HomeMy WebLinkAboutResolution 2004-021 RESOLUTION 2004-021
A RESOLUTION OF THE ATASCADERO CITY COUNCIL
APPROVING CONDITIONAL USE PERMIT AMENDMENT 2002-0067,
ADOPTING A MASTER PLAN OF DEVELOPMENT AMENDMENT
FOR APN 049-011-004
(Ferrocaril Road —De Anza Estates/Gearhart)
WHEREAS, an application has been received from Kelly Gearhart (6205
Alcantara Avenue, Atascadero, CA 93422), Applicant and Property Owner to consider a
project consisting of a Zone Change from RS (Residential Suburban) to RSF-Y
(Residential Single Family-Y), an amendment to an existing Master Plan of Development,
and a Vesting Tentative Tract Map on APN 049-011-004; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2003-0069
were prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act (CEQA); and,
WHEREAS, the Planning Commission has recommended that the site's General Plan
designation be amended from SE (Suburban Estate) to SFR-Y (Single-Family Residential —
Y); and,
WHEREAS, the Planning Commission has recommended that a site be rezoned from
RS (Residential Suburban) to RSF-Y (Residential Single Family-Y); and,
WHEREAS, the Planning Commission has determined that it is in the best interest of
the City to enact this amendment to the Master Plan of Development to protect the health,
safety and welfare of its citizens by applying orderly development and expanding housing
opportunities within the City; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of
the California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone
Change application was held by the City Council of the City of Atascadero at which hearing
evidence, oral and documentary, was admitted on behalf of said zoning amendments; and,
NOW,THEREFORE, the City Council takes the following actions:
SECTION 1. Findings for Approval of Master Plan of Development. The City
Council finds as follows:
1. The proposed project or use is consistent with the General Plan and the City's
Appearance Review Manual; and,
City of Atascadero
Resolution No. 2004-021
Page 2 of 25
2. The proposed project or use satisfies all applicable provisions of the Title (Zoning
Ordinance)including the PD-16 Ordinance; and,
3. The establishment, and subsequent operation or conduct of the use will not, because
of the circumstances and conditions applied in the particular case, be detrimental to
the health, safety, or welfare of the general public or persons residing or working in
the neighborhood of the use, or be detrimental or injurious to property or
improvements in the vicinity of the use; and,
4. That the proposed project or use will not be inconsistent with the character or the
immediate neighborhood or contrary to its orderly development; and,
5. That the proposed use or project will not generate a volume of traffic beyond the safe
capacity of all roads providing access to the project, either existing or to be improved
in conjunction with the project, or beyond the normal traffic volume of the
surrounding neighborhood that would result from full development in accordance
with the Land Use Element.
SECTION 2. Findings for Approval of Tree Removal Permit. The City Council
finds as follows:
The tree is obstructing proposed improvements that cannot be
reasonably designed to avoid the need for tree removal, as
certified by a report from the Site Planner and determined by the
Community Development Department based on the following
factors:
■ Early consultation with the City;
■ Consideration of practical design alternatives;
■ Provision of cost comparisons (from applicant) for
practical design alternatives;
■ If saving tree eliminates all reasonable uses of the
property; or
■ If saving the tree requires the removal of more desirable
trees.
City of Atascadero
Resolution No. 2004-021
Page 3 of 25
SECTION 3. Recommendation of Approval. The City Council of the City of
Atascadero, in a regular session assembled on March 9, 2004, resolves to approve Master
Plan of Development (CUP 2002-0067) subject to the following:
Exhibit A: Conditions of Approval/Mitigation Monitoring Program
Exhibit B: Vesting Tentative Tract Map
Exhibit C: Elevations and Floor Plans
Exhibit D: Arborist Report
Exhibit E: Tree Protection Plan
On motion by Council Member O'Malley and seconded by Mayor Luna, the
foregoing Resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Council Members Clay, O'Malley, Scalise and Mayor Luna
NOES: Council Member Pacas
ABSENT: None
ADOPTED: None
n
CITYO TASCADE
By: 6,, - --�
Dr. Ge rge Luna, Mayor
ATTEST:
Marcia McClure Torgerson, C.M.C., Cit lerk
APPROVED AS TOF RM:
- -yjf)AI I , ,Roy A anley, City Attorne
City of Atascadero
Resolution No.2004-021
Page 4 of 25
Exhibit A: Conditions of Approval/Mitigation Monitoring Program
CUP 2002-0067 Master Plan of Development
Ferrocaril Road-De Anza Estates Site
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:GradingPermd FD:Fire Depadwnt
BP:Building Pernd PD:Police Depadrrerd
FI:Final InspectlDn CE:Ciy Engineer
Exhibit A MinOccury��ncy WW:wastewater
:F
panty CA:Cily Atlomey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
Planning Services
1. The approval of this zone change and use permit shall BP PS
become final and effective following City Council
approval.
2. Approval of this Master Plan of Development shall be FM PS
valid concurrently with the life of Tentative Tract Map
2003-0042 and then indefinitely following final map. The
Master Plan of Development approval shall expire and
become null and void unless a final map is recorded
consistent with the Master Plan of Development.
3. Changes to the Master Plan of Development shall be On-going PS
approved by the Planning Commission and do not
require Council action.
4. The Community Development Department shall have the BP/FM PS
authority to approve the following minor changes to the
project the(1)modify the site plan project by less than
10%,(2)result in a superior site design or appearance,
and/or(3)address a construction design issue that is not
substantive to the Master Plan of Development. The
Planning Commission shall have the final authority to
approve any other changes to the Master Plan of
Development and any associated Tentative Maps.
5. All subsequent Tentative Tract Map and construction SP/FM PS
permits shall be consistent with the Master Plan of
Development contained herein.
6. All exterior elevations,finish materials and colors shall be BP PS
consistent with the Master Plan of Development as
shown in Exhibits Band C.
City of Atascadero
Resolution No. 2004021
Page 5 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:GradingPemul FD:FireDepadment
BP:Building Permit PD:Police Departrriem
Fl:Final Insixidbn CE:Cily Engineer
TO:Temporary Occupancy WW:Wastewater
Exhibit A FO:Final Occupancy CA CityWbmey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041IfTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
7. All site development shall be consistent with the BP/FM PS
maximum intensities described in the statistical project
summary as shown on Exhibit B.
8. All site work,grading,and site improvements shall be BP/FM PS
consistent with the Master Plan of Development as
shown in B and D.
9. All applicable conditions of approval and mitigations BP PS,BS,CE
from the previously approved Ferrocaril-De-Anza Estates
PD-16 project(ZCH 2002-0029,CUP 2002-0067,TTM
2002-0014) shall be incorporated by reference.
10. All project fencing shall be compatible with the overall BP PS
project design,subject to staff approval.
11.Effective March 12,2004,the existing gate located at the Ongoing PS
existing Ferrocaril Road terminus shall be locked and no
construction traffic permitted on existing Ferrocaril Road.
12. Affordable Workforce Housing FM,BP PS,CE
Prior to recordation of final map,the applicant shall enter
into a legal agreement with the City to reserve 1/2 of the
units for sale to residents or workers within the City of
Atascadero, including the affordable units. The
agreement shall include the following provisions:
The units shall be offered for sale to residents or
workers within the City of Atascadero for a minimum of
60-days. During this time period offers may only be
accepted from Atascadero residents or workers;
The applicant shall provide reasonable proof to the
City that at least one of the qualified buyers is a
resident or worker within the City Limits of Atascadero;
City of Atascadero
Resolution No.2004-021
Page 6 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP.Grading Permt FD:FireDepaMient
BP:Building Permit PD:Police Department
FI:Final Inspection CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
Exhibit A FO:Final Occupancy CA City Attorney
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
The Atascadero resident or worker restriction shall
apply to the initial sale only;
The applicant shall identify which units will be reserved;
and
The City Attorney shall approve the final form of the
agreement.
13. All homes shall be consistent with the design intent BP PS
identified in Exhibit C.
All exterior material finishes(brick,stone,plank siding,
materials,lighting,garage doors)shall be durable,high
quality,and consistent with the architectural appearance
of each home.
A variety of garage doors shall be used,be of superior
design quality,and painted to match the residence main
body color.
14. Second units shall be restricted from all 20 residential BP,FM PS,CE
lots within the Ferrocaril-De Anza Estates overall project
area.
15. The applicant shall pay$100 for native tree mitigation FM PS,CE
into the City's tree replacement fund.
Building Services
16. A soils investigation prepared by a licensed BP FM
Geotechnical Engineer is to be provided for the project.
The report is to be provided at the time of building
permit submittal along with the building plans for
review by the Building Division. Recommendations
contained in the report are to be incorporated into the
project plans.
Fire Marshal
17. Final street name selection shall be consistent with the BP PS,BS
future street extension,subject to staff approval.
City of Atascadero
Resolution No. 2004-021
Page 7 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business Ltense BS:Building Ser*es
FERROCARIL ROAD CUP AMENDMENT GP:GradingPermil FD:Fire Department
BP:Building Permit PD:Police Department
Fl:Final Inspection CE:City Engineer
TO:Ternprary Exhibit A F0:FnOccu Occupancy WW.Wastewater
pancy CA Ciy Attorney
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-01201TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
18. Provide a letter from the Atascadero Mutual Water BP BS
Company stating the minimum expected water
available to the site. Amount available must meet min.
requirement specified in the California Fire Code.
19. Note approved address signage is to be provided. BP BS
20. Note on plans that fire lanes shall be delineated to BP BS
restrict parking as required by the Fire Authority.
City Engineer
Standard Conditions
Drainage:
21. The applicant shall enter into a Plan Check/Inspection GP, BP CE
agreement with the City.
22. A six (6) foot Public Utility Easement (PUE) shall be FM CE
provided contiguous to the property frontage.
23. Slope easements shall be obtained by the applicant as GP,BP CE
needed to accommodate cut or fill slopes.
24. Drainage easements shall be obtained by the applicant GP,BP CE
as needed to accommodate both public and private
drainage facilities.
25. A preliminary subdivision guarantee shall be submitted FM CE
for review in conjunction with the processing of the
tract map.
26. The final map shall be signed by the City Engineer FM CE
prior to the map being placed on the agenda for City
Council acceptance.
27. Prior to recording the tract map,the applicant shall pay FM CE
all outstanding plan check/inspection fees.
28. Prior to recording the map, the applicant shall bond for FM CE
or complete all improvements required by these
conditions of approval.
29. Prior to recording the tract map, the applicant shall FM CE
bond for or set monuments at all new property corners.
A registered civil engineer or licensed land surveyor
shall indicate by certificate on the parcel map, that
corners have been set or shall be set by a date specific
and that they will be sufficient to enable the survey to
City of Atascadero
Resolution No.2004-021
Page 8 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:Grading Permit FD:Fre Department
BP:Building Permit PD:Police Department
FI:Final Inspection CE:CilyEngineer
vvater
Exhibit A Fo: iFnallOcccupancynprary Occupancy W CilyAWasDmey
Occupancy CA Ciy Attorney
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-01201TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
be retraced.
30. Prior to recording the tract map, the applicant shall FM CE
submit a map drawn in substantial conformance with
the approved tentative map and in compliance with all
conditions set forth herein.The map shall be submitted
for review and approval by the City in accordance with
the Subdivision Map Act and the City's Subdivision
Ordinance.
31. All existing and proposed utility, pipeline, open space, FM CE
or other easements are to be shown on the final/parcel
map. If there are building or other restrictions related
to the easements, they shall be noted on the
final/parcel map. The applicant shall show all access
restrictions on the final/parcel map.
32. Prior to recording the tract map, the applicant shall FM CE
have the map reviewed by all applicable public and
private utility companies (cable, telephone, gas,
electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility company
indicating their review of the map. The letter shall
identify any new easements that may be required by
the utility company. A copy of the letter shall be
submitted to the City. New easements shall be shown
on the parcel map.
33. Prior to the issuance of building permits the applicant GP,BP CE
shall submit plans and supporting calculations/reports
including street improvements, underground utilities,
composite utilities, and grading/drainage plans
prepared by a registered civil engineer for review and
approval by the City Engineer.
34. The applicant must provide for the maintenance of on- FM CE
site shared improvements.This includes roads,
sidewalks,street trees,streetlights,drainage facilities,
sewer, recreation areas and common landscaping.The
two methods that may be used are:
a. Homeowners Association.This private organization
would be responsible for the maintenance,repair and
replacement of the facilities.
b.Assessment District and Landscape and Lighting
District.Funds for the maintenance,repair and
replacement of the facilities would be collected on the
City of Atascadero
Resolution No. 2004-021
Page 9 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Busineea License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:Grading Permit FD:FireDepartmerd
BP:Building Permit PD:Police Deparlment
FI:Final Inspection CE:Ciy En&eer
TO:Temporery Occupancy WW:Wastewater
Exhibit A FO:FinalOccuparwy CAC4Momey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/7TM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
property tax bill and distributed to the City.
City Engineer
Site Specific Conditions
Public Improvements
35. Prior to recording the final map, provisions for the FM CE
repair and maintenance of the paving of the private
road shall be included in the CC&R's for this tract.
Included shall be a mechanism to maintain the private
street, private sewer, and drainage swale and
structures, such as a homeowners association. The
City Engineer and City Attorney shall approve the final
form prior to recordation
Atascadero Mutual Water Company
36. Before recordation of the final map,the applicant shall BP BS
submit plans to AMWC for the water distribution
facilities needed to serve the project. AMWC shall
review and approve the plans before construction
begins on the water system improvements. All new
water distribution facilities shall be constructed in
conformance with AMWC Standards and Details and
the California Waterworks Standards(Code of
Regulations Title 22, Division 4,Chapter 16). All
cross-connection devices shall conform to AWWA and
California Department of Health Services standards.
37. Prior to the issuance of building permits,the applicant BP BS
shall obtain a"Will Serve"letter from the Atascadero
Mutual Water Company for the newly created lots.
38. Before the start of construction on the water system BP BS
improvements,the applicant shall pay all installation
and connection fees required by AMWC. Subject to
the approval of AMWC,the applicant may enter in to a
"deferred connection"agreement.
39. All water distribution facilities shall be constructed in BP BS
conformance with Atascadero Mutual Water Company
standards, policies and approved procedures. All
City of Atascadero
Resolution No. 2004-021
Page 10 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:GradingPemat FD:Fire Department
BP:Building Permit PD:PoliDe Department
FI:Final Inspection CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
Exhibit A FO:Final Occupancy CA CRYmomey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
cross-connection devices shall be constructed in
conformance with AWWA and Department of Health
Services standards.
40. Before the issuance of building or permits,the BP BS
applicant shall provide AMWC with easements for
those water facilities proposed for operation and
maintenance by AMWC that are constructed outside of
publicly maintained right-of-ways. AMWC shall review
the form and content of the easements before
recordation.
41. The Applicant shall submit a hydraulic analysis with the BP BS
first plan check submittal of the water system
improvements for the project. The analysis should
take into account the fire flows required by the Uniform
Fire Code and requirements of the California
Waterworks Standards. The Analysis should identify
any offsite improvements that may be required.
42. The applicant is responsible for designing and SP BS
constructing water system improvements that will
provide water at pressures and flows adequate for the
domestic and fire protection needs of the project.
Mitigation Measure 1.d.1: All lighting shall be designed to BP BS,PS,CE 1.d.1
eliminate any off site glare. All exterior site lights shall utilize full
cut-off,"hooded"lighting fixtures to prevent offsite light spillage
and glare.
Mitigation Measure 3.b.1: The project shall be conditioned to BP,GP BS,PS,CE 3.b.1
comply with all applicable District regulations pertaining to the
control of fugitive dust(PM-10)as contained in sections 6.3,6.4
and 6.5 of the April 2003 Air Quality Handbook.
Section 6.3: Construction Equipment
■ Maintain all construction equipment in proper tune
according to manufacturer's specifications.
■ Fuel all off-road and portable diesel powered
equipment, including but not limited to bulldozers,
graders,cranes,loaders,scrapers,backhoes,
generator sets,compressors,auxiliary power units,
with ARB certified motor vehicle diesel fuel(Non-
taxed version suitable for use off-road).
• Maximize to the extent feasible,the use of diesel
construction equipment meeting the ARB's 1996 or
newer certification standard for off-road heavy-duty
City of Atascadero
Resolution No.2004-021
Page 11 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:Grading Permit FD:Fire Department
BP:Building Pemi t PD:Police Depmlment
FI:Final Inspection CE Ciy Engineer
T0:Temporary Occupancy WW:Wastewater
Exhibit A FO:Final Occupancy CACilyMomey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
diesel engines.
■ Install diesel oxidation catalysts(DOC),catalyzed
diesels particulate filters(CDPF)or other District
approved emission reduction retrofit services
(Required for projects grading more than 4.0 acres
of continuously worked area).
Section 6.4: Activity Management Techniques
■ Develop a comprehensive construction activity
management plan designed to minimize the amount
of large construction equipment operating during any
given time period.
■ Schedule of construction truck trips during non-peak
hours to reduce peak hour emissions.
■ Limit the length of the construction workday period, if
necessary.
■ Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10
All of the following measures shall be included on grading,
demolition and building plan notes:
A Reduce the amount of the disturbed area where
possible.
B Use of water trucks or sprinkler systems in sufficient
quantities to prevent airborne dust from leaving the
site. Increased watering frequency would be required
whenever wind speeds exceed 15 mph. Reclaimed
(non-potable)water should be used whenever
possible.
C All dirt stockpile areas should be sprayed daily as
needed.
D Permanent dust control measures identified in the
approved project re-vegetation and landscape plans
should be implemented as soon as possible following
completion of any soil disturbing activities.
E Exposed ground areas that are plann4ed to be
reworked at dates greater than one month after initial
grading should be sown with a fast-germinating native
grass seed and watered until vegetation is established.
F All disturbed soil areas not subject to re-vegetation
should be stabilized using approved chemical soil
binder,jute netting,or other methods approved in
advance by the APCD.
City of Atascadero
Resolution No.2004-021
Page 12 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:Grading PenrA FD:Fire Department
BP:Building Permit PD:Police Department
FI:Final InspediDn CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
Exhibit A FO:Final Occupancy CA CityAtlomey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
G All roadways,driveways,sidewalks,etc,to be paved
should be complete as soon as possible. In addition,
building pads should be laid as soon as possible after
grading unless seeding or soil binders are used.
H Vehicle speed for all construction vehicles shall not
exceed 15 mph on any unpaved surface at the
construction site.
I All trucks hauling dirt,sand,soil,or other loose
materials are to be covered or should maintain at least
two feet of freeboard(minimum vertical distance
between top of load and top of trailer)in accordance
with CVC Section 23114.
J Install wheel washers where vehicles enter and exit
unpaved roads onto streets,or was off trucks and
equipment leaving the site.
K Sweep streets at the end of each day if visible soil
material is carried onto adjacent paved roads. Water
sweepers with reclaimed water should be used where
feasible.
The contractor or builder shall designate a person or persons to
monitor the dust control program and to order increased
watering,as necessary,to prevent transport of dust off site.
The name and telephone number of such persons shall be
provided to the APCD prior to land use clearance for map
recordation and land use clearance for finish grading of any
structure.
Mitigation Measure 4.e.1: The building permit site plan shall BP PS,SS,CE 4.e.1
identify all protection and enhancement measures
recommended by the Certified Arborist in the Tree Protection
Plan.Tree protection fencing shall be installed at the locations
called out in the Tree Protection Plan.
City of Atascadero
Resolution No.2004-021
Page 13 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business Lbense BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:Grading Permit FD:FireDeparinent
BP:Budding Pemit PD:Police Depart nent
FI:Final Inspectbn CE:Cly Engineer
Exhibit A FO:FnalOcccu�y CkCkAftorner
Occupancy CA Cily Allomey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
Mitigation Measure 4.e.2: The developer shall contract with a BP,GP PS,BS,CE 4.e.2
certified arborist during all phases of project implementation.
The certified arborists shall be responsible for monitoring the
project during all phases of construction through project
completion,as follows:
(a) A written agreement between the arborist and the
developer outlining a arborist monitoring schedule for each
construction phase through final inspection shall be
submitted to and approved by planning staff prior to the
issuance of building/grading permits.
(b) Arborist shall schedule a pre-construction meeting with
engineering/planning staff,grading equipment operators,
project superintendent to review the project conditions and
requirements prior to any grubbing or earth work for any
portion of the project site. All tree protection fencing and
trunk protection shall be installed for inspection during the
meeting. Tree protection fencing shall be installed at the
line of encroachment into the tree's root zone area unless
otherwise directed by project arborist with city approval.
(c) As specified by the arborist report and City staff:
• Fencing: The proposed fencing is highlighted in
orange on the grading plan. It must be a minimum
of 4'high chain link,snow or safety fence staked
at the drip line or line of encroachment for each
tree or group of trees. The fence must be up
before any construction or earth moving begins.
The owner shall be responsible for maintaining an
erect fence throughout the construction period.
The arborist(s),upon notification,will inspect the
fence placement once it is erected.
■ Soil Aeration Methods: Soils under the drip-
lines that have been compacted by heavy
equipment and/or construction activities must be
returned to their original state before all work is
completed. Methods include water jetting,adding
organic matter,and boring small holes with an
auger(18"deep,24 apart with 2-4"auger)and
the application of moderate amounts of nitrogen
fertilizer. The arborist(s)shall advise.
■ Chip Mulch: All areas within the drip-line of the
trees that cannot be fenced shall receive a 4-6"
layer of chip mulch to retain moisture,soil
structure and reduce the effects of soil compaction
City of Atascadero
Resolution No.2004-021
Page 14 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:Grading Permil FD:Fre Department
BP:Building Pemd PD:Poke Department
Fl:Final Iris**n CE:City Engineer
Exhibit A FO:F�O�CccWancy WW:Wastewater
panty CA Cty Momey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
■ Trenching Within the Drip-Line: All trenching
under the drip-lines of native trees shall be hand
dug,augured,or bored. All major roots shall be
avoided whenever possible. All exposed roots
larger than 1"in diameter shall be clean cut with
sharp pruning tools and not left ragged
■ Grading Within the Drip-Line: Grading should
not encroach within the drip-line. If grading is
necessary,construction of retaining walls or tree
wells or other protection necessary may be
necessary to insure the survivability of the trees.
Chip mulch 4-6"in depth may also be required in
these areas. Grading should not disrupt the
normal drainage pattern around the trees. Fills
should not create a ponding condition and
excavations should not leave the tree on a rapidly
draining mound.
■ Exposed Roots: Any exposed roots shall be
recovered the same day they were exposed. If
they cannot,they must be covered with burlap or
another suitable material and wetted down 2X per
day until re-buried.
■ Paving With the Drip-Line: Pervious surfacing is
preferred within the drip-line of any oak tree.
Arborist(s)will advise.
■ Equipment Operation: Vehicles and all heavy
equipment shall not be driven under the trees,as
this will contribute to soil compaction. Also there
is to be no parking of equipment or personal
vehicles in these areas.
• Existing Surfaces: The existing ground surface
within the drip-line of all oak trees shall not be cut,
filled,compacted or pared.
• Construction Materials and Water: No liquid or
solid construction waste shall be dumped on the
ground within the drip-line of any oak tree.
• Arborist Meeting: An arborist shall be present
for selected activities(trees identified on
spreadsheet)and pre-construction fence
placement. The monitoring does not necessarily
have to be continuous but observational at times
during the above activities. If there is a"yes"in
the monitoring column,this is 100%mandatory.
City of Atascadero
Resolution No. 2004-021
Page 15 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:GradingPenntl FD:Fire Department
BP:Building Permit PD:Police Department
Fl:Final Inspection CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
Exhibit A FO:Final&cupanoy CA,C4ftmey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067ITTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
■ Pre-Construction Meeting: An on-site pre-
construction meeting with the arborist(s),owner,
planning staff,and the earthy moving team may
be required for this project. Prior to final
occupancy,a letter from the arborist(s)shall be
required verifying the health/condition of all
impacted trees and providing any
recommendations for any additional mitigation.
The letter shall verify that the arborist(s)were on
site for all grading and/or trenching activity that
encroached into the drip-line of the selected native
trees,and that all work done in these areas was
completed to the standards set forth above.
Mitigation Measure 6.b.1: The grading permit application GP PS,SS,CE 6.b.1
plans shall include erosion control measures to prevent soil,
dirt,and debris from entering the storm drain system during and
after construction. A separate plan shall be submitted for this
purpose and shall be subject to review and approval of the City
Engineer at the time of Building Permit application.
Mitigation Measure 6.b.2: All cut and fill slopes shall be GP BR BS 6.b.2
hydroseeded with an appropriate erosion control method
(erosion control blanket, hydro-mulch,or straw mulch
appropriately anchored)immediately after completion of
earthwork between the months of October 15 through April 15.
All disturbed slopes shall have appropriate erosion control
methods in place. Duration of the project: The contractor will
be responsible for the clean-up of any mud or debris that is
tracked onto public streets by construction vehicles.
Mitigation Measure 6.e.1: Percolation tests are required for all BR GP PS.BS.CE 6.e.1
lots not served by sewer before building permits for residences
can be issued.
Mitigation Measure 8e.f.1: A Stormwater Pollution Prevention GP PS,BS,CE 8.e.f.1
Plan (SWPPP)/Erosion Control Plan shall be submitted and
approved by the City Engineer prior to the issuance of the
building permit. The plan shall include storm water measures
for the operation and maintenance of the project for the review
and approval of the City Engineer. The Building Permit
application plans shall identify Best Management Practices
(BMPs) appropriate to the uses conducted on site that
effectively prohibit the entry of pollutants into storm water runoff.
City of Atascadero
Resolution No.2004-021
Page 16 of 25
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program (Monitoring Measure
PS:Planning Services
BL:Business License BS:Building Services
FERROCARIL ROAD CUP AMENDMENT GP:GradingPemtll FD:FireDepadmenl
BP:Building Permit PD:Police Department
Fl:Final Inspection CE:City Engineer
TO:Temporary OmWancy WW:Wastewater
Exhibit A FO:Final Occupancy CACly Altomey
Mitigation Monitoring Program
Pine Mountain Transfer of Development Rights(GPA 2003-
0009/ZCH 2003-0073/ZCH 2003-0072/ZCH 2003-0074/ZCH
2003-0076/CUP 2003-0120/TTM 2003-0041/TTM 2003-
0042/CUP 2002-0067/TTM 2003-0045).
8825,8955 Coromar Avenue,3680&3700 Colima Road,
Ferrocaril Road—De Anza Estates,Pine Mountain
Mitigation Measure 8.e.f.2: The developer is responsible for GP PS,BS,CE 8.e.f.2
ensuring that all contractors are aware of all storm water quality
measures and that such measures are implemented. Failure to
comply with the approved construction Best Management
Practices will result in the issuance of correction notices,
citations,or stop orders.
Mitigation Measure 11.d.1: All construction activities shall BP,GP PS,BS,CE 11.d.1
comply with the City of Atascadero Noise Ordinance for hours
of operation,and as follows:
Construction activities shall be limited to the following hours of
operation:
• 7 a.m.to 7 p.m. Monday through Friday
• 9 a.m.to 6 p.m. Saturday&Sunday
Further,particularly loud noises shall not occur before 8 a.m.on
weekdays and not at all on weekends.
The Community Development Director upon a determination
that unusually loud construction activities are having a
significant impact on the neighbors may modify the hours of
construction.
Failure to comply with the above-described hours of operation
may result in withholding of inspections and possible
construction prohibitions,subject to the review and approval of
the Community Development Director.
A sign shall be posted on-site with the hours of operation and a
telephone number of the person to be contacted in the event of
any violations. Staff shall approve the details of such a sign
during the Grading Plan/Building Permit review process.
City of Atascadero
Resolution No.2004-021
Page 17 of 25
Exhibit B:
CUP 2002-0067 Master Plan of Development
Tentative Tract Map
Ferrocaril Road-De Anza Estates Site
x�
F "
8• ,ti +:s ��t
Fw 1
k
6
r �
_. d �
M 5
v
,h-
Mixt
T!
9 t
Oc
r
ki C C y gg' a
d ,�V
I ,
e �
City of Atascadero
Resolution No.2004-021
Page 18 of 25
Exhibit C:
CUP 2002-0067 Master Plan of Development
Elevations and Floor Plans
Ferrocaril Road-De Anza Estates Site
InvsCR
RECEIVED ■
DEC 1 0 2403 -
COMMUNITY DEVELOFA4EN�
-
POCGIl
i
4 R.er_ti4�zl�oob. _ I-� — p
i
roa au'
1 ;
09 WA
I
THE SANTA BAR.BAR.A
1971 S.r.RESIDENCE w12 GARAGE ■
City of Atascadero
Resolution No.2004-021
Page 19 of 25
Exhibit C:
CUP 2002-0067 Master Plan of Development
Elevations and Floor Plans
Fenrocaril Road-De Anza Estates Site
•°
R I' �
..�■ f/bc
DEC 1 0 2003
cot", DEl 011'SHT S KURIkYpn to
1
X00 +,.... ..,•. ..._.._..._....,
1
v i
6A 06,664
THE SANTA BAR-BABA
111 19715.1 RESIDENCE W/3-CAR CARAGE ■
City of Atascadero
Resolution No. 2004-021
Page 20 of 25
Exhibit C:
CUP 2002-0067 Master Plan of Development
Elevations and Floor Plans
Ferrocaril Road-De Anza Estates Site
# p
us
y.
4,
Y1 '
----------------
A D
r
THE SANTA BAR-B NM
■ 197 �k.� E[a���t�K�Z c.`.�iz�:n�iACC.�. �f limit'l�t'f i c..n���ntL�4t�■
City of Atascadero
Resolution No. 2004-021
Page 22 of 25
Exhibit D:
CUP 20024067 Master Plan of Development
Arborist Report
Ferrocaril Road-De Anza Estates Site
The owner$ soicly responsible in providing a (this fines pro ' tip
any and all con ors hWithin the Tip . o it isWOW
advised,that ttre owner tcir t py ` ndti ...
ure f bods fully a 10howed. Any c iti tirdn
wilt be provkIed,by us(tom,srbori s)upon
1. rVacialf: Must be a minimum of 4'h*h chain fi*' O
staked at the drip-fit*or fine of encroachment forvach tree or W , OP oftre". The
must W opbeforenst ionor earth n begins � o shafthe
� for�atnin*an or fence t cat the eofi trwion period. 1U
arborist(s)shall inspect the]once placement once*isweeted, This is mandatory for this
pn*t.
. SOO Aeration tl+teth Spits . err the drip-lines, have co d
by heavy+quip t r I . n it` est be re` d to fir . . e
before all work is completed. M � iter, tt*, �< rpo mer,�
boring-X11 W with an Augo 19" � -Y 1 art with n " ' er) the
application ort e' n f� n# iti r. �ar ` , s)sly irr .
. Chip f alettz Alf arvas within the drip-line of the trees'thate
shall receive 'tayer (chip mulch to retain ,sell structure'aW structure' rod the
effects orsoil compaction,
4. Within Tbitk p"One: All itencift under the drip,4aw6frialive
trees shall be bandldogj ; ori Or bqrcd. All major roots abaft be avo," ver
possible. All an i,'in dfamew shall be cleft cat,,Ah a4.
p l;tools and,tet.kft:lragocd,
5. Grrn4 '" l t T)te Drips-line: shoed not ach. it n the
drip-lim. if grivai;'6 necessaty,construction of rewtungwalls or tmewvIls orotiter
protection measum may be,necessw to insure the ility oftf P mulch
4-60 in depth be hit s uld not upt nip
d " tgd Ott . t
FillashoultlaofavW a pander mottitioa.
excavat ions,shotgnoton A.rapidly ri ', mound, Graft sbabo done
by *d unde " " . to avoid tolainglsoy,r6pt*
6. app RootsR Agy.eW�mots bo�recovered t day they
were exposed. )f t,they mast be covet�h burlap or tuber,strbl
material and down tat day.
7. Paving Within n pervious awficing4s pro* i the
drip-lite of any Oak trec Atbotfst(s)wAl advise
g. l yu ip t C nt 'Vehicles and all heavy equipment shall not be
driven under the us this ibuto$coil co
City of Ataseadero
Resolution No. 2004-021
Page 23 of 25
Exhibit D:
CUP 2002-0067 Master Plan of Development
Arborist Report
Ferrocaril Road-De Anza Estates Site
3
. ting Sam Tbe,existiagground surface,Within the Arip-litle of all Oak
trees shafl,not be cud, lied,coupocted or
10. , Constrecdowb4torisk And Waste: leo fiqui4 or soIldoonstruction tiwaste
hail be dumped on the ground within the drip-lire of any oak twee?
11. Arbor` tMonitoring: An arborist SW be present for se 'c$itti s
1tr ' ihed otr t)and pre-construction kneoplacauent, ri b
does not woessarRy haw to be continuous but obsemmlimud at times during the above
112. Pre-Coo trut don,Meeting: An o - it . . at ion mocting With,the ,
project. Pbor to final ockagxatcy,a letter from the 4rbori s)shall be,required
the h and batt ofall'impeded trees andprovift any recommendations
dit"ion miti nt n. The letter fail vers t the arra ' s)weft on site for 44
grading or trewhing activityencroached into the liter ofthe selected native
tree,and that ail'work done in those areas completed to'the standards ad fixth-
As pointed out o the beet,tree 41 is a very l dote White cult
has past . ' numerouscavitiesand woodpecker iofoststioa. Bac
espanstion area..U withiniia-Dine of this tree and should,be td the
Wei b l$'. Tr f X15 were ' , d in the lel ; y and 7'tea^►the
prirrrat leacft h fid should be to-positiontd,to-positionto the North by fw.
wet vers,(0the porou ) �' the
17-1 . Treo Ott', lta r dous tree. Thmisextei sifttte e,oo . todpec er
int4station,previusWure*and 4 lot ofdeadwood in the.c , thePruningis, t
� r oto . p ' for true 111,howewor,it h%*,advised,to mace
hazard,The,road at tbeedge ofirce#20 aludl be hand dry+ llh bat t' artiara
for toot prunindriveway for lot 1+x11 needs to appromh between thedrip-lines o
trees 3 31 to . .impact. Trev 28 i theoaf tm "t t6te.
rev r,the bom,owy able to he to-positioned,to save this UM
The included spread s)kwhalew trees listed l y n ,species and if
applicaMe,daterand breast , 4. `l,ceaiorr(scalefrrain mor to 11
stams(Avoided,impacted, -of drip,line impacted,miihintion
required( it ),construction bVwt(house,use,toad,etc.),and kAv`dual tree note&,
City of Atascadero
Resolution No. 2004-021
Page 24 of 25
Exhibit D:
CUP 2002-0067 Master Plan of Development
Arborist Report
Ferrocaril Road-De Anza Estates Site
4-
Plww to im know if me can be of aW fbture tea Yom,' r this
Steven C, Alvarez
rti ld Arborist#0511
Chip Tampi
Cert ified Arbo #643
City of Atascadero
Resolution No. 2004-021
Page 25 of 25
Exhibit E:
CUP 2002-0067 Master Plan of Development
Tree Protection Plan
Ferrocaril Road-De Anza Estates Site