Loading...
HomeMy WebLinkAboutResolution 2003-010 RESOLUTION NO. 2003-010 A RESOLUTION OF THE ATASCADERO CITY COUNCIL APPROVING A MASTER PLAN OF DEVELOPMENT (CONDITIONAL USE PERMIT 2000-0024)FOR A PD-7 OVERLAY ZONING DISTRICT ON APN 030-029-065 (6340 Alcantara Avenue/ Russell) WHEREAS, an application has been received from Lorraine Russell (PO Box 257, Atascadero, CA 93423) Applicant and Property Owner to consider a project consisting of a zone change from RMF-10 (Residential Multi-Family) to RMF-10/PD-7 (Residential Multi- Family with Planned Development Overlay #7) with the adoption of a Master Plan of Development, and a six lot residential Tentative Tract Map on APN 030-292-065; and, WHEREAS, the site's vested General Plan Designation is MDR (Medium-Density Residential); and, WHEREAS, the site's vested zoning district is RMF-10 (Residential Multiple- Family); and, WHEREAS, the Planning Commission has recommended that a site be rezoned to a PD-7 overlay district which requires the adoption of a Master Plan of Development; and, WHEREAS, the laws and regulations relating to the preparation and public notice of environmental documents, as set forth in the State and local guidelines for implementation of the California Environmental Quality Act (CEQA) have been adhered to; and, WHEREAS, a timely and properly noticed Public Hearing upon the subject Zone Change application was held by the Planning Commission of the City of Atascadero at which hearing evidence, oral and documentary, was admitted on behalf of said Master Plan of Development; and, WHEREAS, the Planning Commission of the City of Atascadero, at a duly noticed Public Hearing held on Tuesday, January 21, 2003, studied and considered the Master Plan of Development (CUP 2000-0024), after first studying and considering the Proposed Mitigated Negative Declaration prepared for the project, and WHEREAS, the Atascadero City Council, at a Public Hearing held on March 11, 2003, studied and considered the Master Plan of Development for Zone Change 2000-0008, after first studying and considering the Draft Mitigated Negative Declaration prepared for the project, and, NOW, THEREFORE, the City Council takes the following actions: City of Ataseadero Resolution No.2003-010 Page 2 of 25 SECTION 1. Findings for Approval of Master Plan of Development. The City Council finds as follows: 1. The proposed project or use is consistent with the General Plan and the City's Appearance Review Manual; and, 2. The proposed project or use satisfies all applicable provisions of the Title (Zoning Ordinance) including the PD-7 Ordinance; and, 3. The establishment, and subsequent operation or conduct of the use will not, because of the circumstances and conditions applied in the particular case, be detrimental to the health, safety, or welfare of the general public or persons residing or working in the neighborhood of the use, or be detrimental or injurious to property or improvements in the vicinity of the use; and, 4. That the proposed project or use will not be inconsistent with the character or the immediate neighborhood or contrary to its orderly development; and, 5. That the proposed use or project will not generate a volume of traffic beyond the safe capacity of all roads providing access to the project, either existing or to be improved in conjunction with the project, or beyond the normal traffic volume of the surrounding neighborhood that would result from full development in accordance with the Land Use Element. SECTION 2. Approval. The Atascadero City Council, in a regular session assembled on March 11, 2003, resolved to approve Conditional Use Permit 2000-0024, a Master Plan of Development for Zone Change 2000-0008 subject to the following: 1. EXHIBIT A: CONDITIONS OF APPROVAL/MITIGATION MONITORING PROGRAM 2. EXHIBIT B: SITE PLAN 3. EXHIBIT C: STATISTICAL SUMMARY OF PROJECT 4. EXHIBIT D: LANDSCAPE PLAN 5. EXHIBIT E: GRADING & DRAINAGE 6. EXHIBIT F: ELEVATIONS &FLOOR PLANS 7. EXHIBIT G: ELEVATIONS /COLOR AND MATERIALS On motion by Council Member O'Malley and seconded by Council Member Pacas, the foregoing Resolution is hereby adopted following roll call vote: AYES: Council Members Luna, O'Malley, Pacas, Scalise and Mayor Clay NOES: None ABSTAIN: None City of Atascadero Resolution No. 2003-010 Page 3 of 25 ABSENT: None ADOPTED: March 11, 2003 By. Jerry L lay, Sr., Mayor Attest: Marcia McClure Torgerson, City erk Approved as to form: Roy A Hanley, City torney City of Atascadero Resolution No.2003-010 Page 4 of 25 EXHIBIT A:Conditions of Approval/Mitigation Monitoring Program PD-7 Master Plan of Development(CUP 2000-0024)/ZCH2O00-0008 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Peri) FD:Fire Department BP:Building Permit PD:Police Department PD-7 Master Plan of Development Fl:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000.0024/ZCH 2000-0008 FO:Final Occupancy CA:City Attorney Planning Services 1. The approval of this use permit shall become final and PS effective following City Council approval. 2. Approval of this Master Plan of Development shall be valid FM PS concurrently with the life of Tentative Tract Map 2001- 0011 and then indefinitely following final map. The Master Plan of Development approval shall expire and become null and void unless a final map is recorded consistent with the Master Plan of Development. 3. Changes to the Master Plan of Development shall be On-going PS approved by the Planning Commission and do not require Council action. 4. The Community Development Department shall have the BP/FM PS authority to approve the following minor changes to the project the(1)modify the site plan project by less than 10%,(2) result in a superior site design or appearance, and/or(3)address a construction design issue that is not substantive to the Master Plan of Development. The Planning Commission shall have the final authority to approve any other changes to the Master Plan of Development and any associated Tentative Maps. 5. All subsequent Tentative Tract Maps and construction BP/FM PS permits shall be consistent with the Master Plan of Development contained herein. 6. All exterior elevations,finish materials and colors shall be BP PS consistent with the Master Plan of Development as shown in Exhibit F and Exhibit G with the following modifications: a. Each front elevation,and entire side elevations(lots 1 &6)visible from Tecorida Avenue shall incorporate an applied masonry material such as brick or stone along the lower building base,subject to staff approval. This treatment shall return along side elevations to a logical terminus point such as a side yard fence,chimney or doorway. b. Front entry porch columns on each elevation shall be further detailed with use of applied masonry material City of Atascadero Resolution No.2003-010 Page 5 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Peri) FD:Fire Department BP Building Permit PD:Police Department PD-7 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000-0024/ZCH 2000-0008 FO:Final Occupancy CA:City Attorney such as brick or stone. The use of wood timbers may also be incorporated into the column design as appropriate,subject to staff approval. c. Each house shall incorporate the use of double or single hung windows,transom windows,and window shutters,subject to staff approval. d. The garage door color of each new home shall match the house body color. 7. All site development shall be consistent with the maximum BP/FM PS intensities described in the statistical project summary as shown on EXHIBIT C. 8. All site work,grading and site improvements shall be BP/FM PS consistent with the Master Plan of Development as shown in EXHIBIT B, D and E. 9. Native oaks trees shall be preserved and protected during BP PS construction unless approved for removal. Tree protection shall be in place prior to the issuance of any construction permits and the arborist shall be under contract to monitor tree protection. 10. A final landscape and irrigation plan shall be approved BP PS prior to the issuance of building permits and included as part of site improvement plan consistent with EXHIBIT D. All exterior meters,air conditioning units and mechanical equipment shall be screened with landscape material. Trash/recycle container areas shall be screened with fencing or landscape. All front yards and areas between Tecorida Avenue and lots 1 and 6 shall be landscaped by the developer. All landscape maintenance shall be the responsibility of the individual property owner. The five front yard trees shall be 24-inch box native trees. In addition,two additional 15-gallon trees shall trees shall be planted along Tecorida Avenue and four additional 15- gallon native sycamore trees be planted between the creek and the private driveway between lot 4 and 5. 11. All project fencing shall be installed consistent with BP PS EXHIBIT D subject to the following modifications. a. The yards adjacent to Tecorida Avenue shall not be enclosed with any fencing which exceeds 3-feet in height. b. No fences in the rear yards adjoining the on-site City of Atascadero Resolution No.2003-010 Page 6 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building services 66340 Alcantara Avenue GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-7 Master Pian of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000.0024/ZCH 2000-0008 FO:Final Occupancy CA:City Attorney creek shall exceed 3-feet in height. c. The design of all fencing shall be compatible with the overall project design,subject to staff approval 12. Retaining wall design&material shall match or GP PS compliment the texture and color of the primary residence. BP In addition,the retaining wall located within the front yard of lots 3 and 4 shall be rounded or angled back toward lot 4,subject to staff approval. 13. Provisions for on-site circulation reciprocal access GP PS between the adjacent westerly property shall be required BP at the location identified on the site plan. 14. Apply the following tree mitigation: (Mitigation Fee GP PS Table) Evergreen Native Trees(inches) Deciduous Native Trees(inches) Totals dbh notes dbh notes 1 0-inches 1 244-inches 64 white oak trees 2 2 0-inches ranging in size from 3 3 0-inches 2-18 inches 4 4 0-inches 5 5 0-inches 6 0-inches 7 0-inches 6 8 0-inches Total 0-inches Total 244-inches 244-inches Mitigation Requirement req'd tree replacements: 0 five gal trees req'd tree replacements: 81 five gal trees 81 five gal trees Proposed Replanting 0 five gal trees Proposed Replanting 9 five gal trees 9 five gal trees 0 box trees 24") 5 box trees(24") 5 box trees 24") Remaining Mitigation 0 five gal trees Remaining Mitigation 62 five gal trees 62 five gal trees or or Tree Fund Payment: $ Tree Fund Payment: $ 3,116.67 $ 3,116.67 15. Prior to recordation of final map, the applicant shall FM,BP PS,CE enter into a legal agreement with the City to reserve 5 of the units for sale to residents or workers within the City of Atascadero. One of the 6 units shall be the deed restricted affordable units in the moderate category for a period of 15 years. The agreement shall include the following provisions:: City of Atascadero Resolution No. 2003-010 Page 7 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Permit FD:Fire Departrnent BP:Building Permit PD:Police Department PD-7 Master Plan of Development FI:Final Inspection CE:Cl/Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000-0024/ZCH 2000-0008 FO:Final Occupancy CA:CiyAttorney a) The units shall be offered for sale to residents or workers within the City of Atascadero for a minimum of 60-days. During this time period offers may only be accepted from Atascadero residents or workers. b) The applicant shall provide reasonable proof to the City that at least one of the qualified buyers is a resident or worker within the City Limits of Atascadero. c) The Atascadero resident or worker restriction shall apply to the initial sale only. d) The applicant shall identify which units will be reserved. The City Attorney shall approve the final form of the agreement.. Building Services 16. A soils investigation prepared by a licensed BP FM Geotechnical Engineer is to be provided for the project. The report is to be provided at the time of building permit submittal along with the building plans for review by the Building Division. Recommendations contained in the report are to be incorporated into the project plans. Fire Marshal 17. Dimension the width of driveway. A minimum 16' BP BS paved with 20'total width access with a minimum head clearance of 13'-6"is to be provided to each building location. Access drives with slopes less than 12%are to have an all-weather surface. Access drives with slopes equal to or greater than 12%are to be paved. 18. Show location of existing and any proposed fire BP BS hydrants. As presented,the project requires one fire hydrant located within 250 feet of any point along the front property boundary. 19. Provide a letter from the Atascadero Mutual Water BP BS Company stating the minimum expected water available to the site. Amount available must meet min. requirement specified in the California Fire Code. 20. Note approved address signage is to be provided. BP BS 21. Note on plans that fire lanes shall be delineated to BP BS restrict parking as required by the Fire Authority. 22. Access drive where it bridges the creekway is to be BP BS designed and maintained to the satisfaction of the Public Works department to support a minimum City of Atascadero Resolution No.2003-010 Page 8 of 2 Conditions of Approval/ riming Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-7 Master Plan of Development FI:Final Inspection CE:Cily Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000-0024/ZCH 2000-0008 FO:Fined Occupancy CA:Ci y Attorney 40,000 Ib. Imposed load at 25 miles per hour for fire apparatus. City Engineer Standard Conditions 23. Public frontage improvements, on site grading and GP, BP CE drainage plans and the driveway plans shall be produced by a registered civil engineer. The plans shall be in the form required in the City of Atascadero Engineering Standards. The plans will be reviewed and approved by the City Engineer. 24. All public improvements shall be constructed in GP,BP CE conformance with the City of Atascadero Engineering Department Standard Specifications and Drawings or as directed by the City Engineer. 25. The applicant shall enter into a Plan Check & GP, BP CE Inspection agreement with the City. 26. The applicant shall be responsible for the protection, GP,BP CE relocation and/or alteration of existing utilities. 27. The applicant shall install all new utilities (water, gas, GP, BP CE electric,cable TV and telephone) underground. 28. The applicant shall monument all property corners for GP, BP CE construction control and shall promptly replace them if disturbed. 29. Prior to issuance of building permits, the applicant GP, BP CE shall submit a grading and drainage plan with a separate sheet(s) devoted to sedimentation and erosion control, prepared by a registered civil engineer for review and approval by the City Engineer. 30. Prior to the final inspection, all outstanding plan check GP,BP CE and inspection fees shall be paid. 31. Prior to the final inspection, the applicant shall submit GP,BP CE a written statement from a registered civil engineer that all work has been completed and is in full compliance with the approved plans and the Uniform Building Code (UBC). 32. Prior to recording the Tract Map, the applicant shall GP,BP CE submit a map drawn in substantial conformance with the approved tentative map and in compliance with all conditions set forth herein. The map shall be submitted for review and approval by the City in accordance with the Subdivision Map Act and the City's Subdivision Ordinance. 33. In the event that the applicant is allowed to bond for GP,BP CE any public improvements required as a condition of this map, the applicant shall enter into a Subdivision Improvement Agreement with the City Council. An engineer's estimate of probable cost shall be submitted for review and approval by the City Engineer to determine the amount of the bond. The Subdivision Improvement Agreement shall record concurrently with the Final Map. City of Atascadero Resolution No. 2003-010 Page 9 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Permit FD:Fire Depaitment BP:Building Permit PD:Police Department PD-7 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000-0024/ZCH 2000-0008 FO:Final Occupancy CA:City Attorney 34. A preliminary subdivision guarantee shall be GP, BP CE submitted for review in conjunction with the processing of the Tract Map. 35. The final map shall be signed by the City Engineer GP, BP CE prior to the map being placed on the agenda for City Council acceptance. 36. Prior to recording the Tract Map, the applicant shall GP,BP CE pay all outstanding plan check/inspection fees. 37. Prior to recording the Tract Map, the applicant shall GP,BP CE set monuments at all new property corners. A registered civil engineer or licensed land surveyor shall indicate by certificate on the parcel map, that corners have been set or shall be set by a date specific and that they will be sufficient to enable the survey to be retraced. 38. All existing and proposed utility, pipeline, open space, GP,BP CE or other easements are to be shown on the Tract Map. If there are building or other restrictions related to the easements, they shall be noted on the final/parcel map. The applicant shall show all access restrictions on the final/parcel map. 39. Prior to recording the parcel map, the applicant shall GP,BP CE have the map reviewed by all applicable public and private utility companies (cable, telephone, gas, electric, Atascadero Mutual Water Company). The applicant shall obtain a letter from each utility company indicating their review of the map. The letter shall identify any new easements that may be required by the utility company. A copy of the letter shall be submitted to the City. New easements shall be shown on the parcel map. 40. Prior to the issuance of building permits the applicant GP,BP CE shall submit plans and supporting calculations/reports including street improvements,underground utilities, composite utilities,and grading/drainage plans prepared by a registered civil engineer for review and approval by the City Engineer. City Engineer Site Specific Conditions 41. This project is required to pave Tecorida Ave, with GP,BP CE Curb and Gutter on the east side, from the end of the existing paving on the south side of the project to the end of the existing paving (at the barricade) for orderly development and traffic circulation. The length of this paving is approximately 128 feet. 42. Frontage improvements required are curb and gutter GP,BP CE on the east side of Tecorida Ave and concrete drive approach or concrete cross gutter at the driveway to allow the drainage to be conveyed down Tecorida. 43. Public Sanitary Sewer shall be extended from GP,BP CE property line to property line. City of Atascadero Resolution No.2003-010 Page 10 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Permit FD:Fire Department BP:Building Pemrit PD:PolieDepartment PD-7 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000-0024/ZCH 2000-0008 FO:Final Occupancy CA:City Attorney 44. Final project inspection shall be contingent upon GP, BP CE completion of the public sewer extension and Public Works final inspection. A City of Atascadero Sewer Extension Performance Agreement shall be executed. 45. Applicant shall pay sewer Extension Fees for five (5) GP,BP CE newly created lots and Connection fees upon issuance of building permit. Sewer connection permits shall be issued separately from building permit after public sewer extension has been completed and has received a satisfactory final Public Works inspection. Each building shall be separately and independently connected with the public sewer. A backflow valve shall protect sewer piping serving fixtures which have flood level rims located below the elevation of the next upstream manhole (or cleanout) cover. Atascadero Mutual Water Company 46. Prior to recordation of the final map, the applicant GP,BP CE shall submit plans for review and approval by AMWC for all existing and proposed water distribution facilities that provide water service to the proposed lots. All new water distribution facilities shall be constructed in conformance with Atascadero Mutual Water Company Standards. 47. Prior to the issuance of building permits, the applicant GP,BP CE shall obtain a "Will Serve letter from the Atascadero Mutual Water Company for the newly created lots. 48. Prior to the start of construction, the applicant shall GP, BP CE pay all installation and connection fees required by the Atascadero Mutual Water Company, or enter in to a"deferred connection"agreement. 49. Private easements may be needed for the private GP,BP CE water service lines that serve parcels which do not front on Tecorida Road. 50. Water meters located on Tecorida Ave for Lots 1 and GP, BP CE 6 are in acceptable location. Meters for newly created Lots 3, 4 & 5 need to be located on frontage of road at Tecorida Ave and private utility easements provided for private service lines to parcels. Mitigation Measures Mitigation Measure 1.c.1: All lighting shall be designed to BP PS 1.0 eliminate any off site glare. All exterior site lights shall utilize full cut-off,"hooded"lighting fixtures to prevent offsite light spillage and glare. Any luminaire pole height shall not exceed 30-feet in height, limit intensity to 2.0 foot candles at ingress /egress, and otherwise 0.6 foot candle minimum to 1.0 maximum in parking areas. Fixtures shall be shield cut-off type. Mitigation Measure i.c.2: The project landscape shall include BP PS 1.c.2 requiring one 24-inch box sized tree within the front yard of each new residence. City of Atascadero Resolution No.2003-010 Page 11 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Permit FD:Fire Department BP:Building Pemtil PD:Police Department PD-7 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000.0024/ZCH 2000-0008 FO:Final Occupancy CA:City Attorney Mitigation Measure 3.b: The project shall be conditioned to BP BS 3.b comply with all applicable District regulations pertaining to the control of fugitive dust(PM-10)as contained in section 6.4 of the Air Quality Handbook. All site grading and demolition plans notes shall list the following regulations: A. All material excavated or graded shall be sufficiently watered to prevent excessive amounts of dust. Watering shall occur at least twice daily with complete coverage, preferably in the late morning and after work is finished for the day. B. All clearing,grading,earth moving, or excavation activities shall cease during periods of high winds(i.e.greater than 20 mph averaged over one hour)so as to prevent excessive amounts of dust. C. All material transported off-site shall be either sufficiently watered or securely covered to prevent excessive amounts of dust. D. The area disturbed by clearing, grading,earth moving, or excavation operations shall be minimized so as to prevent excessive amounts of dust. E. Permanent dust control measured identified in the approved project revegetation and landscape plans shall be implemented as soon as possible following completion of any soil disturbing activities. F. Exposed ground areas that are planned to be reworked at dates greater than one month after initial grading shall be sown with fast-germinating native grass seed and watered until vegetation becomes established. G. All disturbed areas not subject to revegetation shall be stabilized using approved chemical soil binders,jute netting, or other methods in advance by the APCD. H. All roadways, driveways, sidewalks, etc.to be paved shall be completed as soon as possible. In addition,structural foundations shall be completed as soon as possible following building pad construction. I. On-site vehicle speed shall be limited to 15 mph for any unpaved surface. J. All unpaved areas with vehicle traffic shall be watered at least twice per day, using non-potable water. K. Streets adjacent to the project site shall be swept daily to remove silt which may have accumulated from construction activities so as to prevent excessive amounts of dust from leaving the site. L. Wheel washers may be required when significant offsite import or export of fill is involved. M. Large canopy shade trees shall be provided along street frontages and within parking areas to shade paved areas and minimize urban heat build-up. Mitigation Measure 4.b.1: The proposed creek bridge shall be BP,GP PS 4.b.1 supported by city-approved caissons. Caisson locations shall be tested prior to drilling to insure that no major roots are damaged. Adjacent trees shall have tree trunk protection (2"x4"x8'boards wired together and secured around the tree trunk prior to bridge construction). City of Atascadero Resolution No.2003-010 Page 12 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-7 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000-0024/ZCH 2000-0008 FO:Final Occupancy CA:City Attorney Mitigation Measure 4.b.2: As recommended by California BP,GP PS 4.b.2 Department of Fish&Game Notification R3-2001-0171: ■ All work in the stream shall be confined to June 15 to October 15. ■ No equipment will be operated in live(wet)stream channels. • Any runoff during construction shall be diverted so as not to enter the stream. Sediment catchment basins, erosion control mats,fabric fences, or other appropriate means shall be used when such diversion are necessary. • Wash water containing mud or silt from construction operations shall not be allowed to enter the stream. • Structures and associated materials not designed to withstand high seasonal flows shall be removed to areas above the high water mark before such flows occur. ■ No debris, soil,silt, bark,sawdust, rubbish,cement or concrete or washing thereof, oil or petroleum products or other organic or earthen material from construction or associated activity or whatever nature shall be allowed to enter into or placed where it may be washed by rainfall or runoff into the stream. When operation are completed, any excess materials or debris shall be removed from the work area. No rubbish shall be deposited within 150 feet of the high water mark of the stream. Mitigation Measure 4.e.1: The building permit site plan shall BP,GP PS 4.e.1 identify all protection and enhancement measures recommended by the Certified Arborist in the Tree Protection Plan.Tree protection fencing shall be installed at the locations called out in the Tree Protection Plan. Mitigation Measure 4.e.2: The developer shall contract with a BP,GP PS 4.e.2 certified arborist during all phases of project implementation. The certified arborists shall be responsible for monitoring the project during all phases of construction through project completion,as follows: (a) A written agreement between the arborist and the developer outlining a arborist monitoring schedule for each construction phase through final inspection shall be submitted to and approved by planning staff prior to the issuance of building/grading permits. (b) Arborist shall schedule a pre-construction meeting with engineering/planning staff,grading equipment operators, project superintendent to review the project conditions and requirements prior to any grubbing or earth work for any portion of the project site. All tree protection fencing and trunk protection shall be installed for inspection during the meeting. Tree protection fencing shall be installed at the line of encroachment into the tree's root zone area. As identified in the tree protection plan,the root zone equals 1-foot radius for every 1 inch of tree trunk diameter. Several trees on this site will require tree trunk protection. Tree trunk protection is 2"x 4"x8 foot boards that are wired together and placed around the tree trunk. Trees requiring this protection are:#5,6,20,21, 22,32, 33,34, City of Atascadero Resolution No.2003-010 Page 13 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-7 Master Plan of Development Fl:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000.0024/ZCH 2000-0008 FO:Final Occupancy CA:City Attorney and 35 as identified on the Tree Protection Plan. (c) As specified by the arborist report and City staff: • Remove all berry vines and trees designated for removal by hand; ■ Prune all trees to be saved for structural strength and crown cleaning by a licensed and certified arborist; • Remove all debris and spoils from the lot cleaning and tree pruning. ■ Grub only for the proposed driveway(do not grade nor compact). ■ Install porous pavers over a three-inch bed of 3/4 inch granite covered with one-inch pea gravel for screeding. ■ Use pegged curbs to secure the porous pavers. Pegged curbs are reinforced six to eight curbs poured at grade with a one-foot by one-foot pothole every four to six linear feet. ■ All trenching or grading within the protected root zone area, outside of the tree protection fence shall require hand trenching or preserve and protect roots that are larger than 2 inches in diameter. ■ No grading or trenching is allowed within the fenced protected area. ■ Any roots that are 4 inches in diameter or larger are not to be cut until inspected and approved by the on- site arborist. (d) Upon project completion and prior to final occupancy a final status report shall be prepared by the project arborist certifying that the tree protection plan was implemented, the trees designated for protection were protected during construction, and the construction-related tree protection measures are no longer required for tree protection. Mitigation Measure 5.e: Should any cultural resources be GP BS 5.e unearthed during site development work,the provisions of CEQA-Section 15064.5,will be followed to reduce impacts to a non-significant level. Mitigation Measure 6.b.1: The grading permit application GP PS,BS,CE 6.b.1 plans shall include erosion control measures to prevent soil, dirt, and debris from entering the storm drain system during and after construction. A separate plan shall be submitted for this purpose and shall be subject to review and approval of the Citv En ineer at the time of Building Permit application. Mitigation Measure 6.b.2: All cut and fill slopes shall be GP PS,BS,CE 6.b.2 hydroseeded with an appropriate erosion control method (erosion control blanket, hydro-mulch, or straw mulch appropriately anchored) immediately after completion of earthwork between the months of October 15 through April 15. All disturbed slopes shall have appropriate erosion control methods in place. Duration of the project: The contractor will be responsible for the clean-up of any mud or debris that is tracked onto public streets by construction vehicles. Mitigation Measure 6.c.d: A soils report shall be required to be GP BS 6.c.d submitted with a future building permit by the building department.The building plans will be required to follow the City of Atascadero Resolution No.2003-010 Page 14 of 25 Conditions of Approval/ Timing Responsibility Mitigation Mitigation Monitoring Program /Monitoring Measure PS:Planning Services BL:Business License BS:Building Services 66340 Alcantara Avenue GP:Grading Permit FD:Fire Department BP:Building Permit PD:Police Department PD-7 Master Plan of Development FI:Final Inspection CE:City Engineer TO:Temporary Occupancy WW:Wastewater CUP 2000-0024/ZCH 2000-0008 FO:Final occupancy CA:City AHomey recommendations of the soils report to assure safety for occupants and buildings. Mitigation Measure 8.e.f.1: A Stormwater Pollution Prevention GP PS,BS,CE 8.0.1 Plan (SW PPP)/Erosion Control Plan shall be submitted and approved by the City Engineer prior to the issuance of the building permit. The plan shall include storm water measures for the operation and maintenance of the project for the review and approval of the City Engineer. The Building Permit application plans shall identify Best Management Practices (BMPs)appropriate to the uses conducted on site that effectively prohibit the entry of pollutants into storm water runoff. Mitigation Measure 8.e.f.2: The developer is responsible for GP PS,BS,CE 8.e.f.2 ensuring that all contractors are aware of all storm water quality measures and that such measures are implemented. Failure to comply with the approved construction Best Management Practices will result in the issuance of correction notices, citations, or stop orders. Mitigation Measure 11.d: All construction activities shall BP,GP PS,BS 11.d comply with the City of Atascadero Noise Ordinance for hours of operation. Construction activities shall be limited to the following hours of operation: • 7 a.m.to 7 p.m. Monday through Friday • 9 a.m.to 6 p.m. Saturday • No construction on Sunday Further,particularly loud noises shall not occur before 8 a.m. on weekdays and not at all on weekends. The hours of construction may be modified by the Community Development Director upon a determination that unusually loud construction activities are having a significant impact on the neighbors. Failure to comply with the above-described hours of operation may result in withholding of inspections and possible construction prohibitions,subject to the review and approval of the Planning Commission. A sign shall be posted on-site with the hours of operation and a telephone number of the person to be contacted in the event of any violations. The details of such a sign shall be approved by staff during the Grading Plan/Building Permit review process. Mitigation Measure 16.c.1: Points of concentrated drainage GP BS,CE 16.c.1 into the creek shall incorporate natural rock riprap designed to blend with the natural landscape and function to dissipate energy and eliminate creek bank erosion,subject to review and approval of the City Engineer. City of Atascadero Resolution No.2003-010 Page 16 of 25 EXHIBIT B:Site Plan it t■ 6 �€ISA ,1�� ~� � ,M � � •�Y 1 � � �V y A w QY iY rt aII = 6F. fill3isaa � a4 S N £ Illi) + I I. fill J g a City of Atascadero Resolution No.2003-010 Page 17 of 25 EXHIBIT Q Statistical Summary of Project Proposed Project Summary Building Footprint 1744 sf 1872 sf 1238 sf 1560 sf 1560 sf 1229 sf (not to exceed 35%) 21% 22% 20% 23% 20% 18% Landscaped Area 5330 sf 6440 sf 4000 sf 3970 sf 4690 sf 4770 sf (minimum 40%) 63% 76% 66% 59% 59% 71% Covered Parking 2 spaces 2 spaces 2 spaces 2 spaces 2 spaces 2 spaces Guest Parking 2 spaces 2 spaces 2 spaces 2 spaces 2 spaces 2 spaces Floor Pian C existing A B B Reverse D Lower Living Area 1304 sf 1250 sf 798 sf 1119 sf 1119 sf 789 sf Upper Living Area 1566 sf I none 1916 sf 914 sf 1914 sf 730 sf Garage 1440 sf 1440 sf 1440 sf 1440 sf 1440 sf 440sf City of Atascadero Resolution No.2003-010 Page 18 of 25 EXHIBIT D: Landscape Plan `.;.: re f f f z. g� k r ri F is K l t `t h� N Jill Ill #I oil i � �� City of Atascadero Resolution No.2003-010 Page 19 of 25 EXHIBIT E:Grading and Drainage Plan gr ° lip g a �§ :Se, �� i 16 a 4 lit , ' J � Riot a q `�.� .,� ♦ ♦ � . $ of I s� IRtA d# tR " g +�y ♦�y t� It i o y •. leu)-y • t 01 " � ��`r ♦ 1 its •? � � 8 ���� tip. 1 -� w w { 1 �r3g3 alit ;lir ` all, � y1 City of Atascadero Resolution No.2003-010 Page 20 of 25 EXHIBIT F: Lot 1 -ELEVATIONS AND FLOOR PLANS Aa � o 046,11W IRVAr" awl oo�n �u[�o LUT 1 r 0 _ � 1 0 mw F_J ' �F r i ...,.wao rwJ:. /'�=•bye.wl.x. City of Atascadero Resolution No.2003-010 Page 21 of 25 EXHIBIT F: Lot 3-ELEVATIONS AND FLOOR PLANS gw 7j Lwa m T IWwI � o�dc� " LOT 3 17 gip--tt s x.... .. . .... ...... , _ , City of Atascadero Resolution No.2003-010 Page 22 of 25 EXHIBIT F: Lot 4,ELEVATIONS AND FLOOR PLANS Frf fff ml ED Mi M m LOT 4 �. o - `' �m� LOT, 4 City of Atascadero Resolution No.2003-010 Page 23 of 25 EXHIBIT F: Lot 5-ELEVATIONS AND FLOOR PLANS m m EF LOT 4 • a5r.1[I •.:Y N�M5 ri I r W Li litx. .......... L=J ......................... .................................... I � t LOT 5! City of Atascadero Resolution No.2003-010 Page 24 of 25 EXHIBIT F: Lot 6-ELEVATIONS AND FLOOR PLANS Ell M IBJ Um REAR ELEVATION R*W SIDE ELEVATION Q l FRONT EEYATI LETT -ELEVATION LOT G w ...... .. -2`w -. �( { 6i I i k .- � m f A City of Atascadero Resolution No.2003-010 Page 25 of 25 EXHIBIT G: EXTERIOR COLOR&MATERIAL SAMPLE BOARDS Rl)55 Lf_ PD7 'f.",•ftRipxk h" It3M TECO?JDA AVENUE: AFh:�FiLK�Rt:7,C.$ F:`oii;AD[Ri:.CA, wi Lai 3 CC)LOk.V50ARC I WX Y PAA �3:'^''R! '3TEst;Sc�Lr"3;.R k PXTF.ROK;7MCCC COLOR RR,s;;iG•.`. A,Ci;E'J1�C�JR CR;AA;,Aa,rl'ERTR',A CC..CR OXOR RU5P Lz`. PD7 RU 5 LL P07 A ASCA,OMO'CA, +�1'Ac^xCfsd,.RC,C.k. QQLJR' Q/A G�3L fit? AP 3•RR"q:i6U5E':ar C>c ".XT:^'G'Or,5TUCCQ COLORC,..,.,"h; e VU COLOR Sf?Cf�Ax�N.KtPoiNG i;R:h�i f:L^LGR �.I e f»�bR w'37;�f.`Ydf•7 i... LCR RU,55ELL_P'D7 A05CAPMV,CA. LOT,', cc t7K 50APP R'EtJ+'..,i�t.5(LVFR X ERICY�2f lucco COLOR :.PA t lc,�P At tPFT GOLCJ 64Vg JAY TRJ?,A C0LC£; CArHEJ3vA TL.�COkCR-