Loading...
HomeMy WebLinkAboutResolution 2004-003 RESOLUTION NO. 2004-003 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ATASCADERO APPROVING CONDITIONAL USE PERMIT 2003-0098, ADOPTING A MASTER PLAN OF DEVELOPMENT FOR THE PD-17 OVERLAY ZONING DISTRICT ON APN 049-102-055 (4900 OBISPO ROAD / SHORES) WHEREAS, an application has been received from Ron Shores (2940 Ardilla Way, Atascadero, CA 93422) Applicant and Property Owner to consider a project consisting of a zone change from RSF-X (Residential Single-Family) to RSF-X / PD-17 (Residential Single-Family with Planned Development Overlay #17) with the adoption of a Master Plan of Development, and a eight-lot residential Tentative Tract Map on APN 049-102-055 and, WHEREAS, the site's General Plan Designation is SFR-X (Single-Family Residential - X); and, WHEREAS, the site's current zoning district is RSF-X (Residential Single-Family); and WHEREAS, the Planning Commission has recommended that a site be rezoned to include a PD-17 overlay district which requires the adoption of a Master Plan of Development; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Change application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of Development; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on Tuesday, September 16, 2003, studied and considered the Master Plan of Development (CUP 2003-0098) for Zone Change 2003-0048, after first studying and considering the Proposed Mitigated Negative Declaration prepared for the project, and WHEREAS, the Atascadero City Council, at a Public Hearing held on December 9, 2003, studied and considered the Master Plan of Development (CUP 2003-0098) for Zone Change 2003-0048, after first studying and considering the Draft Mitigated Negative Declaration prepared for the project, and, NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Atascadero: City of Ataseadero Resolution No.2004-003 Page 2 of 32 SECTION 1. Findings for Approval of Master Plan of Development. The City Council finds as follows: 1. The proposed project or use is consistent with the General Plan and the City's Appearance Review Manual; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including the PD-17 Ordinance; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 1. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. SECTION 2. Approval. The Atascadero City Council, in a regular session assembled on December 9, 2003, resolves to approve Conditional Use Permit 2003-0098, a Master Plan of Development for Zone Change 2003-0048 subject to the following: 1. EXHIBIT A: Conditions of Approval/Mitigation Monitoring Program 2. EXHIBIT B: Site Plan 3. EXHIBIT C: Statistical Summary of Project 4. EXHIBIT D: Landscape Plan 5. EXHIBIT E: Grading and Drainage Plan 6. EXHIBIT F: Elevations and Floor Plans 7. EXHIBIT G: Exterior Color&Material Sample Board 8. EXHIBIT H: Landscape Buffer Plan & Sections City of Atascadero Resolution No.2004-003 Page 3 of 32 On motion by Council Member Scalise and seconded by Council Member Clay, the foregoing Resolution is hereby adopted in its entirety by the following roll call vote: AYES: Council Members Clay, O'Malley, and Scalise NOES: Council Member Pacas and Mayor Luna ABSENT: None ADOPTED: January 27, 2004 CITY O ATASCAD O By: Dr. eorge Luna, Mayor ATTEST: Ykd,4� M Marcia McClure Torgerson, C.M.C., City Jerk APPROVED AS TO FORM: �j C � Roy A anley, City Attorn EXHIBIT A: Conditions of Approval/Mitigation Monitoring Program PD-17 Master Plan of Development(CUP 2003-0098)/ZCH 2003-0048 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 4900 Obispo Road GP:Grading Pennd FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development Fl:Final Inspection CE:City Engineer TO:TemporaryOccupancy WW:Wastewater CUP 2003.0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney Planning Services 1. The approval of this zone change and use permit shall BP PS become final and effective following City Council approval. 2. Approval of this Master Plan of Development shall be valid FM PS concurrently with the life of Tentative Tract Map 2003- 0032 and then indefinitely following final map. The Master Plan of Development approval shall expire and become null and void unless a final map is recorded consistent with the Master Plan of Development. 3. Changes to the Master Plan of Development shall be On-going PS approved by the Planning Commission and do not require Council action. 4. The Community Development Department shall have the BP/FM PS authority to approve the following minor changes to the project the(1)modify the site plan project by less than 10%,(2)result in a superior site design or appearance, and/or(3)address a construction design issue that is not substantive to the Master Plan of Development. The Planning Commission shall have the final authority to approve any other changes to the Master Plan of Development and any associated Tentative Maps. 5. All subsequent Tentative Tract Map and construction BP/FM PS permits shall be consistent with the Master Plan of Development contained herein. 6. All exterior elevations,finish materials and colors shall be BP PS consistent with the Master Plan of Development as shown in Exhibits B-G. 7. All site development shall be consistent with the maximum BP/FM PS intensities described in the statistical project summary as shown on Exhibit C. 8. All site work,grading and site improvements shall be BP/FM PS consistent with the Master Plan of Development as shown in EXHIBIT B. 9. A final landscape and irrigation plan shall be approved BP PS prior to the issuance of building permits and included as art of site improvement plan consistent with EXHIBIT B Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL Business License BS:Building Services 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development Fl:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney and D. All exterior meters,air conditioning units and mechanical equipment shall be screened with landscape material. Trash/recycle container areas shall be screened with fencing or landscape. All front and street-facing side yards shall be landscaped by the developer. All landscape maintenance shall be the responsibility of the individual property owner. All proposed tree locations,species,and sizes shall be as identified in Exhibits B and D. Trees shall be double staked. Drainage detention basin shall be landscaped by the developer and maintained by either the property owner or the homeowner's association. Driveways on lots 4 and 6 shall incorporate an initial 12- foot width with a center 4-foot wide decorative paver accent ribbon treatment. 10. All project fencing shall be installed consistent with BP PS EXHIBIT B and D subject to the following modifications. The design of all fencing shall be compatible with the overall project design,subject to staff approval 11. Affordable Housing Requirement: The applicant shall set FM,BP PS,CE aside two housing unit at the moderate category rate for a period of 30 years. 12. Affordable Workforce Housing FM, BP PS,CE Prior to recordation of final map, the applicant shall enter into a legal agreement with the City to reserve t/z of the units for sale to residents or workers within the City of Atascadero, including the affordable units. The agreement shall include the following provisions: • The units shall be offered for sale to residents or workers within the City of Atascadero for a minimum of 60-days. During this time period offers may only be accepted from Atascadero residents or workers; ■ The applicant shall provide reasonable proof to the City that at least one of the qualified buyers is a resident or worker within the City Limits of Atascadero; ■ The Atascadero resident or worker restriction shall Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL Business License BS:Building Services 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney apply to the initial sale only; ■ The applicant shall identify which units to be reserved; and ■ The applicant shall identify two units to be designated as the deed-restricted affordable units at the moderate income level for a 30-year period. The City Attorney shall approve the final form of the agreement. 13. All exterior material finishes(brick,stone,plank siding, BP PS materials,lighting,garage doors)shall be durable,high quality,and consistent with the architectural appearance of each home. A variety of garage doors shall be used,be of superior design quality,and painted to match the residence main body color. 14. Street terminus shall require the following,subject to BP,FM PS,CE staff approval: • Extension of sidewalk beyond driveway apron of fronting Lot 5 to street terminus,for future roadway extension. • Extension of road improvements to property line. • Temporary City standard fire turn-around at street terminus,to be designed to meet city standards and specific configuration to be approved by City Engineer and Fire. • Fire turn-around at street terminus,to be identified as temporary and removed with future roadway extension. Methods of identification and notice to property owners and/or property deed notification shall be subject to approval by City Engineer. 15. Deed notification shall be applied to each of the new FM PS,CE lots, notifying homeowners that adjacent residential lots may be used for agricultural purposes,including keeping of livestock animals,facilities and equipment. Building Services 16. A soils investigation prepared by a licensed BP FM Geotechnical Engineer is to be provided for the project. The report is to be provided at the time of building permit submittal along with the building plans Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Bushes License BS:Building Services 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney for review by the Building Division. Recommendations contained in the report are to be incorporated into the project plans. Fire Marshal 17. Final street name selection shall be consistent with BP PS, BS the future street extension,subject to staff approval. 18. Provide a letter from the Atascadero Mutual Water BP BS Company stating the minimum expected water available to the site. Amount available must meet min. requirement specified in the California Fire Code. 19. Note approved address signage is to be provided. BP BS 20. Note on plans that fire lanes shall be delineated to BP BS restrict parking as required by the Fire Authority. City Engineer Standard Conditions Drainage: BP PW 21. The drainage basin shall be designed to detain the 50-year post development storm and release a 2-year redevelo ment. 22. Lot 1 shall have a drainage basin fronting Obispo BP PW Road and all storm water runoff from the new home and driveway shall enter that basin. No additional storm water will be conveyed to the existing driveway bisecting the lot. 23. Drainage along the westerly property line shall be released in a non-concentrated historical rate or easements from the adjoining property for drainage shall be acquired. 24. Storm water runoff from the projects improvements must not drain across Obispo Road.A conveyance device shall be constructed along the project frontage to stop the increased flow. 25. All requirements of Section 5"Storm Drainage"of the BP PW Engineering Department standard specifications and drawings will be met. 26. Obtain approval by the City Engineer of the grading BP PW and drainage plan and the storm drain design and facilities prior to issuance of any gradingpermits. 27. Submit calculations to support the design of any BP PW structures or pipes. Closed conduits shall be designed to convey the 10-year flow with gravity flow; the 25-year flow with head, and provide safe conveyance for the 100 ear overflow. 28. Concentrated drainage from off-site and onto offsite BP PW areas shall be conveyed across the project site in Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Bush License BS:Building Services 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003.0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney drainage easements. Acquire drainage easements where needed. Drainage shall cross lot lines only where a drainage easement has been provided. Applicant shall provide copies of drainage easement documents showing conveyance of concentrated flows in drainage easements across adjoining properties. Frontage Improvements: BP PW 29. Obispo Road. Obispo road shall be evaluated using BP PW a testing method approved by the City Engineer. The road shall be reconstructed or overlayed as recommended by the test results. The City Engineer shall determine the appropriate Traffic Index(TI)for this roadway. The road shall be constructed to Engineering Standard Drawing No. 401 Type B. 30. All public improvements shall be designed by a BP PW registered Civil Engineer and constructed in conformance with the City Of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer. Improvement Maintenance: Street Improvements and landscaping. 31. The following items are the responsibility of this BP PW development to maintain. They may be maintained through a homeowners association, assessment district, benefit assessment district, landscaping and lighting district, City acceptance or other mechanism to fund and perform short and long term maintenance. This mechanism must be in place prior to the final inspection on the improvements. a. Road Improvements including road surface,curb, gutter and sidewalk and drainage facilities on Calle Miranda. b. The drainage basin. 32. A sight distance traffic analysis shall be required to BP,FM PW identify any specific project ingress/egress improvements. Sight distance recommendations shall be subject to City Engineer review and approval. Wastewater: 33. A City of Atascadero Sewer Extension Performance BP PW Agreement shall be executed. 34. SS mains shall be laid out in a straight line between BP PW manholes. Curved sewer lines will be allowed only under special circumstances. 35. Applicant shall pay sewer Extension (Annexation), BP PW Connection and Reimbursement fees(if applicable) upon issuance of building permit. Conditions of Approval/ 'riming Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003-0048 F0:Final Occupancy CA:City Attomey 36. Final project inspection shall be contingent upon BP PW completion of the public sewer extension and Public Works final inspection. 37. Applicant shall construct public SS Main beginning at BP PW SS Manhole in EI Camino Real approximately 320 feet north of Del Rio road,then east along Del Rio Road to Obispo Road,then north to Obispo Road to the project site. 38. Gravity mains shall terminate in manholes. BP PW 39. Gravity mains and other sewer facilities within the BP PW subdivision shall be privately owned and maintained. 40. Private utility easements will be required for sewer BP PW laterals that cross private property lines. 41. Sewer Drainage piping serving fixtures which have BP PW flood level rims located below the elevation of the next upstream manhole cover of the public or private sewer serving such drainage piping shall be protected from backflow of sewage by installing an approved type backwater valve fixtures above such elevation shall not discharge through the backwater valve. 42. Final project inspection shall be contingent upon BP PW completion of the public sewer extension and Public Works final inspection. 43. All public improvements shall be constructed in BP BS conformance with the City Of Atascadero Engineering Department Standard Specifications and Drawings and/or as directed by the City Engineer. 44. In the event that the applicant is allowed to bond for BP PW the public improvements required as a condition of the final map,the applicant shall enter into a Subdivision Improvement Agreement with the City Council. 45. An engineer's estimate of probable cost shall be BP PW submitted for review and approval by the City Engineer to determine the amount of the bond. 46. The Subdivision Improvement Agreement shall record BP PW concurrently with the Final Map. 47. An encroachment permit shall be obtained prior to the BP BS issuance of building permit. 48. The applicant shall enter into a Plan Check/Inspection BP PW agreement with the City. 49. A six (6) foot Public Utility Easement (PUE) shall be BP BS provided where needed. 50. The applicant shall be responsible for the relocation BP PW and/or alteration of existing utilities. Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 4900 Obispo Road GP:Grading Penni) FD:Fire Department BP:Building Pemrt PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney 51. The applicant shall install all new utilities (water, gas, BP PW electric, cable TV and telephone) underground. Utilities shall be extended to the property line frontage of each lot or its public utility easement. 52. The applicant shall monument all property corners for BP PS/PW construction control and shall promptly replace them if disturbed. 53. The applicant shall acquire title interest in any off-site BP PS/PW land that may be required to allow for the construction of the improvements. The applicant shall bear all costs associated with the necessary acquisitions. The applicant shall also gain concurrence from all adjacent property owners whose ingress and egress is affected by these improvements. 54. Slope easements shall be provided as needed to BP PW accommodate cut of fill slopes. 55. Drainage easements shall be provided as needed to BP BS accommodate both public and private drainage facilities. 56. Plan and Profile drawings of proposed SS facilities BP PW shall be submitted for approval (Utility owner signatures will be required). 57. A preliminary subdivision guarantee shall be BP PW submitted for review in conjunction with the processing of the map. 58. All existing and proposed utility, pipeline, open space, BP PW or other easements are to be shown on the parcel map. If there are building or other restrictions related to the easements, they shall be noted on the parcel map. The applicant shall show all access restrictions on the parcel map. 59. The final map shall be signed by the City Engineer BP PW prior to the map being placed on the agenda for City Council acceptance. 60. Prior to recording the final map, the applicant shall BP PW submit a map drawn in substantial conformance with the approved tentative map and in compliance with all conditions set forth herein. The City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance shall submit the map for review and approval. 61. Prior to recording the final map,the applicant shall set BP PW monuments at all new property corners. A registered Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL: us�ess License BS:Building Services B 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney civil engineer or licensed land surveyor shall indicate by certificate on the parcel map, that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. 62. Prior to recording the parcel map, the applicant shall BP PW pay all outstanding plan check/inspection fees. 63. Prior to recording the map, the applicant shall SP PW complete all improvements required by these conditions of approval. 64. Prior to recording the parcel map, the applicant shall BP PW have the map reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company indicating their review of the map. The letter shall identify any new easements that may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the parcel map. 65. Prior to recording the final map, provisions for the BP PW repair and maintenance of the private sewer shall be included in the CC&R's for this tract. Included shall be a mechanism to maintain the private sewer and structures, such as homeowners association. The City Engineer and City Attorney shall approve the final form prior to recordation. 66. Upon recording the final map, the applicant shall BP PW provide the City with a black line clear Mylar (0.4 mil) copy and a blue line print of the recorded map and a digital copy of the map. 67. Prior to the final inspection of any public BP PW improvements, the applicant shall submit a written statement from a registered civil engineer that all work has been completed and is in full compliance with the approved plans. 68. Prior to the final inspection, the applicant shall submit BP PW a written certification from a registered civil engineer or land surveyor that all survey monuments have been set as shown on the final map. 69. Applicant shall have six(6) months from public sewer BP PW extension final inspection to submit accurate record (as-built) drawings and a reimbursement map/agreement that has been approved by the Director of Public Works. After the six-month deadline, all right to receive reimbursement from others connecting the public sewer extension shall be waived. Atascadero Mutual Water Company 70. Prior to the recording of the Final Map of the issuance BP BS of building permits,the applicant shall submit plans showing the water distribution facilities required to Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 4900 Obispo Road GP:Grading Perk FD:Fire Department BP:Building Permit P0:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003.0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney serve the project for review and approval by the Atascadero Mutual Water Company(AMWC). The plans shall show all facilities required for fire protection. The plans shall show all cross-connection devices required to isolate the fire protection and landscape irrigation systems from the domestic water system. 71. Prior to starting the construction of improvements,the BP BS applicant shall pay all installation and connection fees required by AMWC. 72. Prior to the issuance of building permits,the applicant BP BS shall obtain a"Will Serve"letter from the Atascadero Mutual Water Company. Mitigation Measures Mitigation Measure 1.c.1: The following landscape mitigations BP BS,PS,CE 1.c.1 shall apply: ■ Proposed fencing location and height shall comply with Atascadero Municipal Code. • The project landscaping shall include residential front yards, street facing side yards, Obispo Road frontage, and a minimum 2 street trees per front yard and street facing side yards. ■ The on-site retention basin shall be landscaped with plant materials compatible with the surrounding area while allowing the basin to function as engineered for storm water management. ■ All proposed trees shall be shade trees of 15-gallon size and double staked. Mitigation Measure 1.c.2: The proposed homes shall include BP BS,PS,CE 1.c.2 the use of earth-tone paint and roof colors designed to blend with the surrounding semi-rural environment and reduce the potential for reflected light and glare. Mitigation Measure 1.d.1: No on-site street lighting is BP BS,PS,CE 1.d.1 proposed. However, if exterior street lighting is proposed, it shall be limited to the intersections only and designed to eliminate any off site glare. All exterior site lights shall utilize full cut-off, "hooded"lighting fixtures to prevent offsite light spillage and glare. Any luminaire pole height shall not exceed 20-feet in height, limit intensity to 2.0 foot candles at ingress/egress, and otherwise 0.6 foot candle minimum to 1.0 maximum within the private street. Fixtures shall be shield cut- off type and compatible with neighborhood setting,subject to Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 4900 Obispo Road GP:Grading Peimfl FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003.0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney staff approval. In addition, individual exterior home-owner lighting shall be restricted through CC&R's and individual lot deed-restriction to prohibit high-intensity lighting in excess of one-foot candle, limited in fixture height to not exceed 10 feet, and utilize full cut-off, "hooded"lighting fixtures to prevent offsite light spillage and glare. Mitigation Measure 3.b.1: The project shall be conditioned to BP,GP BS,PS,CE 3.b.1 comply with all applicable District regulations pertaining to the control of fugitive dust(PM-10)as contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality Handbook. Section 6.3: Construction Equipment ■ Maintain all construction equipment in proper tune according to manufacturer's specifications. ■ Fuel all off-road and portable diesel powered equipment, including but not limited to bulldozers, graders,cranes, loaders,scrapers, backhoes, generator sets, compressors, auxiliary power units, with ARB certified motor vehicle diesel fuel (Non- taxed version suitable for use off-road). ■ Maximize to the extent feasible, the use of diesel construction equipment meeting the ARB's 1996 or newer certification standard for off-road heavy-duty diesel engines. • Install diesel oxidation catalysts(DOC),catalyzed diesels particulate filters(CDPF)or other District approved emission reduction retrofit services (Required for projects grading more than 4.0 acres of continuously worked area). Section 6.4: Activity Management Techniques ■ Develop a comprehensive construction activity management plan designed to minimize the amount of large construction equipment operating during any given time period. ■ Schedule of construction truck trips during non-peak hours to reduce peak hour emissions. ■ Limit the length of the construction workday period, if necessary. • Phase construction activities, if appropriate. Section 6.5: Fugitive PM10 All of the following measures shall be included on grading, demolition and building plan notes: A. Reduce the amount of the disturbed area where possible. B. Use of water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:Cry Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003-0048 FO:Final Occupancy CA:Cily Attorney site. Increased watering frequency would be required whenever wind speeds exceed 15 mph. Reclaimed (non-potable)water should be used whenever possible. C. All dirt stockpile areas should be sprayed daily as needed. D. Permanent dust control measures identified in the approved project re-vegetation and landscape plans should be implemented as soon as possible following completion of any soil disturbing activities. E. Exposed ground areas that are plann4ed to be reworked at dates greater than one month after initial grading should be sown with a fast-germinating native grass seed and watered until vegetation is established. F. All disturbed soil areas not subject to re-vegetation should be stabilized using approved chemical soil binder,jute netting, or other methods approved in advance by the APCD. G. All roadways, driveways, sidewalks, etc,to be paved should be complete as soon as possible. In addition, building pads should be laid as soon as possible after grading unless seeding or soil binders are used. H. Vehicle speed for all construction vehicles shall not exceed 15 mph on any unpaved surface at the construction site. I. All trucks hauling dirt,sand, soil, or other loose materials are to be covered or should maintain at least two feet of freeboard(minimum vertical distance between top of load and top of trailer) in accordance with CVC Section 23114. J. Install wheel washers where vehicles enter and exit unpaved roads onto streets, or was off trucks and equipment leaving the site. K. Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water should be used where feasible. L. The contractor or builder shall designate a person or persons to monitor the dust control program and to order increased watering, as necessary,to prevent transport of dust off site. The name and telephone number of such persons shall be provided to the APCD prior to land use clearance for map recordation and land use clearance for finish grading of any structure. Mitigation Measure 4.e.1: The building permit site plan shall BP PS,BS,CE 4.e.1 identify all protection and enhancement measures recommended by the Certified Arborist in the Tree Protection Plan.Tree protection fencing shall be installed at the locations called out in the Tree Protection Plan. Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003.0048 FO:Final Occupancy CA:City Attorney Mitigation Measure 4.e.2: The developer shall contract with a BP,GP PS,BS,CE 4.e.2 certified arborist during all phases of project implementation. The certified arborists shall be responsible for monitoring the project during all phases of construction through project completion, as follows: (a) A written agreement between the arborist and the developer outlining a arborist monitoring schedule for each construction phase through final inspection shall be submitted to and approved by planning staff prior to the issuance of building/grading permits. (b) Arborist shall schedule a pre-construction meeting with engineering/planning staff, grading equipment operators, project superintendent to review the project conditions and requirements prior to any grubbing or earth work for any portion of the project site. All tree protection fencing and trunk protection shall be installed for inspection during the meeting. Tree protection fencing shall be installed at the line of encroachment into the tree's root zone area. (c) As specified by the arborist report and City staff: ■ Fencing: Must be a minimum of 4' high,chain link, and snow or safety fence,staked at the drip-line or line of encroachment for each tree or group of trees. Tree fencing shall be erected before demolition, grading, or construction begins and remains in place until final inspection of the project permit, except for work specifically required in the approved plans in which case the project arborist or Planning Staff must be consulted. ■ Warning Sian: A warning sign shall be prominently displayed on each fence. The sign shall be a minimum of 8.5 x 11-inches and clearly state: WARNING-TREE PROTECTION ZONE-This fence shall not be removed and is subject to a penalty according to the AMC Section 1-3.01. ■ Soil Aeration Methods: Soils under drip-lines that have been compacted by heavy equipment and/or construction activities must be returned to their original state before all work is completed. Methods include water jetting, adding organic matter, and boring small holes with an auger(18"deep,24 apart with a 2-4"auger)and the application of moderate amounts of nitrogen fertilizer. The arborist shall advise. ■ Chip Mulch: All areas within the drip-line of the trees that cannot be fenced shall receive a 4-6"layer of chip mulch to retain moisture,soil structure and reduce the effects of soil compaction. Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Busin License BS:Building Services 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney ■ Trenching within the Drip-line: All trenching under drip-lines of native trees shall be hand dug, augured or bored. All major roots shall be avoided whenever possible. All exposed roots larger than 1"in diameter shall be`clean cut with a sharp pruning tool and not left ragged. ■ Grading within drip-line: Grading should not encroach within the drip-line. If grading is necessary, construction of retaining walls or tree wells or other protection measures may be necessary to insure the survivability of the trees. Chip mulch 4-6"in depth may also be required in these areas. Grading should not disrupt the normal drainage pattern around the trees. Fills should not create a ponding condition and excavations should not leave the tree on a rapidly draining mound. ■ Exposed Roots: Any exposed roots shall be recovered the same day they were exposed. ■ Paving within the Drip-line: Pervious surfacing is required within the dripline of any oak trees. • Compaction: Vehicles and all heavy equipment shall not be driven under the trees,as this will contribute to soil compaction. ■ Existing Surfaces: The existing ground surface within the drip-line of all oak trees shall not be cut,filled, compacted or pared. ■ Construction materials and waste: No liquid or solid construction waste shall be dumped on the ground within the drip-line of any oak tree. • Arborist Monitoring: During construction an arborist shall be present when encroaching within the dripline of any Oak tree. ■ Pre-Construction Meeting: An on-site pre- construction meeting with the Arborist,owner, planning staff, and the earth moving team shall be required for this project. Prior to final occupancy, a letter from the arborist shall be required verifying the health/condition of all impacted trees and providing any recommendations for any additional mitigation. The letter shall verify that the arborist was on site for all grading and/or trenching activity that encroached into the drip-line of the selected native trees, and that all work done in these areas was completed to the standards set forth above. Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 4900 Obispo Road GP:Grading Penni) FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development Fl:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003.0098/ZCH 2003-0048 FO:Final Occupancy CA:City Attorney (d). Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented,the trees designated for protection were protected during construction, and the construction-related tree protection measures are no longer required for tree protection. Mitigation Measure 6.b.1: The grading permit application GP PS,BS,CE 6.b.1 plans shall include erosion control measures to prevent soil, dirt, and debris from entering the storm drain system during and after construction. A separate plan shall be submitted for this purpose and shall be subject to review and approval of the City Engineer at the time of Building Permit application. Mitigation Measure 6.c.1.: A soils report shall be required to BP,GP PS,BS,CE 6.0 be submitted with a future building permit by the building department. Mitigation Measure 8e.f.1: A Stormwater Pollution Prevention GP PS,BS,CE 8.e.f.1 Plan (SWPPP)/Erosion Control Plan shall be submitted and approved by the City Engineer prior to the issuance of the building permit. The plan shall include storm water measures for the operation and maintenance of the project for the review and approval of the City Engineer. The Building Permit application plans shall identify Best Management Practices (BMPs) appropriate to the uses conducted on site that effectively prohibit the entry of pollutants into storm water runoff. Mitigation Measure 8.e.f.2: The developer is responsible for GP PS,BS,CE 8.e.f.2 ensuring that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices, citations, or stop orders. Mitigation Measure 11.d.1: All construction activities shall BP,GP PS,BS,CE 11.d.1 comply with the City of Atascadero Noise Ordinance for hours of operation, and as follows: Construction activities shall be limited to the following hours of operation: • 7 a.m.to 7 p.m. Monday through Friday • 9 a.m.to 6 p.m. Saturday • No construction on Sunday Further, particularly loud noises shall not occur before 8 a.m. on weekdays and not at all on weekends. The Community Development Director upon a determination that unusually loud construction activities are having a significant impact on the neighbors may modify the hours of construction. Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 4900 Obispo Road GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-17 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0098/ZCH 2003.0048 FO:Final Occupancy CA:City Attorney Failure to comply with the above-described hours of operation may result in withholding of inspections and possible construction prohibitions,subject to the review and approval of the Community Development Director. A sign shall be posted on-site with the hours of operation and a telephone number of the person to be contacted in the event of any violations. Staff shall approve the details of such a sign during the Grading Plan/Building Permit review process. EXHIBIT B:Site Plan 000000 Ai tis � L J 090 iii 1 » I 1 1 ff \ I t tV fit Bra 14 oil r ` � I { 1 R � I IR � I EXHIBIT C:Statistical Summary of Project Proposed Project Summary PD--17 I MEND (35X MAX.) (40X MIN.) LOT# NET LOT BLDG BLDG LANDSCAPE LANDSCAPE AREA SF COVERAGE X AR REA 1 22287 2110 9.5X 10536 4 .3X 2152 is.6x 7078 X 14620 211014.4X 7 .4 EXHIBIT D: Landscape Pian A ' E � � 660"opo oAl �;} li Is r I ! I ft ` f b I� 1 "iF I 31 r � rn ZAL-1 E -+ N it _ NO red i EXHIBIT E:Grading and Drainage Plan I \ J 11 Is 1• p ' �\.\ ..r..-�.�j � � ■i7 il, Ij � .ICIi� � i J� � I F jl \ j Ilia `` .,��• ��-' � � :;�.,� IIS '� �� I % 4 O \~�/ / lMai ly I ` % IF � pE� Al 0 4 „a g EXHIBIT F:Lot 1 -ELEVATIONS AND FLOOR PLANS - PLAN A(ONE) it I ;i �� f � : �• � I � 1 1.11111 E.�Ii .1,1II141Y1 f r jl �jII III' it �� r► !! i #€;"i=p9i#===lilli'i=it1#i�#'ii#riri�rc9ia.ii8iaicii5=E#is"rc9^iin99p9 ryPscir #3€siilit=°Ri cii==iii#1=iill'3u== i 9353=191111==9iiiPniitP99•ilii#3i#iii�i'1#=IRii9rf;•53tlr13iSi"#1i'##lr�iii'#i#i3' n=ii`riiipii3iiili'�3i=9n3 ': 0 r{ rilir, I Is i�� 0ll!!$ iipl;!!� , {{!{ {; $ 11 {ii3l6irG{ll��°�ii6{${iir tt O 'lll a III 11 i1},, v1 �i 1`I.1! I{I a8A' I t t,llll III:Ili' ,1.II' i 11 l l� i I Ill tl(lilj l!'I I I 1 h P R -� � � � 4!!r@Ill c l. . 1 llj lj uu 11 j,I Lii 13p 1 i m{1 1 111 fill III =i 973 illi jj I �I(Il�ijl�li 11 !I i:1; Ijj1 III ''i ,if I, `1J ill t if 7t 1141 I,I I 3 !ilrr. C $ n I'll 11 Nl`4,� rd i ti pI Ii'I � O 11 iii j�l 11,I �I�ijil`j If -ooa�° i3G= ° Z O Ii11 I v ! 'ILj -- - I�IIy' Ilj' �I �+�jul Wil lit i �i� ° {[i i =i!6 ' ! i !ii.r i 3 ii 3 i EXHIBIT F: Lot 7 -ELEVATIONS AND FLOOR PLANS - PLAN A(ONE) 0 I ........_ -.-.-_ Ov { ................. g ® ve $ Y i • ; I YI I I ....5-........................_ ' ----------- ISS - • a ; I Q i Illxaa++Y i _ _----- _ y .............. . 11 E .k., a o ............... ------------ _............ ..................... . _..._...:. ...._ ... ............_-.... 1 0 0 mill 9 I O • #� # � �€�'++1111. !�#1E lilt p .. OOO® 9 #gg E a � EXHIBIT F: ELEVATIONS AND FLOOR PLANS - PLAN A(ONE) ---------------Q BO 4-----------� � 4� f 'S QSR STP { y i{ I i 11 ill{! �€ 3 C� �7 EXHIBIT F:ELEVATIONS AND FLOOR PLANS - PLAN A(ONE) b- ————.� ------...... —fl a. i I I ----� --- oa aa' _--------- ----- -------------- z w ! g( � ; f €O 4 P � � �� � � � �I���' psp�ii•p�a�1 ��3 ��� ��.II �� � 61 N � i � �a�jti�I • .f� a: i � p � EXHIBIT F: ELEVATIONS AND FLOOR PLAN - PLAN B (TWO) :I 1 I ` II tt It111 Jill f I ll 8111 �jrillllfl l ( I I ���� �a�i 1 I I f I �11�i1' Ig ',I�t III�II:I:aEa I '�il�� +`11111 I II I I '1 III , 111 1 r a 11 I t1YL P I �� ����� E� , i � ilk i IIIb _ 1311111 I II _ I ##{rpirrllrargprRrit�rak{4gl=i�#lalislsopsa#aaSnlinn44{fret#P{nnli ri1#'s"'fill it#'#€p€=eCµs#s"Ca€€a'€Ig^'IpEaa iigl€ii€;g�gil�I�lllli�€€€'IgR11 I€( gg31�i�,i {€Illi"I� if�:�i �'� fl1#I11�gi�f11i111Iii1il�i� i '41 Illi a€{:e iuiai"gas{E#'a'€##!nr'tia€!#�Aps'!n#a i"{#"fs#•{,sstdfass'{43ia� N{+{###f'csir'#4�'i!#lssil#{ii!'s€€ntra � '.;�II�i�.i+. i lii li't:li' i�1i ��g'glllc g;lojli�i�a111 1{�lgglgllgf�f;t(i�l�ill����gi�l'!I I€�iil��gjgjll�IlpfGl g1i�1i�i1€1�i�lk f D � I,r;1' ;1,1'11 ' !� � �i`ti I,, ,I� ;I I,;� Q �'v 11111 Ito ! 6 fill q I ill� Iffl f11 flt(1� � I1jl+JIl�IIIII�'; (�l1' Il1,,11 , ,Ill i, Jil1 1,# of 10 Jill f� - r• � � Ilii I,I.,,:; utl tlllll I fff —, •-..; - yy pp q @ @ 1 i til 1 I�III ' .� t, I 1 1 NI.11 I i{ is S 6 D.O itl'IINNlll i i;t 1i1, IIIIIIIt"II i Er i � a 1 1 !1 i t ... ##. `c a . a i s a •p g cE•9'i I i � 1 1' 1 i p# a a a i i�• . €as o f � a ali �, "1i ga� f5i�1i ll•1 ;€I 1g��11fa i � I�lp i' of F - da '1 f1 a6 ii ff �;1 ,F@ggl€ fi Riaglgg 111 ; fiil 1 i° #f Fl#1p� �'isl �i1i i #li 11 " f €ia•1� 1€ SS EXHIBIT F: ELEVATIONS AND FLOOR PLAN -PLAN B(TWO) I I I I I � if i r E i iI E fi i rr So. o -- - .44 i ! I f r •/% " ..__._.............._.... ......................i......................................_..'..J.....................................:. J I sI al id €'I � i!) I� +ip!Ilill Hlrii')6 jig, � i a � 5 � i1�A��aaaiiiiiii!li gid�S�ill 3(�•'�a 5 R /�� !la,�� I� 1R i" R 'iS'� � a+ �I � • ���R93 �ai �RI � R i -�RggRR#� 6 i R j{j4R �I }( �It ':�� � 'oil il�d R a s aR! ( rill l ,� R°,ss� g 1 i ° !;' ! 7l7�' II = t6 f A r s j� 7 i I ® 000 EXHIBIT F: ELEVATIONS AND FLOOR PLAN -PLAN B(TWO) -•---------� ----------0 -----------p 01 q �i9 i i i it illl y I � EXHIBIT F: ELEVATIONS AND FLOOR PLAN - PLAN B (TWO) I 711 till f 001 --- l Z R N °� € log ESE e., sI ) i EXHIBIT G: EXTERIOR COLOR&MATERIAL SAMPLE BOARD 4 HOUSECOLORS 0: : 0, 490 B1 0 g M ;# H �sFtY"R \�a�r� .S,;•.yam 3 %.:,r'+s t �. 3.�Y iF5 i,iy�s€Ya�giaz :3417'''�sf„star#< e1c�� TRIM COLORS 3. 132 Arizona White '191 WWO 51no'd*Fa i31 A{�ite �E3 i l�c�isci:: ,ELK COMPOSITION ROOF (30 YEAR,PRESIQUE,HIGH jwAXjpLAArK FIBER CEMENT SIDING i 3tuJcevxxx!'' :YrstNae�r'rxl "t.t. la 1.. Cd r a�lrSfe�d2tt>^e,Ee�l>«ve���3 CULTURED STONE BRUSHED BRICK M rvr I Brushed EXHIBIT H: LANDSCAPE BUFFER PLAN &SECTIONS