HomeMy WebLinkAboutResolution 2003-052 RESOLUTION NO. 2003-052
(Amended 11/25/2003)
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ATASCADERO APPROVING VESTING TENTATIVE TRACT MAP
2002-00189 A FORTY-LOT MAP CONSISTENT WITH A PD-20 OVERLAY
ZONE OF APN 045-358-010
(1200 La Costa Court/ Charnley)
WHEREAS, an application has been received from Andy Charnley (200 S. Main Street,
Templeton, CA 93465) Applicant and Property Owner to consider a project consisting of a zone
change from RMF-16 (Residential Multi-Family) to RMF/PD-20 (Residential Multi-Family with
Planned Development Overlay#20) on a 2.9-acre site located at 1200 La Costa Court (APN 045-
358-010); and
WHEREAS, the site's General Plan Designation is HDR (High-Density Residential);
and,
WHEREAS, the site's current zoning district is RMF-16 (Residential Multi-Family, 16
units/acre); and,
WHEREAS, the Planning Commission has recommended that a site be rezoned to
include a PD-20 overlay with a Master Plan of Development thereby allowing a 40-lot
subdivision of the site; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of the
California Environmental Quality Act(CEQA)have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Tract Map application was held by the Planning Commission of the City of Atascadero at which
hearing evidence, oral and documentary, was admitted on behalf of said application; and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on September 2, 2003, studied and considered Tentative Tract Map 2002-
0018, after first studying and considering the Proposed Mitigated Negative Declaration prepared
for the project; and,
WHEREAS, the Atascadero City Council, at a Public Hearing held on October 14, 2003,
studied and considered Tentative Tract Map 2002-0018, after first studying and considering the
Draft Mitigated Negative Declaration prepared for the project; and,
WHEREAS, the Atascadero City Council, at a Regular Meeting held on November 25,
2003, amended this Resolution by amending condition 9; and,
City of Atascadero
Resolution No.2003-052
Page 2 of 15
NOW, THEREFORE BE IT RESOLVED, by the City Council of the City of
Atascadero:
Section 1. Findings of Approval for Tentative Tract Mau, the Atascadero City
Council finds as follows:
1. The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
2. The design and improvement of the proposed subdivision is consistent with the General
Plan and applicable zoning requirements.
3. The proposed subdivision, as conditioned, is consistent with the proposed Planned
Development Overlay District#20 Master Plan of Development (CUP 2002-0064).
4. The site is physically suitable for the type of development proposed.
5. The site is physically suitable for the density of development proposed.
6. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
7. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
8. Covenants, Conditions and Restrictions (CC&R's) shall be required that incorporate the
planned development conditions of approval to ensure that the site retains the proposed
qualities (colony-influenced architecture, colors, materials, street amenities, fencing, and
landscaping) over time.
9. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
SECTION 2. Approval. The Atascadero City Council in a regular session assembled
on October 14, 2003, resolves to approve Vesting Tentative Tract Map (TTM 2002-0018)
subject to the following:
1. Exhibit A: Vesting Tentative Tract Map 2002-0018
2. Exhibit B: Conditions of Approval/Mitigation Monitoring Program.
City of Atascadero
Resolution No.2003-052
Page 3 of 15
On motion by Council Member O'Malley, and seconded by Council Member Scalise, the
foregoing Resolution is hereby adopted in its entirety by the following roll call vote:
AYES: Council Members Luna, O'Malley,Pacas, Scalise and Mayor Clay
NOES: None
ABSENT: None
ADOPTED: November 25, 2003
By:
z,
i
erry la , Sr., ayor
ATTEST:
Y��WL
Marcia McClure Torgerson, C.M.C., City Clerk
APPROVED AS TO FORM:
U,6� 11&Iq
Roy Hanley, City Atto ey
City of Atascadero
Resolution No.2003-052
Page 4 of 15
Exhibit A:Vesting Tentative Parcel Map 2002-0018
US 101
�– —
--------------------------------------
m, r
[/f
■ M
� j
I = r• I
• � I � � j � r � m �� I -
i
I ILMI
I �� l i ! l i yr i � • 1 ¢
I r —
I — I
' r i — j P t.•-o
I or 1 • S V
` f I
— I
—
I
j 1
I
/�_� I s�� ' I //•ice �\ "�. � � y
m j a
l I
fps s 1 ;la
all D n
.r a
5 Z_
x
pn �
Hal Iti z
�: � fie° w r •
FA ,GJUAWN VEM f.I•. HONVOK60N 4 A660G I ALES
DEV9.0Ptu�1T MUM MAP Awmlf"Im fl,"INi GONIN.441"
LA COSTA HD. mm t."O.0"..l. Irwr-asmsa w.r.rtl.c1 Mcu
ATASCADEI ,CA wa a..a�+ awx.nc a.aud.a.x.r ur.w...lm,a am
City of Atascadero
Resolution No.2003-052
Page 5 of 15
Exhibit Be Conditions Of Approval/Mitigation Monitoring Program
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
La Costa Court SIP:Subdivision FD:Fee Department
Improvement Plans PD:Porce Department
Vesting Tentative Tract Map FM:Final Map Ce Co Engineer
TO:Temporary CccLPM WW:Wastewater
TTM 2002-0018 s:Final inspection CA Cay Aaomey
F0:Final Occupancy AMWC:Water Corrp.
Planning Services
1. The approval of this Tentative Parcel Map shall not FM PS
become final and effective following approval of Zone
Change 2002-0027 and CUP 2002-0064.
2. Approval of this Tentative Parcel Map shall be valid for FM PS
two years after its effective date. At the end of the
period, the approval shall expire and become null and
void unless an extension of time is granted pursuant to
a written request received prior to the expiration date.
3. The Community Development Department shall have FM PS
the authority to approve minor changes to the project
that (1) result in a superior site design or appearance,
and/or(2)address a design issue that is not substantive
to the Tentative Tract Map and that the Final Map is in
substantial conformance with the Tentative Map.
4. The Tract Map shall be subject to additional fees for FM PS
park or recreation purposes (QUIMBY Act) as required
by City Ordinance.
5. The applicant shall record CC&R's for the subdivision FM PS
subject to the review and approval of the City Engineer,
City Attorney and Planning Services. The CC&R's shall
identify the maintenance responsibilities of all private
driveways, sewer facilities, drainage facilities, common
parking areas, site lighting, landscape areas, fencing,
front yards (lots 1 — 40), and other common facilities.
The CC&R's shall also state that all exterior colors,
exterior materials, yard fencing and site landscaping
shall be consistent with the overall master plan of
development.
6. The granting of this entitlement shall apply to the On going PS
property located at 1200 La Costa Court(APN 045-358-
010)regardless of owner.
7. The Final Map shall be drawn in substantial FM PS
conformance with the approved tentative map, and in
compliance with all conditions set forth herein, shall be
submitted for review and approval in accordance with
the Subdivision Map Act and the City's Subdivision
Ordinance.
City of Atascadero
Resolution No.2003-052
Page 6 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
La Costa Court SIP:Subdivision FD:Fre Departmerd
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2002-0018 FI:Final inspection Ca Cily Momey
F0:Final Occupancy AMWC:Water Comp.
8. The subdivider shall defend, indemnify, and hold FM PS
harmless the City of Atascadero or its agents, officers,
and employees against any claim or action brought to
challenge an approval by the city, or any of its entities,
concerning the subdivision.
9. Prior to recordation of final map, 30-year deed FM PS
restriction shall be recorded on three units. In-lieu fees
for remaining un-built units and fractions of units shall
be based on 2.58 5M%of the construction valuation of
the market rate unit, calculated upon the entire 40
residential units. Fees shall be paid at time of building
permit
10. Prior to recordation of final map, the applicant shall FM PS
enter into a legal agreement with the City to reserve 1/z
of the units for sale to residents or workers within the
City of Atascadero, including the affordable units. The
agreement shall include the following provisions:
• The units shall be offered for sale to residents or
workers within the City of Atascadero for a minimum
of 60-days. During this time period offers may only
be accepted from Atascadero residents or workers.
■ The applicant shall provide reasonable proof to the
City that at least one of the qualified buyers is a
resident or worker within the City Limits of
Atascadero.
■ The Atascadero resident or worker restriction shall
apply to the initial sale only.
■ The applicant shall identify which units will be reserved.
■ The City Attorney shall approve the final form of the
agreement.
11. All site development shall be consistent with the GP PS,CE
maximum intensities described in the statistical
ro'ect summary as shown on Exhibit C.
12. There shall be no on-site street lighting along the
project access driveway.
■ The front open space amenity area shall be
expanded with usable landscaping by eliminating
eight parking spaces shown on the Master Plan of
Development.
Building Services
13. A soils investigation prepared by a licensed FM CE
Geotechnical Engineer is to be provided for the
City of Atascadero
Resolution No.2003-052
Page 7 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
La Costa Court
BP: bd io Fnit D FHraD�epadmrfl
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
M.Temporary Occupancy WW:Wastewater
TTM 2002-0018 FI:Final inspection CA City Attomey
F0:Final Occupancy AMWC:Water Comp.
project. The report is to be provided at the time of
building permit submittal along with the building plans
for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
Fire Marshal
13. Show location of existing and any proposed fire FM CE
hydrants.
14. Provide a letter from the Atascadero Mutual Water FM CE
Company stating the minimum expected water
available to the site. Amount available must meet
min. requirement specified in the California Fire Code.
15. Note approved address signage is to be provided. FM CE
16. Note on plans that fire lanes shall be delineated in FM CE
certain areas to restrict parking as required by the
Fire Authority.
City Engineer
Standard Conditions
17. All public improvements shall be constructed in GP,BP CE
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings
and/or as directed by the City Engineer.
18. In the event that the applicant is allowed to bond for the GP,BP CE
public improvements required as a condition of the final
map, the applicant shall enter into a Subdivision
Improvement Agreement with the City Council.
19. An engineer's estimate of probable cost shall be GP,BP CE
submitted for review and approval by the City Engineer
to determine the amount of the bond.
20. The Subdivision Improvement Agreement shall record GP,BP CE
concurrently with the Final Map.
21. An encroachment permit shall be obtained prior to the GP,BP CE
issuance of building permit.
22. The applicant shall enter into a Plan Check/Inspection GP,BP CE
agreement with the City.
23. A six (6) foot Public Utility Easement (PUE) shall be GP,BP CE
provided contiguous to the property frontage.
City of Atascadero
Resolution No.2003-052
Page 8 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Servica
La Costa Court
BP:
P Building
�� FFD:Fire oep�nt
tinent
Vesting Tentative Tract Map FM`F�M`s CE cy Er i eer
TTM 2002-007 8 TO:Ternprary Occupancy WW:Wastewater
FI:Final inspection CA City Asomey
F0:Final Occupancy AMWC:Water Comp.
24. The applicant shall be responsible for the relocation GP,BP CE
and/or alteration of existing utilities.
25. The applicant shall install all new utilities (water, gas, GP,BP CE
electric,cable TV and telephone) underground. Utilities
shall be extended to the property line frontage of each
lot or its public utility easement.
26. The applicant shall monument all property comers for GP,SP CE
construction control and shall promptly replace them if
disturbed.
27. The applicant shall acquire title interest in any off-site GP,BP CE
land that may be required to allow for the construction
of the improvements. The applicant shall bear all costs
associated with the necessary acquisitions. The
applicant shall also gain concurrence from all adjacent
property owners whose ingress and egress is affected
by these improvements.
28. Slope easements shall be provided as needed to GP,BP CE
accommodate cut of fill slopes.
29. Drainage easements shall be provided as needed to GP,BP CE
accommodate both public and private drainage
facilities.
30. A preliminary subdivision guarantee shall be submitted GP,BP CE
for review in conjunction with the processing of the map.
31. All existing and proposed utility, pipeline, open space, GP,BP CE
or other easements are to be shown on the parcel map.
If there are building or other restrictions related to the
easements,they shall be noted on the parcel map. The
applicant shall show all access restrictions on the parcel
map.
32. The final map shall be signed by the City Engineer prior GP,BP CE
to the map being placed on the agenda for City Council
acceptance.
33. Prior to recording the final map, the applicant shall GP,BP CE
submit a map drawn in substantial conformance with
the approved tentative map and in compliance with all
conditions set forth herein.The map shall be submitted
for review and approval by the City in accordance with
the Subdivision Map Act and the City's Subdivision
Ordinance.
34. Prior to recording the parcel map,the applicant shall set GP,BP CE
monuments at all new property comers. A registered
City of Atascadero
Resolution No.2003-052
Page 9 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permt PS:Planning Services
La Costa Court
BP:
P eSbaNlaon� FD iiai��
Improvement Plans PD:Poke Department
Vesting Tentative Tract Map FM:Final Map OE city Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2002-0018 Fl:Final inspectbn ca city Attorney
F0:Final Occupancy AMWO:Water Comp.
civil engineer or licensed land surveyor shall indicate by
certificate on the parcel map, that corners have been
set or shall be set by a date specific and that they will
be sufficient to enable the survey to be retraced.
35. Prior to recording the parcel map, the applicant shall GP,BP CE
pay all outstanding plan checkMspection fees.
36. Prior to recording the map,the applicant shall complete GP,BP CE
all improvements required by these conditions of
approval.
37. Prior to recording the parcel map, the applicant shall GP,BP CE
have the map reviewed by all applicable public and
private utility companies(cable,telephone,gas,electric,
Atascadero Mutual Water Company). The applicant
shall obtain a letter from each utility company indicating
their review of the map. The letter shall identify any
new easements that may be required by the utility
company. A copy of the letter shall be submitted to the
City. New easements shall be shown on the parcel
map.
38. Upon recording the final map, the applicant shall GP,BP CE
provide the City with a black line clear Mylar (0.4 mil)
copy and a blue line print of the recorded map.
39. Prior to the final inspection of any public improvements, GP,BP CE
the applicant shall submit a written statement from a
registered civil engineer that all work has been
completed and is in full compliance with the approved
plans.
40. Prior to the final inspection,the applicant shall submit a GP,BP CE
written certification from a registered civil engineer or
land surveyor that all survey monuments have been set
as shown on the final map.
41. Prior to the issuance of building permits the applicant GP,BP CE
shall submit a grading and drainage plan prepared by a
registered civil engineer for review and approval by the
City Engineer.
City Engineer Project Conditions
42. Applicant shall submit a Storm Water Pollution GP,BP CE
Prevention Plan (SWPPP) and erosion control plan for
approval by the City Engineer prior to any onsite
grading.
City of Atascadero
Resolution No.2003-052
Page 10 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Serwim
La Costa Court �$ISN oD FD.iia��
Improvement Plans PD:Poke DepaMiem
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
T0:Temporary Occupancy WW:Wastewater
TTM 2002-0018 FI:Final inspection CA Ciy marney
F0:Final Occupancy AMWC:Water Comp.
43. Applicant shall submit drainage calculations for all GP,BP CE
improvements.
44. A drainage easement shall be recorded for the drainage GP,BP CE
detention basin.
45. All drainage improvements shall cross property lines GP,BP CE
within drainage easements.
46. The drainage detention basin shall be designed for a GP,BP CE
50-year storm with a 2-year release.
47. The CC&R's shall provide for the repair and GP,BP CE
maintenance all drainage structures, basins, private
sewer mains and manholes,streets,curbs, gutters and
sidewalks, lighting, parking,front yard landscaping (lots
1 —40),and all commonly held areas and open space.
48. City standard curb, gutter and sidewalk shall be GP,BP CE
constructed at the end of the La Costa Court cul-de-
sac.
49. Applicant must provide written authorization from owner GP,BP CE
of Private sewer main in La Costa Court, allowing
connection to sewer system.
50. All new sewer mains shall be privately owned and GP,BP CE
maintained. Funding for maintenance and repair of
private sewer system shall be addressed in the
CC&R's.
Atascadero Mutual Water Company
51. The applicant shall provide a looped water system. GP,BP CE
This looped system shall have two points of
connection to the existing AMWC water grid in order
to provide a more reliable water system for this site.
The looped system shall be shown on the
improvement plan submittal.
52. Prior to the issuance of building permits,the applicant GP,BP CE
shall submit plans showing the water distribution
facilities required to serve the project for review and
approval by the Atascadero Mutual Water Company
(AMWC). The plans shall show all facilities required
for fire protection. The plans shall show all cross-
connection devices required to isolate the fire
protection and landscape irrigation systems from the
domestic water system.
53. Prior to start of construction, the applicant shall pay GP,BP CE
all installation and connection fees required by
City of Atascadero
Resolution No.2003-052
Page 11 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
Building
La Costa Court SIP:SubdWiDn D:�e lOepartmem
Vesting Tentative Tract Map MFinal ^s CE Engineer
�nl
TO:Temporary Occupancy WW:Wasteweter
TTM 2002-0018 FI:Final inspection CA City Attorney
F0:Final Occupancy AMWC:Water ODr p.
AMWC.
54. Prior to the issuance of building permits,the applicant
shall obtain a "Will Serve" letter from the Atascadero
Mutual Water Company.
55. All water distribution facilities shall be constructed in GP,BP CE
conformance with AMWC standards, policies and
approved procedures. All cross connection devices
shall be constructed in conformance with AWWA and
Department of Health Services standards.
56. Water and gas cannot be located in same trench. GP,BP CE
Water main to be in separate trench.
57. Identify water main tie in location on improvement
drawings.
58. Identify all connections and bends in water main. GP,BP CE
59. All service line connections shall be perpendicular to GP,BP CE
water main.
Mitigation Measures GP,BP CE
Mitigation Measure 1.c.1: The following landscape mitigations GP,BP CE
shall apply:
■ Development along U.S. Highway 101 right-of-way shall
be buffered with an informal landscape theme to be
reviewed an approved by CalTrans.
■ Proposed development along the extension of La Costa
Court will include landscaped front yards,street trees,and
the project entry drives that will include special decorative
pavers.
• The project shall include landscaping of all common
areas,including slopes,streetscapes, residential front
yards,and street trees.
■ The on-site retention basin shall be landscaped with plant
materials compatible with the private open space use while
allowing the basin to function as engineered for storm water
management.
Mitigation Measure i.c.2: The proposed homes shall include GP,BP CE
the use of earth-tone paint and roof colors designed to blend
with the surrounding neighborhood and reduce the potential for
reflected light and glare.
City of Atascadero
Resolution No.2003-052
Page 12 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Servim
BP:Building Permit BS:Building Services
La Costa Court SIP:Subdivision FD:Fire Department
Vesting Tentative Tract Map FM Final PD:Police
TTM 2002.00'18 TO:Terrporary Occupancy WW:Wastewater
Fl:Final inspection CA City Attorney
F0:Final Occupancy AMWC:Water Conp.
Mitigation Measure 1.d.1: Exterior street lighting shall be GP,BP CE
designed to eliminate any off site glare. All exterior site lights
shall utilize full cut-off,"hooded"lighting fixtures to prevent
offsite light spillage and glare. Any luminaire pole height shall
not exceed 20-feet in height,limit intensity to 2.0 foot candles
at ingress/egress,and otherwise 0.6 foot candle minimum to
1.0 maximum within the private street. Fixtures shall be shield
cut-off type and compatible with neighborhood setting,subject
to staff approval.
In addition,individual exterior home-owner lighting shall be
restricted through CC&R's and individual lot deed-restriction to
prohibit high-intensity lighting in excess of one-foot candle,
limited in fixture height to not exceed 10 feet,and utilize full
cut-off,"hooded"lighting fixtures to prevent offsite light spillage
and glare.
Mitigation Measure 3.b: The project shall be conditioned to GP,BP CE
comply with all applicable District regulations pertaining to the
control of fugitive dust(PM-10)as contained in sections 6.3,
6.4 and 6.5 of the April 2003 Air Quality Handbook,
Section 6.3: Construction Equipment
■ Maintain all construction equipment in proper tune
according to manufacturer's specifications.
■ Fuel all off-road and portable diesel powered equipment,
including but not limited to bulldozers,graders,cranes,
loaders,scrapers,backhoes,generator sets,
compressors,auxiliary power units,with ARB certified
motor vehicle diesel fuel(Non-taxed version suitable for
use off-road).
■ Maximize to the extent feasible,the use of diesel
construction equipment meeting the ARB's 1996 or newer
certification standard for off-road heavy-duty diesel
engines.
• Install diesel oxidation catalysts(DOC),catalyzed diesels
particulate filters(CDPF)or other District approved
emission reduction retrofit services(Required for projects
grading more than 4.0 acres of continuously worked area).
Section 6.4: Activity Management Techniques
■ Develop a comprehensive construction activity
management plan designed to minimize the amount of
large construction equipment operating during any given
time period.
■ Schedule of construction truck trips during non-peak
hours to reduce peak hour emissions.
■ Limit the length of the construction workday period,if
necessary.
• Phase construction activities, if appropriate.
Section 6.5: Fugitive PM10 GP,BP CE
All of the following measures shall be included on grading,
City of Atascadero
Resolution No.2003-052
Page 13 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pernik PS:Planning Services
ER Building Pernik BS:Building Services
La Costa Court SIP:Subdivision FD:Fire Department
Improvement Plans PD:Poke Department
Vesting Tentative Tract Map FM:Final Map CE:Cily Engineer
T0:Temporary Occupancy WW:Wastewater
TTM 2002-0018 Fl:Final inspection Ca:City Momey
F0:Final Occupancy AMWC:Water Comp.
demolition and building plan notes:
a. Reduce the amount of the disturbed
area where possible.
b. Use of water trucks or sprinkler systems
in sufficient quantities to prevent airborne dust from
leaving the site. Increased watering frequency would be
required whenever wind speeds exceed 15 mph.
Reclaimed(non-potable)water should be used whenever
possible.
C. All dirt stockpile areas should be
sprayed daily as needed.
d. Permanent dust control measures
identified in the approved project re-vegetation and
landscape plans should be implemented as soon as
possible following completion of any soil disturbing
activities.
e. Exposed ground areas that are
plann4ed to be reworked at dates greater than one month
after initial grading should be sown with a fast-germinating
native grass seed and watered until vegetation is
established.
f. All disturbed soil areas not subject to re-
vegetation should be stabilized using approved chemical
soil binder,jute netting,or other methods approved in
advance by the APCD.
g. All roadways,driveways,sidewalks,etc,
to be paved should be complete as soon as possible. In
addition,building pads should be laid as soon as possible
after grading unless seeding or soil binders are used.
h. Vehicle speed for all construction
vehicles shall not exceed 15 mph on any unpaved surface
at the construction site.
i. All trucks hauling dirt,sand,soil,or
other loose materials are to be covered or should maintain
at least two feet of freeboard(minimum vertical distance
between top of load and top of trailer)in accordance with
CVC Section 23114.
j. Install wheel washers where vehicles
enter and exit unpaved roads onto streets,or was off
trucks and equipment leaving the site.
k. Sweep streets at the end of each day if
visible soil material is carried onto adjacent paved roads.
Water sweepers with reclaimed water should be used
where feasible.
L. The contractor or builder shall designate a person or
persons to monitor the dust control program and to order
increased watering,as necessary,to prevent transport of
dust off site. The name and telephone number of such
persons shall be provided to the APCD prior to land use
clearance for map recordation and land use clearance for
finish gradin of any structure.
City of Atascadero
Resolution No.2003-052
Page 14 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pemd PS:Planning Services
BP:Building Permit BS:Building Services
La Costa Court SIP:SubdWbn FD:Fire Depadmant
Vesting Tentative Tract Map FMFinal � CE c Poke� m
T0:Temporary Occupancy WW:Wastewater
TTM 2002-0018 FI:Final mspwW CA:Cily Attomey
F0:Final Occupancy AMWC:Water Comp.
Mitigation Measure 5.b.1: Should any cultural resources be GP,BP CE
unearthed during site development work,the provisions of
CEQA-Section 15064.5,will be followed to reduce impacts to
a non-significant level.
GP,BP CE
Mitigation Measure 6.b.1: The Building Permit Application
plans shall include erosion control measures to prevent soil,
dirt,and debris from entering the storm drain system during
and after construction. A separate plan shall be submitted for
this purpose and shall be subject to review and approval of the
City Engineer at the time of Building Permit application.
Mitigation Measure 6.b.2: All cut and fill slopes shall be hydro GP,BP CE
seeded with an appropriate erosion control method(erosion
control blanket,hydro-mulch,or straw mulch appropriately
anchored)immediately after completion of earthwork between
the months of October 15 through April 15. All disturbed
slopes shall have appropriate erosion control methods in
place. Duration of the project: The contractor will be
responsible for the clean up of any mud or debris that is
tracked onto public streets by construction vehicles.
Mitigation Measure 6.c.d: A soils report shall be required to be GP,BP CE
submitted with a future building permit by the building
department.The building plans will be required to follow the
recommendations of the soils report to assure safety for
occupants and buildings.
Mitigation Measure 8e.f.1: A Stormwater Pollution Prevention GP,BP CE
Plan (SWPPP)/Erosion Control Plan shall be submitted and
approved by the City Engineer prior to the issuance of the
building permit. The plan shall include storm water measures
for the operation and maintenance of the project for the review
and approval of the City Engineer. The Building Permit
application plans shall identify Best Management Practices
(BMPs) appropriate to the uses conducted on site that
effectively prohibit the entry of pollutants into storm water
runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for GP,BP CE
ensuring that all contractors are aware of all storm water
quality measures and that such measures are implemented.
Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction
notices,citations,or stop orders.
Mitigation Measure 11.c.1: A continuous masonry noise GP,BP CE
barrier wall or berm along the west side of the project is
required. The noise barrier wall shall be constructed of earth-
tone masonry material or stone appearance,and six feet in
height above the nearest finished floor level.
City of Atascadero
Resolution No.2003-052
Page 15 of 15
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Pemtit PS:Planning Services
BP: BS:Building Services
La Costa Court SIP: rubdivisioilding nm FD:Fire Depart
Inprovemerd Plans PD:Police Deparbnent
Vesting Tentative Tract Map FM:Final Map CE.Cly Engineer
T0:Temporary Occupancy WW:Wastewater
TTM 2002.0018 FI:Final inspection CA Cay AMmey
F0:Final Occupancy AMWC:Water Comp.
Mitigation Measure 11.c.2: The following construction
specification is required to meet performance of 45 dBA or less
interior noise level along the critical side of the dwelling units
(lots 12,20,21,and 40)nearest the Highway 101 noise
source:
■ Vents and roof penetrations: Soffit vents,eave vents,
dormer vents and other wall and roof penetrations
shall be located on the walls and roofs facing away
from the noise source(facing north,east,and south).
• Walls: The walls of critical living spaces,such as
living rooms, lounges,bedrooms,dens,and habitable
spaces in dwelling units nearest the noise source
shall have wall construction with an S.T.0(Sound
Transmission Class)rating of 30 or greater. Common
acoustic leaks,such as electrical outlets,pipes,
vents,ducts,flues,and other breaks in the integrity of
the wall,ceiling or roof construction on the side of the
dwellings nearest transportation noise source shall
receive special attention during construction. All
construction openings and joints on the walls on the
noise facing the side of the site shall be insulated,
sealed and caulked with a resilient,non-hardening
caulking material. All such openings and joints shall
be airtight to maintain sound isolation.
■ Windows: To meet the interior LDN 45 dBA
requirements,windows for critical habitat spaces of
affected units facing the noise source shall be of
double-glazed construction with one light of laminated
glass,and installed in accordance with the
recommendations of the manufacturer. The windows
shall be fully gasketed,with an S.T.C. rating of 30 or
better,as determined in testing by an accredited
acoustical laboratory.