HomeMy WebLinkAboutResolution 2004-012 RESOLUTION NO. 2004-012
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ATASCADERO APPROVING TENTATIVE PARCEL MAP 2002-0028 (AT
01-091) TO DIVIDE ONE RESIDENTIAL LOT INTO TWO RESIDENTIAL
LOTS ON THE SOUTH SIDE OF VISTA BONITA
(APN 030-441-015)
(FREDERICK)
WHEREAS, Michael Frederick, P.O. Box 573, Atascadero, California 93423
(Applicant/Owner) applied for a Tentative Parcel Map to subdivide one lot totaling 4.33 acres
into two parcels of 1.87 and 2.46 acres, gross; and,
WHEREAS, the proposed project has a General Plan Designation of SFR-Z (Single
Family Residential, 1.5 to 2.5 acre minimum) and, as conditioned, is in conformance with the
Land Use Element of the General Plan and all other applicable General Plan policies; and,
WHEREAS, the site is located in the RSF-Z (Residential Single Family, 1.5 to 2.5 acre
minimum) zoning district, which allows for the proposed use and density when certain findings
are made; and,
WHEREAS, an Initial Study and Draft Mitigated Negative Declaration 2003-0066 were
prepared for the project and made available for public review in accordance with the
requirements of the California Environmental Quality Act(CEQA); and,
WHEREAS,the Planning Commission held a duly noticed public hearing to consider the
proposed Mitigated Negative Declaration and Tentative Parcel Map application on December 16,
2003 at 7:00 p.m. and considered testimony and reports from staff, the applicants, and the public;
and,
WHEREAS, the Planning Commission recommended the City Council certify Mitigated
Negative Declaration 2003-0066; and,
WHEREAS, the Planning Commission recommended the City Council approve TPM
2002-0028 with the following changes:
1. Revise Planning Condition 8 to allow for the use of septic systems on the
resulting lots, and
2. All residential development on Proposed Parcel 1.
NOW, THEREFORE,the City Council takes the following actions:
SECTION 1. Certification of Negative Declaration. The City Council of the City of
Atascadero, hereby certifies Mitigated Negative Declaration 2003-0066 based on the following
findings:
City of Atascadero
Resolution No.2004-012
Page 2 of 15
1. The Proposed Mitigated Negative Declaration has been completed in compliance
with CEQA; and,
2. The Proposed Mitigated Negative Declaration was presented to the Planning
Commission, and the information contained therein was considered by the
Planning Commission, prior to recommending action on the project for which it
was prepared; and,
3. The Proposed Mitigated Negative Declaration was presented to the City Council
and the information contained therein was considered by the Council, prior to
taking action on the project for which it was prepared; and,
4. The project does not have the potential to degrade the environment when
mitigation measures are incorporated into the project.
5. The project will not achieve short-term to the disadvantage of long-term
environmental goals.
6. The project does not have impacts that are individually limited, but cumulatively
considerable.
7. The project will not cause substantial adverse effects on human beings either
directly or indirectly.
SECTION 2. Findings for approval of subdivision. The City Council finds as follows:
1. The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
2. The design and improvement of the proposed subdivision is consistent with the
General Plan and applicable zoning requirements.
3. The site is physically suitable for the type of development proposed.
4. The site is physically suitable for the density of development proposed.
5. The design and improvement of the proposed subdivision will not cause
substantial environmental damage or substantially and unavoidably injure fish and
wildlife or their habitat.
6. The subdivision is consistent with the character of the immediate neighborhood.
City of Atascadero
Resolution No.2004-012
Page 3 of 15
7. The design of the subdivision will not conflict w ith easements acquired by t he
public at large for access through, or the use of property within, the proposed
subdivision; or substantially equivalent alternative easements are provided.
8. The proposed subdivision design and type of improvements proposed will not
cause serious public health problems.
SECTION 3. Approval. The City Council does hereby approve Tentative Parcel Map
2002-0028 (AT 01-091) to subdivide one parcel totaling 4.33 acres into two parcels of 1.87 and
2.46 acres each, subject to the following Conditions and Exhibits:
EXHIBIT A: Mitigated Negative Declaration
EXHIBIT B: Conditions of Approval
EXHIBIT C: Tentative Parcel Map 2002-0028
City of Atascadero
Resolution No.2004-012
Page 4 of 15
On motion by Council Member O'Malley and seconded by Council Member Clay, the foregoing
Resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Council Members Clay, O'Malley, and Scalise
NOES: Council Member Pacas, and Mayor Luna
ABSENT: None
ABSTAINED: None
ADOPTED: February 24, 2004
4Ge
TASCADERO, CA
Luna, Mayor
ATTEST:
Marcia McClure Torgerson, City Clerk
APPROVED AS TO FORM:
Roy Hanley, 61iyltto y
City of Ataseadero
Resolution No.2004-012
Page 5 of 15
EXHIBIT A: Mitigated Negative Declaration
Resolution A
TPM 2002-0028
CITY OFATASCADERO
PROPOSED MMGATED
a r �
NEGATIVE DECLARA77ON #2003-0066
6.500 Palma Avenue Atascadero,CA 93422 8031461-5035
Micloal Fudmick P.OBox ,Atescadem,'
Project T%Ws Tentatin Pwd Map tumeut 2002-0009
ista Bonita Avenue,Atascadain,
L00 Luis Obispo County)APN 030441-015
su nnw
n of a 4M acre,grass,Sit aero two ,
g s,each, Proposed c l 1 is cmently dwoloped with oDdar facilitkas,wlikh wrllbe ronfined
to that kat andpropuedparce12 couldbe developed with a ` -fazuily resiadesxsz. The property
Will utilise the Cite WaStOWSIff fWilitiN and Arc 1' utaai Water 00zccp W will pzavk3a
water services. A prat of Vista Bonita,Avenue,fzom El Avenue,westerly to the Qg de
sac tenuinus of Vista Bonita Avenue is algia Impose&
G,ennalPlanDesignatiou: SM415to23wreadnimum,butdoupedbnmmotwAuds
District: RSI-2,11.5 to 23 acre mitkwint,based on parfiwtanct standards
1�indlag�
1. The project dans Trot have the pct to dogmde the envie
2. The project will not achieve short-termto the disadvardage oflong-tarm environ meatal goals,
3. The project does not have jqa&0AXWJW as individually limited,but cumulatively considerable.
4. The project will not cause mAntantial adverse effects on humen beings either directly or indirectly.
ilta"I �t
Based on the above findings,and the information contained in the initial study 2003-0056(made a pmt hraraofby
reference and on file in the Community Development Dap w.it has been determinedthat,the above project will
not have an advoise,impact on the nnvixonmant when the following proposed mitigation measures are incorporated
into the project(see atter ),
Pmpamd 112: Kerry a M Axscwfata Planner
Posted: December 3,2003
Pubko w Ended December 23,2003
mea -
vicinity
-
Tentative Parcel Map
-
RoadAbandorimerA Exhibit
As"Photo
- lydtial Study2003-0066
City of Atascadero
Resolution No.2004-012
Page 6 of 15
EXHIBIT B: Conditions of Approval
Resolution A
TPM 2002-0028
Conditions of Approval/Mitigation Monitoring Program Timing Responsibility Mitigation
/Monitoring Measure
TPM 2002-0028(AT 01-091) PM: Parcel Map
GP:Grading Pant PS:Planning Services
9230 Vista Bonita Avenue BP:Building Prmt BS:Building Services
TO:Temporary FD:Fire Department
Occupancy PD:Police Department
FO:Final CE:City Engineer
Occupancy WW:Wastewater
PI: Public CA:City Attorney
Improvements AMWC: Atascadero
Mutual Water Company
Planning Services -Standard Planning Conditions
1. The approval of this application shall become final, Ongoing PS
subject to the completion of the conditions of approval,
fourteen (14) days following the Planning Commission
approval unless prior to that time, an appeal to the
decision is filed as set forth in Section 9-1.111(b)of the
Zoning Ordinance.
2. Approval of this Tentative Parcel Map shall be valid for FM PS
two years after its effective date. At the end of the
period, the approval shall expire and become null and
void unless an extension of time is granted pursuant to
a written request received prior to the expiration date,
or a final map is recorded with the County Recorder's
Office.
3. The Community Development Departments hall have FM PS
the authority to approve minor changes to the project
that (1) result in a superior site design or appearance,
and/or (2) address a construction design issue that is
not substantive to the Tentative Parcel Map.
4. A P arcel map d rawn i n s ubstantial c onformance w ith FM PS
the approved tentative map, and in compliance with all
conditions set forth herein, shall be submitted for
review and approval in accordance with the
Subdivision Map Act and the City's Subdivision
Ordinance.
5. The subdivider shall defend, indemnify, and hold Ongoing CA
harmless the City of Atascadero or its agents, officers,
and employees against any claim or action brought to
challenge an approval by the City, or any of its entities,
concerning the subdivision.
6. The final map shall be subject to additional fees for FM PS
park or recreation purposes (QUIMBY Act) as required
by City Ordinance.
City of Atascadero
Resolution No.2004-012
Page 7 of 15
Conditions of Approval/Mitigation Monitoring Program Timing Responsibility Mitigation
/Monitoring Measure
TPM 2002-0028(AT 01-091) PM: Parcel Map
GP:Grading Pant PS:Planning Services
9230 Vista Bonita Avenue BP:Building Prmt BS:Building Services
TO:Temporary FD:Fire Department
Occupancy PD:Police Department
FO:Final CE:City Engineer
Occupancy WW:Wastewater
PI: Public CA:City Attorney
Improvements AMWC: Atascadero
Mutual Water Company
Project Specific Conditions
7. All future residential development on the parcels shall FM PS
be constructed with fire sprinklers.
8. Septic systems may be allowed on these parcels, GP/BP PW/PS/BS
providing the systems meet all City and Building
Code regulations and policies.
9. All future development shall be consistent with the PM PS
Conditions of Approval detailed in Planning
Commission Resolution No. 2001-038.
10. All future proposals for cellular facilities shall be Ongoing PS
required to amend the existing Conditional Use
Permits and shall be required to co-locate on existing
facilities.
11. Prior to recordation of the final map, the applicant PM PS
shall submit a landscaping plan for all areas
previously disturbed and for the area surrounding the
gate on Vista Bonita. This landscaping plan shall be
reviewed and approved by the Community
Development Department and the landscaping shall
be installed prior to recordation of the final map.
Engineering Standard Conditions
12. In the event that the applicant is allowed to bond for FM CE
any public improvements required as a condition of
this map, the applicant shall enter into a Subdivision
Improvement Agreement with the City Council
13. An engineer's estimate of probable cost shall be FM CE
submitted for review and approval by the City
Engineer to determine the amount of the bond.
14. The Subdivision Improvement Agreement shall FM CE
record concurrently with the Final Map.
15. The applicant shall enter into a Plan FM CE
Check/Inspection agreement with the City.
16. The applicant shall acquire title interest in any off-site FM CE
land that may be required to allow for the
City of Atascadero
Resolution No.2004-012
Page 8 of 15
Conditions of Approval/Mitigation Monitoring Program Timing Responsibility Mitigation
/Monitoring Measure
TPM 2002-0028(AT 01-091) PM: Parcel Map
GP:Grading Prmt PS:Planning Services
9230 Vista Bonita Avenue BP:Building Prmt BS:Building Services
TO:Temporary FD:Fire Department
Occupancy PD:Police Department
FO:Final CE:City Engineer
Occupancy WW:Wastewater
PI: Public CA:City Attorney
Improvements AMWC: Atascadero
Mutual Water Company
construction of the improvements. The applicant
shall bear all costs associated with the necessary
acquisitions. The applicant shall also gain
concurrence from all adjacent property owners whose
ingress and egress is affected by these
improvements.
17. Slope easements shall be obtained by the applicant FM CE
as needed to accommodate cut or fill slopes.
15. Drainage easements shall be obtained by the FM CE
applicant as needed to accommodate both public and
private drainage facilities. The applicant shall
address storm water detention prior to grading and
drainage approval.
18. A current preliminary subdivision guarantee shall be FM CE
submitted for review in conjunction with the
processing of the parcel map.
19. The final map shall be signed by the City Engineer FM CE
prior to the map being placed on the agenda for City
Council acceptance.
20. Prior to recording the final map, the applicant shall FM CE
pay all outstanding plan check/inspection fees.
21. Prior to recording the final map, the applicant shall FM CE
complete all improvements required by these
conditions of approval.
22. Prior to recording the final map, the applicant's FM CE
surveyor shall set monuments at all new property
corners.A registered civil engineer or licensed land
surveyor shall indicate by certificate on the parcel
map, that corners have been set or shall be set by a
date specific and that they will be sufficient to enable
the survey to be retraced.
23. Prior to recording the parcel map, the applicant shall FM CE
submit a map drawn in substantial conformance with
the approved tentative map and in compliance with
all conditions set forth herein. The map shall be
submitted for review and approval by the City in
accordance with the Subdivision Map Act and the
City of Atascadero
Resolution No.2004-012
Page 9 of 15
Conditions of Approval/Mitigation Monitoring Program Timing Responsibility Mitigation
/Monitoring Measure
TPM 2002-0028(AT 01-091) PM: Parcel Map
GP:Grading Prmt PS:Planning Services
9230 Vista Bonita Avenue BP:Building Prmt BS:Building Services
TO:Temporary FD:Fire Department
Occupancy PD:Police Department
FO:Final CE:City Engineer
Occupancy WW:Wastewater
PI: Public CA:City Attorney
Improvements AMWC: Atascadero
Mutual Water Company
City's Subdivision Ordinance.
24. All existing and proposed utility, pipeline, open space, FM CE
or other easements are to be shown on the final map.
If there are building or other restrictions related to the
easements, they shall be noted on the final map.
The applicant shall show all access restrictions on
the final map.
25. Prior to recording the final map, the applicant shall FM CE
have the map reviewed by all applicable public and
private utility companies (cable, telephone, gas,
electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility
company indicating their review of the map. The
letter shall identify any new easements that may be
required by the utility company. A copy of the letter
shall be submitted to the City. New easements shall
be shown on the final map.
26. All public improvements shall be constructed in FM CE
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings or
as directed by the City Engineer.
27. The applicant shall be responsible for the relocation FM CE
and/or alteration of existing utilities.
28. The applicant shall install all new utilities (water, gas, FM CE
electric, cable TV and telephone) underground.
Utilities shall be extended to the property line
frontage of each lot or its public utility easement.
29. Prior to the final inspection of any public FM CE
improvements, the applicant shall submit a written
statement from a registered civil engineer that all
work has been completed and is in full compliance
with the approved plans.
30. The applicant shall monument all property corners for FM CE
construction control and shall promptly replace them
if disturbed.
Engineering Project Specific Conditions
City of Atascadero
Resolution No.2004-012
Page 10 of 15
Conditions of Approval/Mitigation Monitoring Program Timing Responsibility Mitigation
/Monitoring Measure
TPM 2002-0028(AT 01-091) PM: Parcel Map
GP:Grading Prmt PS:Planning Services
9230 Vista Bonita Avenue BP:Building Prmt BS:Building Services
TO:Temporary FD:Fire Department
Occupancy PD:Police Department
FO:Final CE:City Engineer
Occupancy WW:Wastewater
PI: Public CA:City Attorney
Improvements AMWC: Atascadero
Mutual Water Company
31. An ingress, egress and utility easement shall be FM CE
retained over Vista Bonita Avenue.
32. A road maintenance agreement shall be prepared for FM CE
maintenance of the private driveway, prior to
recordation of the final map. The agreement shall be
reviewed and approved by the City Engineer,
Community Development Director and the City
Attorney. After approval, the road maintenance shall
record concurrently with the final map.
Building/Fire Marshal:
33. Interior fully automatic fire sprinklers will be required for GP FD/PS/BS
all new residential development.
34. All roads, access ways and driveways shall be built to GP FD/PS/BS
Fire Department standards, including turnouts and/or
turnarounds, as required. The short stretch of grade @
22% shown on the tentative map will be acceptable
due to the shallow bury of utilities.
35. All residential structures shall be within 800 feet of a GP FD/PS/BS
fire hydrant as measured along the road and
driveways. Water tanks will not be an acceptable
method of providing emergency water supplies.
Water Company:
36. The applicant shall design and construct the water FM AMWC
system improvements needed to serve the
subdivision. The water system improvements
required to serve the subdivision shall be private,
shall be operated and maintained by the applicant
and shall be isolated from the AMWC system with an
appropriate back-flow prevention device. The
applicant is responsible for designing and
constructing water system improvements that will
deliver water at the pressures and flows needed to
serve the subdivision.
37. AMWC expressly reserves and retains all rights and
privileges grated to it, among other things, to construct
City of Atascadero
Resolution No.2004-012
Page 11 of 15
Conditions of Approval/Mitigation Monitoring Program Timing Responsibility Mitigation
/Monitoring Measure
TPM 2002-0028(AT 01-091) PM: Parcel Map
GP:Grading Prmt PS:Planning Services
9230 Vista Bonita Avenue BP:Building Print BS:Building Services
TO:Temporary FD:Fire Department
Occupancy PD:Police Department
FO:Final CE:City Engineer
Occupancy WW:Wastewater
PI: Public CA:City Attorney
Improvements AMWC: Atascadero
Mutual Water Company
and operate water facilities over, along, upon and
through the segment of the roadway alignment that is
to be abandoned. Said rights and privileges were
granted to AMWC by that certain Deed, dated October
20, 1914, and recorded in the Office of the County
Recorder, County of San Luis Obispo, State of
California, in Volume 113, at page 56.
MITIGATION MEASURES
Mitigation Measure 3.b.1: The project is conditioned to BS BS/PS 3.b.1
comply with all applicable District regulations pertaining to the
control of fugitive dust(PM-10)as contained in sections 6.3,6.4
and 6.5 of the April 2003 Air Quality Handbook.
Section 6.3: Construction Equipment
Maintain all construction equipment in proper tune
according to manufacturer's specifications.
• Fuel all off-road and portable diesel powered
equipment, including but not limited to bulldozers,
graders, cranes, loaders, scrapers, backhoes,
generator sets, compressors, auxiliary power units,
with ARB certified motor vehicle diesel fuel (Non-
taxed version suitable for use off-road).
• Maximize to the extent feasible, the use of diesel
construction equipment meeting the ARB's 1996 or
newer certification standard for off-road heavy-duty
diesel engines.
• Install diesel oxidation catalysts (DOC), catalyzed
diesels particulate filters (CDPF)or other District
approved emission reduction retrofit services
(Required for projects grading more than 4.0 acres of
continuously worked area).
Section 6.4: Activity Management Techniques
• Develop a comprehensive construction activity
management plan designed to minimize the amount
of large construction equipment operating during any
given time period.
• Schedule of construction truck trips during non-peak
hours to reduce peak hour emissions.
• Limit the length of the construction workday period, if
necessary.
0 Phase construction activities, if appropriate.
City of Atascadero
Resolution No.2004-012
Page 12 of 15
Conditions of Approval/Mitigation Monitoring Program Timing Responsibility Mitigation
/Monitoring Measure
TPM 2002-0028(AT 01-091) PM: Parcel Map
GP:Grading Print PS:Planning Services
9230 Vista Bonita Avenue BP:Building Prmt BS:Building Services
TO:Temporary FD:Fire Department
Occupancy PD:Police Department
FO:Final CE:City Engineer
Occupancy WW:Wastewater
PI: Public CA:City Attorney
Improvements AMWC: Atascadero
Mutual Water Company
Section 6.5: Fugitive PM10
All of the following measures shall be included on
grading, demolition and building plan notes:
A. Reduce the amount of the disturbed area where possible.
B. Use of water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the
site. Increased watering frequency would be required whenever wind speeds exceed 15 mph.
Reclaimed (non-potable)water should be used whenever possible.
C. All dirt stockpile areas should be sprayed daily as needed.
D. Permanent dust control measures identified in the approved project re-vegetation and landscape plans
should be implemented as soon as possible following completion of any soil disturbing activities.
E. Exposed ground areas that are planned to be reworked at dates greater than one month after initial
grading should be sown with a fast-germinating native grass seed and watered until vegetation is
established.
F. All disturbed soil areas not subject to revegatation should be stabilized using approved chemical soil
binder,jute netting, or other methods approved in advance by the APCD.
G. All roadways, driveways, sidewalks, etc, to be paved should be complete as soon as possible. In
addition, building pads should be laid as soon as possible after grading unless seeding or soil binders
are used.
H. Vehicle speed for all construction vehicles shall not exceed 15 mph on any unpaved surface at the
construction site.
I. All trucks hauling dirt, sand, soil, or other loose materials are to be covered or should maintain at least
two feet of freeboard (minimum vertical distance between top of load and top of trailer) in accordance
with CVC Section 23114.
J. Install wheel washers where vehicles enter and exit unpaved roads onto streets, or was off trucks and
equipment leaving the site.
K. Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads.
Water sweepers with reclaimed water should be used where feasible.
L. The contractor or builder shall designate a person or persons to monitor the dust control program and
to order increased watering, as necessary, to prevent transport of dust off site. The name and
telephone number of such persons shall be provided to the APCD prior to land use clearance for map
recordation and land use clearance for finish grading of any structure.
Mitigation Measure 4.e.1: The Grading Plan shall identify tree BP PS 4.e.1
protection fencing around the drip line of each existing on-site tree
and/or native shrub mass within 20 feet of construction activity.
City of Atascadero
Resolution No.2004-012
Page 13 of 15
Conditions of Approval/Mitigation Monitoring Program Timing Responsibility Mitigation
/Monitoring Measure
TPM 2002-0028(AT 01-091) PM: Parcel Map
GP:Grading Prmt PS:Planning Services
9230 Vista Bonita Avenue BP:Building Prmt BS:Building Services
TO:Temporary FD:Fire Department
Occupancy PD:Police Department
FO:Final CE:City Engineer
Occupancy WW:Wastewater
PI: Public CA:City Attorney
Improvements AMWC: Atascadero
Mutual Water Company
Mitigation Measure 4.e.2: Grading and excavation and grading work BP PS 4.e.2
shall be consistent with the City of Atascadero Tree Ordinance.
Special precautions when working around native trees include:
1. All existing trees outside of the limits of work shall remain.
2. Earthwork shall not exceed the limits of the project area.
3. Low branches in danger of being torn from trees shall be
pruned prior to any heavy equipment work being done.
4. Vehicles and stockpiled material shall be stored outside the
drip line of all trees.
5. All trees within the area of work shall be fenced for
protection with 4-foot chain link,snow,or safety fencing
placed per the approved tree protection plan. Tree
protection fencing shall be in place prior to any site
excavation or grading. Fencing shall remain in place until
completion of all construction activities.
6. Any roots that are encountered during excavation shall be
clean cut by hand and sealed with an approved tree seal.
Mitigation Measure 6.b: All disturbed areas, not shown on the BP BS 6.b
project landscape plan for landscaping shall be hydro seeded with a
native seed mix. Erosion control measures shall include an erosion
control blanket for all 2:1 fill slopes.Affected areas that previously
contained native shrubs and vegetation shall be replanted with
similar plant species per an approved landscape plan.
Duration of the project:The contractor will be responsible for the
clean up of any mud or debris that is tracked out on to EI Bordo Rd
and/or the private access drive by construction vehicles.
Mitigation Measure 6.c.d: A soils report shall be required to be BP BS 6.c.d
submitted with any future building permits by the building
department.The building plans will be required to follow the
recommendations of the soils report to assure safety for residents
and buildings.
Mitigation Measure 11.d: All construction activities shall comply with BP BS/PS 11.d
the City of Atascadero Noise Ordinance for hours of operation.
City of Atascadero
Resolution No.2004-012
Page 14 of 15
EXHIBIT Q Tentative Parcel Map
Draft Resolution A
TPM 2002-0028
off
Y, 4
f � ` a" ■ p� � �i � Y
�t I MF ilY �Y �Y
`I �1kti IIS I
II l 12i
i$ � r
City of Atascadero
Resolution No.2004-012
Page 15 of 15