
intensities described in the statistical project summary as
shown on EXHIBIT D.
8. All site work,grading and site improvements shall be BP/FM PS
consistent with the Master Plan of Development as shown
in EXHIBIT B,D and E.
9. A final landscape and irrigation plan shall be approved BP PS
prior to the issuance of building permits and included as
part of site improvement plan consistent with EXHIBIT B.
All exterior meters,air conditioning units and mechanical
equipment shall be screened with landscape material.
Trash/recycle container areas shall be screened with
fencing or landscape.
■ All front yards and street facing side yards shall be
landscaped by the developer. All landscape maintenance
shall be the responsibility of the individual property owner.
■ Street trees shall be 15-gallon London Plane trees
planted on each lot along Navajoa.Two trees shall be
planted on each street facing lot and shall be evenly
spaced.
■ All required landscape trees shall be double staked
upon installation.
■ Where possible,guest parking spaces shall be modified
to provide a landscape planter between the buildings and
the edge of pavement.Colored brick shall separate
parking spaces where designation is necessary.
10. All project fencing shall be installed consistent with BP PS
EXHIBIT B and C subject to the following modifications.
a. Fencing shall be constructed of 4-foot high solid
redwood or cedar boards with 2-foot lattice section
above.
b. No fencing shall be placed within the front or corner
yard setback.
c. The design of all fencing shall be compatible with the
overall project design,subject to staff approval
11. A Tree Protection Plan shall be prepared for GP PS
encroachment within the dripline of native trees located on BP
adjacent properties.
12. Affordable Housing Requirement: The applicant shall FM,BP PS,CE
either set aside one housing unit at the moderate category
rate fora period of 30 years,or pay an in-lieu fee based
City of Atascadero
Resolution No.2004-028
Page 6 of 19
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
7755 Navajoa Ave GP:Grading Pernt FD:Fire Department
BP:Building Permit PD:Police Department
PD-7 Master Plan of Development Fl:Final Inspection CE:C4 Engineer
TO:Temporary Occupancy WW:Wastewater
CUP 2003-0087/ZCH 2002-0036 F0:Final Occupancy cin Cy wbmey
on 2.50%of the valuation of each of the market rate units.
13. All exterior material finishes(stucco,materials,lighting, BP PS
garage doors)shall be durable,high quality,and
consistent with Exhibit H.
14. 24"box live oak trees shall be planted in the front yard of FM PS,CE
Lots 3 and 4.
15. Workforce Housing FM PS,CE
Prior to recordation of final map,the applicant shall enter into a
legal agreement with the City to reserve t/z of the units for sale
to residents or workers within the City of Atascadero, including
the affordable units. The agreement shall include the following
provisions:
■ The units shall be offered for sale to residents or
workers within the City of Atascadero for a
minimum of 60-days. During this time period offers
may only be accepted from Atascadero residents or
workers;
■ The applicant shall provide reasonable proof to the
City that at least one of the qualified buyers is a
resident or worker within the City Limits of
Atascadero;
■ The Atascadero resident or worker restriction shall
apply to the initial sale only;
• The applicant shall identify which units will be reserved;
and
■ The City Attorney shall approve the final form of the
a reement.
Building Services
16. A soils investigation prepared by a licensed BP FM
Geotechnical Engineer is to be provided for the project.
The report is to be provided at the time of building
permit submittal along with the building plans for review
by the Building Division. Recommendations contained
in the report are to be incorporated into the project
plans.
Fire Marshal
17. A minimum 16'paved with 20'total clear width access FM PS,CE
with a minimum head clearance of 13'-6"is to be
provided to each building location. Twenty-foot clear
width may be provided with use of turf block or low-lying
shrubs along the west side for emergency vehicle
access.
City of Atascadero
Resolution No.2004-028
Page 7 of 19
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Sarvices
7755 Navajoa Ave GP:Grading Pend FD:Fire Departmant
BP:Building Pern t PD:P*e Department
PD-7 Master Plan of Development Fl:Final InspaMn CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
CUP 2003-0087/ZCH 2002-0036 FO:Final Occupanoy CACly AWmey
18. The location of all existing and proposed fire hydrants FM CE
shall be shown on subsequent building permit
applications.
19. A letter shall be provided from Atascadero Mutual Water FM CE
Company stating the minimum expected water available
to the site. Amount available must meet minimum
requirement specified in the California Fire Code.
20. Address signage design shall be provided prior to FM CE
issuance of any subsequent building permits.
21. Fire lanes shall be delineated to restrict parking as FM CE
required by the Fire Authority.
City Engineer
Site Specific Conditions
22. The applicant shall construct new curb,gutter and BP PS/PW
sidewalk,in accordance with City Standards,as shown
on improvement plans,along entire frontage.
23. The applicant shall overlay or slurry seal the entire BP PW
street frontage of Navajoa,in accordance with City
Standards.
24. The applicant shall retain the onsite 50 year developed BP/GP/FM PW
storm and meter out the 2-year historic storm in the
historic release location.The basin shall have a
overland escape route for storm events over the 50 year
event.The overland escape route shall not damage
other properties.The Storm water from Navajoa Ave
shall be allowed to enter the site and be released at a
historic location.
25. The applicant shall pay sewer Extension(Annexation) BP PW
and Connection fees upon issuance of building permit.
26. A homeowners association,or other funding and FM PW
maintenance agreement shall be submitted for approval
by the City Engineer and City Attorney prior to recording
the final map. The agreement shall cover scheduled
maintenance of the pervious pavers,and maintenance
of the drainage facilities.
27. Existing drainage patterns from adjacent properties BP PW
shall not be obstructed.
28. All drainage from improvements shall cross property FM PW
lines within drainage easements.
City Engineer
Standard Conditions
29. In the event that the applicant is allowed to bond for the BP BS
public improvements required as a condition of this
map,the applicant shall enter into a Subdivision
City of Atascadero'
Resolution No.2004-028
Page 8 of 19
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
7755 Navajoa Ave GP:GradingPernwl FD:FireD"drrent
BP:Building Pemat PD:Police Department
PD-7 Master Plan of Development Fl:FlnalInapectbri CE:Cily Enginaar
TO:Temporary Occupancy WW:Wastewater
CUP 2003-00872CH 2002-0036 FO:Final Oocuparq CA City Pamey
Improvement Agreement with the City Council.
30. An engineer's estimate of probable cost shall be BP PW
submitted for review and approval by the City Engineer
to determine the amount of the bond.
31. The Subdivision Improvement Agreement shall record BP PW
concurrently with the Final Map.
32. All public improvements shall be constructed in BP PW
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings or
as directed by the City Engineer.
33. The applicant shall enter into a Plan Check/inspection BP BS
agreement with the City.
34. The applicant shall be responsible for the relocation BP PW
and/or alteration of existing utilities.
35. The applicant shall install all new utilities (water, gas, BP BS
electric, cable TV and telephone) underground. Utilities
shall be extended to the property line frontage of each
lot or its public utility easement.
36. The applicant shall monument all property corners for BP PW
construction control and shall promptly replace them if
disturbed.
37. A preliminary subdivision guarantee shall be submitted BP PW
for review in conjunction with the processing of the
parcel map.
38. All existing and proposed utility, pipeline, open space, BP PS/PW
or other easements are to be shown on the parcel map.
If there are building or other restrictions related to the
easements,they shall be noted on the parcel map. The
applicant shall show all access restrictions on the parcel
map.
39. Prior to recording the parcel map, the applicant shall BP PS/PW
submit a map drawn in substantial conformance with
the approved tentative map and in compliance with all
conditions set forth herein shall be submitted for review
and approval by the City in accordance with the
Subdivision Map Act and the City's Subdivision
Ordinance.
40. Prior to recording the parcel map, the applicant's BP PW
surveyor shall set monuments at all new property
corners or shall indicate, by certificate on the final map,
that corners have been set or shall be set by a date
specific and that they will be sufficient to enable the
survey to be retraced.
City of Atascadero
Resolution No.2004-028
Page 9 of 19
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:PlannUp Servion
BL:Business License BS:Building Services
7755 Navajoa Ave GP:Grading Pest F0:Fire oeparm ent
BP:Building Peat PD:Police Department
PD-7 Master Plan of Development FI:Final ftpecWn CE:Cily Engineer
TO:Temporary Occupancy WW:wastewater
CUP 2003-00872CH 2002-0036 FO:Final Occupancy CACity,vtomey
41. Prior to recording the parcel map, the applicant shall BP BS
pay all outstanding plan check/inspection fees.
42. Prior to recording the parcel map, the applicant shall BP PW
have the map reviewed by all applicable public and
private utility companies(cable,telephone, gas, electric,
Atascadero Mutual Water Company). The applicant
shall obtain a letter from each utility company, which
indicates their review of the map. The letter shall
identify any new easements, which may be required by
the utility company. A copy of the letter shall be
submitted to the City. New easements shall be shown
on the parcel map.
43. Upon recording the final map, the applicant shall BP PW
provide the City with a black line clear Mylar (0.4 mil)
copy and a blue line print of the recorded map.
44. Prior to the final inspection of any public improvements, BP PW
the applicant shall submit a written statement from a
registered civil engineer that all work has been
completed and is in full compliance with the approved
plans.
Atascadero Mutual Water Company
45. Prior to the recordation of the Final Parcel Map,the BP BS
applicant shall submit plans showing the water
distribution facilities required to serve the project for
review and approval by the Atascadero Mutual Water
Company.All new water distribution facilities shall be
constructed in conformance with Atascadero Mutual
Water Company Standards.
46. Prior to the issuance of building permits,the applicant BP BS
shall obtain a"Will Serve"letter from the Atascadero
Mutual Water Company.
47. Prior to issuance of building permits,the applicant shall BP BS
pay all installation and connection fees required by the
Atascadero Mutual Water Company.
48. Private easements may be needed for the private water BP BS
service lines that are to serve parcels that do not front
on Navajoa.
Mitigation Measures
Mitigation Measure 1.c.1: If exterior lighting is proposed, it BP PS 1.0
shall be designed to eliminate any off site glare. All exterior
site lights shall utilize full cut-off,"hooded"lighting fixtures to
prevent offsite light spillage and glare. Any luminaire pole
City of Atascadero
Resolution No.2004-028
Page 10 of 19
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Servioes
7755 Navajoa Ave GP:GmdingPemtit FD:FreDepadrnent
BP:Building Pernit PD:Poke Department
PD-7 Master Plan of Development Fl:Final Inspection CE:CiyEngineer
TO:Tempomry Occupancy WW:Wastewater
CUP 2003-0087/ZCH 2002-0036 FO:Final Occupancy Ca Cly Attorney
height shall not exceed 16-feet in height,limit intensity to 2.0
foot candles at ingress/egress,and otherwise 0.6 foot candle
minimum to 1.0 maximum within the private street. Fixtures
shall be shield cut-off type and compatible with historic setting,
subject to staff approval.
Mitigation Measure 1.c.2: Proposed residences shall utilize a
variety of colors and a minimum of two accent base materials
throughout the project.Color Schemes shall be comprised of a
minimum of three complimentary colors and shall be used to
accentuate building trim and architectural features.
Mitigation Measure 3.b.1: The project shall be conditioned to BP BS 3.b.1
comply with all applicable District regulations pertaining to the
control of fugitive dust(PM-10)as contained in sections 6.3,
6.4 and 6.5 of the April 2003 Air Quality Handbook.
Section 6.3: Construction Equipment
• Maintain all construction equipment in proper tune
according to manufacturer's specifications.
• Fuel all off-road and portable diesel powered
equipment, including but not limited to bulldozers,
graders,cranes,loaders,scrapers,backhoes,
generator sets,compressors,auxiliary power units,
with ARB certified motor vehicle diesel fuel(Non-
taxed version suitable for use off-road).
• Maximize to the extent feasible,the use of diesel
construction equipment meeting the ARB's 1996 or
newer certification standard for off-road heavy-duty
diesel engines.
• Install diesel oxidation catalysts(DOC),catalyzed
diesels particulate filters(CDPF)or other District
approved emission reduction retrofit services
(Required for projects grading more than 4.0 acres of
continuously worked area).
Section 6.4: Activity Management Techniques
• Develop a comprehensive construction activity
management plan designed to minimize the amount
of large construction equipment operating during any
given time period.
• Schedule of construction truck trips during non-peak
hours to reduce peak hour emissions.
• Limit the length of the construction workday period, if
necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading,
demolition and building plan notes:
A. Reduce the amount of the disturbed area where possible.
B. Use of water trucks orsprinkler systems in sufficient
City of Atascadero
Resolution No.2004-028
Page 11 of 19
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
7755 Navajoa Ave GP:Grading Permit FD:Fre Depadrneot
BP:Buk ing Permit PD:Police Deparenent
PD-7 Master Plan of Development Fl:Fhallnapection CE:Ck Engineer
To:Temporary occupancy WW:Wastewater
CUP 2003-0087/ZCH 2002.0036 F0:Final occupancy CA Cay Aftomey
quantities to prevent airborne dust from leaving the site.
Increased watering frequency would be required
whenever wind speeds exceed 15 mph. Reclaimed(non-
potable)water should be used whenever possible.
C. All dirt stockpile areas should be sprayed daily as needed.
D. Permanent dust control measures identified in the
approved project re-vegetation and landscape plans
should be implemented as soon as possible following
completion of any soil disturbing activities.
E. Exposed ground areas that are plann4ed to be reworked
at dates greater than one month after initial grading should
be sown with a fast-germinating native grass seed and
watered until vegetation is established.
F. All disturbed soil areas not subject to re-vegetation should
be stabilized using approved chemical soil binder,jute
netting,or other methods approved in advance by the
APCD.
G. All roadways,driveways,sidewalks,etc,to be paved
should be complete as soon as possible. In addition,
building pads should be laid as soon as possible after
grading unless seeding or soil binders are used.
H. Vehicle speed for all construction vehicles shall not
exceed 15 mph on any unpaved surface at the
construction site.
I. All trucks hauling dirt,sand,soil,or other loose materials
are to be covered or should maintain at least two feet of
freeboard(minimum vertical distance between top of load
and top of trailer) in accordance with CVC Section 23114.
J. Install wheel washers where vehicles enter and exit
unpaved roads onto streets,or was off trucks and
equipment leaving the site.
K. Sweep streets at the end of each day if visible soil
material is carried onto adjacent paved roads. Water
sweepers with reclaimed water should be used where
feasible.
L. The contractor or builder shall designate a person or
persons to monitor the dust control program and to order
increased watering,as necessary,to prevent transport of
dust off site. The name and telephone number of such
persons shall be provided to the APCD prior to land use
clearance for map recordation and land use clearance for
finish grading of any structure.
Mitigation Measure 4.e:All tree removals shall be mitigated as GP BS 4.e.1
prescribed by the Atascadero Native Tree Ordinance.
($2900.00)
City of Atascadero
Resolution No.2004-028
Page 12 of 19
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Servicee
BL:Busineas License BS:Builft Services
7755 Navajoa Ave GP:Grading Pen it FD:Fire Depedment
BP:Building PentN PD:Poke Depazanent
PD-7 Master Plan of Development Fl:Fmllrqpection CE:Cily Engineer
TO:Tenpaary Occupancy WW:Wastewater
CUP 2003-0087/ZCH 2002-0036 FO:Final Occupancy Cacilyaaonay
Mitigation Measure 6.b: The grading permit application plans GP BS 4.e.2
shall include erosion control measures to prevent soil,dirt,and
debris from entering the storm drain system during and after
construction. A separate plan shall be submitted for this
purpose and shall be subject to review and approval of the City
Engineer at the time of Building Permit application.
Mitigation Measure 6.c.d: A soils report shall be required to be GP BS 4.a3
submitted with a future building permit by the building
department.The building plans will be required to follow the
recommendations of the soils report to assure safety for
residents and buildings.
Mitigation Measure 8.e.f: The developer is responsible for GP BS 4.e.4
ensuring that all contractors are aware of all storm water
quality measures and that such measures are implemented.
Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction
notices,citations,or stop work orders.
Mitigation Measure 1 IIA: All construction activities shall GP BS 4.e.5
comply with the City of Atascadero Noise Ordinance for hours
of operation.
Construction activities shall be limited to the following hours of
operation:
• 7 a.m.to 7 p.m. Monday through Friday
• 9 a.m.to 6 p.m.Saturday
• No construction on Sunday
Further,particularly loud noises shall not occur before 8 a.m.
on weekdays and not at all on weekends.
The hours of construction may be modified by the Community
Development Director upon a determination that unusually
loud construction activities are having a significant impact on
the neighbors.
Failure to comply with the above-described hours of operation
may result in withholding of inspections and possible
construction prohibitions,subject to the review and approval of
the Community Development Director.
A sign shall be posted on-site with the hours of operation and
a telephone number of the person to be contacted in the event
of any violations. The details of such a sign shall be approved
by staff during the Grading Plan/Building Permit review
process.
1 , t
44
.J.
+ .;:;;iii,♦aa,\\A.,.Y.waa\
..../:..'r..
iiihwh♦A,\\,\s\\\\w.♦Aw,\\Y\\A,YY•.,\Y;Y
,Ii/ii/.'iiJli///Jr,JPJr JJ,fJJPJr/uru/ +.
JI . ..SCvr:ri:,••/l.i Cal\,i\�\ \/,:...a...+'•..\ate _
11 P,.'�':;::...L/// .•//// r/////rJ/r.lrlr//,/r//////..,.////e.rr//r�', _� - e
_ �1i� f0//J/I//J/JJrI.PJI� JP If
/IP"I it;iJlll!'I%I /IJ./I/JJ/r-e--e JJ-•
��a s/P a`ri`iJ a{•Jru.'rrJ..JJ/r J.uPJ/JJ r `W'P'i e'{�
a*i:0 }.1 \\w,• Y\Y\\\„.Aa\Ya\.\„Y\, #W W 81 1
P' `%,♦iri/PJIIJJJJJJPJ:.;;,e`IIJJf...;,\. PW WPP4P1{I
.PPP�t♦�P �/�Y\Y Ya\Y\Y\w\a,a.. :. ♦ PPRP 1i t
i1�e•/r0� �\\\\\\w\Y\\\a\\\A i iiia/%I%a4a r.'1\� PPWW®®ye`•I
W«PPm Pd ;:`rrrP.•rJJr/rfu...• J//iiiPJn }W W a 1 ;{
'i P 4 e \♦-.Yh\,♦w\\\,wh. /\ \\,v.♦\A\♦ e e 4 4 1
” +®♦'i:e �:rJJ/...r//.JJrJJJ..J r�I�Il�\\'aJ vif`rJ. «#�B'J
m e e♦ a�Y,w,h Y,Y„YaYa.. MW4W®�+4e r
� qPr 6Pl1 \ I////r'I/I///I,//:l/%%/i///'I/-,/Jrrr PWP•SP•®1 1
1 e•V♦e•em ;.�\\\w\°r,r\���,�aw�.\Y>w\��e\�w\ .♦ 64dda
•Pd♦ - I; J: I�® Pee♦ePe 1
re e \s e«�♦r 1
a e•Py'y� /■ slrt�w // r Pee♦
♦Pzl ,} •ee♦1
;,Mee-. vs VAAAAA P411n
i,•eek+
',efW.-� •.•/iii” / ♦eee11
Je�•� r"�• \ �Y Pe.W.t
J 3 JPJ i.JJJ �• 0 "«e".e
Pe V1� wf„ef, ♦4#P
( Pee♦ �q� w ;
i..•v�Pt4�♦��Ai�/r.. � ♦ ;`h I a I\ p, # � WeP4#WW' 1
i #WWF#♦4'��} �v ”FIaR. / //
, / PWP V®Y1
i s4e44e "// •♦` \\ A ° ' •POS°e�,
�1 .♦4dWP�r;�-r.- ..'E // r a/ r/ a a / a � •�•y 1
• / / r / PJ //J J P r / / ♦Pr
/ O•m`eed� il.•
1 ePBe
v°1 f♦. • P <�®'//%I%%i�_ i�il♦/illi�Ii�%IiiJ�/e�J.%e/•//!/is•fJ���� �� 4dWW#W�1•
-
44eea.
1 r4P4abee Ya!//l/II J//I//I//I/ II/r/!r//,/I//l,f. e0•PeOe♦,
/ie•♦i :iii\�♦�••�„Y�,\\..:\�a\,wa\A\\Y.,,,,, ee4e
1>♦}# Ir I//IINN/,/I/r!. PPP
MeePP P,`i//r ir�I„/r/ 6PP6
♦4 4 k w\. a,�Jiiii Y\`.Y\\� ��Fi •OPi®WP4 1
1 #e•e e w•\.�\�\\,`,w\\�\; vh iii"\i �«P s4a I
I�k♦Pe4�.•e /E®�C IgP ♦SCY�1ai�w����:��a,• aw,o:C W##P mPP
♦P4O e+PPP
. ......... I` PPIe♦1 PP« �\\!\\ Y'1 ,
..... �%o,�\\
•P i"Pd ii;ilii
1 r9 0 6PrP �q� \♦Av a\Ya\.\• � 1 P W W .
1.H ®® eeMP�9P
P 4�P, ♦ \\\�1\��\Yh ;I�;
i �•eeePM.l. � ii%%i,•,iiiij� O#OP«P� +
lj� ill
♦♦ e �,�/ •e4e#P4P
J J / .. P4P•
■ WWWP.
'♦PW:*PWi# #;;4y���i� ,I YII\ a\1 � - iP e4f�{��
♦ee4 + ♦<4♦ J i P •41 ♦ - . a %I a ��- ® Ike. P��P♦4r1.
i4m °`P ♦ �♦ f. �9 �� / ! I Iia. .PWow•
4♦ri Dm ei 4e 6dr♦d P4P rq- ♦�1 1 f/1J /J Y rWP 4 PPP v� as 4#nr.
bt:♦♦ OP ! P♦i • d P � •1♦i
P•P+V�a 6 # `iI \w v} W ?A dP P IW i >1
�. ♦ e®r��..:r \a °�1. a •.. a/P4Pr 4P=aP -JPP1 ♦4 r`
/. •ArP et P{P JCP. NMP�eeP
Pe#eee:M14 ♦a P♦t P• 6 4 t P®♦ I r
'*'`.►®�",®®`\\Ma�a�\\�w`�®���� -r,tiw!1EEriYrillErr
+aher
�� lay.���.«� of \\\a\\'i'sa®\�►^\�,.�d�_w,
A
City of Atascadero
Resolution No.2004-028
Page 14 of 19
EXHIBIT C:Fencing Design
LA710E FENCING
V TO 22'
I
I
City of Atascadero
Resolution No.2004-028
Page 15 of 19
EXHIBIT D:Statistical Summary of Project
Proposed Project Summary
Lot Area 4511 sf 3878 sf 3751 sf 3798 sf 3934 sf 4406 sf
Building Footprint 1137 sf 1137 sf 1137 sf 1137 sf 1137 sf 1137 sf
(not to exceed 35%) 25% 29% 30% 30% 29% 26%
Landscaped Area 1804 sf 1558 sf 1616 sf 1630 sf 1653 sf 1840 sf
(minimum 40%) 40% 40% 43% 43% 42% 42%
Covered Parking 2 spaces 2 spaces 2 spaces 2 spaces 2 spaces 2 spaces
Guest Parking 1 spaces 2 spaces 1 spaces 1 spaces 1 spaces 1 spaces
Lower Living Area 1137 1137 1137 1137 1137 1137
Upper Living Area 8401 8401 8401 8401 8401 840
City of Atascadero
Resolution No 2004-028
Page 16 of 19
EXHIBIT E:Grading and Drainage Plan
oily
f
ry 3,F
w
r
L _
s
City of Atascadero
Resolution No.2004-028
Page 17 of 19
EXHIBIT F:ELEVATIONS
1
► SIDEM *-aAMVMW
.._ __v _.. ........._ :
ID
*-F9 IEW 1:-•F
M
City of Atascadero
Resolution No.2004-028
Page 18 of 19
EXHIBIT G: FLOOR PLANS
g�
4W C
qqqqk3k .waw «ef
} ... :......:r I
G
� s
i
a
Lo%TRFLOORPLAN
04- 4w
ILI
9
'` :.
City of Atascadero
Resolution No.2004-028
Page 19 of 19
EXHIBIT H: EXTERIOR COLOR S MATERIAL SAMPLE BOARD
`§
BUILDING
�t
_... $TUC
ILDINGS, 24"""51
Apo
iii`5
i
LOIN
T
v
1 _ T 3,, q,a�t ✓
Note: See project
file for colors.