HomeMy WebLinkAboutResolution 2003-003 RESOLUTION NO. 2003-003
A RESOLUTION OF ATASCADERO CITY COUNCIL APPROVING
TENTATIVE TRACT MAP 2002-0015 THEREBY ALLOWING
A FIVE LOT RESIDENTIAL SUBDIVISION OF APN 045-441-
035 & 045-441-004 CONSISTENT WITH THE PD-16 MASTER
PLAN OF DEVELOPMENT (CUP 2002-0086)
(9105 & 9127 San Diego Road /APN 045-441-035 & 045-441-004 / William
Mehring)
WHEREAS, an application has been received from Will Mehring (11190 Santa
Lucia Road, Atascadero, CA 93423) Applicant and Property Owner, to consider a project
consisting of an amendment to the City's Zoning Text to create a new Planned Development
Overlay District (PD 16), a zone change from RS (Residential Suburban — minimum lot size
21/2 to 10 acres) to RS / PD-16 (Residential Suburban— minimum lot size 2 1/2 to 10 acres
with Planned Development Overlay 16), the adoption of a Master Plan of Development, and
a five-lot residential Tentative Parcel Map on APN 045-441-035 &045-441-004; and,
WHEREAS, the site's General Plan Designation is RE (Residential Estates; and,
WHEREAS, the site's current zoning district is RS (Residential Suburban; with a
minimum lot size of 21/z to 10 acres); and,
WHEREAS, the Planning Commission has recommended that the site be rezoned to
include a PD-16 overlay with a Master Plan of Development allowing a five-lot subdivision
of the site; and,
WHEREAS, the laws and regulations relating to the preparation and public notice of
environmental documents, as set forth in the State and local guidelines for implementation of
the California Environmental Quality Act(CEQA) have been adhered to; and,
WHEREAS, a timely and properly noticed public hearing upon the subject Tentative
Parcel Map application was held by the Planning Commission of the City of Atascadero at
which hearing evidence, oral and documentary, was admitted on behalf of said application;
and,
WHEREAS, the Planning Commission of the City of Atascadero, at a public hearing
held on December 17, 2002, studied and considered Tentative Tract Map 2002-0015, after
first studying and considering the Draft Mitigated Negative Declaration prepared for the
project and thereby recommended approval; and,
City of Atascadero
Resolution No.2003-003
Page 2
WHEREAS, the Atascadero City Council, at a public hearing held on February 11,
2003, studied and considered Tentative Tract Map 2002-0015, after first studying and
considering the Draft Mitigated Negative Declaration prepared for the project; and,
NOW, THEREFORE, the Atascadero City Council takes the following actions:
SECTION 1. FINDINGS OF APPROVAL FOR TENTATIVE TRACT MAP,
the Atascadero City Council finds as follows:
a) The proposed subdivision, as conditioned, is consistent with the General Plan and
applicable zoning requirements.
b) The design and improvement of the proposed subdivision is consistent with the
General Plan and applicable zoning requirements.
c) The proposed subdivision, as conditioned, is consistent with the Planned
Development Overlay District #16 Master Plan of Development (CUP 2002-
0086).
d) The site is physically suitable for the type of development proposed.
e) The site is physically suitable for the density of development proposed.
f) The design and improvement of the proposed subdivision will not cause
substantial environmental damage or substantially and unavoidably injure fish and
wildlife or their habitat.
g) The design of the subdivision will not conflict with easements acquired by the
public at large for access through, or the use of property within, the proposed
subdivision; or substantially equivalent alternative easements are provided.
h) The proposed subdivision design and type of improvements proposed will not be
detrimental to the health, safety or welfare of the general public.
SECTION 2. APPROVAL. The Atascadero City Council, in a regular session
assembled on February 11, 2003 resolved to approve the Tentative Tract Map (TTM 2002-
0015) subject to the following:
a) Exhibit A: Tentative Tract Map 2002-0015
b) Exhibit B: Conditions of Approval
On motion by Council Member O'Malley, and seconded by Council Member Pacas the
foregoing Resolution is hereby adopted following roll call vote:
City of Atascadero
Resolution No.2003-003
Page 3
AYES: Council Members Luna, O'Malley, Pacas, Scalise and Mayor Clay
NOES: None
ABSTAIN: None
ABSENT: None
ADOPTED: February 11, 2003
9Y7 Sr., Mayor
Attest:
Marcia McClure Torgerson, City Cl
Approved as to form:
�&, 6,"% 1A1
Roy A� nley, City Attorn
r
City of Atascadero
Resolution No.2003-003
Page 4
Exhibit A: Tentative Tract Map
ZCH 2002-0031/CUP 2002-0089/TTM 2002-0015
� 7
' r ynxnnaz< h�'�r ! t }j,"' �_ $&$Y •- 6$
.` �
ce
b ✓ = Ve-
T rzti� t� S,
7
in
sae n ttYs a��
RkE "", ! }1, "£ `mik
toil nn
r dIj
§ -?v; s
£ 2
mum "t - ' j t
oil
t 7-1
t� s
NOSS
$`D aa. f r oszt 3
$ 1 t t
" r k ( litr 4ii yyY t s
$aE M aa.r�
o
i aw 1 y a t14.jd11 r ` a
gg s '", n:
it 11 t �tL�z� z saw
�� �"�� ��H �.,� � '� '��n i .b Jy �' "". �3�r int(��!!t�• ����
tt §{ fr r 1
R3 Ay Y r 4bhp; % r': ca r z aa
"F *sai rlot 4u s I ys; - r.. N �i ,a . A
� � s r';�sac .�}•,� t 11 f l r�yyr ..�,a r,,• � q�t
` kl�• t)rYlr r i
=Tjjld1 ltrr
4� tis MRS-
TU
��1r1IrJ �✓(� �'`4r• �
iP sE r 1 l, l,ttt p tr 11r 1 aS%
�,_ x .Y'� ,r�''++y, i� 15111`�544l2 f! 2 a •
� " m'ti �i� E ze'��2 � 1t�e1 11111 6 ""•
wja
44-
" s
gig
.....:... ...i... 3y�r SII A"
w # r»a
t t I "' _"
3
mak.. ..
E.
City of Atascadero
Resolution No.2003-003
Page 5
EXHIBIT B: Conditions of Approval
ZCH 2002-0031/CUP 2002-0089/TTM 2002-0015
Conditions of Approval Timing Responsibility Mifiga
/Monitoring �silfo
PM:Parcel Map
9105 8c 9127 San Diego Road GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
TO:Ten"rary Occupancy FD:Fire Department
Tentative Tract Map 2002-0015 FO:Final Occupancy PD:Police Department
PI:Public Improvements CE:City Engineer
WW:Wastewater
CA:City Attorney
AMWQ Atascadero
Mutual Water Corgrany
Planning Services
1. The approval of this application shall become final, subject PM PS
to the completion of the conditions of approval, fourteen
(14) days following the Planning Commission approval
unless prior to the time, an appeal to the decision is filed as
set forth in Section 9-1.111(b)of the Zoning Ordinance.
2. The Tentative Tract Map application shall not be deemed
approved until the end of the ordinance referendum period
and enactment of Zone Change 2002-0031.
3. Approval of this Tentative Tract Map shall be valid for two PM PS
years after its effective date. At the end of the period, the
approval shall expire and become null and void unless an
extension of time is granted pursuant to a written request
received prior to the expiration date.
4. The Community Development Department shall have the PM PS
authority to approve minor changes to the project that (1)
result in a superior site design or appearance, and/or (2)
address a construction design issue that is not substantive
to the Tentative Tract Map.
5. The Final Map shall be subject to additional fees for park or PM PS
recreation purposes (QUIMBY Act) as required by City
Ordinance.
6. The granting of this entitlement shall apply to the property On going PS
located at 9105 & 9127 San Diego Road (APN 045-441-
035&045-441-004)regardless of owner.
1. The Open Space Easement shall be titled"Open Space FM PS/CE
Easement Area"and designated as non-build,non-storage
area,and shall recorded as it appears in the approved
exhibits.
2. Future construction on the lots shall be consistent with the BP PS
Master Plan of Development (CUP 2002-0089) approved
City of Atascadero
Resolution No.2003-003
Page 6
Conditions of Approval Timing Responsibility ga#lan
/Monitoringttllene
PM:Parcel Map
9105&9127 San Diego RoadGP:Grading Pe mtt PS:Planning Services
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
Tentative Tract Map 2002-0015 F0:Final Occupancy PD:Police Department
PI:Public Improvements CE:City Engineer
WW:Wastewater
CA:City Attomey
AMWC:Atascadero
Mutual Water Company
for the site.
3. A final map drawn in substantial conformance with the PM PS
approved tentative map, and in compliance with all
conditions set forth herein, shall be submitted for review
and approval in accordance with the Subdivision Map Act
and the City's Subdivision Ordinance.
Mitigation Measures-CEG A
Mitigation Measure 3.b: The project shall be conditioned to BP BSb
comply with all applicable District regulations pertaining to the
control of fugitive dust(PM-10)as contained in section 6.4 of
the Air Quality Handbook. All site grading and demolition
plans notes shall list the following regulations:
A. All material excavated or graded shall be sufficiently
watered to prevent excessive amounts of dust. Watering
shall occur at least twice daily with complete coverage,
preferably in the late morning and after work is finished for
the day.
B. All clearing,grading, earth moving,or excavation
activities shall cease during periods of high winds(i.e.
greater than 20 mph averaged over one hour)so as to
prevent excessive amounts of dust.
C. All material transported off-site shall be either
sufficiently watered or securely covered to prevent
excessive amounts of dust.
D. The area disturbed by clearing, grading, earth
moving,or excavation operations shall be minimized so
as to prevent excessive amounts of dust.
E. Permanent dust control measured identified in
the approved project revegetation and landscape plans
shall be implemented as soon as possible following
completion of any soil disturbing activities.
F. Exposed ground areas that are planned to be
reworked at dates greater than one month after initial
grading shall be sown with fast-germinating native grass
seed and watered until vegetation becomes established.
G. All disturbed areas not subject to revegetation
shall be stabilized using approved chemical soil binders,
jute netting, or other methods in advance by the APCD.
H. All roadways, driveways, sidewalks,etc.to be
paved shall be completed as soon as possible. In
addition, structural foundations shall be completed as
soon as possible following building pad construction.
I. On-site vehicle speed shall be limited to 15 mph
for any unpaved surface.
J. All unpaved areas with vehicle traffic shall be
watered at least twice per day, using non-potable water.
K. Streets adjacent to the project site shall be swept
daily to remove silt which may have accumulated from
City of Atascadero
Resolution No.2003-003
Page 7
Conditions of Approval Timing Responsibility iYfitigatien
/Monitoring lllilre
PM:Parcel Map
9105 S 9127 San Diego Road GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
Tentative Tract Map 2002-0015 FO:Final Occupancy PD:Police Department
PI:Public Improvements CE:City Engineer
WW:Wastewater
CA:City Attorney
AMWC:Atascadero
Mutual Water Company
construction activities so as to prevent excessive amounts
of dust from leaving the site.
L. Wheel washers may be required when significant
offsite import or export of fill is involved.
M. Large canopy shade trees shall be provided along street
frontages and within parking areas to shade paved areas
and minimize urban heat build-up.
Mitigation Measure 4.e.1: A Tree Protection Plan prepared by GP PS
a Certified Arborist according to the City Of Atascadero
guidelines shall be submitted during the building permit
process and approved for the development of each new parcel
or redevelopment of existing parcels. All tree removals shall
be mitigated according to the Atascadero Tree Ordinance, by
payment into the Tree Mitigation Fund, and on
Mitigation Measure 5.b: Should any cultural resources be GP PS bail
unearthed during site development work,the provisions of
CEQA-Section 15064.5,will be followed to reduce impacts to
a non-significant level.
Mitigation Measure 6.b.1: An erosion and sedimentation GP PS,BS,CE iia1.2
control plan shall be required for single family residential
building permits on the site. All measures required by the City
and the Regional Water Quality Control Board to prevent soil,
dirt, and debris from entering the storm drain system during
and after construction shall be implemented.The plan shall
implement Regional Water Quality Control Board Best
Management Practices(BMP's)and shall be subject to review
and approval of the City Engineer and Planning Staff at the
time of Building Permit application.
Mitigation Measure 6.b.2: All cut and fill slopes shall be GP PS,BS,CE SIs.4
hydroseeded with an appropriate erosion control method
(Straw wattles, erosion control blanket, hydro-mulch, or straw
mulch appropriately anchored) immediately after completion of
earthwork between the months of October 15 through April 15.
All disturbed slopes shall have appropriate erosion control
methods in place. For the duration of the project the
contractor will be responsible for proper erosion control
implementation and the clean-up of any mud or debris that is
tracked onto public streets by construction vehicles.
Mitigation Measure 6.c.d: A soils report shall be required to be GP BS o d
submitted with a future building permit by the building
department.The building plans will be required to follow the
recommendations of the soils report to assure safety for
occupants and buildings.
Mitigation Measure 8.f.1/6.b.1: An erosion and sedimentation GP BS ',a
control plan shall include storm water measures for the
operation and maintenance of the project for the review and
approval of the City Engineer for single family residential
building permits on the site. All measures required by the City
and the Regional Water Quality Control Board to prevent soil,
dirt, and debris from entering the storm drains stem shall be
City of Atascadero
Resolution No.2003-003
Page 8
Conditions of Approval Timing Responsibility Mitigs#ien
/Monitoring MemEsiadre
9105 8s 9127 San Die9 o Road PM:Parcel Map GP:Grading Permit PS:Planning Services
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fre Department
Tentative Tract Map 2002-0015 FO:Final Occupancy PD:Police Department
PI:Public Improvements CE:City Engineer
WW:Wastewater
CA:City Attorney
AMWC:Atascadero
Mutual Water Company
implemented during and after construction. Regional Water
Quality Control Board Best Management Practices(BMP's)
shall be included.The Building Permit application plans shall
identify Best Management Practices(BMPs)appropriate to the
uses conducted on site that effectively prohibit the entry of
pollutants into storm water runoff.
Mitigation Measure 8.e.f.1: A Stormwater Pollution GP PS,BS,CE tib.i
Prevention Plan(SWPPP)/Erosion Control Plan shall be
submitted and approved by the City Engineer prior to the
issuance of the building permit. The plan shall include storm
water measures for the operation and maintenance of the
project for the review and approval of the City Engineer. The
Building Permit application plans shall identify Best
Management Practices(BMPs)appropriate to the uses
conducted on site that effectively prohibit the entry of
pollutants into storm water runoff.
Mitigation Measure 8.e.f.2: The developer is responsible for GP PS,BS,CE 8b3
ensuring that all contractors are aware of all storm water
quality measures and that such measures are implemented.
Failure to comply with the approved construction Best
Management Practices will result in the issuance of correction
notices,citations, or stop orders.
Mitigation Measure 11.d: All construction activities shall BP,GP BS 11.d
comply with the City of Atascadero Noise Ordinance for hours
of operation.
Construction activities shall be limited to the following hours of
operation:
7 a.m.to 7 p.m. Monday through Friday
• 9 a.m.to 6 p.m. Saturday
• No construction on Sunday
Further, particularly loud noises shall not occur before 8 a.m.
on weekdays and not at all on weekends.
The hours of construction may be modified by the Community
Development Director upon a determination that unusually
loud construction activities are having a significant impact on
the neighbors.
Failure to comply with the above-described hours of operation
may result in withholding of inspections and possible
construction prohibitions, subject to the review and approval of
the Planning Commission.
A sign shall be posted on-site with the hours of operation and
a telephone number of the person to be contacted in the event
of any violations. The details of such a sign shall be approved
by staff during the Grading Plan/Building Permit review
process.
City of Atascadero
Resolution No.2003-003
Page 9
Conditions of Approval Timing Responsibility AAitigs#i
/Monitoring Measure
9105&9127 San Diego Road PM:Parcel Map PS:Planning g GP:Grading Penni) g Services
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Department
Tentative Tract Map 2002-0015 F0:Final Occupancy PD:Police Department
PI:Public Improvements CE:City Engineer
WW:Wastewater
CA:City Attorney
AMWC:Atascadero
Mutual Water Company
Engineering Project Specific Conditions:
4. The applicant shall access provide easements for all FM CE
parcels to share access on the existing driveway.
5. Applicant to provide 2" full width asphalt overlay on San
Diego Road across the entire property frontage prior to
Certificate of Occupancy.
Engineering Standard Conditions:
12. All public improvements shall be constructed in
conformance with the City of Atascadero Engineering
Department Standard Specifications and Drawings and/or as
directed by the City Engineer.
13. In the event that the applicant is allowed to bond for the
public improvements required as a condition of the final map,
the applicant shall enter into a Subdivision Improvement
Agreement with the City Council.
14.An engineer's estimate of probable cost shall be submitted
for review and approval by the City Engineer to determine the
amount of the bond.
15.The Subdivision Improvement Agreement shall record
concurrently with the Final Map.
16.An encroachment permit shall be obtained prior to the
issuance of building permit.
17.The applicant shall enter into a Plan Check/Inspection
agreement with the City.
18.A six(6)foot Public Utility Easement(PUE)shall be
provided contiguous to the San Diego Road property frontage.
19.The applicant shall be responsible for the relocation and/or
alteration of existing utilities.
20.The applicant shall install all new utilities(water, gas,
electric,cable TV and telephone) underground. Utilities shall
be extended to the property line frontage of each lot or its
public utility easement.
21.The applicant shall monument all property corners for
construction control and shall promptly replace them if
disturbed.
22.The applicant shall acquire title interest in any off-site land
that may be required to allow for the construction of the
improvements.The applicant shall bear all costs associated
City of Atascadero
Resolution No.2003-003
Page 10
Conditions of Approval Timing Responsibility NNIIItIgIa#ien
/Monitoring Measure
9105&9127 San Diego Road PM:Parcel Map S:Planning� PP
GP:Grading Permit g Services
BP:Building Penni) BS:Building Services
TO:Temporary Occupancy FD:Fire Department
Tentative Tract Map 2002-0015 F0:Final Occupancy PD:Police Department
PI:Public Improvements CE:City Engineer
WW:Wastewater
CA:City Attorney
AMWC:Atascadero
Mutual Water Company
with the necessary acquisitions.The applicant shall also gain
concurrence from all adjacent property owners whose ingress
and egress is affected by these improvements.
23. Slope easements shall be provided as needed to
accommodate cut of fill slopes.
24. Drainage easements shall be provided as needed to
accommodate both public and private drainage facilities.
25.A preliminary subdivision guarantee shall be submitted for
review in conjunction with the processing of the map.
26. All existing and proposed utility, pipeline, open space, or
other easements are to be shown on the parcel map. If there
are building or other restrictions related to the easements,
they shall be noted on the parcel map. The applicant shall
show all access restrictions on the parcel map.
27.The final map shall be signed by the City Engineer prior to
the map being placed on the agenda for City Council
acceptance.
28. Prior to recording the final map,the applicant shall submit
a map drawn in substantial conformance with the approved
tentative map and in compliance with all conditions set forth
herein.The map shall be submitted for review and approval by
the City in accordance with the Subdivision Map Act and the
City's Subdivision Ordinance.
29. Prior to recording the parcel map,the applicant shall set
monuments at all new property corners. A registered civil
engineer or licensed land surveyor shall indicate by certificate
on the parcel map,that corners have been set or shall be set
by a date specific and that they will be sufficient to enable the
survey to be retraced.
30. Prior to recording the parcel map,the applicant shall pay
all outstanding plan check/inspection fees.
31. Prior to recording the map,the applicant shall complete all
improvements required by these conditions of approval.
32. Prior to recording the parcel map,the applicant shall have
the map reviewed by all applicable public and private utility
companies(cable,telephone, gas,electric,Atascadero Mutual
Water Company). The applicant shall obtain a letter from
each utility company indicating their review of the map. The
letter shall identify any new easements that may be required
by the utility company. A copy of the letter shall be submitted
to the City. New easements shall be shown on the parcel
map.
City of Atascadero
Resolution No.2003-003
Page 11
Conditions of Approval Timing Responsibility MiEige� en
/Monitoring MamWstultre
9105&9127 San Diego Road PM:Parcel Map PS:Planning 9 GP:Grading Permit 9 Services
BP:Building Permit BS:Building Services
TO:Temporary Occupancy FD:Fire Depadmem
Tentative Tract Map 2002-0015 F0:Final Occupancy PD:Police Department
PI:Public Improvements CE:City Engineer
WW:Wastewater
CA:City Attorney
AMWC:Atascadero
Mutual Water Company
33. Upon recording the final map,the applicant shall provide
the City with a black line clear Mylar(0.4 mil)copy and a blue
line print of the recorded map.
34. Prior to the final inspection of any public improvements,
the applicant shall submit a written statement from a
registered civil engineer that all work has been completed and
is in full compliance with the approved plans.
35. Prior to the final inspection,the applicant shall submit a
written certification from a registered civil engineer or land
surveyor that all survey monuments have been set as shown
on the final map.
36. Prior to the issuance of building permits the applicant shall
submit a grading and drainage plan prepared by a registered
civil engineer for review and approval by the City Engineer.