HomeMy WebLinkAboutResolution 2003-011 RESOLUTION NO. 2003-011
A RESOLUTION OF THE ATASCADERO CITY COUNCIL
APPROVING VESTING TENTATIVE TRACT MAP 2001-0011
THEREBY ALLOWING A SIX-LOT CLUSTER RESIDENTIAL
SUBDIVISION OF APN 030-029-065 CONSISTENT WITH THE PD-7
MASTER PLAN OF DEVELOPMENT (CUP 2000-0024)
(6340 Alcantara Avenue/ Russell)
WHEREAS, an application has been received from Lorraine Russell (PO Box 257,
Atascadero, CA 93423) Applicant and Property Owner to consider a project consisting of a
zone change from RMF-10 (Residential Multi-Family) to RMF-10/PD-7 (Residential Multi-
Family with Planned Development Overlay #7) with the adoption of a Master Plan of
Development, and a six lot residential Tentative Tract Map on APN 030-292-065; and,
WHEREAS, the site's vested General Plan Designation is MDR (Medium-Density
Residential); and,
WHEREAS, the site's vested zoning district is RMF-10 (Residential Multi-Family);
and,
WHEREAS, the Planning Commission has recommended that a site be rezoned to
include a PD-7 overlay district with a Master Plan of Development thereby allowing a six lot
subdivision of the site; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of
the California Environmental Quality Act (CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed Public Hearing upon the subject Tentative
Tract Map application was held by the Planning Commission of the City of Atascadero at
which hearing evidence, oral and documentary, was admitted on behalf of said application;
and,
WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed
Public Hearing held on January 21, 2003, studied and considered Tentative Tract Map 2001-
0011, after first studying and considering the Proposed Mitigated Negative Declaration
prepared for the project; and,
City of Atascadero
Resolution No.2003-011
Page 2 of 16
NOW, THEREFORE, the City Council takes the following actions:
Section 1. Findings of Approval for Vesting Tentative Tract Map, the Atascadero
City Council finds as follows:
1. The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
2. The design and improvement of the proposed subdivision is consistent with the General
Plan and applicable zoning requirements.
3. The proposed subdivision, as conditioned, is consistent with the Planned Development
Overlay District 7 Master Plan of Development (CUP 2000-0024).
4. The site is physically suitable for the type of development proposed.
5. The site is physically suitable for the density of development proposed.
6. The design and improvement of the proposed subdivision will not cause substantial
environmental damage or substantially and unavoidably injure fish and wildlife or their
habitat.
7. The design of the subdivision will not conflict with easements acquired by the public at
large for access through, or the use of property within, the proposed subdivision; or
substantially equivalent alternative easements are provided.
8. The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
Section 2. Approval. The Atascadero City Council resolves to approve Vesting
Tentative Tract Map 2001-0011 subject to the following:
1. Exhibit A: Vesting Tentative Tract Map 2001-0011
2. Exhibit B: Conditions of Approval/Mitigation Monitoring Program.
On motion by Council Member Scalise and seconded by Council Member O'Malley, the
foregoing Resolution is hereby adopted following roll call vote:
AYES: Council Members Luna, O'Malley, Pacas, Scalise and Mayor Clay
NOES: None
ABSTAIN: None
City of Atascadero
Resolution No.2003-011
Page 3 of 16
ABSENT: None
ADOPTED: March 11, 2003
B
7Jerry . lay, Sr., Mayor
Attest: -
Marcia McClure Torgerson, Citylerk
Approved as to form:
qojt"�G�
U ,
RI Hanley, City Aftomey
City of Atascadero
Resolution No.2003-011
Page 4 of 16
Exhibit A:Vesting Tentative Tract Map 2001-0011
fit
�xraKro�
•
� s
fit
410
} °
alit
lit It
eft � $ u -. � •�.
�R� �l vi ti9
1 ,
HIM H•lit�
al rlt'
tit,
lit
itI
IA x
_ l
t
F
City of Atascadero
Resolution No.2003-011
Page 5 of 16
Exhibit B:Conditions Of Approval/Mitigation Monitoring Program
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
6340 Alcantara Avenue SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:CiyEngineer
TO:Temporary Occupancy WW Wastewater
TTM 2001.0011 FI:Final inspection CA:City Attorney
F0:Final Occupancy AMWC:Water Comp.
Planning Services
1. The approval of this Tentative Tract Map shall not FM PS
become final and effective following approval of Zone
Change 2000-0008 and CUP 2000-0024.
2. Approval of this Tentative Tract Map shall be valid for FM PS
two years after its effective date. At the end of the
period, the approval shall expire and become null and
void unless an extension of time is granted pursuant to
a written request received prior to the expiration date.
3. The Community Development Department shall have FM PS
the authority to approve minor changes to the project
that (1) result in a superior site design or appearance,
and/or(2)address a design issue that is not substantive
to the Tentative Tract Map and that the Final Map is in
substantial conformance with the Tentative Map.
4. The Tract Map shall be subject to additional fees for FM PS
park or recreation purposes (QUIMBY Act) as required
by City Ordinance.
5. The applicant shall record CC&R's for the subdivision FM PS
subject to the review and approval of the City Engineer,
City Attorney and Planning Services. The CC&R's shall
identify the maintenance responsibilities of all private
driveways, sewer facilities, drainage facilities, common
parking areas, site lighting, landscape areas, fencing,
and other common facilities. The CC&R's shall also
state that all exterior colors, exterior materials, yard
fencing and site landscaping shall be consistent with the
overall master plan of development.
6. The granting of this entitlement shall apply to the On going PS
property located at 6340 Alcantara Avenue (APN 030-
292-065)regardless of owner.
7. The Final Map shall be drawn in substantial FM PS
conformance with the approved tentative map, and in
compliance with all conditions set forth herein, shall be
submitted for review and approval in accordance with
the Subdivision Map Act and the City's Subdivision
Ordinance.
8. The subdivider shall defend, indemnify, and hold FM PS
harmless the City of Atascadero or its agents, officers,
and employees against any claim or action brought to
City of Atascadero
Resolution No.2003-011
Page 6 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
6340 Alcantara Avenue SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2001.0011 Fl:Final inspection CA:City Attomey
F0:Final Occupancy AMWC:Water Comp.
challenge an approval by the city, or any of its entities,
concerning the subdivision.
9. Prior to recordation of final map, the applicant shall enter FM,BP PS,CE
into a legal agreement with the City to reserve 1/2 of the
units for sale to residents or workers within the City of
Atascadero. One of the 6 units shall be the deed
restricted affordable units in the moderate category for a
period of 15 years. The agreement shall include the
following provisions::
a) The units shall be offered for sale to residents or
workers within the City of Atascadero for a minimum
of 60-days. During this time period offers may only
be accepted from Atascadero residents or workers.
b) The applicant shall provide reasonable proof to the
City that at least one of the qualified buyers is a
resident or worker within the City Limits of
Atascadero.
c) The Atascadero resident or worker restriction shall
apply to the initial sale only.
d) The applicant shall identify which units will be reserved.
The City Attorney shall approve the final form of the
agreement.
10. Apply the following tree mitigation: (Mitigation Fee GP PS,CE
Table)
City of Atascadero
Resolution No.2003-011
Page 7 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Perm BS:Building Services
6340 Alcantara Avenue SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2001-0011 FI:Final inspection CA:City Attorney
F0:Final Occupancy AMWC:Water Comp.
Evergreen Native Trees(inches) Deciduous Native Trees(inches) Totals
dbh notes dbh notes
1 0-inches 1 244-inches 64 white oak trees
2 2 0-inches ranging in size from
3 3 0-inches 2-18 inches
4 4 0-inches
5 5 0-inches
6 0-inches
7 0-inches
6 8 0-inches
Total 0-inches Total 244-inches 244-inches
Tree Fund Payment: $ Tree Fund Payment: $ 3,116.67 $ 3,116.67
FM PS
City Engineer
Site Specific Conditions
Building Services
11. A soils investigation prepared by a licensed FM CE
Geotechnical Engineer is to be provided for the
project. The report is to be provided at the time of
building permit submittal along with the building plans
for review by the Building Division.
Recommendations contained in the report are to be
incorporated into the project plans.
Fire Marshal
12. Dimension the width of driveway. A minimum 20' FM CE
wide access with a minimum head clearance of 13'-6"
is to be provided to each building location. Access
drives with slopes less than 12%are to have an all-
weather surface. Access drives with slopes equal to
or greater than 12%are to be paved.
13. Show location of existing and any proposed fire FM CE
hydrants. As presented,the project requires one fire
hydrant located within 250 feet of any point along the
City of Atascadero
Resolution No.2003-011
Page 8 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program
/Monitoring Measure
GP:Grading Peri) PS:Planning Services
BP:Building Peri) BS:Building Services
6340 Alcantara Avenue SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2001.0011 FI:Final inspection CA:City Attorney
F0:Final Occupancy AMWC:Water Comp.
front property boundary.
14. Provide a letter from the Atascadero Mutual Water FM CE
Company stating the minimum expected water
available to the site. Amount available must meet
minimum requirement specified in the California Fire
Code.
15. Note that approved address signage is to be FM CE
provided.
16. Note on plans that fire lanes shall be delineated to FM CE
restrict parking as required by the Fire Authority.
17. Access drive where it bridges the creekway is to be FM CE
designed and maintained to the satisfaction of the
Public Works department to support a minimum
40,000 Ib. Imposed load at 25 miles per hour for fire
apparatus.
City Engineer
Standard Conditions
18. Public frontage improvements, on site grading and BP CE
drainage plans and the driveway plans shall be
produced by a registered civil engineer. The plans
shall be in the form required in the City of Atascadero
Engineering Standards. The plans will be reviewed
and approved by the City Engineer.
19. All public improvements shall be constructed in BP CE
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings or
as directed by the City Engineer.
20. The applicant shall enter into a Plan Check & BP CE
Inspection agreement with the City.
21. The applicant shall be responsible for the protection, BP CE
relocation and/or alteration of existing utilities.
22. The applicant shall install all new utilities (water, gas, Ongoing CE
electric,cable TV and telephone) underground.
23. The applicant shall monument all property corners for FM CE
construction control and shall promptly replace them
if disturbed.
24. Prior to issuance of building permits, the applicant FM CE
shall submit a grading and drainage plan with a
separate sheet(s) devoted to sedimentation and
erosion control, prepared by a registered civil
engineer for review and approval by the City
Engineer.
25. Prior to the final inspection, all outstanding plan check FM CE
and inspection fees shall be paid.
26. Prior to the final inspection, the applicant shall submit FM CE
a written statement from a registered civil engineer
that all work has been completed and is in full
compliance with the approved plans and the Uniform
Building Code (UBC).
City of Atascadero
Resolution No.2003-011
Page 9 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
6340 Alcantara Avenue SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2001-0011 FI:Final inspection CA:City Attorney
FO:Final Occupancy AMWC:Water Comp.
27. Prior to recording the Tract Map, the applicant shall FM CE
submit a map drawn in substantial conformance with
the approved tentative map and in compliance with all
conditions set forth herein. The map shall be
submitted for review and approval by the City in
accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
28. In the event that the applicant is allowed to bond for FM CE
any public improvements required as a condition of
this map, the applicant shall enter into a Subdivision
Improvement Agreement with the City Council. An
engineer's estimate of probable cost shall be
submitted for review and approval by the City
Engineer to determine the amount of the bond. The
Subdivision Improvement Agreement shall record
concurrently with the Final Map.
29. A preliminary subdivision guarantee shall be FM CE
submitted for review in conjunction with the
processing of the Tract Map.
30. The final map shall be signed by the City Engineer FM CE
prior to the map being placed on the agenda for City
Council acceptance.
31. Prior to recording the Tract Map, the applicant shall FM CE
pay all outstanding plan check/inspection fees.
32. Prior to recording the Tract Map, the applicant shall
set monuments at all new property corners. A
registered civil engineer or licensed land surveyor
shall indicate by certificate on the parcel map, that
corners have been set or shall be set by a date
specific and that they will be sufficient to enable the
survey to be retraced.
33. All existing and proposed utility, pipeline, open space, FM AMWC
or other easements are to be shown on the Tract
Map. If there are building or other restrictions related
to the easements, they shall be noted on the
final/parcel map. The applicant shall show all access
restrictions on the final/parcel map.
34. Prior to recording the parcel map, the applicant shall FM AMWC
have the map reviewed by all applicable public and
private utility companies (cable, telephone, gas,
electric, Atascadero Mutual Water Company). The
applicant shall obtain a letter from each utility
company indicating their review of the map. The
letter shall identify any new easements that may be
required by the utility company. A copy of the letter
shall be submitted to the City. New easements shall
be shown on the parcel map.
35. Prior to the issuance of building permits the applicant BP AMWC
shall submit plans and supporting calculations/reports
including street improvements,underground utilities,
composite utilities,and grading/drainage plans
prepared by a registered civil engineer for review and
approval by the City Engineer.
City of Atascadero
Resolution No.2003-011
Page 10 of I
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
6340 Alcantara Avenue SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2001-0011 FI:Final inspection CA:City Attorney
F0:Final Occupancy AMWC:Water Comp.
City Engineer
Site Specific Conditions
36. This project is required to pave Tecorida Ave, with FM CE
Curb and Gutter on the east side, from the end of the
existing paving on the south side of the project to the
end of the existing paving (at the barricade) for
orderly development and traffic circulation.The length
of this paving is approximately 128 feet.
37. Frontage improvements required are curb and gutter BP CE
on the east side of Tecorida Ave and concrete drive
approach or concrete cross gutter at the driveway to
allow the drainage to be conveyed down Tecorida.
38. Provisions for on-site circulation reciprocal access FM CE
between the adjacent westerly property shall be
required at the location identified on the site plan.
Wastewater Department
39. Public SS shall be extended to the far property line. BP CE/WW
40. Each building shall be separately and independently BP CE/WW
connected with the public sewer.
41. Drainage piping serving fixtures which have flood level BP CE/WW
rims located below the elevation of the next upstream
manhole (or cleanout) cover shall be protected by a
backflow valve.
42. Sewer connection permits shall be issued separately BP CE/WW
(from building permit) after public sewer extension has
been completed and has received a satisfactory final
Public Works inspection.
43. Final project inspection shall be contingent upon BP CE/WW
completion of the public sewer extension and Public
Works final inspection.
Atascadero Mutual Water Company
44. Prior to recordation of the final map, the applicant GP,BP CE
shall submit plans for review and approval by AMWC
for all existing and proposed water distribution
facilities that provide water service to the proposed
lots. All new water distribution facilities shall be
constructed in conformance with Atascadero Mutual
Water Company Standards.
45. Prior to the issuance of building permits,the applicant GP, BP CE
shall obtain a "Will Serve" letter from the Atascadero
Mutual Water Company for the newly created lots.
City of Atascadero
Resolution No.2003-011
Page 11 of 1
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Pemtil BS:Building Services
6340 Alcantara Avenue SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW Wastewater
TTM 2001-0011 FI:Final inspection CA:City Attorney
F0:Final Occupancy AMWC:Water Comp.
46. Prior to the start of construction, the applicant shall GP,BP CE
pay all installation and connection fees required by
the Atascadero Mutual Water Company, or enter in to
a"deferred connection"agreement.
47. Private easements may be needed for the private GP, BP CE
water service lines that serve parcels which do not
front on Tecorida Road.
48. Water meters located on Tecorida Ave for Lots 1 and GP,BP CE
6 are in acceptable location. Meters for newly created
Lots 3, 4 & 5 need to be located on frontage of road
at Tecorida Ave and private utility easements
provided for private service lines to parcels.
Mitigation Measures
BP PS 1.c.1
Mitigation Measure 1.c.1: All lighting shall be designed to
eliminate any off site glare. All exterior site lights shall utilize
full cut-off, "hooded"lighting fixtures to prevent offsite light
spillage and glare. Any luminaire pole height shall not exceed
30-feet in height, limit intensity to 2.0 foot candles at ingress
/egress,and otherwise 0.6 foot candle minimum to 1.0
maximum in parking areas. Fixtures shall be shield cut-off
type.
Mitigation Measure 1.c.2: The project landscape shall include BP PS 1.c.2
requiring one 24-inch box sized tree within the front yard of
each new residence.
Mitigation Measure 3.b: The project shall be conditioned to BP BS 3.b
comply with all applicable District regulations pertaining to the
control of fugitive dust(PM-10)as contained in section 6.4 of
the Air Quality Handbook. All site grading and demolition
plans notes shall list the following regulations:
A. All material excavated or graded shall be sufficiently
watered to prevent excessive amounts of dust. Watering
shall occur at least twice daily with complete coverage,
preferably in the late morning and after work is finished for
the day.
B. All clearing,grading, earth moving, or excavation activities
shall cease during periods of high winds(i.e.greater than
20 mph averaged over one hour)so as to prevent
excessive amounts of dust.
C. All material transported off-site shall be either sufficiently
watered or securely covered to prevent excessive
amounts of dust.
D. The area disturbed by clearing,grading, earth moving, or
excavation operations shall be minimized so as to prevent
excessive amounts of dust.
E. Permanent dust control measured identified in the
approved project revegetation and landscape plans shall
be implemented as soon as possible following completion
of any soil disturbing activities.
F. Exposed ground areas that are planned to be reworked at
dates greater than one month after initial grading shall be
sown with fast-germinating native grass seed and watered
City of Atascadero
Resolution No.2003-011
Page 12 of 1
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
6340 Alcantara Avenue SIP:Subdivision FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2001-0011 FI:Final inspection CA:City Attorney
F0:Final Occupancy AMWC:Water Comp.
until vegetation becomes established.
G. All disturbed areas not subject to revegetation shall be
stabilized using approved chemical soil binders,jute
netting, or other methods in advance by the APCD.
H. All roadways, driveways, sidewalks, etc.to be paved shall
be completed as soon as possible. In addition,structural
foundations shall be completed as soon as possible
following building pad construction.
I. On-site vehicle speed shall be limited to 15 mph for any
unpaved surface.
J. All unpaved areas with vehicle traffic shall be watered at
least twice per day, using non-potable water.
K. Streets adjacent to the project site shall be swept daily to
remove silt which may have accumulated from
construction activities so as to prevent excessive amounts
of dust from leaving the site.
L. Wheel washers may be required when significant offsite
import or export of fill is involved.
M. Large canopy shade trees shall be provided along street
frontages and within parking areas to shade paved areas
and minimize urban heat build-up.
Mitigation Measure 4.b.1: The proposed creek bridge shall be BP,GP PS 4.b.1
supported by city-approved caissons. Caisson locations shall
be tested prior to drilling to insure that no major roots are
damaged. Adjacent trees shall have tree trunk protection
(2"x4"x8'boards wired together and secured around the tree
trunk prior to bridge construction).
Mitigation Measure 4.b.2: As recommended by California BP,GP PS 4.b.2
Department of Fish&Game Notification R3-2001-0171:
■ All work in the stream shall be confined to June 15 to
October 15.
■ No equipment will be operated in live(wet)stream
channels.
■ Any runoff during construction shall be diverted so as not to
enter the stream. Sediment catchment basins, erosion
control mats,fabric fences,or other appropriate means
shall be used when such diversion are necessary.
• Wash water containing mud or silt from construction
operations shall not be allowed to enter the stream.
■ Structures and associated materials not designed to
withstand high seasonal flows shall be removed to areas
above the high water mark before such flows occur.
• No debris,soil,silt, bark,sawdust, rubbish,cement or
concrete or washing thereof, oil or petroleum products or
other organic or earthen material from construction or
associated activity or whatever nature shall be allowed to
enter into or placed where it may be washed by rainfall or
runoff into the stream. When operation are completed,any
excess materials or debris shall be removed from the work
area. No rubbish shall be deposited within 150 feet of the
high water mark of the stream.
Mitigation Measure 4.e.1: The building permit site plan shall BP,GP PS 4.e.1
identify all protection and enhancement measures
recommended by the Certified Arborist in the Tree Protection
City of Atascadero
Resolution No.2003-011
Page 13 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
6340 Alcantara Avenue SIP:Subdivision FD:Fire Department
Improvement Plans PD:Ponce Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TTM 2007-0011 TO:Temporary Occupancy WW:Wastewater
FI:Final inspection CA:City Attorney
F0:Final Occupancy AMWC:Water Comp.
Plan.Tree protection fencing shall be installed at the locations
called out in the Tree Protection Plan.
Mitigation Measure 4.e.2: The developer shall contract with a BP,GP PS 4.e.2
certified arborist during all phases of project implementation.
The certified arborists shall be responsible for monitoring the
project during all phases of construction through project
completion,as follows:
(a) A written agreement between the arborist and the
developer outlining a arborist monitoring schedule for
each construction phase through final inspection shall be
submitted to and approved by planning staff prior to the
issuance of building/grading permits.
(b) Arborist shall schedule a pre-construction meeting with
engineering/planning staff, grading equipment operators,
project superintendent to review the project conditions and
requirements prior to any grubbing or earth work for any
portion of the project site. All tree protection fencing and
trunk protection shall be installed for inspection during the
meeting. Tree protection fencing shall be installed at the
line of encroachment into the tree's root zone area. As
identified in the tree protection plan,the root zone equals
1-foot radius for every 1 inch of tree trunk diameter.
Several trees on this site will require tree trunk protection.
Tree trunk protection is 2"x 4"x8 foot boards that are
wired together and placed around the tree trunk. Trees
requiring this protection are:#5, 6, 20, 21,22, 32, 33,34,
and 35 as identified on the Tree Protection Plan.
(c) As specified by the arborist report and City staff:
L Remove all berry vines and trees designated for
removal by hand;
ii. Prune all trees to be saved for structural strength and
crown cleaning by a licensed and certified arborist;
iii. Remove all debris and spoils from the lot cleaning and
tree pruning.
■ Grub only for the proposed driveway(do not grade nor
compact).
■ Install porous pavers over a three-inch bed of 3/4 inch
granite covered with one-inch pea gravel for screeding.
• Use pegged curbs to secure the porous pavers.
Pegged curbs are reinforced six to eight curbs poured
at grade with a one-foot by one-foot pothole every four
to six linear feet.
■ All trenching or grading within the protected root zone
area,outside of the tree protection fence shall require
hand trenching or preserve and protect roots that are
larger than 2 inches in diameter.
• No grading or trenching is allowed within the fenced
protected area.
■ Any roots that are 4 inches in diameter or larger are
not to be cut until inspected and approved by the on-
site arborist.
City of Atascadero
Resolution No.2003-011
Page 14 of 16
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
6340 Alcantara Avenue SIP:Subdivisicn FD:Fire Department
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2001-0011 FI:Final inspection CA:City Attorney
FO:Final Occupancy AMWC:Water Comp.
(d) Upon project completion and prior to final occupancy a
final status report shall be prepared by the project arborist
certifying that the tree protection plan was implemented,
the trees designated for protection were protected during
construction, and the construction-related tree protection
measures are no longer required for tree protection.
Mitigation Measure 5.e: Should any cultural resources be GP BS 5.e
unearthed during site development work,the provisions of
CEQA-Section 15064.5, will be followed to reduce impacts to
a non-significant level.
Mitigation Measure 6.b.1: The grading permit application GP PS,BS,CE 6.b.1
plans shall include erosion control measures to prevent soil,
dirt, and debris from entering the storm drain system during
and after construction. A separate plan shall be submitted for
this purpose and shall be subject to review and approval of the
Citv Enciineer at the time of Building Permit application.
Mitigation Measure 6.b.2: All cut and fill slopes shall be GP PS,BS,CE 6.b.2
hydroseeded with an appropriate erosion control method
(erosion control blanket, hydro-mulch, or straw mulch
appropriately anchored)immediately after completion of
earthwork between the months of October 15 through April 15.
All disturbed slopes shall have appropriate erosion control
methods in place. Duration of the project: The contractor will
be responsible for the clean-up of any mud or debris that is
tracked onto public streets by construction vehicles.
Mitigation Measure 6.c.d: A soils report shall be required to be GP BS 6.c.d
submitted with a future building permit by the building
department.The building plans will be required to follow the
recommendations of the soils report to assure safety for
occupants and buildings.
Mitigation Measure 8.e.f.1: A Stormwater Pollution Prevention GP PS,BS,CE 8.e.f.1
Plan (SWPPP)/Erosion Control Plan shall be submitted and
approved by the City Engineer prior to the issuance of the
building permit. The plan shall include storm water measures
for the operation and maintenance of the project for the review
and approval of the City Engineer. The Building Permit
application plans shall identify Best Management Practices
(BMPs)appropriate to the uses conducted on site that
effectively prohibit the entry of pollutants into storm water
runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for GP PS,BS,CE 8.e.f.2
ensuring that all contractors are aware of all storm water
quality measures and that such measures are implemented.
Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction
notices,citations, or stop orders.
Mitigation Measure 11.d: All construction activities shall BP,GP PS,BS 11.d
comply with the City of Atascadero Noise Ordinance for hours
of operation.
Construction activities shall be limited to the following hours of
operation:
City of Atascadero
Resolution No.2003-011
Page 15 of 1
Conditions of Approval/ Timing Responsibility Mitigation
Mitigation Monitoring Program /Monitoring Measure
GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
6340 Alcantara Avenue SIP:Subdvislon FD:FireDepar6ment
Improvement Plans PD:Police Department
Vesting Tentative Tract Map FM:Final Map CE:City Engineer
TO:Temporary Occupancy WW:Wastewater
TTM 2001.0011 FI:Final inspection CA:City Attorney
F0:Final Occupancy AMWC:Water Comp.
• 7 a.m.to 7 p.m. Monday through Friday
• 9 a.m.to 6 p.m. Saturday
• No construction on Sunday
Further, particularly loud noises shall not occur before 8 a.m.
on weekdays and not at all on weekends.
The hours of construction may be modified by the Community
Development Director upon a determination that unusually
loud construction activities are having a significant impact on
the neighbors.
Failure to comply with the above-described hours of operation
may result in withholding of inspections and possible
construction prohibitions,subject to the review and approval of
the Planning Commission.
A sign shall be posted on-site with the hours of operation and
a telephone number of the person to be contacted in the event
of any violations. The details of such a sign shall be approved
by staff during the Grading Plan/Building Permit review
process.
Mitigation Measure 16.c.1: Points of concentrated drainage GP BS,CE 16.c.1
into the creek shall incorporate natural rock riprap designed to
blend with the natural landscape and function to dissipate
energy and eliminate creek bank erosion, subject to review
and approval of the City Engineer.
City of Atascadero
Resolution No.2003-011
Page 16 of 16