HomeMy WebLinkAboutResolution 2003-062 RESOLUTION NO. 2003-062
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ATASCADERO APPROVING VESTING TENTATIVE
PARCEL MAP 2003-0040, A FOUR-LOT MAP CONSISTENT WITH
A PD-7 OVERLAY ZONE OF APN 029-081-003
(5516 Tunitas Avenue/Thibeault)
WHEREAS, an application has been received from Beauwest, LLC, (7400 Balboa
Atascadero, CA 93422) Applicant and Property Owner to consider a project consisting of a zone
change from RMF-10 (Residential Multi-Family) to RMF-10 / PD-7 (Residential Multi-Family
with Planned Development Overlay#7) with the adoption of a Master Plan of Development, and
a four lot residential Tentative Parcel Map on APN 029-081-003 and,
WHEREAS, the site's General Plan Designation is MDR (Medium-Density Residential);
and,
WHEREAS, the site's current zoning district is RMF-10 (Residential Multi-Family);
and,
WHEREAS, the Planning Commission has recommended that a site be rezoned to
include a PD-7 overlay with a Master Plan of Development thereby allowing a six lot
subdivision of the site; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act (CEQA)have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Parcel Map application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on September 16, 2003, studied and considered Tentative Parcel Map 2003-
0040, after first studying and considering the Proposed Mitigated Negative Declaration prepared
for the project; and,
WHEREAS, the Atascadero City Council, at a Public Hearing held on October 28, 2003,
studied and considered Vesting Tentative Parcel Map 2003-0040, after first studying and
considering the Draft Mitigated Negative Declaration prepared for the project; and,
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Atascadero:
City of Atascadero
Resolution No.2003-062
Page 2 of 15
SECTION 1. Findings of Approval for Vesting Tentative Parcel May:
1. The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
2. The design and improvement of the proposed subdivision is consistent with the General
Plan and applicable zoning requirements.
3. The proposed subdivision, as conditioned, is consistent with the proposed Planned
Development Overlay District#7 Master Plan of Development (CUP 2003-0094).
4. The site is physically suitable for the type of development proposed.
5. The site is physically suitable for the density of development proposed.
6. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
7. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
8. The design of the subdivision will provide a deed restriction on the colony house Parcel
D will include a deed restriction preventing the site from being subdivided or from being
altered which degrades the significance of the historic house.
9. Covenants, Conditions and Restrictions (CC&R's) shall be required that incorporate the
planned development conditions of approval to ensure that the site retains the historic
qualities (historic buildings, architecture, colors, materials, street amenities, fencing, and
landscaping) over time
10. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
11. Required 45-foot lot width for Parcel 4 (Unit C) is achieved with a 4-foot jog in the
property line to preserve the open front yard historic setting.
12. Standard guest parking space for Parcel 3 (Unit D) is not provided to preserve the historic
site setting.
SECTION 2. Approval. The Atascadero City Council in a regular session assembled on
October 28, 2003, resolves to approve Vesting Tentative Parcel Map (TPM 2003-0040) subject
to the following:
City of Atascadero
Resolution No.2003-062
Page 3 of 15
1. Exhibit A: Vesting Tentative Parcel Map 2003-0040
2. Exhibit B: Conditions of Approval/Mitigation Monitoring Program.
On motion by Council Member O'Malley, and seconded by Council Member Scalise, the
foregoing Resolution is hereby adopted in its entirety on the following roll call vote:
AYES: Council Members Luna, O'Malley, Pacas, Scalise and Mayor Clay
NOES: None
ABSENT: None
ADOPTED: October 28, 2003
CITY OF ATASCADERO
By:
Jerry IJClay, Sr., Mayo
ATTEST:
Ww��MLU�
Marcia McClure Torgerson, C.M. , City Clerk
APPROVED AS TO FORM:
(/ 4 C, �4&
Roy Vanley, City Att ey
City of Atascadero
Resolution No.2003-062
Page 4 of 15
Exhibit A:Vesting Tentative Parcel Map 2003-0040
R
E, its
ILo
e �
gg� b � l• �g r
oil 1IIt'i --�--
dL
r � .
N
ob
Nw wcx acro m-a-. 'ah.O.lK\b'�'^ro.wMrMro4��n\cuuo\2wLV.Mi
City of Atascadero
Resolution No.2003-062
Page 5 of 15
Exhibit B:Conditions Of Approval/Mitigation Monitoring Program
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measures
GP.Grading Permit PS:Planning Services
BP:Building PemA BS:Building Services
5516 Tunitas Avenue SIP:Subdivision FD:Fre Deparbnem
Ir provetnent Plans PD:Police Depariment
Vesting Tentative Parcel Map FM:Final Map CE:Cry Engineer
TO:Temporary OocuioiM WW:Wastewater
TPM 2003-0040 FI:Final inspection CA City Attorney
F0:Final Occupancy AMWC:Water Comp.
Planning Services
The approval of this Tentative Parcel Map shall not become FM PS
final and effective following approval of Zone Change
2003-0040 and CUP 2003-0094.
Approval of this Tentative Parcel Map shall be valid for two FM PS
years after its effective date. At the end of the period,
the approval shall expire and become null and void
unless an extension of time is granted pursuant to a
written request received prior to the expiration date.
The Community Development Department shall have the FM PS
authority to approve minor changes to the project that
(1) result in a superior site design or appearance,
and/or(2)address a design issue that is not substantive
to the Tentative Tract Map and that the Final Map is in
substantial conformance with the Tentative Map.
The Parcel Map shall be subject to additional fees for park or FM PS
recreation purposes (QUIMBY Act) as required by City
Ordinance.
The applicant shall record CC&R's for the subdivision FM PS
subject to the review and approval of the City Engineer,
City Attorney and Planning Services. The CC&R's shall
identify the maintenance responsibilities of all private
driveways, sewer facilities, drainage facilities, common
parking areas, site lighting, landscape areas, fencing,
and other common facilities. The CC&R's shall also
state that all exterior colors, exterior materials, yard
fencing and site landscaping shall be consistent with the
overall master plan of development.
The granting of this entitlement shall apply to the property On going PS
located at 5516 Tunitas Avenue (APN 029-081-003)
regardless of owner.
The Final Map shall be drawn in substantial conformance FM PS
with the approved tentative map, and in compliance
with all conditions set forth herein,shall be submitted for
review and approval in accordance with the Subdivision
Map Act and the City's Subdivision Ordinance.
City of Atascadero
Resolution No.2003-062
Page 6 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP Grading Perini! PS:Planning Services
ea
5516 Tunitas Avenue SIP Building FD:�laDs�ent
Improvement Plans PD:P*e Deperlrnent
Vesting Tentative Parcel Map FM:Final Map CE:City Engineer
TO:Temporary Occrpericy WW:Wastewater
TPM 2003-0040 Fe Final inapectlon CA:CITY Altmey
F0:Final Occupancy AMWC:Water Comp.
The subdivider shall defend, indemnify, and hold harmless FM PS
the City of Atascadero or its agents, officers, and
employees against any claim or action brought to
challenge an approval by the city, or any of its entities,
concerning the subdivision.
Affordable Housing Requirement: The applicant shall either FM PS,CE
set aside one housing unit at the moderate category
rate for a period of 30 years,or pay an in-lieu fee based
on 2.50% of the valuation of each of the market rate
units.
The colony house lot shall include a deed restriction GP PS,CE
preventing the site from being subdivided or from
being altered,which degrades the historic
significance of the property.
The applicant will be required to record CC&R's for the FM PS,CE
map that will include maintenance and access of
common areas.
Building Services
11. A soils investigation prepared by a licensed FM PS,BS,CE
Geotechnical Engineer is to be provided for the
project. The report is to be provided at the time of
building permit submittal along with the building plans
for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
Fire Marshal
12. Driveway to be paved with decorative pavers. Final FM PS,CE
paver selection to compliment historic colony house,
subject to staff approval.
13. Show location of existing and any proposed fire FM CE
hydrants.
14. Provide a letter from the Atascadero Mutual FM CE
Water Company stating the minimum expected
water available to the site. Amount available
must meet minimum requirement specified in the
California Fire Code.
15. Note that approved address signage is to be FM CE
provided.
16. Note on plans that fire lanes shall be delineated FM CE
to restrict parking as required by the Fire
Authority.
City Engineer
Standard Conditions
City of Atascadero
Resolution No.2003-062
Page 7 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Penit PS:Planning Services
5516 Tunitas Avenue SIP Building
dbddWiDiDn FD:Frea�m nt
Improvement Plans PD:Police Departrnent
Vesting Tentative Parcel Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:wastewater
TPM 2003-0040 s:Final inspection CA:city Agomey
F0:Final Occupancy AMWC:Water Cane.
Standard Conditions
17. In the event that the applicant is allowed to bond for BP BS
the public improvements required as a condition of
this map,the applicant shall enter into a Subdivision
Improvement Agreement with the City Council.
18. An engineer's estimate of probable cost shall be BP PW
submitted for review and approval by the City
Engineer to determine the amount of the bond.
19. The Subdivision Improvement Agreement shall record BP PW
concurrently with the Final Map.
20. All public improvements shall be constructed in BP PW
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings or
as directed by the City Engineer.
21. The applicant shall enter into a Plan Check/inspection BP BS
agreement with the City.
22. The applicant shall be responsible for the relocation BP PW
and/or alteration of existing utilities.
23. The applicant shall install all new utilities (water, gas, BP BS
electric, cable TV and telephone) underground.
Utilities shall be extended to the property line frontage
of each lot or its public utility easement.
24. The applicant shall monument all property corners for BP PW
construction control and shall promptly replace them
if disturbed.
25. A preliminary subdivision guarantee shall be BP PW
submitted for review in conjunction with the
processing of the parcel map.
26. All existing and proposed utility, pipeline, open space, BP PS/PW
or other easements are to be shown on the parcel
map. If there are building or other restrictions related
to the easements, they shall be noted on the parcel
map. The applicant shall show all access restrictions
on the parcel map.
27. Prior to recording the parcel map, the applicant shall SP PS/PW
submit a map drawn in substantial conformance with
the approved tentative map and in compliance with all
conditions the City in accordance with the Subdivision
Map Act and the City's Subdivision Ordinance forth
herein shall submit set for review and approval.
City of Atascadero
Resolution No.2003-062
Page 8 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP;Building Pemit BS:Building Services
5516 Tunitas Avenue SMP.subdh4bn m:FeeDepamnent
Improvement Plans PD:Poke Deparlrrent
Vesting Tentative Parcel Map PM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TPM 2003-0040 FI;Final inspection CA Cily Atlomey
F0:Final Oawpamy AMWC:Water Comp.
28. Prior to recording the parcel map, the applicant's BP PW
surveyor shall set monuments at all new property
corners or shall indicate, by certificate on the final
map, that corners have been set or shall be set by a
date specific and that they will be sufficient to enable
the survey to be retraced.
29. Prior to recording the parcel map, the applicant shall BP BS
pay all outstanding plan checklinspection fees.
30. Prior to recording the parcel map, the applicant shall BP PW
have the map reviewed by all applicable public and
private utility companies (cable, telephone, gas,
electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility
company, which indicates their review of the map.
The letter shall identify any new easements, which
may be required by the utility company. A copy of the
letter shall be submitted to the City. New easements
shall be shown on the parcel map.
31. Upon recording the final map, the applicant shall BP PW
provide the City with a black line clear Mylar(0.4 mil)
copy and a blue line print of the recorded map.
32. Prior to the final inspection of any public SP PW
improvements, the applicant shall submit a written
statement from a registered civil engineer that all
work has been completed and is in full compliance
with the approved plans.
City Engineer
Site Specific Conditions
33. The applicant shall construct new curb and gutter,in BP PS/PW
accordance with City Standards,as shown on
improvement plans,along entire frontage.
34. The applicant shall saw cut and remove existing BP PW
asphalt concrete roadway as shown on plans and
repave to new curb and gutter,in accordance with
City Standards.
35. The applicant shall address storm water detention BP PW
prior to grading and drainage approval.
36. The applicant shall pay sewer Extension(Annexation) BP PW
and Connection fees upon issuance of building
permit.
City of Atascadero
Resolution No.2003-062
Page 9 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pernik PS:Planning Services
BP:Building Pernik BS:Building Services
5516 Tunitas Avenue SIP:SubdNtsbn FD:FireDepedment
Irryxovement Plans PD:Police Deperinierd
Vesting Tentative Parcel Map FM:Final Map CE:Oily Engineer
TO:Terrporery Occupancy WW:Wastewater
TPM 2003-0040 FI:Final inspectbn CA:Gily AWiney
FO:Final Occupancy AMWC:Water Comp.
37. Each building shall be individually connected to the BP PW
public sewer via a 4"gravity lateral to which each
individual 2"force main will be connected.
38. Building plans shall be include detail of sewage BP BS
sumps and pumps,control panel and alarm systems.
Atascadero Mutual Water Company
39. Prior to the recordation of the Final Parcel Map,the BP BS
applicant shall submit plans showing the water
distribution facilities required to serve the project for
review and approval by the Atascadero Mutual Water
Company.All new water distribution facilities shall be
constructed in conformance with Atascadero Mutual
Water Company Standards.
40. Prior to the recordation of the Final Map,the applicant BP BS
shall obtain a"Will Serve"letter from the Atascadero
Mutual Water Company.
41. Prior to issuance of building permits,the applicant BP BS
shall pay all installation and connection fees required
by the Atascadero Mutual Water Company.
42. Show all fire suppression appurtenances required by BP BS
the Atascadero Fire Department.
43. Prior to the recordation of the Final Parcel Map,the BP BS
applicant shall submit plans showing the water
distribution facilities required to serve the project for
review and approval by the Atascadero Mutual Water
Company.All new water distribution facilities shall be
constructed in conformance with Atascadero Mutual
Water Company Standards.
44. A 5-foot drainage easement shall be recorded on the BP PW
final map along the south property line of Parcel A
and Parcel B and the east property line of Parcel B.
45. Existing drainage patterns from adjacent properties BP PW
shall not be obstructed.
46. All drainage from improvements shall cross property BP PW
lines within drainage easements.
Mitigation Measures
Mitigation Measure 1.c.1: If exterior lighting is proposed,it BP PS
shall be designed to eliminate any off site glare. All exterior
site lights shall utilize full cut-off,"hooded"lighting fixtures to
prevent offsite light spillage and glare. Any luminaire pole
height shall not exceed 16-feet in height, limit intensity to 2.0
City of Atascadero
Resolution No.2003-062
Page 10 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Penmit PS:Planning Senkes
BP:Building Perna BS:Building Services
5516 Tunitas Avenue SIP:Subdivision FD:Fire Department
ImprovementPlans PD:Police Departrnent
Vesting Tentative Parcel Map FK Final ft CE CiV Engineer
TO:Temporary Occupancy WW:Wastewater
TPM 2003-0040 FI:Final inspection Ca CAy Attorney
F0:Final Occuparwy AMWC:Water Corrq.
foot candles at ingress/egress,and otherwise 0.6 foot candle
minimum to 1.0 maximum within the private street. Fixtures
shall be shield cut-off type and compatible with historic setting,
subject to staff approval.
Mitigation Measure 3.b.1: The project shall be conditioned to BP BS 3.b.1
comply with all applicable District regulations pertaining to the
control of fugitive dust(PM-10)as contained in sections 6.3,
6.4 and 6.5 of the April 2003 Air Quality Handbook.
Section 6.3: Construction Eau0ment
• Maintain all construction equipment in proper tune
according to manufacturer's specifications.
• Fuel all off-road and portable diesel powered
equipment,including but not limited to bulldozers,
graders,cranes,loaders,scrapers,backhoes,
generator sets,compressors,auxiliary power units,
with ARB certified motor vehicle diesel fuel(Non-
taxed version suitable for use off-road).
• Maximize to the extent feasible,the use of diesel
construction equipment meeting the ARB's 1996 or
newer certification standard for off-road heavy-duty
diesel engines.
• Install diesel oxidation catalysts(DOC),catalyzed
diesels particulate filters(CDPF)or other District
approved emission reduction retrofit services
(Required for projects grading more than 4.0 acres of
continuously worked area).
Section 6.4: Activity Management Techniques
IS Develop a comprehensive construction activity
management plan designed to minimize the amount
of large construction equipment operating during any
given time period.
• Schedule of construction truck trips during non-peak
hours to reduce peak hour emissions.
• Limit the length of the construction workday period, if
necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fuaitive PM10
All of the following measures shall be included on grading,
demolition and building plan notes:
A. Reduce the amount of the disturbed area where possible.
B. Use of water trucks or sprinkler systems in sufficient
quantities to prevent airborne dust from leaving the site.
Increased watering frequency would be required
whenever wind speeds exceed 15 mph. Reclaimed(non-
potable)water should be used whenever possible.
C. All dirt stockpile areas should be sprayed daily as needed.
D. Permanent dust control measures identified in the
City of Atascadero
Resolution No.2003-062
Page 11 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pernik PS:Planning Servkres
BP:Building PermN BS:Buildding Services
5516 Tunitas Avenue SIP:Subdivision FD:Fire DeparNrent
Improvement Plans PD:Police Department
Vesting Tentative Parcel Map FM:Final Map CE:City Engineer
TO:Tenporary Occupancy WW:Wastewater
TPM 2003-0040 F7:Final inion CA Cily Attorney
F0:Final Occupancy AMWC:Water Comp.
approved project re-vegetation and landscape plans
should be implemented as soon as possible following
completion of any soil disturbing activities.
E. Exposed ground areas that are plann4ed to be reworked
at dates greater than one month after initial grading should
be sown with a fast-germinating native grass seed and
watered until vegetation is established.
F. All disturbed soil areas not subject to re-vegetation should
be stabilized using approved chemical soil binder,jute
netting,or other methods approved in advance by the
APCD.
G. All roadways,driveways,sidewalks,etc,to be paved
should be complete as soon as possible. In addition,
building pads should be laid as soon as possible after
grading unless seeding or soil binders are used.
H. Vehicle speed for all construction vehicles shall not
exceed 15 mph on any unpaved surface at the
construction site.
I. All trucks hauling dirt,sand,soil,or other loose materials
are to be covered or should maintain at least two feet of
freeboard(minimum vertical distance between top of load
and top of trailer) in accordance with CVC Section 23114.
J. Install wheel washers where vehicles enter and exit
unpaved roads onto streets,or was off trucks and
equipment leaving the site.
K. Sweep streets at the end of each day if visible soil
material is carried onto adjacent paved roads. Water
sweepers with reclaimed water should be used where
feasible.
L. The contractor or builder shall designate a person or
persons to monitor the dust control program and to order
increased watering,as necessary,to prevent transport of
dust off site. The name and telephone number of such
persons shall be provided to the APCD prior to land use
clearance for map recordation and land use clearance for
finish grading of any structure.
Mitigation Measure 4.e.1: The building permit site plan shall GP BS 4.e.1
identify all protection and enhancement measures
recommended by the Certified Arborist in the Tree Protection
Plan.Tree protection fencing shall be installed at the locations
called out in the Tree Protection Plan.
Mitigation Measure 4.e.2: The developer shall contract with a GP BS 4.e.2
certified arborist during all phases of project implementation.
The certified arborists shall be responsible for monitoring the
project during all phases of construction through project
completion,as follows:
(a). A written agreement between the arborist and the
developer outlining a arborist monitoring schedule for
each construction phase through final inspection shall be
City of Atascadero
Resolution No.2003-062
Page 12 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Graft Perak PS:Planning Services
BP:Bull ft Perak BS:Building Services
5516 Tunitas Avenue SIP:Subdivision FD:FaNparinneM
Improvement Plans PD:P*9 Deparbnent
Vesting Tentative Parcel Map FM:Final Map CE:Cay Engineear
T0:Temporary Occupancy WW:Wastewater
TPM 2003-0040 FI:Foal inspection CA city Atbmey
FO:Flnal Occupancy AMWC:Water Comp.
submitted to and approved by planning staff prior to the
issuance of building/grading permits.
(b). Arborist shall schedule a pre-construction meeting with
engineering/planning staff,grading equipment operators,
project superintendent to review the project conditions and
requirements prior to any grubbing or earth work for any
portion of the project site. All tree protection fencing and
trunk protection shall be installed for inspection during the
meeting. Tree protection fencing shall be installed at the
line of encroachment into the tree's root zone area.
(c). As specified by the arborist report and City staff:
■ Prune all trees to be saved for structural strength and
crown cleaning by a licensed and certified arborist;
■ Remove all debris and spoils from the lot cleaning
and tree pruning.
■ All trenching or grading within the protected root zone
area,outside of the tree protection fence shall require
hand trenching or preserve and protect roots that are
larger than 2 inches in diameter.
■ No grading or trenching is allowed within the fenced
protected area.
■ Any roots that are 4 inches in diameter or larger are
not to be cut until inspected and approved by the on-
site arborist.
■ Apply any additional recommendations of the project
arborist.
(d). Upon project completion and prior to final occupancy a
final status report shall be prepared by the project arborist
certifying that the tree protection plan was implemented,
the trees designated for protection were protected during
construction, and the construction-related tree protection
measures are no longer required for tree protection.
Mitigation Measure 4.e.3: Project manager should be GP BS 4.e.3
responsible for instructing workers about tree protection goals,
implementing protection of root zones, and installing and
maintaining protective fencing.
Mitigation Measure 4.e.4: Protective fencing is required GP BS 4.e.4
between all construction activities and native trees. The
fencing shall consist of five-foot tall orange plastic,with steel t-
posts sunk into the ground, eight feet apart. The fencing shall
be installed prior to any site disturbance or construction, and
shall remain in place until all construction is complete.
Mitigation Measure 4.e.5: No grading,trenching, materials GP BS 4.e.5
storage,soil storage,debris,or site disturbance shall occur
within the protected area. No concrete,plaster,or paint
washout shall be allowed within the tree protection zone.
City of Atascadero
Resolution No.2003-062
Page 13 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Penmil PS:Planning SwAm
5516 Tunitas Avenue
BP:Building
�:FireDeepaM�s
Inpiwemai Plans PD:Polbe Department
Vesting Tentative Parcel Map FM:Final Map CE:City Engineer
M.Temporary Occupancy WW:Wastewater
TPM 2003-0040 Fl;FineI InsWiDn Ca city Agomey
FO:Anal ftuparwy AMWC:Water Comp.
Mitigation Measure 4.e.6: Excavation for buildings A and B GP BS 4.e.6
shall employ techniques that minimize the amount of soil
removed. Vertical cuts are preferred. Any back cuts greater
than six feet from the north wall of building A and west wall of
building B,shall be supported with shoring.
Excavation for the west side of building B, the north side of
building A, shall be done using special procedures for the
upper three feet of soil, to avoid tearing of roots. Heavy
equipment may be used to remove soil to within two feet of the
anticipated edge of cut. Then roots will be uncovered by hand,
and cut cleanly with a sharp hand saw at the lie of finish cut.
This will avoid tearing of roots. The soil may then be removed,
using heavy equipment. Below three feet depth, heavy
equipment may be used for the entire excavation.
Construction of sidewalk and steps from Rosario Avenue to
buildings A and B shall minimize excavation to less than four
inches of cut or fill below the walk.
Mitigation Measure 4.e.7: If living roots two inches in diameter GP BS 4.e.7
or more are encountered during trenching or excavation,they
shall be cleanly cut by the contractor,with a sharp handsaw,to
remove the frayed end. Do no paint the cut ends of roots.
Keep the roots moist by covering the excavation edge with
plastic sheeting. Backfill the excavation as soon as possible.
Mitigation Measure 4.e.8: Excavation for the west side of GP BS 4.e.8
garage D will be by hand in all areas within fifteen feet of the
trunk of tree #1. Any large roots encountered will be
preserved, and the foundation will span over the root.
Cushioning for the root shall be blocks of Styrofoam, four
inches thick,over the top and sides of the root.
Mitigation Measure 4.e.9: Tree pruning should be done by a GP BS 4.e.9
qualified ISA certified arborist or ISA tree worker. A.N.S.I.A-
300 and Z-133 standards for tree care and the City Of
Atascadero Tree Ordinance shall be used and followed at all
times.
Mitigation Measure 5.a.1: The proposed project shall GP PS,BS,CE 5.a.1
incorporate the Secretary of the Interior's Standards and
Illustrated Guidelines for Rehabilitating Historic Buildings. The
standards shall apply to the exterior rehabilitation of the
Colony house,construction of the new detached garage for the
colony house,design of the proposed three homes,and
proposed landscape improvements to the overall project site,
subject to staff review and approval.
Mitigation Measure 5.a.2: Replacement of any exterior GP PS,SS,CE 5.a.2
materials or design features on the original colony homes shall
be consistent with the Secretary of the Interior's Standards and
Illustrated Guidelines for Rehabilitating Historic Buildings. This
shall include the replacements of any doors and windows with
City of Atascadero
Resolution No.2003-062
Page 14 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
5516 Tunitas Avenue SIP:Subdivisbn FD:Fre Departmem
Impmvemerd Plans PD:Police DepaMrent
Vesting Tentative Parcel Map FiN:Final Map CE:City Engineer
T0:Temporary Occupancy WW:Wastewater
TPM 2003-0040 FI:Final'wispecdon ca city Attomey
FO:Final Occupancy AMWO:Water Oar p.
solid wood framing of similar design and appearance. Vinyl,
vinyl-cladding,and metal materials are not permitted.
Mitigation Measure 5.a.3: The proposed project shall include GP PS,BS,CE 5.a.3
Covenants,Conditions and Restrictions(CC&R's)or
equivalent mechanism that incorporate the planned
development conditions of approval to ensure that the site
retains the historic qualities(historic buildings,architecture,
colors,materials,fencing,and landscaping)overtime.
Mitigation Measure 5.b.1: Should any cultural resources be GP PS,BS,CE 5.b.1
unearthed during site development work,the provisions of
CEQA-Section 15064.5,will be followed to reduce impacts to
a non-significant level.
Mitigation Measure 6.b.1:The grading permit application plans GP,BP PS,BS,CE 6.13.1
shall include erosion control measures to prevent soil,dirt,and
debris from entering the storm drain system during and after
construction. A separate plan shall be submitted for this
purpose and shall be subject to review and approval of the City
Engineer at the time of Building Permit application.
Mitigation Measure 6.b.2: All cut and fill slopes shall be hydro GP,BP PS,BS,CE 6.b.2
seeded with an appropriate erosion control method(erosion
control blanket,hydro-mulch,or straw mulch appropriately
anchored)immediately after completion of earthwork between
the months of October 15 through April 15. All disturbed
slopes shall have appropriate erosion control methods in
place. Duration of the project: The contractor will be
responsible for the clean up of any mud or debris that is
tracked onto public streets by construction vehicles.
Mitigation Measure 6.c.d: Asoils report shall be required to be GP,BP PS,BS,CE 6.c.d.1
submitted with a future building permit by the building
department.The building plans will be required to follow the
recommendations of the soils report to assure safety for
residents and buildings.
Mitigation Measure 6.d.1: All recommendations contained GP,BP PS,BS,CE 6.d.1
within the project geotechnical investigation by GSI dated
2/27/03 shall be incorporated into the building plans and
adhered to during construction through project completion.
Mitioation Measure 8e.f.1: A Storm Water Pollution Prevention BP PS,BS,CE 8.e11
Plan (SWPPP)/Erosion Control Plan shall be submitted and
approved by the City Engineer prior to the issuance of the
building permit. The plan shall include storm water measures
for the operation and maintenance of the project for the review
and approval of the City Engineer. The Building Permit
application plans shall identify Best Management Practices
(BMPs) appropriate to the uses conducted on site that
effectively prohibit the entry of pollutants into storm water
runoff.
City of Atascadero
Resolution No.2003-062
Page 15 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading PermM PS:Planning Services
BP:Building Pemit BS:Building Services
5516 Tunitas Avenue SIP:Subdivision FD:Fire Department
Ir provement Plans PD:Police Depedmerd
Vesting Tentative Parcel Map FM:Final Map CE:Cily Engineer
T0:Temporary occupancy WW:Wastewater
TPM 2003-0040 Fl:Final i nspeakri Ca city Attomey
F0:Final Occupancy AMWC:Water Comp.
Mitigation Measure 8.e.f.2: The developer is responsible for BP PS,BS,CE 8.e.f.2
ensuring that all contractors are aware of all storm water
quality measures and that such measures are implemented.
Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction
notices,citations,or stop orders.
Mitigation Measure 11.d.1: All construction activities shall GP,BP PS,BS,CE 11.d.1
comply with the City of Atascadero Noise Ordinance for hours
of operation.
Construction activities shall be limited to the following hours of
operation:
• 7 a.m.to 7 p.m. Monday through Friday
• 9 a.m.to 6 p.m. Saturday
• No construction on Sunday
Further,particularly loud noises shall not occur before 8 a.m.
on weekdays and not at all on weekends.
The Community Development Director upon a determination
that unusually loud construction activities are having a
significant impact on the neighbors may modify the hours of
construction.
Failure to comply with the above-described hours of operation
may result in withholding of inspections and possible
construction prohibitions,subject to the review and approval of
the Community Development Director.
A sign shall be posted on-site with the hours of operation and
a telephone number of the person to be contacted in the event
of any violations. Staff shall approve the details of such a sign
during the Grading Plan/Building Permit review process.