Loading...
HomeMy WebLinkAboutResolution 2003-061 RESOLUTION NO. 2003-061 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ATASCADERO APPROVING CONDITIONAL USE PERMIT 2003-0094, ADOPTING A MASTER PLAN OF DEVELOPMENT FOR THE PD-17 OVERLAY ZONING DISTRICT ON APN 029-081-003 (5516 Tunitas Avenue/Thibeault) WHEREAS, an application has been received from Beauwest, LLC (7400 Balboa Road, Atascadero, CA 93422) Applicant and Property Owner to consider a project consisting of a zone change from RMF-10 (Residential Multi-Family) to RMF-10 / PD-7 (Residential Multi-Family with Planned Development Overlay#7) with the adoption of a Master Plan of Development, and a four lot residential Tentative Parcel Map on APN 029-081-003 and, WHEREAS, the site's General Plan Designation is MDR (Medium-Density Residential); and, WHEREAS, the site's current zoning district is RMF-10 (Residential Multiple-Family); and, WHEREAS, the Planning Commission has recommended that a site be rezoned to include a PD-7 overlay district which requires the adoption of a Master Plan of Development; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA)have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Change application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of Development; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on Tuesday, September 16, 2003, studied and considered the Master Plan of Development (CUP 2003-0090), after first studying and considering the Proposed Mitigated Negative Declaration prepared for the project, and WHEREAS, the Atascadero City Council, at a Public Hearing held on October 28, 2003, studied and considered the Master Plan of Development (CUP 2003-0094) for Zone Change 2003-0045, after first studying and considering the Draft Mitigated Negative Declaration prepared for the project, and, NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Atascadero: City of Atascadero Resolution No.2003-061 Page 2 of 25 SECTION 1. Findings for Approval of Master Plan of Development. The City Council finds as follows: 1. The proposed project or use is consistent with the General Plan and the City's Appearance Review Manual; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance)including the PD-7 Ordinance; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. 6. Proposed project incorporates the U.S. Secretary of the Interior's Standards and Illustrated Guidelines for Rehabilitating Historic Buildings. 7. Required 45-foot lot width for Parcel 4 (Unit C) is achieved with a 4-foot jog in the property line to preserve the open front yard historic setting. 8. Standard guest parking space for Parcel 3 (Unit D) is not provided to preserve the historic site setting. SECTION 2. Approval. The Atascadero City Council, in a regular session assembled on October 28, 2003, resolved to approve Conditional use Permit 2003-0094, a Master Plan of Development for Zone Change 2003-0045 subject to the following: 1. EXHIBIT A: Conditions of Approval/Mitigation Monitoring Program 2. EXHIBIT B: Site Plan/Vesting Tentative Parcel Map 3. EXHIBIT C: Statistical Summary Project 4. EXHIBIT D: Landscape Plan 5. EXHIBIT E: Grading and Drainage Plan 6. EXHIBIT F: Unit A&B Elevations 7. EXHIBIT G: Unit C Elevations 8. EXHIBIT H: Unit A &B Floor Plans 9. EXHIBIT I: Unit C Floor Plans 10. EXHIBIT J: Exterior Color&Material Sample Board City of Atascadero Resolution No.2003-061 Page 3 of 25 On motion by Council Member O'Malley and seconded by Council Member Scalise, the foregoing Resolution is hereby adopted in its entirety on the following roll call vote: AYES: Council Members Luna, O'Malley,Pacas, Scalise and Mayor Clay NOES: None ABSENT: None ADOPTED: October 28, 2003 CITY OF ATASC By: HL. Clarr."Mayor pdgi�� fil ATTEST: J, Marcia McClure Torgerson, C.M.C., ity Clerk APPROVED AS TO FORM: 131-� 2"�� Roy . Hanley, City At rney City of Atascadero Resolution No.2003-061 Page 4 of 25 EXHIBIT A. Conditions of Approval/Mitigation Monitoring Program PD-17 Master Plan of Development(CUP 2003-0098)/ZCH 2003-0048 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 5516 Tunitas Avenue GP:GmdkV Nm it FD:Fre Deparlrnerd BP:Building Permit PD:Porte Department PD-7 Master Plan of Development Fl:Final Inspection CE:City Engineer TO:Tenporary Occupancy WW:Wastewater CUP 2003-0094/ZCH 2003-0045 FO:Final Occupancy CA Citymomey Planning Services 1. The approval of this zone change and use permit shall PS become final and effective following City Council approval. 2. Approval of this Master Plan of Development shall be FM PS valid concurrently with the life of Tentative Parcel Map 2003-0040 and then indefinitely following final map. The Master Plan of Development approval shall expire and become null and void unless a final map is recorded consistent with the Master Plan of Development. 3. Changes to the Master Plan of Development shall be On-going PS approved by the Planning Commission and do not require Council action. 4. The Community Development Department shall have BP/FM PS the authority to approve the following minor changes to the project the(1)modify the site plan project by less than 10%,(2)result in a superior site design or appearance, and/or(3)address a construction design issue that is not substantive to the Master Plan of Development. The Planning Commission shall have the final authority to approve any other changes to the Master Plan of Development and any associated Tentative Maps. 5. All subsequent Tentative Parcel Map and construction BP/FM PS permits shall be consistent with the Master Plan of Development contained herein. 6. All exterior elevations,finish materials and colors shall BP PS be consistent with the Master Plan of Development as shown in Exhibit F,G,H,t,and J. 7. All site development shall be consistent with the BP/FM PS maximum intensities described in the statistical project summary as shown on EXHIBIT C. 8. All site work,grading and site improvements shall be BP/FM PS consistent with the Master Plan of Development as shown in EXHIBIT B,C,D,E,F,G,H,I,and J. 9. A final landscape and irrigation plan shall be approved BP PS prior to the issuance of building permits and included as art of site improvement plan consistent with EXHIBIT D. City of Atascadero Resolution No.2003-061 Page 5 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Service BL:Business License BS:Building Services 5516 Tunitas Avenue GP:Grading Perm! FD:Fire DepeNnent BP:Building Penr t PD:Poise DepaMient PD-7 Master Plan of Development R:Final Inspectbn CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0094/ZCH 2003-0045 FO:Final Occupancy CA:Cq ftmey All exterior meters,air conditioning units and mechanical equipment shall be screened with landscape material. Trash/recycle container areas shall be screened with fencing or landscape. All front,side,rear yards shall be landscaped by the developer. All landscape maintenance shall be the responsibility of the individual property owner. Add one front yard shade tree to Parcel 4. All trees to be 15-gallon size and double staked. 10. All project fencing shall be installed consistent with BP PS EXHIBIT D subject to the following modifications. a. The front yards adjacent to Tunitas Avenue(Parcels C&D)shall not be enclosed with any fencing,which exceeds 3-feet in height. b. The design of all fencing shall be compatible with the overall project design,subject to staff approval. c. Front yard drainage detention basin shall extend over proposed lots 3 and 4 to provide a shallower basin. Basin shall be designed to appear as front lawn. 11. Retaining walls visible for the street shall incorporate GP PS design&materials to match or compliment the texture and BP color of the primary residence. Rear yard retaining walls may be designed to blend with the proposed landscaping. 12. Affordable Housing Requirement: The applicant shall FM,BP PS,CE either set aside one housing unit at the moderate category rate for a period of 30 years,or pay an in-lieu fee based on 2.50%of the valuation of each of the market rate units. Workforce Housing Prior to recordation of final map,the applicant shall enter into a legal agreement with the City to reserve 1/z of the units for sale to residents or workers within the City of Atascadero, including the affordable units. The agreement shall include the following provisions: ■ The units shall be offered for sale to residents or workers within the City of Atascadero for a minimum of 60-days. During this time period offers may only be accepted from Atascadero residents or workers; City of Atascadero Resolution No.2003-061 Page 6 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 5516 Tunitas Avenue GP:Grading Permil FID:Fkeoepadrnant BP:Buildig Permit PD:Ponce DeWrnerd PD-7 Master Plan of Development FI:Final Inspection CE:Ck Engineer To:Temporary occupancy WW:Wastewater CUP 2003-00942CH 2003-0045 FO.Final owupanry Ca OV attomay ■ The applicant shall provide reasonable proof to the City that at least one of the qualified buyers is a resident or worker within the City Limits of Atascadero; ■ The Atascadero resident or worker restriction shall apply to the initial sale only; ■ The applicant shall identify which units will be reserved;and The City Attorney shall approve the final form of the agreement. b. All exterior material finishes(wood, BP PS materials,lighting,garage doors)shall be durable,high quality,and consistent with the historically compatible appearance. 14. The colony house lot shall include a deed restriction FM PS,CE preventing the site from being subdivided or from being altered,which degrades the historic significance of the property. Building Services 15. A soils investigation prepared by a licensed BP FM Geotechnical Engineer is to be provided for the project. The report is to be provided at the time of building permit submittal along with the building plans for review by the Building Division. Recommendations contained in the report are to be incorporated into the project plans. Fire Marshal 16. Driveway to be paved with decorative pavers. Final BP PS,BS paver selection to compliment historic colony house, subject to staff approval. 17. Show location of existing and any proposed fire BP BS hydrants. 18. Provide a letter from the Atascadero Mutual Water BP BS Company stating the minimum expected water available to the site. Amount available must meet min. requirement specified in the California Fire Code. 19. Note approved address signage is to be provided. BP BS City of Atascadero Resolution No.2003-061 Page 7 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program (Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 5516 Tunitas Avenue GP.Grading Pemit FD:Fre Department BP:Building Permit PD:Police Department PD-7 Master Plan of Development FI:Final Inspection CE City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-0094/ZCH 2003.0045 FO:Final Occupancy CkCkyAWmey 20. Note on plans that fire lanes shall be delineated to BP BS restrict parking as required by the Fire Authority. City Engineer Standard Conditions 21. In the event that the applicant is allowed to bond for BP BS the public improvements required as a condition of this map,the applicant shall enter into a Subdivision Improvement Agreement with the City Council. 22. An engineer's estimate of probable cost shall be BP PW submitted for review and approval by the City Engineer to determine the amount of the bond. 23. The Subdivision Improvement Agreement shall record BP PW concurrently with the Final Map. 24. All public improvements shall be constructed in BP PW conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer. 25. The applicant shall enter into a Plan Check/Inspection BP BS agreement with the City. 26. The applicant shall be responsible for the relocation BP PW and/or alteration of existing utilities. 27. The applicant shall install all new utilities (water, gas, BP BS electric, cable TV and telephone) underground. Utilities shall be extended to the property line frontage of each lot or its public utility easement. 28. The applicant shall monument all property corners for BP PW construction control and shall promptly replace them if disturbed. 29. A preliminary subdivision guarantee shall be BP PW submitted for review in conjunction with the processing of the parcel map. 30. All existing and proposed utility, pipeline, open space, BP PS/PW or other easements are to be shown on the parcel map. If there are building or other restrictions related to the easements, they shall be noted on the parcel map. The applicant shall show all access restrictions on the parcel map. 31. Prior to recording the parcel map, the applicant shall BP PS/PW submit a map drawn in substantial conformance with the approved tentative map and in compliance with all conditions the City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance forth City of Atascadero Resolution No.2003-061 Page 8 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business Lbenae BS:Building Services 5516 Tunitas Avenue GP:Grading Perm* FD:Fre Department BP:Building Pam* PD:Poke Department PD-7 Master Plan of Development Fl:Final Inspection CE:Cily Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-00941ZCH 2003-0045 FO:FinalOocupancy CA-c*y,anomey herein shall submit set for review and approval. 32. Prior to recording the parcel map, the applicant's BP PW surveyor shall set monuments at all new property corners or shall indicate, by certificate on the final map, that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. 33. Prior to recording the parcel map, the applicant shall BP BS pay all outstanding plan check/inspection fees. 34. Prior to recording the parcel map, the applicant shall SP PW have the map reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company, which indicates their review of the map. The letter shall identify any new easements, which may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the parcel map. 35. Upon recording the final map, the applicant shall BP PW provide the City with a black line clear Mylar(0.4 mil) copy and a blue line print of the recorded map. 36. Prior to the final inspection of any public BP PW improvements, the applicant shall submit a written statement from a registered civil engineer that all work has been completed and is in full compliance with the approved plans. City Engineer Site Specific Conditions 37. The applicant shall construct new curb and gutter, in BP PS/PW accordance with City Standards,as shown on improvement plans,along entire frontage. 38. The applicant shall saw cut and remove existing BP PW asphalt concrete roadway as shown on plans and repave to new curb and gutter,in accordance with City Standards. 39. The applicant shall address storm water detention BP PW prior to grading and drainage approval. 40. The applicant shall pay sewer Extension(Annexation) BP PW and Connection fees upon issuance of building permit. City of Atascadero Resolution No.2003-061 Page 9 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 5516 Tunitas Avenue GP:GradNPemd FD:FnDapartmant BP:Building Permit PD:Police Depadrnem PD-7 Master Plan of Development Fl:Final lnspaftn CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2003-00941ZCH 2003-0045 FO:Final Occupancy CA Cityftiney 41. Each building shall be individually connected to the BP PW public sewer via a 4"gravity lateral to which each individual 2"force main will be connected. 42. Building plans shall be include detail of sewage BP BS sumps and pumps,control panel and alarm systems. 43. A 5-foot drainage easement shall be recorded on the BP PW final map along the south property line of Parcel A and Parcel B and the east property line of Parcel B. 44. Existing drainage patterns from adjacent properties BP PW shall not be obstructed. 45. All drainage from improvements shall cross property BP PW lines within drainage easements. Atascadero Mutual Water Company 46. Prior to the recordation of the Final Parcel Map,the BP BS applicant shall submit plans showing the water distribution facilities required to serve the project for review and approval by the Atascadero Mutual Water Company.All new water distribution facilities shall be constructed in conformance with Atascadero Mutual Water Company Standards. 47. Prior to the recordation of the Final Map,the applicant BP BS shall obtain a"Will Serve"letter from the Atascadero Mutual Water Company. 48. Prior to issuance of building permits,the applicant BP BS shall pay all installation and connection fees required by the Atascadero Mutual Water Company. 49. Show all fire suppression appurtenances required by BP BS the Atascadero Fire Department. Mitigation Measures Mitigation Measure 1.c.1: If exterior lighting is proposed,it BP PS 1.c.1 shall be designed to eliminate any off site glare. All exterior site lights shall utilize full cut-off,"hooded"lighting fixtures to prevent offsite light spillage and glare. Any luminaire pole height shall not exceed 16-feet in height,limit intensity to 2.0 foot candles at ingress/egress,and otherwise 0.6 foot candle minimum to 1.0 maximum within the private street. Fixtures shall be shield cut-off type and compatible with historic setting, subject to staff approval. Mitigation Measure 3.b.1: The project shall be conditioned to BP BS 3.b.1 comply with all applicable District regulations pertaining to the control of fugitive dust(PM-10)as contained in sections 6.3, 6.4 and 6.5 of the April 2003 Air Quality Handbook. Section 6.3: Construction Equipment City of Atascadero Resolution No.2003-061 Page 10 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measures PS:Planning Services BL:easiness License BS:Building Servb es 5516 Tunitas Avenue GP:Grading Pemtil FD:Fere Deparlmnt BP:Building Permil PD:Ponce Deparlm n! PD-7 Master Plan of Development Fl:Finallnspe*n CE:CiyEngineer CUP 2003-0094RCH 2003-0045 Fa Final�pa�ncyy CA:City�meey • Maintain all construction equipment in proper tune according to manufacturer's specifications. • Fuel all off-road and portable diesel powered equipment, including but not limited to bulldozers, graders,cranes,loaders,scrapers,backhoes, generator sets,compressors,auxiliary power units, with ARB certified motor vehicle diesel fuel(Non- taxed version suitable for use off-road). • Maximize to the extent feasible,the use of diesel construction equipment meeting the ARB's 1996 or newer certification standard for off-road heavy-duty diesel engines. • Install diesel oxidation catalysts(DOC),catalyzed diesels particulate filters(CDPF)or other District approved emission reduction retrofit services (Required for projects grading more than 4.0 acres of continuously worked area). Section 6.4: Activity Management Techniques • Develop a comprehensive construction activity management plan designed to minimize the amount of large construction equipment operating during any given time period. • Schedule of construction truck trips during non-peak hours to reduce peak hour emissions. • Limit the length of the construction workday period, if necessary. • Phase construction activities, if appropriate. Section 6.5: Fugitive PM10 All of the following measures shall be included on grading, demolition and building plan notes: A. Reduce the amount of the disturbed area where possible. B. Use of water trucks or sprinkler systems in sufficient quantities to prevent airborne dust from leaving the site. Increased watering frequency would be required whenever wind speeds exceed 15 mph. Reclaimed(non- potable)water should be used whenever possible. C. All dirt stockpile areas should be sprayed daily as needed. D. Permanent dust control measures identified in the approved project re-vegetation and landscape plans should be implemented as soon as possible following completion of any soil disturbing activities. E. Exposed ground areas that are plann4ed to be reworked at dates greater than one month after initial grading should be sown with a fast-germinating native grass seed and watered until vegetation is established. F. All disturbed soil areas not subject to re-vegetation should be stabilized using approved chemical soil binder,jute netting,or other methods approved in advance by the APCD. G. All roadways,driveways,sidewalks,etc,to be paved City of Atascadero Resolution No.2003-061 Page 11 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business tkense BS:Building Services 5516 Tunitas Avenue GP:Grading Pemwl FD:Fh Departmerd BP:Building Permit PD:Police Department PD-7 Master Plan of Development FI:FinalInapectbn CE:City Engineer TO:Temporary Occupancy WW:wastewater CUP 2003-0094/ZCH 2003-0045 FO:Final Occupancy CA:COMomoy should be complete as soon as possible. In addition, building pads should be laid as soon as possible after grading unless seeding or soil binders are used. H. Vehicle speed for all construction vehicles shall not exceed 15 mph on any unpaved surface at the construction site. I. All trucks hauling dirt,sand,soil,or other loose materials are to be covered or should maintain at least two feet of freeboard(minimum vertical distance between top of load and top of trailer)in accordance with CVC Section 23114. J. Install wheel washers where vehicles enter and exit unpaved roads onto streets,or was off trucks and equipment leaving the site. K. Sweep streets at the end of each day if visible soil material is carried onto adjacent paved roads. Water sweepers with reclaimed water should be used where feasible. L. The contractor or builder shall designate a person or persons to monitor the dust control program and to order increased watering,as necessary,to prevent transport of dust off site. The name and telephone number of such persons shall be provided to the APCD prior to land use clearance for map recordation and land use clearance for finish grading of any structure. Mitigation Measure 4.e.1: The building permit site plan shall GP BS 4.e.1 identify all protection and enhancement measures recommended by the Certified Arborist in the Tree Protection Plan.Tree protection fencing shall be installed at the locations called out in the Tree Protection Plan. Mitioation Measure 4.e.2: The developer shall contract with a GP BS 4.e.2 certified arborist during all phases of project implementation. The certified arborists shall be responsible for monitoring the project during all phases of construction through project completion,as follows: (a). A written agreement between the arborist and the developer outlining a arborist monitoring schedule for each construction phase through final inspection shall be submitted to and approved by planning staff prior to the issuance of building/grading permits. (b). Arborist shall schedule a pre-construction meeting with engineering/planning staff,grading equipment operators, project superintendent to review the project conditions and requirements prior to any grubbing or earth work for any portion of the project site. All tree protection fencing and trunk protection shall be installed for inspection during the meeting. Tree protection fencing shall be installed at the line of encroachment into the tree's root zone area. (c). Asspecified by the arborist report and City staff: City of Atascadero Resolution No.2003-061 Page 12 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business license BS:Building Services 5516 Tunitas Avenue GP:Grading Perm FD:Fire Deparlreent BP:Building Perm PD:Poke Deperlunt PD-7 Master Plan of Development Fl:Final Inspe*n CE:CO En&aer CUP 2003-0094/ZCH 2003-0045 w:Fnal ftupaerrWrary�ncy�nq CA Ck Anomey ■ Prune all trees to be saved for structural strength and crown cleaning by a licensed and certified arborist; ■ Remove all debris and spoils from the lot cleaning and tree pruning. ■ All trenching or grading within the protected root zone area,outside of the tree protection fence shall require hand trenching or preserve and protect roots that are larger than 2 inches in diameter. ■ No grading or trenching is allowed within the fenced protected area. ■ Any roots that are 4 inches in diameter or larger are not to be cut until inspected and approved by the on- site arborist. ■ Apply any additional recommendations of the project arborist. (d). Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented, the trees designated for protection were protected during construction, and the construction-related tree protection measures are no longer required for tree protection. Mitigation Measure 4.e.3: Project manager should be GP BS 4.e.3 responsible for instructing workers about tree protection goals, implementing protection of root zones, and installing and maintaining protective fencing. Mitigation Measure 4.e.4: Protective fencing is required GP BS 4.e.4 between all construction activities and native trees. The fencing shall consist of five-foot tall orange plastic,with steel t- posts sunk into the ground, eight feet apart. The fencing shall be installed prior to any site disturbance or construction, and shall remain in place until all construction is complete. Mitigation Measure 4.e.5: No grading,trenching, materials GP BS 4.e.5 storage,soil storage,debris,or site disturbance shall occur within the protected area. No concrete,plaster,or paint washout shall be allowed within the tree protection zone. Mitigation Measure 4.e.6: Excavation for buildings A and B GP BS 4.e.6 shall employ techniques that minimize the amount of soil removed. Vertical cuts are preferred. Any back cuts greater than six feet from the north wall of building A and west wall of building B,shall be supported with shoring. Excavation for the west side of building B, the north side of building A, shall be done using special procedures for the upper three feet of soil, to avoid tearing of roots. Heavy equipment may be used to remove soil to within two feet of the anticipated edge of cut. Then roots will be uncovered by hand, and cut cleanly with a sharp hand saw at the lie of finish cut. This will avoid tearing of roots. The soil may then be removed, using heavy equipment. Below three feet depth, heavy equipment ma be used for the entire excavation. City of Atascadero Resolution No.2003-061 Page 13 of 25 Conditions of Approval Jr Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 5516 Tunitas Avenue GP:Grading PenrA FD:ReDepadrnent BP:Building Paint PD:Police Depedrnent PD-7 Master Plan of Development FI:FrWInspeotion CECiyEngineer V.Temporary Gocupanq WW:wastewater CUP 2003-0094/ZCH 2003-0045 Fo:Final occupancy CACilywtomey Construction of sidewalk and steps from Rosario Avenue to buildings A and B shall minimize excavation to less than four inches of cut or fill below the walk. Mitigation Measure 4.e.7: If living roots two inches in diameter GP BS 4.e.7 or more are encountered during trenching or excavation,they shall be cleanly cut by the contractor,with a sharp handsaw,to remove the frayed end. Do no paint the cut ends of roots. Keep the roots moist by covering the excavation edge with plastic sheeting. Backfill the excavation as soon as possible. Mitigation Measure 4.e.8: Excavation for the west side of GP BS 4.e.8 garage D will be by hand in all areas within fifteen feet of the trunk of tree #1. Any large roots encountered will be preserved, and the foundation will span over the root. Cushioning for the root shall be blocks of Styrofoam, four inches thick,over the top and sides of the root. Mitigation Measure 4.e.9: Tree pruning should be done by a GP BS 4.e.9 qualified ISA certified arborist or ISA tree worker. A.N.S.I.A- 300 and Z-133 standards for tree care and the City Of Atascadero Tree Ordinance shall be used and followed at all times. Mitigation Measure 5.a.1: The proposed project shall GP PS,BS,CE 5.a.1 incorporate the Secretary of the Interior's Standards and Illustrated Guidelines for Rehabilitating Historic Buildings. The standards shall apply to the exterior rehabilitation of the Colony house,construction of the new detached garage for the colony house,design of the proposed three homes,and proposed landscape improvements to the overall project site, subject to staff review and approval. Mitigation Measure 5.a.2: Replacement of any exterior GP PS,BS,CE 5.a.2 materials or design features on the original colony homes shall be consistent with the Secretary of the Interior's Standards and Illustrated Guidelines for Rehabilitating Historic Buildings. This shall include the replacements of any doors and windows with solid wood framing of similar design and appearance. Vinyl, vinyl-cladding,and metal materials are not permitted. Mitigation Measure 5.a.3: The proposed project shall include GP PS,BS,CE 5.a.3 Covenants,Conditions and Restrictions(CC&R's)or equivalent mechanism that incorporate the planned development conditions of approval to ensure that the site retains the historic qualities(historic buildings,architecture, colors,materials,fencing,and landscaping)over time. Mitigation Measure 5.b.1: Should any cultural resources be GP PS,BS,CE 5.b.1 unearthed during site development work,the provisions of CEQA-Section 15064.5,will be followed to reduce impacts to a non-significant level. City of Atascadero Resolution No.2003-061 Page 14 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:PlannUp Services BL:Business Wena BS:Building Services 5516 Tunitas Avenue GP:Grading Pemit FD:Fre Department BP:Building Perm[ PD:Poke Department PD-7 Master Plan of Development Fl:Final lnsWiDn CE:Illy Engineer T0:Temporary OocMancy WW:Wastewater CUP 2003-00942CH 2003-0045 FD:Final occupancy CA Gy AMmey Mitigation Measure 6.b.1:The grading permit application plans GP,BP PS,BS,CE 6.b.1 shall include erosion control measures to prevent soil,dirt,and debris from entering the storm drain system during and after construction. A separate plan shall be submitted for this purpose and shall be subject to review and approval of the City En ineer at the time of Building Permit application. Mitigation Measure 6.b.2: All cut and fill slopes shall be hydro GP,BP PS,BS,CE 6.b.2 seeded with an appropriate erosion control method(erosion control blanket,hydro-mulch,or straw mulch appropriately anchored)immediately after completion of earthwork between the months of October 15 through April 15. All disturbed slopes shall have appropriate erosion control methods in place. Duration of the project: The contractor will be responsible for the clean up of any mud or debris that is tracked onto public streets by construction vehicles. Mitigation Measure 6.c.d: A soils report shall be required to be GP,BP PS,BS,CE 6.c.d.1 submitted with a future building permit by the building department.The building plans will be required to follow the recommendations of the soils report to assure safety for residents and buildings. Mitigation Measure 6.d.1: All recommendations contained GP,BP PS,BS,CE 6.d.1 within the project geotechnical investigation by GSI dated 2/27/03 shall be incorporated into the building plans and adhered to during construction through project completion. Mitigation Measure 8e.f.1: A Storm Water Pollution Prevention BP PS,BS,CE 8.0.1 Plan (SWPPP)/Erosion Control Plan shall be submitted and approved by the City Engineer prior to the issuance of the building permit. The plan shall include storm water measures for the operation and maintenance of the project for the review and approval of the City Engineer. The Building Permit application plans shall identify Best Management Practices (BMPs) appropriate to the uses conducted on site that effectively prohibit the entry of pollutants into storm water runoff. Mitigation Measure 8.e.f.2: The developer is responsible for BP PS,BS,CE 8.e.f.2 ensuring that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices,citations,or stop orders. City of Atascadero Resolution No.2003-061 Page 15 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Sees EL Business License BS:Bulding Services 5516 Tunitas Avenue GP:Grading Pernik FD:Fire DepaMrerd BP:Building Permit PD:Police DepaMient PD-7 Master Plan of Development FI:Flnel Inspection CE:Cly Engineer CUP 2003-00942CH 2003-0045 FO:FinalOccman CC c��ay Mitigation Measure 11.d.1: All construction activities shall GP,BP PS,BS,CE 11.d.1 comply with the City of Atascadero Noise Ordinance for hours of operation. Construction activities shall be limited to the following hours of operation: • 7 a.m.to 7 p.m. Monday through Friday e 9 a.m.to 6 p.m. Saturday • No construction on Sunday Further,particularly loud noises shall not occur before 8 a.m. on weekdays and not at all on weekends. The Community Development Director upon a determination that unusually loud construction activities are having a significant impact on the neighbors may modify the hours of construction. Failure to comply with the above-described hours of operation may result in withholding of inspections and possible construction prohibitions,subject to the review and approval of the Community Development Director. A sign shall be posted on-site with the hours of operation and a telephone number of the person to be contacted in the event of any violations. Staff shall approve the details of such a sign during the Grading Plan/Building Permit review process. City of Atascadero Resolution No.2003-061 Page 16 of 25 EXHIBIT B:Site Plan J. ...�.. �'�.w....... Wim' •'^".��•. �" Y.•,y,r�ie w City of Atascadero Resolution No.2003-061 Page 17 of 25 EXHIBIT Q Statistical Summary of Project Proposed Project Summary Lot Area 5989 sf 5441 sf 8109 sf 5195 sf Building Footprint 1222 sf 1222 sf 1690 sf 1420 sf not to exceed 35% 20% 23% 20% 27% Landscaped Area 2828 sf 3864 sf 2890 sf 3012 sf minimum 40%required) 48% 71% 360/6 58% Covered Parking 2 space 2 space 1 spaces 1 spaces Guest Parking 2 space 2 space 1 space 1 space Floor Plan A A B Existing Lower Living Area 8741 8741 1230 1040 Upper Living Area 13951 13951 0 0 Garage 624 sfJ 624 sfJ 380 sf 1 380 sf City of Atascadero Resolution No.2003-061 Page 18 of 25 EXHIBIT D:Landscape Plan - --= - _ L IN it it 1 ! / 1 1 l ! / 1 • / ® / � f' � ;?-^.��,•%1 SMI��l it 11:�� , 'f af) ilo.i 1 . • F #sp�YVpY, Fla 4r ,moi P g�Qim jp.Y+ iR 44Q.�AI�AN M „y"' s ,Y tr2 A'IsbCj4�dF tM aYYKyr� ;� !➢? { ll,g b bra�l Cb City of Atascadero Resolution No.2003-061 Page 20 of 25 EXHIBIT F:Lot 1 -ELEVATIONS AND FLOOR PLANS - PLAN A&B 0 ROSARIO AVE. (FRONT) ELEVATION LEFT SIDE ELEVATION a®® moo® Sao ®a ®®o 000® v® o _ RIGHT SIDE ELEVATION _ TUNITUS AVE. (REAR) ELEVATION City of Atascadero Resolution No.2003-061 Page 21 of 25 EXHIBIT G:Lot 1 -ELEVATIONS-UNIT C 013 C W W W W w ARIGHT SIDE ELEVATION REAR ELEVATION FRONT ELEVATION City of Atascadero Resolution No.2003-061 Page 22 of 25 EXHIBIT H:UNIT A&B FLOOR PLANS i an n— -- rrers u-5 r i r Wig - n - I JI I ' zm I' > ' J 1 iD I I i i I I- D ro I W � ^ I I m II � I � I i .a-AL_. �� City of Atascadero Resolution No.2003-061 Page 23 of 25 EXHIBIT H:UNIT A&B FLOOR PLANS .......... ........... ------------------------.......................... ............................... ...... ..... 34-41 JIM #-g .......... ....... ....... ..... .... ......... ....................... ...... ................... .................... 7 0 0 o0 0 12 1, CID ............... .............. WED ... 0- ..... . _.- ........ ........ ........ ........ ........ ........ ..... - ................. -------------------------L ................ I......... ...... . ........ ..l__ ....... ............... ................... .. City of Atascadero Resolution No.2003-061 Page 24 of 25 EXHIBIT 1:UNITA C FLOOR PLANS —- ....... _y.. z c) H - 3 ED 12 JW- L .......... 2. IKemal 9 q" _.. ,_ i q _. . —_ w—� s . I i .cra CD •2